It was observed that PO#s 03-KSA04-PO-01-060 (Globe Valve), 03- Root Cause Analysis: PO has been placed due to urgent material
requirement to meet the delivery schedule.
PO Placed without KSA04-PO-01-043 (Copper Nickel Flanges) has been placed before Correction Action: PO date has been changed after the NOL
Schedule G , CPP- client approval (NOL). Which is a violation of Schedule G clause:
NOL , PO submitted NGCP-QC-PLN- clause: 11.2. , 20-Jul-19 received. Moreover, tool box meeting has been conducted for
2 CPP-NGCP-NCR-PROC-002 Procurement
without PQCS Clause: 6.2.
11.2. Jamaludeen 24-Jun-19 20-Jul-19
more awareness that without Client approval (NOL) PO cannot be Closed
Verification 0002 Moreover, PO#s-03-KSA04-01-060 & 03-KSA04-01-043 has been placed as per Sch G requirement.
issued without PQCS verification, which is a violation of
Procurement Quality Plan CPP-NGCP-QC-PLN-0002 Clause: 6.2. Corrective Action: PO cannot to be submit to Client without PO
review sheet signed by all parties.
Page 1 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Page 2 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
Root cause:Mishandled during loading and
transportation.
Correction Action: Subject two numbers of pipe coating
damaged to be repaired and to be
verified with holiday test for final acceptance by
During surveilliance it inspection.
was noticed that 2 nos During surveilliance it was noticed that 2 nos of pipes Corrective Action:
T-CPP-
CPP-NGCP-NCR-H-001 of pipes (FFCW203 and (FFCW203 and FFCX145) found coating damaged on Pipe loading / off loading crew has been instructed to
1 NA ARAMCO- Coating SAES-H-200 5.5.1 Mohammed Umair 01-Dec-18 01-Mar-19 05-Mar-19 04-Mar-19 Closed
EPM-INCR-6600001240 FFCX145) found the external surface of the pipes , which violates the take care of coating handling with more protection to the
02713
coating damaged on the requirements as on SAES-H-200 para 5.5.1 FBE coating.To prevent any future re-occurence CPP
external surface of informed SAPMT to notify coating vendor for re-
verification prior to dispatch/release any pip
es to site.
General Reply:
Please see attached signed and closed hard copy of
INCR H-001. This INCR can be close in EPM also.
Page 3 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
During routine inspection at HRDH-1171, joint # (02-
Root cause: Careless workmanship from the welders.
During routine FW-152) Welder (CPP-W-008) it was observed that
Correction: 100% RT will be performed for the joint 02-
inspection at HRDH- during welding portable electrode oven was open and
T-CPP- FW-152.
CPP-NGCP-NCR-W-003 1171, joint # (02-FW- temperature was below 65°C, which is a standard Mohammad
8 NA ARAMCO- Welding SAES-W-012 Appendix 1 31-Jan-19 28-Feb-19 02-Mar-19 Correcive Action: Closed
EPM-INCR-6600001542 152) Welder (CPP-W- violation as per W-012, Appendix 1, which state that Sarfaraz
02717 General Reply:
008) it was observed elec
Signed scan copy of INCR-W-003 has been uploaded to
that during welding trodesare continuously stored in a portable oven heated
close this INCR.
to 65°C minimum.
Page 4 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
During daily site visit on date 04-Mar-2019 it was
Root Cause Analysis: Construction team are ignoring
observed at all Hradh Area trenches
the procedure requirements and not following the QC
(1163,1170,1171,922,1116,1122,1117,1145,1162,1172)
inspector Instructions.
During daily site visit on that there is no proper station marks beside trenches for
T-CPP- MOS#(CPP- Correction Action: Provide station marks at every
CPP-NGCP-NCR-CIV-006 date 04-Mar-2019 it proper identification of chainage which is a violation as
16 NA ARAMCO- Civil NGCP-CM- Para-7.2 Hameed Ullah 04-Mar-19 01-May-19 01-May-19 200m. Closed
EPM-INCR-660001833 was observed at all per Approved MOS#(CPP-NGCP-CM-MS-
02712 MS-0003 Corrective Action: Implement the station marking as
Hradh Area trenches 0003-“Trenching and backfilling” Para-7.2) which states
per Approved Method of Statement Requirement for all
that ”Station marks shall be installed to the work site for
pipelines
identification of chainage at an interval of every
General Reply:
200meters”.
During routine surveillance on 06-MARCH-2019 of Well Root Cause Analysis: Site construction ignore the
Pad # HRDH-1035 & HRDH-1116 It was observed on requirements and instruction from the Site QC Inspector
site that the construction team have not maintained the Root Cause Analysis: Site construction ignore the
side slope as per 2:1 (horizontal to vertical) which is a requirements and instruction from the Site QC Inspector
It was observed on
clear violation of IFC drawing # ta-725661-sht-001-rev- Correction Action:
site that the
00 general notes and abbreviations section-6 note-12 Construction team will make the slope 2:1 (horizontal to
T-CPP- construction team have IFC drawing
CPP-NGCP-NCR-CIV-007 section-6 note- which states that the “side slope 2:1(horizotal to vertical) and will make it stabilized with 300mm marl.
