You are on page 1of 172

PREFACE

Major Expenditure Reforms have been undertaken by the Government over the last two-three years.
This not only includes simplification of appraisal and approval processes, but also structural changes
in the process of budget making itself like doing away with Plan Non-plan distinction. As a result,the
cost-centres are being treated in an integrated manner, within only the statutory revenue capital
framework.

This enables another major structural reform, which is to bring the public schemes and projects under
a monitorable Output-Outcome framework. Since 2017-18, in addition to the financial outlays of
schemes of the Ministries being indicated in the Budget document, the expected outputs and
outcomes of the schemes were al s o prepared and presented separately by each Ministry in the
form of Outcome Budget. T h e s e Outlays, Outputs and Outcomes are being presented to the
Parliament in measurable terms, bringing-in greater accountability for the agencies involved in the
execution of government schemes and projects.

utlay is the amount that is provided for a given scheme or project in the Budget; while Outpu refers
to the direct and measurable product of program activities, often expressed in physical terms or
units. utcome are the collective results or qualitative improvements brought about in the delivery of
these services, often expressed in terms of improvements over ex-ante or earlier indicators and
benchmarks.

From the last year s budget, it was decided that the output and outcomes of the schemes of 68
Ministries and Departments would be available along with the financial outlays as a part of the Budget
documents, so that clearly defined objectives and goals for each scheme can be seen by all. The
outcome budget, presents (a) the financial outlay for the year 2018-19 along with (b) the output and
deliverables and (c) the projected medium term outcomes for each Scheme/Project in a single,
consolidated document. This will significantly enhance transparency, predictability and ease of
understanding of the Governmen development agenda.

Through this exercise, the Government aims to nurture an open, accountable, pro-active and
purposeful style of governance by transitioning from mere outlays to result oriented outputs and
outcomes. This effort will enable Ministries to keep track of the scheme objectives and work towards
the development goals set by them.

To further this, scheme wise detailed Output-Outcome monitoring framework prepared, after
discussions with the concerned ministries/departments is presented as Outcome Budget 2018-19. This
will go into a live dashboard being set up by NITI Aayog to monitor the outputs and outcome of
schemes on a continuous basis. The document has been prepared through painstaking efforts, in
consultation with the implementing Ministries and Departments.

It will be our c o n t i n u o u s e f f o r t a n d endeavour to improve, with each passing year,


and provide more information and greater transparency in our efforts towards achieving the National
Development Agenda.
OUTPUT OUTCOME BUDGET FOR 2018-19
INDEX

S.No. Ministry/Department Demand No. Page No.


1. Department of Agriculture, Cooperation and Farmers 1 1-3
Welfare
2. Department of Agricultural Research and Education 2 4-5
3. Department of Animal Husbandry, Dairying and Fisheries 3 6
4. Ministry of Ayurveda, Yoga and Naturapathy, Unani, 5 7-9
Sidha and Homeopathy (AYUSH)
5. Department of Chemicals and Petrochemicals 6 10
6. Department of Fertilizers 7 11
7. Department of Pharmaceuticals 8 12
8. Ministry of Civil Aviation 9 13
9. Ministry of Coal 10 14
10. Department of Commerce 11 15
11. Department of Industrial Policy and Promotion 12 16-17
12. Department of Posts 13 18
13. Department of Telecommunications 14 19-20
14. Department of Consumer Affairs 15 21-24
15. Department of Food and Public Distribution 16 25-26
16. Ministry of Corporate Affairs 17 27
17. Ministry of Culture 18 28-32
18. Ministry of Development of North Eastern Region 23 33-37
19. Ministry of Drinking Water & Sanitation 24 38
20. Ministry of Earth Sciences 25 39-42
21. Ministry of Electronics and Information Technology 26 43-45
22. Ministry of Environment, Forests & Climate Change 27 46-52
23. Ministry of External Affairs 28 53-55
24. Department of Economic Affairs 29 56
25. Department of Expenditure 30 57
26. Department of Financial Services 31 58-59
27. Ministry of Food Processing Industries 41 60
28. Department of Health & Family Welfare 42 61-64
29. Department of Health Research 43 65-66
30. Department of Heavy Industry 44 67-68
31. Department of Public Enterprises 45 69
32. Ministry of Home Affairs 46 70-72
33. Police 48 73-77
34. Ministry of Housing and Urban Affairs 56 78-81
35. Department of School Education and Literacy 57 82-84
36. Department of Higher Education 58 85-91
37. Ministry of Information and Broadcasting 59 92-93
38. Ministry of Labour and Employment 60 94-96
39. Ministry of Law and Justice 61 97
40. Ministry of Micro, Small and Medium Enterprises 64 98-99
41. Ministry of Mines 65 100
42. Ministry of Minority Affairs 66 101-103
43. Ministry of New and Renewable Energy 67 104-10
44. Ministry of Panchayati Raj 68 10 -1
45. Ministry of Petroleum and Natural Gas 72 11
46. Ministry of Planning 73 11 -11
i
47. Ministry of Power 74 11 -11
48. Ministry of Railways 80 11 -12
49. Ministry of Road Transport and Highways 81 12 -12
50. Department of Rural Development 82 12 -12
51. Department of Land Resources 83 12
52. Department of Science and Technology 84 12 -1
53. Department of Biotechnology 85 13 -13
54. Department of Scientific and Industrial Research 86 13
55. Ministry of Shipping 87 13 -13
56. Ministry of Skill Development and Entrepreneurship 88 13 -13
57. Department of Social Justice and Empowerment 89 13 -14
58. Department of Empowerment of Persons with Disabilities 90 14 -14
59. Department of Space 91 14
60. Ministry of Statistics and Programme Implementation 92 14 -14
61. Ministry of Steel 93 14
62. Ministry of Textiles 94 14
63. Ministry of Tourism 95 1 -15
64. Ministry of Tribal Affairs 96 15
65. Ministry of Water Resources, River Development and 97 15 -15
Ganga Rejuvenation
66. Ministry of Women and Child Development 98 1 -16
67. Ministry of Youth Affairs and Sports 99 16 -1

ii
Output Outcome Framework for Schemes 2018-19
Demand No. 01 - Department of Agriculture, Cooperation and Farmers Welfare
(Rs in crores)
S. No Name of Financial Output/Deliverables Projected Medium Term
Scheme/ Sub-Scheme Outlay against the Outlay Outcomes
2018-19 2018-19
A Central Sector Scheme
1 Pradhan Mantri Fasal 13014.15 Insurance coverage of 50% Risk minimization by 60 % of
BimaYojana of the gross cropped area in about 60 million farmer
country households (50% cropped area)
2 Interest Subsidy for Short 15000.00 Crop loans upto Rs. 3 lakh Annual growth in foodgrain
term Credit to Farmers per annum to about 8.5 crore productivity at 2% (CAGR)
farmers at 7% annual
interest and at 4% on timely
repayment of crop loans.
3 Market Intervention 200.00 Need based intervention in Ensure remunerative prices to
Scheme and Price Support distress conditions farmers and avoid distress sale.
Scheme
B Centrally Sponsored Scheme
4 Green Revolution 13959.33
4.1 RashtriyaKrishiVikasYoja 3600.00 States are given complete Marking farming a remunerative
na (RKVY) flexibility to choose projects economic activity through
as per needs, priorities and
resources. risk mitigation and promoting
agri-business entrepreneurship
4.2 KrishiUnnati Schemes
4.2.1 Mission for Integrated 2546.30 Area coverage 1,55,085 Achieving 5% growth in output
Development of ha of horticulture and vegetables
Horticulture (MIDH); CIH, Cold chain/ cold room/
Nagaland, NHB & CDB chambers by NHB 55
new projects
New plantation 4500 ha
Training 1,76,488 persons
4.2.2 Integrated Scheme on Agriculture Census & Statistics
4.2.2.1 Agricultural Census Agriculture Census 2015- Final Report of Agriculture
Scheme 16 Census 2015-16-Recent
Collection of Input data profile of farm and farmers in
250.49 (survey) 2016-17 in different States of India.
States/UTs All India report on Input
Survey 2016-17
4.2.2.2 Comprehensive Scheme Cost of cultivation estimates Final report of cost of
for Studying the Cost of of 25 crops cultivation estimates of 25
Cultivation of Principal crops- Finalization of MSP for
Crops in India crops for price support
4.2.2.3 Improvement of Area estimates under Cropping scenario and likely
Agricultural Statistics principal crops of kharif and production of the country
Scheme rabi seasons

4.2.3 Integrated Scheme on Registration of 20 new Occupation diversification over


Agriculture Cooperation 130.00 cooperatives 100000 persons through
Income generating cooperatives
programmes to benefit
10000 persons
25 SHGs to be converted
into cooperatives
Organisation of 100
training programmes
4.2.4 Integrated Scheme on Agricultural Marketing

1
4.2.4.1 Agriculture Market 30 lakh tons capacity rural Reduce the gap in storage
Infrastructure godowns capacity by 8.72 %
400 other storage
1104.50 infrastructure projects
4.2.4.2 National Agriculture Integration of 200 wholesale Achieve at least 1% of the total
Market (NAM) markets with e-market turnover of the mandis (weighted
platform average) connected to the NAM
4.2.5 National Food Security Additional production of
Mission 1500.00 Rice 1.7 million tons
Wheat 1 million tons
Pulses 1 million tons
Coarse Cereals 0.70
million tons
Total Food grains 4.40
million tons
4.2.6 National Mission on Use of new seeds of Achieving 36.10 million tons
Oilseeds & Oilpalm high yielding varieties. oilseeds production by 2020.
(NMOOP) 402.07 Additional area of Reduce the edible oil imports
45,000 ha under oilpalm by 5%.
Planting of tree borne
oilseeds like Neem,
Karanga, Olive, Jajoba
4.2.6 National Mission for Sustainable Agriculture (NMSA)
4.2.6.1 National Project on Agro 75.00 Planting of 50 trees lakh Enhancing green cover &
forestry improved capacity of farmers.
4.2.6.2 National Project on 160.00 Adoption of Organic Organic Value Chain of
Organic Farming/Value production with 2500 FIG horticulture crops like
Chain Development for with participation of Turmeric, Ginger, Pineapple
North East Region 50000 ha farmers large cardamom etc are
Organic farming on developed.
50000 ha.
4.2.6.3 Paramparagat Krishi 360.00 Adoption of organic Organic farming with value
VikasYojana farming clusters addition has taken up in 10
demonstrations on 10 ha lakh ha.
Assistance to 10 lakh
farmers for Participatory
Guarantee System (PGS)
certification.
4.2.6.4 National Project on Soil 407.84 Collection and analysis of Reducing the distorted use
Health Fertility (including 127 lakh soil samples of nutrients and achieve
Soil Health Card) Distribution 600 lakh Soil balanced application of
Health Cards nutrients on 160350 ha
Capacity building training Economy of fertilizer
1550. application.
Demonstration 1.9 lakh
ha.
4.2.6.5 NMSA (RADP) 234.00
4.2.7 National Mission on Agriculture Extension and Technology
4.2.7.1 Sub Mission on Seeds and 340.60 Organization of seed Increase in SRR by 3% in
Planting Material (SMSP) Villages programme in the catchment area
60,000 villages Increase in productivity by
Increase in seed 5% in the catchment area
processing capacity by
13.50 lakh qtls
Creation of 13.50 lakh
qtls seed storage capacity
Creation of seed reserve of
3.90 lakh qtls for
contingency plans

2
4.2.7.2 Sub Mission on 1040.88 Conducting 2864 courses Enhancing the technology
Agriculture Extension for knowledge adoption rate by 5%
upgradation of extension
functionaries
Training of 6300 Agri-
preneurs for developing
agri-preneuship.
Outreach programme
benefiting 23,40,000
farmers
4.2.7.3 Strengthening/Promoting 17.00 Attending 30 million calls Reaching out to about 50%
Agricultural Information from farmers to provide farm households to solve their
System solutions on agri-related issues queries
4.2.7.4 Sub Mission on Plant 300.00 Surveillance of Locust on Arresting the pest epidemic.
Protection and Plant 150 lakh ha
Quarantine Monitoring of pest
incidence on 9 lakh ha
area in the country
Release of 3300 million
bio-agents for biological
control of pests
Augmentation and
conservation of bio agents
on 9 lakh ha.
Analysis of 22500
samples for estimation of
pesticides residues
4.2.7.5 Sub Mission on 1200.00 Training 15000 farmers, Increase the farm power
Agricultural and other stakeholders availability from 1.84 kw/ha to
Mechanization Establishment of 160 2.2 kw/ha by 2020
post-harvest units
Promotion of Farm
Mechanization in 5382
selected villages
Farm Machinery
promotion in 2600
habitats in NER
4.2.7.6 NEGP 39.00
5 Pradhan Mantri Krishi 4000.00 Bringing 16 lakh ha additional Precision irrigation on 16
SinchaiYojana (Per Drop area under Micro Irrigation lakh ha. Increase in
More Crop) and 1.2 ha area under productivity by 20%
protective irrigation Increase in farm income due
to MI up to 15%.
5.1 National Rainfed Area 10.32 Coverage of 0.80 lakh ha of Increase in cropping intensity
Authority Integrated Farming System in the scheme area by 10 %.
Area Increase in farm income in the
scheme area by 15-20%
5.2 Soil & Land Use Survey of 25.43
India

3
Output-Outcome Framework for Schemes 2018-19
Demand No. 2: Department of Agricultural Research and Education

(Rs in crores)

S. Name of the Financial Output/Deliverables against the Outlay 2018-19 Projected Medium Term
No. Scheme/ Sub- Outlay Outcomes
Scheme 2018-19
1 Natural 264.24 Soil Inventory and characterization in 07 blocks 2 % productivity gain
Resource Testing of 05 soil and water conservation measures for due to efficient and cost-
Management+ supplementary irrigation effective management of
NICRA Development of 12 system based farm production technologies natural resources
Development of 04 organic farming packages
Development of 06 technologies for managing soil health
Design and development of 05 technologies for irrigation
water management

2 Crop Science 676.86 Evaluation of 32000 Germplasm and breeding lines Expected improvement in
Conservation of 4700 Germplasm for long term storage potential productivity of
Conservation of 250 microbial genetic resources crops by 2% due to
Identify 50 Genotypes and register for unique traits development of new
Clone and characterise 12 Genes varieties and
Testing 2250 Entries in AICRP multi-location trials management
Identification of 60 Varieties including pulses and oilseeds by technologies in project
AICRP Varietal Identification Committees areas
Production of 58000 quintal Breeder seed Number of farmers
adopting released
Developing and testing 48 New technologies
varieties of different field
Conducting 10000 Front line demonstrations
crops
Organising 240 Farmers trainings
Human Resource Development - 175 Masters and Doctoral
Degree awarded
3 Horticulture 185.00 Collection of 525 germplasm Enhanced gross
Characterization of 605 germplasm production potential of
Development of 132 pre-breeding lines horticultural crops (t)
Identification of 128 promising/elite breeding lines Enhanced potential
Release of 41 varieties/hybrids coverage under new
Standardization of 92 production technologies improved varieties of
Training and capacity building of farmers and other horticultural crops
stakeholders and field demonstration of technologies 155 Reduction in potential
Production of 22.61 t breeders/Truthfully Levelled seed crop losses due to
introduction of trait
Production of 2250 breeders seed of tuber crops
specific improved
Production of 12.5 lakh quality planting materials and 5 lakh
varieties of horticultural
rooted cuttings (plants)
crops against specific
stress conditions
4 National 63.20 40 publications Increase in quantity and
Agricultural 3 patents and quality of the
Science Fund 4 technologies expected to be adopted publications/
patents/technologies
5 Animal Science 319.37 Evaluation, and characterization of 10 animal genetic resources Total increase in
Part/complete characterization / expression profiling of 20 productivity of livestock
genes sector in the project areas
In situ/ex situ conservation of 80000 important breeds by 1% in project areas
Improvement in traits for 10 Livestock and poultry breeds
Production of 4.3 lakh frozen semen doses from quality bulls
(cattle & buffaloes)
Production of 4000 piglets (8-12 weeks of age)
Production of day old as well as 6 weeks old chicks and
hatching eggs - 10 lakh
Identification of 10 genetic markers and development of

4
diagnostic kits for livestock and poultry disease diagnosis,
adulterants and environmental pollutants
Development of 16 resource based region specific feeding
modules/feed additives for Improving productivity
Standardization of 32000 AI protocol in pigs, yak, sheep,
mithun and equine
Developing 40 new/improvised methods/ identification
mechanisms for enhancing reproductive efficiency
Developing 23 methods of production of animal
products/processes (milk, meat, wool)
6 Fishery Science 140.17 Carrying out 80 Explorations/Surveys for fisheries resource Improved production
assessment from inland, marine and
Developing 1 Mariculture technology of commercially brackish water resources
important cultivable marine finfish species by 4-6% in project areas
Demonstration of open sea cage farming practices at 4 Improved production
locations from reservoirs to 180
Development of 1 breeding protocol of ornamental fish species kg/ha/y and wetlands 600
Development of 2 broodstock and seed production technologies kg/ha/y
for finfish/shellfish species Aquaculture technologies
Developing 1 fish health management protocols developed and
Developing 1 Efficient and cost-effective indigenous feed transferred for extension
formulation commercialization
Development and demonstration of cage & pen culture No. of products
protocols for inland open waters at 4 locations Transferred based on
Development of fishing gear designs for diversified and these technologies
responsible fishing - 1 design
Development of 3 value added and ready to eat products
Genetic characterization of 40 fish species
Institutionalising 80 PG/Doctoral programmes degrees
Conducting training and skill upgradation programmes for
4000 persons
7 Agricultural 935.69 Creation of Student amenities and faculty amenities at 62 Expected increase in
Education institutes enrolment of students by
(Agricultural Developing 14 Niche area of excellence modules for 10 percent
Universities and knowledge generation and capacity building Expected ratio of
Institutions) agriculture
Learning and RAWE/ in-plant training / internship for UG researchers/scientists per
Students targeting 15000 students 100,000 farmers: 0.01%
National Talent Scholarship (UG) for 4000 students Total number of
National Talent Scholarship (PG) for 3500 students publications in impact
Digitization of 10 Libraries factor journals;
Development of online systems in 15 universities Percent of high impact
Establishment of 01 New Agricultural Universities publications from the
Conducting 14 In-house and collaborative research studies on total no. of publications
Agricultural Policy research.
Development of 9 statistical methodologies for improving the
quality of agricultural research
8 Agricultural 56.17 Development of 10 technology/ ma chines Expected increase in
Engineering Development of 03 process protocols for value addition input use efficiency by
Development of 04 New value added Product 3% in project areas
Multiplication of 50 prototype pieces
Testing of 500 machine samples
Training of 100 farmers
Training of 08 custom hiring Entrepreneurs
9 Agricultural 274.07 Conducting 1.38 lakh on-farm trials and frontline Expected increase in
Extension demonstration adoption of technology
(KVK) Training 15.1 lakh farmer and extension personnel by 10% and consequent
Production of 20500 t of seed increase in productivity
Production of 231 lakh planting material
Production of 118.5 lakh livestock strains and fingerlings
Testing of 3.02 lakh soil and water samples

5
Output Outcome Framework for Scheme 2018-19

Demand No. 3: Department of Animal Husbandry, Dairying and Fisheries

(Rs. in Crores)

S.No Name of the Scheme/Sub Financial Output/Deliverables against the Projected Medium term
Scheme Outlay Outlay 2018-19 Outcomes
2018-19

A Centrally Sponsored Schemes

1 Blue Revolution 612.61 Increase in fish production by 11.3 8.9% growth in fish output
lakh tons

2. White Revolution

(a) Pashu Sanjivini 50.00 Registration of 40 million milch 20% increase in milk production
animals with UID; Issue of Health by 2020
cards to 40 million milch animals

B Other Key Deliverables of the Department/Ministry

1 Establishment of self- 200.00 Establishment of 20618 self- Generation of additional


employed Dairy Units (NLM employed Dairy Units employment to 100000 persons
& NPDD CSS)
Training to 4000 MAITRIs Increase in Artificial
Training of MAITRIs (Multipurpose Artificial Insemination by 15%
(Multipurpose Artificial Insemination Technicians)
Insemination Technicians) Increase the value of output of
NPBB
milk by Rs. 15000 Cr.
NPBB
1.50 Million doses- to increase
Sex sorted semen technology- the availability of high genetic
to increase the availability of merit heifers to increase milk
high genetic merit heifers to production and profitability in
increase milk production and Dairy farming
profitability in Dairy Farming
(This Technology is available
and being used in advanced
Dairy Nations for Exotic
Breeds of cattle

6
OutputOutcomeFrameworkforSchemes2018-19

DemandNo.5: Ministry of AYUSH

(Rs. in crores)

Sl. Name of the Financial Output/Deliverables against the Outlay Projected Medium Term
No. Scheme/Sub-Scheme Outlay 2018-19 Outcomes
2018-19
Centrally Sponsored Schemes
1. National AYUSH 504.43 i) Augmentation of AYUSH Services Increase the availability of cost
Mission (NAM) delivery at 4000 Co-location AYUSH units effective AYUSH services with
ii) Increase co-location of AYUSH in 140 universal access by co-location.
additional units. Assure the availability of free
iii) Augmentation of AYUSH Services essential AYUSH drugs in
delivery at 10000 Units for Supply of AYUSH Hospitals and
Essential drugs Dispensaries.
iv) Augmentation of AYUSH Services
delivery at 9000 AYUSH units for up-
gradation of exclusive AYUSH Hospitals and
Dispensaries
v) Increase in 100 additional AYUSH units
by upgrading of AYUSH Hospitals &
Dispensaries
vi) Augmentation of AYUSH Services
delivery at 15 AYUSH units upto 50 bedded
integrated AYUSH Hospitals
vii) Increase in 40 additional AYUSH units
for setting up of upto 50 bedded Integrated
AYUSH Hospitals.
Central Sector Schemes
1. Assistance to accredited 5.00 i) 3 Institutions to be approved for supporting To support institutions to
AYUSH Centres of for up-gradation as CoE upgrade functions and facilities
Excellence in Non- to the level of excellence
Government/ Private ii) 5 Institutions will complete the up-
Sector engaged in gradation process.
AYUSH education/drug
Development and
Research/Clinical
Research/Folk Medicine
etc. (CoE)
2. AYUSH and Public 5.00 i) Promotion of proven AYUSH intervention Better quality and outreach of
Health for community health care. AYUSH Health Care Services.
ii) Encouragement of institutionally qualified
AYUSH practitioners.
iii) Support School Health Programme and
capacity building through AYUSH
intervention by training of teachers for
school children.
iv) Initiation of new projects:-04
v) Continuation of on-going projects:-19
vi) Project expected to be completed :-07
3. Central Drug Controller 1.00 i) Regulation of Ayurveda, Siddha, Unani Better Compliance with
for AYUSH (CDSCO) and Homoeopathy (ASU&H) Drugs through provisions of the Drugs &
creation of vertical structure in CDSCO. Cosmetic Act, 1940 and Rules,
ii) To collect samples of ASU&H drugs from 1945
manufacturing units/market survey samples.
iii) To inspect premises of ASU&H drugs
manufacturing units and submit the report to
Central Drug Controller (AYUSH)
iv) To examine court cases, filing affidavit in
the court for prosecution of defaulter

7
institutes/ manufacturing units.
4. Information, Education 34.00 i) Organisation of National/State Arogya Fair To create Public Awareness
and Communication 6 among people about the
ii) Participation in Health Fairs/Melas - 7 efficacy of AYUSH System
iii) Multimedia Campaigns and distribution through organisation of Arogya
of Publicity Material on AYUSH System Fairs, participation in Health
2 Mela. Multi-media campaign.
iv) Providing a forum among stakeholders of
AYUSH system through Conference/
Seminars/ Workshop etc. - 8
v) Celebration of important days of AYUSH
System - 3
5. Promotion of 13.00 This specific steps to promote Indian System Promotion and propagation of
International Cooperation of Medicine will including the following Indian System of Medicines in
India and abroad
i) Deputation of experts 25
ii) Research Papers 22
iii) Trade Fair 20
iv) International Conferences - 18
v) AYUSH Chairs - 6
vi) Information Cells - 6
vii) International Fellowship - 75
6. Pharmacovigilance 1.50 i) Establishment of National Co-ordination To develop institutional
Initiative for ASU Drugs Centre (NPvCC), Intermediary Centres mechanism for safety
(IPvC) and Peripheral Centres (PPvC). monitoring and post marketing
surveillance of ASU&H drugs
ii) Training of ASU&H Doctors, State Drug and their misleading
Controller, Inspectors. advertisement.
iii) Developing a system-wise database of
Adverse Drug Reactions of ASU&H drugs.
7. Re-orientation Training 3.00 i) 18 CME 6-days subject/specialty specific To upgrade the knowledge of
Programme of AYUSH programme for AYUSH teachers AYUSH personnel
Personnel/Continuing programmes.
Medical Education ii) 04 CME 6-days OTP of AYUSH Systems
(ROTP/CME) for non-AYUSH doctors/scientists.
iii) 05 CME 6-days specialized training for
AYUSH Paramedics/Health workers/
Instructors/ Therapists.
iv) 03 CME 6-Days OTP programmes, Yoga/
Naturopathy training for AYUSH/Allopathy
doctors.
v) 10 CME 6-days theme-specific
programme for AYUSH medical
officers/practitioners or those deployed in
stand-alone and co-located AYUSH
facilities.
vi) 02 CME 3-days/5-day training in
Management/ IT to AYUSH
administrators/heads of departments/
institutions.

8. Extra Mural Research 6.00 To grant aid to various research Standardize/validate and
Projects through organizations to standardize/validate and develop for safety, efficacy and
Research Institutes etc. develop AYUSH drugs & therapies. quality of AYUSH drugs &
therapies through following:-
i) Initiation of new projects 15 Completion of projects 06
Validation of AYUSH
ii) Continuation of ongoing projects 20 drugs/ therapies: 12
Publication of papers: 08
9. National Medicinal 62.49 i) Establishment of Medicinal Plants i) Conservation of Endemic,
Plants Board (NMPB) Conservation and Development Areas Rare, Endangered and
(MPCDAs) 6 Threatened (RET) and other
Medicinal Plants (MPs
ii) In-situ/Ex-situ Conservation, Resource ii) Conservation &

8
Augmentation of Medicinal Plants 2750 Augmentation of MPs for
ha. overall biodiversity and meet
the demand of Ayurveda,
iii) Support to Joint Forest Management Siddha and Unani (ASU)
Committees(JFMCs /BMCs/ Van industry
Panchayats - 44 JFMCs iii) Involvement of Community
Based Organizations (CBOs) in
iv) Research and Development of Medicinal conservation, sustainable
Plants 14 harvesting and improving the
socio-economic status of grass
v) Capacity Building, IEC, Nursery, QPM root level people.
etc. 19 iv) Development of advance
technology for cultivation,
vi) Herbal Gardens (HG) and School Herbal conservation of quality aspects
Gardens (SHG) 9 of MPs
v) Capacity building of all
vii) Setting of Raw Drug Repositories stakeholders working in the
(RDR) - 1 MPs sector
vi) More people aware and
sensitized about significance of
MPs
vii) Assured quality raw
material used by ASU drug
manufacturers

10. Development of Industry 1.00 i) To fill in the critical gaps in the sector Promote standardization,
Cluster especially related to standardization, Quality quality assurance and control,
Assurance and Control, Productivity, productivity, marketing,
Marketing, Infrastructure, Capacity building infrastructure and capacity
through a cluster based approach. Preferably building through a cluster based
for classical ASU and H drugs. approach.

ii) To encourage the level of organization in Projects to be completed-


the sector thereby creating social capital for 03
sustainability of collective initiatives. On going Projects- 02

iii) The scheme would be implemented on a


Support from Ministry of AYUSH and
support would be by the way of grant to
SPV.

iv) Target not fixed.

v) Completion of ongoing sanctioned


projects/committed liabilities.

9
Output Outcome Framework for Schemes 2018-19
DemandNo.6: Department of Chemicals & Petrochemicals
(Rs.incrores)

S. NameoftheScheme/Sub Projected Outputs/Deliverablesagainstthe ProjectedMedium


No. Scheme Financial Outlay2018-19 TermOutcomes
Outlay2018-19
A CentralSectorSchemes
1. AssamGas CrackerProject 0.01 In FY 2018-19, the plant is expected to In medium term, this state-of the
(AGCP) operate at 94 % capacity generating Gross art petrochemical complex would
Revenue of Rs. 2705 crore. The company be in a position to emerge as
is expected to earn Profit After Tax (PAT) dominant player in the polymer
of Rs. 142 crore. market of North East India.

2. CentralInstituteofPlastic 83.64 Establishment of 07 new CIPET To improve


Engineering&Technology centres trainingfacilitiesforstudents
(CIPET) CreationofHostelfacilitiesat inthefieldofplastics engineering
CIPETcentres and technology, Indigenization of
Procurement and installation technology through R&D,
ofmachineriesforR&Dand Technology Supportto Industry.
technicalsupportservices
3. InstituteofPesticides 7.50 State of the art analytical instrumentation Technology developmentfornew
FormulationTechnology for analysis of pesticides and their pesticide formulations for
(IPFT) residues. commercialization.

4. ChemicalPromotion& 3.00 Organizing seminars/workshops for the Knowledge dissemination by


DevelopmentScheme promotion and development of the organizing workshops involving
(CPDS) chemicals across the country are academics / industry over the years
contemplated 2018-19 to 2020-21.

Improvement in performance/
quality of exiting products in
Polymer and Plastics.
Organizing the 9th Edition of the National Awards is expected to
National Awards for Technology foster research & innovation.
Innovation in Petrochemical and
downstream Plastic Processing Industry.

5. NewSchemesofPetrochemicals(55.50)
5.1 Settingup ofdedicated 49.50 80% Overall physical progress Employmentto about
plasticparks ofMadhyaPradeshPlasticPark 1900persons
50% Overall progress of
AssamPlasticPark
60% Overall progress of
OdishaPlasticPark
40% Overall progress of
TamilNaduPlasticPark
5.2 Scheme for setting up of 6.00 3 new CoE projects for implementation The outcome would be in terms of
Centres of Excellence during FY 2018-19. promoting academic, research and
educational excellence through
Improving the existing petrochemicals partnership. The resources and
technology and research in the country capabilities are being strengthened
and to promote development of new for furthering research activities in
applications of polymers and plastics. Advanced Polymeric Materials and
Sustainable Polymers,
Assets created under CoE would boost respectively.
contemporary research in Polymer
science and also contribute to training of
members of polymer industry and
academia.

10
Output Outcome Framework for Schemes 2018-2019
Demand No. 7: Department of Fertilizers

(Rs in Crores)
S.No. Name of the Financial Outputs/Deliverables against Projected Medium Term
Scheme/Sub Outlay the Outlay 2018-19 Outcomes
scheme 2018-19

A Central Sector Scheme


1 Nutrient Based Subsidy
1.1 Indigenous P&k 15820.35 Provide about 152.00 Lakh Availability of indigenously
Metric Ton (LMT) of produced P&K fertilizers to
indigenous P&K fertilizers to farmers at indicative MRPs will
farmers at affordable rates by improve application of P&K
giving subsidy under the NBS nutrients in the soil leading to
scheme balanced use of fertilizers, i.e.
resulting in improvement of
N:P:K ratio
1.2 Imported P&K 9260.00 Provide 80.00 LMT of Balanced use of fertilizers ,
imported P&K fertilizers at resulting in improvement of
affordable rates by giving N:P:K ratio
subsidy
1.3 City Compost 10.00 Provide 2.00 LMT City Use of City compost to enhance
Compost to farmers at agricultural output and gainful
affordable rates by giving use of urban waste; increased
subsidy usage of bio-fertilizers and
increase in agricultural output
2 Urea Subsidy
2.1 Indigenous Urea 34989.50 About 245.00 LMT of Adequate availability of Urea to
along with Freight indigenously manufactured farmers, leading to increased
Subsidy urea will be made available to agricultural productivity and
farmers at the statutory MRP resulting in maximising food
notified by the govt. production in the country
2.2 Imported Urea 13360.00 About 70.00 LMT of Urea is Import of Urea will bridge the
expected to be imported gap between demand and
production. This will ensure
adequate availability of urea to
farmers at the satutory MRP
notified by the Govt.

11
Output Outcome Framework for Schemes 2018-19
Demand No.8: Department of Pharmaceuticals
(Rs.in Crores)
S.No Name of the Scheme/sub Scheme Projected Output / Deliverables Projected Medium
Financial against the Outlay Term Outcomes
Outlay 2018- 2018-19
19
Central Sector Schemes
1. National Institutes of 135.00 Increase in number of Increased Research
Pharmaceutical Education and pharma experts by publications, projects
Research (NIPERs) additional 550 experts; and consultancies,
Patents/Drug
Construction of discovery;
buildings, purchase of Collaboration with
equipment etc. Pharmaceutical
industry.

2. Jan Aushudhi Scheme 85.00 Opening of 1000 Increased access to


additional Jan Aushadhi affordable and quality
stores in the country. generic medicines /
healthcare instruments.

12
Output-Outcome Framework for Scheme 2018-19
DemandNo:9 Ministry of Civil Aviation

(Rs. in Crores)

S. Name of the Scheme/Sub Projected Output/deliverable against Projected medium


No Scheme Financial Outlay2018-19 term
Outlay Outco
2018-19 mes
Central Sector Scheme
(A)Air India Limited (I&EBR)*
Payment for Spare Engines & 238.00 Supporting infrastructure for new Enhanced capacity for
Simulator aircrafts carrying more number of
passengers
Other Capital Expenditure 268.00 Creation of supporting Infrastructure and support
Infrastructure like maintenance system for aircraft
and training , MRO, IT System maintenance, ground
equipment, etc. Required
Air India(GBS) f ati al effici
Equity infusion as per 650.00 As per turn around Plan(TAP) TAP has been approved
Turnaround Plan(TAP) by GoI for operational
efficiency and making
the company financially
viable
(B)AirPort Authority of India Limited(I&IEBR)
1 Upgradation of facilities at 4086.00 New facilities such as hangars, These facilities will
various airports ATC, towers, terminal increase capacity of
buildings, IT, security airports to handle traffic.
infrastructure, navigational
facilities
( C)Pawan Hans Limited(IEBR)*
1 Other Capital Expenditure 9.00 Miscellaneous Civil/Electrical
works, furnitures & Fixtures at
Corporate office & Regions and
Purchase of Ground Support
Equipment

(D)R e g i o n a l C o n n e c t i v i t y S c h e m e ( N o r t h E a s t C o n n e c t i v i t y )
Viability Gap funding for 124.00 Viability Gap funding for
1 North east Connectivity connectivity in North East
(E) Regional Connectivity Scheme (Upgradation of airports)
1 Revival and upgradation of 890.09 Revival of 50 airports/airstrips
airports/airstrips under Regional Connectivity
Scheme
(F) Purchase of new aircrafts for SESF operation
1 Purchase of two new VVIP 4469.50 Purchase of two new VVIP
aircrafts for SESF operation aircrafts for SESF Operations

*Air India Ltd & Pawan Hans Ltd have been chosen for strategic disinvestment in the Financial year 2018-19,
therefore, the Capital expenditure of the aforesaid two may vary accordingly.

13
Output Outcome Framework for Schemes 2018-19
Demand No. 10: Ministry of Coal

(Rs. in crores)
S. Name of the Financial Outputs/Deliverables Projected Medium Term Outcomes
No Scheme/Sub- Outlay 2018- against the Outlay 2018-19
Scheme 2019
Central Sector Schemes
1 Conservation & Safety and Infrastructure Development in Coal Mines
a. Conservation and 59.50 Instalation of two manriding Improvement in productivity of
Safety in Coal system. workmen by increasing effective work
Mines hours on the site.
b. Development of 140.00 Partial funding of two rail This will help in evacuation of coal
Transport projects and road from coal mine area.
Infrastructure in construction.
Coal Mine areas
c. Environmental 0.50 To control mine fires and Dousing of fire at 7 sites.
measures and subsidence in Jharia Coal
Subsidence fields and rehabilitation of Rehabilitation of 7000 families in
Control families residing in Jharia Jharia.
and Raniganj Coal fields.
2. Exploration of Coal & Lignite
a. Regional 150.00 1.10 lakh- meter drilling About 1.5 billion tonnes of new
exploration resources will be added.
b. Detailed 350.00 2.2 lakh meter drilling About 1.2 billion tonnes ofcoal will be
Exploration added to proven reserves.
3. Research and 10.00 3 new projects will be Techno-economic evaluation of
Development undertaken and 4 ongoing developed Self Advancing (mobile)
projects will be completed Goaf Edge Supports [SAGESs]
over conventional techniques of
support systems at Goaf edges.
Evaluation of horizontal stress fields
in deeper horizons and development
of roof hazards maps of coal mines
Possible implications of bioavailable
iron in coal mine dust on coal

Methodology for on-line coal dust


suppression system in opencast
mines & its mitigation by water
spraying

14
Output-Outcome Framework for Schemes 2018-19
Demand No.11: Department of Commerce

(Rs in Crores)
Sl.No. Nameofthe Financial Outputs/deliverables against the Projected medium term
Scheme/sub Outlay outlay 2018-19 outcomes
Scheme 2018-19
1 Interest 2500 Provide interest equalisation Improved competitiveness of
Equalisation coverage in respect of over MSMEs in identified export
Scheme on Pre Rs.100,000 crore worth of trade sectors.
&Post Shipment shipment
Rupee Export
Credit
2 Investment in 500 The capital infusion will bring Compliance to regulatory
Export Credit underwritingcapacity in norms will enable the ECGC
Guarantee terms of maximum liability of to continue providing its
Corporation insurance covers issued within support service to the
prudential limits. As on March exporters.
31,2017, this liability exposure
was Rs.86232 crore (nearly 24
times its net worth.)
3 National Export 330 Increase in project Exports.
Insurance Account capacity in terms of maximum
liability of insurance covers
4 Coffee Board 131.20 To achieve target 340000 MT Support for enhancement of
coffee production (about 9% production, productivity and
growth) and 330000 MT exports quality of coffee
Assist 2000 beneficiaries of
welfare support to labourer and
tiny coffee growers.
500 Ha replanted/expanded area
to be developed in traditional area
5 Rubber Board 118.92 New planting/ replanting in Increase rubber production,
11200 Ha productivity, enhancement,
75000 Farmers to benefit from promotion of extension
Education Programme activities, etc
30920 beneficiaries of Labour
welfare measures
Training to 4000 persons
6 TEA Board 95.80 To achieve target 1250 Mkg tea Overall improvement of
production and 230 Mkg exports production and productivity
2500 Ha area covered with of Tea plantation in India
replanted/replaced planting through technological
2 new factories to be setup for advancement and intensified
production of green tea, orthodox adoption; Improved market
tea and speciality tea access along with new export
22 more SHGs to be formed opportunities; Social security
11479 beneficiaries of welfare for tea plantation workers
activities.

