PROJECT: 7 SWRO Project —Yatfng D DAILY PROGRESS REPORT NAWALOKA PILING (PRIVATE) LIMITED. CLIENT: Ra 4 DATE: 12 }ey| 262° NOISE LEVEL 24666 WORK DONE MAINPOWER PLANT AND MACHINERY Ino. Description Category Dove | Cum Category aye | Cun bb] Mebilizerttes __| Administrative Staff 7 | ex. Operation Manager Submersible Pumps Din a a 7 wef a — | scenieaiae.n. 2.3. [ee on Stel plats | ta [ise 7 7 — nef SDC Scene ct. 7 MAisslerPoy ee ste. MATERIALS RECEIVE Unskilled Labours Barbending Reported by Contractor Consultant's Representative Name Client's Representative PROJECT: 7 SNRO Project —Jaffine @ DAILY PROGRESS REPORT NAWALOKA PILING (PRIVATE) LIMITED. GUENT: Maga DATE: ‘W162 |peee_ NOISE LEVEL 24665 WORK DONE MAINPOWER PLANT AND MACHINERY ho. Description oat | Sei Category ota | Sal DL Mebili2atrers. 7 SAB Z. sig. snl 2 ere rei 'BG Machine - Mat HE 150 Louide eet fname rnc gensynscte -| cava Mobile Crane bem _ z wf camel. an ee [| Den Sade ha WAG Sten ne sos Spe S- PMT 22. MATERIALS RECEIVE Days | Gum | Total Category “Testing Preparai Other 1S. be! “Other Stal NoRain [_] LightRain Heavy Rain ME] Reported by Contractor Consultant's Representative Client's Representative PROJECT: SuQo f royal = Joddne- DAILY PROGRESS REPORT CLIENT. NAWALOKA PILING (PRIVATE) LIMITED. DATE: 9098 Joa |1> NOISE LEVEL 24664 WORK DONE, MAINPOWER PLANT AND MACHINERY Days | Gi Ne. Seat | Sat Category ‘otai_| Total “| Machine. 1148 Welt HE 160 Pb J Condeber Don { he - Stan. (url Seles. wh 22 2D MATERIALS RECEIVE | Bentonite Mixing | Concreting. —| ° | Testing Breparation EIN ANS ps 223) eA No Rain Light Rein A) Heavy Rain Reported by Contractor Consultant's Representative Client's Representative PROJECT, SURO Pvoynet — a DAILY PROGRESS REPORT NAWALOKA PILING (PRIVATE) LIMITED. ‘CLIENT Uap 22663 DATE. sean ealon. NOISE LEVEL 3 WORK DONE MAINPOWER PLANT AND MACHINERY Days | Cum Days | Gum po. Description Category 9a | Sot Category ‘otal_| Sotat ‘Administrative Staff FA SAC [Motor work Operon aa. “walls No Rain Light Rain Heavy Rain ME) Reported by Contractor I Consultant's Representative Client's Representative DAILY PROGRESS REPORT NAWALOKA PILING (PRIVATE) LIMITED. PLANT AND MACHINERY Administrative Staff__ Operation here aN abi lizctGn 8G Machine 1148 Mechanical Eig Assistani Engineer Quality Controtier Boring Fig Operator Qte0t Operator Cerone “] Sdbmrabe Pug” aang RECEIVE Unskilled Labours ‘Testing Preparation, Oter | a bel pial ‘Sore/Office Keeper Sub Contractors Staff Heavy Rain [iE Reported by Contractor Oe Consultants Representative Clients Representative 23667 ‘at [$e A te 1 tI or a 21.167 21 | 18 fora pan | o8 93 02 Tax 2)-lay oF oa 16. Days | cum | Total | Tot Sign Signature at Signature PROJECT: Sao t 9} ot Jo Ero. DAILY PROGRESS REPORT NAWALOKA PILING (PRIVATE) LIMITE! ‘CLIENT lero) 7 24661 DATE: 