CPP RFI STATUS SUMMARY AS ON 7 MAY 2019 (Accumulative)

PROJECT TITLE:- North Gas Compression Pipeline Project


CONTRACT No. / BI-10-02029-0003
Total Actioned By
DISCIPLINE Open Closed Rejected
Issued Contractor

MECHANICAL 987 36 915 0 36

WELDING 5534 283 4988 0 263

CIVIL 2568 164 2234 0 170

Coating 1644 115 1352 0 177

COMMUNICATION 0 0 0 0 0

Cathodic Protection 373 6 134 0 1

TOTAL 11106 604 9623 0 647


PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

CPP RFI LOG (Mechanical)


Last Updated:
Total Actioned By Contractor 3th August
Open Closed Rejected 2019
Summary of RFIs Issued (Out of Open)
@ 7.00 PM
987 36 915 36 0

DRAWING DATE OF TIME OF RFI RFI Raised in Hard


S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID Mapped Status REMARKS
NUMBER INSPECTION INSPECTION STATUS Copy

Material Receiving Inspection of 8" x


1 CPP-NGCP-M-001 1400032297 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1142 FL TA-669367 02-Dec-18 Umair Mr. Rajesh CLOSED
0.375" API 5L GRX65

Stringing and pipe laying inspection 8"


2 CPP-NGCP-M-002 1400035238 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1142 FL TA-669367 13-Dec-18 Umair Mr. Rajesh CLOSED
HRDH-1142 FL

Material Receiving Inspection of 8" x HRDH-


3 CPP-NGCP-M-003 1400039006 Mechanical SATIP-L-450-04 SAIC-L-2112 TA-843656 27-Dec-18 Umair Mr. Rajesh CLOSED
0.344" API 5L GRX65 1170/1171 FL

Stringing and pipe laying inspection 8"


4 CPP-NGCP-M-004 1400038930 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1170 FL TA-843656 27-Dec-18 Umair Mr. Rajesh CLOSED
HRDH-1170 FL

Material Receiving Inspection of 8" x HRDH-


5 CPP-NGCP-M-005 1400039309 Mechanical SATIP-L-450-04 SAIC-L-2112 TA-843656 29-Dec-18 Umair Mr. Rajesh CLOSED
0.344" API 5L GRX65 (50 pipes) 1170/1171 FL

Mechanical SATIP-L-450-04 SAIC-L-2112 Material Receiving Inspection of 8" x 31-Dec-18 Mr. Rajesh
6 CPP-NGCP-M-006 1400039819 HRDH-1171 FL TA-843656 7:30 AM Umair CLOSED
0.344" API 5L GRX65 (70 pipes)

Mechanical SATIP-L-450-04 SAIC-L-2112 Material Receiving Inspection of 8" x HWYH-1134 31-Dec-18 Mr. Rajesh
7 CPP-NGCP-M-007 1400039827 TA-843656 7:40 AM Umair CLOSED
0.344" API 5L GRX65 (60 pipes) FL

Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection 8" HWYH-1134 31-Dec-18 Mr. Rajesh
8 CPP-NGCP-M-008 1400039853 TA-843656 7:45 AM Umair CLOSED
HWYH-1134 FL FL

Material Receiving Inspection of 8" x


9 CPP-NGCP-M-009 1400039912 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1171 FL TA-843656 01-Jan-19 3:00 PM Umair Mr. Rajesh CLOSED
0.344" API 5L GRX65 (100 pipes)

Material Receiving Inspection of 8" x


10 CPP-NGCP-M-010 1400039988 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1171 FL TA-843656 01-Jan-19 1:30 PM Umair Mr. Rajesh CLOSED
0.344" API 5L GRX65 (60 pipes)

Material Receiving Inspection of 8" x HWYH-1071


11 CPP-NGCP-M-011 1400039997 Mechanical SATIP-L-450-04 SAIC-L-2112 TA-445830 01-Jan-19 3:45 PM Umair Mr. Rajesh CLOSED
0.344" API 5L GRX65 (60 pipes) FL

Stringing and pipe laying inspection 8"


12 CPP-NGCP-M-012 1400040053 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1170 FL TA-843656 01-Jan-19 4:00 PM Umair Mr. Rajesh CLOSED
HRDH-1170 FL

Material Receiving Inspection of 8" x HWYH-1134


13 CPP-NGCP-M-013 1400040975 Mechanical SATIP-L-450-04 SAIC-L-2112 TA-843656 05-Jan-19 9:00 AM Umair Mr. Rajesh CLOSED
0.344" API 5L GRX65 (119 pipes) FL

Material Receiving Inspection of 8" x


14 CPP-NGCP-M-014 1400040477 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1116 FL TA-843656 03-Jan-19 9:00 AM Umair Mr. Rajesh CLOSED
0.344" API 5L GRX65 (60 pipes)

Material Receiving Inspection of 8" x HWYH-1134


15 CPP-NGCP-M-015 1400041222 Mechanical SATIP-L-450-04 SAIC-L-2112 TA-445830 06-Jan-19 9:00 AM Umair Mr. Rajesh CLOSED
0.344" API 5L GRX65 (120 pipes) FL

Material Receiving Inspection of 8" x


16 CPP-NGCP-M-016 1400041607 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1171 FL TA-843656 07-Jan-19 9:00 AM Umair Mr. Rajesh CLOSED
0.344" API 5L GRX65 (50 pipes)

Material Receiving Inspection of 8" x


17 CPP-NGCP-M-017 1400042326 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF-1 TA-843656 09-Jan-19 9:00 AM Umair Mr. Rajesh CLOSED
0.344" API 5L GRX65 (240 pipes)

Material receiving RFI for tomorrow 120


18 CPP-NGCP-M-018 1400042684 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF-1 TA-843656 10-Jan-19 2:00 PM Umair Mr. Rajesh CLOSED
pipes (8”X0.344”) at TCF-1

Material receiving RFI for tomorrow 120


19 CPP-NGCP-M-019 1400042648 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1171. TA-843656 10-Jan-19 9:00 AM Umair Mr. Rajesh CLOSED
pipes (8”X0.344”) at HRDH-1171.

Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection 8" 10-Jan-19 Mr. Rajesh
20 CPP-NGCP-M-020 1400042669 HRDH-1171. TA-843656 10:00 AM Umair CLOSED
HRDH-1171 FL

Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection 8" 11-Jan-19 Mr. Rajesh
21 CPP-NGCP-M-021 1400042632 HRDH-1171. TA-843656 8:00 AM Umair CLOSED
HRDH-1171 FL

Mechanical Visual Visual Visual inspection for violation closing. NA NA 12-Jan-19 3:00 PM Mr. Rajesh
22 CPP-NGCP-M-022 1400042934 Umair CLOSED
SALBE-SV-4500007729

Visual inspection for Internal NCR closing.


23 CPP-NGCP-M-023 1400042881 Mechanical Visual Visual CPP-NGCP-NCR-M-001 NA NA 12-Jan-19 3:00 PM Umair Mr. Rajesh CLOSED
(EPM# 6600001218)

Material receiving RFI for tomorrow 150


24 CPP-NGCP-M-024 1400043155 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1171. TA-445836 13-Jan-19 2:00 PM Umair Mr. Rajesh CLOSED
pipes (8”X0.344”) at HRDH-1171.

Material receiving RFI for tomorrow 32


25 CPP-NGCP-M-025 1400043156 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1170 FL TA-843656 13-Jan-19 9:00 AM Umair Mr. Rajesh CLOSED
pipes (8”X0.344”) at HRDH-1170

Material receiving inspection for 308 pipes TCF-1


26 CPP-NGCP-M-026 1400043165 Mechanical SATIP-L-450-04 SAIC-L-2112 (24”X0.469”) at TCF-1 Temporary Storage Temporary NA 13-Jan-19 1:30 PM Umair Mr. Rajesh CLOSED
Yard Storage Yard

Material Receiving Inspection of 8" x


27 CPP-NGCP-M-027 1400043379 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF-1 TA-843656 14-Jan-19 9:00 AM Umair Mr. Rajesh CLOSED
0.344" API 5L GRX65 (60 pipes) at TCF-1.

Material receiving Inspection for 91 pipes


28 CPP-NGCP-M-028 1400043455 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1134 TA-843656 14-Jan-19 2:00 PM Umair Mr. Rajesh CLOSED
(8”X0.344”) at HWYH-1134

Material receiving Inspection for 30 pipes


29 CPP-NGCP-M-029 1400043456 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1071 TA-445830 14-Jan-19 9:00 AM Umair Mr. Rajesh CLOSED
(8”X0.344”) at HWYH-1071.

Material receiving Inspection for 150 pipes


30 CPP-NGCP-M-030 1400045484 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF-1 TA-445988 21-Jan-19 10:00 AM Umair Mr. Rajesh CLOSED
(24”X0.469”) at TCF-1

Material receiving Inspection for 111 pipes


31 CPP-NGCP-M-031 1400045990 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF-1 TA-843961 23-Jan-19 10:00 AM Umair Mr. Rajesh CLOSED
(36”X0.875”) at TCF-1

Field pipe bending Inspection for pipes


Rejected due to
32 CPP-NGCP-M-032 1400046439 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HWYH-1134 at TCF-1 CPP TCF-1 TA-445836 24-Jan-19 10:00 AM Umair Mr. Rajesh Reject
not activity
Pipe yard.

Field pipe bending Inspection for pipes


33 CPP-NGCP-M-033 1400046636 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HWYH-1134 at TCF-1 CPP TCF-1 TA-445836 26-Jan-19 10:00 AM Umair Mr. Rajesh CLOSED
Pipe yard.

Field pipe bending Inspection for pipes


34 CPP-NGCP-M-034 1400046890 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HWYH-1134 at TCF-1 CPP TCF-1 TA-445836 27-Jan-19 10:00 AM Umair Mr. Rajesh Reject Rejected Job Not Ready
Pipe yard.

Field pipe bending Inspection for pipes


35 CPP-NGCP-M-035 1400047525 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HWYH-1134 at TCF-1 CPP TCF-1 TA-445836 29-Jan-19 10:00 AM Umair Mr. Rajesh CLOSED
Pipe yard.

Field pipe bending Inspection for pipes


36 CPP-NGCP-M-036 1400047751 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HWYH-1134 at TCF-1 CPP TCF-1 TA-445836 30-Jan-19 10:00 AM Umair Mr. Rajesh CLOSED
Pipe yard.

Material receiving Inspection for 199 pipes


37 CPP-NGCP-M-037 1400047772 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF-1 TA-843961 30-Jan-19 11:00 AM Umair Mr. Rajesh CLOSED
(24”X0.469”) at TCF-1

Field pipe bending Inspection for pipes


38 CPP-NGCP-M-038 1400048006 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HWYH-1134 at TCF-1 CPP TCF-1 TA-445836 31-Jan-19 10:00 AM Umair Mr. Rajesh CLOSED
Pipe yard.

Field pipe bending Inspection for pipes


39 CPP-NGCP-M-039 1400048205 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1170 at TCF-1 CPP TCF-1 TA-445836 02-Feb-19 10:00 AM Umair Mr. Rajesh CLOSED
Pipe yard.

Stringing and pipe laying inspection 8"


40 CPP-NGCP-M-040 1400048496 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1171 TA-843656 03-Feb-19 10:00 AM Umair Mr. Rajesh CLOSED
HRDH-1171 FL

Stringing and pipe laying inspection 8"


41 CPP-NGCP-M-041 1400048524 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1116 TA-843608 03-Feb-19 11:00 AM Umair Mr. Rajesh CLOSED
HRDH-1116 FL

Stringing and pipe laying inspection 8"


42 CPP-NGCP-M-042 1400048451 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1134 TA-445836 03-Feb-19 1:00 PM Umair Mr. Rajesh CLOSED
HWYH-1134

Field pipe bending Inspection for pipes


43 CPP-NGCP-M-043 1400048499 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HWYH-1134 at TCF-1 CPP TCF-1 N/A 03-Feb-19 9:00 AM Umair Mr. Rajesh CLOSED
Pipe yard.
CANCELLED
Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection 8" 04-Feb-19 Mr. Rajesh Re-Schedule to 05-Feb-19
44 CPP-NGCP-M-044 1400048804 HRDH-1116 TA-843608 9:00 AM Umair Reject DUE TO NOT
HRDH-1116 FL
ACTIVITY

Field pipe bending Inspection for pipes


45 CPP-NGCP-M-045 1400048731 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1170 at TCF-1 CPP TCF-1 TA-843656 04-Feb-19 11:00 AM Umair Mr. Rajesh CLOSED Re-Schedule to 05-Feb-19
Pipe yard.

Field pipe bending Inspection for pipes


46 CPP-NGCP-M-046 1400049222 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1170 at TCF-1 CPP TCF-1 TA-843656 06-Feb-19 11:00 AM Umair Mr. Rajesh CLOSED
Pipe yard.
Field pipe bending Inspection for pipes
47 CPP-NGCP-M-047 1400049666 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1170 at TCF-1 CPP TCF-1 TA-843656 07-Feb-19 11:00 AM Umair Mr. Rajesh CLOSED
Pipe yard.

Stringing and pipe laying inspection 8"


48 CPP-NGCP-M-048 1400050088 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1116 TA-843608 09-Feb-19 9:00 AM Umair Mr. Rajesh CLOSED
HRDH-1116 FL

Field pipe bending Inspection for pipes


49 CPP-NGCP-M-049 1400050195 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1170 at TCF-1 CPP TCF-1 TA-843656 09-Feb-19 9:00 AM Umair Mr. Rajesh CLOSED
Pipe yard.

Stringing and pipe laying inspection 8"


50 CPP-NGCP-M-050 1400050246 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1071 TA-445830 10-Feb-19 9:00 AM Umair Mr. Rajesh CLOSED
HWYH-1071 FL

Field pipe bending Inspection for pipes


51 CPP-NGCP-M-051 1400050364 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1171 at TCF-1 CPP TCF-1 TA-843656 10-Feb-19 9:00 AM Umair Mr. Rajesh CLOSED
Pipe yard.
Material Receiving Inspection of 8" x
52 CPP-NGCP-M-052 1400050427 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1116 FL TA-843608 10-Feb-19 9:00 AM Umair Mr. Rajesh CLOSED
0.344" API 5L GRX65 (150 pipes)
Field pipe bending Inspection for pipes
53 CPP-NGCP-M-053 1400050823 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1171 at TCF-1 CPP TCF-1 TA-843656 11-Feb-19 11:00 AM Umair Mr. Rajesh CLOSED
Pipe yard.
Stringing and pipe laying inspection 8"
54 CPP-NGCP-M-054 1400050742 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1071 TA-445830 11-Feb-19 8:00 AM Umair Mr. Rajesh CLOSED
HWYH-1071 FL

Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection 8" 12-Feb-19 Mr. Rajesh
55 CPP-NGCP-M-055 1400050851 HWYH-1071 TA-445830 8:00 AM Umair CLOSED
HWYH-1071 FL
Material Receiving Inspection of 8" x
56 CPP-NGCP-M-056 1400050909 Mechanical SATIP-L-450-04 SAIC-L-2112 0.344" API 5L GRX65 (360 pipes) HRDH- HRDH-922 TA-843609 12-Feb-19 10:00 AM Umair Mr. Rajesh CLOSED
922
Field pipe bending Inspection for pipes
57 CPP-NGCP-M-057 1400051051 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1171 at TCF-1 CPP TCF-1 TA-843656 12-Feb-19 11:00 AM Umair Mr. Rajesh CLOSED
Pipe yard.

Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving Inspection for 391 pipes 13-Feb-19 Mr. Rajesh
58 CPP-NGCP-M-058 1400051482 TCF-1 VARIOUS 9:00 AM Umair CLOSED
(24”X0.469”) at TCF-1
Material receiving Inspection for 60 pipes
59 CPP-NGCP-M-059 1400051582 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1134 TA-843656 13-Feb-19 2:00 PM Umair Mr. Rajesh CLOSED
(8”X0.344”) at HWYH-1134
Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving Inspection for 60 pipes 13-Feb-19 Mr. Rajesh
60 CPP-NGCP-M-060 1400051607 HWYH-1071 TA-445830 3:00 PM Umair CLOSED
(8”X0.344”) at HWYH-1071
Field pipe bending Inspection for pipes
61 CPP-NGCP-M-061 1400051567 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1116 at TCF-1 CPP TCF-1 TA-843608 13-Feb-19 1:00 PM Umair Mr. Rajesh CLOSED
Pipe yard.
Material receiving Inspection for 120 pipes
62 CPP-NGCP-M-062 1400051989 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH 1100 VARIOUS 14-Feb-19 9:00 AM Umair Mr. Rajesh CLOSED
(8"x0.344") at HWYH 1100

Material receiving Inspection for 60 pipes Rejected due to


63 CPP-NGCP-M-063 1400052001 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH 1055 VARIOUS 14-Feb-19 10:00 AM Umair Mr. Rajesh Reject
(8"x0.344") at HWYH 1055 not activity
DOCUMENT NOT UPLOAD
Field pipe bending Inspection for pipes
64 CPP-NGCP-M-064 1400052053 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1116 at TCF-1 CPP TCF-1 TA-843608 14-Feb-19 1:00 PM Umair Mr. Rajesh CLOSED
Pipe yard.
Material receiving Inspection for 270 pipes
65 CPP-NGCP-M-065 1400052084 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF-1 VARIOUS 14-Feb-19 2:00 PM Umair Mr. Rajesh CLOSED
(24”X0.469”) at TCF-1
Field pipe bending Inspection for pipes
66 CPP-NGCP-M-066 1400052342 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1116 at TCF-1 CPP TCF-1 TA-843608 16-Feb-19 1:00 PM Umair Mr. Rajesh CLOSED
Pipe yard.
Stringing and pipe laying inspection 8"
67 CPP-NGCP-M-067 1400052414 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1071 TA-445830 16-Feb-19 8:00 AM Umair Mr. Rajesh CLOSED
HWYH-1071 FL
Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection 8" 16-Feb-19 Mr. Rajesh
68 CPP-NGCP-M-068 1400052376 HRDH-1116 TA-843608 9:00 AM Umair CLOSED
HRDH-1116 FL
Field pipe bending Inspection for pipes
69 CPP-NGCP-M-069 1400052758 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1116 at TCF-1 CPP TCF-1 TA-843608 17-Feb-19 1:00 PM Umair Mr. Rajesh CLOSED
Pipe yard.
Material receiving Inspection for 120 pipes
70 CPP-NGCP-M-070 1400052767 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1100 TA-445959 17-Feb-19 9:00 AM Umair Mr. Rajesh CLOSED
(8"x0.344") at HWYH 1100
Field pipe bending Inspection for pipes
71 CPP-NGCP-M-071 1400053283 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-922 at TCF-1 CPP TCF-1 TA-843609 18-Feb-19 11:00 AM Umair Mr. Rajesh CLOSED
Pipe yard.
Stringing and pipe laying inspection 8"
72 CPP-NGCP-M-072 1400053268 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1071 TA-445830 18-Feb-19 8:00 AM Umair Mr. Rajesh CLOSED
HWYH-1071 FL
Material receiving Inspection for 60 pipes
73 CPP-NGCP-M-073 1400053229 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1071 VARIOUS 18-Feb-19 9:00 AM Umair Mr. Rajesh CLOSED
(8”X0.344”) at HWYH-1071
Material receiving Inspection for 240 pipes
74 CPP-NGCP-M-074 1400053293 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1117 VARIOUS 18-Feb-19 2:00 PM Umair Mr. Rajesh CLOSED
(8”X0.344”) at HRDH-1117
Field pipe bending Inspection for pipes
75 CPP-NGCP-M-075 1400053475 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-922 at TCF-1 CPP TCF-1 TA-843609 19-Feb-19 9:00 AM Shankar Mr. Rajesh CLOSED
Pipe yard.

Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving Inspection for 60 pipes 19-Feb-19 Mr. Rajesh
76 CPP-NGCP-M-076 1400053583 HRDH-1117 VARIOUS 2:00 PM Umair CLOSED
(8”X0.344”) at HRDH-1117
Material Receiving Inspection of 8" x
77 CPP-NGCP-M-077 1400053767 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1145 TA-843976 20-Feb-19 2:00 PM Umair Mr. Rajesh CLOSED
0.344" API 5L GRX65 ( 60 pipes)

Field pipe bending Inspection for pipes


78 CPP-NGCP-M-078 1400053761 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-922 at TCF-1 CPP TCF-1 TA-843609 20-Feb-19 9:00 AM Shankar Mr. Rajesh CLOSED
Pipe yard.

Stringing and pipe laying inspection 8"


79 CPP-NGCP-M-079 1400053907 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-922 TA-843609 20-Feb-19 8:00 AM Umair Mr. Rajesh CLOSED
HRDH-922 FL

Material Receiving Inspection of 8" x


80 CPP-NGCP-M-080 1400053902 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1063 TA-843953 20-Feb-19 11:00 AM Umair Mr. Rajesh CLOSED
0.344" API 5L GRX65 ( 90 pipes)

Stringing and pipe laying inspection 8"


81 CPP-NGCP-M-081 1400054274 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-922 TA-843609 21-Feb-19 8:00 AM Umair Mr. Rajesh CLOSED
HRDH-922 FL

Field pipe bending Inspection for pipes


82 CPP-NGCP-M-082 1400054434 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1063 at TCF-1 CPP TCF-1 TA-843953 21-Feb-19 1:00 PM Shankar Mr. Rajesh CLOSED
Pipe yard.

Material receiving Inspection for 240 pipes


83 CPP-NGCP-M-083 1400054415 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1100 TA-445959 21-Feb-19 8:00 AM Umair Mr. Rajesh CLOSED
(8”X0.344”) at HWYH-1100

Stringing and pipe laying inspection 8"


84 CPP-NGCP-M-084 1400054473 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1100 TA-445959 21-Feb-19 9:00 AM Umair Mr. Rajesh CLOSED
HWYH-1100

Material receiving Inspection for 92 pipes


85 CPP-NGCP-M-085 1400054410 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1122 BA-407560 21-Feb-19 3:00 PM Umair Mr. Rajesh CLOSED
(8”X0.344”) at HRDH-1122

Material receiving Inspection for 30 pipes


86 CPP-NGCP-M-086 1400054452 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1145 TA-843976 21-Feb-19 4:00 PM Umair Mr. Rajesh CLOSED
(8”X0.344”) at HRDH-1145

Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection 8" 23-Feb-19 Mr. Rajesh
87 CPP-NGCP-M-087 1400054860 HWYH-1100 TA-445959 8:00 AM Umair CLOSED
HWYH-1100
Stringing and pipe laying inspection 8"
88 CPP-NGCP-M-088 1400054890 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1063 TA-843953 23-Feb-19 1:00 PM Umair Mr. Rajesh CLOSED
HRDH-1063
Field pipe bending Inspection for pipes
89 CPP-NGCP-M-089 1400054876 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1063 at TCF-1 CPP TCF-1 TA-843953 23-Feb-19 1:00 PM Shankar Mr. Rajesh CLOSED
Pipe yard.
Material receiving Inspection for 32 pipes
90 CPP-NGCP-M-090 1400055034 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1162 BA-805095 23-Feb-19 3:00 PM Umair Mr. Rajesh CLOSED
(8”X0.344”) at HRDH-1162
Stringing and pipe laying inspection 8"
91 CPP-NGCP-M-091 1400055118 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1117 TA-843656 23-Feb-19 10:00 AM Umair Mr. Rajesh CLOSED
HRDH-1117
Field pipe bending Inspection for pipes
92 CPP-NGCP-M-092 1400055440 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1063 at TCF-1 CPP TCF-1 TA-843953 24-Feb-19 8:00 AM Shankar Mr. Rajesh CLOSED
Pipe yard.
CANCELLED
CPP-NGCP- Stringing and pipe laying inspection 8"
93 1400055460 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1100 TA-445959 24-Feb-19 8:00 AM Umair Mr. Rajesh Reject DUE TO NOT
M+B102:B420-093 HWYH-1100
ACTIVITY
Stringing and pipe laying inspection 8"
94 CPP-NGCP-M-094 1400055431 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1063 TA-843953 24-Feb-19 1:00 PM Umair Mr. Rajesh CLOSED
HRDH-1063
Stringing and pipe laying inspection 8"
95 CPP-NGCP-M-095 1400055452 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1309 VARIOUS 24-Feb-19 2:00 PM Umair Mr. Rajesh CLOSED
HRDH-1309
Field pipe bending Inspection for pipes
96 CPP-NGCP-M-096 1400056024 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-922 at TCF-1 CPP TCF-1 TA-843609 25-Feb-19 8:00 AM Shankar Mr. Rajesh CLOSED
Pipe yard.

1400056025 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection 8" 25-Feb-19 Mr. Rajesh
97 CPP-NGCP-M-097 HRDH-1309 TA-843624 8:00 AM Umair CLOSED
HRDH-1309
Stringing and pipe laying inspection 8"
98 CPP-NGCP-M-098 1400056044 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1063 TA-843953 25-Feb-19 1:00 PM Umair Mr. Rajesh CLOSED
HRDH-1063

Stringing and pipe laying inspection 8"


99 CPP-NGCP-M-099 1400056489 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1309 TA-843624 26-Feb-19 8:00 AM Umair Mr. Rajesh CLOSED
HRDH-1309

1400056501 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection 8" 26-Feb-19 Mr. Rajesh
100 CPP-NGCP-M-100 HRDH-1063 TA-843953 1:00 PM Umair CLOSED
HRDH-1063

Field pipe bending Inspection for pipes


101 CPP-NGCP-M-101 1400056532 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-922 at TCF-1 CPP TCF-1 TA-843609 26-Feb-19 8:00 AM Shankar Mr. Suresh CLOSED
Pipe yard.
Field pipe bending Inspection for pipes
102 CPP-NGCP-M-102 1400057121 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-922 at TCF-1 CPP TCF-1 TA-843609 27-Feb-19 8:00 AM Shankar Mr. Suresh CLOSED
Pipe yard.
Field pipe bending Inspection for pipes
103 CPP-NGCP-M-103 1400057531 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-922 at TCF-1 CPP TCF-1 TA-843609 28-Feb-19 8:00 AM Shankar Mr. Suresh CLOSED
Pipe yard.
Stringing and pipe laying inspection 8"
104 CPP-NGCP-M-104 1400057686 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1117 BA-797882 28-Feb-19 8:00 AM Umair Mr. Rajesh CLOSED
HRDH-1117
Field pipe bending Inspection for pipes
105 CPP-NGCP-M-105 1400058064 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1063 at TCF-1 CPP TCF-1 TA-843953 02-Mar-19 8:00 AM Shankar Mr. Suresh CLOSED
Pipe yard.
Field pipe bending Inspection for pipes
106 CPP-NGCP-M-106 1400058640 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1063 at TCF-1 CPP TCF-1 TA-843953 03-Mar-19 8:00 AM Shankar Mr. Suresh CLOSED
Pipe yard.
Material receiving Inspection for 110 pipes
1400058845 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-BK-RH 03-Mar-19 Mr. Rajesh
107 CPP-NGCP-M-107 (16”X0.438”) API 5L Gr X65, PSL-2 at TA-843957 9:00 AM Umair CLOSED
TL
HRDH-BK-RH T/L
Stringing and pipe laying inspection 8"
108 CPP-NGCP-M-108 1400058903 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1117 BA-797882 03-Mar-19 1:00 PM Umair Mr. Rajesh CLOSED
HRDH-1117

1400058895 Mechanical SATIP-L-450-04 SAIC-L-2112 Material Receiving Inspection of 8" x 03-Mar-19 Mr. Rajesh
109 CPP-NGCP-M-109 HRDH-1142 FL TA-669367 2:00 PM Umair CLOSED
0.375" API 5L GRX65. Qty: 5 pipes
Field pipe bending Inspection for pipes
110 CPP-NGCP-M-110 1400059300 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1063 at TCF-1 CPP TCF-1 TA-843953 04-Mar-19 8:00 AM Shankar Mr. Suresh CLOSED
Pipe yard.
Field pipe bending Inspection for pipes
111 CPP-NGCP-M-111 1400059942 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1063 at TCF-1 CPP TCF-1 TA-843953 05-Mar-19 8:00 AM Shankar Mr. Suresh CLOSED
Pipe yard.
Storage and Preservation of 16"X0.438" TCF-1 Pipe
112 CPP-NGCP-M-112 1400059891 Mechanical SATIP-L-450-04 SAIC-L-2112 N/A 05-Mar-19 9:00 AM Shankar Mr. Suresh CLOSED
Pipes. QTY: 200 , TCF-1 Pipe Yard Yard

1400060013 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection 8" 05-Mar-19 Mr. Rajesh
113 CPP-NGCP-M-113 HRDH-1145 TA-843976 8:00 AM Umair CLOSED
HRDH-1145
Material receiving Inspection for
TCF-1 Pipe
114 CPP-NGCP-M-114 1400059995 Mechanical SATIP-L-450-04 SAIC-L-2112 (16”X0.438”) API 5L Gr X65 at TCF-1 N/A 05-Mar-19 10:00 AM Umair Mr. Suresh CLOSED
Yard
QTY: 200 Pipes
Stringing and pipe laying inspection 8"
115 CPP-NGCP-M-115 1400060419 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1145 TA-843976 06-Mar-19 2:00 PM Umair Mr. Rajesh CLOSED
HRDH-1145

1400060456 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving Inspection for 420 pipes TCF-1 Pipe 06-Mar-19
116 CPP-NGCP-M-116 VARIOUS 10:00 AM Umair Mr. Suresh CLOSED
(36”X0.688”) API 5L Gr X65 PSL2G TCF-1 Yard

Stringing and pipe laying inspection 8"


117 CPP-NGCP-M-117 1400060382 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1309 TA-843624 06-Mar-19 11:00 AM Umair Mr. Rajesh CLOSED
HRDH-1309
Field pipe bending Inspection for pipes
118 CPP-NGCP-M-118 1400060468 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1063 at TCF-1 CPP TCF-1 TA-843953 06-Mar-19 8:00 AM Shankar Mr. Suresh CLOSED
Pipe yard.
Stringing and pipe laying inspection 8"
119 CPP-NGCP-M-119 1400061177 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1172 AA-843627 07-Mar-19 8:00 AM Umair Mr. Rajesh CLOSED
HRDH-1172
Field pipe bending Inspection for pipes
120 CPP-NGCP-M-120 1400061166 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1314 at TCF-1 CPP TCF-1 N/A 07-Mar-19 8:00 AM Shankar Mr. Suresh CLOSED
Pipe yard.

1400061192 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection 8" 07-Mar-19 Mr. Rajesh
121 CPP-NGCP-M-121 HRDH-1122 AA-843611 2:00 PM Umair CLOSED
HRDH-1122
Field pipe bending Inspection for pipes
122 CPP-NGCP-M-122 1400061802 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1314 at TCF-1 CPP TCF-1 N/A 09-Mar-19 8:00 AM Shankar Mr. Suresh CLOSED
Pipe yard.
Stringing and pipe laying inspection 8"
123 CPP-NGCP-M-123 1400061839 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1135 TA-843650 09-Mar-19 8:00 AM Saleem Mr. Rajesh CLOSED
HRDH-1135
Stringing and pipe laying inspection 8"
124 CPP-NGCP-M-124 1400062048 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1076 TA-445861 09-Mar-19 9:00 AM Umair Mr. Suresh CLOSED
HWYH-1076
Stringing and pipe laying inspection 8"
125 CPP-NGCP-M-125 1400062889 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1076 TA-445861 10-Mar-19 8:00 AM Umair Mr. Suresh CLOSED
HWYH-1076
Stringing and pipe laying inspection 8"
126 CPP-NGCP-M-126 1400062820 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1117 BA-797882 10-Mar-19 10:00 AM Umair Mr. Rajesh CLOSED
HRDH-1117
Stringing and pipe laying inspection 8"
127 CPP-NGCP-M-127 1400062896 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1122 AA-843611 10-Mar-19 10:00 AM Saleem Mr. Suresh CLOSED
HRDH-1122
Field pipe bending Inspection for pipes
128 CPP-NGCP-M-128 1400062851 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1314 at TCF-1 CPP TCF-1 N/A 10-Mar-19 8:00 AM Shankar Mr. Suresh CLOSED
Pipe yard.
Stringing and pipe laying inspection 8"
129 CPP-NGCP-M-129 1400062898 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1162 BA-805095 10-Mar-19 2:00 PM Umair Mr. Rajesh CLOSED
HRDH-1162
1400062979 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection 8" 10-Mar-19 Mr. Rajesh
130 CPP-NGCP-M-130 HRDH-1135 TA-843650 3:00 PM Umair CLOSED
HRDH-1135
Stringing and pipe laying inspection 8"
131 CPP-NGCP-M-131 1400062986 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1088 N/A 10-Mar-19 7:30 AM Umair Mr. Rajesh CLOSED
HWYH-1088
Stringing and pipe laying inspection 8"
132 CPP-NGCP-M-132 1400063541 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1314 N/A 11-Mar-19 8:00 AM Umair Mr. Rajesh CLOSED
HRDH-1314
Field pipe bending Inspection for pipes
133 CPP-NGCP-M-133 1400063606 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1170 at TCF-1 CPP TCF-1 N/A 11-Mar-19 8:00 AM Shankar Mr. Suresh CLOSED
Pipe yard.
Stringing and pipe laying inspection 8"
134 CPP-NGCP-M-134 1400063763 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1088 N/A 11-Mar-19 7:30 AM Saleem Mr. Suresh CLOSED
HWYH-1088
Stringing and pipe laying inspection 8"
135 CPP-NGCP-M-135 1400063754 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1076 TA-445861 11-Mar-19 8:00 AM Saleem Mr. Suresh CLOSED
HWYH-1076
Field pipe bending Inspection for pipes
136 CPP-NGCP-M-136 1400064129 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1170 at TCF-1 CPP TCF-1 N/A 12-Mar-19 8:00 AM Shankar Mr. Suresh CLOSED
Pipe yard.

Storage and Preservation of 16"X0.438" TCF-1 Pipe


137 CPP-NGCP-M-137 1400064233 Mechanical SATIP-L-450-04 SAIC-L-2112 N/A 12-Mar-19 9:00 AM Shankar Mr. Suresh CLOSED
Pipes. QTY: 250 , TCF-1 Pipe Yard Yard
Stringing and pipe laying inspection 8"
138 CPP-NGCP-M-138 1400064169 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1145 TA-843976 12-Mar-19 8:00 AM Umair Mr. Suresh CLOSED
HRDH-1145
Stringing and pipe laying inspection 8"
139 CPP-NGCP-M-139 1400064171 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1055 TA-446046 12-Mar-19 8:00 AM Saleem Mr. Suresh CLOSED
HWYH-1055
Stringing and pipe laying inspection 8"
140 CPP-NGCP-M-140 1400064191 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1088 TA-445837 12-Mar-19 10:00 AM Saleem Mr. Suresh CLOSED
HWYH-1088
Stringing and pipe laying inspection 8"
141 CPP-NGCP-M-141 1400064519 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1314 TA-843626 12-Mar-19 10:00 AM Umair Mr. Suresh CLOSED
HRDH-1314
Field pipe bending Inspection for pipes
1400064888 Mechanical SATIP-L-450-04 SAIC-L-2114 13-Mar-19 Mr.
142 CPP-NGCP-M-142 (8”X0.344”), HRDH-1170 at TCF-1 CPP TCF-1 N/A 8:00 AM Shankar CLOSED
Rajendran
Pipe yard.
Stringing and pipe laying inspection 8"
143 CPP-NGCP-M-143 1400064860 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1055 TA-446046 13-Mar-19 8:00 AM Saleem Mr. Suresh CLOSED
HWYH-1055
Field pipe bending Inspection for pipes
Mr.
144 CPP-NGCP-M-144 1400065753 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1145 at TCF-1 CPP TCF-1 N/A 14-Mar-19 8:00 AM Shankar CLOSED
Rajendran
Pipe yard.
Stringing and pipe laying inspection 8"
145 CPP-NGCP-M-145 1400065857 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1055 TA-446046 14-Mar-19 8:00 AM Saleem Mr. Suresh CLOSED
HWYH-1055
Field pipe bending Inspection for pipes
Mr.
146 CPP-NGCP-M-146 1400066524 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1145 at TCF-1 CPP TCF-1 N/A 16-Mar-19 8:00 AM Saleem CLOSED
Rajendran
Pipe yard.

1400066822 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection 8" TA-843605 16-Mar-19
147 CPP-NGCP-M-147 HRDH-1118 8:00 AM Umair Mr. Rajesh CLOSED
HRDH-1118
Stringing and pipe laying inspection 8"
148 CPP-NGCP-M-148 1400067296 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1118 TA-843605 17-Mar-19 8:00 AM Umair Mr. Rajesh CLOSED
HRDH-1118
Field pipe bending Inspection for pipes
1400067314 Mechanical SATIP-L-450-04 SAIC-L-2114 17-Mar-19 Mr.
149 CPP-NGCP-M-149 (8”X0.344”), HRDH-1122 & 1145 at TCF-1 TCF-1 N/A 8:00 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Cleaning/Flushing (Scraping) prior to
151 CPP-NGCP-M-150 1400067510 Mechanical SATIP-A-004-03 SAIC-L-2017 hydrotest for Revalidation of Test Manifold. TCF-4 N/A 17-Mar-19 1.15 PM Umair Mr. Rajesh CLOSED Re-Schedule to 18-
CPP-MF-002 Mar-2019
Verification of Testing equipment for
Revalidation of Test Manifold. CPP-MF-
152 CPP-NGCP-M-151 1400067583 Mechanical SATIP-A-004-03 SAIC-A-2009 TCF-4 N/A 17-Mar-19 1.30 PM Umair Mr. Rajesh CLOSED
002 Re-Schedule to 18-
(including safety reqmts) Mar-2019
Verification of Test Preparation for
153 CPP-NGCP-M-152 1400067562 Mechanical SATIP-A-004-03 SAIC-A-2011 Revalidation of Test Manifold. CPP-MF- TCF-4 N/A 17-Mar-19 1.45 PM Umair Mr. Rajesh CLOSED Re-Schedule to 18-
002 Mar-2019
Filling & Pressurization for Revalidation of
154 CPP-NGCP-M-153 1400067603 Mechanical SATIP-A-004-03 SAIC-A-2013 Test Manifold. CPP-MF-002 TCF-4 N/A 17-Mar-19 2.00 PM Umair Mr. Rajesh CLOSED Re-Schedule to 18-
Visual Inspection at Test Pressure Mar-2019

a. Strength Test Pressure (100%)


155 CPP-NGCP-M-154 1400067613 Mechanical SATIP-A-004-03 SAIC-A-2015 TCF-4 N/A 17-Mar-19 2.15 PM Umair Mr. Rajesh CLOSED
b. Tightness Test Pressure (95%)
Re-Schedule to 18-
for Revalidation of Test Manifold. CPP-MF- Mar-2019
002
De-Pressurization & Water Disposal for
156 CPP-NGCP-M-155 1400067577 Mechanical SATIP-A-004-03 SAIC-A-2017 Revalidation of Test Manifold. CPP-MF- TCF-4 N/A 17-Mar-19 2.30 PM Umair Mr. Rajesh CLOSED Re-Schedule to 18-
002 Mar-2019
Field pipe bending Inspection for pipes
Mr.
157 CPP-NGCP-M-156 1400068060 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1122 at TCF-1 CPP TCF-1 N/A 17-Mar-19 8:00 AM Saleem CLOSED
Rajendran
Pipe yard.

1400068156 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection 8" TA-843586 17-Mar-19
158 CPP-NGCP-M-157 HRDH-1078 8:00 AM Umair Mr. Rajesh CLOSED
HRDH-1078
Field pipe bending Inspection for pipes
Mr.
159 CPP-NGCP-M-158 1400068437 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1122 & 1170 at TCF-1 TCF-1 N/A 19-Mar-19 8:00 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
CANCELLED
Inspection prior to Welding of Temperature
160 CPP-NGCP-M-159 1400068620 Mechanical SATIP-L-450-04 SAIC-L-2115 HRDH-1170 FL TA-843656 19-Mar-19 8:30 AM Umair Mr. Rajesh Reject DUE TO NOT
Tie-In Weld Joint HRDH-1170
ACTIVITY

Material Receiving Inspection Mr.


161 CPP-NGCP-M-160 1400068814 Mechanical SATIP-M-001-01 SAIC-M-2003 DAMMAM N/A 19-Mar-19 10.00 AM Saleem CLOSED
Structural Steel Plates Rajendran
Material receiving Inspection for 30 pipes
162 CPP-NGCP-M-161 1400068752 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1076 VARIOUS 19-Mar-19 9:00 AM Umair Mr. Suresh CLOSED
(8"x0.344") at HWYH 1076
Material receiving Inspection for 90 pipes
163 CPP-NGCP-M-162 1400068844 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1118 VARIOUS 19-Mar-19 9:30 AM Umair Mr. Rajesh CLOSED
(8"x0.344") at HRDH-1118
RFI has been
Stringing and pipe laying inspection of 16" HRDH BK-RH canceled due
164 CPP-NGCP-M-163 1400068894 Mechanical SATIP-L-450-04 SAIC-L-2132 VARIOUS 19-Mar-19 8:00 AM Umair Mr. Rajesh CLOSED to delaying
HRDH BK-RH TR/L TR/L
the pipe
Field pipe bending Inspection for pipes documents,
Mr.
165 CPP-NGCP-M-164 1400069427 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1122 at TCF-1 CPP TCF-1 N/A 20-Mar-19 8:00 AM Saleem CLOSED however
Rajendran
Pipe yard. material
receiving done
Material receiving Inspection for EPM # 77566
Mr.
166 CPP-NGCP-M-165 1400069429 Mechanical SATIP-L-450-04 SAIC-L-2112 (16”X0.438”) API 5L Gr X65 at HRDH-RH- HRDH-RH-BK TA-843957 20-Mar-19 1:00 PM Umair Reject for
Rajendran
BK QTY: 250 Pipes information.
Material receiving Inspection for 30 pipes
167 CPP-NGCP-M-166 1400069519 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1078 TA-843586 20-Mar-19 2.00 PM Umair Mr. Rajesh CLOSED
(8"x0.344") at HRDH-1078
Material receiving Inspection for 60 pipes
168 CPP-NGCP-M-167 1400069563 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1122 TA-843611 20-Mar-19 3.00 PM Umair Mr. Rajesh CLOSED
(8"x0.344") at HRDH-1122
Material receiving Inspection for 150 pipes
169 CPP-NGCP-M-168 1400069452 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-611 N/A 20-Mar-19 4.00 PM Umair Mr. Rajesh CLOSED
(8"x0.344") at HRDH-611
Material receiving Inspection for 90 pipes
170 CPP-NGCP-M-169 1400069583 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1076 TA-445861 20-Mar-19 9.00 AM Umair Mr. SURESH CLOSED
(8"x0.344") at HWYH-1076
Material receiving Inspection for 30 pipes Rejected by not
171 CPP-NGCP-M-170 1400069538 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1055 TA-446046 20-Mar-19 9.30 AM Umair Mr. SURESH Reject
(8"x0.344") at HWYH-1055 activity
Stringing and pipe laying inspection of 8"
172 CPP-NGCP-M-171 1400069584 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1078 TA-843586 20-Mar-19 8:00 AM Umair Mr. Rajesh CLOSED
HRDH-1078
CANCELLED
1400070251 Mechanical SATIP-L-450-04 SAIC-L-2115 Inspection prior to Welding of Temperature
173 CPP-NGCP-M-172 HWYH-1134 FL TA-445836 22-Mar-19 8:30 AM Umair Mr. Rajesh Reject DUE TO JOB
Tie-In Weld Joint HWYH-1134
NOT READY
Stringing and pipe laying inspection of 8"
174 CPP-NGCP-M-173 1400070466 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1078 TA-843586 21-Mar-19 8.30 AM Umair Mr. Rajesh CLOSED
HRDH-1078

1400070427 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving Inspection for 210 pipes 21-Mar-19 Mr. Rajesh
175 CPP-NGCP-M-174 HRDH-1078 TA-843586 8.00 AM Umair CLOSED
(8"x0.344") at HRDH-1078
Field pipe bending Inspection for pipes
Mr.
176 CPP-NGCP-M-175 1400070483 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1117 at TCF-1 CPP TCF-1 N/A 21-Mar-19 8:00 AM Saleem CLOSED
Rajendran
Pipe yard.

1400070484 Mechanical SATIP-L-450-04 SAIC-L-2112 Storage and Preservation of 16"X0.438" TCF-1 Pipe N/A 21-Mar-19
177 CPP-NGCP-M-176 8:30 AM Saleem Mr. Suresh CLOSED
Pipes. TCF-1 Pipe Yard Yard
Field pipe bending Inspection for pipes
Mr.
178 CPP-NGCP-M-177 1400070806 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1117 at TCF-1 CPP TCF-1 N/A 23-Mar-19 8:00 AM Saleem CLOSED
Rajendran
Pipe yard.

Inspection prior to Welding of Temperature Wrong RFI


179 CPP-NGCP-M-178 1400070992 Mechanical SATIP-L-450-04 SAIC-L-2115 HRDH-1170 FL TA-843656 23-Mar-19 8:00 AM Umair Mr. Rajesh Reject selection. Not
Tie-In Weld Joint HRDH-1170
applicable.
CANCELLED
Stringing and pipe laying inspection of 8"
180 CPP-NGCP-M-179 1400071331 Mechanical SATIP-L-450-04 SAIC-L-2132
HWYH-975
HWYH-975 TA-446045 23-Mar-19 8.30 AM Umair Mr. Suresh Reject DUE TO JOB
NOT READY
Stringing and pipe laying inspection of 8"
181 CPP-NGCP-M-180 1400071339 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1118 TA-445909 23-Mar-19 8.30 AM Umair Mr. Suresh CLOSED
HWYH-1118
Material receiving Inspection for 90 pipes
182 CPP-NGCP-M-181 1400071309 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1118 TA-445909 23-Mar-19 8.00 AM Umair Mr. Suresh CLOSED
(8"x0.344") at HWYH-1118
CANCELLED
Material receiving Inspection for 35 pipes
183 CPP-NGCP-M-182 1400071359 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-975 TA-446045 23-Mar-19 8.00 AM Umair Mr. Suresh Reject DUE TO JOB
(8"x0.344") at HWYH-975
NOT READY
Material receiving Inspection for 120 pipes
184 CPP-NGCP-M-183 1400071749 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1118 TA-445909 24-Mar-19 8.00 AM Umair Mr. Suresh CLOSED
(8"x0.344") at HWYH-1118
Stringing and pipe laying inspection of 8"
185 CPP-NGCP-M-184 1400071731 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1118 TA-445909 24-Mar-19 8.15 AM Umair Mr. Suresh CLOSED
HWYH-1118
Stringing and pipe laying inspection of 8" Mr.
186 CPP-NGCP-M-185 1400071742 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-611 N/A 24-Mar-19 8.30 AM Umair CLOSED
HRDH-611 Rajendran
Field pipe bending Inspection for pipes
Mr.
187 CPP-NGCP-M-186 1400071806 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1170 AND 1117 at TCF-1 N/A 24-Mar-19 8:00 AM Saleem CLOSED
Rajendran
TCF-1 CPP Pipe yard.
Stringing and pipe laying inspection of 8"
188 CPP-NGCP-M-187 1400072541 Mechanical SATIP-L-450-04 SAIC-L-2132
HWYH-1118
HWYH-1118 TA-445909 25-Mar-19 8.15 AM Umair Mr. Suresh CLOSED
Material receiving Inspection for 32 pipes Mr.
189 CPP-NGCP-M-188 1400072557 Mechanical SATIP-L-450-04 SAIC-L-2112
(6"x0.312") at HWYH-1122
TCF-1 TA-445892 25-Mar-19 8.00 AM Umair
Rajendran
CLOSED
Material receiving Inspection for 60 pipes Mr.
190 CPP-NGCP-M-189 1400072650 Mechanical SATIP-L-450-04 SAIC-L-2112
(8"x0.344") at HRDH-611
HRDH-611 TA-843603 25-Mar-19 8.00 AM Umair
Rajendran
CLOSED

Field pipe bending Inspection for pipes


1400072652 Mechanical SATIP-L-450-04 SAIC-L-2114 25-Mar-19 Mr.
191 CPP-NGCP-M-190 (8”X0.344”), HRDH-1309 FL at TCF-1 CPP TCF-1 N/A 8:00 AM Saleem CLOSED
Rajendran
Pipe yard.
Material receiving Inspection for 95 pipes
192 CPP-NGCP-M-191 1400072755 Mechanical SATIP-L-450-04 SAIC-L-2112
(6"x0.312") at HWYH-1122
HWYH-1122 TA-445892 25-Mar-19 8.00 AM Masood Mr. Suresh CLOSED

Material receiving Inspection for 13 pipes Mr.


193 CPP-NGCP-M-192 1400072954 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1078 TA-843586 25-Mar-19 8.00 AM Umair CLOSED
(8"x0.344") at HWYH-1078 Rajendran
Stringing and pipe laying inspection of 8" Mr.
194 CPP-NGCP-M-193 1400073305 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-611 TA-843603 26-Mar-19 8.00 AM Umair CLOSED
HRDH-611 Rajendran
Field pipe bending Inspection for pipes
Mr.
195 CPP-NGCP-M-194 1400073456 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1171 FL at TCF-1 CPP TCF-1 N/A 26-Mar-19 8:00 AM Saleem CLOSED
Rajendran
Pipe yard.
Verification of Water Chemistry of
196 CPP-NGCP-M-195 1400073635 Mechanical SATIP-A-004-03 SAIC-A-2008 hydrotest water for NGCP project HRDH- HRDH-804 N/A 26-Mar-19 8.00 AM Umair Mr. Rajesh CLOSED
804
Field pipe bending Inspection for pipes
Mr.
197 CPP-NGCP-M-196 1400074369 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1171 FL at TCF-1 CPP TCF-1 N/A 27-Mar-19 8:00 AM Saleem CLOSED
Rajendran
Pipe yard.
Material receiving Inspection for 50 pipes Mr.
198 CPP-NGCP-M-197 1400074390 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF-1 N/A 27-Mar-19 9.00 AM Saleem CLOSED
(16"x0.438") at TCF-1 Rajendran
Stringing and pipe laying inspection of 8"
199 CPP-NGCP-M-198 1400074391 Mechanical SATIP-L-450-04 SAIC-L-2132
HWYH-1091
HWYH-1091 N/A 27-Mar-19 10.00 AM Umair Mr. Suresh CLOSED
Material receiving Inspection for
(8"x0.344") at HWYH - 1003,
200 CPP-NGCP-M-199 1400074392 Mechanical SATIP-L-450-04 SAIC-L-2112 N/A 27-Mar-19 8.00 AM Umair Mr. Suresh CLOSED
HWYH-1003 -150 pipes, 1091
HWYH -1091 -150 pipes
Material receiving Inspection for
(8"x0.344") at
HRDH-619 -60 pipes,
HRDH-619,
201 CPP-NGCP-M-200 1400074382 Mechanical SATIP-L-450-04 SAIC-L-2112 TA-843603 27-Mar-19 11.00 AM Umair Mr. Rajesh CLOSED
HRDH-611-30 pipes, 611, 1194
HRDH-1194-90 pipes.
Material receiving Inspection for 120 pipes Mr.
202 CPP-NGCP-M-201 1400074473 Mechanical SATIP-L-450-04 SAIC-L-2112
(8"x0.344") at TCF-1
TCF-1 N/A 27-Mar-19 1.00 PM Shankar
Rajendran
CLOSED

Stringing and pipe laying inspection of 8"


203 CPP-NGCP-M-202 1400074459 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1194 TA-843652 27-Mar-19 7.00 AM Umair Mr. Rajesh CLOSED
HRDH-1194
Field pipe bending Inspection for pipes
Mr.
204 CPP-NGCP-M-203 1400075002 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1171 FL at TCF-1 CPP TCF-1 N/A 28-Mar-19 8:00 AM Saleem CLOSED
Rajendran
Pipe yard.
Storage and Preservation of 16"X0.438" TCF-1 Pipe Mr.
205 CPP-NGCP-M-204 1400075031 Mechanical SATIP-L-450-04 SAIC-L-2112 N/A 28-Mar-19 8:30 AM Saleem CLOSED
Pipes. TCF-1 Pipe Yard Yard Rajendran
Field pipe bending Inspection for pipes
Mr.
206 CPP-NGCP-M-205 1400075782 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1171 FL at TCF-1 CPP TCF-1 N/A 30-Mar-19 8:00 AM Saleem CLOSED
Rajendran
Pipe yard.
Field pipe bending Inspection for pipes
Mr.
207 CPP-NGCP-M-206 1400076319 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1171 FL at TCF-1 CPP TCF-1 N/A 31-Mar-19 8:00 AM Shankar CLOSED
Rajendran
Pipe yard.
Stringing and pipe laying inspection of 8"
208 CPP-NGCP-M-207 1400076380 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1091 TA-445958 31-Mar-19 8:00 AM Masood Mr. Suresh CLOSED
HWYH-1091
Material receiving Inspection for 180 pipes
209 CPP-NGCP-M-208 1400076381 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1003 TA-445856 31-Mar-19 8.15 AM Masood Mr. Suresh CLOSED
(8"x0.344") at HWYH-1003
Stringing and pipe laying inspection of 8"
210 CPP-NGCP-M-209 1400076407 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1003 TA-445856 31-Mar-19 8.15 AM Masood Mr. Suresh CLOSED
HWYH-1003
Material receiving Inspection for 220 pipes
211 CPP-NGCP-M-210 1400076424 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1093 TA-445838 31-Mar-19 9.00 AM Masood Mr. Suresh CLOSED
(10"x0.438") at HWYH-1093
Stringing and pipe laying inspection of 10"
212 CPP-NGCP-M-211 1400076408 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1093 TA-445838 31-Mar-19 9.00 AM Masood Mr. Suresh CLOSED
HWYH-1093
Material receiving Inspection for 60 pipes
213 CPP-NGCP-M-212 1400076415 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1112 N/A 31-Mar-19 10.00 AM Masood Mr. Suresh CLOSED
(8"x0.344") at HWYH-1112
Material receiving Inspection for 120 pipes
214 CPP-NGCP-M-213 1400076444 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-902 N/A 31-Mar-19 9.00 AM Umair Mr. Rajesh CLOSED
(10"x0.438") at HRDH-902
Material receiving Inspection for 90 pipes
215 CPP-NGCP-M-214 1400076437 Mechanical SATIP-L-450-04 SAIC-L-2112
(8"x0.344") at HRDH-1108
HRDH-1108 N/A 31-Mar-19 10.00 AM Umair Mr. Rajesh CLOSED
Stringing and pipe laying inspection of 8"
216 CPP-NGCP-M-215 1400076845 Mechanical SATIP-L-450-04 SAIC-L-2132
HWYH-1112
HWYH-1112 TA-445906 01-Apr-19 9.00 AM Masood Mr. Suresh CLOSED

Stringing and pipe laying inspection of 8"


217 CPP-NGCP-M-216 1400076913 Mechanical SATIP-L-450-04 SAIC-L-2132
HWYH-1091
HWYH-1091 TA-445958 01-Apr-19 8.00 AM Masood Mr. Suresh CLOSED
Stringing and pipe laying inspection of 8"
218 CPP-NGCP-M-217 1400076811 Mechanical SATIP-L-450-04 SAIC-L-2132
HWYH-1003
HWYH-1003 TA-445856 01-Apr-19 8.30 AM Masood Mr. Suresh CLOSED

Stringing and pipe laying inspection of 10"


219 CPP-NGCP-M-218 1400076839 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1093 TA-445838 01-Apr-19 9.30 AM Masood Mr. Suresh CLOSED
HWYH-1093
Material receiving Inspection for 180 pipes
220 CPP-NGCP-M-219 1400076923 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1164 N/A 01-Apr-19 9.00 AM Umair Mr. Rajesh CLOSED
(8"x0.344") at HRDH-1164
Material receiving Inspection for 60 pipes
221 CPP-NGCP-M-220 1400076890 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1178 N/A 01-Apr-19 10.00 AM Umair Mr. Rajesh CLOSED
(8"x0.344") at HRDH-1178
Field pipe bending Inspection for pipes
1400076946 Mechanical SATIP-L-450-04 SAIC-L-2114 01-Apr-19 Mr.
222 CPP-NGCP-M-221 (8”X0.344”), HRDH-1171 FL at TCF-1 CPP TCF-1 N/A 8:00 AM Shankar CLOSED
Rajendran
Pipe yard.
Material receiving Inspection for
1400077522 Mechanical SATIP-L-450-04 SAIC-L-2112 02-Apr-19 Mr.
223 CPP-NGCP-M-222 (16”X0.438”) API 5L Gr X65 at HRDH-AK- HRDH-AK-RH TA-843960 8.00 AM Umair CLOSED
Rajendran
RH QTY: 300 Pipes
Stringing and pipe laying inspection of 16" HRDH AK-RH Mr.
224 CPP-NGCP-M-223 1400077558 Mechanical SATIP-L-450-04 SAIC-L-2132 TA-843960 02-Apr-19 9.00 AM Umair CLOSED
HRDH AK-RH TR/L TR/L Rajendran
Material receiving Inspection for
Mr.
225 CPP-NGCP-M-224 1400077566 Mechanical SATIP-L-450-04 SAIC-L-2112 (16”X0.438”) API 5L Gr X65 at HRDH-BK- HRDH-BK-RH TA-843957 02-Apr-19 10.00 AM Umair CLOSED
Rajendran
RH QTY: 145 Pipes
Stringing and pipe laying inspection of 8"
226 CPP-NGCP-M-225 1400077613 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1112 TA-445906 02-Apr-19 8.00 AM Masood Mr. Suresh CLOSED
HWYH-1112
Stringing and pipe laying inspection of 10"
227 CPP-NGCP-M-226 1400077531 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1093 TA-445838 02-Apr-19 9.00 AM Masood Mr. Suresh CLOSED
HWYH-1093
Field pipe bending Inspection for pipes
Mr.
228 CPP-NGCP-M-227 1400077790 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1171 FL at TCF-1 CPP TCF-1 N/A 02-Apr-19 8:00 AM Saleem CLOSED
Rajendran
Pipe yard.
Stringing and pipe laying inspection of 16" HRDH BK-RH Mr.
229 CPP-NGCP-M-228 1400077860 Mechanical SATIP-L-450-04 SAIC-L-2132 TA-843957 02-Apr-19 10.15 AM Umair CLOSED
HRDH BK-RH TR/L TR/L Rajendran
Field pipe bending Inspection for pipes
1400078351 Mechanical SATIP-L-450-04 SAIC-L-2114 03-Apr-19 Mr.
230 CPP-NGCP-M-229 (8”X0.344”), HRDH-1177 FL at TCF-1 CPP TCF-1 N/A 8:00 AM Saleem CLOSED
Rajendran
Pipe yard.

Stringing and pipe laying inspection of 8"


231 CPP-NGCP-M-230 1400078439 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1178 TA-843586 03-Apr-19 8.00 AM Umair Mr. Rajesh CLOSED
HRDH-1178

Stringing and pipe laying inspection of 8"


232 CPP-NGCP-M-231 1400078477 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1164 TA-843592 03-Apr-19 9.00 AM Umair Mr. Rajesh CLOSED
HRDH-1164

Material receiving Inspection for


233 CPP-NGCP-M-232 1400078440 Mechanical SATIP-L-450-04 SAIC-L-2112 (16”X0.438”) API 5L Gr X65 at HRDH-DK- HRDH-DK-RH TA-843954 03-Apr-19 8.30 AM Umair Mr. Rajesh CLOSED
RH QTY: 200 Pipes

Stringing and pipe laying inspection of 16"


234 CPP-NGCP-M-233 1400078409 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-DK-RH TA-843954 03-Apr-19 9.30 AM Umair Mr. Rajesh CLOSED
HRDH DK-RH TR/L

Material receiving Inspection for 90 pipes


235 CPP-NGCP-M-234 1400078488 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1003 TA-445856 03-Apr-19 10.00 AM Masood Mr. Suresh CLOSED
(8"x0.344") at HWYH-1003

Stringing and pipe laying inspection of


236 CPP-NGCP-M-235 1400078772 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1178 FL TA-843586 04-Apr-19 8.00 AM Umair Mr. Rajesh CLOSED
8" HRDH-1178

Stringing and pipe laying inspection of


237 CPP-NGCP-M-236 1400078882 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1164 FL TA-843592 04-Apr-19 9.00 AM Umair Mr. Rajesh CLOSED
8" HRDH-1164

Material receiving Inspection for 60 HWYH-1112


238 CPP-NGCP-M-237 1400078901 Mechanical SATIP-L-450-04 SAIC-L-2112 TA-445906 04-Apr-19 8.00 AM Masood Mr. Suresh CLOSED
pipes (8"x0.344") at HWYH-1112 FL

239 CPP-NGCP-M-238 1400078913 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving Inspection for 180 HWYH-1003 TA-445856 04-Apr-19 9.00 AM Masood Mr. Suresh CLOSED
pipes (8"x0.344") at HWYH-1003 FL
Field pipe bending Inspection for pipes
Mr.
240 CPP-NGCP-M-239 1400079168 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1177 & 611 FL at TCF-1 N/A 04-Apr-19 8:00 AM Shankar CLOSED
Rajendran
TCF-1 CPP Pipe yard.
Storage and Preservation of 16"X0.438" TCF-1 Pipe Mr.
241 CPP-NGCP-M-240 1400079161 Mechanical SATIP-L-450-04 SAIC-L-2112 N/A 04-Apr-19 8:30 AM Shankar CLOSED
Pipes. TCF-1 Pipe Yard Yard Rajendran
Material Receiving Inspection Mr.
242 CPP-NGCP-M-241 1400079142 Mechanical SATIP-M-001-01 SAIC-M-2003 DAMMAM N/A 04-Apr-19 10.00 AM Saleem CLOSED
Structural Steel Plates Rajendran
Field pipe bending Inspection for pipes
Mr.
243 CPP-NGCP-M-242 1400079628 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1177 & 611 FL at TCF-1 N/A 06-Apr-19 8:00 AM Shankar CLOSED
Rajendran
TCF-1 CPP Pipe yard.

Material receiving Inspection for 240


244 CPP-NGCP-M-243 1400079845 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1160 N/A 06-Apr-19 8.00 AM Umair Mr. Rajesh CLOSED
pipes (8"x0.344") at HRDH-1160

Stringing and pipe laying inspection of


245 CPP-NGCP-M-244 1400079853 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1160 FL N/A 06-Apr-19 9.00 AM Umair Mr. Rajesh CLOSED
8" HRDH-1160
Stringing and pipe laying inspection of
246 CPP-NGCP-M-245 1400079827 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1164 FL TA-843592 06-Apr-19 9.30 AM Umair Mr. Rajesh CLOSED
8" HRDH-1164

Material receiving Inspection for 60


247 CPP-NGCP-M-246 1400079829 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (10"x0.438") at HRDH-902 HRDH-902 FL N/A 06-Apr-19 10.00 AM Umair Mr. Rajesh CLOSED

Stringing and pipe laying inspection of


248 CPP-NGCP-M-247 1400079884 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-902 FL N/A 06-Apr-19 10.30 AM Umair Mr. Rajesh CLOSED
10" HRDH-902

Material receiving Inspection for 140


249 CPP-NGCP-M-248 1400079877 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-921 FL N/A 06-Apr-19 11.00 AM Umair Mr. Rajesh CLOSED
pipes (10"x0.438") at HRDH-921

Material receiving Inspection for 105


250 CPP-NGCP-M-249 1400080532 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-975 N/A 07-Apr-19 8.00 AM Masood Mr. Suresh CLOSED
pipes (8"x0.344") at HWYH-975

Material receiving Inspection for 150


251 CPP-NGCP-M-250 1400080564 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1003 N/A 07-Apr-19 9.00 AM Masood Mr. Suresh CLOSED
pipes (8"x0.344") at HWYH-1003
Material receiving Inspection for 500 HWYH CK &
252 CPP-NGCP-M-251 1400080562 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (16"x0.438") at HWYH RH-CK & N/A 07-Apr-19 10.00 AM Masood Mr. Suresh CLOSED
GK - RH
GK TRL
Material receiving Inspection for 180
253 CPP-NGCP-M-252 1400080583 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1177 N/A 07-Apr-19 8.00 AM Umair Mr. Rajesh CLOSED
pipes (8"x0.344") at HRDH-1177
Material receiving Inspection for 100
254 CPP-NGCP-M-253 1400080584 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-921 FL N/A 07-Apr-19 9.00 AM Umair Mr. Rajesh CLOSED
pipes (10"x0.438") at HRDH-921
255 CPP-NGCP-M-254 1400080604 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection of HRDH-902 FL N/A 07-Apr-19 10.00 AM Umair Mr. Rajesh CLOSED
10" HRDH-902
Field pipe bending Inspection for pipes
Mr.
256 CPP-NGCP-M-255 1400080659 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1171 & 1309 FL at TCF-1 N/A 07-Apr-19 8:00 AM Shankar CLOSED
Rajendran
TCF-1 CPP Pipe yard.

257 CPP-NGCP-M-256 1400081088 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection of HRDH-902 FL N/A 08-Apr-19 8:00 AM Umair Mr. Rajesh CLOSED
10" HRDH-902
Stringing and pipe laying inspection of
258 CPP-NGCP-M-257 1400081116 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1160 FL N/A 08-Apr-19 9.00 AM Umair Mr. Rajesh CLOSED
8" HRDH-1160

Material receiving Inspection for 60


259 CPP-NGCP-M-258 1400081187 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1154 TA-669358 08-Apr-19 8.00 AM Umair Mr. Rajesh CLOSED
pipes (8"x0.344") at HRDH-1154

260 CPP-NGCP-M-259 1400081218 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving Inspection for 180 HRDH-902 N/A 08-Apr-19 11.00 AM Umair Mr. Rajesh CLOSED
pipes (10"x0.438) at HRDH-902

261 CPP-NGCP-M-260 1400081246 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving Inspection for 100 HWYH-1036 N/A 08-Apr-19 8.00 AM Masood Mr. Rajesh CLOSED
pipes (10"x0.438) at HWYH-1036

Field pipe bending Inspection for pipes


Mr.
262 CPP-NGCP-M-261 1400081483 Mechanical SATIP-L-450-04 SAIC-L-2114 (8”X0.344”), HRDH-1171 FL at TCF-1 TCF-1 N/A 08-Apr-19 8.00 AM Shankar CLOSED
Rajendran
CPP Pipe yard.
Field pipe bending Inspection for
(8"X0.344”), HRDH-1171,1172& Mr.
263 CPP-NGCP-M-262 1400082214 Mechanical SATIP-L-450-04 SAIC-L-2114 TCF-1 N/A 09-Apr-19 8.00 AM Saleem CLOSED
HWYH-1134 FL at TCF-1 CPP Pipe Rajendran
yard.
Material receiving Inspection for 90 Mr.
264 CPP-NGCP-M-263 1400082207 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8"x0.344) at TCF-1 Pipe yard HWYH-1036 N/A 09-Apr-19 8.00 AM Shankar Rajendran
CLOSED

Material receiving Inspection for 72


265 CPP-NGCP-M-264 1400082231 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-619 N/A 09-Apr-19 8.00 AM Umair Mr. Rajesh CLOSED
pipes (8"x0.344) AT HRDH-619

266 CPP-NGCP-M-265 1400082242 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving Inspection for 108 HRDH-1161 N/A 09-Apr-19 10.00 AM Umair Mr. Rajesh CLOSED
pipes (8"x0.344) AT HRDH-1161

Material receiving Inspection for 252


267 CPP-NGCP-M-266 1400082277 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1160 N/A 09-Apr-19 11.00 AM Umair Mr. Rajesh CLOSED
pipes (8"x0.344) AT HRDH-1160

268 CPP-NGCP-M-267 1400082249 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving Inspection for 144 HRDH-1086 N/A 09-Apr-19 1.00 PM Umair Mr. Rajesh CLOSED
pipes (8"x0.344) AT HRDH-1086

Material receiving Inspection for 90


269 CPP-NGCP-M-268 1400082241 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1153 N/A 09-Apr-19 2.00 PM Umair Mr. Rajesh CLOSED
pipes (8"x0.344) AT HRDH-1153
Field pipe bending Inspection for
Mr.
270 CPP-NGCP-M-269 1400082977 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-611 FL at TCF-1 TCF-1 N/A 10-Apr-19 8.00 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
271 CPP-NGCP-M-270 1400082912 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection of HRDH-1086 FL N/A 10-Apr-19 7.30 AM Masood Mr. Rajesh CLOSED
8" HRDH-1086
Stringing and pipe laying inspection of
272 CPP-NGCP-M-271 1400083023 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1160 FL N/A 10-Apr-19 8.00 AM Masood Mr. Rajesh CLOSED
8" HRDH-1160
Material receiving Inspection for 108
273 CPP-NGCP-M-272 1400082968 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1086 N/A 10-Apr-19 7.00 AM Umair Mr. Rajesh CLOSED
pipes (8"x0.344) AT HRDH-1086

274 CPP-NGCP-M-273 1400083006 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving Inspection for 100 HRDH-921 FL N/A 10-Apr-19 9.00 AM Umair Mr. Rajesh CLOSED
pipes (10"x0.438) at HRDH-921

Material receiving Inspection for 90


275 CPP-NGCP-M-274 1400083007 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1178 N/A 10-Apr-19 10.00 AM Umair Mr. Rajesh CLOSED
pipes (8"x0.344) AT HRDH-1178

Material receiving Inspection for 90


276 CPP-NGCP-M-275 1400083024 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1153 N/A 10-Apr-19 11.00 AM Umair Mr. Rajesh CLOSED
pipes (8"x0.344) AT HRDH-1153
Material receiving Inspection for 28
277 CPP-NGCP-M-276 1400083109 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (16"x0.469") at HWYH RH-EJ HWYH EJ-RH TA-445885 11-Apr-19 7.00 AM Masood Mr. Suresh CLOSED
TRL
Stringing and pipe laying inspection AT
278 CPP-NGCP-M-277 1400083766 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1086 FL TA843625 11-Apr-19 7.00 AM Umair Mr. Rajesh CLOSED
HRDH-1086

Material receiving Inspection for 288


279 CPP-NGCP-M-278 1400083739 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-975 N/A 11-Apr-19 7.00 AM Masood Mr. Suresh CLOSED
pipes (8"x0.344) AT HWYH-975

Material receiving Inspection for 72


280 CPP-NGCP-M-279 1400083740 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-619 N/A 11-Apr-19 8.00 AM Umair Mr. Rajesh CLOSED
pipes (8"x0.344) AT HRDH-619

Material receiving Inspection for 108


281 CPP-NGCP-M-280 1400083749 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1161 N/A 11-Apr-19 10.00 AM Umair Mr. Rajesh CLOSED
pipes (8"x0.344) AT HRDH-1161

Material receiving Inspection for 108


282 CPP-NGCP-M-281 1400083706 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1087 N/A 11-Apr-19 8.00 AM Masood Mr. Suresh CLOSED
pipes (8"x0.344) AT HWYH-1087

Material receiving Inspection for 108


283 CPP-NGCP-M-282 1400083784 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1092 N/A 11-Apr-19 10.00 AM Masood Mr. Suresh CLOSED
pipes (8"x0.344) AT HWYH-1087
Field pipe bending Inspection for
Mr.
284 CPP-NGCP-M-283 1400083751 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-611 FL at TCF-1 TCF-1 N/A 11-Apr-19 8.00 AM Saleem
Rajendran
CLOSED
CPP Pipe yard.

Storage and Preservation of 6", 8", 10" TCF-1 Pipe Mr.


285 CPP-NGCP-M-284 1400083761 Mechanical SATIP-L-450-04 SAIC-L-2112 N/A 11-Apr-19 8:30 AM Shankar CLOSED
& 16" Pipes. TCF-1 Pipe Yard Yard Rajendran

Material receiving Inspection for 108


286 CPP-NGCP-M-285 1400084368 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-201 N/A 13-Apr-19 8.00 AM Masood Mr. Suresh CLOSED
pipes (8"x0.344) AT HWYH-201
287 CPP-NGCP-M-286 1400084350 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving Inspection for 200 HWYH-921 N/A 13-Apr-19 9.00 AM Masood Mr. Suresh CLOSED
pipes (10"x0.438) AT HWYH-921
Material receiving Inspection of sleeves Mr.
288 CPP-NGCP-M-287 1400084362 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF-1 N/A 13-Apr-19 8.00 AM Shankar CLOSED
at TCF-1 Rajendran
Material Receiving Inspection Mr.
289 CPP-NGCP-M-288 1400084425 Mechanical SATIP-M-001-01 SAIC-M-2003 DAMMAM N/A 13-Apr-19 10.00 AM Saleem CLOSED
Structural Steel Plates Rajendran
Field pipe bending Inspection for
Mr.
290 CPP-NGCP-M-289 1400084352 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-611 FL & HWYH TCF-1 N/A 13-Apr-19 8.00 AM Saleem CLOSED
Rajendran
1100 at TCF-1 CPP Pipe yard.
Material receiving Inspection for 360
Mr.
291 CPP-NGCP-M-290 1400084999 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (10"x0.438 API 5L GR.65Q) AT TCF-1 N/A 14-Apr-19 2.00 PM Shankar
Rajendran
CLOSED
TCF-1
Field pipe bending Inspection for
Mr.
292 CPP-NGCP-M-291 1400085064 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-611 FL at TCF-1 TCF-1 N/A 14-Apr-19 8.00 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
CANCELLED
293 CPP-NGCP-M-292 1400085065 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection of HRDH-1086 FL N/A 14-Apr-19 7.00 AM Umair Mr. Rajesh CLOSED DUE TO NOT
8" HRDH-1086 ACTIVITY
Stringing and pipe laying inspection of HWYH GK-RH
294 CPP-NGCP-M-293 1400085000 Mechanical SATIP-L-450-04 SAIC-L-2132 TA-445912 14-Apr-19 7.00 AM Masood Mr. Suresh CLOSED
HWYH GK-RH TRL TRL
CANCELLED
Stringing and pipe laying inspection of
295 CPP-NGCP-M-294 1400085390 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1086 FL N/A 15-Apr-19 7.00 AM Umair Mr. Rajesh Reject DUE TO NOT
8" HRDH-1086
ACTIVITY
Stringing and pipe laying inspection of HWYH GK-RH
296 CPP-NGCP-M-295 1400085397 Mechanical SATIP-L-450-04 SAIC-L-2132 TA-445912 15-Apr-19 7.00 AM Masood Mr. Suresh CLOSED
HWYH GK-RH TRL TRL
Field pipe bending Inspection for
Mr.
297 CPP-NGCP-M-296 1400085451 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1171,1063 FL at TCF-1 N/A 15-Apr-19 8.00 AM Shankar CLOSED
Rajendran
TCF-1 CPP Pipe yard.
Material receiving Inspection for 28
HWYH RH-EJ
298 CPP-NGCP-M-297 1400085491 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (16"x0.469") at HWYH RH-EJ TA-445885 15-Apr-19 7.00 AM Masood Mr. Suresh CLOSED
-CJ -CJ
Material receiving Inspection of bare
Mr.
299 CPP-NGCP-M-298 1400086164 Mechanical SATIP-L-450-04 SAIC-L-2112 2089 pipes (8"x0.344 API 5L GRADE. TCF-1 N/A 16-Apr-19 10.00 AM Shankar CLOSED
Rajendran
.X60Q) AT TCF-1
Field pipe bending Inspection for
Mr.
300 CPP-NGCP-M-299 1400086144 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1160 FL at TCF-1 TCF-1 N/A 16-Apr-19 8.00 AM Saleem
Rajendran
CLOSED
CPP Pipe yard.

Material receiving Inspection for 36


301 CPP-NGCP-M-300 1400086993 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1115 N/A 17-Apr-19 8.00 AM Masood Mr. Suresh CLOSED
pipes (8"x0.344) AT HWYH-1115

Material receiving Inspection for 182


302 CPP-NGCP-M-301 1400087003 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH RH-GK N/A 17-Apr-19 8.00 AM Masood Mr. Suresh CLOSED
pipes (16"x0.438") at HWYH RH-GK

Material receiving
CANCELLED Inspection for 140
303 CPP-NGCP-M-302 1400086986 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving Inspection for 92 HRDH-1177 N/A 17-Apr-19 8.00 AM Lokesh Mr. Rajesh Reject DUE TO NOT pipes
pipes (8"x0.344) AT HRDH-1177
ACTIVITY (16"x0.438'') AT
HRDH-DK

CANCELLED
Material receiving Inspection for 92
304 CPP-NGCP-M-303 1400087135 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-DK N/A 17-Apr-19 8.00 AM Lokesh Mr. Rajesh Reject DUE TO NOT
pipes (8"x0.344) AT HRDH-DK ACTIVITY
Material receiving Inspection for 655
Mr.
305 CPP-NGCP-M-304 1400086890 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (16"x0.469" API 5L GR.65Q) AT TCF-1 N/A 17-Apr-19 10.05 AM Shankar
Rajendran
CLOSED
TCF-1 CPP Pipe yard
Field pipe bending Inspection for
Mr.
306 CPP-NGCP-M-305 1400086894 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1160 FL at TCF-1 TCF-1 N/A 17-Apr-19 7.00 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Storage and Preservation of Pipes.at Mr.
307 CPP-NGCP-M-306 1400087347 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF-1 N/A 18-Apr-19 10.00 AM Shankar
Rajendran
CLOSED
TCF-1 Pipe Yard
Field pipe bending Inspection for
Mr.
308 CPP-NGCP-M-307 1400087393 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1116 &1122&922 TCF-1 N/A 18-Apr-19 7.00 AM Saleem CLOSED
Rajendran
FL at TCF-1 CPP Pipe yard.
309 CPP-NGCP-M-308 1400087697 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving Inspection for 42 HWYH -EJ -CJ N/A 18-Apr-19 7.00 AM Masood Mr. Suresh CLOSED
pipes (16"x0.469") at HWYH-EJ -CJ
Material receiving Inspection for 112
HWYH RH-GK
310 CPP-NGCP-M-309 1400087705 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (16"x0.438") at HWYH RH-GK & N/A 18-Apr-19 8.00 AM Masood Mr. Suresh CLOSED
& CK- RH
CK- RH
CANCELLED
Material receiving Inspection for 182 RE-SHUDEL 04-20-
311 CPP-NGCP-M-310 1400087688 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-DK N/A 18-Apr-19 8.00 AM Lokesh Mr. Rajesh Reject DUE TO JOB
pipes (16"x0.438) AT HRDH-DK NOT READY
2019

312 CPP-NGCP-M-311 1400088100 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving Inspection for 100 HWYH-934 N/A 20-Apr-19 7.00 AM Masood Mr. Suresh CLOSED
pipes (10"x0.438") at HWYH-934

CANCELLED
313 CPP-NGCP-M-312 1400088160 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving Inspection for 70 HWYH RH-GK N/A 20-Apr-19 8.00 AM Masood Mr. Suresh Reject DUE TO NOT
pipes (16"x0.438") at HWYH RH-GK
ACTIVITY

Field pipe bending Inspection for


Mr.
314 CPP-NGCP-M-313 1400088176 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1116 &611&922 FL TCF-1 N/A 20-Apr-19 8.00 AM Saleem CLOSED
Rajendran
at TCF-1 CPP Pipe yard.

Field pipe bending Inspection for


Mr.
315 CPP-NGCP-M-314 1400088946 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-611 &619 FL at TCF-1 N/A 21-Apr-19 6.30 AM Saleem CLOSED
Rajendran
TCF-1 CPP Pipe yard.
Material receiving Inspection for 30
Mr.
316 CPP-NGCP-M-315 1400088950 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8"x0.344" API 5L GR.65Q) AT TCF-1 N/A 21-Apr-19 10.00 AM Shankar CLOSED
Rajendran
TCF-1 CPP Pipe yard
Material receiving Inspection for 120
317 CPP-NGCP-M-316 1400089183 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH 934 N/A 21-Apr-19 8.00 AM Masood Mr. Suresh CLOSED
pipes (10"x0.438") at HWYH 934
318 CPP-NGCP-M-317 1400089138 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection of HWYH CK-RH N/A 21-Apr-19 7.00 AM Masood Mr. Suresh CLOSED
HWYH CK-RH TRL TRL
Stringing and pipe laying inspection of
319 CPP-NGCP-M-318 1400089106 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH 1115 N/A 21-Apr-19 7.00 AM Masood Mr. Suresh CLOSED
HWYH 1115

Material receiving Inspection for 84


320 CPP-NGCP-M-319 1400089139 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH RH-DK N/A 21-Apr-19 8.00 AM Masood Mr. Suresh Reject Rejecte
pipes (16"x0.438") at HWYH RH-DK
CANCELLED
Field pipe bending Inspection at
321 CPP-NGCP-M-320 1400089407 Mechanical SATIP-L-450-04 SAIC-L-2114 TCF-1 TA-445838 22-Apr-19 8:00 AM Umair Mr. Rajesh Reject DUE TO NOT
HWYH-1093 at TCF-1 CPP Pipe yard.
ACTIVITY
CANCELLED
Material receiving Inspection for pipes
322 CPP-NGCP-M-321 1400089410 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH 1087 N/A 22-Apr-19 7.00 AM Masood Mr. Suresh Reject DUE TO JOB
at HWYH 1087 NOT READY
Material receiving Inspection for 120
323 CPP-NGCP-M-322 1400089598 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH 934 N/A 22-Apr-19 8.00 AM Masood Mr. Suresh CLOSED
pipes (10"x0.438") at HWYH 934
Field pipe bending Inspection for
Mr.
324 CPP-NGCP-M-323 1400089784 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1118 FL at TCF-1 TCF-1 N/A 22-Apr-19 6.30 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Material receiving Inspection for 121
Mr.
325 CPP-NGCP-M-324 1400089728 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8"x0.344" API 5L GR.60Q) AT TCF-1 N/A 22-Apr-19 7.00 AM Shankar CLOSED
Rajendran
TCF-1 CPP Pipe yard
326 CPP-NGCP-M-325 1400090295 Mechanical SATIP-L-450-04 SAIC-L-2112
Material receiving Inspection for pipes HWYH 1036 N/A 23-Apr-19 7.00 AM Masood Mr. Suresh CLOSED
at HWYH 1036

RFI has been


Field pipe bending Inspection at canceled due
327 CPP-NGCP-M-326 1400090280 Mechanical SATIP-L-450-04 SAIC-L-2114 TCF-1 TA-445838 23-Apr-19 8:00 AM Saleem Mr. Rajesh Reject to the double
HWYH-1093 at TCF-1 CPP Pipe yard.
raised in the
EPM. 
328 CPP-NGCP-M-327 1400090333 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving Inspection for 60 HWYH 934 N/A 23-Apr-19 9.00 AM Masood Mr. Suresh CLOSED
pipes (10"x0.438")pipes at HWYH 934
Field pipe bending Inspection for
Mr.
329 CPP-NGCP-M-328 1400090317 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1118 ,619 FL at TCF-1 N/A 23-Apr-19 7.00 AM Shankar
Rajendran
CLOSED
TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
330 CPP-NGCP-M-329 1400090393 Mechanical SATIP-L-450-04 SAIC-L-2114 (10"X0.438”), HWYH-1093 FL at TCF- TCF-1 N/A 23-Apr-19 7.30 AM Saleem CLOSED
Rajendran
1 CPP Pipe yard.
Material receiving Inspection for 72
Mr.
331 CPP-NGCP-M-330 1400090370 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8"x0.344" API 5L GR.60Q) AT TCF-1 N/A 23-Apr-19 9.00 AM Shankar
Rajendran
CLOSED
TCF-1 CPP Pipe yard
Field pipe bending Inspection for
Mr.
332 CPP-NGCP-M-331 1400090587 Mechanical SATIP-L-450-04 SAIC-L-2114 (10"X0.438”), HWYH-1093 FL at TCF- TCF-1 N/A 24-Apr-19 7.30 AM Saleem CLOSED
Rajendran
1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
333 CPP-NGCP-M-332 1400091774 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1118 ,619 FL at TCF-1 N/A 24-Apr-19 7.00 AM Shankar
Rajendran
CLOSED
TCF-1 CPP Pipe yard.
Material receiving Inspection
334 CPP-NGCP-M-333 1400091479 Mechanical SATIP-L-450-04 SAIC-L-2112 for238pipes (16"x0.438") at HWYH HWYH RH-GK N/A 25-Apr-19 8.00 AM Masood Mr. Suresh CLOSED
RH-GK
Material receiving Inspection for 200
335 CPP-NGCP-M-334 1400091562 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH 934 N/A 25-Apr-19 9.00 AM Masood Mr. Suresh CLOSED
pipes (10"x0.438")pipes at HWYH 934
Field pipe bending Inspection for
Mr.
336 CPP-NGCP-M-335 1400091198 Mechanical SATIP-L-450-04 SAIC-L-2114 (10"X0.438”), HWYH-1093 FL at TCF- TCF-1 N/A 25-Apr-19 7.30 AM Saleem
Rajendran
CLOSED
1 CPP Pipe yard.

Field pipe bending Inspection for RFI has been


Mr. canceled due
337 CPP-NGCP-M-336 1400091467 Mechanical SATIP-L-450-04 SAIC-L-2114 (10"X0.438”), HWYH-1093 FL at TCF- TCF-1 N/A 26-Apr-19 7.30 AM Saleem
Rajendran
Reject to the double
1 CPP Pipe yard. raised in the
EPM.
Field pipe bending Inspection for
Mr.
338 CPP-NGCP-M-337 1400091684 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-619 FL at TCF-1 TCF-1 N/A 25-Apr-19 7.00 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Storage and Preservation of Pipes.at Mr.
339 CPP-NGCP-M-338 1400091639 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF-1 N/A 25-Apr-19 07.15 AM Shankar CLOSED
TCF-1 Pipe Yard Rajendran

340 CPP-NGCP-M-339 1400091719 Mechanical SATIP-L-450-04 SAIC-L-2120


thurst boring and pipe pulling activity at HWYH-975 TA-446045 26-Apr-19 07.15 AM Masood Mr. Suresh CLOSED
HWYH-975
Field pipe bending Inspection for
Mr.
341 CPP-NGCP-M-340 1400091955 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-619 FL at TCF-1 TCF-1 N/A 27-Apr-19 7.00 AM Shankar
Rajendran
CLOSED
CPP Pipe
Field yard.
pipe bending Inspection for
(10"X0.438”), HWYH-1093 FL and Mr.
342 CPP-NGCP-M-341 1400092694 Mechanical SATIP-L-450-04 SAIC-L-2114 TCF-1 N/A 28-Apr-19 7.30 AM Saleem CLOSED
HWYH-1036 FL at TCF-1 CPP Pipe Rajendran
yard.
Field pipe bending Inspection for
Mr.
343 CPP-NGCP-M-342 1400093157 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1164FL at TCF-1 TCF-1 N/A 28-Apr-19 7.00 AM Shankar
Rajendran
CLOSED
CPP Pipe yard.
Material receiving Inspection for pipes
344 CPP-NGCP-M-343 1400093406 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH 934 N/A 29-Apr-19 9.00 AM Masood Mr. Suresh CLOSED
(10"x0.438") at HWYH 934
Field pipe bending Inspection for
(10"X0.438”), HWYH-1093 FL and Mr.
345 CPP-NGCP-M-344 1400093332 Mechanical SATIP-L-450-04 SAIC-L-2114 TCF-1 N/A 29-Apr-19 7.30 AM Saleem CLOSED
HWYH-1036 FL at TCF-1 CPP Pipe Rajendran
yard.
Material receiving Inspection for 140
346 CPP-NGCP-M-345 1400093783 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH 206 N/A 29-Apr-19 8.00 AM Lokesh Mr. Suresh CLOSED
pipes (10"x0.438")pipes at HWYH 206
Field pipe bending Inspection for
Mr.
347 CPP-NGCP-M-346 1400093814 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1164FL at TCF-1 TCF-1 N/A 29-Apr-19 7.00 AM Shankar CLOSED
Rajendran
CPP Pipe yard.
Field pipe bending Inspection for
348 CPP-NGCP-M-347 1400094108 Mechanical SATIP-L-450-04 SAIC-L-2114 (10"X0.438”), HWYH-1093 FL and TCF-1 N/A 30-Apr-19 7.30 AM Saleem
Mr.
CLOSED
HWYH-1036 FL at TCF-1 CPP Pipe Rajendran
yard.
Material receiving Inspection for 180
349 CPP-NGCP-M-348 1400094413 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH 206 N/A 30-Apr-19 8.00 AM Masood Mr. Suresh CLOSED
pipes (10"x0.438")pipes at HWYH 206
Field pipe bending Inspection for
Mr.
350 CPP-NGCP-M-349 1400094276 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1164 FL at TCF-1 TCF-1 N/A 30-Apr-19 7.00 AM Shankar CLOSED
Rajendran
CPP Pipe yard.
Field pipe bending Inspection for
(10"X0.438”), HWYH-1093 FL and Mr.
351 CPP-NGCP-M-350 1400094931 Mechanical SATIP-L-450-04 SAIC-L-2114 TCF-1 N/A 01-May-19 7.30 AM Saleem
Rajendran
CLOSED
HWYH-1036 FL at TCF-1 CPP Pipe
yard.
Field pipe bending Inspection for
Mr.
352 CPP-NGCP-M-351 1400095175 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1164,1160,619 FL TCF-1 N/A 01-May-19 7.00 AM Saleem CLOSED
Rajendran
at TCF-1 CPP Pipe yard.

RFI has been


Material receiving Inspection for pipes canceled due
353 CPP-NGCP-M-352 1400095512 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH 206 N/A 02-May-19 8.00 AM Masood Mr. Suresh Reject to the double
(CJ-RH10"x0.438")pipes at HWYH 206
raised in the
EPM.
354 CPP-NGCP-M-353 1400095885 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving Inspection for 232 HWYH 1023 N/A 02-May-19 8.00 AM Masood Mr. Suresh CLOSED
pipes (10"x0.438") at HWYH 1023
Material receiving Inspection for 154
355 CPP-NGCP-M-354 1400095811 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH RH EJ N/A 02-May-19 8.00 AM Masood Mr. Suresh CLOSED
pipes (16"X0.438) at HWYH RH EJ
Material receiving Inspection for 182
356 CPP-NGCP-M-355 1400095904 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH RH CK N/A 02-May-19 8.00 AM Masood Mr. Suresh CLOSED
pipes (16"X0.438) at HWYH RH CK
Material receiving Inspection for 415
Mr.
357 CPP-NGCP-M-356 1400095966 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (10"x0.438" API 5L GR.65Q) AT TCF-1 N/A 02-May-19 8.00 AM Shankar
Rajendran
CLOSED
TCF-1 CPP Pipe yard
Material receiving Inspection for
Mr.
358 CPP-NGCP-M-357 1400095921 Mechanical SATIP-L-450-04 SAIC-L-2112 13pipes (16"x0.469" API 5L GR.65Q) TCF-1 N/A 02-May-19 8.30 AM Shankar CLOSED
Rajendran
AT TCF-1 CPP Pipe yard

359 CPP-NGCP-M-358 1400095968 Mechanical SATIP-L-450-04 SAIC-L-2112 Storage and Preservation of Pipes.at TCF-1 N/A 02-May-19 10.00 AM Shankar
Mr.
CLOSED
TCF-1 Pipe Yard Rajendran
Field pipe bending Inspection for
(8"X0.344”), HRDH-619 FL and Mr.
360 CPP-NGCP-M-359 1400095902 Mechanical SATIP-L-450-04 SAIC-L-2114 TCF-1 N/A 02-May-19 7.00 AM Saleem CLOSED
HRDH-1160 FL at TCF-1 CPP Pipe Rajendran
yard.
Field pipe bending Inspection for
(8"X0.344”), HRDH-619 FL and Mr.
361 CPP-NGCP-M-360 1400095972 Mechanical SATIP-L-450-04 SAIC-L-2114 HRDH-1160 FL at TCF-1 CPP Pipe TCF-1 N/A 03-May-19 06.30 AM Saleem
Rajendran
CLOSED
yard.
Field pipe bending Inspection for
Mr.
362 CPP-NGCP-M-361 1400096545 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1178 FL at TCF-1 TCF-1 N/A 04-May-19 06.30 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Field pipe bending Inspection for
Mr.
363 CPP-NGCP-M-362 1400097190 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1160 FL at TCF-1 TCF-1 N/A 05-May-19 07.00 AM Saleem
Rajendran
CLOSED
CPP Pipe yard.
Stringing and pipe laying inspection at
364 CPP-NGCP-M-363 1400097961 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-206 TA-445828 06-May-19 8:00 AM Masood Mr. Suresh CLOSED
HWYH-206
Material receiving Inspection for 180
365 CPP-NGCP-M-364 1400098048 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (10"x0.438")pipes at HWYH HWYH1023 N/A 06-May-19 8.00 AM Masood Mr. Suresh CLOSED
1023
366 CPP-NGCP-M-365 1400098115 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving Inspection for 42 HWYH RH EJ N/A 06-May-19 8.30 AM Masood Mr. Suresh CLOSED
pipes (16"X0.438) at HWYH RH EJ
Material receiving Inspection for 160
367 CPP-NGCP-M-366 1400098163 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN 2201 N/A 06-May-19 9.00 AM Masood Mr. Suresh CLOSED
pipes (10"X0.438) at UTMN 2201
Field pipe bending Inspection for Mr.
368 CPP-NGCP-M-367 1400097963 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1086 FL at TCF-1 TCF-1 N/A 06-May-19 07.00 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Material receiving Inspection for 120
Mr.
369 CPP-NGCP-M-368 1400098013 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (10"x0.438" API 5L GR.65Q) AT TCF-1 N/A 06-May-19 07.00 AM Shankar CLOSED
Rajendran
TCF-1 CPP Pipe yard
warehouse qualification and approval Mr.
370 CPP-NGCP-M-369 1400098190 Mechanical SATIP-L-350-08 SAIC-L-2031 TCF-1 N/A 06-May-19 09.00 AM umair OPEN No Action
at TCF-1 Rajendran
Field pipe bending Inspection for
Mr.
371 CPP-NGCP-M-370 1400098789 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1086 FL at TCF-1 TCF-1 N/A 07-May-19 05.00 AM Saleem
Rajendran
CLOSED
CPP Pipe yard.
Field pipe bending Inspection for
(10"X0.438”), HWYH-1093 FL and Mr.
372 CPP-NGCP-M-371 1400098574 Mechanical SATIP-L-450-04 SAIC-L-2114 TCF-1 N/A 07-May-19 7.30 AM Saleem CLOSED
HWYH-1036 FL at TCF-1 CPP Pipe Rajendran
yard.
Field pipe bending Inspection for
(10"X0.438”), HWYH-1093 FL and Mr.
373 CPP-NGCP-M-372 1400099010 Mechanical SATIP-L-450-04 SAIC-L-2114 HWYH-1036 FL at TCF-1 CPP Pipe TCF-1 N/A 08-May-19 7.30 AM Saleem
Rajendran
CLOSED
yard.
Stringing and pipe laying inspection at
374 CPP-NGCP-M-373 1400099191 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-206 TA-445828 08-May-19 8:00 AM Masood Mr. Suresh CLOSED
HWYH-206
375 CPP-NGCP-M-374 1400099199 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection at HWYH-921 TA-445963 08-May-19 8:00 AM Masood Mr. Suresh CLOSED
HWYH-921
Material receiving Inspection for 120
376 CPP-NGCP-M-375 400099170 Mechanical SATIP-L-450-04 TA-445974 UTMN 2201 N/A 08-May-19 9.00 AM Masood Mr. Suresh CLOSED
pipes (10"X0.438) at UTMN 2201
Material receiving Inspection for 140
377 CPP-NGCP-M-376 1400099208 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH RH EJ N/A 08-May-19 8.30 AM Masood Mr. Suresh CLOSED
pipes (16"X0.438) at HWYH RH EJ
Material receiving Inspection for 9
Mr.
378 CPP-NGCP-M-377 1400099305 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (16"x0.469" API 5L GR.65Q) AT TCF-1 N/A 08-May-19 07.00 AM Shankar
Rajendran
CLOSED
TCF-1 CPP Pipe yard

Material receiving Inspection for 228 RFI has been


Mr. canceled due
379 CPP-NGCP-M-378 1400099311 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (36"x0.688" API 5L GR.65Q) AT TCF-1 N/A 08-May-19 07.00 AM Shankar Reject to the double
Rajendran
TCF-1 CPP Pipe yard raised in the
EPM.
Material receiving Inspection for 60
Mr.
380 CPP-NGCP-M-379 1400100108 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8"x0.344" API 5L GR.65Q) AT TCF-1 N/A 09-May-19 07.00 AM Shankar
Rajendran
CLOSED
TCF-1 CPP Pipe yard
Material receiving Inspection for 277
Mr.
381 CPP-NGCP-M-380 1400100158 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (36"x0.688" API 5L GR.65Q) AT TCF-1 N/A 09-May-19 07.00 AM Shankar CLOSED
Rajendran
TCF-1 CPP Pipe yard
Stringing and pipe laying inspection at HRDH-K13- CANCELLED
382 CPP-NGCP-M-381 1400100201 Mechanical SATIP-L-450-04 SAIC-L-2132 TA-669436 09-May-19 8:00 AM Shankar Mr. Rajesh Reject DUE TO JOB
HRDH-K13-RH RH TR/L NOT READY
Field pipe bending Inspection for
(10"X0.438”), HWYH-1093 FL and Mr.
383 CPP-NGCP-M-382 1400099749 Mechanical SATIP-L-450-04 SAIC-L-2114 TCF-1 N/A 09-May-19 7.30 AM Saleem CLOSED
HWYH-1036 FL at TCF-1 CPP Pipe Rajendran
yard.

Material receiving Inspection for 56


384 CPP-NGCP-M-383 1400099951 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH RH CJ N/A 09-May-19 8.30 AM Masood Mr. Suresh CLOSED
pipes (16"X0.438) at HWYH RH CJ
Field pipe bending Inspection for
(10"X0.438”), HWYH-1093 FL and Mr.
385 CPP-NGCP-M-384 1400100858 Mechanical SATIP-L-450-04 SAIC-L-2114 HWYH-1036 FL at TCF-1 CPP Pipe TCF-1 N/A 11-May-19 7.30 AM Saleem CLOSED
Rajendran
yard.
Material receiving Inspection for 257
Mr.
386 CPP-NGCP-M-385 1400100722 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (36"x0.688" API 5L GR.65Q) AT TCF-1 N/A 11-May-19 07.00 AM Shankar CLOSED
Rajendran
TCF-1 CPP Pipe yard
Material receiving Inspection for 60
Mr.
387 CPP-NGCP-M-386 1400100792 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8"x0.344" API 5L GR.65Q) AT TCF-1 N/A 11-May-19 07.00 AM Shankar
Rajendran
CLOSED
TCF-1 CPP Pipe yard
Field pipe bending Inspection for
Mr.
388 CPP-NGCP-M-387 1400100863 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1086 FL at TCF-1 TCF-1 N/A 11-May-19 05.00 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Material receiving Inspection for 201
389 CPP-NGCP-M-388 1400100782 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (12.750"x0.406" API 5L HRDH-K4-RH N/A 11-May-19 07.00 AM Umair Mr. Rajesh CLOSED
GR.65Q) AT HRDH-K4-RH
Material receiving Inspection for 23
390 CPP-NGCP-M-389 1400101160 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH RH CJ N/A 12-May-19 8.30 AM Masood Mr. Suresh CLOSED
pipes (16"X0.469) at HWYH RH CJ
391 CPP-NGCP-M-390 1400101214 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving Inspection for 160 UTMN 2201 N/A 12-May-19 9.00 AM Masood Mr. Suresh CLOSED
pipes (10"X0.438) at UTMN 2201
Material receiving Inspection for 90
392 CPP-NGCP-M-391 1400101215 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH 201 N/A 12-May-19 9.00 AM Masood Mr. Suresh CLOSED
pipes (8"X0.344) at HWYH 201
Field pipe bending Inspection for
(10"X0.438”), HWYH-1093 FL and Mr.
393 CPP-NGCP-M-392 1400101309 Mechanical SATIP-L-450-04 SAIC-L-2114 TCF-1 N/A 12-May-19 7.30 AM Saleem CLOSED
HWYH-1036 FL at TCF-1 CPP Pipe Rajendran
yard.
Stringing and pipe laying inspection at HRDH-K13-
394 CPP-NGCP-M-393 1400101488 Mechanical SATIP-L-450-04 SAIC-L-2132 TA-669436 12-May-19 8:00 AM Shankar Mr. Rajesh CLOSED
HRDH-K13-RH RH TR/L
Storage and Preservation of Pipes.at Mr.
395 CPP-NGCP-M-394 1400101517 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF-1 N/A 12-May-19 07.00 AM Shankar CLOSED
TCF-1 Pipe Yard Rajendran
Material receiving Inspection for 210
Mr.
396 CPP-NGCP-M-395 1400101498 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (36"x0.688" API 5L GR.65Q) AT TCF-1 N/A 12-May-19 07.30 AM Shankar
Rajendran
CLOSED
TCF-1 CPP Pipe yard
Field pipe bending Inspection for
Mr.
397 CPP-NGCP-M-396 1400101518 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1086 FL at TCF-1 TCF-1 N/A 12-May-19 6.00 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Stringing and pipe laying inspection at HRDH-K13-
398 CPP-NGCP-M-397 1400102204 Mechanical SATIP-L-450-04 SAIC-L-2132 TA-669436 13-May-19 7:00 AM Shankar Mr. Rajesh CLOSED
HRDH-K13-RH RH TR/L
Field pipe bending Inspection for
Mr.
399 CPP-NGCP-M-398 1400102184 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1086 FL at TCF-1 TCF-1 N/A 13-May-19 6.00 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Material receiving Inspection for 236
Mr.
400 CPP-NGCP-M-399 1400102205 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (36"x0.688" API 5L GR.65Q) AT TCF-1 N/A 13-May-19 07.30 AM Shankar CLOSED
Rajendran
TCF-1 CPP Pipe yard
Field pipe bending Inspection for
(10"X0.438”), HWYH-1093 FL and Mr.
401 CPP-NGCP-M-400 1400102032 Mechanical SATIP-L-450-04 SAIC-L-2114 TCF-1 N/A 13-May-19 7.30 AM Saleem CLOSED
HWYH-1036 FL at TCF-1 CPP Pipe Rajendran
yard.
Material receiving Inspection for 60
402 CPP-NGCP-M-401 1400102094 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH 201 N/A 13-May-19 9.00 AM Masood Mr. Suresh CLOSED No Action
pipes (8"X0.344) at HWYH 201
Material receiving Inspection for
403 CPP-NGCP-M-402 1400102076 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH 1069 N/A 13-May-19 9.00 AM Masood Mr. Suresh CLOSED No Action
30pipes (8"X0.344) at HWYH 1069
404 CPP-NGCP-M-403 1400102036 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving Inspection for 13 UTMN 2201 N/A 13-May-19 9.00 AM Masood Mr. Suresh CLOSED
pipes (10"X0.438) at UTMN 2201
Material receiving Inspection for 213
Mr.
405 CPP-NGCP-M-404 1400102780 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (36"x0.688" API 5L GR.65Q) AT TCF-1 N/A 14-May-19 07.00 AM Shankar CLOSED
Rajendran
TCF-1 CPP Pipe yard
Material receiving Inspection for 60
Mr.
406 CPP-NGCP-M-405 1400102797 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8"X0.344) AT TCF-1 CPP Pipe TCF-1 N/A 14-May-19 07.30 AM Shankar CLOSED
Rajendran
yard
Stringing and pipe laying inspection of HRDH-K13-
407 CPP-NGCP-M-406 1400102858 Mechanical SATIP-L-450-04 SAIC-L-2132 RH TR/L TA-669436 14-May-19 7:00 AM Shankar Mr. Rajesh CLOSED
12'X0.406' at HRDH-K13-RH
Material receiving Inspection for 152
408 CPP-NGCP-M-407 1400102859 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8"X0.344) at RH-K4 to RH-K4 N/A 14-May-19 07.30 AM Umair Mr. Rajesh CLOSED
1213,1143,968,1303
Field pipe bending Inspection for
Mr.
409 CPP-NGCP-M-408 1400102800 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1086 FL at TCF-1 TCF-1 N/A 14-May-19 05.30 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Field pipe bending Inspection for
410 CPP-NGCP-M-409 1400102261 Mechanical SATIP-L-450-04 SAIC-L-2114 (10"X0.438”), HWYH-1093 FL and TCF-1 N/A 14-May-19 7.30 AM Saleem
Mr. CLOSED
HWYH-1036 FL at TCF-1 CPP Pipe Rajendran
yard.
Material receiving Inspection for 112
411 CPP-NGCP-M-410 1400102463 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH RH CJ N/A 14-May-19 8.30 AM Masood Mr. Suresh CLOSED
pipes (16"X0.469) at HWYH RH CJ
Material receiving Inspection for 75
Mr.
412 CPP-NGCP-M-411 1400103372 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (36"x0.688" API 5L GR.65Q) AT TCF-1 N/A 15-May-19 07.30 AM Shankar CLOSED
Rajendran
TCF-1 CPP Pipe yard
Material receiving Inspection for 210 HRDH-
413 CPP-NGCP-M-412 1400103435 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8"X0.344) at HRDH- 935.1003.931.1 N/A 15-May-19 08.00 AM Umair Mr. Rajesh CLOSED
935.1003.931.1140.978.1173 140.978.1173
Stringing and pipe laying inspection of
414 CPP-NGCP-M-413 1400103448 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1003 FL TA-669351 15-May-19 8:15 AM Shankar Mr. Rajesh CLOSED
8'X0.344' at HRDH-935-HRDH-1003
Field pipe bending Inspection for
Mr.
415 CPP-NGCP-M-414 1400103332 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1192 FL at TCF-1 TCF-1 N/A 15-May-19 05.30 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Field pipe bending Inspection for
(10"X0.438”), HWYH-1093 FL and Mr.
416 CPP-NGCP-M-415 1400102988 Mechanical SATIP-L-450-04 SAIC-L-2114 TCF-1 N/A 15-May-19 7.30 AM Saleem CLOSED
HWYH-1036 FL at TCF-1 CPP Pipe Rajendran
yard.
Material receiving Inspection for 20
417 CPP-NGCP-M-416 1400103229 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN 2201 N/A 15-May-19 9.00 AM Masood Mr. Suresh CLOSED
pipes (10"X0.438) at UTMN 2201
Stringing and pipe laying inspection at
418 CPP-NGCP-M-417 1400103294 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1036 TA-445861 15-May-19 8:00 AM Masood Mr. Suresh CLOSED
HWYH-1036
Material receiving Inspection for 28
419 CPP-NGCP-M-418 1400103222 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH RH CJ N/A 15-May-19 9.00 AM Lokesh Mr. Suresh CLOSED
pipes (16"X0.438) at HWYH RH CJ
Material receiving Inspection for 42
420 CPP-NGCP-M-419 1400103396 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH RH BK N/A 15-May-19 9.00 AM Lokesh Mr. Suresh CLOSED
pipes (16"X0.438) at HWYH RH BK
Field pipe bending Inspection for
421 CPP-NGCP-M-420 1400103945 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-975 FL and TCF-1 N/A 16-May-19 7.30 AM Saleem
Mr. CLOSED
HWYH-1055 FL at TCF-1 CPP Pipe Rajendran
yard.
Stringing and pipe laying inspection at
422 CPP-NGCP-M-421 1400103946 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1036 TA-445861 16-May-19 8:00 AM Masood Mr. Suresh CLOSED
HWYH-1036
Material receiving Inspection for 90
423 CPP-NGCP-M-422 1400103975 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH 1069 N/A 16-May-19 9.00 AM Lokesh Mr. Suresh CLOSED
pipes (8"X0.344) at HWYH 1069
Material receiving Inspection for 42 HWYH LSS
424 CPP-NGCP-M-423 1400103979 Mechanical SATIP-L-450-04 SAIC-L-2112 N/A 16-May-19 9.00 AM Lokesh Mr. Suresh CLOSED
pipes (16"X0.438) at LSS TRL1 TRL1

425 CPP-NGCP-M-424 1400103994 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving Inspection for 84 HWYH BK RH N/A 16-May-19 9.00 AM Lokesh Mr. Suresh CLOSED
pipes (16"X0.438) at BK RH
thurst boring and pipe pulling activity at
426 CPP-NGCP-M-425 1400104132 Mechanical SATIP-L-450-04 SAIC-L-2120 HRDH-902 TA-446045 16-Apr-19 08.00 AM Shankar Mr. Rajesh CLOSED
HRDH-902
Material receiving Inspection for 60
Mr.
427 CPP-NGCP-M-426 1400104089 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8"x0.344" API 5L GR.65Q) AT TCF-1 N/A 16-May-19 07.00 AM Shankar CLOSED
Rajendran
TCF-1 CPP Pipe yard

428 CPP-NGCP-M-427 1400104107 Mechanical SATIP-L-450-04 SAIC-L-2112 Storage and Preservation of Pipes.at TCF-1 N/A 16-May-19 07.30 AM Shankar
Mr.
CLOSED
TCF-1 Pipe Yard Rajendran
Stringing and pipe laying inspection of
429 CPP-NGCP-M-428 1400104078 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1003 FL TA-669351 16-May-19 8:05 AM Shankar Mr. Rajesh CLOSED
8'X0.344' at HRDH-935-HRDH-1003
Stringing and pipe laying inspection of
430 CPP-NGCP-M-429 1400104079 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1303 FL TA-669344 16-May-19 8:15 AM Umair Mr. Rajesh CLOSED
8'X0.344' at HRDH-968-HRDH-1303
431 CPP-NGCP-M-430 1400104080 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection of HRDH-1313 FL TA-669345 16-May-19 8:40 AM Shankar Mr. Rajesh CLOSED
8'X0.344' at HRDH-K4-HRDH-1313
Material receiving Inspection for 60
Mr.
432 CPP-NGCP-M-431 1400104163 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8"x0.344" API 5L GR.65Q) AT HRDH-1128 N/A 16-May-19 07.30 AM Umair CLOSED
Rajendran
HRDH-1128
Field pipe bending Inspection for
Mr.
433 CPP-NGCP-M-432 1400104154 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH--1192 FL at TCF-1 TCF-1 N/A 16-May-19 5.30 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Field pipe bending Inspection for
(8"X0.344”), HWYH-975 FL and Mr.
434 CPP-NGCP-M-433 1400104555 Mechanical SATIP-L-450-04 SAIC-L-2114 TCF-1 N/A 18-May-19 7.30 AM Saleem CLOSED
HWYH-1055 FL at TCF-1 CPP Pipe Rajendran
yard.
435 CPP-NGCP-M-434 1400104540 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection at HWYH-1036 TA-445861 18-May-19 8:00 AM Lokesh Mr. Suresh CLOSED
HWYH-1036
Stringing and pipe laying inspection at
436 CPP-NGCP-M-435 1400104541 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-921 TA-445963 18-May-19 8:00 AM Lokesh Mr. Suresh CLOSED
HWYH-921
Material receiving Inspection for 42
437 CPP-NGCP-M-436 1400104574 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH RH BK N/A 18-May-19 9.00 AM Masood Mr. Suresh CLOSED
pipes (16"X0.438) at HWYH RH BK
Material receiving Inspection for 56 HWYH LSS
438 CPP-NGCP-M-437 1400104519 Mechanical SATIP-L-450-04 SAIC-L-2112 TRL1 N/A 18-May-19 9.00 AM Masood Mr. Suresh CLOSED
pipes (16"X0.438) at LSS TRL1
Stringing and pipe laying inspection of
440 CPP-NGCP-M-439 1400104338 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1003 FL TA-669351 18-May-19 7:00 AM Shankar Mr. Rajesh CLOSED
8'X0.344' at HRDH-935-HRDH-1003
441 CPP-NGCP-M-440 1400104288 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection of HRDH-1313 FL TA-669345 18-May-19 7:00 AM Umair Mr. Rajesh CLOSED
8'X0.344' at HRDH-K4-HRDH-1313
Stringing and pipe laying inspection of
442 CPP-NGCP-M-441 1400104353 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1303 FL TA-669344 18-May-19 7:15 AM Umair Mr. Rajesh CLOSED
8'X0.344' at HRDH-968-HRDH-1303
Stringing and pipe laying inspection of
443 CPP-NGCP-M-442 1400104354 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1140 FL TA-669420 18-May-19 7:30 AM Umair Mr. Rajesh CLOSED
8'X0.344' at HRDH-931-HRDH-1140
444 CPP-NGCP-M-443 1400104339 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection of HRDH-1173 FL TA-669298 18-May-19 8:00 AM Umair Mr. Rajesh CLOSED
8'X0.344' at HRDH-978-HRDH-1140
Field pipe bending Inspection for
Mr.
445 CPP-NGCP-M-444 1400104960 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1055 FL at TCF-1 TCF-1 N/A 19-May-19 7.30 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Stringing and pipe laying inspection at
446 CPP-NGCP-M-445 1400105376 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1003 N/A 19-May-19 8:00 AM Lokesh Mr. Suresh CLOSED
HWYH-1003
447 CPP-NGCP-M-446 1400105360 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving Inspection for 143 HWYH BK RH N/A 19-May-19 9.00 AM Masood Mr. Suresh CLOSED
pipes (16"X0.469) at HWYH BK RH
Stringing and pipe laying inspection of
448 CPP-NGCP-M-447 1400105470 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1313 FL TA-669345 19-May-19 7:00 AM Umair Mr. Rajesh CLOSED
8'X0.344' at HRDH-K4-HRDH-1313
Stringing and pipe laying inspection of
449 CPP-NGCP-M-448 1400105397 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1303 FL TA-669344 19-May-19 7:30 AM Umair Mr. Rajesh CLOSED
8'X0.344' at HRDH-968-HRDH-1303
450 CPP-NGCP-M-449 1400105473 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection of HRDH-1140 FL TA-669420 19-May-19 8:00 AM Umair Mr. Rajesh CLOSED
8'X0.344' at HRDH-931-HRDH-1140
Stringing and pipe laying inspection of
451 CPP-NGCP-M-450 1400105472 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1173 FL TA-669298 19-May-19 8:30 AM Umair Mr. Rajesh CLOSED
8'X0.344' at HRDH-978-HRDH-1173
Field pipe bending Inspection for Mr.
452 CPP-NGCP-M-451 1400105392 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH--1192 FL at TCF-1 TCF-1 N/A 19-May-19 5.30 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Material receiving Inspection for 60
Mr.
453 CPP-NGCP-M-452 1400106141 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8"x0.344" API 5L GR.65Q) AT TCF-1 N/A 20-May-19 07.00 AM Shankar CLOSED
TCF-1 CPP Pipe yard Rajendran
Material receiving Inspection for 70
Mr.
454 CPP-NGCP-M-453 1400106179 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (16"x0.469" API 5L GR.65Q) AT HRDH-AK-RH TA-843960 20-May-19 08.00 AM Shankar CLOSED
Rajendran
HRDH-AK
Stringing and pipe laying inspection of Mr.
455 CPP-NGCP-M-454 1400106214 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-AK-RH TA-843960 20-May-19 8:15 AM Shankar CLOSED
16'X0.469' at HRDH-AK-GGM Rajendran
Material receiving Inspection for 90
456 CPP-NGCP-M-455 1400106102 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8"x0.344" API 5L GR.65Q) AT HRDH-1159 FL TA-843654 20-May-19 07.00 AM Umair Mr. Ashok CLOSED
HRDH-1159
Material receiving Inspection for 30
457 CPP-NGCP-M-456 1400106142 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8"x0.344" API 5L GR.65Q) AT HRDH-1195 FL TA-669338 20-May-19 07.15 AM Umair Mr. Ashok CLOSED
HRDH-1195
Material receiving Inspection for 60
458 CPP-NGCP-M-457 1400106223 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8"x0.344" API 5L GR.65Q) AT HRDH-1128 FL TA-843607 20-May-19 07.30 AM Umair Mr. Ashok CLOSED
HRDH-1128

Stringing and pipe laying inspection of


459 CPP-NGCP-M-458 1400106215 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1159 FL TA-843654 20-May-19 8:00 AM Umair Mr. Ashok CLOSED
8"x0.344"at HRDH-1159 FL

Stringing and pipe laying inspection of


460 CPP-NGCP-M-459 1400106224 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1128 FL TA-843607 20-May-19 8:15 AM Umair Mr. Ashok CLOSED
8"x0.344"at HRDH-1128 FL

Field pipe bending Inspection for


Mr.
461 CPP-NGCP-M-460 1400106233 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH--1118 FL at TCF-1 TCF-1 N/A 20-May-19 5.30 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Field pipe bending Inspection for
Mr.
462 CPP-NGCP-M-461 1400106020 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1055 FL HWYH- TCF-1 N/A 20-May-19 7.30 AM Saleem CLOSED
Rajendran
1071 at TCF-1 CPP Pipe yard.
Material receiving Inspection for 77 Reject -
463 CPP-NGCP-M-462 1400105981 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (16"X0.469) at HWYH LSS HWYH LSS N/A 20-May-19 9.00 AM Masood Mr. Suresh Job not
TRL1 Ready
TRL1
Material receiving Inspection for 90
464 CPP-NGCP-M-463 1400106047 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH 912 N/A 20-May-19 9.00 AM Masood Mr. Suresh CLOSED
pipes (8"X0.344) at HWYH 912
Material receiving Inspection for 56
465 CPP-NGCP-M-464 1400105922 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (16"X0.438) at HWYH LSS HWYH LSS N/A 20-May-19 9.00 AM Lokesh Mr. Suresh CLOSED
TRL1
Material receiving Inspection for 56 HWYH BK
466 CPP-NGCP-M-465 1400106032 Mechanical SATIP-L-450-04 SAIC-L-2112 N/A 20-May-19 9.00 AM Lokesh Mr. Suresh CLOSED
pipes (16"X0.438) at HWYH BK RH RH
Stringing and pipe laying inspection of
467 CPP-NGCP-M-466 1400106896 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1313 FL TA-669345 21-May-19 7:00 AM Umair Mr. Ashok CLOSED
8'X0.344' at HRDH-K4-HRDH-1313
Stringing and pipe laying inspection of
468 CPP-NGCP-M-467 1400106925 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1303 FL TA-669344 21-May-19 7:30 AM Umair Mr. Ashok CLOSED
8'X0.344' at HRDH-968-HRDH-1303
Stringing and pipe laying inspection of
469 CPP-NGCP-M-468 1400106944 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1140 FL TA-669420 21-May-19 8:00 AM Umair Mr. Ashok CLOSED
8'X0.344' at HRDH-931-HRDH-1140
Stringing and pipe laying inspection of
470 CPP-NGCP-M-469 1400106956 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1173 FL TA-669298 21-May-19 8:30 AM Umair Mr. Ashok CLOSED
8'X0.344' at HRDH-978-HRDH-1173
Field pipe bending Inspection for
Mr.
471 CPP-NGCP-M-470 1400106920 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH--1118 FL at TCF-1 TCF-1 N/A 21-May-19 5.30 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Field pipe bending Inspection for
Mr.
472 CPP-NGCP-M-471 1400106924 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1055 FL HWYH- TCF-1 N/A 21-May-19 7.30 AM Saleem CLOSED
Rajendran
1071 at TCF-1 CPP Pipe yard.
Stringing and pipe laying inspection at
473 CPP-NGCP-M-472 1400107550 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH- 201 HWYH- 201 TA-445834 22-May-19 8:00 AM Lokesh Mr. Suresh CLOSED
Material receiving Inspection for 56 HWYH BK
474 CPP-NGCP-M-473 1400107552 Mechanical SATIP-L-450-04 SAIC-L-2112 N/A 22-May-19 9.00 AM Masood Mr. Suresh CLOSED
pipes (16"X0.438) at HWYH BK RH RH
Material receiving Inspection for 56
475 CPP-NGCP-M-474 1400107582 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (16"X0.438) at HWYH LSS HWYH LSS N/A 22-May-19 9.00 AM Masood Mr. Suresh CLOSED
TRL1
TRL1
Field pipe bending Inspection for
Mr.
476 CPP-NGCP-M-475 1400107694 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1055 FL HWYH- TCF-1 N/A 22-May-19 7.30 AM Saleem CLOSED
Rajendran
1071 at TCF-1 CPP Pipe yard.
Material receiving Inspection for 60
477 CPP-NGCP-M-476 1400107630 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8"x0.344" API 5L GR.65Q) AT HRDH-1144 FL TA-669415 22-May-19 07.00 AM Umair Mr. Ashok CLOSED
HRDH-1144
Material receiving Inspection for 60
478 CPP-NGCP-M-477 1400107645 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8"x0.344" API 5L GR.65Q) AT HRDH-1195 FL TA-669338 22-May-19 07.30 AM Umair Mr. Ashok CLOSED
HRDH-1195
Material receiving Inspection for 60
479 CPP-NGCP-M-478 1400107612 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8"x0.344" API 5L GR.65Q) AT HRDH-1197 FL TA-669357 22-May-19 08.00 AM Umair Mr. Ashok CLOSED
HRDH-1197

Material receiving Inspection for 34


Mr.
480 CPP-NGCP-M-479 1400107632 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8"x0.344" API 5L GR.65Q) AT TCF-1 N/A 22-May-19 07.00 AM Shankar CLOSED
Rajendran
TCF-1 CPP Pipe yard

Stringing and pipe laying inspection of


481 CPP-NGCP-M-480 1400107673 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1159 FL TA-843654 22-May-19 8:00 AM Umair Mr. Ashok CLOSED
8"x0.344"at HRDH-1159 FL

Stringing and pipe laying inspection of


482 CPP-NGCP-M-481 1400107640 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1128 FL TA-843607 22-May-19 8:15 AM Umair Mr. Ashok CLOSED
8"x0.344"at HRDH-1128 FL

Field pipe bending Inspection for


Mr.
483 CPP-NGCP-M-482 1400107641 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH--1118 FL at TCF-1 TCF-1 N/A 22-May-19 5.30 AM Saleem CLOSED
Rajendran
CPP Pipe yard.

Stringing and pipe laying inspection of


484 CPP-NGCP-M-483 1400108308 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1195 FL TA-669338 23-May-19 07.30 AM Umair Mr. Ashok CLOSED
8"x0.344"at HRDH-1195 FL

Stringing and pipe laying inspection of


485 CPP-NGCP-M-484 1400108297 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1197 FL TA-669357 23-May-19 07.30 AM Umair Mr. Ashok CLOSED
8"x0.344"at HRDH-1197 FL

Storage and Preservation of Pipes.at Mr.


486 CPP-NGCP-M-485 1400108298 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF-1 N/A 23-May-19 07.00 AM Saleem CLOSED
TCF-1 Pipe Yard Rajendran

Field pipe bending Inspection for


Mr.
487 CPP-NGCP-M-486 1400108270 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH--1192 FL at TCF-1 TCF-1 N/A 23-May-19 5.30 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Field pipe bending Inspection for
Mr.
488 CPP-NGCP-M-487 1400108411 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1071 HWYH-1076 TCF-1 N/A 23-May-19 7.30 AM Saleem CLOSED
Rajendran
HWYH-201 at TCF-1 CPP Pipe yard.
Material receiving Inspection for 42
489 CPP-NGCP-M-488 1400108378 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (16"X0.438) at HWYH LSS HWYH LSS N/A 23-May-19 9.00 AM Masood Mr. Suresh CLOSED
TRL1

Material receiving Inspection for 28


490 CPP-NGCP-M-489 1400108447 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH BK RH N/A 23-May-19 9.00 AM Lokesh Mr. Suresh CLOSED
pipes (16"X0.438) at HWYH BK RH

Stringing and pipe laying inspection at


491 CPP-NGCP-M-490 1400108454 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH- 201 TA-445834 23-May-19 8:00 AM Lokesh Mr. Suresh CLOSED
HWYH- 201

Stringing and pipe laying inspection of


492 CPP-NGCP-M-491 1400108960 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1195 FL TA-669338 25-May-19 07.30 AM Umair Mr. Ashok CLOSED
8"x0.344"at HRDH-1195 FL

Stringing and pipe laying inspection of


493 CPP-NGCP-M-492 1400108973 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1197 FL TA-669357 25-May-19 07.30 AM Umair Mr. Ashok CLOSED
8"x0.344"at HRDH-1197 FL
RFI has been
Field pipe bending Inspection for canceled due
Mr. to the double
494 CPP-NGCP-M-493 1400108872 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH--1118 FL at TCF-1 TCF-1 N/A 25-May-19 5.30 AM Saleem Reject raised in the
Rajendran
CPP Pipe yard. EPM.
Field pipe bending Inspection for
Mr.
495 CPP-NGCP-M-494 1400108892 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH--1115 FL at TCF-1 TCF-1 N/A 25-May-19 5.40 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Field pipe bending Inspection for
Mr.
496 CPP-NGCP-M-495 1400108482 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1076 HWYH-201 TCF-1 N/A 25-May-19 7.30 AM Saleem CLOSED
Rajendran
at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
497 CPP-NGCP-M-496 1400109151 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1076 HWYH-201 TCF-1 N/A 26-May-19 7.30 AM Saleem CLOSED
Rajendran
at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
498 CPP-NGCP-M-497 1400109714 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH--1115 FL ,HRDH- TCF-1 N/A 26-May-19 5.40 AM Saleem CLOSED
Rajendran
1190FL at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
499 CPP-NGCP-M-498 1400110269 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1076 HWYH- TCF-1 N/A 27-May-19 7.30 AM Saleem CLOSED
Rajendran
1100 at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
500 CPP-NGCP-M-499 1400110449 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH--1115 FL ,HRDH- TCF-1 N/A 27-May-19 5.40 AM Saleem CLOSED
Rajendran
1190FL at TCF-1 CPP Pipe yard.
Material receiving Inspection of
Mr.
501 CPP-NGCP-M-500 1400110475 Mechanical SATIP-M-001-01 SAIC-M-2003 structural steel plates AT TCF-1 CPP TCF-1 N/A 27-May-19 07.00 AM Saleem CLOSED
Rajendran
Pipe yard

Stringing and pipe laying inspection at


502 CPP-NGCP-M-501 1400111116 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH- 201 TA-445834 28-May-19 8:00 AM Lokesh Mr. Suresh CLOSED
HWYH- 201

Material receiving Inspection for 72


503 CPP-NGCP-M-502 1400111117 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH 1115 N/A 28-May-19 9.00 AM Masood Mr. Suresh CLOSED
pipes (8"X0.344) at HWYH 1115

Field pipe bending Inspection for


Mr.
504 CPP-NGCP-M-503 1400111144 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1076 HWYH- TCF-1 N/A 28-May-19 7.30 AM Saleem CLOSED
Rajendran
1100 at TCF-1 CPP Pipe yard.

thurst boring and pipe pulling activity at


505 CPP-NGCP-M-504 1400111113 Mechanical SATIP-L-450-04 SAIC-L-2120 HRDH-1164 FL TA-843592 28-May-19 07.30 AM Shankar Mr. Ashok CLOSED
HRDH-1164

Field pipe bending Inspection for


Mr.
506 CPP-NGCP-M-505 1400111105 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH--1140 FL at TCF-1 TCF-1 N/A 28-May-19 5.40 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Field pipe bending Inspection for
Mr.
507 CPP-NGCP-M-506 1400111821 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH--1140 FL at TCF-1 TCF-1 N/A 29-May-19 5.40 AM Saleem CLOSED
CPP Pipe yard. Rajendran

thurst boring and pipe pulling activity at


508 CPP-NGCP-M-507 1400112411 Mechanical SATIP-L-450-04 SAIC-L-2120 HRDH-1160 FL TA-843565 06-Jun-19 07.00 AM Shankar Mr. Ashok CLOSED
HRDH-1160

Field pipe bending Inspection for


Mr.
509 CPP-NGCP-M-508 1400112489 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH--1140 FL at TCF-1 TCF-1 N/A 30-May-19 5.40 AM Saleem CLOSED
CPP Pipe yard. Rajendran

Storage and Preservation of Pipes.at Mr.


510 CPP-NGCP-M-509 1400112527 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF-1 N/A 30-May-19 07.00 AM Saleem CLOSED
TCF-1 Pipe Yard Rajendran

Material receiving Inspection for 280


511 CPP-NGCP-M-510 1400112400 Mechanical SATIP-L-450-04 SAIC-L-2112 RH-GK-GGM N/A 30-May-19 07.00 AM Umair Mr. Ashok CLOSED
pipes (16"X0.438') at RH-GK-GGM

Field pipe bending Inspection for


Mr.
512 CPP-NGCP-M-511 1400113214 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-975 HWYH-1100 TCF-1 N/A 01-Jun-19 7.30 AM Saleem CLOSED re-schedule to 02-JUNE-2019
Rajendran
at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
513 CPP-NGCP-M-512 1400113118 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH--1313 FL at TCF-1 TCF-1 N/A 01-Jun-19 5.40 AM Saleem CLOSED
CPP Pipe yard. Rajendran

Verification of Replacement Materials


Mr.
514 CPP-NGCP-M-513 1400113170 Mechanical SATIP-A-004-03 SAIC-A-2009 For Hydrotest Manifold. (CPP-MFLD- TCF-1 N/A 01-Jun-19 08.00 AM Shankar CLOSED
Rajendran
NGCP-002)

Material receiving inspection for 90


515 CPP-NGCP-M-514 1400113507 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-912 N/A 02-Jun-19 9.00 AM Lokesh Mr. Suresh CLOSED
pipes(8" X 0. 344") At HWYH-912

Field pipe bending Inspection for


Mr.
516 CPP-NGCP-M-515 1400113832 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH--1313 FL at TCF-1 TCF-1 N/A 02-Jun-19 5.40 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Field pipe bending Inspection for
Mr.
517 CPP-NGCP-M-516 1400113854 Mechanical SATIP-L-450-04 SAIC-L-2114 (10"X0.438”), HRDH--902 FL at TCF-1 TCF-1 N/A 02-Jun-19 5.50 AM Saleem CLOSED re-schedule to 03-JUNE-2019
CPP Pipe yard. Rajendran

Field pipe bending Inspection for


Mr.
518 CPP-NGCP-M-517 1400114296 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH--1313 FL at TCF-1 TCF-1 N/A 03-Jun-19 5.40 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Field pipe bending Inspection for
Mr.
519 CPP-NGCP-M-518 1400114410 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-975 HWYH-1100 TCF-1 N/A 03-Jun-19 7.30 AM Saleem CLOSED
at TCF-1 CPP Pipe yard. Rajendran

Field pipe bending Inspection for


Mr.
520 CPP-NGCP-M-519 1400114589 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-975 HWYH-1100 TCF-1 N/A 09-Jun-19 7.30 AM Saleem CLOSED
Rajendran
at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
521 CPP-NGCP-M-520 1400114809 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH--1313 FL at TCF-1 TCF-1 N/A 09-Jun-19 7.30 AM Saleem CLOSED
CPP Pipe yard. Rajendran

Field pipe bending Inspection for


Mr.
522 CPP-NGCP-M-521 1400114853 Mechanical SATIP-L-450-04 SAIC-L-2114 (10"X0.438”), HRDH--902 FL at TCF-1 TCF-1 N/A 09-Jun-19 5.50 AM Saleem CLOSED
Rajendran
CPP Pipe yard.

523 CPP-NGCP-M-522 1400114799 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving Inspection for 60 HRDH-1155FL TA-669353 09-Jun-19 7.00 AM Umair Mr. Ashok CLOSED
pipes (8"X0.344') at HRDH-1155
Stringing and pipe laying inspection at
524 CPP-NGCP-M-523 1400114801 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1155FL TA-669353 09-Jun-19 8:00 AM Umair Mr. Ashok CLOSED
HRDH-1155
Field pipe bending Inspection for
Mr.
525 CPP-NGCP-M-524 1400115956 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-975 HWYH-1100 TCF-1 N/A 10-Jun-19 7.30 AM Saleem CLOSED
Rajendran
at TCF-1 CPP Pipe yard.
Material receiving inspection for 127
HWYH-LSS-
526 CPP-NGCP-M-525 1400115902 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (16" X0.562") At HWYH-LSS- TRL-1 N/A 10-Jun-19 9.00 AM Lokesh Mr. Suresh CLOSED
TRL-1
Material receiving inspection for 55
527 CPP-NGCP-M-526 1400115979 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-912 N/A 10-Jun-19 9.30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X0. 344") At HWYH-912
Material receiving inspection for 19
528 CPP-NGCP-M-527 1400116005 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8" X0. 344") @ HWYH-1065 HWYH-1065 N/A 10-Jun-19 10.00 AM Lokesh Mr. Suresh CLOSED
Stringing and Pipelaying inspection at
529 CPP-NGCP-M-528 1400116024 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1023 TA-445827 10-Jun-19 10:00 AM Lokesh Mr. Suresh CLOSED
HWYH-1023
Material receiving Inspection for 30
530 CPP-NGCP-M-529 1400116285 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1138FL TA-669297 10-Jun-19 7.00 AM Umair Mr. Ashok CLOSED
pipes (8"X0.344') at HRDH-1138 FL
Stringing and pipe laying inspection at
531 CPP-NGCP-M-530 1400116189 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1138 HRDH-1138FL TA-669297 10-Jun-19 7.30 AM Umair Mr. Ashok CLOSED

Material receiving Inspection for 90


532 CPP-NGCP-M-531 1400116276 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1138FL TA-669297 10-Jun-19 7.45 AM Umair Mr. Ashok CLOSED
pipes (8"X0.344') at HRDH-1189 FL
Material receiving Inspection for 60
533 CPP-NGCP-M-532 1400116190 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1138FL TA-669297 10-Jun-19 8.00 AM Umair Mr. Ashok CLOSED
pipes (8"X0.344') at HRDH-1197 FL
534 CPP-NGCP-M-533 1400116286 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection at HRDH-1138FL TA-669297 10-Jun-19 8.15 AM Umair Mr. Ashok CLOSED
HRDH-1197
Material receiving Inspection for 247
Mr.
535 CPP-NGCP-M-534 1400116334 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8''x 0.344)) AT TCF-1 CPP Pipe TCF-1 N/A 10-Jun-19 08.00 AM Saleem CLOSED
Rajendran
yard pipe bending Inspection for
Field
Mr.
536 CPP-NGCP-M-535 1400116407 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1003FL TCF-1 TCF-1 N/A 10-Jun-19 7.30 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Field pipe bending Inspection for Reject -
Mr. RFI has been canceled due to
537 CPP-NGCP-M-536 1400116376 Mechanical SATIP-L-450-04 SAIC-L-2114 (10"X0.438”), HRDH--902 FL at TCF-1 TCF-1 N/A 10-Jun-19 7.30 AM Saleem Job not
Machine is not working
Rajendran Ready
CPP Pipe yard.

thurst boring and pipe pulling activity at


538 CPP-NGCP-M-537 1400116563 Mechanical SATIP-L-450-04 SAIC-L-2120 HRDH-1160 FL TA-843565 11-Jun-19 08.00 AM Shankar Mr. Ashok CLOSED
HRDH-1160

Field pipe bending Inspection


Mr.
539 CPP-NGCP-M-538 1400116695 Mechanical SATIP-L-450-04 SAIC-L-2114 for (8"X0.344”), HRDH-1003FL , TCF-1 N/A 11-Jun-19 7.30 AM Saleem CLOSED
Rajendran
HRDH-1143FL TCF-1 CPP Pipe yard.
Material receiving Inspection for 120 Mr.
540 CPP-NGCP-M-539 1400117065 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1197FL TA-843975 11-Jun-19 8.00 AM Umair CLOSED
pipes (8"X0.344') at HRDH-1153 FL Rajendran
Stringing and pipe laying inspection at Mr.
541 CPP-NGCP-M-540 1400117046 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1153 FL TA-843975 11-Jun-19 8.15 AM Umair CLOSED
HRDH-1153 Rajendran
Material receiving Inspection for 173
542 CPP-NGCP-M-541 1400117047 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-AK-RH TA-843960 11-Jun-19 08.00 AM Saleem
Mr. CLOSED
pipes (16"x0.469" API 5L GR.65Q) AT Rajendran
HRDH-AK-GGM
Stringing and pipe laying inspection at Mr.
543 CPP-NGCP-M-542 1400117059 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-AK-RH TA-843960 11-Jun-19 8.15 AM Umair CLOSED
HRDH-AK-GGM Rajendran
Material receiving Inspection for 30
544 CPP-NGCP-M-543 1400117075 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1138 FL TA-669297 11-Jun-19 8.00 AM Umair Mr. Ashok CLOSED
pipes (8"X0.344') at HRDH-1138 FL
Field pipe bending Inspection for
545 CPP-NGCP-M-544 1400116429 Mechanical SATIP-L-450-04 SAIC-L-2114 TCF-1 N/A 11-Jun-19 7.30 AM Saleem
Mr. CLOSED
(8"X0.344”), HWYH-975 HWYH-1100, Rajendran
HWYH 1071 at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
546 CPP-NGCP-M-545 1400117639 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-975 HWYH-1100, TCF-1 N/A 12-Jun-19 7.30 AM Saleem CLOSED
Rajendran
at TCF-1 CPP Pipe yard.
Stringing and Pipelaying inspection at
547 CPP-NGCP-M-546 1400117627 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1023 TA-445827 12-Jun-19 10:00 AM Lokesh Mr. Suresh CLOSED
HWYH-1023
Material receiving inspection for 150
548 CPP-NGCP-M-547 1400117610 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1065 N/A 12-Jun-19 10.00 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") at HWYH-1065
Field pipe bending Inspection for Mr.
549 CPP-NGCP-M-548 1400117765 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1143 at TCF-1 TCF-1 N/A 12-Jun-19 7.30 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
10"X 0.438 material receiving Mr.
550 CPP-NGCP-M-549 1400117879 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF-1 N/A 12-Jun-19 7.30 AM Saleem CLOSED
inspection Qty 60 location tcf1 yard Rajendran

551 CPP-NGCP-M-550 1400117869 Mechanical SATIP-L-450-04 SAIC-L-2112 8"X0.344" Material receiving inspection HRDH-1147 FL TA-669416 12-Jun-19 8.00 AM Umair Mr. Ashok CLOSED
location HRDH - 1147

552 CPP-NGCP-M-551 1400118710 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving Inspection for 60 HRDH-1154 FL TA-669358 13-Jun-19 7.00 AM Umair Mr. Ashok CLOSED
pipes (8"X0.344') at HRDH-1154 FL

Stringing and pipe laying inspection at


553 CPP-NGCP-M-552 1400118711 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1154 FL TA-669358 13-Jun-19 7.30 AM Umair Mr. Ashok CLOSED
HRDH-1154

Storage and Preservation of Pipes.at


554 CPP-NGCP-M-553 1400118736 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-902 FL TA-843606 13-Jun-19 08.00 AM Umair Taleb CLOSED
HRDH-902

Storage and Preservation of Pipes.at


555 CPP-NGCP-M-554 1400118744 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF-1 N/A 13-Jun-19 08.15 AM Saleem Mr. Ashok CLOSED
Tcf1 yard

Field pipe bending Inspection


Mr.
556 CPP-NGCP-M-555 1400118731 Mechanical SATIP-L-450-04 SAIC-L-2114 for (8"X0.344”), HRDH-1153FL TCF-1 TCF-1 N/A 13-Jun-19 7.30 AM Saleem CLOSED
Rajendran
CPP Pipe yard.

Field pipe bending Inspection for Reject -


557 CPP-NGCP-M-556 1400118598 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-975 HWYH-1100, TCF-1 N/A 13-Jun-19 7.30 AM Saleem
Mr. Job not Cancelled due to job not ready
Rajendran Ready
at TCF-1 CPP Pipe yard.

Field pipe bending Inspection for Reject -


558 CPP-NGCP-M-557 1400118622 Mechanical SATIP-L-450-04 SAIC-L-2114 (36"X0.688”), HWYH GGM TRL-1 TCF-1 N/A 13-Jun-19 7.30 AM Saleem
Mr. Job not Cancelled due to job not ready
Rajendran Ready
, at TCF-1 CPP Pipe yard.

Field pipe bending Inspection for Reject -


Mr.
559 CPP-NGCP-M-558 1400118561 Mechanical SATIP-L-450-04 SAIC-L-2114 (36"X0.688”), HWYH GGM TRL-1 TCF-1 N/A 14-Jun-19 7.30 AM Saleem Job not Cancelled due to job not ready
Rajendran Ready
, at TCF-1 CPP Pipe yard.

thurst boring and pipe pulling activity at


560 CPP-NGCP-M-559 1400119067 Mechanical SATIP-L-450-04 SAIC-L-2120 HWYH-EJ-RH TA-446045 14-Jun-19 7.30 AM Lokesh Mr. Suresh CLOSED
HWYH-EJ-RH

Field pipe bending Inspection for


Mr.
561 CPP-NGCP-M-560 1400119263 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-975 HWYH-1100, TCF-1 N/A 15-Jun-19 7.30 AM Saleem CLOSED
Rajendran
at TCF-1 CPP Pipe yard.

Field pipe bending Inspection for Reject -


Mr. RE-SHCEDULE TO 16-JUNE-
562 CPP-NGCP-M-561 1400119244 Mechanical SATIP-L-450-04 SAIC-L-2114 (36"X0.688”), HWYH GGM TRL-1 TCF-1 N/A 15-Jun-19 7.30 AM Saleem Job not
2019
Rajendran Ready
, at TCF-1 CPP Pipe yard.

Field pipe bending Inspection for


563 CPP-NGCP-M-562 1400119883 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-AK-GGM TCF-1 N/A 15-Jun-19 7.00 AM Saleem
Mr. CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.

Field pipe bending Inspection for


564 CPP-NGCP-M-563 1400119877 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1153, at TCF-1 TCF-1 N/A 15-Jun-19 7.30 AM Saleem
Mr. CLOSED re-schedule to 16-JUNE-2019
Rajendran
CPP Pipe yard.

Material receiving Inspection for 255 Mr.


565 CPP-NGCP-M-564 1400119893 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (10''x 0.438)) AT TCF-1 CPP TCF-1 N/A 15-Jun-19 08.00 AM Saleem CLOSED
Rajendran
Pipe yard

Material receiving Inspection for 90


Mr.
566 CPP-NGCP-M-565 1400119865 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8''x 0.344)) AT TCF-1 CPP Pipe TCF-1 N/A 15-Jun-19 08.30 AM Saleem CLOSED
Rajendran
yard

Field pipe bending Inspection for


Mr.
567 CPP-NGCP-M-566 1400120064 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-975,HWYH-1112, TCF-1 N/A 16-Jun-19 7.30 AM Saleem CLOSED
Rajendran
HWYH-1118 at TCF-1 CPP Pipe yard.

Stringing and Pipe laying inspection at


568 CPP-NGCP-M-567 1400120278 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-934 TA-445843 16-Jun-19 9:00 AM Lokesh Mr. Suresh CLOSED
HWYH-934
Stringing and Pipelaying inspection at
569 CPP-NGCP-M-568 1400120343 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1023 TA-445827 16-Jun-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-1023

Material receiving inspection for 150


570 CPP-NGCP-M-569 1400120353 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1102 N/A 16-Jun-19 10.00 AM Lokesh Mr. Suresh CLOSED
Pipes (8" X0. 344") At HWYH-1102

Field pipe bending Inspection for


Mr.
571 CPP-NGCP-M-570 1400120558 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-BK-GGM TCF-1 N/A 16-Jun-19 7.00 AM Saleem CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.

Material receiving Inspection for 150


572 CPP-NGCP-M-571 1400120529 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8''x 0.344)) AT TCF-1 CPP Pipe TCF-1 N/A 16-Jun-19 7.05 AM Saleem
Mr. CLOSED
Rajendran
yard

Material receiving Inspection for 170


573 CPP-NGCP-M-572 1400120462 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (10''x 0.438)) AT TCF-1 CPP TCF-1 N/A 16-Jun-19 7.30 AM Saleem
Mr. CLOSED
Rajendran
Pipe yard
Material receiving Inspection for 70
574 CPP-NGCP-M-573 1400121478 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1144 FL N/A 17-Jun-19 7.00 AM Umair Mr. Rajesh CLOSED
pipes (8''x 0.344)) AT HRDH-1144 FL
Material receiving Inspection for 110
575 CPP-NGCP-M-574 1400121442 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1147 FL N/A 17-Jun-19 7.30 AM Umair Mr. Rajesh CLOSED
pipes (8''x 0.344)) AT HRDH-1147 FL
Stringing and pipe laying inspection at
576 CPP-NGCP-M-575 1400121485 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1189 FL N/A 17-Jun-19 7.45 AM Umair Mr. Rajesh CLOSED
HRDH-1189 FL
Stringing and pipe laying inspection at
577 CPP-NGCP-M-576 1400121493 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1144 FL N/A 17-Jun-19 8.00 AM Umair Mr. Rajesh CLOSED
HRDH-1144 FL
Stringing and pipe laying inspection at
578 CPP-NGCP-M-577 1400121471 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1147 FL N/A 17-Jun-19 8.30 AM Umair Mr. Rajesh CLOSED
HRDH-1147 FL
Material receiving Inspection for 90 Mr.
579 CPP-NGCP-M-578 1400121514 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8''x 0.344)) AT TCF-1 CPP Pipe TCF-1 N/A 17-Jun-19 7.00 AM Saleem CLOSED
Rajendran
yard pipe bending Inspection for
Field
Mr.
580 CPP-NGCP-M-579 1400121534 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1153, at TCF-1 TCF-1 N/A 17-Jun-19 7.10 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Field pipe bending Inspection for
Mr.
581 CPP-NGCP-M-580 1400121506 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-BK-GGM TCF-1 N/A 17-Jun-19 7.20 AM Saleem CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
582 CPP-NGCP-M-581 1400121398 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1112, HWYH- TCF-1 N/A 17-Jun-19 7.30 AM Saleem
Mr. CLOSED
Rajendran
1118 at TCF-1 CPP Pipe yard.
Stringing and Pipe laying inspection at
583 CPP-NGCP-M-582 1400121332 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-934 TA-445843 17-Jun-19 9:00 AM Lokesh Mr. Suresh CLOSED
HWYH-934
Material receiving inspection for 30
584 CPP-NGCP-M-583 1400121454 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1065 N/A 17-Jun-19 10.00 AM Lokesh Mr. Suresh CLOSED
pipes (8" X0. 344") At HWYH-1065
Material receiving inspection for 120
585 CPP-NGCP-M-584 1400121441 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1079 N/A 17-Jun-19 10.00 AM Lokesh Mr. Suresh CLOSED
pipes (8" X0. 344") At HWYH-1079
Field pipe bending Inspection for
Mr.
586 CPP-NGCP-M-585 1400121842 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1112, HWYH- TCF-1 N/A 18-Jun-19 7.30 AM Saleem CLOSED
Rajendran
1118 at TCF-1 CPP Pipe yard.
Stringing and pipe laying inspection at HWYH-GK-
587 CPP-NGCP-M-586 1400122164 Mechanical SATIP-L-450-04 SAIC-L-2132 N/A 18-Jun-19 8:00 AM Lokesh Mr. Suresh CLOSED
HWYH-GK-RH RH
Stringing and Pipe laying inspection at
588 CPP-NGCP-M-587 1400122166 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-934 N/A 18-Jun-19 8:30 AM Lokesh Mr. Suresh CLOSED
HWYH-934
Stringing and pipe laying inspection at
589 CPP-NGCP-M-588 1400122183 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1036 N/A 18-Jun-19 9:00 AM Lokesh Mr. Suresh CLOSED
HWYH-1036
Stringing and pipe laying inspection at
590 CPP-NGCP-M-589 1400122082 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-CK-RH N/A 18-Jun-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-CK-RH
Field pipe bending Inspection for
Mr.
591 CPP-NGCP-M-590 1400122334 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1153, at TCF-1 TCF-1 N/A 18-Jun-19 7.10 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Field pipe bending Inspection for
Mr.
592 CPP-NGCP-M-591 1400122269 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-BK-GGM TCF-1 N/A 18-Jun-19 7.20 AM Saleem CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Material receiving Inspection for 90
Mr.
593 CPP-NGCP-M-592 1400122335 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8''x 0.344)) AT TCF-1 CPP Pipe TCF-1 N/A 18-Jun-19 7.30 AM Saleem CLOSED
Rajendran
yard
Field pipe bending Inspection for
Mr.
594 CPP-NGCP-M-593 1400122875 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1112, HWYH- TCF-1 N/A 19-Jun-19 7.30 AM Saleem CLOSED
Rajendran
1118 at TCF-1 CPP Pipe yard.
Stringing and pipe laying inspection at HWYH-GK-
595 CPP-NGCP-M-594 1400123275 Mechanical SATIP-L-450-04 SAIC-L-2132 N/A 19-Jun-19 9:00 AM Lokesh Mr. Ashok CLOSED
HWYH-GK-RH RH
Stringing and pipe laying inspection at
596 CPP-NGCP-M-595 1400123212 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-CK-RH N/A 19-Jun-19 9:00 AM Lokesh Mr. Ashok CLOSED
HWYH-CK-RH
Stringing and pipe laying inspection at
597 CPP-NGCP-M-596 1400123305 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1023 N/A 19-Jun-19 9:00 AM Lokesh Mr. Suresh CLOSED
HWYH-1023
Material receiving inspection for 150
598 CPP-NGCP-M-597 1400123281 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1067 N/A 19-Jun-19 10.00 AM Lokesh Mr. Suresh CLOSED
pipes (8" X0. 344") at HWYH-1067
Material receiving Inspection for 150
599 CPP-NGCP-M-598 1400123657 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1140 FL N/A 19-Jun-19 7.00 AM Umair Mr. Rajesh CLOSED
pipes (8''x 0.344)) AT HRDH-1140 FL
Stringing and pipe laying inspection at
600 CPP-NGCP-M-599 1400123645 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1148 FL N/A 19-Jun-19 7.30 AM Umair Mr. Rajesh CLOSED
HRDH-1148 FL
Field pipe bending Inspection for Mr.
601 CPP-NGCP-M-600 1400123599 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1153, at TCF-1 TCF-1 N/A 19-Jun-19 7.10 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Field pipe bending Inspection for
Mr.
602 CPP-NGCP-M-601 1400123590 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-BK-GGM TCF-1 N/A 19-Jun-19 7.20 AM Saleem CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
thurst boring and pipe pulling activity at
603 CPP-NGCP-M-602 1400123592 Mechanical SATIP-L-450-04 SAIC-L-2120 HRDH-1284 FL N/A 19-Jun-19 08.00 AM Shankar Mr. Rajesh CLOSED
HRDH-1284
Material receiving Inspection for 150
604 CPP-NGCP-M-603 1400124645 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1078 FL N/A 20-Jun-19 7.00 AM Umair Mr. Rajesh CLOSED
pipes (8''x 0.344)) AT HRDH-1078 FL
Stringing and pipe laying inspection at
605 CPP-NGCP-M-604 1400124637 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1078 FL HRDH-1078 FL N/A 20-Jun-19 7.30 AM Umair Mr. Rajesh CLOSED
Material receiving Inspection for 60
606 CPP-NGCP-M-605 1400124560 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1166 FL N/A 20-Jun-19 8.00 AM Umair Mr. Rajesh CLOSED
pipes (8''x 0.344)) AT HRDH-1166 FL
Stringing and pipe laying inspection at
607 CPP-NGCP-M-606 1400124709 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1166 FL N/A 20-Jun-19 8.30 AM Umair Mr. Rajesh CLOSED
HRDH-1166 FL
Material receiving Inspection for 30
608 CPP-NGCP-M-607 1400124688 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8''x 0.344)) AT HRDH-1163 FL HRDH-1163 FL N/A 20-Jun-19 8.45 AM Umair Mr. Rajesh CLOSED
Stringing and pipe laying inspection at
609 CPP-NGCP-M-608 1400124725 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1163 FL N/A 20-Jun-19 9.00 AM Umair Mr. Rajesh CLOSED
HRDH-1163 FL
Storage and Preservation of Pipes.at Mr.
610 CPP-NGCP-M-609 1400124697 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF-1 N/A 20-Jun-19 08.00 AM Saleem CLOSED
Tcf1 yard Rajendran
Field pipe bending Inspection for
Mr.
611 CPP-NGCP-M-610 1400124689 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-BK-GGM TCF-1 N/A 20-Jun-19 7.00 AM Saleem CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
612 CPP-NGCP-M-611 1400124710 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), start point HRDH- TCF-1 N/A 20-Jun-19 7.10 AM Saleem
Mr. Reject
Cancelled due
611,619,922,1063,1117, at TCF-1 CPP Rajendran to job not ready
Pipe yard.
Field pipe bending Inspection for
Mr.
613 CPP-NGCP-M-612 1400124235 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1091, HWYH- TCF-1 N/A 20-Jun-19 7.30 AM Saleem CLOSED
Rajendran
1118 at TCF-1 CPP Pipe yard.
614 CPP-NGCP-M-613 1400124404 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection at HWYH-1071 N/A 20-Jun-19 9:00 AM Lokesh Mr. Suresh CLOSED
HWYH-1071
Field pipe bending Inspection for
Mr.
615 CPP-NGCP-M-614 1400125285 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-BK-GGM TCF-1 N/A 22-Jun-19 7.00 AM Saleem CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
616 CPP-NGCP-M-615 1400125238 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1153, at TCF-1 TCF-1 N/A 22-Jun-19 7.10 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
617 CPP-NGCP-M-616 1400125414 Mechanical SATIP-L-450-04 SAIC-L-2120 thurst boring and pipe pulling activity at HWYH-LSS TA-445981 22-Jun-19 7.30 AM Lokesh Mr. Suresh CLOSED RE-SCHEDULE TO 23-JUNE-
HWYH-LSS 2019
Stringing and Pipe laying inspection at
618 CPP-NGCP-M-617 1400125400 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-934 TA-445843 22-Jun-19 9:00 AM Lokesh Mr. Suresh CLOSED
HWYH-934
Stringing and Pipelaying inspection at
619 CPP-NGCP-M-618 1400125425 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1023 TA-445827 22-Jun-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-1023
620 CPP-NGCP-M-619 1400125429 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving inspection for 120 HWYH-1096 N/A 22-Jun-19 10.00 AM Lokesh Mr. Suresh CLOSED
pipes(8" X0. 344") At HWYH-1096
Material receiving inspection for 90
621 CPP-NGCP-M-620 1400125402 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1072 N/A 22-Jun-19 10.00 AM Lokesh Mr. Suresh CLOSED
pipes (8" X0. 344") @ HWYH-1072
Field pipe bending Inspection for Mr. RE-SCHEDULE TO 23-JUNE-
622 CPP-NGCP-M-621 1400125527 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1091, HWYH- TCF-1 N/A 22-Jun-19 7.30 AM Saleem CLOSED
Rajendran 2019
1118 at TCF-1 CPP Pipe yard.

Field pipe bending Inspection for


Mr.
623 CPP-NGCP-M-622 1400126248 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-BK-GGM TCF-1 N/A 23-Jun-19 7.00 AM Saleem CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
624 CPP-NGCP-M-623 1400126230 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1128, at TCF-1 TCF-1 N/A 23-Jun-19 7.10 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Material receiving Inspection for 78
625 CPP-NGCP-M-624 1400126265 Mechanical SATIP-L-450-04 SAIC-L-2112 RH-IK N/A 23-Jun-19 9.00 AM Umair Mr. Rajesh CLOSED
pipes (20''x 0.500)) AT RH-IK
Material receiving inspection for 98 HWYH-HK-
626 CPP-NGCP-M-625 1400126281 Mechanical SATIP-L-450-04 SAIC-L-2112 RH N/A 23-Jun-19 10.00 AM Lokesh Mr. Suresh CLOSED
pipes (16" X0. 469") @ HWYH-HK-RH
Storage and preservation inspection of
627 CPP-NGCP-M-626 1400126374 Mechanical SATIP-L-450-04 SAIC-L-2112 stringing pipes (16" X0. 438") @ HWYH-CK-RH N/A 23-Jun-19 08.00 AM Lokesh Mr. Ashok CLOSED
HWYH-CK-RH
Field pipe bending Inspection for
628 CPP-NGCP-M-627 1400126780 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-BK-GGM TCF-1 N/A 24-Jun-19 7.00 AM Saleem
Mr. CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
629 CPP-NGCP-M-628 1400126791 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1128,1176 at TCF- TCF-1 N/A 24-Jun-19 7.10 AM Saleem CLOSED
Rajendran
1 CPP Pipe yard.

Material receiving inspection for 180


630 CPP-NGCP-M-629 1400126821 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1165 FL N/A 24-Jun-19 9.00 AM Umair Mr. Rajesh CLOSED
pipes (8" X0. 344") AT HRDH-1165

Stringing and pipe laying inspection at


631 CPP-NGCP-M-630 1400126848 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1165 FL N/A 24-Jun-19 10.00 AM Umair Mr. Rajesh CLOSED
HRDH-1165 FL

Material receiving inspection for 180


632 CPP-NGCP-M-631 1400126875 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1078 FL N/A 24-Jun-19 11.00 AM Umair Mr. Rajesh CLOSED
pipes (8" X0. 344") AT HRDH-1078

Stringing and pipe laying inspection at


633 CPP-NGCP-M-632 1400126893 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1078 FL N/A 24-Jun-19 13.00 PM Umair Mr. Rajesh CLOSED
HRDH-1078 FL
Material receiving Inspection for 24
Mr.
634 CPP-NGCP-M-633 1400126904 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (16''x 0.562)) AT TCF-1 CPP TCF-1 N/A 24-Jun-19 7.30 AM Saleem CLOSED
Rajendran
Pipe yard
Field pipe bending Inspection for
635 CPP-NGCP-M-634 1400126736 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1091, HWYH- TCF-1 N/A 24-Jun-19 7.30 AM Saleem
Mr. CLOSED re-schedule to 25-june-2019
Rajendran
1118 at TCF-1 CPP Pipe yard.
Material receiving inspection for 210
636 CPP-NGCP-M-635 1400127050 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1095 N/A 24-Jun-19 10.00 AM Lokesh Mr. Suresh CLOSED
pipes (8" X0. 344") @HWYH-1095
Field pipe bending Inspection for
Mr.
637 CPP-NGCP-M-636 1400127770 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-BK-GGM TCF-1 N/A 25-Jun-19 7.00 AM Saleem CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
638 CPP-NGCP-M-637 1400127771 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1128,1176 at TCF- TCF-1 N/A 25-Jun-19 7.10 AM Saleem CLOSED
Rajendran
1 CPP Pipe yard.
Fabrication Shop Application and Mr.
639 CPP-NGCP-M-638 1400127846 Mechanical SATIP-L-350-08 SAIC-L-2031 TCF-1 N/A 25-Jun-19 09.00 AM umair CLOSED
approral at TCF-1 Rajendran
Material receiving inspection for 108
640 CPP-NGCP-M-639 1400127873 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1095 N/A 25-Jun-19 10.00 AM Lokesh Mr. Suresh CLOSED
pipes(8" X0. 344") @HWYH-1095
Material receiving inspection for 228
641 CPP-NGCP-M-640 1400127828 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1089 N/A 25-Jun-19 10.00 AM Lokesh Mr. Suresh CLOSED
pipes (8" X0. 344") @HWYH-1089
Stringing and pipe laying inspection at HWYH-HK-
642 CPP-NGCP-M-641 1400127881 Mechanical SATIP-L-450-04 SAIC-L-2132 N/A 25-Jun-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-HK-RH RH
Field pipe bending Inspection for
643 CPP-NGCP-M-642 1400128520 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-AK-GGM TCF-1 N/A 26-Jun-19 7.00 AM Saleem
Mr. CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
644 CPP-NGCP-M-643 1400128585 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), 1176 at TCF-1 CPP Pipe TCF-1 N/A 26-Jun-19 7.10 AM Saleem CLOSED
Rajendran
yard.
Field pipe bending Inspection for
645 CPP-NGCP-M-644 1400127260 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1091, HWYH- TCF-1 N/A 26-Jun-19 7.30 AM Saleem
Mr. CLOSED
Rajendran
1003 at TCF-1 CPP Pipe yard.
Material receiving inspection for 270
646 CPP-NGCP-M-645 1400128402 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1074 N/A 26-Jun-19 10.00 AM Lokesh Mr. Suresh CLOSED
pipes (8" X0. 344") @HWYH-1074
Material receiving inspection for 288
647 CPP-NGCP-M-646 1400128454 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1114 N/A 26-Jun-19 10.00 AM Lokesh Mr. Suresh CLOSED
pipes (8" X0. 344") @HWYH-1114
Field pipe bending Inspection for
648 CPP-NGCP-M-647 1400128909 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1091, HWYH- TCF-1 N/A 27-Jun-19 7.30 AM Saleem
Mr. CLOSED
Rajendran
1003 at TCF-1 CPP Pipe yard.
Stringing and pipe laying inspection at
649 CPP-NGCP-M-648 1400129402 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-CK-RH N/A 27-Jun-19 9:30 AM Lokesh Mr. Ashok CLOSED
HWYH-CK-RH
Stringing and pipe laying inspection at HWYH-GK-
650 CPP-NGCP-M-649 1400129473 Mechanical SATIP-L-450-04 SAIC-L-2132 N/A 27-Jun-19 9:30 AM Lokesh Mr. Ashok CLOSED
HWYH-GK-RH RH
Stringing and pipe laying inspection at
651 CPP-NGCP-M-650 1400129421 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1071 N/A 27-Jun-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-1071
Stringing and pipe laying inspection at
652 CPP-NGCP-M-651 1400129474 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-934 N/A 27-Jun-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-934
Stringing and pipe laying inspection at
653 CPP-NGCP-M-652 1400129410 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1023 N/A 27-Jun-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-1023
Material receiving inspection for 72
654 CPP-NGCP-M-653 1400129411 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1114 N/A 27-Jun-19 10.00 AM Lokesh Mr. Suresh CLOSED
pipes (8" X0. 344") @HWYH-1114
Field pipe bending Inspection for
Mr.
655 CPP-NGCP-M-654 1400129510 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-BK-GGM TCF-1 N/A 27-Jun-19 7.00 AM Saleem CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
656 CPP-NGCP-M-655 1400129564 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), 1176 at TCF-1 CPP Pipe TCF-1 N/A 27-Jun-19 7.10 AM Saleem CLOSED
Rajendran
yard.
Material receiving inspection for 354
657 CPP-NGCP-M-656 1400129565 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1192 FL N/A 27-Jun-19 08.00 AM Umair Mr. Rajesh CLOSED
pipes (8" X0. 344") @HRDH-1192
Material receiving inspection for 108
658 CPP-NGCP-M-657 1400129573 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1163 FL N/A 27-Jun-19 10.00 AM Umair Mr. Rajesh CLOSED
pipes (8" X0. 344") @HRDH-1163
659 CPP-NGCP-M-658 1400129574 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving inspection for 150 HRDH-1169 FL N/A 27-Jun-19 11.00 AM Umair Mr. Rajesh CLOSED
pipes (8" X0. 344") @HRDH-1169
Stringing and pipe laying inspection at
660 CPP-NGCP-M-659 1400129497 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1163 FL N/A 27-Jun-19 10.30 AM Umair Mr. Rajesh CLOSED
HRDH-1163 FL
Storage and Preservation of Pipes.at Mr.
661 CPP-NGCP-M-660 1400129575 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF-1 N/A 27-Jun-19 08.00 AM Saleem CLOSED
Tcf1 yard Rajendran
Field pipe bending Inspection for
662 CPP-NGCP-M-661 1400129547 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), 1176 at TCF-1 CPP Pipe TCF-1 N/A 28-Jun-19 7.20 AM Saleem
Mr. CLOSED
Rajendran
yard.
Field pipe bending Inspection for
Mr.
663 CPP-NGCP-M-662 1400130184 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-AK,BK,CK TCF-1 N/A 29-Jun-19 7.00 AM Saleem CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
664 CPP-NGCP-M-663 1400130089 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), 1154 at TCF-1 CPP Pipe TCF-1 N/A 29-Jun-19 7.10 AM Saleem
Mr. CLOSED
Rajendran
yard.
Material receiving inspection for 60
665 CPP-NGCP-M-664 1400130108 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1199 FL N/A 29-Jun-19 08.00 AM Umair Mr. Rajesh CLOSED
pipes (8" X0. 344") @HRDH-1199
Material receiving inspection for 90
666 CPP-NGCP-M-665 1400130154 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1169 FL N/A 29-Jun-19 08.15 AM Umair Mr. Rajesh CLOSED
pipes (8" X0. 344") @HRDH-1187
Field pipe bending Inspection for
Mr.
667 CPP-NGCP-M-666 1400130113 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1091, HWYH- TCF-1 N/A 29-Jun-19 7.30 AM Saleem CLOSED
Rajendran
1003 at TCF-1 CPP Pipe yard.
Stringing and pipe laying inspection at
668 CPP-NGCP-M-667 1400130086 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-CJ-RH N/A 29-Jun-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-CJ-RH
Material receiving inspection for 162
669 CPP-NGCP-M-668 1400130070 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1114 N/A 29-Jun-19 10.00 AM Lokesh Mr. Suresh CLOSED
pipes (8" X0. 344") @HWYH-1114
670 CPP-NGCP-M-669 1400130088 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving inspection for 264 HWYH-1074 N/A 29-Jun-19 10.00 AM Masood Mr. Suresh CLOSED
pipes (8" X0. 344") @ HWYH-1074
Field pipe bending Inspection for
Mr.
671 CPP-NGCP-M-670 1400130815 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1091, HWYH- TCF-1 N/A 30-Jun-19 7.30 AM Saleem CLOSED
Rajendran
1003 at TCF-1 CPP Pipe yard.

672 CPP-NGCP-M-671 1400130789 Mechanical SATIP-L-450-04 SAIC-L-2120 thurst boring and pipe pulling activity at HWYH-BK-RH TA-445888 30-Jun-19 07.15 AM Lokesh Mr. Suresh CLOSED
HWYH-BK-RH
Field pipe bending Inspection for
Mr.
673 CPP-NGCP-M-672 1400131142 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-AK,BK,CK TCF-1 N/A 30-Jun-19 7.00 AM Saleem
Rajendran CLOSED
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
674 CPP-NGCP-M-673 1400131187 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), 1154 at TCF-1 CPP Pipe TCF-1 N/A 30-Jun-19 7.10 AM Saleem CLOSED
Rajendran
yard.
675 CPP-NGCP-M-674 1400131255 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection at HWYH-1102 N/A 30-Jun-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-1102
Field pipe bending Inspection for
Mr.
676 CPP-NGCP-M-675 1400131878 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-AK,BK,CK TCF-1 N/A 01-Jul-19 7.00 AM Saleem CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
677 CPP-NGCP-M-676 1400131905 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), 1161,1194 at TCF-1 CPP TCF-1 N/A 01-Jul-19 7.10 AM Saleem
Mr. CLOSED
Rajendran
Pipe yard.
Stringing and pipe laying inspection at
678 CPP-NGCP-M-677 1400131941 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1102 N/A 01-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-1102
Material receiving inspection for 30
679 CPP-NGCP-M-678 1400132003 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1114 N/A 01-Jul-19 10.00 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @HWYH-1114
Material receiving inspection for 60
680 CPP-NGCP-M-679 1400131930 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1074 N/A 01-Jul-19 11.00 AM Masood Mr. Suresh CLOSED
pipes (8" X0. 344") @HWYH-1074
Material receiving inspection for 90
681 CPP-NGCP-M-680 1400131978 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1073 N/A 01-Jul-19 10.00 AM Lokesh Mr. Suresh CLOSED
pipes (8" X0. 344") @HWYH-1073
Material receiving inspection for 60
682 CPP-NGCP-M-681 1400131985 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1070 N/A 01-Jul-19 11.00 AM Masood Mr. Suresh CLOSED
pipes (8" X0. 344") @ HWYH-1070
Field pipe bending Inspection for
683 CPP-NGCP-M-682 1400132084 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1091, HWYH- TCF-1 N/A 01-Jul-19 7.30 AM Saleem
Mr. CLOSED
Rajendran
1003 at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
684 CPP-NGCP-M-683 1400132646 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1091, HWYH- TCF-1 N/A 02-Jul-19 7.30 AM Saleem CLOSED
Rajendran
1003 at TCF-1 CPP Pipe yard.
Stringing and pipe laying inspection at
685 CPP-NGCP-M-684 1400132638 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1102 N/A 02-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-1102
Material receiving inspection for 90
686 CPP-NGCP-M-685 1400132733 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-952 N/A 02-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") at HWYH-952
Material receiving inspection for 216
687 CPP-NGCP-M-686 1400132734 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1073 N/A 02-Jul-19 10.00 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") at HWYH-1073
Material receiving inspection for 108
688 CPP-NGCP-M-687 1400132686 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1070 N/A 02-Jul-19 11.00 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") at HWYH-1070
Reject -
689 CPP-NGCP-M-688 1400132689 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection at HWGCP-1 N/A 02-Jul-19 9:30 AM Lokesh Mr. Suresh Job not
HWGCP-1 Ready
Field pipe bending Inspection for
690 CPP-NGCP-M-689 1400132434 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-AK,BK,CK TCF-1 N/A 02-Jul-19 7.00 AM Saleem
Mr. CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
691 CPP-NGCP-M-690 1400132435 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), 1161,1194 at TCF-1 CPP TCF-1 N/A 02-Jul-19 7.10 AM Saleem CLOSED
Rajendran
Pipe yard.
Field pipe bending Inspection for
692 CPP-NGCP-M-691 1400133321 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-AK,BK,CK TCF-1 N/A 03-Jul-19 7.00 AM Saleem
Mr. CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
693 CPP-NGCP-M-692 1400133348 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH- 1161,1194 at TCF- TCF-1 N/A 03-Jul-19 7.10 AM Saleem CLOSED
Rajendran
1 CPP Pipe yard.
Field pipe bending Inspection for
694 CPP-NGCP-M-693 1400133915 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1091, HWYH- TCF-1 N/A 03-Jul-19 7.30 AM Saleem
Mr. CLOSED
Rajendran
1003 at TCF-1 CPP Pipe yard.
Stringing and pipe laying inspection at
695 CPP-NGCP-M-694 1400133897 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-912 N/A 03-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-912
Reject -
Stringing and pipe laying inspection at
696 CPP-NGCP-M-695 1400133867 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1093 N/A 03-Jul-19 9:30 AM Lokesh Mr. Suresh Job not
HWYH-1093 Ready
Stringing and pipe laying inspection at
697 CPP-NGCP-M-696 1400133859 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-BK-RH N/A 03-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-BK-RH
Field pipe bending Inspection for Mr.
698 CPP-NGCP-M-697 1400135164 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1091, HWYH- TCF-1 N/A 04-Jul-19 7.30 AM Saleem CLOSED
Rajendran
1003 at TCF-1 CPP Pipe yard.
Stringing and pipe laying inspection at
699 CPP-NGCP-M-698 1400135052 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-912 N/A 04-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-912
HWYH LSS
700 CPP-NGCP-M-699 1400135093 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection at N/A 04-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH LSS TRL-1 TRL-1
Reject -
Stringing and pipe laying inspection at HWYH GGM
701 CPP-NGCP-M-700 1400135083 Mechanical SATIP-L-450-04 SAIC-L-2132 N/A 04-Jul-19 9:30 AM Lokesh Mr. Suresh Job not
HWYH GGM TRL-2 TRL-2 Ready
Field pipe bending Inspection for
Mr.
702 CPP-NGCP-M-701 1400134765 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-AK,BK,CK TCF-1 N/A 04-Jul-19 7.00 AM Saleem CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
703 CPP-NGCP-M-702 1400134766 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH- 1306,1135 at TCF- TCF-1 N/A 04-Jul-19 7.10 AM Saleem
Mr. CLOSED
Rajendran
1 CPP Pipe yard.
Storage and Preservation of Pipes.at Mr.
704 CPP-NGCP-M-703 1400134793 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF-1 N/A 04-Jul-19 08.00 AM Saleem CLOSED
Tcf1 yard Rajendran
Field pipe bending Inspection for
Mr.
705 CPP-NGCP-M-704 1400134794 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-AK,BK,CK TCF-1 N/A 05-Jul-19 7.00 AM Saleem CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Stringing and pipe laying inspection at
706 CPP-NGCP-M-705 1400136116 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1199 FL N/A 06-Jul-19 7.00 AM Umair Mr. Rajesh CLOSED
HRDH-1199 FL
Stringing and pipe laying inspection at
707 CPP-NGCP-M-706 1400136194 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1192 FL N/A 06-Jul-19 8.00 AM Umair Mr. Rajesh CLOSED
HRDH-1192FL
Material receiving Inspection for 72
708 CPP-NGCP-M-707 1400136080 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1142 FL N/A 06-Jul-19 9.00 AM Umair Mr. Rajesh CLOSED
pipes (8''x 0.344)) AT HRDH-1142 FL
Material receiving Inspection for 72
709 CPP-NGCP-M-708 1400136081 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1151 FL N/A 06-Jul-19 10.00 AM Umair Mr. Rajesh CLOSED
pipes (8''x 0.344)) AT HRDH-1151 FL
Material receiving Inspection for 150
710 CPP-NGCP-M-709 1400136207 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1192 FL N/A 06-Jul-19 11.00 AM Umair Mr. Rajesh CLOSED
pipes (8''x 0.344)) AT HRDH-1192 FL
Material receiving Inspection for 150
711 CPP-NGCP-M-710 1400136236 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1191 FL N/A 06-Jul-19 14.00 PM Umair Mr. Rajesh CLOSED
pipes (8''x 0.344)) AT HRDH-1191 FL
Field pipe bending Inspection for
Mr.
712 CPP-NGCP-M-711 1400136171 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-AK,BK,CK TCF-1 N/A 06-Jul-19 7.00 AM Saleem CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
713 CPP-NGCP-M-712 1400136208 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH- 1306,1135 at TCF- TCF-1 N/A 06-Jul-19 7.10 AM Saleem CLOSED
Rajendran
1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
714 CPP-NGCP-M-713 1400136053 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1091, HWYH- TCF-1 N/A 06-Jul-19 7.30 AM Saleem CLOSED
Rajendran
1003 at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr. RE-SCHEDULE TO 7-JULY-
715 CPP-NGCP-M-714 1400136083 Mechanical SATIP-L-450-04 SAIC-L-2114 (36"X0.688”), HWYH GGM TRL-1 at TCF-1 N/A 06-Jul-19 7.30 AM Saleem CLOSED
Rajendran 2019
TCF-1 CPP Pipe yard.
Material receiving inspection for 60
716 CPP-NGCP-M-715 1400136093 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1095 N/A 06-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X0. 344") @HWYH-1095
Material receiving inspection for 90
717 CPP-NGCP-M-716 1400136011 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1066 N/A 06-Jul-19 10:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X0. 344") @ HWYH-1066
Stringing and pipe laying inspection at
718 CPP-NGCP-M-717 1400136084 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-912 N/A 06-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-912
Stringing and pipe laying inspection at HWYH GGM
719 CPP-NGCP-M-718 1400136009 Mechanical SATIP-L-450-04 SAIC-L-2132 N/A 06-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH GGM TRL-1 TRL-1
Field pipe bending Inspection for
Mr.
720 CPP-NGCP-M-719 1400137372 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-AK,BK,CK TCF-1 N/A 07-Jul-19 7.00 AM Saleem CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
721 CPP-NGCP-M-720 1400137428 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH- 1306,1307,1078 at TCF-1 N/A 07-Jul-19 7.10 AM Saleem CLOSED
Rajendran
TCF-1 CPP Pipe yard.
722 CPP-NGCP-M-721 1400137460 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving Inspection for 96 HRDH-1168 FL N/A 07-Jul-19 11.00 AM Umair Mr. Rajesh CLOSED
pipes (8''x 0.344)) AT HRDH-1168 FL
Material receiving Inspection for 36
723 CPP-NGCP-M-722 1400137437 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1148 FL N/A 07-Jul-19 09.00 AM Umair Mr. Rajesh CLOSED
pipes (8''x 0.344)) AT HRDH-1148 FL
Stringing and pipe laying inspection at
724 CPP-NGCP-M-723 1400137473 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1169 FL N/A 07-Jul-19 7.00 AM Umair Mr. Rajesh CLOSED
HRDH-1169 FL
Field pipe bending Inspection for
Mr.
725 CPP-NGCP-M-724 1400136646 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1091, HWYH- TCF-1 N/A 07-Jul-19 7.30 AM Saleem CLOSED
Rajendran
1003 at TCF-1 CPP Pipe yard.
Stringing and pipe laying inspection at
726 CPP-NGCP-M-725 1400137735 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1091 N/A 07-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH 1091 km0+200
Stringing and pipe laying inspection at
727 CPP-NGCP-M-726 1400137727 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH 1067 N/A 07-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH 1067 m0+150 to km0+450
728 CPP-NGCP-M-727 1400137737 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection at HWYH 1071 N/A 07-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH 1071 km1+350~km1+700
Field pipe bending Inspection for
Mr.
729 CPP-NGCP-M-728 1400136714 Mechanical SATIP-L-450-04 SAIC-L-2114 (36"X0.688”), HWYH GGM TRL-1 at TCF-1 N/A 08-Jul-19 7.30 AM Saleem CLOSED
Rajendran
TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
730 CPP-NGCP-M-729 1400138329 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1087, HWYH- TCF-1 N/A 08-Jul-19 7.30 AM Saleem CLOSED
Rajendran
1003 at TCF-1 CPP Pipe yard.
Stringing and pipe laying inspection at
731 CPP-NGCP-M-730 1400138414 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH 1065 N/A 08-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH 1065
Stringing and pipe laying inspection at
732 CPP-NGCP-M-731 1400138595 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH CJ-RH N/A 08-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH CJ-RH KM0+390-km1
Stringing and pipe laying inspection at HWYH LSS
733 CPP-NGCP-M-732 1400138623 Mechanical SATIP-L-450-04 SAIC-L-2132 N/A 08-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH LSS TRL-1 0+572~1+238 TRL-1
Stringing and pipe laying inspection at
734 CPP-NGCP-M-733 1400138547 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH 1067 N/A 08-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH 1067 m0+150 to km0+450
Material receiving inspection for 96
735 CPP-NGCP-M-734 1400139143 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1094 N/A 08-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ HWYH-1094
Material receiving inspection for 198
736 CPP-NGCP-M-735 1400139153 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN 2245 N/A 08-Jul-19 10:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN 2245
Field pipe bending Inspection for
737 CPP-NGCP-M-736 1400139108 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-AK,BK,CK TCF-1 N/A 08-Jul-19 7.00 AM Saleem
Mr. CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
738 CPP-NGCP-M-737 1400139126 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH- 1307,1078 at TCF- TCF-1 N/A 08-Jul-19 7.10 AM Saleem CLOSED
Rajendran
1 CPP Pipe yard.
Material receiving Inspection for 252
739 CPP-NGCP-M-738 1400139100 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1198 FL N/A 08-Jul-19 8.00 AM Umair Mr. Rajesh CLOSED
pipes (8''x 0.344)) AT HRDH-1198 FL
Stringing and pipe laying inspection at Mr.
740 CPP-NGCP-M-739 1400139119 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-RH-GK N/A 08-Jul-19 7.00 AM Irshad CLOSED
HRDH-RH-GK Rajendran
Field pipe bending Inspection for
Mr.
741 CPP-NGCP-M-740 1400140245 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-AK,BK,CK TCF-1 N/A 09-Jul-19 7.00 AM Saleem CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
742 CPP-NGCP-M-741 1400140229 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH- 1078 at TCF-1 TCF-1 N/A 09-Jul-19 7.10 AM Saleem CLOSED
Rajendran
CPP Pipereceiving
Material yard. Inspection for180
Mr.
743 CPP-NGCP-M-742 1400140254 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (36''x 0.688)) at TCF-1 CPP Pipe TCF-1 N/A 09-Jul-19 7.30 AM Irshad
Rajendran CLOSED
yard.
Material receiving Inspection for 150 Mr.
744 CPP-NGCP-M-743 1400140220 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8''x 0.344)) AT TCF-1 CPP Pipe TCF-1 N/A 09-Jul-19 8.00 AM Saleem CLOSED
Rajendran
yard.
Field pipe bending Inspection for
745 CPP-NGCP-M-744 1400140187 Mechanical SATIP-L-450-04 SAIC-L-2114 (36"X0.688”), HWYH GGM TRL-1 at TCF-1 N/A 09-Jul-19 7.30 AM Saleem
Mr. CLOSED
Rajendran
TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
746 CPP-NGCP-M-745 1400140251 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1087, HWYH- TCF-1 N/A 09-Jul-19 7.30 AM Saleem CLOSED
Rajendran
1003 at TCF-1 CPP Pipe yard.
Stringing and pipe laying inspection at
747 CPP-NGCP-M-746 1400140258 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH 1065 N/A 09-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH 1065
Stringing and pipe laying inspection at
748 CPP-NGCP-M-747 1400140284 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH 1067 N/A 09-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH 1067 m0+150 to km0+450
Stringing and pipe laying inspection at
749 CPP-NGCP-M-748 1400140265 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH CJ-RH N/A 09-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH CJ-RH KM0+390-km1
750 CPP-NGCP-M-749 1400140447 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving inspection for 120 HWYH-1107 N/A 09-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ HWYH-1107
Stringing and pipe laying inspection at
751 CPP-NGCP-M-750 1400140567 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-CK-RH N/A 09-Jul-19 9:30 AM Lokesh Mr. Ashok CLOSED
HWYH-CK-RH KM- 6+900
Stringing and pipe laying inspection at HWYH-GK-
752 CPP-NGCP-M-751 1400140577 Mechanical SATIP-L-450-04 SAIC-L-2132 N/A 09-Jul-19 9:30 AM Lokesh Mr. Ashok CLOSED
HWYH-GK-RH KM- 10+500 RH
753 CPP-NGCP-M-752 1400140585 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving inspection for 150 UMTN-2245 N/A 09-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UMTN-2245
Field pipe bending Inspection for
(8"X0.344”), HWYH-1065,HWYH- Mr.
754 CPP-NGCP-M-753 1400140882 Mechanical SATIP-L-450-04 SAIC-L-2114 1087, HWYH-1003 at TCF-1 CPP Pipe TCF-1 N/A 10-Jul-19 7.30 AM Saleem CLOSED
Rajendran
yard.
Stringing and pipe laying inspection at
755 CPP-NGCP-M-754 1400140868 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH CJ-RH N/A 10-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH CJ-RH KM0+390-km1
756 CPP-NGCP-M-755 1400141553 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection at HWYH 934 N/A 10-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH 934 km6+803
Stringing and pipe laying inspection at HWYH GGM
757 CPP-NGCP-M-756 1400141563 Mechanical SATIP-L-450-04 SAIC-L-2132 N/A 10-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
24" HWYH GGM TRL-1 TRL-1
Stringing and pipe laying inspection at
758 CPP-NGCP-M-757 1400141894 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH 1067 N/A 10-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH 1067 m0+150 to km0+450
Stringing and pipe laying inspection at
759 CPP-NGCP-M-758 1400141934 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH 1065 N/A 10-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH 1065
Field pipe bending Inspection for
760 CPP-NGCP-M-759 1400141287 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-AK,BK,CK TCF-1 N/A 10-Jul-19 7.00 AM Saleem
Mr. CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
761 CPP-NGCP-M-760 1400141257 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH- 1078 at TCF-1 TCF-1 N/A 10-Jul-19 7.10 AM Saleem CLOSED
Rajendran
CPP Pipereceiving
Material yard. Inspection for 201
Mr.
762 CPP-NGCP-M-761 1400141870 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (36''x 0.688)) at TCF-1 CPP Pipe TCF-1 N/A 10-Jul-19 7.30 AM Irshad CLOSED
Rajendran
yard.
Material receiving Inspection for 150 Mr.
763 CPP-NGCP-M-762 1400141888 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8''x 0.344)) AT TCF-1 CPP Pipe TCF-1 N/A 10-Jul-19 8.00 AM Saleem CLOSED
Rajendran
yard.
Field pipe bending Inspection for
(8"X0.344”), HWYH-1065,HWYH- Mr.
764 CPP-NGCP-M-763 1400143555 Mechanical SATIP-L-450-04 SAIC-L-2114 TCF-1 N/A 11-Jul-19 7.30 AM Saleem CLOSED
1087, HWYH-1003 at TCF-1 CPP Pipe Rajendran
yard.
Material receiving inspection for 165
765 CPP-NGCP-M-764 1400143545 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN-2245 N/A 11-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2245
Material receiving inspection for 120
766 CPP-NGCP-M-765 1400143534 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1107 N/A 11-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ HWYH-1107
Field pipe bending Inspection for
Mr.
767 CPP-NGCP-M-766 1400143131 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-AK,BK,CK TCF-1 N/A 11-Jul-19 7.00 AM Saleem CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for Mr.
768 CPP-NGCP-M-767 1400143482 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH- 1078 at TCF-1 TCF-1 N/A 11-Jul-19 7.10 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Material receiving Inspection for 144
769 CPP-NGCP-M-768 1400143492 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1183 FL N/A 11-Jul-19 8.30 AM Umair Mr. Rajesh CLOSED
pipes (8''x 0.344)) AT HRDH-1183FL
Material receiving Inspection for 144
770 CPP-NGCP-M-769 1400143507 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1186 FL N/A 11-Jul-19 9.00 AM Umair Mr. Rajesh CLOSED
pipes (8''x 0.344)) AT HRDH-1186FL
Material receiving Inspection for 216
771 CPP-NGCP-M-770 1400143523 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1284 FL N/A 11-Jul-19 9.30 AM Umair Mr. Rajesh CLOSED
pipes (8''x 0.344)) AT HRDH-1284 FL
Material receiving Inspection for 60
772 CPP-NGCP-M-771 1400143525 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1347 FL N/A 11-Jul-19 10.00 AM Umair Mr. Rajesh CLOSED
pipes (8''x 0.344)) AT HRDH-1347FL
Material receiving Inspection for 189
Mr.
773 CPP-NGCP-M-772 1400143517 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (36''x 0.688)) at TCF-1 CPP Pipe TCF-1 N/A 11-Jul-19 7.30 AM Irshad CLOSED
Rajendran
yard.
Material receiving Inspection for 120 Mr.
774 CPP-NGCP-M-773 1400143627 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8''x 0.344)) AT TCF-1 CPP Pipe TCF-1 N/A 11-Jul-19 8.00 AM Saleem CLOSED
Rajendran
yard.
Storage and Preservation of Pipes.at Mr.
775 CPP-NGCP-M-774 1400143618 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF-1 N/A 11-Jul-19 08.30 AM Saleem CLOSED
Tcf1 yard Rajendran
Field pipe bending Inspection for
(8"X0.344”), HWYH-1065,HWYH- Mr.
776 CPP-NGCP-M-775 1400145204 Mechanical SATIP-L-450-04 SAIC-L-2114 TCF-1 N/A 13-Jul-19 7.30 AM Saleem CLOSED
1087, HWYH-1003 at TCF-1 CPP Pipe Rajendran
yard.
Stringing and pipe laying inspection at
777 CPP-NGCP-M-776 1400145196 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH 1079 N/A 13-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH 1079
Field pipe bending Inspection for
Mr.
778 CPP-NGCP-M-777 1400144951 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-AK,BK,CK TCF-1 N/A 13-Jul-19 7.00 AM Saleem CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for Mr.
779 CPP-NGCP-M-778 1400144969 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH- 1078 at TCF-1 TCF-1 N/A 13-Jul-19 7.10 AM Saleem CLOSED
Rajendran
CPP Pipereceiving
Material yard. Inspection for 138
Mr.
780 CPP-NGCP-M-779 1400144998 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (36''x 0.688)) at TCF-1 CPP Pipe TCF-1 N/A 13-Jul-19 8.00 AM Irshad CLOSED
Rajendran
yard.
Material receiving Inspection for 72
781 CPP-NGCP-M-780 1400145001 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1182 FL N/A 13-Jul-19 8.00 AM Umair Mr. Rajesh CLOSED
pipes (8''x 0.344)) AT HRDH-1182FL
Material receiving Inspection for 72
782 CPP-NGCP-M-781 1400144977 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1307 FL N/A 13-Jul-19 08.30 AM Umair Mr. Rajesh CLOSED
pipes (8''x 0.344)) AT HRDH-1307FL
Field pipe bending Inspection for
Mr.
783 CPP-NGCP-M-782 1400146519 Mechanical SATIP-L-450-04 SAIC-L-2114 (10"X0.438”), HRDH-902 TCF-1 N/A 14-Jul-19 7.00 AM Saleem CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for Mr.
784 CPP-NGCP-M-783 1400146498 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH- 1078 at TCF-1 TCF-1 N/A 14-Jul-19 7.10 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Stringing and pipe laying inspection at
785 CPP-NGCP-M-784 1400146522 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1191 FL N/A 14-Jul-19 8:00 AM Umair Mr. Rajesh CLOSED
HRDH 1191
Stringing and pipe laying inspection at
786 CPP-NGCP-M-785 1400146598 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1187 FL N/A 14-Jul-19 9:00 AM Umair Mr. Rajesh CLOSED
HRDH 1187
Material receiving Inspection for 153 Mr.
787 CPP-NGCP-M-786 1400146737 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (36''x 0.688)) at TCF-1 CPP Pipe TCF-1 N/A 14-Jul-19 07.00 AM Irshad CLOSED
Rajendran
yard.
Material receiving Inspection of pipes Mr.
788 CPP-NGCP-M-787 1400146815 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF-1 N/A 14-Jul-19 07.30 AM Irshad CLOSED
SLEEVES at TCF-1 CPP Pipe yard. Rajendran
Field pipe bending Inspection for
(8"X0.344”), HWYH-1065,HWYH- Mr.
789 CPP-NGCP-M-788 1400146904 Mechanical SATIP-L-450-04 SAIC-L-2114 TCF-1 N/A 14-Jul-19 7.30 AM Saleem CLOSED
1087, HWYH-1003 at TCF-1 CPP Pipe Rajendran
yard.
Stringing and pipe laying inspection at
790 CPP-NGCP-M-789 1400146864 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH 1079 N/A 14-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH 1079
Stringing and pipe laying inspection at
791 CPP-NGCP-M-790 1400146840 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH 1065 HWYH 1065 N/A 14-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
Material receiving inspection for 30
792 CPP-NGCP-M-791 1400146842 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1070 N/A 14-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ HWYH-1070
Material receiving inspection for 195
793 CPP-NGCP-M-792 1400146909 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN-2231 N/A 14-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2231
Material receiving inspection for 72
794 CPP-NGCP-M-793 1400146896 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8" X 0.344") @ HWYH-1082 HWYH-1082 N/A 14-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED

Field pipe bending Inspection for


Mr.
795 CPP-NGCP-M-794 1400147852 Mechanical SATIP-L-450-04 SAIC-L-2114 (10"X0.438”), HRDH-902 TCF-1 N/A 15-Jul-19 7.00 AM Saleem CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
796 CPP-NGCP-M-795 1400147948 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH- 1078 at TCF-1 TCF-1 N/A 15-Jul-19 7.10 AM Saleem
Rajendran CLOSED
CPP Pipe
Field yard.
pipe bending Inspection for
(8"X0.344”), HWYH-1065,HWYH- Mr.
797 CPP-NGCP-M-796 1400148205 Mechanical SATIP-L-450-04 SAIC-L-2114 TCF-1 N/A 15-Jul-19 7.30 AM Saleem CLOSED
1087, HWYH-1003 at TCF-1 CPP Pipe Rajendran
yard.
798 CPP-NGCP-M-797 1400148181 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection at HWYH GGM N/A 15-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH GGM TRL1 TRL1
Stringing and pipe laying inspection at HRDH DK-RH Mr.
799 CPP-NGCP-M-798 1400148564 Mechanical SATIP-L-450-04 SAIC-L-2132 N/A 15-Jul-19 9:00 AM Irshad CLOSED No Action
HRDH DK-RH TR/L TR/L Rajendran
Field pipe bending Inspection for
Mr.
800 CPP-NGCP-M-799 1400149313 Mechanical SATIP-L-450-04 SAIC-L-2114 (10"X0.438”), HRDH-902 TCF-1 N/A 16-Jul-19 7.00 AM Saleem CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
801 CPP-NGCP-M-800 1400149323 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH- 1078 at TCF-1 TCF-1 N/A 16-Jul-19 7.10 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
802 CPP-NGCP-M-801 1400149655 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving inspection for 595 HWYH-RH- N/A 16-Jul-19 9:30 AM Umair Mr. Ashok CLOSED
pipes (20" X 0.562") @ HWYH-RH-DK DK
Material receiving
inspection for 350
Material receiving inspection for 200 Mr.
803 CPP-NGCP-M-802 1400149571 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-RH-DK N/A 16-Jul-19 8:30 AM Umair CLOSED pipes (16" X
pipes (16" X 0.438") @ HRDH-RH-DK Rajendran
0.438") @ HRDH-
RH-DK
Field pipe bending Inspection for
Mr.
804 CPP-NGCP-M-803 1400148690 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-201, HWYH-912 TCF-1 N/A 16-Jul-19 7.30 AM Saleem CLOSED
Rajendran
at TCF-1 CPP Pipe yard.
Material receiving inspection for 108
805 CPP-NGCP-M-804 1400149091 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1082 N/A 16-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ HWYH-1082
806 CPP-NGCP-M-805 1400149124 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving inspection for 92 UTMN-2205 N/A 16-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2205
Material receiving inspection for 160
807 CPP-NGCP-M-806 1400149127 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN-2231 N/A 16-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2231
Stringing and pipe laying inspection at
808 CPP-NGCP-M-807 1400149128 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH 1096 N/A 16-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-1096 KM- 0+200
809 CPP-NGCP-M-808 1400149743 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection at HWYH 952 N/A 16-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-952
Field pipe bending Inspection for
Mr.
810 CPP-NGCP-M-809 1400151192 Mechanical SATIP-L-450-04 SAIC-L-2114 (10"X0.438”), HRDH-902 TCF-1 N/A 17-Jul-19 7.00 AM Saleem CLOSED
, at TCF-1 CPP Pipe yard. Rajendran
Field pipe bending Inspection for
Mr.
811 CPP-NGCP-M-810 1400151197 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH- 1078 at TCF-1 TCF-1 N/A 17-Jul-19 7.10 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
812 CPP-NGCP-M-811 1400151215 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection at HRDH-1307 N/A 17-Jul-19 9:00 AM Umair Mr. Rajesh CLOSED
HRDH-1307
Material receiving inspection for 330
813 CPP-NGCP-M-812 1400151175 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1154 N/A 17-Jul-19 8:30 AM Umair Mr. Rajesh CLOSED
pipes (8" X 0.344") @ HRDH-1154
Material receiving Inspection for 228
Mr.
814 CPP-NGCP-M-813 1400151209 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (36''x 0.688)) at TCF-1 CPP Pipe TCF-1 N/A 17-Jul-19 07.00 AM Irshad CLOSED
Rajendran
yard.
Material receiving Inspection for 357
815 CPP-NGCP-M-814 1400151224 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (16''x 0.438') at TCF-1 CPP Pipe TCF-1 N/A 17-Jul-19 08.00 AM Irshad
Mr. CLOSED
Rajendran
yard.
Field pipe bending Inspection for
Mr.
816 CPP-NGCP-M-815 1400151001 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-201, HWYH-912, TCF-1 N/A 17-Jul-19 7.30 AM Saleem CLOSED
Rajendran
HWYH1087 at TCF-1 CPP Pipe yard.