15
Output-Outcome Framework for Schemes 2018-19
Demand No. 12: Department of Industrial Policy and Promotion

(Rs in crores)
S. Name of the Financial Output/Deliverables against the Outlay Projected Medium
No. Scheme/ Sub- Outlay 2018-19 Term Outcome
Scheme 2018-19
Central Sector Scheme
1. Scheme of 281 Make India among the top 10 most Improvement in
Investment preferred FDI destinations in the world and investor confidence to
Promotion among the top 50 in the ranking of boost investment and
economic growth

Startup India To facilitate and support to 1000 startups Improving the


by March 2019 through policy advocacy, ecosystem for
business plan advisory, connects for flourishing of
financing avenues. Enable access of innovative startups
Startup India Hub a single window will help
platform for Startups, Investors, entrepreneurial
Incubators, Accelerators, Government development among
bodies, Mentors, and users interested in youth and encourage
entrepreneurship for 100,000 users. more of them to
Provide speedy and timely response to become risk-taking job
130,000 inbound queries. creators rather than job
seekers.
2. Development of 1100 Substantial completion of development of Development of
Industrial Corridors trunk infrastructure including Roads & infrastructure facilities
Services, Administrative & Business in the region would
Centre, Water Treatment Plant, Common open avenues for
Effluent Treatment Plant & Sewage development of
Treatment Plant etc. in Dholera Special Greenfield Industrial
Investment Region (DSIR), Shendra Area and provide
Bidkin Industrial Area (SBIA), Dighi Port impetus for further
Industrial Area, MMLH, Nangal development of the
Chaudhury, Vikram Udyogpuri. Expected region.
allotment of plots measuring 350 Ha to
industrial units by March 2019.
3 Exhibition cum 700 The project will be in progress for the On completion, this
Convention Centre construction of all non-PPP components in new facility is
(ECC), Dwarka, New Phase-I which will include 02 exhibition estimated to generate
Delhi halls. Convention Centre, Trunk over five lakh direct
Infrastructure with services and utilities and indirect
and Service Basement under Exhibition employment
Hall. By March 2019, these components opportunities in core
are expected to be completed to an extent ECC facilities as well
of 50%. as in supporting land
uses like retail, office
and hospitality.
4 Indian Leather and 500 Complete modernization and The contemplated
Footwear technology up-gradation to 200 units in support measures
Development footwear, leather and accessories sector. under the programme
Programme Operationalise at least one Mega will help in setting up
Leather Cluster of modern leather units
Upgrade at least 3 existing campuses of

16
Provide Placement Linked Skill benefits of a cluster
Development training to 1.44 lakh approach to industrial
unemployed persons. development leading
to increase in
production and
productivity in the
creating skilled jobs
leather and footwear
sector.

Upgradation of CETPs
will enhance our
capacity of producing
finished leather and
ensure units are
meeting environmental
guidelines.
5 Industrial 200 Complete 10 out of the 24 ongoing Provide improved
Infrastructure projects infrastructure in the
Upgradation industrial clusters which
Scheme would catalyse
industrial growth and
employment generation
6 North East 928 Clear all outstanding claims of Will promote
Industrial industrial units set up by March 2017 industrialization in hilly,
Investment and assist over 400 newly set up remote and inaccessible
Promotion Scheme industrial units. Actual number of units areas by providing
(NEIIP) 2007 as that seek the financial incentives
revamped in 2017 transportcostsubsidytodefrayhighcosts which would catalyse
with merger of in difficult terrain would depend on industrial growth and
Transport Subsidy demand preferred by the industries employment generation.
Scheme / Freight
Subsidy Scheme

7 Incentive schemes 145 Target is to clear all outstanding claims of Will promote
for Special industrial units set up by March 2017 and industrialization in
Category States for assist over 150 newly set up industrial units. hilly, remote and
J and K, Himachal inaccessible areas by
Pardesh and providing financial
Uttarakhand as incentives which
revamped in 2017 would catalyse
industrial growth and
employment
generation.
8 Refund of GST 1500 To assist about 4200 units located in the North Will promote
Eastern region including Sikkim, J&K, industrialization in
Himachal Pradesh and Uttarakhand hilly, remote and
inaccessible areas by
providing financial
incentives which
would catalyse
industrial growth and
employment
generation.

17
Output-Outcome Framework for Schemes 2018-19
Demand No. 13: Department of Post
(Rs. in crores)
Name of Central Financial Output/ Deliverables against the Projected Medium
Sl Sector Outlay Outlay 2018-19 Term Outcomes
No. Scheme/Sub 2018-19
Schemes
Central Sector Scheme
1. Postal Operations 715
Mail Operations 200 Mail Network Optimisation Project-90 Better facilities to
parcel hubs upgradation;50 registry customers through
centres upgradation improved
Development of Road Transport productivity of
Network and Delivery-35 centres;40 processes and
Routes delivery network with
Establishment of 6 e-commerce Parcel expectation of higher
Booking & Business Centres & 20 revenue genertion
automated Parcel Kiosks
Improvement of 115 Marketing of Postal Products Improved
Postal Operations Philately -50 exhibitions, 100 my stamp accessibility to postal
and Promotion of counters,50 Upgradation of bureaus, products for
other products innovative products & processes and customers with
related activities 25 expectation of higher
Postal Savings Banks- 40 lac ATM card revenue generation
Postal life Insurance Publicity, training
& related activities
IT Induction & 375 Maintenance of Data Centre and IT Maintain integrated
Modernization infrastructure for the department network of 1.54 lac
(Financial System Integrator(FSI), Core POs through single
System Integrator(CSI), Network wide area network for
Integration(NI) and DARPAN] core banking & other
related activities
Rural Business & 25 Opening150 BOs and 200 outlets Better visibility,
Access to postal infrastructure and
network 1000 cash safes access in the rural
Postal network
2. Human Resource 60 Training of 45000 officials, Upgradation Upgradation of skills
Management of 55 Workplace Training centres & of the officials to
related activities handle the
computerized
environment
3. Estates 85 120 PO projects- new, old, heritage Improved customer
Management buildings and related activities experience and postal
operations
4. India Post Payment 300 Equity infusion for technology induction Smooth operations of
Banks maintenance and manpower 650 branches with
50,000 access points
financial inclusion of
un-banked and under
banked people

18
Output-Outcome Framework for schemes 2018-19
Demand No.14: Department of Telecommunications
(Rs. In Crores)
Financial
Sl. Name of the Scheme/ Outputs/Deliverable against the Projected Medium Term
Outlay
No. Sub-Scheme Outlay Outcomes
2018-19
Central Sectors Schemes
1 USOF Schemes
1) Bharat Net Phase -I 8000.00 1,50,000 GPs To provide affordable
broadband services to
2) Bharat Net Phase - 2 citizens and institutions in
rural areas
3) Mobile Connectivity 524.00 Additional 156 towers in LWE To improve mobile
in Left Wing Extremism affected area. Upgradation of connectivity in LWE
(LWE) affected areas. bandwidth at 302 VSAT sites from affected areas.
existing 512 Kbps to 1 Mbps
4) Augmentation, 11.68 Out of 323 nodes 319 Nodes have To improve broadband
creation & management been commissioned. Remaining services in rural areas,
of OFC Network in nodes will be commissioned during sufficient back-haul
Assam service area 2018-19 capacity is required to
integrate the voice and
data traffic from the
access network in the
rural areas.
5) Augmentation, 38.80 Out of 2274 kms 1841 kms duct To improve broadband
creation & management laid. Remaining cable will be laid services in rural areas,
of OFC Network in NE during the year 2018-19 sufficient back-haul
I & NE II (Earlier capacity is required to
titled as SAs other than integrate the voice and
Assam) data traffic from the
access network in the
rural areas.
6) Provision of 25,000 450.00 25000 WiFi hot spots would be The scheme will result in
- provided. installation an
the block-level commissioning of 25000
WiFi hotspots to help
Telephone Exchanges in target users in using end-
Rural Areas. user devices like smart
phones, tablets, etc.
7) Comprehensive 443.29 Laying of OFC connectivity in A & To improve mobile
Telecom Development N and Lakshadweep Islands. connectivity and internet
Plan (CTDP) for services in A & N and
Andaman & Nicobar Lakshadweep Islands
Islands and
Lakshadweep Islands.
8) Comprehensive 400.00 To provide 2817 mobile towers in To improve mobile
Telecom Development 4119 identified uncovered villages. connectivity and internet
Plan (CTDP)for NER services in NE region
9) Augmentation of Laying of 2122 kms of underground To ensure reliability and
Transmission Media and 1091 kms aerial OFC along redundancy in
under Comprehensive 100.00 with associated terminal equipment. transmission network and
Telecom Development augmentation of
(CTDP)TDP for NER transmission media.

19
10) Other USOF Roll out periods started. To improve connectivity
Schemes 33.00 in rural areas.

Defence Spectrum - 4500.00 Laying of OFC and Procurement of Provision of OFC based
Optical Fibre Cable equipment for the project alternate communication
2.
based network for network for defence
Defence Services services

20
Output Outcome Framework for Scheme 2018-19
Demand No. 15: Department of Consumer Affairs
(Rs. In Crores)
S. Name of the
Financial Output/Deliverables against the Projected Medium Term
No. Scheme Outlay Outlay 2018-19 Outcomes
2018-19
Central Sectors Schemes
A Consumer Protection
1. Strengthening of 13 Completion of under construction 49 Improvement in the functioning
Consumer Forum buildings and also to provide of Consumer Forum
and Consumer adequate infrastructure to the
Counselling and Consumer Protection at Andhra
Mediation Pradesh, Bihar, Haryana, J&K,
Jharkhand and Maharashtra. Also
providing funds under Swachhta
Action Plan for construction of
toilets.
2. CONFONET 18.50 Fully automated system of case To initiate online feeding of
management to be installed replacing consumer complaints, mediation
the manual system. centres, e-hearing, e-affidavit, e-
payment, e-notice, e-judgments
etc.
3. Consumer 4.00 Holding of seminars, meetings of Chalking out plan of action
Protection Cell CCPC celebration of World through consultation and keeping
Consumer Day etc. stake holders informed about the
activities carried out
4. Integrated 6.67 Integration of multiple agencies Evolving a robust internal
Consumer under NCH and all consumers mechanism to deal with these
Grievance advice, consumer advocacy & grievances and simplifying
Redressal System education to be tailored w.r.t. to the processes and uniform protocol
(ICGRS) emerging trends and to prevent for better service delivery.
consumer detriment obtained
through such analysis.
5 Consumer 70.00 Release of print advertisements Consumer awareness through
Awareness(Adver in newspapers, audio spots in multimedia campaigns including
tising and radio channels, TV spots, and social media, associating with
Publicity) outdoor publicity States/UTs to reach the entire
Participation in trade population including rural,
fairs/exhibitions and rural fairs backward and remote areas
Consumer awareness through
social media

21
6 Strengthening of (i) Addition of 3 new price Strengthening of existing
Price Monitoring 2.00 reporting centers. mechanism of price
Cell (Price monitoring at Centre and State
Monitoring (ii) Hiring 1 IT/Technical levels, streamlining process of
Structure ) professional for strengthening data reporting, monitoring and
NIC services at the Centre. analysis, validation of data
and facilitation of price
(iii) Getting services of at least 1 analyses
independent professional
organization for studies related
to price.

(iv) Subscription of 1 statistical


package for price analysis

(v) Conducting 1 Zonal Conference


cum training and Market Visit
for each of the 5 zones.

(vi) Supporting each Price Reporting


Center of states with
engagement of 1 Data Entry
Operator (DEO).

(vii) Providing 1 Handheld device


with geotagging facilities to
each center.

B Legal Metrology & Quality Assurance


7 Strengthening of
Legal Metrology 45.00
Regulation and
Enforcement:
i)
Strengthening (a) Release of Grant in Aid for Improving testing
Legal Metrology Construction of Standard Laboratory facilities at States/ UTs,
Infrastructure of Buildings
States / UTs (b)Procurement/ Supply of standard
equipments viz. Blood Pressure meter
testing kits, Taxi meter testing units,
Water Bath for testing of Clinical
Thermometers, standard balances etc.
© Training of Legal Metrology
Officers In India and abroad

ii) Strengthening (a) Renovation/ up-gradation of RRSLs and establishment of


Regional subordinate Legal Metrology new RRSLs
Reference Offices/ Laboratories
Standard (b) Procurement of standard testing Training facilities at IILM,
Laboratories equipment for RRSLs and IILM, Ranchi
(RRSLs) and Ranchi
Indian Institute of (c) Establishment of new RRSLs at Capacity building of the
Legal Metrology Varanasi and Nagpur. Legal Metrology Officers
(IILM), Ranchi (d) Training of Legal Metrology
Officers In India and abroad

22
(a) Setting up of Time Servers in the
iii) Dissemination five RRSLs for dissemination of Development of new standards
of Time time and its dissemination

8 National Test 29.00 Constructing new buildings, Modernization of National Test


House augmenting testing facilities, House to facilitate digital India
digitalization of records, creating movement, reduction in testing
digital database for introduction of e- time, new testing facilities for
office and modernization of 9 labs testing packed drinking water,
voltage test facility for
transformers/Impulse voltage of
Transformers and LED.
Strengthening of
9. 2.00
Gold
Hallmarking,
Standard related
capacity building
and research and
development
work:-
Extending the spread of
Setting up and recognition of nine
i) Setting up of Hallmarked jewellery and
Assaying/ Hallmarking Centres
Gold artefacts to the nine additional
Hallmarking/Assa places in the country.
ying Centres in
Organization of 10 training
India Capacity building of the
Programmes for artisans. 4 Training
concerned personnel groups
Programmes for personnel of A & H towards better understanding and
Centres and one Training
implementation of the scheme in
Programme on Auditing of A&H
transparent manner.
Centres for BIS officers.

Intensifying participation in BIS Strengthening the process of


Technical Committee meetings and development of national
ii) National International Standardization standards (new standards and
System for meetings. revision of existing standards)
Standarization taking into consideration national
(NSS) trade and consumers interests.
Taking strategic positions

view point in the International


Standards and safeguard of
National trade and consumers
interests at International level.

Sensitizing stakeholders on the


To organize 28 Seminars / standards setting process,
Workshops, 4 Training Programme implementing standards, and also
for Technical Committee Members for opinion building on subjects
and 4 ISO and IEC and other of national importance.
international meetings/ training Increasing interactions with the
programmes/workshops in India NSBs and experts of other
countries& enhanced
participation for better
rns
by the ISO/IEC Technical and

23
Policy Committees
10 Price Stabilization 1500.00 1. Procurement/import of pulses, to Moderation in volatility of prices
Fund (PSF) maintain the dynamic buffer stock of of notified agri-horticultural
pulses. However, the target level of commodities under PSF. Such
buffer stock of pulses to be volatility will be measured with
maintained will be decided by reference to the prices reported
committee under the chairmanship of by Price Monitoring Cell (PMC)
Member, NITI Aayog.

2. Procurement of agri-horticultural
products like onion to intervene in
the market as and when required.

24
Output-Outcome Framework for Schemes 2018-19
Demand No.16: Department of Food & Public Distribution
(Rs. in Crores)

S. Name of the Scheme/ sub- Financial Outputs/Deliverables Projected Medium


No. Scheme Outlay against the Outlay Term Outcomes
2018-19 2018-19
A. Central Sector Schemes
Food Subsidy
1 Food Subsidy to Food 1,38,123.00
Corporation of India
(FCI)under theNational Food Distribution of about 550.00 lakh Food security for poorer
Security Act (NFSA) tons of foodgrains under the sections of society by sale
2 Food Subsidy for 31,000.00 National Food Security Act. of subsidized foodgrains.
Decentralized Procurement of
Foodgrains under NFSA
3 Sugar Subsidy payable under 200.00 Distribution of sugar to AAY To ensure sugar
Public Distribution System families at subsidized rate. availability to poorer
(PDS) for Antyodaya Anna sections of the society.
Yojana (AAY) Families
4 Ways and Means Advance to 50,000.00 Provided to FCI to overcome its To ensure availability of
FCI cash flow problemstobe foodgrains to public in an
adjustedduring the same financial unhindered manner.
year.

5 Assistance to State Agencies 4,000.00 Delivery and distribution of To ensure delivery of


for intra-state movement of foodgrains under NFSA. foodgrains upto door-steps
foodgrains and Fair Price of FPSs and viability of
FPSs.
under NFSA

Development of Sugar Industry


6 Financial Assistance to Sugar 26.00 Assessment and processing of loan Development of sugar
Undertakings/ Other applications, monitoring and industry.
Expenditure of Sugar recovery of loans provided at
Development Fund (SDF) concessional rate to sugar mills for
(Administration of SDF) development of sugar industry.

7 Scheme for Extending 200.00 Assistance to the sugar industry Assistance tosugar mills
Financial Assistance to Sugar for repayment of farmers cane for payment of sugarcane
Undertakings (SEFASU), price arrears, in the form of price arrears to farmers.
2014 interest subvention, against loans
(Rs. 6485.69crore) taken for the
purpose, by the sugar mills from
Scheduled Banks.

8 Loan for 100.00 Assistance in the form of soft loan Enhancing capacity of
Rehabilitation/Modernization for modernization of sugar mills sugar production for
of Sugar Mills and enhancement in their crushing domestic consumption and
capacity by about 15,000 Tons exports.
Crushed per Day (TCPD).

25
9 Loan to Sugar Mills for Cane 25.00 Assistance in the form of soft Increase in sugarcane
Development loans to enhance yield and yield for higher
productivity of sugarcane in about production of sugar.
10 lakh hectares through
propagation of high yielding
varieties and conservation of water
through promotion of drip
irrigation.
10 Loan to Sugar Mills for 200.00 Assistance to sugar mills through Improving
bagasse based cogeneration soft loans for generation of power viability/liquidity of the
power projects up to 200 MW using sugar mills; re-cycling
bagassewaste. waste bagasse; generating
power from waste.
11 Loan for production of 60.00 Assistance to sugar mills through Improving viability/
Anhydrous Alcohol /Ethanol soft loans for production of liquidity of the sugar
from alcohol ethanol up to 130 Kilo Liter Per mills; producing ethanol
Day (KLPD) using molasses for use in chemical
obtained from sugar production. industry and for blending
under Ethanol Blended
Petrol programme thus
protecting the
environment and saving
foreign exchange, using
molasses.
Other Schemes
12 Storage &Godowns
12.1 Construction of Food Storage 35.00 20000 Metric Tons (MT) of Filling of foodgrains
Godowns by FCI storage capacity to be created. storage gap by
(Investment) constructing new
scientific godowns.
12.2 Construction of Food Storage 25.00 To meet target of 15000 MT Strengthening
Godowns in NE Region by capacity for construction of intermediate storage
State Government intermediate storage godowns by infrastructure in North
(Grants for creation of capital State Governments under Grants- Eastern States.
assets) in-aid.
13 Strengthening of Public 41.00 Automation of additional 1.25 Electronic capturing of
Distribution System lakh fair price shops. transactions
Operation
14 Integrated Management of 10.00 Setting up of PDS network. National level de-
Public Distribution System duplication of ration
(IM-PDS) cards.

26
Output-Outcome Framework for Schemes 2018-19
Demand No. 17: Ministry of Corporate Affairs
(Rs. In Crores)
S.No. Name of the Projected Output/ Deliverables against the Outlay Projected
Scheme / Sub- Financial 2018-19 Medium Term
Scheme Outlay 2018- Outcomes
19
Central Sector Schemes
1. Corporate Data 9.45 In-house data mining and analytics More effective
Management support to the Ministry to effectively policy making
(CDM) System utilize the vast repository of information and better
in its Corporate Registry. analytical
Making available the information to the research in the
Ministry and to other policy and Corporate Sector.
decision making agencies within and
outside the Government.
Conceptualization and design of revenue
generating model for data dissemination.

27
Output-Outcome Framework for Scheme 2018-19
Demand No. 18: Ministry of Culture

(Rs. In Crores)

Name of the Financial


S. Projected Medium
Scheme/Sub Outlay Outputs/ Deliverables against the Outlays 2018-19
No. Term Outcomes
scheme 2018-19
Central Sector Schemes
1 Centenary & 100.00 To provide financial assistance to various organizations To generate awareness
Anniversary for celebration of centenary/anniversary of eminent among the masses about
celebration personalities and for creation of permanent infrastructure the contributions of the
scheme. facilities of public utility. New commemorations namely: icons whose
(i) 1000th Birth Anniversary of Saint Ramanujacharya; anniversaries are being
(ii) 150th Birth Anniversary of Mahatma Gandhi and commemorated;
(iii) 125th Birth Anniversary of Swami Paramahans
Yoganand have been approved. Residual work of 350th
Birth Anniversary of Guru Gobind Singh, Birth
Centenary of Pandit Deen Dayal Upadhaya and other
Commemoration of previous years will also be
undertaken.
2 Kala Sanskriti 310.00
Vikas Yojana
i. Scheme of 98.50 (i) To provide financial assistance to Gurus and Artists Promote Guru-Shishya
Financial of recommended grantee organizations under Repertory Parampara through
Assistance for Grant to disseminate and propagate art & culture supporting organisations
Promotion of Art throughout the country. working in the field of
and Culture performing arts and
generating employment
for Guru and Artistes as
well as disseminate and
propagate art & culture
throughout the country.
(ii) To provide financial assistance to Cultural Enhancing cultural
organizations with national presence during 2018-19 to awareness among
disseminate and propagate art & culture throughout the masses through
country. performances and
(iii) To provide financial assistance to organizations exhibitions and
/individuals under Cultural Function and Production encouraging young
Grant(CFPG) during 2018-19 to disseminate and people to actively
propagate art & culture throughout the country. participate in art and
cultural activities as
well as disseminate and
propagate art & culture
throughout the country.
(iv) To provide financial assistance to recommended Promote, preserve and
Cultural Organisations working in the field of development of cultural
Preservation & Development of Cultural Heritage of heritage of Himlayas.
Himalayas.
(v) To provide financial assistance to recommended Promote and preserve
Cultural Organisations working in the field of Buddhist/Tibetan art
development of Buddhist/Tibetan Art & Culture. and culture and support
Monasteries engaged in
the propagation and
scientific development

28
of Buddhist/Tibetan
culture, tradition and
research in related
fields.
ii National Mission 30.00 (i) Repository of comprehensive database of cultural Availability of
on Cultural assets and resources including various art forms and comprehensive database
Mapping and artists of artists throughout the
Roadmap country which could
also be used for policy
decisions
(ii) Availability/ accessibility of National/ State/ Identification and
Division/ District/ Block/ Gram Panchayat level grading of Artists,
platforms for talent hunt and sharing of ideas and which will facilitate
techniques and pooling off all art forms resources. identifying which art
forms are practicing or
dying and accordingly
take remedial steps to
ensure survival and
propagation of
endangered art forms.
(iii) Availability of high quality and large e-learning To disseminate
resources available free of cost to all stakeholders.. information about the
various art forms of the
country.
iii Scholarship and 14.24 Senior and junior fellowships/scholarship to be awarded; To encourage new
Fellowship for Tagore National Fellowship to be awarded; Grants to be research techniques,
promotion of Art provided to R.K. Mission. technological and
and Culture management principles
in art and culture space.
iv Scheme for 25.00 Financial assistance in the form of monthly pension and Financial support
Pension and medical aid to old & indigent artists who have made leading to a dignified
Medical Aid to significant contributions in the field of art and culture life of artists through
Artistes the pension scheme.
v Scheme on 3.50 Individuals/organizations/ universities/ state To promote and
Intangible Cultural Governments involved in preservation and propagation support organizations/
Heritage (ICH) of Intangible Cultural Heritage will be assisted on the individuals/ institutions
basis of proposals received and recommended by the working in the field of
Expert Committee. preservation and
propagation of
intangible Cultural
Heritage.
vi Domestic Festival 29.70 Cultural festivals and fairs including Rashtriya Sanskriti To create awareness
& Fair Mahotsav, National Cultural Festival of India, etc. will about the different art
be organized. forms of the country.
vii National Gandhi 43.50 (i) Project as decided by the mission to be taken up and To create awareness
Heritage Sites executed. about Gandhian
Mission and (ii) Residual work of on going projects will be expedited. heritage.
Dandi related (iii) Construction of National Dandi Memorial.
Projects (iv) Resurfacing of Dandi-Ahmedabad Bituminous Road.
viii Scheme of 37.00 (i) To provide financial assistance to voluntary not-for- Augment cultural
Financial profit cultural organisations and Government aided spaces and cultural
Assistance for cultural organisations/agencies for creation of cultural infrastructures {Studio
Creation of spaces including Studio Theatres as well as for purchase Threatres, Auditoriums,
Cultural of musical instruments/cultural equipments. cultural equipments
Infrastructure etc.} for artistes and

29
youth with a view to
create cultural
awareness among them.
(ii) To provide financial assistance to Stare Govts./UTs, Augment cultural
Central Govt. and its agencies/bodies, Universities, spaces, cultural
Municipal Corporations etc. for creation of cultrual infrastructures and
spaces/Tagore Cultural Complexes viz. Auditorium, encouraging young
Rehearsal cum Performance Spaces, Open Air Theatres, people to actively
renovation/modernization of existing Tagore Auditoria participate in art and
etc. cultural activities
ix Setting up of 25.00 Construction work at National Centre for Performing To create Cultural
Performing Arts Arts Complex with world class facilities at New Delhi to space, infrastructures
Centre & be commenced. (The scheme is under formulation and for showcasing various
International token provision has been kept) performing art forms
Cultural Centres and to enhance people
participation in cultural
activities.
x Tagore Award for 1.55 On the 150th Birth Anniversary celebration of Promotion of Cultural
Cultural Harmony Rabindranath Tagore, Government of India instituted the Harmony.
award for promoting Cultural Harmony. The Award is
given annually to a person (s) or institution (s).
xi Gandhi Peace 1.50 On 125th Birth Anniversary celebration of Mahatma Promoting of Gandhian
prize Gandhi, Government of India instituted the award for Values like Non-
promoting Gandhian Values like Non-Violence & Peace. Violence and Peace.
The Award is given annually to a person (s) or institution
(s).
xii Development of 0.01 State-of-art, high-tech 3D projection mapping & To create awareness
Jallianwala Bagh multimedia show on a permanent basis at Jallianwala about Jallianwala Bagh
Memorial Bagh instituted. (Token provision has been kept) incident among public
to Enhance the number
of visitors to the site.
xiii Financial 0.50
Assistance for
Bodh Darshan Scheme/project is at initial stage and token provision has been kept.
Higher Study
School, Tabo
3 Development of 105.98
Museums
i Museum Grant 48.08 i) New museums and up gradation / Modernization of Generate awareness and
Scheme existing museums. interest in visitors
across the country about
the rich cultural heritage
of our country.
(ii) Museums of State Governments/NGOs assisted for To create awareness
digitization of art objects and for making their among lakhs of people
images/catalogues available over the website all over the world about
rich cultural heritage of
the country.
(iii) Museum Professionals trained at various levels i.e. To improve the
national level, state level, regional and local level across
the country space management to
international standards.
ii Scheme for 47.90 (i)To set up new Science Cities/Science Centres in the To popularize science
Promotion of state of Uttarakhand, Odisha, Tripura, Andhra Pradesh, and to spread scientific
Culture of Science Kerala, Himachal Pradesh, Assam, Andaman & Nicobar attitude and creation of

30
(SPOCS) Islands, Madhya Pradesh, Rajasthan, Bihar and a scientific temper and
Karnataka. (ii)To set up Innovation Hubs in different awareness among the
Science Centres. (iii) Upgradation of Science people specially the
Cities/Science Centres/Innovation Hubs in the country. young students of the
region. To promote
culture of Innovation
amongst the Youth of
the region.
iii Virtual 5.00 To set up Virtual Experiential Museums (VEMs) across To promote awareness
Experimental the country. (Project is at initial stage and token about rich cultural
Museums provision has been kept) heritage of the country
among the people all
over the world.
iv Museum on PMs 5.00 Special exhibition on Prime Ministers to validate To have a Centre for
of India technologies for Museum on Prime Ministers. Hiring of Excellence to highlight
Academic Consultants and essential Project Staff. the life and works,
(Project is at initial stage and token provision has been charisma and
kept) contributions by all the
Prime Ministers to
nation building, extend
a tradition of public
engagement and
scholarly research in the
area of contemporary
history of India.
4 Development of 99.81
Libraries
i National Mission 99.81 (i)Setting up of NML model libraries. (ii)Qualitative and To enhance access to
on Libraries quantitative survey of libraries. (iii)creation of National Libraries and inculcate
(NML) Virtual Library of India. (iv)Capacity building for reading habits through
Library professionals library movement and to
provide training to
library professionals,
preservation of records
for research scholars.
Development of NVLI
prototype.
5 Global 45.21
Engagement and
International Co-
operation
i Scheme for 43.26 (i) Festival of India to be held abroad To popularise &
Promotion of generate interest in
International Indian arts and culture.
Cultural Relations (ii) Strengthening Indian culture abroad by providing To promote Indian
grant-in-aid to Indo-Foreign Friendship Cultural culture abroad, fostering
Societies. closer friendship and
cultural contacts
between Indian and
foreign country.
ii International 0.95 Mandatory contribution to the International organization working in the field of Arts
Contributions & Culture.
iii Travel grant for 1.00 To support Indian artists for events abroad. (Scheme is Promotion of Indian arts
promotion of under finalization process and token provision has been and culture and the
Indian Culture kept) artists abroad.

31
6 National Mission 15.00 To undertake documentation, conservation, preservation To disseminate and
on preservation on and digitization of manuscripts. To conduct survey in extract knowledge from
Manuscripts different districts; To impart training to scholars. Manuscripts and to
promote research and
publication.

32
Output-Outcome Framework for Schemes 2018-19
Demand No. 23:Ministry of Development of North Eastern Region

(Rs. in Crores)
S. Name of the Financial Outputs/Deliverables against the Outlay Projected Medium Term
No. Scheme/Sub- Outlay 2018-19 Outcomes
Scheme 2018-19
A. Central Sector Schemes
1.1 Schemes of NEC 19.00 The provision is for expenditure of the Secretariat
of North Eastern Council, Shillong.
1.2 Schemes of NEC 321.00
under
1.2.1 Schemes related to 0.02 Rs.1.5 lakh for participation of NEC in Indian Improvement in
Transport & Roads Congress. implementation of road
Communication projects.
Sector
1.2.2 Schemes related 1.00 Support healthcare and telemedicine in NER Improvement of health
to Medical indices in NER
&Health Sector in
Tertiary
Healthcare
1.2.3 Schemes related 121.09 1. Implementation of ongoing projects and Increase of farmers income.
to Agriculture & provision for Agri. Minimum support price Increase in production.
Allied Sector scheme. Number of youths placed and
including piggery 2. Support for value chain production in number of self employed
and support to Floriculture, Aromatic medicinal plants, people in these produces/
livelihood project Horticulture, Poultry, Fishery, Handloom, products.
through Handicraft and Bee-keeping. Percentage increase in
NERCORMP 3. Value-chain development of piggery income of artisans and
processing and packaging units. farmers over baseline.
Increased piggery production
4. About 10 new districts will be added in even for export to
NERCORMP-IV which would benefit about one neighbouring states.
one lakh people. About one lakh people would
benefit from NERCORMP-
IV.
1.2.4 Schemes related 76.30 Higher Education, Tertiary Healthcare (including Development of educational
to HRD&E Sector Health Education) & special interventions in facilities and creation of job
backward areas: opportunities.
1. Support for infrastructure development in Creation of awareness in
Health Educational Institutes like building, science, maths & I.T.
classroom, library etc. and also teachers training applications in NER.
in Science & Maths. Application of I.T. in Improvement in health care
educational sector. services and awareness about
health care specially in rural
areas. Promote medical
tourism in NER.
1.2.5 Schemes related 33.19 Completion of 5 Nos. of ongoing projects. Increased production of high
to Industries and Special thrust for development of bamboo in quality bamboo products in
Tourism Sector North East by setting up regional centres and North East.
including bamboo. institutions.

Tourism: Completion of 9 identified regional


tourism circuits through North East Tourism

33
Development Council and completion of ongoing
PIDDC Schemes under M/o Tourism. Improvement of tourism
infrastructure and increase in
tourism inflow in NER.

1.2.6 Schemes related 19.20 Completion of 10 Nos. of ongoing projects and Promotion of Science
to S&T Sector taking up new projects in the areas of IT &Technology and IT
(STINER) applications, IT training and S&T awareness/IT applications in the NER
application popularisation etc. by setting up including usage of new
technology facilitation centres, early warning technologies.
system for disaster management etc.
1.2.7 Schemes related 14.34 NER Promotion: Support for awareness, Projects underway that will
to IPR Sector advocacy and promotion of NER lead to awareness/advocacy
/promotion of NER through
these Centres in terms of
learning literature culture,
etc.
1.2.8 Schemes related 5.86 Outlay for Evaluation and Monitoring of projects Effective implementation of
to E & M Sector and support for 25 seminars and workshops NEC supported projects

1.2.9 Schemes of NEC - 50.00 Balanced development of the North Eastern Integrated socio-economic
New Region by taking up sectors that need critical gap development of the eight
filing. States of North Eastern
Region
1.3 Schemes of NEC 40.00 (i) 5 Nos. of on-going projects viz. Tezu Airport; Improvement of airport
under Transport & Security infrastructure of Umroi (Barapani) infrastructure with an
Communication Airport, Runway extension of Dibrugarh airport, objective to improve air
Sector hangars at Imphal&Dibrugarh, and connectivity in the NER.
commencement of Runway extension of Umroi
(Barapani) airport. Improved road connectivity.
(ii) To take up Aviation Training Institute in
NER
(iii) Repairs and maintenance of existing 83 Nos.
of Staff Quarters and 2 Nos. of Guest Houses at
Shillong and Delhi
2 Schemes of NEC 505.00
Special
Development
Projects

2.1 Schemes related 158.76 a) Completion of 150 km of roads construction. Completion of 540 Kms of
to Transport & b) Completion of 3 Nos. of Inter State Bus roads and 6 numbers of
Communication Terminus (ISBT). ISBT/ISTT.
Sector c) Completion of 4 Nos. of RCC bridges Taking up some of the
and 20 Nos. of Suspension foot bridges important roads and also
d) Survey of 40 Kms of roads for DPR ISBT/ISTT projects.
preparation. To construct Suspension foot
bridges in remote villages of
NER.

34
2.2 Schemes related 60.79 (i) Undertaking SI for various proposed power (i) To complete 54 on-going
to Power & RRE projects. Generation Capacity addition of 1.50 projects and addition of 24
Sector including MW on completion of 1 project in Mizoram and new projects by 2019-20.
survey and to take up new projects. (ii) To complete the on-going
investigation. (ii) Commissioning of 1000Ckt Km of projects and to take up new
Transmission lines and addition of 300 MVA S/s projects in the Region with a
capacities in the Region. view to add the Generation
Capacity in the Region

2.3 Schemes related 19.59 Completion of 27 Nos. of ongoing projects for Completion of ongoing
to Medical & upgradation of CHCs/PHCs/Hospitals and projects and taking up of new
Health Sector Accident & Trauma Centres (A&TC) projects will lead to improved
health care facilities/services
for the rural/urban population
and also improvement in
availability of doctors and
other medical manpower
2.4 Schemes related 52.43 To execute SI for water-related projects and Providing safe drinking water
to IFC & WSM support for preparation of DPR. Completion of in remote villages and
Sector including 33 Nos. of Irrigation/Water Supply & Anti irrigation and protection of
S&I Erosion projects and taking up new projects. The cultivable land and villages.
number of inhabitants covered under the schemes
is 27,26,308. Coverage under the schemes (i)
Irrigation-7315 hectares with a population of
2184167, 14 villages and 120 families (ii) Water
supply 24 projects covering a population of
542141. (iii) Anti-Erosion 661958 hectares of
command area protected.
2.5 Schemes related 64.93 Completion of 33 Nos. of projects and support Increase in the income of
to Agriculture & for 53 Nos. of ongoing projects. Estimated farmers. Increase in the
Allied Sector increase in the no. of units for production of silk, production of agro-
fish, meat, eggs, milk and agro-horticultural. horticultural produces, meat,
Piggery: Support to development and production eggs, fish, milk and silk.
of piggery.
(i) Livelihood Projects: (1) Implementation of
ongoing projects and provision of
Agri.Minimum support price scheme.
(2) Support for value chain production in
Floriculture, Aromatic medicinal plants,
Horticulture, Poultry, Fishery, Handloom,
Handicraft and Bee-keeping.
2.6 Schemes related 54.34 Completion of 28 Nos. of ongoing projects of Improvement in the quality of
to HRD&E Sector Educational Institutes, Sports Infrastructure and education, access to
Social Sector Infrastructure. 20 nos. of Schools, 6 education, development of
nos. of Colleges and 2 Nos. of Teachers quarter . sports skills and improve the
employability of the youth.
2.7 Schemes related 69.41 (i) Completion of 19 nos. of ongoing projects. Improvement in tourist
to Industries & (ii)Bamboo Sector: Support to NEBDC & CBTC infrastructure will result in
Tourism Sector for promotion of bamboo in NER. increase in the number of
(iii) Regional Tourism: Support for theme tourists visiting the North
based Tourism Circuit in NER. Eastern Region.

2.8 Schemes related 16.57 Outlay is for completion of 8 Nos. of ongoing Development of IT Education

35
to S&T Sector and release to other ongoing projects. Increase in Infrastructure and spread of
number of research papers published over 50 awareness of science and
Nos. developing interest in
Increase in number of research citations over science.
260 Nos.
2.9 Schemes related 8.18 Completion of 3 nos. of ongoing projects. 4 Nos. Promotion of art & culture of
to IPR Sector of Convention Centres are to be taken up at the North East.
district level in NE States. Documentation of indigenous
tribes and their culture.

