CONSTRUCTION OF ELEVATED CORRIDOR FROM KARGIL CHOWK TO NIT, PATNA / GULBI GHAT MORE ON ASHOKA

RAJPATH INCLUDING CONNECTIVITY TO PMCH & KRISHNA GHAT ROAD IN THE CITY OF PATNA.

Details of Structures :

a) Type of Foundation : Pile


b) Type of Substructures : Column / Portal Frame
c) Type of Superstructure : Steel Composite / RCC Solid Slab (Double Decker)
d) Span Arrangement :

Tier-1
Span : 30m x 33 + 25m x 4 + 20m x 3 + 17.5m x 2 + 15m x 5
Length of Viaduct : 1260m
Length of Approaches : 101.761m (DN Ramp T1 to Kargil Chowk)
: 87.457m (UP Ramp Krishna Ghat to T1)
Total Length : 1449.218m

Tier-2
Span : 30m x 60 + 25m x 8 + 20m x 3 + 17.5m x 2 + 15m x 5
Length of Viaduct : 2170m
Length of Approaches : 89.875m (UP Ramp Kargil Chowk to T2)
: 70m (DN Ramp T2 to Krishna Ghat)
: 68.547m (DN Ramp T2 to NIT mode)
Total Length : 2248.422m

PMCH Connectivity (MLCP-2)


Span : 40m x 1
Length of Viaduct : 40m

PMCH Connectivity (MLCP-3)


Span : 40m x 1
Length of Viaduct : 40m

PMCH Connectivity (MLCP-4)


Span : 40m x 1 + 30m x 1
Length of Viaduct : 70m

Total Viaduct Length : 3580m


Total Approach Length : 417.640m