17 NA ARAMCO- Civil not maintained the side # ta-725661- Talal Shabbir 06-Mar-19 06-Jun-19 12-Mar-19 Closed
EPM-INCR-660001854 12 vertical) shall be stabilized with 300mm thick marl, and Corrective Action: Construction will implement the
02712 slope as per 2:1 sht-001-rev-00
for height of embankment 3m and above shall be slope construction at all sites with proper survey
(horizontal to vertical)
provided with horizontal layers of geogrid and spacing markings to achieve the final & stabilized slope of 2:1
which is a clear
shall be as per vendor recommendation”. (horizontal to vertical). Strict surveillance will be done at
Initiated by: Talal Shabbir site to avoid further occurrence.
General Reply:Corrective action done and verified at
site by SAPID.Hence, this INCR is closed.
On March 16, 2019, CPP QC noticed Improper cleaning Root Cause:Lack of standard requirement knowledge
On March 16, 2019,
during joint fit-up preparation at 8”-HWYH-1055 joint no. from the grinder side.
CPP QC noticed
T-CPP- 1-FW-133. This violates SAES-W-012, Para 10.3.1, Correction Action:Clean the joint and RT test shall be
CPP-NGCP-NCR-W-009 Improper cleaning
21 NA ARAMCO- Welding SAES-W-012 Para 10.3.1 which states: Oil, moisture, rust, scale, sand, paint or Umair Mukhtar 16-Mar-19 16-Apr-19 09-Apr-19 performed on the specified joint. Closed
EPM-INCR-6600002016 during joint fit-up
02717 other foreign matter shall be removed from the weld Corrective Action:Awareness toolbox training will be
preparation at 8”-
surface and at least 25 mm of adjacent base metal prior conducted for the welding team to be
HWYH-1055 joint no. 1-
to welding. familiar with joint preparation standard requirement.
Page 5 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
Root Cause Analysis: Improper welder skills.
On March 21, 2019, On March 21, 2019, CPP QC noticed Welder W-050 Correction Action: The defected area will be grinded
CPP QC noticed started the adjacent weld beads from the same location and SAES-W-012 requirement for the welding of
T-CPP-
CPP-NGCP-NCR-W-010 Welder W-050 started Joint 00-FW-72 at 8”-HWYH-1076. This violates SAES- adjacent beads will be followed. RT and hardness test
24 NA ARAMCO- Welding SAES-W-012 Para 10.17 Imran Manzoor 21-Mar-19 21-May-19 21-May-19 Closed
EPM-INCR-6600002115 the adjacent weld W-012, Para 10.17, which states: Adjacent weld beads will be done for joint 00-FW-72.
02717
beads from the same shall be staggered and not started from the same Corrective Action: Awareness toolbox will be
location Joint 00 location. conducted to enhance welder skills and improve their
knowledge of the SAES-W-012 requirement
Page 6 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
Root Cause Analysis: Construction team was
During daily site visit on date 31-Mar-2019 at RH-K1 transporting un-screened material from un-approved
Extension, it was observed that the Material (Select Fill) source.
During daily site visit on
being Dumped for the1st Layer have over size Gravels Correction Action: The subject 1st Layer shall be
T-CPP- date 31-Mar-2019 at
CPP-NGCP-NCR-CIV-009 more than 50mm which is a violation as per SAES-A- scarified in order to Remove over size material from it
26 NA ARAMCO- Civil RH-K1 Extension, it SAES-A-114 Sec. 6.1.2.1. Hameed Ullah 31-Mar-19 15-Apr-19 15-Apr-19 Closed
EPM-INCR-6600002149 114, Sec. 6.1.2.1. which states that “Select Fill or and CPP QC will verify before the compaction begin.
02712 was observed that the
‘Structural Fill’ shall be composed only of inorganic Corrective Action: Construction team shall take
Material (Select Fill)
material and shall have 100% passing the 5 cm (2 in) approved material from approved source before placing
sieve and from 0 to 20% passing the No. 200 sieve”. at site. Subsequently, CPP quality department will firmly
monitor the backfilling work.
During daily site visit on date 02-April-2019 at HRDH
902 (km 2+842), it was observed that the Flowline
Trench is Excavated within 3m Near to powerlines Root Cause Analysis: Construction Team Has
Support Structure which is a Violation as per SAES-B- Followed the Actual Centerline of Flowline without
During daily site visit on
064-Para-7.6.3 Which states That” Where pipeline and keeping Minimum Clearance from Existing Facilities.
T-CPP- date 02-April-2019 at
CPP-NGCP-NCR-CIV-010 overhead powerline corridors cross, the minimum Correction Action: Construction shall provide TQ
27 NA ARAMCO- Civil HRDH 902 (km 2+842), SAES-B-064 Para-7.6.3 Hameed Ullah 06-Apr-19 06-May-19 20-Jun-19 20-Jun-19 Closed
EPM-INCR-6600002160 horizontal separation between any pipeline and the Approved by SAPMT or Designer.
02712 it was observed that the
poles or support structures of overhead powerlines shall Corrective Action: Construction team shall Survey the
Flowline Trench is
be:(c) 4.5 m in producing areas for flowlines, trunklines, centerline of pipe and Notify to PMT if there is any
test lines, gas lift lines, gas injection lines, water Existing Facilities Prior To start Excavation.
injection, supply lines, and disposal lines with pipe
diameters of 24 inches and less.