817 CPP-NGCP-M-816 1400150999 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving inspection for 60 UTMN-2205 N/A 17-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2205
Material receiving inspection for 198
818 CPP-NGCP-M-817 1400151034 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN-2212 N/A 17-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2212
Stringing and pipe laying inspection at
819 CPP-NGCP-M-818 1400151055 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH 1096 N/A 17-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-1096
Stringing and pipe laying inspection at
820 CPP-NGCP-M-819 1400151103 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH 952 N/A 17-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-952
Field pipe bending Inspection for
Mr.
821 CPP-NGCP-M-820 1400152651 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-201, HWYH-912, TCF-1 N/A 18-Jul-19 7.30 AM Saleem CLOSED
Rajendran
HWYH1087 at TCF-1 CPP Pipe yard.
Stringing and pipe laying inspection at
822 CPP-NGCP-M-821 1400152649 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH 1065 N/A 18-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-1065
823 CPP-NGCP-M-822 1400152626 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection at HWYH 1079 N/A 18-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-1079
Stringing and pipe laying inspection at HWYH-GGM-
824 CPP-NGCP-M-823 1400152655 Mechanical SATIP-L-450-04 SAIC-L-2132 N/A 18-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-GGM- TRL-1 TRL-1
Stringing and pipe laying inspection at
825 CPP-NGCP-M-824 1400152652 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-LSS N/A 18-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-LSS
Material receiving inspection for 66
826 CPP-NGCP-M-825 1400152664 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN-2237 N/A 18-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2237
Material receiving inspection for 72
827 CPP-NGCP-M-826 1400152609 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN-2247 N/A 18-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2247
Field pipe bending Inspection for
828 CPP-NGCP-M-827 1400152733 Mechanical SATIP-L-450-04 SAIC-L-2114 (10"X0.438”), HRDH-902 TCF-1 N/A 18-Jul-19 7.00 AM Saleem
Mr. CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
829 CPP-NGCP-M-828 1400152734 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH- 1078 AND HRDH- TCF-1 N/A 18-Jul-19 7.10 AM Saleem CLOSED
Rajendran
1189at TCF-1 CPP Pipe yard.
Material receiving inspection for 392 Mr.
830 CPP-NGCP-M-829 1400152715 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (16" X 0.438") @ HRDH-RH-DK HRDH-RH-DK N/A 18-Jul-19 8:00 AM Irshad CLOSED
Rajendran
TO GGM
Storage and Preservation of Pipes.at Mr.
831 CPP-NGCP-M-830 1400152700 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF-1 N/A 18-Jul-19 08.30 AM Saleem CLOSED
Tcf1 yard Rajendran
Material receiving Inspection for 90
Mr.
832 CPP-NGCP-M-831 1400152716 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8''x 0.344') at TCF-1 CPP Pipe TCF-1 N/A 18-Jul-19 09.00 AM Saleem CLOSED
Rajendran
yard.
Field pipe bending Inspection for
833 CPP-NGCP-M-832 1400153559 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-201, HWYH-912, TCF-1 N/A 20-Jul-19 7.30 AM Saleem
Mr. CLOSED
Rajendran
HWYH1087 at TCF-1 CPP Pipe yard.
Material receiving inspection for 90
834 CPP-NGCP-M-833 1400153569 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN-2212 N/A 20-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2212
Material receiving inspection for 60
835 CPP-NGCP-M-834 1400153570 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN-2233 N/A 20-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2233
Stringing and pipe laying inspection at
836 CPP-NGCP-M-835 1400153634 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1072 N/A 20-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-1072 KM1+000
Field pipe bending Inspection for
Mr.
837 CPP-NGCP-M-836 1400154204 Mechanical SATIP-L-450-04 SAIC-L-2114 (36"X0.688”), HWYH GGM TRL-1 at TCF-1 N/A 20-Jul-19 7.30 AM Saleem CLOSED
Rajendran
TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
838 CPP-NGCP-M-837 1400154059 Mechanical SATIP-L-450-04 SAIC-L-2114 (10"X0.438”), HRDH-902 TCF-1 N/A 20-Jul-19 7.00 AM Saleem
Mr. CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
839 CPP-NGCP-M-838 1400154031 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH- 1078 AND HRDH- TCF-1 N/A 20-Jul-19 7.10 AM Saleem CLOSED
Rajendran
1189at TCF-1 CPP Pipe yard.
Stringing and pipe laying inspection at
840 CPP-NGCP-M-839 1400154018 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1191 FL N/A 20-Jul-19 9:00 AM Umair Mr. Rajesh CLOSED
HRDH-1191
Field pipe bending Inspection for
Mr.
841 CPP-NGCP-M-840 1400155203 Mechanical SATIP-L-450-04 SAIC-L-2114 (10"X0.438”), HRDH-902 TCF-1 N/A 21-Jul-19 7.00 AM Saleem CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for Mr.
842 CPP-NGCP-M-841 1400155216 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1189at TCF-1 TCF-1 N/A 21-Jul-19 7.10 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Verification of underground/
aboveground Pipeline crossing or Mr.
843 CPP-NGCP-M-842 1400155354 Mechanical SATIP-L-450-04 SAIC-L-2131 HRDH-1116 N/A 21-Jul-19 9.00 AM Umair CLOSED
parrallel with existing pipelines and Rajendran
other buried facilities at HRDH-1116
Verification of underground/
aboveground Pipeline crossing or Mr.
844 CPP-NGCP-M-843 1400155363 Mechanical SATIP-L-450-04 SAIC-L-2131 HRDH-922 N/A 21-Jul-19 10.00 AM Umair CLOSED
parrallel with existing pipelines and Rajendran
other buried facilities at HRDH-922
Verification of underground/
aboveground Pipeline crossing or Mr.
845 CPP-NGCP-M-844 1400155355 Mechanical SATIP-L-450-04 SAIC-L-2131 HRDH-1170 N/A 21-Jul-19 11.00 AM Umair CLOSED
parrallel with existing pipelines and Rajendran
other buried facilities at HRDH-1170
Verification of underground/
aboveground Pipeline crossing or Mr.
846 CPP-NGCP-M-845 1400155268 Mechanical SATIP-L-450-04 SAIC-L-2131 HRDH-1063 N/A 21-Jul-19 12.00 AM Umair CLOSED
parrallel with existing pipelines and Rajendran
other buried facilities at HRDH-1063
Material receiving inspection for 350 Mr.
847 CPP-NGCP-M-846 1400155365 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (16" X 0.438") @ HRDH-RH-DK HRDH-RH-DK N/A 21-Jul-19 8:00 AM Irshad CLOSED
Rajendran
TO GGM
Field pipe bending Inspection for
Mr.
848 CPP-NGCP-M-847 1400154863 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-201, HWYH-912, TCF-1 N/A 21-Jul-19 7.30 AM Saleem CLOSED
Rajendran
HWYH1087 at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr. RE-SCHEDULE TO 22-
849 CPP-NGCP-M-848 1400154769 Mechanical SATIP-L-450-04 SAIC-L-2114 (36"X0.688”), HWYH GGM TRL-1 at TCF-1 N/A 21-Jul-19 7.30 AM Saleem CLOSED
Rajendran JULY-2019
TCF-1 CPP Pipe yard.
Material receiving inspection for 120
850 CPP-NGCP-M-849 1400154893 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN-2212 N/A 21-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2212
Material receiving inspection for 60
851 CPP-NGCP-M-850 1400154885 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN-2233 N/A 21-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2233
Stringing and pipe laying inspection at
852 CPP-NGCP-M-851 1400154965 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1072 N/A 21-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-1072
Stringing and pipe laying inspection at
853 CPP-NGCP-M-852 1400154939 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1114 N/A 21-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-1114
Material receiving Inspection for 90
Mr.
854 CPP-NGCP-M-853 1400155601 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (24''x 0.500') at TCF-1 CPP Pipe TCF-1 N/A 21-Jul-19 09.00 AM Irshad CLOSED
Rajendran
yard.
Field pipe bending Inspection for
855 CPP-NGCP-M-854 1400156106 Mechanical SATIP-L-450-04 SAIC-L-2114 (10"X0.438”), HRDH-902 TCF-1 N/A 22-Jul-19 7.00 AM Saleem
Mr. CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
856 CPP-NGCP-M-855 1400156072 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1189at TCF-1 TCF-1 N/A 22-Jul-19 7.10 AM Saleem CLOSED
Rajendran
CPP Pipereceiving
Material yard. inspection for 224
Mr.
857 CPP-NGCP-M-856 1400156596 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (16" X 0.438") @ HRDH-RH-GK HRDH-RH-GK N/A 22-Jul-19 7:00 AM Irshad CLOSED
Rajendran
TO GGM
Visual Inspection of valas at TCF1 Mr.
858 CPP-NGCP-M-857 1400156620 Mechanical SATIP-L-108-01 SAIC-L-2040 TCF-1 N/A 22-Jul-19 09.00 AM Irshad CLOSED
YARD Rajendran
Material receiving
Material receiving inspection for 250 inspection for 318
859 CPP-NGCP-M-858 1400156608 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1171 FL N/A 22-Jul-19 7:00 AM Umair Mr. Ashok CLOSED
pipes (8" X 0.344") @ HRDH-1171 pipes (8" X 0.344")
@ HRDH-1171
Verification of underground/
860 CPP-NGCP-M-859 1400156602 Mechanical SATIP-L-450-04 SAIC-L-2131 HRDH-1171 FL N/A 22-Jul-19 10.00 AM Umair Mr. Ashok CLOSED
aboveground Pipeline at HRDH-1171
Field pipe bending Inspection for
Mr.
861 CPP-NGCP-M-860 1400156739 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-201, HWYH-912, TCF-1 N/A 22-Jul-19 7.30 AM Saleem CLOSED
Rajendran
HWYH1087 at TCF-1 CPP Pipe yard.
Material receiving inspection for 30
862 CPP-NGCP-M-861 1400156771 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN-2239 N/A 22-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2239
Stringing and pipe laying inspection at
863 CPP-NGCP-M-862 1400156722 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1072 N/A 22-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-1072
Stringing and pipe laying inspection at
864 CPP-NGCP-M-863 1400156788 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1114 N/A 22-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-1114
Stringing and pipe laying inspection at
865 CPP-NGCP-M-864 1400156762 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1087 N/A 22-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-1087
Field pipe bending Inspection for
Mr.
866 CPP-NGCP-M-865 1400157995 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-201, HWYH-912, TCF-1 N/A 23-Jul-19 7.30 AM Saleem CLOSED
Rajendran
HWYH1087 at TCF-1 CPP Pipe yard.
Stringing and pipe laying inspection at
867 CPP-NGCP-M-866 1400157996 Mechanical SATIP-L-450-04 SAIC-L-2132 UTMN 2201 N/A 23-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
UTMN 2201
Stringing and pipe laying inspection at
868 CPP-NGCP-M-867 1400158015 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1114 N/A 23-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-1114
Stringing and pipe laying inspection at
869 CPP-NGCP-M-868 1400158044 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1087 N/A 23-Jul-19 9:30 AM Lokesh Mr. Ashok CLOSED
HWYH-1087
Material receiving inspection for 90
870 CPP-NGCP-M-869 1400158111 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN-2239 N/A 23-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2239
Material receiving inspection for 60
871 CPP-NGCP-M-870 1400158116 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN-2212 N/A 23-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2212
Field pipe bending Inspection for
Mr.
872 CPP-NGCP-M-871 1400157768 Mechanical SATIP-L-450-04 SAIC-L-2114 (10"X0.438”), HRDH-902 TCF-1 N/A 23-Jul-19 7.00 AM Saleem CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for Mr.
873 CPP-NGCP-M-872 1400157850 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1189at TCF-1 TCF-1 N/A 23-Jul-19 7.10 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Visual Inspection of valas at TCF1 Mr.
874 CPP-NGCP-M-873 1400158345 Mechanical SATIP-L-108-01 SAIC-L-2040 TCF-1 N/A 23-Jul-19 09.00 AM Irshad CLOSED
YARD Rajendran
Field pipe bending Inspection for
Mr.
875 CPP-NGCP-M-874 1400159017 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-201, HWYH-912, TCF-1 N/A 24-Jul-19 7.30 AM Saleem CLOSED
Rajendran
HWYH1087 at TCF-1 CPP Pipe yard.
Stringing and pipe laying inspection at
876 CPP-NGCP-M-875 1400159057 Mechanical SATIP-L-450-04 SAIC-L-2132 UTMN 2201 N/A 24-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
UTMN 2201
Stringing and pipe laying inspection at
877 CPP-NGCP-M-876 1400159060 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1114 N/A 24-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-1114
Stringing and pipe laying inspection at
878 CPP-NGCP-M-877 1400159020 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1134 N/A 24-Jul-19 9:30 AM Lokesh Mr. Ashok CLOSED
HWYH-1134
879 CPP-NGCP-M-878 1400159108 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection at HWYH-GGM- N/A 24-Jul-19 9:30 AM Lokesh Mr. Ashok CLOSED
HWYH-GGM- TRL-1 TRL-1
Field pipe bending Inspection for
Mr.
880 CPP-NGCP-M-879 1400159565 Mechanical SATIP-L-450-04 SAIC-L-2114 (10"X0.438”), HRDH-921 TCF-1 N/A 24-Jul-19 7.00 AM Saleem CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
881 CPP-NGCP-M-880 1400159573 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1169at TCF-1 TCF-1 N/A 24-Jul-19 7.10 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Visual Inspection of valas at TCF1 Mr.
882 CPP-NGCP-M-881 1400159540 Mechanical SATIP-L-108-01 SAIC-L-2040 TCF-1 N/A 24-Jul-19 09.00 AM Irshad CLOSED
YARD Rajendran
883 CPP-NGCP-M-882 1400159575 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving inspection for 6 HWGP N/A 24-Jul-19 8:00 AM Umair Mr. Ashok OPEN No Action
pipes (16" X 0.688") GRX60 @ HWGP
Field pipe bending Inspection for
Mr.
884 CPP-NGCP-M-883 1400159017 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-201, HWYH-912, TCF-1 N/A 24-Jul-19 7.30 AM Saleem
Rajendran CLOSED
HWYH1087 at TCF-1 CPP Pipe yard.
Stringing and pipe laying inspection at
885 CPP-NGCP-M-884 1400159057 Mechanical SATIP-L-450-04 SAIC-L-2132 UTMN 2201 N/A 24-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
UTMN 2201
886 CPP-NGCP-M-885 1400159060 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection at HWYH-1114 N/A 24-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-1114
Stringing and pipe laying inspection at
887 CPP-NGCP-M-886 1400159020 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1134 N/A 24-Jul-19 9:30 AM Lokesh Mr. Ashok CLOSED
HWYH-1134
Stringing and pipe laying inspection at HWYH-GGM-
888 CPP-NGCP-M-887 1400159108 Mechanical SATIP-L-450-04 SAIC-L-2132 N/A 24-Jul-19 9:30 AM Lokesh Mr. Ashok CLOSED
HWYH-GGM- TRL-1 TRL-1
Field pipe bending Inspection for
Mr.
889 CPP-NGCP-M-888 1400160474 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-952, 1067 , TCF-1 N/A 25-Jul-19 7.30 AM Saleem CLOSED
Rajendran
1072,1079 at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for Mr.
890 CPP-NGCP-M-889 1400160438 Mechanical SATIP-L-450-04 SAIC-L-2114 (36"X0.688”), HWYH GGM TRL-2 at TCF-1 N/A 25-Jul-19 7.30 AM Saleem CLOSED
Rajendran
TCF-1 CPP Pipe yard.
Material receiving inspection for 90
891 CPP-NGCP-M-890 1400160460 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN-2212 N/A 25-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2212
Material receiving inspection for 30
892 CPP-NGCP-M-891 1400160361 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN-2235 N/A 25-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2235
Underground Pipeline crossing or
parallel with existing pipelines and HWYH-LSS-
893 CPP-NGCP-M-892 1400160649 Mechanical SATIP-L-450-04 SAIC-L-2131 N/A 25-Jul-19 7:30 AM Lokesh Mr. Suresh OPEN No Action
other buried facilities @ 16"HWYH- TR/L-1
LSS-TR/L-1 KM-10+911.65
Underground Pipeline crossing or
parallel with existing pipelines and
894 CPP-NGCP-M-893 1400160807 Mechanical SATIP-L-450-04 SAIC-L-2131 HWYH1071 N/A 25-Jul-19 7:30 AM Lokesh Mr. Ashok CLOSED
other buried facilities @ HWYH-1071
KM-1+688.99
Material receiving inspection for 60
895 CPP-NGCP-M-894 1400160928 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN-2212 N/A 25-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2234
Material receiving inspection for 60
896 CPP-NGCP-M-895 1400160917 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN-2235 N/A 25-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2239
Field pipe bending Inspection for
(8"X0.344”), HWYH-1134, 952, Mr.
897 CPP-NGCP-M-896 1400162112 Mechanical SATIP-L-450-04 SAIC-L-2114 TCF-1 N/A 27-Jul-19 7.30 AM Saleem CLOSED
1067 ,1072,1079 , 912 at TCF-1 Rajendran
CPP Pipe yard.
Field pipe bending Inspection for
Mr.
898 CPP-NGCP-M-897 1400162127 Mechanical SATIP-L-450-04 SAIC-L-2114 (36"X0.688”), HWYH GGM TRL-1 at TCF-1 N/A 27-Jul-19 7.30 AM Saleem CLOSED
Rajendran
TCF-1 CPP Pipe yard.

899 CPP-NGCP-M-898 1400162124 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving inspection for 120 UTMN-2238 N/A 27-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2238
Material receiving inspection for 30
900 CPP-NGCP-M-899 1400162156 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN-2243 N/A 27-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2243
Material receiving inspection for 60
901 CPP-NGCP-M-900 1400162094 Mechanical SATIP-L-450-04 SAIC-L-2112 HWYH-1098 N/A 27-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ HWYH--1098
902 CPP-NGCP-M-901 1400162128 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection at UTMN 2201 N/A 27-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
UTMN 2201
Stringing and pipe laying inspection at
903 CPP-NGCP-M-902 1400162082 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1114 N/A 27-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-1114
Field pipe bending Inspection for
Mr.
904 CPP-NGCP-M-903 1400162473 Mechanical SATIP-L-450-04 SAIC-L-2114 (10"X0.438”), HRDH-921 TCF-1 N/A 27-Jul-19 7.00 AM Saleem CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
905 CPP-NGCP-M-904 1400162396 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1155 at TCF-1 TCF-1 N/A 27-Jul-19 7.10 AM Saleem
Mr. CLOSED
Rajendran
CPP Pipe yard.
Material receiving inspection for 19
906 CPP-NGCP-M-905 1400162483 Mechanical SATIP-L-450-04 SAIC-L-2112 HWGP N/A 27-Jul-19 9:00 AM Umair Mr. Suresh OPEN No Action
pipes (16" X 0.688") GRX60 @ HWGP
Visual Inspection of valas at TCF1 Mr.
907 CPP-NGCP-M-906 1400162448 Mechanical SATIP-L-108-01 SAIC-L-2040 TCF-1 N/A 27-Jul-19 08.30 AM Irshad CLOSED
YARD Rajendran
Field pipe bending Inspection for
Mr.
908 CPP-NGCP-M-907 1400163901 Mechanical SATIP-L-450-04 SAIC-L-2114 (10"X0.438”), HWYH-921 TCF-1 N/A 28-Jul-19 7.00 AM Saleem CLOSED
, at TCF-1 CPP Pipe yard. Rajendran

Field pipe bending Inspection for


Mr.
909 CPP-NGCP-M-908 1400163924 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1155.1137 at TCF- TCF-1 N/A 28-Jul-19 7.10 AM Saleem CLOSED
Rajendran
1 CPP Pipe yard.

910 CPP-NGCP-M-909 1400163925 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving inspection for 36 HRDH-1185 N/A 28-Jul-19 7:00 AM Umair Mr. Rajesh CLOSED
pipes (8" X 0.344") @ HRDH-1185
Material receiving inspection for 36
911 CPP-NGCP-M-910 1400163917 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1347 FL N/A 28-Jul-19 8:00 AM Umair Mr. Rajesh CLOSED
pipes (8" X 0.344") @ HRDH-1347
Stringing and pipe laying inspection at
912 CPP-NGCP-M-911 1400163908 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1157 FL N/A 28-Jul-19 8:30 AM Umair Mr. Rajesh CLOSED
HRDH-1157 FL
913 CPP-NGCP-M-912 1400163870 Mechanical SATIP-L-450-04 SAIC-L-2112 Storage and Preservation of Pipes.at HRDH-1154 FL N/A 28-Jul-19 09.00 AM Umair Mr. Rajesh CLOSED
HRDH-1154 FL
pipe LINE DISTENCE VEVIFICATION
914 CPP-NGCP-M-913 1400163902 Mechanical SATIP-L-450-04 SAIC-L-2131 HRDH-1309 FL N/A 28-Jul-19 09.30 AM Umair Mr. Rajesh CLOSED
AT HRDH-1309
Visual Inspection of valas at TCF1 Mr.
915 CPP-NGCP-M-914 1400163871 Mechanical SATIP-L-108-01 SAIC-L-2040 TCF-1 N/A 28-Jul-19 08.30 AM Irshad CLOSED
YARD Rajendran
Field pipe bending Inspection for
(8"X0.344”), HWYH-1134, 952, Mr.
916 CPP-NGCP-M-915 1400163884 Mechanical SATIP-L-450-04 SAIC-L-2114 1067 ,1072,1079 , 912 at TCF-1 TCF-1 N/A 28-Jul-19 7.30 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Field pipe bending Inspection for
Mr.
917 CPP-NGCP-M-916 1400163886 Mechanical SATIP-L-450-04 SAIC-L-2114 (36"X0.688”), HWYH GGM TRL-1 at TCF-1 N/A 28-Jul-19 7.30 AM Saleem CLOSED
Rajendran
TCF-1 CPP Pipe yard.

Stringing and pipe laying inspection at


918 CPP-NGCP-M-917 1400163858 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1070 N/A 28-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-1070

Material receiving inspection for 90


919 CPP-NGCP-M-918 1400163888 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN-2236 N/A 28-Jul-19 9:30 AM Masood Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2236

Material Preservation of FBE Coated


920 CPP-NGCP-M-919 1400163889 Mechanical SATIP-L-450-04 SAIC-L-2112 north side N/A 28-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes 8" X 0.344" WT. API 5L GR X65

Material receiving inspection for 90


921 CPP-NGCP-M-920 1400163895 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN-2243 N/A 28-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2243
922 CPP-NGCP-M-921 1400165016 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving inspection for 30 UTMN-2236 N/A 29-Jul-19 9:30 AM Masood Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2236
Material receiving inspection for 60
923 CPP-NGCP-M-922 1400165021 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN-2232 N/A 29-Jul-19 9:30 AM Masood Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2232
Stringing and pipe laying inspection at
924 CPP-NGCP-M-923 1400164997 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1070 N/A 29-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-1070
925 CPP-NGCP-M-924 1400164988 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection at HWYH-1074 N/A 29-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-1074
Stringing and pipe laying inspection at
926 CPP-NGCP-M-925 1400165139 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-RH-BK N/A 29-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-RH-BK
Stringing and pipe laying inspection at HWYH-LSS
927 CPP-NGCP-M-926 1400165144 Mechanical SATIP-L-450-04 SAIC-L-2132 N/A 29-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
16" HWYH-LSS TRL-1 TRL-1
Stringing and pipe laying inspection at HWYH-GGM
928 CPP-NGCP-M-927 1400165052 Mechanical SATIP-L-450-04 SAIC-L-2132 N/A 29-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
24" HWYH-GGM TRL-1 TRL-1

929 CPP-NGCP-M-928 1400165118 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving inspection for 90 UTMN-2243 N/A 29-Jul-19 9:30 AM Masood Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2243
Field pipe bending Inspection for
Mr.
930 CPP-NGCP-M-929 1400165296 Mechanical SATIP-L-450-04 SAIC-L-2114 (10"X0.438”), HWYH-921 TCF-1 N/A 29-Jul-19 7.00 AM Saleem CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
931 CPP-NGCP-M-930 1400165303 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1155.1137 at TCF- TCF-1 N/A 29-Jul-19 7.10 AM Saleem CLOSED
Rajendran
1 CPP Pipe yard.
Fabrication Shop Qualification and Mr.
932 CPP-NGCP-M-931 1400165364 Mechanical SATIP-L-350-08 SAIC-L-2031 TCF-1 N/A 29-Jul-19 09.00 AM Saleem
Rajendran
OPEN No Action
approval at TCF-1
Visual Inspection of valves at TCF1 Mr.
933 CPP-NGCP-M-932 1400165304 Mechanical SATIP-L-108-01 SAIC-L-2040 TCF-1 N/A 29-Jul-19 08.00 AM Irshad CLOSED
YARD Rajendran
Material receiving inspection for 60 Mr.
934 CPP-NGCP-M-933 1400165313 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF-1 N/A 29-Jul-19 9:00 AM Irshad OPEN No Action
pipes (10" X 0.500") @ TCF1 YARD Rajendran
Field pipe bending Inspection for
(8"X0.344”), HWYH-1134, 952, Mr.
935 CPP-NGCP-M-934 1400165014 Mechanical SATIP-L-450-04 SAIC-L-2114 TCF-1 N/A 29-Jul-19 7.30 AM Saleem CLOSED
1067 ,1072,1079 , 912 at TCF-1 Rajendran
CPP Pipe
Field yard.
pipe bending Inspection for
(8"X0.344”), HWYH-1134, 952, Mr.
936 CPP-NGCP-M-935 1400166076 Mechanical SATIP-L-450-04 SAIC-L-2114 TCF-1 N/A 30-Jul-19 7.30 AM Saleem CLOSED
1067 ,1072,1079 , 912 at TCF-1 Rajendran
CPP Pipe yard.
Field pipe bending Inspection for
Mr.
937 CPP-NGCP-M-936 1400165009 Mechanical SATIP-L-450-04 SAIC-L-2114 (36"X0.688”), HWYH GGM TRL-1 at TCF-1 N/A 30-Jul-19 7.30 AM Saleem CLOSED
Rajendran
TCF-1 CPP Pipe yard.
Material receiving inspection for 120
938 CPP-NGCP-M-937 1400166114 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN-2229 N/A 30-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2229
Stringing and pipe laying inspection at
939 CPP-NGCP-M-938 1400166372 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1070 N/A 30-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-1070
Stringing and pipe laying inspection at
940 CPP-NGCP-M-939 1400166453 Mechanical SATIP-L-450-04 SAIC-L-2132 UTMN-2201 N/A 30-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
UTMN-2201
Stringing and pipe laying inspection at
941 CPP-NGCP-M-940 1400166404 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1114 N/A 30-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-1114
Stringing and pipe laying inspection at
942 CPP-NGCP-M-941 1400166445 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-BK-RH N/A 30-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-BK-RH
Stringing and pipe laying inspection at HWYH-LSS
943 CPP-NGCP-M-942 1400166417 Mechanical SATIP-L-450-04 SAIC-L-2132 N/A 30-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-LSS TRL-1 TRL-1

944 CPP-NGCP-M-943 1400166392 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving inspection for 120 UTMN-2243 N/A 30-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2243
Stringing and pipe laying inspection at
945 CPP-NGCP-M-944 1400166683 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1074 N/A 30-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-1074
Field pipe bending Inspection for Mr.
946 CPP-NGCP-M-945 1400166556 Mechanical SATIP-L-450-04 SAIC-L-2114 (10"X0.438”), HWYH-921 TCF-1 N/A 30-Jul-19 7.00 AM Saleem CLOSED
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
947 CPP-NGCP-M-946 1400166517 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1195 at TCF-1 TCF-1 N/A 30-Jul-19 7.10 AM Saleem CLOSED
Rajendran
CPP Pipe yard.
Stringing and pipe laying inspection at
948 CPP-NGCP-M-947 1400166555 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1168 FL N/A 30-Jul-19 9:30 AM Umair Mr. Rajesh CLOSED
8" HRDH-1168
949 CPP-NGCP-M-948 1400166521 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection at HRDH-1347 FL N/A 30-Jul-19 9:00 AM Umair Mr. Rajesh CLOSED
8" HRDH-1347
Stringing and pipe laying inspection at
950 CPP-NGCP-M-949 1400166557 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1146 FL N/A 30-Jul-19 8:00 AM Umair Mr. Rajesh CLOSED
8" HRDH-1146
Material receiving inspection for 72
951 CPP-NGCP-M-950 1400166547 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-1146 FL N/A 30-Jul-19 7:00 AM Umair Mr. Rajesh CLOSED
pipes (8" X 0.344") @ HRDH-1146 FL
Material receiving
inspection for 170
952 CPP-NGCP-M-951 1400166566 Mechanical SATIP-L-450-04 SAIC-L-2112 Material receiving inspection for 180 HRDH-AK-RH N/A 30-Jul-19 7:00 AM Irshad
Mr. CLOSED pipes (16" X
pipes (16" X 0.438") @ HRDH-AK-RH Rajendran
0.438") @ HRDH-
AK-RH
Material receiving
inspection for 80
Material receiving inspection for 70 Mr.
953 CPP-NGCP-M-952 1400166586 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-BK-RH N/A 30-Jul-19 7:30 AM Irshad CLOSED pipes (16" X
pipes (16" X 0.438") @ HRDH-BK-RH Rajendran
0.438") @ HRDH-
BK-RH
Field pipe bending Inspection for
Mr.
954 CPP-NGCP-M-953 1400167729 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1195 TCF-1 N/A 31-Jul-19 7.00 AM Saleem OPEN No Action
, at TCF-1 CPP Pipe yard. Rajendran

Field pipe bending Inspection for Mr.


955 CPP-NGCP-M-954 1400167758 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-AK,BK,CK at TCF-1 N/A 31-Jul-19 7.10 AM Saleem OPEN No Action
Rajendran
TCF-1 CPP Pipe yard.
Visual Inspection of valves at TCF1 Mr.
956 CPP-NGCP-M-955 1400167799 Mechanical SATIP-L-108-01 SAIC-L-2040 TCF-1 N/A 31-Jul-19 08.30 AM Irshad OPEN No Action
YARD Rajendran
Material receiving inspection for 462 Mr.
957 CPP-NGCP-M-956 1400167772 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF-1 N/A 31-Jul-19 9:00 AM Umair OPEN No Action
RTR pipes 10" @ TCF1 YARD Rajendran
Material receiving inspection for RTR
Mr.
958 CPP-NGCP-M-957 1400167845 Mechanical SATIP-L-450-04 SAIC-L-2112 CASING pipes (18" X 0.688") @ TCF1 TCF-1 N/A 31-Jul-19 9:00 AM Irshad OPEN No Action
Rajendran
YARD
Material receiving inspection for 224 Mr.
959 CPP-NGCP-M-958 1400167789 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-DK-RH N/A 31-Jul-19 8:00 AM Irshad CLOSED
pipes (16" X 0.438") @ HRDH-DK-RH Rajendran
Field pipe bending Inspection for
(8"X0.344”), HWYH-1134, 952, Mr.
960 CPP-NGCP-M-959 1400167442 Mechanical SATIP-L-450-04 SAIC-L-2114 TCF-1 N/A 31-Jul-19 7.00 AM Saleem OPEN No Action
1067 ,1072,1079 , 912 at TCF-1 Rajendran
CPP Pipe yard.
Field pipe bending Inspection for
Mr.
961 CPP-NGCP-M-960 1400167881 Mechanical SATIP-L-450-04 SAIC-L-2114 (10"X0.438”), HWYH-1093 at TCF-1 TCF-1 N/A 31-Jul-19 7.00 AM Saleem OPEN No Action
CPP Pipe yard. Rajendran

Field pipe bending Inspection for


Mr.
962 CPP-NGCP-M-961 1400167459 Mechanical SATIP-L-450-04 SAIC-L-2114 (36"X0.688”), HWYH GGM TRL-1 at TCF-1 N/A 31-Jul-19 7.10 AM Saleem OPEN No Action
Rajendran
TCF-1 CPP Pipe yard.
Material receiving inspection for 120
963 CPP-NGCP-M-962 1400167516 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN-2252 N/A 31-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2252
Material receiving inspection for 90
964 CPP-NGCP-M-963 1400167607 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN-2229 N/A 31-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
pipes (8" X 0.344") @ UTMN-2229
965 CPP-NGCP-M-964 1400167780 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection at HWYH-BK-RH N/A 31-Jul-19 9:30 AM Lokesh Mr. Suresh CLOSED
HWYH-BK-RH
Stringing and pipe laying inspection at
966 CPP-NGCP-M-965 1400167815 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1070 N/A 31-Jul-19 9:30 AM Masood Mr. Suresh CLOSED
HWYH-1070
Stringing and pipe laying inspection at
967 CPP-NGCP-M-966 1400167843 Mechanical SATIP-L-450-04 SAIC-L-2132 UTMN-2201 N/A 31-Jul-19 9:30 AM Masood Mr. Suresh CLOSED
UTMN-2201
Field pipe bending Inspection for
(8"X0.344”), HWYH-1134, 952, Mr.
968 CPP-NGCP-M-967 1400168762 Mechanical SATIP-L-450-04 SAIC-L-2114 1067 ,1072,1079 , 912 at TCF-1 TCF-1 N/A 01-Aug-19 7.00 AM Saleem OPEN No Action
Rajendran
CPP Pipe yard.
Field pipe bending Inspection for
Mr.
969 CPP-NGCP-M-968 1400168833 Mechanical SATIP-L-450-04 SAIC-L-2114 (36"X0.688”), HWYH GGM TRL-1 at TCF-1 N/A 01-Aug-19 7.10 AM Saleem OPEN No Action
Rajendran
TCF-1 CPP Pipe yard.
Material receiving inspection for 90
970 CPP-NGCP-M-969 1400168807 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8" X 0.344") @ Near HWYH- UTMN-1096 N/A 01-Aug-19 9:30 AM Lokesh Mr. Suresh OPEN No Action
1096 in temporary storage area.
Material receiving inspection for 120
971 CPP-NGCP-M-970 1400168802 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN-2252 N/A 01-Aug-19 9:30 AM Lokesh Mr. Suresh OPEN No Action
pipes (8" X 0.344") @ UTMN-2252
Material receiving inspection for 30
972 CPP-NGCP-M-971 1400168873 Mechanical SATIP-L-450-04 SAIC-L-2112 UTMN-2229 N/A 01-Aug-19 9:30 AM Lokesh Mr. Suresh OPEN No Action
pipes (8" X 0.344") @ UTMN-2229
973 CPP-NGCP-M-972 1400168855 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection at HWYH-1074 N/A 01-Aug-19 9:30 AM Lokesh Mr. Suresh OPEN No Action
HWYH-1074
Stringing and pipe laying inspection at
974 CPP-NGCP-M-973 1400168866 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1070 N/A 01-Aug-19 9:30 AM Masood Mr. Suresh OPEN No Action
HWYH-1070
Stringing and pipe laying inspection at
975 CPP-NGCP-M-974 1400169083 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1306 FL N/A 01-Aug-19 9:30 AM Umair Mr. Rajesh OPEN No Action
8" HRDH-1306
976 CPP-NGCP-M-975 1400169343 Mechanical SATIP-L-450-04 SAIC-L-2112 Storage and Preservation of Pipes.at HRDH-1162 FL N/A 01-Aug-19 08.00 AM Umair Mr. Rajesh OPEN No Action
HRDH-1162 FL
977 CPP-NGCP-M-976 1400169344 Mechanical SATIP-L-450-04 SAIC-L-2112 Storage and Preservation of Pipes.at TCF1 N/A 01-Aug-19 08.30 AM Umair Mr. Rajesh OPEN No Action
Tcf1 yard
Material receiving inspection for 235 Mr.
978 CPP-NGCP-M-977 1400169334 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF1 N/A 01-Aug-19 9:00 AM David OPEN No Action
pipes (30" X 0.562") @ TCF1 YARD Rajendran
Stringing and pipe laying inspection at
979 CPP-NGCP-M-978 1400170804 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH -1198 FL N/A 03-Aug-19 9:30 AM Umair Mr. Rajesh OPEN No Action
8" HRDH-1198
Field pipe bending Inspection for
980 CPP-NGCP-M-979 1400170774 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1163 TCF-1 N/A 03-Aug-19 7.00 AM Saleem
Mr. OPEN No Action
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
981 CPP-NGCP-M-980 1400170775 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-AK,BK,CK at TCF-1 N/A 03-Aug-19 7.10 AM Saleem OPEN No Action
Rajendran
TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
982 CPP-NGCP-M-981 1400168815 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1134, 952, TCF-1 N/A 03-Aug-19 7.00 AM Saleem
Mr. OPEN No Action
1067 ,1072,1079 , 912 at TCF-1 Rajendran
CPP Pipe yard.
Field pipe bending Inspection for
Mr. RE-SCHEDULE TO 4-AUG-
983 CPP-NGCP-M-982 1400170641 Mechanical SATIP-L-450-04 SAIC-L-2114 (36"X0.688”), HWYH GGM TRL-1 at TCF-1 N/A 03-Aug-19 7.10 AM Saleem OPEN No Action 2019
Rajendran
TCF-1 CPP Pipe yard.
Material receiving inspection for 120
984 CPP-NGCP-M-983 1400170664 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8" X 0.344") @ Near HWYH-201 HWYH-201 N/A 03-Aug-19 9:30 AM Lokesh Mr. Suresh OPEN No Action
in temporary storage area.
Material receiving inspection for 120
985 CPP-NGCP-M-984 1400170607 Mechanical SATIP-L-450-04 SAIC-L-2112 pipes (8" X 0.344") @ Near HWYH- UTMN-1036 N/A 03-Aug-19 9:30 AM Lokesh Mr. Suresh OPEN No Action
1036 in temporary storage area.
Field pipe bending Inspection for
986 CPP-NGCP-M-985 1400171057 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1134, 952, TCF-1 N/A 04-Aug-19 7.00 AM Saleem
Mr. OPEN No Action
1067 ,1072,1079 , 912 at TCF-1 Rajendran
CPP Pipe yard.
Stringing and pipe laying inspection at
987 CPP-NGCP-M-986 1400171555 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1070 N/A 04-Aug-19 9:30 AM Masood Mr. Suresh OPEN No Action
HWYH-1070
Stringing and pipe laying inspection at
988 CPP-NGCP-M-987 1400171576 Mechanical SATIP-L-450-04 SAIC-L-2132 UTMN-2201 N/A 04-Aug-19 9:30 AM Lokesh Mr. Suresh OPEN No Action
UTMN-2201
Stringing and pipe laying inspection at
989 CPP-NGCP-M-988 1400171508 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-BK-RH N/A 04-Aug-19 9:30 AM Masood Mr. Suresh OPEN No Action
HWYH-BK-RH
Visual Inspection of valves at TCF1 Mr.
990 CPP-NGCP-M-989 1400172075 Mechanical SATIP-L-108-01 SAIC-L-2040 TCF-1 N/A 04-Aug-19 08.30 AM Irshad OPEN No Action
YARD Rajendran
Material receiving inspection for 224 Mr.
991 CPP-NGCP-M-990 1400172093 Mechanical SATIP-L-450-04 SAIC-L-2112 HRDH-GK-RH N/A 04-Aug-19 8:00 AM Irshad OPEN No Action
pipes (16" X 0.438") @ HRDH-GK-RH Rajendran
Field pipe bending Inspection for
992 CPP-NGCP-M-991 1400172040 Mechanical SATIP-L-450-04 SAIC-L-2114 TCF-1 N/A 04-Aug-19 7.00 AM Saleem
Mr. OPEN No Action
(8"X0.344”), HRDH-1163.1197 Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
993 CPP-NGCP-M-992 1400172080 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-AK,BK,CK at TCF-1 N/A 04-Aug-19 7.10 AM Saleem OPEN No Action
Rajendran
TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
994 CPP-NGCP-M-993 1400173048 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HWYH-1134, 952, TCF-1 N/A 05-Aug-19 7.00 AM Saleem
Mr. OPEN No Action
1067 ,1072,1079 , 912 at TCF-1 Rajendran
CPP Pipe yard.
Field pipe bending Inspection for
Mr.
995 CPP-NGCP-M-994 1400173037 Mechanical SATIP-L-450-04 SAIC-L-2114 (36"X0.688”), HWYH GGM TRL-1 at TCF-1 N/A 05-Aug-19 7.10 AM Saleem OPEN No Action
Rajendran
TCF-1 CPP Pipe yard.
Stringing and pipe laying inspection at
996 CPP-NGCP-M-995 1400173010 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1074 N/A 05-Aug-19 9:30 AM Lokesh Mr. Suresh OPEN No Action
HWYH-1074
Stringing and pipe laying inspection at
997 CPP-NGCP-M-996 1400172942 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-BK-RH N/A 05-Aug-19 9:30 AM Masood Mr. Suresh OPEN No Action
HWYH-BK-RH
Stringing and pipe laying inspection at
998 CPP-NGCP-M-997 1400173305 Mechanical SATIP-L-450-04 SAIC-L-2132 UTMN-2201 N/A 05-Aug-19 9:30 AM Masood Mr. Suresh OPEN No Action
UTMN-2201
Field pipe bending Inspection for
999 CPP-NGCP-M-998 1400173593 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1197 TCF-1 N/A 05-Aug-19 7.00 AM Saleem
Mr. OPEN No Action
Rajendran
, at TCF-1 CPP Pipe yard.
Material receiving inspection for 235 Mr.
1000 CPP-NGCP-M-999 1400173561 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF-1 N/A 05-Aug-19 9:30 AM David OPEN No Action
pipes (30" X 0.562") at TCF1 YARD Rajendran
Verification of Water Chemistry of RTR Mr.
1001 CPP-NGCP-M-1000 1400173562 Mechanical SATIP-A-004-03 SAIC-A-2008 TCF-1 N/A 05-Aug-19 8.00 AM Umair OPEN No Action
hydrotest water for NGCP project TCF-1 YAQOOB
Material receiving Inspection of pipes
Mr.
1002 CPP-NGCP-M-1001 1400173604 Mechanical SATIP-L-450-04 SAIC-L-2112 SLEEVES QTY:2 at TCF-1 CPP Pipe TCF-1 N/A 05-Aug-19 07.30 AM Irshad OPEN No Action
Rajendran
yard.
Visual Inspection of valves at TCF1 Mr.
1003 CPP-NGCP-M-1002 1400173565 Mechanical SATIP-L-108-01 SAIC-L-2040 TCF-1 N/A 05-Aug-19 08.30 AM Irshad OPEN No Action
YARD Rajendran
1004 CPP-NGCP-M-1003 1400174621 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection at HWYH GGM N/A 06-Aug-19 9:30 AM Lokesh
Mr. OPEN No Action
HWYH GGM TRL-2 TRL-2 Rajendran
Stringing and pipe laying inspection at
1005 CPP-NGCP-M-1004 1400174649 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH- 1070 N/A 06-Aug-19 9:30 AM Lokesh Mr. Suresh OPEN No Action
HWYH- 1070
1006 CPP-NGCP-M-1005 1400174717 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection at HWYH-1074 N/A 06-Aug-19 9:30 AM Masood Mr. Suresh OPEN No Action
HWYH-1074
Field pipe bending Inspection for
(8"X0.344”), HWYH-1134, 952, Mr.
1007 CPP-NGCP-M-1006 1400173854 Mechanical SATIP-L-450-04 SAIC-L-2114 1067 ,1072,1079 , 912 at TCF-1 TCF-1 N/A 06-Aug-19 7.00 AM Saleem OPEN No Action
Rajendran
CPP Pipe yard.
Field pipe bending Inspection for
Mr.
1008 CPP-NGCP-M-1007 1400173845 Mechanical SATIP-L-450-04 SAIC-L-2114 (36"X0.688”), HWYH GGM TRL-1 at TCF-1 N/A 06-Aug-19 7.10 AM Saleem OPEN No Action
Rajendran
TCF-1 CPP Pipe yard.
Stringing and pipe laying inspection at
1009 CPP-NGCP-M-1008 1400173827 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1066 N/A 10-Aug-19 9:30 AM Lokesh Mr. Suresh OPEN No Action
HWYH-1066
Stringing and pipe laying inspection at
1010 CPP-NGCP-M-1009 1400173812 Mechanical SATIP-L-450-04 SAIC-L-2132 HWYH-1066 N/A 11-Aug-19 9:30 AM Lokesh Mr. Suresh OPEN No Action
HWYH-1066
1011 CPP-NGCP-M-1010 1400173828 Mechanical SATIP-L-450-04 SAIC-L-2132 Stringing and pipe laying inspection at HWYH-1066 N/A 13-Aug-19 9:30 AM Lokesh Mr. Suresh OPEN No Action
HWYH-1066
Stringing and pipe laying inspection at
1012 CPP-NGCP-M-1011 1400174811 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1186 FL N/A 06-Aug-19 9:30 AM Umair Mr. Rajesh OPEN No Action
HRDH-1186 FL
Material receiving inspection for 235 Mr.
1013 CPP-NGCP-M-1012 1400174721 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF-1 N/A 06-Aug-19 9:30 AM David OPEN No Action
pipes (30" X 0.562") at TCF1 YARD Rajendran
Field pipe bending Inspection for
Mr.
1014 CPP-NGCP-M-1013 1400174722 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1197 TCF-1 N/A 06-Aug-19 7.00 AM Saleem OPEN No Action
Rajendran
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
Mr.
1015 CPP-NGCP-M-1014 1400174749 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-AK,BK,CK at TCF-1 N/A 06-Aug-19 7.10 AM Saleem OPEN No Action
Rajendran
TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
(8"X0.344”), HWYH-1134, 952, Mr.
1016 CPP-NGCP-M-1015 1400175032 Mechanical SATIP-L-450-04 SAIC-L-2114 TCF-1 N/A 07-Aug-19 7.00 AM Saleem OPEN No Action
1067 ,1072,1079 , 912 at TCF-1 Rajendran
CPP Pipe yard.
Field pipe bending Inspection for
Mr.
1017 CPP-NGCP-M-1016 1400175124 Mechanical SATIP-L-450-04 SAIC-L-2114 (36"X0.688”), HWYH GGM TRL-1 at TCF-1 N/A 07-Aug-19 7.10 AM Saleem OPEN No Action
Rajendran
TCF-1 CPP Pipe yard.
Verification of Underground Pipeline
1018 CPP-NGCP-M-1017 1400175647 Mechanical SATIP-L-450-04 SAIC-L-2131 crossing with existing pipelines at HWYH-1134 N/A 07-Aug-19 7:30 AM Masood Mr. Suresh OPEN No Action
HWYH-1134 KM-4+450.65
Verification of Underground Pipeline
1019 CPP-NGCP-M-1018 1400175620 Mechanical SATIP-L-450-04 SAIC-L-2131 crossing with existing pipeline at HWYH-1134 N/A 07-Aug-19 7:30 AM Masood Mr. Suresh OPEN No Action
HWYH-1134 KM-4+479.51
Field pipe bending Inspection for
1020 CPP-NGCP-M-1019 1400176313 Mechanical SATIP-L-450-04 SAIC-L-2114 (8"X0.344”), HRDH-1198.1151 TCF-1 N/A 07-Aug-19 7.00 AM Saleem Mr. Ashok OPEN No Action
, at TCF-1 CPP Pipe yard.
Field pipe bending Inspection for
1021 CPP-NGCP-M-1020 1400176279 Mechanical SATIP-L-450-04 SAIC-L-2114 (16"X0.438”), HRDH-AK,BK,CK at TCF-1 N/A 07-Aug-19 7.10 AM Saleem Mr. Ashok OPEN No Action
TCF-1 CPP Pipe yard.
Stringing and pipe laying inspection at
1022 CPP-NGCP-M-1021 1400176306 Mechanical SATIP-L-450-04 SAIC-L-2132 HRDH-1176 FL N/A 07-Aug-19 9:30 AM Umair Mr. Ashok OPEN No Action
HRDH-1176 FL
Verification of underground/
aboveground Pipeline crossing or
1023 CPP-NGCP-M-1022 1400176323 Mechanical SATIP-L-450-04 SAIC-L-2131 HRDH-1170 N/A 07-Aug-19 11.00 AM Umair Mr. Ashok OPEN No Action
parrallel with existing pipelines and
other buried facilities at HRDH-1170
Visual Inspection of valves at TCF1
1024 CPP-NGCP-M-1023 1400176315 Mechanical SATIP-L-108-01 SAIC-L-2040 TCF-1 N/A 07-Aug-19 08.30 AM Irshad Mr. Ashok OPEN No Action
YARD
Material receiving inspection for 225
1025 CPP-NGCP-M-1024 1400176308 Mechanical SATIP-L-450-04 SAIC-L-2112 TCF-1 N/A 07-Aug-19 9:30 AM David Mr. Ashok OPEN No Action
pipes (30" X 0.562") at TCF1 YARD
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. i DISCIPLINE SATIP SAIC DESCRIPTION LOCATION NUMBER INSPECTION INSPECTION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
t
t
a
l
Welding consumables verification and visual
Mr. Babu
1 CPP-NGCP-W-001 1400035575 Welding SATIP-W-012-01 SAIC-W-2044 inspection storage & handling (E 7010-P1 one box Storage Area N/A 15-Dec-18 9:00 AM Sarfaraz CLOSED
Manickam
x 19kg, E 8018-C3 ten box x126Kg

Control,storage, handling, issue and conditioning


TA-669367 19-Dec-18 Mr. Babu
2 CPP-NGCP-W-002 1400037102 Welding SATIP-W-012-01 SAIC-W-2046 of welding consumables HRDH-1142 FL 4:25 PM Sarfaraz CLOSED
Manickam
prior to start of welding at HRDH-1142 FL

Pre-weld and weld joint fit-up inspection for 8inch TA-669367 19-Dec-18 Mr. Babu
3 CPP-NGCP-W-003 1400037122 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1142 FL 4:30 PM Sarfaraz CLOSED
flow line HRDH-1142 FL Manickam

In-process weld inspection for 8inch HRDH-1142 Mr. Babu


4 CPP-NGCP-W-004 1400037173 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1142 FL TA-669367 19-Dec-18 Sarfaraz CLOSED
FL Manickam

Post-welding visual inspection for 8inch HRDH- Mr. Babu


5 CPP-NGCP-W-005 1400037146 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1142 FL TA-669367 19-Dec-18 Sarfaraz CLOSED
1142 FL Manickam

Mr. Babu
6 CPP-NGCP-W-006 1400037164 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8inch HRDH-1142 FL HRDH-1142 FL TA-669367 19-Dec-18 Sarfaraz CLOSED
Manickam

Welding Equipment calibration verification Mr. Babu


7 CPP-NGCP-W-007 1400037163 Welding SATIP-W-012-01 SAIC-W-2045 HRDH-1142 FL TA-669367 19-Dec-18 Sarfaraz CLOSED
inspection prior to welding of HRDH-1142 FL Manickam

NDE selection for welds of 8inch HRDH-1142 Mr. Babu


8 CPP-NGCP-W-008 1400037428 Welding SATIP-W-012-01 SAIC-W-2054 FL HRDH-1142 FL TA-669367 20-Dec-18 Sarfaraz CLOSED
Manickam

Mr. Babu
9 CPP-NGCP-W-009 1400037382 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1142 FL TA-669367 20-Dec-18 Sarfaraz CLOSED
for 8inch HRDH-1142 FL Manickam

Mr. Babu
10 CPP-NGCP-W-010 1400037416 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1142 FL TA-669367 20-Dec-18 Sarfaraz CLOSED
HRDH-1142 FL Manickam

Mr. Babu
11 CPP-NGCP-W-011 1400037617 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1142 FL TA-669367 22-Dec-18 Sarfaraz CLOSED
for 8 inch HRDH-1142 FL Manickam

Mr. Babu
12 CPP-NGCP-W-012 1400037599 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1142 FL TA-669367 12/222018 Sarfaraz CLOSED
HRDH-1142 FL Manickam

Mr. Babu
13 CPP-NGCP-W-013 1400037628 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8inch HRDH-1142 HRDH-1142 FL TA-669367 22-Dec-18 Sarfaraz CLOSED
FL Manickam

Mr. Babu
14 CPP-NGCP-W-014 1400039005 Welding SATIP-NDE-RT-01 SAIC-RT-2004 RT devices & Safety eqiupment inspection and HRDH-1142 FL TA-669367 27-Dec-18 Sarfaraz CLOSED
verification at KM 1+600, HRDH-1142 FL KM 1+600 Manickam

Mr. Babu
15 CPP-NGCP-W-015 1400038942 Welding SATIP-NDE-RT-01 SAIC-RT-2005 RT fims (Unexposed) & Developing Equiment HRDH-1142 TA-669367 27-Dec-18 Sarfaraz CLOSED
inspection at KM 1+600, HRDH-1142 FL KM 1+600 Manickam

In-process verification of techniques and Mr. Babu


16 CPP-NGCP-W-016 1400039013 Welding SATIP-NDE-RT-01 SAIC-RT-2007 procedure implementation at KM 1+600, HRDH- HRDH-1142 FL TA-669367 27-Dec-18 Sarfaraz CLOSED
1142 FL KM 1+600 Manickam

Replied in the EPM as


1400038950 Pre-welding and weld joint fit up inspection HRDH-1170 FL TA-843656 27-Dec-18 Mr. Babu
17 CPP-NGCP-W-017 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1170 FL,at KM 1+600, Sarfaraz REJECTED work could not be started
Manickam
due to work permit issue

Replied in the EPM as


1400039000 Post-welding visual inspection for 8inch HRDH-1170 FL TA-843656 27-Dec-18 Mr. Babu
18 CPP-NGCP-W-018 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1170 FL, at KM 1+200, Sarfaraz REJECTED REJECTED work could not be started
Manickam
due to work permit issue

Pre-welding and weld joint fit up inspection Mr. Babu


19 CPP-NGCP-W-019 1400039836 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1134 FL HWYH-1134 FL TA-843656 31-Dec-18 8:00 AM Sarfaraz CLOSED
Manickam

In-process verification of techniques and Mr. Babu


20 CPP-NGCP-W-020 1400039824 Welding SATIP-W-012-01 SAIC-RT-2007 procedure implementation for 8 inch HWYH- HWYH-1134 FL TA-843656 31-Dec-18 10:00 AM Sarfaraz CLOSED
1134 FL Manickam

Post-welding visual inspection for 8 inch Mr. Babu


21 CPP-NGCP-W-021 1400039818 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL HWYH-1134 FL TA-843656 31-Dec-18 2:00 PM Sarfaraz CLOSED
Manickam

NDE selection for welds of 8 inch HWYH-1134 Mr. Babu


22 CPP-NGCP-W-022 1400039825 Welding SATIP-W-012-01 SAIC-W-2054 FL HWYH-1134 FL TA-843656 31-Dec-18 4:00 PM Sarfaraz CLOSED
Manickam

23 CPP-NGCP-W-023 1400040084 Welding SATIP-W-012-01 SAIC-W-2045 Welding Equipment calibration verification HWYH-1134 FL TA-445836 01-Jan-19 2:00 PM Sarfaraz Mr. Rajesh CLOSED
inspection prior to welding of HWYH-1134 FL

24 CPP-NGCP-W-024 1400040027 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1170 FL TA-843656 01-Jan-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1170 FL,at KM 1+300,

25 CPP-NGCP-W-025 1400040129 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1170 FL TA-843656 01-Jan-19 5:00 PM Sarfaraz Mr. Rajesh CLOSED
HRDH-1170 FL, at KM 1+300,

26 CPP-NGCP-W-026 1400040573 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1170 FL TA-843656 03-Jan-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1170 FL,at KM 1+300,

27 CPP-NGCP-W-027 1400040500 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1170 FL TA-843656 03-Jan-19 5:00 PM Sarfaraz Mr. Rajesh CLOSED
HRDH-1170 FL, at KM 1+300,

Mr. Babu
28 CPP-NGCP-W-028 1400040564 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-843656 03-Jan-19 8:00 AM Sarfaraz CLOSED
for 8 inch HWYH-1134 FL Manickam

Mr. Babu
29 CPP-NGCP-W-029 1400040577 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-843656 03-Jan-19 2:00 PM Sarfaraz CLOSED
HWYH-1134 FL Manickam

Pre-welding and weld joint fit up inspection Mr. Babu


30 CPP-NGCP-W-030 1400040956 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1134 FL HWYH-1134 FL TA-843656 05-Jan-19 8:00 AM Sarfaraz CLOSED
Manickam

1400040966 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-843656 05-Jan-19 10:00 AM Mr. Babu
31 CPP-NGCP-W-031 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL Sarfaraz CLOSED
Manickam

1400041403 NDE selection for welds of 8 inch HRDH-1170 HRDH-1170 & HRDH-1142 FL TA-843656 06-Jan-19 10:00 AM Mr. Babu
32 CPP-NGCP-W-032 Welding SATIP-W-012-01 SAIC-W-2054 & HRDH-1142 FL Sarfaraz CLOSED
Manickam

NDE selection for welds of 8 inch HWYH-1134 Mr. Babu


33 CPP-NGCP-W-033 1400041384 Welding SATIP-W-012-01 SAIC-W-2054 FL HWYH-1134 FL TA-843656 06-Jan-19 10:30 AM Sarfaraz CLOSED
Manickam

RT devices & Safety eqiupment inspection and Mr. Babu


34 CPP-NGCP-W-034 1400041405 Welding SATIP-NDE-RT-01 SAIC-RT-2004 verification at HRDH-1170 &HRDH-1142 FL HRDH-1170 & HRDH-1142 FL TA-843656 06-Jan-19 10:00 AM Sarfaraz REJECTED
Manickam

RT devices & Safety eqiupment inspection and Mr. Babu


35 CPP-NGCP-W-035 1400041319 Welding SATIP-NDE-RT-01 SAIC-RT-2004 verification at HWYH-1134 FL HWYH-1134 FL TA-843656 06-Jan-19 10:30 AM Sarfaraz CLOSED
Manickam

1400042015 Pre-welding and weld joint fit up inspection HRDH-1170 FL TA-843656 08-Jan-19 1:00 PM
36 CPP-NGCP-W-036 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1170 FL,at KM 1+300, Sarfaraz Mr. Rajesh CLOSED

1400041979 Post-welding visual inspection for 8inch HRDH-1170 FL TA-843656 08-Jan-19 1:00 PM
37 CPP-NGCP-W-037 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1170 FL, at KM 1+300, Sarfaraz Mr. Rajesh CLOSED

38 CPP-NGCP-W-038 1400041952 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-843656 08-Jan-19 1:00 PM Umair Mr. Rajesh CLOSED
for 8 inch HWYH-1134 FL @ KM-5+000.

39 CPP-NGCP-W-039 1400041989 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-843656 08-Jan-19 1:00 PM Umair Mr. Rajesh CLOSED
HWYH-1134 FL @ KM-5+000.

40 CPP-NGCP-W-040 1400042037 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-843656 08-Jan-19 4:00 PM Umair Mr. Rajesh CLOSED
FL @ KM-5+000.

41 CPP-NGCP-W-041 1400041997 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1170 HRDH-1170 FL TA-843656 08-Jan-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL, at KM 1+300,L

42 CPP-NGCP-W-042 1400042324 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1170 FL TA-843656 09-Jan-19 1:00 PM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1170 FL,at KM 1+300,

43 CPP-NGCP-W-043 1400042314 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1170 FL TA-843656 09-Jan-19 1:00 PM Sarfaraz Mr. Rajesh CLOSED
HRDH-1170 FL, at KM 1+300,

44 CPP-NGCP-W-044 1400042298 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1170 HRDH-1170 FL TA-843656 09-Jan-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL, at KM 1+300,

1400042342 Pre-welding and weld joint fit up inspection HRDH-1170 FL TA-843656 10-Jan-19 10:30 AM
45 CPP-NGCP-W-045 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1170 FL,at KM 1+300, Sarfaraz Mr. Rajesh CLOSED

1400042369 Post-welding visual inspection for 8inch HRDH-1170 FL TA-843656 10-Jan-19 10:30 AM
46 CPP-NGCP-W-046 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1170 FL, at KM 1+300, Sarfaraz Mr. Rajesh CLOSED

1400042370 NDE selection for welds of 8 inch HRDH-1170 HRDH-1170 FL TA-843656 10-Jan-19 4:00 PM
47 CPP-NGCP-W-047 Welding SATIP-W-012-01 SAIC-W-2054 FL, at KM 1+300,L Sarfaraz Mr. Rajesh CLOSED

Pre-welding and weld joint fit up inspection Mr. Babu


48 CPP-NGCP-W-048 1400042637 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1134 FL @ KM-5+000. HWYH-1134 FL TA-445836 10-Jan-19 1:00 PM Umair CLOSED
Manickam

Post-welding visual inspection for 8 inch Mr. Babu


49 CPP-NGCP-W-049 1400042686 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL @ KM-5+000. HWYH-1134 FL TA-445836 10-Jan-19 1:00 PM Umair CLOSED
Manickam

NDE selection for welds of 8 inch HWYH-1134 Mr. Babu


50 CPP-NGCP-W-050 1400042657 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-5+000. HWYH-1134 FL TA-445836 10-Jan-19 4:00 PM Umair CLOSED
Manickam

1400042758 Pre-welding and weld joint fit up inspection HRDH-1170 FL TA-843656 12-Jan-19 8:00 AM
51 CPP-NGCP-W-051 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1170 FL,at KM 1+300, Sarfaraz Mr. Rajesh CLOSED

52 CPP-NGCP-W-052 1400042789 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1170 FL TA-843656 12-Jan-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1170 FL, at KM 1+300,

53 CPP-NGCP-W-053 1400042759 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1170 HRDH-1170 FL TA-843656 12-Jan-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL, at KM 1+300,L

54 CPP-NGCP-W-054 1400042795 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 12-Jan-19 8:00 AM Umair Mr. Rajesh CLOSED
for 8 inch HWYH-1134 FL @ KM-5+000.

55 CPP-NGCP-W-055 1400042712 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 12-Jan-19 8:10 AM Umair Mr. Rajesh CLOSED
HWYH-1134 FL @ KM-5+000.

56 CPP-NGCP-W-056 1400042760 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 12-Jan-19 4:00 PM Umair Mr. Rajesh CLOSED
FL @ KM-5+000.

57 CPP-NGCP-W-057 1400043042 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1170 FL TA-843656 13-Jan-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1170 FL,at KM 1+200,

58 CPP-NGCP-W-058 1400043136 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1170 FL TA-843656 13-Jan-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1170 FL, at KM 1+200,

1400043124 NDE selection for welds of 8 inch HRDH-1170 HRDH-1170 FL TA-843656 13-Jan-19 4:00 PM
59 CPP-NGCP-W-059 Welding SATIP-W-012-01 SAIC-W-2054 FL, at KM 1+200, Sarfaraz Mr. Rajesh CLOSED

1400043092 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 13-Jan-19 8:00 AM
60 CPP-NGCP-W-060 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1134 FL @ KM-5+000. Umair Mr. Rajesh CLOSED

1400043125 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 13-Jan-19 8:10 AM
61 CPP-NGCP-W-061 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL @ KM-5+000. Umair Mr. Rajesh CLOSED

1400043143 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 13-Jan-19 4:00 PM
62 CPP-NGCP-W-062 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-5+000. Umair Mr. Rajesh CLOSED

In-process verification of techniques and


63 CPP-NGCP-W-063 1400042394 Welding SATIP-NDE-RT-01 SAIC-RT-2007 procedure implementation at KM 1+300, HRDH- HRDH-1170 FL TA-669367 13-Jan-19 8:00 AM Sarfaraz Mr. Rajesh REJECTED
1170 FL

In-process verification of techniques and


64 CPP-NGCP-W-064 1400043126 Welding SATIP-W-012-01 SAIC-RT-2007 procedure implementation at KM-5+000, HWYH- HWYH-1134 FL TA-843656 13-Jan-19 8:00 AM Umair Mr. Rajesh CLOSED
1134 FL

1400043279 Pre-welding and weld joint fit up inspection HRDH-1170 FL TA-843656 14-Jan-19 8:00 AM
65 CPP-NGCP-W-065 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1170 FL,at KM 1+200, Sarfaraz Mr. Rajesh CLOSED

66 CPP-NGCP-W-066 1400043338 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1170 FL TA-843656 14-Jan-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1170 FL, at KM 1+200,

67 CPP-NGCP-W-067 1400043302 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1170 HRDH-1170 FL TA-843656 14-Jan-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL, at KM 1+200,

68 CPP-NGCP-W-068 1400043282 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 14-Jan-19 8:00 AM Umair Mr. Rajesh CLOSED
for 8 inch HWYH-1134 FL @ KM-4+400.
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a
l
1400043339 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 14-Jan-19 8:10 AM
69 CPP-NGCP-W-069 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL @ KM-4+400. Umair Mr. Rajesh CLOSED

70 CPP-NGCP-W-070 1400043328 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 14-Jan-19 4:00 PM Umair Mr. Rajesh CLOSED
FL @ KM-4+400.

Welding consumables verification and visual


71 CPP-NGCP-W-071 1400043504 Welding SATIP-W-012-01 SAIC-W-2044 inspection storage & handling at TCF-4, CPP TCF-4, CPP Storage Yard. N/A 14-Jan-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
Storage Yard.

72 CPP-NGCP-W-072 1400043767 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1170 FL TA-843656 15-Jan-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1170 FL,at KM 1+200,

73 CPP-NGCP-W-073 1400043786 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1170 FL TA-843656 15-Jan-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1170 FL, at KM 1+200,

74 CPP-NGCP-W-074 1400043770 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1170 HRDH-1170 FL TA-843656 15-Jan-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL, at KM 1+200,

75 CPP-NGCP-W-075 1400043780 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 15-Jan-19 8:00 AM Umair Mr. Rajesh CLOSED
for 8 inch HWYH-1134 FL @ KM-4+400.

76 CPP-NGCP-W-076 1400043772 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 15-Jan-19 8:10 AM Umair Mr. Rajesh CLOSED
HWYH-1134 FL @ KM-4+400.

1400043813 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 15-Jan-19 4:00 PM
77 CPP-NGCP-W-077 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-4+400. Umair Mr. Rajesh CLOSED

Welding consumables verification and visual


78 CPP-NGCP-W-078 1400043875 Welding SATIP-W-012-01 SAIC-W-2044 inspection storage & handling at TCF-1, CPP TCF-1, CPP Pipe Yard. TA-445988 15-Jan-19 2:00 PM Sarfaraz Mr. Rajesh CLOSED
Pipe Yard.

Welding Equipment calibration verification Mr. Babu


79 CPP-NGCP-W-079 1400043886 Welding SATIP-W-012-01 SAIC-W-2045 inspection prior to welding at TCF-1, CPP TCF-1, CPP Pipe Yard. TA-445988 15-Jan-19 2:00 PM Sarfaraz CLOSED
Pipe Yard. Manickam

Pre-welding and weld joint fit up inspection


80 CPP-NGCP-W-080 1400043904 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 15-Jan-19 2:30 PM Sarfaraz Mr. Rajesh CLOSED
Yard.

1400043899 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 15-Jan-19 2:30 PM
81 CPP-NGCP-W-081 Welding SATIP-W-012-01 SAIC-W-2048 double joints at TCF-1, CPP Pipe Yard. Sarfaraz Mr. Rajesh CLOSED

1400043861 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 15-Jan-19 4:00 PM
82 CPP-NGCP-W-082 Welding SATIP-W-012-01 SAIC-W-2054 joints at TCF-1, CPP Pipe Yard. Umair Mr. Rajesh CLOSED

1400044033 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 16-Jan-19 10:10 AM
83 CPP-NGCP-W-083 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1134 FL @ KM-4+400. Umair Mr. Rajesh CLOSED

84 CPP-NGCP-W-084 1400043986 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 16-Jan-19 10:20 AM Umair Mr. Rajesh CLOSED
HWYH-1134 FL @ KM-4+400.

85 CPP-NGCP-W-085 1400043971 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 16-Jan-19 3:00 PM Umair Mr. Rajesh CLOSED
FL @ KM-4+400.

86 CPP-NGCP-W-086 1400043942 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1170 FL TA-843656 16-Jan-19 10:30 AM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1170 FL,at KM 1+200,

87 CPP-NGCP-W-087 1400043912 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1170 FL TA-843656 16-Jan-19 2:00 PM Sarfaraz Mr. Rajesh CLOSED
HRDH-1170 FL, at KM 1+200,

88 CPP-NGCP-W-088 1400044016 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1170 HRDH-1170 FL TA-843656 16-Jan-19 3:20 PM Sarfaraz Mr. Rajesh CLOSED
FL, at KM 1+200,

Pre-welding and weld joint fit up inspection


89 CPP-NGCP-W-089 1400044161 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 16-Jan-19 10:00 AM Saif Mr. Rajesh CLOSED
Yard.

90 CPP-NGCP-W-090 1400044222 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 16-Jan-19 2:00 PM Saif Mr. Rajesh CLOSED
double joints at TCF-1, CPP Pipe Yard.

1400044234 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 16-Jan-19 4:00 PM
91 CPP-NGCP-W-091 Welding SATIP-W-012-01 SAIC-W-2054 joints at TCF-1, CPP Pipe Yard. Saif Mr. Rajesh CLOSED

1400044170 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 17-Jan-19 8:00 AM
92 CPP-NGCP-W-092 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1134 FL @ KM-4+400. Umair Mr. Rajesh CLOSED

1400044236 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 17-Jan-19 11:00 AM
93 CPP-NGCP-W-093 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL @ KM-4+400. Umair Mr. Rajesh CLOSED

1400044232 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 17-Jan-19 4:00 PM
94 CPP-NGCP-W-094 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-4+400. Umair Mr. Rajesh CLOSED

1400044274 Pre-welding and weld joint fit up inspection HRDH-1170 FL TA-843656 17-Jan-19 8:15 AM
95 CPP-NGCP-W-095 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1170 FL,at KM 1+200, Sarfaraz Mr. Rajesh CLOSED

1400044172 Post-welding visual inspection for 8inch HRDH-1170 FL TA-843656 17-Jan-19 11:20 AM
96 CPP-NGCP-W-096 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1170 FL, at KM 1+200, Sarfaraz Mr. Rajesh CLOSED

1400044190 NDE selection for welds of 8 inch HRDH-1170 HRDH-1170 FL TA-843656 17-Jan-19 3:50 PM
97 CPP-NGCP-W-097 Welding SATIP-W-012-01 SAIC-W-2054 FL, at KM 1+200, Sarfaraz Mr. Rajesh CLOSED

Pre-welding and weld joint fit up inspection


98 CPP-NGCP-W-098 1400044283 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 17-Jan-19 8:00 AM Saif Mr. Rajesh CLOSED
Yard.

99 CPP-NGCP-W-099 1400044248 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 17-Jan-19 11:00 AM Saif Mr. Rajesh CLOSED
double joints at TCF-1, CPP Pipe Yard.

100 CPP-NGCP-W-100 1400044237 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 17-Jan-19 4:00 PM Saif Mr. Rajesh CLOSED
joints at TCF-1, CPP Pipe Yard.

101 CPP-NGCP-W-101 1400044546 Welding SATIP-W-012-02 SAIC-W-2051 Weld repair verification of joints 01-FW-101 HRDH-1170 FL TA-843656 17-Jan-19 8:00 AM Sarfaraz Mr. Rajesh REJECTED REJECTED Job Not Ready
& 01-FW-103 at KM-1+300, HRDH-1170.

102 CPP-NGCP-W-102 1400044534 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch @ HRDH-1170 FL TA-843656 17-Jan-19 8:10 AM Sarfaraz Mr. Rajesh REJECTED REJECTED CANCEL JOB NOT READY
KM-1+300, HRDH-1170.

103 CPP-NGCP-W-103 1400044518 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 17-Jan-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1171 FL at KM-0+400

104 CPP-NGCP-W-104 1400044490 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 17-Jan-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1171 FL, at KM-0+400

105 CPP-NGCP-W-105 1400044519 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 17-Jan-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL, at KM-0+400

1400044563 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 18-Jan-19 8:00 AM
106 CPP-NGCP-W-106 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1171 FL at KM-0+400 Sarfaraz Mr. Rajesh CLOSED

1400044507 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 18-Jan-19 8:10 AM
107 CPP-NGCP-W-107 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1171 FL, at KM-0+400 Sarfaraz Mr. Rajesh CLOSED

1400044584 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 18-Jan-19 4:00 PM
108 CPP-NGCP-W-108 Welding SATIP-W-012-01 SAIC-W-2054 FL, at KM-0+400 Sarfaraz Mr. Rajesh CLOSED

1400044845 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 19-Jan-19 8:00 AM
109 CPP-NGCP-W-109 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1134 FL @ KM-4+400. Umair Mr. Rajesh CLOSED

1400044897 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 19-Jan-19 11:00 AM
110 CPP-NGCP-W-110 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL @ KM-4+400. Umair Mr. Rajesh CLOSED

1400044868 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 19-Jan-19 4:00 PM
111 CPP-NGCP-W-111 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-4+400. Umair Mr. Rajesh CLOSED

1400044924 In-Process Verification - RT Techniques & HRDH-1170 TA-843656 19-Jan-19 2:00 PM


112 CPP-NGCP-W-112 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation at HRDH-1170 Sarfaraz Mr. Rajesh CLOSED

In-Process Repair Verification of Water


113 CPP-NGCP-W-113 1400044855 Welding SATIP-NDE-LPT-01 SAIC-LPT-2006 Washable Color Contrast (Visible Dye) HRDH-1170 TA-843656 19-Jan-19 11:00 AM Sarfaraz Mr. Rajesh CLOSED Cancelled No Checklist in EPM
Penetrant Examination at HRDH-1170

Review of weekly welder performance and


114 CPP-NGCP-W-114 1400044958 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 11-Jan-2019 to OFFICE N/A 20-Jan-19 9:00 AM Ruhul Mr. Rajesh CLOSED
17 Jan-2019 at CPP site office.

115 CPP-NGCP-W-115 1400044992 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 20-Jan-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1171 FL at KM-0+800

116 CPP-NGCP-W-116 1400045017 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 20-Jan-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1171 FL, at KM-0+800

117 CPP-NGCP-W-117 1400045033 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 20-Jan-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL, at KM-0+800

Pre-welding and weld joint fit up inspection


118 CPP-NGCP-W-118 1400044968 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 20-Jan-19 8:00 AM Saif Mr. Rajesh CLOSED
Yard.

119 CPP-NGCP-W-119 1400045018 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 20-Jan-19 8:10 AM Saif Mr. Rajesh CLOSED
double joints at TCF-1, CPP Pipe Yard.

1400045024 NDE selection for welds of 24 inch double 20-Jan-19 4:00 PM Saif
120 CPP-NGCP-W-120 Welding SATIP-W-012-01 SAIC-W-2054 joints at TCF-1, CPP Pipe Yard. TCF-1, CPP Pipe Yard. TA-445988 Mr. Rajesh CLOSED

1400045034 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 20-Jan-19 8:00 AM
121 CPP-NGCP-W-121 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1134 FL @ KM-4+400. Umair Mr. Rajesh CLOSED

1400044959 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 20-Jan-19 8:10 AM
122 CPP-NGCP-W-122 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL @ KM-4+400. Umair Mr. Rajesh CLOSED

1400044942 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 20-Jan-19 4:00 PM
123 CPP-NGCP-W-123 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-4+400. Umair Mr. Rajesh CLOSED

1400045421 Pre-welding and weld joint fit up inspection HRDH-1171 FL 21-Jan-19 8:00 AM
124 CPP-NGCP-W-124 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1171 FL at KM-0+800 TA-843547 Sarfaraz Mr. Rajesh CLOSED

1400045466 Post-welding visual inspection for 8inch HRDH-1171 FL 21-Jan-19 8:10 AM


125 CPP-NGCP-W-125 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1171 FL, at KM-0+800 TA-843547 Sarfaraz Mr. Rajesh REJECTED

1400045422 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL 21-Jan-19 4:00 PM
126 CPP-NGCP-W-126 Welding SATIP-W-012-01 SAIC-W-2054 FL, at KM-0+800 TA-843547 Sarfaraz Mr. Rajesh CLOSED

Pre-welding and weld joint fit up inspection


127 CPP-NGCP-W-127 1400045438 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 21-Jan-19 8:00 AM Saif Mr. Rajesh REJECTED REJECTED CANCEL JOB NOT READY
Yard.

129 CPP-NGCP-W-129 1400045371 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 21-Jan-19 4:00 PM Saif Mr. Rajesh REJECTED REJECTED CANCEL JOB NOT READY
joints at TCF-1, CPP Pipe Yard.

130 CPP-NGCP-W-130 1400045483 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 21-Jan-19 8:00 AM Umair Mr. Rajesh CLOSED
for 8 inch HWYH-1134 FL @ KM-4+400.

131 CPP-NGCP-W-131 1400045412 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 21-Jan-19 8:10 AM Umair Mr. Rajesh CLOSED
HWYH-1134 FL @ KM-4+400.

132 CPP-NGCP-W-132 1400045468 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 21-Jan-19 4:00 PM Umair Mr. Rajesh CLOSED
FL @ KM-4+400.
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a
l
In-process verification of techniques and
133 CPP-NGCP-W-133 1400045475 Welding SATIP-W-012-01 SAIC-RT-2007 procedure implementation at KM-4+400, HWYH- HWYH-1134 FL TA-843656 21-Jan-19 8:10 AM Umair Mr. Rajesh CLOSED
1134 FL
W
e
l
134 CPP-NGCP-W-134 1400045728 d Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 22-Jan-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1171 FL at KM-0+700
i
n
W
g
e
l
135 CPP-NGCP-W-135 1400045734 d Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 22-Jan-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1171 FL, at KM-0+700
i
n
W
g
e
l
136 CPP-NGCP-W-136 1400045699 d Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 22-Jan-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL, at KM-0+700
i
n
W
g
e
l In-process verification of techniques and
137 CPP-NGCP-W-137 1400045681 d Welding SATIP-W-012-01 SAIC-RT-2007 procedure implementation at HRDH-1171 FL, HRDH-1171 FL TA-843547 22-Jan-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
i at KM-0+700
n
W
g
e
l
138 CPP-NGCP-W-138 1400045650 d Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 22-Jan-19 8:00 AM Umair Mr. Rajesh CLOSED
for 8 inch HWYH-1134 FL @ KM-4+400.
i
n
W
g
e
l
139 CPP-NGCP-W-139 1400045709 d Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 22-Jan-19 8:10 AM Umair Mr. Rajesh CLOSED
HWYH-1134 FL @ KM-4+400.
i
n
W
g
e
l
140 CPP-NGCP-W-140 1400045730 d Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 22-Jan-19 4:00 PM Umair Mr. Rajesh CLOSED
FL @ KM-4+400.
i
n
W
g
e
l
1400045989 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 23-Jan-19 8:00 AM
141 CPP-NGCP-W-141 d Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1171 FL at KM-0+700 Sarfaraz Mr. Rajesh CLOSED
i
n
W
g
e
l
1400045980 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 23-Jan-19 8:10 AM
142 CPP-NGCP-W-142 d Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1171 FL, at KM-0+700 Sarfaraz Mr. Rajesh CLOSED
i
n
W
g
e
l
1400046063 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 23-Jan-19 4:00 PM
143 CPP-NGCP-W-143 d Welding SATIP-W-012-01 SAIC-W-2054 FL, at KM-0+700 Sarfaraz Mr. Rajesh CLOSED
i
n
W
g
e
l
1400046045 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 23-Jan-19 8:00 AM
144 CPP-NGCP-W-144 d Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1134 FL @ KM-4+400. Umair Mr. Rajesh CLOSED
i
n
W
g
e
l
1400046046 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 23-Jan-19 8:10 AM
145 CPP-NGCP-W-145 d Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL @ KM-4+400. Umair Mr. Rajesh CLOSED
i
n
W
g
e
l
1400046064 d NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 23-Jan-19 4:00 PM
146 CPP-NGCP-W-146 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-4+400. Umair Mr. Rajesh CLOSED
i
n
g

1400046421 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 24-Jan-19 8:00 AM
147 CPP-NGCP-W-147 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1134 FL @ KM-3+200. Umair Mr. Rajesh CLOSED

148 CPP-NGCP-W-148 1400046410 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 24-Jan-19 8:10 AM Umair Mr. Rajesh CLOSED
HWYH-1134 FL @ KM-3+200.

149 CPP-NGCP-W-149 1400046484 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 24-Jan-19 4:00 PM Umair Mr. Rajesh CLOSED
FL @ KM-3+200.

150 CPP-NGCP-W-150 1400046485 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 24-Jan-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1171 FL at KM-0+700

151 CPP-NGCP-W-151 1400046437 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 24-Jan-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1171 FL, at KM-0+700

152 CPP-NGCP-W-152 1400046411 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 24-Jan-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL, at KM-0+700

Welding Equipment calibration verification


153 CPP-NGCP-W-153 1400046464 Welding SATIP-W-012-01 SAIC-W-2045 inspection prior to welding of HRDH-1171 HRDH-1171 FL N/A 24-Jan-19 2:00 PM Sarfaraz Mr. Rajesh CLOSED
FL, at KM-0+700

Welding consumables verification and visual


154 CPP-NGCP-W-154 1400046412 Welding SATIP-W-012-01 SAIC-W-2044 inspection storage & handling at HRDH-1171 HRDH-1171 FL N/A 24-Jan-19 2:00 PM Sarfaraz Mr. Rajesh CLOSED
FL, at KM-0+700

1400046465 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 25-Jan-19 8:00 AM
155 CPP-NGCP-W-155 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1171 FL at KM-0+700 Sarfaraz Mr. Rajesh CLOSED

1400046493 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 25-Jan-19 8:10 AM
156 CPP-NGCP-W-156 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1171 FL, at KM-0+700 Sarfaraz Mr. Rajesh CLOSED

1400046438 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 25-Jan-19 4:00 PM
157 CPP-NGCP-W-157 Welding SATIP-W-012-01 SAIC-W-2054 FL, at KM-0+700 Sarfaraz Mr. Rajesh CLOSED

1400046665 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 26-Jan-19 8:00 AM
158 CPP-NGCP-W-158 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1171 FL at KM-0+700 Sarfaraz Mr. Rajesh CLOSED

1400046666 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 26-Jan-19 8:10 AM
159 CPP-NGCP-W-159 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1171 FL, at KM-0+700 Sarfaraz Mr. Rajesh CLOSED

1400046618 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 26-Jan-19 4:00 PM
160 CPP-NGCP-W-160 Welding SATIP-W-012-01 SAIC-W-2054 FL, at KM-0+700 Sarfaraz Mr. Rajesh CLOSED

1400046591 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 26-Jan-19 8:00 AM
161 CPP-NGCP-W-161 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1134 FL @ KM-3+200. Umair Mr. Rajesh CLOSED

162 CPP-NGCP-W-162 1400046632 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 26-Jan-19 8:10 AM Umair Mr. Rajesh CLOSED
HWYH-1134 FL @ KM-3+200.

163 CPP-NGCP-W-163 1400046646 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 26-Jan-19 4:00 PM Umair Mr. Rajesh CLOSED
FL @ KM-3+200.

Pre-welding and weld joint fit up inspection


164 CPP-NGCP-W-164 1400046661 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 26-Jan-19 8:00 AM Saif Mr. Rajesh CLOSED Re-shedule on 27-Jan-
Yard. 2019

165 CPP-NGCP-W-165 1400046662 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 26-Jan-19 8:10 AM Saif Mr. Rajesh CLOSED Re-shedule on 27-Jan-
double joints at TCF-1, CPP Pipe Yard. 2019

166 CPP-NGCP-W-166 1400046687 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 26-Jan-19 4:00 PM Saif Mr. Rajesh REJECTED Re-shedule on 27-Jan-
joints at TCF-1, CPP Pipe Yard. 2019

167 CPP-NGCP-W-167 1400046861 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 27-Jan-19 8:00 AM Umair Mr. Rajesh CLOSED
for 8 inch HWYH-1134 FL @ KM-3+200.

168 CPP-NGCP-W-168 1400046862 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 27-Jan-19 8:10 AM Umair Mr. Rajesh CLOSED
HWYH-1134 FL @ KM-3+200.

169 CPP-NGCP-W-169 1400046916 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 27-Jan-19 4:00 PM Umair Mr. Rajesh CLOSED
FL @ KM-3+200.

In-Process Verification - RT Techniques &


170 CPP-NGCP-W-170 1400046842 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1134 FL @ HWYH-1134 FL TA-445836 27-Jan-19 10:00 AM Umair Mr. Rajesh CLOSED
KM-3+200.

1400046870 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 27-Jan-19 8:00 AM
171 CPP-NGCP-W-171 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1171 FL at KM-0+700 Sarfaraz Mr. Rajesh CLOSED

1400046902 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 27-Jan-19 8:10 AM
172 CPP-NGCP-W-172 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1171 FL, at KM-0+700 Sarfaraz Mr. Rajesh CLOSED

1400046924 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 27-Jan-19 4:00 PM
173 CPP-NGCP-W-173 Welding SATIP-W-012-01 SAIC-W-2054 FL, at KM-0+700 Sarfaraz Mr. Rajesh CLOSED

Review of weekly welder performance and


174 CPP-NGCP-W-174 1400046941 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 18-Jan-2019 to OFFICE N/A 27-Jan-19 9:00 AM Ruhul Mr. Rajesh REJECTED
24 Jan-2019 at CPP site office.

1400047431 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 28-Jan-19 8:00 AM
175 CPP-NGCP-W-175 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1134 FL @ KM-2+600. Umair Mr. Rajesh CLOSED

1400047495 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 28-Jan-19 8:10 AM
176 CPP-NGCP-W-176 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL @ KM-2+600. Umair Mr. Rajesh CLOSED

177 CPP-NGCP-W-177 1400047485 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 28-Jan-19 4:00 PM Umair Mr. Rajesh CLOSED
FL @ KM-2+600.

Don’t have checklist


178 CPP-NGCP-W-178 1400047472 Welding SATIP-NDE-LPT-01 SAIC-LPT-2003 Visual Insp & Verification of LPT mat'ls HRDH-1170 FL TA-843656 28-Jan-19 8:00 AM Saif Mr. Rajesh CLOSED so cant be submitted
(Cleaner, Penetrant, Developer, etc) in EPM

Don’t have checklist


179 CPP-NGCP-W-179 1400047489 Welding SATIP-NDE-LPT-01 SAIC-LPT-2007 Solvent-Removable Color Contrast (Visible HRDH-1170 FL TA-843656 28-Jan-19 8:00 AM Saif Mr. Rajesh CLOSED so cant be submitted
Dye) Penetrant Examination in EPM

Weld repair verification of joints 00-FW-


180 CPP-NGCP-W-180 1400047452 Welding SATIP-W-012-02 SAIC-W-2051 040, 01-FW-101 & 01-FW-103 at KM-1+300, HRDH-1170 FL TA-843656 28-Jan-19 8:00 AM Saif Mr. Rajesh CLOSED
HRDH-1170.

181 CPP-NGCP-W-181 1400047510 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch @ HRDH-1170 FL TA-843656 28-Jan-19 8:10 AM Saif Mr. Rajesh CLOSED
KM-1+300, HRDH-1170.

182 CPP-NGCP-W-182 1400047490 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1171 FL AA-843547 28-Jan-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1171 FL at KM-1+900

183 CPP-NGCP-W-183 1400047478 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1171 FL AA-843547 28-Jan-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1171 FL, at KM-1+900

1400047456 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL AA-843547 28-Jan-19 4:00 PM
184 CPP-NGCP-W-184 Welding SATIP-W-012-01 SAIC-W-2054 FL, at KM-KM-1+900 Sarfaraz Mr. Rajesh CLOSED

In-Process Verification - RT Techniques &


185 CPP-NGCP-W-185 1400047502 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1171 FL, HRDH-1171 FL TA-445836 28-Jan-19 10:00 AM Umair Mr. Rajesh CLOSED
at KM-KM-1+900

1400047522 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 29-Jan-19 8:00 AM
186 CPP-NGCP-W-186 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1134 FL @ KM-2+600. Umair Mr. Rajesh CLOSED

1400047491 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 29-Jan-19 8:10 AM
187 CPP-NGCP-W-187 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL @ KM-2+600. Umair Mr. Rajesh CLOSED

1400047526 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 29-Jan-19 4:00 PM
188 CPP-NGCP-W-188 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-2+600. Umair Mr. Rajesh CLOSED

1400047533 Pre-welding and weld joint fit up inspection HRDH-1171 FL AA-843547 29-Jan-19 8:00 AM
189 CPP-NGCP-W-189 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1171 FL at KM-1+900 Sarfaraz Mr. Rajesh CLOSED

1400047479 Post-welding visual inspection for 8inch HRDH-1171 FL AA-843547 29-Jan-19 8:10 AM
190 CPP-NGCP-W-190 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1171 FL, at KM-1+900 Sarfaraz Mr. Rajesh CLOSED

191 CPP-NGCP-W-191 1400047457 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL AA-843547 29-Jan-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
FL, at KM-KM-1+900

Don’t have checklist


192 CPP-NGCP-W-192 1400047458 Welding SATIP-NDE-LPT-01 SAIC-LPT-2007 Solvent-Removable Color Contrast (Visible HRDH-1171 FL TA-843656 29-Jan-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED so cant be submitted
Dye) Penetrant Examination in EPM
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a
l
1400047492 Weld repair verification of joints 00-FW-045 HRDH-1171FL TA-843656 29-Jan-19 10:00 AM
193 CPP-NGCP-W-193 Welding SATIP-W-012-02 SAIC-W-2051 at HRDH-1171 FL, at KM-KM-0+600 Sarfaraz Mr. Rajesh CLOSED

194 CPP-NGCP-W-194 1400047543 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch at HRDH-1171 FL TA-843656 29-Jan-19 11:00 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1171 FL, at KM-KM-0+600

Pre-welding and weld joint fit up inspection


195 CPP-NGCP-W-195 1400047511 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 29-Jan-19 8:00 AM Saif Mr. Rajesh CLOSED
Yard.

196 CPP-NGCP-W-196 1400047553 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 29-Jan-19 8:10 AM Saif Mr. Rajesh CLOSED
double joints at TCF-1, CPP Pipe Yard.

197 CPP-NGCP-W-197 1400047563 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 29-Jan-19 4:00 PM Saif Mr. Rajesh CLOSED
joints at TCF-1, CPP Pipe Yard.
EPM upload problem

198 CPP-NGCP-W-198 1400047745 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 30-Jan-19 8:00 AM Umair Mr. Rajesh CLOSED
for 8 inch HWYH-1134 FL @ KM-2+600.

199 CPP-NGCP-W-199 1400047777 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 30-Jan-19 8:10 AM Umair Mr. Rajesh CLOSED
HWYH-1134 FL @ KM-2+600.

200 CPP-NGCP-W-200 1400047747 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 30-Jan-19 4:00 PM Umair Mr. Rajesh CLOSED
FL @ KM-2+600.

1400047748 Pre-welding and weld joint fit up inspection HRDH-1171 FL AA-843547 30-Jan-19 8:00 AM
201 CPP-NGCP-W-201 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1171 FL at KM-1+900 Sarfaraz Mr. Rajesh CLOSED

1400047749 Post-welding visual inspection for 8inch HRDH-1171 FL AA-843547 30-Jan-19 8:10 AM
202 CPP-NGCP-W-202 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1171 FL, at KM-1+900 Sarfaraz Mr. Rajesh CLOSED

203 CPP-NGCP-W-203 1400047750 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL AA-843547 30-Jan-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
FL, at KM-KM-1+900

Pre-welding and weld joint fit up inspection


204 CPP-NGCP-W-204 1400047742 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 30-Jan-19 8:00 AM Junaid Mr. Rajesh CLOSED
Yard. RE-shedule on 31-Jan-
2019

1400047778 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 30-Jan-19 8:10 AM
205 CPP-NGCP-W-205 Welding SATIP-W-012-01 SAIC-W-2048 double joints at TCF-1, CPP Pipe Yard. Junaid Mr. Rajesh CLOSED
RE-shedule on 31-Jan-
2019

1400047783 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 30-Jan-19 4:00 PM
206 CPP-NGCP-W-206 Welding SATIP-W-012-01 SAIC-W-2054 joints at TCF-1, CPP Pipe Yard. Junaid Mr. Rajesh CLOSED
RE-shedule on 31-Jan-
2019 EPM upload problem

In-Process Verification - RT Techniques &


207 CPP-NGCP-W-207 1400047986 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1134 FL @ HWYH-1134 FL TA-445836 31-Jan-19 10:00 AM Umair Mr. Rajesh REJECTED
KM-3+000

208 CPP-NGCP-W-208 1400047988 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 31-Jan-19 8:00 AM Umair Mr. Rajesh CLOSED
for 8 inch HWYH-1134 FL @ KM-2+500

209 CPP-NGCP-W-209 1400047947 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 31-Jan-19 8:10 AM Umair Mr. Rajesh CLOSED
HWYH-1134 FL @ KM-2+500

1400047993 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 31-Jan-19 4:00 PM
210 CPP-NGCP-W-210 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-2+500 Umair Mr. Rajesh CLOSED

1400047941 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 31-Jan-19 8:00 AM
211 CPP-NGCP-W-211 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1171 FL at KM-1+900 Sarfaraz Mr. Rajesh CLOSED

212 CPP-NGCP-W-212 1400047968 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 31-Jan-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1171 FL, at KM-1+900

213 CPP-NGCP-W-213 1400047994 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 31-Jan-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL, at KM-KM-1+900

In-Process Verification - RT Techniques &


214 CPP-NGCP-W-214 1400047971 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1171 FL, HRDH-1171 FL TA-445836 31-Jan-19 10:00 AM Sarfaraz Mr. Rajesh REJECTED
at KM-KM-1+390

1400048013 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 01-Feb-19 8:00 AM
215 CPP-NGCP-W-215 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1171 FL at KM-1+900 Sarfaraz Mr. Rajesh CLOSED

1400047970 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 01-Feb-19 8:10 AM
216 CPP-NGCP-W-216 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1171 FL, at KM-1+900 Sarfaraz Mr. Rajesh CLOSED

217 CPP-NGCP-W-217 1400048005 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 01-Feb-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL, at KM-KM-1+900

218 CPP-NGCP-W-218 1400048127 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 02-Feb-19 8:00 AM Umair Mr. Rajesh CLOSED
for 8 inch HWYH-1134 FL @ KM-2+600
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a
l
219 CPP-NGCP-W-219 1400048099 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 02-Feb-19 8:10 AM Umair Mr. Rajesh CLOSED
HWYH-1134 FL @ KM-2+600

220 CPP-NGCP-W-220 1400048100 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 02-Feb-19 4:00 PM Umair Mr. Rajesh CLOSED
FL @ KM-2+600

1400048109 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 02-Feb-19 8:00 AM
221 CPP-NGCP-W-221 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1171 FL at KM-1+900 Sarfaraz Mr. Rajesh CLOSED

1400048166 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 02-Feb-19 8:10 AM
222 CPP-NGCP-W-222 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1171 FL, at KM-1+900 Sarfaraz Mr. Rajesh CLOSED

223 CPP-NGCP-W-223 1400048119 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 02-Feb-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL, at KM-KM-1+900

Pre-welding and weld joint fit up inspection


224 CPP-NGCP-W-224 1400048120 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 02-Feb-19 8:00 AM Junaid Mr. Rajesh CLOSED
Yard.

1400047529 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 02-Feb-19 8:10 AM
225 CPP-NGCP-W-225 Welding SATIP-W-012-01 SAIC-W-2048 double joints at TCF-1, CPP Pipe Yard. Junaid Mr. Rajesh CLOSED

1400048145 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 02-Feb-19 4:00 PM
226 CPP-NGCP-W-226 Welding SATIP-W-012-01 SAIC-W-2054 joints at TCF-1, CPP Pipe Yard. Junaid Mr. Rajesh REJECTED

227 CPP-NGCP-W-227 1400048468 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 03-Feb-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1171 FL at KM-2+700

228 CPP-NGCP-W-228 1400048525 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 03-Feb-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1171 FL, at KM-2+700

1400048533 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 03-Feb-19 4:00 PM
229 CPP-NGCP-W-229 Welding SATIP-W-012-01 SAIC-W-2054 FL, at KM-KM-2+700 Sarfaraz Mr. Rajesh CLOSED

RE-shedule on 5-feb-
230 CPP-NGCP-W-230 1400048534 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1116 FL TA-843608 03-Feb-19 8:00 AM Saif Mr. Rajesh REJECTED REJECTED 2019
for 8 inch HRDH-1116 FL at KM-0+500
CANCEL JOB NOT READY

RE-shedule on 5-feb-
231 CPP-NGCP-W-231 1400048501 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1116 FL TA-843608 03-Feb-19 8:10 AM Saif Mr. Rajesh REJECTED REJECTED 2019
HRDH-1116 FL, at KM-0+500
CANCEL JOB NOT READY

RE-shedule on 5-feb-
1400048502 NDE selection for welds of 8 inch HRDH-1116 HRDH-1116 FL TA-843608 03-Feb-19 4:00 PM 2019
232 CPP-NGCP-W-232 Welding SATIP-W-012-01 SAIC-W-2054 FL, at KM-KM-0+500 Saif Mr. Rajesh REJECTED REJECTED
CANCEL JOB NOT READY

1400048469 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 03-Feb-19 8:00 AM
233 CPP-NGCP-W-233 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1134 FL @ KM-2+200 Umair Mr. Rajesh CLOSED

234 CPP-NGCP-W-234 1400048527 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 03-Feb-19 8:10 AM Umair Mr. Rajesh CLOSED
HWYH-1134 FL @ KM-2+200

235 CPP-NGCP-W-235 1400048537 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 03-Feb-19 4:00 PM Umair Mr. Rajesh CLOSED
FL @ KM-2+200

Pre-welding and weld joint fit up inspection


236 CPP-NGCP-W-236 1400048471 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 03-Feb-19 8:00 AM Junaid Mr. Rajesh CLOSED
Yard.

1400048439 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 03-Feb-19 8:10 AM
237 CPP-NGCP-W-237 Welding SATIP-W-012-01 SAIC-W-2048 double joints at TCF-1, CPP Pipe Yard. Junaid Mr. Rajesh CLOSED

238 CPP-NGCP-W-238 1400048472 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 03-Feb-19 4:00 PM Junaid Mr. Rajesh CLOSED
joints at TCF-1, CPP Pipe Yard.

Review of weekly welder performance and


239 CPP-NGCP-W-239 1400048553 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 25-Jan-2019 to CPP site office N/A 03-Feb-19 9:00 AM Ruhul Mr. Rajesh CLOSED
31 Jan-2019 at CPP site office.
In-Process Verification - RT Techniques &
240 CPP-NGCP-W-240 1400048628 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1171 , HRDH-1171 FL TA-445836 03-Feb-19 10:00 AM Sarfaraz Mr. Rajesh REJECTED Not Inspected & Closed
HRDH-1170 and TCF-1.

241 CPP-NGCP-W-241 1400048813 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 04-Feb-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1171 FL at KM-2+900

1400048732 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 04-Feb-19 8:00 AM
242 CPP-NGCP-W-242 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1171 FL, at KM-2+900 Sarfaraz Mr. Rajesh CLOSED

243 CPP-NGCP-W-243 1400048805 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 04-Feb-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL, at KM-KM-2+900
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a
l
244 CPP-NGCP-W-244 1400048814 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 04-Feb-19 8:00 AM Umair Mr. Rajesh CLOSED
for 8 inch HWYH-1134 FL @ KM-1+800

245 CPP-NGCP-W-245 1400048779 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 04-Feb-19 8:10 AM Umair Mr. Rajesh CLOSED
HWYH-1134 FL @ KM-1+800

1400048792 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 04-Feb-19 4:00 PM
246 CPP-NGCP-W-246 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-1+800 Umair Mr. Rajesh CLOSED

Pre-welding and weld joint fit up inspection


247 CPP-NGCP-W-247 1400048833 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 04-Feb-19 8:00 AM Junaid Mr. Rajesh CLOSED
Yard.

248 CPP-NGCP-W-248 1400048825 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 04-Feb-19 8:10 AM Junaid Mr. Rajesh CLOSED
double joints at TCF-1, CPP Pipe Yard.

249 CPP-NGCP-W-249 1400048760 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 04-Feb-19 4:00 PM Junaid Mr. Rajesh CLOSED
joints at TCF-1, CPP Pipe Yard.

1400048909 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 05-Feb-19 8:00 AM
250 CPP-NGCP-W-250 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1171 FL at KM-3+000 Sarfaraz Mr. Rajesh CLOSED

1400048976 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 05-Feb-19 8:00 AM
251 CPP-NGCP-W-251 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1171 FL, at KM-3+000 Sarfaraz Mr. Rajesh CLOSED

252 CPP-NGCP-W-252 1400048965 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 05-Feb-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL, at KM-KM-3+000

253 CPP-NGCP-W-253 1400048862 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 05-Feb-19 8:00 AM Umair Mr. Rajesh CLOSED
for 8 inch HWYH-1134 FL @ KM-1+600

1400048920 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 05-Feb-19 8:10 AM
254 CPP-NGCP-W-254 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL @ KM-1+600 Umair Mr. Rajesh CLOSED

255 CPP-NGCP-W-255 1400048994 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 05-Feb-19 4:00 PM Umair Mr. Rajesh CLOSED
FL @ KM-1+600

Pre-welding and weld joint fit up inspection


256 CPP-NGCP-W-256 1400049004 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 05-Feb-19 8:00 AM Junaid Mr. Rajesh CLOSED
Yard.

1400049003 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 05-Feb-19 8:10 AM
257 CPP-NGCP-W-257 Welding SATIP-W-012-01 SAIC-W-2048 double joints at TCF-1, CPP Pipe Yard. Junaid Mr. Rajesh CLOSED

1400048966 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 05-Feb-19 4:00 PM
258 CPP-NGCP-W-258 Welding SATIP-W-012-01 SAIC-W-2054 joints at TCF-1, CPP Pipe Yard. Junaid Mr. Rajesh CLOSED

In-Process Verification - RT Techniques &


259 CPP-NGCP-W-259 1400048993 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1171 and HRDH-1171 and TCF-1. TA-445988/TA- 05-Feb-19 4:00 PM Junaid Mr. Rajesh CLOSED
TCF-1. 843547

260 CPP-NGCP-W-260 1400048962 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1116 FL TA-843608 05-Feb-19 8:00 AM Saif Mr. Rajesh CLOSED
for 8 inch HRDH-1116 FL at KM-0+500

261 CPP-NGCP-W-261 1400048969 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1116 FL TA-843608 05-Feb-19 8:10 AM Saif Mr. Rajesh CLOSED
HRDH-1116 FL, at KM-0+500

1400048987 NDE selection for welds of 8 inch HRDH-1116 HRDH-1116 FL TA-843608 05-Feb-19 4:00 PM
262 CPP-NGCP-W-262 Welding SATIP-W-012-01 SAIC-W-2054 FL, at KM-KM-0+500 Saif Mr. Rajesh CLOSED

1400049313 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 06-Feb-19 8:00 AM
263 CPP-NGCP-W-263 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1171 FL at KM-3+000 Sarfaraz Mr. Rajesh CLOSED

264 CPP-NGCP-W-264 1400049315 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 06-Feb-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1171 FL, at KM-3+000

1400049272 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 06-Feb-19 4:00 PM
265 CPP-NGCP-W-265 Welding SATIP-W-012-01 SAIC-W-2054 FL, at KM-KM-3+000 Sarfaraz Mr. Rajesh CLOSED

266 CPP-NGCP-W-266 1400049324 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 06-Feb-19 8:00 AM Umair Mr. Rajesh CLOSED
for 8 inch HWYH-1134 FL @ KM-1+600

1400049325 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 06-Feb-19 8:10 AM
267 CPP-NGCP-W-267 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL @ KM-1+600 Umair Mr. Rajesh CLOSED

268 CPP-NGCP-W-268 1400049277 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 06-Feb-19 4:00 PM Umair Mr. Rajesh CLOSED
FL @ KM-1+600

Pre-welding and weld joint fit up inspection


269 CPP-NGCP-W-269 1400049251 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 06-Feb-19 8:00 AM Junaid Mr. Rajesh CLOSED
Yard.

270 CPP-NGCP-W-270 1400049305 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 06-Feb-19 8:10 AM Junaid Mr. Rajesh CLOSED
double joints at TCF-1, CPP Pipe Yard.

1400049335 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 06-Feb-19 4:00 PM
271 CPP-NGCP-W-271 Welding SATIP-W-012-01 SAIC-W-2054 joints at TCF-1, CPP Pipe Yard. Junaid Mr. Rajesh CLOSED

272 CPP-NGCP-W-272 1400049280 Welding SATIP-NDE-RT-01 SAIC-RT-2007 In-Process Verification - RT Techniques & TCF-1. TA-445988 06-Feb-19 4:00 PM Junaid Mr. Rajesh REJECTED
Procedure Implementation of TCF-1.
Location Change to
HWTH 1134

273 CPP-NGCP-W-273 1400049278 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1116 FL TA-843608 06-Feb-19 8:00 AM Saif Mr. Rajesh CLOSED
for 8 inch HRDH-1116 FL at KM-0+500

1400049288 Post-welding visual inspection for 8inch HRDH-1116 FL TA-843608 06-Feb-19 8:10 AM
274 CPP-NGCP-W-274 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1116 FL, at KM-0+500 Saif Mr. Rajesh CLOSED

275 CPP-NGCP-W-275 1400049326 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1116 HRDH-1116 FL TA-843608 06-Feb-19 4:00 PM Saif Mr. Rajesh CLOSED
FL, at KM-KM-0+500

276 CPP-NGCP-W-276 1400049279 Welding SATIP-NDE-RT-01 SAIC-RT-2007 In-Process Verification - RT Techniques & HRDH-1171 TA-843547 06-Feb-19 4:00 PM Junaid Mr. Rajesh REJECTED
Procedure Implementation of HRDH-1171
Re-Schedule to 7-Feb-
2019

1400049571 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 07-Feb-19 8:00 AM
277 CPP-NGCP-W-277 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1171 FL at KM-3+100 Sarfaraz Mr. Rajesh CLOSED

1400049581 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 07-Feb-19 8:00 AM
278 CPP-NGCP-W-278 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1171 FL, at KM-3+100 Sarfaraz Mr. Rajesh CLOSED

279 CPP-NGCP-W-279 1400049606 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 07-Feb-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL, at KM-KM-3+100

280 CPP-NGCP-W-280 1400049635 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 07-Feb-19 8:00 AM Umair Mr. Rajesh CLOSED
for 8 inch HWYH-1134 FL @ KM-1+500

281 CPP-NGCP-W-281 1400049600 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 07-Feb-19 8:10 AM Umair Mr. Rajesh CLOSED
HWYH-1134 FL @ KM-1+500

1400049609 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 07-Feb-19 4:00 PM
282 CPP-NGCP-W-282 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-1+500 Umair Mr. Rajesh CLOSED

Pre-welding and weld joint fit up inspection


283 CPP-NGCP-W-283 1400049664 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 07-Feb-19 8:00 AM Junaid Mr. Rajesh CLOSED
Yard.

284 CPP-NGCP-W-284 1400049601 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 07-Feb-19 8:10 AM Junaid Mr. Rajesh CLOSED
double joints at TCF-1, CPP Pipe Yard.

285 CPP-NGCP-W-285 1400049674 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 07-Feb-19 4:00 PM Junaid Mr. Rajesh CLOSED
joints at TCF-1, CPP Pipe Yard.

1400049683 Pre-welding and weld joint fit up inspection HRDH-1116 FL TA-843608 07-Feb-19 8:00 AM
286 CPP-NGCP-W-286 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1116 FL at KM-0+500 Saif Mr. Rajesh CLOSED

1400049676 Post-welding visual inspection for 8inch HRDH-1116 FL TA-843608 07-Feb-19 8:10 AM
287 CPP-NGCP-W-287 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1116 FL, at KM-0+500 Saif Mr. Rajesh CLOSED

288 CPP-NGCP-W-288 1400049677 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1116 HRDH-1116 FL TA-843608 07-Feb-19 4:00 PM Saif Mr. Rajesh CLOSED
FL, at KM-KM-0+500

289 CPP-NGCP-W-289 1400049679 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1116 FL TA-843608 08-Feb-19 8:00 AM Saif Mr. Rajesh CLOSED Re-Schedule to 09-Feb-
for 8 inch HRDH-1116 FL at KM-0+550 2019 due to No Permit

1400049680 Post-welding visual inspection for 8inch HRDH-1116 FL TA-843608 08-Feb-19 8:10 AM Re-Schedule to 09-Feb-
290 CPP-NGCP-W-290 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1116 FL, at KM-0+550 Saif Mr. Rajesh CLOSED 2019 due to No Permit

291 CPP-NGCP-W-291 1400049707 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1116 HRDH-1116 FL TA-843608 08-Feb-19 4:00 PM Saif Mr. Rajesh CLOSED Re-Schedule to 09-Feb-
FL, at KM-KM-0+550 2019 due to No Permit

292 CPP-NGCP-W-292 1400050048 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 09-Feb-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1171 FL at KM-3+100 Inspection Checlist
can't be open at the
time of closing

293 CPP-NGCP-W-293 1400050070 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 09-Feb-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1171 FL, at KM-3+100

294 CPP-NGCP-W-294 1400050021 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 09-Feb-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL, at KM-KM-3+100

1400050040 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 09-Feb-19 8:00 AM
295 CPP-NGCP-W-295 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1134 FL @ KM-1+500 Umair Mr. Rajesh CLOSED

1400050089 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 09-Feb-19 8:10 AM
296 CPP-NGCP-W-296 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL @ KM-1+500 Umair Mr. Rajesh CLOSED

297 CPP-NGCP-W-297 1400050008 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 09-Feb-19 4:00 PM Umair Mr. Rajesh CLOSED
FL @ KM-1+500

Pre-welding and weld joint fit up inspection


298 CPP-NGCP-W-298 1400050103 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 09-Feb-19 8:00 AM Junaid Mr. Rajesh CLOSED
Yard.

1400050031 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 09-Feb-19 8:10 AM
299 CPP-NGCP-W-299 Welding SATIP-W-012-01 SAIC-W-2048 double joints at TCF-1, CPP Pipe Yard. Junaid Mr. Rajesh CLOSED

1400050071 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 09-Feb-19 4:00 PM
300 CPP-NGCP-W-300 Welding SATIP-W-012-01 SAIC-W-2054 joints at TCF-1, CPP Pipe Yard. Junaid Mr. Rajesh REJECTED

301 CPP-NGCP-W-301 1400050032 Welding SATIP-NDE-RT-01 SAIC-RT-2007 In-Process Verification - RT Techniques & TCF-1. TA-445988 09-Feb-19 4:00 PM Junaid Mr. Rajesh CLOSED
Procedure Implementation of TCF-1.

1400050052 Visual Insp & Verification of MPT mat'ls and TCF-1. TA-445989 09-Feb-19 9:00 AM
302 CPP-NGCP-W-302 Welding SATIP-NDE-MPT-01 SAIC-MPT-2003 Equipment , TCF-1. Junaid Mr. Rajesh CLOSED Re-Schedule to 10-Feb-
2019
303 CPP-NGCP-W-303 1400050117 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 In-Process Inspection of MPT using TCF-1. TA-445990 09-Feb-19 9:00 AM Junaid Mr. Rajesh CLOSED Re-Schedule to 10-Feb-
Yoke Method, TCF-1. 2019

Review of weekly welder performance and


304 CPP-NGCP-W-304 1400050235 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 01-Feb-2019 to CPP site office N/A 09-Feb-19 9:00 AM Ruhul Mr. Rajesh REJECTED
07- Feb-2019 at CPP site office.

305 CPP-NGCP-W-305 1400050400 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 10-Feb-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1171 FL at KM-3+200
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a
l
1400050379 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 10-Feb-19 8:00 AM
306 CPP-NGCP-W-306 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1171 FL, at KM-3+200 Sarfaraz Mr. Rajesh CLOSED

1400050402 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 10-Feb-19 4:00 PM
307 CPP-NGCP-W-307 Welding SATIP-W-012-01 SAIC-W-2054 FL, at KM-KM-3+200 Sarfaraz Mr. Rajesh REJECTED

308 CPP-NGCP-W-308 1400050453 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 10-Feb-19 8:00 AM Umair Mr. Rajesh CLOSED
for 8 inch HWYH-1134 FL @ KM-1+400

309 CPP-NGCP-W-309 1400050382 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 10-Feb-19 8:10 AM Umair Mr. Rajesh CLOSED
HWYH-1134 FL @ KM-1+400

1400050409 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 10-Feb-19 4:00 PM
310 CPP-NGCP-W-310 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-1+400 Umair Mr. Rajesh REJECTED

Pre-welding and weld joint fit up inspection


311 CPP-NGCP-W-311 1400050473 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 10-Feb-19 8:00 AM Junaid Mr. Rajesh CLOSED
Yard.

312 CPP-NGCP-W-312 1400050464 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 10-Feb-19 8:10 AM Junaid Mr. Rajesh CLOSED
double joints at TCF-1, CPP Pipe Yard.

313 CPP-NGCP-W-313 1400050410 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 10-Feb-19 4:00 PM Junaid Mr. Rajesh REJECTED
joints at TCF-1, CPP Pipe Yard.

1400050418 Pre-welding and weld joint fit up inspection HRDH-1116 FL TA-843608 10-Feb-19 8:00 AM
314 CPP-NGCP-W-314 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1116 FL at KM-0+600 Saif Mr. Rajesh CLOSED

1400050484 Post-welding visual inspection for 8inch HRDH-1116 FL TA-843608 10-Feb-19 8:10 AM
315 CPP-NGCP-W-315 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1116 FL, at KM-0+600 Saif Mr. Rajesh CLOSED

1400050485 NDE selection for welds of 8 inch HRDH-1116 HRDH-1116 FL TA-843608 10-Feb-19 4:00 PM
316 CPP-NGCP-W-316 Welding SATIP-W-012-01 SAIC-W-2054 FL, at KM-KM-0+600 Saif Mr. Rajesh REJECTED

Welding consumables verification and visual


317 CPP-NGCP-W-317 1400050422 Welding SATIP-W-012-01 SAIC-W-2044 inspection storage & handling at HWYH-1071 HWYH-1071 FL TA-445836 10-Feb-19 2:00 PM Umair Mr. Rajesh CLOSED
FL @ KM-0+300
EPM upload problem

1400050458 Pre-welding and weld joint fit up inspection HWYH-1071 FL 10-Feb-19 2:20 PM
318 CPP-NGCP-W-318 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1071 FL @ KM-0+300 TA-445830 Junaid Mr. Rajesh REJECTED

1400050497 Post-welding visual inspection for 8 inch HWYH-1071 FL 10-Feb-19 3:20 PM


319 CPP-NGCP-W-319 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL @ KM-0+300 TA-445830 Junaid Mr. Rajesh CLOSED

320 CPP-NGCP-W-320 1400050481 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1071 HWYH-1071 FL TA-445830 10-Feb-19 5:00 PM Junaid Mr. Rajesh CLOSED
FL @ KM-0+300

321 CPP-NGCP-W-321 1400050837 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 11-Feb-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1171 FL at KM-3+300

1400050864 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 11-Feb-19 8:00 AM
322 CPP-NGCP-W-322 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1171 FL, at KM-3+300 Sarfaraz Mr. Rajesh CLOSED Inspection Checlist
can't be open at the
time of closing

323 CPP-NGCP-W-323 1400050838 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 11-Feb-19 4:00 PM Sarfaraz Mr. Rajesh REJECTED
FL, at KM-KM-3+300

1400050876 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 11-Feb-19 8:00 AM
324 CPP-NGCP-W-324 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1134 FL @ KM-1+300 Umair Mr. Rajesh CLOSED

325 CPP-NGCP-W-325 1400050877 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 11-Feb-19 8:10 AM Umair Mr. Rajesh CLOSED
HWYH-1134 FL @ KM-1+300

1400050844 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 11-Feb-19 4:00 PM
326 CPP-NGCP-W-326 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-1+300 Umair Mr. Rajesh REJECTED

Pre-welding and weld joint fit up inspection


327 CPP-NGCP-W-327 1400050878 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 11-Feb-19 8:00 AM Junaid Mr. Rajesh CLOSED
Yard.

1400050865 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 11-Feb-19 8:10 AM
328 CPP-NGCP-W-328 Welding SATIP-W-012-01 SAIC-W-2048 double joints at TCF-1, CPP Pipe Yard. Junaid Mr. Rajesh CLOSED

329 CPP-NGCP-W-329 1400050814 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 11-Feb-19 4:00 PM Junaid Mr. Rajesh REJECTED
joints at TCF-1, CPP Pipe Yard.

1400050856 Pre-welding and weld joint fit up inspection HRDH-1116 FL TA-843608 11-Feb-19 8:00 AM
330 CPP-NGCP-W-330 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1116 FL at KM-0+700 Saif Mr. Rajesh CLOSED

331 CPP-NGCP-W-331 1400050893 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1116 FL TA-843608 11-Feb-19 8:10 AM Saif Mr. Rajesh CLOSED
HRDH-1116 FL, at KM-0+700

1400050903 NDE selection for welds of 8 inch HRDH-1116 HRDH-1116 FL TA-843608 11-Feb-19 4:00 PM
332 CPP-NGCP-W-332 Welding SATIP-W-012-01 SAIC-W-2054 FL, at KM-KM-0+700 Saif Mr. Rajesh REJECTED

333 CPP-NGCP-W-333 1400050816 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1071 FL TA-445830 11-Feb-19 2:20 PM Junaid Mr. Rajesh CLOSED
for 8 inch HWYH-1071 FL @ KM-0+300

1400050881 Post-welding visual inspection for 8 inch HWYH-1071 FL 11-Feb-19 3:20 PM


334 CPP-NGCP-W-334 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL @ KM-0+300 TA-445830 Junaid Mr. Rajesh CLOSED

1400050885 NDE selection for welds of 8 inch HWYH-1071 HWYH-1071 FL 11-Feb-19 5:00 PM
335 CPP-NGCP-W-335 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-0+300 TA-445830 Junaid Mr. Rajesh REJECTED

1400051081 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 12-Feb-19 8:00 AM
336 CPP-NGCP-W-336 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1171 FL at KM-3+400 Sarfaraz Mr. Rajesh CLOSED

1400051117 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 12-Feb-19 8:00 AM
337 CPP-NGCP-W-337 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1171 FL, at KM-3+400 Sarfaraz Mr. Rajesh CLOSED

1400051099 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 12-Feb-19 4:00 PM
338 CPP-NGCP-W-338 Welding SATIP-W-012-01 SAIC-W-2054 FL, at KM-KM-3+400 Sarfaraz Mr. Rajesh REJECTED

1400051134 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 12-Feb-19 8:00 AM
339 CPP-NGCP-W-339 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1134 FL @ KM-1+200 Umair Mr. Rajesh CLOSED

1400051105 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 12-Feb-19 8:10 AM
340 CPP-NGCP-W-340 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL @ KM-1+200 Umair Mr. Rajesh CLOSED

341 CPP-NGCP-W-341 1400051143 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 12-Feb-19 4:00 PM Umair Mr. Rajesh REJECTED
FL @ KM-1+200

Pre-welding and weld joint fit up inspection


342 CPP-NGCP-W-342 1400051144 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 12-Feb-19 8:00 AM Junaid Mr. Rajesh CLOSED
Yard.

343 CPP-NGCP-W-343 1400051165 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 12-Feb-19 8:10 AM Junaid Mr. Rajesh CLOSED
double joints at TCF-1, CPP Pipe Yard.

344 CPP-NGCP-W-344 1400051164 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 12-Feb-19 4:00 PM Junaid Mr. Rajesh REJECTED
joints at TCF-1, CPP Pipe Yard.

345 CPP-NGCP-W-345 1400051173 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1116 FL TA-843608 12-Feb-19 8:00 AM Saif Mr. Rajesh CLOSED
for 8 inch HRDH-1116 FL at KM-0+800

346 CPP-NGCP-W-346 1400051176 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1116 FL TA-843608 12-Feb-19 8:10 AM Saif Mr. Rajesh CLOSED
HRDH-1116 FL, at KM-0+800

347 CPP-NGCP-W-347 1400051154 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1116 HRDH-1116 FL TA-843608 12-Feb-19 4:00 PM Saif Mr. Rajesh REJECTED
FL, at KM-KM-0+800

348 CPP-NGCP-W-348 1400051194 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1071 FL TA-445830 12-Feb-19 8:00 AM Junaid Mr. Rajesh CLOSED
for 8 inch HWYH-1071 FL @ KM-0+350

349 CPP-NGCP-W-349 1400051203 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1071 FL TA-445830 12-Feb-19 8:10 AM Junaid Mr. Rajesh CLOSED
HWYH-1071 FL @ KM-0+350

350 CPP-NGCP-W-350 1400051157 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1071 HWYH-1071 FL TA-445830 12-Feb-19 4:00 PM Junaid Mr. Rajesh REJECTED
FL @ KM-0+350

351 CPP-NGCP-W-351 1400051149 Welding SATIP-NDE-RT-01 SAIC-RT-2007 In-Process Verification - RT Techniques & HRDH-1171 HRDH-1116 TA-843547 12-Feb-19 9:00 AM Sarfaraz Mr. Rajesh REJECTED
Procedure Implementation of HRDH-1171 & 1116 TA-843608

352 CPP-NGCP-W-352 1400051207 Welding SATIP-NDE-RT-01 SAIC-RT-2007 In-Process Verification - RT Techniques & HWYH-1134 FL TA-445836 12-Feb-19 10:00 AM Umair Mr. Rajesh REJECTED
Procedure Implementation of HWYH-1134

1400051539 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 13-Feb-19 8:00 AM
353 CPP-NGCP-W-353 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1171 FL at KM-3+450 Sarfaraz Mr. Rajesh CLOSED

354 CPP-NGCP-W-354 1400051569 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 13-Feb-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1171 FL, at KM-3+450

355 CPP-NGCP-W-355 1400051614 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 13-Feb-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL, at KM-KM-3+450

1400051541 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 13-Feb-19 8:00 AM
356 CPP-NGCP-W-356 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1134 FL @ KM-1+150 Umair Mr. Rajesh CLOSED

1400051590 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 13-Feb-19 8:10 AM
357 CPP-NGCP-W-357 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL @ KM-1+150 Umair Mr. Rajesh CLOSED

358 CPP-NGCP-W-358 1400051616 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 13-Feb-19 4:00 PM Umair Mr. Rajesh REJECTED
FL @ KM-1+150

Pre-welding and weld joint fit up inspection


359 CPP-NGCP-W-359 1400051625 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 13-Feb-19 8:00 AM Junaid Mr. Rajesh CLOSED
Yard.

1400051570 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 13-Feb-19 8:10 AM
360 CPP-NGCP-W-360 Welding SATIP-W-012-01 SAIC-W-2048 double joints at TCF-1, CPP Pipe Yard. Junaid Mr. Rajesh CLOSED

1400051618 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 13-Feb-19 4:00 PM
361 CPP-NGCP-W-361 Welding SATIP-W-012-01 SAIC-W-2054 joints at TCF-1, CPP Pipe Yard. Junaid Mr. Rajesh REJECTED

362 CPP-NGCP-W-362 1400051636 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1116 FL TA-843608 13-Feb-19 8:00 AM Saif Mr. Rajesh CLOSED
for 8 inch HRDH-1116 FL at KM-0+850

363 CPP-NGCP-W-363 1400051663 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1116 FL TA-843608 13-Feb-19 8:10 AM Saif Mr. Rajesh CLOSED
HRDH-1116 FL, at KM-0+850

1400051626 NDE selection for welds of 8 inch HRDH-1116 HRDH-1116 FL TA-843608 13-Feb-19 4:00 PM
364 CPP-NGCP-W-364 Welding SATIP-W-012-01 SAIC-W-2054 FL, at KM-KM-0+850 Saif Mr. Rajesh CLOSED

1400051598 Pre-welding and weld joint fit up inspection HWYH-1071 FL 13-Feb-19 8:00 AM
365 CPP-NGCP-W-365 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1071 FL @ KM-0+350 TA-445830 Imran Mr. Rajesh CLOSED

366 CPP-NGCP-W-366 1400051645 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1071 FL TA-445830 13-Feb-19 8:10 AM Imran Mr. Rajesh CLOSED
HWYH-1071 FL @ KM-0+350

367 CPP-NGCP-W-367 1400051611 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1071 HWYH-1071 FL TA-445830 13-Feb-19 4:00 PM Imran Mr. Rajesh REJECTED
FL @ KM-0+350

1400051612 In-Process Verification - RT Techniques & TCF-1. TA-445988 13-Feb-19 4:00 PM


368 CPP-NGCP-W-368 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of TCF-1. Junaid Mr. Rajesh CLOSED

369 CPP-NGCP-W-369 1400051638 Welding SATIP-NDE-RT-01 SAIC-RT-2007 In-Process Verification - RT Techniques & HRDH-1171 HRDH-1116 TA-843547 13-Feb-19 9:00 AM Saif Mr. Rajesh REJECTED
Procedure Implementation of HRDH-1171 & 1116 TA-843608

1400052044 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 14-Feb-19 8:00 AM
370 CPP-NGCP-W-370 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1171 FL at KM-3+450 Sarfaraz Mr. Rajesh CLOSED

371 CPP-NGCP-W-371 1400052024 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 14-Feb-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1171 FL, at KM-3+450

1400051981 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 14-Feb-19 4:00 PM
372 CPP-NGCP-W-372 Welding SATIP-W-012-01 SAIC-W-2054 FL, at KM-KM-3+450 Sarfaraz Mr. Rajesh REJECTED

373 CPP-NGCP-W-373 1400052025 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 14-Feb-19 8:00 AM Umair Mr. Rajesh CLOSED
for 8 inch HWYH-1134 FL @ KM-1+150
EPM upload problem

1400052057 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 14-Feb-19 8:10 AM
374 CPP-NGCP-W-374 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL @ KM-1+150 Umair Mr. Rajesh CLOSED

375 CPP-NGCP-W-375 1400052065 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 14-Feb-19 4:00 PM Umair Mr. Rajesh REJECTED
FL @ KM-1+150

Pre-welding and weld joint fit up inspection


376 CPP-NGCP-W-376 1400052018 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 14-Feb-19 8:00 AM Junaid Mr. Rajesh CLOSED
Yard.

377 CPP-NGCP-W-377 1400051972 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 14-Feb-19 8:10 AM Junaid Mr. Rajesh CLOSED
double joints at TCF-1, CPP Pipe Yard.

1400052045 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 14-Feb-19 4:00 PM
378 CPP-NGCP-W-378 Welding SATIP-W-012-01 SAIC-W-2054 joints at TCF-1, CPP Pipe Yard. Junaid Mr. Rajesh REJECTED

379 CPP-NGCP-W-379 1400052047 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1116 FL TA-843608 14-Feb-19 8:00 AM Saif Mr. Rajesh CLOSED
for 8 inch HRDH-1116 FL at KM-0+850

1400052039 Post-welding visual inspection for 8inch HRDH-1116 FL TA-843608 14-Feb-19 8:10 AM
380 CPP-NGCP-W-380 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1116 FL, at KM-0+850 Saif Mr. Rajesh CLOSED

381 CPP-NGCP-W-381 1400052040 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1116 HRDH-1116 FL TA-843608 14-Feb-19 4:00 PM Saif Mr. Rajesh REJECTED
FL, at KM-KM-0+850

1400052048 In-Process Verification - RT Techniques & HWYH-1071 VARIOUS 14-Feb-19 9:00 AM


382 CPP-NGCP-W-382 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1071 & 1134 HWYH-1134 Umair Mr. Rajesh REJECTED

Pre-welding and weld joint fit up inspection


383 CPP-NGCP-W-383 1400052041 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 15-Feb-19 8:00 AM Junaid Mr. Rajesh CLOSED
Yard.

384 CPP-NGCP-W-384 1400052093 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 15-Feb-19 8:10 AM Junaid Mr. Rajesh CLOSED
double joints at TCF-1, CPP Pipe Yard.

1400052083 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 15-Feb-19 4:00 PM
385 CPP-NGCP-W-385 Welding SATIP-W-012-01 SAIC-W-2054 joints at TCF-1, CPP Pipe Yard. Junaid Mr. Rajesh REJECTED
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a
l Pre-welding and weld joint fit up
386 CPP-NGCP-W-386 1400052026 Welding SATIP-W-012-01 SAIC-W-2048 inspection for 8 inch HWYH-1134 FL @ KM- HWYH-1134 FL TA-445836 15-Feb-19 8:00 AM Umair Mr. Rajesh CLOSED
1+150

387 CPP-NGCP-W-387 1400052058 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 15-Feb-19 8:10 AM Umair Mr. Rajesh CLOSED
HWYH-1134 FL @ KM-1+150

1400052049 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 15-Feb-19 4:00 PM
388 CPP-NGCP-W-388 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-1+150 Umair Mr. Rajesh REJECTED

Pre-welding and weld joint fit up


389 CPP-NGCP-W-389 1400052261 Welding SATIP-W-012-01 SAIC-W-2048 inspection for 8 inch HWYH-1134 FL @ KM- HWYH-1134 FL TA-445836 16-Feb-19 8:00 AM Umair Mr. Rajesh CLOSED
1+200

1400052241 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 16-Feb-19 8:10 AM
390 CPP-NGCP-W-390 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL @ KM-1+200 Umair Mr. Rajesh CLOSED

391 CPP-NGCP-W-391 1400052297 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 16-Feb-19 4:00 PM Umair Mr. Rajesh REJECTED
FL @ KM-1+200

Pre-welding and weld joint fit up inspection


392 CPP-NGCP-W-392 1400052337 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 16-Feb-19 8:00 AM Junaid Mr. Rajesh CLOSED
Yard.

1400052300 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 16-Feb-19 8:10 AM
393 CPP-NGCP-W-393 double joints at TCF-1, CPP Pipe Yard. Junaid Mr. Rajesh CLOSED

394 CPP-NGCP-W-394 1400052301 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 16-Feb-19 4:00 PM Junaid Mr. Rajesh CLOSED
joints at TCF-1, CPP Pipe Yard.

1400052318 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 16-Feb-19 8:00 AM
395 CPP-NGCP-W-395 for 8 inch HRDH-1171 FL at KM-4+300 Sarfaraz Mr. Rajesh CLOSED

396 CPP-NGCP-W-396 1400052354 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 16-Feb-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1171 FL, at KM-KM-4+300

397 CPP-NGCP-W-397 1400052344 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 16-Feb-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL, at KM-KM-KM-4+300

1400052384 Pre-welding and weld joint fit up inspection HRDH-1116 FL TA-843608 16-Feb-19 8:00 AM
398 CPP-NGCP-W-398 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1116 FL at KM-1+900 Saif Mr. Rajesh CLOSED

1400052385 Post-welding visual inspection for 8inch HRDH-1116 FL TA-843608 16-Feb-19 8:10 AM
399 CPP-NGCP-W-399 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1116 FL, at KM-1+900 Saif Mr. Rajesh CLOSED

400 CPP-NGCP-W-400 1400052347 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1116 HRDH-1116 FL TA-843608 16-Feb-19 4:00 PM Saif Mr. Rajesh CLOSED
FL, at KM-KM-1+900

1400052394 Pre-welding and weld joint fit up inspection HWYH-1071 FL 16-Feb-19 8:00 AM
401 CPP-NGCP-W-401 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1071 FL @ KM-0+700 TA-445830 Imran Mr. Rajesh CLOSED
Re-Schedule to 17-Feb-
2019

402 CPP-NGCP-W-402 1400052322 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1071 FL TA-445830 16-Feb-19 8:10 AM Imran Mr. Rajesh CLOSED
HWYH-1071 FL @ KM-0+700 Re-Schedule to 17-Feb-
2019

403 CPP-NGCP-W-403 1400052423 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1071 HWYH-1071 FL TA-445830 16-Feb-19 4:00 PM Imran Mr. Rajesh REJECTED
FL @ KM-0+700 Re-Schedule to 17-Feb-
2019
In-Process Verification - RT Techniques &
404 CPP-NGCP-W-404 1400052526 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1171, 1116, HRDH-1171 HRDH-1116 VARIOUS 16-Feb-19 9:00 AM Saif Mr. Rajesh REJECTED
TCF-1 TCF-1

405 CPP-NGCP-W-405 1400052749 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 17-Feb-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1171 FL at KM-4+400

406 CPP-NGCP-W-406 1400052785 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 17-Feb-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1171 FL, at KM-KM-4+400

407 CPP-NGCP-W-407 1400052741 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 17-Feb-19 4:00 PM Sarfaraz Mr. Rajesh REJECTED
FL, at KM-KM-KM-4+400

408 CPP-NGCP-W-408 1400052761 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1116 FL TA-843608 17-Feb-19 8:00 AM Saif Mr. Rajesh CLOSED
for 8 inch HRDH-1116 FL at KM-2+100

409 CPP-NGCP-W-409 1400052823 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1116 FL TA-843608 17-Feb-19 8:10 AM Saif Mr. Rajesh CLOSED
HRDH-1116 FL, at KM-2+100

410 CPP-NGCP-W-410 1400052804 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1116 HRDH-1116 FL TA-843608 17-Feb-19 4:00 PM Saif Mr. Rajesh CLOSED
FL, at KM-KM-2+100

Pre-welding and weld joint fit up


411 CPP-NGCP-W-411 1400052853 Welding SATIP-W-012-01 SAIC-W-2048 inspection for 8 inch HWYH-1134 FL @ KM- HWYH-1134 FL TA-445836 17-Feb-19 8:00 AM Umair Mr. Rajesh CLOSED
1+200

412 CPP-NGCP-W-412 1400052838 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 17-Feb-19 8:10 AM Umair Mr. Rajesh CLOSED
HWYH-1134 FL @ KM-1+200

413 CPP-NGCP-W-413 1400052811 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 17-Feb-19 4:00 PM Umair Mr. Rajesh REJECTED
FL @ KM-1+200

Pre-welding and weld joint fit up inspection


414 CPP-NGCP-W-414 1400052857 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 17-Feb-19 8:00 AM Junaid Mr. Rajesh CLOSED
Yard.

415 CPP-NGCP-W-415 1400052874 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 17-Feb-19 8:10 AM Junaid Mr. Rajesh CLOSED
double joints at TCF-1, CPP Pipe Yard.

416 CPP-NGCP-W-416 1400052858 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 17-Feb-19 4:00 PM Junaid Mr. Rajesh REJECTED
joints at TCF-1, CPP Pipe Yard.

417 CPP-NGCP-W-417 1400052817 Welding SATIP-NDE-RT-01 SAIC-RT-2007 In-Process Verification - RT Techniques & HRDH-1171 TA-843547 17-Feb-19 9:00 AM Sarfaraz Mr. Rajesh REJECTED
Procedure Implementation of HRDH-1171

Review of weekly welder performance and


418 CPP-NGCP-W-418 1400052889 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 08-Feb-2019 to OFFICE N/A 17-Feb-19 9:00 AM Ruhul Mr. Rajesh REJECTED
14 Feb-2019 at CPP site office.
Due to EPM Problem
419 CPP-NGCP-W-419 1400053170 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 18-Feb-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED raised 2 times. 2nd
for 8 inch HRDH-1171 FL at KM-4+900 EPM number is
1400053102

420 CPP-NGCP-W-420 1400053165 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 18-Feb-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1171 FL, at KM-4+900

421 CPP-NGCP-W-421 1400053090 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 18-Feb-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL, at KM-4+900

1400053072 Pre-welding and weld joint fit up inspection HRDH-1116 FL TA-843608 18-Feb-19 8:00 AM
422 CPP-NGCP-W-422 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1116 FL at KM-2+500 Saif Mr. Rajesh CLOSED

1400053052 Post-welding visual inspection for 8inch HRDH-1116 FL TA-843608 18-Feb-19 8:10 AM
423 CPP-NGCP-W-423 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1116 FL, at KM-2+500 Saif Mr. Rajesh CLOSED

424 CPP-NGCP-W-424 1400053113 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1116 HRDH-1116 FL TA-843608 18-Feb-19 4:00 PM Saif Mr. Rajesh CLOSED
FL, at KM-KM-2+500

Pre-welding and weld joint fit up


425 CPP-NGCP-W-425 1400053115 Welding SATIP-W-012-01 SAIC-W-2048 inspection for 8 inch HWYH-1134 FL @ KM- HWYH-1134 FL TA-445836 18-Feb-19 8:00 AM Umair Mr. Rajesh CLOSED
1+000

1400053041 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 18-Feb-19 8:10 AM
426 CPP-NGCP-W-426 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL @ KM-1+000 Umair Mr. Rajesh CLOSED

1400053117 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 18-Feb-19 4:00 PM
427 CPP-NGCP-W-427 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-1+000 Umair Mr. Rajesh REJECTED

Pre-welding and weld joint fit up inspection


428 CPP-NGCP-W-428 1400053098 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 18-Feb-19 8:00 AM Junaid Mr. Rajesh CLOSED
Yard.

429 CPP-NGCP-W-429 1400053205 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 18-Feb-19 8:10 AM Junaid Mr. Rajesh CLOSED
double joints at TCF-1, CPP Pipe Yard.

1400053135 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 18-Feb-19 4:00 PM
430 CPP-NGCP-W-430 joints at TCF-1, CPP Pipe Yard. Junaid Mr. Rajesh CLOSED

431 CPP-NGCP-W-431 1400053166 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1071 FL TA-445830 18-Feb-19 8:00 AM Imran Mr. Rajesh CLOSED
for 8 inch HWYH-1071 FL @ KM-0+675

1400053176 Post-welding visual inspection for 8 inch HWYH-1071 FL 18-Feb-19 8:10 AM


432 CPP-NGCP-W-432 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL @ KM-0+675 TA-445830 Imran Mr. Rajesh CLOSED

433 CPP-NGCP-W-433 1400053168 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1071 HWYH-1071 FL TA-445830 18-Feb-19 4:00 PM Imran Mr. Rajesh REJECTED
FL @ KM-0+675

In-Process Verification - RT Techniques &


434 CPP-NGCP-W-434 1400053265 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1171 and HRDH-1171 and 1116 VARIOUS 18-Feb-19 9:00 AM Sarfaraz Mr. Rajesh REJECTED
1116 Re-Schedule to 19-Feb-
2019
1400053211 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 18-Feb-19 8:00 AM Abdul Aziz
435 CPP-NGCP-W-435 for 8 inch HRDH-1171 FL at KM-9+000 Mr. Rajesh CLOSED
EPM upload problem
1400053152 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 18-Feb-19 8:10 AM Abdul Aziz
436 CPP-NGCP-W-436 HRDH-1171 FL, at KM-9+000 Mr. Rajesh CLOSED
EPM upload problem
1400053271 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 18-Feb-19 4:00 PM Abdul Aziz
437 CPP-NGCP-W-437 FL, at KM-9+000 Mr. Rajesh REJECTED

1400054129 Pre-welding and weld joint fit up inspection HRDH-1116 FL TA-843608 19-Feb-19 8:00 AM
438 CPP-NGCP-W-438 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1116 FL at KM-2+800 Saif Mr. Rajesh CLOSED Due to EPM Problem,
RFI raised on 20-Feb-
2019

1400054145 Post-welding visual inspection for 8inch HRDH-1116 FL TA-843608 19-Feb-19 8:10 AM
439 CPP-NGCP-W-439 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1116 FL, at KM-2+800 Saif Mr. Rajesh CLOSED Due to EPM Problem,
RFI raised on 20-Feb-
2019

440 CPP-NGCP-W-440 1400054156 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1116 HRDH-1116 FL TA-843608 19-Feb-19 4:00 PM Saif Mr. Rajesh REJECTED Due to EPM Problem,
FL, at KM-KM-2+800
RFI raised on 20-Feb-
2019

Pre-welding and weld joint fit up inspection


441 CPP-NGCP-W-441 1400054164 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 19-Feb-19 8:00 AM Junaid Mr. Rajesh CLOSED Due to EPM Problem,
Yard. RFI raised on 20-Feb-
2019

1400054157 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 19-Feb-19 8:10 AM
442 CPP-NGCP-W-442 double joints at TCF-1, CPP Pipe Yard. Junaid Mr. Rajesh CLOSED Due to EPM Problem,
RFI raised on 20-Feb-
2019

1400054098 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 19-Feb-19 4:00 PM
443 CPP-NGCP-W-443 joints at TCF-1, CPP Pipe Yard. Junaid Mr. Rajesh REJECTED Due to EPM Problem,
RFI raised on 20-Feb-
2019

444 CPP-NGCP-W-444 1400054122 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1071 FL TA-445830 19-Feb-19 8:00 AM Imran Mr. Rajesh CLOSED Due to EPM Problem,
for 8 inch HWYH-1071 FL @ KM-0+750
RFI raised on 20-Feb-
2019

445 CPP-NGCP-W-445 1400054070 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1071 FL TA-445830 19-Feb-19 8:10 AM Imran Mr. Rajesh CLOSED Due to EPM Problem,
HWYH-1071 FL @ KM-0+750 RFI raised on 20-Feb-
2019

1400054158 NDE selection for welds of 8 inch HWYH-1071 HWYH-1071 FL 19-Feb-19 4:00 PM
446 CPP-NGCP-W-446 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-0+750 TA-445830 Imran Mr. Rajesh CLOSED Due to EPM Problem,
RFI raised on 20-Feb-
2019

1400054174 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 19-Feb-19 8:00 AM
447 CPP-NGCP-W-447 for 8 inch HRDH-1171 FL at KM-9+000 Sarfaraz Mr. Rajesh CLOSED Due to EPM Problem,
RFI raised on 20-Feb-
2019

448 CPP-NGCP-W-448 1400054159 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 19-Feb-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1171 FL, at KM-9+000 Due to EPM Problem,
RFI raised on 20-Feb-
2019

449 CPP-NGCP-W-449 1400054100 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 19-Feb-19 4:00 PM Sarfaraz Mr. Rajesh REJECTED Due to EPM Problem,
FL, at KM-9+000 RFI raised on 20-Feb-
2019

Pre-welding and weld joint fit up


450 CPP-NGCP-W-450 1400054146 Welding SATIP-W-012-01 SAIC-W-2048 inspection for 8 inch HWYH-1134 FL @ KM- HWYH-1134 FL TA-445836 19-Feb-19 8:00 AM Umair Mr. Rajesh CLOSED Due to EPM Problem,
3+150 RFI raised on 20-Feb-
2019

1400054183 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 19-Feb-19 8:10 AM
451 CPP-NGCP-W-451 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL @ KM-3+150 Umair Mr. Rajesh CLOSED Due to EPM Problem,
RFI raised on 20-Feb-
2019

452 CPP-NGCP-W-452 1400054184 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 19-Feb-19 4:00 PM Umair Mr. Rajesh CLOSED Due to EPM Problem,
FL @ KM-3+150
RFI raised on 20-Feb-
2019

In-Process Verification - RT Techniques &


453 CPP-NGCP-W-453 1400053362 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1134 and HWYH-1134 and 1071 VARIOUS 19-Feb-19 9:00 AM Umair Mr. Rajesh REJECTED
1071

Pre-welding and weld joint fit up


454 CPP-NGCP-W-454 1400054161 Welding SATIP-W-012-01 SAIC-W-2048 inspection for 8 inch HRDH-922 FL @ KM- HRDH-922 FL TA-843609 19-Feb-19 8:00 AM Saif Mr. Rajesh CLOSED Due to EPM Problem,
3+000 RFI raised on 20-Feb-
2019

455 CPP-NGCP-W-455 1400054147 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HRDH-922 FL TA-843609 19-Feb-19 8:10 AM Saif Mr. Rajesh CLOSED Due to EPM Problem,
HRDH-922 FL @ KM-3+000 RFI raised on 20-Feb-
2019

456 CPP-NGCP-W-456 1400054132 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-922 HRDH-922 FL TA-843609 19-Feb-19 4:00 PM Saif Mr. Rajesh REJECTED Due to EPM Problem,
FL @ KM-3+000 RFI raised on 20-Feb-
2019

1400053816 In-Process Verification - RT Techniques & TA-445988 20-Feb-19 9:00 AM


457 CPP-NGCP-W-457 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of TCF-1 TCF-1 Junaid Mr. Rajesh CLOSED
Re-Schedule to 21-Feb-
2019
Pre-welding and weld joint fit up
458 CPP-NGCP-W-458 1400054148 Welding SATIP-W-012-01 SAIC-W-2048 inspection for 8 inch HRDH-922 FL @ KM- HRDH-922 FL TA-843609 20-Feb-19 8:00 AM Saif Mr. Rajesh CLOSED
2+800

459 CPP-NGCP-W-459 1400054214 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HRDH-922 FL TA-843609 20-Feb-19 8:10 AM Saif Mr. Rajesh CLOSED
HRDH-922 FL @ KM-2+800

460 CPP-NGCP-W-460 1400054223 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-922 HRDH-922 FL TA-843609 20-Feb-19 4:00 PM Saif Mr. Rajesh REJECTED
FL @ KM-2+800

Pre-welding and weld joint fit up inspection


461 CPP-NGCP-W-461 1400054176 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 20-Feb-19 8:00 AM Junaid Mr. Rajesh CLOSED
Yard.

1400054216 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 20-Feb-19 8:10 AM
462 CPP-NGCP-W-462 double joints at TCF-1, CPP Pipe Yard. Junaid Mr. Rajesh CLOSED

463 CPP-NGCP-W-463 1400054205 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 20-Feb-19 4:00 PM Junaid Mr. Rajesh REJECTED
joints at TCF-1, CPP Pipe Yard.

464 CPP-NGCP-W-464 1400054135 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1071 FL TA-445830 20-Feb-19 8:00 AM Imran Mr. Rajesh CLOSED
for 8 inch HWYH-1071 FL @ KM-0+750

1400054185 Post-welding visual inspection for 8 inch HWYH-1071 FL 20-Feb-19 8:10 AM


465 CPP-NGCP-W-465 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL @ KM-0+750 TA-445830 Imran Mr. Rajesh CLOSED

1400054206 NDE selection for welds of 8 inch HWYH-1071 HWYH-1071 FL 20-Feb-19 4:00 PM
466 CPP-NGCP-W-466 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-0+750 TA-445830 Imran Mr. Rajesh REJECTED

467 CPP-NGCP-W-467 1400054186 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 20-Feb-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1171 FL at KM-9+000

468 CPP-NGCP-W-468 1400054197 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 20-Feb-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1171 FL, at KM-9+000

1400054219 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 20-Feb-19 4:00 PM
469 CPP-NGCP-W-469 FL, at KM-9+000 Sarfaraz Mr. Rajesh REJECTED

Pre-welding and weld joint fit up


470 CPP-NGCP-W-470 1400054220 Welding SATIP-W-012-01 SAIC-W-2048 inspection for 8 inch HWYH-1134 FL @ KM- HWYH-1134 FL TA-445836 20-Feb-19 8:00 AM Umair Mr. Rajesh CLOSED
3+150

471 CPP-NGCP-W-471 1400054170 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 20-Feb-19 8:10 AM Umair Mr. Rajesh CLOSED
HWYH-1134 FL @ KM-3+150

1400054224 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 20-Feb-19 4:00 PM
472 CPP-NGCP-W-472 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-3+150 Umair Mr. Rajesh REJECTED

Pre-welding and weld joint fit up


473 CPP-NGCP-W-473 1400054419 Welding SATIP-W-012-01 SAIC-W-2048 inspection for 8 inch HRDH-922 FL @ KM- HRDH-922 FL TA-843609 21-Feb-19 8:00 AM Saif Mr. Rajesh CLOSED
3+200

1400054448 Post-welding visual inspection for 8 inch HRDH-922 FL TA-843609 21-Feb-19 8:10 AM
474 CPP-NGCP-W-474 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-922 FL @ KM-3+200 Saif Mr. Rajesh CLOSED

475 CPP-NGCP-W-475 1400054479 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-922 HRDH-922 FL TA-843609 21-Feb-19 4:00 PM Saif Mr. Rajesh REJECTED
FL @ KM-3+200

Pre-welding and weld joint fit up inspection


476 CPP-NGCP-W-476 1400054460 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 21-Feb-19 8:00 AM Junaid Mr. Rajesh CLOSED
Yard.

477 CPP-NGCP-W-477 1400054487 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 21-Feb-19 8:10 AM Junaid Mr. Rajesh CLOSED
double joints at TCF-1, CPP Pipe Yard.
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a
l
1400054461 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 21-Feb-19 4:00 PM
478 CPP-NGCP-W-478 joints at TCF-1, CPP Pipe Yard. Junaid Mr. Rajesh REJECTED

479 CPP-NGCP-W-479 1400054450 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1071 FL TA-445830 21-Feb-19 8:00 AM Imran Mr. Rajesh CLOSED
for 8 inch HWYH-1071 FL @ KM-0+750

1400054481 Post-welding visual inspection for 8 inch HWYH-1071 FL 21-Feb-19 8:10 AM


480 CPP-NGCP-W-480 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL @ KM-0+750 TA-445830 Imran Mr. Rajesh CLOSED

481 CPP-NGCP-W-481 1400054451 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1071 HWYH-1071 FL TA-445830 21-Feb-19 4:00 PM Imran Mr. Rajesh CLOSED
FL @ KM-0+750

1400054525 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 21-Feb-19 8:00 AM
482 CPP-NGCP-W-482 for 8 inch HRDH-1171 FL at KM-6+700 Sarfaraz Mr. Rajesh CLOSED

483 CPP-NGCP-W-483 1400054509 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 21-Feb-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1171 FL, at KM-6+700

1400054526 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 21-Feb-19 4:00 PM
484 CPP-NGCP-W-484 FL, at KM-6+700 Sarfaraz Mr. Rajesh REJECTED

485 CPP-NGCP-W-485 1400054499 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1100 FL TA-445959 21-Feb-19 8:00 AM Umair Mr. Rajesh CLOSED
for 8 inch HWYH-1100 FL @ KM-1+000

1400054432 Post-welding visual inspection for 8 inch HWYH-1100 FL 21-Feb-19 8:10 AM


486 CPP-NGCP-W-486 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1100 FL @ KM-1+000 TA-445959 Umair Mr. Rajesh CLOSED

487 CPP-NGCP-W-487 1400054553 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1100 HWYH-1100 FL TA-445959 21-Feb-19 4:00 PM Umair Mr. Rajesh REJECTED
FL @ KM-1+000

1400054500 Pre-welding and weld joint fit up inspection HWYH-1071 FL 22-Feb-19 8:00 AM
488 CPP-NGCP-W-488 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1071 FL @ KM-0+750 TA-445830 Imran Mr. Rajesh CLOSED

489 CPP-NGCP-W-489 1400054535 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1071 FL TA-445830 22-Feb-19 8:10 AM Imran Mr. Rajesh CLOSED
HWYH-1071 FL @ KM-0+750

1400054519 NDE selection for welds of 8 inch HWYH-1071 HWYH-1071 FL 22-Feb-19 4:00 PM
490 CPP-NGCP-W-490 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-0+750 TA-445830 Imran Mr. Rajesh REJECTED

Pre-welding and weld joint fit up inspection


491 CPP-NGCP-W-491 1400054501 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 22-Feb-19 8:00 AM Junaid Mr. Rajesh CLOSED
Yard.

1400054502 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 22-Feb-19 8:10 AM
492 CPP-NGCP-W-492 double joints at TCF-1, CPP Pipe Yard. Junaid Mr. Rajesh CLOSED

493 CPP-NGCP-W-493 1400054573 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 22-Feb-19 4:00 PM Junaid Mr. Rajesh REJECTED
joints at TCF-1, CPP Pipe Yard.

Pre-welding and weld joint fit up


494 CPP-NGCP-W-494 1400054945 Welding SATIP-W-012-01 SAIC-W-2048 inspection for 8 inch HRDH-922 FL @ KM- HRDH-922 FL TA-843609 23-Feb-19 8:00 AM Saif Mr. Rajesh CLOSED
2+500

1400054851 Post-welding visual inspection for 8 inch HRDH-922 FL TA-843609 23-Feb-19 8:10 AM
495 CPP-NGCP-W-495 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-922 FL @ KM-2+500 Saif Mr. Rajesh CLOSED

496 CPP-NGCP-W-496 1400054901 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-922 HRDH-922 FL TA-843609 23-Feb-19 4:00 PM Saif Mr. Rajesh REJECTED
FL @ KM-2+500

Pre-welding and weld joint fit up inspection


497 CPP-NGCP-W-497 1400054880 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 23-Feb-19 8:00 AM Junaid Mr. Rajesh CLOSED
Yard.

498 CPP-NGCP-W-498 1400054955 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 23-Feb-19 8:10 AM Junaid Mr. Rajesh CLOSED
double joints at TCF-1, CPP Pipe Yard.

1400054936 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 23-Feb-19 4:00 PM
499 CPP-NGCP-W-499 joints at TCF-1, CPP Pipe Yard. Junaid Mr. Rajesh REJECTED

500 CPP-NGCP-W-500 1400054964 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1071 FL TA-445830 23-Feb-19 8:00 AM Imran Mr. Rajesh CLOSED
for 8 inch HWYH-1071 FL @ KM-0+750

1400054965 Post-welding visual inspection for 8 inch HWYH-1071 FL 23-Feb-19 8:10 AM


501 CPP-NGCP-W-501 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL @ KM-0+750 TA-445830 Imran Mr. Rajesh CLOSED

502 CPP-NGCP-W-502 1400054966 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1071 HWYH-1071 FL TA-445830 23-Feb-19 4:00 PM Imran Mr. Rajesh CLOSED
FL @ KM-0+750

1400054950 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 23-Feb-19 8:00 AM
503 CPP-NGCP-W-503 for 8 inch HRDH-1171 FL at KM-6+900 Sarfaraz Mr. Rajesh CLOSED

504 CPP-NGCP-W-504 1400054973 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 23-Feb-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1171 FL, at KM-6+900

1400054937 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 23-Feb-19 4:00 PM
505 CPP-NGCP-W-505 FL, at KM-6+900 Sarfaraz Mr. Rajesh REJECTED

506 CPP-NGCP-W-506 1400055044 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1100 FL TA-445959 23-Feb-19 8:00 AM Umair Mr. Rajesh CLOSED
for 8 inch HWYH-1100 FL @ KM-1+000

1400054987 Post-welding visual inspection for 8 inch HWYH-1100 FL 23-Feb-19 8:10 AM


507 CPP-NGCP-W-507 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1100 FL @ KM-1+000 TA-445959 Umair Mr. Rajesh CLOSED

1400054962 NDE selection for welds of 8 inch HWYH-1100 HWYH-1100 FL 23-Feb-19 4:00 PM
508 CPP-NGCP-W-508 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-1+000 TA-445959 Umair Mr. Rajesh REJECTED

In-Process Verification - RT Techniques &


509 CPP-NGCP-W-509 1400055059 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-922 and HRDH-922 and 1171 VARIOUS 23-Feb-19 8:00 AM Sarfaraz Mr. Rajesh REJECTED
1171
In-Process Verification - RT Techniques &
510 CPP-NGCP-W-510 1400055075 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1071 and HWYH-1071 and 1134 VARIOUS 23-Feb-19 8:00 AM Imran Mr. Rajesh REJECTED
1134

Pre-welding and weld joint fit up


511 CPP-NGCP-W-511 1400055408 Welding SATIP-W-012-01 SAIC-W-2048 inspection for 8 inch HRDH-922 FL @ KM- HRDH-922 FL TA-843609 24-Feb-19 8:00 AM Saif Mr. Rajesh CLOSED
2+300

512 CPP-NGCP-W-512 1400055370 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HRDH-922 FL TA-843609 24-Feb-19 8:10 AM Saif Mr. Rajesh CLOSED
HRDH-922 FL @ KM-2+300

513 CPP-NGCP-W-513 1400055436 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-922 HRDH-922 FL TA-843609 24-Feb-19 4:00 PM Saif Mr. Rajesh REJECTED
FL @ KM-2+300

Pre-welding and weld joint fit up inspection


514 CPP-NGCP-W-514 1400055399 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 24-Feb-19 8:00 AM Junaid Mr. Rajesh CLOSED
Yard.

1400055437 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 24-Feb-19 8:10 AM
515 CPP-NGCP-W-515 double joints at TCF-1, CPP Pipe Yard. Junaid Mr. Rajesh CLOSED

516 CPP-NGCP-W-516 1400055371 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 24-Feb-19 4:00 PM Junaid Mr. Rajesh REJECTED
joints at TCF-1, CPP Pipe Yard.

517 CPP-NGCP-W-517 1400055372 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1071 FL TA-445830 24-Feb-19 8:00 AM Imran Mr. Rajesh CLOSED
for 8 inch HWYH-1071 FL @ KM-0+750

1400055446 Post-welding visual inspection for 8 inch HWYH-1071 FL 24-Feb-19 8:10 AM


518 CPP-NGCP-W-518 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL @ KM-0+750 TA-445830 Imran Mr. Rajesh CLOSED

1400055448 NDE selection for welds of 8 inch HWYH-1071 HWYH-1071 FL 24-Feb-19 4:00 PM
519 CPP-NGCP-W-519 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-0+750 TA-445830 Imran Mr. Rajesh REJECTED

520 CPP-NGCP-W-520 1400055454 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 24-Feb-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1171 FL at KM-7+600

521 CPP-NGCP-W-521 1400055455 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 24-Feb-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1171 FL, at KM-7+600

1400055401 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 24-Feb-19 4:00 PM
522 CPP-NGCP-W-522 FL, at KM-7+600 Sarfaraz Mr. Rajesh REJECTED

1400055412 Pre-welding and weld joint fit up inspection HWYH-1100 FL 24-Feb-19 8:00 AM
523 CPP-NGCP-W-523 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1100 FL @ KM-1+000 TA-445959 Umair Mr. Rajesh CLOSED

1400055438 Post-welding visual inspection for 8 inch HWYH-1100 FL 24-Feb-19 8:10 AM


524 CPP-NGCP-W-524 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1100 FL @ KM-1+000 TA-445959 Umair Mr. Rajesh CLOSED

525 CPP-NGCP-W-525 1400055457 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1100 HWYH-1100 FL TA-445959 24-Feb-19 4:00 PM Umair Mr. Rajesh REJECTED
FL @ KM-1+000

526 CPP-NGCP-W-526 1400055458 Welding SATIP-NDE-RT-01 SAIC-RT-2007 In-Process Verification - RT Techniques & TCF-1 TA-445988 24-Feb-19 8:00 AM Junaid Mr. Rajesh CLOSED
Procedure Implementation of TCF-1.

Review of weekly welder performance and


527 CPP-NGCP-W-527 1400055531 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 15-Feb-2019 to OFFICE N/A 24-Feb-19 9:00 AM Ruhul Mr. Rajesh CLOSED
21 Feb-2019 at CPP site office.
1400055581 In-Process Inspection of MPT using TCF-1. TA-445988 24-Feb-19 8:00 AM
528 CPP-NGCP-W-528 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 Yoke Method, TCF-1. Junaid Mr. Rajesh CLOSED

Pre-welding and weld joint fit up


529 CPP-NGCP-W-529 1400055902 Welding SATIP-W-012-01 SAIC-W-2048 inspection for 8 inch HRDH-922 FL @ KM- HRDH-922 FL TA-843609 25-Feb-19 8:00 AM Saif Mr. Rajesh CLOSED
2+100

530 CPP-NGCP-W-530 1400055919 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HRDH-922 FL TA-843609 25-Feb-19 8:10 AM Saif Mr. Rajesh CLOSED
HRDH-922 FL @ KM-2+100

1400055983 NDE selection for welds of 8 inch HRDH-922 HRDH-922 FL TA-843609 25-Feb-19 4:00 PM
531 CPP-NGCP-W-531 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-2+100 Saif Mr. Rajesh REJECTED

Pre-welding and weld joint fit up inspection


532 CPP-NGCP-W-532 1400055974 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 25-Feb-19 8:00 AM Junaid Mr. Rajesh CLOSED
Yard.

533 CPP-NGCP-W-533 1400055887 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 25-Feb-19 8:10 AM Junaid Mr. Rajesh CLOSED
double joints at TCF-1, CPP Pipe Yard.

534 CPP-NGCP-W-534 1400055889 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 25-Feb-19 4:00 PM Junaid Mr. Rajesh REJECTED
joints at TCF-1, CPP Pipe Yard.

1400055979 Pre-welding and weld joint fit up inspection HWYH-1071 FL 25-Feb-19 8:00 AM
535 CPP-NGCP-W-535 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1071 FL @ KM-1+170 TA-445830 Imran Mr. Rajesh CLOSED

1400056005 Post-welding visual inspection for 8 inch HWYH-1071 FL 25-Feb-19 8:10 AM


536 CPP-NGCP-W-536 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL @ KM-1+170 TA-445830 Imran Mr. Rajesh CLOSED

1400055997 NDE selection for welds of 8 inch HWYH-1071 HWYH-1071 FL 25-Feb-19 4:00 PM
537 CPP-NGCP-W-537 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-1+170 TA-445830 Imran Mr. Rajesh REJECTED

538 CPP-NGCP-W-538 1400056007 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 25-Feb-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1171 FL at KM-7+700

539 CPP-NGCP-W-539 1400056008 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 25-Feb-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1171 FL, at KM-7+700

1400055942 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 25-Feb-19 4:00 PM
540 CPP-NGCP-W-540 FL, at KM-7+700 Sarfaraz Mr. Rajesh REJECTED

1400055961 Pre-welding and weld joint fit up inspection HWYH-1100 FL 25-Feb-19 8:00 AM
541 CPP-NGCP-W-541 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1100 FL @ KM-1+200 TA-445959 Umair Mr. Rajesh CLOSED

542 CPP-NGCP-W-542 1400055962 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1100 FL TA-445959 25-Feb-19 8:10 AM Umair Mr. Rajesh CLOSED
HWYH-1100 FL @ KM-1+200

543 CPP-NGCP-W-543 1400055988 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1100 HWYH-1100 FL TA-445959 25-Feb-19 4:00 PM Umair Mr. Rajesh REJECTED
FL @ KM-1+200

1400055980 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1309 FL 25-Feb-19 8:00 AM Shadab
544 CPP-NGCP-W-544 for 8 inch HRDH-1309 FL at KM-0+300
TA-843624 Mr. Rajesh CLOSED

1400056033 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1309 FL 25-Feb-19 8:10 AM Shadab
545 CPP-NGCP-W-545 HRDH-1309 FL at KM-0+300
TA-843624 Mr. Rajesh CLOSED

546 CPP-NGCP-W-546 1400055982 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1309 HRDH-1309 FL TA-843624 25-Feb-19 4:00 PM Shadab Mr. Rajesh REJECTED
FL at KM-0+300

In-Process Verification - RT Techniques &


547 CPP-NGCP-W-547 1400056043 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-922 and HRDH-922 and 1171 VARIOUS 25-Feb-19 8:00 AM Sarfaraz Mr. Rajesh REJECTED
1171

In-Process Verification - RT Techniques &


548 CPP-NGCP-W-548 1400056036 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1100 and HWYH-1100 and 1071 VARIOUS 25-Feb-19 8:00 AM Umair Mr. Rajesh REJECTED
1071

Pre-welding and weld joint fit up


CPP-NGCP-W-549 1400056427 Welding SATIP-W-012-01 SAIC-W-2048 inspection for 8 inch HRDH-922 FL @ KM- HRDH-922 FL TA-843609 26-Feb-19 8:00 AM Saif Mr. Rajesh CLOSED
1+000

1400056514 Post-welding visual inspection for 8 inch HRDH-922 FL TA-843609 26-Feb-19 8:10 AM
550 CPP-NGCP-W-550 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-922 FL @ KM-1+000 Saif Mr. Rajesh CLOSED

551 CPP-NGCP-W-551 1400056496 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-922 HRDH-922 FL TA-843609 26-Feb-19 4:00 PM Saif Mr. Rajesh CLOSED
FL @ KM-1+000

Pre-welding and weld joint fit up inspection


552 CPP-NGCP-W-552 1400056468 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 26-Feb-19 8:00 AM Junaid Mr. Suresh CLOSED
Yard.

553 CPP-NGCP-W-553 1400056505 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 26-Feb-19 8:10 AM Junaid Mr. Suresh CLOSED
double joints at TCF-1, CPP Pipe Yard.

1400056506 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 26-Feb-19 4:00 PM
554 CPP-NGCP-W-554 joints at TCF-1, CPP Pipe Yard. Junaid Mr. Suresh REJECTED

555 CPP-NGCP-W-555 1400056497 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1071 FL TA-445830 26-Feb-19 8:00 AM Imran Mr. Suresh CLOSED
for 8 inch HWYH-1071 FL @ KM-1+170

1400056518 Post-welding visual inspection for 8 inch HWYH-1071 FL 26-Feb-19 8:10 AM


556 CPP-NGCP-W-556 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL @ KM-1+170 TA-445830 Imran Mr. Suresh CLOSED

557 CPP-NGCP-W-557 1400056525 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1071 HWYH-1071 FL TA-445830 26-Feb-19 4:00 PM Imran Mr. Suresh REJECTED
FL @ KM-1+170

1400056510 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 26-Feb-19 8:00 AM
558 CPP-NGCP-W-558 for 8 inch HRDH-1171 FL at KM-7+900 Sarfaraz Mr. Rajesh CLOSED

559 CPP-NGCP-W-559 1400056526 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 26-Feb-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1171 FL, at KM-7+900

560 CPP-NGCP-W-560 1400056534 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 26-Feb-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL, at KM-7+900

561 CPP-NGCP-W-561 1400056469 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1100 FL TA-445959 26-Feb-19 8:00 AM Umair Mr. Suresh CLOSED
for 8 inch HWYH-1100 FL @ KM-1+400

1400056431 Post-welding visual inspection for 8 inch HWYH-1100 FL 26-Feb-19 8:10 AM


562 CPP-NGCP-W-562 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1100 FL @ KM-1400 TA-445959 Umair Mr. Suresh CLOSED

563 CPP-NGCP-W-563 1400056499 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1100 HWYH-1100 FL TA-445959 26-Feb-19 4:00 PM Umair Mr. Suresh REJECTED
FL @ KM-1+400

1400056512 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1309 FL 26-Feb-19 8:00 AM Shadab
564 CPP-NGCP-W-564 for 8 inch HRDH-1309 FL at KM-0+400
TA-843624 Mr. Rajesh CLOSED

565 CPP-NGCP-W-565 1400056528 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1309 FL TA-843624 26-Feb-19 8:10 AM Shadab Mr. Rajesh CLOSED
HRDH-1309 FL at KM-0+400

1400056471 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1309 HRDH-1309 FL 26-Feb-19 4:00 PM Shadab
566 CPP-NGCP-W-566 FL at KM-0+400
TA-843624 Mr. Rajesh CLOSED

Welding Equipment calibration verification


567 CPP-NGCP-W-567 1400056543 Welding SATIP-W-012-01 SAIC-W-2045 HRDH-1309 FL N/A 26-Feb-19 8:00 AM Shadab Mr. Rajesh CLOSED
inspection prior to welding of HRDH-1309 FL

Pre-welding and weld joint fit up


568 CPP-NGCP-W-568 1400056866 Welding SATIP-W-012-01 SAIC-W-2048 inspection for 8 inch HRDH-922 FL @ KM- HRDH-922 FL TA-843609 27-Feb-19 8:00 AM Saif Mr. Rajesh CLOSED
0+500

1400056881 Post-welding visual inspection for 8 inch HRDH-922 FL TA-843609 27-Feb-19 8:10 AM
569 CPP-NGCP-W-569 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-922 FL @ KM-0+500 Saif Mr. Rajesh CLOSED

570 CPP-NGCP-W-570 1400056913 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-922 HRDH-922 FL TA-843609 27-Feb-19 4:00 PM Saif Mr. Rajesh CLOSED
FL @ KM-0+500

Pre-welding and weld joint fit up inspection


571 CPP-NGCP-W-571 1400056882 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 27-Feb-19 8:00 AM Junaid Mr. Suresh CLOSED
Yard.
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a
l Post-welding visual inspection for 24 inch
572 CPP-NGCP-W-572 1400056867 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 27-Feb-19 8:10 AM Junaid Mr. Suresh CLOSED
double joints at TCF-1, CPP Pipe Yard.

1400056898 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 27-Feb-19 4:00 PM
573 CPP-NGCP-W-573 joints at TCF-1, CPP Pipe Yard. Junaid Mr. Suresh REJECTED

574 CPP-NGCP-W-574 1400056831 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1071 FL TA-445830 27-Feb-19 8:00 AM Imran Mr. Suresh CLOSED
for 8 inch HWYH-1071 FL @ KM-1+600

575 CPP-NGCP-W-575 1400056888 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1071 FL TA-445830 27-Feb-19 8:10 AM Imran Mr. Suresh CLOSED
HWYH-1071 FL @ KM-1+600

1400056899 NDE selection for welds of 8 inch HWYH-1071 HWYH-1071 FL 27-Feb-19 4:00 PM
576 CPP-NGCP-W-576 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-1+600 TA-445830 Imran Mr. Suresh CLOSED

1400056924 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 27-Feb-19 8:00 AM
577 CPP-NGCP-W-577 for 8 inch HRDH-1171 FL at KM-8+350 Sarfaraz Mr. Rajesh CLOSED

578 CPP-NGCP-W-578 1400056852 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 27-Feb-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1171 FL, at KM-8+350

579 CPP-NGCP-W-579 1400056933 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 27-Feb-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL, at KM-8+350

1400056944 Pre-welding and weld joint fit up inspection HWYH-1100 FL 27-Feb-19 8:00 AM
580 CPP-NGCP-W-580 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1100 FL @ KM-1+600 TA-445959 Umair Mr. Suresh CLOSED

1400056953 Post-welding visual inspection for 8 inch HWYH-1100 FL 27-Feb-19 8:10 AM


581 CPP-NGCP-W-581 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1100 FL @ KM-1600 TA-445959 Umair Mr. Suresh CLOSED

1400056908 NDE selection for welds of 8 inch HWYH-1100 HWYH-1100 FL 27-Feb-19 4:00 PM
582 CPP-NGCP-W-582 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-1+600 TA-445959 Umair Mr. Suresh REJECTED

583 CPP-NGCP-W-583 1400056926 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1309 FL TA-843624 27-Feb-19 8:00 AM Shadab Mr. Rajesh CLOSED
for 8 inch HRDH-1309 FL at KM-0+400

584 CPP-NGCP-W-584 1400056945 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1309 FL TA-843624 27-Feb-19 8:10 AM Shadab Mr. Rajesh CLOSED
HRDH-1309 FL at KM-0+400

1400056927 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1309 HRDH-1309 FL 27-Feb-19 4:00 PM Shadab
585 CPP-NGCP-W-585 FL at KM-0+400
TA-843624 Mr. Rajesh CLOSED

In-Process Verification - RT Techniques &


586 CPP-NGCP-W-586 1400056957 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1309,922 HRDH-1309,922 and 1171 VARIOUS 27-Feb-19 8:00 AM Shadab Mr. Rajesh CLOSED Re-Schedule to 28-Feb-
and 1171 2019
In-Process Verification - RT Techniques &
587 CPP-NGCP-W-587 1400057005 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1100 and HWYH-1100 and 1071 VARIOUS 27-Feb-19 8:00 AM Umair Mr. Suresh REJECTED
1071

1400057523 Pre-welding and weld joint fit up inspection HWYH-1100 FL 28-Feb-19 8:00 AM
588 CPP-NGCP-W-588 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1100 FL @ KM-1+600 TA-445959 Umair Mr. Suresh CLOSED

589 CPP-NGCP-W-589 1400057467 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1100 FL TA-445959 28-Feb-19 8:10 AM Umair Mr. Suresh CLOSED
HWYH-1100 FL @ KM-1600

590 CPP-NGCP-W-590 1400057440 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1100 HWYH-1100 FL TA-445959 28-Feb-19 4:00 PM Umair Mr. Suresh CLOSED
FL @ KM-1+600

1400057432 Pre-welding and weld joint fit up inspection HWYH-1071 FL 28-Feb-19 8:00 AM
591 CPP-NGCP-W-591 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1071 FL @ KM-1+600 TA-445830 Imran Mr. Suresh CLOSED

1400057515 Post-welding visual inspection for 8 inch HWYH-1071 FL 28-Feb-19 8:10 AM


592 CPP-NGCP-W-592 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL @ KM-1+600 TA-445830 Imran Mr. Suresh CLOSED

1400057489 NDE selection for welds of 8 inch HWYH-1071 HWYH-1071 FL 28-Feb-19 4:00 PM
593 CPP-NGCP-W-593 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-1+600 TA-445830 Imran Mr. Suresh CLOSED

Pre-welding and weld joint fit up inspection


594 CPP-NGCP-W-594 1400057452 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 28-Feb-19 8:00 AM Junaid Mr. Suresh CLOSED
Yard.

