THIRD FLOOR BEAM SCHEDULE(1of1)
L Reinforcement Stirrups Comments
Top Left Top Right Label b(mm) d(mm)
L/3 Top Center Schematic Top Left Top Middle Top Right Bott. Left Bott. Middle Bott. Right S1 S2
B1,B2,B1A,B2A,B38, 150 700 2 - 10 2 - 10 2 - 10 2 - 12 2 - 12 2 - 12 8 @300c/c 8 @300c/c Type 1
B39,B38A,B39A
SLAB SCHEDULE B3,B4,B36,B37 150 700 2 - 12 2 - 12 2 - 12 2 - 12 2 - 12 2 - 12 8 @300c/c 8 @300c/c Type 1
S1 S1
Bottom S2 Reinforcement Comments B6,B7 150 500 2 - 12 2 - 12 2 - 12 2 - 12 2 - 12 2 - 12 8 @300c/c 8 @300c/c Elevation FL-200mm
Label D(mm)
Along short span Along Long Span
Type 2-Beam B6A,B7A 150 300 2 - 10 2 - 10 2 - 10 2 - 16 2 - 16 2 - 16 8 @300c/c 8 @300c/c Type 1
S1 110 8 @150 8 @250 Two-way
Note: At ends, the top and bott. bars must be bent inside the column
B8,B31 150 700 2 - 20 2 - 20 2 - 20 +2 - 16 2 - 16 2 - 16 2 - 16 8 @200c/c 8 @250c/c Cantilever
to get an anchorage length of atleast 50 db from face of column S2 100 8 @200 8 @220 Two-way
B9,B32 230 700/500 from B8/B31 from B8/B31 2 - 16 2 - 16 2 - 16 2 - 16 8 @200c/c 8 @300c/c See Section
S3 100 8 @220 8 @220 Two-way
B8A,B12A 150 700 2 - 10 2 - 10 2 - 10 2 - 12 2 - 12 2 - 12 8 @300c/c 8 @300c/c Type 1
S4 150 8 @250 10 @140 One-way
L B11,B33 230 700/500 2 - 16 2 - 16 2 - 16 +2 - 20 2 - 16 2 - 16 2 - 16 8 @200c/c 8 @300c/c See Section
Top Left Top Right S5 100 8 @220 8 @250 One-way
L/3 Top center
B12,B34 150 700 from B11/B33 2 - 20 2 - 20 2 - 16 2 - 16 2 - 16 8 @200c/c 8 @250c/c Type 1
Note:
1 Alternate bars should be bent up. B13 230 550 3 - 16 3 - 16 3 - 16 +2 - 16 3 - 16 3 - 16 3 - 16 8 @300c/c 8 @300c/c Type 1
S1 2 Top bars should be developed in adjacent spans along spanning directions. If no adjacent span,
S1 B14 150 600 from B13 2 - 16 2 - 16 2 - 16 +3 - 12 2 - 16 2 - 16 8 @250c/c 8 @300c/c Type 2
Bottom S2 additional top L bar provided and hooked into beam.
Bottom left Bottom Right
B15,B18,B26,B27 150 300 2 - 10 2 - 10 2 - 10 2 - 12 2 - 12 2 - 12 8 @300c/c 8 @300c/c Type 1
Type 1-Beam
B16,B17 150 500 2 - 10 2 - 10 2 - 10 2 - 12 2 - 12 2 - 12 8 @300c/c 8 @300c/c Type 1
Note: At ends, the top and bott. bars must be bent inside the column
to get an anchorage length of atleast 50 db from face of column B19 230 700 2 - 16 2 - 16 2 - 16 +3 - 20 2 - 16 2 - 16 2 - 16 +2 - 16 8 @200c/c 8 @300c/c Cantilever

B20 230 700 from B19 2 - 16 2 - 16 +2 - 16 from B19 2 - 16 2 - 16 +2 - 16 8 @200c/c 8 @300c/c Type 2

B21 230 700 from B20 2 - 16 2 - 16 +2 - 16 from B20 2 - 16 2 - 16 +2 - 16 8 @200c/c 8 @300c/c Type 2

B22 230 700 from B21 2 - 16 2 - 16 from B21 2 - 16 2 - 16 8 @300c/c 8 @300c/c Type 2

B23 230 700 3 - 16 3 - 16 3 - 16 +3 - 20 3 - 16 3 - 16 3 - 16 +3 - 16 8 @300c/c 8 @300c/c Type 2

C D B24 230 700 from B23 3 - 16 3 - 16 +2 - 16 from B23 3 - 16 3 - 16 +3 - 12 8 @200c/c 8 @300c/c Type 2
MB1
B25 230 700 from B24 3 - 16 3 - 16 +2 - 16 from B24 3 - 16 3 - 16 +3 - 12 8 @300c/c 8 @300c/c Type 2
MB3
E