Root Cause Analysis: Construction team followed the
During daily site visit on date 17-April-2019 at HRDH typical rocky area drawing and failed to maintain the
During daily site visit on 1160, it was observed that trench depth at km 3+028 to trench depth as per wadi area drawings.
date 17-April-2019 at 3+063 is 900mm which is not meeting the wadi area Correction Action: Construction team shall excavate
CPP-NGCP-NCR-CIV-011 HRDH 1160, it was crossing drawings TA-017571. The actual trench depth more at all wadi areas according to the Wadi Area Cross
28 Civil IFC drawings TA-017571-001 Hameed Ullah 17-Apr-19 17-Jul-19 17-Oct-19 Closed
EPM-INCR-6600002297 observed that trench provided at site clearly violates the Typical Wadi Area Section Drawing TA-017571.
depth at km 3+028 to Crossing Detail Drawing-TA-017571-001 “which shows Corrective Action: Construction team shall Review the
3+063 is that the total trench depth shall be Plan and Profile drawings before proceeding to
300mm+DIA+1200mm” Excavation and follow the detail Cross section drawings
for specific areas accordingly.
Page 7 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
Page 8 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
Root Cause Analysis:
During surveillance visit to the site- HRDH-1171 &
Negligence of construction team.
HRDH-922, It has been observed that externally FBE
Correction Action:
coated pipes were been stored/strung on the heap of
During surveillance visit Re arrange the pipes to protect the External FBE
big and uneven stones and not stacked in a proper
to the site- HRDH-1171 coating. Effected coating damage area (If any) shall be
T-CPP- manner. It may lead to the external coating damage of
CPP-NGCP-NCR-M-005 & HRDH-922, It has Mohammad marked for repairing prior to lowering. Marl supports full
37 NA ARAMCO- Mechanical SAES-L-450 para 8.3 the pipes. Purpose of nylon string around the pipe was 24-Apr-19 09-May-19 29-Apr-19 Closed
EPM-INCR#6600002387 been observed that Umair of big stones to be corrected by sweet sand or sand
02714 failed due to the metal surface contacts each other.
externally FBE coated bags to protect the pipe coating which was contacted
This is a violation of SAES-L-450 para 8.3 requirement.
pipes with stones.
This standard requires the pipe stacking shall be made
Corrective Action:
in a manner, which will not damage the pipe or the
Quality toolbox meeting and QC monitoring while pipe
coating.
storage and rectify immediately.
Page 9 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
On May 5, 2019 CPP QC observed during site Root Cause Analysis: Negligence and Lack of
On May 5, 2019 CPP
inspection at HWYH RH EJ 16” X 0.438” FBE coated awareness.
QC observed during
T-CPP- pipes are directly touching with the sand, This is clear Correction Action: Re arrange the pipes with proper
CPP-NGCP-NCR-M-009 site inspection at
46 NA ARAMCO- Mechanical SAES-L-450 para 8.3 violation of SAES-L-450 para 8.3, this standard requires Masood Fareed 05-May-19 20-May-19 19-May-19 support to protect the external FBE coating, mark any Closed
EPM-INCR#6600002452 HWYH RH EJ 16” X
02714 the pipe stacking shall be made in a manner which will coating damage for repairing before lowering.
0.438” FBE coated
not damage the pipe or the coating. The pipe joints shall Corrective Action: Close monitoring by QC, awareness
pipes are directly
not laid directly on the ground. tool box meeting.
Page 10 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
During site Surveillance on date 09-MAY-2019 at Root Cause Analysis: The Centerline of pipe was
HRDH-GGM TO RH-CK(10”F/L) it was observed that staked by surveyor, but Construction did not provide
the Excavated Trench is not matching the Centerline of continuous white marking for excavation of Trench.
Pipe as indicated on the IFC Drawing from Correction Action: Construction team shall provide the
Sta:0+511,567,839,984,1070,1196,1297,1396,1849,211 approved redline drawings from SAPMT as per trench
During site Surveillance
1,2186,2244,2313 and Various which is a violation as excavated at site.
T-CPP- on date 09-MAY-2019
CPP-NGCP-NCR-CIV-022 per SAES-L-450,Sec. 7.1.1 which states that” The Corrective Action:
49 NA ARAMCO- Civil at HRDH-GGM TO RH- SAES-L-450 Sec. 7.1.1 Hameed Ullah 13-May-19 13-Jun-19 11-Jun-19 Closed
EPM-INCR-6600002569 pipeline route as stipulated on the Issued for When Ever centerline of pipe marking for trench is
02712 CK(10”F/L) it was
Construction (IFC) drawings shall be surveyed and missing at site, it shall be informed to surveyor to provide
observed that the
staked by the Construction Contractor. Changes to centerline marking again in order to avoid double work.
original routing may be acceptable with prior approval Provide continue white marking for centerline of trench
by Saudi Aramco PMT and the Proponent and surveyor has to checked on daily basis in order to
Representative prior to implementation in the form of avoid rework.
Modified IFC Drawings.”
Page 11 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
Page 12 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
Page 13 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
Root Cause Analysis: No Borrow Pit has been sampled
During daily site visit on date 15-06-2019 at HRDH or submitted for testing of Marl Capping material.
