[MANUAL PROSEDUR MANUAL PROCEDURE
MANUAL PROSEDUR
(MP)
ORIGINAL
DOCUMENT
ENGINEERING DEPARTMENT (ENG)
PROSES REPAIR PARTS
Repairing Parts Process
Quelity Manvel
‘Quality Management System 1SO 9001:2018
REVISI: 1P ~ (Penyesuaian Penyelarasan terhadap Pemenuhan Pereyaratan SNI ISO 9001:2018)
REVISION: O1P - (The adjustment of SMI SO 9001:2015 requirements futfilment)
PROSEDUR STANDAR OPERASIONAL - KERJA
‘SOP (Standard Operating Procedure)
‘DISUSON OLEH ~~ DIFINTAD DAN DIVERIFIKASI OLEH DISETUIUT OLEH: TEL
Compiled by Reviewed & Verified by ‘Approved by DIBERLAKUKAN
effective Date
|
Jparbase) \ ch |
JANUAR 2017
Abad Raft a. Syafir FA Dina Rohyad GA Jelantik Orda
Supentior ‘Manager Supervisor Director |
Department: Depertment: Managemen ecotes |
| Engineering Engineering Quality Assurance Technical & Engineering |
TANGEAL 62 = 12-2016 [ANGGAL:20-12-[TANGGAL 20 i2- | YANGGAL 27-12-2016 |
Date 2016 2016 Date
ote | borePROSES REPAIR PARTS ioe eee —I
REPAIRING PARTS PROCESS 2 |
‘SMM SNIISO 8001:2018 =
| MANUAL PROSEDUR/ MANUAL PROCEDURE tase—t
1. TUJUAN
Purpose
Untuk menetapkan prosedur proses perbalkan Komponen / part yang akan dikerjakan PT, TAKA PRECISION
MANUFACTURING INDONESIA
To establish the procedure for repairing components / parts that will be carried out by PT. TAKA PRECISION
MANUFACTURING INDONESIA
2. RUANG LINGKUP
Scope
Prosedur ini beriaku di PT. TAKA PRECISION MANUFACTURING INDONESIA,
This procedure is applicable at PT. TAKA PRECISION MANUFACTURING INDONESIA
ORIGINAL
DOCUMENT
«> REFERENS!
Reference
= 180 9001:2015,
+ ELEMEN. 8.1 —PERENCANAAN DAN PENGENDALIAN OPERASIONAL
* ELEMEN. 8.5.1 ~PENGENDALIAN PRODUKS! DAN PENYEDIAAN JASA
3. DEFINIS!
Definitions
3.1. Quality Plan (QP): adalah hasil pengkajian suatu job yang berisi acceptance criteria suatu product / service,
Proses-proses yang akan dilakukan, standar-standar yang dipakai, dan sumber daya yang diperiukan.
Quality Plan (QP): is the result of an assessment of a job that contains the acceptance criteria of a product
service, the processes to be carried out, the standards used, and the resources required,
3.2. Bill of Material (BOM): adalah daftar part dalam suatu pekerjaan yang akan diajukan pembelian lewat Material
‘Request (MR). Pemibuatan dokumen ini berdasarkan dari Summary of inspection Report (SIR).
Bill of Materials (BOM): is a list of parts in a job that will be submitted for purchase through Material Request
(MR). The making of this document is based on the Summary of Inspection Report (SIR).
3.3. Inspection Test Plan (ITP): adalah daftar rencana inspeksi dan pengujian untuk setiap proyek pekerjaan.
Inspection Test Plan (ITP): isa list of inspection and testing plans for each work project.
3.4, Summary of Inspection Report (SiR): adalah laporan yang berisi hasi-hasil temuan pada as received
inspection, serta rekomendasi-rekomendasi perbaikan. Pengerjaan as received inspection dilakukan
berdasarkan pada ITP.
‘Summary of Inspection Report (SiR): is a report containing results of findings on as received inspection, as well
recommendations for improvement. As received inspection is carried out based on ITP.
3,5, Material Request (MR) : adalah form pengajuan pembelian material berdasarkan Bill of Material
‘Material Request (MR) : is @ form for submitting material purchases based on Bill of Materials.
