MAIN CONTRACT WORKS TO COMMERCIAL DEVELOPMENT COMPRISING OF A 49 STOREY OFFICE TOWER

AND A 5 STOREY SHOPPING MALL FOR HAVELOCK CITY AT COLOMBO-06, SRI LANKA

NON CONFORMITY REPORTS


Update 6-May-2021

Rectification Method Submission Clossing of NCR


NCR Date
Trade Location Level Description Date of issue Approval/
No
Document Type Number Approval Comments RICF Number Date Clossing of
Submission Replied NCR

As discussed during our VC meeting together


with PTA,there is no skirting indicated in our
design proposal for the above mentioned
1 ID Shopping Mall L-2 Lobby Tiling 19-Feb-2021 RFI CHEC-RICF-A-846-A 25-Feb-2021 5-Mar-2021 Not Approved
areas.Kindly refer to the attachment for the
No
proposed florr to wall termination details for
CHEC to follow up

2 Civil Shopping Mall Hacking of Lift Wall-ST 03 22-Jan-2021 Metod Statement CHEC-RFA-S-1423-A 6-Mar-2021 15-Mar-2021 Approved with comments Use non shrin grout StoCrete NSG Eco No

3 ID Tower L23 Lift Lobby Tile 17-Feb-2021 N/A Defects has to be rectified and rearrange the inspection CHEC-RICF-A-T-087 14-Mar-2021 No

Not Accepted.Recomended thickness of


CHEC-RFA-A-S-1409-A 1-Mar-2021 3-Mar-2021 Rejected
plaster material is 20 mm maximum CHEC-RICF-S-4431 28-03-2021
CHEC-RICF-A-P-089A 30-03-2021
4 Civil Tower L50 & Above External Plaster 8-Feb-2021 Metod Statement Yes
CHEC-RICF-S-4205A 02-04-2021
CHEC-RFA-A-S-1409-B 19-Mar-2021 24-Mar-2021 Information Only Recived.Hollow area should be repaired CHEC-RICF-A-P-092A 02-04-2021

5 Façade Shopping Mall Upper Roof Cinema 6-Steel Roof Structure 8-Mar-2021 N/A Rearrange the inspection and clarify with answering to the client email CHEC-RICF-A-CW-302 8-Mar-2021 Yes

04/26/2022 at 05:18:47 1 of 1 QAQC Department _CHEC