1170, it was observed that Berm Construction is Correction Action: Material used for
Unapproved Marl
T-CPP- ongoing for 8” F/L but Marl material which construction berm and capping construction shall be sampled and
CPP-NGCP-NCR-CIV-027 Material used for berm
65 NA ARAMCO- Civil SAES-L-450 is using for Capping is not approved. Which is a clear Hameedullah 15-Jun-19 27-Jun-19 27-Jun-19 tested by third party. This material shall pass the marl Closed
EPM-INCR#6600002957 construction and
02712 violation as per SAES-L-450-Sec. 14.10.3 which states classifications.
Capping at HRDH-1170
that “The entire dike shall be stabilized with marl of 152 Corrective Action: Construction team shall sample the
mm minimum depth.” material for testing prior to use it on site in order to avoid
any re-work.
On Jun 12, 2019, CPP QC noticed the pipe bevel was Root Cause Analysis: Careless workmanship from
not properly cleaned prior to welding the weld joint 06- welding crew.
FW-531 at 8'' HRDH 1171 F/L. This violates SAES-W-
T-CPP- Improper joint cleaning 012, 10.3.1, which states: Oil, moisture, rust, scale, Correction Action: Joint 06-FW-0531, shall be 100%
CPP-NGCP-NCR-W-022 Mohammed
69 NA ARAMCO- Welding prior to welding @ 8'' SAES-W-012 Para 10.3.1 sand, paint metallic coatings (e.g., zinc), or other foreign 12-Jun-19 12-Jul-19 13-Jun-19 13-Jun-19 radiograph to ensure integrity/ soundness of weld. Closed
EPM-INCR-6600002968 Sarfaraz
02717 HRDH 1171 F/L matter shall be removed from the weld surface and at Corrective Action: Awareness Toolbox
least 25 mm of adjacent base metal prior to welding, training will be conducted to prevent future recurrence,
including any such coatings on temporary attachments Site QC to monitor closely to follow standard
or supports. requirement.
Page 14 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
Root Cause Analysis: Welder failed to comply
Correction Action: QC inspector
immediately instruct welder CPP-W-063 and other crew
On Jun 15, 2019, CPP QC noticed Welder W-063 welders to avoid recurrence. The defected area will be
Adjacent weld beads started the adjacent weld beads from the same location grinded and SAES-W-012 requirement for the welding of
T-CPP-
CPP-NGCP-NCR-W-023 started from the same Joint 00-FW-36 at 16" HWYH GK-RH TR/L. This adjacent beads will be followed. RT and hardness test
72 NA ARAMCO- Welding SAES-W-012 Para 10.17 Imran Manzoor 15-Jun-19 15-Jul-19 07-Jul-19 Closed
EPM-INCR-6600002991 location @ 16" HWYH violates SAES-W-012, Para 10.17, which states: will be done for joint 00-FW-36. Corrective Action:
02717
GK-RH TR/L. Adjacent weld beads shall be staggered and not started Awareness toolbox will be conducted to enhance welder
from the same location. skills and improve their knowledge of the SAES-W-012
requirement.
Page 15 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
Page 16 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
On Jun 26, 2019, CPP QC noticed an arc strike during Root Cause Analysis: Improper condition and fixing of
the welding activities of joint no. 01-FW-104 at 8”- grounding clamp
T-CPP- HRDH-1165. This violates SAES-W-012, 10.10, which Correction Action: Grinding the defected area to
CPP-NGCP-NCR-W-030 Arc strike at @ HRDH-
91 NA ARAMCO- Welding SAES-W-012 states: Arc strikes, gouges, and other indications of Rajesh Kumar 15-Jul-19 07-Jul-19 remove the arc strike and apply PT test, ground clamp to Closed
EPM-INCR-6600003072 1165
02717 careless workmanship (such as surface porosity, be fixed.
uneven weld profiles, and undercut) shall be removed Corrective Action: Proper fixing of grounding clamp
by grinding. shall be provided for further fit-up and welding activities
Page 17 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
Page 18 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
Page 19 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
Page 20 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
During daily site visit on date 07-JULY-2019 at HWYH Root Cause Analysis: Construction team did not follow
1078, it was observed that the CPP construction team the requirements of SAES-L-450 SEC 14.5
lowered the pipe in HWYH-1078 which have Correction Action: The CPP construction team shall
T-CPP- unsupported length more the 3 meter which is clear put the sand bags beneath the pipe on every 3 meter to
CPP-NGCP-NCR-CIV-038 Unsupported length at
110 NA ARAMCO- Civil SAES-L-450 violation as per SAES-L-450 sec 14.5 Prior to backfilling Aqib Hussain 14-Jul-19 22-Jul-19 avoid the unsupported length and CPP QC will verify it. Closed
EPM-INCR-6600003305 HWYH-1078
02712 and during lowering the pipeline shall be supported Corrective Action: A quality
inside the trench with a maximum allowable toolbox meeting will be delivered to site construction
unsupported length 3 meter (m) Any voids below the foreman in order to have full understanding of sand
pipe shall be carefully backfilled. padding as per SAES-L-450.
Page 21 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
Page 22 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
Root Cause Analysis: Negligence of Construction
Team and Ignoring the standard requirements.
Correction Action:
During routine site surveillance at well pad RH-EK zone Construction Team shall remove the excess material
Placement of Layer B, it was found that Construction Team has Placed 1st from the top and shall provide marking for layer
CPP-NGCP-NCR-CIV-046
thickness more than layer of 90cm which is a clear violation as per SAES-A- thickness inside pad area. Qc has to verify the thickness
124 EPM-INCR-6600003590 Civil SAES-A-114 Sec-6.3.3.2 Aamir Solangi 31-Jul-19 15-Aug-19 19-Aug-19 CLOSED
200mm at HWYH-RH- 114-Sec-6.3.3.2 Which states that “Selectfill Material of layer together with surveyor.