3.1 Non Lapsable 702.00 Upgradation education infrastructure. Increase in educational


Central Pool of Water Supply projects infrastructure.
Resources Solid waste management projects Improvement in Water
(NLCPR)-State Tourism Supply.
Improvement in General
Sanitation.
Improvement in Tourism
facilities.
3.2. Non-Lapsable Pool 310.00 Akhaura Agartala (India) rail link Improved rail connectivity
of Resources Protection of Majuli Island from flood etc. in the NER
(NLCPR)-Central Establishment of Agriculture colleges/ Improved resistance
Training centers. towards floods.
Establishment of Power Station (Generators), Improved access to
new substations. education
Improved power
availability
4.1. North East Special 120.00 Projects relating to Tourism Promotion Improvement in Tourism
Infrastructure Infrastructure of Primary & Secondary facilities.
Development Education Increase in educational
Scheme Infrastructure of Primary & Secondary Health infrastructure.
(NESIDS) Sector Better Health facilities.
4.2 Advocacy & 20.00 1. Component :Advocacy & Publicity - 1. Increase in purchase of
Publicity and Showcasing of NER by active publicity and products from North Eastern
Capacity providing platform through events organized, Region (NER). Increase in
enhancement for financial assistance to disseminate arrival of tourists in NER.
Governance in knowledge/ attract investors in NER Increase in Investments in
NER (A&P and the NER
CEGNER) 2. Component : Capacity Enhancement for 2. Better performance of the
Governance in NER training the govt. trained official in the
officials/personnel particular sector in which
trained.
4.3 Hill Area 30.00 Construction of civil enclaves/ staff quarters Improvement in the
Development for teachers and doctors healthcare outcomes.
Programme Physical Infrastructure/ Construction of Roads Enhancement of physical
(HADP) and Bridges and social infrastructure.
Infrastructure creation and Promotion of Eco- Enhancing livelihoods
tourism
5. North East Region 180.00 1. Social Mobilization of poor households and Improvement in sustainable
Livelihood Project Institution building livelihoods of poor. The
(NERLP) 2. Financial Inclusion of SHGs projects for rural livelihood
to be completed by
15.03.2019
6.1 North East Road 334.27 Upgradation/ improvement of 433.7 kms. of road Improved villages/hilly towns
Sector infrastructure in six States in the NER road connectivity in the NE

36
Development Region
Scheme-EAP
6.2 Construction/Impr 40.00 Construction/Upgradation of roads and bridges. Improved villages/hilly towns
ovement of raods road connectivity
of Eco importance
-BRO
6.3 NE Road Sector 250.00 Construction/37pgradation of inter-State roads Improved villages/hilly towns
Development and bridges. road connectivity
Scheme- Construction/ 37pgradation of roads leading to
Programme international borders.
Component
7. Special 20.00 Around 6 Projects of Roads & Bridges and other Improved road connectivity
Development sectors (about 35 kms.) in BTC
Package for
Bodoland
Territorial Council
8. Special 40.00 Around 5 Projects of Roads & Bridge sector Improved road connectivity
Development (about 129 kms.) in KAATC
Package for Karbi
Anglong Territorial
Council
9. Special 20.00 On-going projects would be taken up Completion of 4 projects of
Development cultural and community
Package for Dima homes will improve socio-
Hasao Territorial economic conditions
Council
10. Social and 60.00 Physical outputs include 130 km of road Improved road connectivity,
Infrastructure -60.00 construction, 80 ropeways/ suspension bridges power distribution, health
Development Net: 0.00 and other infrastructure like improvement of link infrastructure in the NER
Scheme (SIDF) roads, power distribution, health, etc.

37
Output-Outcome Framework for schemes 2018-19
Demand No. 24: Ministry of Drinking Water & Sanitation
(Rs. in crores)
S. No. Name of the Financial Outlay Outputs / deliverables Projected Medium term
Scheme 2018-19 against the outlay Outcomes
2018-19

1 National Rural 7000 Coverage of 60,000 Reduction in partially


Drinking partially covered (PC) covered habitations from
Water habitations 18.37 % to 17.37 %
Programme Coverage of 9,000 Reduction in Quality
(NRDWP) Quality Affected Affected habitations from
habitations. 4.21 % to 4.10 %
2 Swachh Bharat 15343.10 Construction of 188 lakh Reduction in open
Mission Individual Household defecation from 20% to 10
(Gramin) Latrines. %
Improvement in Solid and
Liquid Waste Management
of Gram Panchayats

38
Output-Outcome Framework for Schemes 2018-19
Demand No. 25: Ministry of Earth Sciences

(Rs. in Crores)
S. Name of the Financial Outputs/Deliverables against the Projected Medium-Term
No. Schemes/ Sub - Outlay Outlay 2018-19 Outcomes
Schemes 2018-19
1 Atmosphere & 375.00 Setting up of District Agro Issuance of Weather, Climate
Climate meteorological Field Units. A total and Agro meteorological
Research- of 400 of District Agro advisories. Will be extended
Modeling meteorological Field Units from 22 million former to 40
(DAMU) will be established millions
Observing
Augmentation of the Observation State-of-the- Art support
Systems & System Network by system for Aviation safety
Services commissioning of 10 Radars and with the AWOS and advanced
(ACROSS) 10 Aviation Weather Observing forecasting tools at the civil
System (AWOS) airports in the country. Thus
Enhancement of Global Ensemble the frequency of issuance of
Weather Forecasting System. An weather advisories would be
increase in the resolution of increased from 5 hours to 3
Global Ensemble Prediction hours every 3hrs every 3hrs
System for the generation of Global Ensemble Prediction
Probabilistic forecasts increase System with an increased
from 35 km to 12 km Increase in horizontal resolution. The
the resolution of Global Ensemble Ensemble Prediction System
Prediction System for the (EPS) with a better
generation of Probabilistic representation of the
forecasts atmosphere and topography
Development of Earth System Generation of Probabilistic
model by increasing the number of forecasts at a coarse resolution
Coordinated Climate model of 35 km will have better
experiments under Coupled Model Probabilistic forecasts
Intercomparison Project (CMIP) of CMIP model simulations are
the World Climate Research assessed as part of the IPCC
Programme (WCRP) from 600 to Climate Assessment Reports
2000 and various national
Procurement of High Performance assessments. The completion
Computing system by commission of the CMIP (Coupled Model
of the High Performance Intercomparison Project ) -
Computing System of 6.8 PFLOPS DECK (Diagnosis,
from the existing 1.12 PFLOPS Evaluation, and
Characterization of Klima)
simulation and Nearly 2000
years of model integration by
the end of March 2019.
Augmentation of the existing
High Performance Computing
system. This increase in the
capacity of the HPC system.
will result in better weather
services.
2 Ocean Services 399.00 Improved Safety at sea and in The increase in coverage
Technology coastal areas by deploying expansion and improvement

39
Observations Coastal states monitoring buoys of costal water monitoring
Resources from existing none to 4 by enhancing the hotspots
Modeling and Augmentation in the no. of under coastal water quality
observation systems as a part of the monitoring systems
Sciences (O-
multi-hazard warning system No. Augmentation of data would
STORMS)
of tsunami buoys Operational by help in better predication of
increasing Moored buoys from 16 ocean disasters Increased lead
to 19 time for enabling timely
Increase in the resolution of the response on emergency
real-time inundation model from advisories Improve the
existing 5.0 km to 2.25 km accuracy of cyclones
An increase in the number of Improve issue of early
locations for monitoring of coastal warning of tsunamis Time
pollution from 20 to 24 locations taken
Towards assessment of Coastal average/Highest/Lowest) to
Erosion in various states by issue tsunami advisories
increase from existing 4 to 6 This will improve in the
coastal states assessment of health of the
A new system setup for species coastal waters of India
specific advisory services to the This will be useful for
fisherman communicate also on planning and coordination of
with potential fishing zone various developmental
assessment services from existing activities in the coastal states
one species to 3 species. Also by Assess the shoreline
increase the daily fisheries changes of the Indian Coast
advisories from 280 days to 300 The increase in the frequency
days of issue of weather and fishery
Under the Exploration and advisories to support fishing
Exploitation of (a)Underwater industry This will also
living resources - Marine Species enhance the registered mobile
(b)Underwater Non-living user of fisherman community
resources - e.g minerals, the area from 1.8 lakh to 2.4 lakhs
coverage under bathymetric data fishermen
acquisition in exclusive economic The area covered under
zone of India (sq. km.) is proposed bathymetric data acquisition
to be augmented from existing 12 in exclusive economic zone of
Lakh sq. km to 12.50 lakh sq. km India (sq. km.)from 60% to
Acquisition of Ocean Research 62.5 %
Vessels for replacement of ocean This increase in the number
research vessels outlived their will help improve survey
designed life/needs replacement ocean research vessels
(2/5) including construction of outlived their designed
coastal research vessels life/needs replacement (2/5)
Commissioning of OETC OETC powered
powered Desalination plants This will improve provide
including OETC powered safe drinking water to the
Desalination plants commissioned population of Lakshadeep thus
at Lakshadweep islands improve quality of life.
3 Polar Sciences 225.00 Launching of 12th scientific This will improve contribution
Cryosphere expedition to the Arctic launched of India to international polar
(PACER) and 38th scientific expedition to research arena by increasing
the Antarctic including 3rd of scientific research
scientific expeditions to publications, papers published,
Himalayas. international conferences
Launching of 11th multi- representations, etc. with the

40
disciplinary inter-institutional findings from the cryospheric,
scientific expedition to Southern atmospheric and geosciences
Ocean including the Tropical domain related projects
Indian Ocean (TCO) launched As a result, the survey of
Acquisition of Polar research southern ocean would be
vessels Polar the approval and accomplished which would be
Finalization of the Shipyard important for assessing the
resources and understand tele
connection between monsoons
and variability of the southern
Indian ocean
The will help in systematic
and regular expeditions to the
Polar Region with an objective
to acquire more information.
4 Seismological 110.00 Capacity augmentation for The will improve in the
& Geosciences seismological observations. It is earthquake detection
(SAGE) proposed to increase the number of capabilities with increased
seismological observatories from accuracy in earthquake
84 to 116 parameter and also increase
As a part of Himalayan studies, the research base in seismological
number of seismological studies
observatories would be The will also contribute to the
commissioned in the Garhwal- average Time lag in reporting
Kumaon Himalaya for delineation earthquake occurring within
of deep crustal structures and country to 10 minutes
seismic coupling maps by setting The number of f registered
up 5 seismic satiations and 10 GPS users of sms services app will
stations. be enhanced from 500 to 600.
Setting up of a national facility for And number of registered
geochronology Mobile users will be increase
Processing, analysis and from existing none to 5000
interpretation of geophysical data This will increase the research
acquired from the pilot borehole base in seismological studies"
drilled up to 3 km depth. including No. of papers /
publications / findings'
releases due to observations /
studies emerging out of the
newly established
observatories
Enhance capacity building for
analysis of geological and
geophysical data in the
country
Improve understanding the
earthquake process

5 Research 74.23 Providing extramural funding to a To promote capacity building


Education and 45 proposals funded for and encourage research in the
Training undertaking R&D activities in field of earth sciences among
Outreach various academic and research central/state universities and
institutes of the country academic institution
(REACHOUT)
Towards reach out the general For promoting the awareness
public on the various services of the various activities of
rendered by the ministry over 50 MoES towards socioeconomic

41
conferences/seminars/and development
symposium will be organised. Promote science and
Establishment and technology developmental
operationlisation of BIMSTEC activities in the field of earth
centre at Noida and UNESCO sciences in the Indian Ocean
Category-2 centre of ITO ocean at Countries and neighbouring
Hyderabad countries of India

42
Output-Outcome Framework for Schemes 2018-19
Demand No. 26: Ministry of Electronics & Information Technology
(Rs. in crore)
Sl. Name of Scheme/ Financial Output / Deliverables
Projected Medium Term
No. Sub-Scheme Outlay against the Outlay
Outcome
2018-19 2018-19
1 Digital India 3073.00 Transformation of India into a
digitally empowered society and
knowledge economy.

Inclusive progress in 3
dimensions namelydigital
Infrastructure as Utility to
Citizens,Governance& Services
on Demand and Digital
Empowerment of Citizens.
1.1 Manpower 300.00 PHD Schemes-1200 Availability of trained manpower
Development Electronics & ICT academy- for R&D and IT & Electronics
10000 faculty to be trained. industry.
Skill Development in ESDM- 1
lakh
ISEA 15000 Students to be
trained
Chip to System -15000 to be
trained.
NIELIT- support to
centres(including NE) -4.85 lakh
candidates

1.2 Electronics 425.00 Common Services Centre -70000 Steps towards paperless, faceless
Governance (incl. CSCs to be added. and cashless access to e-
EAP) Digital Locker 25 lakhs new Governance services in seamless
users and 400 crores documents manner and creating a knowledge
to be issued economy.
Addl. 20 GIS applications to be
developed
MeghRaj cloud:
100 more Applications and 1500
Virtual servers
Addl. 2 croresE-Sign to be
issued
20 lakhs new MyGov users
Continued financial support to
NeGP projects like SWAN,
SDC, e-Districts, SSDG,
CapacityBuilding
1.3 National 150.00 Links to 50 additional Facilitate resource sharing and
Knowledge institutions collaborative and inter-
Network (NKN) Links to 100 additional districts disciplinary research among
knowledge institutions. Steps
towards transforming India as a
Knowledge Society

43
1.4 Promotion of 864.22 Modified Special Incentive Promotion of electronics
Electronics/IT Package Scheme (M-SIPS): 245 manufacturing by attracting
Hardware projects under process. investment in electronics
Manufacturing manufacturing, leading to Make
Electronics Manufacturing in India ; creation of economic
Clusters (EMC): continued wealth and jobs creation.
support to 22 projects.

Electronics Development Fund:


Investment by daughter funds of
Rs. 910 crore, No. of
transactions/ investments-180

Continued support to Incubators-


29

Financial support to
Electropreneur parks- 4
1.5 Promotion of IT 50.00 India BPO Promotion Scheme Generation of employment in
&ITeS Industries (IBPS)- 48300 Seats to be ITeS sector in Non-Metro
allocated to successful bidders. locations.
North East BPO Promotion
Scheme (NEBPS)- 5000 Seats to
be allocated to successful
bidders.
1.6 R&D in IT/ 178.00 Microprocessor Development R&D in the area of Electronics for
Electronics/CCBT Programme the development of components/
Indian Nano Electronics User subsystems/ systems/ devices in
Programme- 300 users at IIT the areas of Microelectronics,
Mumbai &IISc Bangalore Nano electronics, Photonics &
National MissionProgramme on power Electronics.
Power Electronics Technology
Centre for Excellence for
developing Therasnostic devices
at IIT Guwahati 2 Proof of
Concept
Continuing support to around 20
R&D projects.
Converged cloud communication
network
5G Research project for next
generation communication
1.7 Cyber Security 110.00 Implementation of NCCC Phase- Real-time threat assessment and
Projects (NCCC & II situational awareness to secure
Others) Financial support to three on- Indian cyberspace.
going R&D projects for NCCC Development of new technologies
Continued support to ongoing for protection of Cyber Space
projects-20
1.8 Promotion of 595.78 Digital transactions 2500 crore Promotion & growth of robust,
Digital Payments till April, 2018. secure & inclusive National
MDR reimbursement Digital Payments ecosystem
Promotion of BHIM Schemes including Research & Innovation
viz. Incentive for merchant , in the development of New
Cashback for BHIM user & Digital Payment products,
Incentive for BHIM Aadhaar-3 platforms&services .

44
1.9 PMGDISHA 400.00 PradhanMantriGramin Digital Increased number of digitally
SakshartaAbhiyan literate persons in the rural areas
(PMGDISHA) To make 5
crore additional citizens digitally
literate.

45
Output-Outcome Framework for Schemes 2018-19
DemandNo.27: Ministry of Environment, Forests & Climate Change

(Rs. in crores)

S.No Name of the Financial Output/Deliverables against the Projected Medium


Scheme / Sub-Scheme Outlay Outlay2018-19 Term
2018-19 Outcomes

Centrally Spomsored Scheme

1 National Mission for a 210.00


Green India(CSS)

1.1 Green India Mission 160.00 Increased forest/tree cover on Increased forest/tree
National Afforestation 6163.8 hectare of forest/non- forest cover
Programme lands. Improved quality of
Improved quality of forest/tree forest/tree cover
cover of forest/non-forest lands on Increase in forest
6126.4 hectare of forest/non- forest cover and
lands. improvement in
Afforestation under National quality of existing
Afforestation Programme 50,000 forests.
ha.

1.2 Forest Fire Prevention and 50.00 Creation and maintenance of Decrease in number of
Management firelines including control burning forest fire incidences.
50,000 kms Decrease in forest area
Procurement of fire fighting affected by forest fire.
equipments 500 Nos. Decrease in loss of
Procurement of field vehicles for forests and its resources
transportation of resources 30 due to forest fire.
Nos Increase in the capacity
Water harvesting structure - 150 of forest departments,
Nos JFMCs and other village
Engagement Fire watchers communitiesin
800,000 mandays prevention and control
Training and pre- fire season of forest fire.
workshops 800 Nos Increase in the
Incentivizing villages / JFMCs for participation of JFMCs
protection against forest fire 500 and other village
Nos communities in the
prevention and control
of forest fire.
2 Integrated 555.00
Developmentof
WildlifeHabitats
(CSS)
2.1 ProjectTiger 350.00 Financial assistance to 50 Tiger Improved habitats for
Reserves tigers, elephants and
other wild

46
2.2 ProjectElephant 30.00 Financial assistance to 29 Elephant animals/plants
Reserves

2.3 Development of Wildlife 175.00 Financial assistance to 400


Habitats Protected Areas
3 Conservation of 80.50
Natural Resources
and Ecosystems
(CSS)
3.1 Biodiversity 14.50 Conservationofflora&fa
Conservation unainBiosphereReserve
existingBRs s.
Conservationof
bestpracticesMeasuresforBiodiversity Biodiversityin
Conservationandrurallivelihood ecologicallyimportant
landscapes.
Sharing of knowledge
generated by research
studies.
More research projects
on the important issues
of Biosphere and the
sustainable
development leading to
SDGs to be encouraged
and promoted.

3.2 Conservationof 66.00 Conservation & management Conservation of lakes


Aquatic activities to be completed in 4 lakes and wetlands.
Conservation & management of 25
identifiedWetlands.
4 National River 173.50
Conservation
Programme(CSS)
4.1 National River 173.50 Creation of SewageTreatment Plant Reduction in pollution
Conservation (capacity187.0mld) load in rivers.
Programme
Central Sector Schemes (CS)

1 Environmental 82.50
Knowledgeand
Capacity Building
1.1 Forestry Training and 15.00 1. TrainingofIFSofficersandother Skill upgradation of
CapacityBuilding Stake holders Forest Officers at all
1.1. No. of one week or two days levels.
training
1.2. No. of trainings conducted for
other stakeholders and personnel of
other services
1.3. No. of Foreign Training of
Forestry Personnel
2. Rehabilitation/ construction of
SFTIs and CASFoS under DFE
2.1. Completion of Rehabilitation/

47
1.2 Eco-TaskForce 67.50 Ecological
Approx. 3400 ha. of inhospitable
restoration/regene
terrain/difficult areas is proposed to
ration of
be brought under plantation
inhospitable
mountainous
terrain/deserts
Increase in forest
cover and
improvement in
quality of existing
forests.
2 National Coastal 165.00
Management
Programme
2.1 National Coastal 165.00 Mapping, delineation and Sustainable Coastal
Mission demarcation of hazard lines and Management.
ecological Sensitive areas.
Delineationofcoastal sedimentcells
forthentire coastofIndia.

abatement in Coastal States/UTs

Phase II of the project.

centre in Gujarat

facility in ParadeepOdisha

Gujarat, Odisha and West Bengal.

3 Environment 235.00
Protection,
Managementand
Sustainable
Development
3.1 Pollution Abatement 20.00 Funding to 5 SPCBs for Ongoing Strengthening of
and New projects under Assistance State Pollution
for Abatement of Pollution Control
Completion of on-going 3 CETP Boards/Pollution
projects Control Committees.
Completion of on-going 7 CT To comply with the
projects stipulated norms and
Establishment of 3-4 pilot/ improvement in
Demonstration projects. Water Quality and
2-3 new projects under reduced
Environmental Health. waterpollution.

48
2 Hazardous 15.00 Financial assistance for Innovative Management of
Substances solutions for municipal solid waste Municipal Solid
Management segregation, handling and waste.
treatment. Capacity-building
Training programs of personnel on in the field of waste
prevention of chemical accidents management.
through SPCB Awareness among
stakeholder
Trainings programs of personnel regarding various
engaged in solid waste management rules, regulations on
through SPCB Waste
Management.
Promoting and supporting projects Pilot Projects with
[pilot projects/ lab to field studies] respect to
for innovative technologies in innovative
chemical and waste management. technologies for
environmentally
Development of management sound management
information systems [chemical of chemicals and
database/ waste etc.]. wastes (except
Setting up facilities for municipal solid
management of biomedical waste waste).
and treatment, storage and disposal Management of
of hazardous waste. biomedical and
landfillable
hazardous waste

3.3 ClimateChange 40.00 Increasing the


National Carbonaceous Aerosol
ActionPlan Capacity at Central
Program and State levels in the
1. Source characterization and areas of climate
emission inventory of residential change including
energy, agriculture residue burning, institutional
on-road vehicles and brick production arrangements.

2. Field sampling and source


apportionment
Long Term Ecological Observatories
Program
1. Selection of sites in eight bio
geographical zones
2. Installation of weather stations

3.4 NationalAdaptation 110.00 Appraisal of Project Concept Notes Increased resilience


Fund (PCN) and Detailed Project and adaptive capacity
Reports (DPRs). of vulnerable
Provision of financial assistance to
communities and
States and UTs for Climate
Adaptation Projects. ecosystems against
Provision of financial assistance to climate change impacts
States and UTs for Climate by financing
Adaptation Projects adaptation activities of

49
3.5 NationalMissionon 50.00 Strengthening of PMU data centre Improved
HimalayanStudies with 3D Data Analysis and communication
Visualization Lab (3D-DAVL). strategy for informed
Continuation of Demand driven
policy making in IHR
action research project and start of
15 new multi-state Coordinated Strengthening the
Projects in all 12 states. natural capital for
Development of 30 spring revival sustenance of IHR
models. through time bound
Creation of trained researchers studies
(119).
Strengthening R&D
Initiation of four (4) new Nature
Interpretation Centres (NLCs) in facilities by creating of
four IHR states Human Capital of
Institutes in IHR
Promoting
4 DecisionSupport 120.70 conservation skills and
Systemfor
EnvironmentalPolicy,
PlanningandOutcome
Evaluation
4.1 Environmental 67.00 Sensitization of students (school as Creating
Education,Awareness well as college) on various environment
andTraining environmental issues. awareness among
students and
engagement of
students in
environment
friendly action and

50
4.2 Environmental 24.00 Creation of repository
1(a). Development of ENVIS
InformationSystems of value-added
Knowledge products viz. newsletters,
information products
books, theme based special
such as educational-
publications, e-books, e-bulletins,
kits, mobile Apps,
booklets, educational kits, etc.
environmental videos,
1 (b). Development of Thematic photo bank, research
maps. papers/publications,
thematic maps,
1 (c). Development of ENVIS Mobile directories of
Apps information on
State/regional/
2. Establishment of New ENVIS National level, CD,
Hubs/Resource partners. atlases, thematic
database etc.
3. Indian State-level Basic
Environmental Information Database Establishment of
(ISBEID): Development and analysis ENVIS Hubs on the
of the time series data of 17 modules
of ISBEID. Environment and

4. Green Skill Development States where there is


Programme: To skill youth in various no ENVIS Centre.
green skills such as Pollution Establishment of
Monitoring (Air/Water/Noise), ENVIS Resource
Effluent Treatment Plant (ETP) Partners to fill up the
Operation, Waste Management, gap in the thematic
Valuation of Ecosystem Services, areas related to
Management of Forest Fires, Water environment.
Budgeting & Auditing, etc.
Coverage of data gaps
in environmental and
5. Grid Based Decision Support
associated
System (GRIDSS)- for Sustainable
parameters, as per 17
Management of Natural Resources:
modules and 48 sub-
To carry out environmental survey of
modules. Generate
the country through a grid-based
MIS report on
approach, of various environmental
different
parameters such as air, water, noise,
environmental
soil quality, solid, hazardous & e-
parameters.
waste, forest & wildlife, flora &
fauna, wetlands, lakes, rivers & other Enhancing skills of
water bodies, public health etc. youth in
environmental
6. Community-driven activities and creating
Environmentally Sustainable Village opportunities for them
Program (CESVP): To mobilise to get gainfully
communities on environmental employed/self-
issues, creating decentralized models employed.
of development empowering local
Improving
communities, and building the right
availability of
atmosphere in villages to adopt
information on
environmentally sustainable practices
various
on community level.
environmental
parameters grid-wise
7. Preparation of State of
would aid in critical
Environment Report (SoER)/SoE
assessment of

51
4.3 Centres of Excellence 20.00 Recognition of at least 5 Centres of Implementation
Excellence. of the outcome
Atleast one project from each of the completed
thematic areas identified under the project through
scheme such as : Meeting/Semina
- Sustainable Development r/Workshop i.e.
- Climate change No of trainings
- Pollution given.
- Biodiversity Conservation
- Landscape Conservation and Submission of
Sustainable Livelihoods interim report of
- environmental economics on-going
projects.
4.4 RandD for 9.70 Funding R&D projects to generate Data on availability of
Conservation and data for natural resource Natural resources fort
Development management, conservation heir sustainable
regeneration of degraded areas, utilization.
cleaner technologies for resource
and energy conservation,

52
Output Outcome Framework for schemes 2018-19
Demand No. 28: Ministry of External Affairs

(Rs in crore)
S.No Name of the Scheme Financial Outputs/Deliverable against the Projected
Outlay 2018-19 Outlay 2018-19 Medium Term
Outcomes

1 2 3 4 5
Central Sector Schemes

1. Foreign Service 14.61 Training of MEA officers/staff and As per


Institute foreign officers training framework
adopted in July
2013
2. Embassies & 2701.00 N.A. N.A.
Missions
3. Special Diplomatic 2400.01 N.A. N.A.
Expenditure

4. Passport & 1058.75 Consular Passport and Visa services by Target is for 1.5
Emigration Passport Offices in India and crore passports to
Missions/Posts abroad be issued annually
5. Entertainment 70.50 Visits by foreign dignitaries
Charges
6. International 337.10 Mandatory contributions to UN,
Cooperation Commonwealth, SAARC, SCO etc.
7. South Asian 375.00 Building of Infrastructure To train students
University from SAARC
Countries
8. Nalanda University 200.00 Building of Infrastructure To build a world
class University
9. ICCR 255.00 Strengthening cultural ties with foreign Promotion of
countries and promoting Indian culture Indian culture
abroad abroad
10. ICWA 16.70 Strengthening
countries through research & exchange relations with other
of information and ideas countries
11. RIS 12.00 Autonomous think-tank focused on Development of
economic relations & development economic relations
cooperation, promoting policy dialogue
among developing countries
12. ITEC, SCAAP & 280.00 Training for foreign nationals from 142 Building relations
Colombo Plan developing countries in about 47 civilian through training
and 83 defence institutions
13. Aid to Bangladesh 175.00 Technical and economic development Strengthening
cooperation towards strengthening of relations between
bilateral relations with Bangladesh the two countries
14. Aid to Bhutan 2650.00 Technical and economic development Strengthening
cooperation through hydro-electric relations between
power projects, towards strengthening of the two countries
bilateral relations with Bhutan

53
15. Aid to Nepal 650.00 Technical and economic development Strengthening
cooperation towards strengthening of relations between
bilateral relations with Nepal the two countries
16. Aid to Sri Lanka 150.00 Technical and economic development Strengthening
cooperation towards strengthening of relations between
bilateral relations with Sri Lanka the two countries
17. Aid to Maldives 125.00 Technical and economic development Strengthening
cooperation towards strengthening of relations between
bilateral relations with Maldives the two countries
18. Aid to Myanmar 280.00 Technical and economic development Strengthening
cooperation towards strengthening of relations between
bilateral relations with Myanmar the two countries
19. Aid to Other 115.00 Technical and economic development Strengthening
Developing Countries cooperation towards strengthening of relations with
bilateral relations with developing fellow developing
countries countries
20. Aid to Disaster Relief 20.00 Humanitarian
disaster relief work abroad assistance to
foreign countries
21. SAARC Programme 10.00 SAARC-level initiatives Strengthening
relations with
SAARC countries
22. Aid to African 200.00 Technical and economic cooperation Strengthening
Countries towards strengthening of relations with relations with
African countries African Countries
23. Multilateral 30.00 Strengthening
Economic Relations with foreign countries in a multilateral economic relations
framework with foreign
countries
24. Investment Promotion 75.00 Publicity and promotion in foreign Strengthening
& Publicity countries of investment opportunities in economic relations
Programme India with foreign
countries
25. Aid to Eurasian 30.00 Technical and economic development Strengthening
Countries cooperation towards strengthening of relations with
relations with Eurasian countries Eurasian Countries
26. Aid to Latin 20.00 Technical and economic development Strengthening
American Countries cooperation towards strengthening of relations Latin
relations with Latin American countries American and
Caribbean
Countries
27. Aid to Afghanistan 325.00 Technical and economic development Strengthening
cooperation towards strengthening of relations between
bilateral relations with Afghanistan the two countries
28. Chahbahar Port 150.00 Strategic project To secure
interests
29. Aid to Mauritius 350.00 Technical and economic development Strengthening
cooperation towards strengthening of relations between
bilateral relations the two countries
30. Aid to Seychelles 300.00 Technical and economic development Strengthening
cooperation towards strengthening of relations between
bilateral relations the two countries
31. ASEAN Multilateral 45.00 Strengthening
relations with

54
ASEAN Countries

32. Pravasi Kaushal 5.00 Earlier called SwarnapravasYojana. For skill


Vikas Yojana development.

33. Others 344.69 Miscellaneous schemes


34. Capital Outlay 800.00
acquisition, construction, maintenance
and management

55
Output-Outcome Framework for Schemes 2018-19
Demand No. 29: Department of Economic Affairs
(Rs in Crores)

S. No Name of the Financial Outlay Output/deliverables against Projected medium term


Scheme/ 2018-19 the Outlay outcomes
Programme 2018-19
1 Viability Gap 240.69 Providing financial support / Increased Private Sector
Funding viability gap funding to participation in infrastructure
infrastructure. development.

Support infrastructure projects Reduce viability gap by


through transparent and providing support to
competitive bidding process. infrastructure projects that are
economically justified but fall
short of commercial viability.
2 Interest Equalisation Support
2.1 Interest 629.11 GoI provides Interest To promote India's strategic
Equalisation Equalization Support(IES) to political and economic interest
Support- Interest the EXIM Bank to enable it abroad by positioning it as an
Equalization to lend to developing emerging power, investor
support to EXIM nations on concessional country and partner for
Bank of India. terms. developing countries.

To generate goodwill and


building long term partnerships
with other countries.
2.2 Interest 44.40 Gol provides Interest To support Indian companies
Equalisation Equalization Support (IES) bidding for strategically
Support- Interest of 2% to EXIM Bank to important infrastructure
Equalization offer concessional finance to projects abroad.
support for Indian any foreign Govt. or foreign
Companies. Govt. owned or controlled To promote India's strategic,
entity, if an Indian company political and economic Interest
owned by resident Indian abroad.
citizens, and producing
domestically, succeeds in
getting contract for the
execution of a project
tendered by such foreign
entity and if the project is
considered strategically
important.

56
Output-Outcome Framework for Schemes 2018-19
Demand No.30 Department of Expenditure
(Rs. in crores)
S. Name of the Financial Output/Deliverables against the Projected Medium Term
No. Scheme/Sub-Scheme Outlay Outlay 2018-19 Outcome
2018-19

Central Sector Schemes


1 Public Financial 240.00 Coverage of DBT schemes to Improved citizen
Management System be enlarged. DBT scheme experience in welfare
codes to schemes to be schemes of Government
enlarged. DBT scheme codes
to customized reports
developed for various Public Finances.
stakeholders. Over 75 lakh Tracking the usage of
transactions to be processed funds till the beneficiary.
every week. Tracking the usage of
Reconfiguration of PFMS to funds reporting back the
accommodate new Chart of utilization to disbursing
Accounts and piloting of agency.
revised chart of accounts in at Enable just in time transfer
least 6 states. of funds and faster
Residual interfacing, if any to payment system for
be completed. User support welfare programmes.
and handholding. Digitization of Union
All PAOs and 50% of Government Payment and
disbursing officers to be accounting system.
brought under PFMS. Annual Keeping PFMS updated
accounts to be fully prepared with technological
using PFMS. advance and increased user
Commencement of requirements.
development of new version Improving citizen interface
of PFMS. in financial administration
Customised reports for of Government
citizens, including DBT programmes.
reports, on need to know.
Protocol to be approved for
sharing information on all
media platforms.
2 Other Administrative 5.00 Training up to 120 Officers of Capacity building in Financial
Services (NIFM) Central/State/UT. The Programme Managerial skill and in areas
Central Plan Scheme has trimesters and is a such as Commercial and Govt.
for training to the combination of classroom Accounting, public Finance,
Officers of teaching & project work. Budgeting, Financial Policy
Central/State and UT Formulation/Decision Making
to promote education and Project Management.
and Fiscal
Management
3 Training of Officers in 6.00 Training to about 2000 Officers in For efficiency in Public
Public Procurement Public Procurement Procurement
(NIFM)

57
Output- Outcome Framework for Schemes 2018-19
Demand No. 31- Department of Financial Services
(Rs. in Crore)

S. Name of the Financial Outputs/deliverables against the Projected medium term


No. Scheme/ Sub- Outlay outlay 2018-19 outcomes
Scheme 2018-19
1. Recapitalization of 65,000.01 Enables the Public Sector Banks Provide liquidity support for
Public Sector Banks (PSBs) to maintain their Tier 1 lending operations, enable banks
through issue of CRAR at a comfortable level and to raise funds from the market,
Government to comply with regulatory norms of enable PSBs to comply with
Securities (Bonds) capital adequacy under Basel III. regulatory norms of capital
adequacy under Basel III.
2. Subscription to 3,500 To increase the borrowing power of Increased borrowing power of
Share Capital of NABARD to the extent of 10 times NABARD and help it to leverage
NABARD the equity provided. requisite funds for operations
under Long Term Irrigation Fund
and other schemes of Govt. of
India undertaken by NABARD.
3. Recapitalization of 13 Enable Regional Rural Banks to To enable Regional Rural Banks
Regional Rural maintain their Capital to Risk to discharge their function as
Banks (RRBs) weighted Assets Ratio (CRAR) at envisaged in the RRB Act.
minimum at 9%.
4. Subscription to 500 Increase lending capacity of EXIM The capital infusion by Govt. of
share capital of bank by Rs.5,000 crore and India will be utilized to support
Export-Import maintain capital adequacy. foreign policy and strategic
Bank of India initiatives through Line of Credit
under National Export Insurance
Account and the Concessional
Financing Scheme.
5. Equity Capital to 600 Refinance ability goes up by To increase single party exposure
Micro Units Rs.4200 crore. and to support development of
Development & innovative products.
Refinance Agency
(MUDRA)
6. Equity support to 100 Capital infusion will provide an To facilitate the company to
India Infrastructure additional borrowing headroom of expand its loan portfolio and
Finance Co. Ltd. Rs.700 crore and also help in fulfil committed disbursement,
(IIFCL) maintaining capital adequacy. maintain credit rating credentials
for raising low cost funds and fill
gap in long term infrastructure
finance.

58
7. World Bank 125 To support the construction of Increase availability of affordable
assisted project on about 1250 housing units. houses for informal segment of
income the economy.

India to National
Housing Bank
(NHB) under World
Bank assisted
Microfinance
project.

8. Assistance to 500 To mitigate credit risk to Member To facilitate scale up of


NCGTC to set up Lending Institutions and make entrepreneurship among SC/ST
Stand Up India available collateral free landing to and women target group in India.
eligible borrowers by supporting
loans upto Rs.6200 crore.

9. Credit Guarantee 500 Coverage enhancement by Facilitate higher flow of credit to


Fund for providing mitigating credit risk to Member underserved and un-served areas
guarantee to loans Lending Institutions and make and help in achieving the
extended under available collateral free landing to objective of faster, sustainable
Pradhan Mantri eligible borrowers by supporting and wider growth under PMMY.
Mudra Yojana loans upto Rs.30,000 crore. Help extend collateral free formal
(PMMY) lending to eligible borrowers.

10. Payment to Life 224.28 Timely disbursement to 100% Ensure 100% guaranteed return to
Insurance subscribers of VPBY scheme all VPBY subscribers by helping
Corporation of Under the Scheme LIC with shortage scenarios
India for Pension beneficiaries get an effective Any gap in the guaranteed return
Plan for Senior yield of 9% p.a. over the return generated by the
Citizens LIC on the fund is compensated
by Government of India
11. Atal Pension 155 Subscription of APY would provide To facilitate assured income
Yojana (APY) old age income security to the security to subscribers in the old
subscribers. age.

12. Pradhan Manti 20 Create awareness about Pradhan Augmentation of subscriber base
Jeevan Jyoti Bima Manti Jeevan Jyoti Bima Yojana under Pradhan Manti Jeevan Jyoti
Yojana (PMJJBY) (PMJJBY) and Pradhan Mantri Bima Yojana (PMJJBY) and
and Pradhan Mantri Suraksha Bima Yojana (PMSBY). Pradhan Mantri Suraksha Bima
Suraksha Bima Yojana (PMSBY).
Yojana (PMSBY)

59
Output-Outcome Framework for Schemes 2018-19
Demand No. 41- Ministry of Food Processing Industries
(Rs. in crores)

S. Name of Scheme/ Financial Outlay Output/ Deliverable Projected Medium term Outcomes
No. Sub-Scheme 2018-19 against the Outlay 2018-
19
Central Sector Scheme
1 Pradhan Mantri Kisan 1313.00
Sampada Yojana
1.1 Scheme for Mega Food Parks 390.00 Operationalization of 12
Mega Food Parks from present level of about 2.1 %
1.2 Scheme for Creation of 20.00 Sanction of 100 clusters of the fruits & Veg to 9%;
Infrastructure for
Agro-processing clusters ,600 persons;
1.3 Scheme for Cold Chain and 400.00 Completion of 85Cold
Value Addition Infrastructure Chain projects
1.4 Scheme for Creation/ 395.00 Completion of 75 produce worth Rs. 80,189 crores;
Expansion of Food Food Processing
Processing & Preservation units.
Capacities (with spill over sanctioning of 200 new accredited food testing labs for
liabilities of old scheme) units ensuring quality & safety of
1.5 Scheme for Creation of 20.00 Sanction of 20 new food;
Backward and Forward projects
Linkages
1.6 Scheme for Food Safety and 25.00 development of new products
Completion of 17 FTLs
Quality Assurance and new cost effective
and NABL
Infrastructure technologies for preservation and
accreditation to 12
packaging of food products
FTLs, HACCP/ISO
Certification to 21 units
1.7 Scheme for Human 33.00 Approval to 22 R&D
Resources and Institutions Projects. Completing 75 inefficiencies, reduction in
Promotional Activities cost to consumers and more
remunerative price to
farmers.
1.8 Committed Liabilities under 30.00 Completion of 5
Infrastructure Schemes Abattoirs projects Productionof3.52lakh MT
meat products with the value
of Rs. 4,229crore

60
Output- Outcome Framework for Schemes 2018-19
Demand No.42 -Department of Health and Family Welfare
(Rs. in Crores)

Sl. Name of the Scheme/ Financial Outputs /Deliverables against Projected Medium Term Outcomes
No. Sub-Scheme Outlay the Outlay 2018-19
2018-19
Centrally Sponsored Scheme
National Health Mission (NHM)
1. NRHM - RCH 15006.33
FLEXIBLE POOL
1.1.1 Health System 9752.82 Expanded basket of primary Increased utilization of Public
Strengthening under care services to be provided Health facilities.
NRHM by 11,000 Health and Reduction in MMR & IMR.
Wellness Centres (HWCs). To improve utilization of primary
Increase in care services with focus on
operationalization of FRUs screening and management of
by 50. NCDs.
Implementation of IT Reduction in Out of Pocket
system backed procurement Expenditure (OOPE) on Healthcare.
management and logistics Improved Quality of Care and
for provision of free drugs at patient satisfaction.
the PH facilities-Increase in
number of States by 5%.
10% increase in number of
dialysis sessions in public
health facilities.
Increase by 10 % in
utilization of Public Health
facilities for OPD & IPD
Increase by 5% of number
of PHCs meeting IPHS
norms.
Increase of 50% in NQAS
certified public health
facilities.
Implementation of NHM
free diagnostic initiative
Increase in number of States
by 15%.

