KURVA " S " PERPANJANGAN WAKTU

PEKERJAAN DESAIN, SUPLAI DAN INSTALASI TRANSMISI 500 KV MUARA TAWAR - BEKASI
CONTRACT NO. 0618.PJ/DAN.02.02/010700/2019 Tanggal. 09 Desember 2019

2020 2021 2022 2022 2023


BOBOT BOBOT
ITEM URAIAN PEKERJAAN NOP DES JAN PEB MAR APR MEI JUN JUL AGS SEP OKT NOP DES JAN PEB MAR APR MEI JUN JUL AGS SEP OKT NOP DES JAN PEB MAR APR MEI JUN JUL
(%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
ORI AMD.2 ORI ORI ORI ORI ORI ORI ORI ORI ORI ORI ORI ORI ORI ORI ORI ORI ORI ORI ORI AMD.2 AMD.2 AMD.2 AMD.2 AMD.2 AMD.2 AMD.2 AMD.2 AMD.2 AMD.2 AMD.2 AMD.2 AMD.2 AMD.2

A PEKERJAAN DESAIN, SUPLAI DAN INSTALASI TRANSMISI 500 KV MUARA TAWAR - BEKASI ELEKTRIKAL
0.5319% 0.5319% 0.5319% 0.6649% 0.5319% 0.5319% 0.5319% 0.5319% 0.5319% 0.6649% 0.5319% 0.5319%
1 CONDUCTORS, INCLUDING ALL JOINT AND JUMPER CONNECTIONS 3.324% 3.324%

0.0426% 0.1065% 0.0852% 0.0852% 0.1065% 0.0852% 0.0852% 0.0426% 0.1065% 0.0852% 0.0852% 0.1065% 0.0852% 0.0852%
2 DAMPING SYSTEMS : -CONDUCTOR VIBRATION DAMPERS, CONDUCTOR SPACERS, AND SPACER DAMPERS FOR 500 KV 0.596% 0.596%

3 TOWER EARTHING INCLUDING EXCAVATION, REINSTATEMENT, COMPRESSION JOINTING AND CONNECTION TO TOWER (GANTRY) 0.071% 0.071% 0.0119% 0.0095% 0.0095% 0.0119% 0.0095% 0.0119% 0.0071% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079%

INSULATOR STRING SETS AND EARTH CONDUCTOR ATTACHMENTS, COMPLETE WITH ALL FITTINGS BETWEEN TOWER AND 1.0391% 2.5979% 2.0783% 2.0783% 2.5979% 2.0783% 2.0783% 1.0391% 2.5979% 2.0783% 2.0783% 2.5979% 2.0783% 2.0783%
4 14.548% 14.548%
CONDUCTORS FOR 500 KV
5 CHECK SURVEY AND TOWER ALLOCATION 0.404% 0 0.0950% 0.1188% 0.0950% 0.0950%

B PEKERJAAN DESAIN, SUPLAI DAN INSTALASI TRANSMISI 500 KV MUARA TAWAR - BEKASI SIPIL
500 KV TWO CIRCUIT COMPACT TOWERS AND EXTENDED TOWERS OF THE SUSPENSION TYPE COMPLETE WITH ALL FITTINGS,
1 5.2924% 5.2924% 0.1764% 0.8821% 0.7056% 0.8821% 0.7056% 0.7056% 0.8821% 0.3528% 0.1764% 0.8821% 0.7056% 0.8821% 0.7056% 0.7056% 0.8821% 0.3528%
INCLD CHECK FINAL AND TACK WELDING BOLT & NUTS FOR TOWERS AA10 :

500 KV TWO CIRCUIT COMPACT TOWERS AND EXTENDED TOWERS OF THE TENSION TYPE COMPLETE WITH ALL FITTINGS, INCLD
2 7.1915% 7.1915% 0.7191% 1.1986% 0.9589% 1.1986% 0.9589% 0.9589% 1.1986% 0.7191% 1.1986% 0.9589% 1.1986% 0.9589% 0.9589% 1.1986%
CHECK FINAL AND TACK WELDING BOLT & NUTS FOR TOWERS BB10 :

500 KV TWO CIRCUIT COMPACT TOWERS AND EXTENDED TOWERS OF THE TENSION TYPE COMPLETE WITH ALL FITTINGS, INCLD
3 2.7667% 2.7667% 0.2767% 0.4611% 0.3689% 0.4611% 0.3689% 0.3689% 0.4611% 0.2767% 0.4611% 0.3689% 0.4611% 0.3689% 0.3689% 0.4611%
CHECK FINAL AND TACK WELDING BOLT & NUTS FOR TOWERS CC10 :

500 KV TWO CIRCUIT COMPACT TOWERS AND EXTENDED TOWERS OF THE TENSION TYPE COMPLETE WITH ALL FITTINGS, INCLD
4 0.5714% 0.5714% 0.0190% 0.0762% 0.0952% 0.0762% 0.0952% 0.0762% 0.0762% 0.0571% 0.0190% 0.0762% 0.0952% 0.0762% 0.0952% 0.0762% 0.0762% 0.0571%
CHECK FINAL AND TACK WELDING BOLT & NUTS FOR TOWERS DD10 :