3.6. Service Request (SR) : adalah form pengajuan penggunaan jasa plhak ketiga dikarenakan pihak produksi
internal TPMI tidak sanggup untuk mengerjakan suatu pekerjaan, maupun jasa Konsultasi pada suatu pekerjaan.a RETR R TS : )
PROSES REPAIR PARTS | Pee |
| a
REPAIRING PARTS PROCESS | [isesor | urcecmemcra—|
‘SMM SNI1SO 9001:2018 | =
MANUAL PROSEDUR/ MANUAL PROCEDURE
‘Service Request (SR) : is form for submitting the use of third party services because TPMI's internal production
party is either unable to do a job, or consulting services on a job,
3.7. Non-Conformance Report (NCR): adalah laporan ketidak sesuaian suatu pekerjaan yang dapat berimbas kepada
bertambahnya modal pekerjaan.
‘Non-Conformance Report (NCR): is @ report of non-conformity ofa job that can impact on increasing work capital.
3.8, Surat Perintah Pengiriman Berang (SPPB): adslah surat yang berisi perintah untuk pengiriman barang kemiball ke
customer. Surat ini dterbitkan atas dasar persetujuan Engineer dan sebagai bukti bahwa suatu pekerjaan telah
selesai dikerjakan dan siap krim,
Goods Delivery Order (SPPB): is a letter containing an order to send goods back to the customer. This letter is
issued with Engineer's approval and as proof that a job has been completed and is ready to send.
3.9, Acceptance criteria: adalah criteria keberterimaan suatu produk / proses untuk memenuhi suatu stander tertentu.
Acceptance criteria : are criteria for acceptance of @ product / process to meet a certain standard.
3.10.Work schedule : a
delivery ke pelanggan,
Work schedule : is the work schedule for a job from the time the equipment / material arives to delivery to the
customer.
h jadwal pengerjaan suatu job dari sejak equipmentimaterial datang sampai dengan
3.11.Komponen: adalah bagian dari equipment yang akan dibuat / dimanufacture sesuai drawing atau contoh barang
asiinya.
Component: is part of the equipment to be manufactured according to the drawing or sample of the original item.
3.12.Part: adalah bagian terkecil dari suatu komponen.
Part is the smailest part of a component. ORIGINAL
DOCUMENT
3.13. WOR (Work Order Release): adalah bentuk permintaan untuk mengerjakan su i‘ Sales &
Marketing ke Direktorat Teknik & Engineering. WOR berisi scope pekeriaan yang harus dilakukan, acceptance
criteria, schedule delivery dan persyaratan lainnya dari pelanggan.
WOR (Work Order Release): is @ form of request to do @ job from the Sales & Marketing Department to the
Engineering & Engineering Directorate. WOR contains the scope of work to be done, acceptance criteria, delivery
‘Schedules and other requirements from the customer.
3.14.PPIC (Production Planning & Inventory Control): adalah organisasi di Direktorat Teknik & Engineering yang
berfungsi menetapkan planning dan mengontrol schedule produksi dari sejak receiving sampai dengan delivery
equipment.
PIC (Production Planning & Inventory Control) is an organization in Technical & Engineering Directorate whose
{function isto set planning and control the production schedule from receiving to delivery equipment.
3.18.Process Chart tahapan — tahapan operasi dari suatu job untuk setiap part / komponen.
Process Chart: the stages of the operation of a job for each part /component.
Pott3.16,
3.17.
4, TANGGUNG JAWAB DAN WEWENANG
PROSES REPAIR PARTS ee
REPAIRING PARTS PROCESS BBE NS | Mean Ne RTA
‘SMM SNIISO 800%:2018 vf a
MANUAL PROSEDUR MANUAL PROCEDURE Suse —} TusTeAwE
Rework: adalah kondisi dimana sustu pekerjaan tidak lulus uj, tidek sesuei dengan acceptance criteria, tetapi
‘masih dapat diperbaiki oleh pihak produksi internal TPMI
Rework is a condition where a job doesnt pass the test, doesn't comply with the acceptance criteria, but can
Stil be improved by TPMI internal production party.
Reject: adalah kondis|dimana suetu pekerjaan tidek ulus uj, tidak sesusi dengan acceptance criteria, tetap
sudah tidak dapat ciperbaiki oleh pihek produks! internal TPM, sehingga harus ada pengajuan material request
kembali, dikarenakan bahan sudah tidak dapat diakukan pekerjean Kembali, maupun pengajuan service request
kembali,cikarenakan proses pengerjaan tidak dapat diakukan oleh pihak produks! internal TPM
Reject is @ condition where a job doesn't pass the test, not in accordance with the acceptance criteria, but
cannot be repaired by TPM! internal production, so there must be a re-submission of the material request,
‘because the material cannot be re-worked, or the submission of service request again, because the workmanship
‘process cannot be carried out by TPM! intemal production
Responsibility ORIGINAL
4A,
42.