E
MB2

B25A 230 700 from B25 from B25 from B25 from B25 from B25 from B25 8 @300c/c 8 @300c/c Cantilever

B28 230 700 2 - 16 +3 - 20 2 - 16 2 - 16 +3 - 16 2 - 16 +2 - 12 2 - 16 2 - 16 +2 - 16 8 @250c/c 8 @300c/c Elevation


Type 2FL-200mm
10 11 12 13 14 15 16 17 18

B29 230 500 2 - 16 2 - 16 2 - 16 2 - 16 2 - 16 2 - 16 8 @300c/c 8 @300c/c Elevation FL-200mm


9
8 7 6 5 4 3 2 1
2400

B30 230 500 2 - 16 +2 - 10 2 - 16 2 - 16 2 - 16 2 - 16 2 - 16 8 @250c/c 8 @300c/c Type 1

B29A,B30A 150 300 2 - 10 2 - 10 2 - 10 2 - 16 2 - 16 2 - 16 8 @300c/c 8 @300c/c Type 1


P2

P3

Step in 10
1750

Brick work B35 230 700 2 - 16 +2 - 10 2 - 16 2 - 16 +2 - 10 2 - 16 2 - 16 2 - 16 8 @300c/c 8 @300c/c Type 1


700

9
250 B40,B76 150 700 2 - 12 2 - 12 2 - 12 2 - 12 2 - 12 2 - 12 8 @300c/c 8 @300c/c Type 1
8

130
B41,B77 150 700 2 - 12 2 - 12 2 - 12 2 - 12 2 - 12 2 - 12 8 @300c/c 8 @300c/c Type 1
MB2 MB3 B42,B74 150 700 2 - 16 2 - 16 2 - 16 2 - 12 2 - 12 2 - 12 8 @150c/c 8 @200c/c Cantilever
C D 8 @ 250 c/c
130

10 @ 150 c/c
B43,B75 150 700 2 - 16 2 - 16 2 - 16 2 - 12 2 - 12 2 - 12 8 @150c/c 8 @200c/c Elevation
Cantilever
FL-200mm
Staircase Midlanding Lvl. Section EE
( Scale 1:25) B44 150 500 2 - 12 2 - 12 2 - 12 +2 - 12 2 - 12 2 - 12 2 - 12 8 @150c/c 8 @200c/c Cantilever
Scale 1:50
B45 150 700 2 - 12 2 - 12 2 - 12 from B44 2 - 12 2 - 12 8 @250c/c 8 @300c/c Type 1

B46 150 700 from B45 2 - 12 2 - 12 from B45 2 - 12 2 - 12 8 @250c/c 8 @300c/c Elevation
Type 1FL-200mm
18 B47 150 500 2 - 12 +2 - 12 2 - 12 2 - 12 from B46 2 - 12 2 - 12 8 @150c/c 8 @200c/c Cantilever
MB1
17 2 - 16 +2 - 10 2 - 16 2 - 16 2 - 16 2 - 16 2 - 16 Type 1

350
B48,B68 230 700 8 @250c/c 8 @300c/c
Step in
Brick work 16
B49,B69 230 700 2 - 16 2 - 16 2 - 16 2 - 16 2 - 16 2 - 16 8 @250c/c 8 @300c/c Type 1
700

9 15 B56A
B48A/49A,B68A/69A 150 700 2 - 16 +2 - 12 2 - 16 2 - 16 2 - 12 2 - 12 2 - 12 8 @250c/c 8 @250c/c Cantilever
8 14
B50,B64 230 700 2 - 16 2 - 16 2 - 16 +2 - 16 2 - 16 2 - 16 2 - 16 8 @250c/c 8 @300c/c Cantilever
7 13 B13
12 B51,B65 230 700 from B50/B64 2 - 16 2 - 16 from B50/B64 2 - 16 2 - 16 8 @250c/c 8 @300c/c Type 1
6
10 @ 150 c/c
5 11 B52,B66 230 700 from B51/B65 2 - 16 2 - 16 +2 - 10 from B51/B65 2 - 16 2 - 16 8 @250c/c 8 @300c/c Type 2
0
13

10 @ 150 c/c 4 10 B53,B67 230 700 from B52/B66 from B52/B66 from B52/B66 from B52/B66 from B52/B66 from B52/B66 8 @250c/c 8 @300c/c Cantilever
8 @160c/c 8 @ 250 c/c
700