500 KV TWO CIRCUIT COMPACT TOWERS AND EXTENDED TOWERS OF THE TENSION TYPE COMPLETE WITH ALL FITTINGS, INCLD
5 1.3054% 1.3054% 0.0435% 0.1741% 0.2176% 0.1741% 0.2176% 0.1741% 0.1741% 0.1305% 0.0435% 0.1741% 0.2176% 0.1741% 0.2176% 0.1741% 0.1741% 0.1305%
CHECK FINAL AND TACK WELDING BOLT & NUTS FOR TOWERS EE10 :

500 KV TWO CIRCUIT COMPACT TOWERS AND EXTENDED TOWERS OF THE TENSION TYPE COMPLETE WITH ALL FITTINGS, INCLD
6 0.4682% 0.4682% 0.0468% 0.0624% 0.0780% 0.0624% 0.0780% 0.0624% 0.0624% 0.0156% 0.0468% 0.0624% 0.0780% 0.0624% 0.0780% 0.0624% 0.0624% 0.0156%
CHECK FINAL AND TACK WELDING BOLT & NUTS FOR TOWERS FF10 :

500 KV FOUR CIRCUIT SLIM LATTICE VERTICAL TOWERS AND EXTENDED TOWERS OF THE SUSPENSION TYPE TYPE COMPLETE WITH
14 4.8140% 4.8140% 0.4814% 0.6419% 0.8023% 0.6419% 0.8023% 0.6419% 0.6419% 0.1605% 0.4814% 0.6419% 0.8023% 0.6419% 0.8023% 0.6419% 0.6419% 0.1605%
ALL FITTING,INCLD CHECK FINAL AND TACK WELDING BOLT & NUTS FOR TOWERS 4AA10 :

500 KV FOUR CIRCUIT SLIM LATTICE VERTICAL TOWERS AND EXTENDED TOWERS OF THE SUSPENSION TYPE TYPE COMPLETE WITH
15 6.8458% 6.8458% 0.2282% 0.9128% 0.9128% 1.1410% 0.9128% 1.1410% 0.9128% 0.6846% 0.2282% 0.9128% 0.9128% 1.1410% 0.9128% 1.1410% 0.9128% 0.6846%
ALL FITTING,INCLD CHECK FINAL AND TACK WELDING BOLT & NUTS FOR TOWERS 4BB10 :

500 KV FOUR CIRCUIT SLIM LATTICE VERTICAL TOWERS AND EXTENDED TOWERS OF THE SUSPENSION TYPE TYPE COMPLETE WITH
16 5.9796% 5.9796% 0.1993% 0.7973% 0.7973% 0.9966% 0.7973% 0.9966% 0.7973% 0.5980% 0.1993% 0.7973% 0.7973% 0.9966% 0.7973% 0.9966% 0.7973% 0.5980%
ALL FITTING,INCLD CHECK FINAL AND TACK WELDING BOLT & NUTS FOR TOWERS 4CC10 :

500 KV FOUR CIRCUIT SLIM LATTICE VERTICAL TOWERS AND EXTENDED TOWERS OF THE SUSPENSION TYPE TYPE COMPLETE WITH
17 4.5337% 4.5337% 0.4534% 0.6045% 0.6045% 0.7556% 0.6045% 0.7556% 0.6045% 0.1511% 0.4534% 0.6045% 0.6045% 0.7556% 0.6045% 0.7556% 0.6045% 0.1511%
ALL FITTING,INCLD CHECK FINAL AND TACK WELDING BOLT & NUTS FOR TOWERS 4DD10 :

500 KV FOUR CIRCUIT SLIM LATTICE VERTICAL TOWERS AND EXTENDED TOWERS OF THE SUSPENSION TYPE TYPE COMPLETE WITH
18 5.6078% 5.6078% 0.5608% 0.7477% 0.7477% 0.9346% 0.7477% 0.9346% 0.7477% 0.1869% 0.5608% 0.7477% 0.7477% 0.9346% 0.7477% 0.9346% 0.7477% 0.1869%
ALL FITTING,INCLD CHECK FINAL AND TACK WELDING BOLT & NUTS FOR TOWERS 4EE10 :

500 KV FOUR CIRCUIT SLIM LATTICE VERTICAL TOWERS AND EXTENDED TOWERS OF THE SUSPENSION TYPE TYPE COMPLETE WITH
19 2.4217% 2.4217% 0.4036% 0.3229% 0.3229% 0.4036% 0.3229% 0.4036% 0.2422% 0.4036% 0.3229% 0.3229% 0.4036% 0.3229% 0.4036% 0.2422%
ALL FITTING,INCLD CHECK FINAL AND TACK WELDING BOLT & NUTS FOR TOWERS 4FF10 :

