Ms. Tweetums Cortezano Tariao
May 13, 2022
10:00 A.M.
Presentation Outline
1. DESIGN CRITERIA
• Housing design theme
• Characteristics
• Elements and recommended materials
2. ARCHITECTURAL TREATMENT
• Type of Lot
• Setback Restrictions
• Building Setback
• Roof Setback
• Building Height Restriction
• Cut & Fill
• Utilities
• Landscape
• Lot Verification
3. GUIDE FOR HOUSE CONSTRUCTION
4. SCHEDULE OF FEES
Presentation Outline
1. DESIGN CRITERIA
• Housing design theme
• Characteristics
• Elements and recommended materials
2. ARCHITECTURAL TREATMENT
• Type of Lot
• Setback Restrictions
• Building Setback
• Roof Setback
• Building Height Restriction
• Cut & Fill
• Utilities
• Landscape
• Lot Verification
3. GUIDE FOR HOUSE CONSTRUCTION
4. SCHEDULE OF FEES
House Design Theme
“Modern Contemporary”
• Simplicity and straightforwardness
• Clean lines
• Ornamentation is kept to a minimum
• Strong interrelationship between indoor and outdoor spaces
• Incorporates natural light and ventilation
DOR Article V, Sec. 2.3 / Pattern Book Sec 3.0
• Similar architectural forms and details, building materials and color palette as the
Clubhouse.
Elements and Recommended Materials
External finishes and cladding
1. DESIGN CRITERIA
• Housing design theme
• Characteristics
• Elements and recommended materials
2. ARCHITECTURAL TREATMENT
• Type of Lot
• Setback Restrictions
• Building Setback
• Roof Setback
• Building Height Restriction
• Cut & Fill
• Utilities
• Landscape
• Lot Verification
3. GUIDE FOR HOUSE CONSTRUCTION
4. SCHEDULE OF FEES
TYPE OF LOT
• Special Lot
• Special Lot
BUILDING
FOOTPRINT
Building Setback
How to measure
3.00 m 2.00 m
ADJACENT
STREET LOT
• Minimum 3.00 meters on side/s • Minimum 2.00 meters on side/s NOT
fronting the street/park fronting the street/park
• Shall be measured from the property line to the nearest finished wall/window
or column or any projection from the said wall/window or column.
DOR Article V, Sec. 2.3 / Pattern Book Sec. 2.4.1
Porches, terraces, balconies, decks & stoops
• Balcony above the carport or garage is not allowed UNLESS it will follow the
3.00m setback fronting the street or park and 2.00m on the sides not fronting the
street or park from the property line
Building Setback
Below grade/basement
• When constructed FULLY BELOW GRADE, shall have a minimum setback of 2.00
meters from the property line on all sides
3.00 m 2.00 m
NGL
2.00 m
ROAD
COMMON AREA
Roof Roof
Plan
Plan
• Implementation
• Shall NOT be higher than ten (10.00 )
meters measured vertically from the
HIGHEST LOT CORNER elevation of
the lot to the apex of the roof
10.00 m
Highest
Corner base
on NGL
VEHICULAR ENTRANCES AND DRIVEWAY
• Width shall not exceed 50% of the total • If enclosed, shall follow 3meters
side length of the lot. setback from the property line on
• Minimum dimension for parking space is the side of the lot fronting the
2.40 m x 5.00 street or park
• Canvass canopies with similar coverings
are not allowed.
DOR Article V, Sec. 2.4.1
GARAGE/CARPORT
FIREWALL
3.20 m
0.60m 0.60m
supporting carport must be 1.00
meter from the property line
NOT
ALLOWED
0.90
• 2.00 meters above the finished • 0.90 meters above the finished
grade level of the property line grade level of the property line
adjacent to lot/open space fronting or bordering a street or park
0.90 m
• Swimming pools, whirlpools, jacuzzi shall have a distance of NOT less than 1.00m
from the property line. It must not be facing the street/park
• Any elevated structure but not limited to, water slides, shall NOT exceed 2.00
meters in height from the natural grade level.
DOR Article V, Sec. 1.7
OUTDOOR STRUCTURE
• The design shall be in harmony with the general character of the entire
development DOR Article IX
• Shall follow fence height restrictions - 0.90m fronting the street or park and 2m
not fronting the street or park
DOR Article VI Sec.2.3
FENCE
0.90 m
• WATER TANK/S
➢ At-grade water tanks shall follow setback requirement & shall be properly concealed
➢ NO deep well system and overhead water tank are allowed
DOR Article VII Sec.4,5
➢ Recommended 2.00 meter setback for Cistern at the side not fronting the street/park
NOT
ALLOWED
UTILITIES
• WATER LINE
➢ No larger than 1" diameter pipes connected before the water meter
➢ Install low flow or dual-flush toilet
➢ Install aerators on all faucets and showerheads
➢ Provide dedicated pipelines for recycled/grey water
DOR Article IV Sec.2
• ELECTRICITY
➢ Overhead Electricity
➢ Can be applied once Building Permit & Temporary CEI are secured
• TELEPHONE
➢ PLDT
➢ GLOBE
• CABLE TV
➢ Can be availed thru PLDT fiber optic line
➢ Satellite dish will be temporarily allowed until cable line is
available
LOT UTILITY CONNECTIONS
WATER
DRAINAGE
GRAY
NOT ALLOWED
• Trellis fronting the street is NOT allowed • Pergola shade is allowed fronting the street
LANDSCAPE
• All plants, including trees, and other soft scape elements which shall be used as
perimeter fence or barrier should NOT exceed the fence height requirements
• Landscaping on the green strip or outside property line is NOT allowed
NOT NOT
ALLOWED ALLOWED
• Refer to the Pattern Book for the recommended tree and shrub species and
ground covers
Presentation Outline
1. DESIGN CRITERIA
• Housing design theme
• Characteristics
• Elements and recommended materials
2. ARCHITECTURAL TREATMENT
• Type of Lot
• Setback Restrictions
• Building Setback
• Roof Setback
• Building Height Restriction
• Cut & Fill
• Utilities
• Landscape
• Lot Verification
3. GUIDE FOR HOUSE CONSTRUCTION
4. SCHEDULE OF FEES
House Construction Steps
Owner’s Guide
Submit
Preliminary Plans Start
3 7 Construction
1. DESIGN CRITERIA
• Housing design theme
• Characteristics
• Elements and recommended materials
2. ARCHITECTURAL TREATMENT
• Type of Lot
• Setback Restrictions
• Building Setback
• Roof Setback
• Building Height Restriction
• Cut & Fill
• Utilities
• Landscape
• Lot Verification
3. GUIDE FOR HOUSE CONSTRUCTION
4. SCHEDULE OF FEES
Schedule of Fees
Plan Evaluation
Timelines for Plan Review (30-60 working days)
Submit
Preliminary Plans 45 Working days
1 30-60 Working days
Note: The number of plan
revisions will affect the target
dates
Submit Final 6-10 Working days
2 Plans
Buiding Permit
15 to 30 Working days (estimate)
Application
3
Start
4 Construction
Plan Contents – Key lookouts
Architectural
Plan Type Content/Specifications Scale