DOCUMENT
|. Departemen Sales & Marketing
SALES & MARKETING DEPARTEMENT (SMD)
4.4.1. Membuat WOR berdasarkan PO yang diterima dengan mencantumkan work scope, persyaratan
Pelanggan/acceptance criterianya, dan delivery time.
Make WOR based on the PO received by stating the work scope, customer requirements / acceptance
criteria, and delivery time.
4.4.2. Mengirimkan WOR ke Unit PPC Unit terkaitlainnya,
‘Sending WOR to PPC Unit other related unis.
Departemen PPIC
PRODUCTION
4.2.1. Membuat work schedule pelaksanaan job sesuai WORnya.
Make @ work schedule for job implementation according to the WOR,
4.2.2, Membuat Process Chart berdasarkan work schedule, quality plan dan drawing,
Make a Process Chart based on work schedule, quaifty plan and drawing.
4.2.3, Melaksanakan kontrol proses produksi
Carry out control of the production process.
4.2.4. Memberikan tanda pada setiap parvkomponen yang sedang dimanutacturing
Give a mark on each part /component being manufactured.
4.2.5. Menginformasikan kesiapan delivery equipment ke Departemen Sales & Marketing
Inform delivery equipment readiness to Sales & Marketing Department
4.2.6. Membuat SPPB (Surat Perintah Pengiriman Barang) dan mendistribusikannya ke unit logistic
Make SPPB (Goods Delivery Order) and distribute it to logistics unit
4.3. Departemen Engineering
ENGINEERING DEPARTEMENT (ENG)
4.3.1, Membuat Quality Pian berdasarkan WOR.44.
48.
46.
PROSES REPAIR PARTS a |
each REPAIRING PARTS PROCESS [Ee NA ESL PTA
SHIM SISO 8001-2015 Ta
MANUAL PROSEDUR/ MANUAL PROCEDURE
Make a Quality Plan based on WOR.
4.3.2, Membuat Bill of Material berdasarkan Summary of Inspection Report
Make a Bill of Material based on the Summary of Inspection Report.
4.3.3. Membuat Inspection and Test Plan berdasarkan WOR,
Make an Inspection and Test Plan based on WOR.
4.3.4, Mengajukan Material Request berdasarkan Bill of Material
‘Submit Material Requests based on the Bill of Materials.
4.3.5, Membuat drawing dan menetapkan spesifiasi material yang diperukan untuk setiap part.
Make drawings and determine the material specifications needed for each part.
4.3.6. Memberikan approved terhadap SPPB yang diterbitkan oleh PPIC
Provide approval for SPPB issued by PPIC
4.3.7. Memberikan approved terhadap Final Inspection Report,
Provide approval ofthe Final inspection Report.
TAKA PRECISION MANUFACTURING NOONESA
ORIGINAL
DOCUMENT
Unie uatty Contr
4.4.1, Melaksanakan receiving inspection parts, jka ada sample parts.
Carry out receiving inspection parts, if there are sample parts.
4.4.2. Melaksanakan receiving inspection material
Carry out receiving inspection material
4.4.3. Menerbitkan Summary of Inspection Report
Publish Summary of inspection Report
4.4.4, Melaksanakan inspeksi selama proses repair berlangsung sesuai drawing dan Process Chart.
Carry out inspections during the repair process takes according to the drawing and Process Chart
4.4.5. Melakukan final inspection komponen / part dan membuat final inspection report.
Conduct final inspection of components / parts and make a final inspection report.
4.46. Membuat NCR (Non-Conforming Report) bila ada Ketidak-sesuaian produk yang diproses dan
mengirimkannya ke Departemen QA-HSE.
Making NCR (Non-Conforming Report) if there is @ mismatch of the product being processed and sending
itt QA-HSE Department.
4.4.7. Memberikan final report ke Departemen Engineering
Give the final report to Engineering Department
Departemen Technical & Service - Unit Produk
TECHNICAL SERVICE DEPAR’
4.5.1. Melakukan repair komponen / part
Perform repair components / parts.
4.5.2. Menerbitkan Service Request apabila diperiukan.
Issue @ Service Requests if needed.
Unit Purchasing
PURCHASING UNIT
4.8.1. Melakukan pengadaan material sesuai MR.
Conduct material procurement according to MR.