595 CPP-NGCP-W-595 1400057490 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 28-Feb-19 8:10 AM Junaid Mr. Suresh CLOSED
double joints at TCF-1, CPP Pipe Yard.

1400057491 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 28-Feb-19 4:00 PM
596 CPP-NGCP-W-596 joints at TCF-1, CPP Pipe Yard. Junaid Mr. Suresh CLOSED

Pre-welding and weld joint fit up


597 CPP-NGCP-W-597 1400057593 Welding SATIP-W-012-01 SAIC-W-2048 inspection for 8 inch HRDH-922 FL @ KM- HRDH-922 FL TA-843609 28-Feb-19 8:00 AM Saif Mr. Rajesh CLOSED
0+300

598 CPP-NGCP-W-598 1400057548 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HRDH-922 FL TA-843609 28-Feb-19 8:10 AM Saif Mr. Rajesh CLOSED
HRDH-922 FL @ KM-0+300

599 CPP-NGCP-W-599 1400057586 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-922 HRDH-922 FL TA-843609 28-Feb-19 4:00 PM Saif Mr. Rajesh CLOSED
FL @ KM-0+300

1400057499 Pre-welding and weld joint fit up inspection HWYH-1100 FL 01-Mar-19 8:00 AM PRATHAB
600 CPP-NGCP-W-600 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1100 FL @ KM-1+800 TA-445959 Mr. Suresh CLOSED

1400057544 Post-welding visual inspection for 8 inch HWYH-1100 FL 01-Mar-19 8:10 AM PRATHAB
601 CPP-NGCP-W-601 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1100 FL @ KM-1800 TA-445959 Mr. Suresh CLOSED

602 CPP-NGCP-W-602 1400057554 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1100 HWYH-1100 FL TA-445959 01-Mar-19 4:00 PM PRATHAB Mr. Suresh CLOSED
FL @ KM-1+800

603 CPP-NGCP-W-603 1400057472 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1071 FL TA-445830 01-Mar-19 8:00 AM Imran Mr. Suresh CLOSED
for 8 inch HWYH-1071 FL @ KM-1+600

1400057537 Post-welding visual inspection for 8 inch HWYH-1071 FL 01-Mar-19 8:10 AM


604 CPP-NGCP-W-604 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL @ KM-1+600 TA-445830 Imran Mr. Suresh CLOSED

1400057560 NDE selection for welds of 8 inch HWYH-1071 HWYH-1071 FL 01-Mar-19 4:00 PM
605 CPP-NGCP-W-605 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-1+600 TA-445830 Imran Mr. Suresh CLOSED

Pre-welding and weld joint fit up inspection


606 CPP-NGCP-W-606 1400057521 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 01-Mar-19 8:00 AM Junaid Mr. Suresh CLOSED
Yard.

607 CPP-NGCP-W-607 1400057526 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 01-Mar-19 8:10 AM Junaid Mr. Suresh CLOSED
double joints at TCF-1, CPP Pipe Yard.

608 CPP-NGCP-W-608 1400057527 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 01-Mar-19 4:00 PM Junaid Mr. Suresh CLOSED
joints at TCF-1, CPP Pipe Yard.

1400058123 In-Process Verification - RT Techniques & TCF-1, CPP Pipe Yard. TA-445988 02-Mar-19 8:00 AM
609 CPP-NGCP-W-609 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of TCF-1. Junaid Mr. Suresh CLOSED

Pre-welding and weld joint fit up inspection


610 CPP-NGCP-W-610 1400058070 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 02-Mar-19 8:00 AM Junaid Mr. Suresh CLOSED
Yard.

611 CPP-NGCP-W-611 1400058124 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 02-Mar-19 8:10 AM Junaid Mr. Suresh CLOSED
double joints at TCF-1, CPP Pipe Yard.

612 CPP-NGCP-W-612 1400058095 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 02-Mar-19 4:00 PM Junaid Mr. Suresh CLOSED
joints at TCF-1, CPP Pipe Yard.

1400058165 Pre-welding and weld joint fit up inspection HWYH-1100 FL 02-Mar-19 8:00 AM
613 CPP-NGCP-W-613 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1100 FL @ KM-1+600 TA-445959 Umair Mr. Suresh CLOSED

1400058097 Post-welding visual inspection for 8 inch HWYH-1100 FL 02-Mar-19 8:10 AM


614 CPP-NGCP-W-614 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1100 FL @ KM-1600 TA-445959 Umair Mr. Suresh CLOSED

615 CPP-NGCP-W-615 1400058098 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1100 HWYH-1100 FL TA-445959 02-Mar-19 4:00 PM Umair Mr. Suresh CLOSED
FL @ KM-1+600

616 CPP-NGCP-W-616 1400058120 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1309 FL TA-843624 02-Mar-19 8:00 AM Shadab Mr. Rajesh CLOSED
for 8 inch HRDH-1309 FL at KM-0+400

1400058100 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1309 FL 02-Mar-19 8:10 AM Shadab
617 CPP-NGCP-W-617 HRDH-1309 FL at KM-0+400
TA-843624 Mr. Rajesh CLOSED

1400058155 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1309 HRDH-1309 FL 02-Mar-19 4:00 PM Shadab
618 CPP-NGCP-W-618 FL at KM-0+400
TA-843624 Mr. Rajesh CLOSED

1400058156 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1171 FL TA-843547 02-Mar-19 8:00 AM
619 CPP-NGCP-W-619 for 8 inch HRDH-1171 FL at KM-7+700 Sarfaraz Mr. Rajesh CLOSED

620 CPP-NGCP-W-620 1400058167 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1171 FL TA-843547 02-Mar-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1171 FL, at KM-7+700

621 CPP-NGCP-W-621 1400058140 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1171 HRDH-1171 FL TA-843547 02-Mar-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL, at KM-7+700

1400058136 Pre-welding and weld joint fit up inspection HWYH-1071 FL 02-Mar-19 8:00 AM
622 CPP-NGCP-W-622 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1071 FL @ KM-1+600 TA-445830 Imran Mr. Suresh CLOSED

1400058081 Post-welding visual inspection for 8 inch HWYH-1071 FL 02-Mar-19 8:10 AM


623 CPP-NGCP-W-623 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL @ KM-1+600 TA-445830 Imran Mr. Suresh CLOSED

624 CPP-NGCP-W-624 1400058164 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1071 HWYH-1071 FL TA-445830 02-Mar-19 4:00 PM Imran Mr. Suresh CLOSED
FL @ KM-1+600

625 CPP-NGCP-W-625 1400058112 Welding SATIP-NDE-RT-01 SAIC-RT-2007 In-Process Verification - RT Techniques & HWYH-1071 FL TA-445830 02-Mar-19 8:00 AM Imran Mr. Suresh CLOSED
Procedure Implementation of HWYH-1071

1400058157 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1117 FL 02-Mar-19 8:00 AM Saif
626 CPP-NGCP-W-626 for 8 inch HRDH-1117 FL at KM-0+300 BA-797882 Mr. Rajesh CLOSED

627 CPP-NGCP-W-627 1400058183 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1117 FL BA-797882 02-Mar-19 8:10 AM Saif Mr. Rajesh CLOSED
HRDH-1117 FL at KM-0+300

628 CPP-NGCP-W-628 1400058193 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1117 HRDH-1117 FL BA-797882 02-Mar-19 4:00 PM Saif Mr. Rajesh CLOSED
FL at KM-0+300

1400058202 In-Process Inspection of MPT using TCF-1. TA-445988 02-Mar-19 7:30 AM


629 CPP-NGCP-W-629 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 Yoke Method, TCF-1. Junaid Mr. Suresh CLOSED

Review of weekly welder performance and


630 CPP-NGCP-W-630 1400058569 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 22-Feb-2019 to OFFICE N/A 03-Mar-19 9:00 AM Ruhul Mr. Rajesh CLOSED
28 Feb-2019 at CPP site office.
In-Process Verification - RT Techniques &
631 CPP-NGCP-W-631 1400058502 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1309,922 HRDH-1309,922 and 1171 VARIOUS 03-Mar-19 8:00 AM Shadab Mr. Rajesh CLOSED
and 1171
In-Process Verification - RT Techniques &
632 CPP-NGCP-W-632 1400058619 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1100 and HWYH-1100 and 1071 VARIOUS 03-Mar-19 8:00 AM Umair Mr. Suresh CLOSED
1071

1400058561 Pre-welding and weld joint fit up inspection HWYH-1100 FL 03-Mar-19 8:00 AM
633 CPP-NGCP-W-633 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1100 FL @ KM-1+800 TA-445959 Umair Mr. Suresh CLOSED

634 CPP-NGCP-W-634 1400058571 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1100 FL TA-445959 03-Mar-19 8:10 AM Umair Mr. Suresh CLOSED
HWYH-1100 FL @ KM-1+800

1400058580 NDE selection for welds of 8 inch HWYH-1100 HWYH-1100 FL 03-Mar-19 4:00 PM
635 CPP-NGCP-W-635 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-1+800 TA-445959 Umair Mr. Suresh CLOSED

636 CPP-NGCP-W-636 1400058552 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1071 FL TA-445830 03-Mar-19 8:00 AM Imran Mr. Suresh CLOSED
for 8 inch HWYH-1071 FL @ KM-1+600

1400058601 Post-welding visual inspection for 8 inch HWYH-1071 FL 03-Mar-19 8:10 AM


637 CPP-NGCP-W-637 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL @ KM-1+600 TA-445830 Imran Mr. Suresh CLOSED

638 CPP-NGCP-W-638 1400058602 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1071 HWYH-1071 FL TA-445830 03-Mar-19 4:00 PM Imran Mr. Suresh CLOSED
FL @ KM-1+600

Pre-welding and weld joint fit up inspection


639 CPP-NGCP-W-639 1400058589 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 03-Mar-19 8:00 AM Junaid Mr. Suresh CLOSED
Yard.

640 CPP-NGCP-W-640 1400058610 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 03-Mar-19 8:10 AM Junaid Mr. Suresh CLOSED
double joints at TCF-1, CPP Pipe Yard.

1400058655 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 03-Mar-19 4:00 PM
641 CPP-NGCP-W-641 joints at TCF-1, CPP Pipe Yard. Junaid Mr. Suresh CLOSED

642 CPP-NGCP-W-642 1400058664 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1309 FL TA-843624 03-Mar-19 8:00 AM Shadab Mr. Rajesh CLOSED
for 8 inch HRDH-1309 FL at KM-0+600

1400058647 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1309 FL 03-Mar-19 8:10 AM Shadab
643 CPP-NGCP-W-643 HRDH-1309 FL at KM-0+600
TA-843624 Mr. Rajesh CLOSED

1400058637 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1309 HRDH-1309 FL 03-Mar-19 4:00 PM Shadab
644 CPP-NGCP-W-644 FL at KM-0+600
TA-843624 Mr. Rajesh CLOSED

645 CPP-NGCP-W-645 1400058693 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1117 FL BA-797882 03-Mar-19 8:00 AM Saif Mr. Rajesh CLOSED
for 8 inch HRDH-1117 FL at KM-2+500

1400058703 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1117 FL 03-Mar-19 8:10 AM Saif
646 CPP-NGCP-W-646 HRDH-1117 FL at KM-2+300 BA-797882 Mr. Rajesh CLOSED

647 CPP-NGCP-W-647 1400058658 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1117 HRDH-1117 FL BA-797882 03-Mar-19 4:00 PM Saif Mr. Rajesh CLOSED
FL at KM-2+300

1400058706 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1063 FL TA-843953 03-Mar-19 8:00 AM
648 CPP-NGCP-W-648 for 8 inch HRDH-1063 FL at KM-1+600 Sarfaraz Mr. Rajesh CLOSED

649 CPP-NGCP-W-649 1400058708 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1063 FL TA-843953 03-Mar-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1063 FL at KM-1+600

1400058714 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1063 HRDH-1063 FL TA-843953 03-Mar-19 4:00 PM
650 CPP-NGCP-W-650 FL at KM-1+600 Sarfaraz Mr. Rajesh CLOSED

1400059264 Pre-welding and weld joint fit up inspection HWYH-1100 FL 04-Mar-19 8:00 AM
651 CPP-NGCP-W-651 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1100 FL @ KM-2+000 TA-445959 Umair Mr. Suresh CLOSED

652 CPP-NGCP-W-652 1400059276 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1100 FL TA-445959 04-Mar-19 8:10 AM Umair Mr. Suresh CLOSED
HWYH-1100 FL @ KM-2+000

1400059217 NDE selection for welds of 8 inch HWYH-1100 HWYH-1100 FL 04-Mar-19 4:00 PM
653 CPP-NGCP-W-653 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-2+000 TA-445959 Umair Mr. Suresh CLOSED

654 CPP-NGCP-W-654 1400059218 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1071 FL TA-445830 04-Mar-19 8:00 AM Imran Mr. Suresh CLOSED
for 8 inch HWYH-1071 FL @ KM-1+600

1400059284 Post-welding visual inspection for 8 inch HWYH-1071 FL 04-Mar-19 8:10 AM


655 CPP-NGCP-W-655 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL @ KM-1+600 TA-445830 Imran Mr. Suresh CLOSED

656 CPP-NGCP-W-656 1400059220 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1071 HWYH-1071 FL TA-445830 04-Mar-19 4:00 PM Imran Mr. Suresh CLOSED
FL @ KM-1+600

Pre-welding and weld joint fit up inspection


657 CPP-NGCP-W-657 1400059257 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 04-Mar-19 8:00 AM Junaid Mr. Suresh CLOSED
Yard.

658 CPP-NGCP-W-658 1400059222 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 04-Mar-19 8:10 AM Junaid Mr. Suresh CLOSED
double joints at TCF-1, CPP Pipe Yard.

1400059303 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 04-Mar-19 4:00 PM
659 CPP-NGCP-W-659 joints at TCF-1, CPP Pipe Yard. Junaid Mr. Suresh CLOSED

660 CPP-NGCP-W-660 1400059252 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1309 FL TA-843624 04-Mar-19 8:00 AM Shadab Mr. Rajesh CLOSED
for 8 inch HRDH-1309 FL at KM-0+600

1400059314 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1309 FL 04-Mar-19 8:10 AM Shadab
661 CPP-NGCP-W-661 HRDH-1309 FL at KM-0+600
TA-843624 Mr. Rajesh CLOSED

662 CPP-NGCP-W-662 1400059315 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1309 HRDH-1309 FL TA-843624 04-Mar-19 4:00 PM Shadab Mr. Rajesh CLOSED
FL at KM-0+600

1400059270 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1117 FL 04-Mar-19 8:00 AM Saif
663 CPP-NGCP-W-663 for 8 inch HRDH-1117 FL at KM-2+500 BA-797882 Mr. Rajesh CLOSED

664 CPP-NGCP-W-664 1400059271 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1117 FL BA-797882 04-Mar-19 8:10 AM Saif Mr. Rajesh CLOSED
HRDH-1117 FL at KM-2+300

1400059306 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1117 HRDH-1117 FL 04-Mar-19 4:00 PM Saif
665 CPP-NGCP-W-665 FL at KM-2+300 BA-797882 Mr. Rajesh CLOSED

666 CPP-NGCP-W-666 1400059287 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1063 FL TA-843953 04-Mar-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1063 FL at KM-1+600

1400059327 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1063 FL TA-843953 04-Mar-19 8:10 AM
667 CPP-NGCP-W-667 HRDH-1063 FL at KM-1+600 Sarfaraz Mr. Rajesh CLOSED

668 CPP-NGCP-W-668 1400059309 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1063 HRDH-1063 FL TA-843953 04-Mar-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL at KM-1+600
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a
In-Process Verification - RT Techniques &
669 CPP-NGCP-W-669 1400059344 l Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-1309,922,1117 and 1171 VARIOUS 04-Mar-19 8:00 AM Shadab Mr. Rajesh CLOSED
1309,922,1117 and 1171
In-Process Verification - RT Techniques &
670 CPP-NGCP-W-670 1400059352 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1100 and HWYH-1100 and 1071 VARIOUS 04-Mar-19 8:00 AM Umair Mr. Suresh CLOSED Re-Schedule to 5-Mar-
1134 2019

1400059875 Pre-welding and weld joint fit up inspection HWYH-1100 FL 05-Mar-19 8:00 AM
671 CPP-NGCP-W-671 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1100 FL @ KM-2+200 TA-445959 Umair Mr. Suresh CLOSED

1400059846 Post-welding visual inspection for 8 inch HWYH-1100 FL 05-Mar-19 8:10 AM


672 CPP-NGCP-W-672 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1100 FL @ KM-2+200 TA-445959 Umair Mr. Suresh CLOSED

673 CPP-NGCP-W-673 1400059836 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1100 HWYH-1100 FL TA-445959 05-Mar-19 4:00 PM Umair Mr. Suresh CLOSED
FL @ KM-2+200

674 CPP-NGCP-W-674 1400059822 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1071 FL TA-445830 05-Mar-19 8:00 AM Imran Mr. Suresh CLOSED
for 8 inch HWYH-1071 FL @ KM-1+400

1400059877 Post-welding visual inspection for 8 inch HWYH-1071 FL 05-Mar-19 8:10 AM


675 CPP-NGCP-W-675 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL @ KM-1+400 TA-445830 Imran Mr. Suresh CLOSED

1400059859 NDE selection for welds of 8 inch HWYH-1071 HWYH-1071 FL 05-Mar-19 4:00 PM
676 CPP-NGCP-W-676 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-1+400 TA-445830 Imran Mr. Suresh CLOSED

Pre-welding and weld joint fit up inspection


677 CPP-NGCP-W-677 1400059730 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 05-Mar-19 8:00 AM Junaid Mr. Suresh CLOSED
Yard.

678 CPP-NGCP-W-678 1400059848 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 05-Mar-19 8:10 AM Junaid Mr. Suresh CLOSED
double joints at TCF-1, CPP Pipe Yard.

679 CPP-NGCP-W-679 1400059732 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 05-Mar-19 4:00 PM Junaid Mr. Suresh CLOSED
joints at TCF-1, CPP Pipe Yard.

1400059849 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1309 FL 05-Mar-19 8:00 AM Shadab
680 CPP-NGCP-W-680 for 8 inch HRDH-1309 FL at KM-0+900
TA-843624 Mr. Rajesh CLOSED

1400059825 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1309 FL 05-Mar-19 8:10 AM Shadab
681 CPP-NGCP-W-681 HRDH-1309 FL at KM-0+900
TA-843624 Mr. Rajesh CLOSED

682 CPP-NGCP-W-682 1400059850 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1309 HRDH-1309 FL TA-843624 05-Mar-19 4:00 PM Shadab Mr. Rajesh CLOSED
FL at KM-0+900

683 CPP-NGCP-W-683 1400059894 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1117 FL BA-797882 05-Mar-19 8:00 AM Saif Mr. Rajesh CLOSED
for 8 inch HRDH-1117 FL at KM-2+100

1400059837 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1117 FL 05-Mar-19 8:10 AM Saif
684 CPP-NGCP-W-684 HRDH-1117 FL at KM-2+100 BA-797882 Mr. Rajesh CLOSED

1400059839 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1117 HRDH-1117 FL 05-Mar-19 4:00 PM Saif
685 CPP-NGCP-W-685 FL at KM-2+100 BA-797882 Mr. Rajesh CLOSED

686 CPP-NGCP-W-686 1400059895 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1063 FL TA-843953 05-Mar-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1063 FL at KM-1+400

687 CPP-NGCP-W-687 1400059882 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1063 FL TA-843953 05-Mar-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1063 FL at KM-1+400

1400059903 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1063 HRDH-1063 FL TA-843953 05-Mar-19 4:00 PM
688 CPP-NGCP-W-688 FL at KM-1+400 Sarfaraz Mr. Rajesh CLOSED

1400059862 In-Process Verification - RT Techniques & TCF-1, CPP Pipe Yard. TA-445988 05-Mar-19 8:00 AM
689 CPP-NGCP-W-689 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of TCF-1. Junaid Mr. Suresh CLOSED

In-Process Verification - RT Techniques &


690 CPP-NGCP-W-690 1400059888 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-1309,1063,1117 and 1171 VARIOUS 05-Mar-19 8:00 AM Shadab Mr. Rajesh CLOSED
1309,1063,1117 and 1171

691 CPP-NGCP-W-691 1400059973 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 In-Process Inspection of MPT using TCF-1. TA-445988 05-Mar-19 7:30 AM Junaid Mr. Suresh CLOSED
Yoke Method, TCF-1.

692 CPP-NGCP-W-692 1400060439 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1100 FL TA-445959 06-Mar-19 8:00 AM Umair Mr. Suresh CLOSED
for 8 inch HWYH-1100 FL @ KM-2+400

1400060460 Post-welding visual inspection for 8 inch HWYH-1100 FL 06-Mar-19 8:10 AM


693 CPP-NGCP-W-693 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1100 FL @ KM-2+400 TA-445959 Umair Mr. Suresh CLOSED

694 CPP-NGCP-W-694 1400060474 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1100 HWYH-1100 FL TA-445959 06-Mar-19 4:00 PM Umair Mr. Suresh CLOSED
FL @ KM-2+400

1400060412 Pre-welding and weld joint fit up inspection HWYH-1071 FL 06-Mar-19 8:00 AM
695 CPP-NGCP-W-695 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1071 FL @ KM-0+400 TA-445830 Imran Mr. Suresh CLOSED

696 CPP-NGCP-W-696 1400060448 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1071 FL TA-445830 06-Mar-19 8:10 AM Imran Mr. Suresh CLOSED
HWYH-1071 FL @ KM-0+400

1400060431 NDE selection for welds of 8 inch HWYH-1071 HWYH-1071 FL 06-Mar-19 4:00 PM
697 CPP-NGCP-W-697 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-0+400 TA-445830 Imran Mr. Suresh CLOSED

Pre-welding and weld joint fit up inspection


698 CPP-NGCP-W-698 1400060464 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 06-Mar-19 8:00 AM Junaid Mr. Suresh REJECTED REJECTED Welding was not Done
Yard. due to unavailability
of Side Boom

1400060432 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 06-Mar-19 8:10 AM Welding was not Done
699 CPP-NGCP-W-699 double joints at TCF-1, CPP Pipe Yard. Junaid Mr. Suresh REJECTED REJECTED due to unavailability
of Side Boom

700 CPP-NGCP-W-700 1400060485 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 06-Mar-19 4:00 PM Junaid Mr. Suresh REJECTED REJECTED Welding was not Done
joints at TCF-1, CPP Pipe Yard. due to unavailability
of Side Boom
Location Change to
1400060449 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1309 FL 06-Mar-19 8:00 AM Shadab HRDH-1172
701 CPP-NGCP-W-701 for 8 inch HRDH-1309 FL at KM-1+000
TA-843624 Mr. Rajesh CLOSED Re-Schedule to 7-Mar-
2019
Location Change to
702 CPP-NGCP-W-702 1400060462 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1309 FL TA-843624 06-Mar-19 8:10 AM Shadab Mr. Rajesh CLOSED HRDH-1172
HRDH-1309 FL at KM-1+000 Re-Schedule to 7-Mar-
2019
Location Change to
1400060496 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1309 HRDH-1309 FL 06-Mar-19 4:00 PM Shadab HRDH-1172
703 CPP-NGCP-W-703 FL at KM-1+000
TA-843624 Mr. Rajesh CLOSED Re-Schedule to 7-Mar-
2019

704 CPP-NGCP-W-704 1400060441 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1117 FL BA-797882 06-Mar-19 8:00 AM Saif Mr. Rajesh CLOSED
for 8 inch HRDH-1117 FL at KM-2+000

1400060451 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1117 FL 06-Mar-19 8:10 AM Saif
705 CPP-NGCP-W-705 HRDH-1117 FL at KM-2+000 BA-797882 Mr. Rajesh CLOSED

706 CPP-NGCP-W-706 1400060497 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1117 HRDH-1117 FL BA-797882 06-Mar-19 4:00 PM Saif Mr. Rajesh CLOSED
FL at KM-2+000

1400060467 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1063 FL TA-843953 06-Mar-19 8:00 AM
707 CPP-NGCP-W-707 for 8 inch HRDH-1063 FL at KM-1+200 Sarfaraz Mr. Rajesh CLOSED

708 CPP-NGCP-W-708 1400060488 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1063 FL TA-843953 06-Mar-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1063 FL at KM-1+200

1400060489 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1063 HRDH-1063 FL TA-843953 06-Mar-19 4:00 PM
709 CPP-NGCP-W-709 FL at KM-1+200 Sarfaraz Mr. Rajesh CLOSED

In-Process Verification - RT Techniques &


710 CPP-NGCP-W-710 1400060900 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1100 and HWYH-1100 and 1071 VARIOUS 06-Mar-19 8:00 AM Imran Mr. Suresh CLOSED
1071

1400061095 Pre-welding and weld joint fit up inspection HWYH-1100 FL 07-Mar-19 8:00 AM
711 CPP-NGCP-W-711 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1100 FL @ KM-2+400 TA-445959 Umair Mr. Suresh CLOSED

1400061118 Post-welding visual inspection for 8 inch HWYH-1100 FL 07-Mar-19 8:10 AM


712 CPP-NGCP-W-712 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1100 FL @ KM-2+400 TA-445959 Umair Mr. Suresh CLOSED

1400061136 NDE selection for welds of 8 inch HWYH-1100 HWYH-1100 FL 07-Mar-19 4:00 PM
713 CPP-NGCP-W-713 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-2+400 TA-445959 Umair Mr. Suresh CLOSED

1400061111 Pre-welding and weld joint fit up inspection HWYH-1071 FL 07-Mar-19 8:00 AM
714 CPP-NGCP-W-714 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1071 FL @ KM-0+400 TA-445830 Imran Mr. Suresh CLOSED

1400061062 Post-welding visual inspection for 8 inch HWYH-1071 FL 07-Mar-19 8:10 AM


715 CPP-NGCP-W-715 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL @ KM-0+400 TA-445830 Imran Mr. Suresh CLOSED

1400061071 NDE selection for welds of 8 inch HWYH-1071 HWYH-1071 FL 07-Mar-19 4:00 PM
716 CPP-NGCP-W-716 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-0+400 TA-445830 Imran Mr. Suresh CLOSED

Pre-welding and weld joint fit up inspection


717 CPP-NGCP-W-717 1400061077 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 07-Mar-19 8:00 AM Junaid Mr. Suresh CLOSED
Yard. Re-Schedule to 9-Mar-
2019

1400061120 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 07-Mar-19 8:10 AM
718 CPP-NGCP-W-718 double joints at TCF-1, CPP Pipe Yard. Junaid Mr. Suresh CLOSED
Re-Schedule to 9-Mar-
2019

1400061097 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 07-Mar-19 4:00 PM
719 CPP-NGCP-W-719 joints at TCF-1, CPP Pipe Yard. Junaid Mr. Suresh CLOSED
Re-Schedule to 9-Mar-
2019

1400061153 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1172 FL 07-Mar-19 8:00 AM Shadab
720 CPP-NGCP-W-720 for 8 inch HRDH-1172 FL at KM-1+000
AA-843627 Mr. Rajesh CLOSED
Re-Schedule to 9-Mar-
2019

1400061098 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1172 FL 07-Mar-19 8:10 AM Shadab
721 CPP-NGCP-W-721 HRDH-1172 FL at KM-1+000
AA-843627 Mr. Rajesh CLOSED
Re-Schedule to 9-Mar-
2019

1400061092 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1172 HRDH-1172 FL 07-Mar-19 4:00 PM Shadab
722 CPP-NGCP-W-722 FL at KM-1+000
AA-843627 Mr. Rajesh CLOSED
Re-Schedule to 9-Mar-
2019

1400061128 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1117 FL 07-Mar-19 8:00 AM Saif
723 CPP-NGCP-W-723 for 8 inch HRDH-1117 FL at KM-2+000 BA-797882 Mr. Rajesh CLOSED

1400061155 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1117 FL 07-Mar-19 8:10 AM Saif
724 CPP-NGCP-W-724 HRDH-1117 FL at KM-2+000 BA-797882 Mr. Rajesh CLOSED

1400061156 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1117 HRDH-1117 FL 07-Mar-19 4:00 PM Saif
725 CPP-NGCP-W-725 FL at KM-2+000 BA-797882 Mr. Rajesh CLOSED

1400061145 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1063 FL TA-843953 07-Mar-19 8:00 AM
726 CPP-NGCP-W-726 for 8 inch HRDH-1063 FL at KM-1+200 Sarfaraz Mr. Rajesh CLOSED

1400061175 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1063 FL TA-843953 07-Mar-19 8:10 AM
727 CPP-NGCP-W-727 HRDH-1063 FL at KM-1+200 Sarfaraz Mr. Rajesh CLOSED

1400061146 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1063 HRDH-1063 FL TA-843953 07-Mar-19 4:00 PM
728 CPP-NGCP-W-728 FL at KM-1+200 Sarfaraz Mr. Rajesh CLOSED

In-Process Verification - RT Techniques & HRDH-922,1309,1063,1117 and


729 CPP-NGCP-W-729 1400061139 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- VARIOUS 07-Mar-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
922,1309,1063,1117 and 1171 1171

730 CPP-NGCP-W-730 1400061190 Welding SATIP-W-012-01 SAIC-W-2044 Welding consumables verification and visual TCF-1 N/A 07-Mar-19 8:00 AM Junaid Mr. Suresh CLOSED
inspection storage & handling at TCF-1

1400061181 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1117 FL 08-Mar-19 8:00 AM Saif
731 CPP-NGCP-W-731 for 8 inch HRDH-1117 FL at KM-1+300 BA-797882 Mr. Rajesh CLOSED
Re-Schedule to 9-Mar-
2019

1400061182 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1117 FL 08-Mar-19 8:10 AM Saif
732 CPP-NGCP-W-732 HRDH-1117 FL at KM-1+300 BA-797882 Mr. Rajesh CLOSED
Re-Schedule to 9-Mar-
2019

733 CPP-NGCP-W-733 1400061132 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1117 HRDH-1117 FL BA-797882 08-Mar-19 4:00 PM Saif Mr. Rajesh CLOSED
FL at KM-1+300 Re-Schedule to 9-Mar-
2019
Weld repair verification of joints 02-FW-
734 CPP-NGCP-W-734 1400061588 Welding SATIP-W-012-02 SAIC-W-2051 223, 04-FW-378 & 04-FW-390 at KM-2+700 & KM- HWYH-1134 FL TA-445836 08-Mar-19 8:10 AM Umair Mr. Suresh CLOSED
4+600, HWYH-1134.
Post-welding visual inspection of repair
735 CPP-NGCP-W-735 1400061595 Welding SATIP-W-012-01 SAIC-W-2048 joints 02-FW-223, 04-FW-378 & 04-FW-390 at HWYH-1134 FL TA-445836 08-Mar-19 11::00 AM Umair Mr. Suresh CLOSED
KM-2+700 & KM-4+600, HWYH-1134.
Solvent-Removable Color Contrast (Visible
736 CPP-NGCP-W-736 1400061613 Welding SATIP-NDE-LPT-01 SAIC-LPT-2007 Dye) Penetrant Examination of repair joints HWYH-1134 FL TA-445836 08-Mar-19 9:10 AM Umair Mr. Suresh CLOSED
02-FW-223, 04-FW-378 & 04-FW-390 at KM-2+700
& KM-4+600, HWYH-1134.

1400062069 Pre-welding and weld joint fit up inspection HWYH-1100 FL 09-Mar-19 8:00 AM
737 CPP-NGCP-W-737 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1100 FL @ KM-3+000 TA-445959 Umair Mr. Suresh CLOSED

738 CPP-NGCP-W-738 1400062097 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1100 FL TA-445959 09-Mar-19 8:10 AM Umair Mr. Suresh CLOSED
HWYH-1100 FL @ KM-3+000

1400062070 NDE selection for welds of 8 inch HWYH-1100 HWYH-1100 FL 09-Mar-19 4:00 PM
739 CPP-NGCP-W-739 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-3+000 TA-445959 Umair Mr. Suresh CLOSED

1400062113 Pre-welding and weld joint fit up inspection HWYH-1076 FL 09-Mar-19 8:00 AM
740 CPP-NGCP-W-740 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1076 FL @ KM-0+260 TA-445861 Imran Mr. Suresh CLOSED

741 CPP-NGCP-W-741 1400062114 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1076 FL TA-445861 09-Mar-19 8:10 AM Imran Mr. Suresh CLOSED
HWYH-1076 FL @ KM-0+260

742 CPP-NGCP-W-742 1400062086 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1076 HWYH-1076 FL TA-445861 09-Mar-19 4:00 PM Imran Mr. Suresh CLOSED
FL @ KM-0+260
Pre-welding and weld joint fit up inspection
743 CPP-NGCP-W-743 1400062060 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 09-Mar-19 8:00 AM Junaid Mr. Suresh CLOSED Re-Schedule to 10-Mar-
Yard. 2019

1400062098 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 09-Mar-19 8:10 AM
744 CPP-NGCP-W-744 double joints at TCF-1, CPP Pipe Yard. Junaid Mr. Suresh CLOSED Re-Schedule to 10-Mar-
2019

745 CPP-NGCP-W-745 1400062052 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 09-Mar-19 4:00 PM Junaid Mr. Suresh CLOSED
joints at TCF-1, CPP Pipe Yard. Re-Schedule to 10-Mar-
2019

746 CPP-NGCP-W-746 1400062099 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1135 FL TA-843650 09-Mar-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1135 FL at KM-0+200

1400062110 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1135 FL 09-Mar-19 8:10 AM
747 CPP-NGCP-W-747 HRDH-1135 FL at KM-0+200 TA-843650 Sarfaraz Mr. Rajesh CLOSED

1400062118 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1135 HRDH-1135 FL 09-Mar-19 4:00 PM
748 CPP-NGCP-W-748 FL at KM-0+200 TA-843650 Sarfaraz Mr. Rajesh CLOSED

In-Process Verification - RT Techniques &


749 CPP-NGCP-W-749 1400062143 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1063,1117 HRDH-1063,1117 and 1171 VARIOUS 09-Mar-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
and 1171

1400062987 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1135 FL 10-Mar-19 8:00 AM
750 CPP-NGCP-W-750 for 8 inch HRDH-1135 FL at KM-0+350 TA-843650 Sarfaraz Mr. Rajesh CLOSED

751 CPP-NGCP-W-751 1400062996 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1135 FL TA-843650 10-Mar-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1135 FL at KM-0+350

752 CPP-NGCP-W-752 1400063003 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1135 HRDH-1135 FL TA-843650 10-Mar-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL at KM-0+350

1400063013 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1117 FL 10-Mar-19 8:00 AM Saif
753 CPP-NGCP-W-753 for 8 inch HRDH-1117 FL at KM-0+900 BA-797882 Mr. Rajesh CLOSED

1400063005 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1117 FL 10-Mar-19 8:10 AM Saif
754 CPP-NGCP-W-754 HRDH-1117 FL at KM-0+900 BA-797882 Mr. Rajesh CLOSED

755 CPP-NGCP-W-755 1400062982 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1117 HRDH-1117 FL BA-797882 10-Mar-19 4:00 PM Saif Mr. Rajesh CLOSED
FL at KM-0+900

756 CPP-NGCP-W-756 1400062962 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1172 FL AA-843627 10-Mar-19 8:00 AM Shadab Mr. Rajesh CLOSED
for 8 inch HRDH-1172 FL at KM-0+700

1400062990 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1172 FL 10-Mar-19 8:10 AM Shadab
757 CPP-NGCP-W-757 HRDH-1172 FL at KM-0+700
AA-843627 Mr. Rajesh CLOSED

1400063006 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1172 HRDH-1172 FL 10-Mar-19 4:00 PM Shadab
758 CPP-NGCP-W-758 FL at KM-0+700
AA-843627 Mr. Rajesh CLOSED

759 CPP-NGCP-W-759 1400062951 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1100 FL TA-445959 10-Mar-19 8:00 AM Umair Mr. Suresh CLOSED
for 8 inch HWYH-1100 FL @ KM-3+200

760 CPP-NGCP-W-760 1400062988 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1100 FL TA-445959 10-Mar-19 8:10 AM Umair Mr. Suresh CLOSED
HWYH-1100 FL @ KM-3+200

1400062998 NDE selection for welds of 8 inch HWYH-1100 HWYH-1100 FL 10-Mar-19 4:00 PM
761 CPP-NGCP-W-761 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-3+200 TA-445959 Umair Mr. Suresh CLOSED

1400062961 Pre-welding and weld joint fit up inspection HWYH-1076 FL 10-Mar-19 8:00 AM
762 CPP-NGCP-W-762 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1076 FL @ KM-0+260 TA-445861 Imran Mr. Suresh CLOSED

763 CPP-NGCP-W-763 1400062970 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1076 FL TA-445861 10-Mar-19 8:10 AM Imran Mr. Suresh CLOSED
HWYH-1076 FL @ KM-0+260

764 CPP-NGCP-W-764 1400063024 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1076 HWYH-1076 FL TA-445861 10-Mar-19 4:00 PM Imran Mr. Suresh CLOSED
FL @ KM-0+260

In-Process Verification - RT Techniques &


765 CPP-NGCP-W-765 1400063002 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1172,1117 HRDH-1172,1117 and 1063 VARIOUS 10-Mar-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
and 1063
In-Process Verification - RT Techniques &
766 CPP-NGCP-W-766 1400063025 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1134,1100 HWYH-1134,1100 and 1071 VARIOUS 10-Mar-19 8:00 AM Imran Mr. Suresh CLOSED
and 1071

1400063007 Pre-welding and weld joint fit up inspection HWYH-1088 FL 10-Mar-19 8:00 AM Re-Schedule to 11-Mar-
767 CPP-NGCP-W-767 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1088 FL @ KM-0+500 TA-445837 Rajesh Mr. Suresh CLOSED
19
1400063008 Post-welding visual inspection for 8 inch HWYH-1088 FL 10-Mar-19 8:10 AM Re-Schedule to 11-Mar-
768 CPP-NGCP-W-768 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1088 FL @ KM-0+500 TA-445837 Rajesh Mr. Suresh CLOSED
19
1400063044 NDE selection for welds of 8 inch HWYH-1088 HWYH-1088 FL 10-Mar-19 4:00 PM Re-Schedule to 11-Mar-
769 CPP-NGCP-W-769 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-0+500 TA-445837 Rajesh Mr. Suresh CLOSED
19
Review of weekly welder performance and
770 CPP-NGCP-W-770 1400063017 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 1-Mar-2019 to 7 CPP site office. N/A 10-Mar-19 8:00 AM Ruhul Mr. Rajesh CLOSED
Mar-2019 at CPP site office.
771 CPP-NGCP-W-771 1400063607 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1100 FL TA-445959 11-Mar-19 8:00 AM Umair Mr. Suresh CLOSED
for 8 inch HWYH-1100 FL @ KM-3+400
772 CPP-NGCP-W-772 1400063597 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1100 FL TA-445959 11-Mar-19 8:10 AM Umair Mr. Suresh CLOSED
HWYH-1100 FL @ KM-3+400
773 CPP-NGCP-W-773 1400063562 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1100 HWYH-1100 FL TA-445959 11-Mar-19 4:00 PM Umair Mr. Suresh CLOSED
FL @ KM-3+400
774 CPP-NGCP-W-774 1400063608 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1076 FL TA-445861 11-Mar-19 8:00 AM Imran Mr. Suresh CLOSED
for 8 inch HWYH-1076 FL @ KM-0+260
775 CPP-NGCP-W-775 1400063645 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1076 FL TA-445861 11-Mar-19 8:10 AM Imran Mr. Suresh CLOSED
HWYH-1076 FL @ KM-0+260
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a
776 CPP-NGCP-W-776 1400063636 l Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1076 HWYH-1076 FL TA-445861 11-Mar-19 4:00 PM Imran Mr. Suresh CLOSED
FL @ KM-0+260
777 CPP-NGCP-W-777 1400063586 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1088 FL TA-445837 11-Mar-19 8:00 AM Rajesh Mr. Suresh CLOSED Re-Schedule to 12-Mar-
for 8 inch HWYH-1088 FL @ KM-0+265 19
778 CPP-NGCP-W-778 1400063647 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1088 FL TA-445837 11-Mar-19 8:10 AM Rajesh Mr. Suresh CLOSED Re-Schedule to 12-Mar-
HWYH-1088 FL @ KM-0+265 19
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a
779 CPP-NGCP-W-779 1400063654 l Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1088 HWYH-1088 FL TA-445837 11-Mar-19 4:00 PM Rajesh Mr. Suresh CLOSED Re-Schedule to 12-Mar-
FL @ KM-0+265 19
Pre-welding and weld joint fit up inspection
780 CPP-NGCP-W-780 1400063617 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 11-Mar-19 8:00 AM Junaid Mr. Suresh CLOSED
Yard.

1400063611 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 11-Mar-19 8:10 AM
781 CPP-NGCP-W-781 double joints at TCF-1, CPP Pipe Yard. Junaid Mr. Suresh CLOSED

782 CPP-NGCP-W-782 1400063683 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 11-Mar-19 4:00 PM Junaid Mr. Suresh CLOSED
joints at TCF-1, CPP Pipe Yard.
783 CPP-NGCP-W-783 1400063589 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1135 FL TA-843650 11-Mar-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1135 FL at KM-0+400
784 CPP-NGCP-W-784 1400063676 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1135 FL TA-843650 11-Mar-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1135 FL at KM-0+400
785 CPP-NGCP-W-785 1400063665 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1135 HRDH-1135 FL TA-843650 11-Mar-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL at KM-0+400
786 CPP-NGCP-W-786 1400063670 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1117 FL BA-797882 11-Mar-19 8:00 AM Saif Mr. Rajesh CLOSED
for 8 inch HRDH-1117 FL at KM-0+800
787 CPP-NGCP-W-787 1400063630 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1117 FL BA-797882 11-Mar-19 8:10 AM Saif Mr. Rajesh CLOSED
HRDH-1117 FL at KM-0+800
788 CPP-NGCP-W-788 1400063631 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1117 HRDH-1117 FL BA-797882 11-Mar-19 4:00 PM Saif Mr. Rajesh CLOSED
FL at KM-0+800
789 CPP-NGCP-W-789 1400063695 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1172 FL AA-843627 11-Mar-19 8:00 AM Shadab Mr. Rajesh CLOSED
for 8 inch HRDH-1172 FL at KM-0+900
790 CPP-NGCP-W-790 1400063726 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1172 FL AA-843627 11-Mar-19 8:10 AM Shadab Mr. Rajesh CLOSED
HRDH-1172 FL at KM-0+900
791 CPP-NGCP-W-791 1400063697 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1172 HRDH-1172 FL AA-843627 11-Mar-19 4:00 PM Shadab Mr. Rajesh CLOSED
FL at KM-0+900
In-Process Verification - RT Techniques &
792 CPP-NGCP-W-792 1400063739 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1134,1100 HWYH-1134,1100 and 1071 VARIOUS 11-Mar-19 8:00 AM Imran Mr. Suresh REJECTED
and 1071
1400063750 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1314 FL 11-Mar-19 8:00 AM PRATHAB
793 CPP-NGCP-W-793 for 8 inch HRDH-1314 FL at KM-0+200 N/A Mr. Rajesh CLOSED

1400063721 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1314 FL 11-Mar-19 8:10 AM PRATHAB
794 CPP-NGCP-W-794 HRDH-1314 FL at KM-0+200 N/A Mr. Rajesh CLOSED

1400063795 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1314 HRDH-1314 FL 11-Mar-19 4:00 PM PRATHAB
795 CPP-NGCP-W-795 FL at KM-0+200 N/A Mr. Rajesh CLOSED

Pre-welding and weld joint fit up inspection


796 CPP-NGCP-W-796 1400064315 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1055 FL at KM-0+300 - HWYH-1055 FL TA-446046 12-Mar-19 8:00 AM Umair Mr. Suresh CLOSED
1+720

797 CPP-NGCP-W-797 1400064270 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HWYH-1055 FL TA-446046 12-Mar-19 8:10 AM Umair Mr. Suresh CLOSED
HWYH-1055 FL at KM-0+300 - 1+720
798 CPP-NGCP-W-798 1400064262 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1055 HWYH-1055 FL TA-446046 12-Mar-19 4:00 PM Umair Mr. Suresh CLOSED
FL at KM-0+300 - 1+720
799 CPP-NGCP-W-799 1400064343 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1076 FL TA-445861 12-Mar-19 8:00 AM Imran Mr. Suresh CLOSED
for 8 inch HWYH-1076 FL @ KM-0+260 - 0+600
800 CPP-NGCP-W-800 1400064353 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1076 FL TA-445861 12-Mar-19 8:10 AM Imran Mr. Suresh CLOSED
HWYH-1076 FL @ KM-0+260 - 0+600
801 CPP-NGCP-W-801 1400064301 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1076 HWYH-1076 FL TA-445861 12-Mar-19 4:00 PM Imran Mr. Suresh CLOSED
FL @ KM-0+260 - 0+600
Pre-welding and weld joint fit up inspection
802 CPP-NGCP-W-802 1400064373 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 12-Mar-19 8:00 AM Junaid Mr. Suresh CLOSED
Yard.
1400064374 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 12-Mar-19 8:10 AM
803 CPP-NGCP-W-803 Welding SATIP-W-012-01 SAIC-W-2048 double joints at TCF-1, CPP Pipe Yard. Junaid Mr. Suresh CLOSED

1400064365 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 12-Mar-19 4:00 PM
804 CPP-NGCP-W-804 Welding SATIP-W-012-01 SAIC-W-2054 joints at TCF-1, CPP Pipe Yard. Junaid Mr. Suresh CLOSED

805 CPP-NGCP-W-805 1400064328 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1135 FL TA-843650 12-Mar-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1135 FL at KM-0+500

806 CPP-NGCP-W-806 1400064319 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1135 FL TA-843650 12-Mar-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1135 FL at KM-0+500
807 CPP-NGCP-W-807 1400064341 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1135 HRDH-1135 FL TA-843650 12-Mar-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL at KM-0+500
Pre-welding and weld joint fit up inspection
808 CPP-NGCP-W-808 1400064394 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1117 FL at KM-0+200-KM- HRDH-1117 FL TA-843610 12-Mar-19 8:00 AM Saif Mr. Rajesh CLOSED
0+000

809 CPP-NGCP-W-809 1400064381 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1117 FL TA-843610 12-Mar-19 8:10 AM Saif Mr. Rajesh CLOSED
HRDH-1117 FL at KM-0+200-KM-0+000
810 CPP-NGCP-W-810 1400064382 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1117 HRDH-1117 FL TA-843610 12-Mar-19 4:00 PM Saif Mr. Rajesh CLOSED
FL at KM-0+200-KM-0+000
Pre-welding and weld joint fit up inspection
811 CPP-NGCP-W-811 1400064388 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1145 FL at KM-1+300-KM- HRDH-1145 FL TA-843976 12-Mar-19 8:00 AM Saif Mr. Rajesh CLOSED
1+100
1400064389 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1145 FL 12-Mar-19 8:10 AM Saif
812 CPP-NGCP-W-812 HRDH-1145 FL at KM-1+300-KM-1+100 TA-843976 Mr. Rajesh CLOSED

813 CPP-NGCP-W-813 1400064342 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1145 HRDH-1145 FL TA-843976 12-Mar-19 4:00 PM Saif Mr. Rajesh CLOSED
FL at KM-1+300-KM-1+100
814 CPP-NGCP-W-814 1400064463 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1314 FL TA-843626 12-Mar-19 8:00 AM Shadab Mr. Rajesh CLOSED
for 8 inch HRDH-1314 FL at KM-0+300
815 CPP-NGCP-W-815 1400064464 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1314 FL TA-843626 12-Mar-19 8:10 AM Shadab Mr. Rajesh CLOSED
HRDH-1314 FL at KM-0+300
816 CPP-NGCP-W-816 1400064396 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1314 HRDH-1314 FL TA-843626 12-Mar-19 4:00 PM Shadab Mr. Rajesh CLOSED
FL at KM-0+300
817 CPP-NGCP-W-817 1400064474 Welding SATIP-NDE-RT-01 SAIC-RT-2007 In-Process Verification - RT Techniques & HWYH-1076 FL VARIOUS 12-Mar-19 8:00 AM RAMEEZ Mr. Suresh REJECTED
Procedure Implementation of HWYH-1076
In-Process Verification - RT Techniques &
818 CPP-NGCP-W-818 1400064454 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HWYH-1135,1172,1117,1309 & 1063 VARIOUS 12-Mar-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1135,1172,1117,1309,1063
1400064465 In-Process Verification - RT Techniques & TCF-1 TA-445988 12-Mar-19 8:00 AM RAMEEZ
819 CPP-NGCP-W-819 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of TCF-1. Mr. Suresh CLOSED

Pre-welding and weld joint fit up inspection


820 CPP-NGCP-W-820 1400064934 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1055 FL at KM-0+300 - HWYH-1055 FL TA-446046 13-Mar-19 8:00 AM Umair Mr. Suresh CLOSED
1+720
821 CPP-NGCP-W-821 1400064945 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HWYH-1055 FL TA-446046 13-Mar-19 8:10 AM Umair Mr. Suresh CLOSED
HWYH-1055 FL at KM-0+300 - 1+720
822 CPP-NGCP-W-822 1400064953 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1055 HWYH-1055 FL TA-446046 13-Mar-19 4:00 PM Umair Mr. Suresh CLOSED
FL at KM-0+300 - 1+720
823 CPP-NGCP-W-823 1400064955 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1076 FL TA-445861 13-Mar-19 8:00 AM Imran Mr. Suresh CLOSED
for 8 inch HWYH-1076 FL @ KM-0+260 - 2+500
824 CPP-NGCP-W-824 1400064937 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1076 FL TA-445861 13-Mar-19 8:10 AM Imran Mr. Suresh CLOSED
HWYH-1076 FL @ KM-0+260 - 2+500
825 CPP-NGCP-W-825 1400064912 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1076 HWYH-1076 FL TA-445861 13-Mar-19 4:00 PM Imran Mr. Suresh CLOSED
FL @ KM-0+260 - 2+500
Re-Schedule to 14-Mar-
826 CPP-NGCP-W-826 1400064920 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1088 FL TA-445837 13-Mar-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED 19 due to unavailable
for 8 inch HWYH-1088 FL @ KM-0+265
permit
Post-welding visual inspection for 8 inch Re-Schedule to 14-Mar-
827 CPP-NGCP-W-827 1400064926 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1088 FL @ KM-0+265 HWYH-1088 FL TA-445837 13-Mar-19 8:10 AM Abdul Aziz Mr. Suresh CLOSED 19 due to unavailable
permit
Re-Schedule to 14-Mar-
828 CPP-NGCP-W-828 1400064947 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1088 HWYH-1088 FL TA-445837 13-Mar-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED 19 due to unavailable
FL @ KM-0+265
permit
Pre-welding and weld joint fit up inspection Mr.
829 CPP-NGCP-W-829 1400064983 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 13-Mar-19 8:00 AM Junaid CLOSED
Yard. Rajendran
Mr.
830 CPP-NGCP-W-830 1400064984 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 13-Mar-19 8:10 AM Junaid CLOSED
double joints at TCF-1, CPP Pipe Yard. Rajendran
Mr.
831 CPP-NGCP-W-831 1400064957 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 13-Mar-19 4:00 PM Junaid CLOSED
joints at TCF-1, CPP Pipe Yard. Rajendran
832 CPP-NGCP-W-832 1400064985 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1135 FL TA-843650 13-Mar-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1135 FL at KM-0+700
833 CPP-NGCP-W-833 1400064938 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1135 FL TA-843650 13-Mar-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1135 FL at KM-0+700
834 CPP-NGCP-W-834 1400064939 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1135 HRDH-1135 FL TA-843650 13-Mar-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL at KM-0+700
Pre-welding and weld joint fit up inspection
835 CPP-NGCP-W-835 1400064968 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1145 FL at KM-1+100-KM- HRDH-1145 FL TA-843976 13-Mar-19 8:00 AM Saif Mr. Rajesh CLOSED
0+700
1400064974 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1145 FL 13-Mar-19 8:10 AM Saif
836 CPP-NGCP-W-836 HRDH-1145 FL at KM-1+100-KM-0+700 TA-843976 Mr. Rajesh CLOSED

1400064976 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1145 HRDH-1145 FL 13-Mar-19 4:00 PM Saif
837 CPP-NGCP-W-837 FL at KM-1+100-KM-0+700 TA-843976 Mr. Rajesh CLOSED

1400065014 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1314 FL 13-Mar-19 8:00 AM Shadab
838 CPP-NGCP-W-838 for 8 inch HRDH-1314 FL at KM-0+500 TA-843626 Mr. Rajesh CLOSED

1400065015 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1314 FL 13-Mar-19 8:10 AM Shadab
839 CPP-NGCP-W-839 HRDH-1314 FL at KM-0+500 TA-843626 Mr. Rajesh CLOSED

1400064995 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1314 HRDH-1314 FL 13-Mar-19 4:00 PM Shadab
840 CPP-NGCP-W-840 FL at KM-0+500 TA-843626 Mr. Rajesh CLOSED
Pre-welding and weld joint fit up inspection
841 CPP-NGCP-W-841 1400064997 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1170 FL at KM-0+594.45 - HRDH-1170 FL TA-843656 13-Mar-19 8:00 AM Rajesh Mr. Rajesh CLOSED Re-Schedule to 18-Mar-
KM0+638.83 2019 Re-Schedule to 14-Mar-2019
1400064979 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1170 FL 13-Mar-19 8:10 AM Re-Schedule to 18-Mar-
842 CPP-NGCP-W-842 HRDH-1170 FL at KM-0+594.45 - KM0+638.83 TA-843656 Rajesh Mr. Rajesh CLOSED
2019 Re-Schedule to 14-Mar-2019
1400065036 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1170 HRDH-1170 FL 13-Mar-19 4:00 PM Re-Schedule to 18-Mar-
843 CPP-NGCP-W-843 FL at KM-0+594.45 - KM0+638.83 TA-843656 Rajesh Mr. Rajesh CLOSED
2019 Re-Schedule to 14-Mar-2019
In-Process Verification - RT Techniques & HRDH-1135,1172,1117,1309,1314 Re-Schedule to 14-Mar-
844 CPP-NGCP-W-844 1400065054 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- VARIOUS 13-Mar-19 8:00 AM RAMEEZ Mr. Suresh CLOSED 2019 (Added Location:
1135,1172,1117,1309,1063,1314 & 1063
HRDH-1145
845 CPP-NGCP-W-845 1400065039 Welding SATIP-NDE-RT-01 SAIC-RT-2007 In-Process Verification - RT Techniques & HWYH-1076 & 1100 FL VARIOUS 13-Mar-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
Procedure Implementation of HWYH-1076,1100
Weld repair verification of joints
846 CPP-NGCP-W-846 1400065057 Welding SATIP-W-012-01 SAIC-W-2051 01-FW-81 & 01-FW-121 of HRDH-1063 & HRDH-1134 FL VARIOUS 13-Mar-19 8:10 AM IRSHAD Mr. Suresh CLOSED
07-FW-638,642, 04-FW-364,357T1, 03-FW-255,
01-FW-98 of HRDH-1171
Post-welding visual inspection of repair
joints
847 CPP-NGCP-W-847 1400065084 Welding SATIP-W-012-01 SAIC-W-2048 01-FW-81 & 01-FW-121 of HRDH-1063 & HRDH-1134 FL VARIOUS 13-Mar-19 2:00 PM IRSHAD Mr. Suresh CLOSED
07-FW-638,642, 04-FW-364,357T1, 03-FW-255,
01-FW-98 of HRDH-1171

Solvent-Removable Color Contrast (Visible


Dye) Penetrant Examination of repair joints
848 CPP-NGCP-W-848 1400065059 Welding SATIP-NDE-LPT-01 SAIC-LPT-2007 01-FW-81 & 01-FW-121 of HRDH-1063 & HRDH-1134 FL VARIOUS 13-Mar-19 9:10 AM IRSHAD Mr. Suresh CLOSED Cancelled
07-FW-638,642, 04-FW-364,357T1, 03-FW-255,
01-FW-98 of HRDH-1171
In-Process Verification - RT Techniques &
849 CPP-NGCP-W-849 1400065705 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- HWYH-1076,1088,1055 VARIOUS 14-Mar-19 8:00 AM RAMEEZ Mr. Suresh CLOSED Re-Schedule to 16-Mar-
1076,1088,1055 2019
In-Process Verification - RT Techniques & HRDH-
850 CPP-NGCP-W-850 1400065661 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- 1135,1172,1117,1309,1063,1314,11 VARIOUS 14-Mar-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED Re-Schedule to 16-Mar-
1135,1172,1117,1309,1063,1314,1145 45 2019
1400065696 In-Process Verification - RT Techniques & TCF-1 TA-445988 14-Mar-19 8:00 AM RAMEEZ Mr.
851 CPP-NGCP-W-851 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of TCF-1. CLOSED
Rajendran
In-Process Verification - RT Techniques &
852 CPP-NGCP-W-852 1400065726 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- HWYH-1076,1088,1055 VARIOUS 15-Mar-19 8:00 AM RAMEEZ Mr. Suresh REJECTED
1076,1088,1055
In-Process Verification - RT Techniques & HRDH-
853 CPP-NGCP-W-853 1400065746 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- 1135,1172,1117,1309,1063,1314,11 VARIOUS 15-Mar-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1135,1172,1117,1309,1063,1314,1145 45
1400065727 In-Process Inspection of MPT using TCF-1. TA-445988 14-Mar-19 8:00 AM RAMEEZ Mr.
854 CPP-NGCP-W-854 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 Yoke Method, TCF-1. CLOSED
Rajendran
Pre-welding and weld joint fit up inspection
855 CPP-NGCP-W-855 1400065926 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1055 FL at KM-0+100 - HWYH-1055 FL TA-446046 14-Mar-19 8:00 AM Umair Mr. Suresh REJECTED CANCELLED DUE TO JOB
2+000 NOT READY
856 CPP-NGCP-W-856 1400065973 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HWYH-1055 FL TA-446046 14-Mar-19 8:10 AM Umair Mr. Suresh REJECTED REJECTED CANCELLED DUE TO JOB
HWYH-1055 FL at KM-0+100 - 2+000 NOT READY
857 CPP-NGCP-W-857 1400065927 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1055 HWYH-1055 FL TA-446046 14-Mar-19 4:00 PM Umair Mr. Suresh REJECTED REJECTED CANCELLED DUE TO JOB
FL at KM-0+100 - 2+000 NOT READY
858 CPP-NGCP-W-858 1400065978 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1076 FL TA-445861 14-Mar-19 8:00 AM Imran Mr. Suresh CLOSED
for 8 inch HWYH-1076 FL @ KM-0+100 - 2+500
859 CPP-NGCP-W-859 1400065957 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1076 FL TA-445861 14-Mar-19 8:10 AM Imran Mr. Suresh CLOSED
HWYH-1076 FL @ KM-0+100 - 2+500
860 CPP-NGCP-W-860 1400065996 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1076 HWYH-1076 FL TA-445861 14-Mar-19 4:00 PM Imran Mr. Suresh CLOSED
FL @ KM-0+100 - 2+500
Pre-welding and weld joint fit up inspection Mr.
861 CPP-NGCP-W-861 1400065988 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 14-Mar-19 8:00 AM Junaid CLOSED
Yard. Rajendran
Post-welding visual inspection for 24 inch Mr.
862 CPP-NGCP-W-862 1400065932 Welding SATIP-W-012-01 SAIC-W-2048 double joints at TCF-1, CPP Pipe Yard. TCF-1, CPP Pipe Yard. TA-445988 14-Mar-19 8:10 AM Junaid CLOSED
Rajendran
NDE selection for welds of 24 inch double Mr.
863 CPP-NGCP-W-863 1400066023 Welding SATIP-W-012-01 SAIC-W-2054 joints at TCF-1, CPP Pipe Yard. TCF-1, CPP Pipe Yard. TA-445988 14-Mar-19 4:00 PM Junaid CLOSED
Rajendran
Pre-welding and weld joint fit up inspection
864 CPP-NGCP-W-864 1400066008 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1135 FL at KM-0+700 to HRDH-1135 FL TA-843650 14-Mar-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
0+800

865 CPP-NGCP-W-865 1400066055 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1135 FL TA-843650 14-Mar-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1135 FL at KM-0+700 to 0+800
866 CPP-NGCP-W-866 1400066029 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1135 HRDH-1135 FL TA-843650 14-Mar-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL at KM-0+700 to 0+800
Pre-welding and weld joint fit up inspection
867 CPP-NGCP-W-867 1400066103 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1145 FL at KM-0+450 to HRDH-1145 FL TA-843976 14-Mar-19 8:00 AM Saif Mr. Rajesh CLOSED
0+200

1400066021 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1145 FL 14-Mar-19 8:10 AM Saif
868 CPP-NGCP-W-868 HRDH-1145 FL at KM-0+450 to 0+200 TA-843976 Mr. Rajesh CLOSED

1400066104 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1145 HRDH-1145 FL 14-Mar-19 4:00 PM Saif
869 CPP-NGCP-W-869 FL at KM-0+450 to 0+200 TA-843976 Mr. Rajesh CLOSED

Pre-welding and weld joint fit up inspection


870 CPP-NGCP-W-870 1400066099 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1314 FL at KM-0+700 to HRDH-1314 FL TA-843626 14-Mar-19 8:00 AM Shadab Mr. Rajesh CLOSED
0+800

871 CPP-NGCP-W-871 1400066109 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1314 FL TA-843626 14-Mar-19 8:10 AM Shadab Mr. Rajesh CLOSED
HRDH-1314 FL at KM-0+700 to 0+800
872 CPP-NGCP-W-872 1400066089 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1314 HRDH-1314 FL TA-843626 14-Mar-19 4:00 PM Shadab Mr. Rajesh CLOSED
FL at KM-0+700 to 0+800
Pre-welding and weld joint fit up inspection
873 CPP-NGCP-W-873 1400066125 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1170 FL at KM-0+594.45 - HRDH-1170 FL TA-843656 14-Mar-19 8:00 AM Rajesh Mr. Rajesh CLOSED Re-Schedule to 16-Mar-
KM0+638.83 2019
874 CPP-NGCP-W-874 1400066114 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1170 FL TA-843656 14-Mar-19 8:10 AM Rajesh Mr. Rajesh CLOSED Re-Schedule to 16-Mar-
HRDH-1170 FL at KM-0+594.45 - KM0+638.83 2019
875 CPP-NGCP-W-875 1400066115 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1170 HRDH-1170 FL TA-843656 14-Mar-19 4:00 PM Rajesh Mr. Rajesh CLOSED Re-Schedule to 16-Mar-
FL at KM-0+594.45 - KM0+638.83 2019
Weld repair verification of joints
876 CPP-NGCP-W-876 1400066144 Welding SATIP-W-012-01 SAIC-W-2051 04-FW-364,357T1, 03-FW-255, 01-FW-98, 00-FW- HRDH-1171 FL TA-843547 14-Mar-19 8:10 AM IRSHAD Mr. Suresh CLOSED
53 T2 of HRDH-1171
Post-welding visual inspection of repair
877 CPP-NGCP-W-877 1400066102 Welding SATIP-W-012-01 SAIC-W-2048 joints HRDH-1171 FL TA-843547 14-Mar-19 2:00 PM IRSHAD Mr. Suresh CLOSED
04-FW-364,357T1, 03-FW-255, 01-FW-98, 00-FW-
53 T2 of HRDH-1171
Pre-welding and weld joint fit up inspection
878 CPP-NGCP-W-878 1400066140 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1314 FL at KM-0+800 to HRDH-1314 FL TA-843626 15-Mar-19 8:00 AM Shadab Mr. Rajesh CLOSED
0+900

879 CPP-NGCP-W-879 1400066157 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1314 FL TA-843626 15-Mar-19 8:10 AM Shadab Mr. Rajesh CLOSED
HRDH-1314 FL at KM-0+800 to 0+900
1400066152 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1314 HRDH-1314 FL 15-Mar-19 4:00 PM Shadab
880 CPP-NGCP-W-880 FL at KM-0+800 to 0+900 TA-843626 Mr. Rajesh CLOSED

Pre-welding and weld joint fit up inspection


881 CPP-NGCP-W-881 1400066204 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1055 FL at KM-0+100 - HWYH-1055 FL TA-446046 15-Mar-19 8:00 AM Umair Mr. Suresh CLOSED Re-Schedule to 16-Mar-
2+000 2019
882 CPP-NGCP-W-882 1400066179 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HWYH-1055 FL TA-446046 15-Mar-19 8:10 AM Umair Mr. Suresh CLOSED Re-Schedule to 16-Mar-
HWYH-1055 FL at KM-0+100 - 2+000 2019
883 CPP-NGCP-W-883 1400066215 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1055 HWYH-1055 FL TA-446046 15-Mar-19 4:00 PM Umair Mr. Suresh CLOSED Re-Schedule to 16-Mar-
FL at KM-0+100 - 2+000 2019
884 CPP-NGCP-W-884 1400066196 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1076 FL TA-445861 15-Mar-19 8:00 AM Imran Mr. Suresh CLOSED
for 8 inch HWYH-1076 FL @ KM-0+100 - 2+500
885 CPP-NGCP-W-885 1400066171 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1076 FL TA-445861 15-Mar-19 8:10 AM Imran Mr. Suresh CLOSED
HWYH-1076 FL @ KM-0+100 - 2+500
886 CPP-NGCP-W-886 1400066208 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1076 HWYH-1076 FL TA-445861 15-Mar-19 4:00 PM Imran Mr. Suresh CLOSED
FL @ KM-0+100 - 2+500
887 CPP-NGCP-W-887 1400066209 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1088 FL TA-445837 15-Mar-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
for 8 inch HWYH-1088 FL @ KM-0+000 - 0+260
888 CPP-NGCP-W-888 1400066185 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1088 FL TA-445837 15-Mar-19 8:10 AM Abdul Aziz Mr. Suresh CLOSED
HWYH-1088 FL @ KM-0+000 - 0+260
889 CPP-NGCP-W-889 1400066198 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1088 HWYH-1088 FL TA-445837 15-Mar-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+000 - 0+260
Pre-welding and weld joint fit up inspection Mr.
890 CPP-NGCP-W-890 1400066146 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 15-Mar-19 8:00 AM Junaid CLOSED Re-Schedule to 16-Mar-
Yard. Rajendran
2019
1400066129 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 15-Mar-19 8:10 AM Mr. Re-Schedule to 16-Mar-
891 CPP-NGCP-W-891 Welding SATIP-W-012-01 SAIC-W-2048 double joints at TCF-1, CPP Pipe Yard. Junaid CLOSED
Rajendran 2019
1400066137 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 15-Mar-19 4:00 PM Mr. Re-Schedule to 16-Mar-
892 CPP-NGCP-W-892 Welding SATIP-W-012-01 SAIC-W-2054 joints at TCF-1, CPP Pipe Yard. Junaid CLOSED
Rajendran 2019
Weld repair verification of joints HRDH
893 CPP-NGCP-W-893 1400066120 Welding SATIP-W-012-01 SAIC-W-2051 01-FW-117 of HRDH 922, 922, VARIOUS 15-Mar-19 8:10 AM IRSHAD Mr. Suresh CLOSED
00-FW-21,24,26 of HRDH-1309, 1309,
02-FW-181 of HRDH-1117 1117
Post-welding visual inspection of repair
joints HRDH
894 CPP-NGCP-W-894 1400066138 Welding SATIP-W-012-01 SAIC-W-2048 01-FW-117 of HRDH 922, 922, VARIOUS 15-Mar-19 11:00 AM IRSHAD Mr. Suresh CLOSED
00-FW-21,24,26 of HRDH-1309, 1309,
02-FW-181 of HRDH-1117 1117

Pre-welding and weld joint fit up inspection


895 CPP-NGCP-W-895 1400066547 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1055 FL at KM-0+100 - HWYH-1055 FL TA-446046 16-Mar-19 8:00 AM Umair Mr. Suresh CLOSED Re-Schedule to 17-Mar-
2+000 2019
1400066566 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HWYH-1055 FL 16-Mar-19 8:10 AM Re-Schedule to 17-Mar-
896 CPP-NGCP-W-896 HWYH-1055 FL at KM-0+100 - 2+000 TA-446046 Umair Mr. Suresh CLOSED
2019
1400066568 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1055 HWYH-1055 FL 16-Mar-19 4:00 PM Re-Schedule to 17-Mar-
897 CPP-NGCP-W-897 FL at KM-0+100 - 2+000 TA-446046 Umair Mr. Suresh CLOSED
2019
1400066570 Pre-welding and weld joint fit up inspection HWYH-1076 FL 16-Mar-19 8:00 AM
898 CPP-NGCP-W-898 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1076 FL @ KM-0+100 - 2+500 TA-445861 Imran Mr. Suresh CLOSED

1400066571 Post-welding visual inspection for 8 inch HWYH-1076 FL 16-Mar-19 8:10 AM


899 CPP-NGCP-W-899 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1076 FL @ KM-0+100 - 2+500 TA-445861 Imran Mr. Suresh CLOSED

1400066572 NDE selection for welds of 8 inch HWYH-1076 HWYH-1076 FL 16-Mar-19 4:00 PM
900 CPP-NGCP-W-900 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-0+100 - 2+500 TA-445861 Imran Mr. Suresh CLOSED

1400066578 Pre-welding and weld joint fit up inspection HWYH-1088 FL 16-Mar-19 8:00 AM
901 CPP-NGCP-W-901 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1088 FL @ KM-0+000 - 0+260 TA-445837 Abdul Aziz Mr. Suresh CLOSED

1400066535 Post-welding visual inspection for 8 inch HWYH-1088 FL 16-Mar-19 8:10 AM


902 CPP-NGCP-W-902 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1088 FL @ KM-0+000 - 0+260 TA-445837 Abdul Aziz Mr. Suresh CLOSED

1400066536 NDE selection for welds of 8 inch HWYH-1088 HWYH-1088 FL 16-Mar-19 4:00 PM
903 CPP-NGCP-W-903 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-0+000 - 0+260 TA-445837 Abdul Aziz Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection Mr.
904 CPP-NGCP-W-904 1400066605 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 16-Mar-19 8:00 AM Junaid CLOSED Re-Schedule to 17-Mar-
Yard. Rajendran
2019
Mr.
905 CPP-NGCP-W-905 1400066587 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 16-Mar-19 8:10 AM Junaid CLOSED Re-Schedule to 17-Mar-
double joints at TCF-1, CPP Pipe Yard. Rajendran 2019
Mr.
906 CPP-NGCP-W-906 1400066538 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 16-Mar-19 4:00 PM Junaid CLOSED Re-Schedule to 17-Mar-
joints at TCF-1, CPP Pipe Yard. Rajendran 2019
907 CPP-NGCP-W-907 1400066633 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1118 FL TA843605 16-Mar-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1118 FL @ KM-0+200 - 0+400
908 CPP-NGCP-W-908 1400066634 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HRDH-1118 FL TA843605 16-Mar-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1118 FL @ KM-0+200 - 0+400
909 CPP-NGCP-W-909 1400066561 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1118 HRDH-1118 FL TA843605 16-Mar-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL @ KM-0+200 - 0+400
Pre-welding and weld joint fit up inspection
910 CPP-NGCP-W-910 1400066655 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1145 FL at KM-0+450 to HRDH-1145 FL TA-843976 16-Mar-19 8:00 AM Saif Mr. Rajesh CLOSED Re-Schedule to 18-Mar-
0+200 2019
1400066562 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1145 FL 16-Mar-19 8:10 AM Saif Re-Schedule to 18-Mar-
911 CPP-NGCP-W-911 HRDH-1145 FL at KM-0+450 to 0+200 TA-843976 Mr. Rajesh CLOSED
2019
1400066542 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1145 HRDH-1145 FL 16-Mar-19 4:00 PM Saif Re-Schedule to 18-Mar-
912 CPP-NGCP-W-912 FL at KM-0+450 to 0+200 TA-843976 Mr. Rajesh CLOSED
2019
Pre-welding and weld joint fit up inspection
913 CPP-NGCP-W-913 1400066637 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1314 FL at KM-0+900 to HRDH-1314 FL TA-843626 16-Mar-19 8:00 AM Shadab Mr. Rajesh CLOSED
1+1000
1400066656 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1314 FL 16-Mar-19 8:10 AM Shadab
914 CPP-NGCP-W-914 HRDH-1314 FL at KM-0+900 to 1+1000 TA-843626 Mr. Rajesh CLOSED

1400066647 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1314 HRDH-1314 FL 16-Mar-19 4:00 PM Shadab
915 CPP-NGCP-W-915 FL at KM-0+900 to 1+1000 TA-843626 Mr. Rajesh CLOSED
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a
l Weld repair verification of joints HRDH
1400066686 SATIP-W-012-01 01-FW-117 of HRDH 922, 922, VARIOUS 16-Mar-19 8:10 AM
916 CPP-NGCP-W-916 Welding SAIC-W-2051 00-FW-21,24,26 of HRDH-1309, 1309, IRSHAD Mr. Suresh CLOSED
02-FW-181 of HRDH-1117 1117
Post-welding visual inspection of repair
joints HRDH
917 CPP-NGCP-W-917 1400066658 Welding SATIP-W-012-01 SAIC-W-2048 01-FW-117 of HRDH 922, 922, VARIOUS 16-Mar-19 11:00 AM IRSHAD Mr. Suresh CLOSED
00-FW-21,24,26 of HRDH-1309, 1309,
02-FW-181 of HRDH-1117 1117

Review of weekly welder performance and


918 CPP-NGCP-W-918 1400067320 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 8-Mar-2019 to 14 CPP site office. N/A 17-Mar-19 8:00 AM Ruhul Mr. Rajesh CLOSED
Mar-2019 at CPP site office.

919 CPP-NGCP-W-919 1400067299 Welding SATIP-NDE-RT-01 SAIC-RT-2007 In-Process Verification - RT Techniques & HWYH-1076,1088 VARIOUS 17-Mar-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
Procedure Implementation of HWYH-1076,1088
In-Process Verification - RT Techniques & HRDH-
920 CPP-NGCP-W-920 1400067270 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- VARIOUS 17-Mar-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1117,1135,1145,1171,1309,1314 1117,1135,1145,1171,1309,1314

921 CPP-NGCP-W-921 1400067272 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1076 FL TA-445861 17-Mar-19 8:00 AM Imran Mr. Suresh CLOSED
for 8 inch HWYH-1076 FL @ KM-0+100 to 2+500

1400067310 Post-welding visual inspection for 8 inch HWYH-1076 FL 17-Mar-19 8:10 AM


922 CPP-NGCP-W-922 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1076 FL @ KM-0+100 to 2+500 TA-445861 Imran Mr. Suresh CLOSED

1400067287 NDE selection for welds of 8 inch HWYH-1076 HWYH-1076 FL 17-Mar-19 4:00 PM
923 CPP-NGCP-W-923 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-0+100 to 2+500 TA-445861 Imran Mr. Suresh CLOSED

1400067289 Pre-welding and weld joint fit up inspection HWYH-1088 FL 17-Mar-19 8:00 AM
924 CPP-NGCP-W-924 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1088 FL @ KM-0+000 to 0+260 TA-445837 Abdul Aziz Mr. Suresh CLOSED

1400067340 Post-welding visual inspection for 8 inch HWYH-1088 FL 17-Mar-19 8:10 AM


925 CPP-NGCP-W-925 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1088 FL @ KM-0+000 to 0+260 TA-445837 Abdul Aziz Mr. Suresh CLOSED

1400067279 NDE selection for welds of 8 inch HWYH-1088 HWYH-1088 FL 17-Mar-19 4:00 PM
926 CPP-NGCP-W-926 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-0+000 to 0+260 TA-445837 Abdul Aziz Mr. Suresh CLOSED

1400067328 Pre-welding and weld joint fit up inspection HRDH-1118 FL TA-843605 17-Mar-19 8:00 AM
927 CPP-NGCP-W-927 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1118 FL @ KM-0+300 to 0+400 Sarfaraz Mr. Rajesh CLOSED

1400067329 Post-welding visual inspection for 8 inch HRDH-1118 FL TA-843605 17-Mar-19 8:10 AM
928 CPP-NGCP-W-928 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1118 FL @ KM-0+300 to 0+400 Sarfaraz Mr. Rajesh CLOSED

1400067262 NDE selection for welds of 8 inch HRDH-1118 HRDH-1118 FL TA-843605 17-Mar-19 4:00 PM
929 CPP-NGCP-W-929 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-0+300 to 0+400 Sarfaraz Mr. Rajesh CLOSED

Pre-welding and weld joint fit up inspection


930 CPP-NGCP-W-930 1400067395 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1314 FL at KM-0+900 to HRDH-1314 FL TA-843626 17-Mar-19 8:00 AM Shadab Mr. Rajesh CLOSED
1+000

931 CPP-NGCP-W-931 1400067394 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1314 FL TA-843626 17-Mar-19 8:10 AM Shadab Mr. Rajesh CLOSED
HRDH-1314 FL at KM-0+900 to 1+000
932 CPP-NGCP-W-932 1400067396 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1314 HRDH-1314 FL TA-843626 17-Mar-19 4:00 PM Shadab Mr. Rajesh CLOSED
FL at KM-0+900 to 1+000
Pre-welding and weld joint fit up inspection Mr.
933 CPP-NGCP-W-933 1400067900 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 18-Mar-19 8:00 AM Junaid CLOSED
Yard. Rajendran
Post-welding visual inspection for 24 inch Mr.
934 CPP-NGCP-W-934 1400067890 Welding SATIP-W-012-01 SAIC-W-2048 double joints at TCF-1, CPP Pipe Yard. TCF-1, CPP Pipe Yard. TA-445988 18-Mar-19 8:10 AM Junaid CLOSED
Rajendran
NDE selection for welds of 24 inch double Mr.
935 CPP-NGCP-W-935 1400067926 Welding SATIP-W-012-01 SAIC-W-2054 joints at TCF-1, CPP Pipe Yard. TCF-1, CPP Pipe Yard. TA-445988 18-Mar-19 4:00 PM Junaid CLOSED
Rajendran

936 CPP-NGCP-W-936 1400067921 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1088 FL TA-445837 18-Mar-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
for 8 inch HWYH-1088 FL @ KM-0+000 to 0+260

937 CPP-NGCP-W-937 1400067931 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1088 FL TA-445837 18-Mar-19 8:10 AM Abdul Aziz Mr. Suresh CLOSED
HWYH-1088 FL @ KM-0+000 to 0+260
938 CPP-NGCP-W-938 1400067935 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1088 HWYH-1088 FL TA-445837 18-Mar-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+000 to 0+260
Pre-welding and weld joint fit up inspection
939 CPP-NGCP-W-939 1400068018 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1055 FL at KM-0+100 - HWYH-1055 FL TA-446046 18-Mar-19 8:00 AM Umair Mr. Suresh CLOSED
2+000
1400068046 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HWYH-1055 FL 18-Mar-19 8:10 AM
940 CPP-NGCP-W-940 HWYH-1055 FL at KM-0+100 - 2+000 TA-446046 Umair Mr. Suresh CLOSED

1400068076 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1055 HWYH-1055 FL 18-Mar-19 4:00 PM
941 CPP-NGCP-W-941 FL at KM-0+100 - 2+000 TA-446046 Umair Mr. Suresh CLOSED

942 CPP-NGCP-W-942 1400068065 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1076 FL TA-445861 18-Mar-19 8:00 AM Imran Mr. Suresh CLOSED Re-Schedule to 19-Mar-
for 8 inch HWYH-1076 FL @ KM-0+100 to 2+500
2019
943 CPP-NGCP-W-943 1400068039 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1076 FL TA-445861 18-Mar-19 8:10 AM Imran Mr. Suresh CLOSED Re-Schedule to 19-Mar-
HWYH-1076 FL @ KM-0+100 to 2+500 2019
944 CPP-NGCP-W-944 1400068114 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1076 HWYH-1076 FL TA-445861 18-Mar-19 4:00 PM Imran Mr. Suresh CLOSED Re-Schedule to 19-Mar-
FL @ KM-0+100 to 2+500 2019
945 CPP-NGCP-W-945 1400068116 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1118 FL TA-843605 18-Mar-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1118 FL @ KM-0+400 - 0+700
946 CPP-NGCP-W-946 1400068031 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HRDH-1118 FL TA-843605 18-Mar-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1118 FL @ KM-0+400 - 0+700
947 CPP-NGCP-W-947 1400068042 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1118 HRDH-1118 FL TA-843605 18-Mar-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL @ KM-0+400 - 0+700
Pre-welding and weld joint fit up inspection
948 CPP-NGCP-W-948 1400068118 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1078 FL at KM-5+063 to HRDH-1078 FL TA-843586 18-Mar-19 8:00 AM Shadab Mr. Rajesh REJECTED REJECTED Re-Schedule to 19-Mar- cancelled due to job not
4+800 2019 ready
1400068154 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1078 FL 18-Mar-19 8:10 AM Shadab Re-Schedule to 19-Mar- cancelled due to job not
949 CPP-NGCP-W-949 HRDH-1078 FL at KM-5+063 to 4+800 TA-843586 Mr. Rajesh REJECTED REJECTED
2019 ready
1400068155 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1078 HRDH-1078 FL 18-Mar-19 4:00 PM Shadab Re-Schedule to 19-Mar- cancelled due to job not
950 CPP-NGCP-W-950 FL at KM-5+063 to 4+800 TA-843586 Mr. Rajesh REJECTED REJECTED
2019 ready
In-Process Verification - RT Techniques &
951 CPP-NGCP-W-951 1400068136 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- HWYH-1076,1088,1055 VARIOUS 18-Mar-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1076,1088,1055
1400068524 In-Process Verification - RT Techniques & TCF-1 TA-445988 19-Mar-19 8:00 AM RAMEEZ Mr.
952 CPP-NGCP-W-952 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of TCF-1. CLOSED
Rajendran
In-Process Verification - RT Techniques &
953 CPP-NGCP-W-953 1400068438 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1135, HRDH-1135, 1145, 1314, 1117 VARIOUS 19-Mar-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1145, 1314, 1117
Mr.
954 CPP-NGCP-W-954 1400068490 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 In-Process Inspection of MPT using TCF-1 TA-445988 19-Mar-19 8:00 AM RAMEEZ CLOSED
Yoke Method, TCF-1. Rajendran
Pre-welding and weld joint fit up inspection
955 CPP-NGCP-W-955 1400068527 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1055 FL at KM-0+100 - HWYH-1055 FL TA-446046 19-Mar-19 8:00 AM Umair Mr. Suresh CLOSED
2+000
1400068440 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HWYH-1055 FL 19-Mar-19 8:10 AM
956 CPP-NGCP-W-956 HWYH-1055 FL at KM-0+100 - 2+000 TA-446046 Umair Mr. Suresh CLOSED

1400068519 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1055 HWYH-1055 FL 19-Mar-19 4:00 PM
957 CPP-NGCP-W-957 FL at KM-0+100 - 2+000 TA-446046 Umair Mr. Suresh CLOSED

1400068566 Pre-welding and weld joint fit up inspection HWYH-1088 FL 19-Mar-19 8:00 AM
958 CPP-NGCP-W-958 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1088 FL @ KM-0+000 to 0+260 TA-445837 Abdul Aziz Mr. Suresh CLOSED LOCATION CHANGED TO
1134
959 CPP-NGCP-W-959 1400068567 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1088 FL TA-445837 19-Mar-19 8:10 AM Abdul Aziz Mr. Suresh CLOSED LOCATION CHANGED TO
HWYH-1088 FL @ KM-0+000 to 0+260 1134
960 CPP-NGCP-W-960 1400068575 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1088 HWYH-1088 FL TA-445837 19-Mar-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED LOCATION CHANGED TO
FL @ KM-0+000 to 0+260 1134
Pre-welding and weld joint fit up inspection Mr.
961 CPP-NGCP-W-961 1400068498 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 19-Mar-19 8:00 AM Junaid CLOSED
Yard. Rajendran

1400068544 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 19-Mar-19 8:10 AM Mr.
962 CPP-NGCP-W-962 Welding SATIP-W-012-01 SAIC-W-2048 double joints at TCF-1, CPP Pipe Yard. Junaid CLOSED
Rajendran
1400068520 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 19-Mar-19 4:00 PM Mr.
963 CPP-NGCP-W-963 Welding SATIP-W-012-01 SAIC-W-2054 joints at TCF-1, CPP Pipe Yard. Junaid CLOSED
Rajendran
1400068535 Pre-welding and weld joint fit up inspection HRDH-1118 FL TA-843605 19-Mar-19 8:00 AM
964 CPP-NGCP-W-964 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1118 FL @ KM-0+500 to 0+700 Sarfaraz Mr. Rajesh CLOSED

1400068521 Post-welding visual inspection for 8 inch HRDH-1118 FL TA-843605 19-Mar-19 8:10 AM
965 CPP-NGCP-W-965 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1118 FL @ KM-0+500 to 0+700 Sarfaraz Mr. Rajesh CLOSED

1400068481 NDE selection for welds of 8 inch HRDH-1118 HRDH-1118 FL TA-843605 19-Mar-19 4:00 PM
966 CPP-NGCP-W-966 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-0+500 to 0+700 Sarfaraz Mr. Rajesh CLOSED
Pre-welding and weld joint fit up inspection
967 CPP-NGCP-W-967 1400068538 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1145 FL at KM-0+450 to HRDH-1145 FL TA-843976 19-Mar-19 8:00 AM Saif Mr. Rajesh CLOSED
0+200

968 CPP-NGCP-W-968 1400068522 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1145 FL TA-843976 19-Mar-19 8:10 AM Saif Mr. Rajesh CLOSED
HRDH-1145 FL at KM-0+450 to 0+200
969 CPP-NGCP-W-969 1400068530 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1145 HRDH-1145 FL TA-843976 19-Mar-19 4:00 PM Saif Mr. Rajesh CLOSED
FL at KM-0+450 to 0+200
Pre-welding and weld joint fit up inspection
970 CPP-NGCP-W-970 1400068573 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1122 FL at KM-0+200 to HRDH-1122 FL TA-843611 19-Mar-19 8:00 AM Saif Mr. Rajesh CLOSED
0+800
1400068593 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1122 FL 19-Mar-19 8:10 AM Saif
971 CPP-NGCP-W-971 HRDH-1122 FL at KM-0+200 to 0+800
TA-843611 Mr. Rajesh CLOSED

1400068574 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1122 HRDH-1122 FL 19-Mar-19 4:00 PM Saif
972 CPP-NGCP-W-972 FL at KM-0+200 to 0+800
TA-843611 Mr. Rajesh CLOSED
Pre-welding and weld joint fit up inspection
973 CPP-NGCP-W-973 1400068569 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1170 FL at KM-0+800 - KM- HRDH-1170 FL TA-843656 19-Mar-19 8:00 AM Rajesh Mr. Rajesh CLOSED
1+050

974 CPP-NGCP-W-974 1400068555 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1170 FL TA-843656 19-Mar-19 8:10 AM Rajesh Mr. Rajesh CLOSED
HRDH-1170 FL at KM-0+800 - KM-1+050
975 CPP-NGCP-W-975 1400068603 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1170 HRDH-1170 FL TA-843656 19-Mar-19 4:00 PM Rajesh Mr. Rajesh CLOSED
FL at KM-0+800 - KM-1+050
Weld repair verification of joints
976 CPP-NGCP-W-976 1400068606 Welding SATIP-W-012-01 SAIC-W-2051 00-FW-53 of HRDH 1171, HRDH-1171,1117 VARIOUS 19-Mar-19 8:00 AM IRSHAD Mr. Suresh CLOSED INCLUDED HRDH-1063
01-FW-158 of HRDH-1117
Post-welding visual inspection of repair
977 CPP-NGCP-W-977 1400068633 Welding SATIP-W-012-01 SAIC-W-2048 joints HRDH-1171,1117 VARIOUS 19-Mar-19 10:00 AM IRSHAD Mr. Suresh CLOSED INCLUDED HRDH-1063
00-FW-53 of HRDH 1171,
01-FW-158 of HRDH-1117

978 CPP-NGCP-W-978 1400068619 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HRDH-1170 HRDH -1170 TA-843656 19-Mar-19 9.00 AM Rajesh Mr. Rajesh CLOSED

Pre-welding and weld joint fit up inspection


979 CPP-NGCP-W-979 1400068774 Welding SATIP-W-012-01 SAIC-W-2048 for 16 inch HARADH-BK--HARADH GGM FL at HARADH-BK--HARADH GGM TA-843957 19-Mar-19 8:00 AM Shadab Mr. Rajesh REJECTED REJECTED cancelled due to job
KM-0+500 - KM-0+600 not ready
Post-welding visual inspection for 16 inch
980 CPP-NGCP-W-980 1400068736 Welding SATIP-W-012-01 SAIC-W-2048 HARADH-BK--HARADH GGM FL at KM-0+500 - KM- HARADH-BK--HARADH GGM TA-843957 19-Mar-19 8:10 AM Shadab Mr. Rajesh REJECTED REJECTED cancelled due to job
0+600 not ready
1400068783 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 16 inch HARADH- 19-Mar-19 4:00 PM Shadab cancelled due to job
981 CPP-NGCP-W-981 BK--HARADH GGM FL at KM-0+500 - KM-0+600
HARADH-BK--HARADH GGM TA-843957 Mr. Rajesh REJECTED REJECTED
not ready
Pre-welding and weld joint fit up inspection
982 CPP-NGCP-W-982 1400069397 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1055 FL at KM-0+100 - HWYH-1055 FL TA-446046 20-Mar-19 8:00 AM Umair Mr. Suresh CLOSED
2+000

983 CPP-NGCP-W-983 1400069403 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HWYH-1055 FL TA-446046 20-Mar-19 8:10 AM Umair Mr. Suresh CLOSED
HWYH-1055 FL at KM-0+100 - 2+000
984 CPP-NGCP-W-984 1400069366 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1055 HWYH-1055 FL TA-446046 20-Mar-19 4:00 PM Umair Mr. Suresh CLOSED
FL at KM-0+100 - 2+000
Pre-welding and weld joint fit up inspection
985 CPP-NGCP-W-985 1400069413 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1134 FL @ KM-1+785 to 1+820 HWYH-1134 FL TA-445836 20-Mar-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED

Post-welding visual inspection for 8 inch


986 CPP-NGCP-W-986 1400069359 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL @ KM-1+785 to 1+820 HWYH-1134 FL TA-445836 20-Mar-19 8:10 AM Abdul Aziz Mr. Suresh CLOSED
NDE selection for welds of 8 inch HWYH-1134
987 CPP-NGCP-W-987 1400069404 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-1+785 to 1+820 HWYH-1134 FL TA-445836 20-Mar-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED

988 CPP-NGCP-W-988 1400069390 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1076 FL TA-445861 20-Mar-19 8:00 AM Imran Mr. Suresh CLOSED
for 8 inch HWYH-1076 FL @ KM-0+100 to 2+500

989 CPP-NGCP-W-989 1400069382 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1076 FL TA-445861 20-Mar-19 8:10 AM Imran Mr. Suresh CLOSED
HWYH-1076 FL @ KM-0+100 to 2+500
990 CPP-NGCP-W-990 1400069423 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1076 HWYH-1076 FL TA-445861 20-Mar-19 4:00 PM Imran Mr. Suresh CLOSED
FL @ KM-0+100 to 2+500
Pre-welding and weld joint fit up inspection Mr.
991 CPP-NGCP-W-991 1400069446 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 20-Mar-19 8:00 AM Junaid CLOSED
Yard. Rajendran
Post-welding visual inspection for 24 inch Mr.
992 CPP-NGCP-W-992 1400069408 Welding SATIP-W-012-01 SAIC-W-2048 double joints at TCF-1, CPP Pipe Yard. TCF-1, CPP Pipe Yard. TA-445988 20-Mar-19 8:10 AM Junaid CLOSED
Rajendran
NDE selection for welds of 24 inch double Mr.
993 CPP-NGCP-W-993 1400069434 Welding SATIP-W-012-01 SAIC-W-2054 joints at TCF-1, CPP Pipe Yard. TCF-1, CPP Pipe Yard. TA-445988 20-Mar-19 4:00 PM Junaid CLOSED
Rajendran
1400069454 Pre-welding and weld joint fit up inspection HRDH-1118 FL TA-843605 20-Mar-19 8:00 AM
994 CPP-NGCP-W-994 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1118 FL @ KM-0+700 to 0+900 Sarfaraz Mr. Rajesh CLOSED

1400069426 Post-welding visual inspection for 8 inch HRDH-1118 FL TA-843605 20-Mar-19 8:10 AM
995 CPP-NGCP-W-995 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1118 FL @ KM-0+700 to 0+900 Sarfaraz Mr. Rajesh CLOSED

1400069463 NDE selection for welds of 8 inch HRDH-1118 HRDH-1118 FL TA-843605 20-Mar-19 4:00 PM
996 CPP-NGCP-W-996 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-0+700 to 0+900 Sarfaraz Mr. Rajesh CLOSED
Pre-welding and weld joint fit up inspection
997 CPP-NGCP-W-997 1400069415 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1122 FL at KM-1+200 to HRDH-1122 FL TA-843611 20-Mar-19 8:00 AM Saif Mr. Rajesh CLOSED
0+800
1400069411 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1122 FL 20-Mar-19 8:10 AM Saif
998 CPP-NGCP-W-998 HRDH-1122 FL at KM-1+200 to 0+800
TA-843611 Mr. Rajesh CLOSED

1400069416 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1122 HRDH-1122 FL 20-Mar-19 4:00 PM Saif
999 CPP-NGCP-W-999 FL at KM-1+200 to 0+800
TA-843611 Mr. Rajesh CLOSED

Pre-welding and weld joint fit up inspection


1000 CPP-NGCP-W-1000 1400069473 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1170 FL at KM-1+050 - KM- HRDH-1170 FL TA-843656 20-Mar-19 8:00 AM Rajesh Mr. Rajesh CLOSED
1+100

1001 CPP-NGCP-W-1001 1400069456 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1170 FL TA-843656 20-Mar-19 8:10 AM Rajesh Mr. Rajesh CLOSED
HRDH-1170 FL at KM-1+050 - KM-1+100
1002 CPP-NGCP-W-1002 1400069474 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1170 HRDH-1170 FL TA-843656 20-Mar-19 4:00 PM Rajesh Mr. Rajesh CLOSED
FL at KM-1+050 - KM-1+100
In-Process Verification - RT Techniques &
1003 CPP-NGCP-W-1003 1400069465 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-1118,1145,1170 VARIOUS 20-Mar-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1118,1145,1170
In-Process Verification - RT Techniques &
1004 CPP-NGCP-W-1004 1400069421 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- HWYH-1055,1100,1088 VARIOUS 20-Mar-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1055,1100,1088
Pre-welding and weld joint fit up inspection
1005 CPP-NGCP-W-1005 1400069479 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1078 FL at KM-5+000 to HWYH-1078 FL TA-843586 20-Mar-19 8:00 AM Shadab Mr. Rajesh CLOSED LOCATION CHANGE TO
5+100 HWYH-1078 FL
1400069478 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HWYH-1078 FL 20-Mar-19 8:10 AM Shadab LOCATION CHANGE TO
1006 CPP-NGCP-W-1006 HRDH-1078 FL at KM-5+000 to 5+100 TA-843586 Mr. Rajesh CLOSED
HWYH-1078 FL
1400069524 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1078 HWYH-1078 FL 20-Mar-19 4:00 PM Shadab LOCATION CHANGE TO
1007 CPP-NGCP-W-1007 FL at KM-5+000 to 5+100 TA-843586 Mr. Rajesh CLOSED
HWYH-1078 FL
1400069585 Welding consumables verification and visual TCF-1 N/A 20-Mar-19 8:00 AM Mr.
1008 CPP-NGCP-W-1008 Welding SATIP-W-012-01 SAIC-W-2044 inspection storage & handling at TCF-1 Junaid CLOSED
Rajendran
Pre-welding and weld joint fit up inspection
1009 CPP-NGCP-W-1009 1400070017 Welding SAIC-W-2048 for 8 inch HWYH-1055 FL at KM-0+100 - HWYH-1055 FL TA-446046 21-Mar-19 8:00 AM Umair Mr. Suresh CLOSED
2+000
1010 CPP-NGCP-W-1010 1400070002 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HWYH-1055 FL TA-446046 21-Mar-19 8:10 AM Umair Mr. Suresh CLOSED
HWYH-1055 FL at KM-0+100 - 2+000
1011 CPP-NGCP-W-1011 1400070054 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1055 HWYH-1055 FL TA-446046 21-Mar-19 4:00 PM Umair Mr. Suresh CLOSED
FL at KM-0+100 - 2+000

1012 CPP-NGCP-W-1012 1400069970 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1076 FL TA-445861 21-Mar-19 8:00 AM Imran Mr. Suresh CLOSED
for 8 inch HWYH-1076 FL @ KM-0+100 to 2+500

1400070031 Post-welding visual inspection for 8 inch HWYH-1076 FL 21-Mar-19 8:10 AM


1013 CPP-NGCP-W-1013 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1076 FL @ KM-0+100 to 2+500 TA-445861 Imran Mr. Suresh CLOSED

1400069971 NDE selection for welds of 8 inch HWYH-1076 HWYH-1076 FL 21-Mar-19 4:00 PM
1014 CPP-NGCP-W-1014 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-0+100 to 2+500 TA-445861 Imran Mr. Suresh CLOSED

1015 CPP-NGCP-W-1015 1400070018 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1134 FL TA-445836 21-Mar-19 8:00 AM Abdul Aziz Mr. Suresh REJECTED REJECTED cancelled due to job
for 8 inch HWYH-1134 FL @ KM-3.010 to 3.045
not ready
1016 CPP-NGCP-W-1016 1400069952 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 21-Mar-19 8:10 AM Abdul Aziz Mr. Suresh REJECTED REJECTED cancelled due to job
HWYH-1134 FL @ KM-3.010 to 3.045 not ready
1017 CPP-NGCP-W-1017 1400070064 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 21-Mar-19 4:00 PM Abdul Aziz Mr. Suresh REJECTED REJECTED cancelled due to job
FL @ KM-3.010 to 3.045 not ready
Pre-welding and weld joint fit up inspection
1018 CPP-NGCP-W-1018 1400070093 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1122 FL at KM-0+700 to HRDH-1122 FL TA-843611 21-Mar-19 8:00 AM Saif Mr. Rajesh CLOSED
0+500
1400070103 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1122 FL 21-Mar-19 8:10 AM Saif
1019 CPP-NGCP-W-1019 HRDH-1122 FL at KM-0+700 to 0+500
TA-843611 Mr. Rajesh CLOSED

1400070067 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1122 HRDH-1122 FL 21-Mar-19 4:00 PM Saif
1020 CPP-NGCP-W-1020 FL at KM-0+700 to 0+500
TA-843611 Mr. Rajesh CLOSED

Pre-welding and weld joint fit up inspection


1021 CPP-NGCP-W-1021 1400070058 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1170 FL at KM-1+000 to 950 HRDH-1170 FL TA-843656 21-Mar-19 8:00 AM Rajesh Mr. Rajesh CLOSED
KM-0+400 to 0+500
Post-welding visual inspection for 8inch
1022 CPP-NGCP-W-1022 1400070094 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1170 FL at KM-1+000 to 950 KM-0+400 HRDH-1170 FL TA-843656 21-Mar-19 8:10 AM Rajesh Mr. Rajesh CLOSED
to 0+500
1400070038 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1170 HRDH-1170 FL 21-Mar-19 4:00 PM
1023 CPP-NGCP-W-1023 FL at KM-1+000 to 950 KM-0+400 to 0+500 TA-843656 Rajesh Mr. Rajesh CLOSED

Weld repair verification of joints


01-FW-117 of HRDH 922
1024 CPP-NGCP-W-1024 1400070061 Welding SATIP-W-012-01 SAIC-W-2051 01-FW-158 of HRDH-1117 HRDH-922,1117,1309,1171 VARIOUS 21-Mar-19 8:00 AM IRSHAD Mr. Suresh CLOSED
00-FW-72 of HRDH-1309
00-FW-53T2 of HRDH-1171

Post-welding visual inspection of repair


joints
1025 CPP-NGCP-W-1025 1400070114 Welding SATIP-W-012-01 SAIC-W-2048 01-FW-117 of HRDH 922 HRDH-922,1117,1309,1171 VARIOUS 21-Mar-19 11:00 AM IRSHAD Mr. Suresh CLOSED
01-FW-158 of HRDH-1117
00-FW-72 of HRDH-1309
00-FW-53T2 of HRDH-1171
In-Process Verification - RT Techniques &
1026 CPP-NGCP-W-1026 1400070049 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-1145,1171,1118 VARIOUS 21-Mar-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1145,1171,1118

1400070077 In-Process Verification - RT Techniques & VARIOUS 21-Mar-19 8:00 AM RAMEEZ


1027 CPP-NGCP-W-1027 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1055,1076 HWYH-1055,1076 Mr. Rajesh CLOSED

1028 CPP-NGCP-W-1028 1400070442 Welding SATIP-W-012-01 SAIC-W-2051 Weld repair verification of joints HWYH-1088 FL TA-445837 21-Mar-19 8:10 AM IRSHAD Mr. Suresh CLOSED
00-FW-05, at HWYH-1088
Post-welding visual inspection of repair
1029 CPP-NGCP-W-1029 1400070492 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH-1088 FL TA-445837 21-Mar-19 11:00 AM IRSHAD Mr. Suresh CLOSED
00-FW-05, at HWYH-1088
Pre-welding and weld joint fit up inspection
1030 CPP-NGCP-W-1030 1400070042 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1055 FL at KM-0+100 - HWYH-1055 FL TA-446046 22-Mar-19 8:00 AM Umair Mr. Suresh CLOSED
2+000
1031 CPP-NGCP-W-1031 1400070085 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HWYH-1055 FL TA-446046 22-Mar-19 8:10 AM Umair Mr. Suresh CLOSED
HWYH-1055 FL at KM-0+100 - 2+000
1032 CPP-NGCP-W-1032 1400070123 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1055 HWYH-1055 FL TA-446046 22-Mar-19 4:00 PM Umair Mr. Suresh CLOSED
FL at KM-0+100 - 2+000

1033 CPP-NGCP-W-1033 1400070133 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1076 FL TA-445861 22-Mar-19 8:00 AM Imran Mr. Suresh CLOSED
for 8 inch HWYH-1076 FL @ KM-0+100 to 2+500

1400070118 Post-welding visual inspection for 8 inch HWYH-1076 FL 22-Mar-19 8:10 AM


1034 CPP-NGCP-W-1034 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1076 FL @ KM-0+100 to 2+500 TA-445861 Imran Mr. Suresh CLOSED

1400070143 NDE selection for welds of 8 inch HWYH-1076 HWYH-1076 FL 22-Mar-19 4:00 PM
1035 CPP-NGCP-W-1035 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-0+100 to 2+500 TA-445861 Imran Mr. Suresh CLOSED

Pre-welding and weld joint fit up inspection


1036 CPP-NGCP-W-1036 1400070088 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1134 FL @ KM-3.010 to 3.045 HWYH-1134 FL TA-445836 22-Mar-19 8:00 AM Abdul Aziz Mr. Suresh REJECTED REJECTED cancelled due to job
not ready
1037 CPP-NGCP-W-1037 1400070100 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1134 FL TA-445836 22-Mar-19 8:10 AM Abdul Aziz Mr. Suresh REJECTED REJECTED cancelled due to job
HWYH-1134 FL @ KM-3.010 to 3.045 not ready
1038 CPP-NGCP-W-1038 1400070119 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-445836 22-Mar-19 4:00 PM Abdul Aziz Mr. Suresh REJECTED REJECTED cancelled due to job
FL @ KM-3.010 to 3.045 not ready
Pre-welding and weld joint fit up inspection Mr.
1039 CPP-NGCP-W-1039 1400070120 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 22-Mar-19 8:00 AM Junaid CLOSED
Yard. Rajendran
Post-welding visual inspection for 24 inch Mr.
1040 CPP-NGCP-W-1040 1400070121 Welding SATIP-W-012-01 SAIC-W-2048 double joints at TCF-1, CPP Pipe Yard. TCF-1, CPP Pipe Yard. TA-445988 22-Mar-19 8:10 AM Junaid CLOSED
Rajendran
NDE selection for welds of 24 inch double Mr.
1041 CPP-NGCP-W-1041 1400070137 Welding SATIP-W-012-01 SAIC-W-2054 joints at TCF-1, CPP Pipe Yard. TCF-1, CPP Pipe Yard. TA-445988 22-Mar-19 4:00 PM Junaid CLOSED
Rajendran
In-Process Verification - RT Techniques & Mr.
1042 CPP-NGCP-W-1042 1400070168 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of TCF-1. TCF-1 TA-445988 22-Mar-19 8:00 AM RAMEEZ CLOSED
Rajendran
In-Process Inspection of MPT using Mr.
1043 CPP-NGCP-W-1043 1400070147 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 TCF-1 TA-445988 22-Mar-19 8:00 AM RAMEEZ CLOSED
Yoke Method, TCF-1. Rajendran

1044 CPP-NGCP-W-1044 1400070296 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1134 HWYH -1134 TA-445836 22-Mar-19 9.00 AM Abdul Aziz Mr. Rajesh REJECTED REJECTED cancelled due to job
not ready
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a
1045 CPP-NGCP-W-1045 1400070844 l Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-1118 FL TA-843605 23-Mar-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
for 8 inch HRDH-1118 FL @ KM-0+900 to 1+200
1046 CPP-NGCP-W-1046 1400070853 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HRDH-1118 FL TA-843605 23-Mar-19 8:10 AM Sarfaraz Mr. Rajesh CLOSED
HRDH-1118 FL @ KM-0+900 to 1+200
1047 CPP-NGCP-W-1047 1400070836 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1118 HRDH-1118 FL TA-843605 23-Mar-19 4:00 PM Sarfaraz Mr. Rajesh CLOSED
FL @ KM-0+900 to 1+200
Pre-welding and weld joint fit up inspection
1048 CPP-NGCP-W-1048 1400070864 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1122 FL at KM-1+000 to HRDH-1122 FL TA-843611 23-Mar-19 8:00 AM Saif Mr. Rajesh CLOSED
1+400
1049 CPP-NGCP-W-1049 1400070820 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1122 FL TA-843611 23-Mar-19 8:10 AM Saif Mr. Rajesh CLOSED
HRDH-1122 FL at KM-1+000 to 1+400
1050 CPP-NGCP-W-1050 1400070829 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1122 HRDH-1122 FL TA-843611 23-Mar-19 4:00 PM Saif Mr. Rajesh CLOSED
FL at KM-1+000 to 1+400
1051 CPP-NGCP-W-1051 1400071369 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HRDH-1170 HRDH-1170 FL TA-843656 23-Mar-19 8:00 AM Rajesh Mr. Rajesh CLOSED
Pre-welding and weld joint fit up inspection
1052 CPP-NGCP-W-1052 1400070894 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1170 FL at KM-0+400 - KM- HRDH-1170 FL TA-843656 23-Mar-19 8:00 AM Rajesh Mr. Rajesh CLOSED
0+500
1400070849 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HRDH-1170 FL 23-Mar-19 8:10 AM
1053 CPP-NGCP-W-1053 HRDH-1170 FL at KM-0+400 - KM-0+500 TA-843656 Rajesh Mr. Rajesh CLOSED

1400070896 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1170 HRDH-1170 FL 23-Mar-19 4:00 PM
1054 CPP-NGCP-W-1054 FL at KM-0+400 - KM-0+500 TA-843656 Rajesh Mr. Rajesh CLOSED
In-Process Verification - RT Techniques &
1055 CPP-NGCP-W-1055 1400070885 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-1118,1122,1170,1145 VARIOUS 23-Mar-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1118,1122,1170,1145
In-Process Verification - RT Techniques &
1056 CPP-NGCP-W-1056 1400070870 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- HWYH-1055,1076,1078,1088,1134 VARIOUS 23-Mar-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1055,1076,1078,1088,1134
Pre-welding and weld joint fit up inspection Mr.
1057 CPP-NGCP-W-1057 1400070877 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1078 FL at KM-4+300 to HWYH-1078 FL TA-843586 23-Mar-19 8:00 AM Shadab CLOSED
4+500 Rajendran

Post-welding visual inspection for 8inch Mr.


1058 CPP-NGCP-W-1058 1400070859 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 FL TA-843586 23-Mar-19 8:10 AM Shadab CLOSED
HWYH-1078 FL at KM-4+300 to 4+500 Rajendran
NDE selection for welds of 8 inch HWYH-1078 Mr.
1059 CPP-NGCP-W-1059 1400070906 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1078 FL TA-843586 23-Mar-19 4:00 PM Shadab CLOSED
FL at KM-4+300 to 4+500 Rajendran
Pre-welding and weld joint fit up inspection Mr.
1060 CPP-NGCP-W-1060 1400070933 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 22-Mar-19 8:00 AM Junaid CLOSED
Yard. Rajendran
Post-welding visual inspection for 24 inch Mr.
1061 CPP-NGCP-W-1061 1400070924 Welding SATIP-W-012-01 SAIC-W-2048 double joints at TCF-1, CPP Pipe Yard. TCF-1, CPP Pipe Yard. TA-445988 22-Mar-19 8:10 AM Junaid CLOSED
Rajendran
NDE selection for welds of 24 inch double Mr.
1062 CPP-NGCP-W-1062 1400070925 Welding SATIP-W-012-01 SAIC-W-2054 joints at TCF-1, CPP Pipe Yard. TCF-1, CPP Pipe Yard. TA-445988 22-Mar-19 4:00 PM Junaid CLOSED
Rajendran

1063 CPP-NGCP-W-1063 1400070900 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1076 FL TA-445861 23-Mar-19 8:00 AM Imran Mr. Suresh CLOSED
for 8 inch HWYH-1076 FL @ KM-0+100 to 2+500

1400070927 Post-welding visual inspection for 8 inch HWYH-1076 FL 23-Mar-19 8:10 AM


1064 CPP-NGCP-W-1064 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1076 FL @ KM-0+100 to 2+500 TA-445861 Imran Mr. Suresh CLOSED

1400070935 NDE selection for welds of 8 inch HWYH-1076 HWYH-1076 FL 23-Mar-19 4:00 PM
1065 CPP-NGCP-W-1065 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-0+100 to 2+500 TA-445861 Imran Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection
1066 CPP-NGCP-W-1066 1400071071 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1118 FL @ KM-0+100 to 2+700 HWYH-1118 FL TA-445909 23-Mar-19 8:00 AM Umair Mr. Rajesh CLOSED
Post-welding visual inspection for 8 inch
1067 CPP-NGCP-W-1067 1400071116 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1118 FL @ KM-0+100 to 2+700 HWYH-1118 FL TA-445909 23-Mar-19 8:10 AM Umair Mr. Rajesh CLOSED
NDE selection for welds of 8 inch HWYH-1118
1068 CPP-NGCP-W-1068 1400071090 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-0+100 to 2+700 HWYH-1118 FL TA-445909 23-Mar-19 4:00 PM Umair Mr. Rajesh CLOSED

Pre-welding and weld joint fit up inspection


1069 CPP-NGCP-W-1069 1400071291 Welding SATIP-W-012-01 SAIC-W-2048
for 8 inch HWYH-975 FL at KM-0+550 - 0+720
HWYH-975 FL TA-446045 23-Mar-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED

1070 CPP-NGCP-W-1070 1400071338 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HWYH-975 FL TA-446045 23-Mar-19 8:10 AM Abdul Aziz Mr. Suresh CLOSED
HWYH-975 FL at KM-0+550 - 0+720
1071 CPP-NGCP-W-1071 1400071373 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-975 HWYH-975 FL TA-446045 23-Mar-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
FL at KM-0+550 - 0+720
1072 CPP-NGCP-W-1072 1400071330 Welding SATIP-W-012-01 SAIC-W-2051 Weld repair verification of joints HWYH-1055 FL TA-446046 23-Mar-19 8:10 AM IRSHAD Mr. Suresh CLOSED
01-FW-130, at HWYH-1055 FL
Post-welding visual inspection of repair
1073 CPP-NGCP-W-1073 1400071370 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH-1055 FL TA-446046 23-Mar-19 10.00 AM IRSHAD Mr. Suresh CLOSED
01-FW-130, at HWYH-1055 FL
Pre-welding and weld joint fit up inspection
1074 CPP-NGCP-W-1074 1400071779 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1118 FL @ KM-0+100 to 2+700 HWYH-1118 FL TA-445909 24-Mar-19 8:00 AM Umair Mr. Suresh CLOSED
Post-welding visual inspection for 8 inch
1075 CPP-NGCP-W-1075 1400071825 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1118 FL @ KM-0+100 to 2+700 HWYH-1118 FL TA-445909 24-Mar-19 8:10 AM Umair Mr. Suresh CLOSED
NDE selection for welds of 8 inch HWYH-1118
1076 CPP-NGCP-W-1076 1400071845 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-0+100 to 2+700 HWYH-1118 FL TA-445909 24-Mar-19 4:00 PM Umair Mr. Suresh CLOSED

1400071848 Pre-welding and weld joint fit up inspection HWYH-1076 FL 24-Mar-19 8:00 AM
1077 CPP-NGCP-W-1077 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1076 FL @ KM-0+100 to 2+500 TA-445861 Imran Mr. Suresh CLOSED

1078 CPP-NGCP-W-1078 1400071863 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1076 FL TA-445861 24-Mar-19 8:10 AM Imran Mr. Suresh CLOSED
HWYH-1076 FL @ KM-0+100 to 2+500
1079 CPP-NGCP-W-1079 1400071864 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1076 HWYH-1076 FL TA-445861 24-Mar-19 4:00 PM Imran Mr. Suresh CLOSED
FL @ KM-0+100 to 2+500
Pre-welding and weld joint fit up inspection
1080 CPP-NGCP-W-1080 1400071818 Welding SATIP-W-012-01 SAIC-W-2048
for 8 inch HWYH-975 FL at KM-0+550 - 0+720
HWYH-975 FL TA-446045 24-Mar-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED

Post-welding visual inspection for 8inch


1081 CPP-NGCP-W-1081 1400071850 Welding SATIP-W-012-01 SAIC-W-2048
HWYH-975 FL at KM-0+550 - 0+720
HWYH-975 FL TA-446045 24-Mar-19 8:10 AM Abdul Aziz Mr. Suresh CLOSED
NDE selection for welds of 8 inch HWYH-975
1082 CPP-NGCP-W-1082 1400071799 Welding SATIP-W-012-01 SAIC-W-2054
FL at KM-0+550 - 0+720
HWYH-975 FL TA-446045 24-Mar-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection Mr.
1083 CPP-NGCP-W-1083 1400071830 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1078 FL at KM-4+100 to HWYH-1078 FL TA-843586 24-Mar-19 8:00 AM Shadab CLOSED
4+300 Rajendran

Post-welding visual inspection for 8inch Mr.


1084 CPP-NGCP-W-1084 1400071874 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 FL TA-843586 24-Mar-19 8:10 AM Shadab CLOSED
HWYH-1078 FL at KM-4+100 to 4+300 Rajendran
NDE selection for welds of 8 inch HWYH-1078 Mr.
1085 CPP-NGCP-W-1085 1400071801 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1078 FL TA-843586 24-Mar-19 4:00 PM Shadab CLOSED
FL at KM-4+100 to 4+300 Rajendran
Pre-welding and weld joint fit up inspection Mr.
1086 CPP-NGCP-W-1086 1400071802 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 24-Mar-19 8:00 AM Junaid CLOSED
Yard. Rajendran

Post-welding visual inspection for 24 inch Mr.


1087 CPP-NGCP-W-1087 1400071875 Welding SATIP-W-012-01 SAIC-W-2048 double joints at TCF-1, CPP Pipe Yard. TCF-1, CPP Pipe Yard. TA-445988 24-Mar-19 8:10 AM Junaid
Rajendran
CLOSED
NDE selection for welds of 24 inch double Mr.
1088 CPP-NGCP-W-1088 1400071868 Welding SATIP-W-012-01 SAIC-W-2054 joints at TCF-1, CPP Pipe Yard. TCF-1, CPP Pipe Yard. TA-445988 24-Mar-19 4:00 PM Junaid CLOSED
Rajendran
Pre-welding and weld joint fit up inspection Mr.
1089 CPP-NGCP-W-1089 1400071907 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1118 FL @ KM-1+200 to 1+500 HRDH-1118 FL TA-843605 24-Mar-19 8:00 AM Sarfaraz
Rajendran
CLOSED
Post-welding visual inspection for 8 inch Mr.
1090 CPP-NGCP-W-1090 1400071933 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1118 FL @ KM-1+200 to 1+500 HRDH-1118 FL TA-843605 24-Mar-19 8:10 AM Sarfaraz CLOSED
Rajendran
NDE selection for welds of 8 inch HRDH-1118 Mr.
1091 CPP-NGCP-W-1091 1400071908 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-1+200 to 1+500 HRDH-1118 FL TA-843605 24-Mar-19 4:00 PM Sarfaraz
Rajendran
CLOSED
Pre-welding and weld joint fit up inspection Mr.
1092 CPP-NGCP-W-1092 1400071938 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-611 FL HRDH-611 FL N/A 24-Mar-19 8:00 AM Sarfaraz CLOSED
Rajendran
Post-welding visual inspection for 8 inch Mr.
1093 CPP-NGCP-W-1093 1400071932 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-611 FL HRDH-611 FL N/A 24-Mar-19 8:10 AM Sarfaraz
Rajendran
CLOSED
NDE selection for welds of 8 inch HRDH-611 Mr.
1094 CPP-NGCP-W-1094 1400071939 Welding SATIP-W-012-01 SAIC-W-2054 FL HRDH-611 FL N/A 24-Mar-19 4:00 PM Sarfaraz CLOSED
Rajendran
Pre-welding and weld joint fit up inspection
1095 CPP-NGCP-W-1095 1400071871 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1162 FL at KM-0+900 to HRDH-1162 FL N/A 24-Mar-19 8:00 AM Saif Mr. Rajesh CLOSED
1+000
Post-welding visual inspection for 8inch
1096 CPP-NGCP-W-1096 1400071888 Welding SATIP-W-012-01 SAIC-W-2048
HRDH-1162 FL at KM-0+900 to 1+000
HRDH-1162 FL N/A 24-Mar-19 8:10 AM Saif Mr. Rajesh CLOSED
NDE selection for welds of 8 inch HRDH-1162
1097 CPP-NGCP-W-1097 1400071927 Welding SATIP-W-012-01 SAIC-W-2054
FL at KM-0+900 to 1+000
HRDH-1162 FL N/A 24-Mar-19 4:00 PM Saif Mr. Rajesh CLOSED

Pre-welding and weld joint fit up inspection Mr.


1098 CPP-NGCP-W-1098 1400071919 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1170 FL at KM-0+114 to HRDH-1170 FL TA-843656 24-Mar-19 8:00 AM Rajesh
Rajendran
CLOSED
0+350
Post-welding visual inspection for 8inch Mr.
1099 CPP-NGCP-W-1099 1400071881 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1170 FL TA-843656 24-Mar-19 8:10 AM Rajesh CLOSED
HRDH-1170 FL at KM-0+114 to 0+350 Rajendran
NDE selection for welds of 8 inch HRDH-1170 Mr.
1100 CPP-NGCP-W-1100 1400071920 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1170 FL TA-843656 24-Mar-19 4:00 PM Rajesh CLOSED
FL at KM-0+114 to 0+350 Rajendran
Review of weekly welder performance and
1101 CPP-NGCP-W-1101 1400071974 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 15-Mar-2019 to CPP site office. N/A 24-Mar-19 8:00 AM Ruhul Mr. Rajesh CLOSED
21 Mar-2019 at CPP site office.
In-Process Verification - RT Techniques &
1102 CPP-NGCP-W-1102 1400072022 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-1122,1170,1145,922,1117 VARIOUS 24-Mar-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1122,1170,1145,922,1117
In-Process Verification - RT Techniques &
1103 CPP-NGCP-W-1103 1400072027 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- HWYH-1055,1076,1088 VARIOUS 24-Mar-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1055,1076,1088

Pre-welding and weld joint fit up inspection


1104 CPP-NGCP-W-1104 1400072574 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1118 FL @ KM-0+100 to 2+700 HWYH-1118 FL TA-445909 25-Mar-19 8:00 AM Umair Mr. Suresh CLOSED

1105 CPP-NGCP-W-1105 1400072604 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HWYH-1118 FL TA-445909 25-Mar-19 8:10 AM Umair Mr. Suresh CLOSED
HWYH-1118 FL @ KM-0+100 to 2+700
1106 CPP-NGCP-W-1106 1400072584 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1118 HWYH-1118 FL TA-445909 25-Mar-19 4:00 PM Umair Mr. Suresh CLOSED
FL @ KM-0+100 to 2+700

1107 CPP-NGCP-W-1107 1400072560 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-1076 FL TA-445861 25-Mar-19 8:00 AM Imran Mr. Suresh CLOSED
for 8 inch HWYH-1076 FL @ KM-0+100 to 2+500
Post-welding visual inspection for 8 inch
1108 CPP-NGCP-W-1108 1400072608 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1076 FL @ KM-0+100 to 2+500 HWYH-1076 FL TA-445861 25-Mar-19 8:10 AM Imran Mr. Suresh CLOSED
NDE selection for welds of 8 inch HWYH-1076
1109 CPP-NGCP-W-1109 1400072568 Welding SATIP-W-012-01 SAIC-W-2054 FL @ KM-0+100 to 2+500 HWYH-1076 FL TA-445861 25-Mar-19 4:00 PM Imran Mr. Suresh CLOSED

1110 CPP-NGCP-W-1110 1400072706 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HWYH-975 FL TA-446045 25-Mar-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
for 8 inch HWYH-975 FL at KM-0+550 - 0+720

1111 CPP-NGCP-W-1111 1400072656 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HWYH-975 FL TA-446045 25-Mar-19 8:10 AM Abdul Aziz Mr. Suresh CLOSED
HWYH-975 FL at KM-0+550 - 0+720
1112 CPP-NGCP-W-1112 1400072707 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-975 HWYH-975 FL TA-446045 25-Mar-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
FL at KM-0+550 - 0+720
Pre-welding and weld joint fit up inspection Mr.
1113 CPP-NGCP-W-1113 1400072698 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-1078 FL at KM-3+900 to HWYH-1078 FL TA-843586 25-Mar-19 8:00 AM Shadab CLOSED
4+100 Rajendran

Post-welding visual inspection for 8inch Mr.


1114 CPP-NGCP-W-1114 1400072658 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 FL TA-843586 25-Mar-19 8:10 AM Shadab CLOSED
HWYH-1078 FL at KM-3+900 to 4+100 Rajendran
NDE selection for welds of 8 inch HWYH-1078 Mr.
1115 CPP-NGCP-W-1115 1400072723 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1078 FL TA-843586 25-Mar-19 4:00 PM Shadab CLOSED
FL at KM-3+900 to 4+100 Rajendran
Pre-welding and weld joint fit up inspection Mr.
1116 CPP-NGCP-W-1116 1400072622 Welding SATIP-W-012-01 SAIC-W-2048 for 24 inch double joints at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 25-Mar-19 8:00 AM Junaid CLOSED
Yard. Rajendran
Mr.
1117 CPP-NGCP-W-1117 1400072754 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 24 inch TCF-1, CPP Pipe Yard. TA-445988 25-Mar-19 8:10 AM Junaid CLOSED
double joints at TCF-1, CPP Pipe Yard. Rajendran
Mr.
1118 CPP-NGCP-W-1118 1400072747 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24 inch double TCF-1, CPP Pipe Yard. TA-445988 25-Mar-19 4:00 PM Junaid CLOSED
joints at TCF-1, CPP Pipe Yard. Rajendran
Mr.
1119 CPP-NGCP-W-1119 1400072758 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection HRDH-611 FL TA-843603 25-Mar-19 8:00 AM Sarfaraz CLOSED
for 8 inch HRDH-611 FL KM-3+000 to 3+200 Rajendran
Mr.
1120 CPP-NGCP-W-1120 1400072735 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8 inch HRDH-611 FL TA-843603 25-Mar-19 8:10 AM Sarfaraz CLOSED
HRDH-611 FL KM-3+000 to 3+200 Rajendran
Mr.
1121 CPP-NGCP-W-1121 1400072681 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-611 HRDH-611 FL TA-843603 25-Mar-19 4:00 PM Sarfaraz CLOSED
FL KM-3+000 to 3+200 Rajendran
Pre-welding and weld joint fit up inspection
1122 CPP-NGCP-W-1122 1400072682 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1162 FL at KM-0+800 to HRDH-1162 FL TA-843974 25-Mar-19 8:00 AM Saif Mr. Rajesh CLOSED
0+900
Post-welding visual inspection for 8inch
1123 CPP-NGCP-W-1123 1400072772 Welding SATIP-W-012-01 SAIC-W-2048
HRDH-1162 FL at KM-0+800 to 0+900
HRDH-1162 FL TA-843974 25-Mar-19 8:10 AM Saif Mr. Rajesh CLOSED
NDE selection for welds of 8 inch HRDH-1162
1124 CPP-NGCP-W-1124 1400072803 Welding SATIP-W-012-01 SAIC-W-2054
FL at KM-0+800 to 0+900
HRDH-1162 FL TA-843974 25-Mar-19 4:00 PM Saif Mr. Rajesh CLOSED

Pre-welding and weld joint fit up inspection Mr.


1125 CPP-NGCP-W-1125 1400072752 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HRDH-1170 FL at KM-0+180 to HRDH-1170 FL TA-843656 25-Mar-19 8:00 AM Rajesh CLOSED
0+250, KM-1+350 to 1+420 Rajendran

Post-welding visual inspection for 8inch Mr.


1126 CPP-NGCP-W-1126 1400072833 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1170 FL at KM-0+180 to 0+250, KM- HRDH-1170 FL TA-843656 25-Mar-19 8:10 AM Rajesh CLOSED
1+350 to 1+420 Rajendran
NDE selection for welds of 8 inch HRDH-1170 Mr.
1127 CPP-NGCP-W-1127 1400072843 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1170 FL TA-843656 25-Mar-19 4:00 PM Rajesh CLOSED
FL at KM-0+180 to 0+250, KM-1+350 to 1+420 Rajendran
Weld repair verification of joints
1128 CPP-NGCP-W-1128 1400072834 Welding SATIP-W-012-01 SAIC-W-2051 00-FW-72, at HRDH-1309 FL HRDH-1309,1171 VARIOUS 25-Mar-19 8:10 AM IRSHAD Mr. Rajesh CLOSED
00-FW-53. at HRDH-1171 FL
Post-welding visual inspection of repair
1129 CPP-NGCP-W-1129 1400072794 Welding SATIP-W-012-01 SAIC-W-2048 joints HRDH-1309,1171 VARIOUS 25-Mar-19 10.00 AM IRSHAD Mr. Rajesh CLOSED
00-FW-72, at HRDH-1309 FL
00-FW-53. at HRDH-1171 FL
In-Process Verification - RT Techniques &
1130 CPP-NGCP-W-1130 1400072780 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-1135,1172,1063,1117,1314 VARIOUS 25-Mar-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1135,1172,1063,1117,1314
Mr.
1131 CPP-NGCP-W-1131 1400072795 Welding SATIP-NDE-RT-01 SAIC-RT-2007 In-Process Verification - RT Techniques & TCF-1 VARIOUS 25-Mar-19 8:00 AM RAMEEZ CLOSED
Procedure Implementation of TCF-1 Rajendran
Mr.
1132 CPP-NGCP-W-1132 1400072796 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 In-Process Inspection of MPT using TCF-1 VARIOUS 25-Mar-19 8:00 AM RAMEEZ CLOSED
Yoke Method, TCF-1. Rajendran
Pre-welding and weld joint fit up inspection for 8
1133 CPP-NGCP-W-1133 1400073539 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1118 FL TA-445909 26-Mar-19 8:00 AM Umair Mr. Suresh CLOSED
inch HWYH-1118 FL @ KM-0+100 to 2+700
Post-welding visual inspection for 8 inch HWYH-
1134 CPP-NGCP-W-1134 1400073554 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1118 FL TA-445909 26-Mar-19 2.00 PM Umair Mr. Suresh CLOSED
1118 FL @ KM-0+100 to 2+700
NDE selection for welds of 8 inch HWYH-1118 FL
1135 CPP-NGCP-W-1135 1400073555 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1118 FL TA-445909 26-Mar-19 4:00 PM Umair Mr. Suresh CLOSED
@ KM-0+100 to 2+700
1400073512 Pre-welding and weld joint fit up inspection for 8
1136 CPP-NGCP-W-1136 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1076 FL TA-445861 26-Mar-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1076 FL @ KM-0+100 to 2+500
Post-welding visual inspection for 8 inch HWYH-
1137 CPP-NGCP-W-1137 1400073548 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1076 FL TA-445861 26-Mar-19 2.00 PM Imran Mr. Suresh CLOSED
1076 FL @ KM-0+100 to 2+500
NDE selection for welds of 8 inch HWYH-1076 FL
1138 CPP-NGCP-W-1138 1400073549 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1076 FL TA-445861 26-Mar-19 4:00 PM Imran Mr. Suresh CLOSED
@ KM-0+100 to 2+500
1139 CPP-NGCP-W-1139 1400073565 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1134 HWYH-1134 FL TA-445836 26-Mar-19 8.00 AM Abdul Aziz Mr. Suresh REJECTED REJECTED cancelled due to job
not ready
Pre-welding and weld joint fit up inspection for 8 LOCATION CHANGE TO
1140 CPP-NGCP-W-1140 1400073541 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-843609 26-Mar-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED HWYH-975 FL at KM-
inch HWYH-1134 FL at KM-1+850
0+550 - 0+720
Post-welding visual inspection for 8 inch HWYH- LOCATION CHANGE TO
1141 CPP-NGCP-W-1141 1400073471 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-843609 26-Mar-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED HWYH-975 FL at KM-
1134 FL at KM-1+850
0+550 - 0+720
NDE selection for welds of 8 inch HWYH-1134 FL LOCATION CHANGE TO
1142 CPP-NGCP-W-1142 1400073551 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1134 FL TA-843609 26-Mar-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED HWYH-975 FL at KM-
at KM-1+850
0+550 - 0+720
Pre-welding and weld joint fit up inspection for 24 Mr.
1143 CPP-NGCP-W-1143 1400073559 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 26-Mar-19 8:00 AM Junaid CLOSED
inch double joints at TCF-1, CPP Pipe Yard. Rajendran
Post-welding visual inspection for 24 inch double Mr.
1144 CPP-NGCP-W-1144 1400073574 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 26-Mar-19 2.00 PM Junaid CLOSED
joints at TCF-1, CPP Pipe Yard. Rajendran
NDE selection for welds of 24 inch double joints at Mr.
1145 CPP-NGCP-W-1145 1400073586 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445988 26-Mar-19 4:00 PM Junaid CLOSED
TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
1146 CPP-NGCP-W-1146 1400073552 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 FL TA-843586 26-Mar-19 8:00 AM Shadab CLOSED
inch HWYH-1078 FL at KM-3+800 to 3+900 Rajendran
Post-welding visual inspection for 8inch HWYH- Mr.
1147 CPP-NGCP-W-1147 1400073595 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 FL TA-843586 26-Mar-19 2.00 PM Shadab CLOSED
1078 FL at KM-3+800 to 3+900 Rajendran

1400073567 NDE selection for welds of 8 inch HWYH-1078 FL Mr.


1148 CPP-NGCP-W-1148 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1078 FL TA-843586 26-Mar-19 4:00 PM Shadab CLOSED
at KM-3+800 to 3+900 Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
1149 CPP-NGCP-W-1149 1400073560 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-611 FL TA-843603 26-Mar-19 8:00 AM Sarfaraz CLOSED
inch HRDH-611 FL KM-2+800 to 3+000 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
1150 CPP-NGCP-W-1150 1400073596 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-611 FL TA-843603 26-Mar-19 2.00 PM Sarfaraz CLOSED
611 FL KM-2+800 to 3+000 Rajendran
NDE selection for welds of 8 inch HRDH-611 FL Mr.
1151 CPP-NGCP-W-1151 1400073561 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-611 FL TA-843603 26-Mar-19 4:00 PM Sarfaraz CLOSED
KM-2+800 to 3+000 Rajendran
1400073613 Pre-welding and weld joint fit up inspection for 8
1152 CPP-NGCP-W-1152 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1162 FL TA-843974 26-Mar-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH-1162 FL at KM-0+400 to 0+800
Post-welding visual inspection for 8inch HRDH-
1153 CPP-NGCP-W-1153 1400073614 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1162 FL TA-843974 26-Mar-19 2.00 PM Saif Mr. Rajesh CLOSED
1162 FL at KM-0+400 to 0+800
NDE selection for welds of 8 inch HRDH-1162 FL
1154 CPP-NGCP-W-1154 1400073615 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1162 FL TA-843974 26-Mar-19 4:00 PM Saif Mr. Rajesh CLOSED
at KM-0+400 to 0+800
Pre-welding and weld joint fit up inspection for 8 Mr. cancelled due to NO
1155 CPP-NGCP-W-1155 1400073624 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1063 FL TA-843953 26-Mar-19 8:00 AM Rajesh REJECTED
inch HRDH-1063 FL at KM-1+400 to 1+500 Rajendran PERMIT RE-SCHEDULE TO 27-03-2019
Post-welding visual inspection for 8inch HRDH- Mr. cancelled due to NO
1156 CPP-NGCP-W-1156 1400073625 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1063 FL TA-843953 26-Mar-19 2.00 PM Rajesh REJECTED
1063 FL at KM-1+400 to 1+500 Rajendran PERMIT RE-SCHEDULE TO 27-03-2019
NDE selection for welds of 8 inch HRDH-1063 FL Mr. cancelled due to NO
1157 CPP-NGCP-W-1157 1400073591 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1063 FL TA-843953 26-Mar-19 4:00 PM Rajesh REJECTED
at KM-1+400 to 1+500 Rajendran PERMIT RE-SCHEDULE TO 27-03-2019
In-Process Verification - RT Techniques &
1158 CPP-NGCP-W-1158 1400073606 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-611,1162,1063,1122 VARIOUS 26-Mar-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
611,1162,1063,1122
In-Process Verification - RT Techniques &
1159 CPP-NGCP-W-1159 1400073577 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- HWYH-1076,1078,1088,1118,975 VARIOUS 26-Mar-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1076,1078,1088,1118,975
In-Process Verification - RT Techniques & Mr.
1160 CPP-NGCP-W-1160 1400073570 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of TCF-1 TCF-1 VARIOUS 26-Mar-19 8:00 AM RAMEEZ CLOSED
Rajendran
In-Process Inspection of MPT using Mr.
1161 CPP-NGCP-W-1161 1400073572 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 TCF-1 VARIOUS 26-Mar-19 8:00 AM RAMEEZ CLOSED
Yoke Method, TCF-1. Rajendran
1400074394 Pre-welding and weld joint fit up inspection for 8
1162 CPP-NGCP-W-1162 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1118 FL TA-445909 27-Mar-19 8:00 AM Umair Mr. Suresh CLOSED
inch HWYH-1118 FL @ KM-0+100 to 2+700
Post-welding visual inspection for 8 inch HWYH-
1163 CPP-NGCP-W-1163 1400074319 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1118 FL TA-445909 27-Mar-19 2.00 PM Umair Mr. Suresh CLOSED
1118 FL @ KM-0+100 to 2+700
NDE selection for welds of 8 inch HWYH-1118 FL
1164 CPP-NGCP-W-1164 1400074397 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1118 FL TA-445909 27-Mar-19 4:00 PM Umair Mr. Suresh CLOSED
@ KM-0+100 to 2+700
Pre-welding and weld joint fit up inspection for 8
1165 CPP-NGCP-W-1165 1400074398 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1076 FL TA-445861 27-Mar-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1076 FL @ KM-0+100 to 2+500
Post-welding visual inspection for 8 inch HWYH-
1166 CPP-NGCP-W-1166 1400074340 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1076 FL TA-445861 27-Mar-19 2.00 PM Imran Mr. Suresh CLOSED
1076 FL @ KM-0+100 to 2+500
NDE selection for welds of 8 inch HWYH-1076 FL
1167 CPP-NGCP-W-1167 1400074329 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1076 FL TA-445861 27-Mar-19 4:00 PM Imran Mr. Suresh CLOSED
@ KM-0+100 to 2+500
1168 CPP-NGCP-W-1168 1400074399 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1134 HWYH-1134 FL TA-445836 27-Mar-19 8.00 AM Abdul Aziz Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 8
1169 CPP-NGCP-W-1169 1400074350 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-843609 27-Mar-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1134 FL at KM-1+850

1400074403 Post-welding visual inspection for 8 inch HWYH- TA-843609


1170 CPP-NGCP-W-1170 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL 27-Mar-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1134 FL at KM-1+850

1400074413 NDE selection for welds of 8 inch HWYH-1134 FL TA-843609


1171 CPP-NGCP-W-1171 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1134 FL 27-Mar-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
at KM-1+850
Pre-welding and weld joint fit up inspection for 8 Mr.
1172 CPP-NGCP-W-1172 1400074387 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 FL TA-843586 27-Mar-19 8:00 AM Shadab CLOSED
inch HWYH-1078 FL at KM-3+700 to 3+800 Rajendran
Post-welding visual inspection for 8inch HWYH- Mr.
1173 CPP-NGCP-W-1173 1400074386 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 FL TA-843586 27-Mar-19 2.00 PM Shadab CLOSED
1078 FL at KM-3+700 to 3+800 Rajendran
NDE selection for welds of 8 inch HWYH-1078 FL Mr.
1174 CPP-NGCP-W-1174 1400074414 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1078 FL TA-843586 27-Mar-19 4:00 PM Shadab CLOSED
at KM-3+700 to 3+800 Rajendran
1400074404 Pre-welding and weld joint fit up inspection for 24 Mr.
1175 CPP-NGCP-W-1175 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 27-Mar-19 8:00 AM Junaid CLOSED
inch double joints at TCF-1, CPP Pipe Yard. Rajendran
Post-welding visual inspection for 24 inch double Mr.
1176 CPP-NGCP-W-1176 1400074388 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 27-Mar-19 2.00 PM Junaid CLOSED
joints at TCF-1, CPP Pipe Yard. Rajendran
NDE selection for welds of 24 inch double joints at Mr.
1177 CPP-NGCP-W-1177 1400074362 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445988 27-Mar-19 4:00 PM Junaid CLOSED
TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
1178 CPP-NGCP-W-1178 1400074433 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-611 FL TA-843603 27-Mar-19 8:00 AM Sarfaraz CLOSED
inch HRDH-611 FL KM-2+700 to 2+900 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
1179 CPP-NGCP-W-1179 1400074423 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-611 FL TA-843603 27-Mar-19 2.00 PM Sarfaraz CLOSED
611 FL KM-2+700 to 2+900 Rajendran
1400074424 NDE selection for welds of 8 inch HRDH-611 FL Mr.
1180 CPP-NGCP-W-1180 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-611 FL TA-843603 27-Mar-19 4:00 PM Sarfaraz CLOSED
KM-2+700 to 2+900 Rajendran
Pre-welding and weld joint fit up inspection for 8
1181 CPP-NGCP-W-1181 1400074443 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1162 FL TA-843974 27-Mar-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH-1162 FL at KM-0+050 to 0+400

1400074434 Post-welding visual inspection for 8inch HRDH-


1182 CPP-NGCP-W-1182 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1162 FL TA-843974 27-Mar-19 2.00 PM Saif Mr. Rajesh CLOSED
1162 FL at KM-0+050 to 0+400
NDE selection for welds of 8 inch HRDH-1162 FL
1183 CPP-NGCP-W-1183 1400074426 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1162 FL TA-843974 27-Mar-19 4:00 PM Saif Mr. Rajesh CLOSED
at KM-0+050 to 0+400
Pre-welding and weld joint fit up inspection for 8
1184 CPP-NGCP-W-1184 1400074454 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1194 FL TA-843652 27-Mar-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH-1194 FL at KM-0+050 to 0+400
Post-welding visual inspection for 8inch HRDH-
1185 CPP-NGCP-W-1185 1400074435 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1194 FL TA-843652 27-Mar-19 2.00 PM Saif Mr. Rajesh CLOSED
1194 FL at KM-0+050 to 0+400
NDE selection for welds of 8 inch HRDH-1194 FL
1186 CPP-NGCP-W-1186 1400074446 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1194 FL TA-843652 27-Mar-19 4:00 PM Saif Mr. Rajesh CLOSED
at KM-0+050 to 0+400
1400074456 SATIP-W-012-01 Weld repair verification of joints 8:10 AM
1187 CPP-NGCP-W-1187 Welding SAIC-W-2051 00-FW-45T2, at HRDH-1063 FL HRDH-1063 FL TA-843953 27-Mar-19 IRSHAD Mr. Rajesh CLOSED

Post-welding visual inspection of repair


1188 CPP-NGCP-W-1188 1400074436 Welding SATIP-W-012-01 SAIC-W-2048 joints HRDH-1063 FL TA-843953 27-Mar-19 10.30 AM IRSHAD Mr. Rajesh CLOSED
00-FW-45T2, at HRDH-1063 FL
In-Process Verification - RT Techniques & HRDH-
1189 CPP-NGCP-W-1189 1400074407 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- 1170,611,1118,1135,1172,1063,116 VARIOUS 27-Mar-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1170,611,1118,1135,1172,1063,1162,1171,1309 2,1171,1309

1190 CPP-NGCP-W-1190 1400074457 Welding SATIP-NDE-RT-01 SAIC-RT-2007 In-Process Verification - RT Techniques & HWYH-1118 VARIOUS 27-Mar-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
Procedure Implementation of HWYH-1118
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a Pre-welding and weld joint fit up inspection for 8
1191 CPP-NGCP-W-1191 1400074888 l Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1118 FL TA-445909 28-Mar-19 8:00 AM Umair Mr. Suresh CLOSED
inch HWYH-1118 FL @ KM-0+100 to 2+700
Post-welding visual inspection for 8 inch HWYH-
1192 CPP-NGCP-W-1192 1400074857 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1118 FL TA-445909 28-Mar-19 2.00 PM Umair Mr. Suresh CLOSED
1118 FL @ KM-0+100 to 2+700
NDE selection for welds of 8 inch HWYH-1118 FL
1193 CPP-NGCP-W-1193 1400074858 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1118 FL TA-445909 28-Mar-19 4:00 PM Umair Mr. Suresh CLOSED
@ KM-0+100 to 2+700
Pre-welding and weld joint fit up inspection for 8
1194 CPP-NGCP-W-1194 1400074889 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1076 FL TA-445861 28-Mar-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1076 FL @ KM-0+100 to 2+500
1400074890 Post-welding visual inspection for 8 inch HWYH-
1195 CPP-NGCP-W-1195 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1076 FL TA-445861 28-Mar-19 2.00 PM Imran Mr. Suresh CLOSED
1076 FL @ KM-0+100 to 2+500
NDE selection for welds of 8 inch HWYH-1076 FL
1196 CPP-NGCP-W-1196 1400074867 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1076 FL TA-445861 28-Mar-19 4:00 PM Imran Mr. Suresh CLOSED
@ KM-0+100 to 2+500
Pre-welding and weld joint fit up inspection for 10 CANCEL DUE TO NO
1197 CPP-NGCP-W-1197 1400074983 Welding SATIP-W-012-01 SAIC-W-2048
inch HWYH-1093 FL @ KM-0+200 to 3
HWYH-1093 FL TA-445838 28-Mar-19 8:00 AM Abdul Aziz Mr. Suresh REJECTED
PERMIT
Post-welding visual inspection for 10 inch HWYH- CANCEL DUE TO NO
1198 CPP-NGCP-W-1198 1400074974 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 28-Mar-19 2.00 PM Abdul Aziz Mr. Suresh REJECTED
1093 FL @ KM-0+200 to 3 PERMIT
NDE selection for welds of 10 inch HWYH-1093 CANCEL DUE TO NO
1199 CPP-NGCP-W-1199 1400074921 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 28-Mar-19 4:00 PM Abdul Aziz Mr. Suresh REJECTED
FL @ KM-0+200 to 3 PERMIT
1400074829 Pre-welding and weld joint fit up inspection for 8 Mr.
1200 CPP-NGCP-W-1200 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 FL TA-843586 28-Mar-19 8:00 AM Shadab CLOSED
inch HWYH-1078 FL at KM-3+500 to 3+700 Rajendran
Post-welding visual inspection for 8inch HWYH- Mr.
1201 CPP-NGCP-W-1201 1400074895 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 FL TA-843586 28-Mar-19 2.00 PM Shadab CLOSED
1078 FL at KM-3+500 to 3+700 Rajendran
NDE selection for welds of 8 inch HWYH-1078 FL Mr.
1202 CPP-NGCP-W-1202 1400074822 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1078 FL TA-843586 28-Mar-19 4:00 PM Shadab CLOSED
at KM-3+500 to 3+700 Rajendran
Pre-welding and weld joint fit up inspection for 24 Mr.
1203 CPP-NGCP-W-1203 1400074878 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 28-Mar-19 8:00 AM Junaid CLOSED
inch double joints at TCF-1, CPP Pipe Yard. Rajendran
Post-welding visual inspection for 24 inch double Mr.
1204 CPP-NGCP-W-1204 1400074896 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 28-Mar-19 2.00 PM Junaid CLOSED
joints at TCF-1, CPP Pipe Yard. Rajendran
1400074916 NDE selection for welds of 24 inch double joints at Mr.
1205 CPP-NGCP-W-1205 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445988 28-Mar-19 4:00 PM Junaid CLOSED
TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
1206 CPP-NGCP-W-1206 1400074906 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-611 FL TA-843603 28-Mar-19 8:00 AM Sarfaraz CLOSED
inch HRDH-611 FL KM-2+100 to 2+500 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
1207 CPP-NGCP-W-1207 1400074926 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-611 FL TA-843603 28-Mar-19 2.00 PM Sarfaraz CLOSED
611 FL KM-2+100 to 2+500 Rajendran
NDE selection for welds of 8 inch HRDH-611 FL Mr.
1208 CPP-NGCP-W-1208 1400074927 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-611 FL TA-843603 28-Mar-19 4:00 PM Sarfaraz CLOSED
KM-2+100 to 2+500 Rajendran
Pre-welding and weld joint fit up inspection for 8
1209 CPP-NGCP-W-1209 1400074956 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1194 FL TA-843652 28-Mar-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH-1194 FL at KM-0+200 to 0+800
Post-welding visual inspection for 8inch HRDH-
1210 CPP-NGCP-W-1210 1400074950 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1194 FL TA-843652 28-Mar-19 2.00 PM Saif Mr. Rajesh CLOSED
1194 FL at KM-0+200 to 0+800
NDE selection for welds of 8 inch HRDH-1194 FL
1211 CPP-NGCP-W-1211 1400074966 Welding SATIP-W-012-01 SAIC-W-2054
at KM-0+200 to 0+800
HRDH-1194 FL TA-843652 28-Mar-19 4:00 PM Saif Mr. Rajesh CLOSED

Pre-welding and weld joint fit up inspection for 16" Mr. CANCELLED DUE TO NO
1212 CPP-NGCP-W-1212 1400075059 Welding SATIP-W-012-01 SAIC-W-2048 HRDH AK-RH TA-843960 28-Mar-19 8:00 AM Rajesh REJECTED REJECTED
HRDH AK-RH TR/L FL at KM-0+787 to 0+808 Rajendran ACTIVITY
Post-welding visual inspection for 16" HRDH AK- Mr. CANCELLED DUE TO NO
1213 CPP-NGCP-W-1213 1400075052 Welding SATIP-W-012-01 SAIC-W-2048 HRDH AK-RH TA-843960 28-Mar-19 2.00 PM Rajesh REJECTED REJECTED
RH TR/L at KM-0+787 to 0+808 Rajendran ACTIVITY
NDE selection for welds of 16" HRDH AK-RH Mr. CANCELLED DUE TO NO
1214 CPP-NGCP-W-1214 1400075075 Welding SATIP-W-012-01 SAIC-W-2054
TR/L at KM-0+787 to 0+808
HRDH AK-RH TA-843960 28-Mar-19 4:00 PM Rajesh
Rajendran
REJECTED REJECTED
ACTIVITY
In-Process Verification - RT Techniques &
1215 CPP-NGCP-W-1215 1400074998 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-1063,611,1162 VARIOUS 28-Mar-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1063,611,1162
In-Process Verification - RT Techniques &
1216 CPP-NGCP-W-1216 1400074989 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- HWYH-1118,975,1078 VARIOUS 28-Mar-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1118,975,1078
Pre-welding and weld joint fit up inspection for 8
1217 CPP-NGCP-W-1217 1400075124 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1076 FL TA-445861 29-Mar-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1076 FL @ KM-0+100 to 2+500
Post-welding visual inspection for 8 inch HWYH-
1218 CPP-NGCP-W-1218 1400075125 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1076 FL TA-445861 29-Mar-19 11.30 AM Imran Mr. Suresh CLOSED
1076 FL @ KM-0+100 to 2+500
NDE selection for welds of 8 inch HWYH-1076 FL
1219 CPP-NGCP-W-1219 1400075070 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1076 FL TA-445861 29-Mar-19 12.00 PM Imran Mr. Suresh CLOSED
@ KM-0+100 to 2+500
Pre-welding and weld joint fit up inspection for 24 Mr.
1220 CPP-NGCP-W-1220 1400075072 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 29-Mar-19 8:00 AM Junaid CLOSED
inch double joints at TCF-1, CPP Pipe Yard. Rajendran
Post-welding visual inspection for 24 inch double Mr.
1221 CPP-NGCP-W-1221 1400075126 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 29-Mar-19 12.00 PM Junaid CLOSED
joints at TCF-1, CPP Pipe Yard. Rajendran
NDE selection for welds of 24 inch double joints at Mr.
1222 CPP-NGCP-W-1222 1400075090 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445988 29-Mar-19 4:00 PM Junaid CLOSED
TCF-1, CPP Pipe Yard. Rajendran
Weld repair verification of joints
1223 CPP-NGCP-W-1223 1400075118 Welding SATIP-W-012-01 SAIC-W-2051 00-FW-28,29,31,32 at HWYH-1071 FL HWYH-1071 FL TA-445830 29-Mar-19 8:10 AM PRATHAB Mr. Suresh CLOSED
Post-welding visual inspection of repair
1224 CPP-NGCP-W-1224 1400075091 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH-1071 FL TA-445830 29-Mar-19 11.30 AM PRATHAB Mr. Suresh CLOSED
00-FW-28,29,31,32 at HWYH-1071 FL
Mr.
1225 CPP-NGCP-W-1225 1400075078 Welding SATIP-NDE-RT-01 SAIC-RT-2007 In-Process Verification - RT Techniques & TCF-1 VARIOUS 29-Mar-19 8:00 AM RAMEEZ CLOSED
Procedure Implementation of TCF-1 Rajendran
Mr.
1226 CPP-NGCP-W-1226 1400075129 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 In-Process Inspection of MPT using TCF-1 VARIOUS 29-Mar-19 8:00 AM RAMEEZ CLOSED
Yoke Method, TCF-1. Rajendran
Pre-welding and weld joint fit up inspection for 8
1227 CPP-NGCP-W-1227 1400075794 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1003 FL TA-445909 30-Mar-19 8:00 AM IRSHAD Mr. Suresh CLOSED
inch HWYH-1003 FL @ KM-0+100 to 7+900
Post-welding visual inspection for 8 inch HWYH-
1228 CPP-NGCP-W-1228 1400075853 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1003 FL TA-445909 30-Mar-19 2.00 PM IRSHAD Mr. Suresh CLOSED
1003 FL @ KM-0+100 to 7+900
NDE selection for welds of 8 inch HWYH-1003 FL
1229 CPP-NGCP-W-1229 1400075834 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1003 FL TA-445909 30-Mar-19 4:00 PM IRSHAD Mr. Suresh CLOSED
@ KM-0+100 to 7+900
Pre-welding and weld joint fit up inspection for 8
1230 CPP-NGCP-W-1230 1400075873 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1076 FL TA-445861 30-Mar-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1076 FL @ KM-0+100 to 2+500
Post-welding visual inspection for 8 inch HWYH-
1231 CPP-NGCP-W-1231 1400075737 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1076 FL TA-445861 30-Mar-19 2.00 PM Imran Mr. Suresh CLOSED
1076 FL @ KM-0+100 to 2+500
NDE selection for welds of 8 inch HWYH-1076 FL
1232 CPP-NGCP-W-1232 1400075836 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1076 FL TA-445861 30-Mar-19 4:00 PM Imran Mr. Suresh CLOSED
@ KM-0+100 to 2+500
1233 CPP-NGCP-W-1233 1400076074 Welding SATIP-W-012-01 SAIC-W-2051 Weld repair verification of joints HWYH-1071 FL TA-445830 30-Mar-19 8:10 AM Abdul Aziz Mr. Suresh CLOSED
00-FW-31 at HWYH-1071 FL
Post-welding visual inspection of repair
1234 CPP-NGCP-W-1234 1400075990 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH-1071 FL TA-445830 30-Mar-19 11.30 AM Abdul Aziz Mr. Suresh CLOSED
00-FW-31 at HWYH-1071 FL
Pre-welding and weld joint fit up inspection for 8 Mr.
1235 CPP-NGCP-W-1235 1400075874 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 FL TA-843586 30-Mar-19 8:00 AM Shadab CLOSED
inch HWYH-1078 FL at KM-3+200 to 3+500 Rajendran
Post-welding visual inspection for 8inch HWYH- Mr.
1236 CPP-NGCP-W-1236 1400075857 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 FL TA-843586 30-Mar-19 2.00 PM Shadab CLOSED
1078 FL at KM-3+200 to 3+500 Rajendran

1400075875 NDE selection for welds of 8 inch HWYH-1078 FL Mr.


1237 CPP-NGCP-W-1237 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1078 FL TA-843586 30-Mar-19 4:00 PM Shadab CLOSED
at KM-3+200 to 3+500 Rajendran
Pre-welding and weld joint fit up inspection for 24 Mr.
1238 CPP-NGCP-W-1238 1400075806 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 30-Mar-19 8:00 AM Junaid CLOSED
inch double joints at TCF-1, CPP Pipe Yard. Rajendran
Post-welding visual inspection for 24 inch double Mr.
1239 CPP-NGCP-W-1239 1400075821 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 30-Mar-19 2.00 PM Junaid CLOSED
joints at TCF-1, CPP Pipe Yard. Rajendran
NDE selection for welds of 24 inch double joints at Mr.
1240 CPP-NGCP-W-1240 1400075877 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445988 30-Mar-19 4:00 PM Junaid CLOSED
TCF-1, CPP Pipe Yard. Rajendran

1400075848 Pre-welding and weld joint fit up inspection for 8 Mr.


1241 CPP-NGCP-W-1241 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-611 FL TA-843603 30-Mar-19 8:00 AM Sarfaraz CLOSED
inch HRDH-611 FL KM-1+500 to 2+100 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
1242 CPP-NGCP-W-1242 1400075798 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-611 FL TA-843603 30-Mar-19 2.00 PM Sarfaraz CLOSED
611 FL KM-1+500 to 2+100 Rajendran
NDE selection for welds of 8 inch HRDH-611 FL Mr.
1243 CPP-NGCP-W-1243 1400075822 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-611 FL TA-843603 30-Mar-19 4:00 PM Sarfaraz CLOSED
KM-1+500 to 2+100 Rajendran
Pre-welding and weld joint fit up inspection for 8
1244 CPP-NGCP-W-1244 1400075807 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1194 FL TA-843652 30-Mar-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH-1194 FL at KM-0+800 to 1+000
Post-welding visual inspection for 8inch HRDH-
1245 CPP-NGCP-W-1245 1400075849 Welding SATIP-W-012-01 SAIC-W-2048
1194 FL at KM-0+800 to 1+000
HRDH-1194 FL TA-843652 30-Mar-19 2.00 PM Saif Mr. Rajesh CLOSED

NDE selection for welds of 8 inch HRDH-1194 FL


1246 CPP-NGCP-W-1246 1400075799 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1194 FL TA-843652 30-Mar-19 4:00 PM Saif Mr. Rajesh CLOSED
at KM-0+800 to 1+000
Mr.
1247 CPP-NGCP-W-1247 1400075887 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HRDH-1063 HRDH-1063 FL TA-843953 30-Mar-19 8.00 AM Rajesh CLOSED
Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
1248 CPP-NGCP-W-1248 1400075800 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1063 FL TA-843953 30-Mar-19 8:00 AM Rajesh CLOSED
inch HRDH-1063 FL at KM-1+238 to 1+291 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
1249 CPP-NGCP-W-1249 1400075801 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1063 FL TA-843953 30-Mar-19 2.00 PM Rajesh CLOSED
1063 FL at KM-1+238 to 1+291 Rajendran
NDE selection for welds of 8 inch HRDH-1063 FL Mr.
1250 CPP-NGCP-W-1250 1400075881 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1063 FL TA-843953 30-Mar-19 4:00 PM Rajesh CLOSED
at KM-1+238 to 1+291 Rajendran
Weld repair verification of joints TA843610
1251 CPP-NGCP-W-1251 1400076029 Welding SATIP-W-012-01 SAIC-W-2051 01-FW-153T2 at HRDH-1117 FL HRDH-1117,1314 FL 30-Mar-19 8:10 AM PRATHAB Mr. Rajesh CLOSED
00-FW-60 at HRDH-1314 FL TA843626

Post-welding visual inspection of repair


1252 CPP-NGCP-W-1252 1400076058 Welding SATIP-W-012-01 SAIC-W-2048 joints HRDH-1117,1314 FL
TA843610 30-Mar-19 4.00 PM PRATHAB Mr. Rajesh CLOSED
01-FW-153T2 at HRDH-1117 FL TA843626
00-FW-60 at HRDH-1314 FL
In-Process Verification - RT Techniques &
1253 CPP-NGCP-W-1253 1400075896 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1063, 611, HRDH-1063,611,1162 VARIOUS 30-Mar-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1162
In-Process Verification - RT Techniques &
1254 CPP-NGCP-W-1254 1400075866 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- HWYH-1076,1078,1118 VARIOUS 30-Mar-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1076,1078,1118
Pre-welding and weld joint fit up inspection for 8
1255 CPP-NGCP-W-1255 1400076410 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 31-Mar-19 8:00 AM IRSHAD Mr. Suresh CLOSED
inch HWYH-1091 FL at KM-0+100 to 5+500
Post-welding visual inspection for 8inch HWYH-
1256 CPP-NGCP-W-1256 1400076438 Welding SATIP-W-012-01 SAIC-W-2048
1091 FL at KM-0+100 to 5+500
HWYH-1091 FL TA-445958 31-Mar-19 2.00 PM IRSHAD Mr. Suresh CLOSED

NDE selection for welds of 8 inch HWYH-1091 FL


1257 CPP-NGCP-W-1257 1400076445 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1091 FL TA-445958 31-Mar-19 4:00 PM IRSHAD Mr. Suresh CLOSED
at KM-0+100 to 5+500
Pre-welding and weld joint fit up inspection for 8 CANCELLED DUE TO JOB
1258 CPP-NGCP-W-1258 1400076419 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1003 FL TA-445909 31-Mar-19 8:00 AM IRSHAD Mr. Suresh REJECTED REJECTED
inch HWYH-1003 FL @ KM-0+100 to 7+900 NOT READY
1400076474 Post-welding visual inspection for 8 inch HWYH- CANCELLED DUE TO JOB
1259 CPP-NGCP-W-1259 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1003 FL TA-445909 31-Mar-19 2.00 PM IRSHAD Mr. Suresh REJECTED REJECTED
1003 FL @ KM-0+100 to 7+900 NOT READY
NDE selection for welds of 8 inch HWYH-1003 FL CANCELLED DUE TO JOB
1260 CPP-NGCP-W-1260 1400076439 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1003 FL TA-445909 31-Mar-19 4:00 PM IRSHAD Mr. Suresh REJECTED REJECTED
@ KM-0+100 to 7+900 NOT READY
Pre-welding and weld joint fit up inspection for 8
1261 CPP-NGCP-W-1261 1400076475 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1076 FL TA-445861 31-Mar-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1076 FL @ KM-0+100 to 2+500

1400076465 Post-welding visual inspection for 8 inch HWYH-


1262 CPP-NGCP-W-1262 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1076 FL TA-445861 31-Mar-19 2.00 PM Imran Mr. Suresh CLOSED
1076 FL @ KM-0+100 to 2+500
NDE selection for welds of 8 inch HWYH-1076 FL
1263 CPP-NGCP-W-1263 1400076430 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1076 FL TA-445861 31-Mar-19 4:00 PM Imran Mr. Suresh CLOSED
@ KM-0+100 to 2+500
1264 CPP-NGCP-W-1264 1400076466 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1134 HWYH-1134 FL TA-445836 31-Mar-19 8.00 AM Abdul Aziz Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 8
1265 CPP-NGCP-W-1265 1400076442 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 31-Mar-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1134 FL at KM-3+052
Post-welding visual inspection for 8 inch HWYH-
1266 CPP-NGCP-W-1266 1400076493 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 31-Mar-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1134 FL at KM-3+052
NDE selection for welds of 8 inch HWYH-1134 FL
1267 CPP-NGCP-W-1267 1400076459 Welding SATIP-W-012-01 SAIC-W-2054
at KM-3+052
HWYH-1134 FL TA-445836 31-Mar-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED

1400076462 Pre-welding and weld joint fit up inspection for 24 Mr.


1268 CPP-NGCP-W-1268 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 31-Mar-19 8:00 AM Junaid CLOSED
inch double joints at TCF-1, CPP Pipe Yard. Rajendran
Post-welding visual inspection for 24 inch double Mr.
1269 CPP-NGCP-W-1269 1400076469 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 31-Mar-19 2.00 PM Junaid CLOSED
joints at TCF-1, CPP Pipe Yard. Rajendran
NDE selection for welds of 24 inch double joints at Mr.
1270 CPP-NGCP-W-1270 1400076497 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445988 31-Mar-19 4:00 PM Junaid CLOSED
TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
1271 CPP-NGCP-W-1271 1400076472 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-611 FL TA-843603 31-Mar-19 8:00 AM Sarfaraz CLOSED
inch HRDH-611 FL KM-1+300 to 1+500 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
1272 CPP-NGCP-W-1272 1400076499 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-611 FL TA-843603 31-Mar-19 2.00 PM Sarfaraz CLOSED
611 FL KM-1+300 to 1+500 Rajendran
1400076421 NDE selection for welds of 8 inch HRDH-611 FL Mr.
1273 CPP-NGCP-W-1273 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-611 FL TA-843603 31-Mar-19 4:00 PM Sarfaraz CLOSED
KM-1+300 to 1+500 Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
1274 CPP-NGCP-W-1274 1400076487 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 FL TA-843586 31-Mar-19 8:00 AM Shadab CLOSED
inch HWYH-1078 FL at KM-3+000 to 3+200 Rajendran
Post-welding visual inspection for 8inch HWYH- Mr.
1275 CPP-NGCP-W-1275 1400076516 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 FL TA-843586 31-Mar-19 2.00 PM Shadab CLOSED
1078 FL at KM-3+000 to 3+200 Rajendran
NDE selection for welds of 8 inch HWYH-1078 FL Mr.
1276 CPP-NGCP-W-1276 1400076533 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1078 FL TA-843586 31-Mar-19 4:00 PM Shadab CLOSED
at KM-3+000 to 3+200 Rajendran
Pre-welding and weld joint fit up inspection for 8
1277 CPP-NGCP-W-1277 1400076529 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1194 FL TA-843652 31-Mar-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH-1194 FL at KM-1+000 to 1+300
Post-welding visual inspection for 8inch HRDH-
1278 CPP-NGCP-W-1278 1400076545 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1194 FL TA-843652 31-Mar-19 2.00 PM Saif Mr. Rajesh CLOSED
1194 FL at KM-1+000 to 1+300
NDE selection for welds of 8 inch HRDH-1194 FL
1279 CPP-NGCP-W-1279 1400076492 Welding SATIP-W-012-01 SAIC-W-2054
at KM-1+000 to 1+300
HRDH-1194 FL TA-843652 31-Mar-19 4:00 PM Saif Mr. Rajesh CLOSED
Mr.
1280 CPP-NGCP-W-1280 1400076517 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HRDH-1063 HRDH-1063 FL TA-843953 31-Mar-19 8.00 AM Rajesh CLOSED
Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
1281 CPP-NGCP-W-1281 1400076563 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1063 FL TA-843953 31-Mar-19 8:00 AM Rajesh CLOSED
inch HRDH-1063 FL at KM-1+530 to 1+578 Rajendran

1400076501 Post-welding visual inspection for 8inch HRDH- Mr.


1282 CPP-NGCP-W-1282 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1063 FL TA-843953 31-Mar-19 2.00 PM Rajesh CLOSED
1063 FL at KM-1+530 to 1+578 Rajendran
NDE selection for welds of 8 inch HRDH-1063 FL Mr.
1283 CPP-NGCP-W-1283 1400076554 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1063 FL TA-843953 31-Mar-19 4:00 PM Rajesh CLOSED
at KM-1+530 to 1+578 Rajendran
In-Process Verification - RT Techniques &
1284 CPP-NGCP-W-1284 1400076546 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-1135,1117,1194,1134,1170 VARIOUS 31-Mar-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1135,1117,1194,1134,1170
In-Process Verification - RT Techniques &
1285 CPP-NGCP-W-1285 1400076531 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- HWYH-1078,1055,1076,1071 VARIOUS 31-Mar-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1078,1055,1076,1071
Review of weekly welder performance and
1286 CPP-NGCP-W-1286 1400076583 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 22-Mar-2019 to CPP site office. N/A 31-Mar-19 8:00 AM Ruhul Mr. Rajesh CLOSED
28 Mar-2019 at CPP site office.
Pre-welding and weld joint fit up inspection for 8
1287 CPP-NGCP-W-1287 1400076622 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 01-Apr-19 8:00 AM IRSHAD Mr. Suresh CLOSED
inch HWYH-1091 FL at KM-0+100 to 5+500
Post-welding visual inspection for 8inch HWYH-
1288 CPP-NGCP-W-1288 1400076756 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 01-Apr-19 2.00 PM IRSHAD Mr. Suresh CLOSED
1091 FL at KM-0+100 to 5+500
NDE selection for welds of 8 inch HWYH-1091 FL
1289 CPP-NGCP-W-1289 1400076736 Welding SATIP-W-012-01 SAIC-W-2054
at KM-0+100 to 5+500
HWYH-1091 FL TA-445958 01-Apr-19 4:00 PM IRSHAD Mr. Suresh CLOSED

Pre-welding and weld joint fit up inspection for 8 RE-SCHEDULE TO 02-04-


1290 CPP-NGCP-W-1290 1400076709 Welding SATIP-W-012-01 SAIC-W-2048
inch HWYH-1003 FL @ KM-0+100 to 7+900
HWYH-1003 FL TA-445856 01-Apr-19 8:00 AM IRSHAD Mr. Suresh CLOSED
2019
Post-welding visual inspection for 8 inch HWYH- RE-SCHEDULE TO 02-04-
1291 CPP-NGCP-W-1291 1400076773 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1003 FL TA-445856 01-Apr-19 2.00 PM IRSHAD Mr. Suresh CLOSED
1003 FL @ KM-0+100 to 7+900 2019
NDE selection for welds of 8 inch HWYH-1003 FL RE-SCHEDULE TO 02-04-
1292 CPP-NGCP-W-1292 1400076710 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1003 FL TA-445856 01-Apr-19 4:00 PM IRSHAD Mr. Suresh CLOSED
@ KM-0+100 to 7+900 2019
Pre-welding and weld joint fit up inspection for 8 RE-SCHEDULE TO 02-04-
1293 CPP-NGCP-W-1293 1400076766 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1112 FL TA-445906 01-Apr-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1112 FL @ KM-0+100 to 1+700 2019
Post-welding visual inspection for 8 inch HWYH- RE-SCHEDULE TO 02-04-
1294 CPP-NGCP-W-1294 1400076739 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1112 FL TA-445906 01-Apr-19 2.00 PM Imran Mr. Suresh CLOSED
1112 FL @ KM-0+100 to 1+700 2019
NDE selection for welds of 8 inch HWYH-1112 FL RE-SCHEDULE TO 02-04-
1295 CPP-NGCP-W-1295 1400076797 Welding SATIP-W-012-01 SAIC-W-2054
@ KM-0+100 to 1+700
HWYH-1112 FL TA-445906 01-Apr-19 4:00 PM Imran Mr. Suresh CLOSED
2019
Pre-welding and weld joint fit up inspection for 10 RE-SCHEDULE TO 02-04-
1296 CPP-NGCP-W-1296 1400076750 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 01-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1093 FL @ KM-0+200 to 3 2019
Post-welding visual inspection for 10 inch HWYH- RE-SCHEDULE TO 02-04-
1297 CPP-NGCP-W-1297 1400076798 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 01-Apr-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1093 FL @ KM-0+200 to 3 2019
NDE selection for welds of 10 inch HWYH-1093 RE-SCHEDULE TO 02-04-
1298 CPP-NGCP-W-1298 1400076761 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 01-Apr-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+200 to 3 2019
Pre-welding and weld joint fit up inspection for 24 Mr.
1299 CPP-NGCP-W-1299 1400076700 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 01-Apr-19 8:00 AM Junaid CLOSED
inch double joints at TCF-1, CPP Pipe Yard. Rajendran
1400076770 Post-welding visual inspection for 24 inch double Mr.
1300 CPP-NGCP-W-1300 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 01-Apr-19 2.00 PM Junaid CLOSED
joints at TCF-1, CPP Pipe Yard. Rajendran
NDE selection for welds of 24 inch double joints at Mr.
1301 CPP-NGCP-W-1301 1400076776 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445988 01-Apr-19 4:00 PM Junaid CLOSED
TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
1302 CPP-NGCP-W-1302 1400076800 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 FL TA-843586 01-Apr-19 8:00 AM Shadab CLOSED
inch HWYH-1078 FL at KM-2+800 to 3+000 Rajendran

1400076813 Post-welding visual inspection for 8inch HWYH- Mr.


1303 CPP-NGCP-W-1303 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 FL TA-843586 01-Apr-19 2.00 PM Shadab CLOSED
1078 FL at KM-2+800 to 3+000 Rajendran
NDE selection for welds of 8 inch HWYH-1078 FL Mr.
1304 CPP-NGCP-W-1304 1400076771 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1078 FL TA-843586 01-Apr-19 4:00 PM Shadab CLOSED
at KM-2+800 to 3+000 Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
1305 CPP-NGCP-W-1305 1400076772 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-611 FL TA-843603 01-Apr-19 8:00 AM Sarfaraz CLOSED
inch HRDH-611 FL KM-1+050 to 1+300 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
1306 CPP-NGCP-W-1306 1400076779 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-611 FL TA-843603 01-Apr-19 2.00 PM Sarfaraz CLOSED
611 FL KM-1+050 to 1+300 Rajendran
NDE selection for welds of 8 inch HRDH-611 FL Mr.
1307 CPP-NGCP-W-1307 1400076788 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-611 FL TA-843603 01-Apr-19 4:00 PM Sarfaraz CLOSED
KM-1+050 to 1+300 Rajendran
Pre-welding and weld joint fit up inspection for 8
1308 CPP-NGCP-W-1308 1400076802 Welding SATIP-W-012-01 SAIC-W-2048
inch HRDH-1194 FL at KM-1+300 to 1+600
HRDH-1194 FL TA-843652 01-Apr-19 8:00 AM Saif Mr. Rajesh CLOSED

Post-welding visual inspection for 8inch HRDH-


1309 CPP-NGCP-W-1309 1400076815 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1194 FL TA-843652 01-Apr-19 2.00 PM Saif Mr. Rajesh CLOSED
1194 FL at KM-1+300 to 1+600
NDE selection for welds of 8 inch HRDH-1194 FL
1310 CPP-NGCP-W-1310 1400076826 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1194 FL TA-843652 01-Apr-19 4:00 PM Saif Mr. Rajesh CLOSED
at KM-1+300 to 1+600
Pre-welding and weld joint fit up inspection for 16" Mr.
1311 CPP-NGCP-W-1311 1400076816 Welding SATIP-W-012-01 SAIC-W-2048 HRDH AK-RH TA-843960 01-Apr-19 8:00 AM Rajesh CLOSED
HRDH AK-RH TR/L FL at KM-0+797 to 0+808 Rajendran
Post-welding visual inspection for 16" HRDH AK- Mr.
1312 CPP-NGCP-W-1312 1400076853 Welding SATIP-W-012-01 SAIC-W-2048
RH TR/L at KM-0+797 to 0+808
HRDH AK-RH TA-843960 01-Apr-19 2.00 PM Rajesh
Rajendran
CLOSED

NDE selection for welds of 16" HRDH AK-RH Mr.


1313 CPP-NGCP-W-1313 1400076781 Welding SATIP-W-012-01 SAIC-W-2054 HRDH AK-RH TA-843960 01-Apr-19 4:00 PM Rajesh CLOSED
TR/L at KM-0+797 to 0+808 Rajendran
1400076846 In-Process Verification - RT Techniques & VARIOUS 8:00 AM RAMEEZ
1314 CPP-NGCP-W-1314 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-611, 1063 HRDH-611, 1063 01-Apr-19 Mr. Rajesh CLOSED

1400076807 In-Process Verification - RT Techniques & VARIOUS 8:00 AM RAMEEZ


1315 CPP-NGCP-W-1315 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1071, 1003 HWYH-1071, 1003 01-Apr-19 Mr. Suresh CLOSED
In-Process Verification - RT Techniques & Mr.
1316 CPP-NGCP-W-1316 1400076864 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of TCF-1 TCF-1 VARIOUS 01-Apr-19 8:00 AM RAMEEZ CLOSED
Rajendran
In-Process Inspection of MPT using Mr.
1317 CPP-NGCP-W-1317 1400076834 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 TCF-1 VARIOUS 01-Apr-19 8:00 AM RAMEEZ CLOSED
Yoke Method, TCF-1. Rajendran
Weld repair verification of joints
1318 CPP-NGCP-W-1318 1400077092 Welding SATIP-W-012-01 SAIC-W-2051 00-FW-29 at HWYH-975 FL HWYH-975 FL TA-446045 01-Apr-19 8.00 AM Abdul Aziz Mr. Suresh CLOSED
Post-welding visual inspection of repair
1319 CPP-NGCP-W-1319 1400077193 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH-975 FL TA-446045 01-Apr-19 11.00 AM Abdul Aziz Mr. Suresh CLOSED
00-FW-29 at HWYH-975 FL

1320 CPP-NGCP-W-1320 1400077139 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1134 HWYH-1134 FL TA-445836 01-Apr-19 8.00 AM Abdul Aziz Mr. Suresh REJECTED REJECTED CANCELLED DUE TO JOB
NOT READY RE-SCHEDULE TO 02-04-2019
Pre-welding and weld joint fit up inspection for 8 CANCELLED DUE TO JOB
1321 CPP-NGCP-W-1321 1400077159 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 01-Apr-19 8:00 AM Abdul Aziz Mr. Suresh REJECTED REJECTED
inch HWYH-1134 FL at KM-2+900 NOT READY RE-SCHEDULE TO 02-04-2019
Post-welding visual inspection for 8 inch HWYH- CANCELLED DUE TO JOB
1322 CPP-NGCP-W-1322 1400077213 Welding SATIP-W-012-01 SAIC-W-2048
1134 FL at KM-2+900
HWYH-1134 FL TA-445836 01-Apr-19 2.00 PM Abdul Aziz Mr. Suresh REJECTED REJECTED
NOT READY RE-SCHEDULE TO 02-04-2019
NDE selection for welds of 8 inch HWYH-1134 FL CANCELLED DUE TO JOB
1323 CPP-NGCP-W-1323 1400077204 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1134 FL TA-445836 01-Apr-19 4:00 PM Abdul Aziz Mr. Suresh REJECTED REJECTED
at KM-2+900 NOT READY RE-SCHEDULE TO 02-04-2019
Pre-welding and weld joint fit up inspection for 8
1324 CPP-NGCP-W-1324 1400077868 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 02-Apr-19 8:00 AM Umair Mr. Suresh CLOSED
inch HWYH-1091 FL at KM-0+100 to 5+500
Post-welding visual inspection for 8inch HWYH-
1325 CPP-NGCP-W-1325 1400077832 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 02-Apr-19 2.00 PM Umair Mr. Suresh CLOSED
1091 FL at KM-0+100 to 5+500
NDE selection for welds of 8 inch HWYH-1091 FL
1326 CPP-NGCP-W-1326 1400077888 Welding SATIP-W-012-01 SAIC-W-2054
at KM-0+100 to 5+500
HWYH-1091 FL TA-445958 02-Apr-19 4:00 PM Umair Mr. Suresh CLOSED

Pre-welding and weld joint fit up inspection for 24 Mr.


1327 CPP-NGCP-W-1327 1400077891 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 02-Apr-19 8:00 AM Junaid CLOSED
inch double joints at TCF-1, CPP Pipe Yard. Rajendran
1400077890 Post-welding visual inspection for 24 inch double Mr.
1328 CPP-NGCP-W-1328 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 02-Apr-19 2.00 PM Junaid CLOSED
joints at TCF-1, CPP Pipe Yard. Rajendran
NDE selection for welds of 24 inch double joints at Mr.
1329 CPP-NGCP-W-1329 1400077840 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445988 02-Apr-19 4:00 PM Junaid CLOSED
TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8
1330 CPP-NGCP-W-1330 1400077903 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 FL TA-843586 02-Apr-19 8:00 AM Shadab Mr. Rajesh CLOSED
inch HWYH-1078 FL at KM-2+300 to 2+800

1400077852 Post-welding visual inspection for 8inch HWYH-


1331 CPP-NGCP-W-1331 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 FL TA-843586 02-Apr-19 2.00 PM Shadab Mr. Rajesh CLOSED
1078 FL at KM-2+300 to 2+800
NDE selection for welds of 8 inch HWYH-1078 FL
1332 CPP-NGCP-W-1332 1400077856 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1078 FL TA-843586 02-Apr-19 4:00 PM Shadab Mr. Rajesh CLOSED
at KM-2+300 to 2+800
Pre-welding and weld joint fit up inspection for 8
1333 CPP-NGCP-W-1333 1400077821 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1194 FL TA-843652 02-Apr-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH-1194 FL at KM-1+600 to 1+700
Post-welding visual inspection for 8inch HRDH-
1334 CPP-NGCP-W-1334 1400077904 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1194 FL TA-843652 02-Apr-19 2.00 PM Saif Mr. Rajesh CLOSED
1194 FL at KM-1+600 to 1+700
NDE selection for welds of 8 inch HRDH-1194 FL
1335 CPP-NGCP-W-1335 1400077923 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1194 FL TA-843652 02-Apr-19 4:00 PM Saif Mr. Rajesh CLOSED
at KM-1+600 to 1+700
Pre-welding and weld joint fit up inspection for 16" Mr. RE-SCHEDULE TO 03-04-
1336 CPP-NGCP-W-1336 1400077895 Welding SATIP-W-012-01 SAIC-W-2048
HRDH BK-RH TR/L FL at KM-0+744 to 7+200
HRDH BK-RH TR/L TA-843957 02-Apr-19 8:00 AM Rajesh
Rajendran
CLOSED
2019
Post-welding visual inspection for 16" HRDH BK- Mr. RE-SCHEDULE TO 03-04-
1337 CPP-NGCP-W-1337 1400077914 Welding SATIP-W-012-01 SAIC-W-2048 HRDH BK-RH TR/L TA-843957 02-Apr-19 2.00 PM Rajesh CLOSED
RH TR/L at KM-0+744 to 7+200 Rajendran 2019
NDE selection for welds of 16" HRDH BK-RH Mr. RE-SCHEDULE TO 03-04-
1338 CPP-NGCP-W-1338 1400077896 Welding SATIP-W-012-01 SAIC-W-2054 HRDH BK-RH TR/L TA-843957 02-Apr-19 4:00 PM Rajesh CLOSED
TR/L at KM-0+744 to 7+200 Rajendran 2019
Weld repair verification of joints HRDH-
TA-843650
00-FW-12 at HRDH-1135 FL 1135 FL,
TA-843610 RE-SCHEDULE TO 03-04-
1339 CPP-NGCP-W-1339 1400077858 Welding SATIP-W-012-01 SAIC-W-2051 02-FW-178T2 at HRDH-1117 FL 1117 FL, 02-Apr-19 8.00 AM IRSHAD Mr. Rajesh CLOSED
00-FW-067 at HRDH-1162 FL TA-843974 2019
1162 FL,
04-FW-327 at HWYH-1078 FL TA-843586
1078 FL

Post-welding visual inspection of repair HRDH-


joints TA-843650
1135 FL,
00-FW-12 at HRDH-1135 FL TA-843610 RE-SCHEDULE TO 03-04-
1340 CPP-NGCP-W-1340 1400077924 Welding SATIP-W-012-01 SAIC-W-2048 02-FW-178T2 at HRDH-1117 FL 1117 FL, 02-Apr-19 2.00 PM IRSHAD Mr. Rajesh CLOSED
TA-843974 2019
00-FW-067 at HRDH-1162 FL 1162 FL,
TA-843586
04-FW-327 at HWYH-1078 FL 1078 FL

In-Process Verification - RT Techniques & HRDH-


1341 CPP-NGCP-W-1341 1400077934 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- VARIOUS 02-Apr-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1314,611,1063,1117,1162,1194 1314,611,1063,1117,1162,1194

In-Process Verification - RT Techniques &


1342 CPP-NGCP-W-1342 1400077859 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- HWYH-975,1134,1091,1076,1078 VARIOUS 02-Apr-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
975,1134,1091,1076,1078
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a Pre-welding and weld joint fit up inspection for 8
1343 CPP-NGCP-W-1343 1400078301 l Welding SATIP-W-012-01 SAIC-W-2048
inch HWYH-1091 FL at KM-0+100 to 5+500
HWYH-1091 FL TA-445958 03-Apr-19 8:00 AM Umair Mr. Suresh CLOSED

Post-welding visual inspection for 8inch HWYH-


1344 CPP-NGCP-W-1344 1400078341 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 03-Apr-19 2.00 PM Umair Mr. Suresh CLOSED
1091 FL at KM-0+100 to 5+500
NDE selection for welds of 8 inch HWYH-1091 FL
1345 CPP-NGCP-W-1345 1400078350 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1091 FL TA-445958 03-Apr-19 4:00 PM Umair Mr. Suresh CLOSED
at KM-0+100 to 5+500
Pre-welding and weld joint fit up inspection for 8
1346 CPP-NGCP-W-1346 1400078404 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1003 FL TA-445856 03-Apr-19 8:00 AM Umair Mr. Suresh CLOSED
inch HWYH-1003 FL @ KM-0+100 to 7+900
Post-welding visual inspection for 8 inch HWYH-
1347 CPP-NGCP-W-1347 1400078367 Welding SATIP-W-012-01 SAIC-W-2048
1003 FL @ KM-0+100 to 7+900
HWYH-1003 FL TA-445856 03-Apr-19 2.00 PM Umair Mr. Suresh CLOSED

NDE selection for welds of 8 inch HWYH-1003 FL


1348 CPP-NGCP-W-1348 1400078396 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1003 FL TA-445856 03-Apr-19 4:00 PM Umair Mr. Suresh CLOSED
@ KM-0+100 to 7+900
Pre-welding and weld joint fit up inspection for 8
1349 CPP-NGCP-W-1349 1400078286 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1112 FL TA-445906 03-Apr-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1112 FL @ KM-0+100 to 1+700
Post-welding visual inspection for 8 inch HWYH-
1350 CPP-NGCP-W-1350 1400078315 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1112 FL TA-445906 03-Apr-19 2.00 PM Imran Mr. Suresh CLOSED
1112 FL @ KM-0+100 to 1+700
NDE selection for welds of 8 inch HWYH-1112 FL
1351 CPP-NGCP-W-1351 1400078235 Welding SATIP-W-012-01 SAIC-W-2054
@ KM-0+100 to 1+700
HWYH-1112 FL TA-445906 03-Apr-19 4:00 PM Imran Mr. Suresh CLOSED

Pre-welding and weld joint fit up inspection for 10


1352 CPP-NGCP-W-1352 1400078281 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 03-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1093 FL @ KM-0+200 to 3
Post-welding visual inspection for 10 inch HWYH-
1353 CPP-NGCP-W-1353 1400078236 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 03-Apr-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1093 FL @ KM-0+200 to 3
NDE selection for welds of 10 inch HWYH-1093
1354 CPP-NGCP-W-1354 1400078317 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 03-Apr-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+200 to 3
Pre-welding and weld joint fit up inspection for 24 Mr.
1355 CPP-NGCP-W-1355 1400078237 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 03-Apr-19 8:00 AM Junaid CLOSED
inch double joints at TCF-1, CPP Pipe Yard. Rajendran
1400078333 Post-welding visual inspection for 24 inch double Mr.
1356 CPP-NGCP-W-1356 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 03-Apr-19 2.00 PM Junaid CLOSED
joints at TCF-1, CPP Pipe Yard. Rajendran
NDE selection for welds of 24 inch double joints at Mr.
1357 CPP-NGCP-W-1357 1400078296 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445988 03-Apr-19 4:00 PM Junaid CLOSED
TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
1358 CPP-NGCP-W-1358 1400078309 Welding SATIP-W-012-01 SAIC-W-2048
inch HRDH-1178 FL KM-0+250 to 0+450
HRDH-1178 FL TA-843955 03-Apr-19 8:00 AM Sarfaraz
Rajendran
CLOSED

Post-welding visual inspection for 8 inch HRDH- Mr.


