You are on page 1of 1
IF YOU WANT TO EDIT OR MODIFY THE 1.) Follow this Link @ http://tinyurl.com/7\ Ms 2») Complete a short survey. 13.) You will be downloading the password DATE: Please note that we at Unfold Secrets Tear ldownload. We need your support to Fill the Documents for your convenience This request is submitted pursuantto if the reserve our right to claim for Additional Cost to the Contract and| Thanks. REASON: Cpesign error C1 Design omissi (Owner's Request [_] Field Condition —CTUntaresean Conaition CD Other: (specity) REFERENCE: (Drawings): C Specifications: Totter: ‘speci DISCIPLINE: O prchitectural — Mechanical O curtain watt CO Structural O Electrical CO External Works Deiat Cl Plumbing Clother: ‘Scope of Work: | f V Estimated Cost impact: (aeD) Detailed cost analysis shall be submitted in due course. Estimated Time Impact: (Days) Detailed time analysis shall be submitted in due course. Prepared By: Approved By: Date: Comments by CONTRACTOR: Cl We agree that this is a change to the Contract Documents. (1 We do not agree that this is a change to the Contract Documents, as noted above. Prepared By: Approved By: Date: FIVT-QCF-COMM.27 Issued Draft

You might also like