4.6.2. Melakukan pengadaan jasa sesuai SR.
Providing services according to SR.| PROSES REPAIR PARTS Ler
Ge REPAIRING PARTS PROCESS “S-Me atn-PeN IC TOM
— owe | SMM SNI ISO 9001:2015 oP
| ‘MANUAL PROSEDUR/ MANUAL PROCEDURE Jeo
Engineering Departm
4.7. Unit Logistik & Gudang
HOU
4.7.4. Melakukan penerimaan material,
Conduct material acceptance.
4.7.2. Menginventarisasi (inventory) equipment dan parts yang dikiim sesuai DO (delivery order) yang diterima,
Do inventory equipment and parts that sent according to DO (delivery order) received.
4.7.3. Menindak lanjuti proses sub-kontrak,jka dipertukan,
Follow up on the sub-contract process, if needed.
4.7.4, Melaksanakan proses pengiriman komponen / part.
Carry out the process of sending components / pars.
ORIGINAL
4.8. Departemen QAHSE
QA-HSE DEPARTMENT (QA-HSE) DOCUMENT
4.8.1. Menindak-lanjuti NOR yang diterima dari unit-unit
Follow up on the NCR received from the units.
5, TAHAPAN PROSEDUR
Phase of Procedure
Lihat Flowchart teriampir
‘See attached Flowchart
6. DOKUMEN YANG BERHUBUNGANITERKAIT
Related Documents
6.1. Dokumen SOP (Standard Operating Procedures)
‘SOP (Standard Operating Procedures) Documents
6.1.1. SOP-MP (Manual Prosedur)
8, D2.1-MP.001-PPM-PPCH-TPMI _-MP - Proses Pengadaan Material
b. C2.5-MP-001.PB.EK-WHL-TPMI_ MP - Pengiriman Barang Material-Equipment-Component
c. CS-MP.004-PPTS-PPIC-TPMI _-MP-- Pengendalian Produk Tidak Sesuai
4. C1.3MP.001-PJLIQC-TPMI IMP - Pekerjaan Jasa Inspeksi
@. D2.1MP.002-PS-PPCH-TPMI MP - Proses Subkontrak
{_ B/MP.002-TLKP-SM-TPMI :MP - Tindak- Lanjut Kompiain Pelanggan
61.2. SOP -PK (Prosedur Kerja)
a. _C1.3-PK001PSP-IQC-TPMI IMP - PK Penandaan Status Produk
6.1.3. SOP-STD (Standarisasi)
a, C8-STD.001-SR-PPIC-TPMI ‘STD - Stamps Roster
6..2. Dokunen- Formulir Rekaman
Record Documents
62.1. F-MP (Formuli- Manual Prosedur)
2. 2¢F.000-00%-11-x-T PMI FMP -
6.2.2 F-PK (Formuli-Prosedur Kerja) FPK~
8. %6F.00000-1x-20-T PMI
62.3. F-STD (Formulir-Standarisasi)
8. 6F.000-%00%90030-T PMI PSTD.PROSES REPAIR PARTS === |
REPAIRING PARTS PROCESS | [oor eeueonemmecraa |
HM S180 9001:2018 [ase —Pep
NANUAL PROBEDUR/ MANUAL PROCEDURE eee
7. REKAMAN REVISI
Revlon Records
wo.rewsi | TaNcoaL | KETERANGANURAAN | wenceranui
Roisenn. | “tae | ecmon | AS
| { |
ot | 2vanuan2017 | revs dianukan |
| + Karena Perubahan Struktur Organisasi dan Penambahan
Lingkup-Pekerjaan (Scope of Work) perusahaan PT. TPM
‘+ Untuk Perbaikan Sistem dan Prosedur "Proses Operasional
Administratit dan Teknik-Produksi perusahaan PT. TPMI
sesuai acuan Sistem Manajemen Mutu ISO 9001:2008,
‘+ Karena_perubahan Logo baru PT. TPMI dan Logo baru
Badan Sertifkasi B4T-SC (System Certification)
02 02 Januari 2018
Pemutakhiran Dokumen Sistem Manajemen Mutu terhadap
|
|
|
|
|
|
| Poreran Pteyatten SN TSO SOOT 2015
|
PT. TAXA PRECISION MANUFACTURING INDONESIA
maka ORIGINAL
DOCUMENTT FREER
| PROSES REPAIR PARTS ie
REPAIRING PARTS PROCESS | Pens
‘SHI SAI4SO 001.2018 ca
Engineering Department
MANUAL PROSEDUR | MANUAL PROCEDURE ES
8. LAMPIRAN
‘Attachment
f ‘GENERAL REPAIRING PART PROCESS
wf ee ee |
Co fegge eege Lg
ORIGINAL
DOCUMENT