You are on page 1of 3

Print date: 4/21/2022

NAGA 3
Page 1 of 3
Work Order (filed): 2019-8205
5Y-ANCHOR-WINCH-WIRE-ROPE-MECH

Technical Account details

Tech Acc : 437.040 TA Description : WINCH, MOORING < Towing Equipments >

Reference : Location : Criticality : Critical

Maker : Makers No. : Serial No. :

Work Order details

Id : 2019-8205 Job class : Preventive maintenance Interval : 5 Year

Org Schedule : 437.ANCHOR_WINCH.ME5Y Job type : Check Duration : 12

Priority : Stand-By Critical Job grade : Planned preventive work Float : 30

Finished date : 01.03.2020 Department : Marine Scheduling : Dynamic

Status : Closed Completed by : MKAMILMS Filed by : MKAMILMS

Closed by : MKAMILMS Completed date : 3/1/2020 12:58:23PM Filed date : 3/1/2020 1:53:36PM

Work Order description

Star Information Systems AS v.1 (15-OCT-2010) Star IPS Version: 3.20


Print date: 4/21/2022
NAGA 3
Page 2 of 3
Work Order (filed): 2019-8205
5Y-ANCHOR-WINCH-WIRE-ROPE-MECH

5 YEARLY-ANCHOR WINCH WIRE ROPE MAINTENANCE-MARINE


SAFETY PROCEDURE
=============
Ensure that proper work permits are obtained before performing maintenance on this equipment.
Ensure the equipment is isolated from ALL energy sources.
Ensure the equipment is mechanically isolated.
Wear all proper safety equipment.
Clean up spills promptly.

MAINTENANCE PROCEDURE
==================
As Per API 2I SECTION 3.3, recommended inspection procedure. Inspection need to be done by rig
crew, if any breakage found, require 3rd party to carry out the NDT (UT) on the anchor wire rope.

The recommended inspection procedure includes the following personnel and their duties:

1) The winch operator runs and stops the winch on the order of the chief inspector;
2) The barge master coordinates the work among inspection personnel, gives orders to the winch operator,
performs visual inspections and measurements, and rejects or accepts wire rope;
3) The rig crew keeps inspection records, performs visual inspections, and assists with measurements;
4) Roughnecks assist with inspections.
5) Inspection at least the maximum outboard line length that could be deployed.
6) Inspection criteria to be recorded (Visual)
I. Measure rope diameter.
II. Check for wear.
III. Check for corrosion.
IV. Check for deformation.
V. Check for the broken wire breakage, if found NDT (UT) will require.

NOTE:
· If components have been replaced or repaired, this is also to be reported under Work Report.
· For equipment require please refer API 2I section In-service Inspection of Mooring Hardware for Floating
Structures 3.3.2.
· Non-Destructive test (Ultrasonic test) required if found any broken on the wire rope during major
inspection.

As per:

1) API RP 2I In-service Inspection of Mooring Hardware for Floating Structures SECTION 3.3.6.3.

Barge Master is to ensure all work is carried out in a safety and orderly manner. Upon completion of
work, the Barge Master is to ensure all areas are free of hazards and confirm that all tools are
accounted for and that PTW paperwork has been signed off.

Work done Report

Star Information Systems AS v.1 (15-OCT-2010) Star IPS Version: 3.20


Print date: 4/21/2022
NAGA 3
Page 3 of 3
Work Order (filed): 2019-8205
5Y-ANCHOR-WINCH-WIRE-ROPE-MECH

Plan to do MBL and wire inspection by shipyard Keppel Fels.


Cut and done the MBL by Keppel Fels. (All report inside "connection tab")
Resocket and do the pull test for the socket.
Load test all anchor winch 35 tons and 15 tons.

1) The winch operator runs and stops the winch on the order of the chief inspector;
2) The barge master coordinates the work among inspection personnel, gives orders to the winch operator,
performs visual inspections and measurements, and rejects or accepts wire rope;
3) The rig crew keeps inspection records, performs visual inspections, and assists with measurements;
4) Roughnecks assist with inspections.
5) Inspection at least the maximum outboard line length that could be deployed.
6) Inspection criteria to be recorded (Visual)
I. Measure rope diameter.
II. Check for wear.
III. Check for corrosion.
IV. Check for deformation.
V. Check for the broken wire breakage, if found NDT (UT) will require.

Roundabout Technical Accounts

Technical account Function_Name Status Comments


No additional technical accounts have been connected Not set

Connected Resources

No Resources have been connected

Connected Documents

ID Description Print on WO

R445-TM-M003-R0_WINCHPULLTEST
R445-TM-M003-R0_WINCHPULLTEST No
MTS-IH-1912095PORTFWD-NAGA3-38MMDIADESTRUCTIVETEST-21-12-2019
MBL REPORT PORT FORWARD No

MTS-IH-1912096PORTAFT-NAGA3-38MMDIADESTRUCTIVETEST-21-12-2019
MBL PORT AFT No
MTS-IH-1912097STBDFWD-NAGA3-38MMDIADESTRUCTIVETEST-21-12-2019
MBL STBD FORWARD No

MTS-IH-1912098STBDAFT-NAGA3-38MMDIADESTRUCTIVETEST-21-12-2019
MBL STBD AFT No

Connected Spare Parts

No Spare Parts have been connected

Star Information Systems AS v.1 (15-OCT-2010) Star IPS Version: 3.20

You might also like