500 KV TWO CIRCUIT COMPLETE WITH LEG AND STUB EXTENSION FOR ALL TYPE OF STANDARD TOWER DESIGN INCLUDING FINAL
23 0.1116% 0.1116% 0.0186% 0.0149% 0.0149% 0.0186% 0.0149% 0.0186% 0.0112% 0.0186% 0.0149% 0.0149% 0.0186% 0.0149% 0.0186% 0.0112%
CHECK AND TACK WELDING OF BOLT & NUTS :
24 FOUNDATION 28.3596% 27.2686% 3.3364% 4.1705% 3.3364% 3.3364% 4.1705% 3.3364% 4.1705% 2.5023% 1.1227% 2.8360% 2.8360% 2.8360% 2.8360% 2.8360% 2.8360% 2.8360% 3.4582% 2.8360%
DISMANTLING AND STORING IN PLN STORAGE OF TOWER, CONDUCTOR, INSULATOR, EARTHWIRE AND ACCESSORIES, INCLUDING
25 IDENTIFICATION STEEL MEMBERS, NUMBERING, PACKING,...ETC AND DISMANTLING AND DISPOSING OF TOWER FOUNDATION OF 150 0.3003% 0.3003% 0.1201% 0.1201% 0.0601% 0.1201% 0.1201% 0.0601%
KV PENGGILINGAN - BEKASI EXISTING LINE
26 MISCELLANEEOUS SLOPE PROTECTION AND TIE BEAM WORK PRICES (IF NECESSARY) 0.2279% 0.2279% 0.0570% 0.1140% 0.0570% 0.0570% 0.1140% 0.0570%
27 TESTING (TO BE APPLIED AFTER INSTRUCTED BY ENGINEER) 3.9376% 3.8978% 0.5250% 2.1000% 0.5250% 0.7875% 0.5250% 2.0603% 0.5250% 0.7875%
28 TOWER ACCESSORIES FOR NON STANDARD DESIGN TOWER 0.0832% 0.0832% 0.0416% 0.0416% 0.0416% 0.0416%
29 OTHERS 0.0011% 0.0011% 0.0011% 0.0011%
31 TEST AND COMISSIONING 0.1141% 0.1141% 0.0285% 0.0856% 0.0285% 0.0856%
32 AS BUILT DRAWING ( 3 sets hardcopy and 2 sets softcopy ) consist of : 0.0285% 0.0285% 0.0071% 0.0214% 0.0071% 0.0214%

33 DESIGN (CALCULATION, DETAIL DESIGN AND DRAWING FOR TOWER MUST BE ECONOMICAL DESIGN) 0.0941% 0.0941% 0.0188% 0.0377% 0.0377% 0.0188% 0.0377% 0.0377%

TOTAL 100.0000% 98.4654%


RENCANA ORI 0.0000% 0.0950% 0.6637% 2.2327% 0.7778% 3.4565% 6.1064% 8.1243% 8.8727% 12.1674% 10.8156% 15.5022% 11.6639% 7.3609% 6.2747% 3.0482% 2.7310% 0.1070% 0.0000%
AKUMULASI AKTUAL ORI 0.0000% 0.0950% 0.7587% 2.9914% 3.7692% 7.2257% 13.3321% 21.4563% 30.3291% 42.4964% 53.3121% 68.8143% 80.4782% 87.8390% 94.1138% 97.1620% 99.8930% 100.0000% 100.0000%
REALISASI ORI 0.000 0.035 0.0000 0.0813 0.0000 0.0101 0.0000 0.2547 0.0000 0.0485 0.0000 0.2736 0.0000 0.0000 0.0000 0.2160 0.3581 0.2570 0.000
AKUMULASI AKTUAL ORI 0.000 0.035 0.0353 0.1166 0.1166 0.1267 0.1267 0.3814 0.3814 0.4299 0.4299 0.7034 0.7034 0.7034 0.7034 0.9195 1.2776 1.5346 1.5346
RENCANA 0.0011% 1.1227% 4.8200% 7.4798% 10.4910% 12.4356% 12.4681% 13.5242% 12.6303% 11.4439% 8.5433% 3.2305% 0.1303% 0.1446%
AKUMULASI AKTUAL 1.5357% 2.6584% 7.4783% 14.9581% 25.4491% 37.8847% 50.3528% 63.8771% 76.5074% 87.9512% 96.4946% 99.7251% 99.8554% 100.0000%
REALISASI
AKUMULASI AKTUAL
Jakarta, Mei 2022
Disetujui Oleh : Dibuat Oleh :
PT PLN (Persero) UIP JBB KONSORSIUM PT CITICON ADHINUGRAHA -
PT PLN (Persero) UPP JBB 3 PT GUNUNG BAJA KONSTRUKSI

RIFKI SANTOSO MOH. IBRAHIM


Manager Project Manager