The document contains measurement data from a survey of a roadway. It includes the station, point, distance from the baseline, face, and cross slope measurements at multiple locations along the roadway. It also provides the quantity of embankment needed if an embankment is constructed at elevation +101.000 with a width of 5 meters and a cross slope of 4%.
The document contains measurement data from a survey of a roadway. It includes the station, point, distance from the baseline, face, and cross slope measurements at multiple locations along the roadway. It also provides the quantity of embankment needed if an embankment is constructed at elevation +101.000 with a width of 5 meters and a cross slope of 4%.
The document contains measurement data from a survey of a roadway. It includes the station, point, distance from the baseline, face, and cross slope measurements at multiple locations along the roadway. It also provides the quantity of embankment needed if an embankment is constructed at elevation +101.000 with a width of 5 meters and a cross slope of 4%.
Cross diperlihatkan pada tabel dibawah dan Tentukan 00+050 1 1713 3.00 Kuantitas dari timbunan berikut jika dilakukan 00+050 2 2047 6.00 penimbunan pada elevasi +101.000 dan lebar 5 m 00+050 3 2418 7.50 dengan kemiringan melintang jalan 4 %. 00+050 CL 1652 00+050 a 1586 2.50 Jarak Sta Titik Belakang Muka 00+050 b 1899 5.00 Cross 00+000 1 1546 3.00 00+050 c 2561 6.00
00+000 2 2010 6.00 00+075 1632
00+000 3 2533 7.30 00+075 1 1698 2.50
00+000 CL 1444 00+075 2 2896 5.50
00+000 a 1680 2.00 00+075 3 2443 7.50
00+000 b 1994 4.00 00+075 CL 1632
00+000 c 2624 6.00 00+075 a 1691 2.50
00+025 1584 00+075 b 2132 5.00
00+025 1 1652 3.00 00+075 c 2573 6.00
00+025 2 2063 6.00 00+100 1619
00+025 3 2670 8.00 00+100 1 1533 2.00
00+025 CL 1584 00+100 2 1785 5.00
00+025 a 1805 3.00 00+100 3 2284 6.50
00+025 b 2175 4.80 00+100 CL 1466
00+025 c 2546 6.10 00+100 a 1493 2.00
00+050 1570 00+100 b 1746 5.00
00+100 c 2366 6.30 00+125 1368
Data Hasil Pengukuran Sifat Datar
diperlihatkan pada tabel dibawah dan Tentukan Jarak Kuantitas dari timbunan berikut jika dilakukan Sta Titik Belakang Muka Cross penimbunan pada elevasi +101.000 dan lebar 5 m 00+050 1 1713 3.00 dengan kemiringan melintang jalan 4 %. 00+050 2 2047 6.00 00+050 3 2418 7.50 Jarak 00+050 CL 1652 Sta Titik Belakang Muka Cross 00+050 a 1586 2.50 00+000 1 1546 3.00 00+050 b 1899 5.00 00+000 2 2010 6.00 00+050 c 2561 6.00 00+000 3 2533 7.30 00+075 1632 00+000 CL 1444 00+075 1 1698 2.50 00+000 a 1680 2.00 00+075 2 2896 5.50 00+000 b 1994 4.00 00+075 3 2443 7.50 00+000 c 2624 6.00 00+075 CL 1632 00+025 1584 00+075 a 1691 2.50 00+025 1 1652 3.00 00+075 b 2132 5.00 00+025 2 2063 6.00 00+075 c 2573 6.00 00+025 3 2670 8.00 00+100 1619 00+025 CL 1584 00+100 1 1533 2.00 00+025 a 1805 3.00 00+100 2 1785 5.00 00+025 b 2175 4.80 00+100 3 2284 6.50 00+025 c 2546 6.10 00+100 CL 1466 00+050 1570 00+100 a 1493 2.00 00+100 b 1746 5.00 00+100 c 2366 6.30 00+125 1368