Global APQP Matrix
Global APQP Matrix
Program: Actual" status symbol O item meets target (Shift + letter "o" key)
Supplier Name: key: D item does not meet target; plans exist; low risk (Shift + "d" key)
Part Number(s) C item does not meet target with high risk (Shift + "c" key)
Part Name: N/A not applicable
Supplier Champion: note: D & C these items to be included on gap analysis sheet with actions
phone/e-mail
Program Management Process (PMP) Stage
()Phase 1- date xx/yy/zz ()Phase 2- date xx/yy/zz ()Phase3 - date xx/yy/zz ()Phase 4 - date xx/yy/zz ()Phase 5 - date xx/yy/zz
APQP Elements Target Actual Target Actual Target Actual Target Actual Target Actual
Preliminary DFMEA created for supplier DFMEA reviewed and signed for DFMEA updated to current design level DFMEA updated to current design level
responsible components or supplier has supplier responsible components or
reviewed DFMEA. High RPN’s have
supplier has reviewed , DFMEA.
action plans with timing
High RPNs have action plans with
timing that meets tool kick-off date.
1. Design FMEA
Initial design review complete with supplier 100% design concerns addressed. AIAG Design changes reviewed and 100% Design changes reviewed and 100% Design changes reviewed and 100%
and per AIAG A-2 or equivalent A-2 checklist or equivalent complete and acceptable acceptable acceptable
2. Design Review) open issues resolved
Agreement with ( ) on performance and Prototype testing and measurement is All DV testing to specifications is initiated All DV testing complete. Test results
functional validation plan; Identify key 100% complete. per plan confirm product meets all requirements
dimensional characteristics for layout on
3. Design Verification Plan prototypes
Major program elements are documented Major program elements are Major program elements are documented Major program elements are documented
to meet the program deliverables. documented to meet the program to meet the program deliverables. to meet the program deliverables.
4. Master Timing Plan deliverables.
Tool lead time/maker concept Tool maker and lead time fixed w/ Tool tryout complete and problems Tool at current design release level
gauge and fixture design concepts schedule identified tooling issues 100% resolved
Capacity study complete Gauge plan complete and approved by ( ), Gauges complete and verified Machine/fixture issues 100% resolved
Supplier manufacturing facility identified Machine/fixture plan complete and Machine/fixtures complete and problems Maintenance PM implemented
approved identified with countermeasures Set up instructions/process parameters
AIAG checklist A-5 or equivalent initiated 100%
and open issues identified. Facility 100% ready per A-5.
Evaluation
Pre-launch control plan complete and Controls listed in pre-launch control plan
approved by ( ). Launch containment is have been audited and open issues
documented in plan. AIAG checklist A-8 or identified with actions and timing.
equivalent is complete with no open
issues.
15. Pre-launch Control Plan
Production ramp-up plan defined to Production schedules fixed in MRP No delivery issues during SOP
support ( ) pre-production and production systems including raw material and
requirements component releases to support ( )
requirements. Requirements for ( ) are
16. Production Ramp-up agreed with ( ).
Schedule
Prototype packaging concept approved Production packaging plan reviewed with ( Packaging design complete and reviewed Testing complete with no open issues. No labeling or packaging issues during
17. Packaging Specifications with ( ). ). with ( ). Testing plan established Packaging Declaration submitted and SOP
approved by ( ).
(PKG Declaration)
Production control plan complete and Process audit complete to control plan to
approved by ( ). Launch containment is confirm effective implementation.
documented in plan. AIAG checklist A-8 or
equivalent is complete with no open
issues.
18. Production Control Plan
Plans exist for production trial run with Trial run complete with production
trained operators and production process. process, tooling and equipment. Problems
AIAG checklist A-4 or equivalent updated. identified and corrective actions complete.
Scrap rate and cycle time objectives vs. Scrap rate and cycle time 100% to plan.
plan understood with action plans.
Boundary sample plan reviewed with ( ) Boundary samples agreed and signed off
Quality/SQ by ( ).
24. Boundary Samples
Requirement for Appearance Approval PPAP status full approval PPAP status full approval
25. Production Part Approval (AAR) is agreed with ( ). AAR is complete
(PPAP) if applicable.
Production shipping schedules established No critical delivery occurrences or
to support ( ) requirements Delivery and paperwork errors
26. Production Part Delivery at frequency method agreed with ( ).
MRD
Design has been reviewed for compliance IMDS complete. 'Received' number has IMDS complete to current design level. Warranty Issues
to ELV requirements. Concerns have been provided to ( ). 'Received' number has been provided to
27. IMDS Data Entered into been reviewed with ( ), Engineering. ( ).
System (As needed)
* Project Manager
* Top Management
Program Name:
Champion: Worksheet Revision Date:
Key to "Status" symbols: "O" = item meets target (Shift + letter o); "D" = item does not meet target; plans exist; low risk (Shift + d); "C" = item does not meet target with high risk (Shift + c)
Current
SR Stage APQP Element Target Actual Gap Explanation Counter Measure Responsibility Due Date Status
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21