61
1.1.2 RCH Flexible Pool 5253.51 At least 2% increase in Reduction of MMR to 90 by
including Routine number of PW(Pregnant 2022.
Immunisation women) who received 4 Increase in Full Immunization
programme, Pulse ANCs from year 2017-18. Coverage to 90%.
Polio Immunisation At least 2% increase per Reduction in Total Fertility Rate
Programme, National year in Skilled Birth to 2.1 by 2020.
Iodine Deficiency Attendant (SBA) deliveries Enhancement of availability of
Disorders Control from 2016-17-(67%). adequately iodized salt in the
Programme etc. Increase in Full States/UTs and its consumption
Immunization Coverage to by the community.
90%.
Increase in modern method
contraceptive prevalence
rate (mCPR)- 0.5% increase
from baseline ( Baseline -
mCPR = 47.8 NFHS(IV)).
Availability of adequately
Iodized salt in the country (
>30 ppm at production level,
>15ppm at consumption
level)- 36 States/UTs.

1.2 National Urban Health 875.00 Improving access to Improved access to quality healthcare
Mission - Flexible Healthcare in Urban India- in Urban India
Pool Additional 200 UPHCs
/UCHCs to be functional
with minimum staffing and
service package and
comprehensive primary
healthcare services.
Number of deliveries carried
out at public health facilities
in urban India- 2% increase.
Number of women getting at
least 4 ANCs at all Urban
Health Facilities- 2%
increase.
Number of children getting
full immunization at all
Urban Health Facilities -2%
increase.

1.3 Flexible Pool for 1928.00


Communicable
Diseases
1.3.1 Revised National Increase in total TB cases Improved Treatment Success rate
Tuberculosis Control notified (Public& Private) to (80%) amongst Notified Drug
Programme (RNTCP) 20,00,000 from 17,45,000 (2016) Sensitive TB cases
1.3.2 National Leprosy Physical examination of 80% of Reduction in Grade II disability to 1
Eradication the identified population during per million populations.
Programme Leprosy Case Detection
Campaign (LCDC)

62
1.3.3 Integrated Disease Timely detection and appropriate
Surveillance response to early warning signals.
Programme(IDSP) States and at National Level. Percentage of events which are
investigated within 48 hours.

States and at National Level.

2. Flexible Pool for Non- 1004.67


Communicable
Diseases, Injury and
Trauma
2.1 National Programme Eye care services under Reduction in cases of blindness
for Control of NPCB&VI provided at due to cataract, refractive errors
Blindness primary, secondary at District and other eye diseases including
level and below level glaucoma by taking appropriate
66,00,000 Cataract Surgeries. initiatives.
Reduction of prevalence of
blindness to 0.3% by 2020.
2.2 National Mental Number of registrations of Increase in access to mental healthcare
Health Programme people with mental disorders services.
(NMHP) at mental health facilities to
increase by 10%.
2.3 National Programme No. of Persons Screened for Reduction in premature mortality
for Prevention and High blood pressure & High andmorbidity from cardiovascular
control of Cancer, Blood Sugar - 10% increase. diseases, cancer, diabetes, chronic
Diabetes, respiratory diseases.
Cardiovascular
Diseases and Stroke
(NPCDCS)

2.4 National Programme 10% increase in No. of Improved access to geriatric healthcare
for Health Care of geriatric patients taking services.
Elderly treatment at Govt. Facilities.

3. Human Resources for 4225.00


Health & Medical
Education
3.1 District Hospitals - 452.25 1058 PG seats. To increase the availability of
Upgradation of State specialist doctors.
Govt Medical Colleges
( PG seats)
3.2 Strengthening of Govt 794.07 600 MBBS seats under 10A. To increase the availability of doctors.
Medical Colleges (UG
Seats) and Central
Govt Health
Institutions
3.3 Upgradation/Strengthe 66 To make 40 ANM/ GNM School To increase the number of nurses for
ning of Nursing functional. (To provide financial healthcare.
Services (ANM/GNM) assistance to the State
Government for establishment of
ANM/GNM Schools) .

63
4 Strengthening of State 206 Number of Drug samples to be Increase in samples tested and better
Drug Regulatory tested to increase to 1,00,000 compliance with the Regulatory
System (from existing 57,000). Mechanism so as to improve the
Safety, efficacy and quality of drugs
available to the patients.

64
Output-Outcome Framework for Schemes 2018-19
DemandNo.43: Department of Health Research
(Rs.in Crores)

S. Name of the Financial Outputs/Deliverable Projected Medium Term Outcomes


No Scheme/Sub- Outlay s against the Outlay
Scheme 2018-19 2018-19
Central Sector Schemes

1. Setting up of a 70.00 Establishment of 30 Undertaking testing of about 75,000 samples


Network of New Viral Diagnostic per year and investigation of outbreaks.
Laboratories for &Research Labs Timely diagnosis of common viral
Managing (VRDLs) infections like JE, Chikungunya,
Epidemics and dengue, H1N1, Hepatitis,Zika, Crimean-
National Calamities Congo hemorrhagic Fever (CCHF) etc.
so that prognosis is followed up for
effective health interventions.
To reduce turn around time for
diagnosis of unknown viruses/exotic
viruses to 48-72 hours.
Multi-centric projects on viruses having
far reaching public health concerns, viz.
Zika diagnosis in Government Medical
Colleges across the country ; Measles
Elimination and Rubella Control
Programme by 2020 in collaboration
with WHO.

2. Development of 63.00
Infrastructure for
Promotion of Health
Research
(i) Establishment of Making 12 Model Implementation of new and modern
Model Rural Health Rural Health Research technologies in the rural settings and
Research Units Units (MRHRUs) taking technologies from Lab to field
(MRHRUs) in States functional for for better health care. Development of
undertaking research diagnostic kit at PHC and CHC level for
activities/projects. improving health of rural population,
technology transfer for reducing the
Establishment of 4 new local disease burden like Malnutrition,
Model Rural Health diabetes ,hypertension ,leprosy,
Research Units tuberculosis of the rural population.
(MRHRUs).

65
(ii) Establishment of Making 35 Multi Creating infrastructure and
Multi Disciplinary Disciplinary Research enabling environment for health
Research Units Units (MRUs) research in Government Medical
(MRUs) in functional for Colleges/Research Institutions.
Government Medical undertaking research Development of diagnostic
Colleges/Research activities/projects. kits/technologies for introduction
Institutions Establishment of 10 new into the public health system.
Multi Disciplinary To improve the overall health
Research Units (MRUs) status of the population by
in Government Medical creating evidence-based
Colleges/Research application of diagnostic
3. Human Resource & 72.00 Institutions.
Awarding about 50 procedures/ processes/methods
Publication/presentation of about
Capacity fellowships for training in 23 research papers/on new
Development India and abroad to the clinically/public health relevant
faculty of Government knowledge generated.
Medical Colleges for Conversion of at least 3 leads into
research in cutting edge patents/products/processes for use
areas and funding of about in public health system.
40 research projects in the 35% of fellowships to undertake
areas of public health start-up projects.
importance.
4. Research Governance Undertaking Health Assessment of minimum 4 technologies
Technology Assessment in regard to clinical & cost effectiveness
(HTA) To facilitate the for effective health intervention for
process of transparent and adoption in the health
evidence based decision services/programmes of the National
making in the field of Health Mission (NHM).
health, though evaluation
of appropriateness and cost
effectiveness of the
available and new health
technologies in India, so
that maximum people can
have access to quality
healthcare at minimum cost
in the country.

66
Output-Outcome Framework for Schemes 2018-19
Demand No.44: Department of Heavy Industry

(Rs. in crores)
S. Name of the Financial Output/Deliverables against the Projected Medium Term
No. Scheme/Sub- Outlay Outlay2018-19 Outcome
Scheme 2018-19

1. Enhancement of 120 Creation of common


competitiveness in Excellence (CoE) at CMTI physical infrastructure will
the Indian Capital Bangalore, IIT Madras, PSG enhance the technology
Goods Sector College of Technology Coimbatore, absorption, modernization
IIT Delh, IIT Kharagpur, HEC and competitiveness of
Ranchi and IISC Bangalore for Indian Capital Goods
Technology development are Sector.
expected to achieve average 90%
completion, of which 3 projects are
targeted for 100% completion.
eering Facility
Centres (CEFC) at ARAI Chakan/
Pune, HEC Ranchi, Bardloi, Surat,
IIT Delhi, IISC Banglore, CMTI
Bangalore and by Kirloskar and
Korus industries to provide value
added services to manufacturers are
expected to be substantially
completed.
5 projects under Technological
Acquisition Fund Programme are
expected to be substantially
completed.

2. Faster Adoption 260 Faster adoption and


and Manufacturing hybrid/ electric vehicles and development of
ofElectric manufacturing eco-system manufacturing/ market
(&Hybrid) Vehicles through provision of subsidy for ecosystem of hybrid/electric
purchase of e-vehicles, charging vehicle would lead to
infrastructure and supporting adoption of environment
R&D for indigenous development friendly technology and also
of key components of e-vehicles reduce dependence of the
country on fossil fuels
introduction of over 1000 e-
vehicles with Charging
Infrastructure in the public
transport (buses, taxis, 3-
wheelers) in 11 cities

67
3. National Automotive 378.88 the completion of Noise,
Testing and R&D Vibration, and Harshness (NVH) facilities, the certification
Infrastructure Laboratory and Test Tracks at needs of Indian automotive
Project (NATRIP) International Centre for industry will be met with
Automotive Technology (ICAT) enhanced support for
Manesar, the ICAT will be fully developmental testing for
functional. the automotive industry,
OEMs and components for
Passive Safety and their product development
Electromagnetic compatibility needs.
(EMC) Labs at Global
Automotive Research Centre
(GARC) Chennai

at NATRAX- Indore.

4. R&D project for 100 Successful completion of


development of testing of an 800 MW AUSC this project would improve
Advanced Ultra thermal power plant and power plant efficiency and
Supercritical manufacturing technology of hence reduce the carbon
(AUSC) Technology associated boilers and piping. footprint of the plant.
for thermal power
plants finalisation of turbine design,
Completion of detailed design for
boiler and valves, and
commissioning of the Turbine Rotor
test rig facility.

68
Output-Outcome Framework for Schemes 2018-19
Demand No.45: Department of Public Enterprises
(Rs. in crores)

S. Name of the Financial Output/Deliverables Projected Medium Term Outcome


No. Scheme/Sub- Outlay against
Scheme 2018-19 theOutlay2018-19
Central Sector Scheme
1. Counseling, 6 Retrainingof2000 Ensure well-being of VRS optees and their
Retraining former CPSE families affected due to right sizing or closure
&Redeployment employees who took of the CPSEs by addressing their re-
(CRR) Scheme for VRS/VSS or their employment needs and reducing the adverse
separated employees dependents with the impact of the change.
of CPSEs. target of facilitating
about 60%
redeployment

2. Scheme for 4.3 14 Residential Capacity building and skill development


Research, Training of350-400executivesof CPSEs/SLPEs/DPE
Development and Programmes for officials per annum.
Consultancies on executive of CPSEs
Generic issues and SLPS
related to Public 6 orientation
Sector Enterprises. programmes for
capacity building of
Directors of CPSEs
13 workshops for executives
of CPSEs and SLPEs

69
Output - Outcome framework for Schemes 2018-19
Demand No. 46: Ministry of Home Affairs
(Rs. in crores)
S. No. Name of the Financial Outputs/Deliverables against the Projected Medium Term
Schemes/ Sub- Outlay Outlay 2018-19 Outcomes
schemes 2018-19
Central Sector Schemes
1. Relief and 786.81 Construction of pucca houses for Rehabilitation of the returnees from
Rehabilitation for 225 returnee families. The the enclaves.
Migrants and construction is being carried out by
Repatriates the State Govt. of West Bengal for
infrastructure development like
construction of bridges, bus
terminal, upgradation of highways
and Hospital in 51 erstwhile
Bangladesh enclaves

Construction of 266 housing units


for Tibetan refugees at Dehradun, Providing housing to the refugees
Uttarakhand

Financial Assistance to 36,384


displaced families of Pakistan Providing financial assistance to the
Occupied areas of Jammu & displaced families of Pakistan
Kashmir (PoJK) and Chhamb, Occupied Jammu and Kashmir and
settled in Jammu & Kashmir. Chhamb.

Relief assistance to 63,050


refugees staying in the camps in Rehabilitation of displaced families.
Tamil Nadu and Odisha.

Rehabilitation of 5407 Bru families Cash assistance and rehabilitation of


as per the movement plan to be displaced families.
prepared by the Government of
Mizoram.

2 Freedom Fighters 775.15 Pension to the following group: Timely distribution of pension to the
(pension and other Freedom Fighters- 12657 Freedom Fighters and their
benefits) Widow/er- 23117 dependent family members
Unmarried daughter- 1572
3. Helicopter Services
3.1 Helicopter Services 90.00 The scheme will improve To provide subsidy for Helicopter
in North East connectivity to inaccessible and services to improve the connectivity
Region remote areas of NE Region. to inaccessible areas of North Eastern
region.
3.2 Helicopter Services 15.00 To provide remote area To provide subsidy for Helicopter
in Jammu and connectivity by air, emergency services to improve the connectivity
Kashmir and evacuation of people, medical to inaccessible areas of Jammu and
Himachal Pradesh services in remote areas of Kashmir & Himachal Pradesh
J&K/HP.
4. Infrastructure of 240.02 Approx. 80% construction work of The scheme is for creation of
Disaster office building will be completed infrastructure for all the NDRF
Management in 08 Battalions of NDRF out of 12 Battalions at different locations

70
Battalions. NDRF battalions are envisaged as a
multi-disciplinary, multi skilled, high
Approx. 70% construction work of tech force, capable of effectively
residential building will be responding to all types of disaster.
completed in 06 Battalions out of These are located at different places
12 Battalions. in the country, on the basis of
vulnerability profile of the areas and
the population, so that the response
time for their deployment is
minimized.

Disaster 603.94 Commission of Early Warning This scheme will result in lesser loss
5. Management: Dissemination System (EWDS) in of life and property in the cyclone
National Cyclone the states of Andhra Pradesh and affected areas.
Risk Mitigation Odisha.
Project
Installation of VSATs and high
frequency radio sets at all 120
earmarked locations.

75 Cyclone Shelters, 90 Kms of


Roads, 4 Bridges, 35 Kms Saline
Embankments

Number of training cources-06. No


of persons to be trained - 180

6 Other Disaster 117.00 Under the scheme, Earthquake The Government of India is moving
Management Disaster Risk Index (EDRI) for 50 from relief centric approach to
Schemes cities and 1 model district would be proactive approach of disaster
developed with the help of IIT, management, where disaster risk
Hyderabad. reduction is the prime focus. The
schemes of ODMS would help in
Establishment of GIS server and disaster risk reduction and work
disaster responders in venerable towards objective of Sendai
districts. Framework for Disaster Risk
Reduction
Equipping the surveillance vehicles The scheme will help in development
of nearly 930 police stations in all of co-ordination mechanism at State
major cities with some radioactive and District levels, teaching resource
monitoring systems/. material for earthquake and flood
risk mitigation and use of
communication technology in
Disaster Risk Management.

7 Special Industry 100.00 Plan to Select, train and make To provide exposure to the graduates
Initiative in Jammu employable 14,000 additional and post graduates of Jammu and
and Kashmir candidates by December, 2018 and Kashmir to the best of corporate
UDAAN job offers to another 12,000 India. To provide corporate India
candidates by December, 2018 with exposure to the rich talent pool
available in Jammu and Kashmir.
Udaan is a skill development scheme
to train and enhance the
employability of J&K youth and
targeted at opening new horizons of
growth and mainstreaming them with

71
the rest of the country.

8. Civic Action and 21.00 Various welfare and development The scheme will result in promoting
Media Plan activities like holding medical
camps, sanitation drives, sports people through multi-media publicity
meets, distribution of study which will help in improving the
material to children, minor repairs situation in the Country. The Scheme
of school building, road, bridges will help in boosting the image of
will be undertaken armed forces among the common
people and also help in taking the
local populace in confidence while
deployed in insurgency/ militancy
prone areas of NE region and LWE
affected areas

72
Output - Outcome framework for Schemes 2018-19
Demand No.48- Police
(Rs in crores)
S. No. Name of the Financial Outputs/Deliverables against the Projected Medium Term Outcomes
Schemes/ Sub- Outlay Outlay 2018-19
scheme s 2018-19
Central Sector Schemes
1. Immigration Visa 72.60 C-Visa implementation in remaining 23 Centralize collection and
& Foreigners missions abroad. dissemination of data among all stake
Registration and Conversion of 10 CIS Mission to C-Visa holders in order to achieve the
Tracking Biometric implementation in 63 objective of the Scheme to provide a
remaining Indian Mission abroad. secure and integrated service delivery
framework that facilitates legitimate
travelers while strengthening security.
2. BSF Air Wing, 175.06 i) Payments for overhauling of 06 Providing adequate air sorties for all
Aircraft, numbers MI017- IV helicopters; ii) Border Guarding Forces for various
Riverboat and Procurement of machinery spares, duties relating to Border Guarding
Helibase ground support & handling equipments, duties.
,etc. for 08 numbers MI 17-V5
helicopters, 06 numbers MI 17 IV
helicopters, 06 numbers ALH Dhruv
Helicopters and 03 Aircrafts; iii) Major
maintenance inspection and all repair to
improve or upkeep airworthiness of
Helicopters of BSF Air wing.
3. Border Infrastructure and Management
3.1 Development of 218.32 Phase I : Construction of 97.40 Km road The scheme will enhance the
Infrastructure Phase II : Construction of 100 Kms. operational capability of border
along Indo-China road guarding forces and will result in
Border effective Border Management against
(Phase-I & II cross border infiltration and crimes.
Road)
3.2 Development of 100.00 Construction of 378.11 Km road
Roads along Indo-
Nepal Border
3.3 Development of 0.67 Construction of 70 Km road
Roads along Indo-
Bhutan Border
3.4 Indo Bangladesh Border Works
3.4.1 IBB Barbed wire 269.23 Fence 53.65 Km
fencing
3.4.2 IBB Border Road 33.65 57.08 Km road
3.4.3 IBB Flood Light 67.31 87.71 Km length
3.5 Indo-Pakistan Border Works
3.5.1 Fencing 119.22 24 Km length
3.5.2 Border Road 75.00 659 Km length
3.5.3 Floodlighting 25.00 224 Km length
3.5.4 Hi-Tech 50.00 Two pilot projects at Punjab and Gujarat
Surveillance to be implemented
equipment
3.7.4 BOPs along IBB 235.58 26 Numbers
& IPB

73
3.8 Coastal Security 175.88 Construction of 131Coastal Police Procurement of the four wheelers, two
Scheme (Phase-II) Stations (CPS), 60 jetties, Procurement wheelers and boats etc will enhance
(#) of 131 four wheelers, 242 two wheelers the efficiency of the coastal police
and 225 boats stations.
3.8.1 Construction of 210.70 Construction of 560 element, Barracks This scheme will provide effective
BOPs by Border for Jawan, land cost, Solar street light border management
Guarding Forces for BOP etc.
4 Police Infrastructure
4.1 CAPF Infrastructure
4.1.1 Central Armed 216.04 Establishment of CAPF Institute of The scheme will provide the serving
Police Force Medical Sciences, Super Specialty and retired CAPFs Personnel and their
Institute of hospital, nursing college and school of families for secondary and tertiary
Medical Sciences paramedics at Maidan Garhi. health care.
(CAPF-IMS)
4.1.2 Residential 1644.42 Construction of 20500 houses This scheme will provide housing
buildings satisfaction level from existing
11.63% to 14.00% by 2019-20
4.1.3 Office Buildings 1878.23 304 buildings + 144 barracks. These schemes will provide office
premises to the CAPF institutions
Other Organisations :
4.2 Office Building 88.20 Construction of 20 projects to be This scheme will provide about
(IB) completed 42000.75 sq mtr. of office building
space and 751 flats for residential
accommodation..
4.3 Acquisition of 60.00 40420 Sq mtr area for office building The scheme will provide office and
land and and 58750 sq mtr. area for 616 flats residential accommodation for NIA.
construction of
office 7
residential
building for NIA
4.4 Construction of 80.54 To provide extensive intelligence The NATGRID IT Framework project
Office Building of information system and intelligence and will enable designated (presently, 10
National alert generation system. To complete Nos.) intelligence and investigating
Intelligence Grid construction 38441 .15 sq mtr area. agencies to generate actionable
intelligence from data of 21 Providing
Organisations and thus strengthen
their counter terrorism capabilities.
4.5 52.01 The ongoing construction to be This scheme will facilitate the training
schemes completed of about 3800 police officers every
year.
4.6 National Police 20.06 For ongoing construction of Office and Training capabilities of these
Academy Residential Buildings. academies will be enhanced for
training IPS officers and other Police
4.7 North Easter 11.51 For ongoing construction of Office and officials.
Police Academy Residential Buildings.

4.8 National Institute 12.98 For ongoing construction of Office This will help in strengthening and
of Criminology Buildings. enhancing training capabilities, state-
and Forensic of the-art forensic laboratories , etc.
Sciences
4.9 Central Forensic 10.50 For ongoing construction of Office
Science Buildings.
Laboratory
4.10 Central Forensic 0.50 For ongoing construction of Office
Science Buildings.
Laboratory (CBI)

74
4.11 Narcotics Control 40.00 For ongoing construction of Office Construction of Office-cum-
Bureau Buildings. Residential building would be
completed by the year 2020.
Delhi Police 460.95 Construction of ongoing building Completion of the targeted houses &
5 Building projects, Purchase of land for 8 projects barracks will address the problem to
Programme for i.e. Police Stations, Police Posts, District housing and office premises to a great
office and Lines, Self Defence Training Institute extent.
residential for Women, Advance Research &
buildings Training Institute, Women Hostel,
Battalion offices etc.
6. Assistance to 11.78 Construction of : i) Water treatment Implementation of the Scheme would
Nepal Police Plant; ii) Internal roads; iii) Office lead to strengthening bilateral
Academy complex; iv) Accommodation Block; v) relationship between India and Nepal
Messes; vi) Class rooms and vii) and improve training capacity of the
Seminar Hall / Syndicate Room. Nepal Police.
7. Narcotics Control 8.00 To provide grants to States for bridging This will help the State Governments
Bureau Gap in Resources for checking narcotics in improving their ability to
and psychotropic drug trafficking. effectively combat trafficking in
narcotic and psychotropic drugs.
8. Schemes for Safety of Women
8.1 Women Safety 19.75 Provision of essential items and This will also increase awareness
Schemes Delhi equipments to enhance the capability of amongst public about the
Police. the women police force for training and consequences of Crime against
holding camps for Self Defence women and will also give more
Training in Schools / Colleges, confidence in Women etc.
8.2 Nation Wide 25.00 Establishment of State Emergency The scheme will enhance the
Emergency Response System in 36 states/ UTs and emergency response system in the
Response System Establishment of National Data Center country
(NERS) and Roll out of Pan India no. 112
8.3 Cyber Crime 37.00 Operationalising CCPWC online portal. This will facilitate checking cyber
Prevention against crime against women and children
Women and and to mitigate such crimes by setting
Children up national cyber forensic lab and to
strenghthen capacity building at State
/ UT level and to create awareness
among general public.

Centrally Sponsored Scheme


9. Modernization of Police Force (including security related expenditure)
9.1 Special 94.00 Filling critical infrastructure relating The scheme will help the police
Infrastructure to mobility of security forces administration to handle Left Wing
Scheme (SIS) Secure camping grounds and Extremism problem in more effective
including helipads in remote areas manner and in eradicating the LWE
construction of Enhancing security of police stations, insurgency from states.
250 fortified strengthening of jails and
Police Stations in Fulfilling requirement of training
Left Wing infrastructure, residential
Extremism infrastructure, weaponry and vehicles
affected States. of Special forces of States to fight
against LWE insurgency."
9.2 Security Related 200.00 To meet expenditure incurred on: Ex- Scheme would reduce LWE violence
Expenditure gratia payment to families of civilians/ and number of LWE attacks on
(SRE) Scheme in security personnel killed in LWE Security Forces/Police personnel.
LWE affected violence, Insurance premium of police,
States. Training and operational needs of

75
security forces, Compensation to
surrendered LWE cadres, Security
related infrastructure for Village defense
committees (VDCs), Honorarium to
SPOs and Publicity material
9.3 Reimbursement of 182.00 The scheme has resulted in improving The Scheme would support the
Security Related law and order situation in NE Region, logistic requirement of security forces
Expenditure bringing surrendered militants into to strengthen police establishment and
(SRE) for NE mainstream and strengthening of police wean away misguided youth to join
States establishment of NE States. militant groups through surrender
cum rehabilitation policy for bringing
surrendered militants into the
mainstream.
9.4 Security Related 502.00 It covers carriage of constabulary, The scheme will support the logistic
Expenditure in logistic support for security forces(SFs), requirements of the police force of
Jammu and honorarium of SPOs, IR battalions, civic J&K to combat militancy in the state
Kashmir (Police) action plan for J&K Police, creation and .
upgradation of infrastructure like
construction of alternate
accommodation for security forces so
that they can vacate public and private
buildings etc.
9.5 Security Related 200.00 It covers relief to Kashmiri and Jammu The scheme will support the Relief
Expenditure and Rehabilitation of the Kashmiri
(R&R) package for return and rehabilitation of migrants who have been uprooted
Kashmiri migrants, relief to Next of Kin from the valley during the militancy
of civilians/security personnel killed in period.
militant related attacks, rehabilitation of
surrendered militants etc.
9.6 Crime And 13.79 To provide hardware and software to CCTNS project is expected to benefit
Criminal Tracking approx. 16000 police stations, the Crime reporting and Justice
Network & operations and maintenance of the delivery system
System (CCTNS). system and National Data Center. all across the India by providing
central repository of crime data,
electronic registration of Integrated
Investigation forms etc.
9.7 Assistance to 100.00 i) Upgrading Gujarat Forensic Scince This scheme seeks to assist States for
States for University (Total Outlay : Rs.300.00 special projects / programmes in order
Specialized to leverage / optimize programme
projects/ schemes Paterl Global Centre for Security, outcomes of the Modernisation of
for upgrading Police Forces Scheme.
police at Jaipur (Total Central Share :
infrastructure Rs.165.00 crore); iii) Establishment of
ne Hi-tech State FSL at Amravati,
Andhra Pradesh (Total Central Outlay
: Rs.152.00 crore); iv) Special Projects /
Programmes for upgrading Police
Infrastructure, training institutes,
investigation facilities, etc., in North
Eastern States (Total Central Share :
Rs.90.00 crore).
9.8 Special Central 1000.00 Funds would be provided to LWE This scheme will provide public
Assistance for 35 affected States in advance @ Rs.28.57 infrastructure and services, such as :
worst LWE crore per district per annum for three school buildings, anganwadi centers,
affected Districts years for undertaking works proposed Primary Health Centers, drinking

76
by the States as per their requirements. water supply, village roads, furniture
in schools, etc. in 35 districts most
affected by Left Wing Extremism in 7
States.
Critical gaps of emergent nature not
covered under any developmental
scheme will be filled.

9.9 Implementation of 14.50 Development of core e-Prisons Project The Project aims at computerization
e-prison to be included in the ICJS-e-Prisons and of the functioning of all prisons in the
to provide some common facilities to e- country including digitization &
Prisons project. availability of prisoner data (convicts,
Prisions of 10-15 States are expected to under-trial prisoners, detenues, etc,) in
be covered. an electronic platform and will be
accessible to the designated
authorities of Central and State
Governments.
9.10 SRE J & K 25.00 Various welfare and development The scheme will result in promoting
Security activities like holding medical camps,
Environment sanitation drives, sports meets, people through multi-media publicity
distribution of study material to which will help in improving the
children, minor repairs of school situation in the Country. The scheme
9.11 Civic Action Plan 27.50
building, road, bridges will be will halp in boosting the image of
and Media Plan
undertaken. armed force among the common
LWE
people and also help in taking the
local populace in confidence while
deployed in insurgency / militancy
prone areas of NE Region and LWE
affected areas.
9.12 Assistance to 22.50 Will strengthen infrastructure in LWE Operational efficiency and welfare of
Central Agencies affected districts. CAPF security personnel would be
for LWE enhanced.
Management
10. Border Area 770.97 Development of border areas and This scheme will fulfill the special
Development villages. developmental needs of the people
Programme living in the remote and inaccessible
(BADP) areas situated near the international
borders and promote a sense of
security and well being among the
border population.

77
Output-Outcome Framework for Schemes- 2018-19
Demand No. 56: Ministry of Housing and Urban Affairs
(Rs. in crores)
S. Name of Financial Outlay Outputs/Deliverables against Outlay Projected Medium Term
No. Scheme/Sub 2018-19 2018-19 Outcomes
Schemes
A. Central Sector Scheme
Metro Rail Projects
1. Urban Transport Equity- 1. Approximately 190 km of Metro Reduced traffic
including Metro Rs. 2341.00 cr Rail Network is proposed to be congestion and air
Projects, UT Subordinate- commissioned for public during pollution due to modal
Planning Scheme Debt (SD)-Rs. 2018-19. The detail in kms is as
shift from personal motor
& Capacity 1550.00 cr under:-
Building vehicles to public
Pass-through
Assistance transport
(PTA)-Rs. Delhi Metro: 114
10373.60 cr Chennai Metro: 15.5 Reduced passenger travel
Grant Rs. Bangalore Metro: 12.80 time along metro
50.0 cr Ahmedabad Metro: 6.3 corridors
Others Rs. Nagpur Metro: 11.7
685.40 cr Noida Greater Noida : 29.70
Reduced fuel
Total: Rs. Total: 190 km consumption of motor
15,000.00 cr vehicles
a) Delhi Metro Rail 2. For remaining 342 km, various
Corporation works under civil, electrical,
b) Chennai Metro signaling etc. are in advance stage
Rail Corporation as per following details:
Completion of additional
corridors under Phase-3 of Delhi
c) Bangalore Metro Metro.
Rail Corporation Elevated viaduct, station and
d) Ahmedabad Depot completion of Chennai
Metro Rail Metro.
Corporation Phase-2 Civil works to start in all
e) Nagpur Metro 4 Extensions of Bangalore
Rail Corporation Metro.
f) Mumbai Metro Commissioning of Test Track in
Rail Corporation Ahmedabad Metro.
g) Kochi Metro Rail Completion of 2500piers, 400
Corporation

78
h) Lucknow Metro girders, 3 station building and
Rail Corporation one depot in Nagpur Metro.
Via duct construction, Testing
and commissioning of rolling
stock in Nagpur Metro.
Construction of Civil work of
underground packages and to
commence Track work, power
supply & OHE systems, Rolling
stock, signaling &
Telecommunications & other systems
works in Mumbai Metro.

Completion of underground
package of Lucknow Metro.
Construction of civil works in
Pune Metro.
B. Name of Centrally Sponsored Scheme

1. Swachh Bharat Mission 2500.00 No. of ODF towns -2000 Improved cleanliness and
(Urban) Cumulative (Till 2018-19)- reduction in incidences of
3494 ODF towns. diarrhoeal and vector borne
diseases

Waste to Compost Target by 2nd October, 2019


Production 7Lakh Metric
Tonne Cumulative Waste to
Compost Production-20.11
Lakh Metric Tonne 4041 towns to become Open
Defecation free

Waste to Energy Generation


100 MW Total compost production-54
Cumulative Waste to Lakh Metric Tonne per
Energy Generation- Annum
188.42MW
Waste to Energy-511 MW

% of Wards with 100%


Door-to-Door Collection Total Wards 82602i.e 100%
17% (14042 Wards) wards with 100% Door-to-
Cumulative% of Wards Door Collection
with 100% Door-to-Door
Collection 80% (66082
Wards)

2. Smart Cities Mission 6169.00 Formation of SPVs in 10 Smart Improvement in specific


Cities socio-economic indicators of
Smart Road, Street redesign and Smart Cities based on the
Smart parking- 115 projects to be specific development theme
implemented in 60 cities being pursued by 100 Smart

79
Integrated Command and Control Cities.
Centre including digital
intervention 60 projects to be
implemented in 60 cities.

Development and rejuvenation of


public areas including heritage
site - 85 projects to be
implemented in 60 cities

Rejuvenation of Water bodies


riverfront development - 61
projects to be implemented in 55
cities.

3. Atal Mission for 6000.00 Completion of 700 Projects Universal coverage of water
Rejuvenation and Urban of Green Spaces and Parks. supply in all Mission Cities by
Transformation(AMRUT Completion of 50 Projects of 2020.
) water supply. Substantial improvement in
Completion of 15 Projects of sewerage and seepage facilities
Sewerage/seepage in Mission cities.
management. Reduced incidences of Urban
Completion of 15 Projects of flooding in Mission cities.
Storm Water Drainage. Increased amenity value in
Completion of 45 Projects of Mission cities by improved
Non-motorized urban green spaces and providing
transport. parks.
Monitoring and evaluation
of Reform agenda for all 500
Mission cities in order to
identify winner for 10%
Reform incentive of Rs 600
crore.
Implementation of projects
and release of instalment
amounting to Rs. 4,800
crore.
Train 5000 personnel
(elected and official) under
capacity building program in
36 States and UTs in 500
Mission cities.
4. Pradhan Mantri Awas 4514.92 Sanction of Central Mission outreach to urban poor
Yojana (Urban) assistance to 30 lakh houses across all States and UTs.
approved by States
[ISSR, AHP and BLC Completion of 21 lakh Improvement in the living
components] houses by States/UTs condition of urban poor
75% Occupancy of houses including slum rehabilitation
by providing all-weather self-
owned housing units with
adequate basis services and
infrastructure
Securing relevant Sustainable
Development Goals (SDGs)
Improved social security and

80
dignity of life with special
emphasis on women
empowerment
Credit Linked Subsidy 1900.00 Disbursal of home loan Facilitation of institutional
Scheme (CLSS) under subsidy to about 1 lakh credit flow for urban poor,
Pradhan Mantri Awas EWS and LIG a n d Middle lower income group and
Yojana (Urban) Income Group beneficiaries. middle income group
Significant reduction of the
gap between supply and
demand in housing finance
Ensuring involvement of
Financial Institutions in
outreach of housing finance.
PMAY Capacity 59.00 30 (National /Regional / Awareness/Capacity building
Building and A&OE State/city Level)Workshops at State and City level.
including IEC and Preparation of SORs for 3 Skill development and
Technology Sub-Mission new Technologies. spreading awareness in new
Funding of TSM activities like and emerging technologies
(TSM)
global construction challenge. Creation of technical pool of
experts in Cities/Cluster of
Cities to execute Mission
activities
Greater citizen participation
as stakeholder
To mainstream use of
new technologies with global
expertise to fast-track low
cost, sustainable housing.
5. Deendayal Antyodaya 310.00 Formation of 30,000 Self Help Increase in HH income over
Groups (SHGs) baseline, increased access to
Yojana National Urban
Release of Revolving Fund (RF) bank credit, financial
Livelihood Mission to 21,000 SHGs inclusion of SHGs,
Assistance for setting up of Livelihood diversification
(DAY-NULM)
microenterprises (individual Increase in employment through
& group) to 25,000 Urban skill training and placement
poor
Imparting of skill training to
1,50,000 urban poor
Operationalisation of 40 shelters
Completion of Street vendor
survey in 100 cities
Rs 12 crores towards Past
liabilities

81
Output-Outcome Framework for Schemes 2018-19
Demand No.57: Department of School Education & Literacy
(Rs. in crores)

Financial Output/Deliverables
Name of Scheme/ Sub- Projected Medium Term
S.No Outlay against the Outlay
scheme Outcomes
2018-19 2018-19
Centrally Sponsored Schemes
1. Rashtriya Madhyamik Shiksha 4213.00 In-service training of Improvement in quality of
Abhiyan (Integrated) 4.5 lakh teachers and education and learning outcomes;
headmasters enhanced enrolment in secondary
1500 new schools to schools; reduced dropout rate
provide ICT especially for girls and Children
infrastructure. with Special Needs, after
600 new secondary elementary level; provision of
schools. vocational skills in schools

IEDSS: All children


with special needs to
be covered.
Vocational Education:
1000 new schools to be
taken up.

2. Mid Day Meal (MDM) 10500.00 Provision of MDM to Enhanced quality and coverage
9.83 crore children of Mid-May Meal Scheme and
improve nutritional status of
children through supplementary
meal.

82
3. Sarva Shiksha Abhiyan (SSA) 26128.81 Improved availability Improved learning outcomes,
and accessibility to Improved Pupil teacher ratio in
Schools- 96.5% classrooms, less student drop out,
Provision of free Increased admission in upper
education - including primary and secondary classes.
free books and
uniforms-8.22 crore
text books
Quality education
through recruitment &
training of qualified
teachers (permanent
and contractual)- 100%
Inclusion of identified
CWSNs and
marginalised section
(enrolment & quality
education)-75%
State plan & district
annual work plan
prepared and
approved- 100%
Maintenance of and
addition to school
infrastructure

4. Saakshar Bharat 320.00 Basic literacy to 1 Enhanced provision of basic


crore non-literates literacy to non-literates.