3 B54,B60 230 700 2 - 16 2 - 16 2 - 16 +2 - 16 2 - 16 +2 - 10 2 - 16 2 - 16 8 @250c/c 8 @300c/c Cantilever


Top Starter
2 from B54/B60 from B54/B60 8 @200c/c 8 @250c/c Type 2
8 @ 250 c/c Landing B55,B61 230 700 2 - 16 2 - 16 2 - 16 2 - 16
1 Level
MB1 B56,B62 230 700 from B55/B61 2 - 16 2 - 16 +3 - 20 from B55/B61 2 - 16 2 - 16 +2 - 16 8 @200c/c 8 @250c/c Type 2

Section DD B56A 350 350 2 - 10 2 - 10 2 - 10 2 - 16 2 - 16 2 - 16 8 @200c/c 8 @250c/c Type 1


( Scale 1:25)
10 @150c/c B57,B63 230 700 2 - 16 +2 - 16 2 - 16 +2 - 16 2 - 16 +2 - 16 2 - 12 2 - 12 2 - 12 8 @150c/c 8 @200c/c Cantilever
Bottom Starter
B63A 150 700 2 - 16 +2 - 16 2 - 16 +2 - 16 2 - 16 +2 - 16 2 - 12 2 - 12 2 - 12 8 @150c/c 8 @200c/c Cantilever

Section CC B58 150 700 2 - 10 2 - 10 2 - 10 2 - 12 2 - 12 2 - 12 8 @250c/c 8 @300c/c Type 1

( Scale 1:25) B13 B70 150 500 2 - 12 2 - 12 2 - 12 +2 - 10 2 - 12 2 - 12 2 - 12 8 @250c/c 8 @300c/c Cantilever

B71 150 700 2 - 12 2 - 12 2 - 12 +2 - 10 from B70 2 - 12 2 - 12 8 @250c/c 8 @300c/c Type 1

B72 150 700 from B71 2 - 12 2 - 12 from B71 2 - 12 2 - 12 8 @250c/c 8 @300c/c Type 1

B73 150 500 2 - 12 2 - 12 2 - 12 from B72 2 - 12 2 - 12 8 @300c/c 8 @300c/c Cantilever

MB1 150 700 2 - 12 +2 - 12 2 - 12 2 - 12 +2 - 12 2 - 12 2 - 12 +2 - 16 2 - 12 8 @300c/c 8 @300c/c Type 1


B1 B1A B3 B4 B2A B2
B63A

MB2 150 700 2 - 16 +2 - 12 2 - 16 2 - 16 2 - 12 2 - 12 2 - 12 8 @250c/c 8 @250c/c Cantilever


B69A

B6 MB1 B7
B63

B75
B49A

B53

S5 S5
B67

S5
B57

B8A B12A
B73
B43

B47

S5 C2 MB3 150 700 2 - 16 +2 - 12 2 - 16 2 - 16 2 - 12 2 - 12 2 - 12 8 @250c/c 8 @250c/c Cantilever


B6A P1 B7A
C3 C4 B11
C1
B8 C5 B9 FC1 B12 NOTE: Underlines values represent extra bars in inner layer.
B49

B69
P2

P3

P4
B52

S3 S3
B66

S5 S1 S5
B41

S1
B77
B72

B14
B46

B15 B16 B17 B18


S2 S2
B13
B19 B20 S5 B21 B22 UP B23 S5 B25 B25A
S5 B24
B56A
B56

B62

C8 C9 C10 S4 S4 C11 C12 C13 2-10 hanger bars


S5 C14 B28 C15 S5 Top Reinf. as per
B48

B71
B68
B40

B45

B76

B26
B51

schedule
B65

B27
S3 S3
S2 S2 Slab reinf't
B61
B55

S5 B29A B30A FC2


B58

S1
700

S1 S5
C18 B32 C16 S5 B33 FC3 B34
500

B31 S5
C20 C21 S3 S3 C22 C23 6 dia @250 c/c Design Complaint to the foll. Codes Drawing Title:
B29 B30 Stirrups as per

STRUCTURAL
IS 456-2000 Drawn: JT/PSR
8 @ 200 top Notes:
B48A

B70
B42

B44

schedule THIRD FLOOR LVL.


B68A

B74
B50

B54

B60

B64

S5 S5 Refer General Notes for Concrete


Checked: JSS/NP
B35 beam reinf't

Correct Paper Size: A1


Bottom Reinf. as
& General Specifications
RCC DETAILS Designed: PSR
B38A B36 B37 B39A per schedule
B38 B39
150

Chajja outline
Only written dimensions to be used. Agami Engineering
THIRD FLOOR LAYOUT Typical Variable Depth Beam Section Project:
38/1997 Vakratunda Soc.,
Drawing No.:
(Scale 1:25)
NEETA NIWAS NN - S - 104
SCALE - 1:100 Chajja Slab Detail B 22.09.16 IFC. GandhiNagar, Bandra (E),