Construction of New Integrated Passenger Contractor NCC Ltd. Date Received 21 Nov 2019
Contract Terminal at C.C.S. Airport, Lucknow, India NCCL/AAI-LKO/735/19-20
Ref. No. Response by 11 Dec 2019
Review Status:
Code A Approved no Comments1
Code B Approved with Comments2
Code C Not Approved3
Code D Not considered, Re-submit
Code E Review and/or Approval not Required
EL 01 Objective: Please add: ………..as per BOQ & TS of CA, CPWD & relevant IS standard.
02 Scope: Add: Excavation, Laying, Jointing & refilling as per BOQ & TS of CA.
EL 03 References: 1. Add relevant dwg. no i.e. GFC and Shop dwg, etc., BOQ item no. and clause no. of TS of CA.
EL Equipment: 1. Add night related equipment’s as time slot is from 8 am to 8 pm.
04
2. Include safety equipment and tools.
1
2
Note-
Incorporate all the comments and resubmit shop drawings for further approval and records.
A1 size 3 coloured sets of shop drawings shall be submitted as per the contract and TS.
Provide a copy of commented drawings- 2 sets (1 for Egis and 1 for AAI records).
Reviewed by Discipline Lead Amit Kr. Mishra Amit Saini Date- 19/08/2019
Name /Signature / Date
1
Work may proceed
2
Work may proceed provided comments raised by the Consulting Engineer are incorporated into the document. Contractor is required to resubmit the document for record purposes.
3
Submittal is not in compliance with the Contract. Do not proceed with the work covered by the submittal. Prepare a new submittal in compliance with the Contract.