83
5. Strengthening of Teacher 550.00 Expanding Improving the overall quality of
Training Institutions institutional capacity various activities of teacher
to provide in-service education institutions
training for secondary (DIET/BIET/CTE/IASE/SCERT)
school teachers-4.5 and strengthening their
lakh functioning.
Training for
Educational
Administrators,
including Head
Teachers Speedy
completion of
DIET/CTE/IASE/SCE
RT projects, which
have been sanctioned
but not completed -
25% of total Head
Teachers
Making DIETs, CTEs,
IASEs sanctioned (and
SCERTs
strengthened),
optimally functional
and operational- 864
Total TEIs
Sanction and
implementation of
new
DIET/CTE/IASE/SCE
RT projects- 1480
Central Sector Schemes
6 National Means Cum Merit 299.74 To allocate about 2.70 Ensuring continuation of
Scholarship Scheme Lakh scholarships to education of meritorious students
(NMMSS) meritorious students of economically weaker sections
(fresh + renewal) of class up to secondary stage and
IX and renewal of reduction in their drop-out rate
scholarships to students
of earlier academic years

7. National Scheme for Incentive 255.90 Covering 8.50 lakh girls Increase in secondary school
to Girl Child for Secondary for covering backlog of enrolment of girls belonging to
Education (NSIGSE) previous years. weaker sections of society, and
reduced dropout rate of girls at
the Secondary stage

84
Output-Outcome Budget for Schemes 2018-19
Demand No. 58: Department of Higher Education
(Rs. in crores)
S. Name of Financial Outputs/deliverables Projected Medium term
No. scheme/ Outlay against the Outlay Outcomes
Sub-scheme 2018-19 2018-19
1 National 1400.00 Major outputs/deliverables include:
Education nhanced Access-Increase in the
Mission: p-gradation of 2 autonomous colleges to enrolment of students In Higher
Rashtriya Universities, and creation of 2 Education across the country-
Uchchatar Universities by clustering of colleges 27.50% ;
Shiksha
Abhiyan aculty Improvement by leadership ncrease in enrolment of SC and
(RUSA) development of academic administrators ST by 22% and 20% respectively;

nfrastructure grants to 15 universities and nhanced Quality Education-


350 colleges Increase in number of teachers
that are recruited-20% ;
0 new Model Degree colleges, and up-
gradation of 35 degree colleges to Model rofessional development training
Degree colleges (need based) to be provided to the
faculty/teachers/administrators;
etting up of 6 new professional colleges
o. of students to complete PhDs
rants to 20 states for research and from institutions supported by
common innovation and quality RUSA-70000;
improvement
nhanced research and innovation
tate Higher Education Plans (SHEP) to be facilities, and courses.
approved/funded-15
5 papers per university will be
rants to be provided to SHEC as per the published in peer reviewed
PAB approvals -2500cr journals by students/teachers;

ll projects of Institutes supported by ncrease in employment


RUSA to be monitored on real-time basis opportunities.
on the web portal of RUSA
2 Interest 2150.00 Increase in the enrolment of students
Subsidy and o Provide full interest subsidy during the in Technical/ Professional Courses in
contribution period of moratorium i.e. course period Higher Educational Institutions across
for Guarantee plus one year, on education loan taken by the country by increasing the
Funds students from economically weaker affordability.
sections.-330000 students to avail loan;

otal no. of accounts to be guaranteed-1.65


lakh

85
3 Scholarship 340.00
for College o. of candidates to be considered for mprovement in enrolment of
and University award of scholarships as sent to MHRD meritorious students from low
students by various State Education Boards- income families successfully
82,000 students; pursuing higher studies;

o. of scholarships to be released during


the FY 2018-19--60,000 Fresh + 73000 ncrease in number of students
renewals =133000 scholarships; from J&K who will be able to
pursue higher studies outside the
tudents to be selected from Jammu & State.
Kashmir through AICTE portal /
Counselling for scholarships -5000 fresh
plus 8450 renewals=13450
4 Technical 275.00
Education o. of Institutes that will publish Annual nhancement in student learning
Quality reports in the prescribed format-75%; No. outcomes and employability.
Improvement of engineering education institutes in
Programme of focus States that will meet the enabling ncrease in average score of
Government mechanisms for participation in the students over previous tests;
of India (EAP) project-87; Enhance quality technical
education in engineering institutes
ffiliated Institutes to participate in newly through strengthening research
designed research-hub related activities- and faculty. Increase in no. of
75; PhD students; Increase in no. of
faculty positions up to the
aculty to be trained in subject domain, sanctioned strength. To increase
pedagogy, or management of the externally funded
participating institutes-2500; projects/consultancy works.
Increase in the research
articipation of Institutions in programme- publications,
175

ransition rate of UG engineering students


from the first year to second year in
participating institutes-55% focus States ,
75% non-focus states;
5 Higher 2750.00
Education ducational institutions to be funded to eduction in direct Government
Financing create state-of-the-art research labs and funding for infrastructure
Agency other infrastructure-6; development.
(HEFA)
mount of Loan to be disbursed-1992 entral Educational Institutions
crore (CEIs) will improve their
rankings;
6 e-shodh 180.00 No. of e-journals and other database that will To provide access to Higher
Sindhu be subscribed - 7980. Education Institutions/Members etc.
to current and archival journals and a
No. of Institutions/Universities which will be number of bibliographic, citation and
subscribing the eSS services-2867 factual databases in different
disciplines from a large number of
publishers.
7 National 150.00
Mission in opics to be covered under new Contents ncrease in the fresh contents
Education created for DTH-4800; produced for DTH;

86
Through ICT
nstitutions to be connected to ncrease in resources in NDL and
Internet/NKN/WI-Fi-350; usage;

umber of institutes to benefit from ICT


projects:-

KN/WiFi-350

-Yantra-300

OSSE-100

irtual Labs-75

8 Pandit Madan 120.00 Establishing Schools of Education in Central In-service teachers will undergo
Mohan Universities -7; capacity building/professional
Malaviya development program through CoE
National Establishing Centers of Excellence for and other institutions set up under the
Mission on Curriculum and Pedagogy which include scheme; Teachers will receive
Teachers and CoSME-6, TLC-3 and FDC-3; training in pedagogical and teaching
Teaching learning methods;
Establishing National Resource Centre for
Education /Higher Education Academy.
9 Programme 125.00 No. of Graduate and Technician (Diploma Graduates/ Technicians will be
for Holder) Apprentices to be identified for equipped with practical knowledge
Apprenticeshi stipend-50,000 and skills required in their field of
p Training
work.

10 Start up India 84.23 6 New research Parks in IITs and 1 at IISc Industry-Academia collaboration will
Imitative in Bangalore to be established. be strengthened, start-up culture will
Higher be promoted, more patents will be
Education
registered, awarded and
Institutes
commercialised.

11 Implementatio 102.00 142 research projects to enter third year of Socially relevant research in premier
n of the activity; institutions will be promoted for
IMPRINT 400 Fresh proposals to be called under benefit of the population.
Research IMPRINT-II
Initiative Research projects/initiatives will be
(Impacting undertaken to address the major
Research science and engineering challenges
Innovation that India must address for inclusive
and growth and self-reliance.
Technology)
12 PM Research 75.00 10,000 Research fellows to be supported
Fellowship through scholarship @ Rs.70,000 for the first PhDs at IITs. To provide the quality
two years, 75,000/- for third year and faculties for CFTIs in future and to
Rs.80,000/- for the fourth and fifth year.
address the shortage of teaching staff.

87
13 Setting up of 90.00 Online courses to be delivered -2500; This will help in achieving the three
virtual Students to be registered for online courses- cardinal principles of Education
classrooms 22 Lakh Policy viz., access, equity and quality.
and massive
Providing Online Courses free of cost
open online
courses in the fields of Engineering, Science,
(MOOCs) Humanities and Social Sciences at
Secondary, Graduate & Post Graduate
levels.

14 Uchhatar 95.00 Research in six identified domain areas in Promotion and scaling up of
Avishkar higher educational institutions approved and innovative solutions.
Abhiyan initiated-65 projects to be approved
15 World Class 250.00 Number of public institutions to be Providing world class education
Institutions identified to get support for becoming world within the country at an affordable
class institutions 10; rate to domestic students.
Number of private institutions to be
Improvement in world rankings of the
identified to get the regulatory freedom 10;
selected Indian Institutions.

16 Support to 40.00 Setting up Community Colleges-74; This will increase the employability
Skill based Identification of 50 host institutions i.e. of the students pursuing higher
Higher colleges/polytechnics; education.
Education Preparation of curriculum for 17 skill
including training areas;
Community No. of National and regional level
Colleges seminars/workshops to be organized to
sensitize the stakeholders who would
ultimately play key role in the
implementation of the Community Colleges
Scheme- 5
No. of students who will complete these
certified skill development courses along
with HE courses- 4778;

17 M Tech 35.00 Top 2000 students admitted in M. Tech or Retention of students in M.Tech will
Programme equivalent programme in IITs/IISc, through be increased. M.Tech students shall
Teaching GATE exam shall be offered the enhanced have teaching experience. This will
Assistantship Scholarship of Rs.25,000/- per month.
help in grooming them as faculty in
future.

18 National 32.00 No. of Design Innovation Centers planned- Provision of Cost effective solutions
Initiative for 3; for society, delivery of products for
Design New students to be enrolled- 9900 the rural part of country; This will
Innovation 50 patents will be filed and 200 innovative
enhance reach and raised standards of
products will be delivered.
design education and innovation in
the country. Increase in patents to be
filed and products to be delivered.

19 Global 30.00 HEIs to be identified and approved for as Development of research /industry
Initiative for Hosting Institutions -190; oriented short duration courses of
Academic Foreign experts to be invited for giving international standard and 100
Network lectures and taking courses-500
Courses to be made available on

88
(GIAN) digital platform for benefit of others.
10000 Students will be benefited
participating in the GIAN
Programmes

20 Prime 30.00 Construction of seven Girls Hostels in J&K. Increase in enrolment and retention of
Minister's 3 in Jammu region, 3 in Kashmir region and girl students in higher education in
Girls' Hostel 1 in Ladakh region. respective regions in J&K.

21 Unnat Bharat 20.00 3000 Higher education institutions will be Building institutional capacity in
Abhiyan connected with a maximum of 15000 HEIs in research & training relevant
villages; to the needs of rural India.
Establish UBA cells in the Institutions.- Addressing key problems in rural
3000; India through use of technology;
Adoption of clusters of Gram Panchayats by Strengthen the technical design of
HEIs in their vicinity-6000 Gram Panchayat interventions in key sectoral areas of
Plans to be studied and inputs to be provided; natural resource management such as
Training of Nodal Officers selected at water and soil, economic activities
institution level-2500 such as agriculture and related
250 technical and 1000 social re-engineering production, or related to crafts and
solutions to be provided for village problems; artisans, infrastructure such as
No. of monitoring reports to be prepared at housing, roads, energy.
the Institution/District/State Government
level once a quarter -1250; This will incorporate knowledge
No. of institutions to be registered on Online inputs into planning and
UBA portal-3,000 implementation levels
No. of practical and sustainable solutions to
be provided to address issues in rural India-
2500;
22 Training and 15.00 Establishment of Centres of Excellence These Centres are expected to trigger
Research in (CoE) for Training and Research in Frontier an R&D culture in the institution as
Frontier Areas areas of Science and Technology (FAST); - evident by significant increase in
17;
applications of research outputs,
No. of seminars, conferences workshops, and
IEC to be organized- 20; collaborative and sponsored research,
There will be focus on new and emerging publications in reputed national/
technologies, multidisciplinary and international journals and
translational research relevant to national conferences, patents, innovations,
development goals. commercialized products and Masters
and PhD enrolments.

23 Higher 16.00 Regular updation of common Centralized The survey will strengthen official
Education portal (aishe.nic.in) for conducting portal Statistical system to produce
Statistics and ey on Higher Education Statistics periodically with
Public
timeliness and quality so as to assess
Information institutions of Higher Education;
System Setting up AISHE Unit in all the State and and review the performance of
(HESPIS) AISHE cell in each Affiliating University to education sector and regional
coordinate All India Survey on Higher divergences across the country.
Education-27 State AISHE Units to be set Institutional Coordination between
up. Ministry and other data producing
Coordination with States and Institutions to agencies will be strengthened.
ensure timely uploading of data and its
authenticity through trained Nodal Officers

89
of Higher Education institutions. Students will be benefitted by
20 training and 10 capacity building creation of Centralized portal which
workshops to be conducted. can provide them with updated
information on higher education
institutions.

Help in policy making in Education


Sector.

24 Establishment 10.00 Establishment of multi-disciplinary research Multi-disciplinary research and


of multi- universities including Central University of innovation in universities will be
disciplinary Himalayan Studies (CUHS) and Centres of promoted.
research Excellence and National Centre for
universities Excellence in humanities
including
Central
University of
Himalayan
Studies
(CUHS),
creation of
Centres of
Excellence
and National
Centre for
Excellence in
humanities
25 National 10.00 To facilitate various academic institutions This will create an enabling
Academic including Universities, Institutions of environment which allows academic
Depository National Importance, School Education institutions to issue academic awards
Boards etc to join and on-board on NAD-600
online and thereby reducing the
institutions to be registered;
To provide various academic institutions, an issuance of paper certificates, degrees
online platform for issuance & storage of etc;
academic awards (degrees, mark sheets,
certificates etc.) digitally-2,50,000 This will ensure credible, convenient
students/institutions to be registered. mechanism for online verification and
1,50,000 academic awards will be added on authentication of academic awards
NAD. and thereby reducing fraudulent
250 verification entities will be registered on practices such as forging of academic
NAD.
awards.

26 National 3.00 To increase the participation of institution in Increase in overall performance of


Institutional NIRF Ranking. Higher Education institutions on
Ranking ranking parameters.
Framework
(NIRF) Help the students/ recruiters to
select the best institutions.

27 National 2.00 50 Polytechnics will apply and utilise fund Creation of disable friendly
Initiative on for inclusion of PWDs students; University/ college campus and
inclusion of classrooms, labs etc.
persons with
disabilities in
higher

90
education
28 National 1.30 No. of National Research Professors Promotion of research work to widen
Research positions to be filled -7; the frontiers of knowledge in
Professors Applications received for selection of eligible specialized areas.
National Research Professors found eligible
and receiving grants for research work
(theme wise) -7 to 20;
National Research Professors to receive
pension under the scheme-6;

91
Output-Outcome Framework for Schemes 2018-19
Demand No. 59: Ministry of Information and Broadcasting

(Rs. in Crores)
S. No Name of the Financial Outputs/ deliverables against the Projected Medium-Term Outcomes
Scheme/ Sub- Outlay Outlay 2018-19
schemes 2018-19
1 Grants-in-aid to 315.70 Modernization and Augmentation To increase the number of listeners and
Prasar Bharati of broadcasting network of All viewers.
including Kisan India Radio and Doordarshan. To improve the quality of
and Arun Prabha Content Development. telecast/broadcast for better viewership.
Channel Augmentation of Civil
Infrastructure.
2 Development 182.00 Radio Spot- 88,521 displays To promote awareness about the flagship
Communication Outdoor publicity-10,400displays schemes of the Government through
and Information Printed publicity- 18 numbers of systematic dissemination of information
Dissemination jobs.
(DCID) Exhibitions- 11,205 numbers of
exhibition days.
Organizing 1 National, 2 Regional

Conclaves with journalist from


rural background and 8 Press
Tours.
16,990 programmes for awareness
up to panchayat level by S&DD.
3 Media 39.83 Creation of Media Hub. IIMC owns campus in different regions
Infrastructure Improving infrastructure of IIMC which seek to promote increased
Development Campuses. educational opportunities to students.
Programme Digitalization of records of RNI. Horizontal and vertical integration of all
(MIDP) Digitization of books published by online operations carried out by DAVP.
including Mass Publication Division. Communication Infrastructure
Communication Upgradation to enable better
connectivity with media.
To promote awareness among people
about the quality publications of DPD.

4 Infrastructure 44.20 CBFC- Operation and maintenance Strengthening of regulatory structure


Development of online certification system Better film-making knowledge amongst
Programme www.ecinepramaan.com and new students
relating to Film website of CBFC.
Sector Up-gradation of civil infrastructure
in institutions.

92
5 National Film 57.78 Preventive conservation and To preserve, conserve, digitized and
Heritage Mission condition assessment of 2,25,000 restore the rich heritage of Indian
(NFHM) film reel collection. cinema for posterity.
2K/4K picture and sound
restoration of 1086 landmark
feature films and 1152 short films.
Construction of state-of-the-art
archival and preservation facilities
for restored material.

6 Development 60.74 Organization of Films Festivals in To preserve, research and promote


Communication India & Abroad. heritage of Indian Cinema and showcase
&Dissemination Production of 3 Features Films & the same.
of Filmic Content 2 Short film including North East. To promote, production of quality films
Dubbing of 12 Films, subtitling of including those in regional languages.
10 films.
Acquisition of films in various
formats and their rights and other
film related ancillary material

93
Output Outcome Framework for Schemes 2018-19
Demand No. 60 Ministry of Labour & Employment
(Rs in crores)
Sl. Scheme Name Financial Output/Deliverables against the Projected Medium Term
No. Outlay outlay 2018-19 Outcomes
2018-19
Central Sector Schemes
1 4900.00 Govt. contributes @ 1.16% of the Providing for pension to the
Scheme, 1995 pay (upto Rs.15000/-) of each members and their family.
member to the Employees' Pension Digitization of Jeevan Pranam
Fund where from pension is paid to Patra.
the members and their family
2 Social Security for 35.00 Govt. contributes @ 1.16% towards Social Security benefits to
Plantation Workers in family pension. Plantation workers.
Assam
3 Creation of National 50.00 Development of Hardware and Provide social security for
Platform of Unorganized Software IT infrastructure to unorganised workers
Workers and allotment of an provide 100% Aadhaar seeded ID
Aadhaar seeded to unorganised workers by 2019-
identification numbers 2020
4 BimaYojana for 50.00 2.5 crore beneficiaries to be Providing Social Security
Unorganized Workers covered benefits to Unorganized
Workers
5 National Child Labour 120.00 (i) To attain new enrolment of Decline in the prevalence of
Project including grants-in- 45000 working children in special child labour and bonded labour
aid to voluntary agencies & training Centres (ii) 45000
reimburse-ment of assistance Children to be mainstreamed for
to bonded labour formal system of education.
6 Labour Welfare Scheme 62.00 (i) Financial assistance for Improving the living conditions
construction of houses will be given of Beedi/ Non Coal Mine/Cine
to 20000 workers (ii) Health care workers; providing better health
facilities to be provided to 16 Lakh care facilities to them and their
workers and their families (iii) families and improving
financial assistance to be given to 4 education-al standards of their
lakh wards of Beedi/Non Coal children.
Mines/Cine workers.
7 Labour and Employment 45.00 Collection, compilation and Availability of up-to-date data
Statistical System (LESS) tabulation of CPI (IW), CPI on employment, prices, wage
(AL/RL), House rent indices, wage rates in rural/urban India.
rate data, Data on change in
employment in selected sectors of
the non-farm sector of the
economy, Data on working
conditions of different segments of
labour.
8 Strengthening of system 13.00 (i) Number of accident reports to be To improve working condition in
&infrastructure of analysed- 80 reports mines through awareness,
DGMS(SSID) knowledge upgrada-tion and
(ii) Number of Alerts & Circulars dissemina-tion of information
(based on all fatal accident analysis regarding risks.
etc.) to be issued -25 nos.

94
Instructions & Technical Circulars/
Guidelines/ Standards/ Protocols on
Occupational Safety and Health in
mines to be issued - 12 nos.

(iv) Number of trainings


programmes on facilitating
preparation of Safety Management
Plan to be held 24nos.

(v) Number of Programmes for


safety awareness in small mines
with the help of state governments
to be conducted 24 nos.
9 Strengthening of DGFASLI 11.00 (i) Commencing construction of Promote Occupation-al Safety
and OSH in Factories, Ports Integrated Knowledge Centre and Health (OSH) and skill
& Docks (IKC) at CLI Mumbai. development of professionals.
Carry out research and
(ii) Upgradation of laboratories / development in OSH in the
SHE Centre-2 labs. Northern part of the country.
Development of centre of
(iii) Setting up of webinar centre at excellence in safety systems and
RLI Chennai. chemical process units.
Improve OSH with modern
(iv) Conducting National level testing facilities as per
seminars/ workshop on OSH. International standards.
Availability of Regional Labour
(v) Capacity building/Training of Institute for NER.
Officers-15.

(vi) Inspection in ports- 1500.

(vii) Conduct of training programme


for small and medium
enterprises

(viii) Commencement of construction


of the building for RLI,
Shillong
10 Strengthening of 10.00 Speedy adjudication of industrial Improved Industrial Relations
Adjudication Machinery and disputes, through Central Govt. and addressing of Labour
holding of Lok Adalats Industrial Tribunals-cum-Labour Grievances
courts, arising in industrial
establishments in central sphere.
During 2017-18, these Tribunals
disposed of 1822 cases against
fresh receipt of 1225 .
11 Machinery for Better 32.11 Claim cases-5770, Improved Industrial
Conciliation, Preventive Inspection-33830, Relations.Preven-tion and
Mediation, Effective Training-140, settlement of industrial disputes
Enforcement of Labour Industrial Disputes-8070 in central sphere, enforcement of
Laws, Chief Labour labour laws.
Commissioner

12 DattopantThengadi National 90.00 3.63 lakh different categories of Creating awareness among
Board for Workers Workers to be trained workforce; evaluation of

95
Education and programmes
Development(ErstwhileCB
WE)
13 V.V. Giri National Labour 15.35 22 Research and 130 Training Creating awareness among
Institute Programmes to be conducted workforce; evaluation of
programmes
Centrally Sponsored Schemes
1 Pradhan Mantri Rojgar 1652.09 5 lakhs jobs to be created through Creation of New Jobs
Protsahan Yojana (PMRPY) incentives to employers.
2 National Career Services 109.80 Interlinking of 997 Employment Connecting Employers and Job
(NCS) Exchanges, 1000 job fairs at district Seekers
level, training to 1000 Employment
Officers on NCS.

3 Employment Promotion 13.90 Intake-3200, Evaluation-31000, Training of PwDs and their


Scheme Rehablitation-11500 rehabilitation
4 National Career Service 22.00 Vocational guidance-140000, Mainstreaming of marginalised
Centre for SC/ST (erstwhile Competitive guidance-11000, section
CGCs) Special Coaching-1300, Computer
Training-3900

96
Output Outcome Framework for Schemes 2018-19
Demand No. 61- Ministry of Law & Justice
(Rs. In Crore)
Sl. Name of Scheme Financial Output/ Deliverables against the Outlay Projected Medium
No. Outlay 2018-19 Term Outcomes
2018-19
1. Centrally Sponsored 630.00 Construction of 600 Court Halls and 350 Strengthening the
Scheme (CSS) for Residential Units is to be started during the availability of Judicial
Development of year 2018-19. Infrastructure in the
Infrastructure States enabling them
Facilities for Judiciary expeditious and
efficient disposal of
pending cases in courts
2. E - Court Mission 480.00 Additional hardware for 3477 remaining As mentioned in
Mode Project Phase courts. previous column.
II Computerisation of 709 new courts.
Computerisation of 1738 expected courts.
Technical infrastructure for Court
Complexes: Process servers in 3,304 court
complexes, site preparation of 2,916 court
complexes.
Cloud Connectivity: all 20,000 courts will
be migrated to cloud architecture.
WAN Connectivity in all 3,500 Court
Complexes will be connected to National
Judicial Data Grid (NJDG).
Solar Energy in 41 Court Complexes.
Software Development : Roll out of CIS 3.0

97
Output-Outcome Framework for Schemes 2018-19
Demand No. 64 : Ministry of Micro, Small and Medium Enterprises
(Rs. in crores)
S. Name of Scheme / Sub- Financial Outputs/ deliverables Projected Medium Term Outcomes
No Scheme Outlay against the Outlay 2018-19
2018-19

Central Sector Scheme


1 1,800.64 i)88,000 number of projects to i) Continuous and sustainable
Generation Programme be set up employment.
(PMEGP) and BFL
ii) 7.04 lakh employment to ii) Performance of scheme in backward
be generated States including NER.

iii) Awareness Camps, iii) Arrest migration of rural youth.


exhibitions, bankers meeting
and publicity, etc.
2 Modified Market 306.00 1,500 Khadi institutions to be i) Improvement in production and
Development Assistance benefited. sales of khadi and khadi related
(MMDA) & setting up of products.
Khadi plazas 15.00 5 Khadi plazas to be set up
ii) Increase in wage earning of
artisans.
3 Credit Linked Capital Subsidy 410.50 4,100 MSMEs to be benefited Improvement in productivity and
Scheme(CLCSS) product quality as well as increase in
sales turnover of beneficiary units

4 Performance and credit rating 5.00 1,600 MSEs to be rated Improved access to loans by MSMEs
scheme(PCRS) with higher sanction limit.
Increased productivity of MSMEs
Instilling a sense of confidence among
the buyers of MSEs products/ Services

5 MSE-Cluster Development 279.00 i) 10 CFC to be commissioned Competitiveness of industrial clusters


Programme (MSE-CDP) would be enhanced with improvement
ii) 200 Nos. of MSEs to be in production, turnover and
benefited profitability of units over a period of 2
years
iii) 8 New / upgraded
industrial estate

iv) 160 Nos. of MSEs to be


benefited
6 Technology Centres [earlier 100.00 i) 1,81,500 Nos. Trainees to (i) Higher employable skills of trained
known as Tool Rooms and be trained. individuals would enhance
Tech. institutions (TR&TI)] employment prospects.
(ii) Business & technical advisory
ii) 38,500 Nos Units to be services to MSMEs would enhance
assisted. their competitiveness and productivity.

98
7 A scheme for promotion of 232.00 (i) 100 Livelihood Business Promotion of innovation,
innovation, rural industry and Incubators (LBI) to be setup entrepreneurship and agro industry.
entrepreneurship (ASPIRE)

(ii) 20 Technology Business


Incubators (TBI) to be setup
8 Assistance to training 30.00 i) 9 training institutions and 3 Better skilling following improved
institutions (ATI) State level EDIs to be capacity and physical infrastructure of
supported. training institutions.

ii) 8,000 persons will be given


skill training.

9 Scheme of Fund for 125.00 Setting up of 60 clusters (i) Improvement in the sustainability
Regeneration of Traditional and competitiveness of clusters.
Industries (SFURTI) ii) Organization of traditional industries
and artisans into clusters.
iii) Sustained employability for
traditional Industry artisan and rural
entrepreneurs
iv) Increase in wages of artisans.
10 Credit Guarantee Scheme 700.00 i) 5,08,010 credit proposals to Access of MSEs to credit would be
(CGS) be supported. enhanced

ii) Rs. 55,950 Crore of credit


guarantee to be approved

11 Zero Defect Zero Effect 200.00 5,000 no. of units to be No. of Units assessed / re-assessed
(ZED) assessed / reassessed.

12 Coir Udyami Yojana (CUY) 10.00 480 units to be set up i) Continuous and sustainable
employment.

ii) Better performance of scheme in


backward States including NER.

iii) Arrest migration of rural youth.

99
Output-Outcome Framework for Schemes 2018-19
Demand No.65 Ministry of Mines
(Rs. in crores)

Name of the Financial


S. Output/Deliverables against the Projected Medium Term
Scheme/Sub Outlay
No. Outlay 2018-19 Outcomes
scheme 2018-19
1. Science 8.25 Project proposals from: Government Enhancing capabilities in
&Technology institutions, public sector undertaking, sustainable development
Programme universities etc. peer reviewed by a Group of mining in the country
of Experts constituting and Project
Evaluation &Review Committee (PERC).
Suitable projects are approved by Standing
Scientific Advisory Group (SSAG)

100
Output-Outcome Framework 2018-19
Demand No. 66: Ministry of Minority Affairs
(Rs in crores)

S. NameoftheScheme/Sub- Financial Outputs/ Projected medium termsoutcomes


No. Scheme Outlay Deliverables
2018-19 againstthe Outlay
2018-19

CentralSector Schemes
Umbrella Programme
A.1. Educational Empowerment

1. Pre-Matric Scholarship 980.00 30 lakhstudents Increase in enrolment rate of school going


Minority girl children.

Increase in the girl students passing X


class.

2. PostMatricScholarshipfor 692.00 5.00 lakh students Increase in enrolment rate of school going
Minority girl children.

Increase in the girl students passing XII


class.

3. Merit-cum-means based 522.00 60,000students Increase in the number of girls students


scholarship for professional receiving scholarships for professional
and technical courses- and technical courses- undergraduate and
undergraduate and post-
post- graduate.
graduate

Number of students who completed such


courses.

Number of girl students who completed


such courses.

4. Free Coaching &Allied 74.00 12000 students Increase in number of girl


Scheme for Minorities studentscompletingcoaching

Increaseinnumberofstudentswhoqualify for
Medical/Engineering/MBA etc.

Increaseinnumberofcandidates qualifying
in various competitive examinations for
Govt. Jobs.

5. Support forstudents clearing 8.00 2000 students Increase innumber of candidates selected
prelims conducted by UPSC,

101
SSC, State PS Commissions in the competitive examinations conducted
etc. by UPSC, SSC and State PSCs.

Increase innumber of g i r l students


selected in the competitive examinations
conducted by UPSC, SSC and State PSCs.

6. Interest subsidy on education 24.00 400students Increaseinnumberofstudentswhocompleted


loans foroverseas studies overseasstudies.

Increaseinnumberof girl
studentswhocompleted overseasstudies.

7. Maulana AzadNational 153.00 1000 students Increaseinnumberof studentsawarded PhD.


Fellowship for minorities Increase in number of girl students
students awarded Ph.D.

A.2. Skill Development

8. Seekho aur Kamao - Skill 250.00 1,30,000 Increasein numberof minority youthin
Development Initiatives minority youth wage employment andthereby
increasingworker Participation Rate of
minority.
9. Upgrading Skillsand 30.00 3800 minority Trainingofminority youth in
Trainingin Traditional youth and Traditionalcrafts/arts with a view to
Arts/Crafts for Development organizing 4 Hunur promote such crafts and generation of
(USTAAD) Hats covering 600 employment and income.
Artisans
10. NaiManzil- TheIntegrated 140.00 30,160 school Bringing backschooldropoutstoeducation
educational andLivelihood dropouts systemandmaking thememployable.
initiatives

A.3. Special Programmes of Minorities

11. Scheme for containing 4.00 -- Percentage increasein births in the


population decline of small Parsicommunity (year- on-yearbasis).
minority community

12. Scheme of leadership 15.00 50,000minority Increase in number of sensitized and


Development of Minority women empowered women and enable them to
women avail benefits undervarious schemes.
13. Hamari Dharohar for the 6.00 2 exhibitions Item wise number of activities completed
conservation and protection for conservation and protection of culture
of culture and heritage on and heritage related to Minorities.
Minorities

14. Research/studies, 55.00 10 Research studies Number of research studies/evaluation


Monitoring and Evaluation and 20 workshops completed and findings/recommendations
of Development Schemes studies and evaluation.

102
for Minorities including
Publicity.
A.4 Grants to Autonomous Bodies / PSEs
15. Grants-in-aid to Maulana 125.01 Rs.30.00 crore for Increase in number of institutions with
Azad EducationFoundation grants-in-aid to basic educational infrastructure and
NGOs. facilities after receiving the grants.

Increasein enrolment in the assisted


educational institutions on account of
additional academic infrastructure.

16. Contribution to the Equity 165.02 Disbursement of Rs. Percentage of term loan beneficiaries who
of National Minorities 550 Crore as loan to have repaid loan in full in loan term period
Development and Finance 1.22 lakh of past five year and six months.
Corporation(NMDFC) beneficiaries.
17. Grants-in-aid to State 2.00 Financial assistance Increase in recovery rate.
Channelizing Agencies to 20 SCAs. Reduction in NPAs.
(SCAs) Engaged for
Implementationin National
Minorities Development and
Finance Corporation
(NMDFC)Programme

18. Computerization of records 20.10 -- Increaseindigitization of records of


and strengthening of State Waqfproperties, State-wise, and item-wise.
Waqf boards/ GIA to Waqfs
Centrally SponsoredSchemes

19. Development of Minorities: 1320.00 -- Increase innumber of School


Multi-Sectoral Development buildings/Degree colleges/ additional
Programme for Minorities class rooms/ Hostels / toilets /
(MsDP) Anganavadi Centres / drinking
waterfacilities/IAY units
constructedunder MsDP and
functional/in use.
Improvement inLiteracyrate-
overall & female,Work participation
rate- overall& female,and safe drinking
water & electricity.

103
Output Outcome Framework for Schemes2018-19
DemandNo.67: Ministry of New & Renewable Energy (MNRE)
(Rs in crores)
S. No NameoftheScheme / Financial Outputs/Deliverable ProjectedMedium
SubScheme Outlay against theOutlay Terms Outcomes
2018-19
2018-19
CentralSector Schemes
I. Grid-Interactive Renewable Power
1 WindPower 750 4000MW(The amount is for Increasing
past liability for GBI Renewable Energy
Scheme, which has been shareto17% in total
discontinued from 1st April, Power Generation
2017)

2 Small Hydro Power 207 250 MW (Commissioning of


small hydro power generation
capacity in the country)
3 Biopower ( Scheme to support 25 370MW (Commissioning of bio
promotion of biomass power & power generation capacity in
Bagasse cogeneration in sugar the country including off grid)
mills and Waste to Energy
program)
4 Solar Power 2045.25 11000 MW(Commissioning
of solar power generation
capacity in the country
including 1000 MW from
solar rooftop)

5 Green Energy Corridors 600 Commissioning of cumulative Tocreate about 8553


3000 ckm in 8 implementing CKMs grid lines to
RE rich states evacuate renewable
power from dispersed
renewable generation
locations in 8
Renewable Rich States
6 Externally Aided Projects 7.25 Promotion of two projects namely:
1. UNDP/GEF project on scale up of Access to Clean
Energy for Rural productive uses: project Activities
related to access to energy for increasing livelihood of
the poor in remote villages in UNDAF states.
2. IGEN- Access under Indo-German Bilateral Program:
project activities related to development of conducive
environment and removing market barriers for rural
energy enterprises to prosper and provide energy and
energy products/services.
7 Interest Payment and Issuing 128 Payment of interest towards bondsissued/to be issued by
Expenses on the bond IREDAfor Implementationof RE Projects.
II. Off-Grid/Distributed Renewable Power

104
8 Solar Power (following devices 848.50 Solar PV- 200 MWp & CST Decentralized
will be promoted-Solar Street 20 MWeq generation of renewable
Lights,Solar Home Lighting power for meeting
System,Solar Lanterns, Solar energy requirement on
Pumps etc. Further CST systems distributed basis.
will also be promoted)

9 Small Hydro Power (Water 11.50 500 (Nos.)


mills/micro hydel)
10 Bio Power 23 (since both the schemes of Biomass power/bagasse
cogeneration and Waste to Energy are being rationalized, the
total target of 370 MW under both off grid & grid schemes
have been indicated at column 3)

11 Wind Power 7.50 Small wind energy & hybrid systems program is being
discontinued from this financial year. The budget is required
for clearing pending liabilities only.
12 Biogas Program (family type bio 135 To install one lakh bio gas Providing alternate cooking
gas plants & off-grid biogas plants fuel solutions to one lakh
projects for family/ families/
community/institutional uses) community/institutional

13 Other Renewable Energy 11 To support States for Promoting energy efficiency


Applications (Solar Cities Green creation of Suitable and conservation &
Buildings etc. including Support to Framework Accessibility to Clean
States, Demonstration of Renewable Energy for domestic usage
Energy Applications, Cook-stove
etc.)
III Research & Development
14 Research & Development 94 R&D Projects are continuous
in nature. Likely to continue energy systems / devices
beyond 2018-19. Around 15 affordable, convenient, safe,
projects in different RE and reliable apart
sectors will be undertaken in -
each year up to 2021 competitive.

applications competitive

indigenously designed and


manufactured RE systems/
devices

for RE sector

IV. Supporting Programmes


15 Monitoring/Evaluation and Other 0.30 To Carry out Evaluation and other Studies in Renewable
Studies Energy Sector
16 International Relations 55.00 International Co-operation including Investment Promotion
and assistance to International Solar Alliance
To Support pilot project & training programs in ISA and other
developing countries.

105
17 Human Resources Development 60.00 Training of 20,000 Training of 20,000
and Training Suryamitras, Awarding 800 Suryamitras, Awarding 800
NRE Fellowships and various NRE Fellowships and
short term training various short term training
programmes. Lab up programmes. Lab up
gradation of 10 institutes. gradation of 10 institutes.

18 New & Innovative Projects 0.20 Support/Establishment to Centre for Innovation, Incubation &
entrepreneurship initiatives for innovation and
entrepreneurship
19 Information, Education and 15.00 Demonstration of RE Create awareness among the
Communication applications, Information to public.
Public and education
institutions
20 Information Technology/e- 0.10 For creating e-Governance infrastructure in offices and its
Governance and other initiatives operation & maintenance.

106
Output-Outcome Framework for schemes 2018-19
Demand No. 68: Ministry of Panchayati Raj
(Rs. in crores)
S. Name of the Financial Outputs / deliverables against Projected Medium term
No. Scheme Outlay the outlay Outcomes
2018-19 2018-19
1 Action Research 3.00 Identification of themes and Request for proposal are floated.
number of projects by the PAC Award of studies.
Sanction of studies on the Processing finalization of ongoing
themes identified studies.
Completion of on-going studies

2 International 0.20 Deliverables under the scheme To contribute and learn through
Contribution are not quantifiable. interaction and exchange of ideas
with other Commonwealth
countries in decentralization,
devolution and local governance.
3 Media & Publicity 15.00 Celebration of National Facilitating a national platform for
Panchayati Raj Day 2018 dialogue between the Ministry
Common quarterly and other key stakeholders of
Panchayats.
Ensuring that all Elected
Social Media Interventions Representatives (ERs) as well as
functionaries of Panchayats have
adequate & appropriate
awareness and knowledge to
discharge their functions in an
efficient manner.
Facilitating a platform for two-
way communication. Forum for
free, frank, regular and serious
discussion on the issues relating
to Panchayati Raj Awareness
among policy makers,
academics, experts about the
ground level path-breaking
initiatives taken by PRI.

