Project: Pucobre -El Espino ETAP Page: 1

Location: 16.0.0C Date: 16-06-2021

Contract: P102704-P103325 SN: 4359168

Engineer: M. Repol Revision: Base


Study Case: SCIEC
Filename: Pucobre Config.: Normal

Electrical Transient Analyzer Program

Short-Circuit Analysis

IEC 60909 Standard

3-Phase Fault Currents

Swing V-Control Load Total

Number of Buses: 1 0 7 8

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total

Number of Branches: 3 0 0 4 0 0 7

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total

Number of Machines: 0 1 0 0 0 1

System Frequency: 50.00

Unit System: Metric

Project Filename: Pucobre

Output Filename: C:\ETAP 1600\Pucobre\Untitled.SI1S


Project: Pucobre -El Espino ETAP Page: 2

Location: 16.0.0C Date: 16-06-2021

Contract: P102704-P103325 SN: 4359168

Engineer: M. Repol Revision: Base


Study Case: SCIEC
Filename: Pucobre Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


Project: Pucobre -El Espino ETAP Page: 3

Location: 16.0.0C Date: 16-06-2021

Contract: P102704-P103325 SN: 4359168

Engineer: M. Repol Revision: Base


Study Case: SCIEC
Filename: Pucobre Config.: Normal

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

5200-US-0001 Load 23.000 23.000 1 100.00 0.00


5330-SG-001 Load 23.000 23.000 1 100.00 0.00
Bus1 SWNG 110.000 110.000 1 100.00 0.00
Bus2 Load 110.000 110.000 1 100.00 0.00
Bus3 Load 23.000 23.000 1 100.00 0.00
Bus4 Load 4.160 4.160 1 100.00 0.00
Bus5 Load 0.400 0.400 1 100.00 0.00
Portal Maniobras Load 23.000 23.000 1 100.00 0.00

8 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP.
Project: Pucobre -El Espino ETAP Page: 4

Location: 16.0.0C Date: 16-06-2021

Contract: P102704-P103325 SN: 4359168

Engineer: M. Repol Revision: Base


Study Case: SCIEC
Filename: Pucobre Config.: Normal

Line/Cable Input Data

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

Line1 77,3 1000.0 0 1 75 0.57100 0.36163 0.0000034

Line2 356 400.0 0 1 75 0.11800 0.23728 0.0000050

Line3 356 400.0 0 1 75 0.11800 0.23728 0.0000050

Line4 356 90.0 0 1 75 0.11800 0.23728 0.0000050

Line / Cable resistances are listed at the specified temperatures.


Project: Pucobre -El Espino ETAP Page: 5

Location: 16.0.0C Date: 16-06-2021

Contract: P102704-P103325 SN: 4359168

Engineer: M. Repol Revision: Base


Study Case: SCIEC
Filename: Pucobre Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted

ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z

T1 1.500 23.000 0.400 6.25 6.00 0 0 0 0 0 6.2500

T1-SEU La yesera 25.000 110.000 23.000 10.00 20.00 0 0 0 0 0 10.0000

T2 12.000 23.000 4.160 9.00 20.00 0 0 0 0 0 9.0000


Project: Pucobre -El Espino ETAP Page: 6

Location: 16.0.0C Date: 16-06-2021

Contract: P102704-P103325 SN: 4359168

Engineer: M. Repol Revision: Base


Study Case: SCIEC
Filename: Pucobre Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb

ID Type From Bus To Bus R X Z Y

T1 2W XFMR 5200-US-0001 Bus5 65.89 395.35 400.80

T1-SEU La yesera 2W XFMR Bus2 Bus3 1.97 39.39 39.44

T2 2W XFMR 5330-SG-001 Bus4 3.71 74.27 74.36

Line1 Line Bus1 Bus2 0.47 0.30 0.56

Line2 Line Bus3 Portal Maniobras 0.89 1.79 2.00

Line3 Line Portal Maniobras 5200-US-0001 0.89 1.79 2.00

Line4 Line Portal Maniobras 5330-SG-001 0.20 0.40 0.45


Project: Pucobre -El Espino ETAP Page: 7

Location: 16.0.0C Date: 16-06-2021

Contract: P102704-P103325 SN: 4359168

Engineer: M. Repol Revision: Base


Study Case: SCIEC
Filename: Pucobre Config.: Normal

Power Grid Input Data

% Impedance
Power Grid Connected Bus Rating 100 MVA Base
ID ID MVASC kV R X" R/X

U1 Bus1 100000.000 110.000 0.00995 0.09950 0.10

Total Connected Power Grids ( = 1 ): 100000.000 MVA


Project: Pucobre -El Espino ETAP Page: 8

Location: 16.0.0C Date: 16-06-2021

Contract: P102704-P103325 SN: 4359168

Engineer: M. Repol Revision: Base


Study Case: SCIEC
Filename: Pucobre Config.: Normal

SHORT-CIRCUIT REPORT

3-Phase fault at bus: 5330-SG-001

Nominal kV = 23.000
Voltage c Factor = 1.10 (User-Defined)
Peak Value = 16.500 kA Method C
Steady State = 6.552 kA rms

Contribution Voltage & Initial Symmetrical Current (rms)


From Bus To Bus %V kA kA X/R kA
ID ID From Bus Real Imaginary Ratio Magnitude

5330-SG-001 Total 0.00 0.551 -6.529 11.8 6.552

Portal Maniobras 5330-SG-001 1.07 0.551 -6.529 11.8 6.552

Bus4 5330-SG-001 0.00 0.000 0.000 999.9 0.000

Bus3 Portal Maniobras 5.82 0.551 -6.529 11.8 6.552

5200-US-0001 Portal Maniobras 1.07 0.000 0.000 999.9 0.000

Breaking and DC Fault Current (kA)


Based on Total Bus Fault Current

TD (S) Ib sym Ib asym Idc

0.01 6.552 9.667 7.107

0.02 6.552 8.523 5.452

0.03 6.552 7.773 4.182

0.04 6.552 7.295 3.207

0.05 6.552 6.999 2.460

0.06 6.552 6.818 1.887

0.07 6.552 6.710 1.447

0.08 6.552 6.645 1.110

0.09 6.552 6.607 0.852

0.10 6.552 6.585 0.653

0.15 6.552 6.554 0.173

0.20 6.552 6.552 0.046

0.25 6.552 6.552 0.012

0.30 6.552 6.552 0.003


Project: Pucobre -El Espino ETAP Page: 9

Location: 16.0.0C Date: 16-06-2021

Contract: P102704-P103325 SN: 4359168

Engineer: M. Repol Revision: Base


Study Case: SCIEC
Filename: Pucobre Config.: Normal

Short-Circuit Summary Report

3-Phase Fault Currents

Device Capacity (kA)


Bus Device Making Short-Circuit Current (kA)
ID kV ID Type Peak Ib sym Ib asym Idc I"k ip Ib sym Ib asym Idc Ik
5330-SG-001 23.000 5330-SG-001 SwtchGear 16.000 6.552 16.500 * 6.552

23.000 CB1 CB 40.000 16.000 17.333 6.665 6.552 16.500 6.552 6.897 2.155

23.000 CB2 CB 40.000 16.000 17.333 6.665 6.552 16.500 6.552 6.897 2.155

23.000 CB4 CB 40.000 16.000 17.333 6.665 6.552 16.500 6.552 6.897 2.155

23.000 CB6 CB 40.000 16.000 17.333 6.665 6.552 16.500 6.552 6.897 2.155

ip is calculated using method C


Ib does not include decay of non-terminal faulted induction motors
Ik is the maximum steady state fault current
Idc is based on X/R from Method C and Ib as specified above

LV CB duty determined based on service rating.


Total through current is used for device duty.
* Indicates a device with calculated duty exceeding the device capability.
# Indicates a device with calculated duty exceeding the device marginal limit. ( 95 % times device capability)