EK shall be placed in lifts of 200mm Maximum in loose Corrective Action:
Depth Construction shall provide marking for each layer
thickness to avoid excess of material. QC to monitor
each layer placement and tool Box Meeting shall be
conducted.
On July 18, 2019, CPP QC observed during site Root Cause Analysis:
inspection at KM 0+638 HRDH-1170 8”X0.344” pipes Constriction activity performed without informing to
and cable found backfill without verifying the clearance quality department.
from existing pipeline and cable to the new pipeline. Correction Action:
PIPELINE AND CABLE This is clear violation of SATIP-450-04 item No # 3.14 Verified subjected crossing locations before finalizing
CPP-NGCP-NCR-M-019 T-CPP-
CROSSING and SAES-L-410 PARA 13.4.2, this standard requires berms
126 EPM # INCR- NA ARAMCO- Mechanical SATIP-450-04 PARA 13.4.2 M Umair 18-Jul-19 07-Aug-19 05-Aug-19 CLOSED
CLEARANCE the buried pipelines crossing each other shall have a THIS INCR IS ESCALATED TO LBE
6600003363 02714
VERIFICATION. minimum clearance of 0.6 M (2 ft) and shall be Corrective Action:
increased as achievable. For telecommunication cable, Awareness toolbox, early information and RFI for
the minimum vertical distance between the bottom of verification.
any pipe and the top of the concrete encased conduit
bank shall be 1 M. SAES-T-928 PARA 6.7.1-A.
On Aug 04, 2019, CPP QC noticed during routine Root Cause Analysis: Welding crew didn’t have
inspection at 10”-HWYH-1093 F/L that welding crew not sufficient material to cover the open areas of wind shield.
provided proper wind shield during welding on weld joint Correction Action: RT will be done on joint number 03-
03-FW-258 at KM 03+103, it is clear volition of SAES- FW-258 for ensuring the soundness of the joint.
CPP-NGCP-NCR-W-037 Improper wind shield W-12, paragraph 10.2.1 “Wind shields or tents shall be Corrective Action: Sufficient
129 EPM- 6600003689 Welding during Welding @ 10”- SAES-W-12 paragraph 10.2.1 required when the wind is strong enough to affect arc Asish 04-Aug-19 24-Aug-19 22-Aug-19 material will be provided and inspection of wind shield Closed
HWYH-1093 F/L stability or shielding gas coverage or when deemed will be done before welding by welding foreman and
necessary by Saudi Aramco Inspection. GTAW, welding inspector
GMAW, or gas-shielded FCAW shall not be used for Corrective Action:Corrective
field or yard fabrication unless adequate windshields Action And implemented this INCR Closed
are used
Page 23 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
Page 24 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
Root Cause Analysis:
Due to everyday loading and offloading of coated pipes
On September 24, 2019,During Inspection it was found
hook pad got damaged.
that loading crew were lifting the coated pipes by hook
Correction Action:
CPP-NGCP-NCR-M-022 T-CPP- without padded it is the standard violation against
Lifting coated pipes by Muhammad The damaged pad shall be replaced and the hook shall
141 EPM #INCR ARAMCO- Mechanical Para 5.1.5 SAES-H-200 SAES-H-200 Para 5.1.5 for lifting operations when a 24-Sep-19 10-Oct-19 10-Oct-19 Closed
hook without pad. Saleem be covered with new rubber or shall be padded.
6600004240 02714 hook is used for handing large diameter pipes the hook
Corrective Action:
shall be of sufficient width and depth to fit inside the
Contractor QC will keep monitoring the hook while
pipe and shall be padded or covered with rubber.
loading and offloading of coated pipes.
On Sep 17, 2019, CPP QC noticed during routine Corrective Action: Awareness toolbox will be
inspection at 8”-HWYH-1003 F/L it was observed that conducted to avoid repeating such performance.
Modification of pipeline accepted pipeline string has been cutout without Correction Action:
CPP-NGCP-NCR-W-039
string after weld SATIP-W-12- information to maintain the cable crossing 1.0 M as per Additional weld joint will be added at the cutout point, PT
142 EPM #INCR Welding SH 004 Sanjeeva 17-Sep-19 16-Dec-19 16-Nov-19 Closed
acceptance @ 8”- 01 DWG TA-445856 SH 004 Rev 00, it is clear volition of test will be done at cutting edge and RT after welding to
6600004160
HWYH-1003 F/L SATIP-W-12-01, Item no 3.17 “Modification or Re-Work check welding soundness.
After Weld Acceptance is a Hold point by contractor and Root Cause Analysis: Lack of standard
Saudi Aramco”. awareness by construction crew.
On Sep 22, 2019, CPP QC noticed an arc strike during Corrective Action: : Proper fixing of grounding clamp
the welding activities of joint no. 03-FW-269 at 8”- shall be provided for further fit-up and welding activities.