1359 CPP-NGCP-W-1359 1400078310 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1178 FL TA-843955 03-Apr-19 2.00 PM Sarfaraz CLOSED
1178 FL KM-0+250 to 0+450 Rajendran
NDE selection for welds of 8 inch HRDH-1178 FL Mr.
1360 CPP-NGCP-W-1360 1400078239 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1178 FL TA-843955 03-Apr-19 4:00 PM Sarfaraz CLOSED
KM-0+250 to 0+450 Rajendran
Pre-welding and weld joint fit up inspection for 8
1361 CPP-NGCP-W-1361 1400078320 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1164 FL TA-843592 03-Apr-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH-1164 FL at KM-5+500 to 5+900
Post-welding visual inspection for 8inch HRDH-
1362 CPP-NGCP-W-1362 1400078321 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1164 FL TA-843592 03-Apr-19 2.00 PM Saif Mr. Rajesh CLOSED
1164 FL at KM-5+500 to 5+900
NDE selection for welds of 8 inch HRDH-1164 FL
1363 CPP-NGCP-W-1363 1400078242 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1164 FL TA-843592 03-Apr-19 4:00 PM Saif Mr. Rajesh CLOSED
at KM-5+500 to 5+900
Pre-welding and weld joint fit up inspection for 8
1364 CPP-NGCP-W-1364 1400078290 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 FL TA-843586 03-Apr-19 8:00 AM Shadab Mr. Rajesh CLOSED
inch HWYH-1078 FL at KM-2+100 to 2+300
Post-welding visual inspection for 8inch HWYH-
1365 CPP-NGCP-W-1365 1400078338 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 FL TA-843586 03-Apr-19 2.00 PM Shadab Mr. Rajesh CLOSED
1078 FL at KM-2+100 to 2+300
NDE selection for welds of 8 inch HWYH-1078 FL
1366 CPP-NGCP-W-1366 1400078347 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1078 FL TA-843586 03-Apr-19 4:00 PM Shadab Mr. Rajesh CLOSED
at KM-2+100 to 2+300
In-Process Verification - RT Techniques &
1367 CPP-NGCP-W-1367 1400078340 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-1117,1194,611 VARIOUS 03-Apr-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1117,1194,611
Mr.
1368 CPP-NGCP-W-1368 1400078358 Welding SATIP-NDE-RT-01 SAIC-RT-2007 In-Process Verification - RT Techniques & TCF-1 VARIOUS 03-Apr-19 8:00 AM RAMEEZ CLOSED RE-SCHEDULE TO 05-04-
Procedure Implementation of TCF-1 Rajendran 2019
Mr.
1369 CPP-NGCP-W-1369 1400078375 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 In-Process Inspection of MPT using TCF-1 VARIOUS 03-Apr-19 8:00 AM RAMEEZ CLOSED
Yoke Method, TCF-1. Rajendran
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a Pre-welding and weld joint fit up inspection for 8
1370 CPP-NGCP-W-1370 1400079048 l Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 04-Apr-19 8:00 AM Umair Mr. Suresh CLOSED RE-SCHEDULE TO 06-04-
inch HWYH-1091 FL at KM-0+100 to 5+500 2019
Post-welding visual inspection for 8inch HWYH- RE-SCHEDULE TO 06-04-
1371 CPP-NGCP-W-1371 1400079017 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 04-Apr-19 2.00 PM Umair Mr. Suresh CLOSED
1091 FL at KM-0+100 to 5+500 2019
NDE selection for welds of 8 inch HWYH-1091 FL RE-SCHEDULE TO 06-04-
1372 CPP-NGCP-W-1372 1400079041 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1091 FL TA-445958 04-Apr-19 4:00 PM Umair Mr. Suresh CLOSED
at KM-0+100 to 5+500 2019
Pre-welding and weld joint fit up inspection for 8
1373 CPP-NGCP-W-1373 1400079049 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1003 FL TA-445856 04-Apr-19 8:00 AM Umair Mr. Suresh CLOSED
inch HWYH-1003 FL @ KM-0+100 to 7+900
Post-welding visual inspection for 8 inch HWYH-
1374 CPP-NGCP-W-1374 1400079050 Welding SATIP-W-012-01 SAIC-W-2048
1003 FL @ KM-0+100 to 7+900
HWYH-1003 FL TA-445856 04-Apr-19 2.00 PM Umair Mr. Suresh CLOSED

NDE selection for welds of 8 inch HWYH-1003 FL


1375 CPP-NGCP-W-1375 1400079075 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1003 FL TA-445856 04-Apr-19 4:00 PM Umair Mr. Suresh CLOSED
@ KM-0+100 to 7+900
Pre-welding and weld joint fit up inspection for 8
1376 CPP-NGCP-W-1376 1400079084 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1112 FL TA-445906 04-Apr-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1112 FL @ KM-0+100 to 1+700
Post-welding visual inspection for 8 inch HWYH-
1377 CPP-NGCP-W-1377 1400079085 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1112 FL TA-445906 04-Apr-19 2.00 PM Imran Mr. Suresh CLOSED
1112 FL @ KM-0+100 to 1+700
NDE selection for welds of 8 inch HWYH-1112 FL
1378 CPP-NGCP-W-1378 1400079087 Welding SATIP-W-012-01 SAIC-W-2054
@ KM-0+100 to 1+700
HWYH-1112 FL TA-445906 04-Apr-19 4:00 PM Imran Mr. Suresh CLOSED

Pre-welding and weld joint fit up inspection for 10


1379 CPP-NGCP-W-1379 1400079067 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 04-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1093 FL @ KM-0+200 to 3
Post-welding visual inspection for 10 inch HWYH-
1380 CPP-NGCP-W-1380 1400079090 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 04-Apr-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1093 FL @ KM-0+200 to 3
NDE selection for welds of 10 inch HWYH-1093
1381 CPP-NGCP-W-1381 1400079077 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 04-Apr-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+200 to 3
Pre-welding and weld joint fit up inspection for 24 Mr.
1382 CPP-NGCP-W-1382 1400079091 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 04-Apr-19 8:00 AM Junaid CLOSED
inch double joints at TCF-1, CPP Pipe Yard. Rajendran
1400079095 Post-welding visual inspection for 24 inch double Mr.
1383 CPP-NGCP-W-1383 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 04-Apr-19 2.00 PM Junaid CLOSED
joints at TCF-1, CPP Pipe Yard. Rajendran
NDE selection for welds of 24 inch double joints at Mr.
1384 CPP-NGCP-W-1384 1400079117 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445988 04-Apr-19 4:00 PM Junaid CLOSED
TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
1385 CPP-NGCP-W-1385 1400079097 Welding SATIP-W-012-01 SAIC-W-2048
inch HRDH-1178 FL KM-0+450 to 0+500
HRDH-1178 FL TA-843955 04-Apr-19 8:00 AM Sarfaraz
Rajendran
CLOSED

Post-welding visual inspection for 8 inch HRDH- Mr.


1386 CPP-NGCP-W-1386 1400079068 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1178 FL TA-843955 04-Apr-19 2.00 PM Sarfaraz CLOSED
1178 FL KM-0+450 to 0+500 Rajendran
NDE selection for welds of 8 inch HRDH-1178 FL Mr.
1387 CPP-NGCP-W-1387 1400079098 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1178 FL TA-843955 04-Apr-19 4:00 PM Sarfaraz CLOSED
KM-0+450 to 0+500 Rajendran
Welding Equipment calibration verification
1388 CPP-NGCP-W-1388 1400079165 Welding SATIP-W-012-01 SAIC-W-2045 HRDH-1164 FL TA-843592 04-Apr-19 8:00 AM Saif Mr. Rajesh CLOSED
inspection prior to welding of HRDH-1164 FL
Pre-welding and weld joint fit up inspection for 8
1389 CPP-NGCP-W-1389 1400079136 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1164 FL TA-843592 04-Apr-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH-1164 FL at KM-5+300 to 5+500
Post-welding visual inspection for 8inch HRDH-
1390 CPP-NGCP-W-1390 1400079126 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1164 FL TA-843592 04-Apr-19 2.00 PM Saif Mr. Rajesh CLOSED
1164 FL at KM-5+300 to 5+500
NDE selection for welds of 8 inch HRDH-1164 FL
1391 CPP-NGCP-W-1391 1400079164 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1164 FL TA-843592 04-Apr-19 4:00 PM Saif Mr. Rajesh CLOSED
at KM-5+300 to 5+500
1400079157 Pre-welding and weld joint fit up inspection for 8
1392 CPP-NGCP-W-1392 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 FL TA-843586 04-Apr-19 8:00 AM Shadab Mr. Rajesh CLOSED
inch HWYH-1078 FL at KM-1+900 to 2+100
Post-welding visual inspection for 8inch HWYH-
1393 CPP-NGCP-W-1393 1400079071 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 FL TA-843586 04-Apr-19 2.00 PM Shadab Mr. Rajesh CLOSED
1078 FL at KM-1+900 to 2+100
NDE selection for welds of 8 inch HWYH-1078 FL
1394 CPP-NGCP-W-1394 1400079101 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1078 FL TA-843586 04-Apr-19 4:00 PM Shadab Mr. Rajesh CLOSED
at KM-1+900 to 2+100
Pre-welding and weld joint fit up inspection for 8
1395 CPP-NGCP-W-1395 1400079147 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1116 FL TA-843592 04-Apr-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1116 FL at KM-2+030 to 2+231
Post-welding visual inspection for 8inch HRDH-
1396 CPP-NGCP-W-1396 1400079166 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1116 FL TA-843592 04-Apr-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1116 FL at KM-2+030 to 2+231
NDE selection for welds of 8 inch HRDH-1116 FL INCLUDED
1397 CPP-NGCP-W-1397 1400079149 Welding SATIP-W-012-01 SAIC-W-2054
at KM-2+030 to 2+231
HRDH-1116 FL TA-843592 04-Apr-19 4:00 PM Rajesh Mr. Rajesh CLOSED
00-FW-12,
In-Process Verification - RT Techniques & at HRDH-1135
1398 CPP-NGCP-W-1398 1400079132 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- HWYH-1003,1091,1093,1112 VARIOUS 04-Apr-19 8:00 AM RAMEEZ Mr. Suresh CLOSED 01-FW-148;01-FW-155 at
1003,1091,1093,1112
HRDH-611
00-FW-26
Weld repair verification of joints HRDH-
1400079199 TA-843650 8.00 AM RE-SCHEDULE TO 06- at HRDH-1170
1399 CPP-NGCP-W-1399 Welding SATIP-W-012-01 SAIC-W-2051 00-FW-12 at HRDH-1135 FL 1135 FL, 04-Apr-19 IRSHAD Mr. Rajesh CLOSED
04-2019 00-FW-27
at HRDH 1194
00-FW-40T3;00-FW-47T4 at
Post-welding visual inspection of repair
RE-SCHEDULE TO 06- HRDH 1063
1400 CPP-NGCP-W-1400 1400079201 Welding SATIP-W-012-01 SAIC-W-2048 joints HRDH 1135 FL TA-843650 04-Apr-19 11.00 AM IRSHAD Mr. Rajesh CLOSED 00-FW-05
00-FW-12 at HRDH 1135 FL 04-2019
at HRDH 1162
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a Pre-welding and weld joint fit up inspection for 8
1401 CPP-NGCP-W-1401 1400079130 l Welding SATIP-W-012-01 SAIC-W-2048
inch HWYH-1091 FL at KM-0+100 to 5+500
HWYH-1091 FL TA-445958 05-Apr-19 8:00 AM Umair Mr. Suresh CLOSED

Post-welding visual inspection for 8inch HWYH-


1402 CPP-NGCP-W-1402 1400079215 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 05-Apr-19 11.00 AM Umair Mr. Suresh CLOSED
1091 FL at KM-0+100 to 5+500
NDE selection for welds of 8 inch HWYH-1091 FL
1403 CPP-NGCP-W-1403 1400079197 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1091 FL TA-445958 05-Apr-19 12.00 PM Umair Mr. Suresh CLOSED
at KM-0+100 to 5+500
Pre-welding and weld joint fit up inspection for 8
1404 CPP-NGCP-W-1404 1400079210 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1003 FL TA-445856 05-Apr-19 8:00 AM Umair Mr. Suresh CLOSED
inch HWYH-1003 FL @ KM-0+100 to 7+900
Post-welding visual inspection for 8 inch HWYH-
1405 CPP-NGCP-W-1405 1400079202 Welding SATIP-W-012-01 SAIC-W-2048
1003 FL @ KM-0+100 to 7+900
HWYH-1003 FL TA-445856 05-Apr-19 11.00 AM Umair Mr. Suresh CLOSED

NDE selection for welds of 8 inch HWYH-1003 FL


1406 CPP-NGCP-W-1406 1400079218 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1003 FL TA-445856 05-Apr-19 12.00 PM Umair Mr. Suresh CLOSED
@ KM-0+100 to 7+900
Pre-welding and weld joint fit up inspection for 8
1407 CPP-NGCP-W-1407 1400079192 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1112 FL TA-445906 05-Apr-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1112 FL @ KM-0+100 to 1+700
Post-welding visual inspection for 8 inch HWYH-
1408 CPP-NGCP-W-1408 1400079219 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1112 FL TA-445906 05-Apr-19 11.00 AM Imran Mr. Suresh CLOSED
1112 FL @ KM-0+100 to 1+700
NDE selection for welds of 8 inch HWYH-1112 FL
1409 CPP-NGCP-W-1409 1400079220 Welding SATIP-W-012-01 SAIC-W-2054
@ KM-0+100 to 1+700
HWYH-1112 FL TA-445906 05-Apr-19 12.00 PM Imran Mr. Suresh CLOSED

Pre-welding and weld joint fit up inspection for 10


1410 CPP-NGCP-W-1410 1400079235 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 05-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1093 FL @ KM-0+200 to 3
Post-welding visual inspection for 10 inch HWYH-
1411 CPP-NGCP-W-1411 1400079236 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 05-Apr-19 11.00 AM Abdul Aziz Mr. Suresh CLOSED
1093 FL @ KM-0+200 to 3
NDE selection for welds of 10 inch HWYH-1093
1412 CPP-NGCP-W-1412 1400079237 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 05-Apr-19 12.00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+200 to 3
Pre-welding and weld joint fit up inspection for 24 Mr. correction :- TRL-2
1413 CPP-NGCP-W-1413 1400079283 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 05-Apr-19 8:00 AM Junaid CLOSED
inch double joints at TCF-1, CPP Pipe Yard. Rajendran TA-445989
1400079240 Post-welding visual inspection for 24 inch double Mr. correction :- TRL-2
1414 CPP-NGCP-W-1414 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 05-Apr-19 11.00 AM Junaid CLOSED
joints at TCF-1, CPP Pipe Yard. Rajendran TA-445989
NDE selection for welds of 24 inch double joints at Mr. correction :- TRL-2
1415 CPP-NGCP-W-1415 1400079247 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445988 05-Apr-19 12.00 PM Junaid CLOSED
TCF-1, CPP Pipe Yard. Rajendran TA-445989
Pre-welding and weld joint fit up inspection for 8
1416 CPP-NGCP-W-1416 1400079723 Welding SATIP-W-012-01 SAIC-W-2048
inch HWYH-1003 FL @ KM-0+100 to 7+900
HWYH-1003 FL TA-445856 06-Apr-19 8:00 AM Umair Mr. Suresh CLOSED

Post-welding visual inspection for 8 inch HWYH-


1417 CPP-NGCP-W-1417 1400079660 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1003 FL TA-445856 06-Apr-19 2.00 PM Umair Mr. Suresh CLOSED
1003 FL @ KM-0+100 to 7+900
NDE selection for welds of 8 inch HWYH-1003 FL
1418 CPP-NGCP-W-1418 1400079733 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1003 FL TA-445856 06-Apr-19 4.00 PM Umair Mr. Suresh CLOSED
@ KM-0+100 to 7+900
Pre-welding and weld joint fit up inspection for 8
1419 CPP-NGCP-W-1419 1400079709 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1112 FL TA-445906 06-Apr-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1112 FL @ KM-0+100 to 1+700
Post-welding visual inspection for 8 inch HWYH-
1420 CPP-NGCP-W-1420 1400079734 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1112 FL TA-445906 06-Apr-19 2.00 PM Imran Mr. Suresh CLOSED
1112 FL @ KM-0+100 to 1+700
NDE selection for welds of 8 inch HWYH-1112 FL
1421 CPP-NGCP-W-1421 1400079691 Welding SATIP-W-012-01 SAIC-W-2054
@ KM-0+100 to 1+700
HWYH-1112 FL TA-445906 06-Apr-19 4.00 PM Imran Mr. Suresh CLOSED

Pre-welding and weld joint fit up inspection for 10


1422 CPP-NGCP-W-1422 1400079649 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 06-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1093 FL @ KM-0+200 to 3
Post-welding visual inspection for 10 inch HWYH-
1423 CPP-NGCP-W-1423 1400079701 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 06-Apr-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1093 FL @ KM-0+200 to 3
NDE selection for welds of 10 inch HWYH-1093
1424 CPP-NGCP-W-1424 1400079716 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 06-Apr-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+200 to 3

1425 CPP-NGCP-W-1425 1400079839 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1134 HWYH-1134 FL TA-445836 06-Apr-19 8.00 AM Abdul Aziz Mr. Suresh CLOSED RE-SCHEDULE TO 07-04-
2019
Pre-welding and weld joint fit up inspection for 8 CANCELLED DUE TO NO
1426 CPP-NGCP-W-1426 1400079819 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 06-Apr-19 8:00 AM Abdul Aziz Mr. Suresh REJECTED
inch HWYH-1134 FL at KM-3+158 ACTIVITY
Post-welding visual inspection for 8 inch HWYH- CANCELLED DUE TO NO
1427 CPP-NGCP-W-1427 1400079886 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 06-Apr-19 2.00 PM Abdul Aziz Mr. Suresh REJECTED REJECTED
1134 FL at KM-3+158 ACTIVITY
NDE selection for welds of 8 inch HWYH-1134 FL CANCELLED DUE TO NO
1428 CPP-NGCP-W-1428 1400079820 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1134 FL TA-445836 06-Apr-19 4.00 PM Abdul Aziz Mr. Suresh REJECTED
at KM-3+158 ACTIVITY
1400079650 Pre-welding and weld joint fit up inspection for 24 Mr. correction :- TRL-2
1429 CPP-NGCP-W-1429 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 06-Apr-19 8:00 AM Junaid CLOSED
inch double joints at TCF-1, CPP Pipe Yard. Rajendran TA-445989
Post-welding visual inspection for 24 inch double Mr. correction :- TRL-2
1430 CPP-NGCP-W-1430 1400079719 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 06-Apr-19 2.00 PM Junaid CLOSED
joints at TCF-1, CPP Pipe Yard. Rajendran TA-445989
NDE selection for welds of 24 inch double joints at Mr. correction :- TRL-2
1431 CPP-NGCP-W-1431 1400079773 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445988 06-Apr-19 4.00 PM Junaid CLOSED
TCF-1, CPP Pipe Yard. Rajendran TA-445989
Pre-welding and weld joint fit up inspection for 8 Mr.
1432 CPP-NGCP-W-1432 1400079740 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1178 FL TA-843955 06-Apr-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1178 FL KM-0+450 to 0+500 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
1433 CPP-NGCP-W-1433 1400079764 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1178 FL TA-843955 06-Apr-19 2.00 PM Sarfaraz CLOSED
1178 FL KM-0+450 to 0+500 Rajendran
NDE selection for welds of 8 inch HRDH-1178 FL Mr.
1434 CPP-NGCP-W-1434 1400079765 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1178 FL TA-843955 06-Apr-19 4:00 PM Sarfaraz CLOSED
KM-0+450 to 0+500 Rajendran
Pre-welding and weld joint fit up inspection for 8
1435 CPP-NGCP-W-1435 1400079787 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1164 FL TA-843592 06-Apr-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH-1164 FL at KM-5+300 to 5+500
Post-welding visual inspection for 8inch HRDH-
1436 CPP-NGCP-W-1436 1400079757 Welding SATIP-W-012-01 SAIC-W-2048
1164 FL at KM-5+300 to 5+500
HRDH-1164 FL TA-843592 06-Apr-19 2.00 PM Saif Mr. Rajesh CLOSED
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a NDE selection for welds of 8 inch HRDH-1164 FL
1437 CPP-NGCP-W-1437 1400079767 l Welding SATIP-W-012-01 SAIC-W-2054
at KM-5+300 to 5+500
HRDH-1164 FL TA-843592 06-Apr-19 4:00 PM Saif Mr. Rajesh CLOSED

Pre-welding and weld joint fit up inspection for 8


1438 CPP-NGCP-W-1438 1400079795 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 FL TA-843586 06-Apr-19 8:00 AM Shadab Mr. Rajesh CLOSED
inch HWYH-1078 FL at KM-1+900 to 2+100

1400079741 Post-welding visual inspection for 8inch HWYH-


1439 CPP-NGCP-W-1439 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 FL TA-843586 06-Apr-19 2.00 PM Shadab Mr. Rajesh CLOSED
1078 FL at KM-1+900 to 2+100
NDE selection for welds of 8 inch HWYH-1078 FL
1440 CPP-NGCP-W-1440 1400079722 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1078 FL TA-843586 06-Apr-19 4:00 PM Shadab Mr. Rajesh CLOSED
at KM-1+900 to 2+100
Pre-welding and weld joint fit up inspection for 8 CANCELLED DUE TO
1441 CPP-NGCP-W-1441 1400079769 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1116 FL TA-843592 06-Apr-19 8:00 AM Rajesh Mr. Rajesh REJECTED WELDING MACHINE
inch HRDH-1116 FL at KM-2+030 to 2+231
PROBLEM
Post-welding visual inspection for 8inch HRDH- CANCELLED DUE TO
1442 CPP-NGCP-W-1442 1400079758 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1116 FL TA-843592 06-Apr-19 2.00 PM Rajesh Mr. Rajesh REJECTED WELDING MACHINE
1116 FL at KM-2+030 to 2+231
PROBLEM
NDE selection for welds of 8 inch HRDH-1116 FL CANCELLED DUE TO
1443 CPP-NGCP-W-1443 1400079777 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1116 FL TA-843592 06-Apr-19 4:00 PM Rajesh Mr. Rajesh REJECTED WELDING MACHINE
at KM-2+030 to 2+231
PROBLEM
In-Process Verification - RT Techniques & HRDH-611, 1170, 1162, 1194, 1117,
1444 CPP-NGCP-W-1444 1400079967 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-611, 1170, VARIOUS 06-Apr-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1162, 1194, 1117, 1164 1164

In-Process Verification - RT Techniques &


1445 CPP-NGCP-W-1445 1400079977 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1003, HWYH-1003, 1078, 1091, 1118 VARIOUS 06-Apr-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1078, 1091, 1118
Pre-welding and weld joint fit up inspection for 8 CANCELLED DUE TO NO
1446 CPP-NGCP-W-1446 1400080628 Welding SATIP-W-012-01 SAIC-W-2048
inch HWYH-1091 FL at KM-0+100 to 5+500
HWYH-1091 FL TA-445958 07-Apr-19 8:00 AM Umair Mr. Suresh REJECTED REJECTED
ACTIVITY
Post-welding visual inspection for 8inch HWYH- CANCELLED DUE TO NO
1447 CPP-NGCP-W-1447 1400080601 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 07-Apr-19 2.00 PM Umair Mr. Suresh REJECTED REJECTED
1091 FL at KM-0+100 to 5+500 ACTIVITY
NDE selection for welds of 8 inch HWYH-1091 FL CANCELLED DUE TO NO
1448 CPP-NGCP-W-1448 1400080621 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1091 FL TA-445958 07-Apr-19 4.00 PM Umair Mr. Suresh REJECTED REJECTED
at KM-0+100 to 5+500 ACTIVITY
Pre-welding and weld joint fit up inspection for 8
1449 CPP-NGCP-W-1449 1400080714 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1003 FL TA-445856 07-Apr-19 8:00 AM Umair Mr. Suresh CLOSED
inch HWYH-1003 FL @ KM-0+100 to 7+900
Post-welding visual inspection for 8 inch HWYH-
1450 CPP-NGCP-W-1450 1400080696 Welding SATIP-W-012-01 SAIC-W-2048
1003 FL @ KM-0+100 to 7+900
HWYH-1003 FL TA-445856 07-Apr-19 2.00 PM Umair Mr. Suresh CLOSED

NDE selection for welds of 8 inch HWYH-1003 FL


1451 CPP-NGCP-W-1451 1400080668 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1003 FL TA-445856 07-Apr-19 4.00 PM Umair Mr. Suresh CLOSED
@ KM-0+100 to 7+900
Pre-welding and weld joint fit up inspection for 8
1452 CPP-NGCP-W-1452 1400080697 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1112 FL TA-445906 07-Apr-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1112 FL @ KM-0+100 to 1+700
Post-welding visual inspection for 8 inch HWYH-
1453 CPP-NGCP-W-1453 1400080729 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1112 FL TA-445906 07-Apr-19 2.00 PM Imran Mr. Suresh CLOSED
1112 FL @ KM-0+100 to 1+700
NDE selection for welds of 8 inch HWYH-1112 FL
1454 CPP-NGCP-W-1454 1400080737 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1112 FL TA-445906 07-Apr-19 4.00 PM Imran Mr. Suresh CLOSED
@ KM-0+100 to 1+700
Pre-welding and weld joint fit up inspection for 10
1455 CPP-NGCP-W-1455 1400080686 Welding SATIP-W-012-01 SAIC-W-2048
inch HWYH-1093 FL @ KM-0+200 to 3
HWYH-1093 FL TA-445838 07-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED

Post-welding visual inspection for 10 inch HWYH-


1456 CPP-NGCP-W-1456 1400080671 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 07-Apr-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1093 FL @ KM-0+200 to 3
NDE selection for welds of 10 inch HWYH-1093
1457 CPP-NGCP-W-1457 1400080675 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 07-Apr-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+200 to 3
Pre-welding and weld joint fit up inspection for 8
1458 CPP-NGCP-W-1458 1400080680 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 07-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1134 FL at KM-3+158 TO 3+250
Post-welding visual inspection for 8 inch HWYH-
1459 CPP-NGCP-W-1459 1400080652 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 07-Apr-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1134 FL at KM-3+158 TO 3+250
NDE selection for welds of 8 inch HWYH-1134 FL
1460 CPP-NGCP-W-1460 1400080702 Welding SATIP-W-012-01 SAIC-W-2054
at KM-3+158 TO 3+250
HWYH-1134 FL TA-445836 07-Apr-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 24
Mr.
1461 CPP-NGCP-W-1461 1400080770 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 07-Apr-19 8:00 AM Junaid CLOSED
Rajendran
Yard.
Post-welding visual inspection for 24 inch double Mr.
1462 CPP-NGCP-W-1462 1400080834 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445989 07-Apr-19 2.00 PM Junaid CLOSED
joints TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
NDE selection for welds of 24 inch double joints Mr.
1463 CPP-NGCP-W-1463 1400080771 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 07-Apr-19 4.00 PM Junaid CLOSED
TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
1464 CPP-NGCP-W-1464 1400080789 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1178 FL TA-843955 07-Apr-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1178 FL KM-0+700 to 0+800 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
1465 CPP-NGCP-W-1465 1400080712 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1178 FL TA-843955 07-Apr-19 2.00 PM Sarfaraz CLOSED
1178 FL KM-0+700 to 0+800 Rajendran
NDE selection for welds of 8 inch HRDH-1178 FL Mr.
1466 CPP-NGCP-W-1466 1400080813 Welding SATIP-W-012-01 SAIC-W-2054
KM-0+700 to 0+800
HRDH-1178 FL TA-843955 07-Apr-19 4:00 PM Sarfaraz
Rajendran
CLOSED

Pre-welding and weld joint fit up inspection for 10


1467 CPP-NGCP-W-1467 1400080814 Welding SATIP-W-012-01 SAIC-W-2048
inch HRDH-902 FL at KM-4+850 to 5+050
HRDH-902 FL TA-843606 07-Apr-19 8:00 AM Saif Mr. Rajesh CLOSED

Post-welding visual inspection for 10 inch HRDH-


1468 CPP-NGCP-W-1468 1400080779 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-902 FL TA-843606 07-Apr-19 2.00 PM Saif Mr. Rajesh CLOSED
902 FL at KM-4+850 to 5+050
NDE selection for welds of 10 inch HRDH-902 FL
1469 CPP-NGCP-W-1469 1400080767 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-902 FL TA-843606 07-Apr-19 4:00 PM Saif Mr. Rajesh CLOSED
at KM-4+850 to 5+050
Pre-welding and weld joint fit up inspection for 8
1470 CPP-NGCP-W-1470 1400080768 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 FL TA-843586 07-Apr-19 8:00 AM Shadab Mr. Rajesh CLOSED
inch HWYH-1078 FL at KM-0+700 to 1+000
Post-welding visual inspection for 8inch HWYH-
1471 CPP-NGCP-W-1471 1400080805 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 FL TA-843586 07-Apr-19 2.00 PM Shadab Mr. Rajesh CLOSED
1078 FL at KM-0+700 to 1+000
NDE selection for welds of 8 inch HWYH-1078 FL
1472 CPP-NGCP-W-1472 1400080806 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1078 FL TA-843586 07-Apr-19 4:00 PM Shadab Mr. Rajesh CLOSED
at KM-0+700 to 1+000
Pre-welding and weld joint fit up inspection for 16" Mr.
1473 CPP-NGCP-W-1473 1400080769 Welding SATIP-W-012-01 SAIC-W-2048
HRDH AK-RH TR/L FL at KM-4+929 to 4+936
HRDH AK-RH TA-843960 07-Apr-19 8:00 AM Rajesh
Rajendran
CLOSED

Post-welding visual inspection for 16" HRDH AK- Mr.


1474 CPP-NGCP-W-1474 1400080808 Welding SATIP-W-012-01 SAIC-W-2048 HRDH AK-RH TA-843960 07-Apr-19 2.00 PM Rajesh CLOSED
RH TR/L at KM-4+929 to 4+936 Rajendran
NDE selection for welds of 16" HRDH AK-RH Mr.
1475 CPP-NGCP-W-1475 1400080816 Welding SATIP-W-012-01 SAIC-W-2054 HRDH AK-RH TA-843960 07-Apr-19 4:00 PM Rajesh CLOSED
TR/L at KM-4+929 to 4+936 Rajendran
In-Process Verification - RT Techniques & HRDH-1116,1164,1178,AK-RH,BK-
1476 CPP-NGCP-W-1476 1400080722 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- VARIOUS 07-Apr-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1116,1164,1178,AK-RH,BK-RH RH

In-Process Verification - RT Techniques & HWYH-


1477 CPP-NGCP-W-1477 1400080823 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- VARIOUS 07-Apr-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1003,1078,1091,1093,1112,1134 1003,1078,1091,1093,1112,1134

Weld repair verification of joints


00-FW-12, at HRDH-1135
1478 CPP-NGCP-W-1478 1400080833 Welding SATIP-W-012-01 SAIC-W-2051 00-FW-26, at HRDH-1170 HRDH-1135,1170,1194,1063,1162 VARIOUS 07-Apr-19 8.00 AM IRSHAD Mr. Rajesh CLOSED
00-FW-27, at HRDH 1194
00-FW-40T3;00-FW-47T4, at HRDH 1063
00-FW-05, at HRDH 1162

Post-welding visual inspection of repair


joints
00-FW-12, at HRDH-1135
1400080819 00-FW-26, at HRDH-1170 VARIOUS 4.00 PM
1479 CPP-NGCP-W-1479 Welding SATIP-W-012-01 SAIC-W-2048 00-FW-27, at HRDH 1194 HRDH-1135,1170,1194,1063,1162 07-Apr-19 IRSHAD Mr. Rajesh CLOSED
00-FW-40T3;00-FW-47T4, at HRDH 1063
00-FW-05, at HRDH 1162

Review of weekly welder performance and


1480 CPP-NGCP-W-1480 1400080811 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 29-Mar-2019 to CPP site office. N/A 07-Apr-19 8:00 AM Ruhul Mr. Rajesh CLOSED
04 Apr-2019 at CPP site office.
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a Pre-welding and weld joint fit up inspection for 8
1481 CPP-NGCP-W-1481 1400081181 l Welding SATIP-W-012-01 SAIC-W-2048
inch HWYH-1091 FL at KM-0+100 to 5+500
HWYH-1091 FL TA-445958 08-Apr-19 8:00 AM Umair Mr. Suresh CLOSED

Post-welding visual inspection for 8inch HWYH-


1482 CPP-NGCP-W-1482 1400081199 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 08-Apr-19 2.00 PM Umair Mr. Suresh CLOSED
1091 FL at KM-0+100 to 5+500
NDE selection for welds of 8 inch HWYH-1091 FL
1483 CPP-NGCP-W-1483 1400081237 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1091 FL TA-445958 08-Apr-19 4.00 PM Umair Mr. Suresh CLOSED
at KM-0+100 to 5+500
Pre-welding and weld joint fit up inspection for 8 CANCELLED DUE TO NO
1484 CPP-NGCP-W-1484 1400081289 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1003 FL TA-445856 08-Apr-19 8:00 AM Umair Mr. Suresh REJECTED No Action
inch HWYH-1003 FL @ KM-0+100 to 7+900 ACTIVITY
Post-welding visual inspection for 8 inch HWYH- CANCELLED DUE TO NO
1485 CPP-NGCP-W-1485 1400081295 Welding SATIP-W-012-01 SAIC-W-2048
1003 FL @ KM-0+100 to 7+900
HWYH-1003 FL TA-445856 08-Apr-19 2.00 PM Umair Mr. Suresh REJECTED No Action
ACTIVITY
NDE selection for welds of 8 inch HWYH-1003 FL CANCELLED DUE TO NO
1486 CPP-NGCP-W-1486 1400081281 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1003 FL TA-445856 08-Apr-19 4.00 PM Umair Mr. Suresh REJECTED No Action
@ KM-0+100 to 7+900 ACTIVITY
Pre-welding and weld joint fit up inspection for 8
1487 CPP-NGCP-W-1487 1400081319 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1112 FL TA-445906 08-Apr-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1112 FL @ KM-0+100 to 1+700
Post-welding visual inspection for 8 inch HWYH-
1488 CPP-NGCP-W-1488 1400081337 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1112 FL TA-445906 08-Apr-19 2.00 PM Imran Mr. Suresh CLOSED
1112 FL @ KM-0+100 to 1+700
NDE selection for welds of 8 inch HWYH-1112 FL
1489 CPP-NGCP-W-1489 1400081350 Welding SATIP-W-012-01 SAIC-W-2054
@ KM-0+100 to 1+700
HWYH-1112 FL TA-445906 08-Apr-19 4.00 PM Imran Mr. Suresh CLOSED

Pre-welding and weld joint fit up inspection for 10


1490 CPP-NGCP-W-1490 1400081328 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 08-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1093 FL @ KM-0+200 to 3
Post-welding visual inspection for 10 inch HWYH-
1491 CPP-NGCP-W-1491 1400081403 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 08-Apr-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1093 FL @ KM-0+200 to 3
NDE selection for welds of 10 inch HWYH-1093
1492 CPP-NGCP-W-1492 1400081370 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 08-Apr-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+200 to 3
Pre-welding and weld joint fit up inspection for 8
1493 CPP-NGCP-W-1493 1400081390 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 08-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1134 FL at KM-3+158 TO 3+250
Post-welding visual inspection for 8 inch HWYH-
1494 CPP-NGCP-W-1494 1400081474 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 08-Apr-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1134 FL at KM-3+158 TO 3+250
NDE selection for welds of 8 inch HWYH-1134 FL
1495 CPP-NGCP-W-1495 1400081412 Welding SATIP-W-012-01 SAIC-W-2054
at KM-3+158 TO 3+250
HWYH-1134 FL TA-445836 08-Apr-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 24
Mr.
1496 CPP-NGCP-W-1496 1400081493 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 08-Apr-19 8:00 AM Junaid CLOSED
Rajendran
Yard.
Post-welding visual inspection for 24 inch double Mr.
1497 CPP-NGCP-W-1497 1400081464 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445989 08-Apr-19 2.00 PM Junaid CLOSED
joints TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
NDE selection for welds of 24 inch double joints Mr.
1498 CPP-NGCP-W-1498 1400081496 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 08-Apr-19 4.00 PM Junaid CLOSED
TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
1499 CPP-NGCP-W-1499 1400081450 Welding SATIP-W-012-01 SAIC-W-2048
inch HRDH-1178 FL KM-0+800 to1+300
HRDH-1178 FL TA-843955 08-Apr-19 8:00 AM Sarfaraz
Rajendran
CLOSED
Post-welding visual inspection for 8 inch HRDH- Mr.
1500 CPP-NGCP-W-1500 1400081484 Welding SATIP-W-012-01 SAIC-W-2048
1178 FL KM-KM-0+800 to1+300
HRDH-1178 FL TA-843955 08-Apr-19 2.00 PM Sarfaraz
Rajendran
CLOSED

NDE selection for welds of 8 inch HRDH-1178 FL Mr.


1501 CPP-NGCP-W-1501 1400081500 Welding SATIP-W-012-01 SAIC-W-2054
KM-KM-0+800 to1+300
HRDH-1178 FL TA-843955 08-Apr-19 4:00 PM Sarfaraz
Rajendran
CLOSED

Pre-welding and weld joint fit up inspection for 10


1502 CPP-NGCP-W-1502 1400081466 Welding SATIP-W-012-01 SAIC-W-2048
inch HRDH-902 FL at KM-4+700 to 4+850
HRDH-902 FL TA-843606 08-Apr-19 8:00 AM Saif Mr. Rajesh CLOSED

Post-welding visual inspection for 10 inch HRDH-


1503 CPP-NGCP-W-1503 1400081485 Welding SATIP-W-012-01 SAIC-W-2048
902 FL at KM-4+700 to 4+850
HRDH-902 FL TA-843606 08-Apr-19 2.00 PM Saif Mr. Rajesh CLOSED

NDE selection for welds of 10 inch HRDH-902 FL


1504 CPP-NGCP-W-1504 1400081465 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-902 FL TA-843606 08-Apr-19 4:00 PM Saif Mr. Rajesh CLOSED
at KM-4+700 to 4+850
Pre-welding and weld joint fit up inspection for 8 CANCELLED DUE TO NO
1505 CPP-NGCP-W-1505 1400081449 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1154 FL TA-669358 08-Apr-19 8:00 AM Rajesh Mr. Rajesh REJECTED REJECTED
inch HWYH-1154 FL at KM-1+532 to 1+539 ACTIVITY
Post-welding visual inspection for 8inch HWYH- CANCELLED DUE TO NO
1506 CPP-NGCP-W-1506 1400081503 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1154 FL TA-669358 08-Apr-19 2.00 PM Rajesh Mr. Rajesh REJECTED REJECTED
1154 FL at KM-1+532 to 1+539 ACTIVITY
NDE selection for welds of 8 inch HWYH-1154 FL CANCELLED DUE TO NO
1507 CPP-NGCP-W-1507 1400081430 Welding SATIP-W-012-01 SAIC-W-2054
at KM-1+532 to 1+539
HWYH-1154 FL TA-669358 08-Apr-19 4:00 PM Rajesh Mr. Rajesh CLOSED REJECTED
ACTIVITY
Weld repair verification of joints
1508 CPP-NGCP-W-1508 1400081434 Welding SATIP-W-012-01 SAIC-W-2051 00-FW-40T3;00-FW-47T4 at HRDH 1063 HRDH-1063 TA-843953 08-Apr-19 8.00 AM IRSHAD Mr. Rajesh CLOSED

Post-welding visual inspection of repair


joints
1509 CPP-NGCP-W-1509 1400081428 Welding SATIP-W-012-01 SAIC-W-2048 00-FW-40T3;00-FW-47T4 at HRDH 1063 HRDH-1063 TA-843953 08-Apr-19 4.00 PM IRSHAD Mr. Rajesh CLOSED

In-Process Verification - RT Techniques &


1510 CPP-NGCP-W-1510 1400081425 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-611,1063,1135,1164,1178 VARIOUS 08-Apr-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
611,1063,1135,1164,1178
In-Process Verification - RT Techniques & HWYH-
1511 CPP-NGCP-W-1511 1400081427 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- VARIOUS 08-Apr-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1003,1071,1078,1091,1093,1112 1003,1071,1078,1091,1093,1112
Pre-welding and weld joint fit up inspection for 8
1512 CPP-NGCP-W-1512 1400081786 Welding SATIP-W-012-01 SAIC-W-2048
inch HWYH-1003 FL @ KM-0+100 to 7+900
HWYH-1003 FL TA-445856 09-Apr-19 8:00 AM Umair Mr. Suresh CLOSED

Post-welding visual inspection for 8 inch HWYH-


1513 CPP-NGCP-W-1513 1400081818 Welding SATIP-W-012-01 SAIC-W-2048
1003 FL @ KM-0+100 to 7+900
HWYH-1003 FL TA-445856 09-Apr-19 2.00 PM Umair Mr. Suresh CLOSED

NDE selection for welds of 8 inch HWYH-1003 FL


1514 CPP-NGCP-W-1514 1400081833 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1003 FL TA-445856 09-Apr-19 4.00 PM Umair Mr. Suresh CLOSED
@ KM-0+100 to 7+900
Pre-welding and weld joint fit up inspection for 8
1515 CPP-NGCP-W-1515 1400081804 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1112 FL TA-445906 09-Apr-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1112 FL @ KM-0+100 to 1+700
Post-welding visual inspection for 8 inch HWYH-
1516 CPP-NGCP-W-1516 1400083005 Welding SATIP-W-012-01 SAIC-W-2048
1112 FL @ KM-0+100 to 1+700
HWYH-1112 FL TA-445906 09-Apr-19 2.00 PM Imran Mr. Suresh CLOSED

NDE selection for welds of 8 inch HWYH-1112 FL RE-SCHEDULE TO 08-


1517 CPP-NGCP-W-1517 1400081864 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1112 FL TA-445906 09-Apr-19 4.00 PM Imran Mr. Suresh CLOSED
@ KM-0+100 to 1+700 04-2019
Pre-welding and weld joint fit up inspection
1518 CPP-NGCP-W-1518 1400081798 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-975 FL at KM-0+100 to HWYH-975 FL TA-446045 09-Apr-19 8:00 AM Abdul Aziz Mr. Suresh REJECTED REJECTED CANCELLED DUE TO NO
3+900 ACTIVITY
1519 CPP-NGCP-W-1519 1400081854 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HWYH-975 FL TA-446045 09-Apr-19 8:10 AM Abdul Aziz Mr. Suresh REJECTED REJECTED CANCELLED DUE TO NO
HWYH-975 FL at KM-0+100 to 3+900 ACTIVITY
1520 CPP-NGCP-W-1520 1400081808 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-975 HWYH-975 FL TA-446045 09-Apr-19 4:00 PM Abdul Aziz Mr. Suresh REJECTED REJECTED CANCELLED DUE TO NO
FL at KM-0+100 to 3+900 ACTIVITY
Pre-welding and weld joint fit up inspection for 10
1521 CPP-NGCP-W-1521 1400081800 Welding SATIP-W-012-01 SAIC-W-2048
inch HWYH-1093 FL @ KM-0+200 to 3
HWYH-1093 FL TA-445838 09-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED

Post-welding visual inspection for 10 inch HWYH-


1522 CPP-NGCP-W-1522 1400081821 Welding SATIP-W-012-01 SAIC-W-2048
1093 FL @ KM-0+200 to 3
HWYH-1093 FL TA-445838 09-Apr-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED

NDE selection for welds of 10 inch HWYH-1093


1523 CPP-NGCP-W-1523 1400081937 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 09-Apr-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+200 to 3
Pre-welding and weld joint fit up inspection for 8
1524 CPP-NGCP-W-1524 1400081989 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 09-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1134 FL at KM-3+158 TO 3+250
Post-welding visual inspection for 8 inch HWYH-
1525 CPP-NGCP-W-1525 1400081950 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 09-Apr-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1134 FL at KM-3+158 TO 3+250
NDE selection for welds of 8 inch HWYH-1134 FL
1526 CPP-NGCP-W-1526 1400081992 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1134 FL TA-445836 09-Apr-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
at KM-3+158 TO 3+250
Pre-welding and weld joint fit up inspection for 24
Mr.
1527 CPP-NGCP-W-1527 1400082033 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 09-Apr-19 8:00 AM Junaid CLOSED
Rajendran
Yard.
Post-welding visual inspection for 24 inch double Mr.
1528 CPP-NGCP-W-1528 1400081939 Welding SATIP-W-012-01 SAIC-W-2048
joints TRL-2 at TCF-1, CPP Pipe Yard.
TCF-1, CPP Pipe Yard. TA-445989 09-Apr-19 2.00 PM Junaid
Rajendran
CLOSED

NDE selection for welds of 24 inch double joints Mr.


1529 CPP-NGCP-W-1529 1400082035 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 09-Apr-19 4.00 PM Junaid CLOSED
TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
1530 CPP-NGCP-W-1530 1400082053 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1178 FL TA-843955 09-Apr-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1178 FL KM-1+300 to1+600 Rajendran
NDE selection for welds of 8 inch HRDH-1178 FL Mr.
1532 CPP-NGCP-W-1532 1400082037 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1178 FL TA-843955 09-Apr-19 4:00 PM Sarfaraz CLOSED
KM-KM--1+300 to1+600 Rajendran
Pre-welding and weld joint fit up inspection for 10
1533 CPP-NGCP-W-1533 1400082073 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-902 FL TA-843606 09-Apr-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH-902 FL at KM-4+650 to 4+700
Post-welding visual inspection for 10 inch HRDH-
1534 CPP-NGCP-W-1534 1400082002 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-902 FL TA-843606 09-Apr-19 2.00 PM Saif Mr. Rajesh CLOSED
902 FL at KM-4+650 to 4+700
NDE selection for welds of 10 inch HRDH-902 FL
1535 CPP-NGCP-W-1535 1400082038 Welding SATIP-W-012-01 SAIC-W-2054
at KM-4+650 to 4+700
HRDH-902 FL TA-843606 09-Apr-19 4:00 PM Saif Mr. Rajesh CLOSED

Pre-welding and weld joint fit up inspection for 8


1536 CPP-NGCP-W-1536 1400082022 Welding SATIP-W-012-01 SAIC-W-2048
inch HWYH-1078 FL at KM-0+200 to 0+500
HWYH-1078 FL TA-843586 09-Apr-19 8:00 AM Shadab Mr. Rajesh CLOSED

Post-welding visual inspection for 8inch HWYH-


1537 CPP-NGCP-W-1537 1400082050 Welding SATIP-W-012-01 SAIC-W-2048
1078 FL at KM-0+200 to 0+500
HWYH-1078 FL TA-843586 09-Apr-19 2.00 PM Shadab Mr. Rajesh CLOSED

NDE selection for welds of 8 inch HWYH-1078 FL


1538 CPP-NGCP-W-1538 1400082061 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1078 FL TA-843586 09-Apr-19 4:00 PM Shadab Mr. Rajesh CLOSED
at KM-0+200 to 0+500
Post-welding visual inspection for 8inch HRDH-
1540 CPP-NGCP-W-1540 1400082080 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1164 FL TA-843592 09-Apr-19 2.00 PM Saif Mr. Rajesh CLOSED
1164 FL at KM-5+100 to 5+112
NDE selection for welds of 8 inch HRDH-1164 FL
1541 CPP-NGCP-W-1541 1400082088 Welding SATIP-W-012-01 SAIC-W-2054
at KM-5+100 to 5+112
HRDH-1164 FL TA-843592 09-Apr-19 4:00 PM Saif Mr. Rajesh CLOSED

In-Process Verification - RT Techniques &


1542 CPP-NGCP-W-1542 1400082146 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1162, HRDH-1162, 1170, 1194 VARIOUS 09-Apr-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1170, 1194
Mr.
1543 CPP-NGCP-W-1543 1400082149 Welding SATIP-NDE-RT-01 SAIC-RT-2007 In-Process Verification - RT Techniques & TCF-1 VARIOUS 09-Apr-19 8:00 AM RAMEEZ CLOSED
Procedure Implementation of TCF-1 Rajendran
Mr.
1544 CPP-NGCP-W-1544 1400082168 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 In-Process Inspection of MPT using TCF-1 VARIOUS 09-Apr-19 8:00 AM RAMEEZ CLOSED
Yoke Method, TCF-1. Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
1545 CPP-NGCP-W-1545 1400082584 Welding SATIP-W-012-01 SAIC-W-2048
inch HRDH-1178 FL KM-1+600 to2+000
HRDH-1178 FL TA-843955 10-Apr-19 8:00 AM Sarfaraz
Rajendran
CLOSED

Post-welding visual inspection for 8 inch HRDH- Mr.


1546 CPP-NGCP-W-1546 1400082586 Welding SATIP-W-012-01 SAIC-W-2048
1178 FL KM-1+600 to2+000
HRDH-1178 FL TA-843955 10-Apr-19 2.00 PM Sarfaraz
Rajendran
CLOSED

NDE selection for welds of 8 inch HRDH-1178 FL Mr.


1547 CPP-NGCP-W-1547 1400082509 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1178 FL TA-843955 10-Apr-19 4:00 PM Sarfaraz CLOSED
KM-1+600 to2+000 Rajendran
Pre-welding and weld joint fit up inspection for 10
1548 CPP-NGCP-W-1548 1400082589 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-902 FL TA-843606 10-Apr-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH-902 FL at KM-4+100 to 4+650
Post-welding visual inspection for 10 inch HRDH-
1549 CPP-NGCP-W-1549 1400082578 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-902 FL TA-843606 10-Apr-19 2.00 PM Saif Mr. Rajesh CLOSED
902 FL at KM-4+100 to 4+650
NDE selection for welds of 10 inch HRDH-902 FL
1550 CPP-NGCP-W-1550 1400082579 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-902 FL TA-843606 10-Apr-19 4:00 PM Saif Mr. Rajesh CLOSED
at KM-4+100 to 4+650
Pre-welding and weld joint fit up inspection for 10 CANCELLED DUE TO NO
1551 CPP-NGCP-W-1551 1400082645 Welding SATIP-W-012-01 SAIC-W-2048
inch HRDH-1160 FL at KM-3+200 to 3+300
HRDH-1160 TA843565 10-Apr-19 8:00 AM Saif Mr. Rajesh REJECTED REJECTED
ACTIVITY
Post-welding visual inspection for 10 inchHRDH- CANCELLED DUE TO NO
1552 CPP-NGCP-W-1552 1400082609 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1160 TA843565 10-Apr-19 2.00 PM Saif Mr. Rajesh REJECTED REJECTED
1160 FL at KM-3+200 to 3+300 ACTIVITY
NDE selection for welds of 10 inch HRDH-1160 CANCELLED DUE TO NO
1553 CPP-NGCP-W-1553 1400082673 Welding SATIP-W-012-01 SAIC-W-2054
FL at KM-3+200 to 3+300
HRDH-1160 TA843565 10-Apr-19 4:00 PM Saif Mr. Rajesh REJECTED REJECTED
ACTIVITY
Pre-welding and weld joint fit up inspection for 8
1554 CPP-NGCP-W-1554 1400082552 Welding SATIP-W-012-01 SAIC-W-2048
inch HWYH-1078 FL at KM-0+200 to 0+400
HWYH-1078 FL TA-843586 10-Apr-19 8:00 AM Shadab Mr. Rajesh CLOSED

Post-welding visual inspection for 8inch HWYH-


1555 CPP-NGCP-W-1555 1400082656 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 FL TA-843586 10-Apr-19 2.00 PM Shadab Mr. Rajesh CLOSED
1078 FL at KM-0+200 to 0+400
NDE selection for welds of 8 inch HWYH-1078 FL
1556 CPP-NGCP-W-1556 1400082703 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1078 FL TA-843586 10-Apr-19 4:00 PM Shadab Mr. Rajesh CLOSED
at KM-0+200 to 0+400

1557 CPP-NGCP-W-1557 1400082841 Welding SATIP-W-012-01 SAIC-W-2048


Pre-welding and weld joint fit up inspection for 8
HRDH-1086 TA-843625 10-Apr-19 8:00 AM Shadab Mr. Rajesh REJECTED No Action
RESCHEDULE TO 11-
inch HRDH-1086 04-2019
Post-welding visual inspection for 8 inch HRDH- RESCHEDULE TO 11-
1558 CPP-NGCP-W-1558 1400082918 Welding SATIP-W-012-01 SAIC-W-2048
1086
HRDH-1086 TA-843625 10-Apr-19 2.00 PM Shadab Mr. Rajesh REJECTED No Action
04-2019
RESCHEDULE TO 11-
1559 CPP-NGCP-W-1559 1400082871 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HRDH-1086 HRDH-1086 TA-843625 10-Apr-19 4.00 PM Shadab Mr. Rajesh REJECTED No Action
04-2019
Pre-welding and weld joint fit up inspection for 8
1560 CPP-NGCP-W-1560 1400082677 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1164 FL TA-843592 10-Apr-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1164 FL at KM-5+128 to 5+139
Post-welding visual inspection for 8inch HRDH-
1561 CPP-NGCP-W-1561 1400082714 Welding SATIP-W-012-01 SAIC-W-2048
1164 FL at KM-5+128 to 5+139
HRDH-1164 FL TA-843592 10-Apr-19 2.00 PM Rajesh Mr. Rajesh CLOSED

NDE selection for welds of 8 inch HRDH-1164 FL


1562 CPP-NGCP-W-1562 1400082694 Welding SATIP-W-012-01 SAIC-W-2054
at KM-KM-5+128 to 5+139
HRDH-1164 FL TA-843592 10-Apr-19 4:00 PM Rajesh Mr. Rajesh CLOSED

Pre-welding and weld joint fit up inspection for 8


1563 CPP-NGCP-W-1563 1400082660 Welding SATIP-W-012-01 SAIC-W-2048
inch HWYH-1003 FL @ KM-0+100 to 7+900
HWYH-1003 FL TA-445856 10-Apr-19 8:00 AM Umair Mr. Suresh CLOSED

Post-welding visual inspection for 8 inch HWYH-


1564 CPP-NGCP-W-1564 1400082681 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1003 FL TA-445856 10-Apr-19 2.00 PM Umair Mr. Suresh CLOSED
1003 FL @ KM-0+100 to 7+900
NDE selection for welds of 8 inch HWYH-1003 FL
1565 CPP-NGCP-W-1565 1400082769 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1003 FL TA-445856 10-Apr-19 4.00 PM Umair Mr. Suresh CLOSED
@ KM-0+100 to 7+900
Pre-welding and weld joint fit up inspection
1566 CPP-NGCP-W-1566 1400082768 Welding SATIP-W-012-01 SAIC-W-2048 for 8 inch HWYH-975 FL at KM-0+100 to HWYH-975 FL TA-446045 10-Apr-19 8:00 AM Imran Mr. Suresh CLOSED
3+900

1567 CPP-NGCP-W-1567 1400082709 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HWYH-975 FL TA-446045 10-Apr-19 8:10 AM Imran Mr. Suresh CLOSED
HWYH-975 FL at KM-0+100 to 3+900
1568 CPP-NGCP-W-1568 1400082803 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-975 HWYH-975 FL TA-446045 10-Apr-19 4:00 PM Imran Mr. Suresh CLOSED
FL at KM-0+100 to 3+900
Pre-welding and weld joint fit up inspection for 10
1569 CPP-NGCP-W-1569 1400082806 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 10-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1093 FL @ KM-0+200 to 3
Post-welding visual inspection for 10 inch HWYH-
1570 CPP-NGCP-W-1570 1400082778 Welding SATIP-W-012-01 SAIC-W-2048
1093 FL @ KM-0+200 to 3
HWYH-1093 FL TA-445838 10-Apr-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED

NDE selection for welds of 10 inch HWYH-1093


1571 CPP-NGCP-W-1571 1400082897 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 10-Apr-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+200 to 3
Pre-welding and weld joint fit up inspection for 8 CANCELLED DUE TO NO
1572 CPP-NGCP-W-1572 1400082865 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 10-Apr-19 8:00 AM PRATHAB Mr. Suresh REJECTED No Action
inch HWYH-1134 FL at KM-3+158 TO 3+250 ACTIVITY RE-SCHEDULE TO 11-04-2019
Post-welding visual inspection for 8 inch HWYH- CANCELLED DUE TO NO
1573 CPP-NGCP-W-1573 1400082887 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 10-Apr-19 2.00 PM PRATHAB Mr. Suresh REJECTED No Action
1134 FL at KM-3+158 TO 3+250 ACTIVITY RE-SCHEDULE TO 11-04-2019
NDE selection for welds of 8 inch HWYH-1134 FL CANCELLED DUE TO NO
1574 CPP-NGCP-W-1574 1400082880 Welding SATIP-W-012-01 SAIC-W-2054
at KM-3+158 TO 3+250
HWYH-1134 FL TA-445836 10-Apr-19 4.00 PM PRATHAB Mr. Suresh REJECTED No Action
ACTIVITY RE-SCHEDULE TO 11-04-2019
In-Process Verification - RT Techniques &
1575 CPP-NGCP-W-1575 1400082839 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-902,1063,1178,AK-RH VARIOUS 10-Apr-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
902,1063,1178,AK-RH
In-Process Verification - RT Techniques & HWYH-
1576 CPP-NGCP-W-1576 1400082916 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- VARIOUS 10-Apr-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1003,1078,1091,1093,1112,1134 1003,1078,1091,1093,1112,1134

1576- CPP-NGCP-W-1576- In-Process Verification - RT Techniques and Mr.


1400082156 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of TCF-1 VARIOUS 10-Apr-19 8:00 AM RAMEEZ CLOSED
A A TCF-1 Rajendran

Pre-welding and weld joint fit up inspection for 16"


1577 CPP-NGCP-W-1577 1400082924 Welding SATIP-W-012-01 SAIC-W-2048
HWYH EJ-RH TR/L
HWYH EJ-RH TR/L TA-445885 10-Apr-19 8:00 AM Rajesh Mr. Suresh CLOSED

Post-welding visual inspection for 16" HWYH EJ-


1578 CPP-NGCP-W-1578 1400082935 Welding SATIP-W-012-01 SAIC-W-2048 HWYH EJ-RH TR/L TA-445885 10-Apr-19 2.00 PM Rajesh Mr. Suresh CLOSED
RH TR/L
NDE selection for welds of 16" HWYH EJ-RH
1579 CPP-NGCP-W-1579 1400083003 Welding SATIP-W-012-01 SAIC-W-2054 HWYH EJ-RH TR/L TA-445885 10-Apr-19 4:00 PM Rajesh Mr. Suresh CLOSED
TR/L
Pre-welding and weld joint fit up inspection for 24
Mr.
1580 CPP-NGCP-W-1580 1400082985 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 10-Apr-19 8:00 AM Junaid CLOSED
Rajendran
Yard.
Post-welding visual inspection for 24 inch double Mr.
1581 CPP-NGCP-W-1581 1400083014 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445989 10-Apr-19 2.00 PM Junaid CLOSED
joints TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
NDE selection for welds of 24 inch double joints Mr.
1582 CPP-NGCP-W-1582 1400083004 Welding SATIP-W-012-01 SAIC-W-2054
TRL-2 at TCF-1, CPP Pipe Yard.
TCF-1, CPP Pipe Yard. TA-445989 10-Apr-19 4.00 PM Junaid
Rajendran
CLOSED

Pre-welding and weld joint fit up inspection for 8 Mr.


1584 CPP-NGCP-W-1584 1400083297 Welding SATIP-W-012-01 SAIC-W-2048
inch HRDH-1178 FL KM-2+000 to2+100
HRDH-1178 FL TA843955 11-Apr-19 8:00 AM Sarfaraz
Rajendran
CLOSED

Post-welding visual inspection for 8 inch HRDH- Mr.


1585 CPP-NGCP-W-1585 1400083298 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1178 FL TA843955 11-Apr-19 2.00 PM Sarfaraz CLOSED
1178 FL KM-2+000 to2+100 Rajendran
NDE selection for welds of 8 inch HRDH-1178 FL Mr.
1586 CPP-NGCP-W-1586 1400083288 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1178 FL TA843955 11-Apr-19 4:00 PM Sarfaraz CLOSED
KM-2+000 to2+100 Rajendran
Pre-welding and weld joint fit up inspection for 10
1587 CPP-NGCP-W-1587 1400083375 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1160 TA843565 11-Apr-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH-1160 FL at KM-3+000 to 3+200
Post-welding visual inspection for 10 inchHRDH-
1588 CPP-NGCP-W-1588 1400083292 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1160 TA843565 11-Apr-19 2.00 PM Saif Mr. Rajesh CLOSED
1160 FL at KM-3+000 to 3+200
NDE selection for welds of 10 inch HRDH-1160
1589 CPP-NGCP-W-1589 1400083413 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1160 TA843565 11-Apr-19 4:00 PM Saif Mr. Rajesh CLOSED
FL at KM-3+000 to 3+200
Weld repair verification of joints 00-FW-52 of
1590 CPP-NGCP-W-1590 1400083376 Welding SATIP-W-012-01 SAIC-W-2051
HRDH-AK HRDH -AK VARIOUS 11-Apr-19 8.00 AM IRSHAD Mr. Rajesh CLOSED
00-FW-14 of HRDH-1178 HRDH-1178

Post-welding visual inspection of repair joints HRDH -AK


1591 CPP-NGCP-W-1591 1400083404 Welding SATIP-W-012-01 SAIC-W-2048 00-FW-52 of HRDH-AK VARIOUS 11-Apr-19 4.00 PM IRSHAD Mr. Rajesh CLOSED
00-FW-14 of HRDH-1178 HRDH-1178
Pre-welding and weld joint fit up inspection for 8
1592 CPP-NGCP-W-1592 1400083435 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1003 FL TA-445856 11-Apr-19 8:00 AM Umair Mr. Suresh CLOSED
inch HWYH-1003 FL @ KM-0+100 to 7+900
Post-welding visual inspection for 8 inch HWYH-
1593 CPP-NGCP-W-1593 1400083445 Welding SATIP-W-012-01 SAIC-W-2048
1003 FL @ KM-0+100 to 7+900
HWYH-1003 FL TA-445856 11-Apr-19 2.00 PM Umair Mr. Suresh CLOSED

NDE selection for welds of 8 inch HWYH-1003 FL


1594 CPP-NGCP-W-1594 1400083372 Welding SATIP-W-012-01 SAIC-W-2054
@ KM-0+100 to 7+900
HWYH-1003 FL TA-445856 11-Apr-19 4.00 PM Umair Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 8
1595 CPP-NGCP-W-1595 1400083479 Welding SATIP-W-012-01 SAIC-W-2048
inch HWYH-975 FL at KM-0+100 to 3+900
HWYH-975 FL TA-446045 11-Apr-19 8:00 AM Imran Mr. Suresh CLOSED

1596 CPP-NGCP-W-1596 1400083485 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HWYH-975 HWYH-975 FL TA-446045 11-Apr-19 8:10 AM Imran Mr. Suresh CLOSED
FL at KM-0+100 to 3+900
1597 CPP-NGCP-W-1597 1400083450 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-975 FL HWYH-975 FL TA-446045 11-Apr-19 4:00 PM Imran Mr. Suresh CLOSED
at KM-0+100 to 3+900
Pre-welding and weld joint fit up inspection for 10
1598 CPP-NGCP-W-1598 1400083410 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 11-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1093 FL @ KM-0+200 to 3
Post-welding visual inspection for 10 inch HWYH-
1599 CPP-NGCP-W-1599 1400083467 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 11-Apr-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1093 FL @ KM-0+200 to 3
NDE selection for welds of 10 inch HWYH-1093
1600 CPP-NGCP-W-1600 1400083486 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 11-Apr-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+200 to 3
Pre-welding and weld joint fit up inspection for 8 CANCELLED DUE TO NO
1601 CPP-NGCP-W-1601 1400083429 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 11-Apr-19 8:00 AM PRATHAB Mr. Suresh REJECTED No Action
inch HWYH-1134 FL at KM-3+158 TO 3+250 ACTIVITY
Post-welding visual inspection for 8 inch HWYH- CANCELLED DUE TO NO
1602 CPP-NGCP-W-1602 1400083535 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 11-Apr-19 2.00 PM PRATHAB Mr. Suresh REJECTED No Action
1134 FL at KM-3+158 TO 3+250 ACTIVITY
NDE selection for welds of 8 inch HWYH-1134 FL CANCELLED DUE TO NO
1603 CPP-NGCP-W-1603 1400083431 Welding SATIP-W-012-01 SAIC-W-2054
at KM-3+158 TO 3+250
HWYH-1134 FL TA-445836 11-Apr-19 4.00 PM PRATHAB Mr. Suresh REJECTED No Action
ACTIVITY
Pre-welding and weld joint fit up inspection for 24
Mr.
1604 CPP-NGCP-W-1604 1400083491 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 11-Apr-19 8:00 AM Junaid CLOSED
Rajendran
Yard.
Post-welding visual inspection for 24 inch double Mr.
1605 CPP-NGCP-W-1605 1400083508 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445989 11-Apr-19 2.00 PM Junaid CLOSED
joints TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
NDE selection for welds of 24 inch double joints Mr.
1606 CPP-NGCP-W-1606 1400083469 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 11-Apr-19 4.00 PM Junaid CLOSED
TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 16"
1607 CPP-NGCP-W-1607 1400083593 Welding SATIP-W-012-01 SAIC-W-2048
HWYH EJ-RH TR/L
HWYH EJ-RH TR/L TA-445885 11-Apr-19 8:00 AM Rajesh Mr. Suresh CLOSED

Post-welding visual inspection for 16" HWYH EJ-


1608 CPP-NGCP-W-1608 1400083540 Welding SATIP-W-012-01 SAIC-W-2048 HWYH EJ-RH TR/L TA-445885 11-Apr-19 2.00 PM Rajesh Mr. Suresh CLOSED
RH TR/L
1609 CPP-NGCP-W-1609 1400083578 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 16" HWYH EJ-RH HWYH EJ-RH TR/L TA-445885 11-Apr-19 4:00 PM Rajesh Mr. Suresh CLOSED
TR/L
Pre-welding and weld joint fit up inspection for 8
1610 CPP-NGCP-W-1610 1400083522 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1003 FL TA-445856 12-Apr-19 8:00 AM Umair Mr. Suresh CLOSED
inch HWYH-1003 FL @ KM-0+100 to 7+900
Post-welding visual inspection for 8 inch HWYH-
1611 CPP-NGCP-W-1611 1400083581 Welding SATIP-W-012-01 SAIC-W-2048
1003 FL @ KM-0+100 to 7+900
HWYH-1003 FL TA-445856 12-Apr-19 2.00 PM Umair Mr. Suresh CLOSED

NDE selection for welds of 8 inch HWYH-1003 FL


1612 CPP-NGCP-W-1612 1400083550 Welding SATIP-W-012-01 SAIC-W-2054
@ KM-0+100 to 7+900
HWYH-1003 FL TA-445856 12-Apr-19 4.00 PM Umair Mr. Suresh CLOSED

Pre-welding and weld joint fit up inspection for 8


1613 CPP-NGCP-W-1613 1400083597 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 FL TA-446045 12-Apr-19 8:00 AM Imran Mr. Suresh REJECTED No Action
inch HWYH-975 FL at KM-0+100 to 3+900 CANCELLED DUE TO NO
PERMIT
Post-welding visual inspection for 8inch HWYH-975 CANCELLED DUE TO NO
1614 CPP-NGCP-W-1614 1400083622 Welding SATIP-W-012-01 SAIC-W-2048
FL at KM-0+100 to 3+900
HWYH-975 FL TA-446045 12-Apr-19 8:10 AM Imran Mr. Suresh REJECTED No Action
PERMIT
1615 CPP-NGCP-W-1615 1400083646 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-975 FL HWYH-975 FL TA-446045 12-Apr-19 4:00 PM Imran Mr. Suresh CLOSED
at KM-0+100 to 3+900 RE-SCHEDULE 4/13/2019
Pre-welding and weld joint fit up inspection for 10 CANCELLED DUE TO NO
1616 CPP-NGCP-W-1616 1400083587 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 12-Apr-19 8:00 AM Abdul Aziz Mr. Suresh REJECTED No Action
inch HWYH-1093 FL @ KM-0+200 to 3 ACTIVITY
Post-welding visual inspection for 10 inch HWYH- CANCELLED DUE TO NO
1617 CPP-NGCP-W-1617 1400083647 Welding SATIP-W-012-01 SAIC-W-2048
1093 FL @ KM-0+200 to 3
HWYH-1093 FL TA-445838 12-Apr-19 2.00 PM Abdul Aziz Mr. Suresh REJECTED No Action
ACTIVITY
NDE selection for welds of 10 inch HWYH-1093 CANCELLED DUE TO NO
1618 CPP-NGCP-W-1618 1400083648 Welding SATIP-W-012-01 SAIC-W-2054
FL @ KM-0+200 to 3
HWYH-1093 FL TA-445838 12-Apr-19 4.00 PM Abdul Aziz Mr. Suresh REJECTED No Action
ACTIVITY
Pre-welding and weld joint fit up inspection for 24
Mr.
1619 CPP-NGCP-W-1619 1400083630 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 12-Apr-19 8:00 AM Junaid CLOSED
Rajendran
Yard.
Post-welding visual inspection for 24 inch double Mr.
1620 CPP-NGCP-W-1620 1400083631 Welding SATIP-W-012-01 SAIC-W-2048
joints TRL-2 at TCF-1, CPP Pipe Yard.
TCF-1, CPP Pipe Yard. TA-445989 12-Apr-19 2.00 PM Junaid
Rajendran
CLOSED

NDE selection for welds of 24 inch double joints Mr.


1621 CPP-NGCP-W-1621 1400083641 Welding SATIP-W-012-01 SAIC-W-2054
TRL-2 at TCF-1, CPP Pipe Yard.
TCF-1, CPP Pipe Yard. TA-445989 12-Apr-19 4.00 PM Junaid
Rajendran
CLOSED

Pre-welding and weld joint fit up inspection for 16"


1622 CPP-NGCP-W-1622 1400083655 Welding SATIP-W-012-01 SAIC-W-2048 HWYH EJ-RH TR/L TA-445885 12-Apr-19 8:00 AM Rajesh Mr. Suresh CLOSED
HWYH EJ-RH TR/L
Post-welding visual inspection for 16" HWYH EJ-
1623 CPP-NGCP-W-1623 1400083703 Welding SATIP-W-012-01 SAIC-W-2048 HWYH EJ-RH TR/L TA-445885 12-Apr-19 2.00 PM Rajesh Mr. Suresh CLOSED
RH TR/L
NDE selection for welds of 16" HWYH EJ-RH
1624 CPP-NGCP-W-1624 1400083714 Welding SATIP-W-012-01 SAIC-W-2054
TR/L
HWYH EJ-RH TR/L TA-445885 12-Apr-19 4:00 PM Rajesh Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection HRDH-
1625 CPP-NGCP-W-1625 1400083678 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1030 N/A 11-Apr-19 8:00 AM Shadab Mr. Rajesh CLOSED
1030
1626 CPP-NGCP-W-1626 1400083592 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HRDH-1030 HRDH-1030 N/A 11-Apr-19 2.00 PM Shadab Mr. Rajesh CLOSED
1627 CPP-NGCP-W-1627 1400083695 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HRDH-1030 HRDH-1030 N/A 11-Apr-19 4.00 PM Shadab Mr. Rajesh CLOSED
In-Process Verification - RT Techniques &
1628 CPP-NGCP-W-1628 1400083679 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-1164,1178,902 VARIOUS 11-Apr-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1164,1178,902
In-Process Verification - RT Techniques & Mr.
1629 CPP-NGCP-W-1629 1400083716 Welding SATIP-NDE-RT-01 SAIC-RT-2007 TCF-1 VARIOUS 12-Apr-19 8:00 AM RAMEEZ CLOSED
Procedure Implementation of TRL-2 at TCF-1 Rajendran
In-Process Inspection of MPT using Mr.
1630 CPP-NGCP-W-1630 1400083688 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004
Yoke Method, TRL-2 at TCF-1
TCF-1 VARIOUS 12-Apr-19 8:00 AM RAMEEZ
Rajendran
CLOSED

Pre-welding and weld joint fit up inspection for 8


1631 CPP-NGCP-W-1631 1400083770 Welding SATIP-W-012-01 SAIC-W-2048
inch HRDH-1164 FL at KM-5+128 to 5+139
HRDH-1164 FL TA-843592 11-Apr-19 8:00 AM Rajesh Mr. Rajesh CLOSED

Post-welding visual inspection for 8inch HRDH-


1632 CPP-NGCP-W-1632 1400083771 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1164 FL TA-843592 11-Apr-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1164 FL at KM-5+128 to 5+139
NDE selection for welds of 8 inch HRDH-1164 FL
1633 CPP-NGCP-W-1633 1400083806 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1164 FL TA-843592 11-Apr-19 4:00 PM Rajesh Mr. Rajesh CLOSED
at KM-KM-5+128 to 5+139
Pre-welding and weld joint fit up inspection for 8
1634 CPP-NGCP-W-1634 1400083974 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1003 FL TA-445856 13-Apr-19 8:00 AM Umair Mr. Suresh CLOSED
inch HWYH-1003 FL @ KM-0+100 to 7+900
Post-welding visual inspection for 8 inch HWYH-
1635 CPP-NGCP-W-1635 1400084003 Welding SATIP-W-012-01 SAIC-W-2048
1003 FL @ KM-0+100 to 7+900
HWYH-1003 FL TA-445856 13-Apr-19 2.00 PM Umair Mr. Suresh CLOSED

NDE selection for welds of 8 inch HWYH-1003 FL


1636 CPP-NGCP-W-1636 1400084023 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1003 FL TA-445856 13-Apr-19 4.00 PM Umair Mr. Suresh CLOSED
@ KM-0+100 to 7+900
Pre-welding and weld joint fit up inspection for 10
1637 CPP-NGCP-W-1637 1400084366 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 13-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1093 FL @ KM-0+200 to 3
Post-welding visual inspection for 10 inch HWYH-
1638 CPP-NGCP-W-1638 1400084348 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 13-Apr-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1093 FL @ KM-0+200 to 3
NDE selection for welds of 10 inch HWYH-1093
1639 CPP-NGCP-W-1639 1400084406 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 13-Apr-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+200 to 3
Pre-welding and weld joint fit up inspection for 24
Mr.
1640 CPP-NGCP-W-1640 1400084413 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 13-Apr-19 8:00 AM Junaid CLOSED
Rajendran
Yard.
Post-welding visual inspection for 24 inch double Mr.
1641 CPP-NGCP-W-1641 1400084407 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445989 13-Apr-19 2.00 PM Junaid CLOSED
joints TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a NDE selection for welds of 24 inch double joints Mr.
1642 CPP-NGCP-W-1642 1400084381 l Welding SATIP-W-012-01 SAIC-W-2054
TRL-2 at TCF-1, CPP Pipe Yard.
TCF-1, CPP Pipe Yard. TA-445989 13-Apr-19 4.00 PM Junaid
Rajendran
CLOSED

Pre-welding and weld joint fit up inspection for 8 Mr. RE-SCHEDULE TO 14-04-
1643 CPP-NGCP-W-1643 1400084400 Welding SATIP-W-012-01 SAIC-W-2048
inch HRDH-1178 FL KM-2+100 to2+500
HRDH-1178 FL TA843955 13-Apr-19 8:00 AM Sarfaraz
Rajendran
CLOSED
2019
Post-welding visual inspection for 8 inch HRDH- Mr. RE-SCHEDULE TO 14-04-
1644 CPP-NGCP-W-1644 1400084408 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1178 FL TA843955 13-Apr-19 2.00 PM Sarfaraz CLOSED
1178 FL KM-2+100 to2+500 Rajendran 2019
NDE selection for welds of 8 inch HRDH-1178 FL Mr. RE-SCHEDULE TO 14-04-
1645 CPP-NGCP-W-1645 1400084409 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1178 FL TA843955 13-Apr-19 4:00 PM Sarfaraz CLOSED
KM-2+100 to2+500 Rajendran 2019
Pre-welding and weld joint fit up inspection for 10
1646 CPP-NGCP-W-1646 1400084410 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1160 TA843565 13-Apr-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH-1160 FL at KM-2+800 to 3+000
Post-welding visual inspection for 10 inchHRDH-
1647 CPP-NGCP-W-1647 1400084411 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1160 TA843565 13-Apr-19 2.00 PM Saif Mr. Rajesh CLOSED
1160 FL at KM-2+800 to 3+000
NDE selection for welds of 10 inch HRDH-1160
1648 CPP-NGCP-W-1648 1400084349 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1160 TA843565 13-Apr-19 4:00 PM Saif Mr. Rajesh CLOSED
FL at KM-2+800 to 3+000
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a Pre-welding and weld joint fit up inspection for 8
1649 CPP-NGCP-W-1649 1400084388 l Welding SATIP-W-012-01 SAIC-W-2048
inch HRDH-1086 KP2+800 to KP3+000
HRDH-1086 TA-843625 13-Apr-19 8:00 AM Shadab Mr. Rajesh REJECTED

Post-welding visual inspection for 8 inch HRDH-


1650 CPP-NGCP-W-1650 1400084360 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1086 TA-843625 13-Apr-19 2.00 PM Shadab Mr. Rajesh REJECTED
1086 KP2+800 to KP3+000
NDE selection for welds of 8 inch HRDH-1086
1651 CPP-NGCP-W-1651 1400084361 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1086 TA-843625 13-Apr-19 4.00 PM Shadab Mr. Rajesh REJECTED
KP2+800 to KP3+000
Pre-welding and weld joint fit up inspection for 8 RE-SCHEDULE TO 14-04-
1652 CPP-NGCP-W-1652 1400084414 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1284 TA669347 13-Apr-19 8:00 AM Shadab Mr. Rajesh CLOSED
inch HRDH -1284 KP0+776 to KP0+787; 2019
Post-welding visual inspection for 8 inch HRDH RE-SCHEDULE TO 14-04-
1653 CPP-NGCP-W-1653 1400084382 Welding SATIP-W-012-01 SAIC-W-2048
-1284 KP0+776 to KP0+787;
HRDH -1284 TA669347 13-Apr-19 2.00 PM Shadab Mr. Rajesh CLOSED
2019
NDE selection for welds of 8 inch HRDH -1284 RE-SCHEDULE TO 14-04-
1654 CPP-NGCP-W-1654 1400084389 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1284 TA669347 13-Apr-19 4.00 PM Shadab Mr. Rajesh CLOSED
KP0+776 to KP0+787; 2019
In-Process Verification - RT Techniques & RE-SCHEDULE TO 14-04-
1655 CPP-NGCP-W-1655 1400084367 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-902,1164,1178,AK-RH VARIOUS 13-Apr-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED 2019
902,1164,AK-RH 1178 LOCATION INCLUDED:-
HRDH-1160
In-Process Verification - RT Techniques &
HWYH-
1656 CPP-NGCP-W-1656 1400084423 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- VARIOUS 13-Apr-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1134,1112,1093,1078,1003,1091
1134,1112,1093,1078,1003,1091

1400084754 THIS RFI RELATED TO 47563, 47783, 50422, - 8:00 AM PRATHAB


1657 CPP-NGCP-W-1657 Welding SATIP-W-012-01 - - 14-Apr-19 Mr. Rajesh CLOSED
52025, 52057, 53211, 53152
1400084827 Pre-welding and weld joint fit up inspection for 8 TA-445856
1658 CPP-NGCP-W-1658 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1003 FL 14-Apr-19 8:00 AM Umair Mr. Suresh CLOSED
inch HWYH-1003 FL @ KM-0+100 to 7+900
Post-welding visual inspection for 8 inch HWYH-
1659 CPP-NGCP-W-1659 1400084903 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1003 FL TA-445856 14-Apr-19 2.00 PM Umair Mr. Suresh CLOSED
1003 FL @ KM-0+100 to 7+900
NDE selection for welds of 8 inch HWYH-1003 FL
1660 CPP-NGCP-W-1660 1400084904 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1003 FL TA-445856 14-Apr-19 4.00 PM Umair Mr. Suresh CLOSED
@ KM-0+100 to 7+900
Pre-welding and weld joint fit up inspection for 8
1661 CPP-NGCP-W-1661 1400084829 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 FL TA-446045 14-Apr-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-975 FL at KM-0+100 to 3+900
1662 CPP-NGCP-W-1662 1400084924 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HWYH-975 HWYH-975 FL TA-446045 14-Apr-19 8:10 AM Imran Mr. Suresh CLOSED
FL at KM-0+100 to 3+900
1400084862 NDE selection for welds of 8 inch HWYH-975 FL TA-446045 4:00 PM
1663 CPP-NGCP-W-1663 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-975 FL 14-Apr-19 Imran Mr. Suresh CLOSED
at KM-0+100 to 3+900
Pre-welding and weld joint fit up inspection for 10
1664 CPP-NGCP-W-1664 1400084954 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 14-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1093 FL @ KM-0+200 to 3
Post-welding visual inspection for 10 inch HWYH-
1665 CPP-NGCP-W-1665 1400084963 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 14-Apr-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1093 FL @ KM-0+200 to 3
1400084928 NDE selection for welds of 10 inch HWYH-1093 TA-445838
1666 CPP-NGCP-W-1666 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL 14-Apr-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+200 to 3
Pre-welding and weld joint fit up inspection for 10
1667 CPP-NGCP-W-1667 1400084936 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 14-Apr-19 8:00 AM PRATHAB Mr. Suresh CLOSED
inch 16″HWYH GK-RH TRL km0+100 to 12+500
Post-welding visual inspection for 10 inch
1668 CPP-NGCP-W-1668 1400084966 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 14-Apr-19 2.00 PM PRATHAB Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
NDE selection for welds of 10 inch16″HWYH GK-
1669 CPP-NGCP-W-1669 1400084944 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH GK-RH TRL km0+100 to 16″HWYH GK-RH TRL TA-445912 14-Apr-19 4.00 PM PRATHAB Mr. Suresh CLOSED
12+500
Pre-welding and weld joint fit up inspection for 24
Mr.
1670 CPP-NGCP-W-1670 1400084974 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 14-Apr-19 8:00 AM Junaid CLOSED
Rajendran
Yard.
Post-welding visual inspection for 24 inch double Mr.
1671 CPP-NGCP-W-1671 1400084975 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 14-Apr-19 2.00 PM Junaid CLOSED
joints TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
NDE selection for welds of 24 inch double joints Mr.
1672 CPP-NGCP-W-1672 1400084912 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445988 14-Apr-19 4.00 PM Junaid CLOSED
TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 10
1673 CPP-NGCP-W-1673 1400085027 Welding SATIP-W-012-01 SAIC-W-2048
inch HRDH-1160 FL at KM-2+700 to 2+800
HRDH-1160 TA843565 14-Apr-19 8:00 AM Saif Mr. Rajesh CLOSED

Post-welding visual inspection for 10 inchHRDH-


1674 CPP-NGCP-W-1674 1400084986 Welding SATIP-W-012-01 SAIC-W-2048
1160 FL at KM-2+700 to 2+800
HRDH-1160 TA843565 14-Apr-19 2.00 PM Saif Mr. Rajesh CLOSED

NDE selection for welds of 10 inch HRDH-1160


1675 CPP-NGCP-W-1675 1400085010 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1160 TA843565 14-Apr-19 4:00 PM Saif Mr. Rajesh CLOSED
FL at KM-2+700 to 2+800
Pre-welding and weld joint fit up inspection for 8
1676 CPP-NGCP-W-1676 1400084989 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1086 TA-843625 14-Apr-19 8:00 AM Shadab Mr. Rajesh CLOSED
inch HRDH-1086 KP2+600 to KP2+800
Post-welding visual inspection for 8 inch HRDH-
1677 CPP-NGCP-W-1677 1400085019 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1086 TA-843625 14-Apr-19 2.00 PM Shadab Mr. Rajesh CLOSED
1086 KP2+600 to KP2+800
NDE selection for welds of 8 inch HRDH-1086
1678 CPP-NGCP-W-1678 1400085020 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1086 TA-843625 14-Apr-19 4.00 PM Shadab Mr. Rajesh CLOSED
KP2+600 to KP2+800
Pre-welding and weld joint fit up inspection for 8
1679 CPP-NGCP-W-1679 1400085011 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 TA843560 14-Apr-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-619 KP0+200 to KP0+300
Post-welding visual inspection for 8 inchHRDH-
1680 CPP-NGCP-W-1680 1400085037 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 TA843560 14-Apr-19 2.00 PM Rajesh Mr. Rajesh CLOSED
619 KP0+200 to KP0+300
NDE selection for welds of 8 inchHRDH-619
1681 CPP-NGCP-W-1681 1400085047 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-619 TA843560 14-Apr-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP0+200 to KP0+300
Review of weekly welder performance and
1682 CPP-NGCP-W-1682 1400084980 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 05-APR-2019 to 11 CPP site office. N/A 14-Apr-19 8:00 AM Ruhul Mr. Rajesh CLOSED
Apr-2019 at CPP site office.
1400085030 Weld repair verification of joints VARIOUS 8.00 AM
1683 CPP-NGCP-W-1683 Welding SATIP-W-012-01 SAIC-W-2051 14-Apr-19 IRSHAD Mr. Rajesh CLOSED
00-FW-14 of HRDH-1178 HRDH-1178 RE-SCHEDULE 4/15/2019
Post-welding visual inspection of repair joints
1684 CPP-NGCP-W-1684 1400084981 Welding SATIP-W-012-01 SAIC-W-2048 VARIOUS 14-Apr-19 4.00 PM IRSHAD Mr. Rajesh CLOSED
00-FW-14 of HRDH-1178 HRDH-1178 RE-SCHEDULE 4/15/2019
In-Process Verification - RT Techniques &
1685 CPP-NGCP-W-1685 1400085063 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-EJ-RH- HWYH-EJ-RH- 1003,1078,1112,975 VARIOUS 14-Apr-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1003,1078,1112,975
Pre-welding and weld joint fit up inspection for 10
1686 CPP-NGCP-W-1686 1400085186 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 14-Apr-19 8:00 AM Umair Mr. Suresh CLOSED
inch HWYH-1091 km 2+200
Post-welding visual inspection for 10 inch HWYH-
1687 CPP-NGCP-W-1687 1400085194 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 14-Apr-19 2.00 PM Umair Mr. Suresh CLOSED
1091km 2+200
NDE selection for welds of 10 inch HWYH-1091
1688 CPP-NGCP-W-1688 1400085206 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1091 FL TA-445958 14-Apr-19 4.00 PM Umair Mr. Suresh CLOSED
km 2+200
Pre-welding and weld joint fit up inspection for 8 Mr.
1689 CPP-NGCP-W-1689 1400085097 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1178 FL TA843955 15-Apr-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1178 FL KM-2+500 to2+600 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
1690 CPP-NGCP-W-1690 1400085154 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1178 FL TA843955 15-Apr-19 2.00 PM Sarfaraz CLOSED
1178 FL KM-2+500 to2+600 Rajendran
NDE selection for welds of 8 inch HRDH-1178 FL Mr.
1691 CPP-NGCP-W-1691 1400085060 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1178 FL TA843955 15-Apr-19 4:00 PM Sarfaraz CLOSED
KM-2+500 to2+600 Rajendran
Pre-welding and weld joint fit up inspection for 10
1692 CPP-NGCP-W-1692 1400085132 Welding SATIP-W-012-01 SAIC-W-2048
inch HRDH-1160 FL at KM-2+600 to 2+700
HRDH-1160 TA843565 15-Apr-19 8:00 AM Saif Mr. Rajesh CLOSED
Post-welding visual inspection for 10 inchHRDH-
1693 CPP-NGCP-W-1693 1400085062 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1160 TA843565 15-Apr-19 2.00 PM Saif Mr. Rajesh CLOSED
1160 FL at KM-2+600 to 2+700
NDE selection for welds of 10 inch HRDH-1160
1694 CPP-NGCP-W-1694 1400085119 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1160 TA843565 15-Apr-19 4:00 PM Saif Mr. Rajesh CLOSED
FL at KM-2+600 to 2+700
Pre-welding and weld joint fit up inspection for 8
1695 CPP-NGCP-W-1695 1400085155 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1086 TA-843625 15-Apr-19 8:00 AM Shadab Mr. Rajesh CLOSED
inch HRDH-1086 KP2+600 to KP2+800

1400085185 Post-welding visual inspection for 8 inch HRDH- TA-843625


1696 CPP-NGCP-W-1696 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1086 15-Apr-19 2.00 PM Shadab Mr. Rajesh CLOSED
1086 KP2+600 to KP2+800

1400085176 NDE selection for welds of 8 inch HRDH-1086 TA-843625


1697 CPP-NGCP-W-1697 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1086 15-Apr-19 4.00 PM Shadab Mr. Rajesh CLOSED
KP2+600 to KP2+800
Pre-welding and weld joint fit up inspection for 8
1698 CPP-NGCP-W-1698 1400085101 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 TA843560 15-Apr-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
inch HRDH-619 KP0+200 to KP0+300
Post-welding visual inspection for 8 inchHRDH-
1699 CPP-NGCP-W-1699 1400085217 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 TA843560 15-Apr-19 2.00 PM Sarfaraz Mr. Rajesh CLOSED
619 KP0+200 to KP0+300

1400085245 NDE selection for welds of 8 inchHRDH-619 TA843560


1700 CPP-NGCP-W-1700 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-619 15-Apr-19 4.00 PM Sarfaraz Mr. Rajesh CLOSED
KP0+200 to KP0+300
In-Process Verification - RT Techniques &
1701 CPP-NGCP-W-1701 1400085250 Welding SATIP-NDE-RT-01 SAIC-RT-2007 HRDH-1086,1160 VARIOUS 15-Apr-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
Procedure Implementation of HRDH-1086,1160

1400085275 In-Process Verification - RT Techniques & VARIOUS 8:00 AM RAMEEZ


1702 CPP-NGCP-W-1702 Welding SATIP-NDE-RT-01 SAIC-RT-2007 HWYH-1003,1093 15-Apr-19 Mr. Suresh CLOSED
Procedure Implementation of HWYH-1003,1093
In-Process Verification - RT Techniques & Mr.
1703 CPP-NGCP-W-1703 1400085257 Welding SATIP-NDE-RT-01 SAIC-RT-2007 TCF-1 VARIOUS 15-Apr-19 8:00 AM RAMEEZ CLOSED
Procedure Implementation of TRL-2 at TCF-1 Rajendran
In-Process Inspection of MPT using Mr.
1704 CPP-NGCP-W-1704 1400085142 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 TCF-1 VARIOUS 15-Apr-19 8:00 AM RAMEEZ CLOSED
Yoke Method, TRL-2 at TCF-1 Rajendran
Pre-welding and weld joint fit up inspection for 10
1705 CPP-NGCP-W-1705 1400085353 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 15-Apr-19 8:00 AM Umair Mr. Suresh CLOSED
inch HWYH-1091 km 0+100 to 5+500
Post-welding visual inspection for 10 inch HWYH-
1706 CPP-NGCP-W-1706 1400085319 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 15-Apr-19 2.00 PM Umair Mr. Suresh CLOSED
1091km 0+100 to 5+500
NDE selection for welds of 10 inch HWYH-1091
1707 CPP-NGCP-W-1707 1400085327 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1091 FL TA-445958 15-Apr-19 4.00 PM Umair Mr. Suresh CLOSED
km 0+100 to 5+500
Pre-welding and weld joint fit up inspection for 8
1708 CPP-NGCP-W-1708 1400085355 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 FL TA-446045 15-Apr-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-975 FL at KM-0+100 to 3+900
1400085364 Post-welding visual inspection for 8inch HWYH-975 TA-446045
1709 CPP-NGCP-W-1709 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 FL 15-Apr-19 2.00 PM Imran Mr. Suresh CLOSED
FL at KM-0+100 to 3+900
1400085311 NDE selection for welds of 8 inch HWYH-975 FL TA-446045 4:00 PM
1710 CPP-NGCP-W-1710 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-975 FL 15-Apr-19 Imran Mr. Suresh CLOSED
at KM-0+100 to 3+900
Pre-welding and weld joint fit up inspection for 10
1711 CPP-NGCP-W-1711 1400085312 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 15-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1093 FL @ KM-0+200 to 3
Post-welding visual inspection for 10 inch HWYH-
1712 CPP-NGCP-W-1712 1400085365 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 15-Apr-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1093 FL @ KM-0+200 to 3
NDE selection for welds of 10 inch HWYH-1093
1713 CPP-NGCP-W-1713 1400085301 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 15-Apr-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+200 to 3
Pre-welding and weld joint fit up inspection for 10
1714 CPP-NGCP-W-1714 1400085322 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 15-Apr-19 8:00 AM PRATHAB Mr. Suresh CLOSED
inch 16″HWYH GK-RH TRL km0+100 to 12+500
Post-welding visual inspection for 10 inch
1715 CPP-NGCP-W-1715 1400085357 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 15-Apr-19 2.00 PM PRATHAB Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
NDE selection for welds of 10 inch16″HWYH GK-
1716 CPP-NGCP-W-1716 1400085413 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH GK-RH TRL km0+100 to 16″HWYH GK-RH TRL TA-445912 15-Apr-19 4.00 PM PRATHAB Mr. Suresh CLOSED
12+500
Pre-welding and weld joint fit up inspection for 24
Mr.
1717 CPP-NGCP-W-1717 1400085423 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 15-Apr-19 8:00 AM Junaid CLOSED
Rajendran
Yard.
Post-welding visual inspection for 24 inch double Mr.
1718 CPP-NGCP-W-1718 1400085372 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 15-Apr-19 2.00 PM Junaid CLOSED
joints TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
1400085351 NDE selection for welds of 24 inch double joints TA-445988 Mr.
1719 CPP-NGCP-W-1719 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. 15-Apr-19 4.00 PM Junaid CLOSED
TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 10
1720 CPP-NGCP-W-1720 1400085898 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 16-Apr-19 8:00 AM Umair Mr. Suresh CLOSED
inch HWYH-1091 km 2+100 to 5+500
Post-welding visual inspection for 10 inch HWYH-
1721 CPP-NGCP-W-1721 1400085857 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 16-Apr-19 2.00 PM Umair Mr. Suresh CLOSED
1091km 2+100 to 5+500
NDE selection for welds of 10 inch HWYH-1091
1722 CPP-NGCP-W-1722 1400085851 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1091 FL TA-445958 16-Apr-19 4.00 PM Umair Mr. Suresh CLOSED
km 2+100 to 5+500
Pre-welding and weld joint fit up inspection for 8
1723 CPP-NGCP-W-1723 1400085914 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 FL TA-446045 16-Apr-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-975 FL at KM-0+100 to 3+900
1724 CPP-NGCP-W-1724 1400085852 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 8inch HWYH-975 HWYH-975 FL TA-446045 16-Apr-19 8:10 AM Imran Mr. Suresh CLOSED
FL at KM-0+100 to 3+900
NDE selection for welds of 8 inch HWYH-975 FL
1725 CPP-NGCP-W-1725 1400085925 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-975 FL TA-446045 16-Apr-19 4:00 PM Imran Mr. Suresh CLOSED
at KM-0+100 to 3+900
Pre-welding and weld joint fit up inspection for 10
1726 CPP-NGCP-W-1726 1400085917 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 16-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1093 FL @ KM-0+200 to 3
Post-welding visual inspection for 10 inch HWYH-
1727 CPP-NGCP-W-1727 1400085955 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 16-Apr-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1093 FL @ KM-0+200 to 3
NDE selection for welds of 10 inch HWYH-1093
1728 CPP-NGCP-W-1728 1400085936 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 16-Apr-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+200 to 3
Pre-welding and weld joint fit up inspection for 10
1729 CPP-NGCP-W-1729 1400085947 Welding SATIP-W-012-01 SAIC-W-2048
inch 16″HWYH GK-RH TRL km0+100 to 12+500
16″HWYH GK-RH TRL TA-445912 16-Apr-19 8:00 AM PRATHAB Mr. Suresh CLOSED

Post-welding visual inspection for 10 inch


1730 CPP-NGCP-W-1730 1400085920 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 16-Apr-19 2.00 PM PRATHAB Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
NDE selection for welds of 10 inch16″HWYH GK-
1731 CPP-NGCP-W-1731 1400085969 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH GK-RH TRL km0+100 to 16″HWYH GK-RH TRL TA-445912 16-Apr-19 4.00 PM PRATHAB Mr. Suresh CLOSED
12+500
Pre-welding and weld joint fit up inspection for 24
Mr.
1732 CPP-NGCP-W-1732 1400086003 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 16-Apr-19 8:00 AM Junaid CLOSED
Rajendran
Yard.
Post-welding visual inspection for 24 inch double Mr.
1733 CPP-NGCP-W-1733 1400086013 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 16-Apr-19 2.00 PM Junaid CLOSED
joints TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
NDE selection for welds of 24 inch double joints Mr.
1734 CPP-NGCP-W-1734 1400085938 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445988 16-Apr-19 4.00 PM Junaid CLOSED
TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
In-Process Verification - RT Techniques &
1735 CPP-NGCP-W-1735 1400086130 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-1086,1160,1178,1284 VARIOUS 16-Apr-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1086,1160,1178,1284
In-Process Verification - RT Techniques &
1736 CPP-NGCP-W-1736 1400086154 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- HWYH-975,1003,1091,1093,GK-RH VARIOUS 16-Apr-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
975,1003,1091,1093,GK-RH
Pre-welding and weld joint fit up inspection for 8
1737 CPP-NGCP-W-1737 1400085679 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1160 FL TA843565 16-Apr-19 8:00 AM Junaid Mr. Rajesh CLOSED
inch HRDH-1160 FL at KM-2+200 to 2+600
Post-welding visual inspection for 8 inch HRDH-
1738 CPP-NGCP-W-1738 1400085641 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1160 FL TA843565 16-Apr-19 2.00 PM Junaid Mr. Rajesh CLOSED
1160 FL at KM-2+200 to 2+600
NDE selection for welds of 8 inch HRDH-1160 FL
1739 CPP-NGCP-W-1739 1400085695 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1160 FL TA843565 16-Apr-19 4:00 PM Junaid Mr. Rajesh CLOSED
at KM-2+200 to 2+600
Pre-welding and weld joint fit up inspection for 8
1740 CPP-NGCP-W-1740 1400085704 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1086 FL TA-843625 16-Apr-19 8:00 AM Shadab Mr. Rajesh CLOSED
inch HRDH-1086 KP1+800 to KP2+000
Post-welding visual inspection for 8 inch HRDH-
1741 CPP-NGCP-W-1741 1400085705 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1086 FL TA-843625 16-Apr-19 2.00 PM Shadab Mr. Rajesh CLOSED
1086 KP1+800 to KP2+000
NDE selection for welds of 8 inch HRDH-1086
1742 CPP-NGCP-W-1742 1400085659 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1086 FL TA-843625 16-Apr-19 4.00 PM Shadab Mr. Rajesh CLOSED
KP1+800 to KP2+000
Pre-welding and weld joint fit up inspection for 8 TA843560
1743 CPP-NGCP-W-1743 1400085660 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL 16-Apr-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-619 KP0+300 to KP0+500
Post-welding visual inspection for 8 inch HRDH-
1744 CPP-NGCP-W-1744 1400085690 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL TA843560 16-Apr-19 2.00 PM Rajesh Mr. Rajesh CLOSED
619 KP0+300 to KP0+500
NDE selection for welds of 8 inch HRDH-619
1745 CPP-NGCP-W-1745 1400085747 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-619 FL TA843560 16-Apr-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP0+300 to KP0+500
Weld repair verification of joints
1746 CPP-NGCP-W-1746 1400085748 Welding SATIP-W-012-01 SAIC-W-2051 TA843656 16-Apr-19 8.00 AM IRSHAD Mr. Rajesh REJECTED
00-FW-25T1 of HRDH-1170 HRDH-1170 FL
Post-welding visual inspection of repair joints
1747 CPP-NGCP-W-1747 1400085754 Welding SATIP-W-012-01 SAIC-W-2048 TA843656 16-Apr-19 4.00 PM IRSHAD Mr. Rajesh REJECTED
00-FW-25T1 of HRDH-1170 HRDH-1170 FL
1748 CPP-NGCP-W-1748 1400086183 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HRDH-1116 HRDH-1116 FL TA843608 16-Apr-19 10.00 AM IRSHAD Mr. Rajesh CLOSED
Pre-welding and weld joint fit up inspection for 10 TA-445958
1749 CPP-NGCP-W-1749 1400086719 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL 17-Apr-19 8:00 AM Umair Mr. Suresh CLOSED
inch HWYH-1091 km 0+100 to 5+500
Post-welding visual inspection for 10 inch HWYH-
1750 CPP-NGCP-W-1750 1400086757 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 17-Apr-19 2.00 PM Umair Mr. Suresh CLOSED
1091km 0+100 to 5+500
NDE selection for welds of 10 inch HWYH-1091
1751 CPP-NGCP-W-1751 1400086767 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1091 FL TA-445958 17-Apr-19 4:00 PM Umair Mr. Suresh CLOSED
km 0+100 to 5+500
Pre-welding and weld joint fit up inspection for 8
1752 CPP-NGCP-W-1752 1400086783 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 FL TA-446045 17-Apr-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-975 FL at KM-0+100 to 3+900
Post-welding visual inspection for 8inch HWYH-975
1753 CPP-NGCP-W-1753 1400086793 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 FL TA-446045 17-Apr-19 8:10 AM Imran Mr. Suresh CLOSED
FL at KM-0+100 to 3+900
NDE selection for welds of 8 inch HWYH-975 FL TA-446045 4:00 PM
1754 CPP-NGCP-W-1754 1400086759 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-975 FL 17-Apr-19 Imran Mr. Suresh CLOSED
at KM-0+100 to 3+900
Pre-welding and weld joint fit up inspection for 10
1755 CPP-NGCP-W-1755 1400086786 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 17-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1093 FL @ KM-0+200 to 3
Post-welding visual inspection for 10 inch HWYH-
1756 CPP-NGCP-W-1756 1400086777 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 17-Apr-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1093 FL @ KM-0+200 to 3
NDE selection for welds of 10 inch HWYH-1093
1757 CPP-NGCP-W-1757 1400086712 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 17-Apr-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+200 to 3
Pre-welding and weld joint fit up inspection for 10
1758 CPP-NGCP-W-1758 1400086780 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 17-Apr-19 8:00 AM PRATHAB Mr. Suresh CLOSED
inch 16″HWYH GK-RH TRL km0+100 to 12+500
Post-welding visual inspection for 10 inch
1759 CPP-NGCP-W-1759 1400086815 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 17-Apr-19 2.00 PM PRATHAB Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
NDE selection for welds of 10 inch16″HWYH GK-
1760 CPP-NGCP-W-1760 1400086843 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH GK-RH TRL km0+100 to 16″HWYH GK-RH TRL TA-445912 17-Apr-19 4.00 PM PRATHAB Mr. Suresh CLOSED
12+500
Pre-welding and weld joint fit up inspection for 24
Mr.
1761 CPP-NGCP-W-1761 1400086791 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 17-Apr-19 8:00 AM Junaid CLOSED
Rajendran
Yard.
Post-welding visual inspection for 24 inch double TA-445988 Mr.
1762 CPP-NGCP-W-1762 1400086837 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. 17-Apr-19 2.00 PM Junaid CLOSED
joints TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
NDE selection for welds of 24 inch double joints Mr.
1763 CPP-NGCP-W-1763 1400086782 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445988 17-Apr-19 4.00 PM Junaid CLOSED
TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8
1764 CPP-NGCP-W-1764 1400086709 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL TA843560 17-Apr-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-619 KP0+500 to KP1+200
Post-welding visual inspection for 8 inch HRDH- TA843560
1765 CPP-NGCP-W-1765 1400086742 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL 17-Apr-19 2.00 PM Rajesh Mr. Rajesh CLOSED
619 KP0+500 to KP1+200
NDE selection for welds of 8 inch HRDH-619 TA843560
1766 CPP-NGCP-W-1766 1400086768 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-619 FL 17-Apr-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP0+500 to KP1+200
Pre-welding and weld joint fit up inspection for 8
1767 CPP-NGCP-W-1767 1400086728 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1160 FL TA843565 17-Apr-19 8:00 AM Junaid Mr. Rajesh CLOSED
inch HRDH-1160 FL at KM-2+000 to 2+200
Post-welding visual inspection for 8 inch HRDH-
1768 CPP-NGCP-W-1768 1400086785 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1160 FL TA843565 17-Apr-19 2.00 PM Junaid Mr. Rajesh CLOSED
1160 FL at KM-2+000 to 2+200
NDE selection for welds of 8 inch HRDH-1160
1769 CPP-NGCP-W-1769 1400086824 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1160 FL TA843565 17-Apr-19 4:00 PM Junaid Mr. Rajesh CLOSED
FL at KM-2+000 to 2+200
Pre-welding and weld joint fit up inspection for 8
1770 CPP-NGCP-W-1770 1400086792 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1086 FL TA-843625 17-Apr-19 8:00 AM Shadab Mr. Rajesh CLOSED
inch HRDH-1086 KP1+600 to KP1+800
Post-welding visual inspection for 8 inch HRDH-
1771 CPP-NGCP-W-1771 1400086802 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1086 FL TA-843625 17-Apr-19 2.00 PM Shadab Mr. Rajesh CLOSED
1086 KP1+600 to KP1+800
NDE selection for welds of 8 inch HRDH-1086
1772 CPP-NGCP-W-1772 1400086887 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1086 FL TA-843625 17-Apr-19 4.00 PM Shadab Mr. Rajesh CLOSED
KP1+600 to KP1+800
Pre-welding and weld joint fit up inspection for 8 TA-843609
1773 CPP-NGCP-W-1773 1400086831 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL 17-Apr-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
inch HRDH -922 KP3+110 to KP3+010;
Post-welding visual inspection for 8 inch HRDH
1774 CPP-NGCP-W-1774 1400086818 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 17-Apr-19 2.00 PM Sarfaraz Mr. Rajesh CLOSED
-922 KP3+110 to KP3+010;
NDE selection for welds of 8 inch HRDH -922
1775 CPP-NGCP-W-1775 1400086820 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL TA-843609 17-Apr-19 4.00 PM Sarfaraz Mr. Rajesh CLOSED
KP3+110 to KP3+010;
1776 CPP-NGCP-W-1776 1400086968 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HRDH-1116 HRDH -1116 FL TA-843608 17-Apr-19 8:00 AM IRSHAD Mr. Rajesh CLOSED
Pre-welding and weld joint fit up inspection for 8
1777 CPP-NGCP-W-1777 1400086988 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 17-Apr-19 8:00 AM IRSHAD Mr. Rajesh CLOSED
inch HRDH-1116 FL at KM-2+010 to 2+040
Post-welding visual inspection for 8inch HRDH- TA-843608
1778 CPP-NGCP-W-1778 1400086871 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL 17-Apr-19 2.00 PM IRSHAD Mr. Rajesh CLOSED
1116 FL at KM-2+010 to 2+040
NDE selection for welds of 8 inch HRDH-1116 FL TA-843608
1779 CPP-NGCP-W-1779 1400086983 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1116 FL 17-Apr-19 4.00 PM IRSHAD Mr. Rajesh CLOSED
at KM-2+010 to 2+040
Pre-welding and weld joint fit up inspection for 10
1780 CPP-NGCP-W-1780 1400087366 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 18-Apr-19 8:00 AM Umair Mr. Suresh CLOSED
inch HWYH-1091 km 0+100 to 5+500
Post-welding visual inspection for 10 inch HWYH-
1781 CPP-NGCP-W-1781 1400087338 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 18-Apr-19 2.00 PM Umair Mr. Suresh CLOSED
1091km 0+100 to 5+500
NDE selection for welds of 10 inch HWYH-1091
1782 CPP-NGCP-W-1782 1400087322 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1091 FL TA-445958 18-Apr-19 4.00 PM Umair Mr. Suresh CLOSED
km 0+100 to 5+500
Pre-welding and weld joint fit up inspection for 8
1783 CPP-NGCP-W-1783 1400087387 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 FL TA-446045 18-Apr-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-975 FL at KM-0+100 to 3+900
Post-welding visual inspection for 8inch HWYH-975 TA-446045 8:10 AM
1784 CPP-NGCP-W-1784 1400087413 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 FL 18-Apr-19 Imran Mr. Suresh CLOSED
FL at KM-0+100 to 3+900
1785 CPP-NGCP-W-1785 1400087369 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-975 FL HWYH-975 FL TA-446045 18-Apr-19 4:00 PM Imran Mr. Suresh CLOSED
at KM-0+100 to 3+900
Pre-welding and weld joint fit up inspection for 10 TA-445838
1786 CPP-NGCP-W-1786 1400087351 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL 18-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1093 FL @ KM-0+200 to 3
Post-welding visual inspection for 10 inch HWYH-
1787 CPP-NGCP-W-1787 1400087406 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 18-Apr-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1093 FL @ KM-0+200 to 3
NDE selection for welds of 10 inch HWYH-1093
1788 CPP-NGCP-W-1788 1400087371 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 18-Apr-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+200 to 3
Pre-welding and weld joint fit up inspection for 10
1789 CPP-NGCP-W-1789 1400087434 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 18-Apr-19 8:00 AM PRATHAB Mr. Suresh CLOSED
inch 16″HWYH GK-RH TRL km0+100 to 12+500
Post-welding visual inspection for 10 inch
1790 CPP-NGCP-W-1790 1400087392 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 18-Apr-19 2.00 PM PRATHAB Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
NDE selection for welds of 10 inch16″HWYH GK-
1791 CPP-NGCP-W-1791 1400087425 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH GK-RH TRL km0+100 to 16″HWYH GK-RH TRL TA-445912 18-Apr-19 4.00 PM PRATHAB Mr. Suresh CLOSED
12+500
Pre-welding and weld joint fit up inspection for 24
Mr.
1792 CPP-NGCP-W-1792 1400087493 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 18-Apr-19 8:00 AM Junaid CLOSED
Rajendran
Yard.
Post-welding visual inspection for 24 inch double Mr.
1793 CPP-NGCP-W-1793 1400087428 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 18-Apr-19 2.00 PM Junaid CLOSED
joints TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
NDE selection for welds of 24 inch double joints Mr.
1794 CPP-NGCP-W-1794 1400087459 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445988 18-Apr-19 4.00 PM Junaid CLOSED
TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Weld repair verification of joints
1795 CPP-NGCP-W-1795 1400087495 Welding SATIP-W-012-01 SAIC-W-2051 TA-445909 19-Apr-19 8.00 AM IRSHAD Mr. Rajesh REJECTED
FW178, FW183T1 of HWYH-1118 HWYH-1118
Post-welding visual inspection of repair joints
1796 CPP-NGCP-W-1796 1400087504 Welding SATIP-W-012-01 SAIC-W-2048 TA-445909 19-Apr-19 4.00 PM IRSHAD Mr. Rajesh REJECTED
FW178, FW183T1 of HWYH-1118 HWYH-1118
Weld repair verification of joints
1797 CPP-NGCP-W-1797 1400087514 Welding SATIP-W-012-01 SAIC-W-2051 TA-446046 19-Apr-19 8.00 AM IRSHAD Mr. Rajesh CLOSED
FW62 of HWYH-1055 HWYH-1055
Post-welding visual inspection of repair joints
1798 CPP-NGCP-W-1798 1400087482 Welding SATIP-W-012-01 SAIC-W-2048 TA-446046 19-Apr-19 4.00 PM IRSHAD Mr. Rajesh CLOSED
FW62 of HWYH-1055 HWYH-1055

Weld repair verification of joints


1799 CPP-NGCP-W-1799 1400087490 Welding SATIP-W-012-01 SAIC-W-2051 TA-445856 19-Apr-19 8.00 AM IRSHAD Mr. Rajesh REJECTED
FW570,FW598C of HWYH-1055
HWYH-1003
Post-welding visual inspection of repair joints
1800 CPP-NGCP-W-1800 1400087502 Welding SATIP-W-012-01 SAIC-W-2048
FW570,FW598C of HWYH-1055 HWYH1003
TA-445856 19-Apr-19 4.00 PM IRSHAD Mr. Rajesh REJECTED

Weld repair verification of joints


1801 CPP-NGCP-W-1801 1400087534 Welding SATIP-W-012-01 SAIC-W-2051 TA-445861 19-Apr-19 8.00 AM IRSHAD Mr. Rajesh CLOSED
FW33, FW35of HWYH-1076 HWYH-1076
Post-welding visual inspection of repair joints
1802 CPP-NGCP-W-1802 1400087519 Welding SATIP-W-012-01 SAIC-W-2048
FW33, FW35 of HWYH-1076 HWYH-1076
TA-445861 19-Apr-19 4.00 PM IRSHAD Mr. Rajesh CLOSED
Pre-welding and weld joint fit up inspection for 24
Mr.
1803 CPP-NGCP-W-1803 1400087509 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445988 19-Apr-19 8:00 AM Junaid CLOSED
Rajendran
Yard.
Post-welding visual inspection for 24 inch double Mr.
1804 CPP-NGCP-W-1804 1400087492 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445988 19-Apr-19 2.00 PM Junaid CLOSED
joints TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
NDE selection for welds of 24 inch double joints Mr.
1805 CPP-NGCP-W-1805 1400087531 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445988 19-Apr-19 4.00 PM Junaid CLOSED
TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
In-Process Verification - RT Techniques &
HRDH-
1806 CPP-NGCP-W-1806 1400087521 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- VARIOUS 18-Apr-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
619,902,1086,1160,1164,1178
619,902,1086,1160,1164,1178
In-Process Verification - RT Techniques &
Mr.
1807 CPP-NGCP-W-1807 1400087535 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- HWYH-975,1091,1093,GK-RH VARIOUS 18-Apr-19 8:00 AM RAMEEZ CLOSED
Rajendran
975,1091,1093,GK-RH
In-Process Verification - RT Techniques & Mr.
1808 CPP-NGCP-W-1808 1400087550 Welding SATIP-NDE-RT-01 SAIC-RT-2007 HWYH-1003 VARIOUS 19-Apr-19 8:00 AM RAMEEZ CLOSED
Procedure Implementation of HWYH-1003 Rajendran
In-Process Verification - RT Techniques & Mr.
1809 CPP-NGCP-W-1809 1400087613 Welding SATIP-NDE-RT-01 SAIC-RT-2007
Procedure Implementation of TRL-2 at TCF-1
TCF-1 VARIOUS 19-Apr-19 8:00 AM RAMEEZ
Rajendran
CLOSED

In-Process Inspection of MPT using Mr.


1810 CPP-NGCP-W-1810 1400087616 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004
Yoke Method, TRL-2 at TCF-1
TCF-1 VARIOUS 19-Apr-19 8:00 AM RAMEEZ
Rajendran
CLOSED
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a Pre-welding and weld joint fit up inspection for 8
1811 CPP-NGCP-W-1811 1400087217 l Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL TA843560 18-Apr-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
inch HRDH-619 KP1+200 to KP1+400
Post-welding visual inspection for 8 inch HRDH-
1812 CPP-NGCP-W-1812 1400087170 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL TA843560 18-Apr-19 2.00 PM Sarfaraz Mr. Rajesh CLOSED
619 KP1+200 to KP1+400
NDE selection for welds of 8 inch HRDH-619
1813 CPP-NGCP-W-1813 1400087171 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-619 FL TA843560 18-Apr-19 4.00 PM Sarfaraz Mr. Rajesh CLOSED
KP1+200 to KP1+400
Pre-welding and weld joint fit up inspection for 8
1814 CPP-NGCP-W-1814 1400087200 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1160 FL TA843565 18-Apr-19 8:00 AM Junaid Mr. Rajesh CLOSED
inch HRDH-1160 FL at KM-1+100 to 2+000
Post-welding visual inspection for 8 inch HRDH- TA843565
1815 CPP-NGCP-W-1815 1400087243 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1160 FL 18-Apr-19 2.00 PM Junaid Mr. Rajesh CLOSED
1160 FL at KM-1+100 to 2+000
NDE selection for welds of 8 inch HRDH-1160 TA843565
1816 CPP-NGCP-W-1816 1400087208 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1160 FL 18-Apr-19 4:00 PM Junaid Mr. Rajesh CLOSED
FL at KM-1+100 to 2+000
Pre-welding and weld joint fit up inspection for 8
1817 CPP-NGCP-W-1817 1400087172 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1086 FL TA-843625 18-Apr-19 8:00 AM Shadab Mr. Rajesh CLOSED
inch HRDH-1086 KP1+200 to KP1+400
Post-welding visual inspection for 8 inch HRDH-
1818 CPP-NGCP-W-1818 1400087244 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1086 FL TA-843625 18-Apr-19 2.00 PM Shadab Mr. Rajesh CLOSED
1086 KP1+200 to KP1+400
NDE selection for welds of 8 inch HRDH-1086
1819 CPP-NGCP-W-1819 1400087202 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1086 FL TA-843625 18-Apr-19 4.00 PM Shadab Mr. Rajesh CLOSED
KP1+200 to KP1+400
Pre-welding and weld joint fit up inspection for 8
1820 CPP-NGCP-W-1820 1400087254 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 18-Apr-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH -922 KP2+885 to KP3+078;
Post-welding visual inspection for 8 inch HRDH
1821 CPP-NGCP-W-1821 1400087192 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 18-Apr-19 2.00 PM Rajesh Mr. Rajesh CLOSED
-922 KP2+885 to KP3+078;
NDE selection for welds of 8 inch HRDH -922
1822 CPP-NGCP-W-1822 1400087274 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL TA-843609 18-Apr-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP2+885 to KP3+078;
Pre-welding and weld joint fit up inspection for 16
HRDH -BK-RH
1823 CPP-NGCP-W-1823 1400087283 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH BK-RH TR/L KP0+400 to TA-843957 18-Apr-19 8:00 AM IRSHAD Mr. Rajesh CLOSED
TR/L
KP0+500;
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH
1824 CPP-NGCP-W-1824 1400087221 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 18-Apr-19 2.00 PM IRSHAD Mr. Rajesh CLOSED
BK-RH TR/L KP0+400 to KP0+500; TR/L
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH
1825 CPP-NGCP-W-1825 1400087231 Welding SATIP-W-012-01 SAIC-W-2054 TA-843957 18-Apr-19 4.00 PM IRSHAD Mr. Rajesh CLOSED
TR/L KP0+400 to KP0+500; TR/L
Pre-welding and weld joint fit up inspection for 16
HRDH -BK-RH Mr.
1826 CPP-NGCP-W-1826 1400087349 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH BK-RH TR/L KP0+500 to TA-843957 19-Apr-19 8:00 AM IRSHAD CLOSED
TR/L Rajendran
KP0+600;
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH Mr.
1827 CPP-NGCP-W-1827 1400087405 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 19-Apr-19 2.00 PM IRSHAD CLOSED
BK-RH TR/L KP0+500 to KP0+600; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH Mr.
1828 CPP-NGCP-W-1828 1400087396 Welding SATIP-W-012-01 SAIC-W-2054 TA-843957 19-Apr-19 4.00 PM IRSHAD CLOSED
TR/L KP0+500 to KP0+600; TR/L Rajendran
Pre-welding and weld joint fit up inspection for 10 TA-445958
1829 CPP-NGCP-W-1829 1400088024 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL 20-Apr-19 8:00 AM Umair Mr. Suresh CLOSED
inch HWYH-1091 km 0+100 to 5+500
Post-welding visual inspection for 10 inch HWYH-
1830 CPP-NGCP-W-1830 1400088004 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 20-Apr-19 2.00 PM Umair Mr. Suresh CLOSED
1091km 0+100 to 5+500
NDE selection for welds of 10 inch HWYH-1091
1831 CPP-NGCP-W-1831 1400087971 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1091 FL TA-445958 20-Apr-19 4.00 PM Umair Mr. Suresh CLOSED
km 0+100 to 5+500
Pre-welding and weld joint fit up inspection for 8
1832 CPP-NGCP-W-1832 1400088033 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 FL TA-446045 20-Apr-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-975 FL at KM-0+100 to 3+900
Post-welding visual inspection for 8inch HWYH-975
1833 CPP-NGCP-W-1833 1400088025 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 FL TA-446045 20-Apr-19 8:10 AM Imran Mr. Suresh CLOSED
FL at KM-0+100 to 3+900
NDE selection for welds of 8 inch HWYH-975 FL TA-446045 4:00 PM
1834 CPP-NGCP-W-1834 1400088043 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-975 FL 20-Apr-19 Imran Mr. Suresh CLOSED
at KM-0+100 to 3+900
Pre-welding and weld joint fit up inspection for 10
1835 CPP-NGCP-W-1835 1400088044 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 20-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1093 FL @ KM-0+200 to 3
Post-welding visual inspection for 10 inch HWYH-
1836 CPP-NGCP-W-1836 1400088045 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 20-Apr-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1093 FL @ KM-0+200 to 3
NDE selection for welds of 10 inch HWYH-1093
1837 CPP-NGCP-W-1837 1400087999 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 20-Apr-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+200 to 3
Pre-welding and weld joint fit up inspection for 10
1838 CPP-NGCP-W-1838 1400088007 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 20-Apr-19 8:00 AM PRATHAB Mr. Suresh CLOSED
inch 16″HWYH GK-RH TRL km0+100 to 12+500
Post-welding visual inspection for 10 inch
1839 CPP-NGCP-W-1839 1400088008 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 20-Apr-19 2.00 PM PRATHAB Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
NDE selection for welds of 10 inch16″HWYH GK-
1840 CPP-NGCP-W-1840 1400088053 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH GK-RH TRL km0+100 to 16″HWYH GK-RH TRL TA-445912 20-Apr-19 4.00 PM PRATHAB Mr. Suresh CLOSED
12+500
Pre-welding and weld joint fit up inspection for 24
Mr.
1841 CPP-NGCP-W-1841 1400088095 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 20-Apr-19 8:00 AM Saif CLOSED
Rajendran
Yard.
Post-welding visual inspection for 24 inch double TA-445989 Mr.
1842 CPP-NGCP-W-1842 1400088105 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. 20-Apr-19 2.00 PM Saif CLOSED
joints TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
NDE selection for welds of 24 inch double joints Mr.
1843 CPP-NGCP-W-1843 1400088071 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 20-Apr-19 4.00 PM Saif CLOSED
TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
In-Process Verification - RT Techniques &
HRDH-
1844 CPP-NGCP-W-1844 1400088128 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- VARIOUS 20-Apr-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1170,619,1086,922,1116,1160
1170,619,1086,922,1116,1160
In-Process Verification - RT Techniques &
Mr.
1845 CPP-NGCP-W-1845 1400088166 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- HWYH-975,1091,1093,GK-RH VARIOUS 20-Apr-19 8:00 AM RAMEEZ CLOSED
975,1091,1093,GK-RH Rajendran
Pre-welding and weld joint fit up inspection for 8
1846 CPP-NGCP-W-1846 1400088084 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL TA843560 20-Apr-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
inch HRDH-619 KP1+400 to KP1+600
Post-welding visual inspection for 8 inch HRDH-
1847 CPP-NGCP-W-1847 1400088041 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL TA843560 20-Apr-19 2.00 PM Sarfaraz Mr. Rajesh CLOSED
619 KP1+400 to KP1+600
NDE selection for welds of 8 inch HRDH-619
1848 CPP-NGCP-W-1848 1400088068 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-619 FL TA843560 20-Apr-19 4.00 PM Sarfaraz Mr. Rajesh CLOSED
KP1+400 to KP1+600
Pre-welding and weld joint fit up inspection for 8
1849 CPP-NGCP-W-1849 1400088086 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1160 FL TA843565 20-Apr-19 8:00 AM Junaid Mr. Rajesh CLOSED
inch HRDH-1160 FL at KM-0+800 to 1+100
Post-welding visual inspection for 8 inch HRDH-
1850 CPP-NGCP-W-1850 1400088076 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1160 FL TA843565 20-Apr-19 2.00 PM Junaid Mr. Rajesh CLOSED
1160 FL at KM-0+800 to 1+100
NDE selection for welds of 8 inch HRDH-1160
1851 CPP-NGCP-W-1851 1400088088 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1160 FL TA843565 20-Apr-19 4:00 PM Junaid Mr. Rajesh CLOSED
FL at KM-0+800 to 1+100
Pre-welding and weld joint fit up inspection for 8
1852 CPP-NGCP-W-1852 1400088133 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1086 FL TA-843625 20-Apr-19 8:00 AM Shadab Mr. Rajesh CLOSED
inch HRDH-1086 KP0+900 to KP1+000
Post-welding visual inspection for 8 inch HRDH-
1853 CPP-NGCP-W-1853 1400088118 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1086 FL TA-843625 20-Apr-19 2.00 PM Shadab Mr. Rajesh CLOSED
1086 KP0+900 to KP1+000
NDE selection for welds of 8 inch HRDH-1086
1854 CPP-NGCP-W-1854 1400088124 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1086 FL TA-843625 20-Apr-19 4.00 PM Shadab Mr. Rajesh CLOSED
KP0+900 to KP1+000
Pre-welding and weld joint fit up inspection for 8
1855 CPP-NGCP-W-1855 1400088079 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 20-Apr-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH -922 KP2+650 to KP2+885;
Post-welding visual inspection for 8 inch HRDH TA-843609
1856 CPP-NGCP-W-1856 1400088120 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL 20-Apr-19 2.00 PM Rajesh Mr. Rajesh CLOSED
-922 KP2+650 to KP2+885;
NDE selection for welds of 8 inch HRDH -922 TA-843609
1857 CPP-NGCP-W-1857 1400088082 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL 20-Apr-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP2+650 to KP2+885;
Pre-welding and weld joint fit up inspection for 16
HRDH -BK-RH TA-843957 Mr.
1858 CPP-NGCP-W-1858 1400088092 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH BK-RH TR/L KP0+600 to 20-Apr-19 8:00 AM IRSHAD CLOSED
TR/L Rajendran
KP0+700;
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH TA-843957 Mr.
1859 CPP-NGCP-W-1859 1400088136 Welding SATIP-W-012-01 SAIC-W-2048 20-Apr-19 2.00 PM IRSHAD CLOSED
BK-RH TR/L KP0+600 to KP0+700; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH Mr.
1860 CPP-NGCP-W-1860 1400088174 Welding SATIP-W-012-01 SAIC-W-2054 TA-843957 20-Apr-19 4.00 PM IRSHAD CLOSED
TR/L KP0+600 to KP0+700; TR/L Rajendran
Review of weekly welder performance and
1861 CPP-NGCP-W-1861 1400088628 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 12-APR-2019 to 18 CPP site office. N/A 21-Apr-19 8:00 AM Ruhul Mr. Rajesh CLOSED
Apr-2019 at CPP site office.
Pre-welding and weld joint fit up inspection for 8
1862 CPP-NGCP-W-1862 1400088653 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1118 TA-445909 21-Apr-19 8:00 AM Umair Mr. Suresh CLOSED
inch HWYH-1118 FL @ KM-0+100 to 2+563
Post-welding visual inspection for 8 inch HWYH-
1863 CPP-NGCP-W-1863 1400088610 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1118 TA-445909 21-Apr-19 2.00 PM Umair Mr. Suresh CLOSED
1118 FL @ KM-0+100 to 2+563
NDE selection for welds of 8 inch HWYH-1118 FL
1864 CPP-NGCP-W-1864 1400088663 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1118 TA-445909 21-Apr-19 4:00 PM Umair Mr. Suresh CLOSED
@ KM-0+100 to 2+563
Pre-welding and weld joint fit up inspection for 8 TA-446045 8:00 AM
1865 CPP-NGCP-W-1865 1400088620 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 FL 21-Apr-19 Imran Mr. Suresh CLOSED
inch HWYH-975 FL at KM-0+100 to 3+900
Post-welding visual inspection for 8inch HWYH-975 TA-446045
1866 CPP-NGCP-W-1866 1400088664 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 FL 21-Apr-19 2.00 PM Imran Mr. Suresh CLOSED
FL at KM-0+100 to 3+900
1867 CPP-NGCP-W-1867 1400088612 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-975 FL HWYH-975 FL TA-446045 21-Apr-19 4:00 PM Imran Mr. Suresh CLOSED
at KM-0+100 to 3+900
Pre-welding and weld joint fit up inspection for 10
1868 CPP-NGCP-W-1868 1400088673 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 21-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1093 FL @ KM-0+200 to 3
Post-welding visual inspection for 10 inch HWYH- TA-445838
1869 CPP-NGCP-W-1869 1400088665 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL 21-Apr-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1093 FL @ KM-0+200 to 3
NDE selection for welds of 10 inch HWYH-1093
1870 CPP-NGCP-W-1870 1400088684 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 21-Apr-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+200 to 3
Pre-welding and weld joint fit up inspection for 10
1871 CPP-NGCP-W-1871 1400088655 Welding SATIP-W-012-01 SAIC-W-2048
inch 16″HWYH GK-RH TRL km0+100 to 12+500
16″HWYH GK-RH TRL TA-445912 21-Apr-19 8:00 AM PRATHAB Mr. Suresh CLOSED

Post-welding visual inspection for 10 inch


1872 CPP-NGCP-W-1872 1400088645 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 21-Apr-19 2.00 PM PRATHAB Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
NDE selection for welds of 10 inch16″HWYH GK-
1873 CPP-NGCP-W-1873 1400088636 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH GK-RH TRL km0+100 to 16″HWYH GK-RH TRL TA-445912 21-Apr-19 4.00 PM PRATHAB Mr. Suresh CLOSED
12+500
Pre-welding and weld joint fit up inspection for 24
Mr.
1874 CPP-NGCP-W-1874 1400088630 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 21-Apr-19 8:00 AM Saif CLOSED
Rajendran
Yard.
Post-welding visual inspection for 24 inch double TA-445989 Mr.
1875 CPP-NGCP-W-1875 1400088631 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. 21-Apr-19 2.00 PM Saif CLOSED
joints TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
NDE selection for welds of 24 inch double joints Mr.
1876 CPP-NGCP-W-1876 1400088666 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 21-Apr-19 4.00 PM Saif CLOSED
TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 10 CANCELLED DUE TO NO
1877 CPP-NGCP-W-1877 1400088823 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445912 21-Apr-19 8:00 AM PRATHAB Mr. Suresh REJECTED
inch 16″HWYH CK-RH TRL km0+100 to 8+100 PERMIT
Post-welding visual inspection for 10 inch CANCELLED DUE TO NO
1878 CPP-NGCP-W-1878 1400088833 Welding SATIP-W-012-01 SAIC-W-2048
16″HWYH CK-RH TRL km0+100 to 8+100
16″HWYH CK-RH TRL TA-445912 21-Apr-19 2.00 PM PRATHAB Mr. Suresh REJECTED
PERMIT
NDE selection for welds of 10 inch16″HWYH GK-
1879 CPP-NGCP-W-1879 1400088825 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH CK-RH TRL km0+100 to 16″HWYH CK-RH TRL TA-445912 21-Apr-19 4.00 PM PRATHAB Mr. Suresh REJECTED CANCELLED DUE TO NO
8+100 PERMIT
In-Process Verification - RT Techniques &
1880 CPP-NGCP-W-1880 1400088834 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-6019,922,1086,1160,1178 VARIOUS 21-Apr-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
6019,922,1086,1160,1178
In-Process Verification - RT Techniques &
HWYH- Mr.
1881 CPP-NGCP-W-1881 1400088865 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- VARIOUS 21-Apr-19 8:00 AM RAMEEZ CLOSED
1076,1078,975,1091,1093,GK-RH Rajendran
1076,1078,975,1091,1093,GK-RH
Pre-welding and weld joint fit up inspection for 8
1882 CPP-NGCP-W-1882 1400088874 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL TA843560 21-Apr-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
inch HRDH-619 KP1+600 to KP1+800
Post-welding visual inspection for 8 inch HRDH-
1883 CPP-NGCP-W-1883 1400088792 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL TA843560 21-Apr-19 2.00 PM Sarfaraz Mr. Rajesh CLOSED
619 KP1+600 to KP1+800
NDE selection for welds of 8 inch HRDH-619
1884 CPP-NGCP-W-1884 1400088798 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-619 FL TA843560 21-Apr-19 4.00 PM Sarfaraz Mr. Rajesh CLOSED
KP1+600 to KP1+800
Pre-welding and weld joint fit up inspection for 8
1885 CPP-NGCP-W-1885 1400088846 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1160 FL TA843565 21-Apr-19 8:00 AM Junaid Mr. Rajesh CLOSED
inch HRDH-1160 FL at KM-0+300 to 0+800
Post-welding visual inspection for 8 inch HRDH-
1886 CPP-NGCP-W-1886 1400088884 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1160 FL TA843565 21-Apr-19 2.00 PM Junaid Mr. Rajesh REJECTED
1160 FL at KM-0+300 to 0+800
NDE selection for welds of 8 inch HRDH-1160
1887 CPP-NGCP-W-1887 1400088799 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1160 FL TA843565 21-Apr-19 4:00 PM Junaid Mr. Rajesh CLOSED
FL at KM-0+300 to 0+800
Pre-welding and weld joint fit up inspection for 8 Mr.
1888 CPP-NGCP-W-1888 1400088838 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1086 FL TA-843625 21-Apr-19 8:00 AM Shadab CLOSED
inch HRDH-1086 KP0+500 to KP0+700 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
1889 CPP-NGCP-W-1889 1400088894 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1086 FL TA-843625 21-Apr-19 2.00 PM Shadab CLOSED
1086 KP0+500 to KP0+700 Rajendran
NDE selection for welds of 8 inch HRDH-1086 Mr.
1890 CPP-NGCP-W-1890 1400088909 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1086 FL TA-843625 21-Apr-19 4.00 PM Shadab CLOSED
KP0+500 to KP0+700 Rajendran
Temperature Tie in Welding HRDH -922 KP2+540
1891 CPP-NGCP-W-1891 1400088887 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -922 FL TA-843609 21-Apr-19 8:00 AM Rajesh Mr. Rajesh CLOSED
to KP2+556;
Pre-welding and weld joint fit up inspection for 8
1892 CPP-NGCP-W-1892 1400088916 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 21-Apr-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH -922 KP2+540 to KP2+556;
Post-welding visual inspection for 8 inch HRDH
1893 CPP-NGCP-W-1893 1400088889 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 21-Apr-19 2.00 PM Rajesh Mr. Rajesh CLOSED
-922 KP2+540 to KP2+556;
NDE selection for welds of 8 inch HRDH -922
1894 CPP-NGCP-W-1894 1400088923 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL TA-843609 21-Apr-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP2+540 to KP2+556;
Pre-welding and weld joint fit up inspection for 10
1895 CPP-NGCP-W-1895 1400089386 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 22-Apr-19 8:00 AM Umair Mr. Suresh CLOSED
inch HWYH-1091 km 0+100 to 5+500
Post-welding visual inspection for 10 inch HWYH-
1896 CPP-NGCP-W-1896 1400089331 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 22-Apr-19 2.00 PM Umair Mr. Suresh CLOSED
1091km 0+100 to 5+500
NDE selection for welds of 10 inch HWYH-1091 TA-445958
1897 CPP-NGCP-W-1897 1400089340 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1091 FL 22-Apr-19 4.00 PM Umair Mr. Suresh CLOSED
km 0+100 to 5+500
Pre-welding and weld joint fit up inspection for 8 RECHEDULE TO RE-
1898 CPP-NGCP-W-1898 1400089376 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 FL TA-446045 22-Apr-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-975 FL at KM-0+100 to 3+900 SCHEDULE TO 23-04-2019
Post-welding visual inspection for 8inch HWYH- TA-446045 RECHEDULE TO RE-
1899 CPP-NGCP-W-1899 1400089341 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 FL 22-Apr-19 2.00 PM Imran Mr. Suresh CLOSED
975 FL at KM-0+100 to 3+900 SCHEDULE TO 23-04-2019
NDE selection for welds of 8 inch HWYH-975 FL RECHEDULE TO RE-
1900 CPP-NGCP-W-1900 1400089387 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-975 FL TA-446045 22-Apr-19 4:00 PM Imran Mr. Suresh CLOSED
at KM-0+100 to 3+900 SCHEDULE TO 23-04-2019
Pre-welding and weld joint fit up inspection for 10 TA-445838
1901 CPP-NGCP-W-1901 1400089351 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL 22-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1093 FL @ KM-0+200 to 3
Post-welding visual inspection for 10 inch HWYH-
1902 CPP-NGCP-W-1902 1400089378 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 22-Apr-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1093 FL @ KM-0+200 to 3
NDE selection for welds of 10 inch HWYH-1093 TA-445838
1903 CPP-NGCP-W-1903 1400089395 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL 22-Apr-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+200 to 3
Pre-welding and weld joint fit up inspection for 10 CANCELLED DUE TO NO RECHEDULE TO RE-
1904 CPP-NGCP-W-1904 1400089391 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445912 22-Apr-19 8:00 AM PRATHAB Mr. Suresh REJECTED
inch 16″HWYH CK-RH TRL km0+100 to 8+100 PERMIT SCHEDULE TO 23-04-2019
Post-welding visual inspection for 10 inch TA-445912 PRATHAB CANCELLED DUE TO NO RECHEDULE TO RE-
1905 CPP-NGCP-W-1905 1400089367 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL 22-Apr-19 2.00 PM Mr. Suresh REJECTED
16″HWYH CK-RH TRL km0+100 to 8+100 PERMIT SCHEDULE TO 23-04-2019
NDE selection for welds of 10 inch16″HWYH CK-
1906 CPP-NGCP-W-1906 1400089322 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH CK-RH TRL km0+100 to 16″HWYH CK-RH TRL TA-445912 22-Apr-19 4.00 PM PRATHAB Mr. Suresh REJECTED CANCELLED DUE TO NO RECHEDULE TO RE-
8+100 PERMIT SCHEDULE TO 23-04-2019
Pre-welding and weld joint fit up inspection for 10
1907 CPP-NGCP-W-1907 1400089414 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 22-Apr-19 8:00 AM PRATHAB Mr. Suresh CLOSED
inch 16″HWYH GK-RH TRL km0+100 to 12+500
Post-welding visual inspection for 10 inch
1908 CPP-NGCP-W-1908 1400089423 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 22-Apr-19 2.00 PM PRATHAB Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
NDE selection for welds of 10 inch16″HWYH GK-
1909 CPP-NGCP-W-1909 1400089382 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH GK-RH TRL km0+100 to 16″HWYH GK-RH TRL TA-445912 22-Apr-19 4.00 PM PRATHAB Mr. Suresh CLOSED
12+500
Pre-welding and weld joint fit up inspection for 24
Mr.
1910 CPP-NGCP-W-1910 1400089415 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 22-Apr-19 8:00 AM Saif CLOSED
Rajendran
Yard.
Post-welding visual inspection for 24 inch double TA-445989 Mr.
1911 CPP-NGCP-W-1911 1400089368 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. 22-Apr-19 2.00 PM Saif CLOSED
joints TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
NDE selection for welds of 24 inch double joints Mr.
1912 CPP-NGCP-W-1912 1400089435 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 22-Apr-19 4.00 PM Saif CLOSED
TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
In-Process Verification - RT Techniques &
1913 CPP-NGCP-W-1913 1400089451 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-619,1160,BKRH VARIOUS 22-Apr-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
619,1160,BKRH
Pre-welding and weld joint fit up inspection for 8
1914 CPP-NGCP-W-1914 1400089634 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL TA843560 22-Apr-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
inch HRDH-619 KP2+000 to KP2+400
Post-welding visual inspection for 8 inch HRDH-
1915 CPP-NGCP-W-1915 1400089667 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL TA843560 22-Apr-19 2.00 PM Sarfaraz Mr. Rajesh CLOSED
619 KP2+000 to KP2+400
NDE selection for welds of 8 inch HRDH-619
1916 CPP-NGCP-W-1916 1400089685 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-619 FL TA843560 22-Apr-19 4.00 PM Sarfaraz Mr. Rajesh CLOSED
KP2+000 to KP2+400
Pre-welding and weld joint fit up inspection for 10
1917 CPP-NGCP-W-1917 1400089666 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -902 FL TA-843606 22-Apr-19 8:00 AM Saif Mr. Rajesh REJECTED CANCELED DUE TO WEATHER
inch HRDH -902 KP0+600 to KP0+900; CONDITION
Post-welding visual inspection for 10 inch HRDH
1918 CPP-NGCP-W-1918 1400089637 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -902 FL TA-843606 22-Apr-19 2.00 PM Saif Mr. Rajesh REJECTED CANCELED DUE TO WEATHER
-902 KP0+600 to KP0+900; CONDITION
NDE selection for welds of 10 inch HRDH -902 CANCELED DUE TO WEATHER
1919 CPP-NGCP-W-1919 1400089688 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -902 FL TA-843606 22-Apr-19 4.00 PM Saif Mr. Rajesh REJECTED
KP0+600 to KP0+900; CONDITION
Pre-welding and weld joint fit up inspection for 8 Mr.
1920 CPP-NGCP-W-1920 1400089647 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1086 FL TA-843625 22-Apr-19 8:00 AM Shadab CLOSED
inch HRDH-1086 KP0+300 to KP0+500 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
1921 CPP-NGCP-W-1921 1400089641 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1086 FL TA-843625 22-Apr-19 2.00 PM Shadab CLOSED
1086 KP0+300 to KP0+500 Rajendran
NDE selection for welds of 8 inch HRDH-1086 Mr.
1922 CPP-NGCP-W-1922 1400089690 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1086 FL TA-843625 22-Apr-19 4.00 PM Shadab CLOSED
KP0+300 to KP0+500 Rajendran
Temperature Tie in Welding HRDH-1116 at TA-843608
1923 CPP-NGCP-W-1923 1400089601 Welding SATIP-W-012-01 SAIC-W-2057 KM-1+306 to 1+319 HRDH -1116 FL 22-Apr-19 8:00 AM IRSHAD Mr. Rajesh CLOSED
RE-SCHEDULE TO 23-04-2019
Pre-welding and weld joint fit up inspection for 8
1924 CPP-NGCP-W-1924 1400089773 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 22-Apr-19 8:00 AM IRSHAD Mr. Rajesh CLOSED
inch HRDH-1116 FL at KM-1+306 to 1+319 RE-SCHEDULE TO 23-04-2019
Post-welding visual inspection for 8inch HRDH-
1925 CPP-NGCP-W-1925 1400089738 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 22-Apr-19 2.00 PM IRSHAD Mr. Rajesh CLOSED
1116 FL at KM-1+306 to 1+319 RE-SCHEDULE TO 23-04-2019
NDE selection for welds of 8 inch HRDH-1116 FL
1926 CPP-NGCP-W-1926 1400089767 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1116 FL TA-843608 22-Apr-19 4.00 PM IRSHAD Mr. Rajesh CLOSED
at KM-1+306 to 1+319 RE-SCHEDULE TO 23-04-2019
Pre-welding and weld joint fit up inspection for 8
1927 CPP-NGCP-W-1927 1400089711 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 22-Apr-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH -922 KP2+130 to KP2+154;
Post-welding visual inspection for 8 inch HRDH
1928 CPP-NGCP-W-1928 1400089775 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 22-Apr-19 2.00 PM Rajesh Mr. Rajesh CLOSED
-922 KP2+130 to KP2+154;
NDE selection for welds of 8 inch HRDH -922
1929 CPP-NGCP-W-1929 1400089712 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL TA-843609 22-Apr-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP2+130 to KP2+154;
Pre-welding and weld joint fit up inspection for
1930 CPP-NGCP-W-1930 1400090325 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 23-Apr-19 8:00 AM Umair Mr. Suresh CLOSED
HWYH-1091 km 0+100 to 5+500
Post-welding visual inspection for HWYH-1091 km
1931 CPP-NGCP-W-1931 1400090297 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 23-Apr-19 2.00 PM Umair Mr. Suresh CLOSED
0+100 to 5+500
NDE selection for welds of HWYH-1091 km 0+100
1932 CPP-NGCP-W-1932 1400090298 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1091 FL TA-445958 23-Apr-19 4.00 PM Umair Mr. Suresh CLOSED
to 5+500
Pre-welding and weld joint fit up inspection for 10
1933 CPP-NGCP-W-1933 1400090291 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 23-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1093 FL @ KM-0+200 to 3
Post-welding visual inspection for 10 inch HWYH-
1934 CPP-NGCP-W-1934 1400090364 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 23-Apr-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1093 FL @ KM-0+200 to 3
NDE selection for welds of 10 inch HWYH-1093
1935 CPP-NGCP-W-1935 1400090354 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 23-Apr-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+200 to 3
Pre-welding and weld joint fit up inspection for
1936 CPP-NGCP-W-1936 1400090338 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 23-Apr-19 8:00 AM PRATHAB Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
Post-welding visual inspection for 16″HWYH GK-
1937 CPP-NGCP-W-1937 1400090384 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 23-Apr-19 2.00 PM PRATHAB Mr. Suresh CLOSED
RH TRL km0+100 to 12+500
NDE selection for welds of 10 inch16″HWYH GK-
1938 CPP-NGCP-W-1938 1400090360 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH GK-RH TRL km0+100 to 16″HWYH GK-RH TRL TA-445912 23-Apr-19 4.00 PM PRATHAB Mr. Suresh CLOSED
12+500
Pre-welding and weld joint fit up inspection for 24
TA-445989 Mr.
1939 CPP-NGCP-W-1939 1400090330 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. 23-Apr-19 8:00 AM Junaid CLOSED
Rajendran
Yard.
Post-welding visual inspection for 24 inch double Mr.
1940 CPP-NGCP-W-1940 1400090348 Welding SATIP-W-012-01 SAIC-W-2048 TCF-1, CPP Pipe Yard. TA-445989 23-Apr-19 2.00 PM Junaid CLOSED
joints TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
NDE selection for welds of 24 inch double joints TA-445989 Mr.
1941 CPP-NGCP-W-1941 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. 23-Apr-19 4.00 PM Junaid CLOSED
1400090396 TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8
1942 CPP-NGCP-W-1942 1400089968 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL TA843560 23-Apr-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-619 KP2+400 to KP2+500
Post-welding visual inspection for 8 inch HRDH- TA843560
1943 CPP-NGCP-W-1943 1400089947 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL 23-Apr-19 2.00 PM Rajesh Mr. Rajesh CLOSED
619 KP2+400 to KP2+500
NDE selection for welds of 8 inch HRDH-619
1944 CPP-NGCP-W-1944 1400089948 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-619 FL TA843560 23-Apr-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP2+400 to KP2+500
Pre-welding and weld joint fit up inspection for 10 TA-843606 RE-SCHEDULE TO 24-04-
1945 CPP-NGCP-W-1945 1400089984 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -902 FL 23-Apr-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
inch HRDH -902 KP0+500 to KP0+600; 2019
Post-welding visual inspection for 10 inch HRDH RE-SCHEDULE TO 24-04-
1946 CPP-NGCP-W-1946 1400089928 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -902 FL TA-843606 23-Apr-19 2.00 PM Sarfaraz Mr. Rajesh CLOSED
-902 KP0+500 to KP0+600; 2019
NDE selection for welds of 10 inch HRDH -902 TA-843606 RE-SCHEDULE TO 24-04-
1947 CPP-NGCP-W-1947 1400089949 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -902 FL 23-Apr-19 4.00 PM Sarfaraz Mr. Rajesh CLOSED
KP0+500 to KP0+600; 2019
Pre-welding and weld joint fit up inspection for 8 Mr. RE-SCHEDULE TO 24-04-
1948 CPP-NGCP-W-1948 1400089950 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1115 FL TA-843662 23-Apr-19 8:00 AM Shadab CLOSED
inch HWYH-1115 KP0+300 to KP0+500 Rajendran 2019
Post-welding visual inspection for 8 inch HWYH- Mr. RE-SCHEDULE TO 24-04-
1949 CPP-NGCP-W-1949 1400090015 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1115 FL TA-843662 23-Apr-19 2.00 PM Shadab CLOSED
1115 KP0+300 to KP0+500 Rajendran 2019
NDE selection for welds of 8 inch HWYH-1115 Mr. RE-SCHEDULE TO 24-04-
1950 CPP-NGCP-W-1950 1400090034 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1115 FL TA-843662 23-Apr-19 4.00 PM Shadab CLOSED
KP0+300 to KP0+500 Rajendran 2019
Mr.
1951 CPP-NGCP-W-1951 1400090010 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HRDH-922 HRDH -922 FL TA-843609 23-Apr-19 8:00 AM Sarfaraz CLOSED
Rajendran
Pre-welding and weld joint fit up inspection for 8
Mr.
1952 CPP-NGCP-W-1952 1400090011 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH -922 KP1+980 to KP2+025 and HRDH -922 FL TA-843609 23-Apr-19 8:00 AM Sarfaraz CLOSED
Rajendran RE-SCHEDULE TO 24-04-
KP2+128 to KP2+154 2019
Post-welding visual inspection for 8 inch HRDH
TA-843609 Mr.
1953 CPP-NGCP-W-1953 1400089997 Welding SATIP-W-012-01 SAIC-W-2048 -922 HRDH -922 KP1+980 to KP2+025 and HRDH -922 FL 23-Apr-19 2.00 PM Sarfaraz CLOSED
Rajendran RE-SCHEDULE TO 24-04-
KP2+128 to KP2+154 2019
NDE selection for welds of 8 inch HRDH -922
1954 CPP-NGCP-W-1954 1400089981 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 KP1+980 to KP2+025 and HRDH -922 FL TA-843609 23-Apr-19 4.00 PM Sarfaraz Mr. Rajesh CLOSED RE-SCHEDULE TO 24-04-
KP2+128 to KP2+154 2019
In-Process Verification - RT Techniques &
1955 CPP-NGCP-W-1955 1400090225 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-619,922, HRDH-619,922,1086,1160 VARIOUS 23-Apr-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1086,1160
In-Process Verification - RT Techniques &
HWYH-975,1055,1091,1093, VARIOUS 8:00 AM RAMEEZ
1956 CPP-NGCP-W-1956 1400090238 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- 23-Apr-19 Mr. Suresh CLOSED
GK-RH
975,1055,1091,1093,GK-RH
In-Process Verification - RT Techniques & Mr.
1957 CPP-NGCP-W-1957 1400090250 Welding SATIP-NDE-RT-01 SAIC-RT-2007 TCF-1 VARIOUS 23-Apr-19 8:00 AM RAMEEZ CLOSED
Procedure Implementation of TRL-2 at TCF-1 Rajendran
In-Process Inspection of MPT using Mr. Re-Schedule to 26-Apr-
1958 CPP-NGCP-W-1958 1400090278 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 TCF-1 VARIOUS 23-Apr-19 8:00 AM RAMEEZ CLOSED
Yoke Method, TRL-2 at TCF-1 Rajendran 2019 due to Sand Storm
Weld repair verification of joints
1959 CPP-NGCP-W-1959 1400090509 Welding SATIP-W-012-01 SAIC-W-2051 FW37.FW71.FW64 HWYH-1076 TA-445861 24-Apr-19 8.00 AM Shahbaz Mr. Suresh CLOSED
of HWYH-1076
Post-welding visual inspection of repair joints
1960 CPP-NGCP-W-1960 1400090432 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1076 TA-445861 24-Apr-19 4.00 PM Shahbaz Mr. Suresh CLOSED
FW37.FW71.FW64 of HWYH-1076
Pre-welding and weld joint fit up inspection for
1961 CPP-NGCP-W-1961 1400090634 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 24-Apr-19 8:00 AM Umair Mr. Suresh CLOSED
HWYH-1091 km 0+100 to 5+500
Post-welding visual inspection for HWYH-1091 km TA-445958 2.00 PM Umair
1962 CPP-NGCP-W-1962 1400090624 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL 24-Apr-19 Mr. Suresh CLOSED
0+100 to 5+500
NDE selection for welds of HWYH-1091 km 0+100
1963 CPP-NGCP-W-1963 1400091556 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1091 FL TA-445958 24-Apr-19 4.00 PM Umair Mr. Suresh CLOSED
to 5+500
Pre-welding and weld joint fit up inspection for 8 TA-446045 8:00 AM Imran CANCELLED DUE TO NO
1964 CPP-NGCP-W-1964 1400090528 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 FL 24-Apr-19 Mr. Suresh REJECTED
inch HWYH-975 FL at KM-0+100 to 3+900 PERMIT
Post-welding visual inspection for 8inch HWYH- CANCELLED DUE TO NO
1965 CPP-NGCP-W-1965 1400090532 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 FL TA-446045 24-Apr-19 2.00 PM Imran Mr. Suresh REJECTED
975 FL at KM-0+100 to 3+900 PERMIT
NDE selection for welds of 8 inch HWYH-975 FL TA-446045 4:00 PM Imran CANCELLED DUE TO NO
1966 CPP-NGCP-W-1966 1400090555 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-975 FL 24-Apr-19 Mr. Suresh REJECTED
at KM-0+100 to 3+900 PERMIT
Pre-welding and weld joint fit up inspection for 10
1967 CPP-NGCP-W-1967 1400091535 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 24-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1093 FL @ KM-0+200 to 3
Post-welding visual inspection for 10 inch HWYH- TA-445838 2.00 PM Abdul Aziz
1968 CPP-NGCP-W-1968 1400091510 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL 24-Apr-19 Mr. Suresh CLOSED
1093 FL @ KM-0+200 to 3
NDE selection for welds of 10 inch HWYH-1093
1969 CPP-NGCP-W-1969 1400091500 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 24-Apr-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+200 to 3
Pre-welding and weld joint fit up inspection for 10 TA-445974 8:00 AM PRATHAB
1970 CPP-NGCP-W-1970 1400090556 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL 24-Apr-19 Mr. Suresh CLOSED
inch 16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 10 inch
1971 CPP-NGCP-W-1971 1400090573 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 24-Apr-19 2.00 PM PRATHAB Mr. Suresh CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100
NDE selection for welds of 10 inch16″HWYH CK-
1972 CPP-NGCP-W-1972 1400090574 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH CK-RH TRL km0+100 to 16″HWYH CK-RH TRL TA-445974 24-Apr-19 4.00 PM PRATHAB Mr. Suresh CLOSED
8+100
Pre-welding and weld joint fit up inspection for
1973 CPP-NGCP-W-1973 1400091574 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 24-Apr-19 8:00 AM PRATHAB Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a Post-welding visual inspection for 16″HWYH GK-
1974 CPP-NGCP-W-1974 1400091567 l Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 24-Apr-19 2.00 PM PRATHAB Mr. Suresh CLOSED
RH TRL km0+100 to 12+500
NDE selection for welds of 10 inch16″HWYH GK-
1975 CPP-NGCP-W-1975 1400091547 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH GK-RH TRL km0+100 to 16″HWYH GK-RH TRL TA-445912 24-Apr-19 4.00 PM PRATHAB Mr. Suresh CLOSED
12+500
Pre-welding and weld joint fit up inspection for 24
TA-445989 8:00 AM Mr.
1976 CPP-NGCP-W-1976 1400091586 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. 24-Apr-19 Junaid CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
1977 CPP-NGCP-W-1977 1400091528 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 24-Apr-19 2.00 PM Junaid CLOSED
Yard. Rajendran
NDE selection for welds of 24 inch double joints Mr.
1978 CPP-NGCP-W-1978 1400091589 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 24-Apr-19 4.00 PM Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8
1979 CPP-NGCP-W-1979 1400091717 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL TA843560 24-Apr-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
inch HRDH-619 KP2+500 to KP2+700
Post-welding visual inspection for 8 inch HRDH- TA843560
1980 CPP-NGCP-W-1980 1400091724 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL 24-Apr-19 2.00 PM Sarfaraz Mr. Rajesh CLOSED
619 KP2+500 to KP2+700
NDE selection for welds of 8 inch HRDH-619
1981 CPP-NGCP-W-1981 1400091660 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-619 FL TA843560 24-Apr-19 4.00 PM Sarfaraz Mr. Rajesh CLOSED
KP2+500 to KP2+700
Pre-welding and weld joint fit up inspection for 16 HRDH -BK-RH TA-843957 Mr.
1982 CPP-NGCP-W-1982 1400091708 Welding SATIP-W-012-01 SAIC-W-2048 25-Apr-19 8:00 AM IRSHAD CLOSED
inch HRDH BK-RH TR/L KP0+600 to KP0+700; TR/L Rajendran already inform Irshad
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH Mr.
1983 CPP-NGCP-W-1983 1400091712 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 24-Apr-19 2.00 PM IRSHAD CLOSED
BK-RH TR/L KP0+600 to KP0+700; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH TA-843957 Mr.
1984 CPP-NGCP-W-1984 1400091748 Welding SATIP-W-012-01 SAIC-W-2054 24-Apr-19 4.00 PM IRSHAD CLOSED
TR/L KP0+600 to KP0+700; TR/L Rajendran
In-Process Verification - RT Techniques &
HWYH-975,1091,1093,GK-RH,
1985 CPP-NGCP-W-1985 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- VARIOUS 24-Apr-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1118
1400091766 ### 975,1091,1093,GK-RH, 1118
Weld repair verification of joints
1987 CPP-NGCP-W-1987 Welding SATIP-W-012-01 SAIC-W-2051 FW53.FW56.FW57 HWYH-1076 TA-445861 25-Apr-19 8.00 AM Shahbaz Mr. Suresh CLOSED
1400091197 of HWYH-1076
Post-welding visual inspection of repair joints
1988 CPP-NGCP-W-1988 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1076 TA-445861 25-Apr-19 4.00 PM Shahbaz Mr. Suresh CLOSED
1400091227 FW53.FW56.FW57 of HWYH-1076
Pre-welding and weld joint fit up inspection for
1989 CPP-NGCP-W-1989 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 25-Apr-19 8:00 AM Umair Mr. Suresh CLOSED
1400091235 HWYH-1003 KP0+100 to KP7+900
Post-welding visual inspection forHWYH-1003
1990 CPP-NGCP-W-1990 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 25-Apr-19 2.00 PM Umair Mr. Suresh CLOSED
1400091192 KP0+100 to KP7+900
NDE selection for welds of HWYH-1003 KP0+100
1991 CPP-NGCP-W-1991 Welding SATIP-W-012-01 SAIC-W-2054 HWYH1003 TA-445856 25-Apr-19 4.00 PM Umair Mr. Suresh CLOSED
1400091258 to KP7+900
Pre-welding and weld joint fit up inspection for 8 CANCELLED DUE TO NO
1992 CPP-NGCP-W-1992 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 FL TA-446045 25-Apr-19 8:00 AM Imran Mr. Suresh REJECTED
1400091264 inch HWYH-975 FL at KM-0+100 to 3+900 PERMIT
Post-welding visual inspection for 8inch HWYH- CANCELLED DUE TO NO
1993 CPP-NGCP-W-1993 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 FL TA-446045 25-Apr-19 2.00 PM Imran Mr. Suresh REJECTED
1400091285 975 FL at KM-0+100 to 3+900 PERMIT
NDE selection for welds of 8 inch HWYH-975 FL CANCELLED DUE TO NO
1994 CPP-NGCP-W-1994 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-975 FL TA-446045 25-Apr-19 4:00 PM Imran Mr. Suresh REJECTED
1400091287 at KM-0+100 to 3+900 PERMIT
Pre-welding and weld joint fit up inspection for 10
1995 CPP-NGCP-W-1995 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 25-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
1400091288 inch HWYH-1093 FL @ KM-0+200 to 3
Post-welding visual inspection for 10 inch HWYH-
1996 CPP-NGCP-W-1996 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 25-Apr-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1400091313 1093 FL @ KM-0+200 to 3
NDE selection for welds of 10 inch HWYH-1093
1997 CPP-NGCP-W-1997 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 25-Apr-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
1400091210 FL @ KM-0+200 to 3
Pre-welding and weld joint fit up inspection for 10
1998 CPP-NGCP-W-1998 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 25-Apr-19 8:00 AM PRATHAB Mr. Suresh CLOSED
1400091241 inch 16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 10 inch
1999 CPP-NGCP-W-1999 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 25-Apr-19 2.00 PM PRATHAB Mr. Suresh CLOSED
1400091318 16″HWYH CK-RH TRL km0+100 to 8+100
NDE selection for welds of 10 inch16″HWYH CK-
2000 CPP-NGCP-W-2000 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH CK-RH TRL km0+100 to 16″HWYH CK-RH TRL TA-445974 25-Apr-19 4.00 PM PRATHAB Mr. Suresh CLOSED
1400091307 8+100
Pre-welding and weld joint fit up inspection for 24
Mr.
2001 CPP-NGCP-W-2001 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. TA-445989 25-Apr-19 8:00 AM Junaid CLOSED
Rajendran
1400091320 CPP Pipe Yard.
Post-welding visual inspection for 24 inch double Mr.
2002 CPP-NGCP-W-2002 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 25-Apr-19 2.00 PM Junaid CLOSED
1400091363 Rajendran
Yard.
NDE selection for welds of 24 inch double joints Mr.
2003 CPP-NGCP-W-2003 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 25-Apr-19 4.00 PM Junaid CLOSED
1400091365 HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8 CANCELLED DUE TO NO
2004 CPP-NGCP-W-2004 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 FL TA-446045 26-Apr-19 8:00 AM Imran Mr. Suresh REJECTED
1400091330 inch HWYH-975 FL at KM-0+100 to 3+900 PERMIT
Post-welding visual inspection for 8inch HWYH- CANCELLED DUE TO NO
2005 CPP-NGCP-W-2005 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 FL TA-446045 26-Apr-19 2.00 PM Imran Mr. Suresh REJECTED
1400091404 975 FL at KM-0+100 to 3+900 PERMIT
NDE selection for welds of 8 inch HWYH-975 FL CANCELLED DUE TO NO
2006 CPP-NGCP-W-2006 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-975 FL TA-446045 26-Apr-19 4:00 PM Imran Mr. Suresh REJECTED
1400091312 at KM-0+100 to 3+900 PERMIT
Pre-welding and weld joint fit up inspection for 10
2007 CPP-NGCP-W-2007 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 26-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
1400091445 inch HWYH-1093 FL @ KM-0+200 to 3
Post-welding visual inspection for 10 inch HWYH-
2008 CPP-NGCP-W-2008 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 26-Apr-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1400091425 1093 FL @ KM-0+200 to 3
NDE selection for welds of 10 inch HWYH-1093
2009 CPP-NGCP-W-2009 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 26-Apr-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
1400091350 FL @ KM-0+200 to 3
Weld repair verification of joints FW94
2010 CPP-NGCP-W-2010 Welding SATIP-W-012-01 SAIC-W-2051 HWYH-1076 TA-445861 26-Apr-19 8.00 AM Shahbaz Mr. Suresh CLOSED
1400091381 of HWYH-1076
Post-welding visual inspection of repair joints
2011 CPP-NGCP-W-2011 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1076 TA-445861 26-Apr-19 4.00 PM Shahbaz Mr. Suresh CLOSED
1400091420 FW94 of HWYH-1076
Pre-welding and weld joint fit up inspection for 24
Mr.
2012 CPP-NGCP-W-2012 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. TA-445989 26-Apr-19 8:00 AM Junaid CLOSED
Rajendran
1400091456 CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
2013 CPP-NGCP-W-2013 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 26-Apr-19 2.00 PM Junaid CLOSED
1400091464 Rajendran
Yard.
NDE selection for welds of 24 inch double joints TA-445989 4.00 PM Mr.
2014 CPP-NGCP-W-2014 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. 26-Apr-19 Junaid CLOSED
1400091473 HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 10
2015 CPP-NGCP-W-2015 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -902 TA-843606 25-Apr-19 8:00 AM Saif Mr. Rajesh CLOSED
1400091572 inch HRDH -902 KP0+500 to KP0+600;
Post-welding visual inspection for 10 inch HRDH TA-843606 2.00 PM Saif
2016 CPP-NGCP-W-2016 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -902 25-Apr-19 Mr. Rajesh CLOSED
1400091673 -902 KP0+500 to KP0+600;
NDE selection for welds of 10 inch HRDH -902
2017 CPP-NGCP-W-2017 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -902 TA-843606 25-Apr-19 4.00 PM Saif Mr. Rajesh CLOSED
1400091624 KP0+500 to KP0+600;
Temperature Tie in Welding HRDH-1116 at KM- TA-843608 10:00 AM
2018 CPP-NGCP-W-2018 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1116 FL 25-Apr-19 Rajesh Mr. Rajesh CLOSED
1400091122 1+200
Pre-welding and weld joint fit up inspection for 8
2019 CPP-NGCP-W-2019 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 25-Apr-19 8:00 AM Rajesh Mr. Rajesh CLOSED
1400091516 inch HRDH-1116 FL at KM-1+200
Post-welding visual inspection for 8inch HRDH-
2020 CPP-NGCP-W-2020 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 25-Apr-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1400091321 1116 FL at KM-1+200
NDE selection for welds of 8 inch HRDH-1116 FL
2021 CPP-NGCP-W-2021 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1116 FL TA-843608 25-Apr-19 4.00 PM Rajesh Mr. Rajesh CLOSED
1400091372 at KM-1+200
Pre-welding and weld joint fit up inspection for 8
2022 CPP-NGCP-W-2022 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL TA843560 25-Apr-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
1400091328 inch HRDH-619 KP2+700 to KP3+000
Post-welding visual inspection for 8 inch HRDH-
2023 CPP-NGCP-W-2023 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL TA843560 25-Apr-19 2.00 PM Sarfaraz Mr. Rajesh CLOSED
1400091414 619 KP2+700 to KP3+000
NDE selection for welds of 8 inch HRDH-619
2024 CPP-NGCP-W-2024 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-619 FL TA843560 25-Apr-19 4.00 PM Sarfaraz Mr. Rajesh CLOSED
1400091331 KP2+700 to KP3+000
Pre-welding and weld joint fit up inspection for 10
2025 CPP-NGCP-W-2025 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -902 FL TA-843606 25-Apr-19 8:00 AM Saif Mr. Rajesh CLOSED
1400091415 inch HRDH -902 KP0+900 to KP1+300;
Post-welding visual inspection for 10 inch HRDH
2026 CPP-NGCP-W-2026 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -902 FL TA-843606 25-Apr-19 2.00 PM Saif Mr. Rajesh CLOSED
1400091407 -902 KP0+900 to KP1+300;
NDE selection for welds of 10 inch HRDH -902
2027 CPP-NGCP-W-2027 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -902 FL TA-843606 25-Apr-19 4.00 PM Saif Mr. Rajesh CLOSED
1400091409 KP0+900 to KP1+300;
Pre-welding and weld joint fit up inspection for 16 HRDH -BK-RH Mr.
2028 CPP-NGCP-W-2028 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 25-Apr-19 8:00 AM IRSHAD CLOSED
1400091454 inch HRDH BK-RH TR/L KP0+700 to KP0+800; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH Mr.
2029 CPP-NGCP-W-2029 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 25-Apr-19 2.00 PM IRSHAD CLOSED
1400091436 BK-RH TR/L KP0+700 to KP0+800; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH Mr.
2030 CPP-NGCP-W-2030 Welding SATIP-W-012-01 SAIC-W-2054 TA-843957 25-Apr-19 4.00 PM IRSHAD CLOSED
1400091418 TR/L KP0+700 to KP0+800; TR/L Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
2031 CPP-NGCP-W-2031 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1115 FL TA-843662 25-Apr-19 8:00 AM Shadab CLOSED
1400091391 inch HWYH-1115 KP0+500 to KP0+700 Rajendran
Post-welding visual inspection for 8 inch HWYH- Mr.
2032 CPP-NGCP-W-2032 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1115 FL TA-843662 25-Apr-19 2.00 PM Shadab CLOSED
1400091457 1115 KP0+500 to KP0+700 Rajendran
NDE selection for welds of 8 inch HWYH-1115 Mr.
2033 CPP-NGCP-W-2033 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1115 FL TA-843662 25-Apr-19 4.00 PM Shadab CLOSED
1400091351 KP0+500 to KP0+700 Rajendran
Weld repair verification of joints HRDH
01-FW-153T2 ,158 of HRDH 1117, 1117 VARIOUS 8:00 AM Farhan
2034 CPP-NGCP-W-2034 Welding SATIP-W-012-01 SAIC-W-2051 25-Apr-19 Mr. Rajesh CLOSED
00-FW-91T,127 of HRDH-1063 1063
1400091451 00-FW-35 of HWYH-1078 1078
Post-welding visual inspection of repair joints HRDH
01-FW-153T2 ,158 of HRDH 1117, 1117 VARIOUS 11:00 AM Farhan
2035 CPP-NGCP-W-2035 Welding SATIP-W-012-01 SAIC-W-2048 25-Apr-19 Mr. Rajesh CLOSED
00-FW-91T,127 of HRDH-1063 1063
1400091521 00-FW-35 of HWYH-1078 1078
In-Process Verification - RT Techniques &
2036 CPP-NGCP-W-2036 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-619,902,922,1086,1116,1178 VARIOUS 25-Apr-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1400091647 619,902,922,1086,1116,1178
In-Process Verification - RT Techniques &
2037 CPP-NGCP-W-2037 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- HWYH-975,1091,1093,GK-RH VARIOUS 25-Apr-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1400091582 975,1091,1093,GK-RH
In-Process Verification - RT Techniques & VARIOUS 8:00 AM RAMEEZ Mr.
2038 CPP-NGCP-W-2038 Welding SATIP-NDE-RT-01 SAIC-RT-2007 TCF-1 25-Apr-19 CLOSED
1400091625 Procedure Implementation of TRL-2 at TCF-1 Rajendran
Pre-welding and weld joint fit up inspection for
2039 CPP-NGCP-W-2039 1400091642 Welding SATIP-W-012-01 SAIC-W-2048
HWYH-1003 KP0+100 to KP7+900
HWYH1003 TA-445856 27-Apr-19 8:00 AM Umair Mr. Suresh CLOSED
Post-welding visual inspection forHWYH-1003
2040 CPP-NGCP-W-2040 1400091773 Welding SATIP-W-012-01 SAIC-W-2048
KP0+100 to KP7+900
HWYH1003 TA-445856 27-Apr-19 2.00 PM Umair Mr. Suresh CLOSED
NDE selection for welds of HWYH-1003 KP0+100
2041 CPP-NGCP-W-2041 1400091736 Welding SATIP-W-012-01 SAIC-W-2054
to KP7+900
HWYH1003 TA-445856 27-Apr-19 4.00 PM Umair Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 8
2042 CPP-NGCP-W-2042 1400091670 Welding SATIP-W-012-01 SAIC-W-2048
inch HWYH-1036 KP0+100 to KP6+200
HWYH-1036 FL TA-445826 27-Apr-19 8:00 AM Imran Mr. Suresh CLOSED
Post-welding visual inspection for 8inch HWYH-
2043 CPP-NGCP-W-2043 1400091710 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 27-Apr-19 2.00 PM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 8 inch HWYH-1036
2044 CPP-NGCP-W-2044 1400091764 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 27-Apr-19 4:00 PM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
2045 CPP-NGCP-W-2045 1400091738 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 27-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1093 FL @ KM-0+200 to 3
Post-welding visual inspection for 10 inch HWYH-
2046 CPP-NGCP-W-2046 1400091784 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 27-Apr-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1093 FL @ KM-0+200 to 3
NDE selection for welds of 10 inch HWYH-1093
2047 CPP-NGCP-W-2047 1400091776 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 27-Apr-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+200 to 3
Weld repair verification of joints
2048 CPP-NGCP-W-2048 1400091819 Welding SATIP-W-012-01 SAIC-W-2051 HWYH-1071 TA-445830 27-Apr-19 8.00 AM Shahbaz Mr. Suresh CLOSED
FW10A2,FW12,FW29R1 HWYH-1071
Post-welding visual inspection of repair joints
2049 CPP-NGCP-W-2049 1400091760 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 TA-445830 27-Apr-19 4.00 PM Shahbaz Mr. Suresh CLOSED
FW10A2,FW12,FW29R1 HWYH-1071
Pre-welding and weld joint fit up inspection CANCELLED DUE TO NO
2050 CPP-NGCP-W-2050 1400091740 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 27-Apr-19 8:00 AM PRATHAB Mr. Suresh REJECTED
for16″HWYH CK-RH TRL km0+100 to 8+100 PERMIT RE-SCHEDULE TO 28-04-2019
Post-welding visual inspection for 16″HWYH CK- CANCELLED DUE TO NO
2051 CPP-NGCP-W-2051 1400091793 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 27-Apr-19 2.00 PM PRATHAB Mr. Suresh REJECTED
RH TRL km0+100 to 8+100 PERMIT RE-SCHEDULE TO 28-04-2019
NDE selection for welds of 16″HWYH CK-RH TRL CANCELLED DUE TO NO
2052 CPP-NGCP-W-2052 1400091806 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 27-Apr-19 4.00 PM PRATHAB Mr. Suresh REJECTED
km0+100 to 8+100 PERMIT RE-SCHEDULE TO 28-04-2019
Pre-welding and weld joint fit up inspection for 24
Mr.
2053 CPP-NGCP-W-2053 1400091824 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. TA-445989 27-Apr-19 8:00 AM Junaid CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
TA-445989 Mr.
2054 CPP-NGCP-W-2054 1400091732 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. 27-Apr-19 2.00 PM Junaid CLOSED
Rajendran
Yard.
NDE selection for welds of 24 inch double joints Mr.
2055 CPP-NGCP-W-2055 1400091807 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 27-Apr-19 4.00 PM Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8 TA843560
2056 CPP-NGCP-W-2056 1400091911 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL 27-Apr-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
inch HRDH-619 KP3+000 to KP3+300
Post-welding visual inspection for 8 inch HRDH-
2057 CPP-NGCP-W-2057 1400091915 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL TA843560 27-Apr-19 2.00 PM Sarfaraz Mr. Rajesh CLOSED
619 KP3+000 to KP3+3000
NDE selection for welds of 8 inch HRDH-619
2058 CPP-NGCP-W-2058 1400091916 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-619 FL TA843560 27-Apr-19 4.00 PM Sarfaraz Mr. Rajesh CLOSED
KP3+000 to KP3+300
Pre-welding and weld joint fit up inspection for 10
2059 CPP-NGCP-W-2059 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -902 FL TA-843606 27-Apr-19 8:00 AM Saif Mr. Rajesh CLOSED
1400091877 inch HRDH -902 KP1+300 to KP1+400;
Post-welding visual inspection for 10 inch HRDH
2060 CPP-NGCP-W-2060 1400091944 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -902 FL TA-843606 27-Apr-19 2.00 PM Saif Mr. Rajesh CLOSED
-902 KP1+300 to KP1+400;
NDE selection for welds of 10 inch HRDH -902
2061 CPP-NGCP-W-2061 1400091851 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -902 FL TA-843606 27-Apr-19 4.00 PM Saif Mr. Rajesh CLOSED
KP1+300 to KP1+400;
Pre-welding and weld joint fit up inspection for 16 HRDH -BK-RH Mr.
2062 CPP-NGCP-W-2062 1400091917 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 27-Apr-19 8:00 AM IRSHAD CLOSED
inch HRDH BK-RH TR/L KP0+900 to KP1+000; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH Mr.
2063 CPP-NGCP-W-2063 1400091879 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 27-Apr-19 2.00 PM IRSHAD CLOSED
BK-RH TR/L KP0+900 to KP1+000; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH Mr.
2064 CPP-NGCP-W-2064 1400091880 Welding SATIP-W-012-01 SAIC-W-2054 TA-843957 27-Apr-19 4.00 PM IRSHAD CLOSED
TR/L KP0+900 to KP1+000; TR/L Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
2065 CPP-NGCP-W-2065 1400091932 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1115 FL TA-843662 27-Apr-19 8:00 AM Shadab CLOSED
inch HWYH-1115 KP0+700 to KP1+000 Rajendran
Post-welding visual inspection for 8 inch HWYH- Mr.
2066 CPP-NGCP-W-2066 1400091965 Welding SATIP-W-012-01 SAIC-W-2048
1115 KP0+700 to KP1+000
HWYH-1115 FL TA-843662 27-Apr-19 2.00 PM Shadab
Rajendran
CLOSED
NDE selection for welds of 8 inch HWYH-1115 Mr.
2067 CPP-NGCP-W-2067 1400091952 Welding SATIP-W-012-01 SAIC-W-2054
KP0+700 to KP1+000
HWYH-1115 FL TA-843662 27-Apr-19 4.00 PM Shadab
Rajendran
CLOSED
2068 CPP-NGCP-W-2068 1400092000 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HRDH-922 at KP 1870 HRDH -922 FL TA-843609 27-Apr-19 10:00 AM Rajesh Mr. Rajesh CLOSED
Pre-welding and weld joint fit up inspection for 8
2069 CPP-NGCP-W-2069 1400092020 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH -922 KP1+870 and KP1+722 to HRDH -922 FL TA-843609 27-Apr-19 8:00 AM Rajesh Mr. Rajesh CLOSED
KP1+762
Post-welding visual inspection for 8 inch HRDH TA-843609
2070 CPP-NGCP-W-2070 1400092029 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL 27-Apr-19 2.00 PM Rajesh Mr. Rajesh CLOSED
-922 KP1+870 and KP1+722 to KP1+762
NDE selection for welds of 8 inch HRDH -922
2071 CPP-NGCP-W-2071 1400092043 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL TA-843609 27-Apr-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP1+870 and KP1+722 to KP1+762
In-Process Verification - RT Techniques &
HRDH-619,902,922,1086,1116,BK-
2072 CPP-NGCP-W-2072 1400092102 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- VARIOUS 27-Apr-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
RH
619,902,922,1086,1116,BK-RH
In-Process Verification - RT Techniques &
HWYH-975,1091,1093,GK-RH, CK-
2073 CPP-NGCP-W-2073 1400092176 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- VARIOUS 27-Apr-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
RH
975,1091,1093,GK-RH, CK-RH
Pre-welding and weld joint fit up inspection for
2074 CPP-NGCP-W-2074 1400092553 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 28-Apr-19 8:00 AM Umair Mr. Suresh CLOSED
HWYH-1003 KP0+100 to KP7+900
Post-welding visual inspection forHWYH-1003 TA-445856 2.00 PM Umair
2075 CPP-NGCP-W-2075 1400092554 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 28-Apr-19 Mr. Suresh CLOSED
KP0+100 to KP7+900
NDE selection for welds of HWYH-1003 KP0+100
2076 CPP-NGCP-W-2076 1400092490 Welding SATIP-W-012-01 SAIC-W-2054 HWYH1003 TA-445856 28-Apr-19 4.00 PM Umair Mr. Suresh CLOSED
to KP7+900
Pre-welding and weld joint fit up inspection for 8 TA-445826 8:00 AM Imran
2077 CPP-NGCP-W-2077 1400092559 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL 28-Apr-19 Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 8inch HWYH-
2078 CPP-NGCP-W-2078 1400092560 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 28-Apr-19 2.00 PM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 8 inch HWYH-1036 TA-445826 4:00 PM Imran
2079 CPP-NGCP-W-2079 1400092561 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL 28-Apr-19 Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10 RE-SCHEDULE TO 29-04-
2080 CPP-NGCP-W-2080 1400092593 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 28-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1093 FL @ KM-0+200 to 3 2019
Post-welding visual inspection for 10 inch HWYH- RE-SCHEDULE TO 29-04-
2081 CPP-NGCP-W-2081 1400092512 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 28-Apr-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1093 FL @ KM-0+200 to 3 2019
NDE selection for welds of 10 inch HWYH-1093 RE-SCHEDULE TO 29-04-
2082 CPP-NGCP-W-2082 1400092574 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 28-Apr-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+200 to 3 2019
Weld repair verification of joints
2083 CPP-NGCP-W-2083 1400092572 Welding SATIP-W-012-01 SAIC-W-2051 HWYH-1071 TA-445830 28-Apr-19 8.00 AM PRATHAB Mr. Suresh CLOSED
FW31R1、FW45、FW49、FW128 HWYH-1071
Post-welding visual inspection of repair joints
2084 CPP-NGCP-W-2084 1400092639 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 TA-445830 28-Apr-19 4.00 PM PRATHAB Mr. Suresh CLOSED
FW31R1、FW45、FW49、FW128 HWYH-1071
Pre-welding and weld joint fit up inspection for 24
TA-445989 8:00 AM Mr.
2085 CPP-NGCP-W-2085 1400092640 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. 28-Apr-19 Junaid CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
2086 CPP-NGCP-W-2086 1400092669 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 28-Apr-19 2.00 PM Junaid CLOSED
Rajendran
Yard.
NDE selection for welds of 24 inch double joints TA-445989 4.00 PM Mr.
2087 CPP-NGCP-W-2087 1400092693 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. 28-Apr-19 Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8
2088 CPP-NGCP-W-2088 1400092624 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL TA843560 28-Apr-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
inch HRDH-619 KP3+300 to KP3+500
Post-welding visual inspection for 8 inch HRDH- TA843560
2089 CPP-NGCP-W-2089 1400092588 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL 28-Apr-19 2.00 PM Sarfaraz Mr. Rajesh CLOSED
619 KP3+300 to KP3+500
NDE selection for welds of 8 inch HRDH-619
2090 CPP-NGCP-W-2090 1400092617 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-619 FL TA843560 28-Apr-19 4.00 PM Sarfaraz Mr. Rajesh CLOSED
KP3+300 to KP3+500
Pre-welding and weld joint fit up inspection for 10
2091 CPP-NGCP-W-2091 1400092645 Welding SATIP-W-012-01 SAIC-W-2048
inch HRDH -902KP1+400 to KP1+500;
HRDH -902 FL TA-843606 28-Apr-19 8:00 AM Saif Mr. Rajesh CLOSED

