DEL 3+950 AL 6+832 (PRIMERA VALORIZACION) 3,791.67
DEL 8+000 AL 16+370 EJECUTADO 6,104.81
DEL 20+880 AL 21+330 (FALTA VOLAR PERO ESTA PERFORADO) 4,990.33
DEL 21+330 AL 21+380 (YA ESTA VOLADO PERO FALTA ELIMINAR) 7,163.63
EN ROCAS PUNTUALES 160.80
22,211.23
METRADO DE EXPLANACIONES
SECTOR: AQUIRA
FECHA: ENERO DEL 2018 ELABORADO POR: MGP
SECTOR: AQUIRA
FECHA: ENERO DEL 2018 ELABORADO POR: MGP
SECTOR: AQUIRA
FECHA: ENERO DEL 2018 ELABORADO POR: MGP
SECTOR: AQUIRA
FECHA: ENERO DEL 2018 ELABORADO POR: MGP
SECTOR: AQUIRA
FECHA: ENERO DEL 2018 ELABORADO POR: MGP
TRAMO
LARGO (m) ANCHO (m) ALTO (m) VOLUMEN (m3)
DEL AL
8+620.00 8+623.50 3.50 2.00 1.80 12.60
8+880.00 8+900.00 20.00 0.50 0.50 5.00
9+055.00 9+070.00 15.00 0.50 0.50 3.75
9+280.00 9+285.00 5.00 2.00 0.70 7.00
9+780.00 9+785.00 5.00 2.00 1.50 15.00
9+870.00 9+880.00 10.00 1.20 0.60 7.20
9+940.00 9+947.00 7.00 4.50 3.50 110.25