CPP-NGCP-NCR-W-041 HWYH-1073. This violates SAES-W-012, 10.10, which Correction Action: Correction Action: Grinding the
Arc strike at @ HWYH-
144 EPM #INCR Welding SAES-W-012 , 10.10, states: Arc strikes, gouges, and other indications of 22-Sep-19 09-Oct-19 08-Oct-19 defected area to remove the arc strike and apply PT test, Closed
1073
6600004269 careless workmanship (such as surface porosity, ground clamp to be fixed.
uneven weld profiles, and undercut) shall be removed Root Cause Analysis:Improper
by grinding. condition and fixing of grounding clamp
On Oct 02, 2019, CPP QC noticed the pipe bevel was Root Cause Analysis: Careless workmanship from
not properly cleaned (Less than 25mm) prior to welding welding crew & unawareness of SAES-W-012
the weld joint 10-FW-859 at 16'' HWYH HK RH TR/L. Requirements.
CPP-NGCP-NCR-W-047 Not sufficient surface This violates SAES-W-012, 10.3.1, which states: Oil, Correction Action: Joint 10-FW-859, shall be 100%
148 EPM #INCR Welding cleaning @ 16'' HWYH SAES-W-012 10.3.1 moisture, rust, scale, sand, paint metallic coatings (e.g., Abdul 02-Oct-19 30-Oct-19 27-Oct-19 radiograph to ensure integrity/ soundness of weld. Closed
6600004429 HK RH TR/ zinc), or other foreign matter shall be removed from the Corrective Action:
weld surface and at least 25 mm of adjacent base metal Awareness Toolbox training will be conducted to prevent
prior to welding, including any such coatings on future recurrence, Site QC to monitor closely to follow
temporary attachments or supports. standard requirement.
Root Cause Analysis: Helper Un aware of handling of
On Oct 02, 2019, CPP QC noticed during routine
electrodes.
surveillance that the helper forgot to close the portable
Correction Action: The
CPP-NGCP-NCR-W-046 Opened portable oven oven lid after giving the electrodes to welder. Joint no:
affected electrodes are discarded. RT Will be done for
149 EPM #INCR Welding during welding @ 16”- SAES-W-012 Appendix 1 10-FW-862 @ 16”-HWYH-HK-RH-TR/L which is a Abdul 02-Oct-19 30-Oct-19 24-Oct-19 Closed
joint 10-FW-862 to check weld soundness.
6600004442 HWYH-HK-RH-TR/L standard violation as per SAES-W-012 (Appendix 1)
Corrective Action: Awareness toolbox will be
“Storing, Conditioning and exposure of SMAW
conducted regarding control and handling of
Electrodes Low Hydrogen Electrodes”.
Root Cause Analysis:consumables.
Careless workmanship from the
welders.
During routine inspection at HWYH-921, joint # (06-FW-
Correction Action: 100% RT will be performed for the
553) Welder (CPP-W-016) it was observed that welding
joint # 06-FW-553 to ensure quality/soundness of
CPP-NGCP-NCR-W-044 Insufficient wind shelter was open from both sides during welding in
welding.
150 EPM #INCR Welding shielding during welding SAES-W-012 Para. 10.2.1 strong wind which is a standard violation as per SAES- M Rizwan 05-Oct-19 05-Nov-19 23-Oct-19 Closed
Corrective Action: CPP QC Welding Inspector will
6600004444 at HWYH-921 W-012, Para. 10.2.1 which states that wind shelter or
monitor closely and Awareness Toolbox training will be
tents shall be required when wind is strong enough to
conducted to prevent future Recurrence.
affect arc stability or shielding gas coverage.
Page 25 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
Page 26 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
Page 27 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
During site Surveillance on date 30-Oct-2019 at STA-
3+485 to 3+550 HRDH 1148, it was observed that width Root Cause Analysis: Negligence of Construction.
CPP-NGCP-NCR-CIV-059 of the flat top of the dike berm for 8” flowline was less Correction Action: The flat top of the dike berm will be
Improper berm
EPM #6600004734 than 40cm which is a violation as per SAES-L-450-Sec. extended at least 40cm (Twice of the Pipe Día) and QCI
170 Civil construction for 8”F/L at SAES-L-450 Sec. 14.10.3g 30-Oct-19 20-Nov-19 11-Nov-19 Closed
14.10.3g which states that” The width of the flat top of will verify at site prior to inspection.
HRDH-1148
the dike berm shall be at least twice the pipe diameter Corrective Action: Toolbox shall
along the overall minimum cover above the top of the be conducted.
pipe.”
During internal inspection on 03-Nov-2019 at CPP- Root Cause Analysis: Negligence of Construction team
Precast Yard-2 HRDH it was found that Formwork and Ignoring the SAES/IFC Drawing Requirements.
CPP-NGCP-NCR-CIV-060 Not Maintaining the Dimensions for foundations (SKID-F1 and F3) was not Correction Action: Construction
EPM #6600004897 Proper Formworks in Diagonal and not in proper shape which is a violation shall correct the formwork of foundations in proper shape
171 Civil SAES-Q-001 Sec. 3.2 03-Nov-19 15-Nov-19 11-Nov-19 CLOSED
Dimension as per IFC as per SAES-Q-001-Sec. 3.2 which states that” Forms and it shall be in Diagonal. Corrective Action:
Drawings shall result in a final structure that conforms to shapes, Tool Box shall be conducted and give Awareness
lines, and dimensions of the members as required by regarding IFC Drawings.
the IFC drawings. (ACI 318M-2011, Sec. 6.1.1).”
