Function: 1. To apply the Rational Method (sometimes called the FAA Method)
and hydrograph methods to estimate stormwater detention volume.
Riser Riser Tabulates a stage-discharge relationship for a perforated riser plate (Inlet Control).
Cir-Pipe Tabulates a stage-discharge relationship for a circular pipe, comparing inlet vs. outlet control.
Pipe Outlet
Rect-Pipe Tabulates a stage-discharge relationship for a box culvert, comparing inlet vs. outlet control.
Box Outlet
Rect-Pipe Tabulates a stage-discharge relationship for a spillway.
Spillway
Acknowledgements: This spreadsheet was originally developed by the Denver Urban Drainage and Flood Control
District (UDFCD) and has been modified by the City of Springfield to reflect local criteria and
policies with the permission of UDFCD. The original UDFCD spreadsheet development team
was comprised of:
Dr. James C.Y. Guo, P.E.
Professor, Department of Civil Engineering
University of Colorado at Denver
Ken A. MacKenzie, P.E., JM O'Brien, and James Lester
Urban Drainage and Flood Control District
Wright Water Engineers, Inc.
Denver, Colorado.
Modifications to the spreadsheet to reflect City of Springfield criteria and policies were made
by WWE with consultation and peer review by the City of Springfield, MO.
Comments? Direct all comments regarding this spreadsheet workbook to: Todd Wagner E-Mail
twagner@springfieldmo.gov
Revisions? Check for revised versions of this or any other workbook at: Downloads
http://www.ci.springfield.mo.us/egov/publicworks/storm_water/manual.html
The user must fill in all of the blue cells for these sheets to function.
Project:
Basin ID:
Area A= acres
Runoff Coefficient C=
Maximum Allowable Release Rate Qpo = cfs
Time of Concentration Tc = minutes
Return Period T= 2 1 years
Calculations
Rainfall Rainfall Average Outflow Storage
Duration Intensity Inflow Adjustment Outflow Volume Volume
(min) (in/hr) Volume (ft3) Factor (cfs) (ft3) (ft3)
(1) (2) (3) (4) (5) (6) (7)
0 ---- ---- ---- ---- ---- ----
5 5.40 0 0.50 0.0 0 0
10 4.74 0 0.50 0.0 0 0
15 4.07 0 0.50 0.0 0 0
20 3.52 0 0.50 0.0 0 0
25 3.11 0 0.50 0.0 0 0
30 2.79 0 0.50 0.0 0 0
35 2.53 0 0.50 0.0 0 0
40 2.33 0 0.50 0.0 0 0
45 2.15 0 0.50 0.0 0 0
50 2.01 0 0.50 0.0 0 0
55 1.88 0 0.50 0.0 0 0
60 1.78 0 0.50 0.0 0 0
65 1.68 0 0.50 0.0 0 0
70 1.60 0 0.50 0.0 0 0
75 1.52 0 0.50 0.0 0 0
80 1.45 0 0.50 0.0 0 0
85 1.39 0 0.50 0.0 0 0
90 1.34 0 0.50 0.0 0 0
95 1.29 0 0.50 0.0 0 0
100 1.24 0 0.50 0.0 0 0
105 1.20 0 0.50 0.0 0 0
110 1.16 0 0.50 0.0 0 0
115 1.12 0 0.50 0.0 0 0
120 1.09 0 0.50 0.0 0 0
125 1.06 0 0.50 0.0 0 0
The user must fill in all of the blue cells for these sheets to function.
Project:
Basin ID:
Area A= acres
Runoff Coefficient C=
Maximum Allowable Release Rate Qpo = cfs
Time of Concentration Tc = minutes
Return Period T= 2 1 years
Calculations
Rainfall Rainfall Average Outflow Storage
Duration Intensity Inflow Adjustment Outflow Volume Volume
(min) (in/hr) Volume (ft3) Factor (cfs) (ft3) (ft3)
(1) (2) (3) (4) (5) (6) (7)
130 1.02 0 0.50 0.0 0 0
135 1.00 0 0.50 0.0 0 0
140 0.97 0 0.50 0.0 0 0
145 0.95 0 0.50 0.0 0 0
150 0.92 0 0.50 0.0 0 0
155 0.90 0 0.50 0.0 0 0
160 0.88 0 0.50 0.0 0 0
165 0.86 0 0.50 0.0 0 0
170 0.84 0 0.50 0.0 0 0
175 0.82 0 0.50 0.0 0 0
180 0.80 0 0.50 0.0 0 0
185 0.79 0 0.50 0.0 0 0
190 0.77 0 0.50 0.0 0 0
195 0.76 0 0.50 0.0 0 0
200 0.74 0 0.50 0.0 0 0
205 0.73 0 0.50 0.0 0 0
210 0.71 0 0.50 0.0 0 0
215 0.70 0 0.50 0.0 0 0
220 0.69 0 0.50 0.0 0 0
225 0.68 0 0.50 0.0 0 0
230 0.67 0 0.50 0.0 0 0
235 0.66 0 0.50 0.0 0 0
240 0.64 0 0.50 0.0 0 0
245 0.63 0 0.50 0.0 0 0
250 0.62 0 0.50 0.0 0 0
255 0.62 0 0.50 0.0 0 0
The user must fill in all of the blue cells for these sheets to function.
Project:
Basin ID:
Area A= acres
Runoff Coefficient C=
Maximum Allowable Release Rate Qpo = cfs
Time of Concentration Tc = minutes
Return Period T= 2 1 years
Calculations
Rainfall Rainfall Average Outflow Storage
Duration Intensity Inflow Adjustment Outflow Volume Volume
(min) (in/hr) Volume (ft3) Factor (cfs) (ft3) (ft3)
(1) (2) (3) (4) (5) (6) (7)
260 0.61 0 0.50 0.0 0 0
265 0.60 0 0.50 0.0 0 0
270 0.59 0 0.50 0.0 0 0
275 0.58 0 0.50 0.0 0 0
280 0.57 0 0.50 0.0 0 0
285 0.56 0 0.50 0.0 0 0
290 0.56 0 0.50 0.0 0 0
295 0.55 0 0.50 0.0 0 0
300 0.54 0 0.50 0.0 0 0
305 0.53 0 0.50 0.0 0 0
310 0.53 0 0.50 0.0 0 0
315 0.52 0 0.50 0.0 0 0
320 0.52 0 0.50 0.0 0 0
325 0.51 0 0.50 0.0 0 0
330 0.50 0 0.50 0.0 0 0
335 0.50 0 0.50 0.0 0 0
340 0.49 0 0.50 0.0 0 0
345 0.49 0 0.50 0.0 0 0
350 0.48 0 0.50 0.0 0 0
355 0.47 0 0.50 0.0 0 0
360 0.47 0 0.50 0.0 0 0
365 0.46 0 0.50 0.0 0 0
Project:
Basin ID:
Project:
Basin ID:
Project:
Basin ID:
Stage-Storage Relationship:
Enter water surface elevations in ascending order.
Project:
Basin ID:
Stage-Storage Relationship:
Enter water surface elevations in ascending order.
Project:
Basin ID:
Project:
Basin ID:
Project:
Basin ID:
Project:
Basin ID:
Project:
Basin ID:
Project:
Basin ID:
Project:
Basin ID: