You are on page 1of 1

Emirates 

transport  
RAK technical service unit  
Al Nakheel workshop 
 

Lifter annual maintenance schedule 2020  
2020 ‫اﻟﺨﻄﺔ اﻟﺴﻨﻮﻳﺔ ﻟﺼﻴﺎﻧﺔ اﻟﺮاﻓﻌﺎت ﻟﻠﻌﺎم‬
No Asset No Description Capacity Cell No Current Service Date Next Service Date Remarks
1 CM 3142 FOUR POST 5000 KG 3 2/Mar Grease
2 CM 1267 FOUR POST 4000 KG 6 2/Mar Grease
3 CM 1271 TWIN POST 9000 LBS 9 2/Mar Level Adjusted
4 CM 4618 TWIN POST 10000 LBS 10 5/Apr Level Adjusted
5 CM 5366 TWIN POST 4000 KG 11 5/Apr Level Adjusted
6 CM 1270 TWIN POST 9000 LBS 12 5/Apr Level Adjusted
7 CM 6043 TWIN POST 4000 KG 13 3/May Level Adjusted
8 CM 510 FOUR POST 4500 KG 15 3/May Grease
9 CM 706 FOUR POST 30000 LBS 19 3/May Grease
10 CM 149 FOUR POST 16000 KG 25 3/Aug Grease
11 SS 1 DOUBLE CYLINDER 18000 KG 31 3/Aug
12 SS 2 SINGLE CYLINDER 9000 KG 32 7/Sep
13 CM 5364 ENGINE LIFT 1500 KG 36 4/Oct Clean
14 CM 55 ENGINE LIFT 1500 KG 36 4/Oct Clean
15 CM 150 FOUR POST 16000 KG 42 4/Oct Grease

‫ﻣﺩﻳﺭ ﻭﺣﺩﺓ ﺭﺍﺱ ﺍﻟﺧﻳﻣﺔ ﺍﻟﻔﻧﻳﺔ‬ ‫ﻣﺭﺍﻗﺏ ﺍﻟﺻﻳﺎﻧﺔ‬  

You might also like