107
4 Capacity Building 720.80 Capacity Building and Ensure that all Elected
(CB PSA)/ Training Representatives (ERs) as well
Rashtriya Gram Enhanced capacity and as functionaries of Panchayats
Swaraj Abhiyan technical knowledge of have appropriate knowledge
(RGSA) functioning of PRI system and skills to discharge their
Strengthening GP functions
infrastructure in States GP infrastructure for delivery of
Strengthening Institutional services by Panchayat. The
Infrastructure for Training( activity proposed in new
State Panchayat Resource restructured scheme The
Centers and District activity involve new
Panchayat Resource construction, repair and
Centers) additional hall for Comman
Model Panchayat service centers.
development for best Ensure that Training institutes
practices become functional and are put
Technical and technology for use for imparting training
driven support to Creating models of best practices
Panchayats for e- in Panchayats
enablement Making Panchayats e-enabled
GPDPs prepared in Utilization of available resources
participatory and inclusive more effectively to achieve
manner well-defined objectives
5 Incentivization of 46.00 Conferring Panchayat Awards Since the awards are given on the
Panchayat to Panchayats under under National Panchayati Raj Day
Deen Dayal Upadhyay celebrated on 24th of April every
Panchayat Sashaktikaran year, the processes for selecting
Puraskar (DDUPSP) and Nanaji the awardees are to be completed
Deshmukh Rashtriya Gaurav before that date. Objective is to
Gram Sabha Puraskar improve performance of
(NDRGGSP) on National Panchayats and create an eco-
Panchayati Raj Day celebrated system for overall good
on 24th of April every year. governance at the local level.
6 Mission Mode 20.00 (i) (Updated version of PES Improvement in transparency,
Project on E- applications (accommodating accountability and efficiency in
Panchayat all requests of States) and their the working of Panchayats.
implementation across
Panchayats in the country. Develop national, unified
dashboards to provide aggregated
(ii) Updation of Local data from various sectors at
Government Directory (LGD) Panchayat level.
to serve as the standard
location code directory for all
beneficiary-oriented e-
Governance programmes in the
country; and its mapping with
other e-governance
applications/directories in the
country.

(iii) Uploading of all GPDPs


for 2018-19 on PlanPlus and
integration with the
corresponding State-specific
applications.

(iv) Uploading account details


of all PRIs in PRIASoft and
integration with the
corresponding State-specific

108
applications.

(v) Imparting refresher


trainings to Master Trainers on
PES applications.

109
Output-Outcome Framework for Schemes 2018-19
Demand No.72: Ministry of Petroleum and Natural Gas

(Rs. in crores)
S. Name of the Financial Outputs/Deliverables against the Projected Medium Term Outcomes
No Scheme/ Sub- Outlay Outlay 2018-19
scheme 2018-19

Central Sector Schemes


1. PAHAL 16477.80 All LPG Subsidy beneficiaries to be Direct Transfer of Subsidy to consumer's
linked to Aadhaar Enabled Payment account will lead to efficiency and
System (AEPS) avoidance of leakages.

2. DBTK 96.00 All kerosene consumers receiving Direct Transfer of Subsidy to consumer's
subsidy through DBT platform to account will lead to efficiency and
be migrated to AEPS avoidance of leakages.
3. Ujjwala (LPG 3200.00 2Crore LPG connections to Providing clean Cooking solution to poor
connections to women members of rural BPL households.
BPL households) households
4. ISPRL-I (Crude 700.00 Filling of crude oil in Mangalore To augment 14 days worth of strategic
filling) and Padur caverns towards creation crude oil storage on import basis
of strategic petroleum reserves
5. ISPRL-II 1.00 Construction of caverns in To enhance storage capacity
(Construction) Chandikhol and Padur

6. JHBDPL (new 1674.00 Construction of gas trunk pipelines: The cities which may be covered by gas
scheme) 400 km supply including industries are the
following:
Patna
Varanasi
Ranchi
Jamshedpur
Cuttack
Bhubaneswar

7. IIPE, 32.00 Setting up of IIPE at 178 students enrolled in 2016-17 & 2017-
Visakhapatnam Visakhapatnam 18 for 2 disciplines namely
B.E(Petroleum Engineering) & B.E
(Chemical Engineering) under temporary
campus. IIPE Act notified in the Gazette
of India on 08/01/2018

110
Output-Outcome Framework for Schemes 2018-19
Demand No.73: Ministry of Planning
(Rs. in Crores)
S. Name of the Scheme/ Financial Output/Deliverables against the outlay Projected Medium Term Outcome
No. Sub-Scheme Outlay 2018-19
2018-19
1 Atal Innovation 200.00 Rapid transformation of Innovation
Mission (AIM) Grants-in-Aid to new grantee and entrepreneurship eco-system in
including Self institutions that are selected in 2017- the country.
Employment and 18:
Talent Utilization a) Setting up 600 New Atal Tinkering
(SETU) Labs (ATLs) from the selection of
1500 schools done in 2017-18 under
compliance as per ATL guidelines.
b) Support to 21 Established Incubation
Centres selected in 2017-18 which are
under compliance as per EIC
guidelines Atal Incubation Centre
(AIC).
c) Support to 11 Established Incubation
Centres (AICs) selected in 2017-18
which are under compliance as per EIC
guidelines.
Subsequent Tranche of Grants-in-Aid
to grantee institutions that are selected
in 2016-17 and 2017-18:
a) 700 ATLs
b) 12 AICs
c) 2 EICs (2nd Tranche)
d) 6 EICs (3rd Tranche)
Launching 18 New Atal New India
Challenge/Atal Grand Challenge.
2 Research and Study 3.23
2 25 Research Studies, 15-20 To stimulate and encourage research
Seminars/Workshops proposals are and studies deemed necessary for
expected to be approved during this achievement of the c
financial development objectives.
3 United Nations 0.10 A workshop to familiarize the activities Progress towards attainment of
NITI Aayog planned under the United Nations United Nations Sustainable
Strategic Sustainable Development Framework Development Goals
Partnership Project 2018-2022

111
4 Plan Formulation 30.00
and Appraisal and To conduct various meetings like (i) Data from States/stakeholders
Review Governing Council, Consultation by March, 2018 (ii) Preparation
Meeting with States on state-specific and release of Index by April
subjects. 2018
To undertaking various activities like (i) Issue of RPF by end of
Studies on Assistance to States for February 2018 (ii) Finalization of
preparation of Vision Document of Consultancy service and signing
NITI Aayog. of contract by April 2018 (iii)
Beta version of Project by
Development Support Services of States November 2018 and ((iv) Portal
(DSSS), Hiring Professional Services, to be opened for public use by
consultations with stakeholders on February 2018
SDGs, Biogas, Bio-Fuel etc,
Seeding destructive technologies
To hire the services of in high impact areas
Consultants/Experts for a limited
duration to provide high quality services Policy formulation
for specific and time-bound tasks, for
which general experts is not available Road-map for holistic
with the NITI Aayog. development of islands
(i) Providing technical manpower
Legal/Technical Consultants fee for support for implementation of
review and vetting of the concession MIS Database (ii) Providing
agreement/feasibility report of Public technical manpower support for
Private Partnership (PPP) Projects IT Programme (iii) Expenditure
received from various Ministries, States on preparation of photo albums of
and statutory entities in accordance with the Conference on National
the guidelines for financial support to Initiatives held on 16.2.2017 (iv)
PPPs in infrastructure To provide hospitality, sitting fee
and TA/DA for Non-Official
Development and release of Index in
Members (v) For study, design,
public domain.
development & maintenance of
Development of the web portal with all Knowledge Government Best
its intended features. Practices.
Risk assessment and overcoming the
barrier to application of destructive
technologies.
To conduct research and study to
formulate policy/status report in
Transport Sector
Concept development plans and
detailed master plans (balance 9 reports)
(a) Implementation of MIS database (b)
Implementation of various IT
Programme (c) Arbitration and
enforcement in India Conference (d)
Expenditure on various Task Force on
Methanol Economy and (e) Digital Hub
for Govt. Best Practices for NITI
Aayog.

112
Output-Outcome Framework for Schemes 2018-19
Demand No. 74: Ministry of Power

(Rs in crores)
S. Name of the Schemes/Sub- Financial Output/Deliverables Projected Medium Term
No. schemes Outlay 2018-19 against Outlay 2018-19 Outcomes

A Central Sector Schemes


1 National Hydro Electric 482.00 Commissioning & Post Generation of 1706 MU which
Power Corporation Ltd. Commissioning work of 330 will be fed to Northern Grid
(capacity Addition in MW cpacity from out of which 13% (including
MW) Kishanganga HEP (total 1% for local area development)
capacity 330 MW). Post will be free power to J&K
commissioning balance
works and payment of
liabilities of Nimoo Bazgo
(45 MW)
2 Tehri Hydro Development 52.00 1. Excavation for Dam left 1. Completion of excavation
Corporation (THDC)- abutment (Balance portion) for Dam leff abutment of
9capacity Addition in MW) after river diversion of Vishnugarh Pipalkoti HEP (444
(Vishnugarh Pipalkoti HEP Vishnugarh Pipalkoti HEP MW) 2. Completion of overt
(444 MW) (444 MW) 2. Overt lining lining in intake tunnel-1 of
work intake tunnel 1 of Vishnugarh Pipalkoti HEP (444
Vishnugarh Pipalkoti HEP MW)
(444 MW)

3 North Eastern electric 267.45 Commissioning & Post Generation of 506 MU of Pare
Power Corporation commissioning balance work HEP, 250 MU of Tuirial HEP
(NEEPCO) (capacity of Pare-HEP (110 MW). will be fed into Grid
Addition in MW) Commissioning (CoD) and
post commissioning balance
work of Tuirial HEP
(60MW)
4 PakulDul HEP under J&K 100.00 1. Execution of R&R Plan 2. Awarding of contract to civil
PMDP-2015 Civil, HM and EM works work and starting of civil
works
5 Deen Dayal Upadhyaya 3800.00 intensive Electrification Access to quality and reliable
Gram Jyoti Yojana of Electrified Villages: power. Supply will improve.
100000 (No. of Villages) Quality of life of people and
Feeder Separation facilitate effective delivery of
including new 11 KV essential services like
Lines; 100000 (Circuit education, health,
Kms) communication etc. in rural
Commissioning of areas. Feeder separation will
Sugstations (New & facilitate assured power supply
Augmentation): 600 Nos to farmers resulting in
enhanced agricultural
production. Availability of
reliable electricity services in
rural areas will also facilitate
economic activities and
generate direct as well indirect
employment.
6 Saubhagaya (Sahaj Bijli Har 3700.00 Electricity connection to Electricity connection to rural
Ghar Yojana households: 175 Lakh households
Households

113
7 Integrated Power 3985.00 IPDS work completion as (i) Progress under IPDS system
Development Scheme under: strengthening works would
(IPDS) 33/11 KV substations lead to reliable power supply,
(Numbers): 250 improve quality of life of
HT/LT Lines (Kms): 6000 citizens in urban areas as well
Ariel Bunch Cables (Kms): as improve quality of power
5000 supply to industries.
Under Ground Cabling (ii) IT phase-I SCADA works
(Kms): 1500 progress would lead to
Distribution Transformers systemization of work flows in
(Nos): 10000 utilities and held address
outages in a better manner.
IT interventions under IPDS (iii) IPDS Phase-II works in
in Urban Census (2011) progress would scale up
towns (Number of towns): interventions of IT enablement
350 across smaller urban centres

Verification of Part A (IT)


old projects completion by
TPIEA-IT (No. of town): 450

SCADA under Part A


completion (No. of towns):
26

8 Bureau of Energy 103.37 Implementation of Schemes Targeted savings of 15.00


Efficiency of Standards & Labeling, Billion Units of energy during
Energy Conservation 2018-19
Building Codes and
Strengthening of SDA for
Energy Efficiency and
Demand side Management in
areas of Agriculture,
Municipalitities and SMEs
9 Energy Conservation 55.00 Implementation of Schemes 2 workshop at national & state
of (i) Energy conservation level each. Savings of
awareness, Painting electricity of 3 billion units.
Competition and national EC
Award (ii) national Mission
on Enhanced Energy
Efficiency, Bachat lamp
Yojana and super Efficient
Equipment Programme.
10 220 KV Transmission Line 500.00 Project will be completed by Project will be completed by
from Srinagar to Leh via Sept. 18 and it will provide Sept. 18 and it will provide
Kargil Northern Grid Connectivitiy Northern Grid Connectivitiy to
to Ladakh Region Ladakh Region
11 Power System Improvement 282.50 * 100% packages will be * 100% packages will be
in North Eastern States awarded * awarded *
excluding Arunachal 40% of total civil and 30% of total civil and
Pradesh and Sikkim electromechanical works will electromechanical works will
be completed be completed
12 Strengthening of 300.00 * 100% packages will be * 100% packages will be
Transmission System in the awarded * awarded
States of Arunachal Pradesh 55% of total civil and * 30% of total civil and
and Sikkim electromechanical works will electromechanical works will
be completed be completed

114
13 Power System Development 544.00 * Proposal for 101 projects Award of works for 31 projects
Fund (PSDF) to be met * Sanction issued for 85 to be completed.
from PSDF Fund projects & award for 54
projects to be completed
* Remainig 31 projects
award will be done by Sept.
18
14 Central Power Research 150.00 (i) Augumentation of The augmentation of test
Institutue, Bengaluru Research and Test facilities facilities for electrical
for Capacitors and their equipment enables testing of
applications (ii) Upgradation electrical equipment as per
& Augmentation of High latest standards which will
Voltage test facilities enhance reliablity of power
(iii) Refurbishment of system network. The
Generator at HPL Bengaluru upgradation of non destructive
for sustaining testing and test facilities will enhance
prolonging the life consultancy activities at
(iv)Refurbishment of short Thermal Power Stations.
circuit test facilities for
testing of Distribution
Transformers
(v) Augumentation of on-line
Generator based testing
facility including
supplimentry and sample
handling test facilities at
STDS-CPRI Bhopal
(vi) Enhancing of existing
testing facility for testing of
transformer oil & setting up
of test facility at other units
of CPRI
15 National Power Training 100.55 Renovation, modernization Renovation, modernization
Institute, Faridabad upgradation and upgradation and augmentation
augmentation of existing of existing training facilities
training facilities and setting and setting up of new institutes
up of new institutes at at Alazpuzha (Kerala) and
Alazpuzha (Kerala) and Shivpuri (MP) will enhance the
Shivpuri (MP) capacity for training to the
Power Sector Engineers &
Consultancy Services
16 Smart Grid 5.50 Completion of smart grid Increased reliability and
projects: 1 AT&C loss reduction ( in
Smart metering prominent
projects)

115
Output Outcome Framework for Scheme 2018-19
Demand No. 80: Ministry of Railways
(Rs. in crores)
S. Name of the Financial Outputs/ Deliverables Projected Medium Term Length
No. Scheme/Sub Scheme Outlay 2018- against the Outlay 2018-19 Outcomes (in km)
19
Central Sector Scheme
1 New Lines 28490 1000 Route KM (RKM) Sections planned for commissioning includes
Alirajpur- Jobat 24
Bathnaha - Nepal Custom Yard 8

Biharsharif Barbigha 25.8


Bukru Shivpur 19
Dhansiri- Sukhovi 16
Gangavathi-Karatagi 28
Jhalarapatan-Aklera 40
Kharsia to Dharamjayagarh 74
Khuntla-Deedwana 45.45
Koderma Jharahi 15.4
Obulavaripalle- Venkatachalam 95
Sidhwar Shanki 26.4
Tangani Dhamalgaon and Y- 17.25
connection
2 Gauge Conversion 4016 1000 Route KM (RKM) Bhandarkund - Bhimalgondi 20
Dabhoi-Chandod 18
Dungarpur - Raighadh 70.73
Jaipur-Govindgarh 40
Jaynagar - Janakpur - Kurtha 34
Jhanjharpur-Ghoghardiha. 20
Khandwa Byepass (Ajanti to 9
Mathela)
Nainpur-Palari 30
Sabarmati-Kalol 20.64
Samnapur-Nainpur 60
Sanawad-Attar 25
Vadnagar-Taranga Hill 24.4
3 Doubling 17359 2100 Route KM (RKM) Ajmer-Mangaliyawas 27.43
Ambagaon Kotpar Road 7.61
Bablad - Gulbarga 5.42
Bangurgram-Haripur 38
Bhalwani - Jeur 7.73
Bhua-Orai-Sarsoki 19.82
Bhulon - Motipura Choki 9.78
Binkadkatti-Hulkoti 7.62
Bolangir-Deogaon Rd. 17.35
Boroti - Dudhani 13.66

116
Chabra- Bhulon 11.29

Chakradharpur-Sonua. 21.3
Chamaraj - Ramparada 23.86
Chandresal -Digod 8.16
Charmal-Rairakhol 15
Charumalakusumi Khadapa 6.99
Chittorgarh-Nimbaheda 26.57
Dabpal-Gidam 10.99
Debipur - Palsit 16.82
Deogaon Road-Saintala (IBS) 8.57
Devarapalli-Penukonda 49
Dhavlas - Kem 8.56
Dhutra-Dharuadihi. 18.2
Digaru Tertelia Khetri 23.51
Barahu Jagiroad
Digod - Shri Kalyanpura 5.99
Dudhani - Kulali 9.83
Dungripalli-Khaliapalli 12.77
Gadag-Binkadkatti 4.98
Ganagapur Road - Hunsihadgil 6.58
Harlapur-Kanginhal 9.83
Hatia Govindpur. 41.2
Hubballi South-Savanur 51
Hulkoti-Annigeri 10.06
Hunsihadgil - Savalgi 7.05
Jalgaon-Bhadli 11.51
Jamga Belpahar 33
Jeur-Pophlaj 8.63
Jujumura- Charmal 16.92
Kaklur-Kawargaon 12.13
Kalunga-Rajgangpur. 16.4
Kalyan-Titwala 10.84
Kanginhal-Gadag 8.32
Karadi-Ammasandra 16
Kem - Bhalwani 8.33
Kesoli-Chabra 8.16
Khadapa Dhanapur 6.64
Khakhrechi-Wadharva 8.38
.......... Khaliapali-Loisinga (IBH) 5.1
Khanyan - Bandel 15.93
Koppal-Ginigera-Munirabad 21.83
Kota-Sogaria 2.71
Kotpar Road Charumalakusumi 7.71
Kurduwadi-Dhavalas 9.72

117
Luckeesarai- Karota Patner- 25.32
Seikhpura

Mirkhal - Limbagaon 30.84


Mohiunddin Nagar-Bachwara 19.95
Nagercoil-Kanyakumari 15.51
Naihati - Kalyani - Chakdah 24.14
Parauna-Ait-Bhua & PTSC- 42.62
Nandkhas
Pophlaj - Washimbe 9.97
PTSC-Chirgaon-Nandkhas 18.57
Pune-Phursungi 16.51
Rani-Bhinwaliya 29.94
Ratikheda-Ashok Nagar 7.73
Reoti-Ballia 26.15
Robertson Kirodimalnagar 18
Salegaon - Charbatia 9.86
Salpura-Kesoli 7.45
Sambalpur-Hirakud 7.25
Savalgi - Bablad 7.58
Shadoragaon- Ratikhera 7.63
Shadoragaon-Pilighata 9.5
Shri Kalyanpura - Bhonra 7.32
Sogaria - Chandresal 5.44
Sukhpur-Halvad-Khakhrechi 33.95
Tolahunse-Harihar 23
Tumkuru-Gubbi 18
Wadsinge - Kurduwadi 8.11
Washimbe-Parewadi 7.09
4 Electrification Projects 6302 6000 Route KM (RKM) Miraj Pandharpur (138 rkm) 138
Jasai-Uran (10 rkm) 10
Pen-Roha (67 rkm) 67
Panvel - Pen Thal (75 rkm) 75
Jasai-JNPT (09 rkm) 9
Bhigwan-Washimbe &Gulbarga-
Akalkot (60 rkm) 60
Sikarpai - Lelligumma (16 rkm) 16
Damanjodi Kakiriguma (27
rkm) 27

Balangiri Titlagarh (65 rkm) 65

Boinda-Rairakhol-Sambalpur (118
rkm) 118
Chopan Singrauli (73 rkm)
73
Koderma Duraitanr (52 rkm) 52
Warisaliganj Tilaiya (35 rkm) 35
Muzaffarpur-Pipra-Chanpatia
(144 rkm) 144

118
Bihar Sharif-Daniawan (38 rkm) 38
Fatuha-Islampur (43 rkm) 43
Ara-Vikramganj (57 rkm) 57
Samastipur-Naya Nagar (40 rkm) 40
Giridih- Duraitanr (52 rkm) 52
Raxaul Vairgania (53 rkm) 53
Mansi-Sahrsa-Daura Madhepura
(63 rkm) 63
Katwa-Azimganj (70 rkm) 70
Kiul- Patam Pipanti (152 rkm) 152
Sagardighi - Azimganj (19 rkm) 19
Chunar-Chopan (100 rkm) 100
Idgah- Achnera- Mathura (87
rkm) 87
Bandikui- Bharatpur (97 rkm) 97
Harpalpur Khairar (107 rkm) 107
Bhandai-Udi (113 rkm) 113
Shikohabad Bhongaon (58 rkm) 58
Gorakhpur- Kaptanganj
Valmikinagar (96 rkm) 96
Aunrihar-Jaunpur (60 rkm) 60
Kaptanganj Thawe (100 rkm) 100
Mankapur-Katra-Ayodhya (38
rkm) 38
Kasganj-Bareilly (105 rkm) 105
Mathura-Kasganj (103 rkm) 103
Zafrabad-Akbarpur-Tanda (101
rkm) 101
Unnao Mallanwan (66 rkm) 66
Tapri- Shamli (64 rkm) 64
Panipat-Jind (70 rkm) 70
Garhi Harsaru Farukhnagar (12
rkm) 12
Narwana Geong (44 rkm) 44
Bareily Purvakhera (50 rkm) 50
Gajraula Haldaur (53 rkm) 53
Amritsar Chhina (50 rkm) 50
Rewari Paharsar (150 rkm) 150
Ajmer-Guriya (94 rkm) 94
Bhilwara-Mavli Jn. (120 rkm) 120

Alwar - Bhankhari (95 rkm) 95


Jaipur Phulera (66 rkm) 66
Bhatinda Hisar (186 rkm) 186
Sadulpur - Shitalnagar Halt (139
rkm) 139
Jaipur-Sawai Madhopur (131 rkm) 131
Rani-Palanpur (166 rkm) 166

119
Nalgonda Lingumgunta (129
rkm) 129
Paddapalli Ligampet (83 rkm) 83
Guntakal-Kalluru (40 rkm) 40
Ghansore- Nagarwara (62 rkm) 62
Chhindwara-Jurtara (97 rkm) 97
Tori Lohardaga (44 rkm) 44
Erode-Karur-Tiruchirapalli &
Dindigul Karur (215 rkm) 215
Tiruchirapalli-Thanjavur-
Thiruvarur (104 rkm) 104
Miraj-Belagavi (137 rkm) 137
Satna- Katni (98 rkm) 98
Jalindri-Berach Jn (117 rkm) 117
Katni-Dubrikalan (127 rkm) 127
Ahmedabad-Viramgam-Surendra
Nagar (133 rkm) 133
Mahesana-Viramgam (64 rkm) 64
Samakhyali Wadharwa (49 rkm) 49
Surendra Nagar Dhola (120
rkm) 120
Samakhyali Chirai (30 rkm) 30
Ratlam-Barnagar (50 rkm) 50
Rajkot-Motikhawdi (120 rkm) 120
Wankaner-Pipali yard (50 rkm) 50

Rolling Stock
Locomotives
Diesel 122 Nos.
5 32006.91
Electrical 573Nos.
Coaches 5160 Nos.
Track Machines 52 Nos.
Signalling & Telecom
(only major items)
Replacement works 300 stations
Track circuiting 300 Locations
LED Signals 200 stations
Automatic Block 200 Route KM (RKM)
6 Signalling (ABS) 2025
Block proving by Axle 250 Block Sections
counters
Train protection and 150 Route KM (RKM) 150 RKM on ER, NCR, SCR, SR
warning system (TPWS) & SER
Data Logger 200 stations
Interlocking of LC gates 250 Nos. LC gates
7 Track Renewals 11450 3900 KM

120
Output Outcome Framework for Schemes 2018-19
Demand No. 81 Ministry of Road Transport & Highways
(Rs in crores)
Sr. Name of the Scheme Financial Outputs/Deliverables against the Projected Medium Terms
No. Outlay 2018-19 Outlay 2018-19 Outcomes
A. Central Sector Scheme
1 Bharatmala 29,663.13 Total Length under the (i) Provide road connectivity with
Programme under Phase-I- focus on mobility, safety and
34,800 km comfort;
Program target completion-
2021-22
(ii) Reduce SL/IL NHs to <10% of
Subsumed NHDP total length by 2022;
Total Length- 55,943 km,
Cumulative length completed
(31.12.2017) 33,500 km,
Balance length of program
stands subsumed under
Bharatmala Phase-I.
Target 2018-19 4,500 km
2 Externally Aided 1,200.00 (i) World Bank Funded
Projects (EAP) NHIIP 1,120 km, target for
(World Bank / completion- 2020-21
JICA/ADB)
(ii) JICA funded projects- 495
km, target for completion-
2020-21

(iii) ADB funded projects-128


km, target for completion-
2018-19

Cumulative length completed


(31.12.2017)- 746 km

Target 2018-19 - 200 km


3 LWE including 2,940.00 Total Length under the Provide connectivity to backward,
Vijayawada Ranchi Programme LWE including LWE affected areas for ushering in
Corridor Vijayawada Ranchi Corridor- socio-economic development and
6,045 km, Cumulative length integration with mainstream India.
completed (31.12.2017)-4,885
km,
LWE Program target
completion- 2019-20
Target 2018-19 - 500 km
3.1 LWE including TSP 660.00 400 km
3.2 Development of NH 2,080.00 Included in Sr. No. B.1
in NE States,
Rajasthan, Madhya
Pradesh,
Chhattisgarh,
Jharkhand, etc., under
TSP
3.3. Vijayawada Ranchi 200.00 Vijayawada Ranchi Corridor
target completion- 2018-19
Target 2018-19 - 100 km

121
4 Outlay for N-E 6,210.00 Total Length (Phase A-4,099 Develop Road Connectivity,
Region km and Arunachal Pradesh District HQ connectivity, and
Package 2,319 km) = 6,418 connectivity of strategically
km. Program target completion important areas / international
by 2023-24 and Cumulative border in the North-Eastern part of
target completion by 31.03.2020 the country.
4.1. SARDP including 5,710.00 is 3,700 km (58%), Cumulative
Arunachal Package length completed (31.12.2017)-
2,485 km,
Phase B:-Total Length -3,723
km, approved only for DPR
4.2 NH(O) for N-E States 500.00
preparation

Target 2018-19 - 950 km


B. Others
1 Development of 18,506.42 Total Length -30,524 km
28,899km (as on (=28,899 km + 1,625 km under
31.03.2017) not NH(O)-VGF Scheme), NH(O)
covered any VGF schemes shall be
programme including completed by 2019-20.
Upgradation of SL Target completion
NH/Other high traffic (31.03.2020)- 19,150 km (63%)
NH including NH(O)
+ VGF implemented Target 2018-19 -4,850 km
by Ministry
2 Setu Bharatam Out of NH(O) Total 1,708 (1,500 bridges, 208 Reconstruction / rehabilitation /
(Output- under B (1) ROBs/RUBs) repair of all stand-alone bridges and
Bridges/ROBs in Program target completion- replacement of all existing level
Nos.) 2021-22 crossings on National Highways so
Target completion by as to enhance safety of structures
31.03.2020- 850 nos. (50 %) and enable seamless uninterrupted
movement of traffic.
Target 2018-19 -50 nos.
3 Char Dham Out of NH(O) The DPR is under progress for Provide all weather road
under B (1) many packages, 24 works connectivity to Gangotri,
amounting to Rs. 4,200 crore Yamunotri, Kedarnath, Badrinath
sanctioned and are at various and also restoration of damages
stages of tendering. caused due to cloudbursts,
Total Length under the landslides, etc., during June, 2013.
Programme-889 km Program
target completion- 2019-20
Target 2018-19 80 km
(included under B(1)

C. Other Schemes of Roads Wing


1. Economic Importance 898.70 The fund is earmarked for the scheme to the States/UTs as per CRF
and Inter State Act, 2000 for the development of roads of economic importance and
Connectivity inter State connectivity. It is not possible to indicate output/outcome.
(EI&ISC)
2. R&D, Quality 90.88 This provision is for establishing Quality Assurance System,
Assurance monitoring of the works, research and development by the Central
Government. It is not possible to indicate output/outcome.
3. Information 7.00 This fund is utilized for digitization of the working of the Ministry and
Technology & Other purchase of computer accessories.
Charges
4. PBFF(Toll by States) 13.96 This is toll collected by State PWDs on the NH stretches entrusted to
them. This fund is allocated to States for further development of NHs.
The output and outcome is included under Sl. No. B(1).
5. CRF(State Roads) 8,007.42 This fund is for State Plan and is earmarked to the States/UTs as per
CRF Act, 2000. The fund is released to States as Grant-in-aid for

122
development of State Roads. It is not possible to indicate
output/outcome.
6. Maintenance & 3,020.69 The fund is utilized for the maintenance of developed NHs. The fund is
Repairs (M&R) utilized in the form of improvement in riding quality, flood damage
repairs, special repairs, etc. of NHs keeping in view requirements,
inter-se-priority and availability of funds. These maintenance works are
different than Plan works and it is not possible to indicate
output/outcome.
7.1 Publicity + 80 1. For creating awareness about Reduction of no. of road accident
Advertising other road safety among general public fatalities during financial year and
administrative through broadcast/ telecast of increased awareness about road
Expenditure road safety messages on TV , safety.
radio, cinema halls, SMS,
Conferences , preparation of
video/ radio spot etc.

2. Grant to NGO for undertaking


road safety awareness
programmes.

3. Road safety award.


7.2 NHARSS-National 5 1. Payment of Committed
Highways Accident liabilities of about Rs. 1.00 Crore
Relief Service Project for release of balance amount to
the States of J&K, Andhra
Pradesh.

2. Providing ambulance/ cranes to


the States/ UTs .
7.3 Institute of Driving 100 1. Release of fund to the States/ 1. Improvement in vehicle
Training and UTs relating to IDTR sanctioned standards and driving skills for
Research (IDTR)- during 11th and 12th Plan greater safety and efficiency.
Creation of Capital
2. Sanction of new IDTR, 2. Increase in number of drivers
Assets Grant - in-aid
Regional Driving training Centre thereby enhancing employment
General
(RDTC) and District driving opportunities
training Centre

Training to around 30,000 HMV


drivers of unorganized sector
4. Conducting the around 50
training programme for the
officials of State Transport
Department.
7.4 Inspection and 20 1. Release of fund to the States/
Certification (I&C) UTs relating to I&C Centre
Centre sanctioned during 12 th Plan
2. Sanction of 5 new I&C Centres
3. Operation charges to the I&C
Centre sanctioned during 11th
Plan.
7.5 National Database 4 1. Release of fund to the agencies Enhancement of overall road
Network-Other which have been hired for audit safety
charges- Road Safety the implementation of direction of
Supreme Court appointed Road
Safety Committee.
2. Payment to the Agencies which
have been engaged by the

123
Ministry to evaluate the
implantation of different scheme
administered by Transport Wing.
7.6 Machinery & 15 1. Committed liabilities: -
Equipment for I & C i) Uttar Pradesh- Rs. 3.50 cr.
centre ii) Telanagana - Rs. 3.50 cr.

2. Procurement of Equipment for


the I&C Centre sanctioned during
12th Plan.
7.7. Creation of National 1 1. The provision regarding
Road Safety Traffic creation of NRSTMB is in MV
Management Board (Amendment) Bill 2017. A token
(NRSTMB) provision has been made.
8 Development of Bus 5 (i)Approval of Draft Manual for (i) To improve convenience and
Terminals in Development of Standard Project transportation for passengers/
States/UTs Documents commuters.
(ii) Stakeholder workshop (ii) To improve basic amenities at
(iii) Final Manual for bus ports.
Development of Standard Project (iii) To promote seamless
Documents transportation of passengers/
(iv) Empanelment of Project goods among different modes of
Development Consultants. transport.
(v) Submission of Customized
Menu Driven Solution for
Terminal Design including
software simulation management
toolkit.
(vi) Submission of 3 D Visual
Interpretation Design Elements
9 Strengthening Public 25 1. To improve fleet (i) To improve women safety and
Transport under management in STUs with security in public transport.
Intelligent Transport induction of vehicle tracking (ii) To promote digitization in
System (ITS) Scheme devices. public transport
2. To improve women safety
and security by installation of
CCTV Cameras in public
transport.
10 National Database 60 1. Common User Management, To promote digitisation through
Network- Motor Workflow Distribution and e-payments, SMS, intimations,
Vehicle Registration Authentication for Vahan and open API through upgraded
Sarathi version of Vahan 4.0 and Sarathi
2. Enhanced role for the Citizen 4.0 in transport sector.
and Trade in the application. RTO
visits to be minimized
3. More options for e-payment,
SMS intimations, Open API, 3rd
Party integration, etc.
4. Enhanced Information
Services: Dashboard, MIS, Charts
and Graphs.

124
Output-Outcome Framework for Schemes 2018-19
Demand No. 82: Department of Rural Development

(Rs. in crores)
S. Name of the Financial Outputs / deliverables against the Projected Medium term
No. Scheme/Sub Outlay outlay 2018-19 Outcomes
scheme 2018-19
1 Pradhan Mantri 21,000 Construction of 49 lakh houses Reduction in number of
Awaas Yojana households suffering from
(Gramin) Trained masons- 80,000 housing deprivation.
Provision of basic amenities
to houseless households
through convergence with
other programmes; and
Employment generation in
rural construction.
2 Deen Dayal 5,750 50% of the total HHs to be Increase in HH income over
Antyodaya Yojana mobilized belonging to the SC, ST baseline.
- National Rural and the Minority groups. Increased access of Self Help
Livelihood Mission 70 Lakh households to be Groups (SHGs) to bank
(DAY-NRLM) mobilized into SHGs under NRLM. credit.
2 lakh candidates to be trained Financial inclusion of SHGs.
under DDU-GKY Training and Placement
1.75 lakh SHGs to be provided through DDU-GKY.
Community Investment Fund (CIF)
Rs. 40,000 crore of bank credit to
be accessed by SHGs
3 Mahatma Gandhi 55,000 230 crore person days to be Wage employment to those
National Rural generated seeking wage employments
Employment 10 lakh assets to be created under the Act.
Guarantee Act 60 lakh new works to be registered Livelihoods security through
(MGNREGA) under MGNREGA creation of permanent
community assets.
Irrigation potential created
under MGNREGA
Participation of women,
SC/ST
4 National Social 9,975 Assistance to 3.09 crore Aadhaar seeded digitised
Assistance beneficiaries database of beneficiaries.
Programme Financial Inclusion of all
(NSAP) eligible beneficiaries.
Improve safety net.

5 Pradhan Mantri 19,000 Construction of 57,000 length in Increase in number of eligible


Gram Sadak km habitations by all-weather
Yojana (PMGSY) 100% of eligible habitations (as roads connectivity
per Census 2001) to be connected.
6 Shyama Prasad 1,200 6 lakh households in the first 100 Open Defecation Free Cluster
Mukherjee RURBAN clusters to be provided Zero Waste Cluster
RURBAN Mission fully functional individual LPG gas connections in cluster
household latrines
100% coverage under Solid and
liquid waste management in first
100 RURBAN Clusters
6 lakh households in the first 100
RURBAN clusters to be provided
LPG gas connection

7 Assistance to 24 Assistance to voluntary Sustainable development of

125
CAPART organizations for development rural areas
initiatives
8 Grants to National 75 Training Programmes to be Capacity building of rural
Institute of Rural undertaken - 1525 development functionaries
Development Research Studies to be undertaken Research, Evaluation and
(NIRD &PR) - 44 Impact Study of various RD
Programmes.
Increased number of Rural
Development Professionals
9 Management 254.40 To strengthen district planning Enhanced technical and
support to rural administrative support,
development awareness and effective
programme and monitoring of RD Schemes
strengthening of
district planning
process
10 BPL Census/Socio 75.70 Maintenance of database Use of SECC data in the
Economic and implementation of all major
Caste Census 2011 schemes making way for
evidence based intervention
Better targeting of beneficiaries
Obviate exclusion and inclusion
errors in the selection of
beneficiaries

126
Output-Outcome Framework for Schemes2018-19
Demand No.83: Department of Land Resources

(Rs. in crores)

Sl. Name of the Schemes/ Financial Outlay Output/ Deliverables against Projected Medium Term
No. Sub-Schemes the Outlay 2018-19 Outcomes
2018-19

Centrally Sponsored Scheme


1 PMKSY Watershed 2146.00 1.86 lakh ha of additional area Higher agriculture yield
to be brought under irrigation, Increased farm come
Development Component

2 EAP-World Bank Assisted 105.00 Strengthening Project Accelerated project delivery


National Watershed Management Units and
Management providing technical input

Project Neer Scheme


Central Sector o nine states
3 Digital India Land Records 250.00 Computerization of Land Setting up of Integrated Land
Modernization Programme Records of 100 Districts Information Management
(DILRMP) Central Sector in the country : Systemin100 districts
Scheme Measurable Parameters
Number of villages in
which Record of Rights
(RoRs) computerized
Computerization of
Registration of 100
Districts in the country :
Measurable Parameters
Number of SROs in a
district and Number of
SROs computerized
Integration of Land
Records (RoRs) with
registration in 100
districts: Measurable
Parameters Number of
SROs integrated with
Revenue Offices

127
Output- Outcome Frame work for Schemes 2018-19
DemandNo.84 Department of Science and Technology

(Rs.in crores)

S.No. Name of the Financial Output/Deliverables against the Outlay Projected Medium Term
Scheme/Sub Scheme Outlay 2018-19 Outcomes
2018-19
1. S&TInstitutionaland 1124.43 1. Strengthen S&T infrastructure in 150 IncreasedR&D infrastructure
Human Capacity newand 680ongoing institutions baseand human resources for
Building forpromoting researchand scientific undertakingR&D activities.
excellence.
2. Support 9 0 researchprojects in
cognitivescienceandS&Tfor Yoga and
Meditation (SATYAM)
3.Nurture5 policyresearchcentre,train about
800scientists andtechnologist, Support
about 450projects to women scientists in
basic science researchand societal
benefits.
4. About1lakhschoolstudents from Class VI
to X tobe enrolledfor INSPIRE Award
Scheme. About 10,000 scholarships for
highereducationto be providedfor
pursuingBachelorsand Masters lever
education in science.
Around1000INSPIREFellowshipsto
beprovidedforpursuingPh.D.Around
300scientist to besupported for INSPIRE
FacultyAward for pursuing post-doctoral
research.
5. SupporttostrengthenStateS&T Councils to
beprovided

2. Research and 609.00 1. Around 300R&Dprojectsand 1000 Improvement in lobal


Development exchange visitsofscientistswould be ranking withrespect to quality
supportedthroughBilateral & and quantity of research
Multilateral S&T Cooperation. publication and patents.
2. Around 2 00 pr oj ec ts including new
and ongoingto besupported underthe
NationalMission onNano Scienceand
Nano Technology.
3. Continue supportto 12 MegaScience
projects critical to nation.
4. Pursue c l i m a t e changeprogramme,
Knowledge Networks andthematictask
forces.
5. Activities envisaged for implementing
theSuperComputingMissionwouldbe
6. Pursued. 6 Supercomputers to be
installed.