Post-welding visual inspection for 10 inch HRDH


2092 CPP-NGCP-W-2092 1400092646 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -902 FL TA-843606 28-Apr-19 2.00 PM Saif Mr. Rajesh CLOSED
-902 KP1+400 to KP1+500;
NDE selection for welds of 10 inch HRDH -902 TA-843606
2093 CPP-NGCP-W-2093 1400092570 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -902 FL 28-Apr-19 4.00 PM Saif Mr. Rajesh CLOSED
KP1+400 to KP1+500;
Pre-welding and weld joint fit up inspection for 8 Mr.
2094 CPP-NGCP-W-2094 1400092605 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1115 FL TA-843662 28-Apr-19 8:00 AM Shadab CLOSED
inch HWYH-1115 KP1+000 to KP1+300 Rajendran
Post-welding visual inspection for 8 inch HWYH- Mr.
2095 CPP-NGCP-W-2095 1400092667 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1115 FL TA-843662 28-Apr-19 2.00 PM Shadab CLOSED
1115 KP1+000 to KP1+300 Rajendran
NDE selection for welds of 8 inch HWYH-1115 Mr.
2096 CPP-NGCP-W-2096 1400092675 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1115 FL TA-843662 28-Apr-19 4.00 PM Shadab CLOSED
KP1+000 to KP1+300 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -BK-RH TA-843957 Mr.
2097 CPP-NGCP-W-2097 1400092676 Welding SATIP-W-012-01 SAIC-W-2048 28-Apr-19 8:00 AM IRSHAD CLOSED
inch HRDH BK-RH TR/L KP1+200 to KP1+400; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH Mr.
2098 CPP-NGCP-W-2098 1400092608 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 28-Apr-19 2.00 PM IRSHAD CLOSED
BK-RH TR/L KP1+200 to KP1+400; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH TA-843957 Mr.
2099 CPP-NGCP-W-2099 1400092659 Welding SATIP-W-012-01 SAIC-W-2054 28-Apr-19 4.00 PM IRSHAD CLOSED
TR/L KP1+200 to KP1+400; TR/L Rajendran
In-Process Verification - RT Techniques &
HRDH-619,902,922,1086,1116,BK-
2100 CPP-NGCP-W-2100 1400093174 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- VARIOUS 28-Apr-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
RH
619,902,922,1086,1116,BK-RH
In-Process Verification - RT Techniques &
2101 CPP-NGCP-W-2101 1400093183 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- HWYH-1003,1091,1093,CK-RH VARIOUS 28-Apr-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1003,1091,1093,CK-RH
2102 CPP-NGCP-W-2102 1400093178 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HRDH-922 HRDH -922 FL TA-843609 28-Apr-19 8:00 AM Rajesh Mr. Rajesh CLOSED
Pre-welding and weld joint fit up inspection for 8
2103 CPP-NGCP-W-2103 1400093184 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 28-Apr-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH -922 KP1+850 and KP2+046
Post-welding visual inspection for 8 inch HRDH
2104 CPP-NGCP-W-2104 1400093156 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 28-Apr-19 2.00 PM Rajesh Mr. Rajesh CLOSED
-922 KP1+850 and KP2+046
NDE selection for welds of 8 inch HRDH -922
2105 CPP-NGCP-W-2105 1400093127 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL TA-843609 28-Apr-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP1+850 and KP2+046
Review of weekly welder performance and
2106 CPP-NGCP-W-2106 1400093160 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 19-Mar-2019 to 25 CPP SITE OFFICE N/A 28-Apr-19 8:00 AM Ruhul Mr. Rajesh CLOSED
Mar-2019 at CPP site office.
Pre-welding and weld joint fit up inspection for RE-SCHEDULE TO 30-
2107 CPP-NGCP-W-2107 1400093253 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 29-Apr-19 8:00 AM Umair Mr. Suresh CLOSED
HWYH-1003 KP0+100 to KP7+900 04-2019
Post-welding visual inspection forHWYH-1003 RE-SCHEDULE TO 30-
2108 CPP-NGCP-W-2108 1400093254 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 29-Apr-19 2.00 PM Umair Mr. Suresh CLOSED
KP0+100 to KP7+900 04-2019
NDE selection for welds of HWYH-1003 KP0+100 TA-445856 RE-SCHEDULE TO 30-
2109 CPP-NGCP-W-2109 1400093234 Welding SATIP-W-012-01 SAIC-W-2054 HWYH1003 29-Apr-19 4.00 PM Umair Mr. Suresh CLOSED
to KP7+900 04-2019
Pre-welding and weld joint fit up inspection for 8
2110 CPP-NGCP-W-2110 1400093132 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 29-Apr-19 8:00 AM Umair Mr. Suresh CLOSED
inch HWYH-1091 FL at KM-0+100 to 5+500
Post-welding visual inspection for 8inch HWYH-
2111 CPP-NGCP-W-2111 1400093167 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1091 FL TA-445958 29-Apr-19 2.00 PM Umair Mr. Suresh CLOSED
1091 FL at KM-0+100 to 5+500
NDE selection for welds of 8 inch HWYH-1091 FL TA-445958
2112 CPP-NGCP-W-2112 1400093168 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1091 FL 29-Apr-19 4:00 PM Umair Mr. Suresh CLOSED
at KM-0+100 to 5+500
Pre-welding and weld joint fit up inspection for 8
2113 CPP-NGCP-W-2113 1400093258 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 29-Apr-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 8inch HWYH- TA-445826
2114 CPP-NGCP-W-2114 1400093273 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL 29-Apr-19 2.00 PM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 8 inch HWYH-1036
2115 CPP-NGCP-W-2115 1400093227 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 29-Apr-19 4:00 PM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Weld repair verification of joints FW35R1 at TA-445861 PRATHAB
2116 CPP-NGCP-W-2116 1400093191 Welding SATIP-W-012-01 SAIC-W-2051 HWYH-1076 29-Apr-19 8.00 AM Mr. Suresh CLOSED
HWYH-1076
Post-welding visual inspection of repair joints
2117 CPP-NGCP-W-2117 1400093192 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1076 TA-445861 29-Apr-19 4.00 PM PRATHAB Mr. Suresh CLOSED
FW35R1 HWYH-1076
Pre-welding and weld joint fit up inspection TA-445974
2118 CPP-NGCP-W-2118 1400093299 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL 29-Apr-19 8:00 AM Shahbaz Mr. Suresh CLOSED
for16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK-
2119 CPP-NGCP-W-2119 1400093325 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 29-Apr-19 2.00 PM Shahbaz Mr. Suresh CLOSED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH TRL TA-445974
2120 CPP-NGCP-W-2120 1400093300 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL 29-Apr-19 4.00 PM Shahbaz Mr. Suresh CLOSED
km0+100 to 8+100
Pre-welding and weld joint fit up inspection for 24
Mr.
2121 CPP-NGCP-W-2121 1400093353 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. TA-445989 29-Apr-19 8:00 AM Junaid CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
2122 CPP-NGCP-W-2122 1400093278 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 29-Apr-19 2.00 PM Junaid CLOSED
Rajendran
Yard.
NDE selection for welds of 24 inch double joints Mr.
2123 CPP-NGCP-W-2123 1400093318 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 29-Apr-19 4.00 PM Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8
2124 CPP-NGCP-W-2124 1400093256 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL TA843560 29-Apr-19 8:00 AM Sarfaraz Mr. Rajesh CLOSED
inch HRDH-619 KP3+500 to KP3+700
Post-welding visual inspection for 8 inch HRDH-
2125 CPP-NGCP-W-2125 1400093225 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL TA843560 29-Apr-19 2.00 PM Sarfaraz Mr. Rajesh CLOSED
619 KP3+500 to KP3+700
NDE selection for welds of 8 inch HRDH-619
2126 CPP-NGCP-W-2126 1400093265 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-619 FL TA843560 29-Apr-19 4.00 PM Sarfaraz Mr. Rajesh CLOSED
KP3+500 to KP3+700
Pre-welding and weld joint fit up inspection for 10
2127 CPP-NGCP-W-2127 1400093257 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -902 FL TA-843606 29-Apr-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -902 KP1+200 to KP1+400;
Post-welding visual inspection for 10 inch HRDH
2128 CPP-NGCP-W-2128 1400093198 Welding SATIP-W-012-01 SAIC-W-2048
-902 KP1+200 to KP1+400;
HRDH -902 FL TA-843606 29-Apr-19 2.00 PM Saif Mr. Rajesh CLOSED

NDE selection for welds of 10 inch HRDH -902


2129 CPP-NGCP-W-2129 1400093169 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -902 FL TA-843606 29-Apr-19 4.00 PM Saif Mr. Rajesh CLOSED
KP1+200 to KP1+400;
Pre-welding and weld joint fit up inspection for 10 Mr.
2130 CPP-NGCP-W-2130 1400093259 Welding SATIP-W-012-01 SAIC-W-2048
inch HWYH-921 KP7+500 to KP7+900
HWYH-921 FL TA-843651 29-Apr-19 8:00 AM Shadab
Rajendran
CLOSED
Post-welding visual inspection for 10 inch HWYH- Mr.
2131 CPP-NGCP-W-2131 1400093238 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 29-Apr-19 2.00 PM Shadab CLOSED
921 KP7+500 to KP7+900 Rajendran
NDE selection for welds of 10 inch HWYH-921 Mr.
2132 CPP-NGCP-W-2132 1400093261 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL TA-843651 29-Apr-19 4.00 PM Shadab CLOSED
KP7+500 to KP7+900 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -BK-RH Mr.
2133 CPP-NGCP-W-2133 1400093170 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 29-Apr-19 8:00 AM IRSHAD CLOSED
inch HRDH BK-RH TR/L KP1+600 to KP1+700; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH TA-843957 Mr.
2134 CPP-NGCP-W-2134 1400093240 Welding SATIP-W-012-01 SAIC-W-2048 29-Apr-19 2.00 PM IRSHAD CLOSED
BK-RH TR/L KP1+600 to KP1+700; TR/L Rajendran
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH Mr.
2135 CPP-NGCP-W-2135 1400093241 l Welding SATIP-W-012-01 SAIC-W-2054 TA-843957 29-Apr-19 4.00 PM IRSHAD CLOSED
TR/L KP1+600 to KP1+700; TR/L Rajendran
Weld repair verification of joints
HRDH
00-FW-33T2 ,51,65;01-FW-134 of HRDH 1178,
2136 CPP-NGCP-W-2136 1400093683 Welding SATIP-W-012-01 SAIC-W-2051 1178 VARIOUS 29-Apr-19 8:00 AM Farhan Mr. Rajesh REJECTED
00-FW-88, of HRDH-1086 CANCELLED DUE TO NO
1086
HAVE WORK PERMIT
Post-welding visual inspection of repair joints
HRDH
00-FW-33T2 ,51,65;01-FW-134 of HRDH 1178,
2137 CPP-NGCP-W-2137 1400093674 Welding SATIP-W-012-01 SAIC-W-2048 1178 VARIOUS 29-Apr-19 11:00 AM Farhan Mr. Rajesh REJECTED
00-FW-88, of HRDH-1086 CANCELLED DUE TO NO
1086
HAVE WORK PERMIT
In-Process Verification - RT Techniques &
HRDH-619,902,922,1063,1117,BK-
2138 CPP-NGCP-W-2138 1400093678 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- VARIOUS 29-Apr-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
RH
619,902,922,1063,1117,BK-RH
In-Process Verification - RT Techniques &
2139 CPP-NGCP-W-2139 1400093654 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1003,1071, HWYH-1003,1071, 1091,1093, 1115 VARIOUS 29-Apr-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1091,1093, 1115
Temperature Tie in Welding HRDH-1116 at TA-843608 Temperature Tie in
2140 CPP-NGCP-W-2140 1400093743 Welding SATIP-W-012-01 SAIC-W-2057 KM-0+400 TO 0+570 HRDH -1116 FL 29-Apr-19 10:00 AM Rajesh Mr. Rajesh CLOSED Welding HRDH-922
Pre-welding and weld joint fit up inspection for 8 CANCELLED DUE TO NOT
2141 CPP-NGCP-W-2141 1400093641 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 29-Apr-19 8:00 AM Rajesh Mr. Rajesh REJECTED
inch HRDH-1116 FL at KM-0+400 TO 0+570 WORK PERMIT
Post-welding visual inspection for 8inch HRDH- TA-843608 CANCELLED DUE TO NOT
2142 CPP-NGCP-W-2142 1400093754 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL 29-Apr-19 2.00 PM Rajesh Mr. Rajesh REJECTED
1116 FL at KM-0+400 TO 0+570 WORK PERMIT
NDE selection for welds of 8 inch HRDH-1116 FL CANCELLED DUE TO NOT
2143 CPP-NGCP-W-2143 1400093763 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1116 FL TA-843608 29-Apr-19 4.00 PM Rajesh Mr. Rajesh REJECTED
at KM-0+400 TO 0+570 WORK PERMIT
Pre-welding and weld joint fit up inspection for 8 TA-843609
2144 CPP-NGCP-W-2144 1400093749 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL 29-Apr-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH -922 KP2+086
Post-welding visual inspection for 8 inch HRDH
2145 CPP-NGCP-W-2145 1400093731 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 29-Apr-19 2.00 PM Rajesh Mr. Rajesh CLOSED
-922 KP2+086
NDE selection for welds of 8 inch HRDH -922 TA-843609
2146 CPP-NGCP-W-2146 1400093793 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL 29-Apr-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP2+086
Welding consumables verification and visual Mr.
2147 CPP-NGCP-W-2147 1400094116 Welding SATIP-W-012-01 SAIC-W-2044 TCF-1 N/A 30-Apr-19 8.00 PM Junaid CLOSED
inspection storage & handling at TCF-1 Rajendran
Pre-welding and weld joint fit up inspection for 8 TA-445826
2148 CPP-NGCP-W-2148 1400093982 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL 30-Apr-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 8inch HWYH-
2149 CPP-NGCP-W-2149 1400094013 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 30-Apr-19 2.00 PM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 8 inch HWYH-1036 TA-445826
2150 CPP-NGCP-W-2150 1400094016 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL 30-Apr-19 4:00 PM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
2151 CPP-NGCP-W-2151 1400093940 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 30-Apr-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1093 FL @ KM-0+200 to 3
Post-welding visual inspection for 10 inch HWYH- TA-445838
2152 CPP-NGCP-W-2152 1400094006 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL 30-Apr-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1093 FL @ KM-0+200 to 3
NDE selection for welds of 10 inch HWYH-1093
2153 CPP-NGCP-W-2153 1400093970 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 30-Apr-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+200 to 3
Pre-welding and weld joint fit up inspection
2154 CPP-NGCP-W-2154 1400093941 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 30-Apr-19 8:00 AM Shahbaz Mr. Suresh CLOSED
for16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK-
2155 CPP-NGCP-W-2155 1400094023 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 30-Apr-19 2.00 PM Shahbaz Mr. Suresh CLOSED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH TRL
2156 CPP-NGCP-W-2156 1400094025 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 30-Apr-19 4.00 PM Shahbaz Mr. Suresh CLOSED
km0+100 to 8+100
Pre-welding and weld joint fit up inspection for 24
Mr.
2157 CPP-NGCP-W-2157 1400093997 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. TA-445989 30-Apr-19 8:00 AM Junaid CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
TA-445989 Mr.
2158 CPP-NGCP-W-2158 1400094008 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. 30-Apr-19 2.00 PM Junaid CLOSED
Rajendran
Yard.
NDE selection for welds of 24 inch double joints Mr.
2159 CPP-NGCP-W-2159 1400094009 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 30-Apr-19 4.00 PM Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8 TA843560 Mr.
2160 CPP-NGCP-W-2160 1400094024 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL 30-Apr-19 8:00 AM Sarfaraz CLOSED
inch HRDH-619 KP3+700 to KP4+000 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
2161 CPP-NGCP-W-2161 1400094007 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL TA843560 30-Apr-19 2.00 PM Sarfaraz CLOSED
619 KP3+700 to KP4+000 Rajendran
NDE selection for welds of 8 inch HRDH-619 TA843560 Mr.
2162 CPP-NGCP-W-2162 1400094029 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-619 FL 30-Apr-19 4.00 PM Sarfaraz CLOSED
KP3+700 to KP4+000 Rajendran
Pre-welding and weld joint fit up inspection for 10
2163 CPP-NGCP-W-2163 1400093987 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -902 FL TA-843606 30-Apr-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -902 KP1+500 to KP1+800;
Post-welding visual inspection for 10 inch HRDH TA-843606
2164 CPP-NGCP-W-2164 1400094022 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -902 FL 30-Apr-19 2.00 PM Saif Mr. Rajesh CLOSED
-902 KP1+500 to KP1+800;
NDE selection for welds of 10 inch HRDH -902
2165 CPP-NGCP-W-2165 1400093961 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -902 FL TA-843606 30-Apr-19 4.00 PM Saif Mr. Rajesh CLOSED
KP1+500 to KP1+800;
Pre-welding and weld joint fit up inspection for 10 TA-843651 Mr.
2166 CPP-NGCP-W-2166 1400093901 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL 30-Apr-19 8:00 AM Shadab CLOSED
inch HWYH-921 KP7+300 to KP7+500 Rajendran
Post-welding visual inspection for 10 inch HWYH- Mr.
2167 CPP-NGCP-W-2167 1400093988 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 30-Apr-19 2.00 PM Shadab CLOSED
921 KP7+300 to KP7+500 Rajendran
NDE selection for welds of 10 inch HWYH-921 TA-843651 Mr.
2168 CPP-NGCP-W-2168 1400093972 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL 30-Apr-19 4.00 PM Shadab CLOSED
KP7+300 to KP7+500 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -BK-RH Mr.
2169 CPP-NGCP-W-2169 1400094048 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 30-Apr-19 8:00 AM IRSHAD CLOSED
inch HRDH BK-RH TR/L KP1+900 to KP2+000; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH TA-843957 Mr.
2170 CPP-NGCP-W-2170 1400093989 Welding SATIP-W-012-01 SAIC-W-2048 30-Apr-19 2.00 PM IRSHAD CLOSED
BK-RH TR/L KP1+900 to KP2+000; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH Mr.
2171 CPP-NGCP-W-2171 1400094053 Welding SATIP-W-012-01 SAIC-W-2054 TA-843957 30-Apr-19 4.00 PM IRSHAD CLOSED
TR/L KP1+900 to KP2+000; TR/L Rajendran
Pre-welding and weld joint fit up inspection for 8 TA-843609 Mr.
2172 CPP-NGCP-W-2172 1400094089 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL 30-Apr-19 8:00 AM Rajesh CLOSED
inch HRDH -922 KP2+086 Rajendran
Post-welding visual inspection for 8 inch HRDH Mr.
2173 CPP-NGCP-W-2173 1400094189 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 30-Apr-19 2.00 PM Rajesh CLOSED
-922 KP2+086 Rajendran
NDE selection for welds of 8 inch HRDH -922 Mr.
2174 CPP-NGCP-W-2174 1400094131 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL TA-843609 30-Apr-19 4.00 PM Rajesh CLOSED
KP2+086 Rajendran
In-Process Verification - RT Techniques &
2175 CPP-NGCP-W-2175 1400094365 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-619,902,922,1178,BK-RH VARIOUS 30-Apr-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
619,902,922,1178,BK-RH

In-Process Verification - RT Techniques &


2176 CPP-NGCP-W-2176 1400094384 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1003,1036, HWYH-1003,1036, 1076 VARIOUS 30-Apr-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1076
In-Process Verification - RT Techniques & Mr.
2177 CPP-NGCP-W-2177 1400094376 Welding SATIP-NDE-RT-01 SAIC-RT-2007 TCF-1 VARIOUS 30-Apr-19 8:00 AM RAMEEZ CLOSED
Procedure Implementation of TRL-2 at TCF-1 Rajendran
In-Process Inspection of MPT using Mr.
2178 CPP-NGCP-W-2178 1400094378 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 TCF-1 VARIOUS 30-Apr-19 8:00 AM RAMEEZ CLOSED
Yoke Method, TRL-2 at TCF-1 Rajendran
In-Process Inspection of MPT using Mr.
2179 CPP-NGCP-W-2179 1400094332 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 HRDH-BK-RH VARIOUS 30-Apr-19 8:00 AM RAMEEZ CLOSED
Yoke Method, HRDH-BK-RH Rajendran
Pre-welding and weld joint fit up inspection for
2180 CPP-NGCP-W-2180 1400094773 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 01-May-19 8:00 AM Umair Mr. Suresh CLOSED
HWYH-1003 KP0+100 to KP7+900
Post-welding visual inspection forHWYH-1003
2181 CPP-NGCP-W-2181 1400094758 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 01-May-19 2.00 PM Umair Mr. Suresh CLOSED
KP0+100 to KP7+900
NDE selection for welds of HWYH-1003 KP0+100
2182 CPP-NGCP-W-2182 1400094700 Welding SATIP-W-012-01 SAIC-W-2054 HWYH1003 TA-445856 01-May-19 4.00 PM Umair Mr. Suresh CLOSED
to KP7+900
Pre-welding and weld joint fit up inspection for 8
2183 CPP-NGCP-W-2183 1400094816 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 01-May-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 8inch HWYH-
2184 CPP-NGCP-W-2184 1400094826 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 01-May-19 2.00 PM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 8 inch HWYH-1036
2185 CPP-NGCP-W-2185 1400094806 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 01-May-19 4:00 PM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
2186 CPP-NGCP-W-2186 1400094722 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 01-May-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1093 FL @ KM-0+200 to 3
Post-welding visual inspection for 10 inch HWYH-
2187 CPP-NGCP-W-2187 1400094749 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 01-May-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1093 FL @ KM-0+200 to 3
NDE selection for welds of 10 inch HWYH-1093
2188 CPP-NGCP-W-2188 1400094742 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 01-May-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+200 to 3
Weld repair verification of joints FW598C,570,402 RE-SCHEDULE TO 02-05-
2189 CPP-NGCP-W-2189 1400094827 Welding SATIP-W-012-01 SAIC-W-2051 HWYH1003 TA-445856 01-May-19 8.00 AM PRATHAB Mr. Suresh CLOSED
at HWYH-1003 2019
Post-welding visual inspection of repair joints RE-SCHEDULE TO 02-05-
2190 CPP-NGCP-W-2190 1400094819 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 01-May-19 4.00 PM PRATHAB Mr. Suresh CLOSED
FW598C,570,402 at HWYH-1003 2019
Pre-welding and weld joint fit up inspection
2191 CPP-NGCP-W-2191 1400094859 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 01-May-19 8:00 AM Shahbaz Mr. Suresh CLOSED
for16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK-
2192 CPP-NGCP-W-2192 1400094807 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 01-May-19 2.00 PM Shahbaz Mr. Suresh CLOSED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH TRL
2193 CPP-NGCP-W-2193 1400094943 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 01-May-19 4.00 PM Shahbaz Mr. Suresh CLOSED
km0+100 to 8+100
Pre-welding and weld joint fit up inspection for 24
Mr.
2194 CPP-NGCP-W-2194 1400094902 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. TA-445989 01-May-19 8:00 AM Junaid CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
2195 CPP-NGCP-W-2195 1400094878 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 01-May-19 2.00 PM Junaid CLOSED
Rajendran
Yard.
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a NDE selection for welds of 24 inch double joints Mr.
2196 CPP-NGCP-W-2196 1400094906 l Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 01-May-19 4.00 PM Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
2197 CPP-NGCP-W-2197 1400094824 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL TA-843560 01-May-19 8:00 AM Sarfaraz CLOSED
inch HRDH-619 KP4+000 to KP4+800 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
2198 CPP-NGCP-W-2198 1400094825 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-619 FL TA-843560 01-May-19 2.00 PM Sarfaraz CLOSED
619 KP4+000 to KP4+800 Rajendran
NDE selection for welds of 8 inch HRDH-619 Mr.
2199 CPP-NGCP-W-2199 1400094854 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-619 FL TA-843560 01-May-19 4.00 PM Sarfaraz CLOSED
KP4+000 to KP4+800 Rajendran
Pre-welding and weld joint fit up inspection for 10
2200 CPP-NGCP-W-2200 1400094835 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -902 FL TA-843606 01-May-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -902 KP1+500 to KP2+500;
Post-welding visual inspection for 10 inch HRDH
2201 CPP-NGCP-W-2201 1400094805 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -902 FL TA-843606 01-May-19 2.00 PM Saif Mr. Rajesh CLOSED
-902 KP1+500 to KP2+500;
NDE selection for welds of 10 inch HRDH -902
2202 CPP-NGCP-W-2202 1400094780 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -902 FL TA-843606 01-May-19 4.00 PM Saif Mr. Rajesh CLOSED
KP1+500 to KP2+500;
Pre-welding and weld joint fit up inspection for 10 Mr.
2203 CPP-NGCP-W-2203 1400094857 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 01-May-19 8:00 AM Shadab CLOSED
inch HWYH-921 KP7+100 to KP7+300 Rajendran
Post-welding visual inspection for 10 inch HWYH- Mr.
2204 CPP-NGCP-W-2204 1400094836 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 01-May-19 2.00 PM Shadab CLOSED
921 KP7+100 to KP7+300 Rajendran
NDE selection for welds of 10 inch HWYH-921 Mr.
2205 CPP-NGCP-W-2205 1400094818 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL TA-843651 01-May-19 4.00 PM Shadab CLOSED
KP7+100 to KP7+300 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -BK-RH Mr.
2206 CPP-NGCP-W-2206 1400094820 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 01-May-19 8:00 AM IRSHAD CLOSED
inch HRDH BK-RH TR/L KP2+100 to KP2+200; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH Mr.
2207 CPP-NGCP-W-2207 1400094751 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 01-May-19 2.00 PM IRSHAD CLOSED
BK-RH TR/L KP2+100 to KP2+200; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH Mr.
2208 CPP-NGCP-W-2208 1400094860 Welding SATIP-W-012-01 SAIC-W-2054 TA-843957 01-May-19 4.00 PM IRSHAD CLOSED
TR/L KP2+100 to KP2+200; TR/L Rajendran
Weld repair verification of joints HRDH
00-FW-33T2 ,51;of HRDH 1178, 1178
2209 CPP-NGCP-W-2209 1400094990 Welding SATIP-W-012-01 SAIC-W-2051 00-FW-34,88, of HRDH-1086 1086 VARIOUS 01-May-19 8:00 AM Farhan Mr. Rajesh CLOSED
01-FW-149 of HRDH 619 619
RECHEDULE TO RE-
00-FW-35 of HWYH 1078 HWYH1078 SCHEDULE TO 2-05-2019
Post-welding visual inspection of repair joints
00-FW-33T2 ,51,of HRDH 1178, HRDH
00-FW-34,88, of HRDH-1086 1178
2210 CPP-NGCP-W-2210 1400095011 Welding SATIP-W-012-01 SAIC-W-2048 01-FW-149 of HRDH 619 1086 VARIOUS 01-May-19 11:00 AM Farhan Mr. Rajesh CLOSED
01-FW-149 OF HWYH 1078 619
HWYH1078
RECHEDULE TO RE-
SCHEDULE TO 2-05-2019
Pre-welding and weld joint fit up inspection for 8 Mr.
2211 CPP-NGCP-W-2211 1400095094 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 01-May-19 8:00 AM Rajesh CLOSED
inch HRDH -922 KP0+897 to KP0+945 Rajendran
Post-welding visual inspection for 8 inch HRDH Mr.
2212 CPP-NGCP-W-2212 1400095012 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 01-May-19 2.00 PM Rajesh CLOSED
-922 KP0+897 to KP0+945 Rajendran
NDE selection for welds of 8 inch HRDH -922 Mr.
2213 CPP-NGCP-W-2213 1400095096 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL TA-843609 01-May-19 4.00 PM Rajesh CLOSED
KP0+897 to KP0+945 Rajendran
In-Process Verification - RT Techniques &
HRDH-619,902,922,
2214 CPP-NGCP-W-2214 1400095040 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- VARIOUS 01-May-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1086,1117,BK-RH
619,902,922,1086,1117,BK-RH
In-Process Verification - RT Techniques &
HWYH-921,1036,
2215 CPP-NGCP-W-2215 1400095089 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- VARIOUS 01-May-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1091,1093,CK-RH
921,1036,1091,1093,CK-RH
Pre-welding and weld joint fit up inspection for
2216 CPP-NGCP-W-2216 1400095554 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 02-May-19 8:00 AM Umair Mr. Suresh CLOSED
HWYH-1003 KP0+100 to KP7+900
Post-welding visual inspection forHWYH-1003
2217 CPP-NGCP-W-2217 1400095519 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 02-May-19 2.00 PM Umair Mr. Suresh CLOSED
KP0+100 to KP7+900
NDE selection for welds of HWYH-1003 KP0+100
2218 CPP-NGCP-W-2218 1400095470 Welding SATIP-W-012-01 SAIC-W-2054 HWYH1003 TA-445856 02-May-19 4.00 PM Umair Mr. Suresh CLOSED
to KP7+900
Pre-welding and weld joint fit up inspection for 8
2219 CPP-NGCP-W-2219 1400095623 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 02-May-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 8inch HWYH-
2220 CPP-NGCP-W-2220 1400095541 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 02-May-19 2.00 PM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 8 inch HWYH-1036
2221 CPP-NGCP-W-2221 1400095625 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 02-May-19 4:00 PM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
2222 CPP-NGCP-W-2222 1400095645 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 02-May-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1093 FL @ KM-0+200 to 3
Post-welding visual inspection for 10 inch HWYH-
2223 CPP-NGCP-W-2223 1400095663 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 02-May-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1093 FL @ KM-0+200 to 3
NDE selection for welds of 10 inch HWYH-1093
2224 CPP-NGCP-W-2224 1400095647 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 02-May-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
FL @ KM-0+200 to 3
Pre-welding and weld joint fit up inspection
2225 CPP-NGCP-W-2225 1400095654 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 02-May-19 8:00 AM Shahbaz Mr. Suresh CLOSED
for16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK-
2226 CPP-NGCP-W-2226 1400095621 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 02-May-19 2.00 PM Shahbaz Mr. Suresh CLOSED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH TRL
2227 CPP-NGCP-W-2227 1400095648 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 02-May-19 4.00 PM Shahbaz Mr. Suresh CLOSED
km0+100 to 8+100
Pre-welding and weld joint fit up inspection for 24
Mr.
2228 CPP-NGCP-W-2228 1400095673 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. TA-445989 02-May-19 8:00 AM Junaid CLOSED RE-SCHEDULE TO 04-
Rajendran
CPP Pipe Yard. 05-2019
Post-welding visual inspection for 24 inch double Mr.
TA-445989 RE-SCHEDULE TO 04-
2229 CPP-NGCP-W-2229 1400095611 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. 02-May-19 2.00 PM Junaid CLOSED
Rajendran 05-2019
Yard.
NDE selection for welds of 24 inch double joints Mr. RE-SCHEDULE TO 04-
2230 CPP-NGCP-W-2230 1400095667 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 02-May-19 4.00 PM Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran 05-2019
Pre-welding and weld joint fit up inspection for TA-445856
2231 CPP-NGCP-W-2231 1400095612 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 03-May-19 8:00 AM Umair Mr. Suresh REJECTED
HWYH-1003 KP0+100 to KP7+900
Post-welding visual inspection forHWYH-1003
2232 CPP-NGCP-W-2232 1400095640 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 03-May-19 2.00 PM Umair Mr. Suresh REJECTED
KP0+100 to KP7+900
NDE selection for welds of HWYH-1003 KP0+100 TA-445856
2233 CPP-NGCP-W-2233 1400095656 Welding SATIP-W-012-01 SAIC-W-2054 HWYH1003 03-May-19 4.00 PM Umair Mr. Suresh REJECTED
to KP7+900
Pre-welding and weld joint fit up inspection for 8
2234 CPP-NGCP-W-2234 1400095668 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 03-May-19 8:00 AM Imran Mr. Suresh REJECTED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 8inch HWYH- TA-445826
2235 CPP-NGCP-W-2235 1400095599 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL 03-May-19 2.00 PM Imran Mr. Suresh REJECTED
1036 KP0+100 to KP6+200
NDE selection for welds of 8 inch HWYH-1036
2236 CPP-NGCP-W-2236 1400095601 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 03-May-19 4:00 PM Imran Mr. Suresh REJECTED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
2237 CPP-NGCP-W-2237 1400095658 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 03-May-19 8:00 AM Abdul Aziz Mr. Suresh REJECTED
inch HWYH-1093 FL @ KM-0+200 to 3
Post-welding visual inspection for 10 inch HWYH-
2238 CPP-NGCP-W-2238 1400095689 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 03-May-19 2.00 PM Abdul Aziz Mr. Suresh REJECTED
1093 FL @ KM-0+200 to 3
NDE selection for welds of 10 inch HWYH-1093
2239 CPP-NGCP-W-2239 1400095650 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 03-May-19 4.00 PM Abdul Aziz Mr. Suresh REJECTED
FL @ KM-0+200 to 3
Weld repair verification of joints FW178,183T1
2240 CPP-NGCP-W-2240 1400095713 Welding SATIP-W-012-01 SAIC-W-2051 HWYH1118 TA-445909 03-May-19 8.00 AM PRATHAB Mr. Suresh CLOSED
at HWYH1118
Post-welding visual inspection of repair joints
2241 CPP-NGCP-W-2241 1400095651 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1118 TA-445909 03-May-19 4.00 PM PRATHAB Mr. Suresh CLOSED
FW178,183T1 at HWYH1118
Pre-welding and weld joint fit up inspection RE-SCHEDULE TO 4-05-
2242 CPP-NGCP-W-2242 1400095751 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 03-May-19 8:00 AM Shahbaz Mr. Suresh CLOSED
for16″HWYH CK-RH TRL km0+100 to 8+100 2019
Post-welding visual inspection for 16″HWYH CK- RE-SCHEDULE TO 4-05-
2243 CPP-NGCP-W-2243 1400095739 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 03-May-19 2.00 PM Shahbaz Mr. Suresh CLOSED
RH TRL km0+100 to 8+100 2019
NDE selection for welds of 16″HWYH CK-RH TRL RE-SCHEDULE TO 4-05-
2244 CPP-NGCP-W-2244 1400095730 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 03-May-19 4.00 PM Shahbaz Mr. Suresh CLOSED
km0+100 to 8+100 2019
Pre-welding and weld joint fit up inspection for 24
Mr. RE-SCHEDULE TO 4-05-
2245 CPP-NGCP-W-2245 1400095742 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. TA-445989 03-May-19 8:00 AM Junaid REJECTED No Action
Rajendran 2019
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr. RE-SCHEDULE TO 4-05-
2246 CPP-NGCP-W-2246 1400095768 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 03-May-19 2.00 PM Junaid REJECTED No Action
Rajendran 2019
Yard.
NDE selection for welds of 24 inch double joints Mr. RE-SCHEDULE TO 4-05-
2247 CPP-NGCP-W-2247 1400095782 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 03-May-19 4.00 PM Junaid REJECTED No Action
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran 2019
Pre-welding and weld joint fit up inspection for 8 Mr.
2248 CPP-NGCP-W-2248 1400095502 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1177 FL TA-843575 02-May-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1177 KP0+300 to KP0+400 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
2249 CPP-NGCP-W-2249 1400095531 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1177 FL TA-843575 02-May-19 2.00 PM Sarfaraz CLOSED
1177 KP0+300 to KP0+400 Rajendran
NDE selection for welds of 8 inch HRDH-1177 Mr.
2250 CPP-NGCP-W-2250 1400095481 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1177 FL TA-843575 02-May-19 4.00 PM Sarfaraz CLOSED
KP0+300 to KP0+400 Rajendran
Pre-welding and weld joint fit up inspection for 10
2251 CPP-NGCP-W-2251 1400095567 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -902 FL TA-843606 02-May-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -902 KP2+500 to KP3+600
Post-welding visual inspection for 10 inch HRDH
2252 CPP-NGCP-W-2252 1400095594 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -902 FL TA-843606 02-May-19 2.00 PM Saif Mr. Rajesh CLOSED
-902 KP2+500 to KP3+600
NDE selection for welds of 10 inch HRDH -902
2253 CPP-NGCP-W-2253 1400095557 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -902 FL TA-843606 02-May-19 4.00 PM Saif Mr. Rajesh CLOSED
KP2+500 to KP3+600
Pre-welding and weld joint fit up inspection for 10 Mr.
2254 CPP-NGCP-W-2254 1400095532 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 02-May-19 8:00 AM Shadab CLOSED
inch HWYH-921 KP6+900 to KP7+100 Rajendran
Post-welding visual inspection for 10 inch HWYH- Mr.
2255 CPP-NGCP-W-2255 1400095538 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 02-May-19 2.00 PM Shadab CLOSED
921 KP6+900 to KP7+100 Rajendran
NDE selection for welds of 10 inch HWYH-921 Mr.
2256 CPP-NGCP-W-2256 1400095539 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL TA-843651 02-May-19 4.00 PM Shadab CLOSED
KP6+900 to KP7+100 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -BK-RH Mr.
2257 CPP-NGCP-W-2257 1400095596 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 02-May-19 8:00 AM IRSHAD CLOSED
inch HRDH BK-RH TR/L KP2+400 to KP2+600; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH Mr.
2258 CPP-NGCP-W-2258 1400095613 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 02-May-19 2.00 PM IRSHAD CLOSED
BK-RH TR/L KP2+400 to KP2+600; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH Mr.
2259 CPP-NGCP-W-2259 1400095570 Welding SATIP-W-012-01 SAIC-W-2054 TA-843957 02-May-19 4.00 PM IRSHAD CLOSED
TR/L KP2+400 to KP2+600;; TR/L Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
2260 CPP-NGCP-W-2260 1400095722 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 02-May-19 8:00 AM Rajesh CLOSED
inch HRDH -922 KP4+000 to KP4+100 Rajendran
Post-welding visual inspection for 8 inch HRDH Mr.
2261 CPP-NGCP-W-2261 1400095824 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 02-May-19 2.00 PM Rajesh CLOSED
-922 KP4+000 to KP4+100 Rajendran
NDE selection for welds of 8 inch HRDH -922 Mr.
2262 CPP-NGCP-W-2262 1400095805 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL TA-843609 02-May-19 4.00 PM Rajesh CLOSED
KP4+000 to KP4+100 Rajendran
In-Process Verification - RT Techniques &
2263 CPP-NGCP-W-2263 1400095985 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-902, 619, HRDH-902, 619, 922,BK-RH VARIOUS 02-May-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
922,BK-RH
In-Process Verification - RT Techniques &
2264 CPP-NGCP-W-2264 1400095940 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- HWYH-921,1036,1003,1093,CK-RH VARIOUS 02-May-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
921,1036,1003,1093,CK-RH
In-Process Verification - RT Techniques & Mr.
2265 CPP-NGCP-W-2265 1400095970 Welding SATIP-NDE-RT-01 SAIC-RT-2007 TCF-1 VARIOUS 03-May-19 8:00 AM RAMEEZ CLOSED
Procedure Implementation of TRL-2 at TCF-1 Rajendran
In-Process Inspection of MPT using VARIOUS Mr.
2266 CPP-NGCP-W-2266 1400095971 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 TCF-1 03-May-19 8:00 AM RAMEEZ CLOSED
Yoke Method, TRL-2 at TCF-1 Rajendran
Pre-welding and weld joint fit up inspection for
2267 CPP-NGCP-W-2267 1400096306 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 04-May-19 8:00 AM Umair Mr. Suresh REJECTED
HWYH-1003 KP0+100 to KP7+900
Post-welding visual inspection forHWYH-1003 TA-445856
2268 CPP-NGCP-W-2268 1400096301 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 04-May-19 2.00 PM Umair Mr. Suresh REJECTED
KP0+100 to KP7+900
NDE selection for welds of HWYH-1003 KP0+100
2269 CPP-NGCP-W-2269 1400096261 Welding SATIP-W-012-01 SAIC-W-2054 HWYH1003 TA-445856 04-May-19 4.00 PM Umair Mr. Suresh REJECTED
to KP7+900
Pre-welding and weld joint fit up inspection for 8 TA-445826 RE-SCHEDULE TO 5-05-
2270 CPP-NGCP-W-2270 1400096319 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL 04-May-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200 2019
Post-welding visual inspection for 8inch HWYH- RE-SCHEDULE TO 5-05-
2271 CPP-NGCP-W-2271 1400096262 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 04-May-19 2.00 PM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200 2019
NDE selection for welds of 8 inch HWYH-1036 TA-445826 RE-SCHEDULE TO 5-05-
2272 CPP-NGCP-W-2272 1400096353 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL 04-May-19 4:00 PM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200 2019
Weld repair verification of joints FW86 at HWYH RE-SCHEDULE TO 5-05-
2273 CPP-NGCP-W-2273 1400096271 Welding SATIP-W-012-01 SAIC-W-2051 HWYH 1093 TA-445838 04-May-19 8.00 AM PRATHAB Mr. Suresh REJECTED
1093 2019
Post-welding visual inspection of repair joints RE-SCHEDULE TO 5-05-
2274 CPP-NGCP-W-2274 1400096328 Welding SATIP-W-012-01 SAIC-W-2048 HWYH 1093 TA-445838 04-May-19 4.00 PM PRATHAB Mr. Suresh REJECTED
FW86 at HWYH 1093 2019
1400096329 Pre-welding and weld joint fit up inspection for 10 TA-445912
2275 CPP-NGCP-W-2275 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL 04-May-19 8:00 AM Shahbaz Mr. Suresh CLOSED
inch 16″HWYH GK-RH TRL km0+100 to 12+500
Post-welding visual inspection for 10 inch
2276 CPP-NGCP-W-2276 1400096272 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 04-May-19 2.00 PM Shahbaz Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
NDE selection for welds of 10 inch16″HWYH GK-
2277 CPP-NGCP-W-2277 1400096363 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH GK-RH TRL km0+100 to 16″HWYH GK-RH TRL TA-445912 04-May-19 4.00 PM Shahbaz Mr. Suresh CLOSED
12+500
Pre-welding and weld joint fit up inspection for 10 RE-SCHEDULE TO 5-05-
2278 CPP-NGCP-W-2278 1400096314 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -902 FL TA-843606 04-May-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -902 KP3+500 to KP4+200 2019
Post-welding visual inspection for 10 inch HRDH RE-SCHEDULE TO 5-05-
2279 CPP-NGCP-W-2279 1400096281 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -902 FL TA-843606 04-May-19 2.00 PM Saif Mr. Rajesh CLOSED
-902 KP3+500 to KP4+200 2019
NDE selection for welds of 10 inch HRDH -902 RE-SCHEDULE TO 5-05-
2280 CPP-NGCP-W-2280 1400096289 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -902 FL TA-843606 04-May-19 4.00 PM Saif Mr. Rajesh CLOSED
KP3+500 to KP4+200 2019
Pre-welding and weld joint fit up inspection for 10 Mr.
2281 CPP-NGCP-W-2281 1400096304 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 04-May-19 8:00 AM Shadab CLOSED
inch HWYH-921 KP6+600 to KP6+800 Rajendran
Post-welding visual inspection for 10 inch HWYH- Mr.
2282 CPP-NGCP-W-2282 1400096315 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 04-May-19 2.00 PM Shadab CLOSED
921 KP6+600 to KP6+800 Rajendran
NDE selection for welds of 10 inch HWYH-921 Mr.
2283 CPP-NGCP-W-2283 1400096260 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL TA-843651 04-May-19 4.00 PM Shadab CLOSED
KP6+600 to KP6+800 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -BK-RH Mr.
2284 CPP-NGCP-W-2284 1400096269 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 04-May-19 8:00 AM IRSHAD CLOSED
inch HRDH BK-RH TR/L KP2+700 to KP2+800; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH Mr.
2285 CPP-NGCP-W-2285 1400096316 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 04-May-19 2.00 PM IRSHAD CLOSED
BK-RH TR/L KP2+700 to KP2+800; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH Mr.
2286 CPP-NGCP-W-2286 1400096323 Welding SATIP-W-012-01 SAIC-W-2054 TA-843957 04-May-19 4.00 PM IRSHAD CLOSED
TR/L KP2+700 to KP2+800; TR/L Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
2287 CPP-NGCP-W-2287 1400096450 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 04-May-19 8:00 AM Rajesh CLOSED
inch HRDH-1116 FL at KM-3+120 TO 3+230 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
2288 CPP-NGCP-W-2288 1400096470 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 04-May-19 2.00 PM Rajesh CLOSED
1116 FL at KM-3+120 TO 3+230 Rajendran
NDE selection for welds of 8 inch HRDH-1116 FL Mr.
2289 CPP-NGCP-W-2289 1400096535 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1116 FL TA-843608 04-May-19 4.00 PM Rajesh CLOSED
at KM-3+120 TO 3+230 Rajendran
In-Process Verification - RT Techniques &
2290 CPP-NGCP-W-2290 1400096653 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-902, 619, HRDH-902, 619, 922,BK-RH VARIOUS 04-May-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
922,BK-RH
In-Process Verification - RT Techniques &
2291 CPP-NGCP-W-2291 1400096655 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- HWYH-921,1036,1003,1093,CK-RH VARIOUS 04-May-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
921,1036,1003,1093,CK-RH;1076
Review of weekly welder performance and
2292 CPP-NGCP-W-2292 1400097405 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 19-Mar-2019 to 25 CPP site office N/A 05-May-19 8:00 AM Ruhul Mr. Rajesh CLOSED
Mar-2019 at CPP site office.
Pre-welding and weld joint fit up inspection for
2293 CPP-NGCP-W-2293 1400097217 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 05-May-19 8:00 AM Umair Mr. Suresh CLOSED
HWYH-1003 KP0+100 to KP7+900
Post-welding visual inspection forHWYH-1003
2294 CPP-NGCP-W-2294 1400097248 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 05-May-19 2.00 PM Umair Mr. Suresh CLOSED
KP0+100 to KP7+900
NDE selection for welds of HWYH-1003 KP0+100
2295 CPP-NGCP-W-2295 1400097257 Welding SATIP-W-012-01 SAIC-W-2054 HWYH1003 TA-445856 05-May-19 4.00 PM Umair Mr. Suresh CLOSED
to KP7+900
Weld repair verification of joints FW255 at HWYH PRATHAB
2296 CPP-NGCP-W-2296 1400097218 Welding SATIP-W-012-01 SAIC-W-2051 HWYH 1091 TA-445958 05-May-19 8.00 AM Mr. Suresh CLOSED
1091
Post-welding visual inspection of repair joints
2297 CPP-NGCP-W-2297 1400097231 Welding SATIP-W-012-01 SAIC-W-2048 HWYH 1091 TA-445958 05-May-19 4.00 PM PRATHAB Mr. Suresh CLOSED
FW255 at HWYH 1091
Pre-welding and weld joint fit up inspection for 10
2298 CPP-NGCP-W-2298 1400097184 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 05-May-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH-
2299 CPP-NGCP-W-2299 1400097138 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 05-May-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @
2300 CPP-NGCP-W-2300 1400097198 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 TA-445828 05-May-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Pre-welding and weld joint fit up inspection
2301 CPP-NGCP-W-2301 1400097118 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 05-May-19 8:00 AM Shahbaz Mr. Suresh REJECTED
for16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK-
2302 CPP-NGCP-W-2302 1400097106 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 05-May-19 2.00 PM Shahbaz Mr. Suresh REJECTED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH TRL
2303 CPP-NGCP-W-2303 1400097071 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 05-May-19 4.00 PM Shahbaz Mr. Suresh CLOSED
km0+100 to 8+100
Pre-welding and weld joint fit up inspection for 10
2304 CPP-NGCP-W-2304 1400097224 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 05-May-19 8:00 AM Shahbaz Mr. Suresh CLOSED
inch 16″HWYH GK-RH TRL km0+100 to 12+500
Post-welding visual inspection for 10 inch
2305 CPP-NGCP-W-2305 1400097233 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 05-May-19 2.00 PM Shahbaz Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
NDE selection for welds of 10 inch16″HWYH GK-
2306 CPP-NGCP-W-2306 1400097169 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH GK-RH TRL km0+100 to 16″HWYH GK-RH TRL TA-445912 05-May-19 4.00 PM Shahbaz Mr. Suresh CLOSED
12+500
Pre-welding and weld joint fit up inspection for 24
Mr.
2307 CPP-NGCP-W-2307 1400097006 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. TA-445989 05-May-19 8:00 AM Junaid CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
2308 CPP-NGCP-W-2308 1400096992 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 05-May-19 2.00 PM Junaid CLOSED
Yard. Rajendran
NDE selection for welds of 24 inch double joints Mr.
2309 CPP-NGCP-W-2309 1400097073 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 05-May-19 4.00 PM Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
2310 CPP-NGCP-W-2310 1400096968 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1177 FL TA-843575 05-May-19 8:00 AM Rajesh CLOSED
inch HRDH-1177 KP0+700 to KP1+000 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
2311 CPP-NGCP-W-2311 1400097044 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1177 FL TA-843575 05-May-19 2.00 PM Rajesh CLOSED
1177 KP0+700 to KP1+000 Rajendran
NDE selection for welds of 8 inch HRDH-1177 Mr.
2312 CPP-NGCP-W-2312 1400097017 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1177 FL TA-843575 05-May-19 4.00 PM Rajesh CLOSED
KP0+700 to KP1+000 Rajendran
Pre-welding and weld joint fit up inspection for 8 RECHEDULE TO RE-
2313 CPP-NGCP-W-2313 1400096969 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 05-May-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1164 KP4+000 to KP4+700 SCHEDULE TO 6-05-2019
Post-welding visual inspection for 8 inch HRDH RECHEDULE TO RE-
2314 CPP-NGCP-W-2314 1400096951 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 05-May-19 2.00 PM Saif Mr. Rajesh CLOSED
-1164 KP4+000 to KP4+700 SCHEDULE TO 6-05-2019
NDE selection for welds of 8 inch HRDH -1164 RECHEDULE TO RE-
2315 CPP-NGCP-W-2315 1400097018 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1164 FL TA-843592 05-May-19 4.00 PM Saif Mr. Rajesh CLOSED
KP4+000 to KP4+700 SCHEDULE TO 6-05-2019
Pre-welding and weld joint fit up inspection for 10 Mr.
2316 CPP-NGCP-W-2316 1400097054 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 05-May-19 8:00 AM Shadab CLOSED
inch HWYH-921 KP6+200 to KP6+400 Rajendran
Post-welding visual inspection for 10 inch HWYH- Mr.
2317 CPP-NGCP-W-2317 1400097036 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 05-May-19 2.00 PM Shadab CLOSED
921 KP6+200 to KP6+400 Rajendran
NDE selection for welds of 10 inch HWYH-921 Mr.
2318 CPP-NGCP-W-2318 1400096999 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL TA-843651 05-May-19 4.00 PM Shadab CLOSED
KP6+200 to KP6+400 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -BK-RH Mr.
2319 CPP-NGCP-W-2319 1400097000 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 05-May-19 8:00 AM IRSHAD CLOSED
inch HRDH BK-RH TR/L KP2+900 to KP3+000; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH Mr.
2320 CPP-NGCP-W-2320 1400097001 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 05-May-19 2.00 PM IRSHAD CLOSED
BK-RH TR/L KP2+900 to KP3+000; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH Mr.
2321 CPP-NGCP-W-2321 1400097037 Welding SATIP-W-012-01 SAIC-W-2054 TA-843957 05-May-19 4.00 PM IRSHAD CLOSED
TR/L KP2+900 to KP3+000; TR/L Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
2322 CPP-NGCP-W-2322 1400097186 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 05-May-19 8:00 AM Rajesh CLOSED
inch HRDH-1116 FL at KM-3+120 Rajendran
Post-welding visual inspection for 8inch HRDH- TA-843608 Mr.
2323 CPP-NGCP-W-2323 1400097187 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL 05-May-19 2.00 PM Rajesh CLOSED
1116 FL at KM-3+120 Rajendran
NDE selection for welds of 8 inch HRDH-1116 FL Mr.
2324 CPP-NGCP-W-2324 1400097225 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1116 FL TA-843608 05-May-19 4.00 PM Rajesh CLOSED
at KM-3+120 Rajendran
Pre-welding and weld joint fit up inspection for 8 TA-843609 Mr.
2325 CPP-NGCP-W-2325 1400097227 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL 05-May-19 8:00 AM Rajesh CLOSED
inch HRDH -922 KP3+979 Rajendran
Post-welding visual inspection for 8 inch HRDH Mr.
2326 CPP-NGCP-W-2326 1400097243 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 05-May-19 2.00 PM Rajesh CLOSED
-922 KP3+979 Rajendran
NDE selection for welds of 8 inch HRDH -922 TA-843609 Mr.
2327 CPP-NGCP-W-2327 1400097244 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL 05-May-19 4.00 PM Rajesh CLOSED
KP3+979 Rajendran
In-Process Verification - RT Techniques &
HRDH-902, 619, 922,BK-
2328 CPP-NGCP-W-2328 1400097534 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-902, 619, VARIOUS 05-May-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
RH,1086,1177,1178
922,BK-RH,1086,1177,1178
In-Process Verification - RT Techniques &
HWYH-921,1036,1003,1093,CK-
2329 CPP-NGCP-W-2329 1400097535 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- VARIOUS 05-May-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
RH;1078,1118,
921,1036,1003,1093,CK-RH;1078,1118,
Pre-welding and weld joint fit up inspection for 8 TA-843575 Mr.
2330 CPP-NGCP-W-2330 1400096733 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1177 FL 04-May-19 8:00 AM Rajesh CLOSED
inch HRDH-1177 KP0+400 to KP0+700 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
2331 CPP-NGCP-W-2331 1400096640 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1177 FL TA-843575 04-May-19 2.00 PM Rajesh CLOSED
1177 KP0+400 to KP0+700 Rajendran
NDE selection for welds of 8 inch HRDH-1177 TA-843575 Mr.
2332 CPP-NGCP-W-2332 1400096680 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1177 FL 04-May-19 4.00 PM Rajesh CLOSED
KP0+400 to KP0+700 Rajendran
Pre-welding and weld joint fit up inspection for
2333 CPP-NGCP-W-2333 1400097851 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 06-May-19 8:00 AM Umair Mr. Suresh CLOSED
HWYH-1003 KP0+100 to KP7+900
Post-welding visual inspection forHWYH-1003 TA-445856
2334 CPP-NGCP-W-2334 1400097873 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 06-May-19 2.00 PM Umair Mr. Suresh CLOSED
KP0+100 to KP7+900
NDE selection for welds of HWYH-1003 KP0+100
2335 CPP-NGCP-W-2335 1400097864 Welding SATIP-W-012-01 SAIC-W-2054 HWYH1003 TA-445856 06-May-19 4.00 PM Umair Mr. Suresh CLOSED
to KP7+900
Pre-welding and weld joint fit up inspection for 8 TA-445826
2336 CPP-NGCP-W-2336 1400097844 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL 06-May-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 8inch HWYH-
2337 CPP-NGCP-W-2337 1400097863 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 06-May-19 2.00 PM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 8 inch HWYH-1036 TA-445826
2338 CPP-NGCP-W-2338 1400097846 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL 06-May-19 4:00 PM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
2339 CPP-NGCP-W-2339 1400097789 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 06-May-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH-
2340 CPP-NGCP-W-2340 1400097848 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 06-May-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @
2341 CPP-NGCP-W-2341 1400097850 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 TA-445828 06-May-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Pre-welding and weld joint fit up inspection for 10
2342 CPP-NGCP-W-2342 1400097740 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 06-May-19 8:00 AM Shahbaz Mr. Suresh CLOSED
inch 16″HWYH GK-RH TRL km0+100 to 12+500
Post-welding visual inspection for 10 inch
2343 CPP-NGCP-W-2343 1400097711 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 06-May-19 2.00 PM Shahbaz Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
NDE selection for welds of 10 inch16″HWYH GK-
2344 CPP-NGCP-W-2344 1400097803 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH GK-RH TRL km0+100 to 16″HWYH GK-RH TRL TA-445912 06-May-19 4.00 PM Shahbaz Mr. Suresh CLOSED
12+500
Pre-welding and weld joint fit up inspection for 24
Mr.
2345 CPP-NGCP-W-2345 1400097667 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. TA-445989 06-May-19 8:00 AM Junaid CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
TA-445989 Mr.
2346 CPP-NGCP-W-2346 1400097647 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. 06-May-19 2.00 PM Junaid CLOSED
Rajendran
Yard.
NDE selection for welds of 24 inch double joints Mr.
2347 CPP-NGCP-W-2347 1400097661 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 06-May-19 4.00 PM Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8 TA-843575 Mr.
2348 CPP-NGCP-W-2348 1400097905 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1177 FL 06-May-19 8:00 AM Rajesh CLOSED
inch HRDH-1177 KP1+000 to KP1+200 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
2349 CPP-NGCP-W-2349 1400097906 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1177 FL TA-843575 06-May-19 2.00 PM Rajesh CLOSED
1177 KP1+000 to KP1+200 Rajendran
NDE selection for welds of 8 inch HRDH-1177 TA-843575 Mr.
2350 CPP-NGCP-W-2350 1400097840 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1177 FL 06-May-19 4.00 PM Rajesh CLOSED
KP1+000 to KP1+200 Rajendran
Pre-welding and weld joint fit up inspection for 8
2351 CPP-NGCP-W-2351 1400097907 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 06-May-19 8:00 AM Saif Mr. Rajesh REJECTED
inch HRDH -1164 KP3+500 to KP4+000
Post-welding visual inspection for 8 inch HRDH TA-843592
2352 CPP-NGCP-W-2352 1400097821 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL 06-May-19 2.00 PM Saif Mr. Rajesh REJECTED
-1164 KP3+500 to KP4+000
NDE selection for welds of 8 inch HRDH -1164
2353 CPP-NGCP-W-2353 1400097841 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1164 FL TA-843592 06-May-19 4.00 PM Saif Mr. Rajesh REJECTED
KP3+500 to KP4+000
Pre-welding and weld joint fit up inspection for 10 TA-843651 Mr.
2354 CPP-NGCP-W-2354 1400097822 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL 06-May-19 8:00 AM Shadab CLOSED
inch HWYH-921 KP6+100 to KP6+200 Rajendran
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a Post-welding visual inspection for 10 inch HWYH- Mr.
2355 CPP-NGCP-W-2355 1400097891 l Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 06-May-19 2.00 PM Shadab CLOSED
921 KP6+100 to KP6+200 Rajendran
NDE selection for welds of 10 inch HWYH-921 Mr.
2356 CPP-NGCP-W-2356 1400097908 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL TA-843651 06-May-19 4.00 PM Shadab CLOSED
KP6+100 to KP6+200 Rajendran
Mr.
2357 CPP-NGCP-W-2357 1400097923 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HRDH-1171 at HRDH -1171 FL TA-843547 06-May-19 10:00 AM Rajesh CLOSED
KM-0+400 TO 0+447 Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
2358 CPP-NGCP-W-2358 1400097913 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 06-May-19 8:00 AM Rajesh CLOSED
inch HRDH-1171 at KM-0+400 TO 0+447 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
2359 CPP-NGCP-W-2359 1400097914 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 06-May-19 2.00 PM Rajesh CLOSED
1171 at KM-0+400 TO 0+447 Rajendran
NDE selection for welds of 8 inch HRDH-1171 at Mr.
2360 CPP-NGCP-W-2360 1400097944 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 06-May-19 4.00 PM Rajesh CLOSED
KM-0+400 TO 0+447 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -BK-RH Mr.
2361 CPP-NGCP-W-2361 1400098027 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 06-May-19 8:00 AM IRSHAD CLOSED
inch HRDH BK-RH TR/L KP2+900 to KP3+000; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH Mr.
2362 CPP-NGCP-W-2362 1400098028 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 06-May-19 2.00 PM IRSHAD CLOSED
BK-RH TR/L KP2+900 to KP3+000; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH Mr.
2363 CPP-NGCP-W-2363 1400098017 Welding SATIP-W-012-01 SAIC-W-2054 TA-843957 06-May-19 4.00 PM IRSHAD CLOSED
TR/L KP2+900 to KP3+000; TR/L Rajendran
In-Process Verification - RT Techniques &
2364 CPP-NGCP-W-2364 1400098099 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-1116,1177 VARIOUS 06-May-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1116,1177,BK
In-Process Verification - RT Techniques &
HWYH-1003,1091,1115,CK-RH;GK-
2365 CPP-NGCP-W-2365 1400098136 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- VARIOUS 06-May-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
RH
1003,1091,1115,CK-RH;GK-RH
Weld repair verification of joints FW298 at HWYH TA-445856 PRATHAB
2366 CPP-NGCP-W-2366 1400098226 Welding SATIP-W-012-01 SAIC-W-2051 HWYH 1003 06-May-19 8.00 AM Mr. Suresh CLOSED
1003
Post-welding visual inspection of repair joints
2367 CPP-NGCP-W-2367 1400098197 Welding SATIP-W-012-01 SAIC-W-2048 HWYH 1003 TA-445856 06-May-19 4.00 PM PRATHAB Mr. Suresh CLOSED
FW298 at HWYH 1003
Pre-welding and weld joint fit up inspection for 8 TA-843575 Mr.
2368 CPP-NGCP-W-2368 1400098736 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1177 FL 07-May-19 8:00 AM Rajesh CLOSED
inch HRDH-1177 KP1+200 to KP1+300 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
2369 CPP-NGCP-W-2369 1400098763 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1177 FL TA-843575 07-May-19 2.00 PM Rajesh CLOSED
1177 KP1+200 to KP1+300 Rajendran
NDE selection for welds of 8 inch HRDH-1177 TA-843575 Mr.
2370 CPP-NGCP-W-2370 1400098757 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1177 FL 07-May-19 4.00 PM Rajesh CLOSED
KP1+200 to KP1+300 Rajendran
Pre-welding and weld joint fit up inspection for 8
2371 CPP-NGCP-W-2371 1400098748 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 07-May-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1164 KP3+400 to KP3+700
Post-welding visual inspection for 8 inch HRDH TA-843592
2372 CPP-NGCP-W-2372 1400098731 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL 07-May-19 2.00 PM Saif Mr. Rajesh CLOSED
-1164 KP3+400 to KP3+700
NDE selection for welds of 8 inch HRDH -1164
2373 CPP-NGCP-W-2373 1400098699 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1164 FL TA-843592 07-May-19 4.00 PM Saif Mr. Rajesh CLOSED
KP3+400 to KP3+700
Pre-welding and weld joint fit up inspection for 10 TA-843651 Mr.
2374 CPP-NGCP-W-2374 1400098773 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL 07-May-19 8:00 AM Shadab CLOSED
inch HWYH-921 KP5+900 to KP6+100 Rajendran
Post-welding visual inspection for 10 inch HWYH- Mr.
2375 CPP-NGCP-W-2375 1400098758 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 07-May-19 2.00 PM Shadab CLOSED
921 KP5+900 to KP6+100 Rajendran
NDE selection for welds of 10 inch HWYH-921 Mr.
2376 CPP-NGCP-W-2376 1400098768 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL TA-843651 07-May-19 4.00 PM Shadab CLOSED
KP5+900 to KP6+100 Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
2377 CPP-NGCP-W-2377 1400098669 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 07-May-19 8:00 AM Rajesh CLOSED
inch HRDH-1171 at KM-0+651 TO 0+738 Rajendran
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a Post-welding visual inspection for 8inch HRDH- Mr.
2378 CPP-NGCP-W-2378 1400098740 l Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 07-May-19 2.00 PM Rajesh CLOSED
1171 at KM-0+651 TO 0+738 Rajendran
NDE selection for welds of 8 inch HRDH-1171 at Mr.
2379 CPP-NGCP-W-2379 1400098770 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 07-May-19 4.00 PM Rajesh CLOSED
KM-0+651 TO 0+738 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -BK-RH Mr.
2380 CPP-NGCP-W-2380 1400098751 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 07-May-19 8:00 AM IRSHAD CLOSED
inch HRDH BK-RH TR/L KP3+000 to KP3+200; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH Mr.
2381 CPP-NGCP-W-2381 1400098671 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 07-May-19 2.00 PM IRSHAD CLOSED
BK-RH TR/L KP3+000 to KP3+200; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH Mr.
2382 CPP-NGCP-W-2382 1400098762 Welding SATIP-W-012-01 SAIC-W-2054 TA-843957 07-May-19 4.00 PM IRSHAD CLOSED
TR/L KP3+000 to KP3+200; TR/L Rajendran
In-Process Verification - RT Techniques &
HRDH-
2383 CPP-NGCP-W-2383 1400098815 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-902,922, VARIOUS 07-May-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
902,922,1086,1116,1177,BK
1086,1116,1177,BK-RH
In-Process Verification - RT Techniques &
HWYH-1003,1091,CK-RH;GK-
2384 CPP-NGCP-W-2384 1400098843 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- VARIOUS 07-May-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
RH,921,206
1003,1091,CK-RH;GK-RH,921,206
Pre-welding and weld joint fit up inspection for
2385 CPP-NGCP-W-2385 1400098349 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 07-May-19 8:00 AM Umair Mr. Suresh CLOSED
HWYH-1003 KP0+100 to KP7+900
Post-welding visual inspection forHWYH-1003
2386 CPP-NGCP-W-2386 1400098388 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 07-May-19 2.00 PM Umair Mr. Suresh CLOSED
KP0+100 to KP7+900
NDE selection for welds of HWYH-1003 KP0+100
2387 CPP-NGCP-W-2387 1400098390 Welding SATIP-W-012-01 SAIC-W-2054 HWYH1003 TA-445856 07-May-19 4.00 PM Umair Mr. Suresh CLOSED
to KP7+900
Pre-welding and weld joint fit up inspection for 8
2388 CPP-NGCP-W-2388 1400098414 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 07-May-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 8inch HWYH-
2389 CPP-NGCP-W-2389 1400098380 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 07-May-19 2.00 PM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 8 inch HWYH-1036
2390 CPP-NGCP-W-2390 1400098322 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 07-May-19 4:00 PM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
2391 CPP-NGCP-W-2391 1400098382 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 07-May-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH-
2392 CPP-NGCP-W-2392 1400098409 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 07-May-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @
2393 CPP-NGCP-W-2393 1400098420 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 TA-445828 07-May-19 4.00 PM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Weld repair verification of joints FW86 at HWYH TA-445838 PRATHAB
2394 CPP-NGCP-W-2394 1400098475 Welding SATIP-W-012-01 SAIC-W-2051 HWYH 1093 07-May-19 8.00 AM Mr. Suresh CLOSED
1093
Post-welding visual inspection of repair joints
2395 CPP-NGCP-W-2395 1400098462 Welding SATIP-W-012-01 SAIC-W-2048 HWYH 1093 TA-445838 07-May-19 4.00 PM PRATHAB Mr. Suresh CLOSED
FW86 at HWYH 1093
Pre-welding and weld joint fit up inspection for 10 TA-445912
2396 CPP-NGCP-W-2396 1400098450 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL 07-May-19 8:00 AM Shahbaz Mr. Suresh CLOSED
inch 16″HWYH GK-RH TRL km0+100 to 12+500
Post-welding visual inspection for 10 inch
2397 CPP-NGCP-W-2397 1400098586 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 07-May-19 2.00 PM Shahbaz Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
NDE selection for welds of 10 inch16″HWYH GK-
2398 CPP-NGCP-W-2398 1400098588 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH GK-RH TRL km0+100 to 16″HWYH GK-RH TRL TA-445912 07-May-19 4.00 PM Shahbaz Mr. Suresh CLOSED
12+500
Pre-welding and weld joint fit up inspection for 24
Mr.
2399 CPP-NGCP-W-2399 1400098231 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. TA-445989 07-May-19 8:00 AM Junaid CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
2400 CPP-NGCP-W-2400 1400098403 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 07-May-19 2.00 PM Junaid CLOSED
Rajendran
Yard.
NDE selection for welds of 24 inch double joints Mr.
2401 CPP-NGCP-W-2401 1400098375 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 07-May-19 4.00 PM Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for
2402 CPP-NGCP-W-2402 1400098912 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 08-May-19 6:00 AM Umair Mr. Suresh CLOSED
HWYH-1003 KP0+100 to KP7+900
Post-welding visual inspection forHWYH-1003
2403 CPP-NGCP-W-2403 1400098811 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 08-May-19 11.00 PM Umair Mr. Suresh CLOSED
KP0+100 to KP7+900
NDE selection for welds of HWYH-1003 KP0+100
2404 CPP-NGCP-W-2404 1400098913 Welding SATIP-W-012-01 SAIC-W-2054 HWYH1003 TA-445856 08-May-19 12.00 PM Umair Mr. Suresh CLOSED
to KP7+900
Pre-welding and weld joint fit up inspection for 8
2405 CPP-NGCP-W-2405 1400098900 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 08-May-19 6:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 8inch HWYH- TA-445826
2406 CPP-NGCP-W-2406 1400098970 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL 08-May-19 11.00 PM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 8 inch HWYH-1036
2407 CPP-NGCP-W-2407 1400098984 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 08-May-19 12.00 PM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10 TA-445828
2408 CPP-NGCP-W-2408 1400098993 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 08-May-19 6:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH-
2409 CPP-NGCP-W-2409 1400099005 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 08-May-19 11.00 PM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @ TA-445828
2410 CPP-NGCP-W-2410 1400098938 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 08-May-19 12.00 PM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Weld repair verification of joints FW395 at HWYH
2411 CPP-NGCP-W-2411 1400099019 Welding SATIP-W-012-01 SAIC-W-2051 HWYH CK-RH TA-445912 08-May-19 6.00 AM PRATHAB Mr. Suresh CLOSED
CK-RH
Post-welding visual inspection of repair joints TA-445912 PRATHAB
2412 CPP-NGCP-W-2412 1400099037 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CK-RH 08-May-19 12.00 PM Mr. Suresh CLOSED
FW395 at HWYH CK-RH
Pre-welding and weld joint fit up inspection for 10
2413 CPP-NGCP-W-2413 1400098831 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 08-May-19 6:00 AM Shahbaz Mr. Suresh CLOSED
inch 16″HWYH GK-RH TRL km0+100 to 12+500
Post-welding visual inspection for 10 inch TA-445912
2414 CPP-NGCP-W-2414 1400098906 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL 08-May-19 11.00 PM Shahbaz Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
NDE selection for welds of 10 inch16″HWYH GK-
2415 CPP-NGCP-W-2415 1400098907 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH GK-RH TRL km0+100 to 16″HWYH GK-RH TRL TA-445912 08-May-19 12.00 PM Shahbaz Mr. Suresh CLOSED
12+500
Pre-welding and weld joint fit up inspection for 24
TA-445989 Mr.
2416 CPP-NGCP-W-2416 1400098810 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. 08-May-19 6:00 AM Junaid CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
2417 CPP-NGCP-W-2417 1400098909 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 08-May-19 11.00 PM Junaid CLOSED
Yard. Rajendran
NDE selection for welds of 24 inch double joints Mr.
2418 CPP-NGCP-W-2418 1400098910 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 08-May-19 12.00 PM Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
2419 CPP-NGCP-W-2419 1400098832 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1177 FL TA-843575 08-May-19 8:00 AM Rajesh CLOSED
inch HRDH-1177 KP1+300 to KP1+450 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
2420 CPP-NGCP-W-2420 1400098839 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1177 FL TA-843575 08-May-19 2.00 PM Rajesh CLOSED
1177 KP1+300 to KP1+450 Rajendran
NDE selection for welds of 8 inch HRDH-1177 Mr.
2421 CPP-NGCP-W-2421 1400098897 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1177 FL TA-843575 08-May-19 4.00 PM Rajesh CLOSED
KP1+300 to KP1+450 Rajendran
Pre-welding and weld joint fit up inspection for 8
2422 CPP-NGCP-W-2422 1400098872 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 08-May-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1164 KP3+300 to KP3+400
Post-welding visual inspection for 8 inch HRDH
2423 CPP-NGCP-W-2423 1400098914 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 08-May-19 2.00 PM Saif Mr. Rajesh CLOSED
-1164 KP3+300 to KP3+400 draft
NDE selection for welds of 8 inch HRDH -1164
2424 CPP-NGCP-W-2424 1400098884 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1164 FL TA-843592 08-May-19 4.00 PM Saif Mr. Rajesh CLOSED
KP3+300 to KP3+400
Pre-welding and weld joint fit up inspection for 10 Mr.
2425 CPP-NGCP-W-2425 1400098915 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 08-May-19 8:00 AM Shadab CLOSED
inch HWYH-921 KP5+600 to KP5+700 Rajendran
Post-welding visual inspection for 10 inch HWYH- Mr.
2426 CPP-NGCP-W-2426 1400098840 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 08-May-19 2.00 PM Shadab CLOSED
921 KP5+600 to KP5+700 Rajendran
NDE selection for welds of 10 inch HWYH-921 Mr.
2427 CPP-NGCP-W-2427 1400098858 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL TA-843651 08-May-19 4.00 PM Shadab CLOSED
KP5+600 to KP5+700 Rajendran
Pre-welding and weld joint fit up inspection for 8 TA-843547 Mr.
2428 CPP-NGCP-W-2428 1400098955 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL 08-May-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1171 at KM-1+550 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
2429 CPP-NGCP-W-2429 1400098995 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 08-May-19 2.00 PM Sarfaraz CLOSED
1171 at KM-1+550 Rajendran
NDE selection for welds of 8 inch HRDH-1171 at TA-843547 Mr.
2430 CPP-NGCP-W-2430 1400098989 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL 08-May-19 4.00 PM Sarfaraz CLOSED
KM-1+550 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -BK-RH Mr.
2431 CPP-NGCP-W-2431 1400098950 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 08-May-19 8:00 AM IRSHAD CLOSED
inch HRDH BK-RH TR/L KP3+200 to KP3+300; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH TA-843957 Mr.
2432 CPP-NGCP-W-2432 1400099035 Welding SATIP-W-012-01 SAIC-W-2048 08-May-19 2.00 PM IRSHAD CLOSED
BK-RH TR/L KP3+200 to KP3+300; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH Mr.
2433 CPP-NGCP-W-2433 1400098941 Welding SATIP-W-012-01 SAIC-W-2054 TA-843957 08-May-19 4.00 PM IRSHAD CLOSED
TR/L KP3+200 to KP3+300; TR/L Rajendran
In-Process Verification - RT Techniques &
2434 CPP-NGCP-W-2434 1400099341 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-1116,1177,1171,BK-RH VARIOUS 08-May-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1164,1177,BK-RH,1171
In-Process Verification - RT Techniques &
HWYH-206,921,1003,1036,CK-
2435 CPP-NGCP-W-2435 1400099362 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-206,921, VARIOUS 08-May-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
RH;GK-RH
1003,1036,CK-RH;GK-RH
In-Process Verification - RT Techniques & Mr.
2436 CPP-NGCP-W-2436 1400099394 Welding SATIP-NDE-RT-01 SAIC-RT-2007 TCF-1 VARIOUS 08-May-19 8:00 AM RAMEEZ CLOSED
Procedure Implementation of TRL-2 at TCF-1 Rajendran
In-Process Inspection of MPT using Mr.
2437 CPP-NGCP-W-2437 1400099404 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 TCF-1 VARIOUS 08-May-19 8:00 AM RAMEEZ CLOSED
Yoke Method, TRL-2 at TCF-1 Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
2438 CPP-NGCP-W-2438 1400099651 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1177 FL TA-843575 09-May-19 8:00 AM Rajesh CLOSED
inch HRDH-1177 KP1+450 to KP1+800 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
2439 CPP-NGCP-W-2439 1400099723 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1177 FL TA-843575 09-May-19 2.00 PM Rajesh CLOSED
1177 KP1+450 to KP1+800 Rajendran
NDE selection for welds of 8 inch HRDH-1177 Mr.
2440 CPP-NGCP-W-2440 1400099601 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1177 FL TA-843575 09-May-19 4.00 PM Rajesh CLOSED
KP1+450 to KP1+800 Rajendran
Pre-welding and weld joint fit up inspection for 8
2441 CPP-NGCP-W-2441 1400099755 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 09-May-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1164 KP3+200 to KP3+300
Post-welding visual inspection for 8 inch HRDH
2442 CPP-NGCP-W-2442 1400099758 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 09-May-19 2.00 PM Saif Mr. Rajesh CLOSED
-1164 KP3+200 to KP3+300
NDE selection for welds of 8 inch HRDH -1164
2443 CPP-NGCP-W-2443 1400099763 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1164 FL TA-843592 09-May-19 4.00 PM Saif Mr. Rajesh CLOSED
KP3+200 to KP3+300
Pre-welding and weld joint fit up inspection for 10 Mr.
2444 CPP-NGCP-W-2444 1400099737 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 09-May-19 8:00 AM Shadab CLOSED
inch HWYH-921 KP5+400 to KP5+500 Rajendran
Post-welding visual inspection for 10 inch HWYH- Mr. CLOSED AGAINST RFI
2445 CPP-NGCP-W-2445 1400099773 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 09-May-19 2.00 PM Shadab CLOSED
921 KP5+400 to KP5+500 Rajendran NO#1400102989
NDE selection for welds of 10 inch HWYH-921 Mr. DUE TO EPM
2446 CPP-NGCP-W-2446 1400099748 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL TA-843651 09-May-19 4.00 PM Shadab CLOSED
KP5+400 to KP5+500 Rajendran UPLOADING PROBLEM
Temperature Tie in Welding HRDH-1171 at KM- Mr.
2447 CPP-NGCP-W-2447 1400099784 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1171 FL TA-843547 09-May-19 10:00 AM Sarfaraz CLOSED
1+600 Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
2448 CPP-NGCP-W-2448 1400099787 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 09-May-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1171 at KM-1+600 and KM-1+700 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
2449 CPP-NGCP-W-2449 1400099672 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 09-May-19 2.00 PM Sarfaraz CLOSED
1171 at KM-1+600 and KM-1+700 Rajendran
NDE selection for welds of 8 inch HRDH-1171 at TA-843547 Mr.
2450 CPP-NGCP-W-2450 1400099711 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL 09-May-19 4.00 PM Sarfaraz CLOSED
KM-1+600 and KM-1+700 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -BK-RH Mr.
2451 CPP-NGCP-W-2451 1400099776 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 09-May-19 8:00 AM IRSHAD CLOSED
inch HRDH BK-RH TR/L KP3+400 to KP3+500; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH TA-843957 Mr.
2452 CPP-NGCP-W-2452 1400099702 Welding SATIP-W-012-01 SAIC-W-2048 09-May-19 2.00 PM IRSHAD CLOSED
BK-RH TR/L KP3+400 to KP3+500; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH Mr.
2453 CPP-NGCP-W-2453 1400099804 Welding SATIP-W-012-01 SAIC-W-2054 TA-843957 09-May-19 4.00 PM IRSHAD CLOSED
TR/L KP3+400 to KP3+500; TR/L Rajendran
In-Process Verification - RT Techniques &
HRDH-1164,1177,1171,1172,BK-
2454 CPP-NGCP-W-2454 1400100074 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- VARIOUS 09-May-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
RH
1164,1177,BK-RH,1171.1172
In-Process Verification - RT Techniques &
HWYH-206,921,1003,1036,CK- VARIOUS
2455 CPP-NGCP-W-2455 1400100039 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-206,921, 09-May-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
RH;GK-RH,1093,1115
1003,1036,CK-RH;GK-RH.1093.1115
In-Process Verification - RT Techniques & Mr.
2456 CPP-NGCP-W-2456 1400100084 Welding SATIP-NDE-RT-01 SAIC-RT-2007 TCF-1 VARIOUS 10-May-19 8:00 AM RAMEEZ CLOSED
Procedure Implementation of TRL-2 at TCF-1 Rajendran
In-Process Inspection of MPT using VARIOUS Mr.
2457 CPP-NGCP-W-2457 1400100041 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 TCF-1 10-May-19 8:00 AM RAMEEZ CLOSED
Yoke Method, TRL-2 at TCF-1 Rajendran
Pre-welding and weld joint fit up inspection for
2458 CPP-NGCP-W-2458 1400099542 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 09-May-19 6:00 AM Umair Mr. Suresh CLOSED
HWYH-1003 KP0+100 to KP7+900
Post-welding visual inspection forHWYH-1003 TA-445856
2459 CPP-NGCP-W-2459 1400099597 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 09-May-19 11.00 AM Umair Mr. Suresh CLOSED
KP0+100 to KP7+900
NDE selection for welds of HWYH-1003 KP0+100
2460 CPP-NGCP-W-2460 1400099550 Welding SATIP-W-012-01 SAIC-W-2054 HWYH1003 TA-445856 09-May-19 12.00 AM Umair Mr. Suresh REJECTED
to KP7+900
Pre-welding and weld joint fit up inspection for 8 TA-445826
2461 CPP-NGCP-W-2461 1400099635 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL 09-May-19 6:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 8inch HWYH-
2462 CPP-NGCP-W-2462 1400099656 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 09-May-19 11.00 AM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 8 inch HWYH-1036 TA-445826
2463 CPP-NGCP-W-2463 1400099657 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL 09-May-19 12.00 AM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
2464 CPP-NGCP-W-2464 1400099661 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 09-May-19 6:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH- TA-445828
2465 CPP-NGCP-W-2465 1400099676 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 09-May-19 11.00 AM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @
2466 CPP-NGCP-W-2466 1400099598 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 TA-445828 09-May-19 12.00 AM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Pre-welding and weld joint fit up inspection for 10
2467 CPP-NGCP-W-2467 1400099664 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 09-May-19 6:00 AM PRATHAB Mr. Suresh CLOSED
inch 16″HWYH GK-RH TRL km0+100 to 12+500
Post-welding visual inspection for 10 inch
2468 CPP-NGCP-W-2468 1400099645 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 09-May-19 11.00 AM PRATHAB Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
NDE selection for welds of 10 inch16″HWYH GK-
2469 CPP-NGCP-W-2469 1400099693 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH GK-RH TRL km0+100 to 16″HWYH GK-RH TRL TA-445912 09-May-19 12.00 AM PRATHAB Mr. Suresh CLOSED
12+500
Pre-welding and weld joint fit up inspection for 24
Mr.
2470 CPP-NGCP-W-2470 1400099686 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. TA-445989 09-May-19 6:00 AM Shahbaz CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
2471 CPP-NGCP-W-2471 1400099687 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 09-May-19 11.00 AM Shahbaz CLOSED
Rajendran
Yard.
NDE selection for welds of 24 inch double joints Mr.
2472 CPP-NGCP-W-2472 1400099612 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 09-May-19 12.00 AM Shahbaz CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for TA-445856
2473 CPP-NGCP-W-2473 1400100283 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 11-May-19 6:00 AM Umair Mr. Suresh CLOSED
HWYH-1003 KP0+100 to KP7+900
Post-welding visual inspection forHWYH-1003
2474 CPP-NGCP-W-2474 1400100264 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 11-May-19 11.00 AM Umair Mr. Suresh CLOSED
KP0+100 to KP7+900
NDE selection for welds of HWYH-1003 KP0+100 TA-445856
2475 CPP-NGCP-W-2475 1400100293 Welding SATIP-W-012-01 SAIC-W-2054 HWYH1003 11-May-19 12.00 AM Umair Mr. Suresh CLOSED
to KP7+900
Pre-welding and weld joint fit up inspection for 10
2476 CPP-NGCP-W-2476 1400100279 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 11-May-19 6:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 10inch HWYH- TA-445826
2477 CPP-NGCP-W-2477 1400100284 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL 11-May-19 11.00 AM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 10 inch HWYH-1036
2478 CPP-NGCP-W-2478 1400100787 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 11-May-19 12.00 AM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10 TA-445828
2479 CPP-NGCP-W-2479 1400100749 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 11-May-19 6:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH-
2480 CPP-NGCP-W-2480 1400100772 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 11-May-19 11.00 AM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @ TA-445828
2481 CPP-NGCP-W-2481 1400100776 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 11-May-19 12.00 AM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Pre-welding and weld joint fit up inspection for 10
2482 CPP-NGCP-W-2482 1400100285 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 11-May-19 6:00 AM PRATHAB Mr. Suresh CLOSED
inch 16″HWYH GK-RH TRL km0+100 to 12+500
Post-welding visual inspection for 10 inch TA-445912 PRATHAB
2483 CPP-NGCP-W-2483 1400100282 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL 11-May-19 11.00 AM Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
NDE selection for welds of 10 inch16″HWYH GK-
2484 CPP-NGCP-W-2484 1400100819 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH GK-RH TRL km0+100 to 16″HWYH GK-RH TRL TA-445912 11-May-19 12.00 AM PRATHAB Mr. Suresh CLOSED
12+500
Pre-welding and weld joint fit up inspection for 24
TA-445989 Mr.
2485 CPP-NGCP-W-2485 1400100258 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. 11-May-19 6:00 AM Shahbaz CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
2486 CPP-NGCP-W-2486 1400100265 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 11-May-19 11.00 AM Shahbaz CLOSED
Yard. Rajendran
NDE selection for welds of 24 inch double joints Mr.
2487 CPP-NGCP-W-2487 1400100303 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 11-May-19 12.00 AM Shahbaz CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
2488 CPP-NGCP-W-2488 1400100823 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1177 FL TA-843575 11-May-19 8:00 AM Rajesh CLOSED
inch HRDH-1177 KP1+800 to KP1+900 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
2489 CPP-NGCP-W-2489 1400100815 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1177 FL TA-843575 11-May-19 2.00 PM Rajesh CLOSED
1177 KP1+800 to KP1+900 Rajendran
NDE selection for welds of 8 inch HRDH-1177 Mr.
2490 CPP-NGCP-W-2490 1400100750 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1177 FL TA-843575 11-May-19 4.00 PM Rajesh CLOSED
KP1+800 to KP1+900 Rajendran
Pre-welding and weld joint fit up inspection for 8
2491 CPP-NGCP-W-2491 1400100751 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 11-May-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1164 KP2+600 to KP3+200
Post-welding visual inspection for 8 inch HRDH
2492 CPP-NGCP-W-2492 1400100778 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 11-May-19 2.00 PM Saif Mr. Rajesh CLOSED
-1164 KP2+600 to KP3+200
NDE selection for welds of 8 inch HRDH -1164
2493 CPP-NGCP-W-2493 1400100820 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1164 FL TA-843592 11-May-19 4.00 PM Saif Mr. Rajesh CLOSED
KP2+600 to KP3+200
Pre-welding and weld joint fit up inspection for 10 Mr.
2494 CPP-NGCP-W-2494 1400100789 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 11-May-19 8:00 AM Shadab CLOSED
inch HWYH-921 KP5+250 to KP5+400 Rajendran
Post-welding visual inspection for 10 inch HWYH- TA-843651 Mr.
2495 CPP-NGCP-W-2495 1400100822 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL 11-May-19 2.00 PM Shadab CLOSED
921 KP5+250 to KP5+400 Rajendran
NDE selection for welds of 10 inch HWYH-921 Mr.
2496 CPP-NGCP-W-2496 1400100833 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL TA-843651 11-May-19 4.00 PM Shadab CLOSED
KP5+250 to KP5+400 Rajendran
Temperature Tie in Welding HRDH-1171 at KM- TA-843547 Mr.
2497 CPP-NGCP-W-2497 1400100807 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1171 FL 11-May-19 10:00 AM Sarfaraz CLOSED
1+720 Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
2498 CPP-NGCP-W-2498 1400100830 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 11-May-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1171 at KM-1+720 Rajendran
Post-welding visual inspection for 8inch HRDH- TA-843547 Mr.
2499 CPP-NGCP-W-2499 1400100800 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL 11-May-19 2.00 PM Sarfaraz CLOSED
1171 at KM-1+720 Rajendran
NDE selection for welds of 8 inch HRDH-1171 at Mr.
2500 CPP-NGCP-W-2500 1400100831 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 11-May-19 4.00 PM Sarfaraz CLOSED
KM-1+720 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -BK-RH TA-843957 Mr.
2501 CPP-NGCP-W-2501 1400100780 Welding SATIP-W-012-01 SAIC-W-2048 11-May-19 8:00 AM IRSHAD CLOSED
inch HRDH BK-RH TR/L KP3+500 to KP3+600; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH Mr.
2502 CPP-NGCP-W-2502 1400100835 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 11-May-19 2.00 PM IRSHAD CLOSED
BK-RH TR/L KP3+500 to KP3+600; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH TA-843957 Mr.
2503 CPP-NGCP-W-2503 1400100808 Welding SATIP-W-012-01 SAIC-W-2054 11-May-19 4.00 PM IRSHAD CLOSED
TR/L KP3+500 to KP3+600; TR/L Rajendran
In-Process Verification - RT Techniques &
2504 CPP-NGCP-W-2504 1400100855 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-1164,1177,1171,BK-RH VARIOUS 11-May-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1164,1177,1171,BK-RH
In-Process Verification - RT Techniques &
HWYH-206,921,1003,1036,CK- VARIOUS
2505 CPP-NGCP-W-2505 1400100856 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-206,921, 11-May-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
RH;GK-RH,
1003,1036,CK-RH;GK-RH,
Review of weekly welder performance and
2506 CPP-NGCP-W-2506 1400101254 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 12-May-2019 to 19 CPP site office N/A 12-May-19 8:00 AM Ruhul Mr. Rajesh CLOSED
May-2019 at CPP site office.
Pre-welding and weld joint fit up inspection for CLOSED AGAINST RFI
2507 CPP-NGCP-W-2507 1400101068 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 12-May-19 6:00 AM Umair Mr. Suresh CLOSED
HWYH-1003 KP0+100 to KP7+900 NO#1400102989
Post-welding visual inspection forHWYH-1003 CLOSED AGAINST RFI
2508 CPP-NGCP-W-2508 1400101154 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 12-May-19 11.00 AM Umair Mr. Suresh CLOSED
KP0+100 to KP7+900 NO#1400102989
NDE selection for welds of HWYH-1003 KP0+100 DUE TO EPM
2509 CPP-NGCP-W-2509 1400101163 Welding SATIP-W-012-01 SAIC-W-2054 HWYH1003 TA-445856 12-May-19 12.00 AM Umair Mr. Suresh REJECTED
to KP7+900 UPLOADING PROBLEM
Pre-welding and weld joint fit up inspection for 10
2510 CPP-NGCP-W-2510 1400101069 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 12-May-19 6:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 10inch HWYH-
2511 CPP-NGCP-W-2511 1400101144 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 12-May-19 11.00 AM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
2513 CPP-NGCP-W-2513 1400101165 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 12-May-19 6:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH-
2514 CPP-NGCP-W-2514 1400101184 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 12-May-19 11.00 AM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @
2515 CPP-NGCP-W-2515 1400101193 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 TA-445828 12-May-19 12.00 AM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Pre-welding and weld joint fit up inspection for 10
2516 CPP-NGCP-W-2516 1400101048 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 12-May-19 6:00 AM PRATHAB Mr. Suresh CLOSED
inch 16″HWYH GK-RH TRL km0+100 to 12+500
Post-welding visual inspection for 10 inch
2517 CPP-NGCP-W-2517 1400101011 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 12-May-19 11.00 AM PRATHAB Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
NDE selection for welds of 10 inch16″HWYH GK-
2518 CPP-NGCP-W-2518 1400101093 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH GK-RH TRL km0+100 to 16″HWYH GK-RH TRL TA-445912 12-May-19 12.00 AM PRATHAB Mr. Suresh REJECTED
12+500
Pre-welding and weld joint fit up inspection for 24
Mr. CLOSED AGAINST RFI
2519 CPP-NGCP-W-2519 1400101058 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. TA-445989 12-May-19 6:00 AM Shahbaz CLOSED
Rajendran NO#1400102989
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
2520 CPP-NGCP-W-2520 1400101000 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 12-May-19 11.00 AM Shahbaz CLOSED
Rajendran
Yard.
NDE selection for welds of 24 inch double joints Mr.
2521 CPP-NGCP-W-2521 1400101040 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 12-May-19 12.00 AM Shahbaz CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
2522 CPP-NGCP-W-2522 1400101002 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1177 FL TA-843575 12-May-19 8:00 AM Rajesh REJECTED
inch HRDH-1177 KP1+900 to KP2+300 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
2523 CPP-NGCP-W-2523 1400101062 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1177 FL TA-843575 12-May-19 2.00 PM Rajesh REJECTED
1177 KP1+900 to KP2+300 Rajendran
NDE selection for welds of 8 inch HRDH-1177 Mr.
2524 CPP-NGCP-W-2524 1400101083 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1177 FL TA-843575 12-May-19 4.00 PM Rajesh CLOSED
KP1+900 to KP2+300 Rajendran
Pre-welding and weld joint fit up inspection for 8 TA-843592
2525 CPP-NGCP-W-2525 1400101041 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL 12-May-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1164 KP2+500 to KP2+600
Post-welding visual inspection for 8 inch HRDH
2526 CPP-NGCP-W-2526 1400100992 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 12-May-19 2.00 PM Saif Mr. Rajesh CLOSED
-1164 KP2+500 to KP2+600
NDE selection for welds of 8 inch HRDH -1164 TA-843592
2527 CPP-NGCP-W-2527 1400101103 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1164 FL 12-May-19 4.00 PM Saif Mr. Rajesh CLOSED
KP2+500 to KP2+600
Pre-welding and weld joint fit up inspection for 10 Mr.
2528 CPP-NGCP-W-2528 1400101074 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 12-May-19 8:00 AM Shadab CLOSED
inch HWYH-921 KP5+000 to KP5+100 Rajendran
Post-welding visual inspection for 10 inch HWYH- TA-843651 Mr.
2529 CPP-NGCP-W-2529 1400101042 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL 12-May-19 2.00 PM Shadab CLOSED
921 KP5+000 to KP5+100 Rajendran
NDE selection for welds of 10 inch HWYH-921 Mr.
2530 CPP-NGCP-W-2530 1400101113 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL TA-843651 12-May-19 4.00 PM Shadab CLOSED
KP5+000 to KP5+100 Rajendran
Temperature Tie in Welding HRDH-1171 at KM- TA-843547 Mr.
2531 CPP-NGCP-W-2531 1400101156 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1171 FL 12-May-19 10:00 AM Sarfaraz CLOSED
1+850 Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
2532 CPP-NGCP-W-2532 1400101138 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 12-May-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1171 at KM-1+850 Rajendran
Post-welding visual inspection for 8inch HRDH- TA-843547 Mr.
2533 CPP-NGCP-W-2533 1400101157 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL 12-May-19 2.00 PM Sarfaraz CLOSED
1171 at KM-1+850 Rajendran
NDE selection for welds of 8 inch HRDH-1171 at Mr.
2534 CPP-NGCP-W-2534 1400101158 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 12-May-19 4.00 PM Sarfaraz REJECTED
KM-1+850 Rajendran

Pre-welding and weld joint fit up inspection for 16 HRDH -BK-RH Mr.
2535 CPP-NGCP-W-2535 1400101123 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 12-May-19 8:00 AM IRSHAD CLOSED
inch HRDH BK-RH TR/L KP3+700 to KP3+800; TR/L Rajendran

Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH Mr.


2536 CPP-NGCP-W-2536 1400101105 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 12-May-19 2.00 PM IRSHAD CLOSED
BK-RH TR/L KP3+700 to KP3+800; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH Mr.
2537 CPP-NGCP-W-2537 1400101124 Welding SATIP-W-012-01 SAIC-W-2054 TA-843957 12-May-19 4.00 PM IRSHAD CLOSED
TR/L KP3+700 to KP3+800; TR/L Rajendran
In-Process Verification - RT Techniques &
2538 CPP-NGCP-W-2538 1400101522 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-1164,1177,1171,BK-RH VARIOUS 12-May-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1164,1177,1171,BK-RH
In-Process Verification - RT Techniques &
2539 CPP-NGCP-W-2539 1400101430 Welding SATIP-NDE-RT-01 SAIC-RT-2007 HWYH-921, VARIOUS 12-May-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
Procedure Implementation of HWYH-921,
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a In-Process Verification - RT Techniques & Mr.
2540 CPP-NGCP-W-2540 1400101507 l Welding SATIP-NDE-RT-01 SAIC-RT-2007 TCF-1 VARIOUS 12-May-19 8:00 AM RAMEEZ CLOSED
Procedure Implementation of TRL-2 at TCF-1 Rajendran
In-Process Inspection of MPT using Mr.
2541 CPP-NGCP-W-2541 1400101491 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 TCF-1 VARIOUS 12-May-19 8:00 AM RAMEEZ CLOSED
Yoke Method, TRL-2 at TCF-1 Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
2542 CPP-NGCP-W-2542 1400101665 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1177 FL TA-843575 13-May-19 8:00 AM Rajesh CLOSED
inch HRDH-1177 KP2+300 to KP2+500 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
2543 CPP-NGCP-W-2543 1400101695 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1177 FL TA-843575 13-May-19 2.00 PM Rajesh CLOSED
1177 KP2+300 to KP2+500 Rajendran
NDE selection for welds of 8 inch HRDH-1177 Mr.
2544 CPP-NGCP-W-2544 1400101705 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1177 FL TA-843575 13-May-19 4.00 PM Rajesh CLOSED
KP2+300 to KP2+500 Rajendran
Pre-welding and weld joint fit up inspection for 8
2545 CPP-NGCP-W-2545 1400101707 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 13-May-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1164 KP2+300 to KP2+500
Post-welding visual inspection for 8 inch HRDH
2546 CPP-NGCP-W-2546 1400101657 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 13-May-19 2.00 PM Saif Mr. Rajesh CLOSED
-1164 KP2+300 to KP2+500
NDE selection for welds of 8 inch HRDH -1164
2547 CPP-NGCP-W-2547 1400101689 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1164 FL TA-843592 13-May-19 4.00 PM Saif Mr. Rajesh CLOSED
KP2+300 to KP2+500
Pre-welding and weld joint fit up inspection for 10 Mr.
2548 CPP-NGCP-W-2548 1400102016 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 13-May-19 8:00 AM Shadab CLOSED
inch HWYH-921 KP4+900 to KP5+000 Rajendran
Post-welding visual inspection for 10 inch HWYH- Mr.
2549 CPP-NGCP-W-2549 1400101810 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 13-May-19 2.00 PM Shadab CLOSED
921 KP4+900 to KP5+000 Rajendran
NDE selection for welds of 10 inch HWYH-921 Mr.
2550 CPP-NGCP-W-2550 1400101826 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL TA-843651 13-May-19 4.00 PM Shadab CLOSED
KP4+900 to KP5+000 Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
2551 CPP-NGCP-W-2551 1400102005 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 13-May-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1171 at KM 2+137 to KM 2+216 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
2552 CPP-NGCP-W-2552 1400102034 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 13-May-19 2.00 PM Sarfaraz CLOSED
1171 at KM 2+137 to KM 2+216 Rajendran
NDE selection for welds of 8 inch HRDH-1171 at Mr.
2553 CPP-NGCP-W-2553 1400102000 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 13-May-19 4.00 PM Sarfaraz CLOSED
KM 2+137 to KM 2+216 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -BK-RH Mr.
2554 CPP-NGCP-W-2554 1400102006 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 13-May-19 8:00 AM IRSHAD CLOSED
inch HRDH BK-RH TR/L KP3+800 to KP3+900; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH Mr.
2555 CPP-NGCP-W-2555 1400101958 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 13-May-19 2.00 PM IRSHAD CLOSED
BK-RH TR/L KP3+800 to KP3+900; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH Mr.
2556 CPP-NGCP-W-2556 1400101986 Welding SATIP-W-012-01 SAIC-W-2054 TA-843957 13-May-19 4.00 PM IRSHAD CLOSED
TR/L KP3+800 to KP3+900; TR/L Rajendran
In-Process Verification - RT Techniques &
2557 CPP-NGCP-W-2557 1400102171 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-922,1177,1171, VARIOUS 13-May-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
922,1177,1171,
In-Process Verification - RT Techniques &
HWYH-206.1003.1036.CK-RH.GK-
2558 CPP-NGCP-W-2558 1400102194 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- VARIOUS 13-May-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
RH
206.1003.1036.CK-RH.GK-RH
Pre-welding and weld joint fit up inspection for
2559 CPP-NGCP-W-2559 1400101636 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 13-May-19 6:00 AM Umair Mr. Suresh CLOSED
HWYH-1003 KP0+100 to KP7+900
Post-welding visual inspection forHWYH-1003 TA-445856
2560 CPP-NGCP-W-2560 1400101649 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 13-May-19 11.00 AM Umair Mr. Suresh CLOSED
KP0+100 to KP7+900
NDE selection for welds of HWYH-1003 KP0+100
2561 CPP-NGCP-W-2561 1400101651 Welding SATIP-W-012-01 SAIC-W-2054 HWYH1003 TA-445856 13-May-19 12.00 AM Umair Mr. Suresh CLOSED
to KP7+900
Pre-welding and weld joint fit up inspection for 10
2562 CPP-NGCP-W-2562 1400101666 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 13-May-19 6:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 10inch HWYH-
2563 CPP-NGCP-W-2563 1400101655 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 13-May-19 11.00 AM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 10 inch HWYH-1036
2564 CPP-NGCP-W-2564 1400101706 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 13-May-19 12.00 AM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
2565 CPP-NGCP-W-2565 1400101677 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 13-May-19 6:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH-
2566 CPP-NGCP-W-2566 1400101671 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 13-May-19 11.00 AM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @
2567 CPP-NGCP-W-2567 1400101660 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 TA-445828 13-May-19 12.00 AM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Pre-welding and weld joint fit up inspection for 10
2568 CPP-NGCP-W-2568 1400101773 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 13-May-19 6:00 AM PRATHAB Mr. Suresh CLOSED
inch 16″HWYH GK-RH TRL km0+100 to 12+500
Post-welding visual inspection for 10 inch
2569 CPP-NGCP-W-2569 1400101717 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 13-May-19 11.00 AM PRATHAB Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
NDE selection for welds of 10 inch16″HWYH GK-
2570 CPP-NGCP-W-2570 1400101905 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH GK-RH TRL km0+100 to 16″HWYH GK-RH TRL TA-445912 13-May-19 12.00 AM PRATHAB Mr. Suresh CLOSED
12+500
Pre-welding and weld joint fit up inspection for 24
Mr.
2571 CPP-NGCP-W-2571 1400101847 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. TA-445989 13-May-19 6:00 AM Junaid CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
TA-445989 Mr.
2572 CPP-NGCP-W-2572 1400101906 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. 13-May-19 11.00 AM Junaid CLOSED
Rajendran
Yard.
NDE selection for welds of 24 inch double joints Mr.
2573 CPP-NGCP-W-2573 1400101860 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 13-May-19 12.00 AM Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8 TA-843575 Mr.
2574 CPP-NGCP-W-2574 1400102341 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1177 FL 14-May-19 6:00 AM Rajesh CLOSED
inch HRDH-1177 KP2+500 to KP2+600 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
2575 CPP-NGCP-W-2575 1400102610 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1177 FL TA-843575 14-May-19 11.00 AM Rajesh CLOSED
1177 KP2+500 to KP2+600 Rajendran
NDE selection for welds of 8 inch HRDH-1177 TA-843575 Mr.
2576 CPP-NGCP-W-2576 1400102650 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1177 FL 14-May-19 12.00 AM Rajesh CLOSED
KP2+500 to KP2+600 Rajendran
Pre-welding and weld joint fit up inspection for 8
2577 CPP-NGCP-W-2577 1400102561 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 14-May-19 6:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1164 KP2+200 to KP2+400
Post-welding visual inspection for 8 inch HRDH TA-843592
2578 CPP-NGCP-W-2578 1400102706 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL 14-May-19 11.00 AM Saif Mr. Rajesh CLOSED
-1164 KP2+200 to KP2+400
NDE selection for welds of 8 inch HRDH -1164
2579 CPP-NGCP-W-2579 1400102744 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1164 FL TA-843592 14-May-19 12.00 AM Saif Mr. Rajesh CLOSED
KP2+200 to KP2+400
Pre-welding and weld joint fit up inspection for 10 TA-843651 Mr.
2580 CPP-NGCP-W-2580 1400102729 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL 14-May-19 6:00 AM Shadab CLOSED
inch HWYH-921 KP4+700 to KP4+900 Rajendran
Post-welding visual inspection for 10 inch HWYH- Mr.
2581 CPP-NGCP-W-2581 1400102708 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 14-May-19 11.00 AM Shadab CLOSED
921 KP4+700 to KP4+900 Rajendran
NDE selection for welds of 10 inch HWYH-921 TA-843651 Mr.
2582 CPP-NGCP-W-2582 1400102715 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL 14-May-19 12.00 AM Shadab CLOSED
KP4+700 to KP4+900 Rajendran
Temperature Tie in Welding HRDH-1170 at KM Mr.
2583 CPP-NGCP-W-2583 1400102768 Welding SATIP-W-012-01 SAIC-W-2057 HRDH-1170 FL TA-843656 14-May-19 10:00 AM Sarfaraz CLOSED
0+900 to KM 1+000 and KM 1+000 to KM 1+100 Rajendran
Pre-welding and weld joint fit up inspection for 8
Mr.
2584 CPP-NGCP-W-2584 1400102805 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH-1170 at KM 0+900 to KM 1+000 and HRDH-1170 FL TA-843656 14-May-19 6:00 AM Sarfaraz CLOSED
Rajendran
KM 1+000 to KM 1+100
Post-welding visual inspection for 8inch HRDH-
Mr.
2585 CPP-NGCP-W-2585 1400102758 Welding SATIP-W-012-01 SAIC-W-2048 1170 at KM 0+900 to KM 1+000 and KM 1+000 HRDH-1170 FL TA-843656 14-May-19 11.00 AM Sarfaraz CLOSED
Rajendran
to KM 1+100
NDE selection for welds of 8 inch HRDH-1170 at
Mr.
2586 CPP-NGCP-W-2586 1400102778 Welding SATIP-W-012-01 SAIC-W-2054 KM 0+900 to KM 1+000 and KM 1+000 to KM HRDH-1170 FL TA-843656 14-May-19 12.00 AM Sarfaraz CLOSED
Rajendran
1+100
Pre-welding and weld joint fit up inspection for 16 HRDH -BK-RH Mr.
2587 CPP-NGCP-W-2587 1400102699 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 14-May-19 6:00 AM IRSHAD CLOSED
inch HRDH BK-RH TR/L KP4+000 to KP4+100; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH Mr.
2588 CPP-NGCP-W-2588 1400102700 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 14-May-19 11.00 AM IRSHAD CLOSED
BK-RH TR/L KP4+000 to KP4+100; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH Mr.
2589 CPP-NGCP-W-2589 1400102661 Welding SATIP-W-012-01 SAIC-W-2054 TA-843957 14-May-19 12.00 AM IRSHAD CLOSED
TR/L KP4+000 to KP4+100; TR/L Rajendran
In-Process Verification - RT Techniques &
HRDH-1164,1177,1171,
2590 CPP-NGCP-W-2590 1400102740 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- VARIOUS 14-May-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1172,BK-RH
1164,1177,1171,1172,BK-RH
In-Process Verification - RT Techniques &
2591 CPP-NGCP-W-2591 1400102749 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- HWYH-206.1003.1036.GK-RH VARIOUS 14-May-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
206.1003.1036.GK-RH
Pre-welding and weld joint fit up inspection for
2592 CPP-NGCP-W-2592 1400102247 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 14-May-19 6:00 AM Umair Mr. Suresh CLOSED
HWYH-1003 KP0+100 to KP7+900
Post-welding visual inspection forHWYH-1003 TA-445856
2593 CPP-NGCP-W-2593 1400102178 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 14-May-19 11.00 AM Umair Mr. Suresh CLOSED
KP0+100 to KP7+900
NDE selection for welds of HWYH-1003 KP0+100
2594 CPP-NGCP-W-2594 1400102188 Welding SATIP-W-012-01 SAIC-W-2054 HWYH1003 TA-445856 14-May-19 12.00 AM Umair Mr. Suresh CLOSED
to KP7+900
Pre-welding and weld joint fit up inspection for 10 TA-445826
2595 CPP-NGCP-W-2595 1400102179 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL 14-May-19 6:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 10inch HWYH-
2596 CPP-NGCP-W-2596 1400102228 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 14-May-19 11.00 AM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 10 inch HWYH-1036 TA-445826
2597 CPP-NGCP-W-2597 1400102180 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL 14-May-19 12.00 AM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
2598 CPP-NGCP-W-2598 1400102309 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 14-May-19 6:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH- TA-445828
2599 CPP-NGCP-W-2599 1400102344 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 14-May-19 11.00 AM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @
2600 CPP-NGCP-W-2600 1400102271 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 TA-445828 14-May-19 12.00 AM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Pre-welding and weld joint fit up inspection for TA-445912 PRATHAB
2601 CPP-NGCP-W-2601 1400102212 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL 14-May-19 6:00 AM Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
Post-welding visual inspection for 16″HWYH GK-
2602 CPP-NGCP-W-2602 1400102252 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 14-May-19 11.00 AM PRATHAB Mr. Suresh CLOSED
RH TRL km0+100 to 12+500
NDE selection for welds of 16″HWYH GK-RH TRL TA-445912 PRATHAB
2603 CPP-NGCP-W-2603 1400102293 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL 14-May-19 12.00 AM Mr. Suresh CLOSED
km0+100 to 12+500
Pre-welding and weld joint fit up inspection for 24
Mr.
2604 CPP-NGCP-W-2604 1400102824 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. TA-445989 14-May-19 6:00 AM Junaid CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
2605 CPP-NGCP-W-2605 1400102295 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 14-May-19 11.00 AM Junaid CLOSED
Rajendran
Yard.
NDE selection for welds of 24 inch double joints Mr.
2606 CPP-NGCP-W-2606 1400102279 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 14-May-19 12.00 AM Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
2607 CPP-NGCP-W-2607 1400103039 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1177 FL TA-843575 15-May-19 6:00 AM Rajesh CLOSED
inch HRDH-1177 KP2+600 to KP2+700 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
2608 CPP-NGCP-W-2608 1400103048 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1177 FL TA-843575 15-May-19 11.00 AM Rajesh CLOSED
1177 KP2+600 to KP2+700 Rajendran
NDE selection for welds of 8 inch HRDH-1177 Mr.
2609 CPP-NGCP-W-2609 1400103040 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1177 FL TA-843575 15-May-19 12.00 AM Rajesh CLOSED
KP2+600 to KP2+700 Rajendran
Pre-welding and weld joint fit up inspection for 8
2610 CPP-NGCP-W-2610 1400103084 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 15-May-19 6:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1164 KP2+000 to KP2+200
Post-welding visual inspection for 8 inch HRDH
2611 CPP-NGCP-W-2611 1400103066 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 15-May-19 11.00 AM Saif Mr. Rajesh CLOSED
-1164 KP2+000 to KP2+200
NDE selection for welds of 8 inch HRDH -1164
2612 CPP-NGCP-W-2612 1400103052 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1164 FL TA-843592 15-May-19 12.00 AM Saif Mr. Rajesh CLOSED
KP2+000 to KP2+200
Pre-welding and weld joint fit up inspection for 10 TA-843651 Mr.
2613 CPP-NGCP-W-2613 1400103087 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL 15-May-19 6:00 AM Shadab CLOSED
inch HWYH-921 KP4+600 to KP4+700 Rajendran
Post-welding visual inspection for 10 inch HWYH- Mr.
2614 CPP-NGCP-W-2614 1400103077 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 15-May-19 11.00 AM Shadab CLOSED
921 KP4+600 to KP4+700 Rajendran
NDE selection for welds of 10 inch HWYH-921 TA-843651 Mr.
2615 CPP-NGCP-W-2615 1400103104 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL 15-May-19 12.00 AM Shadab CLOSED
KP4+600 to KP4+700 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -BK-RH Mr.
2616 CPP-NGCP-W-2616 1400103069 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 15-May-19 6:00 AM IRSHAD CLOSED
inch HRDH BK-RH TR/L KP4+100 to KP4+200; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH TA-843957 Mr.
2617 CPP-NGCP-W-2617 1400103113 Welding SATIP-W-012-01 SAIC-W-2048 15-May-19 11.00 AM IRSHAD CLOSED
BK-RH TR/L KP4+100 to KP4+200; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH Mr.
2618 CPP-NGCP-W-2618 1400103095 Welding SATIP-W-012-01 SAIC-W-2054 TA-843957 15-May-19 12.00 AM IRSHAD CLOSED
TR/L KP4+100 to KP4+200; TR/L Rajendran
Pre-welding and weld joint fit up inspection for 8
Mr.
2619 CPP-NGCP-W-2619 1400103374 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH-1170 at KM 0+900 to KM 1+000 and HRDH-1170 FL TA-843656 15-May-19 6:00 AM Sarfaraz CLOSED
Rajendran
KM 1+000 to KM 1+100
Post-welding visual inspection for 8inch HRDH-
Mr.
2620 CPP-NGCP-W-2620 1400103354 Welding SATIP-W-012-01 SAIC-W-2048 1170 at KM 0+900 to KM 1+000 and KM 1+000 HRDH-1170 FL TA-843656 15-May-19 11.00 AM Sarfaraz CLOSED
Rajendran
to KM 1+100
NDE selection for welds of 8 inch HRDH-1170 at
Mr.
2621 CPP-NGCP-W-2621 1400103383 Welding SATIP-W-012-01 SAIC-W-2054 KM 0+900 to KM 1+000 and KM 1+000 to KM HRDH-1170 FL TA-843656 15-May-19 12.00 AM Sarfaraz CLOSED
Rajendran
1+100
In-Process Verification - RT Techniques &
2622 CPP-NGCP-W-2622 1400103393 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-1164,1177,BK-RH VARIOUS 15-May-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1164,1177,BK-RH
In-Process Verification - RT Techniques &
2623 CPP-NGCP-W-2623 1400103320 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- HWYH-206.921.1003.GK-RH VARIOUS 15-May-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
206.921.1003.GK-RH
Pre-welding and weld joint fit up inspection for TA-445856
2624 CPP-NGCP-W-2624 1400102932 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 15-May-19 6:00 AM Umair Mr. Suresh CLOSED
HWYH-1003 KP0+100 to KP7+900
Post-welding visual inspection forHWYH-1003
2625 CPP-NGCP-W-2625 1400102934 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 15-May-19 11.00 AM Umair Mr. Suresh CLOSED
KP0+100 to KP7+900
NDE selection for welds of HWYH-1003 KP0+100 TA-445856
2626 CPP-NGCP-W-2626 1400102935 Welding SATIP-W-012-01 SAIC-W-2054 HWYH1003 15-May-19 12.00 AM Umair Mr. Suresh CLOSED
to KP7+900
Pre-welding and weld joint fit up inspection for 10
2627 CPP-NGCP-W-2627 1400103013 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 15-May-19 6:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 10inch HWYH- TA-445826
2628 CPP-NGCP-W-2628 1400102970 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL 15-May-19 11.00 AM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 10 inch HWYH-1036
2629 CPP-NGCP-W-2629 1400103005 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 15-May-19 12.00 AM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
2630 CPP-NGCP-W-2630 1400102964 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 15-May-19 6:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH-
2631 CPP-NGCP-W-2631 1400102957 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 15-May-19 11.00 AM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @
2632 CPP-NGCP-W-2632 1400102912 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 TA-445828 15-May-19 12.00 AM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Pre-welding and weld joint fit up inspection for
2633 CPP-NGCP-W-2633 1400102892 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 15-May-19 6:00 AM PRATHAB Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
Post-welding visual inspection for 16″HWYH GK-
2634 CPP-NGCP-W-2634 1400102945 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 15-May-19 11.00 AM PRATHAB Mr. Suresh CLOSED
RH TRL km0+100 to 12+500
NDE selection for welds of 16″HWYH GK-RH TRL
2635 CPP-NGCP-W-2635 1400102946 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 15-May-19 12.00 AM PRATHAB Mr. Suresh CLOSED
km0+100 to 12+500
Pre-welding and weld joint fit up inspection for 24
TA-445989 Mr.
2636 CPP-NGCP-W-2636 1400102984 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. 15-May-19 6:00 AM Junaid CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
2637 CPP-NGCP-W-2637 1400102962 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 15-May-19 11.00 AM Junaid CLOSED
Rajendran
Yard.
NDE selection for welds of 24 inch double joints TA-445989 Mr.
2638 CPP-NGCP-W-2638 1400102975 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. 15-May-19 12.00 AM Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for
2639 CPP-NGCP-W-2639 1400103565 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 16-May-19 6:00 AM Umair Mr. Suresh CLOSED
HWYH-1003 KP0+100 to KP7+900
Post-welding visual inspection forHWYH-1003 TA-445856
2640 CPP-NGCP-W-2640 1400103568 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 16-May-19 11.00 AM Umair Mr. Suresh CLOSED
KP0+100 to KP7+900
NDE selection for welds of HWYH-1003 KP0+100
2641 CPP-NGCP-W-2641 1400103569 Welding SATIP-W-012-01 SAIC-W-2054 HWYH1003 TA-445856 16-May-19 12.00 AM Umair Mr. Suresh CLOSED
to KP7+900
Pre-welding and weld joint fit up inspection for 10 TA-445826
2642 CPP-NGCP-W-2642 1400103472 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL 16-May-19 6:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 10inch HWYH-
2643 CPP-NGCP-W-2643 1400103547 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 16-May-19 11.00 AM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 10 inch HWYH-1036 TA-445826
2644 CPP-NGCP-W-2644 1400103548 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL 16-May-19 12.00 AM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
2645 CPP-NGCP-W-2645 1400103549 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 16-May-19 6:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH- TA-445828
2646 CPP-NGCP-W-2646 1400103460 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 16-May-19 11.00 AM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @
2647 CPP-NGCP-W-2647 1400103575 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 TA-445828 16-May-19 12.00 AM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Pre-welding and weld joint fit up inspection for TA-445912 PRATHAB
2648 CPP-NGCP-W-2648 1400103576 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL 16-May-19 6:00 AM Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
Post-welding visual inspection for 16″HWYH GK-
2649 CPP-NGCP-W-2649 1400103578 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 16-May-19 11.00 AM PRATHAB Mr. Suresh CLOSED
RH TRL km0+100 to 12+500
NDE selection for welds of 16″HWYH GK-RH TRL TA-445912 PRATHAB
2650 CPP-NGCP-W-2650 1400103594 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL 16-May-19 12.00 AM Mr. Suresh CLOSED
km0+100 to 12+500
Pre-welding and weld joint fit up inspection for 24
Mr.
2651 CPP-NGCP-W-2651 1400103634 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. TA-445989 16-May-19 6:00 AM Junaid CLOSED CLOSED AGAINST RFI
Rajendran
CPP Pipe Yard. NO#1400106248 Check again
Post-welding visual inspection for 24 inch double
Mr. CLOSED AGAINST RFI
2652 CPP-NGCP-W-2652 1400103626 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 16-May-19 11.00 AM Junaid CLOSED
Rajendran NO#1400106248 Check again
Yard.
NDE selection for welds of 24 inch double joints Mr. CLOSED AGAINST RFI
2653 CPP-NGCP-W-2653 1400103587 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 16-May-19 12.00 AM Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran NO#1400106248
Pre-welding and weld joint fit up inspection for 8
2654 CPP-NGCP-W-2654 1400103646 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 TA-446045 16-May-19 6:00 AM Shahbaz Mr. Suresh CLOSED
inch HWYH-975 FL at KM-0+550 - 0+720
Post-welding visual inspection for 8 inch HWYH-
2655 CPP-NGCP-W-2655 1400103612 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 TA-446045 16-May-19 11.00 AM Shahbaz Mr. Suresh CLOSED
975 FL at KM-0+550 - 0+720
NDE selection for welds of 16″ 8 inch HWYH-975
2656 CPP-NGCP-W-2656 1400103776 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-975 TA-446045 16-May-19 12.00 AM Shahbaz Mr. Suresh CLOSED
FL at KM-0+550 - 0+720
Pre-welding and weld joint fit up inspection for 10
2657 CPP-NGCP-W-2657 1400103779 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 17-May-19 6:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH- TA-445828
2658 CPP-NGCP-W-2658 1400103818 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 17-May-19 11.00 AM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @
2659 CPP-NGCP-W-2659 1400103772 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 TA-445828 17-May-19 12.00 AM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Pre-welding and weld joint fit up inspection for 8 TA-669345 CLOSED AGAINST RFI
2660 CPP-NGCP-W-2660 1400103959 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1313 FL 16-May-19 6:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1313 KP0+250 to KP0+350 NO#1400106248
Post-welding visual inspection for 8 inch HRDH-
2661 CPP-NGCP-W-2661 1400103972 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1313 FL TA-669345 16-May-19 11.00 AM Rajesh Mr. Rajesh CLOSED
1313 KP0+250 to KP0+350
NDE selection for welds of 8 inch HRDH-1313 TA-669345 CLOSED AGAINST RFI
2662 CPP-NGCP-W-2662 1400103985 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1313 FL 16-May-19 12.00 AM Rajesh Mr. Rajesh CLOSED
KP0+250 to KP0+350 NO#1400106248
Pre-welding and weld joint fit up inspection for 8
2663 CPP-NGCP-W-2663 1400104000 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 16-May-19 6:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1164 KP1+800 to KP2+000
Post-welding visual inspection for 8 inch HRDH TA-843592
2664 CPP-NGCP-W-2664 1400104010 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL 16-May-19 11.00 AM Saif Mr. Rajesh CLOSED
-1164 KP1+800 to KP2+000
NDE selection for welds of 8 inch HRDH -1164
2665 CPP-NGCP-W-2665 1400104028 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1164 FL TA-843592 16-May-19 12.00 AM Saif Mr. Rajesh CLOSED
KP1+800 to KP2+000
Pre-welding and weld joint fit up inspection for 10 TA-843651 Mr. CLOSED AGAINST RFI
2666 CPP-NGCP-W-2666 1400104011 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL 16-May-19 6:00 AM Shadab REJECTED
inch HWYH-921 KP4+400 to KP4+600 Rajendran NO#1400106270 Check again
Post-welding visual inspection for 10 inch HWYH- Mr. CLOSED AGAINST RFI
2667 CPP-NGCP-W-2667 1400103988 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 16-May-19 11.00 AM Shadab REJECTED
921 KP4+400 to KP4+600 Rajendran NO#1400106270 Check again
NDE selection for welds of 10 inch HWYH-921 TA-843651 Mr. CLOSED AGAINST RFI
2668 CPP-NGCP-W-2668 1400104012 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL 16-May-19 12.00 AM Shadab REJECTED
KP4+400 to KP4+600 Rajendran NO#1400106270 Check again
In-Process Verification - RT Techniques & CLOSED AGAINST RFI
2669 CPP-NGCP-W-2669 1400104002 Welding SATIP-NDE-RT-01 SAIC-RT-2007 HRDH-BK-RH VARIOUS 16-May-19 8:00 AM RAMEEZ Mr. Rajesh REJECTED
Procedure Implementation of HRDH-BK-RH NO#1400106248
In-Process Verification - RT Techniques & VARIOUS Mr.
2670 CPP-NGCP-W-2670 1400104060 Welding SATIP-NDE-RT-01 SAIC-RT-2007 TCF-1 16-May-19 8:00 AM RAMEEZ CLOSED
Procedure Implementation of TRL-2 at TCF-1 Rajendran
In-Process Inspection of MPT using Mr. CLOSED AGAINST RFI
2671 CPP-NGCP-W-2671 1400103989 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 TCF-1 VARIOUS 16-May-19 8:00 AM RAMEEZ REJECTED
Yoke Method, TRL-2 at TCF-1 Rajendran NO#1400106248
Pre-welding and weld joint fit up inspection for TA-445856
2672 CPP-NGCP-W-2672 1400104091 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 18-May-19 6:00 AM Umair Mr. Suresh CLOSED
HWYH-1003 KP0+100 to KP7+900
Post-welding visual inspection forHWYH-1003
2673 CPP-NGCP-W-2673 1400104141 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 18-May-19 11.00 AM Umair Mr. Suresh CLOSED
KP0+100 to KP7+900
NDE selection for welds of HWYH-1003 KP0+100
2674 CPP-NGCP-W-2674 1400104203 Welding SATIP-W-012-01 SAIC-W-2054 HWYH1003 TA-445856 18-May-19 12.00 AM Umair Mr. Suresh CLOSED
to KP7+900
Pre-welding and weld joint fit up inspection for 10
2675 CPP-NGCP-W-2675 1400104204 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 18-May-19 6:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 10inch HWYH-
2676 CPP-NGCP-W-2676 1400104161 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 18-May-19 11.00 AM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 10 inch HWYH-1036
2677 CPP-NGCP-W-2677 1400104166 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 18-May-19 12.00 AM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
2678 CPP-NGCP-W-2678 1400104207 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 18-May-19 6:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH-
2679 CPP-NGCP-W-2679 1400104197 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 18-May-19 11.00 AM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @
2680 CPP-NGCP-W-2680 1400104198 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 TA-445828 18-May-19 12.00 AM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Pre-welding and weld joint fit up inspection for
2681 CPP-NGCP-W-2681 1400104199 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 18-May-19 6:00 AM PRATHAB Mr. Suresh CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK-
2682 CPP-NGCP-W-2682 1400104212 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 18-May-19 11.00 AM PRATHAB Mr. Suresh CLOSED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH
2683 CPP-NGCP-W-2683 1400104249 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 18-May-19 12.00 AM PRATHAB Mr. Suresh CLOSED
TRL km0+100 to 8+100
Pre-welding and weld joint fit up inspection for 24
TA-445989 Mr.
2684 CPP-NGCP-W-2684 1400104283 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. 18-May-19 6:00 AM Junaid CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
2685 CPP-NGCP-W-2685 1400104275 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 18-May-19 11.00 AM Junaid CLOSED
Rajendran
Yard.
NDE selection for welds of 24 inch double joints TA-445989 Mr.
2686 CPP-NGCP-W-2686 1400104257 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. 18-May-19 12.00 AM Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8
2687 CPP-NGCP-W-2687 1400104192 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 TA-446045 18-May-19 6:00 AM Shahbaz Mr. Suresh CLOSED
inch HWYH-975 FL at KM-0+550 - 0+720
Post-welding visual inspection for 8 inch HWYH- TA-446045
2688 CPP-NGCP-W-2688 1400104258 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 18-May-19 11.00 AM Shahbaz Mr. Suresh CLOSED
975 FL at KM-0+550 - 0+720
NDE selection for welds of 16″ 8 inch HWYH-975
2689 CPP-NGCP-W-2689 1400104276 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-975 TA-446045 18-May-19 12.00 AM Shahbaz Mr. Suresh CLOSED
FL at KM-0+550 - 0+720
Pre-welding and weld joint fit up inspection for 8 TA-669345
2690 CPP-NGCP-W-2690 1400104321 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1313 FL 18-May-19 6:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1313 KP0+350 to KP0+500
Post-welding visual inspection for 8 inch HRDH-
2691 CPP-NGCP-W-2691 1400104344 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1313 FL TA-669345 18-May-19 11.00 AM Rajesh Mr. Rajesh CLOSED
1313 KP0+350 to KP0+500
NDE selection for welds of 8 inch HRDH-1313 TA-669345
2692 CPP-NGCP-W-2692 1400104309 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1313 FL 18-May-19 12.00 AM Rajesh Mr. Rajesh CLOSED
KP0+350 to KP0+500
Pre-welding and weld joint fit up inspection for 8
2693 CPP-NGCP-W-2693 1400104222 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 18-May-19 6:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1164 KP1+600 to KP1+800
Post-welding visual inspection for 8 inch HRDH TA-843592
2694 CPP-NGCP-W-2694 1400104285 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL 18-May-19 11.00 AM Saif Mr. Rajesh CLOSED
-1164 KP1+600 to KP1+800
NDE selection for welds of 8 inch HRDH -1164
2695 CPP-NGCP-W-2695 1400104323 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1164 FL TA-843592 18-May-19 12.00 AM Saif Mr. Rajesh CLOSED
KP1+600 to KP1+800
Pre-welding and weld joint fit up inspection for 10 Mr.
2696 CPP-NGCP-W-2696 1400104337 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 18-May-19 6:00 AM Shadab CLOSED
inch HWYH-921 KP4+300 to KP4+400 Rajendran
Post-welding visual inspection for 10 inch HWYH- Mr.
2697 CPP-NGCP-W-2697 1400104327 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 18-May-19 11.00 AM Shadab CLOSED
921 KP4+300 to KP4+400 Rajendran
NDE selection for welds of 10 inch HWYH-921 Mr.
2698 CPP-NGCP-W-2698 1400104294 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL TA-843651 18-May-19 12.00 AM Shadab CLOSED
KP4+300 to KP4+400 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -BK-RH Mr.
2699 CPP-NGCP-W-2699 1400104282 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 18-May-19 6:00 AM IRSHAD CLOSED
inch HRDH BK-RH TR/L KP4+200 to KP4+300; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH Mr.
2700 CPP-NGCP-W-2700 1400104325 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 18-May-19 11.00 AM IRSHAD CLOSED
BK-RH TR/L KP4+200 to KP4+300; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH Mr.
2701 CPP-NGCP-W-2701 1400104317 Welding SATIP-W-012-01 SAIC-W-2054 TA-843957 18-May-19 12.00 AM IRSHAD CLOSED
TR/L KP4+200 to KP4+300; TR/L Rajendran
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a In-Process Verification - RT Techniques &
l
2702 CPP-NGCP-W-2702 1400104663 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-1164,1171,1170,1177,BK-RH VARIOUS 18-May-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1164,1171,1170,1177,BK-RH
In-Process Verification - RT Techniques &
HWYH-206.921.1003.1036,
2703 CPP-NGCP-W-2703 1400104595 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- VARIOUS 18-May-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1093,GK-RH
206.921.1003.1036,1093,GK-RH
Verification of Hardness testing of joints 00-FW-
2704 CPP-NGCP-W-2704 1400104788 Welding SATIP-W-012-01 SAIC-W-2014 29, HWYH-1071 and 00-FW-35, 00-FW-72, HWYH-1071   HWYH-1076 VARIOUS 18-May-19 6:00 AM Ruhul Mr. Suresh CLOSED
HWYH-1076.
Review of weekly welder performance and
2705 CPP-NGCP-W-2705 1400104967 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 20-May-2019 to 27 CPP site office N/A 19-May-19 8:00 AM Ruhul Mr. Rajesh CLOSED
May-2019 at CPP site office.
Pre-welding and weld joint fit up inspection for
2706 CPP-NGCP-W-2706 1400104913 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 19-May-19 6:00 AM Umair Mr. Suresh CLOSED
HWYH-1003 KP0+100 to KP7+900
Post-welding visual inspection forHWYH-1003
2707 CPP-NGCP-W-2707 1400104914 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 19-May-19 11.00 AM Umair Mr. Suresh CLOSED
KP0+100 to KP7+900
NDE selection for welds of HWYH-1003 KP0+100
2708 CPP-NGCP-W-2708 1400104869 Welding SATIP-W-012-01 SAIC-W-2054 HWYH1003 TA-445856 19-May-19 12.00 AM Umair Mr. Suresh CLOSED
to KP7+900
Pre-welding and weld joint fit up inspection for 10 TA-445826
2709 CPP-NGCP-W-2709 1400104870 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL 19-May-19 6:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 10inch HWYH-
2710 CPP-NGCP-W-2710 1400104916 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 19-May-19 11.00 AM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 10 inch HWYH-1036 TA-445826
2711 CPP-NGCP-W-2711 1400104888 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL 19-May-19 12.00 AM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
2712 CPP-NGCP-W-2712 1400104859 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 19-May-19 6:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH- TA-445828
2713 CPP-NGCP-W-2713 1400104919 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 19-May-19 11.00 AM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @
2714 CPP-NGCP-W-2714 1400104936 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 TA-445828 19-May-19 12.00 AM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Pre-welding and weld joint fit up inspection for TA-445974 PRATHAB
2715 CPP-NGCP-W-2715 1400104894 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL 19-May-19 6:00 AM Mr. Suresh CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK-
2716 CPP-NGCP-W-2716 1400104921 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 19-May-19 11.00 AM PRATHAB Mr. Suresh CLOSED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH TA-445974 PRATHAB
2717 CPP-NGCP-W-2717 1400104922 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL 19-May-19 12.00 AM Mr. Suresh CLOSED
TRL km0+100 to 8+100
Pre-welding and weld joint fit up inspection for 24
Mr.
2718 CPP-NGCP-W-2718 1400104937 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. TA-445989 19-May-19 6:00 AM Junaid CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
2719 CPP-NGCP-W-2719 1400104861 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 19-May-19 11.00 AM Junaid CLOSED
Rajendran
Yard.
NDE selection for welds of 24 inch double joints Mr.
2720 CPP-NGCP-W-2720 1400104938 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 19-May-19 12.00 AM Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8
2721 CPP-NGCP-W-2721 1400104939 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 TA-446045 19-May-19 6:00 AM Shahbaz Mr. Suresh CLOSED
inch HWYH-975 FL at KM-0+550 - 0+720
Post-welding visual inspection for 8 inch HWYH-
2722 CPP-NGCP-W-2722 1400104963 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 TA-446045 19-May-19 11.00 AM Shahbaz Mr. Suresh CLOSED
975 FL at KM-0+550 - 0+720
NDE selection for welds of 16″ 8 inch HWYH-975
2723 CPP-NGCP-W-2723 1400104996 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-975 TA-446045 19-May-19 12.00 AM Shahbaz Mr. Suresh CLOSED
FL at KM-0+550 - 0+720
Pre-welding and weld joint fit up inspection for 8
2724 CPP-NGCP-W-2724 1400105486 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 TA-445830 19-May-19 6:00 AM Shahbaz Mr. Suresh CLOSED
inch HWYH-1071 FL at KM0+100 to KM0+800
Post-welding visual inspection for 8 inch HWYH-
2725 CPP-NGCP-W-2725 1400105444 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 TA-445830 19-May-19 11.00 AM Shahbaz Mr. Suresh CLOSED
1071 FL at KM0+100 to KM0+800
NDE selection for welds of 16″ 8 inch HWYH-1071
2726 CPP-NGCP-W-2726 1400105487 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1071 TA-445830 19-May-19 12.00 AM Shahbaz Mr. Suresh CLOSED
FL at KM0+100 to KM0+800
Pre-welding and weld joint fit up inspection for 8
2727 CPP-NGCP-W-2727 1400105359 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1313 FL TA-669345 19-May-19 6:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1313 KP0+500 to KP0+600
Post-welding visual inspection for 8 inch HRDH-
2728 CPP-NGCP-W-2728 1400105383 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1313 FL TA-669345 19-May-19 11.00 AM Rajesh Mr. Rajesh CLOSED
1313 KP0+500 to KP0+600
NDE selection for welds of 8 inch HRDH-1313
2729 CPP-NGCP-W-2729 1400105332 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1313 FL TA-669345 19-May-19 12.00 AM Rajesh Mr. Rajesh CLOSED
KP0+500 to KP0+600
Pre-welding and weld joint fit up inspection for 8
2730 CPP-NGCP-W-2730 1400105341 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 19-May-19 6:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1164 KP1+400 to KP1+600
Post-welding visual inspection for 8 inch HRDH TA-843592
2731 CPP-NGCP-W-2731 1400105393 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL 19-May-19 11.00 AM Saif Mr. Rajesh CLOSED
-1164 KP1+400 to KP1+600
NDE selection for welds of 8 inch HRDH -1164
2732 CPP-NGCP-W-2732 1400105403 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1164 FL TA-843592 19-May-19 12.00 AM Saif Mr. Rajesh CLOSED
KP1+400 to KP1+600
Pre-welding and weld joint fit up inspection for 10 TA-843651 Mr.
2733 CPP-NGCP-W-2733 1400105413 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL 19-May-19 6:00 AM Shadab CLOSED
inch HWYH-921 KP4+100 to KP4+300 Rajendran
Post-welding visual inspection for 10 inch HWYH- Mr.
2734 CPP-NGCP-W-2734 1400105362 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 19-May-19 11.00 AM Shadab CLOSED
921 KP4+100 to KP4+300 Rajendran
NDE selection for welds of 10 inch HWYH-921 TA-843651 Mr.
2735 CPP-NGCP-W-2735 1400105372 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL 19-May-19 12.00 AM Shadab CLOSED
KP4+100 to KP4+300 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -BK-RH Mr.
2736 CPP-NGCP-W-2736 1400105421 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 19-May-19 6:00 AM IRSHAD CLOSED
inch HRDH BK-RH TR/L KP4+400 to KP4+500; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH TA-843957 Mr.
2737 CPP-NGCP-W-2737 1400105405 Welding SATIP-W-012-01 SAIC-W-2048 19-May-19 11.00 AM IRSHAD CLOSED
BK-RH TR/L KP4+400 to KP4+500; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH Mr.
2738 CPP-NGCP-W-2738 1400105415 Welding SATIP-W-012-01 SAIC-W-2054 TA-843957 19-May-19 12.00 AM IRSHAD CLOSED
TR/L KP4+400 to KP4+500; TR/L Rajendran
In-Process Verification - RT Techniques &
2739 CPP-NGCP-W-2739 1400105406 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-1164,1170,BK-RH VARIOUS 19-May-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
1164,1170,BK-RH
In-Process Verification - RT Techniques &
2740 CPP-NGCP-W-2740 1400105395 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- HWYH-921.1003.1036,GK-RH VARIOUS 19-May-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
921.1003.1036,GK-RH
Temperature Tie in Welding HRDH-1171 at KM- TA-843547 Mr.
2741 CPP-NGCP-W-2741 1400105457 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1171 FL 19-May-19 6:00 AM Sarfaraz CLOSED
2+137 Rajendran
Pre-welding and weld joint fit up inspection for 8
Mr.
2742 CPP-NGCP-W-2742 1400105513 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH-1171 at KM-2+137 and KM 2+275 to HRDH -1171 FL TA-843547 19-May-19 6:00 AM Sarfaraz CLOSED
Rajendran
KM 2+314
Post-welding visual inspection for 8inch HRDH- Mr.
2743 CPP-NGCP-W-2743 1400105490 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 19-May-19 11.00 AM Sarfaraz CLOSED
1171 at KM-2+137 and KM 2+275 to KM 2+314 Rajendran
NDE selection for welds of 8 inch HRDH-1171 at Mr.
2744 CPP-NGCP-W-2744 1400105504 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 19-May-19 12.00 AM Sarfaraz CLOSED
KM-2+137 and KM 2+275 to KM 2+314 Rajendran
1400105644 Pre-welding and weld joint fit up inspection for 8
2745 CPP-NGCP-W-2745 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1313 FL TA-669345 20-May-19 6:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1313 KP0+600 to KP0+900
Post-welding visual inspection for 8 inch HRDH-
2746 CPP-NGCP-W-2746 1400105645 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1313 FL TA-669345 20-May-19 11.00 AM Rajesh Mr. Rajesh CLOSED
1313 KP0+600 to KP0+900
NDE selection for welds of 8 inch HRDH-1313
2747 CPP-NGCP-W-2747 1400105597 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1313 FL TA-669345 20-May-19 12.00 AM Rajesh Mr. Rajesh CLOSED
KP0+600 to KP0+900
Pre-welding and weld joint fit up inspection for 8
2748 CPP-NGCP-W-2748 1400105641 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 20-May-19 6:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1164 KP1+300 to KP1+400
Post-welding visual inspection for 8 inch HRDH
2749 CPP-NGCP-W-2749 1400105642 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 20-May-19 11.00 AM Saif Mr. Rajesh CLOSED
-1164 KP1+300 to KP1+400
NDE selection for welds of 8 inch HRDH -1164
2750 CPP-NGCP-W-2750 1400105646 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1164 FL TA-843592 20-May-19 12.00 AM Saif Mr. Rajesh CLOSED
KP1+300 to KP1+400
Pre-welding and weld joint fit up inspection for 10 Mr.
2751 CPP-NGCP-W-2751 1400105611 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 20-May-19 6:00 AM Shadab CLOSED
inch HWYH-921 KP4+000 to KP4+100 Rajendran
Post-welding visual inspection for 10 inch HWYH- Mr.
2752 CPP-NGCP-W-2752 1400105612 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 20-May-19 11.00 AM Shadab CLOSED
921 KP4+000 to KP4+100 Rajendran
NDE selection for welds of 10 inch HWYH-921 TA-843651 Mr.
2753 CPP-NGCP-W-2753 1400105663 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL 20-May-19 12.00 AM Shadab CLOSED
KP4+000 to KP4+100 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -BK-RH Mr.
2754 CPP-NGCP-W-2754 1400105572 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 20-May-19 6:00 AM IRSHAD CLOSED
inch HRDH BK-RH TR/L KP4+700 to KP4+800; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH TA-843957 Mr.
2755 CPP-NGCP-W-2755 1400105647 Welding SATIP-W-012-01 SAIC-W-2048 20-May-19 11.00 AM IRSHAD CLOSED
BK-RH TR/L KP4+700 to KP4+800; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH Mr.
2756 CPP-NGCP-W-2756 1400105627 Welding SATIP-W-012-01 SAIC-W-2054 TA-843957 20-May-19 12.00 AM IRSHAD CLOSED
TR/L KP4+700 to KP4+800; TR/L Rajendran
Temperature Tie in Welding HRDH-1171 at KM- TA-843547 Mr.
2757 CPP-NGCP-W-2757 1400106011 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1171 FL 20-May-19 6:00 AM Sarfaraz CLOSED
2+137 Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
2758 CPP-NGCP-W-2758 1400105658 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 20-May-19 6:00 AM Sarfaraz CLOSED
inch HRDH-1171 at KM-2+314 Rajendran
Post-welding visual inspection for 8inch HRDH- TA-843547 Mr.
2759 CPP-NGCP-W-2759 1400105675 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL 20-May-19 11.00 AM Sarfaraz CLOSED
1171 at KM-2+314 Rajendran
NDE selection for welds of 8 inch HRDH-1171 at Mr.
2760 CPP-NGCP-W-2760 1400105660 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 20-May-19 12.00 AM Sarfaraz CLOSED
KM-2+314 Rajendran
Pre-welding and weld joint fit up inspection for 8 TA-669367
2761 CPP-NGCP-W-2761 1400106043 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1142 FL 20-May-19 6:00 AM Rajesh Mr. Ashok CLOSED
inch HRDH-1142 at KM-0+332
Post-welding visual inspection for 8inch HRDH-
2762 CPP-NGCP-W-2762 1400105972 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1142 FL TA-669367 20-May-19 11.00 AM Rajesh Mr. Ashok CLOSED
1142 at KM-0+332
NDE selection for welds of 8 inch HRDH-1142 at TA-669367
2763 CPP-NGCP-W-2763 1400106063 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1142 FL 20-May-19 12.00 AM Rajesh Mr. Ashok CLOSED
KM-0+332
In-Process Verification - RT Techniques &
2764 CPP-NGCP-W-2764 1400106100 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-1313,1170,BK-RH VARIOUS 20-May-19 8:00 AM RAMEEZ Mr. Ashok CLOSED
1313,1170,BK-RH
In-Process Verification - RT Techniques &
HWYH-921.206.1003.975, VARIOUS
2765 CPP-NGCP-W-2765 1400106129 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- 20-May-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1036,CK-RH,GK-RH
921.206.1003.975,1036,CK-RH,GK-RH
Pre-welding and weld joint fit up inspection for
2766 CPP-NGCP-W-2766 1400105620 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 20-May-19 6:00 AM Umair Mr. Suresh CLOSED
HWYH-1003 KP0+100 to KP7+900
Post-welding visual inspection forHWYH-1003
2767 CPP-NGCP-W-2767 1400105666 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 20-May-19 11.00 AM Umair Mr. Suresh CLOSED
KP0+100 to KP7+900
NDE selection for welds of HWYH-1003 KP0+100
2768 CPP-NGCP-W-2768 1400105650 Welding SATIP-W-012-01 SAIC-W-2054 HWYH1003 TA-445856 20-May-19 12.00 AM Umair Mr. Suresh CLOSED
to KP7+900
Pre-welding and weld joint fit up inspection for 10
2769 CPP-NGCP-W-2769 1400105723 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 20-May-19 6:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 10inch HWYH-
2770 CPP-NGCP-W-2770 1400105695 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 20-May-19 11.00 AM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 10 inch HWYH-1036
2771 CPP-NGCP-W-2771 1400105698 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 20-May-19 12.00 AM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
2772 CPP-NGCP-W-2772 1400105672 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 20-May-19 6:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH-
2773 CPP-NGCP-W-2773 1400105709 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 20-May-19 11.00 AM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @
2774 CPP-NGCP-W-2774 1400105710 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 TA-445828 20-May-19 12.00 AM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Pre-welding and weld joint fit up inspection for TA-445974 PRATHAB
2775 CPP-NGCP-W-2775 1400105764 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL 20-May-19 6:00 AM Mr. Suresh CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK-
2776 CPP-NGCP-W-2776 1400105805 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 20-May-19 11.00 AM PRATHAB Mr. Suresh CLOSED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH TA-445974 PRATHAB
2777 CPP-NGCP-W-2777 1400105843 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL 20-May-19 12.00 AM Mr. Suresh CLOSED
TRL km0+100 to 8+100
Pre-welding and weld joint fit up inspection for 8
2778 CPP-NGCP-W-2778 1400105653 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 TA-446045 20-May-19 6:00 AM Shahbaz Mr. Suresh CLOSED
inch HWYH-975 FL at KM-0+550 - 0+720
Post-welding visual inspection for 8 inch HWYH- TA-446045
2779 CPP-NGCP-W-2779 1400105599 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 20-May-19 11.00 AM Shahbaz Mr. Suresh CLOSED
975 FL at KM-0+550 - 0+720
NDE selection for welds of 16″ 8 inch HWYH-975
2780 CPP-NGCP-W-2780 1400105654 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-975 TA-446045 20-May-19 12.00 AM Shahbaz Mr. Suresh CLOSED
FL at KM-0+550 - 0+720
Pre-welding and weld joint fit up inspection for 8 TA-669345
2781 CPP-NGCP-W-2781 1400106785 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1313 FL 21-May-19 6:00 AM Rajesh Mr. Ashok CLOSED
inch HRDH-1313 KP0+900 to KP1+300
Post-welding visual inspection for 8 inch HRDH-
2782 CPP-NGCP-W-2782 400106720 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1313 FL TA-669345 21-May-19 11.00 AM Rajesh Mr. Ashok CLOSED
1313 KP0+900 to KP1+300
NDE selection for welds of 8 inch HRDH-1313
2783 CPP-NGCP-W-2783 1400106761 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1313 FL TA-669345 21-May-19 12.00 AM Rajesh Mr. Ashok CLOSED
KP0+900 to KP1+300
Pre-welding and weld joint fit up inspection for 8
2784 CPP-NGCP-W-2784 1400106794 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 21-May-19 6:00 AM Farhan Mr. Ashok CLOSED
inch HRDH -1164 KP1+200 to KP1+300
Post-welding visual inspection for 8 inch HRDH
2785 CPP-NGCP-W-2785 1400106672 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 21-May-19 11.00 AM Farhan Mr. Ashok CLOSED
-1164 KP1+200 to KP1+300
NDE selection for welds of 8 inch HRDH -1164
2786 CPP-NGCP-W-2786 1400106775 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1164 FL TA-843592 21-May-19 12.00 AM Farhan Mr. Ashok CLOSED
KP1+200 to KP1+300
Pre-welding and weld joint fit up inspection for 10 Mr.
2787 CPP-NGCP-W-2787 1400106732 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 21-May-19 6:00 AM Shadab CLOSED
inch HWYH-921 KP3+700 to KP3+900 Rajendran
Post-welding visual inspection for 10 inch HWYH- Mr.
2788 CPP-NGCP-W-2788 1400106776 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 21-May-19 11.00 AM Shadab CLOSED
921 KP3+700 to KP3+900 Rajendran
NDE selection for welds of 10 inch HWYH-921 Mr.
2789 CPP-NGCP-W-2789 1400106796 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL TA-843651 21-May-19 12.00 AM Shadab CLOSED
KP3+700 to KP3+900 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -BK-RH Mr.
2790 CPP-NGCP-W-2790 1400106789 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 21-May-19 6:00 AM IRSHAD CLOSED
inch HRDH BK-RH TR/L KP4+900 to KP5+100; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH Mr.
2791 CPP-NGCP-W-2791 1400106824 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 21-May-19 11.00 AM IRSHAD CLOSED
BK-RH TR/L KP4+900 to KP5+100; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH Mr.
2792 CPP-NGCP-W-2792 1400106800 Welding SATIP-W-012-01 SAIC-W-2054 TA-843957 21-May-19 12.00 AM IRSHAD CLOSED
TR/L KP4+900 to KP5+100; TR/L Rajendran
Temperature Tie in Welding HRDH-1171 at KM- Mr.
2793 CPP-NGCP-W-2793 1400106801 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1171 FL TA-843547 21-May-19 6:00 AM Sarfaraz CLOSED
3+400 to KM 3+560 Rajendran

Pre-welding and weld joint fit up inspection for 8 TA-843547 Mr.


2794 CPP-NGCP-W-2794 1400106836 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL 21-May-19 6:00 AM Sarfaraz CLOSED
inch HRDH-1171 at KM-3+400 to KM 3+560 Rajendran

Post-welding visual inspection for 8inch HRDH- Mr.


