Improvement Plan/s
The building was designed that each office do have only one plug for electricity supply and thus
more plugs cannot be accommodated.
Make use of multiplug adaptors with an overloading protection built in the adaptors, the make is
SABS approved ABC 202.
ABC 202 adaptors will be ordered on 23 September 2011 and once delivered the adaptors will be
issued to all staff.
The main electricity boards’ switches will be tested bi-annually and if found defective the switch will
be replaced. The first inspection will be 7 October 2011.
New equipment was ordered on 19 September 2011.