9035 fos Jog NOISE LEVEL Work done WARPOWER PLANT AND WAGHWNERY Coteooy | 3G | Ser ret | fh Light Rain Heavy Rain ME] Reported by Contractor Consultant's Representative Client's Representative Prosect: SORG Obeleet — Shinn DAILY PRD GRESS REPORT NAWALOKA PILING (PRIVATE) LIMITED. CLIENT Gs DATE: So: 04 Job - NOISE LEVEL 24666 WORK DONE PLANT AND MACHINERY s Description Sum Category Das ] Sun Heavy Rain IE) Reported by Contractor Consultant's Representative Client's Representative ———____| [ PROVECE Say Projet Jab era, DAILY PROGRESS: REPORT NAWALOKA. PILING (PRIVATE) LUMITE! SE Plage i log Jog. NOISE LEVEL WORK ie | PLANT AND MACHINERY cum Days [Cum Tal_| et Client's Representative PROJECT: Solo Prejed ~F > Jetlne. DAILY PROGRESS: REPORT NAWALOKA PILING (PRIVATE) LIMITED. CUENT: Ptaxe DATE: 9098 fon lou NOISE LEVEL 24658 WORK DONE MAINPOWER PLANT AND’ MACHINERY . Description fiat | | catogoy wen [San = — koe : ‘Quality Surveyor Safety, Ofer Reported by Contractor Consuitant’s Representative Client's Representative ———~__] [PRouect: Sei lo Pre, cle jakbne- a DAILY P} ‘SS REPORT NAWALOKA PILING (PRIVATE) LIMITED. Guiewr: Feta oxre NOISE Leven 24857 WORK DON! PLANT AND MAGHINi | os Bae TS oes 2 ea [a pil Metiliaatex a: Unskiled Labours Barberi NoRain = [7] Light Rain (ZA Heavy Rain Reported by Contractor Consultant's Representative Client's Representative | PROJECT, SuRo £ Wwatet = Joe ina a DAILY PROGRESS REPORT NAWALOKA PILING (PRIVATE) LIMITED. CLIENT DATE: 9093'fon Jog. NOISE LEVEL 24656 WORK Done MAINPOWER PLANTAND MACHINERY eae Category 2a | Sam Days [Gum No Rain Light Rain Heavy Rain [ET Reported by Contractor Consultant's Representative Client's Representative PROJECT; SUN t yeOyeah — “Jodha @ DAILY PROGRESS REPORT NAWALOKA PILING (PRIVATE) LIMITED. | ‘CLIENT Deas . i DATE oa tot NOISE LEVEL wana TPO POT ARR ho] Description Category Dare | Sam Category Das [Sum aa ~ on Aaa Sa} — & PAsailaextex SS. Operation Manager | BS Machine - 24 aa : arena [I 8 Machine 28. - - Project Engineor | 2, | 8S Machine - 30 7 : : ‘Site Engineer 21 [S86 Machine 1148 a a C - | Mechanical Enginger | Malt HE 150 scenennsnnvnsannf Assistant Engineer | Mait He 180-7 7 — ooo: Quality Surveyor Mait HR 160, fa Safety Offcer | Winch Machine ~~ = a ensue | Quality Controle TATARig ae E seen PAINE vw-nnuef Extavator, nf OL [OF a= Other - |-soble Crane eo for Sitad Laer LT enerton 2). los Barbender | Bentonite tive a. oe - “| Welder. st Compressor 7 | Boring Rig Operaior | Mud Pump x - - ‘thet Operator. Creed 5 "|S [Water Pump _ Driver 21. | 08"] Welding Plant er les 7 Electrician oof SLL OL [Gass Cutter Set fw Toe Mechanic 21..