This request is submitted pursuantto if the
reserve our right to claim for Additional Cost to the Contract and| Thanks.
REASON: Cpesign error C1 Design omissi
(Owner's Request [_] Field Condition —CTUntaresean Conaition
CD Other: (specity)
REFERENCE: (Drawings):
C Specifications:
Totter: ‘speci
DISCIPLINE: O prchitectural — Mechanical O curtain watt
CO Structural O Electrical CO External Works
Deiat Cl Plumbing Clother:
‘Scope of Work: | f V
Estimated Cost impact: (aeD)
Detailed cost analysis shall be submitted in due course.
Estimated Time Impact: (Days)
Detailed time analysis shall be submitted in due course.
Prepared By: Approved By: Date:
Comments by CONTRACTOR:
Cl We agree that this is a change to the Contract Documents.
(1 We do not agree that this is a change to the Contract Documents, as noted above.
Prepared By: Approved By: Date:
FIVT-QCF-COMM.27 Issued Draft