Page 28 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
On Oct 21, 2019, CPP QC noticed during routine Root Cause Analysis: modification done as per
inspection at 8”-HWYH-1134 F/L it was observed that Technical query TR-02029-003-01933/19-CPP for
two accepted pipeline string has been cutout (Pipe not crossing of existing pipelines and CPP start cutting
Modification of pipeline joint) near joint 01-FW-122 and 01-FW-131without without notification due Lack of standard awareness by
CPP-NGCP-NCR-W-053 string after weld information to adjust slope due to thrust boring area, it construction crew.
179 Welding Binish 21-Oct-19 20-Nov-19 16-Nov-19 CLOSED
EPM-INCR-6600004756 acceptance @ 8”- is clear volition of SATIP-W-12-01, Item no 3.17 Correction Action: Additional two weld joint will be
HWYH-1134 “Modification or Re-Work After Weld Acceptance is a added at the cutout point, PT test will be done at cutting
Hold point by contractor and Saudi Aramco”. edge Corrective Action:
Awareness toolbox will be conducted to avoid repeating
such performance
Page 29 of 42
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Electrical &
Coating 42 4 38 Cathodic 20 3 17
Protectton
Telecommunicatio
Welding 84 3 81 2 0 2
n
Procurement RTR/Plumbing 11 0 11
Instrument 1 1 0
TARGET
STANDARDS VIOLATED REVISED
S. Raised Closed DATE OF
NCR NO. DISCIPLINE Title DESCRIPTION Originator DATE OF ISSUE TARGET COMPLETION DATE ACTION TAKEN Status
No. transmittal transmittal COMPLETIO
DOC. REF. PARA NO. DATE
N
Root Cause Analysis: Lack of awareness of Saudi
On Dec 09, 2019, CPP QC noticed that during welding
Aramco standards by the construction team.
Moving of Pipe During of fill pass of Joint No. 03-FW-253 at 16”-HWYH-GK-RH
CPP-NGCP-NCR-W-057 Correction Action: Joint
Welding Removal of @ TR/L the pipe was lifted by side boom to place the sand
188 EPM-INCR- Welding Mir Muzaffar Ali 09-Dec-19 10-Feb-20 16-Jan-20 03-FW-253 will be covered by 100% RT and MT to verify Closed
16”-HWYH-GK-RH bags below the pipe. It is a clear violation of the
weld soundness.
TR/L standard SAES-W-012 (Para 10.7.4) which states:” The
Correction Action: Joint 03-FW-253 will be covered by
pipe shall not be lifted or moved during welding.”
100% RT and MT to verify weld soundness.
Page 30 of 42
PROJECT T
S
STANDARDS VIOLATED
S. No. SALBE NO. SALBE TYPE DISCIPLINE
DOC. REF. PARA NO.
Para-5
SAEP-1152
Para-7.5.2
SANCR- Shedule Q
3 Saudi Aramco NCR Mechanical Appendix-D
500015156 SAEP-381
Para-4.3
SAES-W-016
Para 6.2.4 &
SANCR-50001531 SAEP-
Saudi Aramco NCR Mechanical appendix #D,Annex
1 35SAMSS-048
A,para-7,para 1 31
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
Corrective
Action:Corrective Action
And implemented this
INCR Closed
N/A N/A N/A Closed
Contractor shall implement an ongoing training program to introduce and familiarize all contractor and
SALBE-PN-EPM4500007536 Acknowledged. Contractor will
13 Violation Mechanical Schedule Q Para. No.-5.15. Training Program subcontractor personnel with the project quality requirements for their area of responsibility as per Schedule 03 January 2019 04 March 2019 N/A N/A CLOSED
comply schedule'Q' requirements.
Q-Para. No.-5.15.
Focus assessment was conducted at HRDH-1170 area last Jan. 21, 2019 at
around 2pm in order to assess on-going and planned civil acti
vities. The following opportunities for improvement and proactive
notifications were observed. 1. Contractor has to install temporar
y or permanent kilometer markers to be spaced at every 1km during and
after trenching activities as per scope of work para. 8.4. 2.
Pipeline Trenching Intersecting points between existing pipeline shall be properly Acknowledged with thanks. CPP
57 SALBE-PN-EPM4500008647 Violation Mechanical scope of work para. 8.4. 2 23 January 2019 21 February 2019 N/A N/A CLOSED
Activities identified with caution markers in order to preserve and work safely will comply he requirements.
within existing pipelines, Buried pipeline crossing each other shall
have a minimum clearance of 0.6m. 3. Survey stakes and referen Root Cause:
ces shall be installed accordingly and survey report must be verified Mr. shankar left for his personal
by contractor QC to match with design coordinates. Any major emergency for 3-4 days during
changes shall be documented accordingly as per approved field the weekends and anticipated to
engineering change control procedure. be back at work at start of week
and he failed to do so.
Correction Action:
On 16 March 2019, BI-10-02029-0003, Contractor CPP, during site visit at
Late notification is being
material yard bending area TCF-1 it has been observed Contr
transmitted by CPP to Saudi
actor approved QC inspector Mr. Shankar has left on an emergency
Aramco to notify the leave of Mr.
SALBE-SV- vacation since last Thursday, March 14, 2019. Without any informati
Q.C Personal shankar officially.
