You are on page 1of 7

Corrected

Maximum
Density Breaking Load
Member Date Cast Age (Days) Mass (g) (g/cm3) (N)
In-Situ Cover Slabs 3-Nov-21 7 8061 2.388 773
C06 Km 1+400 - 3-Nov-21 7 8087 2.396 735
1+508 RHS 3-Nov-21 7 8056 2.387 763
In-Situ Cover Slabs 3-Nov-21 28 8061 2.388 773
C06 Km 1+400 - 3-Nov-21 28 8087 2.396 735
1+508 RHS 3-Nov-21 28 8056 2.387 763
Box Culvert Wall 19-Nov-21 7 7989 2.367 662
LHS/RHS C14 19-Nov-21 7 8008 2.373 647
Km1+405 19-Nov-21 7 7995 2.369 650
Box Culvert Wall 18-Sep-21 28 7963 2.359 593
LHS/RHS C14 18-Sep-21 28 8038 2.382 592
Km1+405 18-Sep-21 28 8130 2.409 616
Box Culvert Blinding 11-Nov-21 7 7999 2.370 661
& Base LHS/RHS C14 11-Nov-21 7 7996 2.369 607
Km1+405 11-Nov-21 7 8005 2.372 668
Box Culvert Blinding 11-Nov-21 28 8006 2.372 636
& Base LHS/RHS C14 11-Nov-21 28 8028 2.379 596
Km1+405 11-Nov-21 28 8053 2.386 634
In-situ U-Drain 23-Nov-21 7 8100 2.400 538
C14Km 0+170 - 23-Nov-21 7 7791 2.308 566
0+210 LHS 23-Nov-21 7 7986 2.366 552
In-situ U-Drain 23-Nov-21 28 7958 2.358 656
C14Km 0+170 - 23-Nov-21 28 8024 2.377 624
0+210 LHS 23-Nov-21 28 8016 2.375 574
In-Situ Cover Slabs 24-Nov-21 7 8164 2.419 542
C11 Km 1+200 - 24-Nov-21 7 7948 2.355 560
1+500 RHS 24-Nov-21 7 8003 2.371 508
In-Situ Cover Slabs 24-Nov-21 28 8009 2.373 731
C11 Km 1+200 - 24-Nov-21 28 7957 2.358 754
1+500 RHS 24-Nov-21 28 8038 2.382 822
In-situ U-Drain C14 19-Sep-21 7 8003 2.371 539
Km 0+170 - 0+210 19-Sep-21 7 7934 2.351 499
LHS 19-Sep-21 7 7988 2.367 555
In-situ U-Drain C14 19-Sep-21 28 7980 2.364 665
Km 0+170 - 0+210 19-Sep-21 28 8053 2.386 638
LHS 19-Sep-21 28 8026 2.378 619
Culvert Ext C11 Km 21-Sep-21 7 8070 2.391 481
1+710 Wing Walls & 21-Sep-21 7 7903 2.342 559
head walls LHS/RHS 21-Sep-21 7 7983 2.365 547
Culvert Ext C11 Km 21-Sep-21 28 7986 2.366 607
1+710 Wing Walls & 21-Sep-21 28 8073 2.392 624
head walls LHS/RHS 21-Sep-21 28 8001 2.371 670
Culvert Ext C11 Km 28-Sep-21 7 8011 2.374 562
2+030 Base,Apron &
Cut-Off Wall 28-Sep-21 7 7841 2.323 541
LHS/RHS 28-Sep-21 7 8004 2.372 532
Culvert Ext C11 Km 28-Sep-21 28 8009 2.373 654
2+030 Base,Apron &
Cut-Off Wall 28-Sep-21 28 8028 2.379 624
LHS/RHS 28-Sep-21 28 8034 2.380 671
Culvert Ext C11 Km 5-Oct-21 7 8118 2.405 506
1+472 Base,Apron &
Cut-Off Wall 5-Oct-21 7 7787 2.307 493
LHS/RHS 5-Oct-21 7 7988 2.367 507
Culvert Ext C11 Km 5-Oct-21 28 7972 2.362 625
1+472 Base,Apron &
Cut-Off Wall 5-Oct-21 28 8050 2.385 604
LHS/RHS 5-Oct-21 28 8002 2.371 570
Culvert Ext C11 Km 12-Oct-21 7 8098 2.399 511
2+030 Wing Walls & 12-Oct-21 7 7865 2.330 537
head walls LHS/RHS 12-Oct-21 7 7994 2.369 530
Culvert Ext C11 Km 12-Oct-21 28 7965 2.360 685
2+030 Wing Walls & 12-Oct-21 28 8032 2.380 631
head walls LHS/RHS 12-Oct-21 28 8078 2.393 635
Culvert Ext C11 Km 15-Oct-21 7 7957 2.358 537
1+472 Wall &
Decking Slab 15-Oct-21 7 7977 2.364 468
LHS/RHS 15-Oct-21 7 7989 2.367 531
Culvert Ext C11 Km 18-Oct-21 7 8072 2.392 460
1+472 Wing Walls & 18-Oct-21 7 7904 2.342 469
head walls LHS/RHS 18-Oct-21 7 7997 2.369 560
In-Situ U-Drain C10 24-Oct-21 7 8004 2.372 506
Km 0+310 - 0+320 24-Oct-21 7 7744 2.295 541
LHS 24-Oct-21 7 7998 2.370 547
In-Situ U-Drain C11 2-Nov-21 7 8073 2.392 497
Km 1+500 - 1+600 2-Nov-21 7 7783 2.306 476
RHS 2-Nov-21 7 7982 2.365 500
In-Situ U-Drain C03 5-Nov-21 7 8113 2.404 465
Km 1+250 - 1+300 5-Nov-21 7 7844 2.324 471
LHS 5-Nov-21 7 8023 2.377 536
In-Situ U-Drain C14 8-Nov-21 7 8057 2.387 468
Km 1+250 - 1+300 8-Nov-21 7 7805 2.313 552
LHS 8-Nov-21 7 7988 2.367 556
Non-mountable Edge 8-Nov-21 7 7956 2.357 506
Beam C03 Km 0+150 8-Nov-21 7 7875 2.333 489
- 0+250 RHS 8-Nov-21 7 7999 2.370 534
Non-mountable Edge 9-Nov-21 7 8067 2.390 543
Beam C03 Km 0+150 9-Nov-21 7 7952 2.356 472
- 0+250 RHS 9-Nov-21 7 7984 2.366 521
20-Nov-21 7 7940 2.353 558
Cut-Off Drain C11
20-Nov-21 7 7836 2.322 521
Km 1+487 LHS
20-Nov-21 7 8000 2.370 529
23-Nov-21 7 8183 2.425 502
Cut-Off Drain C11
Km 1+260 LHS
Cut-Off Drain C11
23-Nov-21 7 7974 2.363 533
Km 1+260 LHS
23-Nov-21 7 7993 2.368 561
Corrected
Compressive
Strength
(N/mm2) `
34
33
34
34
33
34
29
29
29
26
26
27
29
27
30
28
26
28
24
25
25
29
28
26
24
25
23
32
34
37
24
22
25
30
28
28
21
25 5.36
24 7.035
27
28
30
25 C8 4.64 6.09
24 5.8
24 2135
29
28
30
22
22
23
28
27
25
23
24
24
30
28
28
24
21
24
20
21
25
22
24
24
22
21
22
21
21
24
21
25
25
22
22
24
24 C8 4.64 6.09
21 5.8
23 2135
25
23
24
22
24
25