128
3. Innovation, Technology 720.00 1. About 110 R&D projects IncreasedS&Tknowledge
Development and to be supported for development of base, wealth creationand
Deployment various technologies and systems, relevance of science in
about 250for CleanEnergy serving societal needs of
ResearchInitiativeand 150 country.
projectsinWaterTechnology.
2. Initiate and support projects on Increase in patent
geospatial database creation andGIS filedand products
applications. commercialized.
3. Creation of facilitiesforcarrying out
researchin Drugs and Pharmaceuticals.
4. Continue supportto 70 Technology
Business Incubators(TBIs) and other
start-uprelatedactivities.
5. Nurture 5 Technical Research Centres
for translational research.
6. Outreach toabout 25 lakh persons
through Science Communication
activities.
7. Extendcore support to 28 Organizations
fortechnology advancement in rural
areas, 65projectsforaddressingsocietal
needs,disabledandelderly, 5 0 projects
4. Science and 900.00 Support around 1500 extra mural R&D Enhancequalityandquantity of
Engineering Research projects for science and engineering scientificresearch.
Board research and 2000 fellowships of various
kinds.
5. Technology 100.00 Support Indian industries for Commercialization of
DevelopmentBoard commercialization of technologies. indigenous technology.

129
Output- Outcome Frame work for Schemes 2018-19
Demand No. 85 - Department of Biotechnology
(Rs in crores)
S. Name of Financial Output/Deliverable against the Outlay Projected Medium term
No. Scheme/sub Outlay 2018-19 Outcomes
Scheme 2018-19
1 Biotechnology 1350.00 Continued extramural research Will generate high
Research funding to research quality publications,
&Development institutions/universities/organization patents, technologies and
pursuing R&D in the areas of knowledge in the
immunology, Plant biotechnology, respective scientific
genome engineering, life sciences, domain and create
applied bio processing, medical solutions for various
biotechnology, environmental problems being faced by
biotechnology, DNA fingerprinting the humankind.
etc for basic and applied research R&D products and
Infrastructure support for creation of services developed by
new R & D facilities and for identified institutes will
expansion & strengthening of the be available for transfer
existing R & D facilities. to industry and would be
addressing societal
needs.
focuses on Research in Clean Energy. Mission on Healthcare
A mission on Healthcare will be will deliver 5
implemented with at target to deliver biopharmaceuticals in
5 biopharmaceuticals in next 5 years. next 5 years.
Intensive mapping of Hot-spots and Farmers and agriculture
National Coral Reefs under Mapping scientists will be
Mission in collaboration with benefited
Department of Space Strategy for
management of Sickle
Cell
Indigenous
The large scale demonstration of manufacturing of iron
Brielle Disease Free Villages of fortified pre-mixed rice
livestock in States and Union for management of
Territories will be undertaken. anaemia in children
Biotech-KISAN Farmer Centric Functional technology
Mission will be undertaken for conversion of
Sickle Cell Management Mission municipal solids and
Health Mission-Nutrition liquid waste to energy.
Provide support to 65 Postgraduate Bio- digesters with new
teaching Program in multidisciplinary toilet designs.
area of Biotechnology. Increased milk yield
New HRD program - dual degree from dairy cattle
program and skill development Trained manpower.
program will be initiated and Improved quality of
advertised biological science
education in colleges.
To select 700 biotechnology students Generation of
for six months industrial training- and employable technical
100 students from North East Region. manpower.
Employment opportunities for women Scientists would return
scientists will be created and from abroad and
approximately 50 women scientists contribute in national S
will be granted their first Research & T development.
grant
Continuing support and creating new
Centres of Excellence.
Supporting Re-entry and research
fellowships for Scientists.
Forging international collaboration to
undertaken innovative research

130
&development in the field of
biotechnology
2 Industrial and 249.24 To scale up the number of Startups in Increased bio-economy
Entrepreneur- the sector by nurturing approximately Application of
ship 300-500 new Startups to have around Technologies emanating
Development 2,000 Startups by 2020. from public funded R &
02 new bio-clusters, 15 new Bio- D for well being society.
incubators, 15 technologies transfer Trained technology
offices and 4 Bio-connect offices will transfer professionals
be set up in research institutes and will be available
universities across India Financial assistance to
Rs. 50 Crore Biotech Equity Fund young startups
BIRAC Ace Fund will be Trained manpower and
operationalised in partnership with publications in high
National Equity Funds and financial impact journals, patents
assistance to young biotech Startups and availability of
will be provided by way of investment. technologies.
Amplification of Bio-entrepreneurship
through BIRAC Regional
Entrepreneurship Centres (BREC). The
BREC aims to impart bio-entrepreneurs
with the necessary knowledge and skill
required got converting innovative
ideas into successful ventures.
Department of Biotechnology shall set
up 3 Regional Centers of Mini-BIRAC
in the next 3 years
Research will be conducted as per
approved objectives by creating
infrastructure and facilities and output
will be achieved in terms of generation
of trained manpower, publications,
patents, generation of knowledge and
technologies.

131
Output-Outcome Framework for Schemes 2018-19
DemandNo.86: Department of Scientific & Industrial Research

(Rs.in crores)
S. Nameof Financial Output/Deliverables against the Projected Medium Term
No. Scheme/sub Outlay outlay in 2018-19. Outcomes
Scheme 2018-19

1. Industrial 26.50 Support to 25 New Innovative Demonstration of 10


Research and Projects of Individuals; innovations for scale-up/market
Development Support to 6 new technology seeding/new venture creation
development and demonstration and creation of 5 start-ups;
projects;
Continuing support to 7 CRTDHs
set up and initiating 4 new Development and demonstration
CRTDHs; of 3 technologies for
20 new Workshops, Seminars, commercialization;
Conferences and Exhibitions
related to promotion of R&D, MoUs between 20 new
innovation, technology Enterprises and CRTDHs to be
development and transfer to be signed for use of facilities in
supported; CRTDHs;
5 new Proposals related to
technological capacity building
and empowerment of women to be Around 100 women engaged in
supported; various trades shall be imparted
6 new studies on innovation and superior technological skills that
technology commercialization to will enhance their outputs and
be supported. earnings;
2. Assistance to 15.00 Development of products for Prototypes of railway products to
PSEs Indian Railways (Single section be made ready for deployment;
Digital Axle Counter (SSDAC) &
new generation SSDAC
Modernization & Up-gradation of Modernization of fire fighting &
Plant & Equipment at CEL; fire hydrant system;
Development of solar park
10 meritorious innovation awards;

Providing IPR services to 24 Recognition and motivation to the


MSMEs; inventors by providing
employment opportunities;
Value addition for taking 25 lab Increased IP filing and awareness
scale technologies to commercial on importance of IP and its
scale; protection;
Organise / participate in 25
exhibitions, 3 industry meets; Facilitating technology transfers
Seed funding for disruptive resulting in start-ups / new
manufacturing start-ups in ventures;
incubation centres;
Equity stake in companies and to
exiting at the right time to
maximize profits;

132
Output-OutcomeFrameworkforSchemes2018-19
DemandNo.87:Ministry of Shipping
(Rs. in crores)
Sl. Name of the Financial Output/deliverable Projected medium term outcomes
No Scheme/Sub Scheme Outlay against the Outlay 2018-
2018-19 19

Development of Major Ports


1 Capital Dredging 67.71 Support for infrastructure Achieving deeper draft for handling
Project- VoCPort Trust development and lager vessel and resultant increase in
modernization of port cargo
infrastructure including
capital and maintenance
dredging, connectivity etc.
2 Construction of 34.86 Subway for facilitating Facilitation of speedy evacuation of
Subway/RoB- Cochin speedy evacuation of cargo.
Port Trust containers from ICTT and
3 Rail Connectivity to CFSs,
ICTT at Vallarpadam- Rail Over Bridge at ICTT,
Cochin Port Trust replacing the temporary
level crossing thereby
easing road traffic
congestion
4 Coastal Road 23 100% completion of work Avoiding erosion of sea shore adjacent
Protection Work- will stop erosion of sea coastal road
Chennai Port Trust shore adjacent to coastal
road
5 4Lane road 35 4Lane road connectivity Enable faster evacuation of traffic and
connectivity passenger movement
(Mormogao Port
Trust)
6 Swachhta Action Plan 8 Swachhta activities in four Cleanliness in Port environment
Major ports viz. Cochin
Port, Chennai Port,
Mormugao Port and
Kolkata Port
Development of Minor Ports
1 Andaman 140.00 Various Harbours works in To augment the capacity enhancement of
Lakshadweep Harbour Andaman &Lakshadweep traffic volume/cargo handled at minor
Works Island related to ports.
construction of jetties,
breakwaters, acquisition of
tugs, upgradation of cargo
handling equipment and,
studies for new works.

1 Oil Pollution 10 Financially supported for Equipments/materials to combat oil


mitigating measures procurement of Pollution pollution installed
Response (PR)
equipments/materials to
combat oil pollution and
mitigating measures
2 Development Wing of 4 Research and Development
Ministry of Shipping activities
Sagarmala
1 Sagarmala 600 Infrastructure and other To augment the capacity, enhancement
support for port of traffic volume/cargo handled at ports
modernization, port Inter-
land Connectivity, port led
industrialisation etc.
Shipping and Ship Building
1 Subsidy to Non- 30 Vessels construction and Promote ship building in individual

133
Central PSU Shipyards delivery shipyards which would generate
and Private Sector employment.
Shipyards
2 Research and 0.5 Grants-in-aid for research
Development(Shipping and development schemes
sector) for ship building
Inland Water Transport
1 Grants to IWAI 360 Infrastructure and other Easy transportation of goods and people
including NE Areas support for Inland to the North East and improved
2 Central Sector Scheme 140 waterway to augment the connectivity.
for development of capacity, traffic
IWT in NER volume/cargo handled by
Inland waterway
3 Aid to Bangladesh 8.00 Meeting expenditure Operationalise the activities in other
arising out of transit and countries
trade agreement with
Bangladesh Government
Other Central Sector Schemes
1 Tariff Authority of 10.75 Grants for the
Major Ports establishment of Tariff
Authority for Major Ports
2 Development of Indian 30 Creation of infrastructure Providing education and research in
Maritime University facilities to promote maritime sector
Maritime Studies and
extension work with focus
on emerging areas like
Marine Science &
Technology, Marine
Environment, socio-
economic etc.; Focus on PG
course and R&D projects
are being developed by
IITs.
3 HDPE 1.65 Loan for payment of salary Restructuring HDPE which is a loss
to the remaining employees making company
4 Maintenance dredging 155.01 Maintain the draft of both
subsidy- KoPT Haldia and KDS channel

134
Output-Outcome Framework for Schemes 2018-19
DemandNo.88: Ministry of Skill Development and Entrepreneurship
(Rs. in Crores)
Sl. Nameofthe Financial Output/Deliverables against the Outlay 2018-19 Projected MediumTerm
No. Scheme/Sub- Outlay Outcomes
Scheme 2018-19
Centrally Sponsored Scheme
Pradhan Mantri Kaushal Vikas Yojana
1 Development of 2134.31 (i)30 lakhs people to be trained under scheme (i)IncreasedEmployability
Skills (Umbrella Component Pradhan Mantri Kaushal Vikas Under scheme component
Scheme) Yojana having outlay of Rs.1952.34crore. Pradhan Mantri Kaushal
(ii)527 Pradhan Mantri Kendras in 484 districts to Vikas Yojana.
train5.15lakh trainees under scheme component (ii)Setting up of
Technical Assistance Scheme of the National aspirational model training
Skill Development corporation having institutes under scheme
outlayofRs.44.77crore. component Technical
(iii)Implemented in mission mode through World Assistance Scheme of
Bank support to achieve the objectives laid down NSDC.
in the National Skill Development Mission under (iii)Skill Development and
scheme component EAP- Skills Acquisition and gainful employment under
Knowledge Awareness for Livelihood Promotion scheme component EAP
(SANKALP) having outlay of Rs.130.18crore. Skills Acquisition and
(iv)Existing collaboration will be taken forward. Knowledge Awareness for
Activities will be undertaken with UKIERI & Livelihood Promotion
Australia through joint funding under component (SANKALP).
International Cooperation having outlay of Rs.6.37 (iv)To learn from global
crore. best practices under
(v)State, regional& national level competitions component International
will be organized for selection & eventual Cooperation.
participation on world skills under component (v)Showcase/enhance
World Skills India having India s skill potential
outlayofRs.21.31crore. across the globe under
component World Skills
India.
2 Development of 87.86 (i)2.67 Lakhs students to be covered under Enhancement in the
Entrepreneurship entrepreneurship, education and training under Entrepreneurial ability of
(Umbrella scheme component Pradhan Mantri Yuva youth in the country.
Scheme) Udyamita Abhiyan having outlay of Rs.67.86
crore.
(ii)For scheme component Hand holding
&Mentoring of Perspective Entrepreneurs having
outlay of Rs.5crore, SFC note is under process.
(iii)Country wide 24 awards will be given to
entrepreneurs and their ecosystem builders under
component National Entrepreneurship Award
Scheme having outlay of Rs.10crore.
(iv)Construction of common facility building at
Indian Institute of Entrepreneurship
(IIE),Guwahati having outlay of Rs.5 crore.

3 National Board 24.75 Certifying 20 lakhs students Harmonizing and


For Skill Standardizing processes
Certification involved in examination,
Assessment and
Certification.

4 National Skill 20.00 Coordinate and harmonize the Skill development To achieve the skilling
Development Efforts of the Government and privatesector. Targets and endeavor to
Agency bridge the social, regional,
gender and economic gap.

135
5 MultiSkill 50.00 50 MSTIs would be setup to train10000 Enhanced employability of
Training Candidates in 2018-19. youth
Institutes(MSTI)
/ ModelITI
6 Apprenticeship 746.39 (i) 45000 apprentices to be trained under (i) Availability of
and Training component scheme National Apprenticeship industrial training
(Umbrella Scheme) Promotion Scheme(NAPS)having outlay of 90 workforce under
crore. NAPS.
(ii) Upgradation of 29 existing ITIs into Model (ii)Improved training
ITIs under component Upgradation of existing facility under component
ITIs into Model ITIs having outlayof22 crore. Up gradation of existing
(iii)4 new ITIs, Supplement deficient infrastructure ITIs into Model ITIs and
in 2 existing ITIs in NE states Up-gradation of 1396 Govt
undercomponentschemeEnhancingskill dev. Infra. ITI.
In NE states& Sikkim (ESDI) having outlayof (iii)Improved training
Rs.30.50 crore.
facility for additional 400
(iv)Monitoring of Up-gradationof 1396 Govt. ITI
trainees under component
through PPP under component Up-gradation
of 1396Govt. ITI havingoutlayof Rs. 0.75 schemeESDI.
crore. (iv) Increased training
(v) 5 new ITIs and 6SDCs under component scheme capacity to additional 500
Skill dev.for 47 distt. Affected by leftwing extremism trainees in ITIs and 600
(LWE) having outlayof Rs.19.35crore. trainees in SDCs under
(vi) 12 ATIs in PPP mode in 12 states to train component scheme LWE.
4600 trainees and Indian Institute of Skills would (v)Availability of quality
be setup under component Setting up of new instructor under
ATIs/Indian Institute of Skill having outlay of component Setting up of
Rs.48crore. new ATIs/Indian Institute
(vii)Training to50000 candidates/instructors of Skill.
under Long term /short term CITS/AVTS/other (vi)Availability of skilled
tailor made vocational training coursesunder workforce and instructors
scheme component under scheme component
Establishment, operation, maintenance &up EOM&U.
gradation (EOM&U) of DGT Institutes.
(viii)500 instruction training materials under (vii)Improved e-learning
scheme component National Instructional Media content would be available
Institute (NIMI) having outlay of Rs.6crore. in13156ITIs and new ITIs
(ix) Training in 400 Centers of Excellence under under scheme component
scheme component Vocational Training
NIMI.
Improvement Project (VTIP) having outlay of
(viii)Availability ofSkilled
Rs.27 crore.
(x)EAP-STRIVE (Skill Strengthening manpower undercomponent
For industrial value enhancement) having VTIP.
outlayof Rs. 35.50 crore in 2018-19 (ix)Facilitation of training
is to revitalize the ITI ecosystem. It of 70000 apprentices under
covers improving the delivery quality of 500 ITIs component RDAT.
including 100 Private ITIs.
(xi) 3 new Regional Directorate of Apprenticeship (x)Improved relevance and
Training being setup inBhopal, efficiency of vocational
MohaliandGuwahatiundercomponentscheme training under component
Setting up of new Regional Directorate of STRIVE.
Apprenticeship Training (RDAT) in
addition to existing 6 RDATs.
(xii)ISO certification of selected ITIs iswould be
done to elevate the standard of training under the
Component ISO certification of ITIs having
outlayofRs.6 crore.
(xiii) Two Woman Apprenticeship Training
Institutes started in Uttarakhanad and Haryana
having an outlay of Rs. 3.50 crore in 2018-19.

136
7 Scheme of 190.00 (1)Setting up of 300 new Polytechnics. (1)Increased training
Polytechnics (2) Up-gradation of existing 500 Polytechnics. capacity
(3) Construction of women Hostels is selected 500 (2) Availability of skilled
Polytechnics. manpower from CDTP
(4)Community Development Through Polytechnics scheme
(CDTP)

137
Output Outcome Framework for Schemes 2018-19
Demand No. 89: Department of Social Justice & Empowerment
(Rs in crores)

S.No. Name of the Financial Output / Deliverables against the Projected Medium Term
Scheme/Sub Outlay Outlay 2018-19 Outcomes
scheme 2018-19

1. Post-Matric 3000.0 60 lakh students to avail Increase in Number of


Scholarship for SCs scholarships for completing their students who have availed
studies scholarships for completing
their studies
2. Special Central 1000.0 7.7 Lakh SC beneficiaries to start Increase in no of SC
Assistance to income generating activities after beneficiaries who started
Scheduled Castes assistance income generating activities
Sub Plan after assistance
3. National 300.0 10,000 SC students to get Increase in number of SC
Fellowships for fellowships for doing students getting fellowships
Scheduled Castes research/M.Phil/P.hd for for doing research /
new/renewal cases. M.Phil/Ph.d
4. National Scheduled 1.25 lakh SC beneficiaries to get Increase in number of SC
Castes Finance and 137.39 soft loans for employment beneficiaries getting soft loans
Development generating activities. for employment generating
Corporation activities.
(NSFDC)
5. Protection of Civil 403.72 Effective implementation of Increase in number of cases
Rights (PCR) Act. various provisions of the two Acts. registered under SC/ST PoA
1955 and Scheduled Act 1989
Castes and
Scheduled Tribes Increase in Exclusive Special
(Prevention of Courts for trying cases under
Atrocities Act. PoA Act 1989
1989.
6. National overseas 15.0 Increase in number of students
scholarship for SCs 100 students to get scholarship for getting scholarship for
overseas higher education overseas higher education

7. Top class education 35.0 2050 SC students to avail Increase in number of SC


for SCs scholarship for study in students to avail scholarship
government professional institutes for study in government
of repute including National professional institutes of
Institutes of Excellence repute including National
Institutes of Excellence
8. Pre-matric 5.0 3 lakh students to avail Increase in number of students
Scholarship for scholarships for completing their who have availed scholarships
children of those studies in classes I to X for completing their studies in
engaged in unclean classes I to X
occupations
9. Pre-Matric 125.0 30 lakh students to avail Increase in number of students
Scholarship for SC scholarships for completing their who have availed scholarships
Students studies in classes IX and X. for completing their studies in
classes IX and X.
10. Girls Hostels for 155.45 5025 beneficiaries to be benefited Increase in number of SC
SCs under the Scheme. beneficiaries availing hostel
facilities to complete their
education
11. Boys Hostels for 5.0 310 beneficiaries to be benefited Increase in number of SC
SCs. under the Scheme beneficiaries availing hostel
facilities to complete their
education
12. Pradhan Mantri 70.0 140 villages to be covered under Increase in number of villages
Adarsh Gram PMAGY developed as Adarsh Gram
Yojana

138
13. Free Coaching for 30.0 3250 students coached for Increase in number of students
SC and OBC competitive examinations coached for competitive
Students examinations
14. National Safai 30.0 19350 Safai Karamcharis and Increase in number of Safai
Karamcharis Manual Scavengers beneficiaries Karamcharis and Manual
Finance and to get soft loans and assistance for Scavengers beneficiaries
Development forming SHGs. getting soft loans
Corporation
15. Venture Capital 140.0 55 SC Entrepreneurs to be Increase in no of entrepreneurs
Fund for Scheduled provided Venture Capital funding to be provided Venture
Castes (VCF-SC) to promote Entrepreneurship Capital funding to promote
among SCs Entrepreneurship among SCs
16. Credit Enhancement 0.01 5 Scheduled Castes Entrepreneurs Increase in no. of Scheduled
Guarantee Scheme to avail Credit Guarantee under the Castes Entrepreneurs who
for Scheduled scheme availed Credit Guarantee
Castes (CEGSSC) under the scheme
17. State Scheduled 20.0 75000 SC beneficiaries to get soft Increase in number of SC
Castes Development loans beneficiaries getting soft loans
Corporation
(SCDC)
18. Self- employment 20.0 Increase in number of manual
scheme for Manual Scavengers to be provided scavengers provided with one
Rehabilitation of Onetime Cash assistance, Skill time cash assistance, Skill
Manual Scavengers training and soft loans for training and soft loans for
employment generating activities employment generating
activities
19. Dr. B.R. Ambedkar Assistance provided to SC/ST for Increase in number of SC/ST
Foundation 1.0 medical assistance, inter-caste for medical assistance, inter-
marriages and merit awards for caste marriages and merit
Classes X and XII students awards for Classes X and XII
students.
20. Assistance to 50.0 50000 beneficiaries to be benefited Increase in no. of beneficiaries
Voluntary out the Grants given under the who are benefited out the
organsiations Scheme including 20000 under Grants given under the
working for the skill development Scheme.
welfare of SCs
21. Post-Matric 1100.0 40 lakh students to avail Increase in number of students
Scholarship to OBC scholarships for completing their who have availed scholarships
students studies. for completing their studies.
22. National Backward 100.0 1.35 lakh OBC beneficiaries to Increase in number of OBC
Classes Finance and avail soft loans for income beneficiaries to avail soft
Development generating activities loans for income generating
Corporation activities
23. Pre-Matric 232.0 25 lakh students to avail Increase in number of students
Scholarship to OBC scholarships for completing their who have availed scholarships
students studies. for completing their studies.
24. National fellowships 110.0 1500 students to get fellowships Increase in number students to
for OBCs for doing research/M.Phil/P.hd for get fellowships for doing
new/renewal cases. research/M.Phil/P.hd for
new/renewal cases.
25. National Overseas 10.0 1200 students to avail interest Increase in number of students
Scholarships for subsidy on loan taken to study to avail interest subsidy on
OBCs abroad. loan taken to study abroad.
26. Assistance to 30.0 25275 OBC beneficiaries to avail Increase in number of OBC
Voluntary skill development training for beneficiaries who have availed
Organizations for income generating activities skill development training for
OBCs income generating activities
27. Scheme for 103.0 2 lakh students to avail Increase in number of students
development of scholarships for completing their who have availed scholarships
EBCs (for studies. for completing their studies.
scholarship for
education)
28. Hostels for OBC 50.0 4500 students to avail hostel Increase in number of students
Boys and Girls. facility for completing their who have availed hostel

139
studies. facility for completing their
studies.
29. Scheme for 10.0 24225 students avail scholarships Increase in number of students
educational and for completing their studies. who have availed scholarships
economic for completing their studies.
development of
Denotified
Nomadic Tribes.
30. Assistance to 3.0 Ensuring wide coverage to relief Ensuring wide coverage to
Voluntary and rehabilitation in the State of relief and rehabilitation to
Organization for Jammu and Kashmir Widows, Orphans,
Providing Social Handicapped and Senior
Defence Service Citizens by way of Pensions
and marriage assistance to
young widows and grown up
daughters, scholarship for
Professional studies,
Assistance to
Handicapped/Disabled persons
(Victims of Militancy)
31. National Survey to 7.0 Timely completion of survey. Timely completion of survey
Assess the extent with all possible metrics
pattern and covered for all states.
Trends on Drug and
Substance abuse
32. Prevention of 50.0 118000 beneficiaries to benefit Increase in number of
Alcoholism and under the Scheme. beneficiaries who have
Substance (Drug) benefited under the Scheme.
Abuse
33. Research studies 5.0 To carry out third party evaluation Evaluating the performance
and publications of schemes and programmes of the and outcomes of schemes and
Department on need basis. programmes of the
Department
34. Information and 65.0 Media coverage and advertisement Increase in Media coverage
mass education cell for wider dissemination for and advertisement for wider
programmes and Schemes of the dissemination for programmes
Department and Schemes of the
Department
35. Assistance to 60.0 52215 beneficiaries to be covered Increase in number of
Voluntary in the various components of the beneficiaries covered in the
Organisations for IPOP Scheme various components of the
Programmes IPOP Scheme
Relating to Aged

36. National Policy on 155.50 27000 beneficiaries (Drug addicts) Increase in beneficiaries
Prevention of to be assisted under the scheme (Drug addicts) to be assisted
Alcoholism and under the scheme
Drug Abuse.

37. Scheme of 1.0 Legislation to be passed based on Welfare of transgender


Transgender persons which Scheme to be formulated persons
38. Integrated 0.50 Welfare of beggars Welfare of beggars
Programmes for
Rehabilitation of
Beggars

140
Output Outcome Framework for Schemes 2018-19
Demand No. 90- Department of Empowerment of Persons With Disabilities
(Rs in crores)
S.No. Central Sector Financial Output/Deliverable against the Outlay 2018- Projected Medium
Schemes Outlay 19 Term Outcome
2018-19

1 Assistance to 220.00 35 types of affordable and available (i) Mitigating the


Disabled Persons assistive devices for different types of impact of disability to
for purchase of disabilities live a normal life
Fitting Devices 200 Districts covered under ADIP
(ADIP) 2.85 lakh Persons with Disabilities (ii) Improved
(PwDs) beneficiaries to be provided with participation by all
aids and appliances sections of people in
71,250 female beneficiaries Socio-economic
45,600 SC beneficiaries activities
22,800 ST beneficiaries
25 advertisements to promote awareness
of the programme for PWDs

2 Setting up of 5.00 (i) Establishment of at least 2 Centres for To serve economically


State/UT Spinal providing free treatment and management of weaker Spinal Injury
Injury Centre spinal injury Patients
(ii) Continued support to existing centres and
2500 beds in occupation in each centre

3 Indian Spinal 2.00 1953 free beds annually Benefitting persons To serve economically
Injury Centre, New with Spinal Injuries of the economically weaker Spinal Injury
Delhi weaker sections of the Society by means of Patients
supplementing expenditure on treatment and
management of spinal injuries

4 Central Sector 10.00 (i) Estt. of 3 new Braille presses in States To serve the need of
Scheme of (ii) Estt. of 2 small units of Braille press in UTs visually impaired
(iii) Release of Rs. 10 crore as non recurring school going children
establishment, grant to the Braille presses and recurring grant with Braille books.
modernization, to the braille presses already installed
capacity
augmentation of

5 Deendayal 70.00 (i) Number of NGOs to be covered - 700 Better availability of


Disabled (ii) Number of beneficiaries to be covered - support services for
Rehabilitation 42000 persons with
Scheme (DDRS) 75.66 Empowering 30000 students with disabilities disabilities.
Scholarships for through education
students with Two/Three advertisements , activities
disabilities undertaken to create awareness among masses
about scholarships
6 Establishment of a 3.00 Release of grant for enhancing the capacity of Empowerment of
College for Deaf in Deaf and dumb colleges in each of the five persons with disabilities
5 Regions of the regions of the country through education.
Country
7 Budgetary Support 17.00 To support early intervention centers, Better support services
to National Trust residential care centers for persons with
Health insurance of persons with disabilities multiple disabilities.
benefitting 1,05,000 persons with disabilities

141
8 SIPDA (AIC, Skill 300.00 Effective
Training, Rehabilitation &
(a)Awareness mainstreaming of
Generation and persons with
Publicity (b) disabilities.
Research on
disability related
technology,
product and issues
(c) In-Service
Training and
Sensitization of
Key Functionaries
of Central And
State Governments,
Local Bodies and
Other Service
Providers (d)
Incentive to
Employers in the
Private Sector for
Providing
Employment to
Persons with
Disabilities
8(a) Accessible India (i) To have atleast one programme in each Public spaces and
Campaign major TV channels for PwDs. utilities which are
(ii) 600 Accessible Official websites accessible.
(iii) 600 public building would be made Greater awareness
accessible among all citizens
(iv) Accessible Transport system for better & stakeholders on
mobility for PwDs. accessibility
(v)To make PwDs and their families aware of requirements of
the various schemes for PwDs. So that they can PWDs.
avail desired facilities.

8(b) Skill Training Quality Vocational Training to 40000 Enhancement of the


Under SIPDA beneficiaries living standard of lives
Scheme High Employability to 25000 beneficiaries of PwDs
550 Homogeneous training curriculum
Use of latest technology in training Improved participation
Synergistic participation of the private sector in Socio-economic
and NGOs in the training and placement activities for PwDs.
process
Provision of personal assistive devices, to all
trainees.
30% reservation for women

8 (C) *Awareness 3.00 Release of Grant for creating awareness and


Generation and sensitization about schemes and programmes
Publicity Scheme for PwDs.
(* to be merged
under SIPDA
Scheme from
2018-19)
8(d) In-Service Training 2.00 (i) 4000 key functionaries to be trained
and Sensitization (ii) atleast 75 batches to be completed
of Key (iii) 28 states to be covered
Functionaries of
Central And State
Governments,
Local Bodies and
Other Service

142
Providers (* to
merged under
SIPDA Scheme
from 2018-19)

143
Output Outcome Framework for Schemes 2018-19
Demand No 91- Department of Space
(Rs in crores)

S.No. Name of the Scheme/ Financial Output/Deliverable Projected Medium Term Outcome
Sub-Scheme out lay against the Outlay 2018-19
2018-19

1. Research & 6576.02 3 Earth Observation


Development, design Augmentation of Space
space-crafts ready for
of technologies and Infrastructure for providing
launch
realization of space continuity of EO Services with
4 PSV Flights.
systems for launch improved capabilities
One GSLV MK-III
vehicles and Flight. Ensuring operational launch
spacecrafts One GSLV. services for domestic and
commercial satellites.
Self-sufficiency in launching 4
Tonne class of communication
satellites into Geo-synchronous
transfer orbit.
Self-sufficiency in launching 2.5
- 3 Tonne class of
Communication Satellites into
Geo-synchronous Transfer Orbit.
2. Design & 1746.25 9 EO/Communications Information on optimal
Development of payloads management of natural resource,
Applications for EO, Information support natural disasters, agricultural
Communication, for 5 disaster event planning, infrastructure planning
Disaster Management 8500 maps to support and access to basic services in
etc. National Missions and rural areas
Users Projects.
300000 value added
products disseminated
to users.

3. Undertaking space 230.10 Realization of Indian Development of indigenous


science missions and Lunar capability for design and
interplanetary Mission/Chandrayaan-II development of space
expeditions Readiness of 2 sub- infrastructure for better
systems for Aditya-L1 understanding of the Universe.
Mission
35 Publications from
Space Science Missions.
Release 2 TB of Space
Science related Data to
Public for Utilisation
250 Research projects in
Academia supported
through ISRO
programmes
4. Completion and 411.60 2 communication Augment and support the existing
launch of 2 satellites to be services to telecommunication
communication launched during /television broadcasting, disaster
satellites the year. communications, Tele-education
and Tele-health services

144
Output-Outcome Framework for Schemes 2018-19
Demand No. 92: Ministry of Statistics and Programme Implementation

(Rs in Crores)

S. No Name of the Financial Output/deliverables against Projected medium term


Scheme/ Outlay the Outlay outcomes
Programme 2018-19 2018-19
1 Capacity Development 208.00
Scheme
1.1 Capacity Development (Main Scheme)

1.1 Capacity Development 192.93 To improve the quality, coverage Improvement in compilation
(Main Scheme) and timeliness of National of National Accounts
Accounts, Economic, Price and estimates
Social Sector Statistics

To create a pool of trained To track the price movement


manpower in theoretical and which impacts economy and
applied statistics to manage public at large
emerging challenges of data
collection, collation, analysis and
dissemination for better Availability of trained
formulation of policies, evaluation manpower for efficient
of large scale programmes / collection and management
projects through specialized short / of data with better quality
medium term training programmes
that include domestic as well as
overseas learning component
To release data with lesser
To increasingly use ICT and online time lag and making Official
system for collection, processing, Statistics data more visible
compilation and dissemination of
official statistics in order to reduce
the time lag at each stage Availability of estimates of
various aggregates /indicators
To ensure better coordination with of industrial sector
the Central and State Statistical
Organizations for timely, reliable
and credible socio-economic Availability of Statistics on
statistics major eocio-economic
scenario and thereby
To strengthen NSSO for
facilitate targeted policy
undertaking various socio-
formulation
economic sample surveys by
digitization of Urban Frame
Survey (UFS), use of modern IT
Strengthening of Survey
devices for data collection and
Capabilities of NSSO in NER
transmission, opening of new
Regional Offices/ Data Processing
Centre in the North Eastern
Region; Grant-in-Aid to North- To assess labour market and
Eastern States, conduct of Periodic to estimate Labour Force
Labour Force Survey (PLFS) Participation Rate (LFPR),
Work Population Ratio
To support the Central and State (WPR) & Unemployment
Governments/UTs with necessary Rate (UR), Distribution of
consultation in matters relating to workers by industry and
training of their statistical occupation, Average earnings
personnel; designing and of workers etc.
conducting surveys & research and
for building capacity of their
statistical institutes and entities.

To optimally utilize various social


media platforms for dissemination

145
of data products of the Ministry
and also interact with stakeholders
on various statistical products
released by the Ministry

Technical and financial assistance Strengthening the State


to the States/UTs who have signed Statistical systems relating to
MOUs collection, compilation and
Sub-Scheme:
Support for Statistical Signing of MoUs with new dissemination of reliable official
1.2
Strengthening States/UTs statistics for policy planning at
15.00 the State and Sub-State levels

1.3 Sub-Scheme: 0.07 Preparatory activities relating the 7th -


Economic Census Economic Census
Fund scholastic facilities for top class More robust national statistics
education in the field of statistics with availability of better
279.42 analytical inputs in area of data
Grant-in-aid to ISI
analysis
2

3. 3950 Release of funds to Districts Creation of durable public assets


Members of Parliament Authorities for taking up projects on based on local needs and
Local Area Development
scheme(MPLADS) national priorities
Members of Parliament

146
Output-Outcome Framework for Schemes 2018-19
Demand No.93: Ministry of Steel
(Rs in crores)
Sl. Name of the Financial Output/ Deliverables against the Projected Medium Term Outcome
No. Scheme/ Sub Outlay Outlay 2018-19
Scheme 2018-19
Central Sector Scheme
1 Promotion of 15.00 (1) Completion of following R&D Development of Processes/ Technologies
Research & projects: to utilize low grade iron ore, improve
Development in Development of Infrared Camera quality of coal blend for mfg of coke, to
Iron & Steel Sector Based Torpedo Ladle Car improve productivity and product
Condition Monitoring System by quality, to develop new products, to
MECON Ltd. recycle/ re-use waste
Economic production of iron following the completion of on-going
through direct reduction of Mill R&D projects in the area of:
Scale by low grade coal of Production of good quality
Rajasthan by MNIT Jaipur metallurgical coke by developing
Production of low Carbon & low coal blending model
Phosphorus Ferromanganese by Direct reduction of Mill Scale by
metallothermic treatment of high low grade coal
Manganese Slag using Refractory Lining Materials for
Silicomanganese by NML production of Quality Steel in
Jamshedpur induction furnace
Condition Monitory System for
Torpedo Ladle Car
Nickel free nitrogen austenitic
stainless steel
Model based Breakout Prediction
System (BOPS)
Production of high quality
(2) Approval of new R&D projects & Ferromanganese
pursuing R&D thereof. Production of DRI from mill scale &
lean grade coal
Reduction Roasting of difficult to
treat Ores.

147
Output-Outcome Framework for Schemes 2018-19
Demand No.94: Ministry of Textiles
(Rs. in crores)
S. NameoftheScheme/Sub Financial Outputs/Deliverablesagainst ProjectedMediumTerm
No. Scheme Outlay theOutlay2018-19 Outcome
2018-19

1. NorthEastRegionTextile 90.00 Comprehensive development of Overall development of


PromotionScheme allsegments of Textile Sectors Textile Sector in North
such as Powerloom, Silk,Jute, Easternregion(NER)
Handloom, Handicrafts and
Apparel & Garmenting
2. IntegratedSkill 200.00 Increasing the number of people Possibility of higher
DevelopmentScheme being trained and placed in textile productivity inthesector
sector. following increased
availability ofemployable
skilledmanpower
3. Sericulture 500.61 50 New projects to be initiated 35 Enhancedcapacitybuilding
projects to be concluded. 240 intheSilksector enabling
technologies to be disseminated higherproductivity and
and 15770 nos of capacity qualityproducts
building and & Training.

4. CHCDS 30.00 Consolidation of 09 ongoing Development of Handicraft


4.1HandicraftMega Handicraft Mega Clusters sectorthrough cluster
cluster projects. approach andenhanced
4.2Marketing&support 34.20 Supportfor 1 1 1 Domesticevents marketingsupport
Services and24 Internationalevents
5. SchemeforIntegrated 30.00 Completion of 47 ongoing project Higher production and
TextilePark textiles park sanctioned under SITP productivity following
creation ofworldclass
infrastructure facilities for
thetextilesector
6. IntegratedProcessing 3.80 Around 4000 processing units will Makes textile processing
DevelopmentScheme be supported for complying, with sector compliant with
environmental standards. environmentalstandards
7. NationalHandloom 150.00 5355 lakh Kg of yarn will be Increase in production and
DevelopmentProgramme supplied productivity of the
7.1YarnSupplyScheme handloom sectoraswellas
7.2 RRRPackageand 100.00 31new block level cluster to be increaseinexports
comprehensivehandloom set up and 2000 weavers covered
developmentscheme for loom up-gradation
7.3 Comprehensive 35.00 60 Blockcluster to setup
HandloomsCluster
DevelopmentScheme
8. AmendedTechnology 2300.00 Increasing productivity through Technology up-gradation
UpgradationFundScheme technology upgrdation for higher leading to higher
fixed capital investment productivity
9. Schemesforpromoting 15.00 Construction of 40Kms .Road Better infrastructure facility
usageofGeotechnical with Geotextiles Would enable
TextilesinNER 20 Slope Stabilization Projects to development of NER through
be carried out increasein production
25Water Reservoir Projects to be andproductivity
carried out ofthetextilesector.
10. Remission of State Levies 1663.85 To create export incentives for To increase total export from
exporters. India

148
Output-Outcome Framework for Schemes 2018-19
Demand No. 95: Ministry of Tourism
(Rs. in Crores)
S. Name of the Financial Output/Deliverable against the Outlay Projected Medium-term
No. Schemes/ Outlay 2018-19 Outcomes
Sub-Scheme 2018-19
1 Tourism Infrastructure
1.1 Swadesh 1100.00 Completion of 15 projects Increase in Tourist
Darshan sanctioned in 2014-15,2015-16 and arrival
Integrated 2016 17. Increase in revenue
Development Undertaking 13 new projects. Increase in employment
of Tourist Development of Iconic Tourist generation in select
Circuits on Sites. areas.
Specific Development of two Special
Themes Tourism Zones.