187 EPM#4500013150 Violation Mechanical Schedule Q on and notification. This is the violation of Schedule Q para 5.14 which 20 March 2019 26 March 2019 11 April 2019 CLOSED
absent notification Corrective Action:
states, All other changes such as illness and emergency lea
CPP quality department will follow
ves shall be notified within 24 hours. Contractor has to provide the
the schedule 'Q' requirements in
Root cause, corrective and preventive action for it. Initiated
order to notify any emergency
by PID Rajendran Thambusamy Root Cause: CPPpersonnel.
construction
para 5.14 leave of quality
failed toGeneral
provide Reply:
the corrective
action which exceeded
Official notification have the time
been
on 15 April 2019 Project inspection has issued a Nonconformance report
frame of 7through
sent days astransmittal
per schedule
500013964 against Prime contractor CPP for related to Coatin
T-CPP-ARAMCO-01380 "Q". for leave
g activities. Until now 5 May 2019 contractor not yet submitted any root
of Mr.Corrective
Shankar. Action:
Hence, this
SALBE-SV-EPM cause and corrective action plan for this issue. It is a vi
355 Violation Mechanical Schedule Q Late Reply for NCR 06 May 2019 8/4/2019 5/12/2019 CPPviolation
submittedcanthe
beRoot Cause CLOSED
closed.
4500017600 olation of Schedule Q Para 7.5.4 which states that Contractor shall
and corrective actions through
investigate the root cause of non-conformities and initiate Corr
official transmittal for SAPMT and
ective Actions to prevent recurrence of nonconformities maximum seven
SAPID confirmation.
[7] days of the issue date
Preventive Action:
Para 7.5.4 CPP will comply the Schedule "Q"
requirements in any future case.
n May 02, 2020, Contractor CPP, BI No. 10-02029-0003, PID representative found that, 04Nos
scraper trappers 1. 510-L-0012-4869 4M, 2. 510-L-0013- 4869 4N, 3. 510-L-0005- 4869 4H, 4.
510-L-0007- 4869 4J were installed without material receiving inspection and pre-installation
inspection of scraper trappers. This is violation to the requirements of SATIP-L-420-01, activity
item no. 3.3, Which is hold point for contractor QC Inspector and it violates Schedule Q, attachment
SALBE-SV-EPM Instalation Done
2413 Violation Mechanical Schedule Q, para 3.3 IV, para 3.3 which states that CONTRACTOR shall visually inspect all incoming equipment for 04 May 2020 07 June 2020 OPEN
004500089038 Prior reciver QC
damage and for conformance to all applicable requirements, including the CONTRACTORs
inspection release, when applicable, with verified Material Test Reports. Contractor is advised to
analyze the root cause with corrective and preventive action within the ACD date. Contractor shall
comply the standard requirement without fail in order to avoid violation escalation as per SAEP-
381.
On 01 may 2020 During Material receiving and pre installation , Flow line connection OPTF Skids
It was noted that OPTF SKIDS Inlet and Outlet connection, Orientation marking mismatching with
the P&ID and plan drawing .Due to the wrong Orientation marking provided OPTF SKID Valves and
spectacled blinds are installed wrong orientation instant of open, close vice versa for the Eight
Orientation
SALBE-SV-EPM OPTF skids S.no:- HWYH-942,HWYH-1002, HWYH-1076, HWYH-1134, HWYH-1071, HWYH-969,
2414
004500088906
Violation Mechanical Schedule Q, para 3.3 mismatching with
HWYH-1055, and HWYH-1087.whic is violating the standard drawing requirements Ex:, TA-130185
03 May 2020 01 August 2020 Closed
the P&ID
Sht001 rev-0F1, BA-760448 Sht001 Rev 0F2 and TA-130571 Sht001 Rev0F1,TA-130220 Sht01
rev 0F2.Prior to initiate RFI to SAPID contractor shall verify the remaining skids. Hence skid is
received with FAT test and V.P.C.I preservation, contractor is requested to provide the corrective
action and root cause by vendor Alderlay, KSA.
On 09 May 2020, During Material Receiving inspection of 16inch X 22inch Dia Cl900 Scraper Traps
number H92- L- 0025 at HWYH EJ RH and H92- L- 0028 at HWYH CK RH respectively, ID noticed
rust formation inside the Scraper Launchers since they are not preserved with VpCI 309 inhibitor as
per Manufacturer recommendation in Handling, Shipping and Storage procedure with Clients P.O
number- 03-KSA04-PR-01-016, para. 03. This is a violation against Schedule Q Attachment IV,
VpCI 309
para. 06, which states that CONTRACTOR shall include procedures for handling, storage, and
inhibitor as per
SALBE-SV-EPM preservation of material as specified in all applicable specifications, manufacturer
2416 Violation Mechanical #NAME? para. 03 Manufacturer 09 May 2020 09 July 2020 OPEN
004500090444 recommendations and COMPANYs standards. The procedure shall list all inspection schedules for
recommendation
maintaining the quality of the material or equipment as well as provide for documentation that the
in Handling
required activities have been performed. Individuals responsible for special handling, storage and
preservation shall be fully qualified to do so, and supplied with predetermined WORK and
inspection instructions. Contractor is advised to analyze the root cause with corrective and
preventive action within the ACD date. Contractor shall comply the standard requirement without
fail in order to avoid violation escalation as per SAEP- 381.
RTR 10
Welding 69
Coating 7
Civil 81,92
###