| 08" submersible Pumps Other Cacesiler Opp: 21.104” [other : fi 7 ¢ nf Padatees “bon | oa | ya. aa . - | heel lade 1G Pag Pest lor loa fatten Pumdl ood. =e oe wrens LOR. lad, MATERIALS RECEIVE Day Cum - Category Tot_| oat 1185" cement - Send - Bentonite Testing Preparation | ‘ABC ss Other_ Store. Wile 601 Si] Steet =n Other Sif SorelOfice Keeper | |] 8 — Sub Contractors Staff Superior Sos a Wa on eo ght Rain EB " a ale Heavy Rain ME) ~ i + a : Reported by Contractor bp. Deas L Name Consuitant’s Representative Signa” nee. “Signature ‘Name TRAP. Chelueom, Client's Representative PROJECT. SUV Dwyeck= Yok Fno roar PROGRESS REPORT NAWALOKA PILING (PRIVATE) LIMITED. ‘CLIENT Mega other DATE: Meno \o\3) NOISE LEVEL WORK DONE WANPOWER PLANT AND MACHINERY Ss Description Category Daye | Cure Catogory Das [cum Nlewireerien Heavy Rain MEE ——— Reported by Contractor Consultants Representative Client's Representative |] PROJECT: S WhO Ord pia @ 7 DAILY PROGRESS REPORT NAWALOKA PILING (PRIVATE) LIMITED. CLIENT: Isa 2. 4653 DATE: 3a59\o\\30 NOISE LEVEL 93 wena aN FART RO NACHE fe] Pere cxecoy | 5 | BH 25 [Se ToiNieal G. Bentonite Mixing Concre Reported by Contractor Consultant's Representative Name Client's Representative [Prove Swke Prejek.— tadinor DAILY PROGRESS REPORT NAWALOKA PILING (PRIVATE) LIMITED. ‘CUIENT Hoag yo" DATE : aeae \er\aq. NOISE LEVEL 24657 wore one HARTER PLANTAND WSHNeRS Pe] oncen cowsey [Oat | Si i | Anas Sa] Saas d Op Consultant's Representative Client's Representative [peer Suro Oreck = Jeno oS | DAILY PROGRESS REPORT NAWALOKA PILING (PRIVATE) LIMITED. CLIENT = oe" denatilog nose even 24651 MANPOWER PLANT AND MACHINERY ho Desctation Cacooy [933 | ai | cancoy | Oe [Ea 7 7 ‘Administrative Stafl Sele 7 L_ bah WASta ze kes “sigs Spear Manager i 8G Machine “34 fi = Ste Manager|” on BG Machine - 28 7 Sonos -PrOjeet Engineer 7 | BG Machine - 30 i a Site Engineer 21] Si" |'8G Machine - 1146 7 7 ~ | Mechanical Enginaar - [Maite 150° Te = Assistant Engineer | Mait HR 180-1 7 [Quality Surveyor MaitHR 180-2” - a - Safety Oricer - | Winch Machine ES fh ee a 7 : [Trainee Ba Excavator ET Tether ‘Mebiie Crane af ei Skilled Labors : Generstor SIS ‘Barbender a Bentonite iiggr “| Weider i ‘Comp i Boring Rig Operator | F iad Pump : the. Operator Cremad 31 [S| Weter Pump i Dever. - Sif SL | Welding Plant ol tsi Electrician -f-21 [orl Gass Cuter set” S| Se Mechanic nf 2h. [SL | Submersible Pur ° Other Op Other is a eae i Castine ow og [ea i ood mea ai “MATERIALS RECEWE Unskilled Labours aye] Cu Saening r Cacoy | Baas | Sa “Machine Heiper 21st [cement : Bentonite Mixing fT Send fe Concreting i Bentonite Testing Preparation : ABC - = Otter oo ET steel” aa Other Staff : 7 I : ‘Sore/Office Keeper 7 os sant Sub Contractors Staif r - Superson Si Ter 7 : No Rain [Sever Group. po oe fn | Foreman Litton : - = - = Heavy Rain ME] a = rs [iam Reported by Contactor H@:\ Oranba Name |e Consultant's Representative os Rama Clients Representative PG. Chodby 2eraloa| Bate

You might also like