2795 CPP-NGCP-W-2795 1400106834 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 21-May-19 11.00 AM Sarfaraz CLOSED
1171 at KM-3+400 to KM 3+560 Rajendran
NDE selection for welds of 8 inch HRDH-1171 at Mr.
2796 CPP-NGCP-W-2796 1400106752 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 21-May-19 12.00 AM Sarfaraz CLOSED
KM-3+400 to KM 3+560 Rajendran
In-Process Verification - RT Techniques &
2797 CPP-NGCP-W-2797 1400106829 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-1142,1164.1171.1313.BK-RH VARIOUS 21-May-19 8:00 AM RAMEEZ Mr. Ashok CLOSED
1142,1164.1171.1313.BK-RH
In-Process Verification - RT Techniques &
HWYH-921.1003.975,
2798 CPP-NGCP-W-2798 1400106804 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- VARIOUS 21-May-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1036,1071.CK-RH,
921.1003.975,1036,1071.CK-RH,
In-Process Verification - RT Techniques & Mr.
2799 CPP-NGCP-W-2799 1400106805 Welding SATIP-NDE-RT-01 SAIC-RT-2007 TCF-1 VARIOUS 21-May-19 8:00 AM RAMEEZ CLOSED
Procedure Implementation of TRL-2 at TCF-1 Rajendran
In-Process Inspection of MPT using VARIOUS Mr.
2800 CPP-NGCP-W-2800 1400106842 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 TCF-1 21-May-19 8:00 AM RAMEEZ CLOSED
Yoke Method, TRL-2 at TCF-1 Rajendran
Pre-welding and weld joint fit up inspection for
2801 CPP-NGCP-W-2801 1400106976 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 TA-445856 21-May-19 6:00 AM Umair Mr. Suresh CLOSED
HWYH-1003 KP0+100 to KP7+900
Post-welding visual inspection forHWYH-1003 TA-445856
2802 CPP-NGCP-W-2802 1400106950 Welding SATIP-W-012-01 SAIC-W-2048 HWYH1003 21-May-19 11.00 AM Umair Mr. Suresh CLOSED
KP0+100 to KP7+900
NDE selection for welds of HWYH-1003 KP0+100
2803 CPP-NGCP-W-2803 1400106983 Welding SATIP-W-012-01 SAIC-W-2054 HWYH1003 TA-445856 21-May-19 12.00 AM Umair Mr. Suresh CLOSED
to KP7+900
Pre-welding and weld joint fit up inspection for TA-445834 re-schedule to 22-MAY- re-schedule to 23-MAY-
2804 CPP-NGCP-W-2804 1400106247 Welding SATIP-W-012-01 SAIC-W-2048 HWYH201 21-May-19 6:00 AM Umair Mr. Suresh CLOSED
HWYH-201 KM0+100 to KM3+500 2019 2019
Post-welding visual inspection for HWYH-201 re-schedule to 22-MAY- re-schedule to 23-MAY-
2805 CPP-NGCP-W-2805 1400106281 Welding SATIP-W-012-01 SAIC-W-2048 HWYH201 TA-445834 21-May-19 11.00 AM Umair Mr. Suresh CLOSED
KM0+100 to KM3+500 2019 2019
NDE selection for welds of HWYH-201 KM0+100 TA-445834 re-schedule to 22-MAY- re-schedule to 23-MAY-
2806 CPP-NGCP-W-2806 1400106256 Welding SATIP-W-012-01 SAIC-W-2054 HWYH201 21-May-19 12.00 AM Umair Mr. Suresh CLOSED
to KM3+500 2019 2019
Pre-welding and weld joint fit up inspection for 10
2807 CPP-NGCP-W-2807 1400106331 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 21-May-19 6:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 10inch HWYH-
2808 CPP-NGCP-W-2808 1400106377 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 21-May-19 11.00 AM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 10 inch HWYH-1036
2809 CPP-NGCP-W-2809 1400106332 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 21-May-19 12.00 AM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
2810 CPP-NGCP-W-2810 1400106362 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 21-May-19 6:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH-
2811 CPP-NGCP-W-2811 1400106406 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 21-May-19 11.00 AM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @
2812 CPP-NGCP-W-2812 1400106624 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 TA-445828 21-May-19 12.00 AM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Pre-welding and weld joint fit up inspection for
2813 CPP-NGCP-W-2813 1400106663 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 21-May-19 6:00 AM PRATHAB Mr. Suresh CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK-
2814 CPP-NGCP-W-2814 1400106654 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 21-May-19 11.00 AM PRATHAB Mr. Suresh CLOSED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH
2815 CPP-NGCP-W-2815 1400106693 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 21-May-19 12.00 AM PRATHAB Mr. Suresh CLOSED
TRL km0+100 to 8+100
Pre-welding and weld joint fit up inspection for 8
2816 CPP-NGCP-W-2816 1400106666 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 TA-446045 21-May-19 6:00 AM Shahbaz Mr. Suresh CLOSED
inch HWYH-975 FL at KM-0+550 - 0+720
Post-welding visual inspection for 8 inch HWYH-
2817 CPP-NGCP-W-2817 1400106609 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 TA-446045 21-May-19 11.00 AM Shahbaz Mr. Suresh CLOSED
975 FL at KM-0+550 - 0+720
NDE selection for welds of 16″ 8 inch HWYH-975
2818 CPP-NGCP-W-2818 1400106681 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-975 TA-446045 21-May-19 12.00 AM Shahbaz Mr. Suresh CLOSED
FL at KM-0+550 - 0+720
Pre-welding and weld joint fit up inspection for 24
Mr. re-schedule to 22-MAY-
2819 CPP-NGCP-W-2819 1400106682 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. TA-445989 21-May-19 6:00 AM Junaid CLOSED
Rajendran 2019
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
TA-445989 Mr. re-schedule to 22-MAY-
2820 CPP-NGCP-W-2820 1400106699 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. 21-May-19 11.00 AM Junaid CLOSED 2019
Rajendran
Yard.
NDE selection for welds of 24 inch double joints Mr. re-schedule to 22-MAY-
2821 CPP-NGCP-W-2821 1400106713 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 21-May-19 12.00 AM Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran 2019
Welding consumables verification and visual N/A Mr.
2822 CPP-NGCP-W-2822 1400106880 Welding SATIP-W-012-01 SAIC-W-2044 TCF-1 21-May-19 6:00 AM Junaid CLOSED
inspection storage & handling at TCF-1 Rajendran
Pre-welding and weld joint fit up inspection for 10
2823 CPP-NGCP-W-2823 1400107037 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 22-May-19 6:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 10inch HWYH- TA-445826
2824 CPP-NGCP-W-2824 1400107058 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL 22-May-19 11.00 AM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 10 inch HWYH-1036
2825 CPP-NGCP-W-2825 1400106988 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 22-May-19 12.00 AM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10 TA-445828
2826 CPP-NGCP-W-2826 1400107099 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 22-May-19 6:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH-
2827 CPP-NGCP-W-2827 1400107134 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 22-May-19 11.00 AM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @ TA-445828
2828 CPP-NGCP-W-2828 1400107076 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 22-May-19 12.00 AM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Pre-welding and weld joint fit up inspection for
2829 CPP-NGCP-W-2829 1400107115 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 22-May-19 6:00 AM PRATHAB Mr. Suresh CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK-
2830 CPP-NGCP-W-2830 1400107116 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 22-May-19 11.00 AM PRATHAB Mr. Suresh CLOSED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH
2831 CPP-NGCP-W-2831 1400107089 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 22-May-19 12.00 AM PRATHAB Mr. Suresh CLOSED
TRL km0+100 to 8+100
Pre-welding and weld joint fit up inspection for 8
2832 CPP-NGCP-W-2832 1400107071 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 TA-446045 22-May-19 6:00 AM Shahbaz Mr. Suresh CLOSED
inch HWYH-975 FL at KM-0+550 - 0+720
Post-welding visual inspection for 8 inch HWYH-
2833 CPP-NGCP-W-2833 1400107125 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 TA-446045 22-May-19 11.00 AM Shahbaz Mr. Suresh CLOSED
975 FL at KM-0+550 - 0+720
NDE selection for welds of 16″ 8 inch HWYH-975
2834 CPP-NGCP-W-2834 1400107080 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-975 TA-446045 22-May-19 12.00 AM Shahbaz Mr. Suresh CLOSED
FL at KM-0+550 - 0+720
Pre-welding and weld joint fit up inspection for 8
2835 CPP-NGCP-W-2835 1400107475 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1313 FL TA-669345 22-May-19 6:00 AM Rajesh Mr. Ashok CLOSED
inch HRDH-1313 KP1+300 to KP1+450
Post-welding visual inspection for 8 inch HRDH-
2836 CPP-NGCP-W-2836 1400107442 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1313 FL TA-669345 22-May-19 11.00 AM Rajesh Mr. Ashok CLOSED
1313 KP1+300 to KP1+450
NDE selection for welds of 8 inch HRDH-1313
2837 CPP-NGCP-W-2837 1400107503 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1313 FL TA-669345 22-May-19 12.00 AM Rajesh Mr. Ashok CLOSED
KP1+300 to KP1+450
Pre-welding and weld joint fit up inspection for 8
2838 CPP-NGCP-W-2838 1400107485 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 22-May-19 6:00 AM Farhan Mr. Ashok CLOSED
inch HRDH -1164 KP0+900 to KP1+200
Post-welding visual inspection for 8 inch HRDH
2839 CPP-NGCP-W-2839 1400107446 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 22-May-19 11.00 AM Farhan Mr. Ashok CLOSED
-1164 KP0+900 to KP1+200
NDE selection for welds of 8 inch HRDH -1164
2840 CPP-NGCP-W-2840 1400107445 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1164 FL TA-843592 22-May-19 12.00 AM Farhan Mr. Ashok CLOSED
KP0+900 to KP1+200
Pre-welding and weld joint fit up inspection for 8
2841 CPP-NGCP-W-2841 1400107543 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1303 FL TA-669344 22-May-19 6:00 AM Rajesh Mr. Ashok CLOSED
inch HRDH-1303 KP0+800 to KP0+900
Post-welding visual inspection for 8 inch HRDH-
2842 CPP-NGCP-W-2842 1400107448 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1303 FL TA-669344 22-May-19 11.00 AM Rajesh Mr. Ashok CLOSED
1303 KP0+800 to KP0+900
NDE selection for welds of 8 inch HRDH-1303
2843 CPP-NGCP-W-2843 1400107514 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1303 FL TA-669344 22-May-19 12.00 AM Rajesh Mr. Ashok CLOSED
KP0+800 to KP0+900
Pre-welding and weld joint fit up inspection for 10 Mr.
2844 CPP-NGCP-W-2844 1400107498 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 22-May-19 6:00 AM Shadab CLOSED
inch HWYH-921 KP3+500 to KP3+700 Rajendran
Post-welding visual inspection for 10 inch HWYH- Mr.
2845 CPP-NGCP-W-2845 1400107517 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 22-May-19 11.00 AM Shadab CLOSED
921 KP3+500 to KP3+700 Rajendran
NDE selection for welds of 10 inch HWYH-921 Mr.
2846 CPP-NGCP-W-2846 1400107497 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL TA-843651 22-May-19 12.00 AM Shadab CLOSED
KP3+500 to KP3+700 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -BK-RH Mr.
2847 CPP-NGCP-W-2847 1400107450 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 22-May-19 6:00 AM IRSHAD CLOSED
inch HRDH BK-RH TR/L KP5+100 to KP5+200; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH Mr.
2848 CPP-NGCP-W-2848 1400107518 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 22-May-19 11.00 AM IRSHAD CLOSED
BK-RH TR/L KP5+100 to KP5+200; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH Mr.
2849 CPP-NGCP-W-2849 1400107499 Welding SATIP-W-012-01 SAIC-W-2054 TA-843957 22-May-19 12.00 AM IRSHAD CLOSED
TR/L KP5+100 to KP5+200; TR/L Rajendran
Temperature Tie in Welding HRDH-1171 at KM- Mr.
2850 CPP-NGCP-W-2850 1400107547 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1171 FL TA-843547 22-May-19 6:00 AM Sarfaraz CLOSED
3+560 and KM 3+630 Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
2851 CPP-NGCP-W-2851 1400107546 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 22-May-19 6:00 AM Sarfaraz CLOSED
inch HRDH-1171 at KM-3+560 and KM 3+630 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
2852 CPP-NGCP-W-2852 1400107481 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 22-May-19 11.00 AM Sarfaraz CLOSED
1171 at KM-3+560 and KM 3+630 Rajendran
NDE selection for welds of 8 inch HRDH-1171 at Mr.
2853 CPP-NGCP-W-2853 1400107501 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 22-May-19 12.00 AM Sarfaraz CLOSED
KM-3+560 and KM 3+630 Rajendran
In-Process Verification - RT Techniques &
HRDH-1142,1164.
2854 CPP-NGCP-W-2854 1400107535 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1142,1164. VARIOUS 22-May-19 8:00 AM RAMEEZ Mr. Ashok CLOSED
1171.1313.1170.BK-RH
1171.1313.1170.BK-RH
In-Process Verification - RT Techniques &
Procedure Implementation of 921.206.1003.975,HWYH-921.206.1003.975,1115.1093
2855 CPP-NGCP-W-2855 1400107555 Welding SATIP-NDE-RT-01 SAIC-RT-2007 VARIOUS 22-May-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1115.1093 1036.CK-RH,GK-RH,
1036.CK-RH,GK-RH,
Pre-welding and weld joint fit up inspection for 8
2856 CPP-NGCP-W-2856 1400108110 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 23-May-19 6:00 AM Farhan Mr. Ashok CLOSED
inch HRDH -1164 KP0+600 to KP0+800
Post-welding visual inspection for 8 inch HRDH
2857 CPP-NGCP-W-2857 1400108111 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 23-May-19 11.00 AM Farhan Mr. Ashok CLOSED
-1164 KP0+600 to KP0+800
NDE selection for welds of 8 inch HRDH -1164 TA-843592
2858 CPP-NGCP-W-2858 1400108253 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1164 FL 23-May-19 12.00 AM Farhan Mr. Ashok CLOSED
KP0+600 to KP0+800
Pre-welding and weld joint fit up inspection for 10 Mr.
2859 CPP-NGCP-W-2859 1400108112 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 23-May-19 6:00 AM Shadab CLOSED
inch HWYH-921 KP3+300 to KP3+500 Rajendran
Post-welding visual inspection for 10 inch HWYH- TA-843651 Mr.
2860 CPP-NGCP-W-2860 1400108225 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL 23-May-19 11.00 AM Shadab CLOSED
921 KP3+300 to KP3+500 Rajendran
NDE selection for welds of 10 inch HWYH-921 Mr.
2861 CPP-NGCP-W-2861 1400108263 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL TA-843651 23-May-19 12.00 AM Shadab CLOSED
KP3+300 to KP3+500 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -BK-RH TA-843957 Mr.
2862 CPP-NGCP-W-2862 1400108237 Welding SATIP-W-012-01 SAIC-W-2048 23-May-19 6:00 AM IRSHAD CLOSED
inch HRDH BK-RH TR/L KP5+900 to KP6+000; TR/L Rajendran
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH Mr.
2863 CPP-NGCP-W-2863 1400108266 l Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 23-May-19 11.00 AM IRSHAD CLOSED
BK-RH TR/L KP5+900 to KP6+000; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH Mr.
2864 CPP-NGCP-W-2864 1400108251 Welding SATIP-W-012-01 SAIC-W-2054 TA-843957 23-May-19 12.00 AM IRSHAD CLOSED
TR/L KP5+900 to KP6+000; TR/L Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
2865 CPP-NGCP-W-2865 1400108286 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 23-May-19 6:00 AM Sarfaraz CLOSED
inch HRDH-1171 at KM 3+630 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
2866 CPP-NGCP-W-2866 1400108239 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 23-May-19 11.00 AM Sarfaraz CLOSED
1171 at KM 3+630 Rajendran
NDE selection for welds of 8 inch HRDH-1171 at Mr.
2867 CPP-NGCP-W-2867 1400108240 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 23-May-19 12.00 AM Sarfaraz CLOSED
KM 3+630 Rajendran
In-Process Verification - RT Techniques &
HRDH-
2868 CPP-NGCP-W-2868 1400108257 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- VARIOUS 23-May-19 8:00 AM RAMEEZ Mr. Ashok CLOSED
1171.1313.1170.1177.BK-RH
1171.1313.1170.1177.BK-RH
In-Process Verification - RT Techniques &
HWYH-921.206.975,1115.
2869 CPP-NGCP-W-2869 1400108218 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH- VARIOUS 23-May-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1036.CK-RH,
921.206.975,1115.1036.CK-RH,
Pre-welding and weld joint fit up inspection for 10
2870 CPP-NGCP-W-2870 1400107836 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 23-May-19 6:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 10inch HWYH-
2871 CPP-NGCP-W-2871 1400107791 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 23-May-19 11.00 AM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 10 inch HWYH-1036
2872 CPP-NGCP-W-2872 1400107801 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 23-May-19 12.00 AM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
2873 CPP-NGCP-W-2873 1400107865 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 23-May-19 6:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH-
2874 CPP-NGCP-W-2874 1400107828 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 23-May-19 11.00 AM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @
2875 CPP-NGCP-W-2875 1400107895 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 TA-445828 23-May-19 12.00 AM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Pre-welding and weld joint fit up inspection for
2876 CPP-NGCP-W-2876 1400107884 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 23-May-19 6:00 AM PRATHAB Mr. Suresh CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK-
2877 CPP-NGCP-W-2877 1400107934 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 23-May-19 11.00 AM PRATHAB Mr. Suresh CLOSED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH
2878 CPP-NGCP-W-2878 1400107966 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 23-May-19 12.00 AM PRATHAB Mr. Suresh CLOSED
TRL km0+100 to 8+100
Pre-welding and weld joint fit up inspection for 8
2879 CPP-NGCP-W-2879 1400107967 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 TA-446045 23-May-19 6:00 AM Shahbaz Mr. Suresh CLOSED
inch HWYH-975 FL at KM-0+550 - 0+720
Post-welding visual inspection for 8 inch HWYH-
2880 CPP-NGCP-W-2880 1400107948 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 TA-446045 23-May-19 11.00 AM Shahbaz Mr. Suresh CLOSED
975 FL at KM-0+550 - 0+720
NDE selection for welds of 16″ 8 inch HWYH-975
2881 CPP-NGCP-W-2881 1400107956 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-975 TA-446045 23-May-19 12.00 AM Shahbaz Mr. Suresh CLOSED
FL at KM-0+550 - 0+720
Pre-welding and weld joint fit up inspection for 24
Mr.
2882 CPP-NGCP-W-2882 1400108002 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. TA-445989 23-May-19 6:00 AM Junaid CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
2883 CPP-NGCP-W-2883 1400108007 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 23-May-19 11.00 AM Junaid CLOSED
Rajendran
Yard.
NDE selection for welds of 24 inch double joints TA-445989 Mr.
2884 CPP-NGCP-W-2884 1400108053 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. 23-May-19 12.00 AM Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 10
2885 CPP-NGCP-W-2885 1400108453 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 24-May-19 6:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH-
2886 CPP-NGCP-W-2886 1400108367 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 24-May-19 11.00 AM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @
2887 CPP-NGCP-W-2887 1400108463 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 TA-445828 24-May-19 12.00 AM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Pre-welding and weld joint fit up inspection for 8
2888 CPP-NGCP-W-2888 1400108911 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1303 FL TA-669344 25-May-19 6:00 AM Rajesh Mr. Ashok CLOSED
inch HRDH-1303 KP0+700 to KP0+800
Post-welding visual inspection for 8 inch HRDH-
2889 CPP-NGCP-W-2889 1400108943 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1303 FL TA-669344 25-May-19 11.00 AM Rajesh Mr. Ashok CLOSED
1303 KP0+700 to KP0+800
NDE selection for welds of 8 inch HRDH-1303
2890 CPP-NGCP-W-2890 1400108912 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1303 FL TA-669344 25-May-19 12.00 AM Rajesh Mr. Ashok CLOSED
KP0+700 to KP0+800
Pre-welding and weld joint fit up inspection for 8
2891 CPP-NGCP-W-2891 1400108934 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1159 FL TA-843654 25-May-19 6:00 AM Farhan Mr. Ashok CLOSED
inch HRDH -1159 KP1+200 to KP1+400
Post-welding visual inspection for 8 inch HRDH
2892 CPP-NGCP-W-2892 1400108891 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1159 FL TA-843654 25-May-19 11.00 AM Farhan Mr. Ashok CLOSED
-1159 KP1+200 to KP1+400
NDE selection for welds of 8 inch HRDH -1159
2893 CPP-NGCP-W-2893 1400108880 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1159 FL TA-843654 25-May-19 12.00 AM Farhan Mr. Ashok CLOSED
KP1+200 to KP1+400
Pre-welding and weld joint fit up inspection for 10 Mr.
2894 CPP-NGCP-W-2894 1400108881 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 25-May-19 6:00 AM Shadab CLOSED
inch HWYH-921 KP3+100 to KP3+300 Rajendran
Post-welding visual inspection for 10 inch HWYH- Mr.
2895 CPP-NGCP-W-2895 1400108929 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 25-May-19 11.00 AM Shadab CLOSED
921 KP3+100 to KP3+300 Rajendran
NDE selection for welds of 10 inch HWYH-921 Mr.
2896 CPP-NGCP-W-2896 1400108959 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL TA-843651 25-May-19 12.00 AM Shadab CLOSED
KP3+100 to KP3+300 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -BK-RH Mr.
2897 CPP-NGCP-W-2897 1400108900 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 25-May-19 6:00 AM IRSHAD CLOSED
inch HRDH BK-RH TR/L KP6+100 to KP6+200; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH Mr.
2898 CPP-NGCP-W-2898 1400108901 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 25-May-19 11.00 AM IRSHAD CLOSED
BK-RH TR/L KP6+100 to KP6+200; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH Mr.
2899 CPP-NGCP-W-2899 1400108920 Welding SATIP-W-012-01 SAIC-W-2054 TA-843957 25-May-19 12.00 AM IRSHAD CLOSED
TR/L KP6+100 to KP6+200; TR/L Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
2900 CPP-NGCP-W-2900 1400108944 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 25-May-19 6:00 AM Sarfaraz CLOSED
inch HRDH-1171 at KM 3+720 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
2901 CPP-NGCP-W-2901 1400108921 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 25-May-19 11.00 AM Sarfaraz CLOSED
1171 at KM 3+720 Rajendran
NDE selection for welds of 8 inch HRDH-1171 at Mr.
2902 CPP-NGCP-W-2902 1400108935 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 25-May-19 12.00 AM Sarfaraz CLOSED
KM 3+720 Rajendran
In-Process Verification - RT Techniques &
2903 CPP-NGCP-W-2903 1400108964 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1164, 1171, HRDH-1164, 1171, 1313, BK-RH VARIOUS 25-May-19 8:00 AM RAMEEZ Mr. Ashok CLOSED
1313, BK-RH
In-Process Verification - RT Techniques &
HWYH-206, 975, 1003,
2904 CPP-NGCP-W-2904 1400108932 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-206, 975, VARIOUS 25-May-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1036, CK-RH, 921
1003, 1036, CK-RH, 921
Pre-welding and weld joint fit up inspection for
2905 CPP-NGCP-W-2905 1400108467 Welding SATIP-W-012-01 SAIC-W-2048 HWYH201 TA-445834 25-May-19 6:00 AM Umair Mr. Suresh CLOSED
HWYH-201 KM0+100 to KM3+500
Post-welding visual inspection for HWYH-201 TA-445834
2906 CPP-NGCP-W-2906 1400108493 Welding SATIP-W-012-01 SAIC-W-2048 HWYH201 25-May-19 11.00 AM Umair Mr. Suresh CLOSED
KM0+100 to KM3+500
NDE selection for welds of HWYH-201 KM0+100
2907 CPP-NGCP-W-2907 1400108452 Welding SATIP-W-012-01 SAIC-W-2054 HWYH201 TA-445834 25-May-19 12.00 AM Umair Mr. Suresh CLOSED
to KM3+500
Pre-welding and weld joint fit up inspection for 10
2908 CPP-NGCP-W-2908 1400108468 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 25-May-19 6:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 10inch HWYH-
2909 CPP-NGCP-W-2909 1400108487 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 25-May-19 11.00 AM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 10 inch HWYH-1036
2910 CPP-NGCP-W-2910 1400108488 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 25-May-19 12.00 AM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
2911 CPP-NGCP-W-2911 1400108368 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 25-May-19 6:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH-
2912 CPP-NGCP-W-2912 1400108369 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 25-May-19 11.00 AM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @
2913 CPP-NGCP-W-2913 1400108504 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 TA-445828 25-May-19 12.00 AM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Pre-welding and weld joint fit up inspection for
2914 CPP-NGCP-W-2914 1400108370 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 25-May-19 6:00 AM PRATHAB Mr. Suresh CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK-
2915 CPP-NGCP-W-2915 1400108533 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 25-May-19 11.00 AM PRATHAB Mr. Suresh CLOSED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH
2916 CPP-NGCP-W-2916 1400108515 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 25-May-19 12.00 AM PRATHAB Mr. Suresh CLOSED
TRL km0+100 to 8+100
Pre-welding and weld joint fit up inspection for 8
2917 CPP-NGCP-W-2917 1400108524 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 TA-446045 25-May-19 6:00 AM Shahbaz Mr. Suresh CLOSED
inch HWYH-975 FL at KM-0+550 - 0+720
Post-welding visual inspection for 8 inch HWYH-
2918 CPP-NGCP-W-2918 1400108505 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 TA-446045 25-May-19 11.00 AM Shahbaz Mr. Suresh CLOSED
975 FL at KM-0+550 - 0+720
NDE selection for welds of 16″ 8 inch HWYH-975
2919 CPP-NGCP-W-2919 1400108521 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-975 TA-446045 25-May-19 12.00 AM Shahbaz Mr. Suresh CLOSED
FL at KM-0+550 - 0+720
Pre-welding and weld joint fit up inspection for 24
Mr.
2920 CPP-NGCP-W-2920 1400108496 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. TA-445989 25-May-19 6:00 AM Junaid CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
2921 CPP-NGCP-W-2921 1400108534 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 25-May-19 11.00 AM Junaid CLOSED
Rajendran
Yard.
NDE selection for welds of 24 inch double joints TA-445989 Mr.
2922 CPP-NGCP-W-2922 1400108561 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. 25-May-19 12.00 AM Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Review of weekly welder performance and
2923 CPP-NGCP-W-2923 1400109230 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 28-May-2019 to 4 CPP site office N/A 26-May-19 8:00 AM Ruhul Mr. Rajesh CLOSED
Jun-2019 at CPP site office.
Pre-welding and weld joint fit up inspection for
2924 CPP-NGCP-W-2924 1400109042 Welding SATIP-W-012-01 SAIC-W-2048 HWYH201 TA-445834 26-May-19 6:00 AM Umair Mr. Suresh CLOSED
HWYH-201 KM0+100 to KM3+500
Post-welding visual inspection for HWYH-201
2925 CPP-NGCP-W-2925 1400109050 Welding SATIP-W-012-01 SAIC-W-2048 HWYH201 TA-445834 26-May-19 11.00 AM Umair Mr. Suresh CLOSED
KM0+100 to KM3+500
NDE selection for welds of HWYH-201 KM0+100
2926 CPP-NGCP-W-2926 1400109060 Welding SATIP-W-012-01 SAIC-W-2054 HWYH201 TA-445834 26-May-19 12.00 AM Umair Mr. Suresh CLOSED
to KM3+500
Pre-welding and weld joint fit up inspection for 10
2927 CPP-NGCP-W-2927 1400109144 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 26-May-19 6:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 10inch HWYH-
2928 CPP-NGCP-W-2928 1400109134 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 26-May-19 11.00 AM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 10 inch HWYH-1036
2929 CPP-NGCP-W-2929 1400109164 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 26-May-19 12.00 AM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
2930 CPP-NGCP-W-2930 1400109173 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 26-May-19 6:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH-
2931 CPP-NGCP-W-2931 1400109183 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 26-May-19 11.00 AM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @
2932 CPP-NGCP-W-2932 1400109166 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 TA-445828 26-May-19 12.00 AM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Pre-welding and weld joint fit up inspection for
2933 CPP-NGCP-W-2933 1400109174 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 26-May-19 6:00 AM FARHAN Mr. Suresh CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK-
2934 CPP-NGCP-W-2934 1400109135 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 26-May-19 11.00 AM FARHAN Mr. Suresh CLOSED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH
2935 CPP-NGCP-W-2935 1400109062 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 26-May-19 12.00 AM FARHAN Mr. Suresh CLOSED
TRL km0+100 to 8+100
Pre-welding and weld joint fit up inspection for 8 TA-446045
2936 CPP-NGCP-W-2936 1400109146 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 26-May-19 6:00 AM Shahbaz Mr. Suresh CLOSED
inch HWYH-975 FL at KM-0+550 - 0+720
Post-welding visual inspection for 8 inch HWYH-
2937 CPP-NGCP-W-2937 1400109204 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 TA-446045 26-May-19 11.00 AM Shahbaz Mr. Suresh CLOSED
975 FL at KM-0+550 - 0+720
NDE selection for welds of 16″ 8 inch HWYH-975 TA-446045
2938 CPP-NGCP-W-2938 1400109167 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-975 26-May-19 12.00 AM Shahbaz Mr. Suresh CLOSED
FL at KM-0+550 - 0+720
Pre-welding and weld joint fit up inspection for 24
Mr.
2939 CPP-NGCP-W-2939 1400109137 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. TA-445989 26-May-19 6:00 AM Ruhul CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
2940 CPP-NGCP-W-2940 1400109195 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 26-May-19 11.00 AM Ruhul CLOSED
Rajendran
Yard.
NDE selection for welds of 24 inch double joints Mr.
2941 CPP-NGCP-W-2941 1400109155 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 26-May-19 12.00 AM Ruhul CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8
2942 CPP-NGCP-W-2942 1400109684 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1303 FL TA-669344 26-May-19 6:00 AM Rajesh Mr. Ashok CLOSED
inch HRDH-1303 KP0+600 to KP0+700
Post-welding visual inspection for 8 inch HRDH-
2943 CPP-NGCP-W-2943 1400109630 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1303 FL TA-669344 26-May-19 11.00 AM Rajesh Mr. Ashok CLOSED
1303 KP0+600 to KP0+700
NDE selection for welds of 8 inch HRDH-1303
2944 CPP-NGCP-W-2944 1400109677 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1303 FL TA-669344 26-May-19 12.00 AM Rajesh Mr. Ashok CLOSED
KP0+600 to KP0+700
Pre-welding and weld joint fit up inspection for 8
2945 CPP-NGCP-W-2945 1400109561 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1159 FL TA-843654 26-May-19 6:00 AM Saif Mr. Ashok CLOSED
inch HRDH -1159 KP0+900 to KP1+100
Post-welding visual inspection for 8 inch HRDH
2946 CPP-NGCP-W-2946 1400109679 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1159 FL TA-843654 26-May-19 11.00 AM Saif Mr. Ashok CLOSED
-1159 KP0+900 to KP1+100
NDE selection for welds of 8 inch HRDH -1159
2947 CPP-NGCP-W-2947 1400109581 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1159 FL TA-843654 26-May-19 12.00 AM Saif Mr. Ashok CLOSED
KP0+900 to KP1+100
Pre-welding and weld joint fit up inspection for 10 Mr.
2948 CPP-NGCP-W-2948 1400109681 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 26-May-19 6:00 AM Shadab CLOSED
inch HWYH-921 KP2+600 to KP3+100 Rajendran
Post-welding visual inspection for 10 inch HWYH- Mr.
2949 CPP-NGCP-W-2949 1400109685 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 26-May-19 11.00 AM Shadab CLOSED
921 KP2+600 to KP3+100 Rajendran
NDE selection for welds of 10 inch HWYH-921 Mr.
2950 CPP-NGCP-W-2950 1400109602 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL TA-843651 26-May-19 12.00 AM Shadab CLOSED
KP2+600 to KP3+100 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -BK-RH Mr.
2951 CPP-NGCP-W-2951 1400109693 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 26-May-19 6:00 AM IRSHAD CLOSED
inch HRDH BK-RH TR/L KP6+200 to KP6+500; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -BK-RH Mr.
2952 CPP-NGCP-W-2952 1400109694 Welding SATIP-W-012-01 SAIC-W-2048 TA-843957 26-May-19 11.00 AM IRSHAD CLOSED
BK-RH TR/L KP6+200 to KP6+500; TR/L Rajendran
NDE selection for welds of 16 inch HRDH BK-RH HRDH -BK-RH Mr.
2953 CPP-NGCP-W-2953 1400109686 Welding SATIP-W-012-01 SAIC-W-2054 TA-843957 26-May-19 12.00 AM IRSHAD CLOSED
TR/L KP6+200 to KP6+500; TR/L Rajendran
Temperature Tie in Welding HRDH-1171 at KM- Mr.
2954 CPP-NGCP-W-2954 1400109713 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1171 FL TA-843547 26-May-19 6:00 AM Sarfaraz CLOSED
3+920 Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
2955 CPP-NGCP-W-2955 1400109695 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 26-May-19 6:00 AM Sarfaraz CLOSED
inch HRDH-1171 at KM-3+920 and KM 5+100 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
2956 CPP-NGCP-W-2956 1400109704 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 26-May-19 11.00 AM Sarfaraz CLOSED
1171 at KM-3+920 and KM 5+100 Rajendran
NDE selection for welds of 8 inch HRDH-1171 at Mr.
2957 CPP-NGCP-W-2957 1400109632 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 26-May-19 12.00 AM Sarfaraz CLOSED
KM-3+920 and KM 5+100 Rajendran
In-Process Verification - RT Techniques &
2958 CPP-NGCP-W-2958 1400109733 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1164, 1171, HRDH-1164, 1171, 1303, BK-RH VARIOUS 26-May-19 8:00 AM RAMEEZ Mr. Ashok CLOSED
1303, BK-RH
In-Process Verification - RT Techniques &
HWYH-201.206, 975,
2959 CPP-NGCP-W-2959 1400109650 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-201.206, VARIOUS 26-May-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1036, CK-RH,GK-RH, 921
975, 1036, CK-RH,GK-RH, 921
In-Process Verification - RT Techniques & Mr.
2960 CPP-NGCP-W-2960 1400109743 Welding SATIP-NDE-RT-01 SAIC-RT-2007 TCF-1 VARIOUS 26-May-19 8:00 AM RAMEEZ CLOSED
Procedure Implementation of TRL-2 at TCF-1 Rajendran
In-Process Inspection of MPT using Mr.
2961 CPP-NGCP-W-2961 1400109725 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 TCF-1 VARIOUS 26-May-19 8:00 AM RAMEEZ CLOSED
Yoke Method, TRL-2 at TCF-1 Rajendran
Weld repair verification of joints HRDH
00-FW-24T2 ,of HRDH 1178, 1178
2962 CPP-NGCP-W-2962 1400109717 Welding SATIP-W-012-01 SAIC-W-2051 VARIOUS 26-May-19 6:30 AM Junaid Mr. Ashok CLOSED
00-FW-63 of HRDH-1160 1160
02-FW-209 of HRDH 1177 1177
Post-welding visual inspection of repair joints HRDH
00-FW-24T2 ,of HRDH 1178, 1178
2963 CPP-NGCP-W-2963 1400109772 Welding SATIP-W-012-01 SAIC-W-2048 VARIOUS 26-May-19 11:00 AM Junaid Mr. Ashok CLOSED
00-FW-63 of HRDH-1160 1160
02-FW-209 of HRDH 1177 1177
Pre-welding and weld joint fit up inspection for
2964 CPP-NGCP-W-2964 1400110039 Welding SATIP-W-012-01 SAIC-W-2048 HWYH201 TA-445834 27-May-19 6:00 AM Umair Mr. Suresh CLOSED
HWYH-201 KM0+100 to KM3+500
Post-welding visual inspection for HWYH-201
2965 CPP-NGCP-W-2965 1400110069 Welding SATIP-W-012-01 SAIC-W-2048 HWYH201 TA-445834 27-May-19 11.00 AM Umair Mr. Suresh CLOSED
KM0+100 to KM3+500
NDE selection for welds of HWYH-201 KM0+100
2966 CPP-NGCP-W-2966 1400110070 Welding SATIP-W-012-01 SAIC-W-2054 HWYH201 TA-445834 27-May-19 12.00 AM Umair Mr. Suresh CLOSED
to KM3+500
Pre-welding and weld joint fit up inspection for 10
2967 CPP-NGCP-W-2967 1400110088 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 27-May-19 6:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 10inch HWYH-
2968 CPP-NGCP-W-2968 1400110104 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 27-May-19 11.00 AM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 10 inch HWYH-1036
2969 CPP-NGCP-W-2969 1400110080 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 27-May-19 12.00 AM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
2970 CPP-NGCP-W-2970 1400110113 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 27-May-19 6:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH-
2971 CPP-NGCP-W-2971 1400110082 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 27-May-19 11.00 AM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @
2972 CPP-NGCP-W-2972 1400110096 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 TA-445828 27-May-19 12.00 AM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Pre-welding and weld joint fit up inspection for
2973 CPP-NGCP-W-2973 1400110071 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 27-May-19 6:00 AM FARHAN Mr. Suresh CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK-
2974 CPP-NGCP-W-2974 1400110116 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 27-May-19 11.00 AM FARHAN Mr. Suresh CLOSED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH
2975 CPP-NGCP-W-2975 1400110153 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 27-May-19 12.00 AM FARHAN Mr. Suresh CLOSED
TRL km0+100 to 8+100
Pre-welding and weld joint fit up inspection for 8
2976 CPP-NGCP-W-2976 1400110138 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 TA-446045 27-May-19 6:00 AM Shahbaz Mr. Suresh CLOSED
inch HWYH-975 FL at KM-0+550 - 0+720
Post-welding visual inspection for 8 inch HWYH-
2977 CPP-NGCP-W-2977 1400110091 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 TA-446045 27-May-19 11.00 AM Shahbaz Mr. Suresh CLOSED
975 FL at KM-0+550 - 0+720
NDE selection for welds of 16″ 8 inch HWYH-975 TA-446045
2978 CPP-NGCP-W-2978 1400110166 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-975 27-May-19 12.00 AM Shahbaz Mr. Suresh CLOSED
FL at KM-0+550 - 0+720
Pre-welding and weld joint fit up inspection for 24
Mr.
2979 CPP-NGCP-W-2979 1400110146 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. TA-445989 27-May-19 6:00 AM Ruhul CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
2980 CPP-NGCP-W-2980 1400110249 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 27-May-19 11.00 AM Ruhul CLOSED
Rajendran
Yard.
NDE selection for welds of 24 inch double joints Mr.
2981 CPP-NGCP-W-2981 1400110267 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 27-May-19 12.00 AM Ruhul CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8
2982 CPP-NGCP-W-2982 1400110345 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1303 FL TA-669344 27-May-19 6:00 AM Rajesh Mr. Ashok CLOSED
inch HRDH-1303 KP0+450 to KP0+600
Post-welding visual inspection for 8 inch HRDH-
2983 CPP-NGCP-W-2983 1400110356 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1303 FL TA-669344 27-May-19 11.00 AM Rajesh Mr. Ashok CLOSED
1303 KP0+450 to KP0+600
NDE selection for welds of 8 inch HRDH-1303
2984 CPP-NGCP-W-2984 1400110346 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1303 FL TA-669344 27-May-19 12.00 AM Rajesh Mr. Ashok CLOSED
KP0+450 to KP0+600
Pre-welding and weld joint fit up inspection for 8
2985 CPP-NGCP-W-2985 1400110302 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1003 FL TA-669344 27-May-19 6:00 AM Rajesh Mr. Ashok CLOSED
inch HRDH-1003 KP0+300 to KP0+350
Post-welding visual inspection for 8 inch HRDH-
2986 CPP-NGCP-W-2986 1400110371 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1003 FL TA-669344 27-May-19 11.00 AM Rajesh Mr. Ashok CLOSED
1003 KP0+300 to KP0+350
NDE selection for welds of 8 inch HRDH-1003
2987 CPP-NGCP-W-2987 1400110339 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1003 FL TA-669344 27-May-19 12.00 AM Rajesh Mr. Ashok CLOSED
KP0+300 to KP0+350
Pre-welding and weld joint fit up inspection for 8
2988 CPP-NGCP-W-2988 1400110406 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1159 FL TA-843654 27-May-19 6:00 AM Saif Mr. Ashok CLOSED
inch HRDH -1159 KP0+700 to KP0+900
Post-welding visual inspection for 8 inch HRDH
2989 CPP-NGCP-W-2989 1400110421 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1159 FL TA-843654 27-May-19 11.00 AM Saif Mr. Ashok CLOSED
-1159 KP0+700 to KP0+900
NDE selection for welds of 8 inch HRDH -1159
2990 CPP-NGCP-W-2990 1400110425 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1159 FL TA-843654 27-May-19 12.00 AM Saif Mr. Ashok CLOSED
KP0+700 to KP0+900
Pre-welding and weld joint fit up inspection for 10 Mr.
2991 CPP-NGCP-W-2991 1400110422 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 27-May-19 6:00 AM Shadab CLOSED
inch HWYH-921 KP2+400 to KP2+600 Rajendran
Post-welding visual inspection for 10 inch HWYH- Mr.
2992 CPP-NGCP-W-2992 1400110362 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 27-May-19 11.00 AM Shadab CLOSED
921 KP2+400 to KP2+600 Rajendran
NDE selection for welds of 10 inch HWYH-921 Mr.
2993 CPP-NGCP-W-2993 1400110453 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL TA-843651 27-May-19 12.00 AM Shadab CLOSED
KP2+400 to KP2+600 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -AK-RH Mr.
2994 CPP-NGCP-W-2994 1400110426 Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 27-May-19 6:00 AM IRSHAD CLOSED
inch HRDH AK-RH TR/L KP3+800 to KP4+000; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -AK-RH Mr.
2995 CPP-NGCP-W-2995 1400110463 Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 27-May-19 11.00 AM IRSHAD CLOSED
AK-RH TR/L KP3+800 to KP4+000; TR/L Rajendran
NDE selection for welds of 16 inch HRDH AK-RH HRDH -AK-RH Mr.
2996 CPP-NGCP-W-2996 1400110342 Welding SATIP-W-012-01 SAIC-W-2054 TA-843960 27-May-19 12.00 AM IRSHAD CLOSED
TR/L KP3+800 to KP4+000; TR/L Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
2997 CPP-NGCP-W-2997 1400110455 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 27-May-19 6:00 AM Sarfaraz CLOSED
inch HRDH-1171 at KM-5+100 to KM 5+200 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
2998 CPP-NGCP-W-2998 1400110390 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 27-May-19 11.00 AM Sarfaraz CLOSED
1171 at KM-5+100 to KM 5+200 Rajendran
NDE selection for welds of 8 inch HRDH-1171 at Mr.
2999 CPP-NGCP-W-2999 1400110391 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 27-May-19 12.00 AM Sarfaraz CLOSED
KM-5+100 to KM 5+200 Rajendran
In-Process Verification - RT Techniques &
3000 CPP-NGCP-W-3000 1400110446 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1177, 1171, HRDH-1177, 1171, 1159.1178,1303, VARIOUS 27-May-19 8:00 AM RAMEEZ Mr. Ashok CLOSED
1159.1178,1303,
In-Process Verification - RT Techniques &
HWYH-201.206, 975,
3001 CPP-NGCP-W-3001 1400110427 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-201.206, VARIOUS 27-May-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1036, 921
975, 1036, 921
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a Weld repair verification of joints HRDH
l Mr.
3002 CPP-NGCP-W-3002 1400110458 Welding SATIP-W-012-01 SAIC-W-2051 02-FW-203,209 ,of HRDH 1177 1177 VARIOUS 27-May-19 6:00 AM Junaid CLOSED
Rajendran
00-FW-30T1,of HRDH 1086 1086
Post-welding visual inspection of repair joints HRDH
Mr.
3003 CPP-NGCP-W-3003 1400110447 Welding SATIP-W-012-01 SAIC-W-2048 02-FW-203,209 ,of HRDH 1177 1177 VARIOUS 27-May-19 11:00 AM Junaid CLOSED
Rajendran
00-FW-30T1,of HRDH 1086 1086
Pre-welding and weld joint fit up inspection for
3004 CPP-NGCP-W-3004 1400110618 Welding SATIP-W-012-01 SAIC-W-2048 HWYH201 TA-445834 28-May-19 6:00 AM Umair Mr. Suresh CLOSED
HWYH-201 KM0+100 to KM3+500
Post-welding visual inspection for HWYH-201
3005 CPP-NGCP-W-3005 1400110619 Welding SATIP-W-012-01 SAIC-W-2048 HWYH201 TA-445834 28-May-19 11.00 AM Umair Mr. Suresh CLOSED
KM0+100 to KM3+500
NDE selection for welds of HWYH-201 KM0+100
3006 CPP-NGCP-W-3006 1400110606 Welding SATIP-W-012-01 SAIC-W-2054 HWYH201 TA-445834 28-May-19 12.00 AM Umair Mr. Suresh CLOSED
to KM3+500
Pre-welding and weld joint fit up inspection for 10
3007 CPP-NGCP-W-3007 1400110579 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 28-May-19 6:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 10inch HWYH-
3008 CPP-NGCP-W-3008 1400110608 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 28-May-19 11.00 AM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 10 inch HWYH-1036
3009 CPP-NGCP-W-3009 1400110609 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 28-May-19 12.00 AM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
3010 CPP-NGCP-W-3010 1400110644 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 28-May-19 6:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH-
3011 CPP-NGCP-W-3011 1400110638 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 28-May-19 11.00 AM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @
3012 CPP-NGCP-W-3012 1400110589 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 TA-445828 28-May-19 12.00 AM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Pre-welding and weld joint fit up inspection for
3013 CPP-NGCP-W-3013 1400110630 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 28-May-19 6:00 AM abdul raheem Mr. Suresh CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK-
3014 CPP-NGCP-W-3014 1400110995 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 28-May-19 11.00 AM abdul raheem Mr. Suresh CLOSED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH
3015 CPP-NGCP-W-3015 1400111024 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 28-May-19 12.00 AM abdul raheem Mr. Suresh CLOSED
TRL km0+100 to 8+100
Pre-welding and weld joint fit up inspection for 8
3016 CPP-NGCP-W-3016 1400111054 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 TA-446045 28-May-19 6:00 AM Shahbaz Mr. Suresh CLOSED
inch HWYH-975 FL at KM-0+550 - 0+720
Post-welding visual inspection for 8 inch HWYH-
3017 CPP-NGCP-W-3017 1400111049 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 TA-446045 28-May-19 11.00 AM Shahbaz Mr. Suresh CLOSED
975 FL at KM-0+550 - 0+720
NDE selection for welds of 16″ 8 inch HWYH-975
3018 CPP-NGCP-W-3018 1400111085 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-975 TA-446045 28-May-19 12.00 AM Shahbaz Mr. Suresh CLOSED
FL at KM-0+550 - 0+720
Pre-welding and weld joint fit up inspection for 24
Mr.
3019 CPP-NGCP-W-3019 1400111039 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. TA-445989 28-May-19 6:00 AM Junaid CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
3020 CPP-NGCP-W-3020 1400111069 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 28-May-19 11.00 AM Junaid CLOSED
Rajendran
Yard.
NDE selection for welds of 24 inch double joints TA-445989 Mr.
3021 CPP-NGCP-W-3021 1400111089 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. 28-May-19 12.00 AM Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8
3022 CPP-NGCP-W-3022 1400110990 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1003 FL TA-669344 28-May-19 6:00 AM Rajesh Mr. Ashok CLOSED
inch HRDH-1003 KP0+350 to KP0+500
Post-welding visual inspection for 8 inch HRDH- TA-669344
3023 CPP-NGCP-W-3023 1400111015 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1003 FL 28-May-19 11.00 AM Rajesh Mr. Ashok CLOSED
1003 KP0+350 to KP0+500
NDE selection for welds of 8 inch HRDH-1003
3024 CPP-NGCP-W-3024 1400110910 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1003 FL TA-669344 28-May-19 12.00 AM Rajesh Mr. Ashok CLOSED
KP0+350 to KP0+500
Pre-welding and weld joint fit up inspection for 8
3025 CPP-NGCP-W-3025 1400111034 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1159 FL TA-843654 28-May-19 6:00 AM Saif Mr. Ashok CLOSED
inch HRDH -1159 KP0+600 to KP0+700
Post-welding visual inspection for 8 inch HRDH
3026 CPP-NGCP-W-3026 1400110977 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1159 FL TA-843654 28-May-19 11.00 AM Saif Mr. Ashok CLOSED
-1159 KP0+600 to KP0+700
NDE selection for welds of 8 inch HRDH -1159
3027 CPP-NGCP-W-3027 1400110992 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1159 FL TA-843654 28-May-19 12.00 AM Saif Mr. Ashok CLOSED
KP0+600 to KP0+700
Pre-welding and weld joint fit up inspection for 10 Mr.
3028 CPP-NGCP-W-3028 1400111045 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 28-May-19 6:00 AM Shadab CLOSED
inch HWYH-921 KP2+300 to KP2+400 Rajendran
Post-welding visual inspection for 10 inch Mr.
3029 CPP-NGCP-W-3029 1400111016 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 28-May-19 11.00 AM Shadab CLOSED
HWYH-921 KP2+300 to KP2+400 Rajendran
NDE selection for welds of 10 inch HWYH-921 Mr.
3030 CPP-NGCP-W-3030 1400111011 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL TA-843651 28-May-19 12.00 AM Shadab CLOSED
KP2+300 to KP2+400 Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
3031 CPP-NGCP-W-3031 1400111048 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 28-May-19 6:00 AM Sarfaraz CLOSED
inch HRDH-1171 at KM-5+200 to KM 5+270 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
3032 CPP-NGCP-W-3032 1400111018 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 28-May-19 11.00 AM Sarfaraz CLOSED
1171 at KM-5+200 to KM 5+270 Rajendran
NDE selection for welds of 8 inch HRDH-1171 at Mr.
3033 CPP-NGCP-W-3033 1400111065 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 28-May-19 12.00 AM Sarfaraz CLOSED
KM-5+200 to KM 5+270 Rajendran
In-Process Verification - RT Techniques &
3034 CPP-NGCP-W-3034 1400110997 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1177, 1171, HRDH-1177, 1171, 1159.1178,1303, VARIOUS 28-May-19 8:00 AM RAMEEZ Mr. Ashok CLOSED
1159.1178,1303,
In-Process Verification - RT Techniques &
HWYH-201.206, 975,
3035 CPP-NGCP-W-3035 1400111071 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-201.206, VARIOUS 28-May-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
975, 1036, 921 1036, 921
Weld repair verification of joints
HRDH-1086 Mr.
3036 CPP-NGCP-W-3036 1400111078 Welding SATIP-W-012-01 SAIC-W-2051 00-FW-30T1,of HRDH 1086 VARIOUS 28-May-19 6:00 AM FARHAN CLOSED
HWYH-1115 Rajendran
00-FW-101,96T2,94,79T2 of HWYH-1115
Post-welding visual inspection of repair joints
HRDH-1086 Mr.
3037 CPP-NGCP-W-3037 1400111091 Welding SATIP-W-012-01 SAIC-W-2048 00-FW-30T1,of HRDH 1086 VARIOUS 28-May-19 11:00 AM FARHAN CLOSED
HWYH-1115 Rajendran
00-FW-101,96T2,94,79T2 of HWYH-1115
Pre-welding and weld joint fit up inspection for EPM PROBLEM. NOT
3038 CPP-NGCP-W-3038 1400111357 Welding SATIP-W-012-01 SAIC-W-2048 HWYH201 TA-445834 29-May-19 6:00 AM Umair Mr. Suresh CLOSED
HWYH-201 KM0+100 to KM3+500 UPLOAD
Post-welding visual inspection for HWYH-201
3039 CPP-NGCP-W-3039 1400111347 Welding SATIP-W-012-01 SAIC-W-2048 HWYH201 TA-445834 29-May-19 11.00 AM Umair Mr. Suresh CLOSED
KM0+100 to KM3+500
NDE selection for welds of HWYH-201 KM0+100
3040 CPP-NGCP-W-3040 1400111358 Welding SATIP-W-012-01 SAIC-W-2054 HWYH201 TA-445834 29-May-19 12.00 AM Umair Mr. Suresh CLOSED
to KM3+500
Pre-welding and weld joint fit up inspection for 10
3041 CPP-NGCP-W-3041 1400111399 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 29-May-19 6:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 10inch HWYH-
3042 CPP-NGCP-W-3042 1400111675 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 29-May-19 11.00 AM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 10 inch HWYH-1036
3043 CPP-NGCP-W-3043 1400111646 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 29-May-19 12.00 AM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
3044 CPP-NGCP-W-3044 1400111610 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 29-May-19 6:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH-
3045 CPP-NGCP-W-3045 1400111678 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 29-May-19 11.00 AM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @
3046 CPP-NGCP-W-3046 1400111681 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 TA-445828 29-May-19 12.00 AM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Pre-welding and weld joint fit up inspection for
3047 CPP-NGCP-W-3047 1400111651 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 29-May-19 6:00 AM abdul raheem Mr. Suresh CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK-
3048 CPP-NGCP-W-3048 1400111686 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 29-May-19 11.00 AM abdul raheem Mr. Suresh CLOSED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH
3049 CPP-NGCP-W-3049 1400111716 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 29-May-19 12.00 AM abdul raheem Mr. Suresh CLOSED
TRL km0+100 to 8+100
Pre-welding and weld joint fit up inspection for 8
3050 CPP-NGCP-W-3050 1400111733 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 TA-446045 29-May-19 6:00 AM Shahbaz Mr. Suresh CLOSED
inch HWYH-975 FL at KM-0+550 - 0+720
Post-welding visual inspection for 8 inch HWYH-
3051 CPP-NGCP-W-3051 1400111753 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 TA-446045 29-May-19 11.00 AM Shahbaz Mr. Suresh CLOSED
975 FL at KM-0+550 - 0+720
NDE selection for welds of 16″ 8 inch HWYH-975
3052 CPP-NGCP-W-3052 1400111766 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-975 TA-446045 29-May-19 12.00 AM Shahbaz Mr. Suresh CLOSED
FL at KM-0+550 - 0+720
Pre-welding and weld joint fit up inspection for 24
Mr.
3053 CPP-NGCP-W-3053 1400111784 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. TA-445989 29-May-19 6:00 AM Junaid CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
3054 CPP-NGCP-W-3054 1400111771 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 29-May-19 11.00 AM Junaid CLOSED
Yard. Rajendran
NDE selection for welds of 24 inch double joints Mr.
3055 CPP-NGCP-W-3055 1400111730 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 29-May-19 12.00 AM Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8
3056 CPP-NGCP-W-3056 1400111820 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1003 FL TA-669351 29-May-19 6:00 AM Rajesh Mr. Ashok CLOSED
inch HRDH-1003 KP0+500 to KP0+800
Post-welding visual inspection for 8 inch HRDH-
3057 CPP-NGCP-W-3057  1400111852 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1003 FL TA-669351 29-May-19 11.00 AM Rajesh Mr. Ashok CLOSED
1003 KP0+500 to KP0+800
NDE selection for welds of 8 inch HRDH-1003
3058 CPP-NGCP-W-3058 1400111873 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1003 FL TA-669351 29-May-19 12.00 AM Rajesh Mr. Ashok CLOSED
KP0+500 to KP0+800
Pre-welding and weld joint fit up inspection for 8
3059 CPP-NGCP-W-3059 1400111789 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1159 FL TA-843654 29-May-19 6:00 AM Saif Mr. Ashok CLOSED
inch HRDH -1159 KP0+400 to KP0+600
Post-welding visual inspection for 8 inch HRDH
3060 CPP-NGCP-W-3060 1400111874 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1159 FL TA-843654 29-May-19 11.00 AM Saif Mr. Ashok CLOSED
-1159 KP0+400 to KP0+600
NDE selection for welds of 8 inch HRDH -1159
3061 CPP-NGCP-W-3061 1400111854 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1159 FL TA-843654 29-May-19 12.00 AM Saif Mr. Ashok CLOSED
KP0+400 to KP0+600
Pre-welding and weld joint fit up inspection for 10 Mr.
3062 CPP-NGCP-W-3062 1400111876 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 29-May-19 6:00 AM Shadab CLOSED
inch HWYH-921 KP2+200 to KP2+300 Rajendran
Post-welding visual inspection for 10 inch Mr.
3063 CPP-NGCP-W-3063 1400111878 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 29-May-19 11.00 AM Shadab CLOSED
HWYH-921 KP2+200 to KP2+300 Rajendran
1400111881 NDE selection for welds of 10 inch HWYH-921 Mr.
CPP-NGCP-W-3064 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL TA-843651 29-May-19 12.00 AM Shadab CLOSED
KP2+200 to KP2+300 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -AK-RH Mr.
3065 CPP-NGCP-W-3065 1400111893 Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 29-May-19 6:00 AM IRSHAD CLOSED
inch HRDH AK-RH TR/L KP3+700 to KP3+800; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -AK-RH Mr.
3066 CPP-NGCP-W-3066 1400111856 Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 29-May-19 11.00 AM IRSHAD CLOSED
AK-RH TR/L KP3+700 to KP3+800; TR/L Rajendran
NDE selection for welds of 16 inch HRDH AK-RH HRDH -AK-RH Mr.
3067 CPP-NGCP-W-3067 1400111799 Welding SATIP-W-012-01 SAIC-W-2054 TA-843960 29-May-19 12.00 AM IRSHAD CLOSED
TR/L KP3+700 to KP3+800; TR/L Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
3068 CPP-NGCP-W-3068 1400111864 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 29-May-19 6:00 AM Sarfaraz CLOSED
inch HRDH-1171 at KM-5+270 to KM 5+320 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
3069 CPP-NGCP-W-3069 1400111857 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 29-May-19 11.00 AM Sarfaraz CLOSED
1171 at KM-5+270 to KM 5+320 Rajendran
NDE selection for welds of 8 inch HRDH-1171 at Mr.
3070 CPP-NGCP-W-3070 1400111896 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 29-May-19 12.00 AM Sarfaraz CLOSED
KM-5+270 to KM 5+320 Rajendran
In-Process Verification - RT Techniques &
3071 CPP-NGCP-W-3071 1400111822 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1159, HRDH-1159, 1086,1303, VARIOUS 29-May-19 8:00 AM RAMEEZ Mr. Ashok CLOSED
1086,1303,
In-Process Verification - RT Techniques &
HWYH-201.206, 975,
3072 CPP-NGCP-W-3072 1400111826 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-201.206, VARIOUS 29-May-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
975, 1036, 921 1036, 921
In-Process Verification - RT Techniques & Mr.
3073 CPP-NGCP-W-3073 1400111898 Welding SATIP-NDE-RT-01 SAIC-RT-2007 TCF-1 VARIOUS 29-May-19 8:00 AM RAMEEZ CLOSED
Procedure Implementation of TRL-2 at TCF-1 Rajendran
In-Process Inspection of MPT using Mr.
3074 CPP-NGCP-W-3074 1400111840 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 TCF-1 VARIOUS 29-May-19 8:00 AM RAMEEZ CLOSED
Yoke Method, TRL-2 at TCF-1 Rajendran
Weld repair verification of joints VARIOUS Mr. re-schedule to 30-MAY-
3075 CPP-NGCP-W-3075 1400111903 Welding SATIP-W-012-01 SAIC-W-2051 HWYH-1115 29-May-19 6:00 AM FARHAN CLOSED
00-FW-101,79T2, 71,69T1 of HWYH-1115 Rajendran 2019
Post-welding visual inspection of repair joints Mr. re-schedule to 30-MAY-
3076 CPP-NGCP-W-3075 1400111841 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1115 VARIOUS 29-May-19 11:00 AM FARHAN CLOSED
00-FW-101,79T2, 71,69T1 of HWYH-1115 Rajendran 2019
Pre-welding and weld joint fit up inspection for HWYH201
3077 CPP-NGCP-W-3076 1400111995 Welding SATIP-W-012-01 SAIC-W-2048 TA-445834 30-May-19 6:00 AM Umair Mr. Suresh CLOSED
HWYH-201 KM0+100 to KM3+500
Post-welding visual inspection for HWYH-201
3078 CPP-NGCP-W-3077 1400112006 Welding SATIP-W-012-01 SAIC-W-2048 HWYH201 TA-445834 30-May-19 11.00 AM Umair Mr. Suresh CLOSED
KM0+100 to KM3+500
NDE selection for welds of HWYH-201 KM0+100 TA-445834
3079 CPP-NGCP-W-3078 1400111987 Welding SATIP-W-012-01 SAIC-W-2054 HWYH201 30-May-19 12.00 AM Umair Mr. Suresh CLOSED
to KM3+500
Pre-welding and weld joint fit up inspection for 10
3080 CPP-NGCP-W-3079 1400112279 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 30-May-19 6:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 10inch HWYH- TA-445826
3081 CPP-NGCP-W-3080 1400112334 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL 30-May-19 11.00 AM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 10 inch HWYH-1036
3082 CPP-NGCP-W-3081 1400112364 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 30-May-19 12.00 AM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10 TA-445828
3083 CPP-NGCP-W-3082 1400112367 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 30-May-19 6:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH-
3084 CPP-NGCP-W-3083 1400112302 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 30-May-19 11.00 AM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @ TA-445828
3085 CPP-NGCP-W-3084 1400112374 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 30-May-19 12.00 AM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Pre-welding and weld joint fit up inspection for
3086 CPP-NGCP-W-3085 1400112341 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 30-May-19 6:00 AM abdul raheem Mr. Suresh CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK- TA-445974
3087 CPP-NGCP-W-3086 1400112320 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL 30-May-19 11.00 AM abdul raheem Mr. Suresh CLOSED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH
3088 CPP-NGCP-W-3087 1400112393 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 30-May-19 12.00 AM abdul raheem Mr. Suresh CLOSED
TRL km0+100 to 8+100
Pre-welding and weld joint fit up inspection for 10 TA-445912
3089 CPP-NGCP-W-3088 1400112357 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL 30-May-19 8:00 AM abdul raheem Mr. Suresh CLOSED
inch 16″HWYH GK-RH TRL km0+100 to 12+500
Post-welding visual inspection for 10 inch
3090 CPP-NGCP-W-3089 1400112417 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 30-May-19 2.00 PM abdul raheem Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
NDE selection for welds of 10 inch16″HWYH GK-
3091 CPP-NGCP-W-3090 1400112322 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH GK-RH TRL km0+100 to 16″HWYH GK-RH TRL TA-445912 30-May-19 4.00 PM abdul raheem Mr. Suresh CLOSED
12+500
Pre-welding and weld joint fit up inspection for 8
3092 CPP-NGCP-W-3091 1400112376 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445836 30-May-19 6:00 AM Shahbaz Mr. Suresh CLOSED
inch HWYH-1071 FL KM 0+100 to km2+040
Post-welding visual inspection for 8 inch HWYH-
3093 CPP-NGCP-W-3092 1400112395 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 30-May-19 11.00 AM Shahbaz Mr. Suresh CLOSED
1071 FL KM 0+100 to km2+040
NDE selection for welds of 8 inch HWYH-1071 FL
3094 CPP-NGCP-W-3093 1400112396 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1071 FL TA-445830 30-May-19 12.00 AM Shahbaz Mr. Suresh CLOSED
KM 0+100 to km2+040
Pre-welding and weld joint fit up inspection for 24
TA-445989 Mr.
3095 CPP-NGCP-W-3094 1400112447 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. 30-May-19 6:00 AM Junaid CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
3096 CPP-NGCP-W-3095 1400112391 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 30-May-19 11.00 AM Junaid CLOSED
Rajendran
Yard.
NDE selection for welds of 24 inch double joints TA-445989 Mr.
3097 CPP-NGCP-W-3096 1400112449 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. 30-May-19 12.00 AM Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 10
3098 CPP-NGCP-W-3097 1400112508 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 31-May-19 6:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH- TA-445828
3099 CPP-NGCP-W-3098 1400112441 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 31-May-19 11.00 AM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @
3100 CPP-NGCP-W-3099 1400112467 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 TA-445828 31-May-19 12.00 AM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Weld repair verification of joints FW088T2, at TA-445838
3101 CPP-NGCP-W-3100 1400112440 Welding SATIP-W-012-01 SAIC-W-2051 HWYH-1093 FL 31-May-19 8:10 AM Shahbaz Mr. Suresh CLOSED
HWYH-1093 FL
Post-welding visual inspection of repair joints
3102 CPP-NGCP-W-3101 1400112487 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 FL TA-445838 31-May-19 10.00 AM Shahbaz Mr. Suresh CLOSED
FW088T2, at HWYH-1093 FL
Pre-welding and weld joint fit up inspection for 10 TA-445912
3103 CPP-NGCP-W-3102 1400112350 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL 31-May-19 8:00 AM abdul raheem Mr. Suresh CLOSED
inch 16″HWYH GK-RH TRL km0+100 to 12+500
Post-welding visual inspection for 10 inch
3104 CPP-NGCP-W-3103 1400112495 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 31-May-19 2.00 PM abdul raheem Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
NDE selection for welds of 10 inch16″HWYH GK-
3105 CPP-NGCP-W-3104 1400112351 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH GK-RH TRL km0+100 to 16″HWYH GK-RH TRL TA-445912 31-May-19 4.00 PM abdul raheem Mr. Suresh CLOSED
12+500
Pre-welding and weld joint fit up inspection for 24
Mr.
3106 CPP-NGCP-W-3105 1400112352 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. TA-445989 31-May-19 6:00 AM Junaid CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
3107 CPP-NGCP-W-3106 1400112509 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 31-May-19 11.00 AM Junaid CLOSED
Rajendran
Yard.
NDE selection for welds of 24 inch double joints Mr.
3108 CPP-NGCP-W-3107 1400112510 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 31-May-19 12.00 AM Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8
3109 CPP-NGCP-W-3108 1400112484 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1003 FL TA-669351 30-May-19 6:00 AM Rajesh Mr. Ashok CLOSED
inch HRDH-1003 KP0+800 to KP1+000
Post-welding visual inspection for 8 inch HRDH-
3110 CPP-NGCP-W-3109 1400112399 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1003 FL TA-669351 30-May-19 11.00 AM Rajesh Mr. Ashok CLOSED
1003 KP0+800 to KP1+000
NDE selection for welds of 8 inch HRDH-1003
3111 CPP-NGCP-W-3110 1400112460 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1003 FL TA-669351 30-May-19 12.00 AM Rajesh Mr. Ashok CLOSED
KP0+800 to KP1+000
Pre-welding and weld joint fit up inspection for 8
3112 CPP-NGCP-W-3111 1400112462 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1128 FL TA-843607 30-May-19 6:00 AM Saif Mr. Ashok CLOSED
inch HRDH -1128 KP0+450 to KP0+600
Post-welding visual inspection for 8 inch HRDH
3113 CPP-NGCP-W-3112 1400112349 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1128 FL TA-843607 30-May-19 11.00 AM Saif Mr. Ashok CLOSED
-1128 KP0+450 to KP0+600
NDE selection for welds of 8 inch HRDH -1128
3114 CPP-NGCP-W-3113 1400112437 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1128 FL TA-843607 30-May-19 12.00 AM Saif Mr. Ashok CLOSED
KP0+450 to KP0+600
Pre-welding and weld joint fit up inspection for 10 Mr.
3115 CPP-NGCP-W-3114 1400112442 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 30-May-19 6:00 AM Shadab CLOSED
inch HWYH-921 KP1+900 to KP2+200 Rajendran
Post-welding visual inspection for 10 inch Mr.
3116 CPP-NGCP-W-3115 1400112380 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 30-May-19 11.00 AM Shadab CLOSED
HWYH-921 KP1+900 to KP2+200 Rajendran
NDE selection for welds of 10 inch HWYH-921 Mr.
3117 CPP-NGCP-W-3116 1400112496 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL TA-843651 30-May-19 12.00 AM Shadab CLOSED
KP1+900 to KP2+200 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -AK-RH Mr.
3118 CPP-NGCP-W-3117 1400112468 Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 30-May-19 6:00 AM IRSHAD CLOSED
inch HRDH AK-RH TR/L KP3+600 to KP3+700; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -AK-RH TA-843960 Mr.
3119 CPP-NGCP-W-3118 1400112497 Welding SATIP-W-012-01 SAIC-W-2048 30-May-19 11.00 AM IRSHAD CLOSED
AK-RH TR/L KP3+600 to KP3+700; TR/L Rajendran
NDE selection for welds of 16 inch HRDH AK-RH HRDH -AK-RH Mr.
3120 CPP-NGCP-W-3119 1400112513 Welding SATIP-W-012-01 SAIC-W-2054 TA-843960 30-May-19 12.00 AM IRSHAD CLOSED
TR/L KP3+600 to KP3+700; TR/L Rajendran
Pre-welding and weld joint fit up inspection for 8 TA-843547 Mr.
3121 CPP-NGCP-W-3120 1400112477 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL 30-May-19 6:00 AM Sarfaraz CLOSED
inch HRDH-1171 at KM-5+320 to KM 5+390 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
3122 CPP-NGCP-W-3121 1400112498 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 30-May-19 11.00 AM Sarfaraz CLOSED
1171 at KM-5+320 to KM 5+390 Rajendran
NDE selection for welds of 8 inch HRDH-1171 at TA-843547 Mr.
3123 CPP-NGCP-W-3122 1400112523 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL 30-May-19 12.00 AM Sarfaraz CLOSED
KM-5+320 to KM 5+390 Rajendran
In-Process Verification - RT Techniques &
3124 CPP-NGCP-W-3123 1400112524 Welding SATIP-NDE-RT-01 SAIC-RT-2007 HRDH-AK-RH,1003, VARIOUS 30-May-19 8:00 AM RAMEEZ Mr. Ashok CLOSED
Procedure Implementation of HRDH-AK-RH,1003,
In-Process Verification - RT Techniques &
HWYH-201.206, 975, VARIOUS
3125 CPP-NGCP-W-3124 1400112512 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-201.206, 30-May-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1036, CK-RH,
975, 1036, CK-RH,
Pre-welding and weld joint fit up inspection for
3126 CPP-NGCP-W-3125 1400112745 Welding SATIP-W-012-01 SAIC-W-2048 HWYH201 TA-445834 01-Jun-19 6:00 AM Umair Mr. Suresh CLOSED
HWYH-201 KM0+100 to KM3+500
Post-welding visual inspection for HWYH-201 TA-445834
3127 CPP-NGCP-W-3126 1400112736 Welding SATIP-W-012-01 SAIC-W-2048 HWYH201 01-Jun-19 11.00 AM Umair Mr. Suresh CLOSED
KM0+100 to KM3+500
NDE selection for welds of HWYH-201 KM0+100
3128 CPP-NGCP-W-3127 1400112690 Welding SATIP-W-012-01 SAIC-W-2054 HWYH201 TA-445834 01-Jun-19 12.00 AM Umair Mr. Suresh CLOSED
to KM3+500
Pre-welding and weld joint fit up inspection for 10 TA-445826
3129 CPP-NGCP-W-3128 1400112759 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL 01-Jun-19 6:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 10inch HWYH-
3130 CPP-NGCP-W-3129 1400112747 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 01-Jun-19 11.00 AM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 10 inch HWYH-1036 TA-445826
3131 CPP-NGCP-W-3130 1400112692 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL 01-Jun-19 12.00 AM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
3132 CPP-NGCP-W-3131 1400112804 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 01-Jun-19 6:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH- TA-445828
3133 CPP-NGCP-W-3132 1400112792 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 01-Jun-19 11.00 AM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @
3134 CPP-NGCP-W-3133 1400112850 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 TA-445828 01-Jun-19 12.00 AM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Pre-welding and weld joint fit up inspection for 10
3135 CPP-NGCP-W-3134 1400112876 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 01-Jun-19 8:00 AM abdul raheem Mr. Suresh CLOSED
inch 16″HWYH GK-RH TRL km0+100 to 12+500
Post-welding visual inspection for 10 inch
3136 CPP-NGCP-W-3135 1400112799 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 01-Jun-19 2.00 PM abdul raheem Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
NDE selection for welds of 10 inch16″HWYH GK-
3137 CPP-NGCP-W-3136 1400112892 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH GK-RH TRL km0+100 to 16″HWYH GK-RH TRL TA-445912 01-Jun-19 4.00 PM abdul raheem Mr. Suresh Reject
12+500
3138 CPP-NGCP-W-3137 1400113167 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1071 HWYH-1071 FL TA-445830 01-Jun-19 6.00 AM Shahbaz Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 8
3139 CPP-NGCP-W-3138 1400112915 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 01-Jun-19 6:00 AM Shahbaz Mr. Suresh CLOSED
inch HWYH-1071 FL KM 0+100 to km2+040
Post-welding visual inspection for 8 inch HWYH- TA-445830
3140 CPP-NGCP-W-3139 1400112821 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL 01-Jun-19 11.00 AM Shahbaz Mr. Suresh CLOSED
1071 FL KM 0+100 to km2+040
NDE selection for welds of 8 inch HWYH-1071 FL
3141 CPP-NGCP-W-3140 1400113142 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1071 FL TA-445830 01-Jun-19 12.00 AM Shahbaz Mr. Suresh CLOSED
KM 0+100 to km2+040
Pre-welding and weld joint fit up inspection for 24
Mr.
3142 CPP-NGCP-W-3141 1400113174 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. TA-445989 01-Jun-19 6:00 AM Junaid CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
3143 CPP-NGCP-W-3142 1400113166 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 01-Jun-19 11.00 AM Junaid CLOSED
Yard. Rajendran
NDE selection for welds of 24 inch double joints Mr.
3144 CPP-NGCP-W-3143 1400113122 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. TA-445989 01-Jun-19 12.00 AM Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8
3145 CPP-NGCP-W-3144 1400113048 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1003 FL TA-669351 01-Jun-19 6:00 AM Rajesh Mr. Ashok CLOSED
inch HRDH-1003 KP1+000 to KP1+100
Post-welding visual inspection for 8 inch HRDH-
3146 CPP-NGCP-W-3145 1400113092 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1003 FL TA-669351 01-Jun-19 11.00 AM Rajesh Mr. Ashok CLOSED
1003 KP1+000 to KP1+100
NDE selection for welds of 8 inch HRDH-1003
3147 CPP-NGCP-W-3146 1400113144 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1003 FL TA-669351 01-Jun-19 12.00 AM Rajesh Mr. Ashok CLOSED
KP1+000 to KP1+100
Pre-welding and weld joint fit up inspection for 8
3148 CPP-NGCP-W-3147 1400113072 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1128 FL TA-843607 01-Jun-19 6:00 AM Saif Mr. Ashok CLOSED
inch HRDH -1128 KP0+600 to KP1+100
Post-welding visual inspection for 8 inch HRDH
3149 CPP-NGCP-W-3148 1400113155 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1128 FL TA-843607 01-Jun-19 11.00 AM Saif Mr. Ashok CLOSED
-1128 KP0+600 to KP1+100
NDE selection for welds of 8 inch HRDH -1128
3150 CPP-NGCP-W-3149 1400113102 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1128 FL TA-843607 01-Jun-19 12.00 AM Saif Mr. Ashok CLOSED
KP0+600 to KP1+100
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a Pre-welding and weld joint fit up inspection for 10 Mr.
3151 CPP-NGCP-W-3150 1400113139 l Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 01-Jun-19 6:00 AM Shadab CLOSED
inch HWYH-921 KP1+700 to KP1+900 Rajendran
Post-welding visual inspection for 10 inch HWYH- Mr.
3152 CPP-NGCP-W-3151 1400113163 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 01-Jun-19 11.00 AM Shadab CLOSED
921 KP1+700 to KP1+900 Rajendran
NDE selection for welds of 10 inch HWYH-921 Mr.
3153 CPP-NGCP-W-3152 1400113159 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL TA-843651 01-Jun-19 12.00 AM Shadab CLOSED
KP1+700 to KP1+900 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -AK-RH Mr.
3154 CPP-NGCP-W-3153 1400113193 Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 01-Jun-19 6:00 AM IRSHAD CLOSED
inch HRDH AK-RH TR/L KP3+300 to KP3+500; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -AK-RH Mr.
3155 CPP-NGCP-W-3154 1400113194 Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 01-Jun-19 11.00 AM IRSHAD CLOSED
AK-RH TR/L KP3+300 to KP3+500; TR/L Rajendran
NDE selection for welds of 16 inch HRDH AK-RH HRDH -AK-RH Mr.
3156 CPP-NGCP-W-3155 1400113195 Welding SATIP-W-012-01 SAIC-W-2054 TA-843960 01-Jun-19 12.00 AM IRSHAD CLOSED
TR/L KP3+300 to KP3+500; TR/L Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
3157 CPP-NGCP-W-3156 1400113196 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 01-Jun-19 6:00 AM Sarfaraz CLOSED
inch HRDH-1171 at KM-5+390 to KM 5+450 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
3158 CPP-NGCP-W-3157 1400113197 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 01-Jun-19 11.00 AM Sarfaraz CLOSED
1171 at KM-5+390 to KM 5+450 Rajendran
NDE selection for welds of 8 inch HRDH-1171 at Mr.
3159 CPP-NGCP-W-3158 1400113164 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 01-Jun-19 12.00 AM Sarfaraz CLOSED
KM-5+390 to KM 5+450 Rajendran
In-Process Verification - RT Techniques &
3160 CPP-NGCP-W-3159 1400113148 Welding SATIP-NDE-RT-01 SAIC-RT-2007 HRDH-AK-RH, VARIOUS 01-Jun-19 8:00 AM RAMEEZ Mr. Ashok CLOSED
Procedure Implementation of HRDH-AK-RH,
In-Process Verification - RT Techniques &
HWYH-201.206, 975,
3161 CPP-NGCP-W-3160 1400113082 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-201.206, VARIOUS 01-Jun-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
975, CK-RH, CK-RH,
Review of weekly welder performance and
3162 CPP-NGCP-W-3161 1400113465 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 5-june-2019 to 12 CPP site office N/A 02-Jun-19 8:00 AM Ruhul Mr. Rajesh CLOSED
Jun-2019 at CPP site office.
Pre-welding and weld joint fit up inspection for TA-445834
3163 CPP-NGCP-W-3162 1400113186 Welding SATIP-W-012-01 SAIC-W-2048 HWYH201 02-Jun-19 6:00 AM Umair Mr. Suresh CLOSED
HWYH-201 KM0+100 to KM3+500
Post-welding visual inspection for HWYH-201
3164 CPP-NGCP-W-3163 1400113229 Welding SATIP-W-012-01 SAIC-W-2048 HWYH201 TA-445834 02-Jun-19 11.00 AM Umair Mr. Suresh CLOSED
KM0+100 to KM3+500
NDE selection for welds of HWYH-201 KM0+100 TA-445834
3165 CPP-NGCP-W-3164 1400113244 Welding SATIP-W-012-01 SAIC-W-2054 HWYH201 02-Jun-19 12.00 AM Umair Mr. Suresh CLOSED
to KM3+500
Pre-welding and weld joint fit up inspection for 10
3166 CPP-NGCP-W-3165 1400113236 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 02-Jun-19 6:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 10inch HWYH- TA-445826
3167 CPP-NGCP-W-3166 1400113245 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL 02-Jun-19 11.00 AM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 10 inch HWYH-1036
3168 CPP-NGCP-W-3167 1400113179 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 02-Jun-19 12.00 AM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10 TA-445828
3169 CPP-NGCP-W-3168 1400113187 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 02-Jun-19 6:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH-
3170 CPP-NGCP-W-3169 1400113217 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 02-Jun-19 11.00 AM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @ TA-445828
3171 CPP-NGCP-W-3170 1400113237 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 02-Jun-19 12.00 AM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Pre-welding and weld joint fit up inspection for 10
3172 CPP-NGCP-W-3171 1400113171 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 02-Jun-19 6:00 AM abdul raheem Mr. Suresh CLOSED
inch 16″HWYH GK-RH TRL km0+100 to 12+500
Post-welding visual inspection for 10 inch
3173 CPP-NGCP-W-3172 1400113180 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 02-Jun-19 11.00 AM abdul raheem Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
NDE selection for welds of 10 inch16″HWYH GK-
3174 CPP-NGCP-W-3173 1400113253 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH GK-RH TRL km0+100 to 16″HWYH GK-RH TRL TA-445912 02-Jun-19 12.00 AM abdul raheem Mr. Suresh CLOSED
12+500
Pre-welding and weld joint fit up inspection for
3175 CPP-NGCP-W-3174 1400113368 Welding SATIP-W-012-01 SAIC-W-2048 HWYH BK-RH TA-445888 02-Jun-19 6:00 AM abdul raheem Mr. Suresh CLOSED
16″HWYH BK-RH KM0+100 TO KM12+800
Post-welding visual inspection for 16″HWYH BK-
3176 CPP-NGCP-W-3175 1400113447 Welding SATIP-W-012-01 SAIC-W-2048 HWYH BK-RH TA-445888 02-Jun-19 11.00 AM abdul raheem Mr. Suresh CLOSED
RH KM0+100 TO KM12+800
NDE selection for welds of 16″HWYH BK-RH
3177 CPP-NGCP-W-3176 1400113450 Welding SATIP-W-012-01 SAIC-W-2054 HWYH BK-RH TA-445888 02-Jun-19 12.00 AM abdul raheem Mr. Suresh CLOSED
KM0+100 TO KM12+800
Pre-welding and weld joint fit up inspection for
3178 CPP-NGCP-W-3177 1400113434 Welding SATIP-W-012-01 SAIC-W-2048 HWYH LSS TRL-1 TA-445981 02-Jun-19 6:00 AM abdul raheem Mr. Suresh CLOSED
16″HWYH LSS TRL-1 KM0+100 TO KM15+800
Post-welding visual inspection for 16″HWYH LSS
3179 CPP-NGCP-W-3178 1400113418 Welding SATIP-W-012-01 SAIC-W-2048 HWYH LSS TRL-1 TA-445981 02-Jun-19 11.00 AM abdul raheem Mr. Suresh CLOSED
TRL-1 KM0+100 TO KM15+800
NDE selection for welds of 16″HWYH LSS TRL-1
3180 CPP-NGCP-W-3179 1400113474 Welding SATIP-W-012-01 SAIC-W-2054 HWYH LSS TRL-1 TA-445981 02-Jun-19 12.00 AM abdul raheem Mr. Suresh CLOSED
KM0+100 TO KM15+800
Pre-welding and weld joint fit up inspection for 24
TA-445989 Mr.
3181 CPP-NGCP-W-3180 1400113172 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. 02-Jun-19 6:00 AM Junaid CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
3182 CPP-NGCP-W-3181 1400113239 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 02-Jun-19 11.00 AM Junaid CLOSED
Rajendran
Yard.
NDE selection for welds of 24 inch double joints TA-445989 Mr.
3183 CPP-NGCP-W-3182 1400113210 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. 02-Jun-19 12.00 AM Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 8
3184 CPP-NGCP-W-3183 1400113856 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1003 FL TA-669351 02-Jun-19 6:00 AM Rajesh Mr. Ashok CLOSED
inch HRDH-1003 KP1+100 to KP1+200
Post-welding visual inspection for 8 inch HRDH- TA-669351
3185 CPP-NGCP-W-3184 1400113845 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1003 FL 02-Jun-19 11.00 AM Rajesh Mr. Ashok CLOSED
1003 KP1+100 to KP1+200
NDE selection for welds of 8 inch HRDH-1003
3186 CPP-NGCP-W-3185 1400113858 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1003 FL TA-669351 02-Jun-19 12.00 AM Rajesh Mr. Ashok CLOSED
KP1+100 to KP1+200
Pre-welding and weld joint fit up inspection for 8 TA-843607
3187 CPP-NGCP-W-3186 1400113857 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1128 FL 02-Jun-19 6:00 AM Saif Mr. Ashok CLOSED
inch HRDH -1128 KP1+100 to KP1+400
Post-welding visual inspection for 8 inch HRDH
3188 CPP-NGCP-W-3187 1400113808 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1128 FL TA-843607 02-Jun-19 11.00 AM Saif Mr. Ashok CLOSED
-1128 KP1+100 to KP1+400
NDE selection for welds of 8 inch HRDH -1128 TA-843607
3189 CPP-NGCP-W-3188 1400113875 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1128 FL 02-Jun-19 12.00 AM Saif Mr. Ashok CLOSED
KP1+100 to KP1+400
Pre-welding and weld joint fit up inspection for 10 Mr.
3190 CPP-NGCP-W-3189 1400113847 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 02-Jun-19 6:00 AM Shadab CLOSED
inch HWYH-921 KP1+500 to KP1+700 Rajendran
Post-welding visual inspection for 10 inch HWYH- TA-843651 Mr.
3191 CPP-NGCP-W-3190 1400113848 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL 02-Jun-19 11.00 AM Shadab CLOSED
921 KP1+500 to KP1+700 Rajendran
NDE selection for welds of 10 inch HWYH-921 Mr.
3192 CPP-NGCP-W-3191 1400113837 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL TA-843651 02-Jun-19 12.00 AM Shadab CLOSED
KP1+500 to KP1+700 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -AK-RH TA-843960 Mr.
3193 CPP-NGCP-W-3192 1400113884 Welding SATIP-W-012-01 SAIC-W-2048 02-Jun-19 6:00 AM IRSHAD CLOSED
inch HRDH AK-RH TR/L KP3+100 to KP3+300; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -AK-RH Mr.
3194 CPP-NGCP-W-3193 1400113838 Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 02-Jun-19 11.00 AM IRSHAD CLOSED
AK-RH TR/L KP3+100 to KP3+300; TR/L Rajendran
NDE selection for welds of 16 inch HRDH AK-RH HRDH -AK-RH Mr.
3195 CPP-NGCP-W-3194 1400113895 Welding SATIP-W-012-01 SAIC-W-2054 TA-843960 02-Jun-19 12.00 AM IRSHAD CLOSED
TR/L KP3+100 to KP3+300; TR/L Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
3196 CPP-NGCP-W-3195 1400113839 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 02-Jun-19 6:00 AM Sarfaraz CLOSED
inch HRDH-1171 at KM-5+500 to KM 5+570 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
3197 CPP-NGCP-W-3196 1400113878 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 02-Jun-19 11.00 AM Sarfaraz CLOSED
1171 at KM-5+500 to KM 5+570 Rajendran
NDE selection for welds of 8 inch HRDH-1171 at Mr.
3198 CPP-NGCP-W-3197 1400113850 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 02-Jun-19 12.00 AM Sarfaraz Drafted No Action
KM-5+500 to KM 5+570 Rajendran
In-Process Verification - RT Techniques &
3199 CPP-NGCP-W-3198 1400113900 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-1159,1171,1128 VARIOUS 02-Jun-19 8:00 AM RAMEEZ Mr. Ashok CLOSED
1159,1171,1128,
In-Process Verification - RT Techniques &
HWYH-201.206, 921,1071,1036
3200 CPP-NGCP-W-3199 1400113851 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-201.206, VARIOUS 02-Jun-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
CK-RH,
921,1071,1036,CK-RH,
In-Process Verification - RT Techniques & VARIOUS Mr.
3201 CPP-NGCP-W-3200 1400113901 Welding SATIP-NDE-RT-01 SAIC-RT-2007 TCF-1 02-Jun-19 8:00 AM RAMEEZ CLOSED
Procedure Implementation of TRL-2 at TCF-1 Rajendran
In-Process Inspection of MPT using Mr.
3202 CPP-NGCP-W-3201 1400113904 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 TCF-1 VARIOUS 02-Jun-19 8:00 AM RAMEEZ CLOSED
Yoke Method, TRL-2 at TCF-1 Rajendran
Pre-welding and weld joint fit up inspection for 12 TA-669436
3203 CPP-NGCP-W-3202 1400114297 Welding SATIP-W-012-01 SAIC-W-2048 HRDH K13 -RH FL 03-Jun-19 6:00 AM Rajesh Mr. Ashok CLOSED
inch HRDH-K13 KP1+450 to KP1+600
Post-welding visual inspection for 12 inch
3204 CPP-NGCP-W-3203 1400114279 Welding SATIP-W-012-01 SAIC-W-2048 HRDH K13 -RH FL TA-669436 03-Jun-19 11.00 AM Rajesh Mr. Ashok CLOSED
HRDH-K13 KP1+450 to KP1+600
NDE selection for welds of 12 inch HRDH-K13 TA-669436
3205 CPP-NGCP-W-3204 1400114334 Welding SATIP-W-012-01 SAIC-W-2054 HRDH K13 -RH FL 03-Jun-19 12.00 AM Rajesh Mr. Ashok CLOSED
KP1+450 to KP1+600
Pre-welding and weld joint fit up inspection for 8
3206 CPP-NGCP-W-3205 1400114280 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1128 FL TA-843607 03-Jun-19 6:00 AM Saif Mr. Ashok CLOSED
inch HRDH -1128 KP1+400 to KP1+800
Post-welding visual inspection for 8 inch HRDH TA-843607
3207 CPP-NGCP-W-3206 1400114344 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1128 FL 03-Jun-19 11.00 AM Saif Mr. Ashok CLOSED
-1128 KP1+400 to KP1+800
NDE selection for welds of 8 inch HRDH -1128
3208 CPP-NGCP-W-3207 1400114353 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1128 FL TA-843607 03-Jun-19 12.00 AM Saif Mr. Ashok CLOSED
KP1+400 to KP1+800
Pre-welding and weld joint fit up inspection for 10 TA-843651 Mr.
3209 CPP-NGCP-W-3208 1400114231 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL 03-Jun-19 6:00 AM Shadab CLOSED
inch HWYH-921 KP1+400 to KP1+500 Rajendran
Post-welding visual inspection for 10 inch HWYH- Mr.
3210 CPP-NGCP-W-3209 1400114309 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 03-Jun-19 11.00 AM Shadab CLOSED
921 KP1+400 to KP1+500 Rajendran
NDE selection for welds of 10 inch HWYH-921 TA-843651 Mr.
3211 CPP-NGCP-W-3210 1400114336 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL 03-Jun-19 12.00 AM Shadab CLOSED
KP1+400 to KP1+500 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -AK-RH Mr.
3212 CPP-NGCP-W-3211 1400114345 Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 03-Jun-19 6:00 AM IRSHAD CLOSED
inch HRDH AK-RH TR/L KP2+900 to KP3+100; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -AK-RH TA-843960 Mr.
3213 CPP-NGCP-W-3212 1400114318 Welding SATIP-W-012-01 SAIC-W-2048 03-Jun-19 11.00 AM IRSHAD CLOSED
AK-RH TR/L KP2+900 to KP3+100; TR/L Rajendran
NDE selection for welds of 16 inch HRDH AK-RH HRDH -AK-RH Mr.
3214 CPP-NGCP-W-3213 1400114346 Welding SATIP-W-012-01 SAIC-W-2054 TA-843960 03-Jun-19 12.00 AM IRSHAD CLOSED
TR/L KP2+900 to KP3+100; TR/L Rajendran
Pre-welding and weld joint fit up inspection for 8 TA-843547 Mr.
3215 CPP-NGCP-W-3214 1400114331 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL 03-Jun-19 6:00 AM Sarfaraz CLOSED
inch HRDH-1171 at KM-5+570 to KM 5+700 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
3216 CPP-NGCP-W-3215 1400114332 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 03-Jun-19 11.00 AM Sarfaraz CLOSED
1171 at KM-5+570 to KM 5+700 Rajendran
NDE selection for welds of 8 inch HRDH-1171 at Mr.
3217 CPP-NGCP-W-3216 1400114310 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 03-Jun-19 12.00 AM Sarfaraz CLOSED
KM-5+570 to KM 5+700 Rajendran
In-Process Verification - RT Techniques &
HRDH-1171,1128,1003,
3218 CPP-NGCP-W-3217 1400114347 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- VARIOUS 03-Jun-19 8:00 AM RAMEEZ Mr. Ashok CLOSED
AK-RH,BK-RH
1171,1128,1003,AK-RH,BK-RH
In-Process Verification - RT Techniques &
HWYH-201.206, 921,1071,1115,
3219 CPP-NGCP-W-3218 1400114364 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-201.206, VARIOUS 03-Jun-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
CK-RH,GK-RH,1093
921,1071,1115,CK-RH,GK-RH,1093
In-Process Verification - RT Techniques & Mr.
3220 CPP-NGCP-W-3219 1400114365 Welding SATIP-NDE-RT-01 SAIC-RT-2007 TCF-1 VARIOUS 03-Jun-19 8:00 AM RAMEEZ CLOSED
Procedure Implementation of TRL-2 at TCF-1 Rajendran
In-Process Inspection of MPT using Mr.
3221 CPP-NGCP-W-3220 1400114319 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 TCF-1 VARIOUS 03-Jun-19 8:00 AM RAMEEZ CLOSED
Yoke Method, TRL-2 at TCF-1 Rajendran
Pre-welding and weld joint fit up inspection for
3222 CPP-NGCP-W-3221 1400114007 Welding SATIP-W-012-01 SAIC-W-2048 HWYH201 TA-445834 03-Jun-19 6:00 AM Umair Mr. Suresh CLOSED
HWYH-201 KM0+100 to KM3+500
Post-welding visual inspection for HWYH-201
3223 CPP-NGCP-W-3222 1400113920 Welding SATIP-W-012-01 SAIC-W-2048 HWYH201 TA-445834 03-Jun-19 11.00 AM Umair Mr. Suresh CLOSED
KM0+100 to KM3+500
NDE selection for welds of HWYH-201 KM0+100
3224 CPP-NGCP-W-3223 1400114073 Welding SATIP-W-012-01 SAIC-W-2054 HWYH201 TA-445834 03-Jun-19 12.00 AM Umair Mr. Suresh CLOSED
to KM3+500
Pre-welding and weld joint fit up inspection for 10
3225 CPP-NGCP-W-3224 1400114049 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 03-Jun-19 6:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-206 @ KP0+100 to KP4+500
Post-welding visual inspection for 10 inch HWYH-
3226 CPP-NGCP-W-3225 1400114067 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-206 TA-445828 03-Jun-19 11.00 AM Abdul Aziz Mr. Suresh CLOSED
206 @ KP0+100 to KP4+500
NDE selection for welds of 10 inch HWYH-206 @
3227 CPP-NGCP-W-3226 1400114011 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-206 TA-445828 03-Jun-19 12.00 AM Abdul Aziz Mr. Suresh CLOSED
KP0+100 to KP4+500
Pre-welding and weld joint fit up inspection for 24
TA-445989 Mr.
3228 CPP-NGCP-W-3227 1400114371 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. 03-Jun-19 6:00 AM Junaid CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
3229 CPP-NGCP-W-3228 1400114386 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 03-Jun-19 11.00 AM Junaid CLOSED
Rajendran
Yard.
NDE selection for welds of 24 inch double joints TA-445989 Mr.
3230 CPP-NGCP-W-3229 1400114338 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. 03-Jun-19 12.00 AM Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for
3231 CPP-NGCP-W-3230 1400114560 Welding SATIP-W-012-01 SAIC-W-2048 HWYH201 TA-445834 09-Jun-19 8:00 AM Umair Mr. Suresh CLOSED
HWYH-201 KM0+100 to KM3+500
Post-welding visual inspection for HWYH-201 TA-445834
3232 CPP-NGCP-W-3231 1400114507 Welding SATIP-W-012-01 SAIC-W-2048 HWYH201 09-Jun-19 2.00 PM Umair Mr. Suresh CLOSED
KM0+100 to KM3+500
NDE selection for welds of HWYH-201 KM0+100
3233 CPP-NGCP-W-3232 1400114421 Welding SATIP-W-012-01 SAIC-W-2054 HWYH201 TA-445834 09-Jun-19 4:00 PM Umair Mr. Suresh CLOSED
to KM3+500
Pre-welding and weld joint fit up inspection for 10 TA-445826
3234 CPP-NGCP-W-3233 1400114535 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL 09-Jun-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 10inch HWYH-
3235 CPP-NGCP-W-3234 1400114527 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 09-Jun-19 2.00 PM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 10 inch HWYH-1036 TA-445826
3236 CPP-NGCP-W-3235 1400114573 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL 09-Jun-19 4:00 PM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
3237 CPP-NGCP-W-3236 1400114482 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 TA-445827 09-Jun-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1023 @ KP0+100 to KP5+300
Post-welding visual inspection for 10 inch HWYH- TA-445827
3238 CPP-NGCP-W-3237 1400114575 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 09-Jun-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1023 @ KP0+100 to KP5+300
NDE selection for welds of 10 inch HWYH-1023
3239 CPP-NGCP-W-3238 1400114502 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1023 TA-445827 09-Jun-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
@ KP0+100 to KP5+300
Pre-welding and weld joint fit up inspection for
3240 CPP-NGCP-W-3239 1400114578 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 09-Jun-19 8:00 AM abdul raheem Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
Post-welding visual inspection for 16″HWYH GK-
3241 CPP-NGCP-W-3240 1400114605 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 09-Jun-19 2.00 PM abdul raheem Mr. Suresh CLOSED
RH TRL km0+100 to 12+500
NDE selection for welds of 16″HWYH GK-RH TRL
3242 CPP-NGCP-W-3241 1400114613 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 09-Jun-19 4:00 PM abdul raheem Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
3243 CPP-NGCP-W-3242 1400114755 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1071 HWYH-1071 FL TA-445830 09-Jun-19 7.00 AM Shahbaz Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 8
3244 CPP-NGCP-W-3243 1400114586 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 09-Jun-19 8:00 AM Shahbaz Mr. Suresh CLOSED
inch HWYH-1071 FL KM 0+100 to km2+040
Post-welding visual inspection for 8 inch HWYH-
3245 CPP-NGCP-W-3244 1400114614 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 09-Jun-19 2.00 PM Shahbaz Mr. Suresh CLOSED
1071 FL KM 0+100 to km2+040
NDE selection for welds of 8 inch HWYH-1071 FL
3246 CPP-NGCP-W-3245 1400114608 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1071 FL TA-445830 09-Jun-19 4:00 PM Shahbaz Mr. Suresh CLOSED
KM 0+100 to km2+040
Pre-welding and weld joint fit up inspection for 24
TA-445989 Mr.
3247 CPP-NGCP-W-3246 1400114634 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GGM TRL-2 at TCF-1, TCF-1, CPP Pipe Yard. 09-Jun-19 8:00 AM Junaid CLOSED
Rajendran
CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
3248 CPP-NGCP-W-3247 1400114625 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GGM TRL-2 at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445989 09-Jun-19 2.00 PM Junaid CLOSED
Rajendran
Yard.
NDE selection for welds of 24 inch double joints TA-445989 Mr.
3249 CPP-NGCP-W-3248 1400114551 Welding SATIP-W-012-01 SAIC-W-2054 TCF-1, CPP Pipe Yard. 09-Jun-19 4:00 PM Junaid CLOSED
HWYH GGM TRL-2 at TCF-1, CPP Pipe Yard. Rajendran
Pre-welding and weld joint fit up inspection for 12
3250 CPP-NGCP-W-3249 1400114624 Welding SATIP-W-012-01 SAIC-W-2048 HRDH K13 -RH FL TA-669436 09-Jun-19 8:00 AM Rajesh Mr. Ashok CLOSED
inch HRDH-K13 KP1+450 to KP1+650
Post-welding visual inspection for 12 inch TA-669436
3251 CPP-NGCP-W-3250 1400114542 Welding SATIP-W-012-01 SAIC-W-2048 HRDH K13 -RH FL 09-Jun-19 2.00 PM Rajesh Mr. Ashok CLOSED
HRDH-K13 KP1+450 to KP1+650
NDE selection for welds of 12 inch HRDH-K13
3252 CPP-NGCP-W-3251 1400114633 Welding SATIP-W-012-01 SAIC-W-2054 HRDH K13 -RH FL TA-669436 09-Jun-19 4.00 PM Rajesh Mr. Ashok CLOSED
KP1+450 to KP1+650
Pre-welding and weld joint fit up inspection for 8 TA-843607
3253 CPP-NGCP-W-3252 1400114549 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1128 FL 09-Jun-19 8:00 AM Saif Mr. Ashok CLOSED
inch HRDH -1128 KP1+800 to KP2+000
Post-welding visual inspection for 8 inch HRDH
3254 CPP-NGCP-W-3253 1400114609 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1128 FL TA-843607 09-Jun-19 2.00 PM Saif Mr. Ashok CLOSED
-1128 KP1+800 to KP2+000
NDE selection for welds of 8 inch HRDH -1128 TA-843607
3255 CPP-NGCP-W-3254 1400114550 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1128 FL 09-Jun-19 4.00 PM Saif Mr. Ashok CLOSED
KP1+800 to KP2+000
Pre-welding and weld joint fit up inspection for 10 Mr.
3256 CPP-NGCP-W-3255 1400114635 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 09-Jun-19 8:00 AM Shadab CLOSED
inch HWYH-921 KP1+000 to KP1+200 Rajendran
Post-welding visual inspection for 10 inch HWYH- TA-843651 Mr.
3257 CPP-NGCP-W-3256 1400114618 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL 09-Jun-19 2.00 PM Shadab CLOSED
921 KP1+000 to KP1+200 Rajendran
NDE selection for welds of 10 inch HWYH-921 Mr.
3258 CPP-NGCP-W-3257 1400114588 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL TA-843651 09-Jun-19 4.00 PM Shadab CLOSED
KP1+000 to KP1+200 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -AK-RH TA-843960 Mr.
3259 CPP-NGCP-W-3258 1400114789 Welding SATIP-W-012-01 SAIC-W-2048 09-Jun-19 8:00 AM IRSHAD CLOSED
inch HRDH AK-RH TR/L KP2+800 to KP2+900; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -AK-RH Mr.
3260 CPP-NGCP-W-3259 1400114837 Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 09-Jun-19 2.00 PM IRSHAD CLOSED
AK-RH TR/L KP2+800 to KP2+900; TR/L Rajendran
NDE selection for welds of 16 inch HRDH AK-RH HRDH -AK-RH TA-843960 Mr.
3261 CPP-NGCP-W-3260 1400114839 Welding SATIP-W-012-01 SAIC-W-2054 09-Jun-19 4.00 PM IRSHAD CLOSED
TR/L KP2+800 to KP2+900; TR/L Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
3262 CPP-NGCP-W-3261 1400114798 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 09-Jun-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1171 at KM-5+700 to KM 5+830 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
3263 CPP-NGCP-W-3262 1400114818 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 09-Jun-19 2.00 PM Sarfaraz CLOSED
1171 at KM-5+700 to KM 5+830 Rajendran
NDE selection for welds of 8 inch HRDH-1171 at Mr.
3264 CPP-NGCP-W-3263 1400114790 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 09-Jun-19 4.00 PM Sarfaraz CLOSED
KM-5+700 to KM 5+830 Rajendran
Pre-welding and weld joint fit up inspection for TA-445834
3265 CPP-NGCP-W-3264 1400115756 Welding SATIP-W-012-01 SAIC-W-2048 HWYH201 10-Jun-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-201 KM0+100 to KM3+500
Post-welding visual inspection for HWYH-201
3266 CPP-NGCP-W-3265 1400115773 Welding SATIP-W-012-01 SAIC-W-2048 HWYH201 TA-445834 10-Jun-19 2.00 PM Shahbaz Mr. Suresh CLOSED
KM0+100 to KM3+500
NDE selection for welds of HWYH-201 KM0+100 TA-445834
3267 CPP-NGCP-W-3266 1400115757 Welding SATIP-W-012-01 SAIC-W-2054 HWYH201 10-Jun-19 4:00 PM Shahbaz Mr. Suresh CLOSED
to KM3+500
Pre-welding and weld joint fit up inspection for 10
3268 CPP-NGCP-W-3267 1400115768 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 10-Jun-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 10inch HWYH- TA-445826
3269 CPP-NGCP-W-3268 1400115772 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL 10-Jun-19 2.00 PM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 10 inch HWYH-1036
3270 CPP-NGCP-W-3269 1400115803 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 10-Jun-19 4:00 PM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10 TA-445827
3271 CPP-NGCP-W-3270 1400115813 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 10-Jun-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1023 @ KP0+100 to KP5+300
Post-welding visual inspection for 10 inch HWYH-
3272 CPP-NGCP-W-3271 1400115806 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 TA-445827 10-Jun-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1023 @ KP0+100 to KP5+300
NDE selection for welds of 10 inch HWYH-1023 TA-445827
3273 CPP-NGCP-W-3272 1400115810 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1023 10-Jun-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
@ KP0+100 to KP5+300
Pre-welding and weld joint fit up inspection for
3274 CPP-NGCP-W-3273 1400115812 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 10-Jun-19 8:00 AM abdul raheem Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
Post-welding visual inspection for 16″HWYH GK- TA-445912
3275 CPP-NGCP-W-3274 1400115778 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL 10-Jun-19 2.00 PM abdul raheem Mr. Suresh CLOSED
RH TRL km0+100 to 12+500
NDE selection for welds of 16″HWYH GK-RH TRL
3276 CPP-NGCP-W-3275 1400115823 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 10-Jun-19 4:00 PM abdul raheem Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
Pre-welding and weld joint fit up inspection for 24
TA-445990 Mr.
3277 CPP-NGCP-W-3276 1400115852 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe Yard. 10-Jun-19 8:00 AM Junaid CLOSED
Rajendran
TCF-1, CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
3278 CPP-NGCP-W-3277 1400115939 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GCP-1 T/L SWEET at TCF-1, CPP TCF-1, CPP Pipe Yard. TA-445990 10-Jun-19 2.00 PM Junaid CLOSED
Pipe Yard. Rajendran
NDE selection for welds of 24 inch double joints
Mr.
3279 CPP-NGCP-W-3278 1400115892 Welding SATIP-W-012-01 SAIC-W-2054 HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445990 10-Jun-19 4:00 PM Junaid CLOSED
Rajendran
Yard.
Pre-welding and weld joint fit up inspection for 12
3280 CPP-NGCP-W-3279 1400115909 Welding SATIP-W-012-01 SAIC-W-2048 HRDH K13 -RH FL TA-669436 10-Jun-19 8:00 AM Rajesh Mr. Ashok CLOSED
inch HRDH-K13 KP1+650 to KP1+750
Post-welding visual inspection for 12 inch
3281 CPP-NGCP-W-3280 1400115789 Welding SATIP-W-012-01 SAIC-W-2048 HRDH K13 -RH FL TA-669436 10-Jun-19 2.00 PM Rajesh Mr. Ashok CLOSED
HRDH-K13 KP1+650 to KP1+750
NDE selection for welds of 12 inch HRDH-K13
3282 CPP-NGCP-W-3281 1400115880 Welding SATIP-W-012-01 SAIC-W-2054 HRDH K13 -RH FL TA-669436 10-Jun-19 4.00 PM Rajesh Mr. Ashok CLOSED
KP1+650 to KP1+750
Pre-welding and weld joint fit up inspection for 8
3283 CPP-NGCP-W-3282 1400115911 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1195 FL TA-669338 10-Jun-19 8:00 AM Saif Mr. Ashok CLOSED
inch HRDH -1195 KP0+350 to KP0+700
Post-welding visual inspection for 8 inch HRDH
3284 CPP-NGCP-W-3283 1400115924 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1195 FL TA-669338 10-Jun-19 2.00 PM Saif Mr. Ashok CLOSED
-1195 KP0+350 to KP0+700
NDE selection for welds of 8 inch HRDH -1195
3285 CPP-NGCP-W-3284 1400115934 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1195 FL TA-669338 10-Jun-19 4.00 PM Saif Mr. Ashok CLOSED
KP0+350 to KP0+700
Pre-welding and weld joint fit up inspection for 10 Mr.
3286 CPP-NGCP-W-3285 1400115944 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 10-Jun-19 8:00 AM Shadab CLOSED
inch HWYH-921 KP0+700 to KP1+000 Rajendran
Post-welding visual inspection for 10 inch HWYH- TA-843651 Mr.
3287 CPP-NGCP-W-3286 1400115916 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL 10-Jun-19 2.00 PM Shadab CLOSED
921 KP0+700 to KP1+000 Rajendran
NDE selection for welds of 10 inch HWYH-921 Mr.
3288 CPP-NGCP-W-3287 1400115947 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL TA-843651 10-Jun-19 4.00 PM Shadab CLOSED
KP0+700 to KP1+000 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -AK-RH TA-843960 Mr.
3289 CPP-NGCP-W-3288 1400115900 Welding SATIP-W-012-01 SAIC-W-2048 10-Jun-19 8:00 AM IRSHAD CLOSED
inch HRDH AK-RH TR/L KP2+700 to KP2+800; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -AK-RH Mr.
3290 CPP-NGCP-W-3289 1400115950 Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 10-Jun-19 2.00 PM IRSHAD CLOSED
AK-RH TR/L KP2+700 to KP2+800; TR/L Rajendran
NDE selection for welds of 16 inch HRDH AK-RH HRDH -AK-RH TA-843960 Mr.
3291 CPP-NGCP-W-3290 1400115901 Welding SATIP-W-012-01 SAIC-W-2054 10-Jun-19 4.00 PM IRSHAD CLOSED
TR/L KP2+700 to KP2+800; TR/L Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
3292 CPP-NGCP-W-3291 1400115942 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 10-Jun-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1171 at KM-5+830 to KM 6+070 Rajendran
Post-welding visual inspection for 8inch HRDH- TA-843547 Mr.
3293 CPP-NGCP-W-3292 1400115983 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL 10-Jun-19 2.00 PM Sarfaraz CLOSED
1171 at KM-5+830 to KM 6+070 Rajendran
NDE selection for welds of 8 inch HRDH-1171 at Mr.
3294 CPP-NGCP-W-3293 1400115951 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 10-Jun-19 4.00 PM Sarfaraz CLOSED
KM-5+830 to KM 6+070 Rajendran
In-Process Verification - RT Techniques &
HRDH-1003, 1171, 1128, K13-RH,
3295 CPP-NGCP-W-3294 1400116060 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1003, 1171, VARIOUS 10-Jun-19 8:00 AM RAMEEZ Mr. Ashok CLOSED
AK-RH
1128, K13-RH, AK-RH
In-Process Verification - RT Techniques &
HWYH-921, 1036, 206, 1071, GK-
3296 CPP-NGCP-W-3295 1400116061 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-921, 1036, VARIOUS 10-Jun-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
RH, 1093, 201
206, 1071, GK-RH, 1093, 201
Review of weekly welder performance and
3297 CPP-NGCP-W-3296 1400116462 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 13-june-2019 to 20 CPP site office N/A 09-Jun-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
Jun-2019 at CPP site office.
Pre-welding and weld joint fit up inspection for 12
3298 CPP-NGCP-W-3297 1400116536 Welding SATIP-W-012-01 SAIC-W-2048 HRDH K13 -RH FL TA-669436 11-Jun-19 8:00 AM Rajesh Mr. Ashok CLOSED
inch HRDH-K13 KP1+750 to KP2+100
Post-welding visual inspection for 12 inch
3299 CPP-NGCP-W-3298 1400116516 Welding SATIP-W-012-01 SAIC-W-2048 HRDH K13 -RH FL TA-669436 11-Jun-19 2.00 PM Rajesh Mr. Ashok CLOSED
HRDH-K13 KP1+750 to KP2+100
NDE selection for welds of 12 inch HRDH-K13
3300 CPP-NGCP-W-3299 1400116537 Welding SATIP-W-012-01 SAIC-W-2054 HRDH K13 -RH FL TA-669436 11-Jun-19 4.00 PM Rajesh Mr. Ashok CLOSED
KP1+750 to KP2+100
Pre-welding and weld joint fit up inspection for 8
3301 CPP-NGCP-W-3300 1400116508 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1195 FL TA-669338 11-Jun-19 8:00 AM Saif Mr. Ashok CLOSED
inch HRDH -1195 KP0+700 to KP0+900
Post-welding visual inspection for 8 inch HRDH
3302 CPP-NGCP-W-3301 1400116519 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1195 FL TA-669338 11-Jun-19 2.00 PM Saif Mr. Ashok CLOSED
-1195 KP0+700 to KP0+900
NDE selection for welds of 8 inch HRDH -1195
3303 CPP-NGCP-W-3302 1400116544 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1195 FL TA-669338 11-Jun-19 4.00 PM Saif Mr. Ashok CLOSED
KP0+700 to KP0+900

3304 CPP-NGCP-W-3303 1400116478 Welding SATIP-W-012-01 SAIC-W-2048


Pre-welding and weld joint fit up inspection for 10
HRDH-1153 F/L TA-843975 11-Jun-19 8:00 AM Shadab
Mr.
CLOSED
RE-SCHEDULE TO
inch HRDH-1153 KP0+400 to KP0+600 Rajendran 12-JUNE-2019
Post-welding visual inspection for 10 inch HRDH- TA-843975 Mr. RE-SCHEDULE TO
3305 CPP-NGCP-W-3304 1400116555 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1153 F/L 11-Jun-19 2.00 PM Shadab CLOSED
1153 KP0+400 to KP0+600 Rajendran 12-JUNE-2019
NDE selection for welds of 10 inch HRDH-1153 TA-843975 Mr. RE-SCHEDULE TO
3306 CPP-NGCP-W-3305 1400116520 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1153 F/L 11-Jun-19 4.00 PM Shadab CLOSED
KP0+400 to KP0+600 Rajendran 12-JUNE-2019
Pre-welding and weld joint fit up inspection for 16 HRDH -AK-RH Mr.
3307 CPP-NGCP-W-3306 1400116716 Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 11-Jun-19 8:00 AM IRSHAD CLOSED
inch HRDH AK-RH TR/L KP2+400 to KP2+600; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -AK-RH Mr.
3308 CPP-NGCP-W-3307 1400116699 Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 11-Jun-19 2.00 PM IRSHAD CLOSED
AK-RH TR/L KP2+400 to KP2+600; TR/L Rajendran
NDE selection for welds of 16 inch HRDH AK-RH HRDH -AK-RH Mr.
3309 CPP-NGCP-W-3308 1400116746 Welding SATIP-W-012-01 SAIC-W-2054 TA-843960 11-Jun-19 4.00 PM IRSHAD CLOSED
TR/L KP2+400 to KP2+600; TR/L Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
3310 CPP-NGCP-W-3309 1400116754 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 11-Jun-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1171 at KM-6+344 to KM 6+590 Rajendran
Post-welding visual inspection for 8inch HRDH- TA-843547 Mr.
3311 CPP-NGCP-W-3310 1400116717 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL 11-Jun-19 2.00 PM Sarfaraz CLOSED
1171 at KM-6+344 to KM 6+590 Rajendran
NDE selection for welds of 8 inch HRDH-1171 at Mr.
3312 CPP-NGCP-W-3311 1400116702 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 11-Jun-19 4.00 PM Sarfaraz CLOSED
KM-6+344 to KM 6+590 Rajendran
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a In-Process Verification - RT Techniques &
l HRDH-1003, AK-RH, K13-RH,
3313 CPP-NGCP-W-3312 1400117061 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1003, AK- VARIOUS 11-Jun-19 8:00 AM RAMEEZ Mr. Ashok CLOSED
1128, 1171
RH, K13-RH, 1128, 1171
In-Process Verification - RT Techniques &
HWYH-921, 1093, 1023, GK-RH,
3314 CPP-NGCP-W-3313 1400116982 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-921, 1093, VARIOUS 11-Jun-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
201
1023, GK-RH, 201
In-Process Verification - RT Techniques & Mr.
3315 CPP-NGCP-W-3314 1400117062 Welding SATIP-NDE-RT-01 SAIC-RT-2007 TCF-1 VARIOUS 11-Jun-19 8:00 AM RAMEEZ CLOSED
Procedure Implementation of TRL-2 at TCF-1 Rajendran
In-Process Inspection of MPT using Mr.
3316 CPP-NGCP-W-3315 1400117076 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 TCF-1 VARIOUS 11-Jun-19 8:00 AM RAMEEZ CLOSED
Yoke Method, TRL-2 at TCF-1 Rajendran
Pre-welding and weld joint fit up inspection for 10 Mr.
3317 CPP-NGCP-W-3316 1400117106 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 11-Jun-19 8:00 AM Shadab CLOSED
inch HWYH-921 KP0+900 to KP1+000 Rajendran
Post-welding visual inspection for 10 inch HWYH- Mr.
3318 CPP-NGCP-W-3317 1400117149 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-921 FL TA-843651 11-Jun-19 2.00 PM Shadab CLOSED
921 KP0+900 to KP1+000 Rajendran
NDE selection for welds of 10 inch HWYH-921 Mr.
3319 CPP-NGCP-W-3318 1400117175 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-921 FL TA-843651 11-Jun-19 4.00 PM Shadab CLOSED
KP0+900 to KP1+000 Rajendran
Pre-welding and weld joint fit up inspection for TA-445843
3320 CPP-NGCP-W-3319 1400115831 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 11-Jun-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-934 km0+100 to km8+700
Post-welding visual inspection for HWYH-934
3321 CPP-NGCP-W-3320 1400115887 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 11-Jun-19 2.00 PM Shahbaz Mr. Suresh CLOSED
km0+100 to km8+700
NDE selection for welds of HWYH-934 km0+100 TA-445843
3322 CPP-NGCP-W-3321 1400115945 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-934 11-Jun-19 4:00 PM Shahbaz Mr. Suresh CLOSED
to km8+700
Pre-welding and weld joint fit up inspection for 10
3323 CPP-NGCP-W-3322 1400116385 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 11-Jun-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 10inch HWYH- TA-445826
3324 CPP-NGCP-W-3323 1400116435 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL 11-Jun-19 2.00 PM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 10 inch HWYH-1036
3325 CPP-NGCP-W-3324 1400116436 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 11-Jun-19 4:00 PM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10 TA-445827
3326 CPP-NGCP-W-3325 1400116439 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 11-Jun-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1023 @ KP0+100 to KP5+300
Post-welding visual inspection for 10 inch HWYH-
3327 CPP-NGCP-W-3326 1400116386 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 TA-445827 11-Jun-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1023 @ KP0+100 to KP5+300
NDE selection for welds of 10 inch HWYH-1023 TA-445827
3328 CPP-NGCP-W-3327 1400116339 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1023 11-Jun-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
@ KP0+100 to KP5+300
Pre-welding and weld joint fit up inspection for
3329 CPP-NGCP-W-3328 1400116751 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 11-Jun-19 8:00 AM abdul raheem Mr. Suresh CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK- TA-445974
3330 CPP-NGCP-W-3329 1400116769 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL 11-Jun-19 2.00 PM abdul raheem Mr. Suresh CLOSED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH
3331 CPP-NGCP-W-3330 1400116784 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 11-Jun-19 4:00 PM abdul raheem Mr. Suresh CLOSED
TRL km0+100 to 8+100
Pre-welding and weld joint fit up inspection for TA-445912
3332 CPP-NGCP-W-3331 1400116442 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL 11-Jun-19 8:00 AM abdul raheem Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
Post-welding visual inspection for 16″HWYH GK-
3333 CPP-NGCP-W-3332 1400116443 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 11-Jun-19 2.00 PM abdul raheem Mr. Suresh CLOSED
RH TRL km0+100 to 12+500
NDE selection for welds of 16″HWYH GK-RH TRL
3334 CPP-NGCP-W-3333 1400116453 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 11-Jun-19 4:00 PM abdul raheem Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+100 to 12+500
Pre-welding and weld joint fit up inspection for 24
Mr.
3335 CPP-NGCP-W-3334 1400116446 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe Yard. TA-445990 11-Jun-19 8:00 AM Junaid CLOSED
Rajendran
TCF-1, CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
3336 CPP-NGCP-W-3335 1400116456 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GCP-1 T/L SWEET at TCF-1, CPP TCF-1, CPP Pipe Yard. TA-445990 11-Jun-19 2.00 PM Junaid CLOSED
Rajendran
Pipe Yard.
NDE selection for welds of 24 inch double joints
Mr.
3337 CPP-NGCP-W-3336 1400116474 Welding SATIP-W-012-01 SAIC-W-2054 HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445990 11-Jun-19 4:00 PM Junaid CLOSED
Yard. Rajendran
Pre-welding and weld joint fit up inspection for
3338 CPP-NGCP-W-3337 1400117308 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 12-Jun-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-934 km0+100 to km8+700
Post-welding visual inspection for HWYH-934
3339 CPP-NGCP-W-3338 1400117287 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 12-Jun-19 2.00 PM Shahbaz Mr. Suresh CLOSED
km0+100 to km8+700
NDE selection for welds of HWYH-934 km0+100 TA-445843
3340 CPP-NGCP-W-3339 1400117302 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-934 12-Jun-19 4:00 PM Shahbaz Mr. Suresh CLOSED
to km8+700
Pre-welding and weld joint fit up inspection for 10
3341 CPP-NGCP-W-3340 1400117333 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 12-Jun-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 10inch HWYH- TA-445826
3342 CPP-NGCP-W-3341 1400117353 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL 12-Jun-19 2.00 PM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 10 inch HWYH-1036
3343 CPP-NGCP-W-3342 1400117345 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 12-Jun-19 4:00 PM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10 TA-445827
3344 CPP-NGCP-W-3343 1400117312 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 12-Jun-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1023 @ KP0+100 to KP5+300
Post-welding visual inspection for 10 inch HWYH-
3345 CPP-NGCP-W-3344 1400117316 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 TA-445827 12-Jun-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1023 @ KP0+100 to KP5+300
NDE selection for welds of 10 inch HWYH-1023 TA-445827
3346 CPP-NGCP-W-3345 1400117347 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1023 12-Jun-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
@ KP0+100 to KP5+300
Pre-welding and weld joint fit up inspection for
3347 CPP-NGCP-W-3346 1400117350 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 12-Jun-19 8:00 AM abdul raheem Mr. Suresh CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK- TA-445974
3348 CPP-NGCP-W-3347 1400117376 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL 12-Jun-19 2.00 PM abdul raheem Mr. Suresh CLOSED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH
3349 CPP-NGCP-W-3348 1400117320 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 12-Jun-19 4:00 PM abdul raheem Mr. Suresh CLOSED
TRL km0+100 to 8+100
Pre-welding and weld joint fit up inspection for TA-445912
3350 CPP-NGCP-W-3349 1400117403 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL 12-Jun-19 8:00 AM asish Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+400-km1+200
Post-welding visual inspection for 16″HWYH GK-
3351 CPP-NGCP-W-3350 1400117369 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 12-Jun-19 2.00 PM asish Mr. Suresh CLOSED
RH TRL km0+400-km1+200
NDE selection for welds of 16″HWYH GK-RH TRL TA-445912
3352 CPP-NGCP-W-3351 1400117404 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL 12-Jun-19 4:00 PM asish Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+400-km1+200
Pre-welding and weld joint fit up inspection for 24
Mr.
3353 CPP-NGCP-W-3352 1400117453 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe Yard. TA-445990 12-Jun-19 8:00 AM Junaid CLOSED
Rajendran
TCF-1, CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
3354 CPP-NGCP-W-3353 1400117428 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GCP-1 T/L SWEET at TCF-1, CPP TCF-1, CPP Pipe Yard. TA-445990 12-Jun-19 2.00 PM Junaid CLOSED
Rajendran
Pipe Yard.
NDE selection for welds of 24 inch double joints
Mr.
3355 CPP-NGCP-W-3354 1400117416 Welding SATIP-W-012-01 SAIC-W-2054 HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445990 12-Jun-19 4:00 PM Junaid CLOSED
Yard. Rajendran
Pre-welding and weld joint fit up inspection for 12
3356 CPP-NGCP-W-3355 1400117326 Welding SATIP-W-012-01 SAIC-W-2048 HRDH K13 -RH FL TA-669436 12-Jun-19 8:00 AM Rajesh Mr. Ashok CLOSED
inch HRDH-K13 KP2+100 to KP2+300
Post-welding visual inspection for 12 inch
3357 CPP-NGCP-W-3356 1400117364 Welding SATIP-W-012-01 SAIC-W-2048 HRDH K13 -RH FL TA-669436 12-Jun-19 2.00 PM Rajesh Mr. Ashok CLOSED
HRDH-K13 KP2+100 to KP2+300
NDE selection for welds of 12 inch HRDH-K13
3358 CPP-NGCP-W-3357 1400117291 Welding SATIP-W-012-01 SAIC-W-2054 HRDH K13 -RH FL TA-669436 12-Jun-19 4.00 PM Rajesh Mr. Ashok CLOSED
KP2+100 to KP2+300
Pre-welding and weld joint fit up inspection for 8
3359 CPP-NGCP-W-3358 1400117374 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1195 FL TA-669338 12-Jun-19 8:00 AM Saif Mr. Ashok CLOSED
inch HRDH -1195 KP0+900 to KP1+600
Post-welding visual inspection for 8 inch HRDH
3360 CPP-NGCP-W-3359 1400117351 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1195 FL TA-669338 12-Jun-19 2.00 PM Saif Mr. Ashok CLOSED
-1195 KP0+900 to KP1+600
NDE selection for welds of 8 inch HRDH -1195
3361 CPP-NGCP-W-3360 1400117355 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1195 FL TA-669338 12-Jun-19 4.00 PM Saif Mr. Ashok CLOSED
KP0+900 to KP1+600
Pre-welding and weld joint fit up inspection for 16 HRDH -AK-RH TA-843960 Mr.
3362 CPP-NGCP-W-3361 1400117622 Welding SATIP-W-012-01 SAIC-W-2048 12-Jun-19 8:00 AM IRSHAD CLOSED
inch HRDH AK-RH TR/L KP2+400 to KP2+200; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -AK-RH Mr.
3363 CPP-NGCP-W-3362 1400117653 Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 12-Jun-19 2.00 PM IRSHAD CLOSED
AK-RH TR/L KP2+400 to KP2+200; TR/L Rajendran
NDE selection for welds of 16 inch HRDH AK-RH HRDH -AK-RH TA-843960 Mr.
3364 CPP-NGCP-W-3363 1400117673 Welding SATIP-W-012-01 SAIC-W-2054 12-Jun-19 4.00 PM IRSHAD CLOSED
TR/L KP2+400 to KP2+200; TR/L Rajendran
Temperature Tie in Welding HRDH-1171 at KM- Mr.
3365 CPP-NGCP-W-3364 1400117637 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1171 FL TA-843547 12-Jun-19 10:00 AM Sarfaraz CLOSED
6+624 to KM-6+670 Rajendran
Pre-welding and weld joint fit up inspection for 8 TA-843547 Mr.
3366 CPP-NGCP-W-3365 1400117641 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL 12-Jun-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1171 at KM-6+624 to KM-6+670 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
3367 CPP-NGCP-W-3366 1400117683 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 12-Jun-19 2.00 PM Sarfaraz CLOSED
1171 at KM-6+624 to KM-6+670 Rajendran
NDE selection for welds of 8 inch HRDH-1171 at TA-843547 Mr.
3368 CPP-NGCP-W-3367 1400117648 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL 12-Jun-19 4.00 PM Sarfaraz CLOSED
KM-6+624 to KM-6+670 Rajendran
In-Process Verification - RT Techniques &
3369 CPP-NGCP-W-3368 1400117679 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-AK-RH, HRDH-AK-RH, 1195 VARIOUS 12-Jun-19 8:00 AM RAMEEZ Mr. Ashok CLOSED
1195
In-Process Verification - RT Techniques &
HWYH-921, 1036, 1023, GK-RH,
3370 CPP-NGCP-W-3369 1400117642 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-921, 1036, VARIOUS 12-Jun-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
201, 975
1023, GK-RH, 201, 975
Pre-welding and weld joint fit up inspection for 8 Mr.
3371 CPP-NGCP-W-3370 1400117860 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1116 TA-843608 12-Jun-19 8:00 AM FARHAN CLOSED
inch HRDH-1116 FL at KM-1+854 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
3372 CPP-NGCP-W-3371 1400117861 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1116 TA-843608 12-Jun-19 2.00 PM FARHAN CLOSED
1116 FL at KM-KM-1+854 Rajendran

NDE selection for welds of 8 inch HRDH-1116 FL Mr.


3373 CPP-NGCP-W-3372 1400117927 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1116 TA-843608 12-Jun-19 4.00 PM FARHAN CLOSED
at KM-KM-1+854 Rajendran

Pre-welding and weld joint fit up inspection for 12 TA-669436


3374 CPP-NGCP-W-3373 1400118719 Welding SATIP-W-012-01 SAIC-W-2048 HRDH K13 -RH FL 13-Jun-19 8:00 AM Rajesh Mr. Ashok CLOSED
inch HRDH-K13 KP2+300 to KP2+450

Post-welding visual inspection for 12 inch


3375 CPP-NGCP-W-3374 1400118767 Welding SATIP-W-012-01 SAIC-W-2048 HRDH K13 -RH FL TA-669436 13-Jun-19 2.00 PM Rajesh Mr. Ashok CLOSED
HRDH-K13 KP2+300 to KP2+450

NDE selection for welds of 12 inch HRDH-K13


3376 CPP-NGCP-W-3375 1400118769 Welding SATIP-W-012-01 SAIC-W-2054 HRDH K13 -RH FL TA-669436 13-Jun-19 4.00 PM Rajesh Mr. Ashok CLOSED
KP2+300 to KP2+450

Pre-welding and weld joint fit up inspection for 8


3377 CPP-NGCP-W-3376 1400118750 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1195 FL TA-669338 13-Jun-19 8:00 AM Saif Mr. Ashok CLOSED
inch HRDH -1195 KP1+600 to KP1+700

Post-welding visual inspection for 8 inch HRDH


3378 CPP-NGCP-W-3377 1400118778 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1195 FL TA-669338 13-Jun-19 2.00 PM Saif Mr. Ashok CLOSED
-1195 KP1+600 to KP1+700

NDE selection for welds of 8 inch HRDH -1195 TA-669338


3379 CPP-NGCP-W-3378 1400118751 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1195 FL 13-Jun-19 4.00 PM Saif Mr. Ashok CLOSED
KP1+600 to KP1+700

Pre-welding and weld joint fit up inspection for 8


3380 CPP-NGCP-W-3379 1400118794 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1197 FL TA-669357 13-Jun-19 8:00 AM Saif Mr. Ashok CLOSED
inch HRDH -1197 KP1+800 to KP2+000

Post-welding visual inspection for 8 inch HRDH


3381 CPP-NGCP-W-3380 1400118824 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1197 FL TA-669357 13-Jun-19 2.00 PM Saif Mr. Ashok CLOSED
-1197 KP1+800 to KP2+000

NDE selection for welds of 8 inch HRDH -1197


3382 CPP-NGCP-W-3381 1400118780 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1197 FL TA-669357 13-Jun-19 4.00 PM Saif Mr. Ashok CLOSED
KP1+800 to KP2+000

Pre-welding and weld joint fit up inspection for 10 Mr.


3383 CPP-NGCP-W-3382 1400118796 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1153 F/L TA-843975 13-Jun-19 8:00 AM Shadab CLOSED
inch HRDH-1153 KP0+900 to KP1+000 Rajendran

Post-welding visual inspection for 10 inch HRDH- Mr.


3384 CPP-NGCP-W-3383 1400118798 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1153 F/L TA-843975 13-Jun-19 2.00 PM Shadab CLOSED
1153 KP0+900 to KP1+000 Rajendran

NDE selection for welds of 10 inch HRDH-1153 Mr.


3385 CPP-NGCP-W-3384 1400118799 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1153 F/L TA-843975 13-Jun-19 4.00 PM Shadab CLOSED
KP0+900 to KP1+000 Rajendran

Pre-welding and weld joint fit up inspection for 16 HRDH -AK-RH TA-843960 Mr.
3386 CPP-NGCP-W-3385 1400118863 Welding SATIP-W-012-01 SAIC-W-2048 13-Jun-19 8:00 AM IRSHAD CLOSED
inch HRDH AK-RH TR/L KP2+000 to KP2+200; TR/L Rajendran

Post-welding visual inspection for 16 inch HRDH HRDH -AK-RH Mr.


3387 CPP-NGCP-W-3386 1400118854 Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 13-Jun-19 2.00 PM IRSHAD CLOSED
AK-RH TR/L KP2+000 to KP2+200; TR/L Rajendran

NDE selection for welds of 16 inch HRDH AK-RH HRDH -AK-RH Mr.
3388 CPP-NGCP-W-3387 1400118848 Welding SATIP-W-012-01 SAIC-W-2054 TA-843960 13-Jun-19 4.00 PM IRSHAD CLOSED
TR/L KP2+000 to KP2+200; TR/L Rajendran

Temperature Tie in Welding HRDH-1116 at KM- Mr.


3389 CPP-NGCP-W-3388 1400118790 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1116 FL TA-843608 13-Jun-19 10:00 AM Farhan CLOSED RE-SCHEDULE TO
1+800 to KM-1+880 Rajendran
15-JUNE-2019

Pre-welding and weld joint fit up inspection for 8 Mr.


3390 CPP-NGCP-W-3389 1400118791 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 13-Jun-19 8:00 AM Farhan CLOSED RE-SCHEDULE TO
inch HRDH-1116 at KM-1+800 to KM-1+880 Rajendran
15-JUNE-2019

Post-welding visual inspection for 8inch HRDH- Mr.


3391 CPP-NGCP-W-3390 1400118802 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 13-Jun-19 2.00 PM Farhan CLOSED RE-SCHEDULE TO
1116 at KM-1+800 to KM-1+880 Rajendran
15-JUNE-2019

NDE selection for welds of 8 inch HRDH-1116 at Mr.


3392 CPP-NGCP-W-3391 1400118885 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1116 FL TA-843608 13-Jun-19 4.00 PM Farhan CLOSED RE-SCHEDULE TO
KM-1+800 to KM-1+880 Rajendran
15-JUNE-2019

Pre-welding and weld joint fit up inspection for 8 TA-843953 Mr.


3393 CPP-NGCP-W-3392 1400118905 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1063 FL 13-Jun-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1063 at KM-0+729 to KM-0+823 Rajendran

Post-welding visual inspection for 8inch HRDH- Mr.


3394 CPP-NGCP-W-3393 1400118821 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1063 FL TA-843953 13-Jun-19 2.00 PM Sarfaraz CLOSED
1063 at KM-0+729 to KM-0+823 Rajendran

NDE selection for welds of 8 inch HRDH-1063 at Mr.


3395 CPP-NGCP-W-3394 1400118895 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1063 FL TA-843953 13-Jun-19 4.00 PM Sarfaraz CLOSED
KM-0+729 to KM-0+823 Rajendran

In-Process Verification - RT Techniques &


3396 CPP-NGCP-W-3395 1400118896 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-AK-RH, HRDH-AK-RH, 1195 1171,K13-RH VARIOUS 13-Jun-19 8:00 AM RAMEEZ Mr. Ashok CLOSED
1195 1171,K13-RH
In-Process Verification - RT Techniques &
HWYH-921, 1036, 1023, GK-RH, VARIOUS
3397 CPP-NGCP-W-3396 1400118906 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-921, 1036, 13-Jun-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
201, 934,CK-RH
1023, GK-RH, 201, 934,CK-RH

Pre-welding and weld joint fit up inspection for


3398 CPP-NGCP-W-3397 1400118225 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 13-Jun-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-934 km0+100 to km8+700

Post-welding visual inspection for HWYH-934


3399 CPP-NGCP-W-3398 1400118209 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 13-Jun-19 2.00 PM Shahbaz Mr. Suresh CLOSED
km0+100 to km8+700

NDE selection for welds of HWYH-934 km0+100


3400 CPP-NGCP-W-3399 1400118233 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-934 TA-445843 13-Jun-19 4:00 PM Shahbaz Mr. Suresh CLOSED
to km8+700

Pre-welding and weld joint fit up inspection for 10


3401 CPP-NGCP-W-3400 1400118245 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 13-Jun-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200

Post-welding visual inspection for 10inch HWYH-


3402 CPP-NGCP-W-3401 1400118246 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 13-Jun-19 2.00 PM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200

NDE selection for welds of 10 inch HWYH-1036


3403 CPP-NGCP-W-3402 1400118182 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 13-Jun-19 4:00 PM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200

Pre-welding and weld joint fit up inspection for 10 TA-445827


3404 CPP-NGCP-W-3403 1400118220 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 13-Jun-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1023 @ KP0+100 to KP5+300

Post-welding visual inspection for 10 inch HWYH-


3405 CPP-NGCP-W-3404 1400118238 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 TA-445827 13-Jun-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1023 @ KP0+100 to KP5+300

NDE selection for welds of 10 inch HWYH-1023


3406 CPP-NGCP-W-3405 1400118242 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1023 TA-445827 13-Jun-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
@ KP0+100 to KP5+300

Pre-welding and weld joint fit up inspection for


3407 CPP-NGCP-W-3406 1400118170 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 13-Jun-19 8:00 AM abdul raheem Mr. Suresh CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100

Post-welding visual inspection for 16″HWYH CK-


3408 CPP-NGCP-W-3407 1400118275 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 13-Jun-19 2.00 PM abdul raheem Mr. Suresh CLOSED
RH TRL km0+100 to 8+100

NDE selection for welds of 16″HWYH CK-RH


3409 CPP-NGCP-W-3408 1400118264 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 13-Jun-19 4:00 PM abdul raheem Mr. Suresh CLOSED
TRL km0+100 to 8+100

Pre-welding and weld joint fit up inspection for


3410 CPP-NGCP-W-3409 1400118283 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 13-Jun-19 8:00 AM asish Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+400-km6

Post-welding visual inspection for 16″HWYH GK- TA-445912


3411 CPP-NGCP-W-3410 1400118303 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL 13-Jun-19 2.00 PM asish Mr. Suresh CLOSED
RH TRL km0+400-km6

NDE selection for welds of 16″HWYH GK-RH TRL


3412 CPP-NGCP-W-3411 1400118398 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 13-Jun-19 4:00 PM asish Mr. Suresh CLOSED
16″HWYH GK-RH TRL km0+400-km6

Pre-welding and weld joint fit up inspection for 24


Mr.
3413 CPP-NGCP-W-3412 1400118474 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe Yard. TA-445990 13-Jun-19 8:00 AM Junaid CLOSED
Rajendran
TCF-1, CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
3414 CPP-NGCP-W-3413 1400118459 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GCP-1 T/L SWEET at TCF-1, CPP TCF-1, CPP Pipe Yard. TA-445990 13-Jun-19 2.00 PM Junaid CLOSED
Rajendran
Pipe Yard.
NDE selection for welds of 24 inch double joints
TA-445990 Mr.
3415 CPP-NGCP-W-3414 1400118495 Welding SATIP-W-012-01 SAIC-W-2054 HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. 13-Jun-19 4:00 PM Junaid CLOSED
Rajendran
Yard.

Pre-welding and weld joint fit up inspection for 10


3416 CPP-NGCP-W-3415 1400118402 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 TA-445827 14-Jun-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1023 @ KP0+100 to KP5+300

Post-welding visual inspection for 10 inch HWYH-


3417 CPP-NGCP-W-3416 1400118498 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 TA-445827 14-Jun-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1023 @ KP0+100 to KP5+300

NDE selection for welds of 10 inch HWYH-1023


3418 CPP-NGCP-W-3417 1400118521 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1023 TA-445827 14-Jun-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
@ KP0+100 to KP5+300

Pre-welding and weld joint fit up inspection for 24


Mr.
3419 CPP-NGCP-W-3418 1400118564 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe Yard. TA-445990 14-Jun-19 8:00 AM Junaid CLOSED
Rajendran
TCF-1, CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
3420 CPP-NGCP-W-3419 1400118538 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GCP-1 T/L SWEET at TCF-1, CPP TCF-1, CPP Pipe Yard. TA-445990 14-Jun-19 2.00 PM Junaid CLOSED
Rajendran
Pipe Yard.

NDE selection for welds of 24 inch double joints


Mr.
3421 CPP-NGCP-W-3420 1400118584 Welding SATIP-W-012-01 SAIC-W-2054 HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445990 14-Jun-19 4:00 PM Junaid CLOSED
Rajendran
Yard.

Pre-welding and weld joint fit up inspection for


3422 CPP-NGCP-W-3421 1400119096 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 15-Jun-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-934 km0+100 to km8+700

Post-welding visual inspection for HWYH-934


3423 CPP-NGCP-W-3422 1400119140 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 15-Jun-19 2.00 PM Shahbaz Mr. Suresh CLOSED
km0+100 to km8+700

NDE selection for welds of HWYH-934 km0+100 TA-445843


3424 CPP-NGCP-W-3423 1400119173 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-934 15-Jun-19 4:00 PM Shahbaz Mr. Suresh CLOSED
to km8+700

Pre-welding and weld joint fit up inspection for 10


3425 CPP-NGCP-W-3424 1400119164 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 15-Jun-19 8:00 AM Imran Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200

Post-welding visual inspection for 10inch HWYH-


3426 CPP-NGCP-W-3425 1400119167 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 15-Jun-19 2.00 PM Imran Mr. Suresh CLOSED
1036 KP0+100 to KP6+200

NDE selection for welds of 10 inch HWYH-1036


3427 CPP-NGCP-W-3426 1400119109 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 15-Jun-19 4:00 PM Imran Mr. Suresh CLOSED
KP0+100 to KP6+200

Pre-welding and weld joint fit up inspection for 10


3428 CPP-NGCP-W-3427 1400119176 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 TA-445827 15-Jun-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1023 @ KP0+100 to KP5+300

Post-welding visual inspection for 10 inch HWYH-


3429 CPP-NGCP-W-3428 1400119186 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 TA-445827 15-Jun-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1023 @ KP0+100 to KP5+300

NDE selection for welds of 10 inch HWYH-1023


3430 CPP-NGCP-W-3429 1400119197 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1023 TA-445827 15-Jun-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
@ KP0+100 to KP5+300

Pre-welding and weld joint fit up inspection for TA-445974 RE-SCHEDULE TO 16-
3431 CPP-NGCP-W-3430 1400119253 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL 15-Jun-19 8:00 AM abdul raheem Mr. Ashok CLOSED JUNE-2019
16″HWYH CK-RH TRL km0+100 to 8+100

Post-welding visual inspection for 16″HWYH CK- RE-SCHEDULE TO 16-


3432 CPP-NGCP-W-3431 1400119217 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 15-Jun-19 2.00 PM abdul raheem Mr. Ashok CLOSED
RH TRL km0+100 to 8+100 JUNE-2019

NDE selection for welds of 16″HWYH CK-RH RE-SCHEDULE TO 16-


3433 CPP-NGCP-W-3432 1400119120 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 15-Jun-19 4:00 PM abdul raheem Mr. Ashok CLOSED
TRL km0+100 to 8+100 JUNE-2019

Pre-welding and weld joint fit up inspection for


3434 CPP-NGCP-W-3433 1400119218 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 15-Jun-19 8:00 AM asish Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6

Post-welding visual inspection for 16″HWYH GK- TA-445912


3435 CPP-NGCP-W-3434 1400119206 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL 15-Jun-19 2.00 PM asish Mr. Ashok CLOSED
RH TRL km0+400-km6

NDE selection for welds of 16″HWYH GK-RH TRL


3436 CPP-NGCP-W-3435 1400119255 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 15-Jun-19 4:00 PM asish Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a
l Pre-welding and weld joint fit up inspection for 24
TA-445990 Mr.
3437 CPP-NGCP-W-3436 1400119121 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe Yard. 15-Jun-19 8:00 AM Junaid CLOSED
Rajendran
TCF-1, CPP Pipe Yard.

Post-welding visual inspection for 24 inch double


Mr.
3438 CPP-NGCP-W-3437 1400119219 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GCP-1 T/L SWEET at TCF-1, CPP TCF-1, CPP Pipe Yard. TA-445990 15-Jun-19 2.00 PM Junaid CLOSED
Rajendran
Pipe Yard.

NDE selection for welds of 24 inch double joints


Mr.
3439 CPP-NGCP-W-3438 1400119192 Welding SATIP-W-012-01 SAIC-W-2054 HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445990 15-Jun-19 4:00 PM Junaid CLOSED
Rajendran
Yard.

Pre-welding and weld joint fit up inspection for 12


3440 CPP-NGCP-W-3439 1400119866 Welding SATIP-W-012-01 SAIC-W-2048 HRDH K13 -RH FL TA-669436 15-Jun-19 8:00 AM Rajesh Mr. Ashok CLOSED
inch HRDH-K13 KP2+450 to KP2+600

Post-welding visual inspection for 12 inch TA-669436


3441 CPP-NGCP-W-3440 1400119849 Welding SATIP-W-012-01 SAIC-W-2048 HRDH K13 -RH FL 15-Jun-19 2.00 PM Rajesh Mr. Ashok CLOSED
HRDH-K13 KP2+450 to KP2+600

NDE selection for welds of 12 inch HRDH-K13


3442 CPP-NGCP-W-3441 1400119822 Welding SATIP-W-012-01 SAIC-W-2054 HRDH K13 -RH FL TA-669436 15-Jun-19 4.00 PM Rajesh Mr. Ashok CLOSED
KP2+450 to KP2+600

Pre-welding and weld joint fit up inspection for 8


3443 CPP-NGCP-W-3442 1400119878 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1197 FL TA-669357 15-Jun-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1197 KP1+400 to KP1+600

Post-welding visual inspection for 8 inch HRDH


3444 CPP-NGCP-W-3443 1400119879 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1197 FL TA-669357 15-Jun-19 2.00 PM Saif Mr. Rajesh CLOSED
-1197 KP1+400 to KP1+600

NDE selection for welds of 8 inch HRDH -1197


3445 CPP-NGCP-W-3444 1400119856 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1197 FL TA-669357 15-Jun-19 4.00 PM Saif Mr. Rajesh CLOSED
KP1+400 to KP1+600

Pre-welding and weld joint fit up inspection for 10 Mr.


3446 CPP-NGCP-W-3445 1400119857 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1153 F/L TA-843975 15-Jun-19 8:00 AM Shadab CLOSED
inch HRDH-1153 KP1+200 to KP1+700 Rajendran

Post-welding visual inspection for 10 inch HRDH- Mr.


3447 CPP-NGCP-W-3446 1400119894 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1153 F/L TA-843975 15-Jun-19 2.00 PM Shadab CLOSED
1153 KP1+200 to KP1+700 Rajendran

NDE selection for welds of 10 inch HRDH-1153 TA-843975 Mr.


3448 CPP-NGCP-W-3447 1400119850 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1153 F/L 15-Jun-19 4.00 PM Shadab CLOSED
KP1+200 to KP1+700 Rajendran

Pre-welding and weld joint fit up inspection for 16 HRDH -AK-RH Mr.
3449 CPP-NGCP-W-3448 1400119895 Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 15-Jun-19 8:00 AM IRSHAD CLOSED
inch HRDH AK-RH TR/L KP1+800 to KP2+000; TR/L Rajendran

Post-welding visual inspection for 16 inch HRDH HRDH -AK-RH Mr.


3450 CPP-NGCP-W-3449 1400119851 Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 15-Jun-19 2.00 PM IRSHAD CLOSED
AK-RH TR/L KP1+800 to KP2+000; TR/L Rajendran

NDE selection for welds of 16 inch HRDH AK-RH HRDH -AK-RH Mr.
3451 CPP-NGCP-W-3450 1400119904 Welding SATIP-W-012-01 SAIC-W-2054 TA-843960 15-Jun-19 4.00 PM IRSHAD CLOSED
TR/L KP1+800 to KP2+000; TR/L Rajendran

Temperature Tie in Welding HRDH-922 at KM- TA-843608 Mr.


3452 CPP-NGCP-W-3451 1400119880 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -922 FL 15-Jun-19 10:00 AM Farhan CLOSED RE-SCHEDULE TO
2+638 to KM-2+700 Rajendran
16-JUNE-2019

Pre-welding and weld joint fit up inspection for 8 Mr.


3453 CPP-NGCP-W-3452 1400119852 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843608 15-Jun-19 8:00 AM Farhan CLOSED RE-SCHEDULE TO
inch HRDH-922 at KM-2+638 to KM-2+700 Rajendran
16-JUNE-2019

Post-welding visual inspection for 8inch HRDH- Mr.


3454 CPP-NGCP-W-3453 1400119841 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843608 15-Jun-19 2.00 PM Farhan CLOSED RE-SCHEDULE TO
922 at KM-2+638 to KM-2+700 Rajendran
16-JUNE-2019

NDE selection for welds of 8 inch HRDH-922 at Mr.


3455 CPP-NGCP-W-3454 1400119953 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL TA-843608 15-Jun-19 4.00 PM Farhan CLOSED RE-SCHEDULE TO
KM-2+638 to KM-2+700 Rajendran
16-JUNE-2019

Temperature Tie in Welding HRDH-1063 at KM-


3456 CPP-NGCP-W-3455 1400119963 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1063 FL TA-843953 15-Jun-19 10:00 AM Sarfaraz Mr. Ashok CLOSED
0+823 and KM-0+235 to KM 0+450

Pre-welding and weld joint fit up inspection for 8


3457 CPP-NGCP-W-3456 1400119964 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH-1063 at KM-0+823 and KM-0+235 HRDH -1063 FL TA-843953 15-Jun-19 8:00 AM Sarfaraz Mr. Ashok CLOSED
to KM 0+450

Post-welding visual inspection for 8inch HRDH-


3458 CPP-NGCP-W-3457 1400119965 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1063 FL TA-843953 15-Jun-19 2.00 PM Sarfaraz Mr. Ashok CLOSED
1063 at KM-0+823 and KM-0+235 to KM 0+450

NDE selection for welds of 8 inch HRDH-1063 at TA-843953


3459 CPP-NGCP-W-3458 1400119973 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1063 FL 15-Jun-19 4.00 PM Sarfaraz Mr. Ashok CLOSED
KM-0+823 and KM-0+235 to KM 0+450

In-Process Verification - RT Techniques &


Mr.
3460 CPP-NGCP-W-3459 1400119924 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-AK-RH, HRDH-AK-RH, K13-RH, 1171, 1153 VARIOUS 15-Jun-19 8:00 AM RAMEEZ CLOSED
Rajendran
K13-RH, 1171, 1153

In-Process Verification - RT Techniques &


3461 CPP-NGCP-W-3460 1400119966 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1023, 934, HWYH-1023, 934, 1036, CK-RH VARIOUS 15-Jun-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1036, CK-RH

In-Process Verification - RT Techniques & Mr.


3462 CPP-NGCP-W-3461 1400119945 Welding SATIP-NDE-RT-01 SAIC-RT-2007 TCF-1 VARIOUS 15-Jun-19 8:00 AM RAMEEZ CLOSED
Procedure Implementation of TRL-2 at TCF-1 Rajendran

In-Process Inspection of MPT using VARIOUS Mr.


3463 CPP-NGCP-W-3462 1400119967 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 TCF-1 15-Jun-19 8:00 AM RAMEEZ CLOSED
Yoke Method, TRL-2 at TCF-1 Rajendran

Review of weekly welder performance and


3464 CPP-NGCP-W-3463 1400120043 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 13-june-2019 to 20 CPP site office N/A 16-Jun-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
Jun-2019 at CPP site office.
Welding consumables verification and visual Mr.
3465 CPP-NGCP-W-3464 1400120884 Welding SATIP-W-012-01 SAIC-W-2044 TCF-1 N/A 16-Jun-19 8:00 AM Junaid CLOSED
inspection storage & handling at TCF-1 Rajendran
Pre-welding and weld joint fit up inspection for
3466 CPP-NGCP-W-3465 1400120010 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 16-Jun-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-934 km0+100 to km8+700
Post-welding visual inspection for HWYH-934
3467 CPP-NGCP-W-3466 1400120002 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 16-Jun-19 2.00 PM Shahbaz Mr. Suresh CLOSED
km0+100 to km8+700
NDE selection for welds of HWYH-934 km0+100
3468 CPP-NGCP-W-3467 1400119986 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-934 TA-445843 16-Jun-19 4:00 PM Shahbaz Mr. Suresh CLOSED
to km8+700
Pre-welding and weld joint fit up inspection for 10
3469 CPP-NGCP-W-3468 1400120011 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 16-Jun-19 8:00 AM asish Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 10inch HWYH-
3470 CPP-NGCP-W-3469 1400119927 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 16-Jun-19 2.00 PM asish Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 10 inch HWYH-1036
3471 CPP-NGCP-W-3470 1400119951 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL TA-445826 16-Jun-19 4:00 PM asish Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
3472 CPP-NGCP-W-3471 1400120013 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 TA-445827 16-Jun-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1023 @ KP0+100 to KP5+300
Post-welding visual inspection for 10 inch HWYH-
3473 CPP-NGCP-W-3472 1400119987 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 TA-445827 16-Jun-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1023 @ KP0+100 to KP5+300
NDE selection for welds of 10 inch HWYH-1023
3474 CPP-NGCP-W-3473 1400119935 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1023 TA-445827 16-Jun-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
@ KP0+100 to KP5+300
Pre-welding and weld joint fit up inspection for
3475 CPP-NGCP-W-3474 1400120029 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 16-Jun-19 8:00 AM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
Post-welding visual inspection for 16″HWYH GK-
3476 CPP-NGCP-W-3475 1400119920 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 16-Jun-19 2.00 PM Imran Mr. Ashok CLOSED
RH TRL km0+400-km6
NDE selection for welds of 16″HWYH GK-RH TRL
3477 CPP-NGCP-W-3476 1400120031 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 16-Jun-19 4:00 PM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
Pre-welding and weld joint fit up inspection for 24
Mr.
3478 CPP-NGCP-W-3477 1400119936 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe Yard. TA-445990 16-Jun-19 8:00 AM Junaid CLOSED
Rajendran
TCF-1, CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
3479 CPP-NGCP-W-3478 1400119937 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GCP-1 T/L SWEET at TCF-1, CPP TCF-1, CPP Pipe Yard. TA-445990 16-Jun-19 2.00 PM Junaid CLOSED
Rajendran
Pipe Yard.
NDE selection for welds of 24 inch double joints Mr.
3480 CPP-NGCP-W-3479 1400119959 Welding SATIP-W-012-01 SAIC-W-2054 HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445990 16-Jun-19 4:00 PM Junaid CLOSED
Rajendran
Yard.
Pre-welding and weld joint fit up inspection for 12
3481 CPP-NGCP-W-3480 1400120396 Welding SATIP-W-012-01 SAIC-W-2048 HRDH K13 -RH FL TA-669436 16-Jun-19 8:00 AM Rajesh Mr. Ashok CLOSED
inch HRDH-K13 KP2+600 to KP3+400
Post-welding visual inspection for 12 inch
3482 CPP-NGCP-W-3481 1400120402 Welding SATIP-W-012-01 SAIC-W-2048 HRDH K13 -RH FL TA-669436 16-Jun-19 2.00 PM Rajesh Mr. Ashok CLOSED
HRDH-K13 KP2+600 to KP3+400
NDE selection for welds of 12 inch HRDH-K13
3483 CPP-NGCP-W-3482 1400120420 Welding SATIP-W-012-01 SAIC-W-2054 HRDH K13 -RH FL TA-669436 16-Jun-19 4.00 PM Rajesh Mr. Ashok CLOSED
KP2+600 to KP3+400
Pre-welding and weld joint fit up inspection for 12
3484 CPP-NGCP-W-3483 1400120458 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1143 FL TA-669419 16-Jun-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1143 KP0+550 to KP0+650
Post-welding visual inspection for 12 inch
3485 CPP-NGCP-W-3484 1400120476 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1143 FL TA-669419 16-Jun-19 2.00 PM Rajesh Mr. Rajesh CLOSED
HRDH-1143 KP0+550 to KP0+650
NDE selection for welds of 12 inch HRDH-1143
3486 CPP-NGCP-W-3485 1400120507 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1143 FL TA-669419 16-Jun-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP0+550 to KP0+650
Pre-welding and weld joint fit up inspection for 8
3487 CPP-NGCP-W-3486 1400120440 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1197 FL TA-669357 16-Jun-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1197 KP1+200 to KP1+400
Post-welding visual inspection for 8 inch HRDH
3488 CPP-NGCP-W-3487 1400120514 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1197 FL TA-669357 16-Jun-19 2.00 PM Saif Mr. Rajesh CLOSED
-1197 KP1+200 to KP1+400
NDE selection for welds of 8 inch HRDH -1197
3489 CPP-NGCP-W-3488 1400120491 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1197 FL TA-669357 16-Jun-19 4.00 PM Saif Mr. Rajesh CLOSED
KP1+200 to KP1+400
Pre-welding and weld joint fit up inspection for 10 Mr.
3490 CPP-NGCP-W-3489 1400120480 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1153 F/L TA-843975 16-Jun-19 8:00 AM Shadab CLOSED
inch HRDH-1153 KP1+800 to KP2+000 Rajendran
Post-welding visual inspection for 10 inch HRDH- Mr.
3491 CPP-NGCP-W-3490 1400120509 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1153 F/L TA-843975 16-Jun-19 2.00 PM Shadab CLOSED
1153 KP1+800 to KP2+000 Rajendran
NDE selection for welds of 10 inch HRDH-1153 Mr.
3492 CPP-NGCP-W-3491 1400120524 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1153 F/L TA-843975 16-Jun-19 4.00 PM Shadab CLOSED
KP1+800 to KP2+000 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -AK-RH Mr.
3493 CPP-NGCP-W-3492 1400120543 Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 16-Jun-19 8:00 AM IRSHAD CLOSED
inch HRDH AK-RH TR/L KP1+300 to KP1+800; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -AK-RH Mr.
3494 CPP-NGCP-W-3493 1400120553 Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 16-Jun-19 2.00 PM IRSHAD CLOSED
AK-RH TR/L KP1+300 to KP1+800; TR/L Rajendran
NDE selection for welds of 16 inch HRDH AK-RH HRDH -AK-RH Mr.
3495 CPP-NGCP-W-3494 1400120460 Welding SATIP-W-012-01 SAIC-W-2054 TA-843960 16-Jun-19 4.00 PM IRSHAD CLOSED
TR/L KP1+300 to KP1+800; TR/L Rajendran

Temperature Tie in Welding HRDH-1063 at KM-


3496 CPP-NGCP-W-3495 1400120461 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1063 FL TA-843953 16-Jun-19 10:00 AM Sarfaraz Mr. Ashok CLOSED RE-SCHEDULE TO RE-SCHEDULE TO 18-
0+580 and KM-0+195 to KM 0+300
17-JUNE-2019 JUNE-2019
Pre-welding and weld joint fit up inspection for 8
3497 CPP-NGCP-W-3496 1400120573 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH-1063 at KM-0+580 and KM-0+195 HRDH -1063 FL TA-843953 16-Jun-19 8:00 AM Sarfaraz Mr. Ashok CLOSED
to KM 0+300
Post-welding visual inspection for 8inch HRDH- TA-843953
3498 CPP-NGCP-W-3497 1400120574 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1063 FL 16-Jun-19 2.00 PM Sarfaraz Mr. Ashok CLOSED
1063 at KM-0+580 and KM-0+195 to KM 0+300
NDE selection for welds of 8 inch HRDH-1063 at
3499 CPP-NGCP-W-3498 1400120577 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1063 FL TA-843953 16-Jun-19 4.00 PM Sarfaraz Mr. Ashok CLOSED
KM-0+580 and KM-0+195 to KM 0+300
In-Process Verification - RT Techniques &
3500 CPP-NGCP-W-3499 1400120578 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-AK-RH, HRDH-AK-RH, 1195, K13-RH, 1063, 1153 VARIOUS 16-Jun-19 8:00 AM RAMEEZ Mr. Ashok CLOSED
1195, K13-RH, 1063, 1153
In-Process Verification - RT Techniques &
3501 CPP-NGCP-W-3500 1400120583 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1093,HWYH-1093,
1023, VARIOUS
1023, CK-RH, GK-RH, 1036, 934, 1071 16-Jun-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
CK-RH, GK-RH, 1036, 934, 1071
Pre-welding and weld joint fit up inspection for 8
3502 CPP-NGCP-W-3501 1400120914 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1143 FL TA-669419 17-Jun-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1143 KP0+350 to KP0+550
Post-welding visual inspection for 8 inch HRDH-
3503 CPP-NGCP-W-3502 1400120915 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1143 FL TA-669419 17-Jun-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1143 KP0+350 to KP0+550
NDE selection for welds of 8 inch HRDH-1143
3504 CPP-NGCP-W-3503 1400120892 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1143 FL TA-669419 17-Jun-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP0+350 to KP0+550
Pre-welding and weld joint fit up inspection for 8
3505 CPP-NGCP-W-3504 1400121403 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1140 FL TA-669420 17-Jun-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1140 KP0+180 to KP0+300
Post-welding visual inspection for 8 inch HRDH-
3506 CPP-NGCP-W-3505 1400121349 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1140 FL TA-669420 17-Jun-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1140 KP0+180 to KP0+300
NDE selection for welds of 8 inch HRDH-1140
3507 CPP-NGCP-W-3506 1400121407 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1140 FL TA-669420 17-Jun-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP0+180 to KP0+300
Pre-welding and weld joint fit up inspection for 8
3508 CPP-NGCP-W-3507 1400120872 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1197 FL TA-669357 17-Jun-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1197 KP0+900 to KP1+200
Post-welding visual inspection for 8 inch HRDH
3509 CPP-NGCP-W-3508 1400120925 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1197 FL TA-669357 17-Jun-19 2.00 PM Saif Mr. Rajesh CLOSED
-1197 KP0+900 to KP1+200
NDE selection for welds of 8 inch HRDH -1197
3510 CPP-NGCP-W-3509 1400120832 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1197 FL TA-669357 17-Jun-19 4.00 PM Saif Mr. Rajesh CLOSED
KP0+900 to KP1+200
Pre-welding and weld joint fit up inspection for 10 Mr.
3511 CPP-NGCP-W-3510 1400120933 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1153 F/L TA-843975 17-Jun-19 8:00 AM Shadab CLOSED
inch HRDH-1153 KP2+100 to KP2+300 Rajendran
Post-welding visual inspection for 10 inch HRDH- Mr.
3512 CPP-NGCP-W-3511 1400120943 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1153 F/L TA-843975 17-Jun-19 2.00 PM Shadab CLOSED
1153 KP2+100 to KP2+300 Rajendran
NDE selection for welds of 10 inch HRDH-1153 Mr.
3513 CPP-NGCP-W-3512 1400120926 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1153 F/L TA-843975 17-Jun-19 4.00 PM Shadab CLOSED
KP2+100 to KP2+300 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -AK-RH Mr.
3514 CPP-NGCP-W-3513 1400120907 Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 17-Jun-19 8:00 AM IRSHAD CLOSED
inch HRDH AK-RH TR/L KP0+700 to KP1+100; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -AK-RH Mr.
3515 CPP-NGCP-W-3514 1400120942 Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 17-Jun-19 2.00 PM IRSHAD CLOSED
AK-RH TR/L KP0+700 to KP1+100; TR/L Rajendran
NDE selection for welds of 16 inch HRDH AK-RH HRDH -AK-RH Mr.
3516 CPP-NGCP-W-3515 1400120996 Welding SATIP-W-012-01 SAIC-W-2054 TA-843960 17-Jun-19 4.00 PM IRSHAD CLOSED
TR/L KP0+700 to KP1+100; TR/L Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
3517 CPP-NGCP-W-3516 1400120936 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843608 17-Jun-19 8:00 AM Farhan CLOSED
inch HRDH-922 at KM-3+240 to KM-3+315 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
3518 CPP-NGCP-W-3517 1400120953 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843608 17-Jun-19 2.00 PM Farhan CLOSED
922 at KM-3+240 to KM-3+315 Rajendran
NDE selection for welds of 8 inch HRDH-922 at Mr.
3519 CPP-NGCP-W-3518 1400120954 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL TA-843608 17-Jun-19 4.00 PM Farhan CLOSED
KM-3+240 to KM-3+315 Rajendran
Pre-welding and weld joint fit up inspection for 8
3520 CPP-NGCP-W-3519 1400121396 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH-1063 at KM-0+580 and KM-0+195 HRDH -1063 FL TA-843953 17-Jun-19 8:00 AM Sarfaraz Mr. Ashok CLOSED RE-SCHEDULE TO
to KM 0+300 18-JUNE-2019
Post-welding visual inspection for 8inch HRDH- RE-SCHEDULE TO
3521 CPP-NGCP-W-3520 1400121387 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1063 FL TA-843953 17-Jun-19 2.00 PM Sarfaraz Mr. Ashok CLOSED
1063 at KM-0+580 and KM-0+195 to KM 0+300 18-JUNE-2019
NDE selection for welds of 8 inch HRDH-1063 at RE-SCHEDULE TO
3522 CPP-NGCP-W-3521 1400121409 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1063 FL TA-843953 17-Jun-19 4.00 PM Sarfaraz Mr. Ashok CLOSED
KM-0+580 and KM-0+195 to KM 0+300 18-JUNE-2019
In-Process Verification - RT Techniques &
3523 CPP-NGCP-W-3522 1400121437 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-AK-RH, HRDH-AK-RH, 1197, 1063 VARIOUS 17-Jun-19 8:00 AM RAMEEZ Mr. Ashok CLOSED
1197, 1063
In-Process Verification - RT Techniques &
HWYH-CK-RH, GK-RH, 934, 1023,
3524 CPP-NGCP-W-3523 1400121438 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-CK-RH, GK- VARIOUS 17-Jun-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1036
RH, 934, 1023, 1036
In-Process Verification - RT Techniques & Mr.
3525 CPP-NGCP-W-3524 1400121402 Welding SATIP-NDE-RT-01 SAIC-RT-2007 TCF-1 VARIOUS 17-Jun-19 8:00 AM RAMEEZ CLOSED
Procedure Implementation of TRL-2 at TCF-1 Rajendran
In-Process Inspection of MPT using Mr.
3526 CPP-NGCP-W-3525 1400121418 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 TCF-1 VARIOUS 17-Jun-19 8:00 AM RAMEEZ CLOSED
Yoke Method, TRL-2 at TCF-1 Rajendran
In-Process Inspection of MPT using
3527 CPP-NGCP-W-3526 1400121476 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 HWYH-GK-RH VARIOUS 17-Jun-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
Yoke Method, at HWYH-GK-RH
Pre-welding and weld joint fit up inspection for
3528 CPP-NGCP-W-3527 1400120890 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 17-Jun-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-934 km0+100 to km8+700
Post-welding visual inspection for HWYH-934 TA-445843
3529 CPP-NGCP-W-3528 1400120891 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 17-Jun-19 2.00 PM Shahbaz Mr. Suresh CLOSED
km0+100 to km8+700
NDE selection for welds of HWYH-934 km0+100
3530 CPP-NGCP-W-3529 1400120902 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-934 TA-445843 17-Jun-19 4:00 PM Shahbaz Mr. Suresh CLOSED
to km8+700
Pre-welding and weld joint fit up inspection for 10 TA-445826
3531 CPP-NGCP-W-3530 1400120859 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL 17-Jun-19 8:00 AM asish Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 10inch HWYH-
3532 CPP-NGCP-W-3531 1400120923 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 17-Jun-19 2.00 PM asish Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 10 inch HWYH-1036 TA-445826
3533 CPP-NGCP-W-3532 1400120924 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL 17-Jun-19 4:00 PM asish Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
3534 CPP-NGCP-W-3533 1400120871 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 TA-445827 17-Jun-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1023 @ KP0+100 to KP5+300
Post-welding visual inspection for 10 inch HWYH- TA-445827
3535 CPP-NGCP-W-3534 1400120860 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 17-Jun-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1023 @ KP0+100 to KP5+300
NDE selection for welds of 10 inch HWYH-1023
3536 CPP-NGCP-W-3535 1400120905 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1023 TA-445827 17-Jun-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
@ KP0+100 to KP5+300
Pre-welding and weld joint fit up inspection for TA-445974
3537 CPP-NGCP-W-3536 1400119977 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL 17-Jun-19 8:00 AM abdul raheem Mr. Ashok CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK-
3538 CPP-NGCP-W-3537 1400120027 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 17-Jun-19 2.00 PM abdul raheem Mr. Ashok CLOSED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH TA-445974
3539 CPP-NGCP-W-3538 1400120028 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL 17-Jun-19 4:00 PM abdul raheem Mr. Ashok CLOSED
TRL km0+100 to 8+100
Pre-welding and weld joint fit up inspection for
3540 CPP-NGCP-W-3539 1400120861 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 17-Jun-19 8:00 AM Imran Mr. Ashok Reject
16″HWYH GK-RH TRL km0+400-km6
Post-welding visual inspection for 16″HWYH GK- TA-445912
3541 CPP-NGCP-W-3540 1400121077 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL 17-Jun-19 2.00 PM Imran Mr. Ashok CLOSED
RH TRL km0+400-km6
NDE selection for welds of 16″HWYH GK-RH TRL
3542 CPP-NGCP-W-3541 1400121079 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 17-Jun-19 4:00 PM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
Pre-welding and weld joint fit up inspection for 24
TA-445990 Mr.
3543 CPP-NGCP-W-3542 1400121084 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe Yard. 17-Jun-19 8:00 AM Junaid CLOSED
Rajendran
TCF-1, CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
3544 CPP-NGCP-W-3543 1400121164 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GCP-1 T/L SWEET at TCF-1, CPP TCF-1, CPP Pipe Yard. TA-445990 17-Jun-19 2.00 PM Junaid CLOSED
Pipe Yard. Rajendran
NDE selection for welds of 24 inch double joints
Mr.
3545 CPP-NGCP-W-3544 1400119956 Welding SATIP-W-012-01 SAIC-W-2054 HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445990 17-Jun-19 4:00 PM Junaid CLOSED
Rajendran
Yard.
Pre-welding and weld joint fit up inspection for
3546 CPP-NGCP-W-3545 1400121787 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 18-Jun-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-934 km0+100 to km8+700
Post-welding visual inspection for HWYH-934
3547 CPP-NGCP-W-3546 1400121789 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 18-Jun-19 2.00 PM Shahbaz Mr. Suresh CLOSED
km0+100 to km8+700
NDE selection for welds of HWYH-934 km0+100
3548 CPP-NGCP-W-3547 1400121750 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-934 TA-445843 18-Jun-19 4:00 PM Shahbaz Mr. Suresh CLOSED
to km8+700
Pre-welding and weld joint fit up inspection for 10
3549 CPP-NGCP-W-3548 1400121791 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 18-Jun-19 8:00 AM asish Mr. Suresh CLOSED
inch HWYH-1036 KP0+100 to KP6+200
Post-welding visual inspection for 10inch HWYH-
3550 CPP-NGCP-W-3549 1400121771 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 FL TA-445826 18-Jun-19 2.00 PM asish Mr. Suresh CLOSED
1036 KP0+100 to KP6+200
NDE selection for welds of 10 inch HWYH-1036 TA-445826
3551 CPP-NGCP-W-3550 1400121692 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1036 FL 18-Jun-19 4:00 PM asish Mr. Suresh CLOSED
KP0+100 to KP6+200
Pre-welding and weld joint fit up inspection for 10
3552 CPP-NGCP-W-3551 1400121732 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 TA-445827 18-Jun-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1023 @ KP0+100 to KP5+300
Post-welding visual inspection for 10 inch HWYH- TA-445827
3553 CPP-NGCP-W-3552 1400121803 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 18-Jun-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1023 @ KP0+100 to KP5+300
NDE selection for welds of 10 inch HWYH-1023
3554 CPP-NGCP-W-3553 1400121792 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1023 TA-445827 18-Jun-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
@ KP0+100 to KP5+300
Pre-welding and weld joint fit up inspection for TA-445974
3555 CPP-NGCP-W-3554 1400121772 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL 18-Jun-19 8:00 AM abdul raheem Mr. Ashok CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK-
3556 CPP-NGCP-W-3555 1400121805 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 18-Jun-19 2.00 PM abdul raheem Mr. Ashok CLOSED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH TA-445974
3557 CPP-NGCP-W-3556 1400121794 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL 18-Jun-19 4:00 PM abdul raheem Mr. Ashok CLOSED
TRL km0+100 to 8+100
Pre-welding and weld joint fit up inspection for
3558 CPP-NGCP-W-3557 1400121825 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 18-Jun-19 8:00 AM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
Post-welding visual inspection for 16″HWYH GK- TA-445912
3559 CPP-NGCP-W-3558 1400121810 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL 18-Jun-19 2.00 PM Imran Mr. Ashok CLOSED
RH TRL km0+400-km6
NDE selection for welds of 16″HWYH GK-RH TRL
3560 CPP-NGCP-W-3559 1400121873 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 18-Jun-19 4:00 PM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
Pre-welding and weld joint fit up inspection for 24
TA-445990 Mr. RE-SCHEDULE TO 19-
3561 CPP-NGCP-W-3560 1400121885 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe Yard. 18-Jun-19 8:00 AM Junaid CLOSED JUNE-2019
Rajendran
TCF-1, CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr. RE-SCHEDULE TO 19-
3562 CPP-NGCP-W-3561 1400121861 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GCP-1 T/L SWEET at TCF-1, CPP TCF-1, CPP Pipe Yard. TA-445990 18-Jun-19 2.00 PM Junaid CLOSED JUNE-2019
Pipe Rajendran
NDE Yard.
selection for welds of 24 inch double joints
Mr. RE-SCHEDULE TO 19-
3563 CPP-NGCP-W-3562 1400121925 Welding SATIP-W-012-01 SAIC-W-2054 HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445990 18-Jun-19 4:00 PM Junaid CLOSED
Rajendran JUNE-2019
Yard.
Pre-welding and weld joint fit up inspection for 8
3564 CPP-NGCP-W-3563 1400122169 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1140 FL TA-669420 18-Jun-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1140 KP0+300 to KP0+500
Post-welding visual inspection for 8 inch HRDH-
3565 CPP-NGCP-W-3564 1400122159 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1140 FL TA-669420 18-Jun-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1140 KP0+300 to KP0+500
NDE selection for welds of 8 inch HRDH-1140
3566 CPP-NGCP-W-3565 1400122148 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1140 FL TA-669420 18-Jun-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP0+300 to KP0+500
Pre-welding and weld joint fit up inspection for 8
3567 CPP-NGCP-W-3566 1400122184 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1197 FL TA-669357 18-Jun-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1197 KP0+500 to KP0+900
Post-welding visual inspection for 8 inch HRDH
3568 CPP-NGCP-W-3567 1400122131 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1197 FL TA-669357 18-Jun-19 2.00 PM Saif Mr. Rajesh CLOSED
-1197 KP0+500 to KP0+900
NDE selection for welds of 8 inch HRDH -1197
3569 CPP-NGCP-W-3568 1400122188 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1197 FL TA-669357 18-Jun-19 4.00 PM Saif Mr. Rajesh CLOSED
KP0+500 to KP0+900
Pre-welding and weld joint fit up inspection for 8
3570 CPP-NGCP-W-3569 1400122171 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1148 FL TA-669357 18-Jun-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1148 KP2+100 to KP2+400
Post-welding visual inspection for 8 inch HRDH
3571 CPP-NGCP-W-3570 1400122177 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1148 FL TA-669357 18-Jun-19 2.00 PM Saif Mr. Rajesh CLOSED
-1148 KP2+100 to KP2+400
NDE selection for welds of 8 inch HRDH -1148
3572 CPP-NGCP-W-3571 1400122203 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1148 FL TA-669357 18-Jun-19 4.00 PM Saif Mr. Rajesh CLOSED
KP2+100 to KP2+400
Pre-welding and weld joint fit up inspection for 10 TA-843975 Mr.
3573 CPP-NGCP-W-3572 1400122189 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1153 F/L 18-Jun-19 8:00 AM Shadab CLOSED
inch HRDH-1153 KP2+300 to KP2+700 Rajendran
Post-welding visual inspection for 10 inch HRDH- Mr.
3574 CPP-NGCP-W-3573 1400122191 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1153 F/L TA-843975 18-Jun-19 2.00 PM Shadab CLOSED
1153 KP2+300 to KP2+700 Rajendran
NDE selection for welds of 10 inch HRDH-1153 TA-843975 Mr.
3575 CPP-NGCP-W-3574 1400122223 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1153 F/L 18-Jun-19 4.00 PM Shadab CLOSED
KP2+300 to KP2+700 Rajendran
Pre-welding and weld joint fit up inspection for 10 RE-SCHEDULE TO RE-SCHEDULE TO 20-
3576 CPP-NGCP-W-3575 1400122149 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1189 F/L TA-669337 18-Jun-19 8:00 AM Shadab Mr. Rajesh CLOSED
inch HRDH-1189 KP0+400 to KP0+600 19-JUNE-2019 JUNE-2019
3577 CPP-NGCP-W-3576 1400122194 Welding SATIP-W-012-01 SAIC-W-2048
Post-welding visual inspection for 10 inch HRDH-
HRDH-1189 F/L TA-669337 18-Jun-19 2.00 PM Shadab Mr. Rajesh CLOSED
RE-SCHEDULE TO RE-SCHEDULE TO 20-
1189 KP0+400 to KP0+600 19-JUNE-2019 JUNE-2019
NDE selection for welds of 10 inch HRDH-1189 RE-SCHEDULE TO RE-SCHEDULE TO 20-
3578 CPP-NGCP-W-3577 1400122150 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1189 F/L TA-669337 18-Jun-19 4.00 PM Shadab Mr. Rajesh CLOSED
KP0+400 to KP0+600 19-JUNE-2019 JUNE-2019
Pre-welding and weld joint fit up inspection for 16 HRDH -AK-RH Mr.
3579 CPP-NGCP-W-3578 1400122196 Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 18-Jun-19 8:00 AM IRSHAD CLOSED
inch HRDH AK-RH TR/L KP0+400 to KP0+700; TR/L Rajendran
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a Post-welding visual inspection for 16 inch HRDH HRDH -AK-RH Mr.
3580 CPP-NGCP-W-3579 1400122152 l Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 18-Jun-19 2.00 PM IRSHAD CLOSED
AK-RH TR/L KP0+400 to KP0+700; TR/L Rajendran
NDE selection for welds of 16 inch HRDH AK-RH HRDH -AK-RH Mr.
3581 CPP-NGCP-W-3580 1400122235 Welding SATIP-W-012-01 SAIC-W-2054 TA-843960 18-Jun-19 4.00 PM IRSHAD CLOSED
TR/L KP0+400 to KP0+700; TR/L Rajendran
Temperature Tie in Welding HRDH-922 at KM- TA-843609 Mr.
3582 CPP-NGCP-W-3581 1400122198 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -922 FL 18-Jun-19 10:00 AM Farhan CLOSED
3+315 Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
3583 CPP-NGCP-W-3582 1400122218 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 18-Jun-19 8:00 AM Farhan CLOSED
inch HRDH-922 at KM-3+315 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
3584 CPP-NGCP-W-3583 1400122237 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 18-Jun-19 2.00 PM Farhan CLOSED
922 at KM-3+315 Rajendran
NDE selection for welds of 8 inch HRDH-922 at TA-843609 Mr.
3585 CPP-NGCP-W-3584 1400122256 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL 18-Jun-19 4.00 PM Farhan CLOSED
KM-3+315 Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
3586 CPP-NGCP-W-3585 1400122206 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 18-Jun-19 8:00 AM Farhan CLOSED
inch HRDH-1116 at KM-2+360 to KM-2+470 Rajendran
Post-welding visual inspection for 8inch HRDH- TA-843608 Mr.
3587 CPP-NGCP-W-3586 1400122257 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL 18-Jun-19 2.00 PM Farhan CLOSED
1116 at KM-2+360 to KM-2+470 Rajendran
NDE selection for welds of 8 inch HRDH-1116 at Mr.
3588 CPP-NGCP-W-3587 1400122207 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1116 FL TA-843608 18-Jun-19 4.00 PM Farhan CLOSED
KM-2+360 to KM-2+470 Rajendran
Temperature Tie in Welding HRDH-1309 at KM- TA-843624
3589 CPP-NGCP-W-3588 1400122232 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1309 FL 18-Jun-19 10:00 AM Sarfaraz Mr. Ashok CLOSED
0+810 to KM-0+855
Pre-welding and weld joint fit up inspection for 8
3590 CPP-NGCP-W-3589 1400122277 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1309 FL TA-843624 18-Jun-19 8:00 AM Sarfaraz Mr. Ashok CLOSED
inch HRDH-1309 at KM-0+810 to KM-0+855
Post-welding visual inspection for 8inch HRDH- TA-843624
3591 CPP-NGCP-W-3590 1400122279 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1309 FL 18-Jun-19 2.00 PM Sarfaraz Mr. Ashok CLOSED
1309 at KM-0+810 to KM-0+855
NDE selection for welds of 8 inch HRDH-1309 at
3592 CPP-NGCP-W-3591 1400122247 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1309 FL TA-843624 18-Jun-19 4.00 PM Sarfaraz Mr. Ashok CLOSED
KM-0+810 to KM-0+855
3593 CPP-NGCP-W-3592 1400122239 Welding SATIP-W-012-01 SAIC-W-2051 Weld repair verification of joints HRDH -1063 FL TA-843953 18-Jun-19 8:00 AM Sarfaraz Mr. Ashok CLOSED
00-FW-40T3;at HRDH 1063
In-Process Verification - RT Techniques &
HRDH-1116, 1143, 1153, K13-RH, VARIOUS
3594 CPP-NGCP-W-3593 1400122282 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1116, 1143, 18-Jun-19 8:00 AM RAMEEZ Mr. Ashok CLOSED
922.
1153, K13-RH, 922.
In-Process Verification - RT Techniques &
HWYH-1093, 1036, GK-RH, 934,
3595 CPP-NGCP-W-3594 1400122303 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1093, 1036, VARIOUS 18-Jun-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
201
GK-RH, 934, 201
Pre-welding and weld joint fit up inspection TA-445843
3596 CPP-NGCP-W-3595 1400122824 Welding SATIP-W-012-01 SAIC-W-2048 for HWYH-934 km0+100 to km8+700 HWYH-934 19-Jun-19 8:00 AM Shahbaz Mr. Suresh CLOSED
Post-welding visual inspection for HWYH-934 TA-445843
3597 CPP-NGCP-W-3596 1400122825 Welding SATIP-W-012-01 SAIC-W-2048 km0+100 to km8+700 HWYH-934 19-Jun-19 2.00 PM Shahbaz Mr. Suresh CLOSED
NDE selection for welds of HWYH-934 km0+100 TA-445843
3598 CPP-NGCP-W-3597 1400122843 Welding SATIP-W-012-01 SAIC-W-2054 to km8+700 HWYH-934 19-Jun-19 4:00 PM Shahbaz Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection TA-445826
3599 CPP-NGCP-W-3598 1400122792 Welding SATIP-W-012-01 SAIC-W-2048 for 10 inch HWYH-1036 KP0+100 to KP6+200 HWYH-1036 FL 19-Jun-19 8:00 AM asish Mr. Suresh CLOSED
Post-welding visual inspection for 10inch TA-445826
3600 CPP-NGCP-W-3599 1400122836 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 KP0+100 to KP6+200 HWYH-1036 FL 19-Jun-19 2.00 PM asish Mr. Suresh CLOSED
NDE selection for welds of 10 inch HWYH-1036 TA-445826
3601 CPP-NGCP-W-3600 1400122821 Welding SATIP-W-012-01 SAIC-W-2054 KP0+100 to KP6+200 HWYH-1036 FL 19-Jun-19 4:00 PM asish Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection TA-445827
3602 CPP-NGCP-W-3601 1400122772 Welding SATIP-W-012-01 SAIC-W-2048 for 10 inch HWYH-1023 @ KP0+100 to KP5+300 HWYH-1023 19-Jun-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
Post-welding visual inspection for 10 inch TA-445827
3603 CPP-NGCP-W-3602 1400122826 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 @ KP0+100 to KP5+300 HWYH-1023 19-Jun-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED

3604 CPP-NGCP-W-3603 1400122781 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 10 inch HWYH-1023 HWYH-1023 TA-445827 19-Jun-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
@ KP0+100 to KP5+300
3605 CPP-NGCP-W-3604 1400122844 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection 16″HWYH CK-RH TRL TA-445974 19-Jun-19 8:00 AM abdul raheem Mr. Ashok CLOSED
for 16″HWYH CK-RH TRL km0+100 to 8+100
3606 CPP-NGCP-W-3605 1400122809 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 16″HWYH 16″HWYH CK-RH TRL TA-445974 19-Jun-19 2.00 PM abdul raheem Mr. Ashok CLOSED
CK-RH TRL km0+100 to 8+100
3607 CPP-NGCP-W-3606 1400122782 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 16″HWYH CK-RH 16″HWYH CK-RH TRL TA-445974 19-Jun-19 4:00 PM abdul raheem Mr. Ashok CLOSED
TRL km0+100 to 8+100
3608 CPP-NGCP-W-3607 1400122857 Welding SATIP-W-012-01 SAIC-W-2051 Weld repair verification of joints 16″HWYH CK-RH TRL TA-445974 19-Jun-19 8:00 AM abdul raheem Mr. Ashok CLOSED Re-Schedule to 21-JUN-
04-FW-366 HWYH CK-RH 2019
Post-welding visual inspection of repair
3609 CPP-NGCP-W-3608 1400122845 Welding SATIP-W-012-01 SAIC-W-2048 joints 16″HWYH CK-RH TRL TA-445974 19-Jun-19 2.00 PM abdul raheem Mr. Ashok CLOSED Re-Schedule to 21-JUN-
04-FW-366 HWYH CK-RH 2019
Pre-welding and weld joint fit up inspection TA-445912
3610 CPP-NGCP-W-3609 1400122810 Welding SATIP-W-012-01 SAIC-W-2048 for 16″HWYH GK-RH TRL km0+400-km6 16″HWYH GK-RH TRL 19-Jun-19 8:00 AM Imran Mr. Ashok CLOSED
Post-welding visual inspection for 16″HWYH TA-445912
3611 CPP-NGCP-W-3610 1400122858 Welding SATIP-W-012-01 SAIC-W-2048 GK-RH TRL km0+400-km6 16″HWYH GK-RH TRL 19-Jun-19 2.00 PM Imran Mr. Ashok CLOSED
NDE selection for welds of 16″HWYH GK-RH TA-445912
3612 CPP-NGCP-W-3611 1400122829 Welding SATIP-W-012-01 SAIC-W-2054 TRL 16″HWYH GK-RH TRL km0+400-km6 16″HWYH GK-RH TRL 19-Jun-19 4:00 PM Imran Mr. Ashok CLOSED
Pre-welding and weld joint fit up inspection for 8
3613 CPP-NGCP-W-3612 1400123269 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1173 FL TA-669298 19-Jun-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1173 KP1+600 to KP1+750
Post-welding visual inspection for 8 inch HRDH-
3614 CPP-NGCP-W-3613 1400123435 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1173 FL TA-669298 19-Jun-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1173 KP1+600 to KP1+750
NDE selection for welds of 8 inch HRDH-1173
3615 CPP-NGCP-W-3614 1400123409 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1173 FL TA-669298 19-Jun-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP1+600 to KP1+750
Pre-welding and weld joint fit up inspection for 8 TA-669357 RE-SCHEDULE TO
3616 CPP-NGCP-W-3615 1400123410 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1148 FL 19-Jun-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1148 KP1+700 to KP2+100 20-JUNE-2019
3617 CPP-NGCP-W-3616 1400123485 Welding SATIP-W-012-01 SAIC-W-2048
Post-welding visual inspection for 8 inch HRDH
HRDH -1148 FL TA-669357 19-Jun-19 2.00 PM Saif Mr. Rajesh CLOSED
RE-SCHEDULE TO
-1148 KP1+700 to KP2+100 20-JUNE-2019
NDE selection for welds of 8 inch HRDH -1148 TA-669357 RE-SCHEDULE TO
3618 CPP-NGCP-W-3617 1400123426 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1148 FL 19-Jun-19 4.00 PM Saif Mr. Rajesh CLOSED
KP1+700 to KP2+100 20-JUNE-2019
Pre-welding and weld joint fit up inspection for 16 HRDH -AK-RH Mr.
3619 CPP-NGCP-W-3618 1400123442 Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 19-Jun-19 8:00 AM IRSHAD CLOSED
inch HRDH AK-RH TR/L KP0+300 to KP0+400; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -AK-RH Mr.
3620 CPP-NGCP-W-3619 1400123543 Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 19-Jun-19 2.00 PM IRSHAD CLOSED
AK-RH TR/L KP0+300 to KP0+400; TR/L Rajendran
NDE selection for welds of 16 inch HRDH AK-RH HRDH -AK-RH Mr.
3621 CPP-NGCP-W-3620 1400123565 Welding SATIP-W-012-01 SAIC-W-2054 TA-843960 19-Jun-19 4.00 PM IRSHAD CLOSED
TR/L KP0+300 to KP0+400; TR/L Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -CK-RH Mr. RE-SCHEDULE TO
3622 CPP-NGCP-W-3621 1400123499 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 19-Jun-19 8:00 AM IRSHAD CLOSED
inch HRDH CK-RH TR/L KP0+300 to KP0+400; TR/L Rajendran 20-JUNE-2019
Post-welding visual inspection for 16 inch HRDH HRDH -CK-RH Mr. RE-SCHEDULE TO
3623 CPP-NGCP-W-3622 1400123546 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 19-Jun-19 2.00 PM IRSHAD CLOSED
CK-RH TR/L KP0+300 to KP0+400; TR/L Rajendran 20-JUNE-2019
3624 CPP-NGCP-W-3623 1400123471 Welding SATIP-W-012-01 SAIC-W-2054
NDE selection for welds of 16 inch HRDH CK-RH HRDH -CK-RH
TA-843958 19-Jun-19 4.00 PM IRSHAD
Mr.
CLOSED
RE-SCHEDULE TO
TR/L KP0+300 to KP0+400; TR/L Rajendran 20-JUNE-2019
Temperature Tie in Welding HRDH-1116 at KM- Mr.
3625 CPP-NGCP-W-3624 1400123550 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1116 FL TA-843608 19-Jun-19 10:00 AM Farhan CLOSED
2+460 and KM-2+657 to KM-2+750 Rajendran
Pre-welding and weld joint fit up inspection for 8
TA-843608 Mr.
3626 CPP-NGCP-W-3625 1400123490 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH-1116 at KM-2+460 and KM-2+657 to HRDH -1116 FL 19-Jun-19 8:00 AM Farhan CLOSED
Rajendran
KM-2+750
Post-welding visual inspection for 8inch HRDH- Mr.
3627 CPP-NGCP-W-3626 1400123522 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 19-Jun-19 2.00 PM Farhan CLOSED
1116 KM-2+460 and KM-2+657 to KM-2+750 Rajendran
NDE selection for welds of 8 inch HRDH-1116 TA-843608 Mr.
3628 CPP-NGCP-W-3627 1400123531 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1116 FL 19-Jun-19 4.00 PM Farhan CLOSED
KM-2+460 and KM-2+657 to KM-2+750 Rajendran
Temperature Tie in Welding HRDH-1309 at KM-
3629 CPP-NGCP-W-3628 1400123587 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1309 FL TA-843624 19-Jun-19 10:00 AM Sarfaraz Mr. Ashok CLOSED
0+900 to KM-0+987
Pre-welding and weld joint fit up inspection for 8 TA-843624
3630 CPP-NGCP-W-3629 1400123605 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1309 FL 19-Jun-19 8:00 AM Sarfaraz Mr. Ashok CLOSED
inch HRDH-1309 at KM-0+900 to KM-0+987
Post-welding visual inspection for 8inch HRDH-
3631 CPP-NGCP-W-3630 1400123606 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1309 FL TA-843624 19-Jun-19 2.00 PM Sarfaraz Mr. Ashok CLOSED
1309 at KM-0+900 to KM-0+987
NDE selection for welds of 8 inch HRDH-1309 at TA-843624
3632 CPP-NGCP-W-3631 1400123588 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1309 FL 19-Jun-19 4.00 PM Sarfaraz Mr. Ashok CLOSED
KM-0+900 to KM-0+987
In-Process Verification - RT Techniques &
HRDH- 1143, K13-RH, 922, 1140, Mr.
3633 CPP-NGCP-W-3632 1400123577 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- 1143, K13- VARIOUS 19-Jun-19 8:00 AM RAMEEZ CLOSED
1063 Rajendran
RH, 922, 1140, 1063
In-Process Verification - RT Techniques &
3634 CPP-NGCP-W-3633 1400123633 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1093, GK- HWYH-1093, GK-RH, CK-RH, 1023 VARIOUS 19-Jun-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
RH, CK-RH, 1023
In-Process Verification - RT Techniques & Mr.
3635 CPP-NGCP-W-3634 1400123643 Welding SATIP-NDE-RT-01 SAIC-RT-2007 TCF-1 VARIOUS 19-Jun-19 8:00 AM RAMEEZ CLOSED
Procedure Implementation of TRL-2 at TCF-1 Rajendran
In-Process Inspection of MPT using Mr.
3636 CPP-NGCP-W-3635 1400123578 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 TCF-1 VARIOUS 19-Jun-19 8:00 AM RAMEEZ CLOSED
Yoke Method, TRL-2 at TCF-1 Rajendran
Pre-welding and weld joint fit up inspection for 8
3637 CPP-NGCP-W-3636 1400124353 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1173 FL TA-669298 20-Jun-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1173 KP1+600 to KP1+750
Post-welding visual inspection for 8 inch HRDH-
3638 CPP-NGCP-W-3637 1400124311 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1173 FL TA-669298 20-Jun-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1173 KP1+600 to KP1+750
NDE selection for welds of 8 inch HRDH-1173
3639 CPP-NGCP-W-3638 1400124354 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1173 FL TA-669298 20-Jun-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP1+600 to KP1+750
Pre-welding and weld joint fit up inspection for 8 Mr.
3640 CPP-NGCP-W-3639 1400124454 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 20-Jun-19 8:00 AM Farhan CLOSED
inch HRDH-1116 at KM-2+657 to KM-2+750 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
3641 CPP-NGCP-W-3640 1400124417 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 20-Jun-19 2.00 PM Farhan CLOSED
1116 KM-2+657 to KM-2+750 Rajendran
NDE selection for welds of 8 inch HRDH-1116 Mr.
3642 CPP-NGCP-W-3641 1400124382 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1116 FL TA-843608 20-Jun-19 4.00 PM Farhan CLOSED
KM-2+657 to KM-2+750 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -CK-RH Mr. Cancelled due to
3643 CPP-NGCP-W-3642 1400124360 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 20-Jun-19 8:00 AM IRSHAD REJECTED
inch HRDH CK-RH TR/L KP0+400 to KP0+600; TR/L Rajendran already raised
Post-welding visual inspection for 16 inch HRDH HRDH -CK-RH Mr. Cancelled due to
3644 CPP-NGCP-W-3643 1400124413 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 20-Jun-19 2.00 PM IRSHAD REJECTED
CK-RH TR/L KP0+400 to KP0+600; TR/L Rajendran already raised
NDE selection for welds of 16 inch HRDH CK-RH HRDH -CK-RH Mr. Cancelled due to
3645 CPP-NGCP-W-3644 1400124377 Welding SATIP-W-012-01 SAIC-W-2054 TA-843958 20-Jun-19 4.00 PM IRSHAD REJECTED
TR/L KP0+400 to KP0+600; TR/L Rajendran already raised
In-Process Verification - RT Techniques &
HRDH-AK-RH, 1140, 1148, 1309, Mr.
3646 CPP-NGCP-W-3645 1400124397 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-AK-RH, VARIOUS 20-Jun-19 8:00 AM RAMEEZ CLOSED
1063 Rajendran
1140, 1148, 1309, 1063
In-Process Verification - RT Techniques &
HWYH-1036, 934, 1023, CK-RH, VARIOUS
3647 CPP-NGCP-W-3646 1400124407 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1036, 934, 20-Jun-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
GK-RH
1023, CK-RH, GK-RH
Welding consumables verification and visual Mr.
3648 CPP-NGCP-W-3647 1400124690 Welding SATIP-W-012-01 SAIC-W-2044 inspection storage & handling at TCF-1 TCF-1 N/A 20-Jun-19 8:00 AM Junaid CLOSED
Rajendran
Weld repair verification of joints
FW-428,207 of HWYH-921
HWYH-921 VARIOUS 8:00 AM Mr.
3649 CPP-NGCP-W-3648 1400124717 Welding SATIP-W-012-01 SAIC-W-2051 531T of HRDH-1171 20-Jun-19 Shanmuga CLOSED
HRDH-1171.1153 .1116 Rajendran
51 HRDH-1153
139T HRDH-1116
Pre-welding and weld joint fit up inspection TA-445843
3650 CPP-NGCP-W-3649 1400122827 Welding SATIP-W-012-01 SAIC-W-2048 for HWYH-934 km0+100 to km8+700 HWYH-934 20-Jun-19 8:00 AM Shahbaz Mr. Suresh CLOSED
Post-welding visual inspection for HWYH-934 TA-445843
3651 CPP-NGCP-W-3650 1400122828 Welding SATIP-W-012-01 SAIC-W-2048 km0+100 to km8+700 HWYH-934 20-Jun-19 2.00 PM Shahbaz Mr. Suresh CLOSED
NDE selection for welds of HWYH-934 km0+100 TA-445843
3652 CPP-NGCP-W-3651 1400123572 Welding SATIP-W-012-01 SAIC-W-2054 to km8+700 HWYH-934 20-Jun-19 4:00 PM Shahbaz Mr. Suresh CLOSED
3653 CPP-NGCP-W-3652 1400124037 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1071 FL HWYH-1071 FL TA-445836 20-Jun-19 7.00 AM asish Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 8 TA-445836
3654 CPP-NGCP-W-3653 1400124008 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL 20-Jun-19 8:00 AM asish Mr. Suresh CLOSED
inch HWYH-1071 FL KM 0+100 to km2+040
Post-welding visual inspection for 8 inch HWYH-
3655 CPP-NGCP-W-3654 1400124065 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 20-Jun-19 2.00 PM asish Mr. Suresh CLOSED
1071 FL KM 0+100 to km2+040
NDE selection for welds of 8 inch HWYH-1071 FL TA-445830
3656 CPP-NGCP-W-3655 1400124011 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1071 FL 20-Jun-19 4:00 PM asish Mr. Suresh CLOSED
KM 0+100 to km2+040
Pre-welding and weld joint fit up inspection TA-445827
3657 CPP-NGCP-W-3656 1400123838 Welding SATIP-W-012-01 SAIC-W-2048 for 10 inch HWYH-1023 @ KP0+100 to KP5+300 HWYH-1023 20-Jun-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
Post-welding visual inspection for 10 inch TA-445827
3658 CPP-NGCP-W-3657 1400123913 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 @ KP0+100 to KP5+300 HWYH-1023 20-Jun-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
NDE selection for welds of 10 inch HWYH-1023 TA-445827
3659 CPP-NGCP-W-3658 1400123914 Welding SATIP-W-012-01 SAIC-W-2054 @ KP0+100 to KP5+300 HWYH-1023 20-Jun-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection TA-445974
3660 CPP-NGCP-W-3659 1400123890 Welding SATIP-W-012-01 SAIC-W-2048 for 16″HWYH CK-RH TRL km0+100 to 8+100 16″HWYH CK-RH TRL 20-Jun-19 8:00 AM abdul raheem Mr. Ashok CLOSED
Post-welding visual inspection for 16″HWYH TA-445974
3661 CPP-NGCP-W-3660 1400123911 Welding SATIP-W-012-01 SAIC-W-2048 CK-RH TRL km0+100 to 8+100 16″HWYH CK-RH TRL 20-Jun-19 2.00 PM abdul raheem Mr. Ashok CLOSED
NDE selection for welds of 16″HWYH CK-RH TA-445974
3662 CPP-NGCP-W-3661 1400123831 Welding SATIP-W-012-01 SAIC-W-2054 TRL km0+100 to 8+100 16″HWYH CK-RH TRL 20-Jun-19 4:00 PM abdul raheem Mr. Ashok CLOSED
Pre-welding and weld joint fit up inspection TA-445912
3663 CPP-NGCP-W-3662 1400124038 Welding SATIP-W-012-01 SAIC-W-2048 for 16″HWYH GK-RH TRL km0+400-km6 16″HWYH GK-RH TRL 20-Jun-19 8:00 AM abdul raheem Mr. Ashok CLOSED
Post-welding visual inspection for 16″HWYH TA-445912
3664 CPP-NGCP-W-3663 1400124062 Welding SATIP-W-012-01 SAIC-W-2048 GK-RH TRL km0+400-km6 16″HWYH GK-RH TRL 20-Jun-19 2.00 PM abdul raheem Mr. Ashok CLOSED

3665 CPP-NGCP-W-3664 1400124124 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 16″HWYH GK-RH 16″HWYH GK-RH TRL TA-445912 20-Jun-19 4:00 PM abdul raheem Mr. Ashok CLOSED
TRL 16″HWYH GK-RH TRL km0+400-km6
3666 CPP-NGCP-W-3665 1400123925 Welding SATIP-W-012-01 SAIC-W-2048 Pre-welding and weld joint fit up inspection 16″HWYH GK-RH TRL TA-445912 20-Jun-19 8:00 AM Imran Mr. Ashok CLOSED
for 16″HWYH GK-RH TRL km0+400-km6
3667 CPP-NGCP-W-3666 1400123901 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for 16″HWYH 16″HWYH GK-RH TRL TA-445912 20-Jun-19 2.00 PM Imran Mr. Ashok CLOSED
GK-RH TRL km0+400-km6
3668 CPP-NGCP-W-3667 1400123871 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 16″HWYH GK-RH 16″HWYH GK-RH TRL TA-445912 20-Jun-19 4:00 PM Imran Mr. Ashok CLOSED
TRL 16″HWYH GK-RH TRL km0+400-km6
3669 CPP-NGCP-W-3668 1400124133 Welding SATIP-W-012-01 SAIC-W-2051 Weld repair verification of joints 16″HWYH GK-RH TRL TA-445912 21-Jun-19 8:00 AM abdul raheem Mr. Ashok CLOSED
08-FW-716,08-FW-717,08-FW-681 HWYH GK-RH
Post-welding visual inspection of repair
3670 CPP-NGCP-W-3669 1400124102 Welding SATIP-W-012-01 SAIC-W-2048 joints 16″HWYH GK-RH TRL TA-445912 21-Jun-19 2.00 PM abdul raheem Mr. Ashok CLOSED
08-FW-716,08-FW-717,08-FW-681 HWYH GK-RH
Weld repair verification of joints HWYH-975 FL TA-446045
3671 CPP-NGCP-W-3670 1400124167 Welding SATIP-W-012-01 SAIC-W-2051 FW44,FW48 HWYH 975 21-Jun-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED

Post-welding visual inspection of repair


3672 CPP-NGCP-W-3671 1400124183 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH-975 FL TA-446045 21-Jun-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
FW44,FW48 HWYH 975
Temperature Tie in Welding HRDH-1309 at KM- Mr.
3673 CPP-NGCP-W-3672 1400124672 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1309 FL TA-843624 20-Jun-19 10:00 AM Sarfaraz CLOSED
2+020 to KM-2+120 Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
3674 CPP-NGCP-W-3673 1400124754 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1309 FL TA-843624 20-Jun-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1309 at KM-2+020 to KM-2+120 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
3675 CPP-NGCP-W-3674 1400124730 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1309 FL TA-843624 20-Jun-19 2.00 PM Sarfaraz CLOSED
1309 at KM-2+020 to KM-2+120 Rajendran
NDE selection for welds of 8 inch HRDH-1309 at Mr.
3676 CPP-NGCP-W-3675 1400124680 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1309 FL TA-843624 20-Jun-19 4.00 PM Sarfaraz CLOSED
KM-2+020 to KM-2+120 Rajendran

3677 CPP-NGCP-W-3676 1400124356 Welding SATIP-W-012-01 SAIC-W-2048


Pre-welding and weld joint fit up inspection for 8
HRDH -922 FL TA-843609 20-Jun-19 8:00 AM Farhan
Mr.
REJECTED
RE-SCHEDULE TO CANCELLED DUE TO no work permit
inch HRDH-922 at KM-3+500 to 3+600 Rajendran 22-JUNE-2019
Post-welding visual inspection for 8inch HRDH- TA-843609 Mr. RE-SCHEDULE TO CANCELLED DUE TO no work permit
3678 CPP-NGCP-W-3677 1400124321 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL 20-Jun-19 2.00 PM Farhan REJECTED
922 at KM-3+500 to 3+600 Rajendran 22-JUNE-2019
NDE selection for welds of 8 inch HRDH-922 at TA-843609 Mr. RE-SCHEDULE TO CANCELLED DUE TO no work permit
3679 CPP-NGCP-W-3678 1400124312 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL 20-Jun-19 4.00 PM Farhan REJECTED
KM-3+500 to 3+600 Rajendran 22-JUNE-2019
Pre-welding and weld joint fit up inspection for 8
3680 CPP-NGCP-W-3679 1400124935 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1173 FL TA-669298 22-Jun-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1173 KP1+000 to KP1+400
Post-welding visual inspection for 8 inch HRDH-
3681 CPP-NGCP-W-3680 1400124919 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1173 FL TA-669298 22-Jun-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1173 KP1+000 to KP1+400
NDE selection for welds of 8 inch HRDH-1173
3682 CPP-NGCP-W-3681 1400124936 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1173 FL TA-669298 22-Jun-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP1+000 to KP1+400
Pre-welding and weld joint fit up inspection for 8
3683 CPP-NGCP-W-3682 1400124792 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1148 FL TA-669357 22-Jun-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1148 KP1+600 to KP1+800
Post-welding visual inspection for 8 inch HRDH
3684 CPP-NGCP-W-3683 1400124955 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1148 FL TA-669357 22-Jun-19 2.00 PM Saif Mr. Rajesh CLOSED
-1148 KP1+600 to KP1+800
NDE selection for welds of 8 inch HRDH -1148
3685 CPP-NGCP-W-3684 1400125098 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1148 FL TA-669357 22-Jun-19 4.00 PM Saif Mr. Rajesh CLOSED
KP1+600 to KP1+800
Pre-welding and weld joint fit up inspection for TA-445843
3686 CPP-NGCP-W-3685 1400124857 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 22-Jun-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-934 km0+100 to km8+700
Post-welding visual inspection for HWYH-934
3687 CPP-NGCP-W-3686 1400124859 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 22-Jun-19 2.00 PM Shahbaz Mr. Suresh CLOSED
km0+100 to km8+700
NDE selection for welds of HWYH-934 km0+100 TA-445843
3688 CPP-NGCP-W-3687 1400124838 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-934 22-Jun-19 4:00 PM Shahbaz Mr. Suresh CLOSED
to km8+700
The Joint welded 04-FW-
369 is normal joint not
temperature tie-in and
3689 CPP-NGCP-W-3688 1400125156 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1134 FL HWYH-1134 FL TA-843656 22-Jun-19 7.00 AM Umair Mr. Suresh Reject covered at pre and
poswelding RFI no
1400125689 - RFI need to
be cancelled
RFI repeated with RFI
Pre-welding and weld joint fit up inspection for 8
3690 CPP-NGCP-W-3689 1400125157 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-843656 22-Jun-19 8:00 AM Umair Mr. Suresh Reject 1400125689 - Need to be
inch HWYH-1134
cancelled
RFI repeated with RFI
Post-welding visual inspection for 8 inch HWYH-
3691 CPP-NGCP-W-3690 1400125139 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-843656 22-Jun-19 2.00 PM Umair Mr. Suresh Reject 1400125601 - Need to be
1134
cancelled
RFI repeated with RFI
3692 CPP-NGCP-W-3691 1400125191 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-843656 22-Jun-19 4:00 PM Umair Mr. Suresh Reject 1400125690 - Need to be
cancelled

3693 CPP-NGCP-W-3692 1400124890 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1071 FL HWYH-1071 FL TA-445836 22-Jun-19 7.00 AM asish Mr. Suresh CLOSED RE-SCHEDULE TO 23-
JUNE-2019
Pre-welding and weld joint fit up inspection for 8
3694 CPP-NGCP-W-3693 1400124910 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445836 22-Jun-19 8:00 AM asish Mr. Suresh CLOSED
inch HWYH-1071 FL KM 0+100 to km2+040

Post-welding visual inspection for 8 inch HWYH- TA-445830


3695 CPP-NGCP-W-3694 1400125060 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL 22-Jun-19 2.00 PM asish Mr. Suresh CLOSED
1071 FL KM 0+100 to km2+040
NDE selection for welds of 8 inch HWYH-1071 FL
3696 CPP-NGCP-W-3695 1400125099 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1071 FL TA-445830 22-Jun-19 4:00 PM asish Mr. Suresh CLOSED
KM 0+100 to km2+040
Pre-welding and weld joint fit up inspection for 10 TA-445827
3697 CPP-NGCP-W-3696 1400125020 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 22-Jun-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1023 @ KP0+100 to KP5+300
Post-welding visual inspection for 10 inch HWYH-
3698 CPP-NGCP-W-3697 1400125021 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 TA-445827 22-Jun-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1023 @ KP0+100 to KP5+300
NDE selection for welds of 10 inch HWYH-1023 TA-445827
3699 CPP-NGCP-W-3698 1400125180 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1023 22-Jun-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
@ KP0+100 to KP5+300
Pre-welding and weld joint fit up inspection for
3700 CPP-NGCP-W-3699 1400125198 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 22-Jun-19 8:00 AM abdul raheem Mr. Ashok CLOSED
16″HWYH GK-RH TRL km9+850
Post-welding visual inspection for 16″HWYH GK-
3701 CPP-NGCP-W-3700 140012521 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 22-Jun-19 2.00 PM abdul raheem Mr. Ashok CLOSED
RH TRL km9+850
NDE selection for welds of 16″HWYH GK-RH TRL
3702 CPP-NGCP-W-3701 1400125161 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 22-Jun-19 4:00 PM abdul raheem Mr. Ashok CLOSED
16″HWYH GK-RH TRL km9+850
Pre-welding and weld joint fit up inspection for
3703 CPP-NGCP-W-3702 1400125216 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 22-Jun-19 8:00 AM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
Post-welding visual inspection for 16″HWYH GK-
3704 CPP-NGCP-W-3703 1400125266 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 22-Jun-19 2.00 PM Imran Mr. Ashok CLOSED
RH TRL km0+400-km6
NDE selection for welds of 16″HWYH GK-RH TRL
3705 CPP-NGCP-W-3704 1400125260 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 22-Jun-19 4:00 PM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
Pre-welding and weld joint fit up inspection for 24
Mr.
3706 CPP-NGCP-W-3705 1400125263 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe Yard. TA-445990 22-Jun-19 8:00 AM Junaid CLOSED
Rajendran
TCF-1, CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
TA-445990 Mr.
3707 CPP-NGCP-W-3706 1400125286 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GCP-1 T/L SWEET at TCF-1, CPP TCF-1, CPP Pipe Yard. 22-Jun-19 2.00 PM Junaid CLOSED
Rajendran
Pipe Yard.
NDE selection for welds of 24 inch double joints
Mr.
3708 CPP-NGCP-W-3707 1400125252 Welding SATIP-W-012-01 SAIC-W-2054 HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445990 22-Jun-19 4:00 PM Junaid CLOSED
Rajendran
Yard.
Pre-welding and weld joint fit up inspection for 10 TA-669337
3709 CPP-NGCP-W-3708 1400125070 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1189 F/L 22-Jun-19 8:00 AM Shadab Mr. Rajesh CLOSED
inch HRDH-1189 KP0+900 to KP1+000
Post-welding visual inspection for 10 inch HRDH-
3710 CPP-NGCP-W-3709 1400125071 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1189 F/L TA-669337 22-Jun-19 2.00 PM Shadab Mr. Rajesh CLOSED
1189 KP0+900 to KP1+000
NDE selection for welds of 10 inch HRDH-1189 TA-669337
3711 CPP-NGCP-W-3710 1400125110 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1189 F/L 22-Jun-19 4.00 PM Shadab Mr. Rajesh CLOSED
KP0+900 to KP1+000
Pre-welding and weld joint fit up inspection for 16 HRDH -CK-RH Mr.
3712 CPP-NGCP-W-3711 1400125115 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 22-Jun-19 8:00 AM IRSHAD CLOSED
inch HRDH CK-RH TR/L KP0+600 to KP1+000; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -CK-RH TA-843958 Mr.
3713 CPP-NGCP-W-3712 1400125100 Welding SATIP-W-012-01 SAIC-W-2048 22-Jun-19 2.00 PM IRSHAD CLOSED
CK-RH TR/L KP0+600 to KP1+000; TR/L Rajendran
NDE selection for welds of 16 inch HRDH CK-RH HRDH -CK-RH Mr.
3714 CPP-NGCP-W-3713 1400125061 Welding SATIP-W-012-01 SAIC-W-2054 TA-843958 22-Jun-19 4.00 PM IRSHAD CLOSED
TR/L KP0+600 to KP1+000; TR/L Rajendran
Pre-welding and weld joint fit up inspection for 8 TA-843608
3715 CPP-NGCP-W-3714 1400125022 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL 22-Jun-19 8:00 AM Farhan Mr. Ashok CLOSED
inch HRDH-1116 at KM-2+750 to KM-2+850
Post-welding visual inspection for 8inch HRDH-
3716 CPP-NGCP-W-3715 1400125143 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 22-Jun-19 2.00 PM Farhan Mr. Ashok CLOSED
1116 at KM-2+750 to KM-2+850
NDE selection for welds of 8 inch HRDH-1116 at TA-843608
3717 CPP-NGCP-W-3716 1400125128 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1116 FL 22-Jun-19 4.00 PM Farhan Mr. Ashok CLOSED
KM-2+750 to KM-2+850
Pre-welding and weld joint fit up inspection for 8 Mr.
3718 CPP-NGCP-W-3717 1400125137 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1172 FL TA-843627 22-Jun-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1172 KP0+600 to KP0+800 Rajendran
Post-welding visual inspection for 8 inch HRDH- HRDH-1172 FL Mr.
3719 CPP-NGCP-W-3718 1400125088 Welding SATIP-W-012-01 SAIC-W-2048 TA-843627 22-Jun-19 2.00 PM Sarfaraz CLOSED
1172 KP0+600 to KP0+800 Rajendran
NDE selection for welds of 8 inch HRDH-1172 Mr.
3720 CPP-NGCP-W-3719 1400125138 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1172 FL TA-843627 22-Jun-19 4.00 PM Sarfaraz CLOSED
KP0+600 to KP0+800 Rajendran
Weld repair verification of joints
FW-428,207 of HWYH-921 HWYH-921 Mr.
3721 CPP-NGCP-W-3720 1400125389 Welding SATIP-W-012-01 SAIC-W-2051 VARIOUS 22-Jun-19 8:00 AM Shanmuga CLOSED
531T of HRDH-1171 HRDH-1171.1153 . Rajendran RE-SCHEDULE TO 23-
51 , 75 HRDH-1153 JUNE-2019
In-Process Verification - RT Techniques & Mr.
3722 CPP-NGCP-W-3721 1400125407 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-922, 1116, HRDH-922, 1116, 1173, 1309 VARIOUS 22-Jun-19 8:00 AM RAMEEZ CLOSED
Rajendran
1173, 1309
In-Process Verification - RT Techniques &
HWYH-1023, CK-RH, GK-RH, 1036,
3723 CPP-NGCP-W-3722 1400125408 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1023, CK- VARIOUS 22-Jun-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
934
RH, GK-RH, 1036, 934
Review of weekly welder performance and
3724 CPP-NGCP-W-3723 1400125706 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 13-june-2019 to 20 CPP site office N/A 23-Jun-19 8:00 AM RAMEEZ Mr. Rajesh CLOSED
Jun-2019 at CPP site office.
Pre-welding and weld joint fit up inspection for 8
3725 CPP-NGCP-W-3724 1400126023 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1173 FL TA-669298 23-Jun-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1173 KP0+800 to KP1+000
Post-welding visual inspection for 8 inch HRDH-
3726 CPP-NGCP-W-3725 1400126024 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1173 FL TA-669298 23-Jun-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1173 KP0+800 to KP1+000
NDE selection for welds of 8 inch HRDH-1173
3727 CPP-NGCP-W-3726 1400126019 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1173 FL TA-669298 23-Jun-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP0+800 to KP1+000
Pre-welding and weld joint fit up inspection for 8
3728 CPP-NGCP-W-3727 1400125971 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1148 FL TA-669357 23-Jun-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1148 KP1+500 to KP1+600
Post-welding visual inspection for 8 inch HRDH
3729 CPP-NGCP-W-3728 1400125980 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1148 FL TA-669357 23-Jun-19 2.00 PM Saif Mr. Rajesh CLOSED
-1148 KP1+500 to KP1+600
NDE selection for welds of 8 inch HRDH -1148
3730 CPP-NGCP-W-3729 1400126033 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1148 FL TA-669357 23-Jun-19 4.00 PM Saif Mr. Rajesh CLOSED
KP1+500 to KP1+600
Pre-welding and weld joint fit up inspection for 10
3731 CPP-NGCP-W-3730 1400126035 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1189 F/L TA-669337 23-Jun-19 8:00 AM Shadab Mr. Rajesh CLOSED
inch HRDH -1189 KP1+100 to KP1+400
Post-welding visual inspection for 10 inch HRDH
3732 CPP-NGCP-W-3731 1400126027 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1189 F/L TA-669337 23-Jun-19 2.00 PM Shadab Mr. Rajesh CLOSED
-1189 KP1+100 to KP1+400
NDE selection for welds of 10 inch HRDH -1189
3733 CPP-NGCP-W-3732 1400126010 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1189 F/L TA-669337 23-Jun-19 4.00 PM Shadab Mr. Rajesh CLOSED
KP1+100 to KP1+400
Pre-welding and weld joint fit up inspection for 16 HRDH -CK-RH Mr.
3734 CPP-NGCP-W-3733 1400126046 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 23-Jun-19 8:00 AM IRSHAD CLOSED
inch HRDH CK-RH TR/L KP1+000 to KP1+200; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -CK-RH Mr.
3735 CPP-NGCP-W-3734 1400126064 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 23-Jun-19 2.00 PM IRSHAD CLOSED
CK-RH TR/L KP1+000 to KP1+200; TR/L Rajendran
NDE selection for welds of 16 inch HRDH CK-RH HRDH -CK-RH Mr.
3736 CPP-NGCP-W-3735 1400126011 Welding SATIP-W-012-01 SAIC-W-2054 TA-843958 23-Jun-19 4.00 PM IRSHAD CLOSED
TR/L KP1+000 to KP1+200; TR/L Rajendran
Temperature Tie in Welding HRDH-1116 at KM-
3737 CPP-NGCP-W-3736 1400126057 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1116 FL TA-843608 23-Jun-19 10:00 AM Farhan Mr. Ashok CLOSED
2+810 and KM-2+790 to KM-2+880
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a Pre-welding and weld joint fit up inspection for 8
3738 CPP-NGCP-W-3737 1400126040 l Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH-1116 at KM-2+810 and KM-2+790 to HRDH -1116 FL TA-843608 23-Jun-19 8:00 AM Farhan Mr. Ashok CLOSED
KM-2+880
Post-welding visual inspection for 8inch HRDH-
3739 CPP-NGCP-W-3738 1400126074 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 23-Jun-19 2.00 PM Farhan Mr. Ashok CLOSED
1116 at KM-2+810 and KM-2+790 to KM-2+880
NDE selection for welds of 8 inch HRDH-1116 at
3740 CPP-NGCP-W-3739 1400126059 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1116 FL TA-843608 23-Jun-19 4.00 PM Farhan Mr. Ashok CLOSED
KM-2+810 and KM-2+790 to KM-2+880
Pre-welding and weld joint fit up inspection for 8 Mr.
3741 CPP-NGCP-W-3740 1400126042 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1172 FL TA-843627 23-Jun-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1172 KP0+300 to KP0+600 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
3742 CPP-NGCP-W-3741 1400126086 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1172 FL TA-843627 23-Jun-19 2.00 PM Sarfaraz CLOSED
1172 KP0+300 to KP0+600 Rajendran
NDE selection for welds of 8 inch HRDH-1172 Mr.
3743 CPP-NGCP-W-3742 1400126048 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1172 FL TA-843627 23-Jun-19 4.00 PM Sarfaraz CLOSED
KP0+300 to KP0+600 Rajendran
In-Process Verification - RT Techniques &
Mr.
3744 CPP-NGCP-W-3743 1400126093 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1153 , CK- HRDH-1153 , CK-RH, 1148, 1189. VARIOUS 23-Jun-19 8:00 AM RAMEEZ CLOSED
RH, 1148, 1189. Rajendran
In-Process Verification - RT Techniques &
HWYH-1023, CK-RH, GK-RH, 1071,
3745 CPP-NGCP-W-3744 1400126068 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1023, CK- VARIOUS 23-Jun-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
934
RH, GK-RH, 1071, 934
Pre-welding and weld joint fit up inspection for TA-445843
3746 CPP-NGCP-W-3745 1400125600 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 23-Jun-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-934 km0+100 to km8+700
Post-welding visual inspection for HWYH-934
3747 CPP-NGCP-W-3746 1400125635 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 23-Jun-19 2.00 PM Shahbaz Mr. Suresh CLOSED
km0+100 to km8+700
NDE selection for welds of HWYH-934 km0+100 TA-445843
3748 CPP-NGCP-W-3747 1400125685 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-934 23-Jun-19 4:00 PM Shahbaz Mr. Suresh CLOSED
to km8+700
RFI repeated with RFI
RE-SCHEDULE TO 24-
3749 CPP-NGCP-W-3748 1400125671 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1134 FL HWYH-1134 FL TA-843656 23-Jun-19 7.00 AM Umair Mr. Suresh CLOSED 1400125156 - Need to be
JUNE-2019
cancelled
Pre-welding and weld joint fit up inspection for 8 RE-SCHEDULE TO 24-
3750 CPP-NGCP-W-3749 1400125689 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-843656 23-Jun-19 8:00 AM Umair Mr. Suresh CLOSED
inch HWYH-1134 JUNE-2019
Post-welding visual inspection for 8 inch HWYH- TA-843656 RE-SCHEDULE TO 24-
3751 CPP-NGCP-W-3750 1400125601 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL 23-Jun-19 2.00 PM Umair Mr. Suresh CLOSED
1134 JUNE-2019
RE-SCHEDULE TO 24-
3752 CPP-NGCP-W-3751 1400125690 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-843656 23-Jun-19 4:00 PM Umair Mr. Suresh CLOSED
JUNE-2019
Weld repair verification of joints HWYH-975 FL TA-446045 RE-SCHEDULE TO 24-
3753 CPP-NGCP-W-3752 1400125642 Welding SATIP-W-012-01 SAIC-W-2051 FW44,FW48 HWYH 975 23-Jun-19 8:00 AM asish Mr. Suresh CLOSED
JUNE-2019
Post-welding visual inspection of repair RE-SCHEDULE TO 24-
3754 CPP-NGCP-W-3753 1400125714 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH-975 FL TA-446045 23-Jun-19 2.00 PM asish Mr. Suresh CLOSED
FW44,FW48 HWYH 975 JUNE-2019