1.2 PRASAD 150.00 Completion of 11 projects


National sanctioned in 2014-15, 2015-16 and
Mission for 2016 17.
Pilgrimage To undertake development
Rejuvenation activities at 10 more pilgrimage
and Spiritual destinations.
Drive Development activities at 3 heritage
sites.
1.3 Assistance to 70.00 To continue/complete Sound and
Central Light Show at 5 ASI Monuments.
Agencies for To continue/complete Tourist
Tourism Infrastructure Facilities at 4 Ports.
Infrastructure Renovation of one ASI Monument.
Development To continue/complete 25 ongoing
Joint Development of Railway
Stations
To continue/complete improvement
of Tourist Facilities at 3 Railway
stations under Konkan Railway.
Tourist infrastructure facilities by
ITDC and other Central Agencies -
3

2 Promotion and Publicity


2.1 Domestic 135.00 Release of advertisement on major Create awareness about
Promotion and newspapers on important occasions. major initiative of the
Publicity Release of TV campaigns in North Ministry of Tourism
including East & J&K Promote tourism in the
Hospitality Release of Online Campaign States of J&K and North
Release of Outdoor Campaigns East and to sensitise
Release of advertisement on public about the benefits
boarding passes, Water & of tourism sector.
Electricity Bills, through SMS and Increase in the domestic
other such items tourist visits and
Organizing/participating in various Foreign Tourist Arrivals
promotional events such Bharat in the country
Parv Paryatan Parv etc.
2.2 Overseas 454.24 1. Increase the visibility of Indian To augment foreign tourist
Promotion and tourism products in the overseas arrivals
Publicity markets and to promote India as a
including preferred tourist destination.
Market 2. Undertake joint promotion efforts
Development with international airlines, tour
Assistance operators and wholesalers overseas,
Indian missions and other

149
organizations to broad-base the
scope of promotion activities.
3. Effective, coordinated & impactful
participation in Trade Fairs and
Exhibitions.
4. Organizing and participating in
Road Shows, India Evenings,
Seminar and Workshops in
important overseas markets to
showcase the varied Indian tourism
products.
5. Organizing/Participation in Indian
Food and Cultural Festivals and
other promotional events.
6. To vigorously pursue Incredible
India Campaign 2.0 launched by

Tourism Day, 2017.


7. Promoting India as a destination for
Conferences and Conventions and
promoting other niche tourism
products such as Rural Tourism,
Medical & Wellness Tourism,
Tourism Trains, etc. in the overseas
markets.
8. Reinforced Hospitality Programmes
by inviting media personnel, travel
agents and tour operators on
familiarization tours to India to get
firsthand knowledge on various
tourism products as well as to
participate in and cover important
events.
9. To provide Marketing Development
Assistance support to smaller
service providers in the travel,
transport and hospitality industry
for promotion activities undertaken,
including participation in Travel
Fairs/Exhibitions Production of
publicity material, sales Tours etc.
10. To organize International Buddhist
Conference, 2018.
3 Training
3.1 Assistance to 85.00 To initiate process for setting up of 2 new
IHM/FCIs/IIT Institutes. 100% employment placement/
TM/NCHMCT To fund 15 ongoing projects of IHMs/FCI/ entrepreneurship.
etc.
Completion of 4 ongoing projects and
making operational the said institutes.
Strengthening of 3 institutes by augmenting
existing facilities.

150
Output-Outcome Framework for Schemes- 2018-19
Demand No. 96: Ministry of Tribal Affairs
(Rs. in crores)

S. Name of Financial Outputs/ Projected Medium Term Outcomes


No. Scheme/Sub Outlay Deliverables
Schemes 2018-19 against Outlay
2018-19
A. Centrally Sponsored Schemes
Umbrella Programme for Development of Scheduled Tribes
1 Tribal Education
1.1 Education of ST
Children
1.1.1 Post Matric 1586.00 18.55 lakh students Increase in no. of students attaining 1st
Scholarship Division in Class-X
Reduction in dropout rate between class
XI and XII
Number of students completing post
matric courses successfully.
1.1.2 Pre-Matric 350.00 12.10 lakh students Number of students receiving
Scholarship Scheme scholarship and number out of them
promoted to the next class.
10th class passing rate of those receiving
10th class scholarship
Reduction in dropout rate between class
I-V, I-VII and I-X.
2. Vanbandhu Kalyan Yojana

2.1 Development of 260.00 1.25 lakh Improvement of basic amenities


Particularly Increase in literacy rate
Vulnerable Tribal Number of activities completed
Groups successfully and in use by PVTGs
Improvement in health & livelihood
2.2 Tribal Festivals, 25.00 Activities as Showering tribal heritage,
Research Information indicated in the documentation and to create awareness
and Mass Education given scheme about schemes and programmes.
2.3 Aid to Voluntary 130.00 (i) 65057 Completion rate of students who
Organizations beneficiaries received education in the Residential
working for the in education School/ Non Residential School and
Welfare of Scheduled sector those who availed benefits of
Tribes (ii) 8,67,163 education given.
beneficiaries
in health
sector
2.4 Monitoring and 5.00 All schemes of Number of evaluations/ research studies
Evaluation Ministry completed.
Policy initiatives undertaken as per
recommendation of the research works
and findings of evaluation.

151
Output-Outcome Budget for Schemes 2018-19
Demandno.97: Ministry of Water Resources, River Development and Ganga Rejuvenation

(Rs. in crores)
Sl. Name of Scheme/Sub- Financial Output/ Projected Medium Term
No. scheme Outlay Deliverables against the outlay Outcomes
2018-19 2018-19

Centrally Sponsored Schemes


1 Pradhan Mantri Krishi 6000.00* Works for identified 48 projects under Creation of additional Irrigation
Sinchayee Mission mode will remain in progress, Potential of 10 lakh ha by June
Yojana(PMKSY)- *Through along with left over works of any other 2019 and 34.5 lakh ha by
Accelerated Irrigation NABARD project from previous phase (planned to December, 2019.
Benefits Programme & funding. be completed in 2019).
Command Area Utilisation of irrigation potential
Development in an additional culturable
Command Area of 15 lakh ha.

Resulting in increase in yield of


crops & income of farmers;
replenishment ofground waterand
increased water availability for
other uses.

2 PMKSY HarKhetKo Pani 2600.00 Repayment of interest/ principal of loan Debt servicing towards LTIF
from NABARD under LTIF for borrowings.
Implementation of Priority projects in
Mission Mode.

Completion of 50 Surface minor Increase in area under assured


irrigation/Repair Renovation and irrigation resulting in increase
Restoration of Water Bodies scheme; in :-
creation of irrigation potential of 0.20 (i) Crop yield
lakh ha. (ii)
(iii) Ground water
availability
(iv) Water availability for
other uses.
(v) Water Use Efficiency

152
3 Flood Management & 527.00 (i) Executionofriver management Reduction in damage due to
Border Areas Programme worksincriticalareas,Anti- floods, river bank erosion,
erosion coastal erosion and sediment
works,drainagedevelopmentw erosion in selected river
orks andanti-seaerosionworks catchments.
under the 224 ongoing projects Mitigation of recurring
sanctioned under the scheme. floods
(ii) Preparation of Joint Detailed Assessment of water
Project Reports (DPR) by resource potential in
PDA & undertaking pre- international rivers
construction works for Better flood forecasting
Pancheshwar multi-purpose The DPR for Pancheshwar
Project. multi-purpose project would
(iii) Preparation of DPR by JPO for help in drawing programme
Sapta Kosi High dam for implementation of the
including Sunkosi diversion project & preconstruction
cum storage scheme & Kamla works.
dam project.
(iv) Continuation of hydrological
observations & transmissions
of flood & related data from
neighboring countries;
(v) Development works on
common/border rivers;
(vi) Anti-erosion and anti sea
erosion works of UTs.
(vii) Maintenance of flood
protection works of Kosi and
Gandak Projects (in Nepal).
4 Irrigation Census 50.00 (i) Organisation of All India Preparatory/stage works for
Training Workshop for 6th MI completion and publication of
Census and Census of Water 6th MI Census report by
Bodies 2020-2021.
(ii) Organisation of Regional Informed planning and
Training Workshops for 6th policy formulation in the
MI Census and Census of minor irrigation sector.
Water Bodies
(iii) Start of Field Work of 6th MI
Census and Census of Water
Bodies by States/UTs

CentralSectorSchemes
5 Polavaram Multi-purpose (through (i) Earth work 81.89% Creation of ultimate irrigation
Project NABARD (ii) Concrete 43% potential of 2,91,000 ha.
funding) Drinking water supply to a
(iii) Structures 39%
(iv) Length of canal works population of 28.50 lakh in
completed (50.992 km.) 540 villages,
Diversion of 80 TMC of
water to Krishna river basin.
6 Farakka Barrage 195.00 Operation & Maintenance of Farakka Improved navigability in
Barrage and its associated structures Bhagirathi Hooghly river
system.
Compliance of the Ganga
Water Treaty, 1996

153
7 Dam Rehabilitation and 124.00 (i) Overall coordination Improve the safety and
Improvement Programme and supervision of dam safety performance of selected
rehabilitation works existing dams and associated
(ii) Capacity building in dam appurtenances in a sustainable
safety areas. manner.
(iii) Seismic hazard mapping Capacity building
studies of North and North- of Water Resources officials
East India through CWPRS, Standardization of dam
Pune. safety procedures and
(iv) Development of remaining guidelines
modules of dam safety World Bank loan to Damodar
software DHARMA. Valley Corporation
(v) 8 National training
programmes on dam safety; 3
International training
programmes and one
International Conference in
Bhubaneshwar;
(vi) Finalization of 5 guidelines on
various areas of dam safety;
(vii) Third party construction
supervision of the ongoing
DRIP works;
(viii) Inundation maps and dam
break analysis for Emergency
Action Plans for 50 dams.
(ix) EAP loan component of
Damodar Valley Corporation

8 Ghat Works for 50.00 (i) Construction/modernization of Improvement in amenities through


beautification of seven additional ghats maintaining cleanliness on river
River fronts (ii) Construction/Development of edges and better infrastructure for
five additional crematoria social and cultural activities and
creation of better infrastructure for
cremation rituals, preventing
unburnt bodies disposed into river
Ganga.

9. National River (i) Reduction in number of non- Pollution abatement


Conservation Plan complying grossly polluting through regulation of direct

154
10. National Ganga Plan Industries. discharge of industrial waste
(ii) Increase in number of Water in Ganga.
Quality Monitoring Stations Protection, stabilization and
installed (Manual & Real Time)
conservation of river Ganga
(iii) Establishment of 20 new Sewage by preventing direct discharge
Treatment Plants (STPs) with of sewage waste in Ganga
369 MLD treatment capacities.
(iv) Construction of 155 Ghats and 49 Maintaining cleanliness on
crematoria. river edges and better
(v) Scientific base line survey done to
infrastructure for social and
identify threats and identify cultural activities
approx. 200 Kms of potential Better infrastructure for
habitat for conservation of iconic cremation rituals, preventing
species. unburnt bodies disposed into
(vi) Capacity building for monitoring river Ganga
and conservation of the iconic
species in the Ganga. Afforestation, biodiversity
conservation & Ganga
(vii) Creating biodiversity profile of
two selected stretches of Ganga
rejuvenation
river; Reduction of threats to the
(viii) Spatial database on aquatic endangered aquatic species of
wildlife, habitat condition and Ganga river.
spatial risk maps. Awareness and behaviour
(ix) Afforestation of 10000 ha. of land change through IEC activities
along the Ganga river bank.
Increasing social outreach for
(x) IEC Activities (in Melas/ Mass
baths/ Exhibitions/ Competitions/
public participation and
Advertisements/ usage of social encouraging healthy and
media and continuous activity) hygienic practices

155
11 River Basin Management 225.00 (i) Works relating to preparation Completion of interlinking of
of Detailed Project Report/ river projects facilitates
Feasibility Report / Pre- transfer of water from water
feasibility Report / surplus to water deficit areas.
Preparation of water balance Generation of power from
studies report in respect of 8 hydel resources after effective
inter linking of river projects implementation of
and 4 intra- linking of rivers projects covered under DPRs.
by National Water
Development Agency. Protection of Majuli Island
and other areas from flood
(ii) Works related to Ken- Betwa
and erosion.
link by National Water
Development Agency. Reclamation of agricultural
land and area to be made
(iii) Continued investigation works free from drainage
for preparation of DPRs for congestion
the three hydroelectric (HE)
Flood and Bank protection
power projects in North
works.
Eastern States and start of
investigations of Berinium HE
Project (J&K) by CWC.
(iv) R&M of Seismological
observations will be
continued in Sankosh Basin
by CWC
(v) Execution of flood and anti-
erosion works; preparation of
six Master Plans and DPRs of
two drainage development
schemes; completion of
mathematical model studies of
river Brahmaputra; and
execution of five bank
protection projects by Geobag
technology by Brahmaputra
Board

12 Development of 211.27 (i) Providing flood forecasts from Timely dissemination of


WaterResources 275 existing flood forecasting flood forecasts
Information System stations and 843 base stations. Reduction in flood incidence
(ii) Continuation of and resultant damage
Hydrological observation &
data collection at 878 old Increased coverage of Water
sites. Resources Information
(iii) Operationalisation of new 720 System.
stations. Minimizing loss of life and
(iv) Water quality monitoring at property due to floods
572 sites To create a reliable and
(v) 120 additional reservoirs being sound database for informed
real-time monitored for water planning and policy
storage formulation
(vi) Real time data acquisition
system installation at 458 base
stations

156
13 Ground Water 450.00 (i) Preparation of Aquifer Map Sustainable ground water
Management and and Management Plan- 3.00 resource management in the
Regulation lakh Sqkm country.
(ii) Ground Water level Increased spatial coverage of
surveillance through 23125 Information generation for
wells sustainable management of
(iii) Ground water quality Ground Water Resources
monitoring through 15448 Sensitization and awareness
wells. creation on ground water
(iv) Conducting 70 public resource usage
interaction Programmes on
aquifer maps and management
plan

14 National Hydrology Project 250.00 (i) Operationalisation of Improved Water resources


National Water management in the country
Informatics Centre. through improved
(ii) Procurement and flood forecasting and water
installation of 4370 resources assessment and
Hydro met equipment planning.
(iii) River Basin Assessment and Improved collection,
Planning for 3 basins collation, storage and
dissemination of Hydro met
(iv) Improvement in Flood forecast
and spatial data in the
based upon ID modeling for 6
country.
Basins

15 Research & Development 95.00 (i) Publication of 150 Increase in number of


and Implementation of publications and 150 research research papers in reputed
National Water Mission papers. journals
(ii) Holding of 25 workshops/ Awareness generation on
trainings focusing on R&D water conservation
(iii) Completion of eleven State Improved indigenously
Specific Action Plans developed technology use,
(iv) Twenty Five Capacity increased officer capacities
Building trainings and wider research based
utilization.
(v) Completion of fifteen baseline
Water budgeting and
studies and two
preparation of water budget
demonstration/ benchmarking/
by States.
pilot projects.
Demonstration of modern and
new technology for
Conservation of water and
abatement of pollution
16 Human Resources 62.77 (i) 200 training programmes Increased awareness, upgradation
Development including 3 international of knowledge and skills of water
and Capacity Building training programmes. resources professionals (Technical
in NERIWALM, (ii) 41 outreach activities covering as well as non-technical) in the
National Water advertisements, outdoor field of water resources planning,
Academy,RGI- publicity, electronic media development and management,
Groundwater, campaign, participation in thereby contributing in the
MoWRand IEC exhibitions etc. including sustainable development and
thirteen special activities aimed conservation of water resources in
at children/tribal areas. India.
(iii) 26 workshops/ seminars
(iv) Training of about 200 officials.

157
17 Infrastructure Development 87.76 (i) Renovation of approx 15 Better working environment
Rooms/Toilets in offices of on completion of works.
Ministry proper. Savings on monthly rent on
(ii) Continuation of completion of works.
construction/renovation of Speedy disposal of files on
buildings & services of CWC implementation of e-office.
(five places) and CGWB (six Better monitoring of Human
places) as approved under Resources.
scheme.
(iii) Implementation of e-Office in
Three Organisations under the
Ministry.
(iv) Implementation of e-HRMS in
Six Organisations under the
Ministry.

158
Output-Outcome Framework for Scheme 2018-19
Demand No. 98 : Ministry of Women and Child Development

(Rs. in Crores)

S. Name of Financial Output/Deliverable against the Projected Medium Term Outcomes


No. Scheme/Sub- Outlay Outlay 2018-19
Scheme 2018-19

1 Aganwadi 16334.88 1. Operationalisation of Aganwadi 1. Operationalisation of remaining 45,084


Services Centre. Aganwadi Centres
2. Children (between 0 and 6 years): Reduction
2. Reduction in underweight children in underweight children. The details of
Aganwadi services beneficiaries shall be
maintained on RRS.
3. Providing drinking water facility to 3. @ 20,000 Aganwadi Centres (AWCs) per
Aganwadi Centres. annum
4. Providing toilet facility to Aganwadi
Centres 4. @ 70,000 Aganwadi Centres (AWCs) per
annum

2 National 71.30 1. Operationalizing the AWCs Improved nutritional and health status
Nutrition Of children in the age group 0-5 years.
Mission-EAP 1. % of AWCs operational as part of
Component ICT RTM.
2. AWWs and Lady Supervisors to
hold requisite devices i.e smartphones
and Tablets and to be trained on the
ICT RTM Mobile application, to
capture and Monitor progress
respectively Enhanced capability of mother to look after own
2. Create Awareness regarding Health health & nutrition of child.
and Nutrition Behavior
1. 1% of children breastfed with 1hour
of birth.
2. % of registered beneficiaries with
institutional deliveries.
3 Pradhan Mantri 2400.00 Pan-India implementation covering all Reduction in low birth weight by 1% per annum
Matru Vandna the districts of the country. Estimated 2019-20 (Baseline NFHS 4 level)
Yojna No. of beneficiaries= 51,70,000
(PMMVY)
4 Scheme for 500.00 Scheme will be implemented in 508 Improvement in the Nutritional status of
Adolescent selected districts across the country adolescent girls.
Girls benefitting 40.26 lakh out of school Out of school girls are motivated to join school
adolescent Girls of age 11-14 years. system, hence will help improving girls
enrolment and retention in school.
5 National 128.39 The National Creche Scheme is being
Crèche Scheme implemented through the State/UTs
w.e.f 01.01.2017 and the States/UTs
have been requested to verify and take
over the functional crèches. As the
states/UTs are still in the process of
taking over crèches, the complete
details of the actual number of
functional crèches on ground is not yet
available. The final picture will be
shared shortly
6 Child 725.00 1. Additional 24 JJBs will be
Protection constituted.
Services 2. Additional 19 CWC will be
constituted.
3. Recognition of additional 365

159
SAAs will be done in phase manner.
4. State child protection society
(SCPS)- will be constituted.
5. Additional 26 Districts Child
Protection Units will be constituted.
6. State Adoption Resource agency
Additional 1 SARA will be constituted.
7. At least 10% of children in homes
shall be mainstreamed in the society by
placing them with their family under
-
per month per child
8. Efforts shall be made that all orphan
Abandoned and surrendered children
are provided due opportunity for loving
family through adoptions.
9. As per Act, adoption order is to be
concluded within two months. Delay
shall be removed.
10. At least one Awareness Generation
Programme per month shall be
conducted for stakeholders and
pendency of CWC/JJBs etc shall be
monitored so that speedy benefit is
provided to child.
7. Mahila Shakti 267.30 State Resource Centre for Women 50% women to be covered in the selected
Kendra (SRCW) set up under the respective blocks through awareness and outreach
State Govt./UT Adm. in all activities of MSK
States/UTs % of women demanding services out of the
220 District Level Centre for Women women reached
(DLCW) set up in 220 districts 70% of women provided with government
500 blocks in 100 selected districts scheme benefits/services out of total women
(5 block per district) to provide MSK demanding such services
convergent service for empowering
women
8. Swadhar Greh 95.00 18000 Beneficiaries to be covered Providing an opportunity to live in society and
self support to women in difficult
circumstances by providing them primary need
of shelter, food clothing emotional support and
counseling social and rehabilitation through
education, awareness and skill up gradation.
9 Ujjawala 50.00 6000 Providing an opportunity to live in society and
Beneficiaries self support to women who are forced into
To be covered menace of trafficking by the methods of
prevention of trafficked rescuing the trafficking
person ensure rehabilitation and reintegration of
the victim and repatriation of any foreign
national who is forced into trafficking
10 Working 60.00 45 new Working Women Hostels To promote availability of safe and conveniently
Women proposed to be sanctioned with 4500 located accommodation for working women
Hostel Capacity with day care facility for their children.
11 Gender 8.28 I. Mainstreaming Gender concerns 10 training programmers/ workshops/ refresher
Budgeting through Gender Budgeting initiatives courses organized by the Ministry, designated
& in approximately 10 Central central Nodal Agency on GB 50 training
Research, Ministries/Departments programmers / workshops/ refresher courses
Publication and II. Mainstreaming Gender concerns organized by the Ministry, designated state
Monitoring through Gender Budgeting initiatives Nodal Centers on GB
in approximately 10 State
Governments

160
The scheme is demand driven as per Relevant research works or
research priorities of the Ministry Seminars/Conferences would lead to improved
hence outputs are not strictly policy improvements and better implementation
quantifiable. Meeting of research of programmes of MWCD.
Advisory Committee, headed by
Secretary taken place only after
sufficient and suitable number of
proposal are available. Deliverables
are:

Research studies:
15 ongoing projects of 2016-17
5 New Projects

Seminars: 2
More no. of Research study and
seminars are likely to be delivered

12 Beti Bachao 280.00 I. Improve the sex Ratio at birth (SRB) Output deliverable is measured on annual basis
Beti Padhao in gender critical districts by 2 points
Campaign per year.
(BBBP) II. Reduce Gender differentials in
Under Five Child Mortality Rate From
7 points in 2014 (latest available SRS
reports) to 1.5 points per year.
III. At least 1% increase per year of
1at Trimester ANC Registration.

Secondary education.

in the selected districts.


13 Women 28.80 Consolidation of WHL in 36 Out of 33 sanctioned women Helpline, 27
Helpline States/UTs women Helpline have become operational.
14 One Stop 105.10 Operationalization of 186 Out of 186 sanctioned one stop
Centre sanctioned OSC. Centres, 165 one stop Centres have
Expansion of OSC in 50 become functional.
districts in addition to 186
sanctioned OSCs

161
Output - Outcome Framework for Schemes 2018-19
Demand No. 99: Ministry of Youth Affairs and Sports / Department of Youth Affairs

(Rs. in Crores)
S. Name of Financial Output/ Deliverables against the Projected Medium-term
Outcomes
No. Scheme/Sub- Outlay Outlay 2018-19

Schemes 2018-19

1. Nehru Yuva 255.00 Youth Club Development: 2397 Strengthening of existing clubs and
formation of new clubs & No. of
Kendra Training on Youth Leadership and Youth enrolled in Clubs will
Sangathan
(NYKS) Community Development: 2397 be increased by about 25% by 2018-19

Sports Material to Clubs: 25446 Developing leadership qualities of


99000 youth over the year with focus
Block/ District level Sports Meets:2867 on Community

Skill Upgradation Training Development


Programme:5737 Development of Youth through
engagement in sports activities; 4.50
Promotion of Folk Art & Culture
lakh youth to be benefited over the
(District level Programmes): 623
year.
Observance of Days of National &
Total 1.21 lakh youth to be
International Importance: 16509
benefitted over the year by increasing
District Youth Conventions: 623 their incomes by about 20-25%.

Folk Art and Culture and Local Crafts


Mahatma Gandhi Yuva Swachhta
to be promoted among 0.75 lakh
Abhiyan evam Shramadan Karyakram: youth.
150
Total 16.67 lakh youth to be involved
YuvaAadarsh Gram Vikas in programmes, creating awareness in
Karyakaram: 150 Society on important issues.
Awards to Outstanding Youth Total 0.60 lakh youth to be
Clubs: 661. involved in programmes,
promoting best practices through
heme based awareness and education
program on positivity:1869 experience sharing

Creating awareness on Swachhta


and water conservation in 627
Districts over the year.
Swachh sankalp se swachh siddhi:
12460 Developing 209 villages as Model
Villages over the year.

Promoting excellence by rewarding


outstanding work done by youth clubs

2. National 80.00 Selection, Training and NYC volunteers to act as extended


arm of NYKS at block level for
Youth Corps Deployment of NYC volunteers at carrying out various activities through
Block level for effective youth clubs.
(NYC) implementation of NYKS activities:
12000

162
3. National 20.00 Neighbourhood Youth Parliament Developing leadership qualities of 5
lakh youth over the year by
Young Programmes- Block level: 11970 involving them in debate/
discussion on contemporary issues.
Leaders Youth for Development
Programme Shramadaan: 236 Developing leadership qualities of
(NYLP) 1.24 Lakh youth club functionaries
National Youth Development Fund over the year by involving them in
debate.
(NYDF): 3000
Developing leadership qualities of
29.64 lakh youth by involving
them in Shramadaan on
community projects (NSS and NYKS)

Development/ Empowerment of 2500


youth over the year through
innovative initiatives not covered
under other programes

4. National 25.00 Tenzing Norgay National Promoting adventure activities by


awarding outstanding work.
Programme Adventure Awards: 4
for Youth Promoting the spirit of national
and National Youth Festival: 1 integration among 5000 youth from all
Adolescent over the country in addition to the
Development National Youth Awards:35 general public in the host states
(NPYAD)
Assistance to Organisations for Youth Encouraging youth to take up
community work by awarding
and Adolescent Development
outstanding work done by youth
Programmes: 200
Total 2.00 lakh Youth/
adolescents to be benefitted from
various programmes by organisations
assisted by Ministry.

5. International 20.00 International Youth Exchange Development of International


Perspective among 350 Youth over
Cooperation Programmes: 11 the year.

UNV/ UNDP Project for Dissemination of information on the


strengthening of NYKS/ NSS: Further best practices implemented under the
extension of the project beyond 2018.
project for their replication all over
the country.

6. Youth 1.70 Efficient Management of Youth Total 211191 youth benefitted over
the year by staying in Youth Hostels
Hostels Hostels: 2,20,000 at concessional rates.

7. National 5.00 Reimbursement of committed This is only for reimbursement of past


liability to States committed liability in respect of a
Discipline programme already transferred to
states.
Scheme

(NDS)

8. Assistance to 1.50 Assistance to Scouting & Guiding Total 21000 youth to benefit
from various programmes out of
Scouting & Organizations for their assistance sanctioned by

Guiding Programmes: 21000 Ministry.

Organizations

163
9. National 166.00 NSS Awards: 52 Motivating volunteers to engage in
community service by rewarding
Service Adoption of Villages/ Slums for outstanding work
Scheme NSS activities: 17000 Personality & Character development
of 38 lakh NSS volunteers through
(NSS) Employment of NSS Volunteers community work such as
& carrying out regular activities - participation in health/ eye/
immunization camps (17500
37 lakh programmes), awareness
programmes/ rallies/ campaigns on
Special Camps in adopted social issues (37,500 Programmes),
villages Slums: 17000
Shramadaan (1.25 Crores
National Integration Camps/ North volunteer hours), blood donation (2.5
East Youth Festivals: 25 lakh units), plantation of saplings
(27.5 Crore saplings) and so on.
Adventure Activities: 1700
Developing spirit of National
Republic Day Parade Camps: 200
Integration among 5000 NSS
volunteers from across the country.

Developing spirit of adventure


among 1750 Volunteers through
participation in these programmes

Developing a sense of national pride


and discipline among NSS volunteers

10. Rajiv Gandhi 23.00 Academic Programmes: 180 Development of human resource in
the field of youth development.
National Collaborative Programmes with other Total 1,95,000 students to pass out
Institute of Institutions: 15 in the year.
Youth
Training/ Capacity Building Development of 4 4 5 youth through
Development
Programmes: Other Programmes:460 innovative programmes run in
(RGNIYD)
collaboration with reputed
National/ International Seminars/
institutions.
Workshops: 24

Research Programmes:20 Development of 21323 youth through


their capacity building in a large
spectrum of subjects.
Training/ Capacity Building
Development of knowledge/ expertise
Programmes: Training of
of 1200 youth through participation in
various workshops/ seminar
Trainers:70
Development of body of knowledge in
youth development through 24
research scholars.

Total 2205 functionaries working for


youth to be trained and enabled to
work for youth in a more effective
manner.

164
Output-Outcome framework for Schemes 2018-19
Demand No. 99: Ministry of Youth Affairs and Sports / Department of Sports

(Rs. in Crore)
S. Name of the Financial Outputs / Deliverables against Projected Medium-Term Outcomes
No. Scheme/ Sub Outlay the
- Schemes 2018-19 Outlay 2018-19

1 Development in Sports Institutions (an Umbrella Scheme)


1.1 Sports 429.56 Set up 5 new Indigenous and Martial To identify and nurture talented
Authority of Arts Centre14 new NSTC Centres sports persons (Boys/Girls) at
India (SAI) Set up 10 new akharas grassroots and elite level under
Set up 6 new army boys company SAI Sports Promotional Schemes
centres from about 14,500 during 2017-
Set up 12 new SAI Training Centres 18 to 16,000 during 2018-19.
Set up 10 new Special area Games Upgrade existing facilities to
centres the Olympic standard of
Set up 1 0 0 new STC/SAG infrastructure
Extension Centres for elite
Set up5 new Centres of Excellence players
Set up 10 new National sports Increase coaches at Grassroots
academies level to 313; induct quality
Replacement of 4 new synthetic coaches with minimum required
athletic and hockey turfs qualifications and experience
Creation of 2 synthetic football (develop mechanism for the same)
grounds for State/National and
Construction of 2 new Swimming International teams
pools
1250 new coaches to be hired

1.2 Lakshamibai 45.00 250 B. PEds would be passing out Assuring 100% employability
National Institute 120 M. PEds would be passing out for these professionals
of Physical 250 student/trainees to be passing
Education, out from diploma/certificate courses
Gwalior
1.3 National Dope 4.00 8000 urine samples to be tested Develop transparent testing
Test 320 blood samples to be tested procedures
Laboratory 6 research programmes to be Mandate participation in
launched awareness sessions for all
1.4 National Anti- 10.00 5500 urine and blood samples to athletes above state level and
Doping be collected
Agency assure 100% knowledge
80 education/awareness programmes
dissemination on certified and
to be conducted
banned health and performance
1.5 National Centre 40.00 Decision has been taken to set up Accordingly, it is proposed to fund
for Sports National Centre for Sports Science another 3 universities and 2
Science and and Research National Institute of Medical Colleges for the year
Research Sports, Patiala by upgrading existing 2018-19 and also continue
(erstwhile facilities and funds have been upgradation of the existing
Indian Institute allocated Rs.10 Cr. for the same. facilities at NIS, Patiala for which
of Sports Also, it is proposed to fund 6 Rs.20 cr. will be required.
Science and Universities and 6 Institutes/Medical
Research) Colleges in a phased manner and
Funding has been made for 3
Universities and 2 Institutes/Medical
colleges for which Rs.10 cr. required.

165
1.6 National 30.00 It has been decided to Accordingly, existing facilities at
Centre for Sports set up National Centre for Sports NIS Patiala will be required to be
Coaching Coaching at NIS Patiala upgraded for which Rs. 10 cr.
Around 400 coaches are proposed
1.7 National Sports 65.00 Admission to 50 students in BPES toAdmission
be producedtoannually.
50 students in
University, and 50 students in B.Sc. (Sports BPES and 50 students in B.Sc.
Manipur Coaching) for academic session (Sports Coaching) for academic
1.8 Contribution to 1.00 2018 19
Contribution by Indian being session 2018 19by Indian being
Contribution
WADA member country of WADA member country of WADA

2 Encouragement and Awards to Sportspersons (an Umbrella Scheme)


2.1 Special Cash 11.00 500 sportspersons and coaches to be To encourage and foster
awards to Given cash awards sporting culture
medal winners
in international
sports events
2.2 Awards (Arjuna, 2.00 23 awards for motivation and To encourage and foster sporting
Dhyanchand Encouragement of sportspersons; culture among active and retired
& motivating sportspersons to continue sportspersons.
Dronocharya) with sports even after active sports
career; and recognition of the
contribution of coaches in India s
performance at international level.

2.3 Pension to 10.00 20 new cases of pension to be Ensure future security to qualified
Meritorious Sanctioned to sportspersons sportspersons
Sportspersons
2.4 Assistance to 342.00 181 National tournaments to be Promotion of Sports and to
National organized achieve excellence in national
Sports 60 International tournaments to and international tournaments.
be organized Upgrading & Professionalizing
Federations 44 Number of Foreign Managing practices
(NSFs) Coaches/Special Personnel would be
appointed to NSFs
3000 Number of Sportspersons to
receive Financial Assistance for
International Tournaments/Training
Programmes

166
2.5 Scheme of Human 5.00 6 Fellowships to be granted Developing human resources in
Resource Participation in seminars etc., sports sciences and sports medicine
Development abroad minimum 15
10 seminars to be held in the country
in Sports
10 Training courses for coaches in
the country to be organized
6 Research Projects to be undertaken
2 Publications to be published
15 No of Fellowships to be awarded
to sports specialists/ coaches/support
personnel and match officials for
specialized studies
500 No. of participants under various
workshops/seminars/conferences
15 No. of Match Officials/Coaches
/Supporting Personnel to receive
financial assistance
20 Lakh Amount of funds to be
provided for attending international
2.6 National Sports 2.00 Assist120 athletes Select 120 worthy athletes and 5
Development 5 institutes/academies to be setup for institutes via a transparent
Fund sports infrastructure selection
process
2.7 National Welfare 2.00 To promote welfare of sportspersons. To promote welfare of
Fund for The exact number cannot be sportspersons.
Sports persons indicated as it will depend on the
number of applications received.
3. Khelo India: National Programme for Development of Sports
3.1 Khelo India 520.09
i.Play Fields a. Number of States/UTs in which This initiative will see increase in the
Development Playing Fields Associations set up number of
8
i. Persons participating in
b. Coverage of Fields/Play areas by sporting activities, like
States/UTs for their development, sports competitions,
promotion and protection 40 marathons, etc.
ii. There will be a discernable
c. Number of Playfields where
reduction in patients of
critical gaps will be filled up - 5
lifestyle diseases, like cardio
vascular diseases, obesity,
juvenile diabetes, etc.
ii.Community No. of coaches/PETs/Volunteers The number of coaches being
Coaching trained as master trainers - 2000 certified will increase significantly
Development and the data base of coaches either
developed or certified under the
Scheme will provide indication of
the outcome. Similarly, the increase
in bench strength at the
developmental level will also
indicate a favorable outcome.
iii. State Level Number of centres supported 13 Availability of better training
Khelo India facilities in newer areas of the
Centres country will lead to reduced pressure
on existing centres, thereby
indicating the success of the new
centres.

167
iv. Annual Sports No. of participants- 10000 With greater participation in a single
Competitions organized competition structure, the
number of sporting talents identified
will increase significantly, thereby
indicating success of the
competitions. Over the years, with
increased competition, the level of
excellence achieved by the
participants in the competitions will
also see quantum jump.
v. Talent Search & No of Talents identified and supported Over the years, the bench strength
Development - 2000 number of sportspersons achieving
excellence in the priority sports
disciplines will see gradual and
significant increase.
vi.Creation/Upgradation of Sports Infrastructure
a. University No. of centres set up 4 More athletes will emerge from the
Centre of University structure to achieve
Excellence excellence in Sports, especially at the
Programme International level, thus increasing
our bench strength at the second,
third and fourth tier, thus providing
ample backup for our teams, once the
performance of 1st rung athletes start
waning.
b. Creation of No of infrastructure created or Creation of advanced infrastructure
Appropriate supported 30 from across the country will indicate
Sports increased availability of
Infrastructure. infrastructure. There will also be
greater production of sportspersons
from areas where such infrastructure
are available.
vii. Support to No. of academies set up/supported 10 The number of elite athletes being
National developed will increase reflecting in
Regional/State the increase of bench strength at the
Sports Academies elite level.
viii. Physical No. of children measured 5 crore There will be significant reduction in
Fitness of School the number of school children
going Children suffering from lifestyle diseases,
especially obesity and juvenile
diabetes.
ix. Sports for Number of participants in competition The number of women sportspersons
Women 3000 achieving excellence will increase
gradually and significantly.

x. Sports for Peace A number of sporting activities will be There will be greater incidence of
& Development undertaken spread across the year. children and youth from disturbed
areas taking up sports as a way of
life, thereby reducing the incidence
of such youth participating in
disruptive activities.
xi. Promotion of Sports among persons with disabilities

168
a. No. of Para-Athletes classified / The number of persons with
No. of Indian classifiers trained -disability taking part in sports will
increase. There will be reduced
2000/20 complaints from such persons
regarding inaccessibility at sports
b. No. of specialised Training Centre infrastructures across the country.
supported 2

xii. Promotion of Number of participants in the The number of persons practicing


indigenous games competitions - 3500 traditional and indigenous games
increase, as will be borne out by the
number of participants in
competitions for such games.
3.2 CWG, 2010 0.50 This is related to residual matter This is related to residual matter of
of CWG, 2010.
3.3 Enhancement of 50.00 Number of stadium upgraded 2 Providing opportunity to the youth
Sports Facility at of the State for engaging in
J&K Construction of multi-purpose indoor sporting activities
halls 12 in next2-3 years
3.4 Himalayan 5.00 To organise annual sports events in To strengthen relations
Region Sports Himalayan Region in the among Himalayan region
Festival Scheme Countries and the States. C o u n t r i e s and States by
organising Sports Festival.
3.5 Expenditure on 1.00 To organise seminars/ workshops For promotion of Schemes of the
Seminar related to Ministry of Youth Affairs Ministry.
Committees, and Sports. The number cannot be
indicated.
Meetings etc.

169

You might also like