Primer Seal Test

Particle Size Analysis


Chaianag
Date Sieve(mm
e
) 19 13.2 9.5 6.7 1.18
Spec 100 95-100 0-20 0-5 0-0.5
26-Aug-2021 C18 (0+06014mm 100 97 13 1 0
2-Sep-2021 C18 (0+20014mm 100 98 15 0 0
2-Sep-2021 C19 (0+07514mm 100 98 15 3 0
4-Sep-2021 C16 (0+10014mm 100 99 15 3 0
4-Sep-2021 C14 (0+70514mm 100 98 12 3 0
9-Sep-2021 C14 (0+96014mm 100 98 10 3 0
25-Sep-2021 C03 (1+40014mm 100 98 12 1 0
26-Sep-2021 C01 (0+25014mm 100 99 14 2 0
26-Sep-2021 C03B (0+0014mm 100 99 11 1 0
26-Sep-2021 C01 (0+58014mm 100 99 13 1 0

SEAL TEST REPORT

Particle Size Analysis


Chaianag
Date Sieve(mm
e
) 13.2 9.5 6.7 4.75 1.18
Spec 100 85-100 0-30 0-5 0-0
25-Sep-2021 C04 (0+00010mm 100 98 10 3 0
25-Sep-2021 C04 (0+00010mm 100 99 13 1 0
25-Sep-2021 C04 (0+00010mm 100 99 13 1 0
Spray Chippings
Rate of Spread Temperat
Cutback Rate ure (oC)
(L/m2) (m2/m3) (60 - 80)
1.55 103 78
1.55 101 76
1.58 100 74
1.56 100 76
1.57 101 74
1.57 99 76
1.63 115 76
1.66 111 78
1.69 114 74
1.62 115 78

Spray Chippings
Rate of Spread Temperat
Cutback Rate ure (oC)
(L/m2) (m2/m3) (60 - 80)
0.96 158 78
0.91 160 76