Pre-welding and weld joint fit up inspection for 8 TA-445836


3755 CPP-NGCP-W-3754 1400125747 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL 23-Jun-19 8:00 AM asish Mr. Suresh CLOSED
inch HWYH-1071 FL KM 0+100 to km2+040
Post-welding visual inspection for 8 inch HWYH-
3756 CPP-NGCP-W-3755 1400125725 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 23-Jun-19 2.00 PM asish Mr. Suresh CLOSED
1071 FL KM 0+100 to km2+040
NDE selection for welds of 8 inch HWYH-1071 FL TA-445830
3757 CPP-NGCP-W-3756 1400125945 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1071 FL 23-Jun-19 4:00 PM asish Mr. Suresh CLOSED
KM 0+100 to km2+040
Pre-welding and weld joint fit up inspection for 10
3758 CPP-NGCP-W-3757 1400125941 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 TA-445827 23-Jun-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1023 @ KP0+100 to KP5+300
Post-welding visual inspection for 10 inch HWYH-
3759 CPP-NGCP-W-3758 1400125955 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 TA-445827 23-Jun-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1023 @ KP0+100 to KP5+300
NDE selection for welds of 10 inch HWYH-1023
3760 CPP-NGCP-W-3759 1400125958 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1023 TA-445827 23-Jun-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
@ KP0+100 to KP5+300
Pre-welding and weld joint fit up inspection for
3761 CPP-NGCP-W-3760 1400125994 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 23-Jun-19 8:00 AM abdul raheem Mr. Ashok CLOSED
16″HWYH GK-RH TRL km9+850
Post-welding visual inspection for 16″HWYH GK-
3762 CPP-NGCP-W-3761 1400126013 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 23-Jun-19 2.00 PM abdul raheem Mr. Ashok CLOSED
RH TRL km9+850
NDE selection for welds of 16″HWYH GK-RH TRL
3763 CPP-NGCP-W-3762 1400125969 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 23-Jun-19 4:00 PM abdul raheem Mr. Ashok CLOSED
16″HWYH GK-RH TRL km9+850
Pre-welding and weld joint fit up inspection for
3764 CPP-NGCP-W-3763 1400126005 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 23-Jun-19 8:00 AM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
Post-welding visual inspection for 16″HWYH GK-
3765 CPP-NGCP-W-3764 1400125970 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 23-Jun-19 2.00 PM Imran Mr. Ashok CLOSED
RH TRL km0+400-km6
NDE selection for welds of 16″HWYH GK-RH TRL
3766 CPP-NGCP-W-3765 1400126020 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 23-Jun-19 4:00 PM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
Pre-welding and weld joint fit up inspection for 24
TA-445990 Mr.
3767 CPP-NGCP-W-3766 1400126026 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe Yard. 23-Jun-19 8:00 AM Junaid CLOSED
Rajendran
TCF-1, CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
3768 CPP-NGCP-W-3767 1400126045 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GCP-1 T/L SWEET at TCF-1, CPP TCF-1, CPP Pipe Yard. TA-445990 23-Jun-19 2.00 PM Junaid CLOSED
Rajendran
Pipe Yard.
NDE selection for welds of 24 inch double joints
TA-445990 Mr.
3769 CPP-NGCP-W-3768 1400126083 Welding SATIP-W-012-01 SAIC-W-2054 HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. 23-Jun-19 4:00 PM Junaid CLOSED
Rajendran
Yard.
Pre-welding and weld joint fit up inspection for 10
3770 CPP-NGCP-W-3769 1400126022 Welding SATIP-W-012-01 SAIC-W-2048
inch HWYH-1093 FL @ KM-0+200 to 3
HWYH-1093 FL TA-445838 23-Jun-19 8:00 AM Imran Mr. Suresh CLOSED

Post-welding visual inspection for 10 inch HWYH-


3771 CPP-NGCP-W-3770 1400126079 Welding SATIP-W-012-01 SAIC-W-2048
1093 FL @ KM-0+200 to 3
HWYH-1093 FL TA-445838 23-Jun-19 2.00 PM Imran Mr. Suresh CLOSED

NDE selection for welds of 10 inch HWYH-1093


3772 CPP-NGCP-W-3771 1400126032 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1093 FL TA-445838 23-Jun-19 4:00 PM Imran Mr. Suresh CLOSED
FL @ KM-0+200 to 3
1400126519 Pre-welding and weld joint fit up inspection for 8 TA-669298
3773 CPP-NGCP-W-3772 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1173 FL 24-Jun-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1173 KP0+500 to KP0+800
Post-welding visual inspection for 8 inch HRDH-
3774 CPP-NGCP-W-3773 1400126487 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1173 FL TA-669298 24-Jun-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1173 KP0+500 to KP0+800

1400126430 NDE selection for welds of 8 inch HRDH-1173 TA-669298


3775 CPP-NGCP-W-3774 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1173 FL 24-Jun-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP0+500 to KP0+800
Pre-welding and weld joint fit up inspection for 8
3776 CPP-NGCP-W-3775 1400126469 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1148 FL TA-669357 24-Jun-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1148 KP1+000 to KP1+500
1400126510 Post-welding visual inspection for 8 inch HRDH TA-669357
3777 CPP-NGCP-W-3776 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1148 FL 24-Jun-19 2.00 PM Saif Mr. Rajesh CLOSED
-1148 KP1+000 to KP1+500
NDE selection for welds of 8 inch HRDH -1148
3778 CPP-NGCP-W-3777 1400126431 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1148 FL TA-669357 24-Jun-19 4.00 PM Saif Mr. Rajesh CLOSED
KP1+000 to KP1+500

1400126535 Pre-welding and weld joint fit up inspection for 8 HRDH-1144 F/L TA-669415
3779 CPP-NGCP-W-3778 Welding SATIP-W-012-01 SAIC-W-2048 24-Jun-19 8:00 AM Shadab Mr. Rajesh CLOSED
inch HRDH -1144 KP0+600 to KP0+800
Post-welding visual inspection for 8 inch HRDH
3780 CPP-NGCP-W-3779 1400126520 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1144 F/L TA-669415 24-Jun-19 2.00 PM Shadab Mr. Rajesh CLOSED
-1144 KP0+600 to KP0+800
NDE selection for welds of 8 inch HRDH -1144
3781 CPP-NGCP-W-3780 1400126536 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1144 F/L TA-669415 24-Jun-19 4.00 PM Shadab Mr. Rajesh CLOSED
KP0+600 to KP0+800
Pre-welding and weld joint fit up inspection for 16 HRDH -CK-RH Mr.
3782 CPP-NGCP-W-3781 1400126521 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 24-Jun-19 8:00 AM IRSHAD CLOSED
inch HRDH CK-RH TR/L KP1+200 to KP1+400; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -CK-RH Mr.
3783 CPP-NGCP-W-3782 1400126497 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 24-Jun-19 2.00 PM IRSHAD CLOSED
CK-RH TR/L KP1+200 to KP1+400; TR/L Rajendran
NDE selection for welds of 16 inch HRDH CK-RH HRDH -CK-RH Mr.
3784 CPP-NGCP-W-3783 1400126574 Welding SATIP-W-012-01 SAIC-W-2054 TA-843958 24-Jun-19 4.00 PM IRSHAD CLOSED
TR/L KP1+200 to KP1+400; TR/L Rajendran
Pre-welding and weld joint fit up inspection for 8
3785 CPP-NGCP-W-3784 1400126565 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 24-Jun-19 8:00 AM Farhan Mr. Ashok CLOSED
inch HRDH-922 at KM-3+509 to 3+614
Post-welding visual inspection for 8inch HRDH-
3786 CPP-NGCP-W-3785 1400126586 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 24-Jun-19 2.00 PM Farhan Mr. Ashok CLOSED
922 at KM-3+509 to 3+614
NDE selection for welds of 8 inch HRDH-922 at
3787 CPP-NGCP-W-3786 1400126502 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL TA-843609 24-Jun-19 4.00 PM Farhan Mr. Ashok CLOSED
KM-3+509 to 3+614
Pre-welding and weld joint fit up inspection for 8
Mr.
3788 CPP-NGCP-W-3787 1400126604 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH-1171 KP4+597 and KP4+970 to HRDH -1171 FL TA-843547 24-Jun-19 8:00 AM Sarfaraz CLOSED
Rajendran
KP5+050
Post-welding visual inspection for 8 inch HRDH- Mr.
3789 CPP-NGCP-W-3788 1400126613 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 24-Jun-19 2.00 PM Sarfaraz CLOSED
1171 KP4+597 and KP4+970 to KP5+050 Rajendran
NDE selection for welds of 8 inch HRDH-1171 Mr.
3790 CPP-NGCP-W-3789 1400126559 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 24-Jun-19 4.00 PM Sarfaraz CLOSED
KP4+597 and KP4+970 to KP5+050 Rajendran
In-Process Verification - RT Techniques &
1400126758 HRDH-1197, 1309, 1173, 1172, VARIOUS Mr.
3791 CPP-NGCP-W-3790 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1197, 1309, 24-Jun-19 8:00 AM RAMEEZ CLOSED
1189, 1171 Rajendran
1173, 1172, 1189, 1171
In-Process Verification - RT Techniques &
HWYH-921, 1023, GK-RH, 1071,
3792 CPP-NGCP-W-3791 1400126764 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-921, 1023, VARIOUS 24-Jun-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
934
GK-RH, 1071, 934
In-Process Inspection of MPT using
3793 CPP-NGCP-W-3792 1400126765 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 GK-RH VARIOUS 24-Jun-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
Yoke Method, HWYH-GK-RH
Pre-welding and weld joint fit up inspection for 8
3794 CPP-NGCP-W-3793 1400126804 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1147 F/L TA-669416 24-Jun-19 8:00 AM Shadab Mr. Rajesh CLOSED
inch HRDH -1147 KP1+500 to KP1+750
Post-welding visual inspection for 8 inch HRDH
3795 CPP-NGCP-W-3794 1400126825 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1147 F/L TA-669416 24-Jun-19 2.00 PM Shadab Mr. Rajesh CLOSED
-1147 KP1+500 to KP1+750
NDE selection for welds of 8 inch HRDH -1147
3796 CPP-NGCP-W-3795 1400126826 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1147 F/L TA-669416 24-Jun-19 4.00 PM Shadab Mr. Rajesh CLOSED
KP1+500 to KP1+750
Pre-welding and weld joint fit up inspection for 8
3797 CPP-NGCP-W-3796 1400126815 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1165 FL TA-669300 24-Jun-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1165 KP1+800 to KP2+000
Post-welding visual inspection for 8 inch HRDH-
3798 CPP-NGCP-W-3797 1400126829 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1165 FL TA-669300 24-Jun-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1165 KP1+800 to KP2+000
NDE selection for welds of 8 inch HRDH-1165
3799 CPP-NGCP-W-3798 1400126834 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1165 FL TA-669300 24-Jun-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP1+800 to KP2+000
Weld repair verification of joints
HRDH-AK Mr.
3800 CPP-NGCP-W-3799 1400126808 Welding SATIP-W-012-01 SAIC-W-2051 FW-190,283,285 of HRDH-AK VARIOUS 24-Jun-19 8:00 AM Shanmuga CLOSED
HRDH-BK Rajendran
FW-142 , 244 HRDH-BK
Weld repair verification of joints Mr.
3801 CPP-NGCP-W-3800 1400126915 Welding SATIP-W-012-01 SAIC-W-2051 HRDH-1153 . VARIOUS 24-Jun-19 8:00 AM Shanmuga CLOSED
51 , HRDH-1153 Rajendran
1400126466 Pre-welding and weld joint fit up inspection for TA-445843 8:00 AM
3802 CPP-NGCP-W-3801 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 24-Jun-19 Shahbaz Mr. Suresh CLOSED
HWYH-934 km0+100 to km8+700
Post-welding visual inspection for HWYH-934
3803 CPP-NGCP-W-3802 1400126504 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 24-Jun-19 2.00 PM Shahbaz Mr. Suresh CLOSED
km0+100 to km8+700
NDE selection for welds of HWYH-934 km0+100
3804 CPP-NGCP-W-3803 1400126477 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-934 TA-445843 24-Jun-19 4:00 PM Shahbaz Mr. Suresh CLOSED
to km8+700
Pre-welding and weld joint fit up inspection for 8
3805 CPP-NGCP-W-3804 1400126523 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445836 24-Jun-19 8:00 AM asish Mr. Suresh CLOSED
inch HWYH-1071 FL KM 0+100 to km2+040
Post-welding visual inspection for 8 inch HWYH-
3806 CPP-NGCP-W-3805 1400126495 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 24-Jun-19 2.00 PM asish Mr. Suresh CLOSED
1071 FL KM 0+100 to km2+040
NDE selection for welds of 8 inch HWYH-1071 FL
3807 CPP-NGCP-W-3806 1400126485 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1071 FL TA-445830 24-Jun-19 4:00 PM asish Mr. Suresh CLOSED
KM 0+100 to km2+040
Pre-welding and weld joint fit up inspection for 10
3808 CPP-NGCP-W-3807 1400126482 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 TA-445827 24-Jun-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1023 @ KP0+100 to KP5+300
Post-welding visual inspection for 10 inch HWYH-
3809 CPP-NGCP-W-3808 1400126551 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 TA-445827 24-Jun-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1023 @ KP0+100 to KP5+300
NDE selection for welds of 10 inch HWYH-1023
3810 CPP-NGCP-W-3809 1400126552 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1023 TA-445827 24-Jun-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
@ KP0+100 to KP5+300
Pre-welding and weld joint fit up inspection for
3811 CPP-NGCP-W-3810 1400126515 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 24-Jun-19 8:00 AM abdul raheem Mr. Ashok CLOSED
16″HWYH GK-RH TRL km9+850
Post-welding visual inspection for 16″HWYH GK-
3812 CPP-NGCP-W-3811 1400126517 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 24-Jun-19 2.00 PM abdul raheem Mr. Ashok CLOSED
RH TRL km9+850
NDE selection for welds of 16″HWYH GK-RH TRL
3813 CPP-NGCP-W-3812 1400126481 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 24-Jun-19 4:00 PM abdul raheem Mr. Ashok CLOSED
16″HWYH GK-RH TRL km9+850
Pre-welding and weld joint fit up inspection for
3814 CPP-NGCP-W-3813 1400126571 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 24-Jun-19 8:00 AM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
Post-welding visual inspection for 16″HWYH GK-
3815 CPP-NGCP-W-3814 1400126618 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 24-Jun-19 2.00 PM Imran Mr. Ashok CLOSED
RH TRL km0+400-km6
NDE selection for welds of 16″HWYH GK-RH TRL
3816 CPP-NGCP-W-3815 1400126598 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 24-Jun-19 4:00 PM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
Pre-welding and weld joint fit up inspection for 24
Mr.
3817 CPP-NGCP-W-3816 1400126599 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe Yard. TA-445990 24-Jun-19 8:00 AM Junaid CLOSED
Rajendran
TCF-1, CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
1400126706 TA-445990 2.00 PM Mr.
3818 CPP-NGCP-W-3817 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GCP-1 T/L SWEET at TCF-1, CPP TCF-1, CPP Pipe Yard. 24-Jun-19 Junaid CLOSED
Rajendran
Pipe
NDE Yard.
selection for welds of 24 inch double joints
Mr.
3819 CPP-NGCP-W-3818 1400126734 Welding SATIP-W-012-01 SAIC-W-2054 HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445990 24-Jun-19 4:00 PM Junaid CLOSED
Rajendran
Yard.
1400126983 Pre-welding and weld joint fit up inspection for TA-445889 8:00 AM
3820 CPP-NGCP-W-3819 Welding SATIP-W-012-01 SAIC-W-2048 HWYH HK-RH 24-Jun-19 sanjeev Mr. Suresh CLOSED
HWYH HK-RH HDD road crossing
Post-welding visual inspection for HWYH HK-RH
3821 CPP-NGCP-W-3820 1400126929 Welding SATIP-W-012-01 SAIC-W-2048 HWYH HK-RH TA-445889 24-Jun-19 2.00 PM sanjeev Mr. Suresh CLOSED
HDD road crossing
NDE selection for welds of HWYH HK-RH HDD
3822 CPP-NGCP-W-3821 1400126978 Welding SATIP-W-012-01 SAIC-W-2054 HWYH HK-RH TA-445889 24-Jun-19 4:00 PM sanjeev Mr. Suresh CLOSED
road crossing

1400127588 Pre-welding and weld joint fit up inspection for 8 TA-669357


3823 CPP-NGCP-W-3822 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1148 FL 25-Jun-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1148 KP0+700 to KP1+000
Post-welding visual inspection for 8 inch HRDH
3824 CPP-NGCP-W-3823 1400127627 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1148 FL TA-669357 25-Jun-19 2.00 PM Saif Mr. Rajesh CLOSED
-1148 KP0+700 to KP1+000

1400127655 NDE selection for welds of 8 inch HRDH -1148 TA-669357


3825 CPP-NGCP-W-3824 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1148 FL 25-Jun-19 4.00 PM Saif Mr. Rajesh CLOSED
KP0+700 to KP1+000
Pre-welding and weld joint fit up inspection for 8
3826 CPP-NGCP-W-3825 1400127656 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1144 F/L TA-669415 25-Jun-19 8:00 AM Shadab Mr. Rajesh CLOSED
inch HRDH -1144 KP0+400 to KP0+600
Post-welding visual inspection for 8 inch HRDH
3827 CPP-NGCP-W-3826 1400127647 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1144 F/L TA-669415 25-Jun-19 2.00 PM Shadab Mr. Rajesh CLOSED
-1144 KP0+400 to KP0+600
NDE selection for welds of 8 inch HRDH -1144
3828 CPP-NGCP-W-3827 1400127638 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1144 F/L TA-669415 25-Jun-19 4.00 PM Shadab Mr. Rajesh CLOSED
KP0+400 to KP0+600
Pre-welding and weld joint fit up inspection for 16 HRDH -CK-RH Mr.
3829 CPP-NGCP-W-3828 1400127610 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 25-Jun-19 8:00 AM IRSHAD CLOSED
inch HRDH CK-RH TR/L KP1+400 to KP1+600; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -CK-RH Mr.
3830 CPP-NGCP-W-3829 1400127658 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 25-Jun-19 2.00 PM IRSHAD CLOSED
CK-RH TR/L KP1+400 to KP1+600; TR/L Rajendran
NDE selection for welds of 16 inch HRDH CK-RH HRDH -CK-RH Mr.
3831 CPP-NGCP-W-3830 1400127611 Welding SATIP-W-012-01 SAIC-W-2054 TA-843958 25-Jun-19 4.00 PM IRSHAD CLOSED
TR/L KP1+400 to KP1+600; TR/L Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
3832 CPP-NGCP-W-3831 1400127631 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 25-Jun-19 8:00 AM Farhan CLOSED
inch HRDH-922 at KM-3+614 to 3+735 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
3833 CPP-NGCP-W-3832 1400127668 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 25-Jun-19 2.00 PM Farhan CLOSED
922 at KM-3+614 to 3+735 Rajendran
NDE selection for welds of 8 inch HRDH-922 at Mr.
3834 CPP-NGCP-W-3833 1400127713 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL TA-843609 25-Jun-19 4.00 PM Farhan CLOSED No Action
KM-3+614 to 3+735 Rajendran
Temperature Tie in Welding HRDH-1171 at KM-
3835 CPP-NGCP-W-3834 1400127602 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1171 FL TA-843547 25-Jun-19 10:00 AM Sarfaraz Mr. Ashok CLOSED
4+597 and 3+368
Pre-welding and weld joint fit up inspection for 8
3836 CPP-NGCP-W-3835 1400127677 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 25-Jun-19 8:00 AM Sarfaraz Mr. Ashok CLOSED
inch HRDH-1171 at KM-4+597 and 3+368
Post-welding visual inspection for 8 inch HRDH-
3837 CPP-NGCP-W-3836 1400127678 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 25-Jun-19 2.00 PM Sarfaraz Mr. Ashok CLOSED
1171 at KM-4+597 and 3+368
NDE selection for welds of 8 inch HRDH-1171 at
3838 CPP-NGCP-W-3837 1400127630 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 25-Jun-19 4.00 PM Sarfaraz Mr. Ashok CLOSED
KM-4+597 and 3+368
In-Process Verification - RT Techniques &
3839 CPP-NGCP-W-3838 1400127766 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1023, GK- HWYH-1023, GK-RH, 1071 VARIOUS 25-Jun-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
RH, 1071
MT Re-Schedule to 26-
In-Process Inspection of MPT using
3840 CPP-NGCP-W-3839 1400127803 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 HWYH-GK-RH, CK-RH VARIOUS 25-Jun-19 8:00 AM RAMEEZ Mr. Suresh CLOSED June-2019 due to break
Yoke Method, HWYH-GK-RH, CK-RH
down of Generator

1400127688 Pre-welding and weld joint fit up inspection for 8 TA-669300


3841 CPP-NGCP-W-3840 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1165 FL 25-Jun-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1165 KP1+350 to KP1+800
Post-welding visual inspection for 8 inch HRDH-
3842 CPP-NGCP-W-3841 1400127689 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1165 FL TA-669300 25-Jun-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1165 KP1+350 to KP1+800

1400127690 NDE selection for welds of 8 inch HRDH-1165 TA-669300


3843 CPP-NGCP-W-3842 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1165 FL 25-Jun-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP1+350 to KP1+800
Weld repair verification of joints
HRDH-AK Mr.
3844 CPP-NGCP-W-3843 1400127735 Welding SATIP-W-012-01 SAIC-W-2051 FW-165,39,196 of HRDH-AK VARIOUS 25-Jun-19 8:00 AM Shanmuga CLOSED
HRDH-BK Rajendran
FW-142 , 244 HRDH-BK

Pre-welding and weld joint fit up inspection for 10


3845 CPP-NGCP-W-3844 1400127714 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1189 F/L TA-669337 25-Jun-19 8:00 AM Shadab Mr. Rajesh CLOSED
inch HRDH -1189 KP1+400 to KP1+500

Post-welding visual inspection for 10 inch HRDH


3846 CPP-NGCP-W-3845 1400127691 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1189 F/L TA-669337 25-Jun-19 2.00 PM Shadab Mr. Rajesh CLOSED
-1189 KP1+400 to KP1+500
NDE selection for welds of 10 inch HRDH -1189
3847 CPP-NGCP-W-3846 1400127711 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1189 F/L TA-669337 25-Jun-19 4.00 PM Shadab Mr. Rajesh CLOSED
KP1+400 to KP1+500
Pre-welding and weld joint fit up inspection for
3848 CPP-NGCP-W-3847 1400127223 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 25-Jun-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-934 km0+100 to km8+700
Post-welding visual inspection for HWYH-934
3849 CPP-NGCP-W-3848 1400127187 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 25-Jun-19 2.00 PM Shahbaz Mr. Suresh CLOSED
km0+100 to km8+700
NDE selection for welds of HWYH-934 km0+100
3850 CPP-NGCP-W-3849 1400127170 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-934 TA-445843 25-Jun-19 4:00 PM Shahbaz Mr. Suresh CLOSED
to km8+700
3851 CPP-NGCP-W-3850 1400127432 Welding SATIP-W-012-01 SAIC-W-2051 Weld repair verification of joints HWYH-1003 TA-445909 25-Jun-19 8:00 AM Umair Mr. Suresh CLOSED
FW151,Fw589 HWYH-1003
3852 CPP-NGCP-W-3851 1400127482 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection of repair HWYH-1003 TA-445909 25-Jun-19 2.00 PM Umair Mr. Suresh CLOSED
joints FW151,Fw589 HWYH-1003
1400127215 Pre-welding and weld joint fit up inspection for 8 TA-445836 8:00 AM RE-SCHEDEULE TO 26-
3853 CPP-NGCP-W-3852 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL 25-Jun-19 asish Mr. Suresh CLOSED
inch HWYH-1071 FL KM 0+100 to km2+040 JUNE-2019
Post-welding visual inspection for 8 inch HWYH- RE-SCHEDEULE TO 26-
3854 CPP-NGCP-W-3853 1400127140 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 25-Jun-19 2.00 PM asish Mr. Suresh CLOSED
1071 FL KM 0+100 to km2+040 JUNE-2019

1400127171 NDE selection for welds of 8 inch HWYH-1071 FL TA-445830 4:00 PM RE-SCHEDEULE TO 26-
3855 CPP-NGCP-W-3854 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1071 FL 25-Jun-19 asish Mr. Suresh CLOSED
KM 0+100 to km2+040 JUNE-2019
Pre-welding and weld joint fit up inspection for 10
3856 CPP-NGCP-W-3855 1400127233 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 TA-445827 25-Jun-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1023 @ KP0+100 to KP5+300

1400127224 Post-welding visual inspection for 10 inch HWYH- TA-445827 2.00 PM


3857 CPP-NGCP-W-3856 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 25-Jun-19 Abdul Aziz Mr. Suresh CLOSED
1023 @ KP0+100 to KP5+300
NDE selection for welds of 10 inch HWYH-1023
3858 CPP-NGCP-W-3857 1400127234 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1023 TA-445827 25-Jun-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
@ KP0+100 to KP5+300
1400127189 Pre-welding and weld joint fit up inspection for TA-445912 8:00 AM
3859 CPP-NGCP-W-3858 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL 25-Jun-19 abdul raheem Mr. Ashok CLOSED
16″HWYH GK-RH TRL km9+850
Post-welding visual inspection for 16″HWYH GK-
3860 CPP-NGCP-W-3859 1400127209 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 25-Jun-19 2.00 PM abdul raheem Mr. Ashok CLOSED
RH TRL km9+850
1400127199 NDE selection for welds of 16″HWYH GK-RH TRL TA-445912 4:00 PM
3861 CPP-NGCP-W-3860 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL 25-Jun-19 abdul raheem Mr. Ashok CLOSED
16″HWYH GK-RH TRL km9+850
Pre-welding and weld joint fit up inspection for
3862 CPP-NGCP-W-3861 1400127200 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 25-Jun-19 8:00 AM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
1400127201 Post-welding visual inspection for 16″HWYH GK- TA-445912 2.00 PM
3863 CPP-NGCP-W-3862 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL 25-Jun-19 Imran Mr. Ashok CLOSED
RH TRL km0+400-km6
NDE selection for welds of 16″HWYH GK-RH TRL
3864 CPP-NGCP-W-3863 1400127253 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 25-Jun-19 4:00 PM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
Pre-welding and weld joint fit up inspection for 24
1400127225 TA-445990 8:00 AM Mr.
3865 CPP-NGCP-W-3864 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe Yard. 25-Jun-19 Junaid CLOSED
Rajendran
TCF-1, CPP Pipe Yard.
Post-welding visual inspection for 24 inch double
Mr.
3866 CPP-NGCP-W-3865 1400127210 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GCP-1 T/L SWEET at TCF-1, CPP TCF-1, CPP Pipe Yard. TA-445990 25-Jun-19 2.00 PM Junaid CLOSED
Pipe Rajendran
NDE Yard.
selection for welds of 24 inch double joints
Mr.
3867 CPP-NGCP-W-3866 1400127255 Welding SATIP-W-012-01 SAIC-W-2054 HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445990 25-Jun-19 4:00 PM Junaid CLOSED
Rajendran
Yard.
Pre-welding and weld joint fit up inspection for
3868 CPP-NGCP-W-3867 1400127379 Welding SATIP-W-012-01 SAIC-W-2048 HWYH HK-RH TA-445889 25-Jun-19 8:00 AM sanjeev Mr. Suresh CLOSED
HWYH HK-RH HDD road crossing
Post-welding visual inspection for HWYH HK-RH
3869 CPP-NGCP-W-3868 1400127332 Welding SATIP-W-012-01 SAIC-W-2048 HWYH HK-RH TA-445889 25-Jun-19 2.00 PM sanjeev Mr. Suresh CLOSED
HDD road crossing
NDE selection for welds of HWYH HK-RH HDD
3870 CPP-NGCP-W-3869 1400127433 Welding SATIP-W-012-01 SAIC-W-2054 HWYH HK-RH TA-445889 25-Jun-19 4:00 PM sanjeev Mr. Suresh CLOSED
road crossing
Temperature Tie in Welding HRDH-922 at KM- Mr. RE-SCHEDEULE TO 27-
3871 CPP-NGCP-W-3870 1400128593 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -922 FL TA-843609 26-Jun-19 10:00 AM Farhan CLOSED
3+652 to KM 3+735 Rajendran JUNE-2019
Pre-welding and weld joint fit up inspection for 8 Mr.
3872 CPP-NGCP-W-3871 1400128600 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 26-Jun-19 8:00 AM Farhan CLOSED
inch HRDH-922 at KM-3+652 to KM 3+735 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
3873 CPP-NGCP-W-3872 1400128677 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 26-Jun-19 2.00 PM Farhan CLOSED
922 at KM-3+652 to KM 3+735 Rajendran
NDE selection for welds of 8 inch HRDH-922 at Mr.
3874 CPP-NGCP-W-3873 1400128665 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL TA-843609 26-Jun-19 4.00 PM Farhan CLOSED
KM-3+652 to KM 3+735 Rajendran
Temperature Tie in Welding HRDH-1171 at KM-
3875 CPP-NGCP-W-3874 1400128696 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1171 FL TA-843547 26-Jun-19 10:00 AM Sarfaraz Mr. Ashok CLOSED
3+368 and 2+850 to 3+000
Pre-welding and weld joint fit up inspection for 8
3876 CPP-NGCP-W-3875 1400128684 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH-1171 at KM-3+368 and 2+850 to HRDH -1171 FL TA-843547 26-Jun-19 8:00 AM Sarfaraz Mr. Ashok CLOSED
3+000
Post-welding visual inspection for 8 inch HRDH-
3877 CPP-NGCP-W-3876 1400128694 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 26-Jun-19 2.00 PM Sarfaraz Mr. Ashok CLOSED
1171 at KM-3+368 and 2+850 to 3+000
1400128666 NDE selection for welds of 8 inch HRDH-1171 at TA-843547
3878 CPP-NGCP-W-3877 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL 26-Jun-19 4.00 PM Sarfaraz Mr. Ashok CLOSED
KM-3+368 and 2+850 to 3+000
In-Process Verification - RT Techniques &
3879 CPP-NGCP-W-3878 1400128601 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-934, GK-RH, HWYH-934, GK-RH, 975,1036 VARIOUS 26-Jun-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
975,1036
1400128685 Weld repair verification of joints VARIOUS 8:00 AM Mr.
3880 CPP-NGCP-W-3879 Welding SATIP-W-012-01 SAIC-W-2051 HRDH-BK 26-Jun-19 Shanmuga CLOSED
FW-142 , 244 HRDH-BK Rajendran
Pre-welding and weld joint fit up inspection for 8
3881 CPP-NGCP-W-3880 1400127968 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1165 FL TA-669300 26-Jun-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1165 KP1+100 to KP1+350
1400127985 Post-welding visual inspection for 8 inch HRDH- TA-669300
3882 CPP-NGCP-W-3881 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1165 FL 26-Jun-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1165 KP1+100 to KP1+350
NDE selection for welds of 8 inch HRDH-1165
3883 CPP-NGCP-W-3882 1400127977 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1165 FL TA-669300 26-Jun-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP1+100 to KP1+350

1400128003 Pre-welding and weld joint fit up inspection for 8 TA-669357


3884 CPP-NGCP-W-3883 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1148 FL 26-Jun-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1148 KP0+600 to KP0+700
Post-welding visual inspection for 8 inch HRDH
3885 CPP-NGCP-W-3884 1400128004 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1148 FL TA-669357 26-Jun-19 2.00 PM Saif Mr. Rajesh CLOSED
-1148 KP0+600 to KP0+700

1400127940 NDE selection for welds of 8 inch HRDH -1148 TA-669357


3886 CPP-NGCP-W-3885 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1148 FL 26-Jun-19 4.00 PM Saif Mr. Rajesh CLOSED
KP0+600 to KP0+700
Pre-welding and weld joint fit up inspection for 8
3887 CPP-NGCP-W-3886 1400127945 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1144 F/L TA-669415 26-Jun-19 8:00 AM Shadab Mr. Rajesh CLOSED
inch HRDH -1144 KP0+300 to KP0+400
1400127986 Post-welding visual inspection for 8 inch HRDH HRDH-1144 F/L TA-669415
3888 CPP-NGCP-W-3887 Welding SATIP-W-012-01 SAIC-W-2048 26-Jun-19 2.00 PM Shadab Mr. Rajesh CLOSED
-1144 KP0+300 to KP0+400
NDE selection for welds of 8 inch HRDH -1144
3889 CPP-NGCP-W-3888 1400127959 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1144 F/L TA-669415 26-Jun-19 4.00 PM Shadab Mr. Rajesh CLOSED
KP0+300 to KP0+400

1400128697 Pre-welding and weld joint fit up inspection for 8 HRDH-1147 F/L TA-669416
3890 CPP-NGCP-W-3889 Welding SATIP-W-012-01 SAIC-W-2048 26-Jun-19 7:30 AM Shadab Mr. Rajesh CLOSED
inch HRDH -1147 KP2+400 to KP2+500
Post-welding visual inspection for 8 inch HRDH
3891 CPP-NGCP-W-3890 1400128724 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1147 F/L TA-669416 26-Jun-19 2.30 PM Shadab Mr. Rajesh CLOSED
-1147 KP2+400 to KP2+500
NDE selection for welds of 8 inch HRDH -1147
3892 CPP-NGCP-W-3891 1400128670 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1147 F/L TA-669416 26-Jun-19 4.30 PM Shadab Mr. Rajesh CLOSED
KP2+400 to KP2+500
In-Process Verification - RT Techniques &
HRDH-AK, 1148, 1153, 1116, 922, Mr. RE-SCHEDEULE TO 27-
3893 CPP-NGCP-W-3892 1400128733 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-AK, 1148, VARIOUS 26-Jun-19 8:00 AM RAMEEZ CLOSED
CK-RH,1173,1172,1309,1171 Rajendran JUNE-2019
1153, 1116, 922, CK-RH,1173,1172,1309,1171
Pre-welding and weld joint fit up inspection for 16 HRDH -CK-RH Mr.
3894 CPP-NGCP-W-3893 1400128735 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 26-Jun-19 8:00 AM IRSHAD CLOSED
inch HRDH CK-RH TR/L KP1+700 to KP2+000; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -CK-RH Mr.
3895 CPP-NGCP-W-3894 1400128699 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 26-Jun-19 2.00 PM IRSHAD CLOSED
CK-RH TR/L KP1+700 to KP2+000; TR/L Rajendran
NDE selection for welds of 16 inch HRDH CK-RH HRDH -CK-RH Mr.
3896 CPP-NGCP-W-3895 1400128734 Welding SATIP-W-012-01 SAIC-W-2054 TA-843958 26-Jun-19 4.00 PM IRSHAD CLOSED
TR/L KP1+700 to KP2+000; TR/L Rajendran
NDE selection for welds of 10 inch16″HWYH CK-
3897 CPP-NGCP-W-3896 1400127429 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH CK-RH TRL km0+100 to 16″HWYH CK-RH TRL TA-445974 26-Jun-19 4:00 PM abdul raheem Mr. Ashok CLOSED
8+100
1400128115 Pre-welding and weld joint fit up inspection for TA-445912
3898 CPP-NGCP-W-3897 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL 26-Jun-19 8:00 AM abdul raheem Mr. Ashok CLOSED
16″HWYH GK-RH TRL km9+850
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a Post-welding visual inspection for 16″HWYH GK-
3899 CPP-NGCP-W-3898 1400128085 l Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 26-Jun-19 2.00 PM abdul raheem Mr. Ashok CLOSED
RH TRL km9+850
NDE selection for welds of 16″HWYH GK-RH TRL
3900 CPP-NGCP-W-3899 1400128117 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 26-Jun-19 4:00 PM abdul raheem Mr. Ashok CLOSED
16″HWYH GK-RH TRL km9+850
Pre-welding and weld joint fit up inspection for
3901 CPP-NGCP-W-3900 1400128134 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 26-Jun-19 8:00 AM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
Post-welding visual inspection for 16″HWYH GK-
3902 CPP-NGCP-W-3901 1400128164 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 26-Jun-19 2.00 PM Imran Mr. Ashok CLOSED
RH TRL km0+400-km6
NDE selection for welds of 16″HWYH GK-RH TRL
3903 CPP-NGCP-W-3902 1400128099 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 26-Jun-19 4:00 PM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6

Pre-welding and weld joint fit up inspection for 24


Mr.
3904 CPP-NGCP-W-3903 1400128108 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe Yard. TA-445990 26-Jun-19 8:00 AM Junaid CLOSED
Rajendran
TCF-1, CPP Pipe Yard.

Post-welding visual inspection for 24 inch double


1400128100 TA-445990 Mr.
3905 CPP-NGCP-W-3904 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GCP-1 T/L SWEET at TCF-1, CPP TCF-1, CPP Pipe Yard. 26-Jun-19 2.00 PM Junaid CLOSED
Rajendran
Pipe Yard.

NDE selection for welds of 24 inch double joints


Mr.
3906 CPP-NGCP-W-3905 1400128101 Welding SATIP-W-012-01 SAIC-W-2054 HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445990 26-Jun-19 4:00 PM Junaid CLOSED
Rajendran
Yard.

Pre-welding and weld joint fit up inspection for


3907 CPP-NGCP-W-3906 1400128139 Welding SATIP-W-012-01 SAIC-W-2048 HWYH HK-RH TA-445889 26-Jun-19 8:00 AM sanjeev Mr. Suresh CLOSED
HWYH HK-RH HDD road crossing

Post-welding visual inspection for HWYH HK-RH


3908 CPP-NGCP-W-3907 1400128177 Welding SATIP-W-012-01 SAIC-W-2048 HWYH HK-RH TA-445889 26-Jun-19 2.00 PM sanjeev Mr. Suresh CLOSED
HDD road crossing

NDE selection for welds of HWYH HK-RH HDD


3909 CPP-NGCP-W-3908 1400128140 Welding SATIP-W-012-01 SAIC-W-2054 HWYH HK-RH TA-445889 26-Jun-19 4:00 PM sanjeev Mr. Suresh CLOSED
road crossing

Pre-welding and weld joint fit up inspection for


3910 CPP-NGCP-W-3909 1400128052 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 26-Jun-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-934 km0+100 to km8+700

Post-welding visual inspection for HWYH-934


3911 CPP-NGCP-W-3910 1400128061 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 26-Jun-19 2.00 PM Shahbaz Mr. Suresh CLOSED
km0+100 to km8+700

NDE selection for welds of HWYH-934 km0+100


3912 CPP-NGCP-W-3911 1400127991 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-934 TA-445843 26-Jun-19 4:00 PM Shahbaz Mr. Suresh CLOSED
to km8+700

Pre-welding and weld joint fit up inspection for


3913 CPP-NGCP-W-3912 1400128088 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1003 TA-445909 26-Jun-19 8:00 AM Umair Mr. Suresh CLOSED
HWYH-1003

3914 CPP-NGCP-W-3913 1400128193 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1003 HWYH-1003 TA-445909 26-Jun-19 2.00 PM Umair Mr. Suresh CLOSED

3915 CPP-NGCP-W-3914 1400128141 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1003 HWYH-1003 TA-445909 26-Jun-19 4:00 PM Umair Mr. Suresh CLOSED

Weld repair verification of joints 01-FW-129,01-


3916 CPP-NGCP-W-3915 1400128114 Welding SATIP-W-012-01 SAIC-W-2051 HWYH-201 TA-445909 26-Jun-19 8:00 AM Umair Mr. Suresh CLOSED
FW-130T2 HWYH-201

Post-welding visual inspection of repair joints 01-


3917 CPP-NGCP-W-3916 1400128021 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-201 TA-445909 26-Jun-19 2.00 PM Umair Mr. Suresh CLOSED
FW-129,01-FW-130T2 HWYH-201

1400128002 Pre-welding and weld joint fit up inspection for 10 TA-445827


3918 CPP-NGCP-W-3917 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 26-Jun-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1023 @ KP0+100 to KP5+300

Post-welding visual inspection for 10 inch HWYH-


3919 CPP-NGCP-W-3918 1400128123 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 TA-445827 26-Jun-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1023 @ KP0+100 to KP5+300

NDE selection for welds of 10 inch HWYH-1023


3920 CPP-NGCP-W-3919 1400128079 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1023 TA-445827 26-Jun-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
@ KP0+100 to KP5+300

Pre-welding and weld joint fit up inspection for 10


3921 CPP-NGCP-W-3920 1400127418 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 26-Jun-19 8:00 AM abdul raheem Mr. Ashok CLOSED
inch 16″HWYH CK-RH TRL km0+100 to 8+100

1400127341 Post-welding visual inspection for 10 inch TA-445974


3922 CPP-NGCP-W-3921 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL 26-Jun-19 2.00 PM abdul raheem Mr. Ashok CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100

Pre-welding and weld joint fit up inspection for


3923 CPP-NGCP-W-3922 1400128787 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 27-Jun-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-934 km0+100 to km8+700

Post-welding visual inspection for HWYH-934


3924 CPP-NGCP-W-3923 1400128816 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 27-Jun-19 2.00 PM Shahbaz Mr. Suresh CLOSED
km0+100 to km8+700

NDE selection for welds of HWYH-934 km0+100


3925 CPP-NGCP-W-3924 1400128838 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-934 TA-445843 27-Jun-19 4:00 PM Shahbaz Mr. Suresh CLOSED
to km8+700

Pre-welding and weld joint fit up inspection for 8


3926 CPP-NGCP-W-3925 1400128066 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445836 27-Jun-19 8:00 AM sanjeev Mr. Suresh CLOSED
inch HWYH-1071 FL KM 0+100 to km2+040

1400128067 Post-welding visual inspection for 8 inch HWYH- TA-445830


3927 CPP-NGCP-W-3926 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL 27-Jun-19 2.00 PM sanjeev Mr. Suresh CLOSED
1071 FL KM 0+100 to km2+040

NDE selection for welds of 8 inch HWYH-1071 FL


3928 CPP-NGCP-W-3927 1400128093 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1071 FL TA-445830 27-Jun-19 4:00 PM sanjeev Mr. Suresh CLOSED
KM 0+100 to km2+040

Pre-welding and weld joint fit up inspection for 10


3929 CPP-NGCP-W-3928 1400128798 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 TA-445827 27-Jun-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1023 @ KP0+100 to KP5+300

Post-welding visual inspection for 10 inch HWYH-


3930 CPP-NGCP-W-3929 1400128749 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 TA-445827 27-Jun-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1023 @ KP0+100 to KP5+300

1400128840 NDE selection for welds of 10 inch HWYH-1023 TA-445827


3931 CPP-NGCP-W-3930 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1023 27-Jun-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
@ KP0+100 to KP5+300

Pre-welding and weld joint fit up inspection for 10


3932 CPP-NGCP-W-3931 1400128887 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 27-Jun-19 8:00 AM abdul raheem Mr. Ashok CLOSED
inch 16″HWYH CK-RH TRL km0+100 to 8+100

Post-welding visual inspection for 10 inch


3933 CPP-NGCP-W-3932 1400128898 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 27-Jun-19 2.00 PM abdul raheem Mr. Ashok CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100

NDE selection for welds of 10 inch16″HWYH CK-


3934 CPP-NGCP-W-3933 1400128913 Welding SATIP-W-012-01 SAIC-W-2054 RH TRL 16″HWYH CK-RH TRL km0+100 to 16″HWYH CK-RH TRL TA-445974 27-Jun-19 4:00 PM abdul raheem Mr. Ashok CLOSED
8+100

1400128762 Pre-welding and weld joint fit up inspection for TA-445912


3935 CPP-NGCP-W-3934 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL 27-Jun-19 8:00 AM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6

Post-welding visual inspection for 16″HWYH GK-


3936 CPP-NGCP-W-3935 1400128817 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 27-Jun-19 2.00 PM Imran Mr. Ashok CLOSED
RH TRL km0+400-km6

NDE selection for welds of 16″HWYH GK-RH TRL


3937 CPP-NGCP-W-3936 1400128863 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 27-Jun-19 4:00 PM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6

Pre-welding and weld joint fit up inspection for 24


Mr. RE-SCHEDULE TO 29-
3938 CPP-NGCP-W-3937 1400128854 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe Yard. TA-445990 27-Jun-19 8:00 AM Junaid CLOSED
Rajendran JUEN-2019
TCF-1, CPP Pipe Yard.

Post-welding visual inspection for 24 inch double


1400128770 TA-445990 Mr. RE-SCHEDULE TO 29-
3939 CPP-NGCP-W-3938 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GCP-1 T/L SWEET at TCF-1, CPP TCF-1, CPP Pipe Yard. 27-Jun-19 2.00 PM Junaid CLOSED
Rajendran JUEN-2019
Pipe Yard.

NDE selection for welds of 24 inch double joints


Mr. RE-SCHEDULE TO 29-
3940 CPP-NGCP-W-3939 1400128771 Welding SATIP-W-012-01 SAIC-W-2054 HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445990 27-Jun-19 4:00 PM Junaid CLOSED
Rajendran JUEN-2019
Yard.

Pre-welding and weld joint fit up inspection for


3941 CPP-NGCP-W-3940 1400128908 Welding SATIP-W-012-01 SAIC-W-2048 HWYH HK-RH TA-445889 27-Jun-19 8:00 AM asish Mr. Suresh CLOSED
HWYH HK-RH HDD road crossing

Post-welding visual inspection for HWYH HK-RH


3942 CPP-NGCP-W-3941 1400128900 Welding SATIP-W-012-01 SAIC-W-2048 HWYH HK-RH TA-445889 27-Jun-19 2.00 PM asish Mr. Suresh CLOSED
HDD road crossing

NDE selection for welds of HWYH HK-RH HDD


3943 CPP-NGCP-W-3942 1400128914 Welding SATIP-W-012-01 SAIC-W-2054 HWYH HK-RH TA-445889 27-Jun-19 4:00 PM asish Mr. Suresh CLOSED
road crossing

Pre-welding and weld joint fit up inspection for 24 CANCELLED DUE TO


1400128941 TA-445990 Mr.
3944 CPP-NGCP-W-3943 Welding SATIP-W-012-01 SAIC-W-2048 inch double joints HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe Yard. 28-Jun-19 8:00 AM Junaid REJECTED PAY WELDER BREAK
Rajendran
TCF-1, CPP Pipe Yard. DOWN

Post-welding visual inspection for 24 inch double CANCELLED DUE TO


Mr.
3945 CPP-NGCP-W-3944 1400129053 Welding SATIP-W-012-01 SAIC-W-2048 joints HWYH GCP-1 T/L SWEET at TCF-1, CPP TCF-1, CPP Pipe Yard. TA-445990 28-Jun-19 2.00 PM Junaid REJECTED PAY WELDER BREAK
Rajendran
Pipe Yard. DOWN

NDE selection for welds of 24 inch double joints CANCELLED DUE TO


Mr.
3946 CPP-NGCP-W-3945 1400129068 Welding SATIP-W-012-01 SAIC-W-2054 HWYH GCP-1 T/L SWEET at TCF-1, CPP Pipe TCF-1, CPP Pipe Yard. TA-445990 28-Jun-19 4:00 PM Junaid REJECTED PAY WELDER BREAK
Rajendran
Yard. DOWN
Pre-welding and weld joint fit up inspection for 8
3947 CPP-NGCP-W-3946 1400129494 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1147 F/L TA-669416 27-Jun-19 7:30 AM Shadab Mr. Rajesh CLOSED
inch HRDH -1147 KP2+200 to KP2+400
1400129492 Post-welding visual inspection for 8 inch HRDH HRDH-1147 F/L TA-669416
3948 CPP-NGCP-W-3947 Welding SATIP-W-012-01 SAIC-W-2048 27-Jun-19 2.30 PM Shadab Mr. Rajesh CLOSED
-1147 KP2+200 to KP2+400
NDE selection for welds of 8 inch HRDH -1147
3949 CPP-NGCP-W-3948 1400129506 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1147 F/L TA-669416 27-Jun-19 4.30 PM Shadab Mr. Rajesh CLOSED
KP2+200 to KP2+400
Pre-welding and weld joint fit up inspection for 8
3950 CPP-NGCP-W-3949 1400129448 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1148 FL TA-669357 27-Jun-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1148 KP0+500 to KP0+600
Post-welding visual inspection for 8 inch HRDH
3951 CPP-NGCP-W-3950 1400129507 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1148 FL TA-669357 27-Jun-19 2.00 PM Saif Mr. Rajesh CLOSED
-1148 KP0+500 to KP0+600
NDE selection for welds of 8 inch HRDH -1148
3952 CPP-NGCP-W-3951 1400129472 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1148 FL TA-669357 27-Jun-19 4.00 PM Saif Mr. Rajesh CLOSED
KP0+500 to KP0+600
Pre-welding and weld joint fit up inspection for 8
3953 CPP-NGCP-W-3952 1400129524 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1138 FL TA-669297 27-Jun-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1138 KP0+400 to KP0+500
Post-welding visual inspection for 8 inch HRDH
3954 CPP-NGCP-W-3953 1400129534 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1138 FL TA-669297 27-Jun-19 2.00 PM Saif Mr. Rajesh CLOSED
-1138 KP0+400 to KP0+500
NDE selection for welds of 8 inch HRDH -1138
3955 CPP-NGCP-W-3954 1400129525 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1138 FL TA-669297 27-Jun-19 4.00 PM Saif Mr. Rajesh CLOSED
KP0+400 to KP0+500
Pre-welding and weld joint fit up inspection for 8
3956 CPP-NGCP-W-3955 1400129517 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1165 FL TA-669300 27-Jun-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1165 KP0+900 to KP1+100
Post-welding visual inspection for 8 inch HRDH-
3957 CPP-NGCP-W-3956 1400129496 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1165 FL TA-669300 27-Jun-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1165 KP0+900 to KP1+100
NDE selection for welds of 8 inch HRDH-1165
3958 CPP-NGCP-W-3957 1400129543 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1165 FL TA-669300 27-Jun-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP0+900 to KP1+100
Pre-welding and weld joint fit up inspection for 8 Mr.
3959 CPP-NGCP-W-3958 1400129535 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 27-Jun-19 8:00 AM Farhan CLOSED
inch HRDH-922 at KM-3+690 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
3960 CPP-NGCP-W-3959 1400129536 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 27-Jun-19 2.00 PM Farhan CLOSED
922 at KM-3+690 Rajendran
NDE selection for welds of 8 inch HRDH-922 at Mr.
3961 CPP-NGCP-W-3960 1400129479 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL TA-843609 27-Jun-19 4.00 PM Farhan CLOSED
KM-3+690 Rajendran
Pre-welding and weld joint fit up inspection for 8
3962 CPP-NGCP-W-3961 1400129527 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 27-Jun-19 7:30 AM Farhan Mr. Ashok CLOSED
inch HRDH-1116 at KM-3+040 to KM-3+150
Post-welding visual inspection for 8inch HRDH-
3963 CPP-NGCP-W-3962 1400129481 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 27-Jun-19 2.30 PM Farhan Mr. Ashok CLOSED
1116 at KM-3+040 to KM-3+150
NDE selection for welds of 8 inch HRDH-1116 at
3964 CPP-NGCP-W-3963 1400129480 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1116 FL TA-843608 27-Jun-19 4.30 PM Farhan Mr. Ashok CLOSED
KM-3+040 to KM-3+150
Pre-welding and weld joint fit up inspection for 8
3965 CPP-NGCP-W-3964 1400129563 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 27-Jun-19 8:00 AM Sarfaraz Mr. Ashok CLOSED
inch HRDH-1171 at KM- 2+750 to 2+950
Post-welding visual inspection for 8 inch HRDH-
3966 CPP-NGCP-W-3965 1400129545 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 27-Jun-19 2.00 PM Sarfaraz Mr. Ashok CLOSED
1171 at KM- 2+750 to 2+950
NDE selection for welds of 8 inch HRDH-1171 at
3967 CPP-NGCP-W-3966 1400129528 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 27-Jun-19 4.00 PM Sarfaraz Mr. Ashok CLOSED
KM- 2+750 to 2+950
Pre-welding and weld joint fit up inspection for 16 HRDH -CK-RH Mr.
3968 CPP-NGCP-W-3967 1400129554 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 27-Jun-19 8:00 AM IRSHAD CLOSED
inch HRDH CK-RH TR/L KP1+700 to KP2+000; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -CK-RH Mr.
3969 CPP-NGCP-W-3968 1400129518 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 27-Jun-19 2.00 PM IRSHAD CLOSED
CK-RH TR/L KP1+700 to KP2+000; TR/L Rajendran
NDE selection for welds of 16 inch HRDH CK-RH HRDH -CK-RH Mr.
3970 CPP-NGCP-W-3969 1400129529 Welding SATIP-W-012-01 SAIC-W-2054 TA-843958 27-Jun-19 4.00 PM IRSHAD CLOSED
TR/L KP1+700 to KP2+000; TR/L Rajendran
In-Process Verification - RT Techniques &
HWYH-934, GK-RH,HK-
3971 CPP-NGCP-W-3970 1400129519 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-934, GK- VARIOUS 27-Jun-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
RH,1134.1023, ,1071
RH,HK-RH,1134.1023, ,1071
In-Process Verification - RT Techniques & HRDH-1148, 1116, 922, CK-
1400129531 Procedure Implementation of HRDH-1148, 1116, VARIOUS Mr.
3972 CPP-NGCP-W-3971 Welding SATIP-NDE-RT-01 SAIC-RT-2007 RH,1173,1172,1171,1165,1147,1 28-Jun-19 8:00 AM RAMEEZ CLOSED
922, CK- Rajendran
144,1189,
RH,1173,1172,1171,1165,1147,1144,1189,
Pre-welding and weld joint fit up inspection for 8
3973 CPP-NGCP-W-3972 1400129799 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1165 FL TA-669300 29-Jun-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1165 KP0+900 to KP1+100
Post-welding visual inspection for 8 inch HRDH-
3974 CPP-NGCP-W-3973 1400129813 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1165 FL TA-669300 29-Jun-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1165 KP0+900 to KP1+100
NDE selection for welds of 8 inch HRDH-1165
3975 CPP-NGCP-W-3974 1400129722 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1165 FL TA-669300 29-Jun-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP0+900 to KP1+100
Pre-welding and weld joint fit up inspection for 8
3976 CPP-NGCP-W-3975 1400129823 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1138 FL TA-669297 29-Jun-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1138 KP0+400 to KP0+500
Post-welding visual inspection for 8 inch HRDH
3977 CPP-NGCP-W-3976 1400129833 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1138 FL TA-669297 29-Jun-19 2.00 PM Saif Mr. Rajesh CLOSED
-1138 KP0+400 to KP0+500
1400129769 NDE selection for welds of 8 inch HRDH -1138 TA-669297
3978 CPP-NGCP-W-3977 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1138 FL 29-Jun-19 4.00 PM Saif Mr. Rajesh CLOSED
KP0+400 to KP0+500
Pre-welding and weld joint fit up inspection for 8 Mr.
3979 CPP-NGCP-W-3978 1400129850 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 29-Jun-19 7:30 AM Farhan CLOSED
inch HRDH-1116 at KM-3+040 to KM-3+150 Rajendran
1400129875 Post-welding visual inspection for 8inch HRDH- TA-843608 Mr.
3980 CPP-NGCP-W-3979 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL 29-Jun-19 2.30 PM Farhan CLOSED
1116 at KM-3+040 to KM-3+150 Rajendran
NDE selection for welds of 8 inch HRDH-1116 at Mr.
3981 CPP-NGCP-W-3980 1400129887 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1116 FL TA-843608 29-Jun-19 4.30 PM Farhan CLOSED
KM-3+040 to KM-3+150 Rajendran

1400129869 Temperature Tie in Welding HRDH-1171 at KM- TA-843547


3982 CPP-NGCP-W-3981 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1171 FL 29-Jun-19 10:00 AM Sarfaraz Mr. Ashok CLOSED
4+597 and 3+368
Pre-welding and weld joint fit up inspection for 8
3983 CPP-NGCP-W-3982 1400129915 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 29-Jun-19 8:00 AM Sarfaraz Mr. Ashok CLOSED
inch HRDH-1171 at KM-4+597 and 3+368

1400129895 Post-welding visual inspection for 8 inch HRDH- TA-843547


3984 CPP-NGCP-W-3983 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL 29-Jun-19 2.00 PM Sarfaraz Mr. Ashok CLOSED
1171 at KM-4+597 and 3+368
NDE selection for welds of 8 inch HRDH-1171 at
3985 CPP-NGCP-W-3984 1400129923 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 29-Jun-19 4.00 PM Sarfaraz Mr. Ashok CLOSED
KM-4+597 and 3+368
Weld repair verification of joints
FW-158.166 of HRDH-1153
Mr.
3986 CPP-NGCP-W-3985 1400130136 Welding SATIP-W-012-01 SAIC-W-2051 FW-59 HRDH-1063 HRDH-1153.1063.1172.1189 VARIOUS 29-Jun-19 8:00 AM Shadab CLOSED
Rajendran
FW-41 HRDH-1172
FW-29 HRDH-1189
In-Process Verification - RT Techniques &
HRDH-1148, 1116, 922, CK-
Procedure Implementation of HRDH-1148, 1116, Mr.
3987 CPP-NGCP-W-3986 1400130146 Welding SATIP-NDE-RT-01 SAIC-RT-2007 RH,1173,1172,1171,1165,1147,1 VARIOUS 29-Jun-19 8:00 AM RAMEEZ CLOSED
922, CK- Rajendran
144,1189,
RH,1173,1172,1171,1165,1147,1144,1189,
In-Process Verification - RT Techniques &
1400130072 HWYH-934, GK-RH, 1071, 1134, VARIOUS
3988 CPP-NGCP-W-3987 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-934, GK-RH, 29-Jun-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
HK-RH, 201
1071, 1134, HK-RH, 201
In-Process Inspection of MPT using
3989 CPP-NGCP-W-3988 1400130105 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 HWYH-HK-RH, GK-RH. VARIOUS 29-Jun-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
Yoke Method, HWYH-HK-RH, GK-RH.
Pre-welding and weld joint fit up inspection for 8
3990 CPP-NGCP-W-3989 1400130330 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1147 F/L TA-669416 29-Jun-19 7:30 AM Shanmuga Mr. Rajesh CLOSED
inch HRDH -1147 KP2+000 to KP2+200
Post-welding visual inspection for 8 inch HRDH
3991 CPP-NGCP-W-3990 1400130279 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1147 F/L TA-669416 29-Jun-19 2.30 PM Shanmuga Mr. Rajesh CLOSED
-1147 KP2+000 to KP2+200
NDE selection for welds of 8 inch HRDH -1147
3992 CPP-NGCP-W-3991 1400130331 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1147 F/L TA-669416 29-Jun-19 4.30 PM Shanmuga Mr. Rajesh CLOSED
KP2+000 to KP2+200
Pre-welding and weld joint fit up inspection for 16 HRDH -CK-RH Mr.
3993 CPP-NGCP-W-3992 1400130306 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 29-Jun-19 8:00 AM IRSHAD CLOSED
inch HRDH CK-RH TR/L KP2+000 to KP2+500; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -CK-RH Mr.
3994 CPP-NGCP-W-3993 1400130260 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 29-Jun-19 2.00 PM IRSHAD CLOSED
CK-RH TR/L KP2+000 to KP2+500; TR/L Rajendran
NDE selection for welds of 16 inch HRDH CK-RH HRDH -CK-RH Mr.
3995 CPP-NGCP-W-3994 1400130332 Welding SATIP-W-012-01 SAIC-W-2054 TA-843958 29-Jun-19 4.00 PM IRSHAD CLOSED
TR/L KP2+000 to KP2+500; TR/L Rajendran
Pre-welding and weld joint fit up inspection for
3996 CPP-NGCP-W-3995 1400129592 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 29-Jun-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-934 km0+100 to km8+700
Post-welding visual inspection for HWYH-934
3997 CPP-NGCP-W-3996 1400129645 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 29-Jun-19 2.00 PM Shahbaz Mr. Suresh CLOSED
km0+100 to km8+700
NDE selection for welds of HWYH-934 km0+100
3998 CPP-NGCP-W-3997 1400129674 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-934 TA-445843 29-Jun-19 4:00 PM Shahbaz Mr. Suresh CLOSED
to km8+700
Pre-welding and weld joint fit up inspection for 8
3999 CPP-NGCP-W-3998 1400129675 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445836 29-Jun-19 8:00 AM sanjeev Mr. Suresh CLOSED
inch HWYH-1071 FL KM 0+100 to km2+040

1400129648 Post-welding visual inspection for 8 inch HWYH- TA-445830


4000 CPP-NGCP-W-3999 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL 29-Jun-19 2.00 PM sanjeev Mr. Suresh CLOSED
1071 FL KM 0+100 to km2+040
NDE selection for welds of 8 inch HWYH-1071 FL
4001 CPP-NGCP-W-4000 1400129636 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1071 FL TA-445830 29-Jun-19 4:00 PM sanjeev Mr. Suresh CLOSED
KM 0+100 to km2+040
1400129676 Pre-welding and weld joint fit up inspection for 10 TA-445827
4002 CPP-NGCP-W-4001 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 29-Jun-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
inch HWYH-1023 @ KP0+100 to KP5+300
Post-welding visual inspection for 10 inch HWYH-
4003 CPP-NGCP-W-4002 1400129705 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1023 TA-445827 29-Jun-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
1023 @ KP0+100 to KP5+300
1400129639 NDE selection for welds of 10 inch HWYH-1023 TA-445827
4004 CPP-NGCP-W-4003 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1023 29-Jun-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
@ KP0+100 to KP5+300
Pre-welding and weld joint fit up inspection for
4005 CPP-NGCP-W-4004 1400129707 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 29-Jun-19 8:00 AM abdul raheem Mr. Ashok CLOSED
16″HWYH GK-RH TRL km9+850
1400129684 Post-welding visual inspection for 16″HWYH GK- TA-445912
4006 CPP-NGCP-W-4005 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL 29-Jun-19 2.00 PM abdul raheem Mr. Ashok CLOSED
RH TRL km9+850
NDE selection for welds of 16″ 16″HWYH GK-RH
4007 CPP-NGCP-W-4006 1400129632 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 29-Jun-19 4:00 PM abdul raheem Mr. Ashok CLOSED
TRL km9+850
1400129733 Pre-welding and weld joint fit up inspection for TA-445912
4008 CPP-NGCP-W-4007 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL 29-Jun-19 8:00 AM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
Post-welding visual inspection for 16″HWYH GK-
4009 CPP-NGCP-W-4008 1400129715 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 29-Jun-19 2.00 PM Imran Mr. Ashok CLOSED
RH TRL km0+400-km6

1400129692 NDE selection for welds of 16″HWYH GK-RH TRL TA-445912


4010 CPP-NGCP-W-4009 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL 29-Jun-19 4:00 PM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
Pre-welding and weld joint fit up inspection for
4011 CPP-NGCP-W-4010 1400129901 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH TA-445887 29-Jun-19 8:00 AM asish Mr. Suresh CLOSED
HWYH CJ-RH HDD road crossing
1400129911 Post-welding visual inspection for HWYH CJ-RH TA-445887
4012 CPP-NGCP-W-4011 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH 29-Jun-19 2.00 PM asish Mr. Suresh CLOSED
HDD road crossing
NDE selection for welds of HWYH CJ-RH HDD
4013 CPP-NGCP-W-4012 1400130004 Welding SATIP-W-012-01 SAIC-W-2054 HWYH CJ-RH TA-445887 29-Jun-19 4:00 PM asish Mr. Suresh CLOSED
road crossing
1400130056 Weld repair verification of joints FW211 HWYH- TA-445826
4014 CPP-NGCP-W-4013 Welding SATIP-W-012-01 SAIC-W-2051 HWYH-1036 29-Jun-19 8:00 AM Umair Mr. Suresh CLOSED
1036
Post-welding visual inspection of repair joints
4015 CPP-NGCP-W-4014 1400130073 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1036 TA-445826 29-Jun-19 2.00 PM Umair Mr. Suresh CLOSED
FW211 HWYH-1036
Welding consumables verification and visual Mr.
4016 CPP-NGCP-W-4015 1400129830 Welding SATIP-W-012-01 SAIC-W-2044 TCF-1 N/A 29-Jun-19 8:00 AM Junaid CLOSED
inspection storage & handling at TCF-1 Rajendran
Pre-welding and weld joint fit up inspection for
4017 CPP-NGCP-W-4016 1400130497 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 30-Jun-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-934 km0+100 to km8+700
Post-welding visual inspection for HWYH-934
4018 CPP-NGCP-W-4017 1400130505 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 30-Jun-19 2.00 PM Shahbaz Mr. Suresh CLOSED
km0+100 to km8+700
NDE selection for welds of HWYH-934 km0+100
4019 CPP-NGCP-W-4018 1400130499 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-934 TA-445843 30-Jun-19 4:00 PM Shahbaz Mr. Suresh CLOSED
to km8+700
Pre-welding and weld joint fit up inspection for 8
4020 CPP-NGCP-W-4019 1400130487 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445836 30-Jun-19 8:00 AM sanjeev Mr. Suresh CLOSED
inch HWYH-1071 FL KM 0+100 to km2+040

1400130536 Post-welding visual inspection for 8 inch HWYH- TA-445830


4021 CPP-NGCP-W-4020 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL 30-Jun-19 2.00 PM sanjeev Mr. Suresh CLOSED
1071 FL KM 0+100 to km2+040
NDE selection for welds of 8 inch HWYH-1071 FL
4022 CPP-NGCP-W-4021 1400130480 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1071 FL TA-445830 30-Jun-19 4:00 PM sanjeev Mr. Suresh CLOSED
KM 0+100 to km2+040
1400130541 Pre-welding and weld joint fit up inspection for TA-445899
4023 CPP-NGCP-W-4022 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1102 30-Jun-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
HWYH-1102
4024 CPP-NGCP-W-4023 1400130572 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for h HWYH-1102 HWYH-1102 TA-445899 30-Jun-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
4025 CPP-NGCP-W-4024 1400130529 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1102 HWYH-1102 TA-445899 30-Jun-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
1400130593 Pre-welding and weld joint fit up inspection for TA-445912
4026 CPP-NGCP-W-4025 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL 30-Jun-19 8:00 AM abdul raheem Mr. Ashok CLOSED
16″HWYH GK-RH TRL km9+850
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a Post-welding visual inspection for 16″HWYH GK-
4027 CPP-NGCP-W-4026 1400130686 l Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 30-Jun-19 2.00 PM abdul raheem Mr. Ashok CLOSED
RH TRL km9+850
NDE selection for welds of 16″ 16″HWYH GK-RH
4028 CPP-NGCP-W-4027 1400130696 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 30-Jun-19 4:00 PM abdul raheem Mr. Ashok CLOSED
TRL km9+850
Pre-welding and weld joint fit up inspection for
4029 CPP-NGCP-W-4028 1400130660 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 30-Jun-19 8:00 AM abdul raheem Mr. Ashok CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK-
4030 CPP-NGCP-W-4029 1400130669 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 30-Jun-19 2.00 PM abdul raheem Mr. Ashok CLOSED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH
4031 CPP-NGCP-W-4030 1400130722 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 30-Jun-19 4:00 PM abdul raheem Mr. Ashok CLOSED
TRL km0+100 to 8+100
Pre-welding and weld joint fit up inspection for
4032 CPP-NGCP-W-4031 1400130746 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 30-Jun-19 8:00 AM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
Post-welding visual inspection for 16″HWYH GK-
4033 CPP-NGCP-W-4032 1400130783 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 30-Jun-19 2.00 PM Imran Mr. Ashok CLOSED
RH TRL km0+400-km6
NDE selection for welds of 16″HWYH GK-RH TRL
4034 CPP-NGCP-W-4033 1400130794 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 30-Jun-19 4:00 PM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
Pre-welding and weld joint fit up inspection for
4035 CPP-NGCP-W-4034 1400130966 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH TA-445887 30-Jun-19 8:00 AM asish Mr. Suresh CLOSED
HWYH CJ-RH HDD road crossing
Post-welding visual inspection for HWYH CJ-RH
4036 CPP-NGCP-W-4035 1400130978 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH TA-445887 30-Jun-19 2.00 PM asish Mr. Suresh CLOSED
HDD road crossing
NDE selection for welds of HWYH CJ-RH HDD
4037 CPP-NGCP-W-4036 1400130996 Welding SATIP-W-012-01 SAIC-W-2054 HWYH CJ-RH TA-445887 30-Jun-19 4:00 PM asish Mr. Suresh CLOSED
road crossing
Pre-welding and weld joint fit up inspection for RE-SCHEDULE TO 1-
4038 CPP-NGCP-W-4037 1400131001 Welding SATIP-W-012-01 SAIC-W-2048 HWYH GGM TRL-1 TA-445988 30-Jun-19 8:00 AM PRATHAB Mr. Suresh CLOSED
24″HWYH GGM TRL-1 JULY-2019
Post-welding visual inspection for 24″HWYH RE-SCHEDULE TO 1-
4039 CPP-NGCP-W-4038 1400131029 Welding SATIP-W-012-01 SAIC-W-2048 HWYH GGM TRL-1 TA-445988 30-Jun-19 2.00 PM PRATHAB Mr. Suresh CLOSED
GGM TRL-1 JULY-2019
RE-SCHEDULE TO 1-
4040 CPP-NGCP-W-4039 1400130988 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24″HWYH GGM TRL-1 HWYH GGM TRL-1 TA-445988 30-Jun-19 4:00 PM PRATHAB Mr. Suresh CLOSED
JULY-2019
Pre-welding and weld joint fit up inspection RE-SCHEDULE TO 1-
4041 CPP-NGCP-W-4040 1400131057 Welding SATIP-W-012-01 SAIC-W-2048 HWYH GGM TRL-2 TA-445989 30-Jun-19 8:00 AM PRATHAB Mr. Suresh CLOSED
24″HWYH GGM TRL-2 JULY-2019
Post-welding visual inspection for 24″HWYH RE-SCHEDULE TO 1-
4042 CPP-NGCP-W-4041 1400131052 Welding SATIP-W-012-01 SAIC-W-2048 HWYH GGM TRL-2 TA-445989 30-Jun-19 2.00 PM PRATHAB Mr. Suresh CLOSED
GGM TRL-2 JULY-2019
RE-SCHEDULE TO 1-
4043 CPP-NGCP-W-4042 1400131094 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24″HWYH GGM TRL-2 HWYH GGM TRL-2 TA-445989 30-Jun-19 4:00 PM PRATHAB Mr. Suresh CLOSED
JULY-2019
Pre-welding and weld joint fit up inspectionfor 24
4044 CPP-NGCP-W-4043 1400129679 Welding SATIP-W-012-01 SAIC-W-2048 HWYH GCP-1 T/L SWEET TA-445990 30-Jun-19 8:00 AM PRATHAB Mr. Suresh CLOSED
inch HWYH GCP-1 T/L SWEET
Post-welding visual inspection for 24 inch HWYH
4045 CPP-NGCP-W-4044 1400129732 Welding SATIP-W-012-01 SAIC-W-2048 HWYH GCP-1 T/L SWEET TA-445990 30-Jun-19 2.00 PM PRATHAB Mr. Suresh CLOSED
GCP-1 T/L SWEET
NDE selection for welds of 24 inchHWYH GCP-1
4046 CPP-NGCP-W-4045 1400129696 Welding SATIP-W-012-01 SAIC-W-2054 HWYH GCP-1 T/L SWEET TA-445990 30-Jun-19 4:00 PM PRATHAB Mr. Suresh CLOSED
T/L SWEET
Pre-welding and weld joint fit up inspection for 8
4047 CPP-NGCP-W-4046 1400130531 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1165 FL TA-669300 30-Jun-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1165 KP0+500 to KP0+700
Post-welding visual inspection for 8 inch HRDH-
4048 CPP-NGCP-W-4047 1400130491 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1165 FL TA-669300 30-Jun-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1165 KP0+500 to KP0+700
NDE selection for welds of 8 inch HRDH-1165
4049 CPP-NGCP-W-4048 1400130560 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1165 FL TA-669300 30-Jun-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP0+500 to KP0+700
Pre-welding and weld joint fit up inspection for 8 Cancelled due to
4050 CPP-NGCP-W-4049 1400130532 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1138 FL TA-669297 30-Jun-19 8:00 AM Saif Mr. Rajesh REJECTED
inch HRDH -1138 KP0+700 to KP0+800 already raised
Post-welding visual inspection for 8 inch HRDH Cancelled due to
4051 CPP-NGCP-W-4050 1400130633 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1138 FL TA-669297 30-Jun-19 2.00 PM Saif Mr. Rajesh REJECTED
-1138 KP0+700 to KP0+800 already raised
NDE selection for welds of 8 inch HRDH -1138 Cancelled due to
4052 CPP-NGCP-W-4051 1400130634 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1138 FL TA-669297 30-Jun-19 4.00 PM Saif Mr. Rajesh CLOSED
KP0+700 to KP0+800 already raised
Pre-welding and weld joint fit up inspection for 8
4053 CPP-NGCP-W-4052 1400130609 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1078 FL TA-669295 30-Jun-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1078 KP4+400 to KP4+600
1400130589 Post-welding visual inspection for 8 inch HRDH TA-669295
4054 CPP-NGCP-W-4053 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1078 FL 30-Jun-19 2.00 PM Saif Mr. Rajesh CLOSED
-1078 KP4+400 to KP4+600
NDE selection for welds of 8 inch HRDH -1078
4055 CPP-NGCP-W-4054 1400130617 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1078 FL TA-669295 30-Jun-19 4.00 PM Saif Mr. Rajesh CLOSED
KP4+400 to KP4+600
1400130618 Pre-welding and weld joint fit up inspection for 8 TA-669416
4056 CPP-NGCP-W-4055 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1147 F/L 30-Jun-19 7:30 AM Shanmuga Mr. Rajesh CLOSED
inch HRDH -1147 KP1+900 to KP2+000
Post-welding visual inspection for 8 inch HRDH
4057 CPP-NGCP-W-4056 1400130522 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1147 F/L TA-669416 30-Jun-19 2.30 PM Shanmuga Mr. Rajesh CLOSED
-1147 KP1+900 to KP2+000
1400130636 NDE selection for welds of 8 inch HRDH -1147 TA-669416
4058 CPP-NGCP-W-4057 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1147 F/L 30-Jun-19 4.30 PM Shanmuga Mr. Rajesh CLOSED
KP1+900 to KP2+000
Pre-welding and weld joint fit up inspection for 16 HRDH -CK-RH Mr.
4059 CPP-NGCP-W-4058 1400130611 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 30-Jun-19 8:00 AM IRSHAD CLOSED
inch HRDH CK-RH TR/L KP2+400 to KP2+600; TR/L Rajendran

1400130640 Post-welding visual inspection for 16 inch HRDH HRDH -CK-RH TA-843958 Mr.
4060 CPP-NGCP-W-4059 Welding SATIP-W-012-01 SAIC-W-2048 30-Jun-19 2.00 PM IRSHAD CLOSED
CK-RH TR/L KP2+400 to KP2+600; TR/L Rajendran
NDE selection for welds of 16 inch HRDH CK-RH HRDH -CK-RH Mr.
4061 CPP-NGCP-W-4060 1400130677 Welding SATIP-W-012-01 SAIC-W-2054 TA-843958 30-Jun-19 4.00 PM IRSHAD CLOSED
TR/L KP2+400 to KP2+600; TR/L Rajendran
1400130693 Pre-welding and weld joint fit up inspection for 8 TA-843609 Mr.
4062 CPP-NGCP-W-4061 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL 30-Jun-19 8:00 AM Farhan CLOSED
inch HRDH-922 at KM-3+900 to KM-4+000 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
4063 CPP-NGCP-W-4062 1400130639 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 30-Jun-19 2.00 PM Farhan CLOSED
922 at KM-3+900 to KM-4+000 Rajendran
1400130591 NDE selection for welds of 8 inch HRDH-922 at TA-843609 Mr.
4064 CPP-NGCP-W-4063 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL 30-Jun-19 4.00 PM Farhan CLOSED
KM-3+900 to KM-4+000 Rajendran
Temperature Tie in Welding HRDH-1171 at KM-
4065 CPP-NGCP-W-4064 1400130689 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1171 FL TA-843547 30-Jun-19 10:00 AM Sarfaraz Mr. Ashok CLOSED
2+560 and 2+036 to 2+075
Pre-welding and weld joint fit up inspection for 8
4066 CPP-NGCP-W-4065 1400130690 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH-1171 at KM-2+560 and 2+036 to HRDH -1171 FL TA-843547 30-Jun-19 8:00 AM Sarfaraz Mr. Ashok CLOSED
2+075
Post-welding visual inspection for 8 inch HRDH-
4067 CPP-NGCP-W-4066 1400130667 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 30-Jun-19 2.00 PM Sarfaraz Mr. Ashok CLOSED
1171 at KM-2+560 and 2+036 to 2+075
1400130668 NDE selection for welds of 8 inch HRDH-1171 at TA-843547
4068 CPP-NGCP-W-4067 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL 30-Jun-19 4.00 PM Sarfaraz Mr. Ashok CLOSED
KM-2+560 and 2+036 to 2+075
Weld repair verification of joints
Mr.
4069 CPP-NGCP-W-4068 1400131172 Welding SATIP-W-012-01 SAIC-W-2051 FW-55 of HRDH-1153 HRDH-1153.1189 VARIOUS 30-Jun-19 8:00 AM Shadab CLOSED
Rajendran
FW-29 ,68,70 HRDH-1189
In-Process Verification - RT Techniques &
Mr.
4070 CPP-NGCP-W-4069 1400131243 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1173, 1172, HRDH-1173, 1172, 1309, 922 VARIOUS 30-Jun-19 8:00 AM RAMEEZ CLOSED
Rajendran
1309, 922 Verification - RT Techniques &
In-Process
4071 CPP-NGCP-W-4070 1400131205 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1003, CK- HWYH-1003, CK-RH, 934 VARIOUS 30-Jun-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
RH, 934
Review of weekly welder performance and
4072 CPP-NGCP-W-4071 1400131634 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 13-june-2019 to 20 CPP site office N/A 01-Jul-19 8:00 AM Ruhul Mr. Rajesh CLOSED
Jun-2019 at CPP site office.
CPP-NGCP-W-4071- Pre-welding and weld joint fit up inspection for 8
4073 1400131375 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1165 FL TA-669300 1-Jul-19 8:00 AM Rajesh Mr. Rajesh CLOSED
A inch HRDH-1165 KP0+400 to KP0+500
Post-welding visual inspection for 8 inch HRDH-
4074 CPP-NGCP-W-4072 1400131260 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1165 FL TA-669300 1-Jul-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1165 KP0+400 to KP0+500
NDE selection for welds of 8 inch HRDH-1165
4075 CPP-NGCP-W-4073 1400131261 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1165 FL TA-669300 1-Jul-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP0+400 to KP0+500
Pre-welding and weld joint fit up inspection for 8
4076 CPP-NGCP-W-4074 1400131992 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1163 FL TA-669425 1-Jul-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1163 KP 1+200 to KP1+300
Post-welding visual inspection for 8 inch HRDH-
4077 CPP-NGCP-W-4075 1400132051 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1163 FL TA-669425 1-Jul-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1163 KP 1+200 to KP1+300
NDE selection for welds of 8 inch HRDH-1163 KP
4078 CPP-NGCP-W-4076 1400132052 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1163 FL TA-669425 1-Jul-19 4.00 PM Rajesh Mr. Rajesh CLOSED
1+200 to KP1+300
Pre-welding and weld joint fit up inspection for 8
4079 CPP-NGCP-W-4077 1400131338 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1078 FL TA-669295 1-Jul-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1078 KP4+200 to KP4+400
Post-welding visual inspection for 8 inch HRDH
4080 CPP-NGCP-W-4078 1400131332 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1078 FL TA-669295 1-Jul-19 2.00 PM Saif Mr. Rajesh CLOSED
-1078 KP4+200 to KP4+400
NDE selection for welds of 8 inch HRDH -1078
4081 CPP-NGCP-W-4079 1400131403 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1078 FL TA-669295 1-Jul-19 4.00 PM Saif Mr. Rajesh CLOSED
KP4+200 to KP4+400
Pre-welding and weld joint fit up inspection for 8
4082 CPP-NGCP-W-4080 1400131396 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1147 F/L TA-669416 1-Jul-19 7:30 AM Shanmuga Mr. Rajesh CLOSED
inch HRDH -1147 KP1+400 to KP1+600
Post-welding visual inspection for 8 inch HRDH
4083 CPP-NGCP-W-4081 1400131368 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1147 F/L TA-669416 1-Jul-19 2.30 PM Shanmuga Mr. Rajesh CLOSED
-1147 KP1+400 to KP1+600
NDE selection for welds of 8 inch HRDH -1147
4084 CPP-NGCP-W-4082 1400131356 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1147 F/L TA-669416 1-Jul-19 4.30 PM Shanmuga Mr. Rajesh CLOSED
KP1+400 to KP1+600
Pre-welding and weld joint fit up inspection for 16 HRDH -CK-RH Mr.
4085 CPP-NGCP-W-4083 1400131854 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 1-Jul-19 8:00 AM IRSHAD CLOSED
inch HRDH CK-RH TR/L KP2+600 to KP3+700; TR/L Rajendran

Post-welding visual inspection for 16 inch HRDH HRDH -CK-RH Mr.


4086 CPP-NGCP-W-4084 1400131798 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 1-Jul-19 2.00 PM IRSHAD REJECTED
CK-RH TR/L KP2+600 to KP3+700; TR/L Rajendran

NDE selection for welds of 16 inch HRDH CK-RH HRDH -CK-RH Mr.
4087 CPP-NGCP-W-4085 1400131835 Welding SATIP-W-012-01 SAIC-W-2054 TA-843958 1-Jul-19 4.00 PM IRSHAD CLOSED
TR/L KP2+600 to KP3+700; TR/L Rajendran

Temperature Tie in Welding HRDH-1116 at KM- Mr.


4088 CPP-NGCP-W-4086 1400131349 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1116 FL TA-843608 1-Jul-19 10:00 AM Farhan CLOSED
2+995 to KM-3+095 Rajendran

1400131340 Pre-welding and weld joint fit up inspection for 8 TA-843608 Mr.
4089 CPP-NGCP-W-4087 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL 1-Jul-19 8:00 AM Farhan CLOSED
inch HRDH-1116 at KM-2+995 to KM-3+095 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
4090 CPP-NGCP-W-4088 1400131357 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 1-Jul-19 2.00 PM Farhan CLOSED
1116 at KM-2+995 to KM-3+095 Rajendran

1400131341 NDE selection for welds of 8 inch HRDH-1116 at TA-843608 Mr.


4091 CPP-NGCP-W-4089 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1116 FL 1-Jul-19 4.00 PM Farhan CLOSED
KM-2+995 to KM-3+095 Rajendran

Temperature Tie in Welding HRDH-1171 at KM-


4092 CPP-NGCP-W-4090 1400131827 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1171 FL TA-843547 1-Jul-19 10:00 AM Sarfaraz Mr. Ashok CLOSED
2+036 and 0+651 to 0+738
Pre-welding and weld joint fit up inspection for 8
4093 CPP-NGCP-W-4091 1400131828 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH-1171 at KM-2+036 and 0+651 to HRDH -1171 FL TA-843547 1-Jul-19 8:00 AM Sarfaraz Mr. Ashok CLOSED
0+738
Post-welding visual inspection for 8 inch HRDH-
4094 CPP-NGCP-W-4092 1400131810 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 1-Jul-19 2.00 PM Sarfaraz Mr. Ashok CLOSED
1171 at KM-2+036 and 0+651 to 0+738
NDE selection for welds of 8 inch HRDH-1171 at
4095 CPP-NGCP-W-4093 1400131865 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 1-Jul-19 4.00 PM Sarfaraz Mr. Ashok CLOSED
KM-2+036 and 0+651 to 0+738
In-Process Verification - RT Techniques &
4097 CPP-NGCP-W-4095 1400131856 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-GK-RH, HWYH-GK-RH, 1071 VARIOUS 1-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1071
Pre-welding and weld joint fit up inspection for
4098 CPP-NGCP-W-4096 1400131239 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 1-Jul-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-934 km0+100 to km8+700
Post-welding visual inspection for HWYH-934
4099 CPP-NGCP-W-4097 1400131286 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 1-Jul-19 2.00 PM Shahbaz Mr. Suresh CLOSED
km0+100 to km8+700
1400131257 NDE selection for welds of HWYH-934 km0+100 TA-445843
4100 CPP-NGCP-W-4098 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-934 1-Jul-19 4:00 PM Shahbaz Mr. Suresh CLOSED
to km8+700
4101 CPP-NGCP-W-4099 1400132055 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1134 HWYH-1134 FL TA-843656 1-Jul-19 8:00 AM Umair Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 8
4102 CPP-NGCP-W-4100 1400131969 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-843656 1-Jul-19 8:00 AM Umair Mr. Suresh CLOSED
inch HWYH-1134
Post-welding visual inspection for 8 inch HWYH-
4103 CPP-NGCP-W-4101 1400131970 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-843656 1-Jul-19 2.00 PM Umair Mr. Suresh CLOSED
1134
4104 CPP-NGCP-W-4102 1400131994 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 HWYH-1134 FL TA-843656 1-Jul-19 4:00 PM Umair Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 8
4105 CPP-NGCP-W-4103 1400131240 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445836 1-Jul-19 8:00 AM sanjeev Mr. Suresh CLOSED
inch HWYH-1071 FL KM 0+100 to km2+040
Post-welding visual inspection for 8 inch HWYH-
4106 CPP-NGCP-W-4104 1400131307 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 1-Jul-19 2.00 PM sanjeev Mr. Suresh CLOSED
1071 FL KM 0+100 to km2+040
NDE selection for welds of 8 inch HWYH-1071 FL
4107 CPP-NGCP-W-4105 1400131308 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1071 FL TA-445830 1-Jul-19 4:00 PM sanjeev Mr. Suresh CLOSED
KM 0+100 to km2+040
Pre-welding and weld joint fit up inspection for
4108 CPP-NGCP-W-4106 1400131400 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1102 TA-445899 1-Jul-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
HWYH-1102
4109 CPP-NGCP-W-4107 1400131414 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1102 HWYH-1102 TA-445899 1-Jul-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
4110 CPP-NGCP-W-4108 1400131433 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1102 HWYH-1102 TA-445899 1-Jul-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4111 CPP-NGCP-W-4109 1400131399 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 1-Jul-19 8:00 AM abdul raheem Mr. Ashok CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK-
4112 CPP-NGCP-W-4110 1400131398 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 1-Jul-19 2.00 PM abdul raheem Mr. Ashok CLOSED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH
4113 CPP-NGCP-W-4111 1400131335 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 1-Jul-19 4:00 PM abdul raheem Mr. Ashok CLOSED
TRL km0+100 to 8+100
Pre-welding and weld joint fit up inspection for
4114 CPP-NGCP-W-4112 1400131323 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 1-Jul-19 8:00 AM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
Post-welding visual inspection for 16″HWYH GK-
4115 CPP-NGCP-W-4113 1400131222 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 1-Jul-19 2.00 PM Imran Mr. Ashok CLOSED
RH TRL km0+400-km6
NDE selection for welds of 16″HWYH GK-RH TRL
4116 CPP-NGCP-W-4114 1400131324 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 1-Jul-19 4:00 PM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
Pre-welding and weld joint fit up inspection for
4117 CPP-NGCP-W-4115 1400131212 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH TA-445887 1-Jul-19 8:00 AM asish Mr. Suresh CLOSED
HWYH CJ-RH HDD road crossing
1400131288 Post-welding visual inspection for HWYH CJ-RH TA-445887
4118 CPP-NGCP-W-4116 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH 1-Jul-19 2.00 PM asish Mr. Suresh CLOSED
HDD road crossing
NDE selection for welds of HWYH CJ-RH HDD
4119 CPP-NGCP-W-4117 1400131290 Welding SATIP-W-012-01 SAIC-W-2054 HWYH CJ-RH TA-445887 1-Jul-19 4:00 PM asish Mr. Suresh CLOSED
road crossing

1400131737 Pre-welding and weld joint fit up inspection for TA-445987 PRATHAB RE-SCHEDULE TO 2-
4120 CPP-NGCP-W-4118 Welding SATIP-W-012-01 SAIC-W-2048 HWGCP-1 TL SOUR 1-Jul-19 8:00 AM Mr. Suresh CLOSED
36″HWGCP-1 TL SOUR JULY-2019
Post-welding visual inspection for 36″HWGCP-1 RE-SCHEDULE TO 2-
4121 CPP-NGCP-W-4119 1400131795 Welding SATIP-W-012-01 SAIC-W-2048 HWGCP-1 TL SOUR TA-445987 1-Jul-19 2.00 PM PRATHAB Mr. Suresh CLOSED
TL SOUR JULY-2019

1400131761 NDE selection for welds of 36″HWGCP-1 TL TA-445987 PRATHAB RE-SCHEDULE TO 2-


4122 CPP-NGCP-W-4120 Welding SATIP-W-012-01 SAIC-W-2054 HWGCP-1 TL SOUR 1-Jul-19 4:00 PM Mr. Suresh CLOSED
SOUR JULY-2019
Welding consumables verification and visual Mr.
4123 CPP-NGCP-W-4121 1400132460 Welding SATIP-W-012-01 SAIC-W-2044 TCF-1 N/A 2-Jul-19 8:00 AM Junaid CLOSED
inspection storage & handling at TCF-1 Rajendran
1400132131 Pre-welding and weld joint fit up inspection for TA-445843
4124 CPP-NGCP-W-4122 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 2-Jul-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-934 km0+100 to km8+700
Post-welding visual inspection for HWYH-934
4125 CPP-NGCP-W-4123 1400132132 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-934 TA-445843 2-Jul-19 2.00 PM Shahbaz Mr. Suresh CLOSED
km0+100 to km8+700
1400132142 NDE selection for welds of HWYH-934 km0+100 TA-445843
4126 CPP-NGCP-W-4124 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-934 2-Jul-19 4:00 PM Shahbaz Mr. Suresh CLOSED
to km8+700
Pre-welding and weld joint fit up inspection for 8
4127 CPP-NGCP-W-4125 1400132193 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445836 2-Jul-19 8:00 AM sanjeev Mr. Suresh CLOSED
inch HWYH-1071 FL KM 0+100 to km2+040
1400132206 Post-welding visual inspection for 8 inch HWYH- TA-445830
4128 CPP-NGCP-W-4126 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL 2-Jul-19 2.00 PM sanjeev Mr. Suresh CLOSED
1071 FL KM 0+100 to km2+040
NDE selection for welds of 8 inch HWYH-1071 FL
4129 CPP-NGCP-W-4127 1400132156 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1071 FL TA-445830 2-Jul-19 4:00 PM sanjeev Mr. Suresh CLOSED
KM 0+100 to km2+040
1400132169 Pre-welding and weld joint fit up inspection for TA-445899
4130 CPP-NGCP-W-4128 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1102 2-Jul-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
HWYH-1102
4131 CPP-NGCP-W-4129 1400132197 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1102 HWYH-1102 TA-445899 2-Jul-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
4132 CPP-NGCP-W-4130 1400132121 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1102 HWYH-1102 TA-445899 2-Jul-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4133 CPP-NGCP-W-4131 1400132208 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 2-Jul-19 8:00 AM abdul raheem Mr. Ashok CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK-
4134 CPP-NGCP-W-4132 1400132191 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 2-Jul-19 2.00 PM abdul raheem Mr. Ashok CLOSED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH
4135 CPP-NGCP-W-4133 1400132181 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 2-Jul-19 4:00 PM abdul raheem Mr. Ashok CLOSED
TRL km0+100 to 8+100
Pre-welding and weld joint fit up inspection for
4136 CPP-NGCP-W-4134 1400132259 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 2-Jul-19 8:00 AM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
Post-welding visual inspection for 16″HWYH GK-
4137 CPP-NGCP-W-4135 1400132334 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 2-Jul-19 2.00 PM Imran Mr. Ashok CLOSED
RH TRL km0+400-km6
NDE selection for welds of 16″HWYH GK-RH
4138 CPP-NGCP-W-4136 1400132373 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 2-Jul-19 4:00 PM Imran Mr. Ashok CLOSED
TRL km0+400-km6
Pre-welding and weld joint fit up inspection for CANCELLED DUE TO
4139 CPP-NGCP-W-4137 1400132309 Welding SATIP-W-012-01 SAIC-W-2048 HWYH LSS TRL-1 TA-445981 2-Jul-19 8:00 AM asish Mr. Suresh CLOSED
16″HWYH LSS TRL-1 HDD road crossing JOB NOT READY
Post-welding visual inspection for 16″HWYH LSS CANCELLED DUE TO
4140 CPP-NGCP-W-4138 1400132384 Welding SATIP-W-012-01 SAIC-W-2048 HWYH LSS TRL-1 TA-445981 2-Jul-19 2.00 PM asish Mr. Suresh CLOSED
TRL-1 HDD road crossing JOB NOT READY
NDE selection for welds of 16″HWYH LSS TRL-1 CANCELLED DUE TO
4141 CPP-NGCP-W-4139 1400132439 Welding SATIP-W-012-01 SAIC-W-2054 HWYH LSS TRL-1 TA-445981 2-Jul-19 4:00 PM asish Mr. Suresh CLOSED
HDD road crossing JOB NOT READY
Pre-welding and weld joint fit up inspection for 8
4142 CPP-NGCP-W-4140 1400132278 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1163 FL TA-669425 2-Jul-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1163 KP 0+800 to KP1+200
Post-welding visual inspection for 8 inch HRDH-
4143 CPP-NGCP-W-4141 1400132279 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1163 FL TA-669425 2-Jul-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1163 KP 0+800 to KP1+200
NDE selection for welds of 8 inch HRDH-1163 KP
4144 CPP-NGCP-W-4142 1400132285 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1163 FL TA-669425 2-Jul-19 4.00 PM Rajesh Mr. Rajesh CLOSED
0+800 to KP1+200
Pre-welding and weld joint fit up inspection for 8
4145 CPP-NGCP-W-4143 1400132315 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1078 FL TA-669295 2-Jul-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1078 KP4+000 to KP4+200
Post-welding visual inspection for 8 inch HRDH
4146 CPP-NGCP-W-4144 1400132304 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1078 FL TA-669295 2-Jul-19 2.00 PM Saif Mr. Rajesh CLOSED
-1078 KP4+000 to KP4+200
NDE selection for welds of 8 inch HRDH -1078
4147 CPP-NGCP-W-4145 1400132271 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1078 FL TA-669295 2-Jul-19 4.00 PM Saif Mr. Rajesh CLOSED
KP4+000 to KP4+200
Pre-welding and weld joint fit up inspection for 8
4148 CPP-NGCP-W-4146 1400132251 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1147 F/L TA-669416 2-Jul-19 7:30 AM Shanmuga Mr. Rajesh CLOSED
inch HRDH -1147 KP1+100 to KP1+400
Post-welding visual inspection for 8 inch HRDH
4149 CPP-NGCP-W-4147 1400132299 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1147 F/L TA-669416 2-Jul-19 2.30 PM Shanmuga Mr. Rajesh CLOSED
-1147 KP1+100 to KP1+400
NDE selection for welds of 8 inch HRDH -1147
4150 CPP-NGCP-W-4148 1400132320 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1147 F/L TA-669416 2-Jul-19 4.30 PM Shanmuga Mr. Rajesh CLOSED
KP1+100 to KP1+400
Pre-welding and weld joint fit up inspection for 16 HRDH -CK-RH Mr.
4151 CPP-NGCP-W-4149 1400132350 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 2-Jul-19 8:00 AM IRSHAD CLOSED
inch HRDH CK-RH TR/L KP3+700 to KP3+900; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -CK-RH Mr.
4152 CPP-NGCP-W-4150 1400132312 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 2-Jul-19 2.00 PM IRSHAD CLOSED
CK-RH TR/L KP3+700 to KP3+900; TR/L Rajendran
NDE selection for welds of 16 inch HRDH CK-RH HRDH -CK-RH Mr.
4153 CPP-NGCP-W-4151 1400132413 Welding SATIP-W-012-01 SAIC-W-2054 TA-843958 2-Jul-19 4.00 PM IRSHAD CLOSED
TR/L KP3+700 to KP3+900; TR/L Rajendran
Temperature Tie in Welding HRDH-1116 at KM- Mr.
4154 CPP-NGCP-W-4152 1400132305 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1116 FL TA-843608 2-Jul-19 10:00 AM Farhan CLOSED
3+020 Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
4155 CPP-NGCP-W-4153 1400132321 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 2-Jul-19 8:00 AM Farhan CLOSED
inch HRDH-1116 at KM-3+020 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
4156 CPP-NGCP-W-4154 1400132322 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 2-Jul-19 2.00 PM Farhan CLOSED
1116 at KM-3+020 Rajendran
NDE selection for welds of 8 inch HRDH-1116 at Mr.
4157 CPP-NGCP-W-4155 1400132335 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1116 FL TA-843608 2-Jul-19 4.00 PM Farhan CLOSED
KM-3+020 Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
4158 CPP-NGCP-W-4156 1400132353 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 2-Jul-19 8:00 AM Farhan CLOSED
inch HRDH-922 at KM-3+860 to KM-3 +936 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
4159 CPP-NGCP-W-4157 1400132336 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 2-Jul-19 2.00 PM Farhan CLOSED
922 at KM-3+860 to KM-3 +936 Rajendran
1400132329 NDE selection for welds of 8 inch HRDH-922 at TA-843609 Mr.
4160 CPP-NGCP-W-4158 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL 2-Jul-19 4.00 PM Farhan CLOSED
KM-3+860 to KM-3 +936 Rajendran
Temperature Tie in Welding HRDH-1171 at KM- RE-SCHEDULE TO 3-
4161 CPP-NGCP-W-4159 1400132363 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1171 FL TA-843547 2-Jul-19 10:00 AM Sarfaraz Mr. Ashok CLOSED
0+600 to 0+690 JULY-2019

1400132307 Pre-welding and weld joint fit up inspection for 8 TA-843547


4162 CPP-NGCP-W-4160 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL 2-Jul-19 8:00 AM Sarfaraz Mr. Ashok CLOSED
inch HRDH-1171 at KM-0+600 to 0+690
Post-welding visual inspection for 8 inch HRDH-
4163 CPP-NGCP-W-4161 1400132330 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 2-Jul-19 2.00 PM Sarfaraz Mr. Ashok CLOSED
1171 at KM-0+600 to 0+690
1400132289 NDE selection for welds of 8 inch HRDH-1171 at TA-843547
4164 CPP-NGCP-W-4162 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL 2-Jul-19 4.00 PM Sarfaraz Mr. Ashok CLOSED
KM-0+600 to 0+690
In-Process Verification - RT Techniques &
HRDH-CK-RH, 1173, 1189, 1165, Mr.
4165 CPP-NGCP-W-4163 1400132914 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-CK-RH, VARIOUS 2-Jul-19 8:00 AM RAMEEZ CLOSED
1172 Rajendran
1173, 1189, 1165, 1172
In-Process Verification - RT Techniques &
4166 CPP-NGCP-W-4164 1400132812 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-GK-RH, HWYH-GK-RH, 1036,GK-RH,1023 VARIOUS 2-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1036,GK-RH,1023
Pre-welding and weld joint fit up inspection for 8
4167 CPP-NGCP-W-4165 1400133151 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1163 FL TA-669425 3-Jul-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1163 KP 0+600 to KP0+800
Post-welding visual inspection for 8 inch HRDH-
4168 CPP-NGCP-W-4166 1400133219 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1163 FL TA-669425 3-Jul-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1163 KP 0+600 to KP0+800
NDE selection for welds of 8 inch HRDH-1163 KP
4169 CPP-NGCP-W-4167 1400133220 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1163 FL TA-669425 3-Jul-19 4.00 PM Rajesh Mr. Rajesh CLOSED
0+600 to KP0+800
Pre-welding and weld joint fit up inspection for 8
4170 CPP-NGCP-W-4168 1400133221 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1078 FL TA-669295 3-Jul-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1078 KP3+800 to KP4+000
Post-welding visual inspection for 8 inch HRDH
4171 CPP-NGCP-W-4169 1400133190 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1078 FL TA-669295 3-Jul-19 2.00 PM Saif Mr. Rajesh CLOSED
-1078 KP3+800 to KP4+000
NDE selection for welds of 8 inch HRDH -1078
4172 CPP-NGCP-W-4170 1400133237 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1078 FL TA-669295 3-Jul-19 4.00 PM Saif Mr. Rajesh CLOSED
KP3+800 to KP4+000
1400133274 Pre-welding and weld joint fit up inspection for 8 TA-669416
4173 CPP-NGCP-W-4171 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1147 F/L 3-Jul-19 7:30 AM Shanmuga Mr. Rajesh CLOSED
inch HRDH -1147 KP0+700 to KP1+100
Post-welding visual inspection for 8 inch HRDH
4174 CPP-NGCP-W-4172 1400133303 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1147 F/L TA-669416 3-Jul-19 2.30 PM Shanmuga Mr. Rajesh CLOSED
-1147 KP0+700 to KP1+100
NDE selection for welds of 8 inch HRDH -1147
4175 CPP-NGCP-W-4173 1400133275 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1147 F/L TA-669416 3-Jul-19 4.30 PM Shanmuga Mr. Rajesh CLOSED
KP0+700 to KP1+100
Pre-welding and weld joint fit up inspection for 16 HRDH -CK-RH Mr.
4176 CPP-NGCP-W-4174 1400133230 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 3-Jul-19 8:00 AM IRSHAD CLOSED
inch HRDH CK-RH TR/L KP3+900 to KP4+100; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -CK-RH Mr.
4177 CPP-NGCP-W-4175 1400133241 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 3-Jul-19 2.00 PM IRSHAD CLOSED
CK-RH TR/L KP3+900 to KP4+100; TR/L Rajendran
NDE selection for welds of 16 inch HRDH CK-RH HRDH -CK-RH Mr.
4178 CPP-NGCP-W-4176 1400133269 Welding SATIP-W-012-01 SAIC-W-2054 TA-843958 3-Jul-19 4.00 PM IRSHAD CLOSED
TR/L KP3+900 to KP4+100; TR/L Rajendran
1400133287 Temperature Tie in Welding HRDH-922 at KM- TA-843609 Mr.
4179 CPP-NGCP-W-4177 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -922 FL 3-Jul-19 10:00 AM Farhan CLOSED
3+880 Rajendran
1400133288 Pre-welding and weld joint fit up inspection for 8 TA-843609 Mr.
4180 CPP-NGCP-W-4178 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL 3-Jul-19 8:00 AM Farhan CLOSED
inch HRDH-922 at KM-3+880 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
4181 CPP-NGCP-W-4179 1400133280 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 3-Jul-19 2.00 PM Farhan CLOSED
922 at KM-3+880 Rajendran

1400133281 NDE selection for welds of 8 inch HRDH-922 at TA-843609 Mr.


4182 CPP-NGCP-W-4180 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL 3-Jul-19 4.00 PM Farhan CLOSED
KM-3+880 Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr. RE-SCHEDULE TO 4-
4183 CPP-NGCP-W-4181 1400133282 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 3-Jul-19 8:00 AM Farhan CLOSED
inch HRDH-1116at KM-0+388 to KM-0+517 Rajendran JULY-2019
Post-welding visual inspection for 8inch HRDH- Mr. RE-SCHEDULE TO 4-
4184 CPP-NGCP-W-4182 1400133324 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 3-Jul-19 2.00 PM Farhan CLOSED
1116at KM-0+388 to KM-0+517 Rajendran JULY-2019
NDE selection for welds of 8 inch HRDH-1116at Mr. RE-SCHEDULE TO 4-
4185 CPP-NGCP-W-4183 1400133290 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1116 FL TA-843608 3-Jul-19 4.00 PM Farhan CLOSED
KM-0+388 to KM-0+517 Rajendran JULY-2019
Temperature Tie in Welding HRDH-1171 at KM- CANCELLED DUE TO no
4186 CPP-NGCP-W-4184 1400133291 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1171 FL TA-843547 3-Jul-19 10:00 AM Sarfaraz Mr. Ashok CLOSED
8+700 to 8+800 work permit
Pre-welding and weld joint fit up inspection for 8
4187 CPP-NGCP-W-4185 1400133252 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 3-Jul-19 8:00 AM Sarfaraz Mr. Ashok CLOSED
inch HRDH-1171 at KM-8+700 to 8+800
Post-welding visual inspection for 8 inch HRDH-
4188 CPP-NGCP-W-4186 1400133272 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 3-Jul-19 2.00 PM Sarfaraz Mr. Ashok CLOSED
1171 at KM-8+700 to 8+800
NDE selection for welds of 8 inch HRDH-1171 at
4189 CPP-NGCP-W-4187 1400133345 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 3-Jul-19 4.00 PM Sarfaraz Mr. Ashok CLOSED
KM-8+700 to 8+800
In-Process Verification - RT Techniques &
Mr.
4190 CPP-NGCP-W-4188 1400133492 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1078, 1165, HRDH-1078, 1165, 1163 VARIOUS 3-Jul-19 8:00 AM RAMEEZ CLOSED
Rajendran
1163
In-Process Verification - RT Techniques &
Procedure Implementation of HWYH-1003, CJ-
4191 CPP-NGCP-W-4189 1400133430 Welding SATIP-NDE-RT-01 SAIC-RT-2007 RH, 934 HWYH-1003, CJ-RH, 934 VARIOUS 3-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED

Pre-welding and weld joint fit up inspection for


4192 CPP-NGCP-W-4190 1400131734 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-912 TA-446044 3-Jul-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-912
4193 CPP-NGCP-W-4191 1400131691 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-912 HWYH-912 TA-446044 3-Jul-19 2.00 PM Shahbaz Mr. Suresh CLOSED
4194 CPP-NGCP-W-4192 1400131712 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-912 HWYH-912 TA-446044 3-Jul-19 4:00 PM Shahbaz Mr. Suresh CLOSED
CANCELLED DUE TO
4195 CPP-NGCP-W-4193 1400133925 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1071 HWYH-1071 FL TA-445836 3-Jul-19 7:00 AM sanjeev Mr. Suresh CLOSED
JOB NOT READY
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a Pre-welding and weld joint fit up inspection for 8 CANCELLED DUE TO
4196 CPP-NGCP-W-4194 1400132970 l Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445836 3-Jul-19 8:00 AM sanjeev Mr. Suresh CLOSED
inch HWYH-1071 FL km0+600~km0+700 JOB NOT READY
Post-welding visual inspection for 8 inch HWYH- CANCELLED DUE TO
4197 CPP-NGCP-W-4195 1400133028 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 3-Jul-19 2.00 PM sanjeev Mr. Suresh CLOSED
1071 FL km0+600~km0+700 JOB NOT READY
NDE selection for welds of 8 inch HWYH-1071 FL CANCELLED DUE TO
4198 CPP-NGCP-W-4196 1400132951 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1071 FL TA-445830 3-Jul-19 4:00 PM sanjeev Mr. Suresh CLOSED
KM km0+600~km0+700 JOB NOT READY
Pre-welding and weld joint fit up inspection for
4199 CPP-NGCP-W-4197 1400133016 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1102 TA-445899 3-Jul-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
HWYH-1102
4200 CPP-NGCP-W-4198 1400133054 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1102 HWYH-1102 TA-445899 3-Jul-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
4201 CPP-NGCP-W-4199 1400133046 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1102 HWYH-1102 TA-445899 3-Jul-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4202 CPP-NGCP-W-4200 1400133084 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 3-Jul-19 8:00 AM abdul raheem Mr. Ashok CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK-
4203 CPP-NGCP-W-4201 1400133086 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 3-Jul-19 2.00 PM abdul raheem Mr. Ashok CLOSED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH
4204 CPP-NGCP-W-4202 1400133040 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 3-Jul-19 4:00 PM abdul raheem Mr. Ashok CLOSED
TRL km0+100 to 8+100
Pre-welding and weld joint fit up inspection for
4205 CPP-NGCP-W-4203 1400133260 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 3-Jul-19 8:00 AM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
Post-welding visual inspection for 16″HWYH GK-
4206 CPP-NGCP-W-4204 1400133271 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 3-Jul-19 2.00 PM Imran Mr. Ashok CLOSED
RH TRL km0+400-km6
NDE selection for welds of 16″HWYH GK-RH
4207 CPP-NGCP-W-4205 1400133318 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 3-Jul-19 4:00 PM Imran Mr. Ashok CLOSED
TRL km0+400-km6
Pre-welding and weld joint fit up inspection for
4208 CPP-NGCP-W-4206 1400133330 Welding SATIP-W-012-01 SAIC-W-2048 HWYH BK-RH TA-445888 3-Jul-19 8:00 AM asish Mr. Suresh CLOSED
16″HWYH BK-RH HDD road crossing
Post-welding visual inspection for 16″HWYH BK-
4209 CPP-NGCP-W-4207 1400133375 Welding SATIP-W-012-01 SAIC-W-2048 HWYH BK-RH TA-445888 3-Jul-19 2.00 PM asish Mr. Suresh CLOSED
RH HDD road crossing
NDE selection for welds of 16″HWYH BK-RH
4210 CPP-NGCP-W-4208 1400133312 Welding SATIP-W-012-01 SAIC-W-2054 HWYH BK-RH TA-445888 3-Jul-19 4:00 PM asish Mr. Suresh CLOSED
HDD road crossing
Pre-welding and weld joint fit up inspection for
4211 CPP-NGCP-W-4209 1400133804 Welding SATIP-W-012-01 SAIC-W-2048 HWGCP-1 TL SOUR TA-445987 3-Jul-19 8:00 AM PRATHAB Mr. Suresh CLOSED
36″HWGCP-1 TL SOUR
Post-welding visual inspection for 36″HWGCP-1
4212 CPP-NGCP-W-4210 1400133864 Welding SATIP-W-012-01 SAIC-W-2048 HWGCP-1 TL SOUR TA-445987 3-Jul-19 2.00 PM PRATHAB Mr. Suresh CLOSED
TL SOUR
NDE selection for welds of 36″HWGCP-1 TL
4213 CPP-NGCP-W-4211 1400133883 Welding SATIP-W-012-01 SAIC-W-2054 HWGCP-1 TL SOUR TA-445987 3-Jul-19 4:00 PM PRATHAB Mr. Suresh CLOSED
SOUR
1400134093 Pre-welding and weld joint fit up inspection for TA-446044
4214 CPP-NGCP-W-4212 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-912 4-Jul-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-912
4215 CPP-NGCP-W-4213 1400134069 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-912 HWYH-912 TA-446044 4-Jul-19 2.00 PM Shahbaz Mr. Suresh CLOSED
4216 CPP-NGCP-W-4214 1400134048 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-912 HWYH-912 TA-446044 4-Jul-19 4:00 PM Shahbaz Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4217 CPP-NGCP-W-4215 1400134402 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 4-Jul-19 8:00 AM Umair Mr. Suresh CLOSED
HWYH-1093
4218 CPP-NGCP-W-4216 1400134488 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 4-Jul-19 2.00 PM Umair Mr. Suresh CLOSED
4219 CPP-NGCP-W-4217 1400134458 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 4-Jul-19 4:00 PM Umair Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 8
4220 CPP-NGCP-W-4218 1400134512 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445836 4-Jul-19 8:00 AM sanjeev Mr. Suresh CLOSED
inch HWYH-1071 FL km0+600~km0+700
1400134489 Post-welding visual inspection for 8 inch HWYH- TA-445830
4221 CPP-NGCP-W-4219 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL 4-Jul-19 2.00 PM sanjeev Mr. Suresh CLOSED
1071 FL km0+600~km0+700
NDE selection for welds of 8 inch HWYH-1071 FL
4222 CPP-NGCP-W-4220 1400134527 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1071 FL TA-445830 4-Jul-19 4:00 PM sanjeev Mr. Suresh CLOSED
KM km0+600~km0+700

1400134062 Pre-welding and weld joint fit up inspection for TA-445899


4223 CPP-NGCP-W-4221 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1102 4-Jul-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
HWYH-1102
4224 CPP-NGCP-W-4222 1400134104 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1102 HWYH-1102 TA-445899 4-Jul-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
4225 CPP-NGCP-W-4223 1400134124 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1102 HWYH-1102 TA-445899 4-Jul-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
1400134111 Pre-welding and weld joint fit up inspection for TA-445974
4226 CPP-NGCP-W-4224 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL 4-Jul-19 8:00 AM abdul raheem Mr. Ashok CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK-
4227 CPP-NGCP-W-4225 1400134139 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 4-Jul-19 2.00 PM abdul raheem Mr. Ashok CLOSED
RH TRL km0+100 to 8+100
1400134193 NDE selection for welds of 16″HWYH CK-RH TA-445974
4228 CPP-NGCP-W-4226 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL 4-Jul-19 4:00 PM abdul raheem Mr. Ashok CLOSED
TRL km0+100 to 8+100
Pre-welding and weld joint fit up inspection for
4229 CPP-NGCP-W-4227 1400134160 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 4-Jul-19 8:00 AM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
1400134469 Post-welding visual inspection for 16″HWYH GK- TA-445912
4230 CPP-NGCP-W-4228 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL 4-Jul-19 2.00 PM Imran Mr. Ashok CLOSED
RH TRL km0+400-km6
NDE selection for welds of 16″HWYH GK-RH
4231 CPP-NGCP-W-4229 1400134604 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 4-Jul-19 4:00 PM Imran Mr. Ashok CLOSED
TRL km0+400-km6
1400134586 Pre-welding and weld joint fit up inspection for TA-445981
4232 CPP-NGCP-W-4230 Welding SATIP-W-012-01 SAIC-W-2048 HWYH LSS TRL-1 4-Jul-19 8:00 AM asish Mr. Suresh CLOSED
16″HWYH LSS TRL-1 HDD road crossing
Post-welding visual inspection for 16″HWYH LSS
4233 CPP-NGCP-W-4231 1400134552 Welding SATIP-W-012-01 SAIC-W-2048 HWYH LSS TRL-1 TA-445981 4-Jul-19 2.00 PM asish Mr. Suresh CLOSED
TRL-1 HDD road crossing
NDE selection for welds of 16″HWYH LSS TRL-1
4234 CPP-NGCP-W-4232 1400134643 Welding SATIP-W-012-01 SAIC-W-2054 HWYH LSS TRL-1 TA-445981 4-Jul-19 4:00 PM asish Mr. Suresh CLOSED
HDD road crossing
Pre-welding and weld joint fit up inspection for
4235 CPP-NGCP-W-4233 1400134625 Welding SATIP-W-012-01 SAIC-W-2048 HWGCP-1 TL SOUR TA-445987 4-Jul-19 8:00 AM PRATHAB Mr. Suresh CLOSED
36″HWGCP-1 TL SOUR
Post-welding visual inspection for 36″HWGCP-1
4236 CPP-NGCP-W-4234 1400134644 Welding SATIP-W-012-01 SAIC-W-2048 HWGCP-1 TL SOUR TA-445987 4-Jul-19 2.00 PM PRATHAB Mr. Suresh CLOSED
TL SOUR
NDE selection for welds of 36″HWGCP-1 TL
4237 CPP-NGCP-W-4235 1400134663 Welding SATIP-W-012-01 SAIC-W-2054 HWGCP-1 TL SOUR TA-445987 4-Jul-19 4:00 PM PRATHAB Mr. Suresh CLOSED
SOUR
Pre-welding and weld joint fit up inspection for RE-SCHEDULE TO 5-
4238 CPP-NGCP-W-4236 1400134619 Welding SATIP-W-012-01 SAIC-W-2048 36″HWYH GGM TRL-2 TA-445986 4-Jul-19 8:00 AM PRATHAB Mr. Suresh CLOSED
36″HWYH GGM TRL-2 JULY-2019
Post-welding visual inspection for 36″HWYH GGM RE-SCHEDULE TO 5-
4239 CPP-NGCP-W-4237 1400134659 Welding SATIP-W-012-01 SAIC-W-2048 36″HWYH GGM TRL-2 TA-445986 4-Jul-19 2.00 PM PRATHAB Mr. Suresh CLOSED
TRL-2 JULY-2019
RE-SCHEDULE TO 5-
4240 CPP-NGCP-W-4238 1400134686 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 36″HWYH GGM TRL-2 36″HWYH GGM TRL-2 TA-445986 4-Jul-19 4:00 PM PRATHAB Mr. Suresh CLOSED
JULY-2019
Verification of Hardness testing of joints 00-FW-36
4241 CPP-NGCP-W-4239 1400135009 Welding SATIP-W-012-01 SAIC-W-2014 HWYH-GK-RH TA-445912 4-Jul-19 7:00 AM Mohamed othman Mr. Suresh CLOSED
HWYH-GK-RH
Pre-welding and weld joint fit up inspection for RE-SCHEDULE TO 6-
4242 CPP-NGCP-W-4240 1400134601 Welding SATIP-W-012-01 SAIC-W-2048 36″HWYH GGM TRL-2 TA-445986 5-Jul-19 8:00 AM PRATHAB Mr. Suresh CLOSED
36″HWYH GGM TRL-2 JULY-2019
Post-welding visual inspection for 36″HWYH GGM RE-SCHEDULE TO 6-
4243 CPP-NGCP-W-4241 1400134670 Welding SATIP-W-012-01 SAIC-W-2048 36″HWYH GGM TRL-2 TA-445986 5-Jul-19 2.00 PM PRATHAB Mr. Suresh CLOSED
TRL-2 JULY-2019
RE-SCHEDULE TO 6-
4244 CPP-NGCP-W-4242 1400134671 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 36″HWYH GGM TRL-2 36″HWYH GGM TRL-2 TA-445986 5-Jul-19 4:00 PM PRATHAB Mr. Suresh CLOSED
JULY-2019
Pre-welding and weld joint fit up inspection for 8
4245 CPP-NGCP-W-4243 1400134610 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1163 FL TA-669425 4-Jul-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1163 KP 0+400 to KP0+600
Post-welding visual inspection for 8 inch HRDH-
4246 CPP-NGCP-W-4244 1400134627 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1163 FL TA-669425 4-Jul-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1163 KP 0+400 to KP0+600
NDE selection for welds of 8 inch HRDH-1163 KP
4247 CPP-NGCP-W-4245 1400134578 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1163 FL TA-669425 4-Jul-19 4.00 PM Rajesh Mr. Rajesh CLOSED
0+400 to KP0+600
Pre-welding and weld joint fit up inspection for 8
4248 CPP-NGCP-W-4246 1400134645 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 4-Jul-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1192 KP 0+200 to KP0+300
Post-welding visual inspection for 8 inch HRDH-
4249 CPP-NGCP-W-4247 1400134646 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 4-Jul-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1192 KP 0+200 to KP0+300
NDE selection for welds of 8 inch HRDH-1192 KP
4250 CPP-NGCP-W-4248 1400134595 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1192 FL TA-669428 4-Jul-19 4.00 PM Rajesh Mr. Rajesh CLOSED
0+200 to KP0+300
Pre-welding and weld joint fit up inspection for 8
4251 CPP-NGCP-W-4249 1400134648 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1078 FL TA-669295 4-Jul-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1078 KP3+500 to KP3+800
Post-welding visual inspection for 8 inch HRDH
4252 CPP-NGCP-W-4250 1400134622 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1078 FL TA-669295 4-Jul-19 2.00 PM Saif Mr. Rajesh CLOSED
-1078 KP3+500 to KP3+800
NDE selection for welds of 8 inch HRDH -1078
4253 CPP-NGCP-W-4251 1400134642 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1078 FL TA-669295 4-Jul-19 4.00 PM Saif Mr. Rajesh CLOSED
KP3+500 to KP3+800
Pre-welding and weld joint fit up inspection for 8
4254 CPP-NGCP-W-4252 1400134685 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1147 F/L TA-669416 4-Jul-19 7:30 AM Shanmuga Mr. Rajesh CLOSED
inch HRDH -1147 KP0+300 to KP0+600
Post-welding visual inspection for 8 inch HRDH
4255 CPP-NGCP-W-4253 1400134651 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1147 F/L TA-669416 4-Jul-19 2.30 PM Shanmuga Mr. Rajesh CLOSED
-1147 KP0+300 to KP0+600
NDE selection for welds of 8 inch HRDH -1147
4256 CPP-NGCP-W-4254 1400134662 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1147 F/L TA-669416 4-Jul-19 4.30 PM Shanmuga Mr. Rajesh CLOSED
KP0+300 to KP0+600
Pre-welding and weld joint fit up inspection for 16 HRDH -CK-RH Mr. Due to EPM Problem
4257 CPP-NGCP-W-4255 1400134582 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 4-Jul-19 8:00 AM IRSHAD CLOSED
inch HRDH CK-RH TR/L KP4+100 to KP4+300 ; TR/L Rajendran 1400157135
Post-welding visual inspection for 16 inch HRDH HRDH -CK-RH Mr. Due to EPM Problem
4258 CPP-NGCP-W-4256 1400134688 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 4-Jul-19 2.00 PM IRSHAD CLOSED
CK-RH TR/L KP4+100 to KP4+300; TR/L Rajendran 1400157135
NDE selection for welds of 16 inch HRDH CK-RH HRDH -CK-RH Mr.
4259 CPP-NGCP-W-4257 1400134725 Welding SATIP-W-012-01 SAIC-W-2054 TA-843958 4-Jul-19 4.00 PM IRSHAD CLOSED
TR/L KP4+100 to KP4+300; TR/L Rajendran

1400134718 Temperature Tie in Welding HRDH-1171 at KM- TA-843547 RE-SCHEDULE TO 6-


4260 CPP-NGCP-W-4258 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1171 FL 4-Jul-19 10:00 AM Sarfaraz Mr. Ashok CLOSED
8+700 to 8+800 JULY-2019
Pre-welding and weld joint fit up inspection for 8
4261 CPP-NGCP-W-4259 1400134734 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL TA-843547 4-Jul-19 8:00 AM Sarfaraz Mr. Ashok CLOSED
inch HRDH-1171 at KM-8+700 to 8+800

1400134735 Post-welding visual inspection for 8 inch HRDH- TA-843547


4262 CPP-NGCP-W-4260 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1171 FL 4-Jul-19 2.00 PM Sarfaraz Mr. Ashok CLOSED
1171 at KM-8+700 to 8+800
NDE selection for welds of 8 inch HRDH-1171 at
4263 CPP-NGCP-W-4261 1400134699 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1171 FL TA-843547 4-Jul-19 4.00 PM Sarfaraz Mr. Ashok CLOSED
KM-8+700 to 8+800
In-Process Verification - RT Techniques &
HRDH-CK-RH, 1309, 1172, AKRH, Mr.
4264 CPP-NGCP-W-4262 1400134866 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-CK-RH, VARIOUS 4-Jul-19 8:00 AM RAMEEZ CLOSED
922, 1116 Rajendran
1309, 1172, AKRH, 922, 1116
In-Process Verification - RT Techniques &
4265 CPP-NGCP-W-4263 1400134850 Welding SATIP-NDE-RT-01 SAIC-RT-2007 HWYH-GK-RH VARIOUS 4-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
Procedure Implementation of HWYH-GK-RH
In-Process Inspection of MPT using
4266 CPP-NGCP-W-4264 1400134827 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 HWYH-CJ-RH VARIOUS 4-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
Yoke Method, HWYH-CJ-RH
In-Process Verification - RT Techniques & Mr.
4267 CPP-NGCP-W-4265 1400134856 Welding SATIP-NDE-RT-01 SAIC-RT-2007 HRDH-1147, 1171 VARIOUS 5-Jul-19 8:00 AM RAMEEZ CLOSED
Procedure Implementation of HRDH-1147, 1171 Rajendran
In-Process Verification - RT Techniques &
4268 CPP-NGCP-W-4266 1400134826 Welding SATIP-NDE-RT-01 SAIC-RT-2007 HWYH-GK-RH VARIOUS 5-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
Procedure Implementation of HWYH-GK-RH
Pre-welding and weld joint fit up inspection for 8
4269 CPP-NGCP-W-4267 1400135951 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 6-Jul-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1192 KP 0+300 to KP0+500
Post-welding visual inspection for 8 inch HRDH-
4270 CPP-NGCP-W-4268 1400135966 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 6-Jul-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1192 KP 0+300 to KP0+500
NDE selection for welds of 8 inch HRDH-1192 KP
4271 CPP-NGCP-W-4269 1400135956 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1192 FL TA-669428 6-Jul-19 4.00 PM Rajesh Mr. Rajesh CLOSED
0+300 to KP0+500
Pre-welding and weld joint fit up inspection for 8
4272 CPP-NGCP-W-4270 1400135919 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1078 FL TA-669295 6-Jul-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1078 KP3+200 to KP3+500
Post-welding visual inspection for 8 inch HRDH
4273 CPP-NGCP-W-4271 1400135891 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1078 FL TA-669295 6-Jul-19 2.00 PM Saif Mr. Rajesh CLOSED
-1078 KP3+200 to KP3+500
NDE selection for welds of 8 inch HRDH -1078
4274 CPP-NGCP-W-4272 1400135939 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1078 FL TA-669295 6-Jul-19 4.00 PM Saif Mr. Rajesh CLOSED
KP3+200 to KP3+500
Pre-welding and weld joint fit up inspection for 8
4275 CPP-NGCP-W-4273 1400136000 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1199 F/L TA-669301 6-Jul-19 7:30 AM Shanmuga Mr. Rajesh CLOSED
inch HRDH -1199 KP0+700 to KP0+950
Post-welding visual inspection for 8 inch HRDH
4276 CPP-NGCP-W-4274 1400136034 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1199 F/L TA-669301 6-Jul-19 2.30 PM Shanmuga Mr. Rajesh CLOSED
-1199 KP0+700 to KP0+950
NDE selection for welds of 8 inch HRDH -1199
4277 CPP-NGCP-W-4275 1400136048 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1199 F/L TA-669301 6-Jul-19 4.30 PM Shanmuga Mr. Rajesh CLOSED
KP0+700 to KP0+950
Pre-welding and weld joint fit up inspection for 16 HRDH -CK-RH Mr.
4278 CPP-NGCP-W-4276 1400135982 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 6-Jul-19 8:00 AM IRSHAD CLOSED
inch HRDH CK-RH TR/L KP4+300 to KP4+500 ; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -CK-RH Mr.
4279 CPP-NGCP-W-4277 1400136029 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 6-Jul-19 2.00 PM IRSHAD CLOSED
CK-RH TR/L KP4+300 to KP4+500; TR/L Rajendran
NDE selection for welds of 16 inch HRDH CK-RH HRDH -CK-RH Mr.
4280 CPP-NGCP-W-4278 1400136008 Welding SATIP-W-012-01 SAIC-W-2054 TA-843958 6-Jul-19 4.00 PM IRSHAD CLOSED
TR/L KP4+300 to KP4+500; TR/L Rajendran
Pre-welding and weld joint fit up inspection for 8 RE-SCHEDULE TO 7-
4281 CPP-NGCP-W-4279 1400136037 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1309 FL TA-843624 6-Jul-19 8:00 AM Sarfaraz Mr. Ashok CLOSED
inch HRDH-1309 at KM-0+650 to 0+730 JULY-2019
1400136038 Post-welding visual inspection for 8 inch HRDH- TA-843624 RE-SCHEDULE TO 7-
4282 CPP-NGCP-W-4280 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1309 FL 6-Jul-19 2.00 PM Sarfaraz Mr. Ashok CLOSED
1309 at KM-0+650 to 0+730 JULY-2019
NDE selection for welds of 8 inch HRDH-1309 at RE-SCHEDULE TO 7-
4283 CPP-NGCP-W-4281 1400136002 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1309 FL TA-843624 6-Jul-19 4.00 PM Sarfaraz Mr. Ashok CLOSED
KM-0+650 to 0+730 JULY-2019
In-Process Verification - RT Techniques &
HRDH-CK-RH, 1063, 1171, 922, Mr.
4284 CPP-NGCP-W-4282 1400136113 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-CK-RH, VARIOUS 6-Jul-19 8:00 AM RAMEEZ CLOSED
1148,1078 Rajendran
1063, 1171, 922, 1148,1078
In-Process Verification - RT Techniques &
4285 CPP-NGCP-W-4283 1400136104 Welding SATIP-NDE-RT-01 SAIC-RT-2007 HWYH-GK-RH;GCP VARIOUS 6-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
Procedure Implementation of HWYH-GK-RH;GCP
In-Process Inspection of MPT using
4286 CPP-NGCP-W-4284 1400136087 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 HWYH-GCP VARIOUS 6-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
Yoke Method, HWYH-GCP
Pre-welding and weld joint fit up inspection for 8 Mr.
4287 CPP-NGCP-W-4285 1400136220 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 6-Jul-19 8:00 AM Farhan CLOSED
inch HRDH-1116at KM-0+890 to KM-1+000 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
4288 CPP-NGCP-W-4286 1400136283 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 6-Jul-19 2.00 PM Farhan CLOSED
1116at KM-0+890 to KM-1+000 Rajendran
NDE selection for welds of 8 inch HRDH-1116at Mr.
4289 CPP-NGCP-W-4287 1400136221 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1116 FL TA-843608 6-Jul-19 4.00 PM Farhan CLOSED
KM-0+890 to KM-1+000 Rajendran
Pre-welding and weld joint fit up inspection for
4290 CPP-NGCP-W-4288 1400135269 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-912 TA-446044 6-Jul-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-912
4291 CPP-NGCP-W-4289 1400135353 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-912 HWYH-912 TA-446044 6-Jul-19 2.00 PM Shahbaz Mr. Suresh CLOSED
4292 CPP-NGCP-W-4290 1400135326 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-912 HWYH-912 TA-446044 6-Jul-19 4:00 PM Shahbaz Mr. Suresh CLOSED
4293 CPP-NGCP-W-4291 1400135453 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1093 HWYH-1093 TA-445838 6-Jul-19 7:00 AM Umair Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4294 CPP-NGCP-W-4292 1400135454 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 6-Jul-19 8:00 AM Umair Mr. Suresh CLOSED
HWYH-1093
4295 CPP-NGCP-W-4293 1400135411 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 6-Jul-19 2.00 PM Umair Mr. Suresh CLOSED
4296 CPP-NGCP-W-4294 1400135464 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 6-Jul-19 4:00 PM Umair Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 8
4297 CPP-NGCP-W-4295 1400135331 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445836 6-Jul-19 8:00 AM sanjeev Mr. Suresh CLOSED
inch HWYH-1071 FL km1+350~km1+700
Post-welding visual inspection for 8 inch HWYH-
4298 CPP-NGCP-W-4296 1400135374 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 6-Jul-19 2.00 PM sanjeev Mr. Suresh CLOSED
1071 FL km1+350~km1+700
NDE selection for welds of 8 inch HWYH-1071 FL
4299 CPP-NGCP-W-4297 1400135320 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1071 FL TA-445830 6-Jul-19 4:00 PM sanjeev Mr. Suresh CLOSED
KM km1+350~km1+700
Pre-welding and weld joint fit up inspection for
4300 CPP-NGCP-W-4298 1400135377 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1102 TA-445899 6-Jul-19 8:00 AM Abdul Aziz Mr. Suresh CLOSED
HWYH-1102
4301 CPP-NGCP-W-4299 1400135282 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1102 HWYH-1102 TA-445899 6-Jul-19 2.00 PM Abdul Aziz Mr. Suresh CLOSED
4302 CPP-NGCP-W-4300 1400135428 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1102 HWYH-1102 TA-445899 6-Jul-19 4:00 PM Abdul Aziz Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4303 CPP-NGCP-W-4301 1400135433 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 6-Jul-19 8:00 AM abdul raheem Mr. Ashok CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK-
4304 CPP-NGCP-W-4302 1400135434 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 6-Jul-19 2.00 PM abdul raheem Mr. Ashok CLOSED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH
4305 CPP-NGCP-W-4303 1400135432 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 6-Jul-19 4:00 PM abdul raheem Mr. Ashok CLOSED
TRL km0+100 to 8+100
1400135430 Pre-welding and weld joint fit up inspection for TA-445912 RE-SCHEDULE TO 7-
4306 CPP-NGCP-W-4304 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL 6-Jul-19 8:00 AM abdul raheem Mr. Ashok CLOSED
16″HWYH GK-RH TRL JULY-2019
Post-welding visual inspection for 16″HWYH GK- RE-SCHEDULE TO 7-
4307 CPP-NGCP-W-4305 1400135431 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 6-Jul-19 2.00 PM abdul raheem Mr. Ashok CLOSED
RH TRL JULY-2019
1400135388 NDE selection for welds of 16″HWYH GK-RH TA-445912 RE-SCHEDULE TO 7-
4308 CPP-NGCP-W-4306 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL 6-Jul-19 4:00 PM abdul raheem Mr. Ashok CLOSED
TRL JULY-2019
Weld repair verification of joints 10-FW-838,
4309 CPP-NGCP-W-4307 1400135730 Welding SATIP-W-012-01 SAIC-W-2051 HWYH-GK-RH TA-445912 6-Jul-19 12:00 PM abdul raheem Mr. Ashok CLOSED
HWYH-GK-RH

1400135793 Post-welding visual inspection of repair joints 10- TA-445912


4310 CPP-NGCP-W-4308 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-GK-RH 6-Jul-19 4:00 PM abdul raheem Mr. Ashok CLOSED
FW-838, HWYH-GK-RH
Pre-welding and weld joint fit up inspection for
4311 CPP-NGCP-W-4309 1400135389 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 6-Jul-19 8:00 AM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6

1400135390 Post-welding visual inspection for 16″HWYH GK- TA-445912


4312 CPP-NGCP-W-4310 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL 6-Jul-19 2.00 PM Imran Mr. Ashok CLOSED
RH TRL km0+400-km6
NDE selection for welds of 16″HWYH GK-RH
4313 CPP-NGCP-W-4311 1400135455 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 6-Jul-19 4:00 PM Imran Mr. Ashok CLOSED
TRL km0+400-km6
1400135900 Pre-welding and weld joint fit up inspection for TA-445985 PRATHAB RE-SCHEDULE TO 7-
4314 CPP-NGCP-W-4312 Welding SATIP-W-012-01 SAIC-W-2048 36″HWYH GGM TRL-1 6-Jul-19 8:00 AM Mr. Suresh CLOSED
36″HWYH GGM TRL-1 JULY-2019
Post-welding visual inspection for 36″HWYH GGM RE-SCHEDULE TO 7-
4315 CPP-NGCP-W-4313 1400135954 Welding SATIP-W-012-01 SAIC-W-2048 36″HWYH GGM TRL-1 TA-445985 6-Jul-19 2.00 PM PRATHAB Mr. Suresh CLOSED
TRL-1 JULY-2019
1400135938 TA-445985 PRATHAB RE-SCHEDULE TO 7-
4316 CPP-NGCP-W-4314 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 36″HWYH GGM TRL-1 36″HWYH GGM TRL-1 6-Jul-19 4:00 PM Mr. Suresh CLOSED
JULY-2019
Review of weekly welder performance and
4317 CPP-NGCP-W-4315 1400136907 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 8-july-2019 to 15- CPP site office N/A 07-Jul-19 8:00 AM Ruhul Mr. Rajesh CLOSED
July-2019 at CPP site office.
Pre-welding and weld joint fit up inspection for 8
4318 CPP-NGCP-W-4316 1400136718 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 7-Jul-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1192 KP 0+500 to KP0+800
Post-welding visual inspection for 8 inch HRDH-
4319 CPP-NGCP-W-4317 1400136775 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 7-Jul-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1192 KP 0+500 to KP0+800
NDE selection for welds of 8 inch HRDH-1192 KP
4320 CPP-NGCP-W-4318 1400136783 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1192 FL TA-669428 7-Jul-19 4.00 PM Rajesh Mr. Rajesh CLOSED
0+500 to KP0+800
Pre-welding and weld joint fit up inspection for 8
4321 CPP-NGCP-W-4319 1400136793 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1078 FL TA-669295 7-Jul-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1078 KP2+800 to KP3+200
Post-welding visual inspection for 8 inch HRDH
4322 CPP-NGCP-W-4320 1400136719 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1078 FL TA-669295 7-Jul-19 2.00 PM Saif Mr. Rajesh CLOSED
-1078 KP2+800 to KP3+200
NDE selection for welds of 8 inch HRDH -1078
4323 CPP-NGCP-W-4321 1400136803 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1078 FL TA-669295 7-Jul-19 4.00 PM Saif Mr. Rajesh CLOSED
KP2+800 to KP3+200
Pre-welding and weld joint fit up inspection for 8
4324 CPP-NGCP-W-4322 1400136923 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1199 F/L TA-669301 7-Jul-19 7:30 AM Shanmuga Mr. Rajesh CLOSED
inch HRDH -1199 KP0+400 to KP0+700
Post-welding visual inspection for 8 inch HRDH
4325 CPP-NGCP-W-4323 1400136892 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1199 F/L TA-669301 7-Jul-19 2.30 PM Shanmuga Mr. Rajesh CLOSED
-1199 KP0+400 to KP0+700
NDE selection for welds of 8 inch HRDH -1199
4326 CPP-NGCP-W-4324 1400136916 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1199 F/L TA-669301 7-Jul-19 4.30 PM Shanmuga Mr. Rajesh CLOSED
KP0+400 to KP0+700
Pre-welding and weld joint fit up inspection for 16 HRDH -CK-RH Mr.
4327 CPP-NGCP-W-4325 1400136973 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 7-Jul-19 8:00 AM IRSHAD CLOSED
inch HRDH CK-RH TR/L KP4+500 to KP4+700 ; TR/L Rajendran
1400136928 Post-welding visual inspection for 16 inch HRDH HRDH -CK-RH TA-843958 Mr.
4328 CPP-NGCP-W-4326 Welding SATIP-W-012-01 SAIC-W-2048 7-Jul-19 2.00 PM IRSHAD CLOSED
CK-RH TR/L KP4+500 to KP4+700; TR/L Rajendran
NDE selection for welds of 16 inch HRDH CK-RH HRDH -CK-RH Mr.
4329 CPP-NGCP-W-4327 1400136908 Welding SATIP-W-012-01 SAIC-W-2054 TA-843958 7-Jul-19 4.00 PM IRSHAD CLOSED
TR/L KP4+500 to KP4+700; TR/L Rajendran
1400136861 Temperature Tie in Welding HRDH-1309 at KM- TA-843624
4330 CPP-NGCP-W-4328 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1309 FL 7-Jul-19 10:00 AM Sarfaraz Mr. Ashok CLOSED
0+650 to KM-0+730
Pre-welding and weld joint fit up inspection for 8 Cancelled due to
4331 CPP-NGCP-W-4329 1400136964 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1309 FL TA-843624 7-Jul-19 8:00 AM Sarfaraz Mr. Ashok CLOSED
inch HRDH-1309 at KM-0+650 to 0+730 already raised
1400136929 Post-welding visual inspection for 8 inch HRDH- TA-843624 Cancelled due to
4332 CPP-NGCP-W-4330 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1309 FL 7-Jul-19 2.00 PM Sarfaraz Mr. Ashok CLOSED
1309 at KM-0+650 to 0+730 already raised
NDE selection for welds of 8 inch HRDH-1309 at Cancelled due to
4333 CPP-NGCP-W-4331 1400136956 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1309 FL TA-843624 7-Jul-19 4.00 PM Sarfaraz Mr. Ashok CLOSED
KM-0+650 to 0+730 already raised
In-Process Verification - RT Techniques &
1400137414 VARIOUS Mr.
4334 CPP-NGCP-W-4332 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-922, 1147, HRDH-922, 1147, 1144, 1192 7-Jul-19 8:00 AM RAMEEZ CLOSED
Rajendran
1144, 1192
In-Process Verification - RT Techniques &
4335 CPP-NGCP-W-4333 1400137411 Welding SATIP-NDE-RT-01 SAIC-RT-2007 HWYH-CK-RH VARIOUS 7-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
Procedure Implementation ofHWYH-CK-RH
1400136935 Temperature Tie in Welding HRDH-1116 at KM- TA-843608 Mr.
4336 CPP-NGCP-W-4334 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1116 FL 7-Jul-19 10:00 AM Farhan CLOSED
0+950 to KM-1+000 Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
4337 CPP-NGCP-W-4335 1400136905 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL TA-843608 7-Jul-19 8:00 AM Farhan CLOSED
inch HRDH-1116 at KM-0+950 to KM-1+000 Rajendran
1400136918 Post-welding visual inspection for 8inch HRDH- TA-843608 Mr.
4338 CPP-NGCP-W-4336 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1116 FL 7-Jul-19 2.00 PM Farhan CLOSED
1116 at KM-0+950 to KM-1+000 Rajendran
NDE selection for welds of 8 inch HRDH-1116 at Mr.
4339 CPP-NGCP-W-4337 1400136906 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1116 FL TA-843608 7-Jul-19 4.00 PM Farhan CLOSED
KM-0+950 to KM-1+000 Rajendran

1400136880 Pre-welding and weld joint fit up inspection for 8 TA-843609 Mr. RE-SCHEDULE TO 8-
4340 CPP-NGCP-W-4338 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL 7-Jul-19 7:30 AM Farhan CLOSED
inch HRDH-922 at KM-1+120 to KM-1+200 Rajendran JULY-2019
Post-welding visual inspection for 8inch HRDH- Mr. RE-SCHEDULE TO 8-
4341 CPP-NGCP-W-4339 1400136919 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 7-Jul-19 2.30 PM Farhan CLOSED
922 at KM-1+120 to KM-1+200 Rajendran JULY-2019
1400136850 NDE selection for welds of 8 inch HRDH-922 at TA-843609 Mr. RE-SCHEDULE TO 8-
4342 CPP-NGCP-W-4340 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL 7-Jul-19 4.30 PM Farhan CLOSED
KM-1+120 to KM-1+200 Rajendran JULY-2019
Pre-welding and weld joint fit up inspection for
4343 CPP-NGCP-W-4341 1400136504 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-912 TA-446044 7-Jul-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-912
4344 CPP-NGCP-W-4342 1400136505 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-912 HWYH-912 TA-446044 7-Jul-19 2.00 PM Shahbaz Mr. Suresh CLOSED
4345 CPP-NGCP-W-4343 1400136516 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-912 HWYH-912 TA-446044 7-Jul-19 4:00 PM Shahbaz Mr. Suresh CLOSED
RE-SCHEDULE TO 8-
4346 CPP-NGCP-W-4344 1400137740 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1093 HWYH-1093 TA-445838 7-Jul-19 7:00 AM Umair Mr. Suresh CLOSED cancelled due to job not ready
JULY-2018
Pre-welding and weld joint fit up inspection for
4347 CPP-NGCP-W-4345 1400137741 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 7-Jul-19 8:00 AM Umair Mr. Suresh CLOSED
HWYH-1093
4348 CPP-NGCP-W-4346 1400137632 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 7-Jul-19 2.00 PM Umair Mr. Suresh CLOSED
4349 CPP-NGCP-W-4347 1400137793 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 7-Jul-19 4:00 PM Umair Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 8
4350 CPP-NGCP-W-4348 1400136507 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 7-Jul-19 8:00 AM sanjeev Mr. Suresh CLOSED
inch HWYH-1071 FL km1+350~km1+700
Post-welding visual inspection for 8 inch HWYH-
4351 CPP-NGCP-W-4349 1400136518 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 7-Jul-19 2.00 PM sanjeev Mr. Suresh CLOSED
1071 FL km1+350~km1+700
NDE selection for welds of 8 inch HWYH-1071 FL
4352 CPP-NGCP-W-4350 1400136520 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1071 FL TA-445830 7-Jul-19 4:00 PM sanjeev Mr. Suresh CLOSED
KM km1+350~km1+700
Pre-welding and weld joint fit up inspection for
4353 CPP-NGCP-W-4351 1400136563 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1102 TA-445899 7-Jul-19 8:00 AM VARUN Mr. Suresh CLOSED
HWYH-1102
4354 CPP-NGCP-W-4352 1400136546 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1102 HWYH-1102 TA-445899 7-Jul-19 2.00 PM VARUN Mr. Suresh CLOSED
4355 CPP-NGCP-W-4353 1400136565 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1102 HWYH-1102 TA-445899 7-Jul-19 4:00 PM VARUN Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for RE-SCHEDULE TO 8-
4356 CPP-NGCP-W-4354 1400136577 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 7-Jul-19 8:00 AM abdul raheem Mr. Ashok CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100 JULY-2018
Post-welding visual inspection for 16″HWYH CK- RE-SCHEDULE TO 8-
4357 CPP-NGCP-W-4355 1400136549 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 7-Jul-19 2.00 PM abdul raheem Mr. Ashok CLOSED
RH TRL km0+100 to 8+100 JULY-2018
NDE selection for welds of 16″HWYH CK-RH RE-SCHEDULE TO 8-
4358 CPP-NGCP-W-4356 1400136598 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 7-Jul-19 4:00 PM abdul raheem Mr. Ashok CLOSED
TRL km0+100 to 8+100 JULY-2018
Pre-welding and weld joint fit up inspection for
4359 CPP-NGCP-W-4357 1400136589 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 7-Jul-19 8:00 AM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
Post-welding visual inspection for 16″HWYH GK-
4360 CPP-NGCP-W-4358 1400136568 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 7-Jul-19 2.00 PM Imran Mr. Ashok CLOSED
RH TRL km0+400-km6
NDE selection for welds of 16″HWYH GK-RH
4361 CPP-NGCP-W-4359 1400136614 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 7-Jul-19 4:00 PM Imran Mr. Ashok CLOSED
TRL km0+400-km6
Pre-welding and weld joint fit up inspection for
4362 CPP-NGCP-W-4360 1400137256 Welding SATIP-W-012-01 SAIC-W-2048 HWYH 1091 TA-445958 7-Jul-19 8:00 AM asish Mr. Suresh CLOSED
HWYH 1091 km0+200
Post-welding visual inspection for HWYH 1091
4363 CPP-NGCP-W-4361 1400137276 Welding SATIP-W-012-01 SAIC-W-2048 HWYH 1091 TA-445958 7-Jul-19 2.00 PM asish Mr. Suresh CLOSED
km0+200
4364 CPP-NGCP-W-4362 1400137273 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH 1091 km0+200 HWYH 1091 TA-445958 7-Jul-19 4:00 PM asish Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4365 CPP-NGCP-W-4363 1400136639 Welding SATIP-W-012-01 SAIC-W-2048 36″HWYH GGM TRL-2 TA-445986 7-Jul-19 8:00 AM PRATHAB Mr. Suresh CLOSED
36″HWYH GGM TRL-2
Post-welding visual inspection for 36″HWYH GGM
4366 CPP-NGCP-W-4364 1400136697 Welding SATIP-W-012-01 SAIC-W-2048 36″HWYH GGM TRL-2 TA-445986 7-Jul-19 2.00 PM PRATHAB Mr. Suresh CLOSED
TRL-2
4367 CPP-NGCP-W-4365 1400136618 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 36″HWYH GGM TRL-2 36″HWYH GGM TRL-2 TA-445986 7-Jul-19 4:00 PM PRATHAB Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for CANCELLED DUE TO
4368 CPP-NGCP-W-4366 1400138014 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1065 TA-445966 8-Jul-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-1065 JOB NOT READY
CANCELLED DUE TO
4369 CPP-NGCP-W-4367 1400137971 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1065 HWYH-1065 TA-445966 8-Jul-19 2.00 PM Shahbaz Mr. Suresh CLOSED
JOB NOT READY
CANCELLED DUE TO
4370 CPP-NGCP-W-4368 1400138036 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1065 HWYH-1065 TA-445966 8-Jul-19 4:00 PM Shahbaz Mr. Suresh CLOSED
JOB NOT READY
Pre-welding and weld joint fit up inspection for
4371 CPP-NGCP-W-4369 1400138486 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 8-Jul-19 8:00 AM Umair Mr. Suresh CLOSED
HWYH-1093
4372 CPP-NGCP-W-4370 1400138505 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 8-Jul-19 2.00 PM Umair Mr. Suresh CLOSED
4373 CPP-NGCP-W-4371 1400138487 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 8-Jul-19 4:00 PM Umair Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 8
4374 CPP-NGCP-W-4372 1400138044 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 8-Jul-19 8:00 AM sanjeev Mr. Suresh CLOSED
inch HWYH-1071 FL km1+350~km1+700
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a Post-welding visual inspection for 8 inch HWYH-
4375 CPP-NGCP-W-4373 1400138017 l Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 8-Jul-19 2.00 PM sanjeev Mr. Suresh CLOSED
1071 FL km1+350~km1+700
NDE selection for welds of 8 inch HWYH-1071 FL
4376 CPP-NGCP-W-4374 1400138047 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1071 FL TA-445830 8-Jul-19 4:00 PM sanjeev Mr. Suresh CLOSED
KM km1+350~km1+700
Pre-welding and weld joint fit up inspection for
4377 CPP-NGCP-W-4375 1400138055 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1067 TA-445884 8-Jul-19 8:00 AM VARUN Mr. Suresh CLOSED
HWYH-1067
4378 CPP-NGCP-W-4376 1400137987 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1067 HWYH-1067 TA-445884 8-Jul-19 2.00 PM VARUN Mr. Suresh CLOSED
4379 CPP-NGCP-W-4377 1400137999 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1067 HWYH-1067 TA-445884 8-Jul-19 4:00 PM VARUN Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4380 CPP-NGCP-W-4378 1400138061 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 8-Jul-19 8:00 AM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
Post-welding visual inspection for 16″HWYH GK-
4381 CPP-NGCP-W-4379 1400138075 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 8-Jul-19 2.00 PM Imran Mr. Ashok CLOSED
RH TRL km0+400-km6
NDE selection for welds of 16″HWYH GK-RH
4382 CPP-NGCP-W-4380 1400138077 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 8-Jul-19 4:00 PM Imran Mr. Ashok CLOSED
TRL km0+400-km6
Pre-welding and weld joint fit up inspection for
4383 CPP-NGCP-W-4381 1400138495 Welding SATIP-W-012-01 SAIC-W-2048 HWYH LSS TRL-1 TA-445981 8-Jul-19 8:00 AM asish Mr. Suresh CLOSED
16″HWYH LSS TRL-1
Post-welding visual inspection for 16″HWYH LSS
4384 CPP-NGCP-W-4382 1400138496 Welding SATIP-W-012-01 SAIC-W-2048 HWYH LSS TRL-1 TA-445981 8-Jul-19 2.00 PM asish Mr. Suresh CLOSED
TRL-1
4385 CPP-NGCP-W-4383 1400138510 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 16″HWYH LSS TRL-1 HWYH LSS TRL-1 TA-445981 8-Jul-19 4:00 PM asish Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4386 CPP-NGCP-W-4384 1400138557 Welding SATIP-W-012-01 SAIC-W-2048 36″HWYH GGM TRL-1 TA-445985 8-Jul-19 8:00 AM PRATHAB Mr. Suresh CLOSED
36″HWYH GGM TRL-1
Post-welding visual inspection for 36″HWYH GGM
4387 CPP-NGCP-W-4385 1400138543 Welding SATIP-W-012-01 SAIC-W-2048 36″HWYH GGM TRL-1 TA-445985 8-Jul-19 2.00 PM PRATHAB Mr. Suresh CLOSED
TRL-1
4388 CPP-NGCP-W-4386 1400138466 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 36″HWYH GGM TRL-1 36″HWYH GGM TRL-1 TA-445985 8-Jul-19 4:00 PM PRATHAB Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 8
4389 CPP-NGCP-W-4387 1400138065 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 8-Jul-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1192 KP 0+800 to KP0+900
Post-welding visual inspection for 8 inch HRDH-
4390 CPP-NGCP-W-4388 1400138079 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 8-Jul-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1192 KP 0+800 to KP0+900
NDE selection for welds of 8 inch HRDH-1192 KP
4391 CPP-NGCP-W-4389 1400138051 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1192 FL TA-669428 8-Jul-19 4.00 PM Rajesh Mr. Rajesh CLOSED
0+800 to KP0+900
Pre-welding and weld joint fit up inspection for 8
4392 CPP-NGCP-W-4390 1400138052 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1078 FL TA-669295 8-Jul-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1078 KP2+600 to KP2+800
Post-welding visual inspection for 8 inch HRDH
4393 CPP-NGCP-W-4391 1400138094 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1078 FL TA-669295 8-Jul-19 2.00 PM Saif Mr. Rajesh CLOSED
-1078 KP2+600 to KP2+800
NDE selection for welds of 8 inch HRDH -1078
4394 CPP-NGCP-W-4392 1400138103 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1078 FL TA-669295 8-Jul-19 4.00 PM Saif Mr. Rajesh CLOSED
KP2+600 to KP2+800
Pre-welding and weld joint fit up inspection for 8
4395 CPP-NGCP-W-4393 1400138133 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1199 F/L TA-669301 8-Jul-19 7:30 AM Shanmuga Mr. Rajesh CLOSED
inch HRDH -1199 KP0+200 to KP0+400
Post-welding visual inspection for 8 inch HRDH
4396 CPP-NGCP-W-4394 1400137992 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1199 F/L TA-669301 8-Jul-19 2.30 PM Shanmuga Mr. Rajesh CLOSED
-1199 KP0+200 to KP0+400
NDE selection for welds of 8 inch HRDH -1199
4397 CPP-NGCP-W-4395 1400138068 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1199 F/L TA-669301 8-Jul-19 4.30 PM Shanmuga Mr. Rajesh CLOSED
KP0+200 to KP0+400
Pre-welding and weld joint fit up inspection for 8
4398 CPP-NGCP-W-4396 1400138085 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1169 F/L TA-669421 8-Jul-19 8:00 AM Shanmuga Mr. Rajesh CLOSED
inch HRDH -1169 KP2+000 to KP2+200
Post-welding visual inspection for 8 inch HRDH
4399 CPP-NGCP-W-4397 1400138143 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1169 F/L TA-669421 8-Jul-19 2.00 PM Shanmuga Mr. Rajesh CLOSED
-1169 KP2+000 to KP2+200
NDE selection for welds of 8 inch HRDH -1169
4400 CPP-NGCP-W-4398 1400138153 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1169 F/L TA-669421 8-Jul-19 4.00 PM Shanmuga Mr. Rajesh CLOSED
KP2+000 to KP2+200
Pre-welding and weld joint fit up inspection for 16 HRDH -CK-RH Mr.
4401 CPP-NGCP-W-4399 1400138694 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 8-Jul-19 8:00 AM IRSHAD CLOSED
inch HRDH CK-RH TR/L KP4+700 to KP5+200 ; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -CK-RH Mr.
4402 CPP-NGCP-W-4400 1400138608 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 8-Jul-19 2.00 PM IRSHAD CLOSED
CK-RH TR/L KP4+700 to KP5+200; TR/L Rajendran
NDE selection for welds of 16 inch HRDH CK-RH HRDH -CK-RH Mr.
4403 CPP-NGCP-W-4401 1400138713 Welding SATIP-W-012-01 SAIC-W-2054 TA-843958 8-Jul-19 4.00 PM IRSHAD CLOSED
TR/L KP4+700 to KP5+200; TR/L Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
4404 CPP-NGCP-W-4402 1400138715 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -902 FL TA-843606 8-Jul-19 8:00 AM Sarfaraz CLOSED
inch HRDH-902 at KM-4+200 to 4+327 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
4405 CPP-NGCP-W-4403 1400138687 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -902 FL TA-843606 8-Jul-19 2.00 PM Sarfaraz CLOSED
902 at KM-4+200 to 4+327 Rajendran
NDE selection for welds of 8 inch HRDH-902 at Mr.
4406 CPP-NGCP-W-4404 1400138661 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -902 FL TA-843606 8-Jul-19 4.00 PM Sarfaraz CLOSED
KM-4+200 to 4+327 Rajendran
Pre-welding and weld joint fit up inspection for 16 HRDH -AK-RH Mr.
4407 CPP-NGCP-W-4405 1400138804 Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 8-Jul-19 8:00 AM Shadab CLOSED
inch HRDH AK-RH TR/L KP0+698 to KP0+787; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -AK-RH Mr.
4408 CPP-NGCP-W-4406 1400138782 Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 8-Jul-19 2.00 PM Shadab CLOSED
AK-RH TR/L KP0+698 to KP0+787; TR/L Rajendran
NDE selection for welds of 16 inch HRDH AK-RH HRDH -AK-RH Mr.
4409 CPP-NGCP-W-4407 1400138824 Welding SATIP-W-012-01 SAIC-W-2054 TA-843960 8-Jul-19 4.00 PM Shadab CLOSED
TR/L KP0+698 to KP0+787; TR/L Rajendran
In-Process Verification - RT Techniques &
Mr.
4410 CPP-NGCP-W-4408 1400139081 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-922, AK-RH, HRDH-922, AK-RH, 1078, 1199 VARIOUS 8-Jul-19 8:00 AM RAMEEZ CLOSED
Rajendran
1078, 1199 Verification - RT Techniques &
In-Process
4411 CPP-NGCP-W-4409 1400139118 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1078, GK- HWYH-1078, GK-RH, CK-RH VARIOUS 8-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
RH, CK-RH
Pre-welding and weld joint fit up inspection for 8 Mr. Cancelled due to already
4412 CPP-NGCP-W-4410 1400138096 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 8-Jul-19 7:30 AM Farhan CLOSED
inch HRDH-922 at KM-0+500 to KM-0+800 Rajendran raised
Post-welding visual inspection for 8inch HRDH- Mr. Cancelled due to already
4413 CPP-NGCP-W-4411 1400138154 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 8-Jul-19 2.30 PM Farhan CLOSED
922 at KM-0+500 to KM-0+800 Rajendran raised
NDE selection for welds of 8 inch HRDH-922 at Mr. Cancelled due to already
4414 CPP-NGCP-W-4412 1400138134 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL TA-843609 8-Jul-19 4.30 PM Farhan CLOSED
KM-0+500 to KM-0+800 Rajendran raised
Pre-welding and weld joint fit up inspection for
4415 CPP-NGCP-W-4413 1400139158 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-912 TA-446044 8-Jul-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-912
4416 CPP-NGCP-W-4414 1400139140 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-912 HWYH-912 TA-446044 8-Jul-19 2.00 PM Shahbaz Mr. Suresh CLOSED
4417 CPP-NGCP-W-4415 1400139130 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-912 HWYH-912 TA-446044 8-Jul-19 4:00 PM Shahbaz Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 8
4418 CPP-NGCP-W-4416 1400139520 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 9-Jul-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1192 KP 0+900 to KP1+100
Post-welding visual inspection for 8 inch HRDH-
4419 CPP-NGCP-W-4417 1400139527 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 9-Jul-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1192 KP 0+900 to KP1+100
NDE selection for welds of 8 inch HRDH-1192 KP
4420 CPP-NGCP-W-4418 1400139460 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1192 FL TA-669428 9-Jul-19 4.00 PM Rajesh Mr. Rajesh CLOSED
0+900 to KP1+100
Pre-welding and weld joint fit up inspection for 8
4421 CPP-NGCP-W-4419 1400139544 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1078 FL TA-669295 9-Jul-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1078 KP2+400 to KP2+600
Post-welding visual inspection for 8 inch HRDH
4422 CPP-NGCP-W-4420 1400139545 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1078 FL TA-669295 9-Jul-19 2.00 PM Saif Mr. Rajesh CLOSED
-1078 KP2+400 to KP2+600
NDE selection for welds of 8 inch HRDH -1078
4423 CPP-NGCP-W-4421 1400139522 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1078 FL TA-669295 9-Jul-19 4.00 PM Saif Mr. Rajesh CLOSED
KP2+400 to KP2+600
Pre-welding and weld joint fit up inspection for 8
4424 CPP-NGCP-W-4422 1400139560 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1169 F/L TA-669421 9-Jul-19 8:00 AM Shanmuga Mr. Rajesh CLOSED
inch HRDH -1169 KP1+900 to KP2+200
Post-welding visual inspection for 8 inch HRDH
4425 CPP-NGCP-W-4423 1400139501 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1169 F/L TA-669421 9-Jul-19 2.00 PM Shanmuga Mr. Rajesh CLOSED
-1169 KP1+900 to KP2+200
1400139575 NDE selection for welds of 8 inch HRDH -1169 TA-669421
4426 CPP-NGCP-W-4424 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1169 F/L 9-Jul-19 4.00 PM Shanmuga Mr. Rajesh CLOSED
KP1+900 to KP2+200
Pre-welding and weld joint fit up inspection for 16 HRDH -CK-RH Mr.
4427 CPP-NGCP-W-4425 1400139990 Welding SATIP-W-012-01 SAIC-W-2048 TA-843958 9-Jul-19 8:00 AM IRSHAD CLOSED
inch HRDH CK-RH TR/L KP5+300 to KP5+400 ; TR/L Rajendran
1400139931 Post-welding visual inspection for 16 inch HRDH HRDH -CK-RH TA-843958 Mr.
4428 CPP-NGCP-W-4426 Welding SATIP-W-012-01 SAIC-W-2048 9-Jul-19 2.00 PM IRSHAD CLOSED
CK-RH TR/L KP5+300 to KP5+400; TR/L Rajendran
NDE selection for welds of 16 inch HRDH CK-RH HRDH -CK-RH Mr.
4429 CPP-NGCP-W-4427 1400140014 Welding SATIP-W-012-01 SAIC-W-2054 TA-843958 9-Jul-19 4.00 PM IRSHAD CLOSED
TR/L KP5+300 to KP5+400; TR/L Rajendran
1400139940 Pre-welding and weld joint fit up inspection for 16 TA-843956 Mr.
4430 CPP-NGCP-W-4428 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L 9-Jul-19 7:30 AM IRSHAD CLOSED
inch HRDH GK-RH TR/L KP0+450 to KP0+950; Rajendran
Post-welding visual inspection for 16 inch HRDH Mr.
4431 CPP-NGCP-W-4429 1400139997 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 9-Jul-19 2.30 PM IRSHAD CLOSED
GK-RH TR/L KP0+450 to KP0+950; Rajendran
1400139980 NDE selection for welds of 16 inch HRDH GK-RH TA-843956 Mr.
4432 CPP-NGCP-W-4430 Welding SATIP-W-012-01 SAIC-W-2054 HRDH GK-RH TR/L 9-Jul-19 4.30 PM IRSHAD CLOSED
TR/L KP0+450 to KP0+950; Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
4433 CPP-NGCP-W-4431 1400140148 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -902 FL TA-843606 9-Jul-19 8:00 AM Sarfaraz CLOSED
inch HRDH-902 at KM-4+027 to 4+044 Rajendran
1400140142 Post-welding visual inspection for 8 inch HRDH- TA-843606 Mr.
4434 CPP-NGCP-W-4432 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -902 FL 9-Jul-19 2.00 PM Sarfaraz CLOSED
902 at KM-4+027 to 4+044 Rajendran
NDE selection for welds of 8 inch HRDH-902 at Mr.
4435 CPP-NGCP-W-4433 1400140172 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -902 FL TA-843606 9-Jul-19 4.00 PM Sarfaraz CLOSED
KM-4+027 to 4+044 Rajendran
1400140162 Pre-welding and weld joint fit up inspection for 16 HRDH -AK-RH TA-843960 Mr.
4436 CPP-NGCP-W-4434 Welding SATIP-W-012-01 SAIC-W-2048 9-Jul-19 8:00 AM Shadab CLOSED
inch HRDH AK-RH TR/L KP0+698 to KP0+787; TR/L Rajendran
Post-welding visual inspection for 16 inch HRDH HRDH -AK-RH Mr.
4437 CPP-NGCP-W-4435 1400140149 Welding SATIP-W-012-01 SAIC-W-2048 TA-843960 9-Jul-19 2.00 PM Shadab CLOSED
AK-RH TR/L KP0+698 to KP0+787; TR/L Rajendran
1400140182 NDE selection for welds of 16 inch HRDH AK-RH HRDH -AK-RH TA-843960 Mr.
4438 CPP-NGCP-W-4436 Welding SATIP-W-012-01 SAIC-W-2054 9-Jul-19 4.00 PM Shadab CLOSED
TR/L KP0+698 to KP0+787; TR/L Rajendran
In-Process Verification - RT Techniques &
HRDH-1163, 1148, 1192, 1116, Mr.
4439 CPP-NGCP-W-4437 1400140511 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1163, 1148, VARIOUS 9-Jul-19 8:00 AM RAMEEZ CLOSED
1171 Rajendran
1192, 1116, 1171
In-Process Verification - RT Techniques &
HWYH-GGM-TRL-1, GGM-TRL-2,
4440 CPP-NGCP-W-4438 1400140584 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-GGM-TRL-1, VARIOUS 9-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
GK-RH
GGM-TRL-2, GK-RH
In-Process Inspection of MPT using
1400140595 HWYH-TRL-SOUR, GGM-TRL-1, VARIOUS
4441 CPP-NGCP-W-4439 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 Yoke Method, HWYH-TRL-SOUR, GGM-TRL-1, 9-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
GGM-TRL-2, CK-RH
GGM-TRL-2, CK-RH
Pre-welding and weld joint fit up inspection for 8 Mr.
4442 CPP-NGCP-W-4440 1400139461 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 9-Jul-19 7:30 AM Farhan CLOSED
inch HRDH-922 at KM-0+500 to KM-0+677 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
4443 CPP-NGCP-W-4441 1400139492 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 9-Jul-19 2.30 PM Farhan CLOSED
922 at KM-0+500 to KM-0+677 Rajendran
NDE selection for welds of 8 inch HRDH-922 at Mr.
4444 CPP-NGCP-W-4442 1400139583 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL TA-843609 9-Jul-19 4.30 PM Farhan CLOSED
KM-0+500 to KM-0+677 Rajendran
Weld repair verification of joints Mr. RE-SCHEDULE TO 10-
4445 CPP-NGCP-W-4443 1400140734 Welding SATIP-W-012-01 SAIC-W-2051 HRDH-AK VARIOUS 9-Jul-19 11:00 AM IRSHAD CLOSED CANCELLED DUE TO no work permit
FW-60 of HRDH-AK Rajendran JULY-2018
Pre-welding and weld joint fit up inspection for
4446 CPP-NGCP-W-4444 1400139177 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1065 TA-445966 9-Jul-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-1065
4447 CPP-NGCP-W-4445 1400139178 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1065 HWYH-1065 TA-445966 9-Jul-19 2.00 PM Shahbaz Mr. Suresh CLOSED
4448 CPP-NGCP-W-4446 1400139237 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1065 HWYH-1065 TA-445966 9-Jul-19 4:00 PM Shahbaz Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4449 CPP-NGCP-W-4447 1400140003 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 9-Jul-19 8:00 AM Umair Mr. Suresh CLOSED
HWYH-1093
4450 CPP-NGCP-W-4448 1400139951 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 9-Jul-19 2.00 PM Umair Mr. Suresh CLOSED
4451 CPP-NGCP-W-4449 1400139932 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 9-Jul-19 4:00 PM Umair Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 8
4452 CPP-NGCP-W-4450 1400139167 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 9-Jul-19 8:00 AM sanjeev Mr. Suresh CLOSED
inch HWYH-1071 FL km1+350~km1+700
1400139168 Post-welding visual inspection for 8 inch HWYH- TA-445830
4453 CPP-NGCP-W-4451 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL 9-Jul-19 2.00 PM sanjeev Mr. Suresh CLOSED
1071 FL km1+350~km1+700
NDE selection for welds of 8 inch HWYH-1071 FL
4454 CPP-NGCP-W-4452 1400139239 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1071 FL TA-445830 9-Jul-19 4:00 PM sanjeev Mr. Suresh CLOSED
KM km1+350~km1+700
1400139927 Pre-welding and weld joint fit up inspection for TA-445884
4455 CPP-NGCP-W-4453 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1067 9-Jul-19 8:00 AM VARUN Mr. Suresh CLOSED
HWYH-1067
4456 CPP-NGCP-W-4454 1400139948 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1067 HWYH-1067 TA-445884 9-Jul-19 2.00 PM VARUN Mr. Suresh CLOSED
4457 CPP-NGCP-W-4455 1400140023 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1067 HWYH-1067 TA-445884 9-Jul-19 4:00 PM VARUN Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4458 CPP-NGCP-W-4456 1400139993 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 9-Jul-19 8:00 AM abdul raheem Mr. Ashok CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100
1400139949 Post-welding visual inspection for 16″HWYH CK- TA-445974
4459 CPP-NGCP-W-4457 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL 9-Jul-19 2.00 PM abdul raheem Mr. Ashok CLOSED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH
4460 CPP-NGCP-W-4458 1400140033 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 9-Jul-19 4:00 PM abdul raheem Mr. Ashok CLOSED
TRL km0+100 to 8+100
1400140035 Pre-welding and weld joint fit up inspection for TA-445912
4461 CPP-NGCP-W-4459 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL 9-Jul-19 8:00 AM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
Post-welding visual inspection for 16″HWYH GK-
4462 CPP-NGCP-W-4460 1400140036 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 9-Jul-19 2.00 PM Imran Mr. Ashok CLOSED
RH TRL km0+400-km6
1400140021 NDE selection for welds of 16″HWYH GK-RH TA-445912
4463 CPP-NGCP-W-4461 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL 9-Jul-19 4:00 PM Imran Mr. Ashok CLOSED
TRL km0+400-km6
Pre-welding and weld joint fit up inspection for
4464 CPP-NGCP-W-4462 1400139961 Welding SATIP-W-012-01 SAIC-W-2048 HWYH BK-RH TA-445888 9-Jul-19 8:00 AM asish Mr. Suresh CLOSED
16″HWYH BK-RH km1+340

1400139982 Post-welding visual inspection for 16″HWYH BK- TA-445888


4465 CPP-NGCP-W-4463 Welding SATIP-W-012-01 SAIC-W-2048 HWYH BK-RH 9-Jul-19 2.00 PM asish Mr. Suresh CLOSED
RH km1+340
NDE selection for welds of 16″HWYH BK-RH
4466 CPP-NGCP-W-4464 1400140009 Welding SATIP-W-012-01 SAIC-W-2054 HWYH BK-RH TA-445888 9-Jul-19 4:00 PM asish Mr. Suresh CLOSED
km1+340
Pre-welding and weld joint fit up inspection for
4467 CPP-NGCP-W-4465 1400140000 Welding SATIP-W-012-01 SAIC-W-2048 HWYH 934 TA-445843 9-Jul-19 8:00 AM asish Mr. Suresh CLOSED
HWYH 934 km8+785

1400140026 Post-welding visual inspection for HWYH 934 TA-445843


4468 CPP-NGCP-W-4466 Welding SATIP-W-012-01 SAIC-W-2048 HWYH 934 9-Jul-19 2.00 PM asish Mr. Suresh CLOSED
km8+785
4469 CPP-NGCP-W-4467 1400140046 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH 934 km8+785 HWYH 934 TA-445843 9-Jul-19 4:00 PM asish Mr. Suresh CLOSED
Verification of Hardness testing of joints 01-FW- Mr.
4470 CPP-NGCP-W-4468 1400141800 Welding SATIP-W-012-01 SAIC-W-2014 HRDH-CK-RH TA-445912 4-Jul-19 7:00 AM IRSHAD CLOSED
120 HRDH-CK-RH Rajendran
Pre-welding and weld joint fit up inspection for
4471 CPP-NGCP-W-4469 1400140824 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1065 TA-445966 10-Jul-19 8:00 AM BEENESH Mr. Suresh CLOSED
HWYH-1065
4472 CPP-NGCP-W-4470 1400140788 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1065 HWYH-1065 TA-445966 10-Jul-19 2.00 PM BEENESH Mr. Suresh CLOSED
4473 CPP-NGCP-W-4471 1400140836 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1065 HWYH-1065 TA-445966 10-Jul-19 4:00 PM BEENESH Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4474 CPP-NGCP-W-4472 1400140781 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 10-Jul-19 8:00 AM Umair Mr. Suresh CLOSED
HWYH-1093
4475 CPP-NGCP-W-4473 1400140834 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 10-Jul-19 2.00 PM Umair Mr. Suresh CLOSED
4476 CPP-NGCP-W-4474 1400140794 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 10-Jul-19 4:00 PM Umair Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 8
4477 CPP-NGCP-W-4475 1400140833 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 10-Jul-19 8:00 AM sanjeev Mr. Suresh CLOSED
inch HWYH-1071 FL km1+300~km1+700
Post-welding visual inspection for 8 inch HWYH-
4478 CPP-NGCP-W-4476 1400140835 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 10-Jul-19 2.00 PM sanjeev Mr. Suresh CLOSED
1071 FL km1+300~km1+700
NDE selection for welds of 8 inch HWYH-1071 FL
4479 CPP-NGCP-W-4477 1400140740 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1071 FL TA-445830 10-Jul-19 4:00 PM sanjeev Mr. Suresh CLOSED
KM km1+300~km1+700
Pre-welding and weld joint fit up inspection for
4480 CPP-NGCP-W-4478 1400140805 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1067 TA-445884 10-Jul-19 8:00 AM VARUN Mr. Suresh CLOSED
HWYH-1067
4481 CPP-NGCP-W-4479 1400140732 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1067 HWYH-1067 TA-445884 10-Jul-19 2.00 PM VARUN Mr. Suresh CLOSED
4482 CPP-NGCP-W-4480 1400140857 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1067 HWYH-1067 TA-445884 10-Jul-19 4:00 PM VARUN Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4483 CPP-NGCP-W-4481 1400140806 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 10-Jul-19 8:00 AM abdul raheem Mr. Ashok CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK-
4484 CPP-NGCP-W-4482 1400140856 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 10-Jul-19 2.00 PM abdul raheem Mr. Ashok CLOSED
RH TRL km0+100 to 8+100
NDE selection for welds of 16″HWYH CK-RH
4485 CPP-NGCP-W-4483 1400140742 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL TA-445974 10-Jul-19 4:00 PM abdul raheem Mr. Ashok CLOSED
TRL km0+100 to 8+100
Pre-welding and weld joint fit up inspection for
4486 CPP-NGCP-W-4484 1400140791 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 10-Jul-19 8:00 AM Imran Mr. Ashok CLOSED
16″HWYH GK-RH TRL km0+400-km6
Post-welding visual inspection for 16″HWYH GK-
4487 CPP-NGCP-W-4485 1400140841 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 10-Jul-19 2.00 PM Imran Mr. Ashok CLOSED
RH TRL km0+400-km6
NDE selection for welds of 16″HWYH GK-RH
4488 CPP-NGCP-W-4486 1400140799 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 10-Jul-19 4:00 PM Imran Mr. Ashok CLOSED
TRL km0+400-km6
Pre-welding and weld joint fit up inspection for
4489 CPP-NGCP-W-4487 1400140876 Welding SATIP-W-012-01 SAIC-W-2048 HWYH 934 TA-445843 10-Jul-19 8:00 AM asish Mr. Suresh CLOSED
HWYH 934 km6+803
Post-welding visual inspection for HWYH 934
4490 CPP-NGCP-W-4488 1400140808 Welding SATIP-W-012-01 SAIC-W-2048 HWYH 934 TA-445843 10-Jul-19 2.00 PM asish Mr. Suresh CLOSED
km6+803
4491 CPP-NGCP-W-4489 1400140831 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH 934 km6+803 HWYH 934 TA-445843 10-Jul-19 4:00 PM asish Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 8
4492 CPP-NGCP-W-4490 1400141180 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 10-Jul-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1192 KP 1+100 to KP1+300
Post-welding visual inspection for 8 inch HRDH-
4493 CPP-NGCP-W-4491 1400141171 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 10-Jul-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1192 KP 1+100 to KP1+300
NDE selection for welds of 8 inch HRDH-1192 KP
4494 CPP-NGCP-W-4492 1400141181 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1192 FL TA-669428 10-Jul-19 4.00 PM Rajesh Mr. Rajesh CLOSED
1+100 to KP1+300
Pre-welding and weld joint fit up inspection for 8
4495 CPP-NGCP-W-4493 1400141197 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1078 FL TA-669295 10-Jul-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1078 KP2+100 to KP2+400
Post-welding visual inspection for 8 inch HRDH
4496 CPP-NGCP-W-4494 1400141182 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1078 FL TA-669295 10-Jul-19 2.00 PM Saif Mr. Rajesh CLOSED
-1078 KP2+100 to KP2+400
NDE selection for welds of 8 inch HRDH -1078
4497 CPP-NGCP-W-4495 1400141172 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1078 FL TA-669295 10-Jul-19 4.00 PM Saif Mr. Rajesh CLOSED
KP2+100 to KP2+400
Pre-welding and weld joint fit up inspection for 8
4498 CPP-NGCP-W-4496 1400141225 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1169 F/L TA-669421 10-Jul-19 8:00 AM Shanmuga Mr. Rajesh CLOSED
inch HRDH -1169 KP1+500 to KP1+800
Post-welding visual inspection for 8 inch HRDH
4499 CPP-NGCP-W-4497 1400141139 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1169 F/L TA-669421 10-Jul-19 2.00 PM Shanmuga Mr. Rajesh CLOSED
-1169 KP1+500 to KP1+800
NDE selection for welds of 8 inch HRDH -1169
4500 CPP-NGCP-W-4498 1400141207 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1169 F/L TA-669421 10-Jul-19 4.00 PM Shanmuga Mr. Rajesh CLOSED
KP1+500 to KP1+800

1400141198 Pre-welding and weld joint fit up inspection for 16 TA-843956 Mr.
4501 CPP-NGCP-W-4499 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L 10-Jul-19 7:30 AM IRSHAD CLOSED
inch HRDH GK-RH TR/L KP0+100 to KP0+300; Rajendran
Post-welding visual inspection for 16 inch HRDH Mr.
4502 CPP-NGCP-W-4500 1400141200 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 10-Jul-19 2.30 PM IRSHAD CLOSED
GK-RH TR/L KP0+100 to KP0+300; Rajendran

1400141201 NDE selection for welds of 16 inch HRDH GK-RH TA-843956 Mr.
4503 CPP-NGCP-W-4501 Welding SATIP-W-012-01 SAIC-W-2054 HRDH GK-RH TR/L 10-Jul-19 4.30 PM IRSHAD CLOSED
TR/L KP0+100 to KP0+300; Rajendran
Pre-welding and weld joint fit up inspection for 8
Mr.
4504 CPP-NGCP-W-4502 1400141273 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH-902 at KM-3+680 to 3+740 and KM- HRDH -902 FL TA-843606 10-Jul-19 8:00 AM Sarfaraz CLOSED
Rajendran
4+052 to KM-4+100
Post-welding visual inspection for 8 inch HRDH-
Mr.
4505 CPP-NGCP-W-4503 1400141248 Welding SATIP-W-012-01 SAIC-W-2048 902 at KM-3+680 to 3+740 and KM-4+052 to KM- HRDH -902 FL TA-843606 10-Jul-19 2.00 PM Sarfaraz CLOSED
Rajendran
4+100
NDE selection for welds of 8 inch HRDH-902 at Mr.
4506 CPP-NGCP-W-4504 1400141249 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -902 FL TA-843606 10-Jul-19 4.00 PM Sarfaraz CLOSED
KM-3+680 to 3+740 and KM-4+052 to KM-4+100 Rajendran
In-Process Verification - RT Techniques &
Mr.
4507 CPP-NGCP-W-4505 1400141838 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1171, 1309, HRDH-1171, 1309, 1138, 1199 VARIOUS 10-Jul-19 8:00 AM RAMEEZ CLOSED
Rajendran
1138, 1199 Verification - RT Techniques &
In-Process
4508 CPP-NGCP-W-4506 1400141847 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-GK-RH, CJ- HWYH-GK-RH, CJ-RH VARIOUS 10-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
RH
In-Process Inspection of MPT using
4509 CPP-NGCP-W-4507 1400141903 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 HWYH-GK-RH VARIOUS 10-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
Yoke Method, HWYH-GK-RH
Temperature Tie in Welding HRDH-922 at KM- Mr. RE-SCHEDULE TO 11-
4510 CPP-NGCP-W-4508 1400141283 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -922 FL TA-843609 10-Jul-19 10:00 AM Farhan CLOSED
0+500 to KM-0+589 Rajendran JULY-2018
Pre-welding and weld joint fit up inspection for 8 Mr.
4511 CPP-NGCP-W-4509 1400141265 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 10-Jul-19 7:30 AM Farhan CLOSED
inch HRDH-922 at KM-0+500 to KM-0+589 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
4512 CPP-NGCP-W-4510 1400141274 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 10-Jul-19 2.30 PM Farhan CLOSED
922 at KM-0+500 to KM-0+589 Rajendran
NDE selection for welds of 8 inch HRDH-922 at Mr.
4513 CPP-NGCP-W-4511 1400141231 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL TA-843609 10-Jul-19 4.30 PM Farhan CLOSED
KM-0+500 to KM-0+589 Rajendran
Welding consumables verification and visual Mr.
4514 CPP-NGCP-W-4512 1400143083 Welding SATIP-W-012-01 SAIC-W-2044 TCF-1 N/A 11-Jul-19 8:00 AM Junaid CLOSED
inspection storage & handling at TCF-1 Rajendran
Pre-welding and weld joint fit up inspection for
4515 CPP-NGCP-W-4513 1400142739 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1065 TA-445966 11-Jul-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-1065
4516 CPP-NGCP-W-4514 1400142784 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1065 HWYH-1065 TA-445966 11-Jul-19 2.00 PM Shahbaz Mr. Suresh CLOSED
4517 CPP-NGCP-W-4515 1400142768 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1065 HWYH-1065 TA-445966 11-Jul-19 4:00 PM Shahbaz Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4518 CPP-NGCP-W-4516 1400142943 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 11-Jul-19 8:00 AM BEENESH Mr. Suresh CLOSED
HWYH-1093
4519 CPP-NGCP-W-4517 1400142973 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 11-Jul-19 2.00 PM BEENESH Mr. Suresh CLOSED
4520 CPP-NGCP-W-4518 1400142928 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 11-Jul-19 4:00 PM BEENESH Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 8
4521 CPP-NGCP-W-4519 1400142787 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 11-Jul-19 8:00 AM sanjeev Mr. Ashok CLOSED
inch HWYH-1071 FL km1+300~km1+700
Post-welding visual inspection for 8 inch HWYH-
4522 CPP-NGCP-W-4520 1400142936 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 11-Jul-19 2.00 PM sanjeev Mr. Ashok CLOSED
1071 FL km1+300~km1+700
NDE selection for welds of 8 inch HWYH-1071 FL
4523 CPP-NGCP-W-4521 1400142983 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1071 FL TA-445830 11-Jul-19 4:00 PM sanjeev Mr. Ashok CLOSED
KM km1+300~km1+700
Pre-welding and weld joint fit up inspection for
4524 CPP-NGCP-W-4522 1400142844 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1067 TA-445884 11-Jul-19 8:00 AM VARUN Mr. Suresh CLOSED
HWYH-1067
4525 CPP-NGCP-W-4523 1400142953 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1067 HWYH-1067 TA-445884 11-Jul-19 2.00 PM VARUN Mr. Suresh CLOSED
4526 CPP-NGCP-W-4524 1400142964 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1067 HWYH-1067 TA-445884 11-Jul-19 4:00 PM VARUN Mr. Suresh CLOSED
1400142988 Pre-welding and weld joint fit up inspection for TA-445974
4527 CPP-NGCP-W-4525 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL 11-Jul-19 8:00 AM abdul raheem Mr. Ashok CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK-
4528 CPP-NGCP-W-4526 1400142972 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 11-Jul-19 2.00 PM abdul raheem Mr. Ashok CLOSED
RH TRL km0+100 to 8+100
1400143124 NDE selection for welds of 16″HWYH CK-RH TA-445974
4529 CPP-NGCP-W-4527 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL 11-Jul-19 4:00 PM abdul raheem Mr. Ashok CLOSED
TRL km0+100 to 8+100
Weld repair verification of joints
4530 CPP-NGCP-W-4528 1400142995 Welding SATIP-W-012-01 SAIC-W-2051 16″HWYH CK-RH TRL TA-445974 11-Jul-19 8:00 AM abdul raheem Mr. Ashok CLOSED
06-FW-496, at HWYH CK-RH

1400143023 Post-welding visual inspection of repair joints TA-445974


4531 CPP-NGCP-W-4529 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL 11-Jul-19 10.00 AM abdul raheem Mr. Ashok CLOSED
06-FW-496, at HWYH CK-RH
Pre-welding and weld joint fit up inspection for
4532 CPP-NGCP-W-4530 1400140874 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH TA-445887 11-Jul-19 8:00 AM Imran Mr. Suresh CLOSED
HWYH CJ-RH KM0+390-km1
1400140865 Post-welding visual inspection for HWYH CJ-RH TA-445887
4533 CPP-NGCP-W-4531 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH 11-Jul-19 2.00 PM Imran Mr. Suresh CLOSED
KM0+390-km1
NDE selection for welds of HWYH CJ-RH
4534 CPP-NGCP-W-4532 1400140820 Welding SATIP-W-012-01 SAIC-W-2054 HWYH CJ-RH TA-445887 11-Jul-19 4:00 PM Imran Mr. Suresh CLOSED
KM0+390-km1
1400143006 Weld repair verification of joints TA-445887
4535 CPP-NGCP-W-4533 Welding SATIP-W-012-01 SAIC-W-2051 HWYH CJ-RH 11-Jul-19 8:00 AM asish Mr. Suresh CLOSED
03-FW-335,HWYH CJ-RH
Post-welding visual inspection of repair joints
4536 CPP-NGCP-W-4534 1400143116 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH TA-445887 11-Jul-19 2.00 PM asish Mr. Suresh CLOSED
03-FW-335, HWYH CJ-RH
1400142758 Pre-welding and weld joint fit up inspection for 8 TA-669428
4537 CPP-NGCP-W-4535 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL 11-Jul-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1192 KP 1+300 to KP1+600
Post-welding visual inspection for 8 inch HRDH-
4538 CPP-NGCP-W-4536 1400142759 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 11-Jul-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1192 KP 1+300 to KP1+600
1400142700 NDE selection for welds of 8 inch HRDH-1192 TA-669428
4539 CPP-NGCP-W-4537 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1192 FL 11-Jul-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP 1+300 to KP1+600
Pre-welding and weld joint fit up inspection for 8
4540 CPP-NGCP-W-4538 1400142701 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1078 FL TA-669295 11-Jul-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1078 KP1+600 to KP2+100

1400142730 Post-welding visual inspection for 8 inch HRDH TA-669295


4541 CPP-NGCP-W-4539 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1078 FL 11-Jul-19 2.00 PM Saif Mr. Rajesh CLOSED
-1078 KP1+600 to KP2+100
NDE selection for welds of 8 inch HRDH -1078
4542 CPP-NGCP-W-4540 1400142765 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1078 FL TA-669295 11-Jul-19 4.00 PM Saif Mr. Rajesh CLOSED
KP1+600 to KP2+100
Pre-welding and weld joint fit up inspection for 8
4543 CPP-NGCP-W-4541 1400142850 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH -1169 KP1+100 to KP1+200 and HRDH-1169 F/L TA-669421 11-Jul-19 8:00 AM Shanmuga Mr. Rajesh CLOSED
KM0+700 to KM0+800
Post-welding visual inspection for 8 inch HRDH
4544 CPP-NGCP-W-4542 1400142873 Welding SATIP-W-012-01 SAIC-W-2048 -1169 KP1+100 to KP1+200 and KM0+700 to HRDH-1169 F/L TA-669421 11-Jul-19 2.00 PM Shanmuga Mr. Rajesh CLOSED
KM0+800
NDE selection for welds of 8 inch HRDH -1169
4545 CPP-NGCP-W-4543 1400142871 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1169 F/L TA-669421 11-Jul-19 4.00 PM Shanmuga Mr. Rajesh CLOSED
KP1+100 to KP1+200 and KM0+700 to KM0+800
Pre-welding and weld joint fit up inspection for 16 Mr.
4546 CPP-NGCP-W-4544 1400142832 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 11-Jul-19 7:30 AM IRSHAD CLOSED
inch HRDH GK-RH TR/L KP0+500 to KP0+700; Rajendran
Post-welding visual inspection for 16 inch HRDH Mr.
4547 CPP-NGCP-W-4545 1400142791 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 11-Jul-19 2.30 PM IRSHAD CLOSED
GK-RH TR/L KP0+500 to KP0+700; Rajendran
NDE selection for welds of 16 inch HRDH GK-RH Mr.
4548 CPP-NGCP-W-4546 1400142876 Welding SATIP-W-012-01 SAIC-W-2054 HRDH GK-RH TR/L TA-843956 11-Jul-19 4.30 PM IRSHAD CLOSED
TR/L KP0+500 to KP0+700; Rajendran
1400142913 Pre-welding and weld joint fit up inspection for 8 TA-843592 Mr.
4549 CPP-NGCP-W-4547 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL 11-Jul-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1164 at KM-5+000 to 5+090 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
4550 CPP-NGCP-W-4548 1400142920 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 11-Jul-19 2.00 PM Sarfaraz CLOSED
1164 at KM-5+000 to 5+090 Rajendran
1400142966 NDE selection for welds of 8 inch HRDH-1164 at TA-843592 Mr.
4551 CPP-NGCP-W-4549 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1164 FL 11-Jul-19 4.00 PM Sarfaraz CLOSED
KM-5+000 to 5+090 Rajendran
In-Process Verification - RT Techniques & Mr.
4552 CPP-NGCP-W-4550 1400143026 Welding SATIP-NDE-RT-01 SAIC-RT-2007 HRDH-1078, 1192 VARIOUS 11-Jul-19 8:00 AM RAMEEZ CLOSED
Procedure Implementation of HRDH-1078, 1192 Rajendran
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a In-Process Verification - RT Techniques &
l HWYH-1078, CJ-RH, 934, BK-RH,
4553 CPP-NGCP-W-4551 1400143015 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1078, CJ- VARIOUS 11-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
912
RH, 934, BK-RH, 912
In-Process Verification - RT Techniques &
Mr.
4554 CPP-NGCP-W-4552 1400143016 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1078, 1199, HRDH-1078, 1199, 1138, CK-RH VARIOUS 12-Jul-19 8:00 AM RAMEEZ CLOSED
1138, CK-RH Rajendran
In-Process Verification - RT Techniques &
4555 CPP-NGCP-W-4553 1400143054 Welding SATIP-NDE-RT-01 SAIC-RT-2007 HWYH-GK-RH VARIOUS 12-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
Procedure Implementation of HWYH-GK-RH
Pre-welding and weld joint fit up inspection for 8 Mr.
4556 CPP-NGCP-W-4554 1400142967 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 11-Jul-19 7:30 AM Farhan CLOSED
inch HRDH-922 at KM-0+530 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
4557 CPP-NGCP-W-4555 1400142997 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -922 FL TA-843609 11-Jul-19 2.30 PM Farhan CLOSED
922 at KM-0+530 Rajendran
NDE selection for welds of 8 inch HRDH-922 at Mr.
4558 CPP-NGCP-W-4556 1400142930 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -922 FL TA-843609 11-Jul-19 4.30 PM Farhan CLOSED
KM-0+530 Rajendran
1400143668 Weld repair verification of joints VARIOUS Mr.
4559 CPP-NGCP-W-4557 Welding SATIP-W-012-01 SAIC-W-2051 HRDH-CK 11-Jul-19 8:00 AM Shadab CLOSED
FW-60 of HRDH-CK Rajendran
Pre-welding and weld joint fit up inspection for
4560 CPP-NGCP-W-4558 1400144195 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1065 TA-445966 13-Jul-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-1065
4561 CPP-NGCP-W-4559 1400144131 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1065 HWYH-1065 TA-445966 13-Jul-19 2.00 PM Shahbaz Mr. Suresh CLOSED
4562 CPP-NGCP-W-4560 1400144140 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1065 HWYH-1065 TA-445966 13-Jul-19 4:00 PM Shahbaz Mr. Suresh CLOSED
1400144161 Pre-welding and weld joint fit up inspection for TA-445838
4563 CPP-NGCP-W-4561 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 13-Jul-19 8:00 AM BEENESH Mr. Suresh CLOSED
HWYH-1093
4564 CPP-NGCP-W-4562 1400144151 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 13-Jul-19 2.00 PM BEENESH Mr. Suresh CLOSED
4565 CPP-NGCP-W-4563 1400144229 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 13-Jul-19 4:00 PM BEENESH Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 8
4566 CPP-NGCP-W-4564 1400144203 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 13-Jul-19 8:00 AM sanjeev Mr. Ashok CLOSED
inch HWYH-1071 FL km0+650~km0+665
1400144214 Post-welding visual inspection for 8 inch HWYH- TA-445830
4567 CPP-NGCP-W-4565 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL 13-Jul-19 2.00 PM sanjeev Mr. Ashok CLOSED
1071 FL km0+650~km0+665
NDE selection for welds of 8 inch HWYH-1071 FL
4568 CPP-NGCP-W-4566 1400144216 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1071 FL TA-445830 13-Jul-19 4:00 PM sanjeev Mr. Ashok CLOSED
km0+650~km0+665
1400144462 Pre-welding and weld joint fit up inspection for TA-445884
4569 CPP-NGCP-W-4567 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1067 13-Jul-19 8:00 AM VARUN Mr. Suresh CLOSED
HWYH-1067
4570 CPP-NGCP-W-4568 1400144512 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1067 HWYH-1067 TA-445884 13-Jul-19 2.00 PM VARUN Mr. Suresh CLOSED
4571 CPP-NGCP-W-4569 1400144482 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1067 HWYH-1067 TA-445884 13-Jul-19 4:00 PM VARUN Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4572 CPP-NGCP-W-4570 1400145026 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1079 TA-445898 13-Jul-19 8:00 AM VARUN Mr. Suresh CLOSED
HWYH-1079
4573 CPP-NGCP-W-4571 1400145037 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1079 HWYH-1079 TA-445898 13-Jul-19 2.00 PM VARUN Mr. Suresh CLOSED
4574 CPP-NGCP-W-4572 1400145064 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1079 HWYH-1079 TA-445898 13-Jul-19 4:00 PM VARUN Mr. Suresh CLOSED
1400144533 Pre-welding and weld joint fit up inspection for TA-445974
4575 CPP-NGCP-W-4573 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL 13-Jul-19 8:00 AM abdul raheem Mr. Ashok CLOSED
16″HWYH CK-RH TRL km0+100 to 8+100
Post-welding visual inspection for 16″HWYH CK-
4576 CPP-NGCP-W-4574 1400144480 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH CK-RH TRL TA-445974 13-Jul-19 2.00 PM abdul raheem Mr. Ashok CLOSED
RH TRL km0+100 to 8+100
1400144532 NDE selection for welds of 16″HWYH CK-RH TA-445974
4577 CPP-NGCP-W-4575 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH CK-RH TRL 13-Jul-19 4:00 PM abdul raheem Mr. Ashok CLOSED
TRL km0+100 to 8+100
Pre-welding and weld joint fit up inspection for
4578 CPP-NGCP-W-4576 1400144545 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 13-Jul-19 8:00 AM abdul raheem Mr. Ashok CLOSED
16″HWYH GK-RH TRL
Post-welding visual inspection for 16″HWYH GK-
4579 CPP-NGCP-W-4577 1400144583 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 13-Jul-19 2.00 PM abdul raheem Mr. Ashok CLOSED
RH TRL
NDE selection for welds of 16″HWYH GK-RH
4580 CPP-NGCP-W-4578 1400144613 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 13-Jul-19 4:00 PM abdul raheem Mr. Ashok CLOSED
TRL
Pre-welding and weld joint fit up inspection for
4581 CPP-NGCP-W-4579 1400144655 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH TA-445887 13-Jul-19 8:00 AM Imran Mr. Suresh CLOSED
HWYH CJ-RH KM0+390-km1
Post-welding visual inspection for HWYH CJ-RH
4582 CPP-NGCP-W-4580 1400144656 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH TA-445887 13-Jul-19 2.00 PM Imran Mr. Suresh CLOSED
KM0+390-km1
NDE selection for welds of HWYH CJ-RH
4583 CPP-NGCP-W-4581 1400144634 Welding SATIP-W-012-01 SAIC-W-2054 HWYH CJ-RH TA-445887 13-Jul-19 4:00 PM Imran Mr. Suresh CLOSED
KM0+390-km1
Pre-welding and weld joint fit up inspection for
4584 CPP-NGCP-W-4582 1400144960 Welding SATIP-W-012-01 SAIC-W-2048 HWYH HK-RH TA-445889 13-Jul-19 8:00 AM asish Mr. Suresh CLOSED
16″HWYH HK-RH km1+162
Post-welding visual inspection for 16″HWYH HK-
4585 CPP-NGCP-W-4583 1400145053 Welding SATIP-W-012-01 SAIC-W-2048 HWYH HK-RH TA-445889 13-Jul-19 2.00 PM asish Mr. Suresh CLOSED
RH km1+162
NDE selection for welds of 16″HWYH HK-RH
4586 CPP-NGCP-W-4584 1400145039 Welding SATIP-W-012-01 SAIC-W-2054 HWYH HK-RH TA-445889 13-Jul-19 4:00 PM asish Mr. Suresh CLOSED
km1+162
Pre-welding and weld joint fit up inspection for 8
4587 CPP-NGCP-W-4585 1400144813 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 13-Jul-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1192 KP 1+600 to KP2+000
Post-welding visual inspection for 8 inch HRDH-
4588 CPP-NGCP-W-4586 1400144739 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 13-Jul-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1192 KP 1+600 to KP2+000
NDE selection for welds of 8 inch HRDH-1192
4589 CPP-NGCP-W-4587 1400144823 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1192 FL TA-669428 13-Jul-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP 1+600 to KP2+000
Pre-welding and weld joint fit up inspection for 8
4590 CPP-NGCP-W-4588 1400144759 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1078 FL TA-669295 13-Jul-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1078 KP1+400 to KP1+600
Post-welding visual inspection for 8 inch HRDH
4591 CPP-NGCP-W-4589 1400144791 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1078 FL TA-669295 13-Jul-19 2.00 PM Saif Mr. Rajesh CLOSED
-1078 KP1+400 to KP1+600
NDE selection for welds of 8 inch HRDH -1078
4592 CPP-NGCP-W-4590 1400144825 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1078 FL TA-669295 13-Jul-19 4.00 PM Saif Mr. Rajesh CLOSED
KP1+400 to KP1+600
Pre-welding and weld joint fit up inspection for 8
4593 CPP-NGCP-W-4591 1400144792 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1169 F/L TA-669421 13-Jul-19 8:00 AM Shanmuga Mr. Rajesh CLOSED
inch HRDH -1169 KM0+500 to KM0+700
Post-welding visual inspection for 8 inch HRDH
4594 CPP-NGCP-W-4592 1400144883 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1169 F/L TA-669421 13-Jul-19 2.00 PM Shanmuga Mr. Rajesh CLOSED
-1169 KM0+500 to KM0+700
NDE selection for welds of 8 inch HRDH -1169
4595 CPP-NGCP-W-4593 1400144887 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1169 F/L TA-669421 13-Jul-19 4.00 PM Shanmuga Mr. Rajesh CLOSED
KM0+500 to KM0+700
Pre-welding and weld joint fit up inspection for 16 Mr.
4596 CPP-NGCP-W-4594 1400144840 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 13-Jul-19 7:30 AM IRSHAD CLOSED
inch HRDH GK-RH TR/L KP0+700 to KP1+000; Rajendran
Post-welding visual inspection for 16 inch HRDH Mr.
4597 CPP-NGCP-W-4595 1400144857 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 13-Jul-19 2.30 PM IRSHAD CLOSED
GK-RH TR/L KP0+700 to KP1+000; Rajendran
NDE selection for welds of 16 inch HRDH GK-RH Mr.
4598 CPP-NGCP-W-4596 1400144905 Welding SATIP-W-012-01 SAIC-W-2054 HRDH GK-RH TR/L TA-843956 13-Jul-19 4.30 PM IRSHAD CLOSED
TR/L KP0+700 to KP1+000; Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
4599 CPP-NGCP-W-4597 1400144895 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 13-Jul-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1164 at KM-4+870 to 5+000 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
4600 CPP-NGCP-W-4598 1400144858 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 13-Jul-19 2.00 PM Sarfaraz CLOSED
1164 at KM-4+870 to 5+000 Rajendran
NDE selection for welds of 8 inch HRDH-1164 at Mr.
4601 CPP-NGCP-W-4599 1400144841 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1164 FL TA-843592 13-Jul-19 4.00 PM Sarfaraz CLOSED
KM-4+870 to 5+000 Rajendran
In-Process Verification - RT Techniques & Mr.
4602 CPP-NGCP-W-4600 1400144946 Welding SATIP-NDE-RT-01 SAIC-RT-2007 HRDH-1169,GK-RH VARIOUS 13-Jul-19 8:00 AM RAMEEZ CLOSED
Procedure Implementation of HRDH-1169,GK-RH Rajendran
In-Process Verification - RT Techniques &
4603 CPP-NGCP-W-4601 1400144899 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-CJ-RH,CK- HWYH-CJ-RH,CK-RH,1071 VARIOUS 13-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
RH,1071
Inspection Requirements Prior to UT Applications
Mr.
4604 CPP-NGCP-W-4602 1400144935 Welding SATIP-NDE-UT-01 SAIC-UT-2007 - (Pre-Test Inspection of HRDH-CK-RH & HWYH-GK-RH VARIOUS 13-Jul-19 8:00 AM RAMEEZ CLOSED
Rajendran
Exam Area) HRDH-CK-RH & HWYH-GK-RH
In-Process Verification of Techniques & Mr.
4605 CPP-NGCP-W-4603 1400144868 Welding SATIP-NDE-UT-01 SAIC-UT-2008 Procedure Impementation of UT. HRDH-CK-RH & HRDH-CK-RH & HWYH-GK-RH VARIOUS 13-Jul-19 8:00 AM RAMEEZ CLOSED
Rajendran
HWYH-GK-RH
Pre-welding and weld joint fit up inspection for 8 Mr.
4606 CPP-NGCP-W-4604 1400144966 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1086 FL TA-843625 13-Jul-19 7:30 AM Farhan CLOSED
inch HRDH-1086 at KM-0+520 to KM 0+590 Rajendran
Post-welding visual inspection for 8inch HRDH- Mr.
4607 CPP-NGCP-W-4605 1400144929 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1086 FL TA-843625 13-Jul-19 2.30 PM Farhan CLOSED
1086 at KM-0+520 to KM 0+590 Rajendran
NDE selection for welds of 8 inch HRDH-1086 at Mr.
4608 CPP-NGCP-W-4606 1400144949 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1086 FL TA-843625 13-Jul-19 4.30 PM Farhan CLOSED
KM-0+520 to KM 0+590 Rajendran
4609 CPP-NGCP-W-4607 1400145404 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1071 HWYH-1071 TA-445830 13-Jul-19 7:00 AM sanjeev Mr. Ashok CLOSED
Review of weekly welder performance and
4610 CPP-NGCP-W-4608 1400146981 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 9-july-2019 to 22- CPP site office N/A 14-Jul-19 8:00 AM Ruhul Mr. Rajesh CLOSED
July-2019 at CPP site office.
Temperature Tie in Welding HRDH-1086 at KM-
4611 CPP-NGCP-W-4609 1400146074 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -1086 FL TA-843625 13-Jul-19 10.00 AM Farhan Mr. Ashok CLOSED
0+520 to KM 0+590
Pre-welding and weld joint fit up inspection for 8
4612 CPP-NGCP-W-4610 1400146188 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 14-Jul-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1192 KP 2+200 to KP2+700
Post-welding visual inspection for 8 inch HRDH-
4613 CPP-NGCP-W-4611 1400146149 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 14-Jul-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1192 KP 2+200 to KP2+700
NDE selection for welds of 8 inch HRDH-1192
4614 CPP-NGCP-W-4612 1400146210 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1192 FL TA-669428 14-Jul-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP 2+200 to KP2+700
Pre-welding and weld joint fit up inspection for 8
4615 CPP-NGCP-W-4613 1400146211 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1078 FL TA-669295 14-Jul-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1078 KP1+200 to KP1+400
Post-welding visual inspection for 8 inch HRDH
4616 CPP-NGCP-W-4614 1400146212 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1078 FL TA-669295 14-Jul-19 2.00 PM Saif Mr. Rajesh CLOSED
-1078 KP1+200 to KP1+400
NDE selection for welds of 8 inch HRDH -1078
4617 CPP-NGCP-W-4615 1400146218 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1078 FL TA-669295 14-Jul-19 4.00 PM Saif Mr. Rajesh CLOSED
KP1+200 to KP1+400
Pre-welding and weld joint fit up inspection for 8
4618 CPP-NGCP-W-4616 1400146330 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1166 FL TA-669352 14-Jul-19 7:30 AM Saif Mr. Rajesh CLOSED
inch HRDH -1166 KP1+000 to KP1+100
Post-welding visual inspection for 8 inch
4619 CPP-NGCP-W-4617 1400146344 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1166 FL TA-669352 14-Jul-19 2.30 PM Saif Mr. Rajesh CLOSED
HRDH -1166 KP1+000 to KP1+100
NDE selection for welds of 8 inch HRDH -1166
4620 CPP-NGCP-W-4618 1400146317 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1166 FL TA-669352 14-Jul-19 4.30 PM Saif Mr. Rajesh CLOSED
KP1+000 to KP1+100
Pre-welding and weld joint fit up inspection for 8
4621 CPP-NGCP-W-4619 1400146338 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1169 F/L TA-669421 14-Jul-19 8:00 AM Shanmuga Mr. Rajesh CLOSED
inch HRDH -1169 KM0+450 to KM0+500
Post-welding visual inspection for 8 inch HRDH
4622 CPP-NGCP-W-4620 1400146339 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1169 F/L TA-669421 14-Jul-19 2.00 PM Shanmuga Mr. Rajesh CLOSED
-1169 KM0+450 to KM0+500
NDE selection for welds of 8 inch HRDH -1169
4623 CPP-NGCP-W-4621 1400146355 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1169 F/L TA-669421 14-Jul-19 4.00 PM Shanmuga Mr. Rajesh CLOSED
KM0+450 to KM0+500
Pre-welding and weld joint fit up inspection for 8
4624 CPP-NGCP-W-4622 1400146332 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1187 F/L TA-669348 14-Jul-19 7:30 AM Shanmuga Mr. Rajesh CLOSED
inch HRDH -1187 KM0+900 to KM1+000
Post-welding visual inspection for 8 inch HRDH
4625 CPP-NGCP-W-4623 1400146377 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1187 F/L TA-669348 14-Jul-19 2.30 PM Shanmuga Mr. Rajesh CLOSED
-1187 KM0+900 to KM1+000
NDE selection for welds of 8 inch HRDH -1187
4626 CPP-NGCP-W-4624 1400146347 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1187 F/L TA-669348 14-Jul-19 4.30 PM Shanmuga Mr. Rajesh CLOSED
KM0+900 to KM1+000
Pre-welding and weld joint fit up inspection for 16 Mr.
4627 CPP-NGCP-W-4625 1400146322 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 14-Jul-19 8:00 AM IRSHAD CLOSED
inch HRDH GK-RH TR/L KP1+000 to KP1+400; Rajendran
Post-welding visual inspection for 16 inch HRDH Mr.
4628 CPP-NGCP-W-4626 1400146348 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 14-Jul-19 2.00 PM IRSHAD CLOSED
GK-RH TR/L KP1+000 to KP1+400; Rajendran
NDE selection for welds of 16 inch HRDH GK-RH Mr.
4629 CPP-NGCP-W-4627 1400146368 Welding SATIP-W-012-01 SAIC-W-2054 HRDH GK-RH TR/L TA-843956 14-Jul-19 4.00 PM IRSHAD CLOSED
TR/L KP1+000 to KP1+400; Rajendran
1400146370 Pre-welding and weld joint fit up inspection for 8 TA-843592 Mr.
4630 CPP-NGCP-W-4628 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL 14-Jul-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1164 at KM-4+870 to 5+000 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
4631 CPP-NGCP-W-4629 1400146464 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 14-Jul-19 2.00 PM Sarfaraz CLOSED
1164 at KM-4+870 to 5+000 Rajendran
1400146473 NDE selection for welds of 8 inch HRDH-1164 at TA-843592 Mr.
4632 CPP-NGCP-W-4630 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1164 FL 14-Jul-19 4.00 PM Sarfaraz CLOSED
KM-4+870 to 5+000 Rajendran
In-Process Verification - RT Techniques &
Mr.
4633 CPP-NGCP-W-4631 1400146436 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1116, CK- HRDH-1116, CK-RH, 922, 1169 VARIOUS 14-Jul-19 8:00 AM RAMEEZ CLOSED
Rajendran
RH, 922, 1169
In-Process Verification - RT Techniques &
HWYH-934, BK-RH, 912, CK-RH,
4634 CPP-NGCP-W-4632 1400146360 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-934, BK-RH, VARIOUS 14-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
CJ-RH, HK-RH, LSS, GK-RH
912, CK-RH, CJ-RH, HK-RH, LSS, GK-RH
Pre-welding and weld joint fit up inspection for 8
4635 CPP-NGCP-W-4633 1400146400 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1086 FL TA-843625 14-Jul-19 7:30 AM Farhan Mr. Ashok CLOSED
inch HRDH-1086 at KM-0+520 to KM 0+590
Post-welding visual inspection for 8inch HRDH-
4636 CPP-NGCP-W-4634 1400146494 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1086 FL TA-843625 14-Jul-19 2.30 PM Farhan Mr. Ashok CLOSED
1086 at KM-0+520 to KM 0+590
NDE selection for welds of 8 inch HRDH-1086 at
4637 CPP-NGCP-W-4635 1400146471 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1086 FL TA-843625 14-Jul-19 4.30 PM Farhan Mr. Ashok CLOSED
KM-0+520 to KM 0+590
Pre-welding and weld joint fit up inspection for
4639 CPP-NGCP-W-4637 1400145465 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1065 TA-445966 14-Jul-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-1065
4640 CPP-NGCP-W-4638 1400145514 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1065 HWYH-1065 TA-445966 14-Jul-19 2.00 PM Shahbaz Mr. Suresh CLOSED
4641 CPP-NGCP-W-4639 1400145498 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1065 HWYH-1065 TA-445966 14-Jul-19 4:00 PM Shahbaz Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4642 CPP-NGCP-W-4640 1400145418 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 14-Jul-19 8:00 AM BEENESH Mr. Suresh CLOSED
HWYH-1093
4643 CPP-NGCP-W-4641 1400145392 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 14-Jul-19 2.00 PM BEENESH Mr. Suresh CLOSED
4644 CPP-NGCP-W-4642 1400145530 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 14-Jul-19 4:00 PM BEENESH Mr. Suresh CLOSED
4645 CPP-NGCP-W-4643 1400145615 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1071 HWYH-1071 FL TA-445830 14-Jul-19 7:00 AM sanjeev Mr. Ashok CLOSED
Pre-welding and weld joint fit up inspection for 8
4646 CPP-NGCP-W-4644 1400145513 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 14-Jul-19 8:00 AM sanjeev Mr. Ashok CLOSED
inch HWYH-1071 FL km0+650~km0+665
Post-welding visual inspection for 8 inch HWYH-
4647 CPP-NGCP-W-4645 1400145477 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 14-Jul-19 2.00 PM sanjeev Mr. Ashok CLOSED
1071 FL km0+650~km0+665
NDE selection for welds of 8 inch HWYH-1071 FL
4648 CPP-NGCP-W-4646 1400145508 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1071 FL TA-445830 14-Jul-19 4:00 PM sanjeev Mr. Ashok CLOSED
km0+650~km0+665
Pre-welding and weld joint fit up inspection for
4649 CPP-NGCP-W-4647 1400145610 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1079 TA-445898 14-Jul-19 8:00 AM VARUN Mr. Suresh CLOSED
HWYH-1079
4650 CPP-NGCP-W-4648 1400145612 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1079 HWYH-1079 TA-445898 14-Jul-19 2.00 PM VARUN Mr. Suresh CLOSED
4651 CPP-NGCP-W-4649 1400145625 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1079 HWYH-1079 TA-445898 14-Jul-19 4:00 PM VARUN Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4652 CPP-NGCP-W-4650 1400145653 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 14-Jul-19 8:00 AM abdul raheem Mr. Ashok CLOSED
16″HWYH GK-RH TRL
Post-welding visual inspection for 16″HWYH GK-
4653 CPP-NGCP-W-4651 1400145630 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 14-Jul-19 2.00 PM abdul raheem Mr. Ashok CLOSED
RH TRL
NDE selection for welds of 16″HWYH GK-RH
4654 CPP-NGCP-W-4652 1400145632 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 14-Jul-19 4:00 PM abdul raheem Mr. Ashok CLOSED
TRL
Pre-welding and weld joint fit up inspection for
4655 CPP-NGCP-W-4653 1400145627 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH TA-445887 14-Jul-19 8:00 AM Imran Mr. Suresh CLOSED
HWYH CJ-RH KM0+390-km1
Post-welding visual inspection for HWYH CJ-RH
4656 CPP-NGCP-W-4654 1400145622 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH TA-445887 14-Jul-19 2.00 PM Imran Mr. Suresh CLOSED
KM0+390-km1

1400145657 NDE selection for welds of HWYH CJ-RH TA-445887


4657 CPP-NGCP-W-4655 Welding SATIP-W-012-01 SAIC-W-2054 HWYH CJ-RH 14-Jul-19 4:00 PM Imran Mr. Suresh CLOSED
KM0+390-km1
Pre-welding and weld joint fit up inspection for
4658 CPP-NGCP-W-4656 1400145676 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 FL TA-446045 14-Jul-19 8:00 AM asish Mr. Suresh CLOSED
HWYH 975
4659 CPP-NGCP-W-4657 1400145644 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH 975 HWYH-975 FL TA-446045 14-Jul-19 2.00 PM asish Mr. Suresh CLOSED
4660 CPP-NGCP-W-4658 1400145685 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH 975 HWYH-975 FL TA-446045 14-Jul-19 4:00 PM asish Mr. Suresh CLOSED
1400146185 Weld repair verification of joints TA-445986 PRATHAB
4661 CPP-NGCP-W-4659 Welding SATIP-W-012-01 SAIC-W-2051 36″HWYH GGM TRL-2 14-Jul-19 8:00 AM Mr. Suresh CLOSED
07-FW-611 07-FW-612, at 36″HWYH GGM TRL-2
Post-welding visual inspection of repair joints
4662 CPP-NGCP-W-4660 1400145540 Welding SATIP-W-012-01 SAIC-W-2048 36″HWYH GGM TRL-2 TA-445986 14-Jul-19 10.00 AM PRATHAB Mr. Suresh CLOSED
07-FW-611 07-FW-612, at 36″HWYH GGM TRL-2
1400145581 Weld repair verification of joints TA-445987 PRATHAB
4663 CPP-NGCP-W-4661 Welding SATIP-W-012-01 SAIC-W-2051 36″HWGCP-1 TL SOUR 14-Jul-19 8:00 AM Mr. Suresh CLOSED
00-FW-22, at HWGCP-1 TL SOUR
Post-welding visual inspection of repair joints
4664 CPP-NGCP-W-4662 1400145623 Welding SATIP-W-012-01 SAIC-W-2048 36″HWGCP-1 TL SOUR TA-445987 14-Jul-19 10.00 AM PRATHAB Mr. Suresh CLOSED
00-FW-22, at HWGCP-1 TL SOUR

1400147509 Pre-welding and weld joint fit up inspection for 8 TA-669428


4665 CPP-NGCP-W-4663 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL 15-Jul-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1192 KP 2+700 to KP2+900
Post-welding visual inspection for 8 inch HRDH-
4666 CPP-NGCP-W-4664 1400147510 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 15-Jul-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1192 KP 2+700 to KP2+900
1400147566 NDE selection for welds of 8 inch HRDH-1192 TA-669428
4667 CPP-NGCP-W-4665 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1192 FL 15-Jul-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP 2+700 to KP2+900
Pre-welding and weld joint fit up inspection for 8
4668 CPP-NGCP-W-4666 1400147567 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1166 FL TA-669352 15-Jul-19 7:30 AM Saif Mr. Rajesh CLOSED
inch HRDH -1166 KP0+600 to KP1+000
1400147568 Post-welding visual inspection for 8 inch TA-669352
4669 CPP-NGCP-W-4667 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1166 FL 15-Jul-19 2.30 PM Saif Mr. Rajesh CLOSED
HRDH -1166 KP0+600 to KP1+000
NDE selection for welds of 8 inch HRDH -1166
4670 CPP-NGCP-W-4668 1400147518 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1166 FL TA-669352 15-Jul-19 4.30 PM Saif Mr. Rajesh CLOSED
KP0+600 to KP1+000
1400147570 Pre-welding and weld joint fit up inspection for 8 TA-669348
4671 CPP-NGCP-W-4669 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1187 F/L 15-Jul-19 7:30 AM Shanmuga Mr. Rajesh CLOSED
inch HRDH -1187 KM0+700 to KM0+900
Post-welding visual inspection for 8 inch HRDH
4672 CPP-NGCP-W-4670 1400147521 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1187 F/L TA-669348 15-Jul-19 2.30 PM Shanmuga Mr. Rajesh CLOSED
-1187 KM0+700 to KM0+900
1400147571 NDE selection for welds of 8 inch HRDH -1187 TA-669348
4673 CPP-NGCP-W-4671 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1187 F/L 15-Jul-19 4.30 PM Shanmuga Mr. Rajesh CLOSED
KM0+700 to KM0+900
Pre-welding and weld joint fit up inspection for 16 Mr.
4674 CPP-NGCP-W-4672 1400147574 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 15-Jul-19 8:00 AM IRSHAD CLOSED
inch HRDH GK-RH TR/L KP1+400 to KP1+600; Rajendran
Post-welding visual inspection for 16 inch HRDH Mr.
4675 CPP-NGCP-W-4673 1400147583 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 15-Jul-19 2.00 PM IRSHAD CLOSED
GK-RH TR/L KP1+400 to KP1+600; Rajendran
NDE selection for welds of 16 inch HRDH GK-RH Mr.
4676 CPP-NGCP-W-4674 1400147526 Welding SATIP-W-012-01 SAIC-W-2054 HRDH GK-RH TR/L TA-843956 15-Jul-19 4.00 PM IRSHAD CLOSED
TR/L KP1+400 to KP1+600; Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
4677 CPP-NGCP-W-4675 1400147603 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1160 FL TA-843565 15-Jul-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1160 at KM-1+420 to 1+520 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
4678 CPP-NGCP-W-4676 1400147604 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1160 FL TA-843565 15-Jul-19 2.00 PM Sarfaraz CLOSED
1160 at KM-1+420 to 1+520 Rajendran
NDE selection for welds of 8 inch HRDH-1160 at Mr.
4679 CPP-NGCP-W-4677 1400147528 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1160 FL TA-843565 15-Jul-19 4.00 PM Sarfaraz CLOSED
KM-1+420 to 1+520 Rajendran
In-Process Verification - RT Techniques &
Mr.
4680 CPP-NGCP-W-4678 1400148225 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-902, AK-RH, HRDH-902, AK-RH, 1169. VARIOUS 15-Jul-19 8:00 AM RAMEEZ CLOSED
Rajendran
1169.
In-Process Verification - RT Techniques &
4681 CPP-NGCP-W-4679 1400148197 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-GCP, 1134, HWYH-GCP, 1134, 1102, 1071, 912 VARIOUS 15-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1102, 1071, 912\
Temperature Tie in Welding HRDH-1086 at KM-
4682 CPP-NGCP-W-4680 1400147549 Welding SATIP-W-012-01 SAIC-W-2057 0+680 to KM 0+710 and KM-1+400 to KM HRDH -1086 FL TA-843625 15-Jul-19 10.00 AM Farhan Mr. Ashok CLOSED
1+496
Pre-welding and weld joint fit up inspection for 8
4683 CPP-NGCP-W-4681 1400147540 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH-1086 at KM-0+680 to KM 0+710 HRDH -1086 FL TA-843625 15-Jul-19 7:30 AM Farhan Mr. Ashok CLOSED
and KM-1+400 to KM 1+496
Post-welding visual inspection for 8inch HRDH-
4684 CPP-NGCP-W-4682 1400147606 Welding SATIP-W-012-01 SAIC-W-2048 1086 at KM-0+680 to KM 0+710 and KM-1+400 HRDH -1086 FL TA-843625 15-Jul-19 2.30 PM Farhan Mr. Ashok CLOSED
to KM 1+496
NDE selection for welds of 8 inch HRDH-1086 at
4685 CPP-NGCP-W-4683 1400147613 Welding SATIP-W-012-01 SAIC-W-2054 KM-0+680 to KM 0+710 and KM-1+400 to KM HRDH -1086 FL TA-843625 15-Jul-19 4.30 PM Farhan Mr. Ashok CLOSED
1+496
Pre-welding and weld joint fit up inspection for 16 Mr.
4686 CPP-NGCP-W-4684 1400148047 Welding SATIP-W-012-01 SAIC-W-2048 HRDH DK-RH TR/L TA-843954 15-Jul-19 8:00 AM Shadab CLOSED
inch HRDH DK -RH TR/L KP0+600 to KP0+900; Rajendran
Post-welding visual inspection for 16 inch HRDH Mr.
4687 CPP-NGCP-W-4685 1400148039 Welding SATIP-W-012-01 SAIC-W-2048 HRDH DK-RH TR/L TA-843954 15-Jul-19 2.00 PM Shadab CLOSED
DK -RH TR/L KP0+600 to KP0+900; Rajendran
NDE selection for welds of 16 inch HRDH DK -RH Mr.
4688 CPP-NGCP-W-4686 1400148088 Welding SATIP-W-012-01 SAIC-W-2054 HRDH DK-RH TR/L TA-843954 15-Jul-19 4.00 PM Shadab CLOSED
TR/L KP0+600 to KP0+900; Rajendran
Pre-welding and weld joint fit up inspection for
4689 CPP-NGCP-W-4687 1400145587 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1065 TA-445966 15-Jul-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-1065
4690 CPP-NGCP-W-4688 1400146147 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1065 HWYH-1065 TA-445966 15-Jul-19 2.00 PM Shahbaz Mr. Suresh CLOSED
4691 CPP-NGCP-W-4689 1400145562 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1065 HWYH-1065 TA-445966 15-Jul-19 4:00 PM Shahbaz Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4692 CPP-NGCP-W-4690 1400147410 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 15-Jul-19 8:00 AM BEENESH Mr. Suresh CLOSED
HWYH-1093
4693 CPP-NGCP-W-4691 1400147468 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 15-Jul-19 2.00 PM BEENESH Mr. Suresh CLOSED
4694 CPP-NGCP-W-4692 1400147450 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 15-Jul-19 4:00 PM BEENESH Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4699 CPP-NGCP-W-4697 1400147483 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1079 TA-445898 15-Jul-19 8:00 AM VARUN Mr. Suresh CLOSED
HWYH-1079
4700 CPP-NGCP-W-4698 1400147437 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1079 HWYH-1079 TA-445898 15-Jul-19 2.00 PM VARUN Mr. Suresh CLOSED
4701 CPP-NGCP-W-4699 1400147477 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1079 HWYH-1079 TA-445898 15-Jul-19 4:00 PM VARUN Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4702 CPP-NGCP-W-4700 1400147653 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 15-Jul-19 8:00 AM abdul raheem Mr. Ashok CLOSED
16″HWYH GK-RH TRL
Post-welding visual inspection for 16″HWYH GK-
4703 CPP-NGCP-W-4701 1400147727 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 15-Jul-19 2.00 PM abdul raheem Mr. Ashok CLOSED
RH TRL
NDE selection for welds of 16″HWYH GK-RH
4704 CPP-NGCP-W-4702 1400147710 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 15-Jul-19 4:00 PM abdul raheem Mr. Ashok CLOSED
TRL
Pre-welding and weld joint fit up inspection for
4705 CPP-NGCP-W-4703 1400147644 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH TA-445887 15-Jul-19 8:00 AM Imran Mr. Suresh CLOSED
HWYH CJ-RH KM0+390-km1
Post-welding visual inspection for HWYH CJ-RH
4706 CPP-NGCP-W-4704 1400147824 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH TA-445887 15-Jul-19 2.00 PM Imran Mr. Suresh CLOSED
KM0+390-km1
NDE selection for welds of HWYH CJ-RH
4707 CPP-NGCP-W-4705 1400147843 Welding SATIP-W-012-01 SAIC-W-2054 HWYH CJ-RH TA-445887 15-Jul-19 4:00 PM Imran Mr. Suresh CLOSED
KM0+390-km1
Pre-welding and weld joint fit up inspection for
4708 CPP-NGCP-W-4706 1400147791 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 FL TA-446045 15-Jul-19 8:00 AM asish Mr. Suresh CLOSED
HWYH 975
4709 CPP-NGCP-W-4707 1400147807 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH 975 HWYH-975 FL TA-446045 15-Jul-19 2.00 PM asish Mr. Suresh CLOSED
4710 CPP-NGCP-W-4708 1400147848 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH 975 HWYH-975 FL TA-446045 15-Jul-19 4:00 PM asish Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 24“
4711 CPP-NGCP-W-4709 1400147976 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 15-Jul-19 8:00 AM PRATHAB Mr. Suresh CLOSED
HWYH GGM TRL1
1400147871 Post-welding visual inspection for 24“ HWYH TA-445988 PRATHAB
4712 CPP-NGCP-W-4710 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 15-Jul-19 2.00 PM Mr. Suresh CLOSED
GGM TRL1
4713 CPP-NGCP-W-4711 1400148034 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24“ HWYH GGM TRL1 24“ HWYH GGM TRL1 TA-445988 15-Jul-19 4:00 PM PRATHAB Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 8
4714 CPP-NGCP-W-4712 1400149106 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 16-Jul-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1192 KP 2+900 to KP3+200
1400149132 Post-welding visual inspection for 8 inch HRDH- TA-669428
4715 CPP-NGCP-W-4713 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL 16-Jul-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1192 KP 2+900 to KP3+200
NDE selection for welds of 8 inch HRDH-1192
4716 CPP-NGCP-W-4714 1400149163 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1192 FL TA-669428 16-Jul-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP 2+900 to KP3+200
1400149173 Pre-welding and weld joint fit up inspection for 8 TA-669352
4717 CPP-NGCP-W-4715 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1166 FL 16-Jul-19 8:00 AM Saif Mr. Rajesh CLOSED
inch HRDH -1166 KP0+500 to KP0+700
Post-welding visual inspection for 8 inch
4718 CPP-NGCP-W-4716 1400149148 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1166 FL TA-669352 16-Jul-19 2.00 PM Saif Mr. Rajesh CLOSED
HRDH -1166 KP0+500 to KP0+700
NDE selection for welds of 8 inch HRDH -1166
4719 CPP-NGCP-W-4717 1400149117 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1166 FL TA-669352 16-Jul-19 4.00 PM Saif Mr. Rajesh CLOSED
KP0+500 to KP0+700
Pre-welding and weld joint fit up inspection for 8 RE-SCHEDULE TO 17-
4720 CPP-NGCP-W-4718 1400149186 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1191FL TA-669429 16-Jul-19 7:30 AM Saif Mr. Rajesh CLOSED
inch HRDH -1191 KP3+800 to KP3+900 JULY-2019
Post-welding visual inspection for 8 inch RE-SCHEDULE TO 17-
4721 CPP-NGCP-W-4719 1400149102 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1191FL TA-669429 16-Jul-19 2.30 PM Saif Mr. Rajesh CLOSED
HRDH -1191 KP3+800 to KP3+900 JULY-2019
NDE selection for welds of 8 inch HRDH -1191 RE-SCHEDULE TO 17-
4722 CPP-NGCP-W-4720 1400149121 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1191FL TA-669429 16-Jul-19 4.30 PM Saif Mr. Rajesh CLOSED
KP3+800 to KP3+900 JULY-2019
Pre-welding and weld joint fit up inspection for 8
4723 CPP-NGCP-W-4721 1400149180 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH -1187 KM0+600 to KM0+700 and HRDH-1187 F/L TA-669348 16-Jul-19 7:30 AM Shanmuga Mr. Rajesh CLOSED
KM-0+400 to KM- 0+500
Post-welding visual inspection for 8 inch HRDH
4724 CPP-NGCP-W-4722 1400149167 Welding SATIP-W-012-01 SAIC-W-2048 -1187 KM0+600 to KM0+700 and KM-0+400 to HRDH-1187 F/L TA-669348 16-Jul-19 2.30 PM Shanmuga Mr. Rajesh CLOSED
KM- 0+500
NDE selection for welds of 8 inch HRDH -1187
4725 CPP-NGCP-W-4723 1400149188 Welding SATIP-W-012-01 SAIC-W-2054 KM0+600 to KM0+700 and KM-0+400 to KM- HRDH-1187 F/L TA-669348 16-Jul-19 4.30 PM Shanmuga Mr. Rajesh CLOSED
0+500
Pre-welding and weld joint fit up inspection for 16 Mr.
4726 CPP-NGCP-W-4724 1400149217 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 16-Jul-19 8:00 AM IRSHAD CLOSED
inch HRDH GK-RH TR/L KP1+600 to KP1+800; Rajendran
Post-welding visual inspection for 16 inch HRDH Mr.
4727 CPP-NGCP-W-4725 1400149170 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 16-Jul-19 2.00 PM IRSHAD CLOSED
GK-RH TR/L KP1+600 to KP1+800; Rajendran
NDE selection for welds of 16 inch HRDH GK-RH Mr.
4728 CPP-NGCP-W-4726 1400149171 Welding SATIP-W-012-01 SAIC-W-2054 HRDH GK-RH TR/L TA-843956 16-Jul-19 4.00 PM IRSHAD CLOSED
TR/L KP1+600 to KP1+800; Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
4729 CPP-NGCP-W-4727 1400149219 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1160 FL TA-843565 16-Jul-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1160 at KM-2+200 to 2+300 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
4730 CPP-NGCP-W-4728 1400149226 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1160 FL TA-843565 16-Jul-19 2.00 PM Sarfaraz CLOSED
1160 at KM-2+200 to 2+300 Rajendran
NDE selection for welds of 8 inch HRDH-1160 at Mr.
4731 CPP-NGCP-W-4729 1400149111 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1160 FL TA-843565 16-Jul-19 4.00 PM Sarfaraz CLOSED
KM-2+200 to 2+300 Rajendran
In-Process Verification - RT Techniques &
Mr.
4732 CPP-NGCP-W-4730 1400149736 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-AK-RH, CK- HRDH-AK-RH, CK-RH, 1078 VARIOUS 16-Jul-19 8:00 AM RAMEEZ CLOSED
Rajendran
RH, 1078 Verification - RT Techniques &
In-Process
4733 CPP-NGCP-W-4731 1400149752 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1093, 1102, HWYH-1093, 1102, 1091, CK-RH VARIOUS 16-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1091, CK-RH
In-Process Inspection of MPT using
4734 CPP-NGCP-W-4732 1400149728 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 HWYH-HK-RH, GK-RH VARIOUS 16-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
Yoke Method, HWYH-HK-RH, GK-RH
Temperature Tie in Welding HRDH-1086 at KM-
RE-SCHEDULE TO 17-
4735 CPP-NGCP-W-4733 1400149212 Welding SATIP-W-012-01 SAIC-W-2057 1+400 to KM 1+496 and KM-1+160 to KM HRDH -1086 FL TA-843625 16-Jul-19 10.00 AM Farhan Mr. Ashok CLOSED
1+190 JULY-2019
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a Pre-welding and weld joint fit up inspection for 8
l
4736 CPP-NGCP-W-4734 1400149267 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH-1086 at KM-1+400 to KM 1+496 HRDH -1086 FL TA-843625 16-Jul-19 7:30 AM Farhan Mr. Ashok CLOSED
and KM-1+160 to KM 1+190
Post-welding visual inspection for 8inch HRDH-
4737 CPP-NGCP-W-4735 1400149199 Welding SATIP-W-012-01 SAIC-W-2048 1086 at KM-1+400 to KM 1+496 and KM-1+160 HRDH -1086 FL TA-843625 16-Jul-19 2.30 PM Farhan Mr. Ashok CLOSED
to KM 1+190
NDE selection for welds of 8 inch HRDH-1086 at
4738 CPP-NGCP-W-4736 1400149268 Welding SATIP-W-012-01 SAIC-W-2054 KM-1+400 to KM 1+496 and KM-1+160 to KM HRDH -1086 FL TA-843625 16-Jul-19 4.30 PM Farhan Mr. Ashok CLOSED
1+190
Pre-welding and weld joint fit up inspection for 16 Mr. RE-SCHEDULE TO 17-
4739 CPP-NGCP-W-4737 1400149285 Welding SATIP-W-012-01 SAIC-W-2048 HRDH DK-RH TR/L TA-843954 16-Jul-19 8:00 AM Shadab CLOSED
inch HRDH DK -RH TR/L KP0+600 to KP0+900; Rajendran JULY-2019

1400149301 Post-welding visual inspection for 16 inch HRDH TA-843954 Mr. RE-SCHEDULE TO 17-
4740 CPP-NGCP-W-4738 Welding SATIP-W-012-01 SAIC-W-2048 HRDH DK-RH TR/L 16-Jul-19 2.00 PM Shadab CLOSED
DK -RH TR/L KP0+600 to KP0+900; Rajendran JULY-2019

1400149202 NDE selection for welds of 16 inch HRDH DK -RH TA-843954 Mr. RE-SCHEDULE TO 17-
4741 CPP-NGCP-W-4739 Welding SATIP-W-012-01 SAIC-W-2054 HRDH DK-RH TR/L 16-Jul-19 4.00 PM Shadab CLOSED
TR/L KP0+600 to KP0+900; Rajendran JULY-2019
Weld repair verification of joints
4742 CPP-NGCP-W-4740 1400149734 Welding SATIP-W-012-01 SAIC-W-2051 HWYH-1078 VARIOUS 16-Jul-19 8:00 AM Rizwan Mr. Ashok CLOSED
FW-327 of HWYH-1078

1400149698 Weld repair verification of joints FW310,FW239, TA-445836 PRATHAB


4743 CPP-NGCP-W-4741 Welding SATIP-W-012-01 SAIC-W-2051 HWYH-GK-RH 16-Jul-19 8:00 AM Mr. Ashok CLOSED
HWYH-GK-RH
Post-welding visual inspection of repair joints
4744 CPP-NGCP-W-4742 1400149805 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-GK-RH TA-445836 16-Jul-19 2.00 PM PRATHAB Mr. Ashok CLOSED
FW310,FW239, HWYH-GK-RH
1400148625 Pre-welding and weld joint fit up inspection for TA-445900
4745 CPP-NGCP-W-4743 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1096 16-Jul-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-1096
4746 CPP-NGCP-W-4744 1400148615 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1096 HWYH-1096 TA-445900 16-Jul-19 2.00 PM Shahbaz Mr. Suresh CLOSED
4747 CPP-NGCP-W-4745 1400148655 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1096 HWYH-1096 TA-445900 16-Jul-19 4:00 PM Shahbaz Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for RE-SCHEDULE TO 17-
4748 CPP-NGCP-W-4746 1400148646 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 16-Jul-19 8:00 AM BEENESH Mr. Suresh CLOSED
HWYH-1093 JULY-2019

1400148617 TA-445838 RE-SCHEDULE TO 17-


4749 CPP-NGCP-W-4747 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 16-Jul-19 2.00 PM BEENESH Mr. Suresh CLOSED
JULY-2019
RE-SCHEDULE TO 17-
4750 CPP-NGCP-W-4748 1400148611 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 16-Jul-19 4:00 PM BEENESH Mr. Suresh CLOSED
JULY-2019
1400148472 Pre-welding and weld joint fit up inspection for TA-445898
4751 CPP-NGCP-W-4749 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1079 16-Jul-19 8:00 AM VARUN Mr. Suresh CLOSED
HWYH-1079
4752 CPP-NGCP-W-4750 1400148651 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1079 HWYH-1079 TA-445898 16-Jul-19 2.00 PM VARUN Mr. Suresh CLOSED
4753 CPP-NGCP-W-4751 1400148620 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1079 HWYH-1079 TA-445898 16-Jul-19 4:00 PM VARUN Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4754 CPP-NGCP-W-4752 1400148642 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 16-Jul-19 8:00 AM abdul raheem Mr. Ashok CLOSED
16″HWYH GK-RH TRL

1400148674 Post-welding visual inspection for 16″HWYH GK- TA-445912


4755 CPP-NGCP-W-4753 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL 16-Jul-19 2.00 PM abdul raheem Mr. Ashok CLOSED
RH TRL
NDE selection for welds of 16″HWYH GK-RH
4756 CPP-NGCP-W-4754 1400148696 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 16-Jul-19 4:00 PM abdul raheem Mr. Ashok CLOSED
TRL
Pre-welding and weld joint fit up inspection for
4757 CPP-NGCP-W-4755 1400148684 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH TA-445887 16-Jul-19 8:00 AM Imran Mr. Suresh CLOSED
HWYH CJ-RH KM0+390-km1

1400148599 Post-welding visual inspection for HWYH CJ-RH TA-445887


4758 CPP-NGCP-W-4756 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH 16-Jul-19 2.00 PM Imran Mr. Suresh CLOSED
KM0+390-km1
NDE selection for welds of HWYH CJ-RH
4759 CPP-NGCP-W-4757 1400148677 Welding SATIP-W-012-01 SAIC-W-2054 HWYH CJ-RH TA-445887 16-Jul-19 4:00 PM Imran Mr. Suresh CLOSED
KM0+390-km1
Pre-welding and weld joint fit up inspection for
4760 CPP-NGCP-W-4758 1400148685 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 FL TA-446045 16-Jul-19 8:00 AM asish Mr. Suresh CLOSED
HWYH 975
4761 CPP-NGCP-W-4759 1400148709 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH 975 HWYH-975 FL TA-446045 16-Jul-19 2.00 PM asish Mr. Suresh CLOSED
4762 CPP-NGCP-W-4760 1400148710 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH 975 HWYH-975 FL TA-446045 16-Jul-19 4:00 PM asish Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 24“
4763 CPP-NGCP-W-4761 1400148667 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 16-Jul-19 8:00 AM Junaid Mr. Suresh CLOSED
HWYH GGM TRL1
Post-welding visual inspection for 24“ HWYH
4764 CPP-NGCP-W-4762 1400148698 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 16-Jul-19 2.00 PM Junaid Mr. Suresh CLOSED
GGM TRL1
4765 CPP-NGCP-W-4763 1400148700 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24“ HWYH GGM TRL1 24“ HWYH GGM TRL1 TA-445988 16-Jul-19 4:00 PM Junaid Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4766 CPP-NGCP-W-4764 1400148981 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-952 TA-445883 16-Jul-19 8:00 AM VARUN Mr. Suresh CLOSED
HWYH-952
4767 CPP-NGCP-W-4765 1400149011 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-952 HWYH-952 TA-445883 16-Jul-19 2.00 PM VARUN Mr. Suresh CLOSED
4768 CPP-NGCP-W-4766 1400149086 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-952 HWYH-952 TA-445883 16-Jul-19 4:00 PM VARUN Mr. Suresh CLOSED
Pre welding and fit up inspection for re weld ,Re
4769 CPP-NGCP-W-4767 1400149964 Welding SATIP-W-012-01 SAIC-W-2048 welded due to debris issue inside the pipe 16″HWYH GK-RH TRL TA-445912 16-Jul-19 8:00 AM abdul raheem Mr. Ashok CLOSED
16″HWYH GK-RH TRL
post weld inspection for 16 inch GK RH re welded
4770 CPP-NGCP-W-4768 1400149928 Welding SATIP-W-012-01 SAIC-W-2048 joints for debris issue inside the pipe 16″HWYH 16″HWYH GK-RH TRL TA-445912 16-Jul-19 2.00 PM abdul raheem Mr. Ashok CLOSED
GK-RH TRL
NDE selection for re welded joints of 16″HWYH
4771 CPP-NGCP-W-4769 1400149916 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 16-Jul-19 4:00 PM abdul raheem Mr. Ashok CLOSED
GK-RH TRL
Pre-welding and weld joint fit up inspection for 8
4766 CPP-NGCP-W-4764 1400151243 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 17-Jul-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1192 KP 2+900 to KP3+200
Post-welding visual inspection for 8 inch HRDH-
4767 CPP-NGCP-W-4765 1400151253 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 17-Jul-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1192 KP 2+900 to KP3+200
NDE selection for welds of 8 inch HRDH-1192
4768 CPP-NGCP-W-4766 1400151198 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1192 FL TA-669428 17-Jul-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP 2+900 to KP3+200
Pre-welding and weld joint fit up inspection for 8
4769 CPP-NGCP-W-4767 1400151254 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1188 F/L TA-669346 17-Jul-19 7:30 AM Shanmuga Mr. Rajesh OPEN No Action
inch HRDH -1188 KM0+300 to KM0+500
Post-welding visual inspection for 8 inch HRDH
4770 CPP-NGCP-W-4768 1400151234 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1188 F/L TA-669346 17-Jul-19 2.30 PM Shanmuga Mr. Rajesh CLOSED
-1188 KM0+300 to KM0+500
NDE selection for welds of 8 inch HRDH -1188
4771 CPP-NGCP-W-4769 1400151199 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1188 F/L TA-669346 17-Jul-19 4.30 PM Shanmuga Mr. Rajesh CLOSED
KM0+300 to KM0+500
Pre-welding and weld joint fit up inspection for 16 Mr.
4772 CPP-NGCP-W-4770 1400151176 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 17-Jul-19 8:00 AM IRSHAD CLOSED
inch HRDH GK-RH TR/L KP1+800 to KP2+000; Rajendran
Post-welding visual inspection for 16 inch HRDH Mr.
4773 CPP-NGCP-W-4771 1400151210 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 17-Jul-19 2.00 PM IRSHAD CLOSED
GK-RH TR/L KP1+800 to KP2+000; Rajendran
NDE selection for welds of 16 inch HRDH GK-RH Mr.
4774 CPP-NGCP-W-4772 1400151235 Welding SATIP-W-012-01 SAIC-W-2054 HRDH GK-RH TR/L TA-843956 17-Jul-19 4.00 PM IRSHAD CLOSED
TR/L KP1+800 to KP2+000; Rajendran

Pre-welding and weld joint fit up inspection for 8 Mr.


4775 CPP-NGCP-W-4773 1400151244 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1160 FL TA-843565 17-Jul-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1160 at KM-2+200 to 2+300 Rajendran

1400151245 Post-welding visual inspection for 8 inch HRDH- TA-843565 Mr.


4776 CPP-NGCP-W-4774 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1160 FL 17-Jul-19 2.00 PM Sarfaraz CLOSED
1160 at KM-2+200 to 2+300 Rajendran
NDE selection for welds of 8 inch HRDH-1160 at Mr.
4777 CPP-NGCP-W-4775 1400151246 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1160 FL TA-843565 17-Jul-19 4.00 PM Sarfaraz CLOSED
KM-2+200 to 2+300 Rajendran
Pre-welding and weld joint fit up inspection for 8
4778 CPP-NGCP-W-4776 1400151200 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1086 FL TA-843625 17-Jul-19 7:30 AM Farhan Mr. Ashok CLOSED
inch HWYH-1086 at KM-1+450 to KM 1+516
Post-welding visual inspection for 8inch HWYH-
4779 CPP-NGCP-W-4777 1400151225 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1086 FL TA-843625 17-Jul-19 2.30 PM Farhan Mr. Ashok CLOSED
1086 at KM-1+450 to KM 1+516
NDE selection for welds of 8 inch HWYH-1086
4780 CPP-NGCP-W-4778 1400151140 Welding SATIP-W-012-01 SAIC-W-2054 HWYH -1086 FL TA-843625 17-Jul-19 4.30 PM Farhan Mr. Ashok CLOSED
at KM-1+450 to KM 1+516
CUT OUT &Pre-welding and weld joint fit up
4781 CPP-NGCP-W-4779 1400151201 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 VARIOUS 17-Jul-19 7:30 AM Farhan Mr. Ashok CLOSED
inspection for 8 inch HWYH-1078 at KM-4+120
Post-welding visual inspection for 8inch HWYH-
4782 CPP-NGCP-W-4780 1400151216 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 VARIOUS 17-Jul-19 2.30 PM Farhan Mr. Ashok CLOSED
1078 at KM-4+120
NDE selection for welds of 8 inch HWYH-1078
4783 CPP-NGCP-W-4781 1400151255 Welding SATIP-W-012-01 SAIC-W-2054 HWYH-1078 VARIOUS 17-Jul-19 4.30 PM Farhan Mr. Ashok CLOSED
at KM-4+120
In-Process Verification - RT Techniques & Mr.
4784 CPP-NGCP-W-4782 1400151217 Welding SATIP-NDE-RT-01 SAIC-RT-2007 HRDH-GK-RH. VARIOUS 17-Jul-19 8:00 AM RAMEEZ CLOSED
Procedure Implementation of HRDH-GK-RH. Rajendran
In-Process Verification - RT Techniques &
4785 CPP-NGCP-W-4783 1400151256 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-GK-RH, HWYH-GK-RH, 1071 VARIOUS 17-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1071
Pre-welding and weld joint fit up inspection for
4786 CPP-NGCP-W-4784 1400150351 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1096 TA-445900 17-Jul-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-1096
4787 CPP-NGCP-W-4785 1400150407 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1096 HWYH-1096 TA-445900 17-Jul-19 2.00 PM Shahbaz Mr. Suresh CLOSED
4788 CPP-NGCP-W-4786 1400150322 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1096 HWYH-1096 TA-445900 17-Jul-19 4:00 PM Shahbaz Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4789 CPP-NGCP-W-4787 1400150389 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-952 TA-445883 17-Jul-19 8:00 AM VARUN Mr. Suresh CLOSED
HWYH-952
4790 CPP-NGCP-W-4788 1400150444 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-952 HWYH-952 TA-445883 17-Jul-19 2.00 PM VARUN Mr. Suresh CLOSED
4791 CPP-NGCP-W-4789 1400150438 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-952 HWYH-952 TA-445883 17-Jul-19 4:00 PM VARUN Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4792 CPP-NGCP-W-4790 1400150397 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 17-Jul-19 8:00 AM abdul raheem Mr. Ashok CLOSED
16″HWYH GK-RH TRL
Post-welding visual inspection for 16″HWYH GK-
4793 CPP-NGCP-W-4791 1400150478 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH GK-RH TRL TA-445912 17-Jul-19 2.00 PM abdul raheem Mr. Ashok CLOSED
RH TRL
NDE selection for welds of 16″HWYH GK-RH
4794 CPP-NGCP-W-4792 1400150523 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 17-Jul-19 4:00 PM abdul raheem Mr. Ashok CLOSED
TRL
Pre-welding and weld joint fit up inspection for
4795 CPP-NGCP-W-4793 1400150445 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH TA-445887 17-Jul-19 8:00 AM Imran Mr. Suresh CLOSED
HWYH CJ-RH KM0+390-km1+500
Post-welding visual inspection for HWYH CJ-RH
4796 CPP-NGCP-W-4794 1400150432 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH TA-445887 17-Jul-19 2.00 PM Imran Mr. Suresh CLOSED
KM0+390-km1+500
NDE selection for welds of HWYH CJ-RH
4797 CPP-NGCP-W-4795 1400150524 Welding SATIP-W-012-01 SAIC-W-2054 HWYH CJ-RH TA-445887 17-Jul-19 4:00 PM Imran Mr. Suresh CLOSED
KM0+390-km1+500
Pre-welding and weld joint fit up inspection for
4798 CPP-NGCP-W-4796 1400150439 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 FL TA-446045 17-Jul-19 8:00 AM asish Mr. Suresh CLOSED
HWYH 975
4799 CPP-NGCP-W-4797 1400150515 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH 975 HWYH-975 FL TA-446045 17-Jul-19 2.00 PM asish Mr. Suresh CLOSED
4800 CPP-NGCP-W-4798 1400150440 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH 975 HWYH-975 FL TA-446045 17-Jul-19 4:00 PM asish Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 24“
4801 CPP-NGCP-W-4799 1400150534 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 17-Jul-19 8:00 AM Junaid Mr. Suresh CLOSED
HWYH GGM TRL1
Post-welding visual inspection for 24“ HWYH
4802 CPP-NGCP-W-4800 1400150496 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 17-Jul-19 2.00 PM Junaid Mr. Suresh CLOSED
GGM TRL1
4803 CPP-NGCP-W-4801 1400150462 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24“ HWYH GGM TRL1 24“ HWYH GGM TRL1 TA-445988 17-Jul-19 4:00 PM Junaid Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4804 CPP-NGCP-W-4802 1400150379 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 17-Jul-19 8:00 AM BEENESH Mr. Suresh CLOSED
HWYH-1093
4805 CPP-NGCP-W-4803 1400150414 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 17-Jul-19 2.00 PM BEENESH Mr. Suresh CLOSED
4806 CPP-NGCP-W-4804 1400150453 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 17-Jul-19 4:00 PM BEENESH Mr. Suresh CLOSED
Weld repair verification of joints
4807 CPP-NGCP-W-4805 1400150905 Welding SATIP-W-012-01 SAIC-W-2051 FW233,FW231,FW226,FW225 HWYH-GK- HWYH-GK-RH TA-445836 17-Jul-19 8:00 AM PRATHAB Mr. Ashok CLOSED
RH
Post-welding visual inspection of repair joints
4808 CPP-NGCP-W-4806 1400150878 Welding SATIP-W-012-01 SAIC-W-2048 FW233,FW231,FW226,FW225 HWYH-GK- HWYH-GK-RH TA-445836 17-Jul-19 2.00 PM PRATHAB Mr. Ashok CLOSED
RH
Verification of Hardness
Verification of Hardness testing of joints 10-FW- testing of joints 10-FW-
4809 CPP-NGCP-W-4807 1400152363 Welding SATIP-W-012-01 SAIC-W-2014 HWYH-GK-RH TA-445912 18-Jul-19 7:00 AM Mohamed othman Mr. Ashok CLOSED
837,838R1,839,840,840 HRDH-CK-RH 837,838R1,839,840,840
HRDH-GK-RH

1400151397 Pre-welding and weld joint fit up inspection for TA-445900


4810 CPP-NGCP-W-4808 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1096 18-Jul-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-1096
4811 CPP-NGCP-W-4809 1400151470 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1096 HWYH-1096 TA-445900 18-Jul-19 2.00 PM Shahbaz Mr. Suresh CLOSED
4812 CPP-NGCP-W-4810 1400151504 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1096 HWYH-1096 TA-445900 18-Jul-19 4:00 PM Shahbaz Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for RE-SCHEDULE TO 20-
4813 CPP-NGCP-W-4811 1400151468 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 18-Jul-19 8:00 AM UMAIR Mr. Ashok CLOSED
HWYH-1093 JULY-2019
1400151456 TA-445838 RE-SCHEDULE TO 20-
4814 CPP-NGCP-W-4812 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 18-Jul-19 2.00 PM UMAIR Mr. Ashok CLOSED
JULY-2019
RE-SCHEDULE TO 20-
4815 CPP-NGCP-W-4813 1400151439 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 18-Jul-19 4:00 PM UMAIR Mr. Ashok CLOSED
JULY-2019
4816 CPP-NGCP-W-4814 1400147956 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1071 HWYH-1071 FL TA-445830 18-Jul-19 7:00 AM sanjeev Mr. Ashok CLOSED
1400147449 Pre-welding and weld joint fit up inspection for 8 TA-445830
4817 CPP-NGCP-W-4815 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL 18-Jul-19 8:00 AM sanjeev Mr. Ashok CLOSED
inch HWYH-1071 FL
Post-welding visual inspection for 8 inch HWYH-
4818 CPP-NGCP-W-4816 1400147634 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 18-Jul-19 2.00 PM sanjeev Mr. Ashok CLOSED
1071 FL
4819 CPP-NGCP-W-4817 1400147678 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1071 FL HWYH-1071 FL TA-445830 18-Jul-19 4:00 PM sanjeev Mr. Ashok CLOSED
1400152304 Pre-welding and weld joint fit up inspection for TA-445898
4820 CPP-NGCP-W-4818 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1079 18-Jul-19 8:00 AM VARUN Mr. Suresh CLOSED
HWYH-1079
4821 CPP-NGCP-W-4819 1400152267 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1079 HWYH-1079 TA-445898 18-Jul-19 2.00 PM VARUN Mr. Suresh CLOSED
4822 CPP-NGCP-W-4820 1400152290 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1079 HWYH-1079 TA-445898 18-Jul-19 4:00 PM VARUN Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4823 CPP-NGCP-W-4821 1400151446 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-952 TA-445883 18-Jul-19 8:00 AM VARUN Mr. Suresh CLOSED
HWYH-952
4824 CPP-NGCP-W-4822 1400151474 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-952 HWYH-952 TA-445883 18-Jul-19 2.00 PM VARUN Mr. Suresh CLOSED
4825 CPP-NGCP-W-4823 1400151487 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-952 HWYH-952 TA-445883 18-Jul-19 4:00 PM VARUN Mr. Suresh CLOSED
1400152335 Weld repair verification of joints 06-FW-496 TA-445912
4826 CPP-NGCP-W-4824 Welding SATIP-W-012-01 SAIC-W-2051 HWYH-CK-RH 18-Jul-19 8:00 AM abdul raheem Mr. Suresh CLOSED
HWYH-CK-RH
Post-welding visual inspection of repair joints 06-
4827 CPP-NGCP-W-4825 1400152345 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-CK-RH TA-445912 18-Jul-19 2.00 PM abdul raheem Mr. Suresh CLOSED
FW-496 HWYH-CK-RH
1400151420 Pre-welding and weld joint fit up inspection for TA-445981
4828 CPP-NGCP-W-4826 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH LSS TRL-1 18-Jul-19 8:00 AM abdul raheem Mr. Suresh CLOSED
16″HWYH LSS TRL-1
Post-welding visual inspection for 16″HWYH LSS
4829 CPP-NGCP-W-4827 1400151451 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH LSS TRL-1 TA-445981 18-Jul-19 2.00 PM abdul raheem Mr. Suresh CLOSED
TRL-1
4830 CPP-NGCP-W-4828 1400151481 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 16″HWYH LSS TRL-1 16″HWYH LSS TRL-1 TA-445981 18-Jul-19 4:00 PM abdul raheem Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4831 CPP-NGCP-W-4829 1400151452 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH TA-445887 18-Jul-19 8:00 AM Imran Mr. Suresh CLOSED
HWYH CJ-RH KM0+390-km1+500
Post-welding visual inspection for HWYH CJ-RH
4832 CPP-NGCP-W-4830 1400151554 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH TA-445887 18-Jul-19 2.00 PM Imran Mr. Suresh CLOSED
KM0+390-km1+500
NDE selection for welds of HWYH CJ-RH
4833 CPP-NGCP-W-4831 1400151550 Welding SATIP-W-012-01 SAIC-W-2054 HWYH CJ-RH TA-445887 18-Jul-19 4:00 PM Imran Mr. Suresh CLOSED
KM0+390-km1+500
Pre-welding and weld joint fit up inspection for
4834 CPP-NGCP-W-4832 1400151511 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 FL TA-446045 18-Jul-19 8:00 AM asish Mr. Suresh CLOSED
HWYH 975
4835 CPP-NGCP-W-4833 1400151516 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH 975 HWYH-975 FL TA-446045 18-Jul-19 2.00 PM asish Mr. Suresh CLOSED
4836 CPP-NGCP-W-4834 1400151563 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH 975 HWYH-975 FL TA-446045 18-Jul-19 4:00 PM asish Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 24“
4837 CPP-NGCP-W-4835 1400152319 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 18-Jul-19 8:00 AM Junaid Mr. Suresh CLOSED
HWYH GGM TRL1
Post-welding visual inspection for 24“ HWYH
4838 CPP-NGCP-W-4836 1400152322 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 18-Jul-19 2.00 PM Junaid Mr. Suresh CLOSED
GGM TRL1
4839 CPP-NGCP-W-4837 1400152366 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24“ HWYH GGM TRL1 24“ HWYH GGM TRL1 TA-445988 18-Jul-19 4:00 PM Junaid Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4840 CPP-NGCP-W-4838 1400152367 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 18-Jul-19 8:00 AM BEENESH Mr. Suresh CLOSED
HWYH-1093
4841 CPP-NGCP-W-4839 1400152371 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 18-Jul-19 2.00 PM BEENESH Mr. Suresh CLOSED
4842 CPP-NGCP-W-4840 1400152406 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 18-Jul-19 4:00 PM BEENESH Mr. Suresh CLOSED
Weld repair verification of joints
RE-SCHEDULE TO 20-
4843 CPP-NGCP-W-4841 1400152349 Welding SATIP-W-012-01 SAIC-W-2051 FW213,FW216,FW225,FW226 HWYH-GK- HWYH-GK-RH TA-445836 18-Jul-19 8:00 AM PRATHAB Mr. Ashok CLOSED
JULY-2019
RH
Post-welding visual inspection of repair joints
RE-SCHEDULE TO 20-
4844 CPP-NGCP-W-4842 1400152375 Welding SATIP-W-012-01 SAIC-W-2048 FW213,FW216,FW225,FW226 HWYH-GK- HWYH-GK-RH TA-445836 18-Jul-19 2.00 PM PRATHAB Mr. Ashok CLOSED
RH JULY-2019
Pre-welding and weld joint fit up inspection for
4845 CPP-NGCP-W-4843 1400152370 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1079 TA-445898 19-Jul-19 8:00 AM VARUN Mr. Suresh CLOSED
HWYH-1079
4846 CPP-NGCP-W-4844 1400152403 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1079 HWYH-1079 TA-445898 19-Jul-19 2.00 PM VARUN Mr. Suresh CLOSED
4847 CPP-NGCP-W-4845 1400152384 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1079 HWYH-1079 TA-445898 19-Jul-19 4:00 PM VARUN Mr. Suresh CLOSED
Weld repair verification of joints FW205,FW207
4848 CPP-NGCP-W-4846 1400152412 Welding SATIP-W-012-01 SAIC-W-2051 HWYH-GK-RH TA-445836 19-Jul-19 8:00 AM PRATHAB Mr. Ashok CLOSED
HWYH-GK-RH
Post-welding visual inspection of repair joints
4849 CPP-NGCP-W-4847 1400152386 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-GK-RH TA-445836 19-Jul-19 2.00 PM PRATHAB Mr. Ashok CLOSED
FW205,FW207 HWYH-GK-RH
1400152411 Weld repair verification of joints FW129R1 HWYH- TA-445834
4850 CPP-NGCP-W-4848 Welding SATIP-W-012-01 SAIC-W-2051 HWYH-201 19-Jul-19 8:00 AM Shahbaz Mr. Ashok CLOSED
201
Post-welding visual inspection of repair jointsFW-
4851 CPP-NGCP-W-4849 1400152420 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-201 TA-445834 19-Jul-19 2.00 PM Shahbaz Mr. Ashok CLOSED
129R1, HWYH-201
1400151396 Pre-welding and weld joint fit up inspection for 8 TA-669428
4852 CPP-NGCP-W-4850 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL 18-Jul-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1192 KP3+500 to KP3+700
Post-welding visual inspection for 8 inch HRDH-
4853 CPP-NGCP-W-4851 1400151443 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 18-Jul-19 2.00 PM Rajesh Mr. Rajesh CLOSED
1192 KP3+500 to KP3+700
NDE selection for welds of 8 inch HRDH-1192
4854 CPP-NGCP-W-4852 1400151426 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1192 FL TA-669428 18-Jul-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP3+500 to KP3+700
Pre-welding and weld joint fit up inspection for 8
4855 CPP-NGCP-W-4853 1400151377 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1191FL TA-669429 18-Jul-19 7:30 AM Saif Mr. Rajesh CLOSED
inch HRDH -1191 KP3+500 to KP3+600
Post-welding visual inspection for 8 inch
4856 CPP-NGCP-W-4854 1400151408 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1191FL TA-669429 18-Jul-19 2.30 PM Saif Mr. Rajesh CLOSED
HRDH -1191 KP3+500 to KP3+600
NDE selection for welds of 8 inch HRDH -1191
4857 CPP-NGCP-W-4855 1400151444 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1191FL TA-669429 18-Jul-19 4.30 PM Saif Mr. Rajesh CLOSED
KP3+500 to KP3+600
Pre-welding and weld joint fit up inspection for 8
4858 CPP-NGCP-W-4856 1400151435 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1188 F/L TA-669346 18-Jul-19 7:30 AM Shanmuga Mr. Rajesh CLOSED
inch HRDH -1188 KM0+200 to KM0+300
Post-welding visual inspection for 8 inch HRDH
4859 CPP-NGCP-W-4857 1400151453 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1188 F/L TA-669346 18-Jul-19 2.30 PM Shanmuga Mr. Rajesh CLOSED
-1188 KM0+200 to KM0+300
NDE selection for welds of 8 inch HRDH -1188
4860 CPP-NGCP-W-4858 1400151445 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1188 F/L TA-669346 18-Jul-19 4.30 PM Shanmuga Mr. Rajesh CLOSED
KM0+200 to KM0+300
Pre-welding and weld joint fit up inspection for 16 Mr.
4861 CPP-NGCP-W-4859 1400151378 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 18-Jul-19 8:00 AM IRSHAD CLOSED
inch HRDH GK-RH TR/L KP2+000 to KP2+200; Rajendran
Post-welding visual inspection for 16 inch HRDH Mr.
4862 CPP-NGCP-W-4860 1400151412 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 18-Jul-19 2.00 PM IRSHAD CLOSED
GK-RH TR/L KP2+000 to KP2+200; Rajendran
NDE selection for welds of 16 inch HRDH GK-RH Mr.
4863 CPP-NGCP-W-4861 1400151429 Welding SATIP-W-012-01 SAIC-W-2054 HRDH GK-RH TR/L TA-843956 18-Jul-19 4.00 PM IRSHAD CLOSED
TR/L KP2+000 to KP2+200; Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
4864 CPP-NGCP-W-4862 1400151463 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1160 FL TA-843565 18-Jul-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1160 at KM-2+100 to 2+200 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
4865 CPP-NGCP-W-4863 1400151431 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1160 FL TA-843565 18-Jul-19 2.00 PM Sarfaraz CLOSED
1160 at KM-2+100 to 2+200 Rajendran
NDE selection for welds of 8 inch HRDH-1160 at Mr.
4866 CPP-NGCP-W-4864 1400151464 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1160 FL TA-843565 18-Jul-19 4.00 PM Sarfaraz CLOSED
KM-2+100 to 2+200 Rajendran
Pre-welding and weld joint fit up inspection for 8
4867 CPP-NGCP-W-4865 1400151465 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1086 FL TA-843625 18-Jul-19 8:00 AM Farhan Mr. Ashok CLOSED
inch HWYH-1086 at KM-1+480 to KM 1+650
Post-welding visual inspection for 8inch HWYH-
4868 CPP-NGCP-W-4866 1400151381 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1086 FL TA-843625 18-Jul-19 2.00 PM Farhan Mr. Ashok CLOSED
1086 at KM-1+480 to KM 1+650
NDE selection for welds of 8 inch HWYH-1086
4869 CPP-NGCP-W-4867 1400151467 Welding SATIP-W-012-01 SAIC-W-2054 HWYH -1086 FL TA-843625 18-Jul-19 4.00 PM Farhan Mr. Ashok CLOSED
at KM-1+480 to KM 1+650
In-Process Verification - RT Techniques &
Mr.
4870 CPP-NGCP-W-4868 1400152701 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1078, 1192, HRDH-1078, 1192, 1166 VARIOUS 18-Jul-19 8:00 AM RAMEEZ CLOSED
1166 Rajendran
In-Process Verification - RT Techniques &
HWYH-GK-RH, CK-RH, CJ-RH,
4871 CPP-NGCP-W-4869 1400152660 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-GK-RH, CK- VARIOUS 18-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
LSS-TRL-1, HWGCP-TL
RH, CJ-RH, LSS-TRL-1, HWGCP-TL
In-Process Verification - RT Techniques &
1400152704 VARIOUS Mr.
4872 CPP-NGCP-W-4870 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1164, 1169, HRDH-1164, 1169, 1187, 1166 19-Jul-19 8:00 AM RAMEEZ CLOSED
Rajendran
1187, 1166
In-Process Verification - RT Techniques &
HWYH-1086, 1067, 1065, BK-RH,
4873 CPP-NGCP-W-4871 1400152661 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-1086, 1067, VARIOUS 19-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
HK-RH, 1134, 1071, 1091, 1102
1065, BK-RH, HK-RH, 1134, 1071, 1091, 1102
Pre-welding and weld joint fit up inspection for
4874 CPP-NGCP-W-4872 1400153309 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1096 TA-445900 20-Jul-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-1096
4875 CPP-NGCP-W-4873 1400153394 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1096 HWYH-1096 TA-445900 20-Jul-19 2.00 PM Shahbaz Mr. Suresh CLOSED
4876 CPP-NGCP-W-4874 1400153982 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1096 HWYH-1096 TA-445900 20-Jul-19 4:00 PM Shahbaz Mr. Suresh CLOSED
RE-SCHEDULE TO 21- CANCELLED DUE TO NO
4877 CPP-NGCP-W-4875 1400153983 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1071 HWYH-1071 FL TA-445830 20-Jul-19 7:00 AM sanjeev Mr. Ashok CLOSED
JULY-2019 WORK PERMIT
Pre-welding and weld joint fit up inspection for 8 RE-SCHEDULE TO 21-
4878 CPP-NGCP-W-4876 1400153948 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 20-Jul-19 8:00 AM sanjeev Mr. Ashok CLOSED
inch HWYH-1071 FL JULY-2019
Post-welding visual inspection for 8 inch HWYH- RE-SCHEDULE TO 21-
4879 CPP-NGCP-W-4877 1400153942 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 20-Jul-19 2.00 PM sanjeev Mr. Ashok CLOSED
1071 FL JULY-2019
RE-SCHEDULE TO 21-
4880 CPP-NGCP-W-4878 1400153985 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1071 FL HWYH-1071 FL TA-445830 20-Jul-19 4:00 PM sanjeev Mr. Ashok CLOSED
JULY-2019

1400153311 Pre-welding and weld joint fit up inspection for TA-445883


4881 CPP-NGCP-W-4879 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-952 20-Jul-19 8:00 AM VARUN Mr. Suresh CLOSED
HWYH-952
4882 CPP-NGCP-W-4880 1400153984 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-952 HWYH-952 TA-445883 20-Jul-19 2.00 PM VARUN Mr. Suresh CLOSED
4883 CPP-NGCP-W-4881 1400153967 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-952 HWYH-952 TA-445883 20-Jul-19 4:00 PM VARUN Mr. Suresh CLOSED
1400153355 Pre-welding and weld joint fit up inspection for TA-445981
4884 CPP-NGCP-W-4882 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH LSS TRL-1 20-Jul-19 8:00 AM abdul raheem Mr. Suresh CLOSED
16″HWYH LSS TRL-1
Post-welding visual inspection for 16″HWYH LSS
4885 CPP-NGCP-W-4883 1400153922 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH LSS TRL-1 TA-445981 20-Jul-19 2.00 PM abdul raheem Mr. Suresh CLOSED
TRL-1
4886 CPP-NGCP-W-4884 1400153960 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 16″HWYH LSS TRL-1 16″HWYH LSS TRL-1 TA-445981 20-Jul-19 4:00 PM abdul raheem Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4887 CPP-NGCP-W-4885 1400153860 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH TA-445887 20-Jul-19 8:00 AM Imran Mr. Suresh CLOSED
HWYH CJ-RH KM0+390-km1+500
Post-welding visual inspection for HWYH CJ-RH
4888 CPP-NGCP-W-4886 1400153997 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH TA-445887 20-Jul-19 2.00 PM Imran Mr. Suresh CLOSED
KM0+390-km1+500
NDE selection for welds of HWYH CJ-RH
4889 CPP-NGCP-W-4887 1400153970 Welding SATIP-W-012-01 SAIC-W-2054 HWYH CJ-RH TA-445887 20-Jul-19 4:00 PM Imran Mr. Suresh CLOSED
KM0+390-km1+500
Pre-welding and weld joint fit up inspection for RE-SCHEDULE TO 21-
4890 CPP-NGCP-W-4888 1400153995 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 FL TA-446045 20-Jul-19 8:00 AM asish Mr. Suresh CLOSED
HWYH 975 JULY-2019
RE-SCHEDULE TO 21-
4891 CPP-NGCP-W-4889 1400154024 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH 975 HWYH-975 FL TA-446045 20-Jul-19 2.00 PM asish Mr. Suresh CLOSED
JULY-2019
RE-SCHEDULE TO 21-
4892 CPP-NGCP-W-4890 1400153961 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH 975 HWYH-975 FL TA-446045 20-Jul-19 4:00 PM asish Mr. Suresh CLOSED
JULY-2019
Pre-welding and weld joint fit up inspection for 24“
4893 CPP-NGCP-W-4891 1400153968 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 20-Jul-19 8:00 AM Junaid Mr. Suresh CLOSED
HWYH GGM TRL1
Post-welding visual inspection for 24“ HWYH
4894 CPP-NGCP-W-4892 1400154013 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 20-Jul-19 2.00 PM Junaid Mr. Suresh CLOSED
GGM TRL1
4895 CPP-NGCP-W-4893 1400153962 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24“ HWYH GGM TRL1 24“ HWYH GGM TRL1 TA-445988 20-Jul-19 4:00 PM Junaid Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4896 CPP-NGCP-W-4894 1400153998 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 20-Jul-19 8:00 AM BEENESH Mr. Ashok CLOSED
HWYH-1093
4897 CPP-NGCP-W-4895 1400153971 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 20-Jul-19 2.00 PM BEENESH Mr. Ashok CLOSED
4898 CPP-NGCP-W-4896 1400154004 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 20-Jul-19 4:00 PM BEENESH Mr. Ashok CLOSED
Pre-welding and weld joint fit up inspection for 8
4899 CPP-NGCP-W-4897 1400154019 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 20-Jul-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1192 KP3+700 to KP3+900
Post-welding visual inspection for 8 inch
4900 CPP-NGCP-W-4898 1400154084 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 20-Jul-19 2.00 PM Rajesh Mr. Rajesh CLOSED
HRDH-1192 KP3+700 to KP3+900
NDE selection for welds of 8 inch HRDH-1192
4901 CPP-NGCP-W-4899 1400154060 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1192 FL TA-669428 20-Jul-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP3+700 to KP3+900
Pre-welding and weld joint fit up inspection for 8
4902 CPP-NGCP-W-4900 1400154068 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1191FL TA-669429 20-Jul-19 7:30 AM Saif Mr. Rajesh CLOSED
inch HRDH -1191 KP3+400 to KP3+500
Post-welding visual inspection for 8 inch
4903 CPP-NGCP-W-4901 1400154008 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1191FL TA-669429 20-Jul-19 2.30 PM Saif Mr. Rajesh CLOSED
HRDH -1191 KP3+400 to KP3+500
NDE selection for welds of 8 inch HRDH -1191
4904 CPP-NGCP-W-4902 1400154041 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1191FL TA-669429 20-Jul-19 4.30 PM Saif Mr. Rajesh CLOSED
KP3+400 to KP3+500
Pre-welding and weld joint fit up inspection for 8
4905 CPP-NGCP-W-4903 1400154042 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1307F/L TA-843653 20-Jul-19 7:30 AM Shanmuga Mr. Rajesh OPEN No Action
inch HRDH -1307 KM0+300 to KM0+600
Post-welding visual inspection for 8 inch HRDH
4906 CPP-NGCP-W-4904 1400154086 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1307F/L TA-843653 20-Jul-19 2.30 PM Shanmuga Mr. Rajesh OPEN No Action
-1307 KM0+300 to KM0+600
NDE selection for welds of 8 inch HRDH -1307
4907 CPP-NGCP-W-4905 1400154048 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1307F/L TA-843653 20-Jul-19 4.30 PM Shanmuga Mr. Rajesh OPEN No Action
KM0+300 to KM0+600
Pre-welding and weld joint fit up inspection for 16 Mr.
4908 CPP-NGCP-W-4906 1400154087 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 20-Jul-19 8:00 AM IRSHAD CLOSED
inch HRDH GK-RH TR/L KP2+400 to KP2+600; Rajendran
Post-welding visual inspection for 16 inch HRDH Mr.
4909 CPP-NGCP-W-4907 1400154074 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 20-Jul-19 2.00 PM IRSHAD CLOSED
GK-RH TR/L KP2+400 to KP2+600; Rajendran
NDE selection for welds of 16 inch HRDH GK-RH Mr.
4910 CPP-NGCP-W-4908 1400154009 Welding SATIP-W-012-01 SAIC-W-2054 HRDH GK-RH TR/L TA-843956 20-Jul-19 4.00 PM IRSHAD CLOSED
TR/L KP2+400 to KP2+600; Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
4911 CPP-NGCP-W-4909 1400154103 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 20-Jul-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1164 at KM-5+149 to 5+300 Rajendran
Post-welding visual inspection for 8 inch HRDH- Mr.
4912 CPP-NGCP-W-4910 1400154104 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 20-Jul-19 2.00 PM Sarfaraz CLOSED
1164 at KM-5+149 to 5+300 Rajendran
NDE selection for welds of 8 inch HRDH-1164 at Mr.
4913 CPP-NGCP-W-4911 1400154020 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1164 FL TA-843592 20-Jul-19 4.00 PM Sarfaraz CLOSED
KM-5+149 to 5+300 Rajendran
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a Pre-welding and weld joint fit up inspection for 8
4914 CPP-NGCP-W-4912 1400154106 l Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL TA-843586 20-Jul-19 8:00 AM Farhan Mr. Ashok CLOSED
inch HWYH-1078 at KM-0+450 to KM 0+670
Post-welding visual inspection for 8inch HWYH-
4915 CPP-NGCP-W-4913 1400154107 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL TA-843586 20-Jul-19 2.00 PM Farhan Mr. Ashok CLOSED
1078 at KM-0+450 to KM 0+670
NDE selection for welds of 8 inch HWYH-1078
4916 CPP-NGCP-W-4914 1400154108 Welding SATIP-W-012-01 SAIC-W-2054 HWYH -1078 FL TA-843586 20-Jul-19 4.00 PM Farhan Mr. Ashok CLOSED
at KM-0+450 to KM 0+670
In-Process Verification - RT Techniques &
HRDH-1160, DK-RH, AK-RH, 1166, Mr.
4917 CPP-NGCP-W-4915 1400154110 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1160, DK- VARIOUS 20-Jul-19 8:00 AM RAMEEZ CLOSED
1078 Rajendran
RH, AK-RH, 1166, 1078
In-Process Verification - RT Techniques &
HWYH-GGM-TRL-1, GK-RH, CK-
4918 CPP-NGCP-W-4916 1400154049 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation ofHWYH-GGM-TRL-1, VARIOUS 20-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
RH, 934, 1079
GK-RH, CK-RH, 934, 1079
Pre-welding and weld joint fit up inspection for 16 Mr.
4919 CPP-NGCP-W-4917 1400154109 Welding SATIP-W-012-01 SAIC-W-2048 HRDH DK-RH TR/L TA-843954 20-Jul-19 8:00 AM Shadab CLOSED
inch HRDH DK -RH TR/L KP1+000 to KP1+100; Rajendran
Post-welding visual inspection for 16 inch HRDH Mr.
4920 CPP-NGCP-W-4918 1400154011 Welding SATIP-W-012-01 SAIC-W-2048 HRDH DK-RH TR/L TA-843954 20-Jul-19 2.00 PM Shadab CLOSED
DK -RH TR/L KP1+000 to KP1+100; Rajendran
NDE selection for welds of 16 inch HRDH DK -RH Mr.
4921 CPP-NGCP-W-4919 1400154021 Welding SATIP-W-012-01 SAIC-W-2054 HRDH DK-RH TR/L TA-843954 20-Jul-19 4.00 PM Shadab CLOSED
TR/L KP1+000 to KP1+100; Rajendran
Review of weekly welder performance and
4922 CPP-NGCP-W-4920 1400155183 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 23-july-2019 to 29- CPP site office N/A 21-Jul-19 8:00 AM Ruhul Mr. Rajesh CLOSED
July-2019 at CPP site office.

1400155160 Welding consumables verification and visual N/A Mr.


4923 CPP-NGCP-W-4921 Welding SATIP-W-012-01 SAIC-W-2044 TCF-1 21-Jul-19 8:00 AM Junaid CLOSED
inspection storage & handling at TCF-1 Rajendran
Pre-welding and weld joint fit up inspection for 8
4922 CPP-NGCP-W-4920 1400154782 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 21-Jul-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1192 KP3+900 to KP4+400
1400154859 Post-welding visual inspection for 8 inch TA-669428
4923 CPP-NGCP-W-4921 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL 21-Jul-19 2.00 PM Rajesh Mr. Rajesh CLOSED
HRDH-1192 KP3+900 to KP4+400
NDE selection for welds of 8 inch HRDH-1192
4924 CPP-NGCP-W-4922 1400154818 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1192 FL TA-669428 21-Jul-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP3+900 to KP4+400

1400154866 Pre-welding and weld joint fit up inspection for 8 TA-669429


4925 CPP-NGCP-W-4923 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1191FL 21-Jul-19 7:30 AM Saif Mr. Rajesh CLOSED
inch HRDH -1191 KP3+200 to KP3+400
Post-welding visual inspection for 8 inch
4926 CPP-NGCP-W-4924 1400154877 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1191FL TA-669429 21-Jul-19 2.30 PM Saif Mr. Rajesh CLOSED
HRDH -1191 KP3+200 to KP3+400
1400154890 NDE selection for welds of 8 inch HRDH -1191 TA-669429
4927 CPP-NGCP-W-4925 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1191FL 21-Jul-19 4.30 PM Saif Mr. Rajesh CLOSED
KP3+200 to KP3+400
Pre-welding and weld joint fit up inspection for 8
4928 CPP-NGCP-W-4926 1400154935 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1307F/L TA-843653 21-Jul-19 7:30 AM Shanmuga Mr. Rajesh OPEN No Action
inch HRDH -1307 KM0+600 to KM0+800
1400154918 Post-welding visual inspection for 8 inch HRDH TA-843653
4929 CPP-NGCP-W-4927 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1307F/L 21-Jul-19 2.30 PM Shanmuga Mr. Rajesh OPEN No Action
-1307 KM0+600 to KM0+800
NDE selection for welds of 8 inch HRDH -1307
4930 CPP-NGCP-W-4928 1400154862 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1307F/L TA-843653 21-Jul-19 4.30 PM Shanmuga Mr. Rajesh OPEN No Action
KM0+600 to KM0+800
1400154879 Pre-welding and weld joint fit up inspection for 16 TA-843956 Mr.
4931 CPP-NGCP-W-4929 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L 21-Jul-19 8:00 AM IRSHAD CLOSED
inch HRDH GK-RH TR/L KP2+600 to KP2+800; Rajendran
Post-welding visual inspection for 16 inch HRDH Mr.
4932 CPP-NGCP-W-4930 1400154920 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 21-Jul-19 2.00 PM IRSHAD CLOSED
GK-RH TR/L KP2+600 to KP2+800; Rajendran

1400154881 NDE selection for welds of 16 inch HRDH GK- TA-843956 Mr.
4933 CPP-NGCP-W-4931 Welding SATIP-W-012-01 SAIC-W-2054 HRDH GK-RH TR/L 21-Jul-19 4.00 PM IRSHAD CLOSED
RH TR/L KP2+600 to KP2+800; Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
4934 CPP-NGCP-W-4932 1400154892 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 21-Jul-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1164 at KM-5+200 to 5+300 Rajendran
Post-welding visual inspection for 8 inch Mr.
4935 CPP-NGCP-W-4933 1400154906 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 21-Jul-19 2.00 PM Sarfaraz CLOSED
HRDH-1164 at KM-5+200 to 5+300 Rajendran
NDE selection for welds of 8 inch HRDH-1164 Mr.
4936 CPP-NGCP-W-4934 1400154922 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1164 FL TA-843592 21-Jul-19 4.00 PM Sarfaraz CLOSED
at KM-5+200 to 5+300 Rajendran
Pre-welding and weld joint fit up inspection for 8
4937 CPP-NGCP-W-4935 1400154870 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL TA-843586 21-Jul-19 8:00 AM Farhan Mr. Ashok CLOSED
inch HWYH-1078 at KM-0+500 to KM 0+670
Post-welding visual inspection for 8inch
4938 CPP-NGCP-W-4936 1400154975 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL TA-843586 21-Jul-19 2.00 PM Farhan Mr. Ashok CLOSED
HWYH-1078 at KM-0+500 to KM 0+670
NDE selection for welds of 8 inch HWYH-1078
4939 CPP-NGCP-W-4937 1400154948 Welding SATIP-W-012-01 SAIC-W-2054 HWYH -1078 FL TA-843586 21-Jul-19 4.00 PM Farhan Mr. Ashok CLOSED
at KM-0+500 to KM 0+670
In-Process Verification - RT Techniques &
4940 CPP-NGCP-W-4938 1400155014 Welding SATIP-NDE-RT-01 SAIC-RT-2007 HWYH-1079, 1065, VARIOUS 21-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
Procedure Implementation of HWYH-1079, 1065,
In-Process Inspection of MPT using
1400155024 hwyh-GK-RH, BK-RH, LSS-TRL-1, VARIOUS
4941 CPP-NGCP-W-4939 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 Yoke Method, hwyh-GK-RH, BK-RH, LSS-TRL-1, 21-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
GGM-TRL-1, HRDH-AK-Rh
GGM-TRL-1, HRDH-AK-Rh
Pre-welding and weld joint fit up inspection for 16 Mr.
4942 CPP-NGCP-W-4940 1400154871 Welding SATIP-W-012-01 SAIC-W-2048 HRDH DK-RH TR/L TA-843954 21-Jul-19 8:00 AM Shadab OPEN No Action
inch HRDH DK -RH TR/L KP1+100 to KP1+300; Rajendran

1400154909 Post-welding visual inspection for 16 inch HRDH TA-843954 Mr.


4943 CPP-NGCP-W-4941 Welding SATIP-W-012-01 SAIC-W-2048 HRDH DK-RH TR/L 21-Jul-19 2.00 PM Shadab CLOSED
DK -RH TR/L KP1+100 to KP1+300; Rajendran
NDE selection for welds of 16 inch HRDH DK -RH Mr.
4944 CPP-NGCP-W-4942 1400154967 Welding SATIP-W-012-01 SAIC-W-2054 HRDH DK-RH TR/L TA-843954 21-Jul-19 4.00 PM Shadab CLOSED
TR/L KP1+100 to KP1+300; Rajendran
1400154393 Pre-welding and weld joint fit up inspection for TA-445901
4945 CPP-NGCP-W-4943 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1072 21-Jul-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-1072
4946 CPP-NGCP-W-4944 1400154332 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1072 HWYH-1072 TA-445901 21-Jul-19 2.00 PM Shahbaz Mr. Suresh CLOSED
4947 CPP-NGCP-W-4945 1400154406 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1072 HWYH-1072 TA-445901 21-Jul-19 4:00 PM Shahbaz Mr. Suresh CLOSED
1400154403 Pre-welding and weld joint fit up inspection for TA-445838
4948 CPP-NGCP-W-4946 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 21-Jul-19 8:00 AM UMAIR Mr. Ashok CLOSED
HWYH-1093
4949 CPP-NGCP-W-4947 1400154322 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 21-Jul-19 2.00 PM UMAIR Mr. Ashok CLOSED
4950 CPP-NGCP-W-4948 1400154423 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 21-Jul-19 4:00 PM UMAIR Mr. Ashok CLOSED
1400154407 Pre-welding and weld joint fit up inspection for TA-445961
4951 CPP-NGCP-W-4949 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1114 21-Jul-19 8:00 AM VARUN Mr. Suresh CLOSED
HWYH-1114
4952 CPP-NGCP-W-4950 1400154400 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1114 HWYH-1114 TA-445961 21-Jul-19 2.00 PM VARUN Mr. Suresh CLOSED
4953 CPP-NGCP-W-4951 1400154382 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1114 HWYH-1114 TA-445961 21-Jul-19 4:00 PM VARUN Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4954 CPP-NGCP-W-4952 1400154370 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH LSS TRL-1 TA-445981 21-Jul-19 8:00 AM abdul raheem Mr. Suresh CLOSED
16″HWYH LSS TRL-1
Post-welding visual inspection for 16″HWYH LSS
4955 CPP-NGCP-W-4953 1400154351 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH LSS TRL-1 TA-445981 21-Jul-19 2.00 PM abdul raheem Mr. Suresh CLOSED
TRL-1
4956 CPP-NGCP-W-4954 1400154401 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 16″HWYH LSS TRL-1 16″HWYH LSS TRL-1 TA-445981 21-Jul-19 4:00 PM abdul raheem Mr. Suresh CLOSED
1400154418 Pre-welding and weld joint fit up inspection for TA-445887
4957 CPP-NGCP-W-4955 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH 21-Jul-19 8:00 AM Imran Mr. Suresh CLOSED
HWYH CJ-RH KM0+390-km1+500
Post-welding visual inspection for HWYH CJ-RH
4958 CPP-NGCP-W-4956 1400154352 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH TA-445887 21-Jul-19 2.00 PM Imran Mr. Suresh CLOSED
KM0+390-km1+500
1400154412 NDE selection for welds of HWYH CJ-RH TA-445887
4959 CPP-NGCP-W-4957 Welding SATIP-W-012-01 SAIC-W-2054 HWYH CJ-RH 21-Jul-19 4:00 PM Imran Mr. Suresh CLOSED
KM0+390-km1+500
Pre-welding and weld joint fit up inspection for 24“
4960 CPP-NGCP-W-4958 1400154437 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 21-Jul-19 8:00 AM Junaid Mr. Suresh CLOSED
HWYH GGM TRL1
1400154484 Post-welding visual inspection for 24“ HWYH TA-445988
4961 CPP-NGCP-W-4959 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 21-Jul-19 2.00 PM Junaid Mr. Suresh CLOSED
GGM TRL1
4962 CPP-NGCP-W-4960 1400154488 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24“ HWYH GGM TRL1 24“ HWYH GGM TRL1 TA-445988 21-Jul-19 4:00 PM Junaid Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
4963 CPP-NGCP-W-4961 1400154421 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 21-Jul-19 8:00 AM BEENESH Mr. Ashok CLOSED
HWYH-1093
4964 CPP-NGCP-W-4962 1400154503 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 21-Jul-19 2.00 PM BEENESH Mr. Ashok CLOSED
4965 CPP-NGCP-W-4963 1400154451 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 21-Jul-19 4:00 PM BEENESH Mr. Ashok CLOSED
Pre-welding and weld joint fit up inspection for 8
4966 CPP-NGCP-W-4964 1400155769 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 22-Jul-19 8:00 AM Rajesh Mr. Rajesh OPEN No Action
inch HRDH-1192 KP4+500 to KP4+600
Post-welding visual inspection for 8 inch
4967 CPP-NGCP-W-4965 1400155789 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 22-Jul-19 2.00 PM Rajesh Mr. Rajesh OPEN No Action
HRDH-1192 KP4+500 to KP4+600
NDE selection for welds of 8 inch HRDH-1192
4968 CPP-NGCP-W-4966 1400155770 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1192 FL TA-669428 22-Jul-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP4+500 to KP4+600
Pre-welding and weld joint fit up inspection for 8
4969 CPP-NGCP-W-4967 1400155771 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1191FL TA-669429 22-Jul-19 7:30 AM Saif Mr.Rajesh OPEN No Action
inch HRDH -1191 KP3+000 to KP3+200
Post-welding visual inspection for 8 inch
4970 CPP-NGCP-W-4968 1400155790 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1191FL TA-669429 22-Jul-19 2.30 PM Saif Mr.Rajesh OPEN No Action
HRDH -1191 KP3+000 to KP3+200
NDE selection for welds of 8 inch HRDH -1191
4971 CPP-NGCP-W-4969 1400155791 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1191FL TA-669429 22-Jul-19 4.30 PM Saif Mr.Rajesh CLOSED
KP3+000 to KP3+200
Pre-welding and weld joint fit up inspection for 8
4972 CPP-NGCP-W-4970 1400155779 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1307F/L TA-843653 22-Jul-19 7:30 AM Shanmuga Mr.Rajesh CLOSED
inch HRDH -1307 KM0+800 to KM1+000
Post-welding visual inspection for 8 inch HRDH
4973 CPP-NGCP-W-4971 1400155833 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1307F/L TA-843653 22-Jul-19 2.30 PM Shanmuga Mr.Rajesh CLOSED
-1307 KM0+800 to KM1+000
NDE selection for welds of 8 inch HRDH -1307
4974 CPP-NGCP-W-4972 1400155792 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1307F/L TA-843653 22-Jul-19 4.30 PM Shanmuga Mr.Rajesh CLOSED
KM0+800 to KM1+000
Pre-welding and weld joint fit up inspection for 16 Mr.
4975 CPP-NGCP-W-4973 1400155814 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 22-Jul-19 8:00 AM IRSHAD CLOSED
inch HRDH GK-RH TR/L KP3+400 to KP3+600; Rajendran
1400155815 Post-welding visual inspection for 16 inch HRDH TA-843956 Mr.
4976 CPP-NGCP-W-4974 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L 22-Jul-19 2.00 PM IRSHAD CLOSED
GK-RH TR/L KP3+400 to KP3+600; Rajendran
NDE selection for welds of 16 inch HRDH GK- Mr.
4977 CPP-NGCP-W-4975 1400155835 Welding SATIP-W-012-01 SAIC-W-2054 HRDH GK-RH TR/L TA-843956 22-Jul-19 4.00 PM IRSHAD CLOSED
RH TR/L KP3+400 to KP3+600; Rajendran
1400155802 Pre-welding and weld joint fit up inspection for 8 TA-843592 Mr.
4978 CPP-NGCP-W-4976 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL 22-Jul-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1164 at KM-5+250 to 5+350 Rajendran
Post-welding visual inspection for 8 inch Mr.
4979 CPP-NGCP-W-4977 1400155853 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 22-Jul-19 2.00 PM Sarfaraz CLOSED
HRDH-1164 at KM-5+250 to 5+350 Rajendran

1400155818 NDE selection for welds of 8 inch HRDH-1164 TA-843592 Mr.


4980 CPP-NGCP-W-4978 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1164 FL 22-Jul-19 4.00 PM Sarfaraz CLOSED
at KM-5+250 to 5+350 Rajendran
Pre-welding and weld joint fit up inspection for 8
4981 CPP-NGCP-W-4979 1400155836 Welding SATIP-W-012-01 SAIC-W-2048 inch HWYH-1078 at KM-0+450 to KM 0+510 HWYH -1078 FL TA-843586 22-Jul-19 8:00 AM Farhan Mr. Ashok CLOSED
and KM 0+762 to KM 0+860
Post-welding visual inspection for 8inch
4982 CPP-NGCP-W-4980 1400155824 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1078 at KM-0+450 to KM 0+510 and HWYH -1078 FL TA-843586 22-Jul-19 2.00 PM Farhan Mr. Ashok CLOSED
KM 0+762 to KM 0+860
NDE selection for welds of 8 inch HWYH-1078
4983 CPP-NGCP-W-4981 1400155854 Welding SATIP-W-012-01 SAIC-W-2054 at KM-0+450 to KM 0+510 and KM 0+762 to HWYH -1078 FL TA-843586 22-Jul-19 4.00 PM Farhan Mr. Ashok CLOSED
KM 0+860 Verification - RT Techniques &
In-Process
Mr.
4984 CPP-NGCP-W-4982 1400155993 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1188, GK- HRDH-1188, GK-RH, CK-RH. VARIOUS 22-Jul-19 8:00 AM RAMEEZ CLOSED
Rajendran
RH, CK-RH.
In-Process Verification - RT Techniques &
HWYH-975, 1102, GK-RH, 201,
4985 CPP-NGCP-W-4983 1400155984 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-975, 1102, VARIOUS 22-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1093, GGM-TRL-1
GK-RH, 201, 1093, GGM-TRL-1
Pre-welding and weld joint fit up inspection for 16 Mr.
4986 CPP-NGCP-W-4984 1400155855 Welding SATIP-W-012-01 SAIC-W-2048 HRDH DK-RH TR/L TA-843954 22-Jul-19 8:00 AM Shadab CLOSED
inch HRDH DK -RH TR/L KP1+300 to KP1+500; Rajendran
Post-welding visual inspection for 16 inch HRDH Mr.
4987 CPP-NGCP-W-4985 1400155820 Welding SATIP-W-012-01 SAIC-W-2048 HRDH DK-RH TR/L TA-843954 22-Jul-19 2.00 PM Shadab CLOSED
DK -RH TR/L KP1+300 to KP1+500; Rajendran
NDE selection for welds of 16 inch HRDH DK -RH Mr.
4988 CPP-NGCP-W-4986 1400155856 Welding SATIP-W-012-01 SAIC-W-2054 HRDH DK-RH TR/L TA-843954 22-Jul-19 4.00 PM Shadab CLOSED
TR/L KP1+300 to KP1+500; Rajendran
Pre-welding and weld joint fit up inspection for
4989 CPP-NGCP-W-4987 1400156129 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1072 TA-445901 22-Jul-19 8:00 AM Shahbaz Mr. Suresh CLOSED
HWYH-1072
4990 CPP-NGCP-W-4988 1400156175 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1072 HWYH-1072 TA-445901 22-Jul-19 2.00 PM Shahbaz Mr. Suresh CLOSED
4991 CPP-NGCP-W-4989 1400156189 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1072 HWYH-1072 TA-445901 22-Jul-19 4:00 PM Shahbaz Mr. Suresh CLOSED
RE-SCHEDULE TO 23-
4992 CPP-NGCP-W-4990 1400153947 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1093 HWYH-1093 TA-445838 22-Jul-19 7:00 AM UMAIR Mr. Ashok CLOSED
JULY-2019
Pre-welding and weld joint fit up inspection for RE-SCHEDULE TO 23-
4993 CPP-NGCP-W-4991 1400156104 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 22-Jul-19 8:00 AM UMAIR Mr. Ashok CLOSED
HWYH-1093 JULY-2019
RE-SCHEDULE TO 23-
4994 CPP-NGCP-W-4992 1400156115 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 22-Jul-19 2.00 PM UMAIR Mr. Ashok CLOSED
JULY-2019
RE-SCHEDULE TO 23-
4995 CPP-NGCP-W-4993 1400156155 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 22-Jul-19 4:00 PM UMAIR Mr. Ashok CLOSED
JULY-2019
RE-SCHEDULE TO 23-
4996 CPP-NGCP-W-4994 1400156856 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1071 HWYH-1071 FL TA-445830 22-Jul-19 7:00 AM sanjeev Mr. Ashok CLOSED
JULY-2019
Pre-welding and weld joint fit up inspection for 8
4997 CPP-NGCP-W-4995 1400154321 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 22-Jul-19 8:00 AM sanjeev Mr. Ashok CLOSED
inch HWYH-1071 FL
1400154389 Post-welding visual inspection for 8 inch HWYH- TA-445830
4998 CPP-NGCP-W-4996 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL 22-Jul-19 2.00 PM sanjeev Mr. Ashok CLOSED
1071 FL
4999 CPP-NGCP-W-4997 1400154416 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1071 FL HWYH-1071 FL TA-445830 22-Jul-19 4:00 PM sanjeev Mr. Ashok CLOSED
Pre-welding and weld joint fit up inspection for
5000 CPP-NGCP-W-4998 1400156082 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1114 TA-445961 22-Jul-19 8:00 AM VARUN Mr. Suresh CLOSED
HWYH-1114
5001 CPP-NGCP-W-4999 1400156136 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1114 HWYH-1114 TA-445961 22-Jul-19 2.00 PM VARUN Mr. Suresh CLOSED
5002 CPP-NGCP-W-5000 1400156150 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1114 HWYH-1114 TA-445961 22-Jul-19 4:00 PM VARUN Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
5003 CPP-NGCP-W-5001 1400156123 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH LSS TRL-1 TA-445981 22-Jul-19 8:00 AM abdul raheem Mr. Suresh CLOSED
16″HWYH LSS TRL-1
Post-welding visual inspection for 16″HWYH LSS
5004 CPP-NGCP-W-5002 1400156121 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH LSS TRL-1 TA-445981 22-Jul-19 2.00 PM abdul raheem Mr. Suresh CLOSED
TRL-1
5005 CPP-NGCP-W-5003 1400156138 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 16″HWYH LSS TRL-1 16″HWYH LSS TRL-1 TA-445981 22-Jul-19 4:00 PM abdul raheem Mr. Suresh CLOSED
1400156140 Pre-welding and weld joint fit up inspection for TA-445887
5006 CPP-NGCP-W-5004 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH 22-Jul-19 8:00 AM Imran Mr. Suresh CLOSED
HWYH CJ-RH KM0+390-km1+500
Post-welding visual inspection for HWYH CJ-RH
5007 CPP-NGCP-W-5005 1400156169 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH TA-445887 22-Jul-19 2.00 PM Imran Mr. Suresh CLOSED
KM0+390-km1+500
1400156237 NDE selection for welds of HWYH CJ-RH TA-445887
5008 CPP-NGCP-W-5006 Welding SATIP-W-012-01 SAIC-W-2054 HWYH CJ-RH 22-Jul-19 4:00 PM Imran Mr. Suresh CLOSED
KM0+390-km1+500
Pre-welding and weld joint fit up inspection for
5009 CPP-NGCP-W-5007 1400154445 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1087 TA-445831 22-Jul-19 8:00 AM Asish Mr. Ashok CLOSED
HWYH-1087
5010 CPP-NGCP-W-5008 1400154474 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1087 HWYH-1087 TA-445831 22-Jul-19 2.00 PM asish Mr. Ashok CLOSED
5011 CPP-NGCP-W-5009 1400154495 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1087 HWYH-1087 TA-445831 22-Jul-19 4:00 PM asish Mr. Ashok CLOSED
Pre-welding and weld joint fit up inspection for 24“
5012 CPP-NGCP-W-5010 1400156141 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 22-Jul-19 8:00 AM JUNAID Mr. Suresh CLOSED
HWYH GGM TRL1
Post-welding visual inspection for 24“ HWYH
5013 CPP-NGCP-W-5011 1400156216 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 22-Jul-19 2.00 PM JUNAID Mr. Suresh CLOSED
GGM TRL1

5014 CPP-NGCP-W-5012 1400156190 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24“ HWYH GGM TRL1 24“ HWYH GGM TRL1 TA-445988 22-Jul-19 4:00 PM JUNAID Mr. Suresh CLOSED

1400156662 TA-445838 RE-SCHEDULE TO 23-


5015 CPP-NGCP-W-5013 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1093 HWYH-1093 22-Jul-19 7:00 AM BINEESH Mr. Ashok CLOSED
JULY-2019
Pre-welding and weld joint fit up inspection for
5016 CPP-NGCP-W-5014 1400156241 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 22-Jul-19 8:00 AM BINEESH Mr. Ashok CLOSED
HWYH-1093
lo CPP-NGCP-W-5015 1400156296 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 22-Jul-19 2.00 PM BINEESH Mr. Ashok CLOSED
5018 CPP-NGCP-W-5016 1400156298 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 22-Jul-19 4:00 PM BINEESH Mr. Ashok CLOSED
Pre-welding and weld joint fit up inspection for
5019 CPP-NGCP-W-5017 1400157170 Welding SATIP-W-012-01 SAIC-W-2048 UTMN 2201 TA-445963 23-Jul-19 8:00 AM Shahbaz Mr. Suresh CLOSED
UTMN 2201
5020 CPP-NGCP-W-5018 1400157740 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for UTMN 2201 UTMN 2201 TA-445963 23-Jul-19 2.00 PM Shahbaz Mr. Suresh CLOSED
5021 CPP-NGCP-W-5019 1400157612 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of UTMN 2201 UTMN 2201 TA-445963 23-Jul-19 4:00 PM Shahbaz Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 8
5022 CPP-NGCP-W-5020 1400157150 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL TA-445830 23-Jul-19 8:00 AM sanjeev Mr. Ashok CLOSED
inch HWYH-1071 FL
1400155726 Post-welding visual inspection for 8 inch HWYH- TA-445830
5023 CPP-NGCP-W-5021 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 FL 23-Jul-19 2.00 PM sanjeev Mr. Ashok CLOSED
1071 FL
5024 CPP-NGCP-W-5022 1400157112 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1071 FL HWYH-1071 FL TA-445830 23-Jul-19 4:00 PM sanjeev Mr. Ashok CLOSED
Pre-welding and weld joint fit up inspection for
5025 CPP-NGCP-W-5023 1400157711 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1114 TA-445961 23-Jul-19 8:00 AM VARUN Mr. Suresh CLOSED
HWYH-1114
5026 CPP-NGCP-W-5024 1400157784 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1114 HWYH-1114 TA-445961 23-Jul-19 2.00 PM VARUN Mr. Suresh CLOSED
5027 CPP-NGCP-W-5025 1400157785 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1114 HWYH-1114 TA-445961 23-Jul-19 4:00 PM VARUN Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
5028 CPP-NGCP-W-5026 1400157765 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH LSS TRL-1 TA-445981 23-Jul-19 8:00 AM abdul raheem Mr. Suresh CLOSED
16″HWYH LSS TRL-1

1400157804 Post-welding visual inspection for 16″HWYH LSS TA-445981


5029 CPP-NGCP-W-5027 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH LSS TRL-1 23-Jul-19 2.00 PM abdul raheem Mr. Suresh CLOSED
TRL-1
5030 CPP-NGCP-W-5028 1400157807 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 16″HWYH LSS TRL-1 16″HWYH LSS TRL-1 TA-445981 23-Jul-19 4:00 PM abdul raheem Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for
5031 CPP-NGCP-W-5029 1400157827 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH TA-445887 23-Jul-19 8:00 AM Imran Mr. Suresh CLOSED
HWYH CJ-RH KM0+390-km1+500
Post-welding visual inspection for HWYH CJ-RH
5032 CPP-NGCP-W-5030 1400157856 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH TA-445887 23-Jul-19 2.00 PM Imran Mr. Suresh CLOSED
KM0+390-km1+500
NDE selection for welds of HWYH CJ-RH
5033 CPP-NGCP-W-5031 1400157817 Welding SATIP-W-012-01 SAIC-W-2054 HWYH CJ-RH TA-445887 23-Jul-19 4:00 PM Imran Mr. Suresh CLOSED
KM0+390-km1+500
Pre-welding and weld joint fit up inspection for
5034 CPP-NGCP-W-5032 1400157838 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1087 TA-445831 23-Jul-19 8:00 AM Asish Mr. Ashok CLOSED
HWYH-1087
5035 CPP-NGCP-W-5033 1400157929 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1087 HWYH-1087 TA-445831 23-Jul-19 2.00 PM asish Mr. Ashok CLOSED
5036 CPP-NGCP-W-5034 1400157964 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1087 HWYH-1087 TA-445831 23-Jul-19 4:00 PM asish Mr. Ashok CLOSED
Pre-welding and weld joint fit up inspection for 24“
5037 CPP-NGCP-W-5035 1400157878 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 23-Jul-19 8:00 AM JUNAID Mr. Suresh CLOSED
HWYH GGM TRL1
Post-welding visual inspection for 24“ HWYH
5038 CPP-NGCP-W-5036 1400157162 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 23-Jul-19 2.00 PM JUNAID Mr. Suresh CLOSED
GGM TRL1
5039 CPP-NGCP-W-5037 1400157180 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24“ HWYH GGM TRL1 24“ HWYH GGM TRL1 TA-445988 23-Jul-19 4:00 PM JUNAID Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
5040 CPP-NGCP-W-5038 1400157905 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 23-Jul-19 8:00 AM BINEESH Mr. Ashok CLOSED
HWYH-1093
5041 CPP-NGCP-W-5039 1400157918 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 23-Jul-19 2.00 PM BINEESH Mr. Ashok CLOSED
5042 CPP-NGCP-W-5040 1400157111 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 23-Jul-19 4:00 PM BINEESH Mr. Ashok CLOSED
Pre-welding and weld joint fit up inspection for 8
5043 CPP-NGCP-W-5041 1400157226 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 23-Jul-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1192 KP4+600 to KP4+900
Post-welding visual inspection for 8 inch
5044 CPP-NGCP-W-5042 1400157273 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 23-Jul-19 2.00 PM Rajesh Mr. Rajesh CLOSED
HRDH-1192 KP4+600 to KP4+900
NDE selection for welds of 8 inch HRDH-1192
5045 CPP-NGCP-W-5043 1400157274 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1192 FL TA-669428 23-Jul-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP4+600 to KP4+900
Pre-welding and weld joint fit up inspection for 8
5046 CPP-NGCP-W-5044 1400157198 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1191FL TA-669429 23-Jul-19 7:30 AM Saif Mr.Rajesh CLOSED
inch HRDH -1191 KP2+500 to KP3+000
Post-welding visual inspection for 8 inch
5047 CPP-NGCP-W-5045 1400157236 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1191FL TA-669429 23-Jul-19 2.30 PM Saif Mr.Rajesh OPEN No Action
HRDH -1191 KP2+500 to KP3+000
NDE selection for welds of 8 inch HRDH -1191
5048 CPP-NGCP-W-5046 1400157215 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1191FL TA-669429 23-Jul-19 4.30 PM Saif Mr.Rajesh CLOSED
KP2+500 to KP3+000
Pre-welding and weld joint fit up inspection for 8
5049 CPP-NGCP-W-5047 1400157247 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1307F/L TA-843653 23-Jul-19 7:30 AM Shanmuga Mr.Rajesh CLOSED
inch HRDH -1307 KM1+000 to KM1+300
Post-welding visual inspection for 8 inch HRDH
5050 CPP-NGCP-W-5048 1400157286 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1307F/L TA-843653 23-Jul-19 2.30 PM Shanmuga Mr.Rajesh CLOSED
-1307 KM1+000 to KM1+300
NDE selection for welds of 8 inch HRDH -1307
5051 CPP-NGCP-W-5049 1400157320 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1307F/L TA-843653 23-Jul-19 4.30 PM Shanmuga Mr.Rajesh CLOSED
KM1+000 to KM1+300
Pre-welding and weld joint fit up inspection for 16 Mr.
5052 CPP-NGCP-W-5050 1400157344 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 23-Jul-19 8:00 AM IRSHAD CLOSED
inch HRDH GK-RH TR/L KP3+600 to KP3+800; Rajendran
Post-welding visual inspection for 16 inch HRDH Mr.
5053 CPP-NGCP-W-5051 1400157307 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 23-Jul-19 2.00 PM IRSHAD CLOSED
GK-RH TR/L KP3+600 to KP3+800; Rajendran
NDE selection for welds of 16 inch HRDH GK- Mr.
5054 CPP-NGCP-W-5052 1400157353 Welding SATIP-W-012-01 SAIC-W-2054 HRDH GK-RH TR/L TA-843956 23-Jul-19 4.00 PM IRSHAD CLOSED
RH TR/L KP3+600 to KP3+800; Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
5055 CPP-NGCP-W-5053 1400157219 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 23-Jul-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1164 at KM-5+350 to 5+450 Rajendran
Post-welding visual inspection for 8 inch Mr.
5056 CPP-NGCP-W-5054 1400157356 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 23-Jul-19 2.00 PM Sarfaraz CLOSED
HRDH-1164 at KM-5+350 to 5+450 Rajendran
NDE selection for welds of 8 inch HRDH-1164 Mr.
5057 CPP-NGCP-W-5055 1400157366 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1164 FL TA-843592 23-Jul-19 4.00 PM Sarfaraz CLOSED
at KM-5+350 to 5+450 Rajendran
Pre-welding and weld joint fit up inspection for 8
5058 CPP-NGCP-W-5056 1400157335 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL TA-843586 23-Jul-19 8:00 AM Farhan Mr. Ashok CLOSED
inch HWYH-1078 at KM-0+800 to KM 1+000
Post-welding visual inspection for 8inch
5059 CPP-NGCP-W-5057 1400157383 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL TA-843586 23-Jul-19 2.00 PM Farhan Mr. Ashok CLOSED
HWYH-1078 at KM-0+800 to KM 1+000
NDE selection for welds of 8 inch HWYH-1078
5060 CPP-NGCP-W-5058 1400157423 Welding SATIP-W-012-01 SAIC-W-2054 HWYH -1078 FL TA-843586 23-Jul-19 4.00 PM Farhan Mr. Ashok CLOSED
at KM-0+800 to KM 1+000
In-Process Verification - RT Techniques &
Mr.
5061 CPP-NGCP-W-5059 1400157932 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- HRDH-1192.1191.1160 VARIOUS 23-Jul-19 8:00 AM RAMEEZ CLOSED
Rajendran
1192.1191.1160
In-Process Verification - RT Techniques &
5062 CPP-NGCP-W-5060 1400157935 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HWYH-952.LLS- HWYH-952.LLS-TRL-1,1096.CJ-RH VARIOUS 23-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
TRL-1,1096.CJ-RH
Pre-welding and weld joint fit up inspection for 16 Mr.
5063 CPP-NGCP-W-5061 1400157386 Welding SATIP-W-012-01 SAIC-W-2048 HRDH DK-RH TR/L TA-843954 23-Jul-19 8:00 AM Shadab CLOSED
inch HRDH DK -RH TR/L KP1+500 to KP1+700; Rajendran
Post-welding visual inspection for 16 inch HRDH Mr.
5064 CPP-NGCP-W-5062 1400157400 Welding SATIP-W-012-01 SAIC-W-2048 HRDH DK-RH TR/L TA-843954 23-Jul-19 2.00 PM Shadab CLOSED
DK -RH TR/L KP1+500 to KP1+700; Rajendran
NDE selection for welds of 16 inch HRDH DK -RH Mr.
5065 CPP-NGCP-W-5063 1400157407 Welding SATIP-W-012-01 SAIC-W-2054 HRDH DK-RH TR/L TA-843954 23-Jul-19 4.00 PM Shadab CLOSED
TR/L KP1+500 to KP1+700; Rajendran
Pre-welding and weld joint fit up inspection for
5066 CPP-NGCP-W-5064 1400158468 Welding SATIP-W-012-01 SAIC-W-2048 UTMN 2201 TA-445963 24-Jul-19 8:00 AM Shahbaz Mr. Suresh CLOSED
UTMN 2201
5067 CPP-NGCP-W-5065 1400158523 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for UTMN 2201 UTMN 2201 TA-445963 24-Jul-19 2.00 PM Shahbaz Mr. Suresh CLOSED
5068 CPP-NGCP-W-5066 1400158462 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of UTMN 2201 UTMN 2201 TA-445963 24-Jul-19 4:00 PM Shahbaz Mr. Suresh CLOSED
RE-SCHEDULE TO 25-
5069 CPP-NGCP-W-5067 1400159287 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1093 HWYH-1093 TA-445838 24-Jul-19 7:00 AM UMAIR Mr. Ashok CLOSED
JULY-2019
Pre-welding and weld joint fit up inspection for RE-SCHEDULE TO 25-
5070 CPP-NGCP-W-5068 1400158509 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 24-Jul-19 8:00 AM UMAIR Mr. Ashok CLOSED
HWYH-1093 JULY-2019
RE-SCHEDULE TO 25-
5071 CPP-NGCP-W-5069 1400158469 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 24-Jul-19 2.00 PM UMAIR Mr. Ashok CLOSED
JULY-2019
RE-SCHEDULE TO 25-
5072 CPP-NGCP-W-5070 1400158533 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 24-Jul-19 4:00 PM UMAIR Mr. Ashok CLOSED
JULY-2019
1400158510 Pre-welding and weld joint fit up inspection for 8 TA-843656
5073 CPP-NGCP-W-5071 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL 24-Jul-19 8:00 AM sanjeev Mr. Ashok CLOSED
inch HWYH-1134
Post-welding visual inspection for 8 inch HWYH-
5074 CPP-NGCP-W-5072 1400158511 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-843656 24-Jul-19 2.00 PM sanjeev Mr. Ashok CLOSED
1134 FL

5075 CPP-NGCP-W-5073 1400158440 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 FL HWYH-1134 FL TA-843656 24-Jul-19 4:00 PM sanjeev Mr. Ashok CLOSED

Pre-welding and weld joint fit up inspection for


5076 CPP-NGCP-W-5074 1400158534 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1114 TA-445961 24-Jul-19 8:00 AM VARUN Mr. Suresh CLOSED
HWYH-1114
5077 CPP-NGCP-W-5075 1400158480 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1114 HWYH-1114 TA-445961 24-Jul-19 2.00 PM VARUN Mr. Suresh CLOSED
5078 CPP-NGCP-W-5076 1400158541 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1114 HWYH-1114 TA-445961 24-Jul-19 4:00 PM VARUN Mr. Suresh CLOSED
1400158544 Pre-welding and weld joint fit up inspection for TA-445981
5079 CPP-NGCP-W-5077 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH LSS TRL-1 24-Jul-19 8:00 AM abdul raheem Mr. Suresh CLOSED
16″HWYH LSS TRL-1
Post-welding visual inspection for 16″HWYH LSS
5080 CPP-NGCP-W-5078 1400158471 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH LSS TRL-1 TA-445981 24-Jul-19 2.00 PM abdul raheem Mr. Suresh CLOSED
TRL-1
5081 CPP-NGCP-W-5079 1400158546 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 16″HWYH LSS TRL-1 16″HWYH LSS TRL-1 TA-445981 24-Jul-19 4:00 PM abdul raheem Mr. Suresh CLOSED
Pre welding and fit up inspection for re weld ,Re
5082 CPP-NGCP-W-5080 1400158782 Welding SATIP-W-012-01 SAIC-W-2048 welded due to debris issue inside the pipe 16″HWYH GK-RH TRL TA-445912 24-Jul-19 8:00 AM abdul raheem Mr. Ashok CLOSED
16″HWYH GK-RH TRL
post weld inspection for 16 inch GK RH re welded
5083 CPP-NGCP-W-5081 1400158904 Welding SATIP-W-012-01 SAIC-W-2048 joints for debris issue inside the pipe 16″HWYH 16″HWYH GK-RH TRL TA-445912 24-Jul-19 2.00 PM abdul raheem Mr. Ashok CLOSED
GK-RH TRL
NDE selection for re welded joints of 16″HWYH
5084 CPP-NGCP-W-5082 1400158909 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 24-Jul-19 4:00 PM abdul raheem Mr. Ashok CLOSED
GK-RH TRL
Pre-welding and weld joint fit up inspection for
5085 CPP-NGCP-W-5083 1400158548 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH TA-445887 24-Jul-19 8:00 AM Imran Mr. Suresh CLOSED
HWYH CJ-RH KM0+390-km1+500
Post-welding visual inspection for HWYH CJ-RH
5086 CPP-NGCP-W-5084 1400158557 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH TA-445887 24-Jul-19 2.00 PM Imran Mr. Suresh CLOSED
KM0+390-km1+500
NDE selection for welds of HWYH CJ-RH
5087 CPP-NGCP-W-5085 1400158529 Welding SATIP-W-012-01 SAIC-W-2054 HWYH CJ-RH TA-445887 24-Jul-19 4:00 PM Imran Mr. Suresh CLOSED
KM0+390-km1+500
Pre-welding and weld joint fit up inspection for
5088 CPP-NGCP-W-5086 1400158555 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1087 TA-445831 24-Jul-19 8:00 AM Asish Mr. Ashok CLOSED
HWYH-1087
5089 CPP-NGCP-W-5087 1400158528 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1087 HWYH-1087 TA-445831 24-Jul-19 2.00 PM asish Mr. Ashok CLOSED
5090 CPP-NGCP-W-5088 1400158583 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1087 HWYH-1087 TA-445831 24-Jul-19 4:00 PM asish Mr. Ashok CLOSED
Pre-welding and weld joint fit up inspection for 24“
5091 CPP-NGCP-W-5089 1400158556 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 24-Jul-19 8:00 AM JUNAID Mr. Suresh CLOSED
HWYH GGM TRL1
Post-welding visual inspection for 24“ HWYH
5092 CPP-NGCP-W-5090 1400158573 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 24-Jul-19 2.00 PM JUNAID Mr. Suresh CLOSED
GGM TRL1
5093 CPP-NGCP-W-5091 1400158564 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24“ HWYH GGM TRL1 24“ HWYH GGM TRL1 TA-445988 24-Jul-19 4:00 PM JUNAID Mr. Suresh CLOSED
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a RE-SCHEDULE TO 25-
5094 CPP-NGCP-W-5092 1400159117 l Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1093 HWYH-1093 TA-445838 24-Jul-19 7:00 AM BINEESH Mr. Ashok CLOSED
JULY-2019
Pre-welding and weld joint fit up inspection for
5095 CPP-NGCP-W-5093 1400158860 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 24-Jul-19 8:00 AM BINEESH Mr. Ashok CLOSED
HWYH-1093
5096 CPP-NGCP-W-5094 1400158849 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 24-Jul-19 2.00 PM BINEESH Mr. Ashok CLOSED
5097 CPP-NGCP-W-5095 1400158822 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 24-Jul-19 4:00 PM BINEESH Mr. Ashok CLOSED
Pre-welding and weld joint fit up inspection for 8
5098 CPP-NGCP-W-5096 1400159351 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 24-Jul-19 8:00 AM Rajesh Mr. Rajesh CLOSED
inch HRDH-1192 KP4+900 to KP5+600
Post-welding visual inspection for 8 inch
5099 CPP-NGCP-W-5097 1400159386 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 24-Jul-19 2.00 PM Rajesh Mr. Rajesh OPEN No Action
HRDH-1192 KP4+900 to KP5+600
NDE selection for welds of 8 inch HRDH-1192
5100 CPP-NGCP-W-5098 1400159423 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1192 FL TA-669428 24-Jul-19 4.00 PM Rajesh Mr. Rajesh CLOSED
KP4+900 to KP5+600
Pre-welding and weld joint fit up inspection for 8
5101 CPP-NGCP-W-5099 1400159414 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1191FL TA-669429 24-Jul-19 7:30 AM Saif Mr.Rajesh CLOSED
inch HRDH -1191 KP2+200 to KP2+500
Post-welding visual inspection for 8 inch
5102 CPP-NGCP-W-5100 1400159415 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1191FL TA-669429 24-Jul-19 2.30 PM Saif Mr.Rajesh CLOSED
HRDH -1191 KP2+200 to KP2+500
NDE selection for welds of 8 inch HRDH -1191
5103 CPP-NGCP-W-5101 1400159441 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1191FL TA-669429 24-Jul-19 4.30 PM Saif Mr.Rajesh CLOSED
KP2+200 to KP2+500
Pre-welding and weld joint fit up inspection for 8 Mr.Joy
5104 CPP-NGCP-W-5102 1400159464 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1182 F/L TA-843660 24-Jul-19 7:30 AM Shanmuga OPEN No Action
inch HRDH -1182 KM0+300 to KM0+500 Kumar
Post-welding visual inspection for 8 inch HRDH Mr.Joy
5105 CPP-NGCP-W-5103 1400159417 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1182 F/L TA-843660 24-Jul-19 2.30 PM Shanmuga OPEN No Action
-1182 KM0+300 to KM0+500 Kumar
NDE selection for welds of 8 inch HRDH -1182 Mr.Joy
5106 CPP-NGCP-W-5104 1400159474 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1182 F/L TA-843660 24-Jul-19 4.30 PM Shanmuga OPEN No Action
KM0+300 to KM0+500 Kumar
Pre-welding and weld joint fit up inspection for 16 Mr.
5107 CPP-NGCP-W-5105 1400159426 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 24-Jul-19 8:00 AM IRSHAD CLOSED
inch HRDH GK-RH TR/L KP3+800 to KP4+000; Rajendran
Post-welding visual inspection for 16 inch HRDH Mr.
5108 CPP-NGCP-W-5106 1400159427 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 24-Jul-19 2.00 PM IRSHAD CLOSED
GK-RH TR/L KP3+800 to KP4+000; Rajendran
NDE selection for welds of 16 inch HRDH GK- Mr.
5109 CPP-NGCP-W-5107 1400159401 Welding SATIP-W-012-01 SAIC-W-2054 HRDH GK-RH TR/L TA-843956 24-Jul-19 4.00 PM IRSHAD CLOSED
RH TR/L KP3+800 to KP4+000; Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
5110 CPP-NGCP-W-5108 1400159466 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 24-Jul-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1164 at KM-5+450 to 5+550 Rajendran
Post-welding visual inspection for 8 inch Mr.
5111 CPP-NGCP-W-5109 1400159504 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1164 FL TA-843592 24-Jul-19 2.00 PM Sarfaraz CLOSED
HRDH-1164 at KM-5+450 to 5+550 Rajendran
NDE selection for welds of 8 inch HRDH-1164 Mr.
5112 CPP-NGCP-W-5110 1400159380 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1164 FL TA-843592 24-Jul-19 4.00 PM Sarfaraz CLOSED
at KM-5+450 to 5+550 Rajendran
Pre-welding and weld joint fit up inspection for 8
5113 CPP-NGCP-W-5111 1400159564 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL TA-843586 24-Jul-19 8:00 AM Farhan Mr. Ashok CLOSED
inch HWYH-1078 at KM-0+900 to KM 1+000
Post-welding visual inspection for 8inch
5114 CPP-NGCP-W-5112 1400159538 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL TA-843586 24-Jul-19 2.00 PM Farhan Mr. Ashok CLOSED
HWYH-1078 at KM-0+900 to KM 1+000
NDE selection for welds of 8 inch HWYH-1078
5115 CPP-NGCP-W-5113 1400159551 Welding SATIP-W-012-01 SAIC-W-2054 HWYH -1078 FL TA-843586 24-Jul-19 4.00 PM Farhan Mr. Ashok CLOSED
at KM-0+900 to KM 1+000
In-Process Verification - RT Techniques &
HRDH-1164, 1188, GK-RH, DK-RH, Mr.
5116 CPP-NGCP-W-5114 1400159554 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1164, 1188, VARIOUS 24-Jul-19 8:00 AM RAMEEZ CLOSED
1086 Rajendran
GK-RH, DK-RH, 1086
In-Process Verification - RT Techniques &
1400159539 HWYH-CJ-RH, 1071, 1091, LSS- VARIOUS
5117 CPP-NGCP-W-5115 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation o fHWYH-CJ-RH, 24-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
TRL-1, 1093, 1003, 1036
1071, 1091, LSS-TRL-1, 1093, 1003, 1036
Pre-welding and weld joint fit up inspection for 16 Mr.
5118 CPP-NGCP-W-5116 1400159520 Welding SATIP-W-012-01 SAIC-W-2048 HRDH DK-RH TR/L TA-843954 24-Jul-19 8:00 AM Shadab CLOSED
inch HRDH DK -RH TR/L KP1+700 to KP1+900; Rajendran
Post-welding visual inspection for 16 inch HRDH Mr.
5119 CPP-NGCP-W-5117 1400159524 Welding SATIP-W-012-01 SAIC-W-2048 HRDH DK-RH TR/L TA-843954 24-Jul-19 2.00 PM Shadab CLOSED
DK -RH TR/L KP1+700 to KP1+900; Rajendran
NDE selection for welds of 16 inch HRDH DK -RH Mr.
5120 CPP-NGCP-W-5118 1400159552 Welding SATIP-W-012-01 SAIC-W-2054 HRDH DK-RH TR/L TA-843954 24-Jul-19 4.00 PM Shadab CLOSED
TR/L KP1+700 to KP1+900; Rajendran
1400159800 Pre-welding and weld joint fit up inspection for TA-445963
5153 CPP-NGCP-W-5151 Welding SATIP-W-012-01 SAIC-W-2048 UTMN 2201 25-Jul-19 8:00 AM Shahbaz Mr. Suresh CLOSED
UTMN 2201
5154 CPP-NGCP-W-5152 1400159875 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for UTMN 2201 UTMN 2201 TA-445963 25-Jul-19 2.00 PM Shahbaz Mr. Suresh CLOSED
5155 CPP-NGCP-W-5153 1400159852 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of UTMN 2201 UTMN 2201 TA-445963 25-Jul-19 4:00 PM Shahbaz Mr. Suresh CLOSED
Pre welding and fit up inspection for re weld ,Re
5156 CPP-NGCP-W-5154 1400159849 Welding SATIP-W-012-01 SAIC-W-2048 welded due to debris issue inside the pipe 16″HWYH GK-RH TRL TA-445912 25-Jul-19 8:00 AM UMAIR Mr. Ashok CLOSED
16″HWYH GK-RH TRL
post weld inspection for 16 inch GK RH re welded
5157 CPP-NGCP-W-5155 1400159861 Welding SATIP-W-012-01 SAIC-W-2048 joints for debris issue inside the pipe 16″HWYH 16″HWYH GK-RH TRL TA-445912 25-Jul-19 2.00 PM UMAIR Mr. Ashok CLOSED
GK-RH TRL
NDE selection for re welded joints of 16″HWYH
5158 CPP-NGCP-W-5156 1400159851 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH GK-RH TRL TA-445912 25-Jul-19 4:00 PM UMAIR Mr. Ashok CLOSED
GK-RH TRL

1400159866 Pre-welding and weld joint fit up inspection for 8 TA-843656


5159 CPP-NGCP-W-5157 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL 25-Jul-19 8:00 AM sanjeev Mr. Ashok CLOSED
inch HWYH-1134
Post-welding visual inspection for 8 inch HWYH-
5160 CPP-NGCP-W-5158 1400159801 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-843656 25-Jul-19 2.00 PM sanjeev Mr. Ashok CLOSED
1134 FL
5161 CPP-NGCP-W-5159 1400159894 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 FL HWYH-1134 FL TA-843656 25-Jul-19 4:00 PM sanjeev Mr. Ashok CLOSED
Pre-welding and weld joint fit up inspection for
5162 CPP-NGCP-W-5160 1400159957 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1114 TA-445961 25-Jul-19 8:00 AM VARUN Mr. Suresh CLOSED
HWYH-1114
5163 CPP-NGCP-W-5161 1400159965 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1114 HWYH-1114 TA-445961 25-Jul-19 2.00 PM VARUN Mr. Suresh CLOSED
5164 CPP-NGCP-W-5162 1400159911 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1114 HWYH-1114 TA-445961 25-Jul-19 4:00 PM VARUN Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
5165 CPP-NGCP-W-5163 1400159973 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH LSS TRL-1 TA-445981 25-Jul-19 8:00 AM abdul raheem Mr. Suresh CLOSED
16″HWYH LSS TRL-1
Post-welding visual inspection for 16″HWYH LSS
5166 CPP-NGCP-W-5164 1400159930 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH LSS TRL-1 TA-445981 25-Jul-19 2.00 PM abdul raheem Mr. Suresh CLOSED
TRL-1
5167 CPP-NGCP-W-5165 1400159912 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 16″HWYH LSS TRL-1 16″HWYH LSS TRL-1 TA-445981 25-Jul-19 4:00 PM abdul raheem Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
5168 CPP-NGCP-W-5166 1400159929 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH TA-445887 25-Jul-19 8:00 AM Imran Mr. Suresh CLOSED
HWYH CJ-RH KM0+390-km1+500
Post-welding visual inspection for HWYH CJ-RH CANCELLED DUE TO
5169 CPP-NGCP-W-5167 1400159958 Welding SATIP-W-012-01 SAIC-W-2048 HWYH CJ-RH TA-445887 25-Jul-19 2.00 PM Imran Mr. Suresh CLOSED
KM0+390-km1+500 JOB NOT READY
NDE selection for welds of HWYH CJ-RH CANCELLED DUE TO
5170 CPP-NGCP-W-5168 1400159974 Welding SATIP-W-012-01 SAIC-W-2054 HWYH CJ-RH TA-445887 25-Jul-19 4:00 PM Imran Mr. Suresh CLOSED
KM0+390-km1+500 JOB NOT READY
CANCELLED DUE TO
5171 CPP-NGCP-W-5169 1400160563 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-975 HWYH-975 TA-446045 25-Jul-19 7:00 AM Asish Mr. Ashok CLOSED
JOB NOT READY
Pre-welding and weld joint fit up inspection for CANCELLED DUE TO
5172 CPP-NGCP-W-5170 1400159975 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-975 TA-446045 25-Jul-19 8:00 AM Asish Mr. Ashok CLOSED
HWYH-975 JOB NOT READY
5173 CPP-NGCP-W-5171 1400159993 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-975 HWYH-975 TA-446045 25-Jul-19 2.00 PM asish Mr. Ashok CLOSED
5174 CPP-NGCP-W-5172 1400159976 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-975 HWYH-975 TA-446045 25-Jul-19 4:00 PM asish Mr. Ashok CLOSED
Pre-welding and weld joint fit up inspection for 24“
5175 CPP-NGCP-W-5173 1400159984 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 25-Jul-19 8:00 AM JUNAID Mr. Suresh CLOSED
HWYH GGM TRL1
Post-welding visual inspection for 24“ HWYH
5176 CPP-NGCP-W-5174 1400160003 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 25-Jul-19 2.00 PM JUNAID Mr. Suresh CLOSED
GGM TRL1
5177 CPP-NGCP-W-5175 1400159994 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24“ HWYH GGM TRL1 24“ HWYH GGM TRL1 TA-445988 25-Jul-19 4:00 PM JUNAID Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
5178 CPP-NGCP-W-5176 1400159922 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 25-Jul-19 8:00 AM BINEESH Mr. Ashok CLOSED
HWYH-1093
5179 CPP-NGCP-W-5177 1400159931 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 25-Jul-19 2.00 PM BINEESH Mr. Ashok CLOSED
5180 CPP-NGCP-W-5178 1400159995 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 25-Jul-19 4:00 PM BINEESH Mr. Ashok CLOSED
Weld repair verification of joints FW020,FW067
5181 CPP-NGCP-W-5179 1400160575 Welding SATIP-W-012-01 SAIC-W-2051 HWYH-1071 TA-445830 26-Jul-19 8:00 AM PRATHAB Mr. Ashok CLOSED
HWYH-1071
1400160576 Post-welding visual inspection of repair joints TA-445830
5182 CPP-NGCP-W-5180 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 26-Jul-19 2.00 PM PRATHAB Mr. Ashok CLOSED
FW020,FW067 HWYH-1071
Weld repair verification of joints FW-272,FW-276
5183 CPP-NGCP-W-5181 1400160752 Welding SATIP-W-012-01 SAIC-W-2051 HWYH 912 TA-446044 26-Jul-19 8:00 AM Asish Mr. Ashok CLOSED
HWYH 912
Post-welding visual inspection of repair joints FW-
5184 CPP-NGCP-W-5182 1400160742 Welding SATIP-W-012-01 SAIC-W-2048 HWYH 912 TA-446044 26-Jul-19 2.00 PM Asish Mr. Ashok CLOSED
272,FW-276 HWYH 912
Verification of Hardness testing of HWYH-CKRH
5185 CPP-NGCP-W-5183 1400161693 Welding SATIP-W-012-01 SAIC-W-2014 HWYH-CK-RH,201 TA-445912 27-Jul-19 7:00 AM Mohamed othman Mr. Ashok CLOSED
06-FW-496R2 HWYH-201 01-FW-129R2
Pre-welding and weld joint fit up inspection for
5186 CPP-NGCP-W-5184 1400161674 Welding SATIP-W-012-01 SAIC-W-2048 UTMN 2201 TA-445963 27-Jul-19 8:00 AM Shahbaz Mr. Suresh CLOSED
UTMN 2201
5187 CPP-NGCP-W-5185 1400161676 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for UTMN 2201 UTMN 2201 TA-445963 27-Jul-19 2.00 PM Shahbaz Mr. Suresh CLOSED
5188 CPP-NGCP-W-5186 1400161667 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of UTMN 2201 UTMN 2201 TA-445963 27-Jul-19 4:00 PM Shahbaz Mr. Suresh CLOSED
5189 CPP-NGCP-W-5187 1400162235 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1093 HWYH-1093 TA-445838 27-Jul-19 7:00 AM UMAIR Mr. Ashok CLOSED
1400161591 Pre-welding and weld joint fit up inspection for TA-445838
5190 CPP-NGCP-W-5188 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 27-Jul-19 8:00 AM UMAIR Mr. Ashok CLOSED
HWYH-1093
5191 CPP-NGCP-W-5189 1400161680 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 27-Jul-19 2.00 PM UMAIR Mr. Ashok CLOSED
5192 CPP-NGCP-W-5190 1400161697 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 27-Jul-19 4:00 PM UMAIR Mr. Ashok CLOSED
1400161640 Pre-welding and weld joint fit up inspection for 8 TA-843656
5193 CPP-NGCP-W-5191 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL 27-Jul-19 8:00 AM sanjeev Mr. Ashok OPEN No Action
inch HWYH-1134
Post-welding visual inspection for 8 inch HWYH-
5194 CPP-NGCP-W-5192 1400161642 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-843656 27-Jul-19 2.00 PM sanjeev Mr. Ashok OPEN No Action
1134 FL
5195 CPP-NGCP-W-5193 1400161649 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 FL HWYH-1134 FL TA-843656 27-Jul-19 4:00 PM sanjeev Mr. Ashok CLOSED
Pre-welding and weld joint fit up inspection for
5196 CPP-NGCP-W-5194 1400161718 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1114 TA-445961 27-Jul-19 8:00 AM VARUN Mr. Suresh CLOSED
HWYH-1114
5197 CPP-NGCP-W-5195 1400161736 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1114 HWYH-1114 TA-445961 27-Jul-19 2.00 PM VARUN Mr. Suresh CLOSED
5198 CPP-NGCP-W-5196 1400161804 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1114 HWYH-1114 TA-445961 27-Jul-19 4:00 PM VARUN Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
5199 CPP-NGCP-W-5197 1400161692 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH LSS TRL-1 TA-445981 27-Jul-19 8:00 AM abdul raheem Mr. Suresh CLOSED
16″HWYH LSS TRL-1
Post-welding visual inspection for 16″HWYH LSS
5200 CPP-NGCP-W-5198 1400161783 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH LSS TRL-1 TA-445981 27-Jul-19 2.00 PM abdul raheem Mr. Suresh CLOSED
TRL-1
5201 CPP-NGCP-W-5199 1400161813 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 16″HWYH LSS TRL-1 16″HWYH LSS TRL-1 TA-445981 27-Jul-19 4:00 PM abdul raheem Mr. Suresh CLOSED
RE-SCHEDULE TO 28-
5202 CPP-NGCP-W-5200 1400162226 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1134 HWYH-1134 TA-843656 27-Jul-19 7:00 AM Imran Mr. Ashok CLOSED
JULY-2019
Pre-welding and weld joint fit up inspection for 8
5203 CPP-NGCP-W-5201 1400161775 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-843656 27-Jul-19 8:00 AM Imran Mr. Ashok OPEN No Action
inch HWYH-1134
Post-welding visual inspection for 8 inch HWYH-
5204 CPP-NGCP-W-5202 1400161761 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-843656 27-Jul-19 2.00 PM Imran Mr. Ashok OPEN No Action
1134 FL
5205 CPP-NGCP-W-5203 1400161817 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 FL HWYH-1134 FL TA-843656 27-Jul-19 4:00 PM Imran Mr. Ashok CLOSED
5206 CPP-NGCP-W-5204 1400162324 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1134 HWYH-1134 TA-843656 27-Jul-19 7:00 AM Asish Mr. Ashok OPEN No Action
Pre-welding and weld joint fit up inspection for 8 RE-SCHEDULE TO 28-
5207 CPP-NGCP-W-5205 1400161800 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-843656 27-Jul-19 8:00 AM Asish Mr. Ashok CLOSED
inch HWYH-1134 JULY-2019
Post-welding visual inspection for 8 inch HWYH- RE-SCHEDULE TO 28-
5208 CPP-NGCP-W-5206 1400161832 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-843656 27-Jul-19 2.00 PM asish Mr. Ashok CLOSED
1134 FL JULY-2019
RE-SCHEDULE TO 28-
5209 CPP-NGCP-W-5207 1400161887 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 FL HWYH-1134 FL TA-843656 27-Jul-19 4:00 PM asish Mr. Ashok CLOSED
JULY-2019
Pre-welding and weld joint fit up inspection for 24“
5210 CPP-NGCP-W-5208 1400161826 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 27-Jul-19 8:00 AM JUNAID Mr. Suresh CLOSED
HWYH GGM TRL1
Post-welding visual inspection for 24“ HWYH
5211 CPP-NGCP-W-5209 1400161790 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 27-Jul-19 2.00 PM JUNAID Mr. Suresh CLOSED
GGM TRL1
5212 CPP-NGCP-W-5210 1400161915 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24“ HWYH GGM TRL1 24“ HWYH GGM TRL1 TA-445988 27-Jul-19 4:00 PM JUNAID Mr. Suresh CLOSED
1400161808 Pre-welding and weld joint fit up inspection for TA-445838
5213 CPP-NGCP-W-5211 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 27-Jul-19 8:00 AM BINEESH Mr. Ashok CLOSED
HWYH-1093
5214 CPP-NGCP-W-5212 1400161874 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 27-Jul-19 2.00 PM BINEESH Mr. Ashok CLOSED
5215 CPP-NGCP-W-5213 1400161924 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 27-Jul-19 4:00 PM BINEESH Mr. Ashok CLOSED
Pre-welding and weld joint fit up inspection for 8
5216 CPP-NGCP-W-5214 1400162474 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 27-Jul-19 8:00 AM Rajesh Mr. Rajesh OPEN No Action
inch HRDH-1192 KP5+800 to KP6+000
Post-welding visual inspection for 8 inch
5217 CPP-NGCP-W-5215 1400162485 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 27-Jul-19 2.00 PM Rajesh Mr. Rajesh OPEN No Action
HRDH-1192 KP5+800 to KP6+000
NDE selection for welds of 8 inch HRDH-1192
5218 CPP-NGCP-W-5216 1400162486 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1192 FL TA-669428 27-Jul-19 4.00 PM Rajesh Mr. Rajesh OPEN No Action
KP5+800 to KP6+000
Pre-welding and weld joint fit up inspection for 8
5219 CPP-NGCP-W-5217 1400162467 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1191FL TA-669429 27-Jul-19 7:30 AM Saif Mr.Rajesh OPEN No Action
inch HRDH -1191 KP1+400 to KP1+900
Post-welding visual inspection for 8 inch
5220 CPP-NGCP-W-5218 1400162487 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1191FL TA-669429 27-Jul-19 2.30 PM Saif Mr.Rajesh OPEN No Action
HRDH -1191 KP1+400 to KP1+900
NDE selection for welds of 8 inch HRDH -1191
5221 CPP-NGCP-W-5219 1400162488 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1191FL TA-669429 27-Jul-19 4.30 PM Saif Mr.Rajesh OPEN No Action
KP1+400 to KP1+900
Pre-welding and weld joint fit up inspection for 8
5222 CPP-NGCP-W-5220 1400162468 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1182 F/L TA-843660 27-Jul-19 7:30 AM Shanmuga Mr.Rajesh OPEN No Action
inch HRDH -1182 KM1+000 to KM1+500
Post-welding visual inspection for 8 inch HRDH
5223 CPP-NGCP-W-5221 1400162439 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1182 F/L TA-843660 27-Jul-19 2.30 PM Shanmuga Mr.Rajesh OPEN No Action
-1182 KM1+000 to KM1+500
NDE selection for welds of 8 inch HRDH -1182
5224 CPP-NGCP-W-5222 1400162389 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1182 F/L TA-843660 27-Jul-19 4.30 PM Shanmuga Mr.Rajesh OPEN No Action
KM1+000 to KM1+500
Pre-welding and weld joint fit up inspection for 16 Mr.
5225 CPP-NGCP-W-5223 1400162426 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 27-Jul-19 8:00 AM IRSHAD CLOSED
inch HRDH GK-RH TR/L KP4+200 to KP4+400; Rajendran
Post-welding visual inspection for 16 inch HRDH Mr.
5226 CPP-NGCP-W-5224 1400162417 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 27-Jul-19 2.00 PM IRSHAD CLOSED
GK-RH TR/L KP4+200 to KP4+400; Rajendran
NDE selection for welds of 16 inch HRDH GK- Mr.
5227 CPP-NGCP-W-5225 1400162398 Welding SATIP-W-012-01 SAIC-W-2054 HRDH GK-RH TR/L TA-843956 27-Jul-19 4.00 PM IRSHAD CLOSED
RH TR/L KP4+200 to KP4+400; Rajendran
Temperature Tie in Welding HRDH-902 at KM-
Mr.
5228 CPP-NGCP-W-5226 1400162491 Welding SATIP-W-012-01 SAIC-W-2057 4+810 to KM 4+850 and KM-4+350 TO KM- HRDH -902 FL TA-843606 27-Jul-19 10:00 AM Sarfaraz CLOSED
4+400 Rajendran
Pre-welding and weld joint fit up inspection for 10
Mr.
5229 CPP-NGCP-W-5227 1400162469 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH-902 at KM-4+810 to KM 4+850 and HRDH -902 FL TA-843606 27-Jul-19 8:00 AM Sarfaraz CLOSED
Rajendran
KM-4+350 TO KM-4+400
Post-welding visual inspection for 10 inch
Mr.
5230 CPP-NGCP-W-5228 1400162418 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-902 at KM-4+810 to KM 4+850 and KM- HRDH -902 FL TA-843606 27-Jul-19 2.00 PM Sarfaraz CLOSED
Rajendran
4+350 TO KM-4+400
NDE selection for welds of 10 inch HRDH-902
Mr.
5231 CPP-NGCP-W-5229 1400162470 Welding SATIP-W-012-01 SAIC-W-2054 at KM-4+810 to KM 4+850 and KM-4+350 TO HRDH -902 FL TA-843606 27-Jul-19 4.00 PM Sarfaraz CLOSED
KM-4+400 Rajendran
Pre-welding and weld joint fit up inspection for 8
5232 CPP-NGCP-W-5230 1400162428 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL TA-843586 27-Jul-19 8:00 AM Farhan Mr. Ashok CLOSED
inch HWYH-1078 at KM-3+390 to KM 3+480
Post-welding visual inspection for 8inch
5233 CPP-NGCP-W-5231 1400162390 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL TA-843586 27-Jul-19 2.00 PM Farhan Mr. Ashok CLOSED
HWYH-1078 at KM-3+390 to KM 3+480
NDE selection for welds of 8 inch HWYH-1078 at
5234 CPP-NGCP-W-5232 1400162419 Welding SATIP-W-012-01 SAIC-W-2054 HWYH -1078 FL TA-843586 27-Jul-19 4.00 PM Farhan Mr. Ashok CLOSED
KM-3+390 to KM 3+480
In-Process Verification - RT Techniques &
HRDH-1160.1182.GK- Mr.
5235 CPP-NGCP-W-5233 1400162429 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH- VARIOUS 27-Jul-19 8:00 AM RAMEEZ CLOSED
RH.1192.1191 Rajendran
1160.1182.GK-RH.1192.1191
In-Process Verification - RT Techniques &
HWYH-LSS-TRL-1,UTMN-2201,
5236 CPP-NGCP-W-5234 1400162391 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation o f HWYH-LSS-TRL- VARIOUS 27-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1114.952.GGM-TRL-1, CJ-RH
1,UTMN-2201,1114.952.GGM-TRL-1, CJ-RH
Pre-welding and weld joint fit up inspection for 16 Mr.
5237 CPP-NGCP-W-5235 1400162476 Welding SATIP-W-012-01 SAIC-W-2048 HRDH DK-RH TR/L TA-843954 27-Jul-19 8:00 AM Shadab CLOSED
inch HRDH DK -RH TR/L KP2+400 to KP2+600; Rajendran
Post-welding visual inspection for 16 inch HRDH Mr.
5238 CPP-NGCP-W-5236 1400162399 Welding SATIP-W-012-01 SAIC-W-2048 HRDH DK-RH TR/L TA-843954 27-Jul-19 2.00 PM Shadab CLOSED
DK -RH TR/L KP2+400 to KP2+600; Rajendran
NDE selection for welds of 16 inch HRDH DK -RH Mr.
5239 CPP-NGCP-W-5237 1400162400 Welding SATIP-W-012-01 SAIC-W-2054 HRDH DK-RH TR/L TA-843954 27-Jul-19 4.00 PM Shadab CLOSED
TR/L KP2+400 to KP2+600; Rajendran
Pre-welding and weld joint fit up inspection for 8
5240 CPP-NGCP-W-5238 1400163048 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 28-Jul-19 8:00 AM Rajesh Mr. Rajesh OPEN No Action
inch HRDH-1192 KP6+000 to KP6+300
Post-welding visual inspection for 8 inch HRDH-
5241 CPP-NGCP-W-5239 1400163064 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 28-Jul-19 2.00 PM Rajesh Mr. Rajesh OPEN No Action
1192 KP6+000 to KP6+300
NDE selection for welds of 8 inch HRDH-1192
5242 CPP-NGCP-W-5240 1400163066 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1192 FL TA-669428 28-Jul-19 4.00 PM Rajesh Mr. Rajesh OPEN No Action
KP6+000 to KP6+300
Pre-welding and weld joint fit up inspection for 8
5243 CPP-NGCP-W-5241 1400163068 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1191FL TA-669429 28-Jul-19 7:30 AM Saif Mr.Rajesh OPEN No Action
inch HRDH -1191 KP1+100 to KP1+200
Post-welding visual inspection for 8 inch HRDH
5244 CPP-NGCP-W-5242 1400163051 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1191FL TA-669429 28-Jul-19 2.30 PM Saif Mr.Rajesh OPEN No Action
-1191 KP1+100 to KP1+200
1400163070 NDE selection for welds of 8 inch HRDH -1191 TA-669429
5245 CPP-NGCP-W-5243 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1191FL 28-Jul-19 4.30 PM Saif Mr.Rajesh OPEN No Action
KP1+100 to KP1+200
Pre-welding and weld joint fit up inspection for 8 Mr.Joy
5246 CPP-NGCP-W-5244 1400163101 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1157 F/L TA-843641 28-Jul-19 7:30 AM Shanmuga OPEN No Action
inch HRDH -1157 KM0+430 to KM0+600 Kumar
1400163105 Post-welding visual inspection for 8 inch HRDH TA-843641 Mr.Joy
5247 CPP-NGCP-W-5245 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1157 F/L 28-Jul-19 2.30 PM Shanmuga OPEN No Action
-1157 KM0+430 to KM0+600 Kumar
NDE selection for welds of 8 inch HRDH -1157 Mr.Joy
5248 CPP-NGCP-W-5246 1400163061 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1157 F/L TA-843641 28-Jul-19 4.30 PM Shanmuga OPEN No Action
KM0+430 to KM0+600 Kumar

1400163137 Pre-welding and weld joint fit up inspection for 16 TA-843956 Mr.
5249 CPP-NGCP-W-5247 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L 28-Jul-19 8:00 AM IRSHAD CLOSED
inch HRDH GK-RH TR/L KP4+300 to KP4+500; Rajendran
Post-welding visual inspection for 16 inch HRDH Mr.
5250 CPP-NGCP-W-5248 1400163042 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 28-Jul-19 2.00 PM IRSHAD CLOSED
GK-RH TR/L KP4+300 to KP4+500; Rajendran
1400163106 NDE selection for welds of 16 inch HRDH GK-RH TA-843956 Mr.
5251 CPP-NGCP-W-5249 Welding SATIP-W-012-01 SAIC-W-2054 HRDH GK-RH TR/L 28-Jul-19 4.00 PM IRSHAD CLOSED
TR/L KP4+300 to KP4+500; Rajendran
Temperature Tie in Welding HRDH-902 at KM- Mr. RE-SCHEDULE TO 29-
5252 CPP-NGCP-W-5250 1400163151 Welding SATIP-W-012-01 SAIC-W-2057 HRDH -902 FL TA-843606 28-Jul-19 10:00 AM Sarfaraz CLOSED
4+350 TO KM-5+450 Rajendran JULY-2019
1400163140 Pre-welding and weld joint fit up inspection for 10 TA-843606 Mr.
5253 CPP-NGCP-W-5251 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -902 FL 28-Jul-19 8:00 AM Sarfaraz CLOSED
inch HRDH-902 at KM-4+350 TO KM-5+450 Rajendran
Post-welding visual inspection for 10 inch Mr.
5254 CPP-NGCP-W-5252 1400163153 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -902 FL TA-843606 28-Jul-19 2.00 PM Sarfaraz CLOSED
HRDH-902 at KM-4+350 TO KM-5+450 Rajendran
1400163163 NDE selection for welds of 10 inch HRDH-902 at TA-843606 Mr.
5255 CPP-NGCP-W-5253 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -902 FL 28-Jul-19 4.00 PM Sarfaraz CLOSED
KM-4+350 TO KM-5+450 Rajendran
Temperature Tie in Welding HWYH-1078 at
5256 CPP-NGCP-W-5254 1400163149 Welding SATIP-W-012-01 SAIC-W-2057 HWYH -1078 FL TA-843586 28-Jul-19 10:00 AM Sarfaraz Mr. Ashok CLOSED
KM-3+440 to KM 3+550
1400163078 Pre-welding and weld joint fit up inspection for 8 TA-843586
5257 CPP-NGCP-W-5255 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL 28-Jul-19 8:00 AM Farhan Mr. Ashok CLOSED
inch HWYH-1078 at KM-3+440 to KM 3+550
Post-welding visual inspection for 8inch
5258 CPP-NGCP-W-5256 1400163715 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL TA-843586 28-Jul-19 2.00 PM Farhan Mr. Ashok CLOSED
HWYH-1078 at KM-3+440 to KM 3+550
1400163728 NDE selection for welds of 8 inch HWYH-1078 at TA-843586
5259 CPP-NGCP-W-5257 Welding SATIP-W-012-01 SAIC-W-2054 HWYH -1078 FL 28-Jul-19 4.00 PM Farhan Mr. Ashok CLOSED
KM-3+440 to KM 3+550
In-Process Verification - RT Techniques &
HRDH-CK-RH, DK-RH, BK-RH, GK- Mr.
5260 CPP-NGCP-W-5258 1400163891 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-CK-RH, DK- VARIOUS 28-Jul-19 8:00 AM RAMEEZ CLOSED
RH, 1164, 1191, 1192, 1182 Rajendran
RH, BK-RH, GK-RH, 1164, 1191, 1192, 1182
In-Process Verification - RT Techniques &
HWYH-1078, 912, 1071, 1134,
5261 CPP-NGCP-W-5259 1400163898 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation o f HWYH-1078, 912, VARIOUS 28-Jul-19 8:00 AM RAMEEZ Mr. Suresh CLOSED
1093, 975, 1114,
1071, 1134, 1093, 975, 1114,
In-Process Inspection of MPT using Mr.
5262 CPP-NGCP-W-5260 1400163905 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 TCF-1 VARIOUS 28-Jul-19 8:00 AM RAMEEZ CLOSED
Yoke Method, TRL-2 at TCF-1 Rajendran
Pre-welding and weld joint fit up inspection for 16
Mr.
5263 CPP-NGCP-W-5261 1400163859 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH DK -RH TR/L KP2+600 to HRDH DK-RH TR/L TA-843954 28-Jul-19 8:00 AM Shadab CLOSED
Rajendran
KP2+800;
Post-welding visual inspection for 16 inch HRDH Mr.
5264 CPP-NGCP-W-5262 1400163897 Welding SATIP-W-012-01 SAIC-W-2048 HRDH DK-RH TR/L TA-843954 28-Jul-19 2.00 PM Shadab CLOSED
DK -RH TR/L KP2+600 to KP2+800; Rajendran
NDE selection for welds of 16 inch HRDH DK -RH Mr.
5265 CPP-NGCP-W-5263 1400163892 Welding SATIP-W-012-01 SAIC-W-2054 HRDH DK-RH TR/L TA-843954 28-Jul-19 4.00 PM Shadab CLOSED
TR/L KP2+600 to KP2+800; Rajendran
Pre-welding and weld joint fit up inspection for
5266 CPP-NGCP-W-5264 1400163110 Welding SATIP-W-012-01 SAIC-W-2048 UTMN 2201 TA-445963 28-Jul-19 8:00 AM Shahbaz Mr. Suresh CLOSED
UTMN 2201
5267 CPP-NGCP-W-5265 1400163156 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for UTMN 2201 UTMN 2201 TA-445963 28-Jul-19 2.00 PM Shahbaz Mr. Suresh CLOSED
5268 CPP-NGCP-W-5266 1400163119 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of UTMN 2201 UTMN 2201 TA-445963 28-Jul-19 4:00 PM Shahbaz Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for 8
5269 CPP-NGCP-W-5267 1400163132 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 28-Jul-19 8:00 AM sanjeev Mr. Ashok OPEN No Action
inch HWYH-1134
Post-welding visual inspection for 8 inch HWYH-
5270 CPP-NGCP-W-5268 1400163177 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 28-Jul-19 2.00 PM sanjeev Mr. Ashok OPEN No Action
1134 FL
5271 CPP-NGCP-W-5269 1400163214 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 FL HWYH-1134 FL TA-445836 28-Jul-19 4:00 PM sanjeev Mr. Ashok CLOSED
Pre-welding and weld joint fit up inspection for
5272 CPP-NGCP-W-5270 1400163272 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1114 TA-445961 28-Jul-19 8:00 AM VARUN Mr. Suresh CLOSED
HWYH-1114
5273 CPP-NGCP-W-5271 1400163385 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1114 HWYH-1114 TA-445961 28-Jul-19 2.00 PM VARUN Mr. Suresh CLOSED
5274 CPP-NGCP-W-5272 1400163659 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1114 HWYH-1114 TA-445961 28-Jul-19 4:00 PM VARUN Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
5275 CPP-NGCP-W-5273 1400163232 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH LSS TRL-1 TA-445981 28-Jul-19 8:00 AM abdul raheem Mr. Suresh CLOSED
16″HWYH LSS TRL-1
Post-welding visual inspection for 16″HWYH
5276 CPP-NGCP-W-5274 1400163296 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH LSS TRL-1 TA-445981 28-Jul-19 2.00 PM abdul raheem Mr. Suresh CLOSED
LSS TRL-1
NDE selection for welds of 16″HWYH LSS TRL-
5277 CPP-NGCP-W-5275 1400163608 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH LSS TRL-1 TA-445981 28-Jul-19 4:00 PM abdul raheem Mr. Suresh CLOSED
1
1400163334 Pre-welding and weld joint fit up inspection for 8 TA-445836
5278 CPP-NGCP-W-5276 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL 28-Jul-19 8:00 AM Imran Mr. Ashok CLOSED
inch HWYH-1134
Post-welding visual inspection for 8 inch HWYH-
5279 CPP-NGCP-W-5277 1400163703 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 28-Jul-19 2.00 PM Imran Mr. Ashok CLOSED
1134 FL
5280 CPP-NGCP-W-5278 1400163668 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 FL HWYH-1134 FL TA-445836 28-Jul-19 4:00 PM Imran Mr. Ashok CLOSED
Pre-welding and weld joint fit up inspection for 24“
5281 CPP-NGCP-W-5279 1400163358 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 28-Jul-19 8:00 AM JUNAID Mr. Suresh CLOSED
HWYH GGM TRL1
Post-welding visual inspection for 24“ HWYH
5282 CPP-NGCP-W-5280 1400163662 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 28-Jul-19 2.00 PM JUNAID Mr. Suresh CLOSED
GGM TRL1
5283 CPP-NGCP-W-5281 1400163709 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24“ HWYH GGM TRL1 24“ HWYH GGM TRL1 TA-445988 28-Jul-19 4:00 PM JUNAID Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
5284 CPP-NGCP-W-5282 1400163174 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 28-Jul-19 8:00 AM BINEESH Mr. Ashok CLOSED
HWYH-1093
5285 CPP-NGCP-W-5283 1400163112 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 28-Jul-19 2.00 PM BINEESH Mr. Ashok CLOSED
5286 CPP-NGCP-W-5284 1400163194 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 28-Jul-19 4:00 PM BINEESH Mr. Ashok CLOSED
Review of weekly welder performance and
5287 CPP-NGCP-W-5285 1400163557 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 30-july-2019 to 4- CPP site office N/A 28-Jul-19 8:00 AM Ruhul Mr. Rajesh OPEN No Action
Aug-2019 at CPP site office.

1400163492 Welding consumables verification and visual N/A Mr.


5288 CPP-NGCP-W-5286 Welding SATIP-W-012-01 SAIC-W-2044 TCF-1 28-Jul-19 8:00 AM Rizwan CLOSED
inspection storage & handling at TCF-1 Rajendran
Pre-welding and weld joint fit up inspection for
5289 CPP-NGCP-W-5287 1400164294 Welding SATIP-W-012-01 SAIC-W-2048 UTMN 2201 TA-445963 29-Jul-19 8:00 AM Shahbaz Mr. Suresh CLOSED
UTMN 2201
5290 CPP-NGCP-W-5288 1400164295 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for UTMN 2201 UTMN 2201 TA-445963 29-Jul-19 2.00 PM Shahbaz Mr. Suresh CLOSED
5291 CPP-NGCP-W-5289 1400164307 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of UTMN 2201 UTMN 2201 TA-445963 29-Jul-19 4:00 PM Shahbaz Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for
5292 CPP-NGCP-W-5290 1400164256 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1070 TA-445897 29-Jul-19 8:00 AM PRATHAB Mr. Ashok CLOSED
HWYH-1070
5293 CPP-NGCP-W-5291 1400164272 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1070 HWYH-1070 TA-445897 29-Jul-19 2.00 PM PRATHAB Mr. Ashok CLOSED
5294 CPP-NGCP-W-5292 1400164315 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1070 HWYH-1070 TA-445897 29-Jul-19 4:00 PM PRATHAB Mr. Ashok OPEN No Action
5295 CPP-NGCP-W-5293 1400165220 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1134 HWYH-1134 TA-843656 29-Jul-19 7:00 AM sanjeev Mr. Ashok OPEN No Action
1400164278 Pre-welding and weld joint fit up inspection for 8 TA-445836
5296 CPP-NGCP-W-5294 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL 29-Jul-19 8:00 AM sanjeev Mr. Ashok OPEN No Action
inch HWYH-1134
Post-welding visual inspection for 8 inch HWYH-
5297 CPP-NGCP-W-5295 1400164313 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 29-Jul-19 2.00 PM sanjeev Mr. Ashok OPEN No Action
1134 FL
5298 CPP-NGCP-W-5296 1400164316 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 FL HWYH-1134 FL TA-445836 29-Jul-19 4:00 PM sanjeev Mr. Ashok CLOSED
Pre-welding and weld joint fit up inspection for
5299 CPP-NGCP-W-5297 1400164345 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1114 TA-445961 29-Jul-19 8:00 AM VARUN Mr. Suresh OPEN No Action
HWYH-1114
5300 CPP-NGCP-W-5298 1400164192 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1114 HWYH-1114 TA-445961 29-Jul-19 2.00 PM VARUN Mr. Suresh OPEN No Action
5301 CPP-NGCP-W-5299 1400164301 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1114 HWYH-1114 TA-445961 29-Jul-19 4:00 PM VARUN Mr. Suresh CLOSED
1400165132 Pre-welding and weld joint fit up inspection for TA-445962 RE-SCHEDULE TO 30-
5302 CPP-NGCP-W-5300 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1074 29-Jul-19 8:00 AM VARUN Mr. Suresh CLOSED
HWYH-1074 JULY-2019
RE-SCHEDULE TO 30-
5303 CPP-NGCP-W-5301 1400165101 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1074 HWYH-1074 TA-445962 29-Jul-19 2.00 PM VARUN Mr. Suresh CLOSED
JULY-2019
RE-SCHEDULE TO 30-
5304 CPP-NGCP-W-5302 1400165102 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1074 HWYH-1074 TA-445962 29-Jul-19 4:00 PM VARUN Mr. Suresh CLOSED
JULY-2019

1400164353 Pre-welding and weld joint fit up inspection for TA-445981


5305 CPP-NGCP-W-5303 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH LSS TRL-1 29-Jul-19 8:00 AM abdul raheem Mr. Suresh OPEN No Action
16″HWYH LSS TRL-1

1400164363 Post-welding visual inspection for 16″HWYH TA-445981


5306 CPP-NGCP-W-5304 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH LSS TRL-1 29-Jul-19 2.00 PM abdul raheem Mr. Suresh OPEN No Action
LSS TRL-1
NDE selection for welds of 16″HWYH LSS TRL-
5307 CPP-NGCP-W-5305 1400164334 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH LSS TRL-1 TA-445981 29-Jul-19 4:00 PM abdul raheem Mr. Suresh OPEN No Action
1
Pre-welding and weld joint fit up inspection for RE-SCHEDULE TO 30-
5308 CPP-NGCP-W-5306 1400164383 Welding SATIP-W-012-01 SAIC-W-2048 HWYH BK-RH TA-445888 29-Jul-19 8:00 AM abdul raheem Mr. Suresh CLOSED
HWYH BK-RH JULY-2019
1400164322 TA-445888 RE-SCHEDULE TO 30-
5309 CPP-NGCP-W-5307 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH BK-RH HWYH BK-RH 29-Jul-19 2.00 PM abdul raheem Mr. Suresh CLOSED
JULY-2019
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a RE-SCHEDULE TO 30-
5310 CPP-NGCP-W-5308 1400164329 l Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH BK-RH HWYH BK-RH TA-445888 29-Jul-19 4:00 PM abdul raheem Mr. Suresh CLOSED
JULY-2019
Pre-welding and weld joint fit up inspection for 8
5311 CPP-NGCP-W-5309 1400164326 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 29-Jul-19 8:00 AM Imran Mr. Ashok OPEN No Action
inch HWYH-1134
Post-welding visual inspection for 8 inch HWYH-
5312 CPP-NGCP-W-5310 1400164354 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 29-Jul-19 2.00 PM Imran Mr. Ashok OPEN No Action
1134 FL
5313 CPP-NGCP-W-5311 1400164328 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 FL HWYH-1134 FL TA-445836 29-Jul-19 4:00 PM Imran Mr. Ashok CLOSED
Pre-welding and weld joint fit up inspection for 8
5314 CPP-NGCP-W-5312 1400164992 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-843656 29-Jul-19 8:00 AM Asish Mr. Ashok CLOSED
inch HWYH-1134

1400165160 Post-welding visual inspection for 8 inch HWYH- TA-843656


5315 CPP-NGCP-W-5313 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL 29-Jul-19 2.00 PM asish Mr. Ashok CLOSED
1134 FL
5316 CPP-NGCP-W-5314 1400165087 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 FL HWYH-1134 FL TA-843656 29-Jul-19 4:00 PM asish Mr. Ashok CLOSED
Pre-welding and weld joint fit up inspection for 24“
5317 CPP-NGCP-W-5315 1400164336 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 29-Jul-19 8:00 AM JUNAID Mr. Suresh OPEN No Action
HWYH GGM TRL1
Post-welding visual inspection for 24“ HWYH
5318 CPP-NGCP-W-5316 1400164373 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 29-Jul-19 2.00 PM JUNAID Mr. Suresh OPEN No Action
GGM TRL1
5319 CPP-NGCP-W-5317 1400164302 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24“ HWYH GGM TRL1 24“ HWYH GGM TRL1 TA-445988 29-Jul-19 4:00 PM JUNAID Mr. Suresh OPEN No Action
1400165151 TA-445838 RE-SCHEDULE TO 30-
5320 CPP-NGCP-W-5318 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1093 HWYH-1093 29-Jul-19 8:00 AM BINEESH Mr. Ashok OPEN No Action
JULY-2019
Pre-welding and weld joint fit up inspection for
5321 CPP-NGCP-W-5319 1400164355 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 29-Jul-19 8:00 AM BINEESH Mr. Ashok CLOSED
HWYH-1093
5322 CPP-NGCP-W-5320 1400164364 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 29-Jul-19 2.00 PM BINEESH Mr. Ashok CLOSED
5323 CPP-NGCP-W-5321 1400164309 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 29-Jul-19 4:00 PM BINEESH Mr. Ashok CLOSED
Pre-welding and weld joint fit up inspection for 8
5324 CPP-NGCP-W-5322 1400165271 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL TA-669428 29-Jul-19 8:00 AM Rajesh Mr. Rajesh OPEN No Action
inch HRDH-1192 KP6+300 to KP6+700
1400165287 Post-welding visual inspection for 8 inch HRDH- TA-669428
5325 CPP-NGCP-W-5323 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1192 FL 29-Jul-19 2.00 PM Rajesh Mr. Rajesh OPEN No Action
1192 KP6+300 to KP6+700
NDE selection for welds of 8 inch HRDH-1192
5326 CPP-NGCP-W-5324 1400165272 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1192 FL TA-669428 29-Jul-19 4.00 PM Rajesh Mr. Rajesh OPEN No Action
KP6+300 to KP6+700
Pre-welding and weld joint fit up inspection for 8
5327 CPP-NGCP-W-5325 1400165251 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1191FL TA-669429 29-Jul-19 7:30 AM Saif Mr.Rajesh OPEN No Action
inch HRDH -1191 KP0+800 to KP1+000
Post-welding visual inspection for 8 inch HRDH
5328 CPP-NGCP-W-5326 1400165181 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1191FL TA-669429 29-Jul-19 2.30 PM Saif Mr.Rajesh OPEN No Action
-1191 KP0+800 to KP1+000
NDE selection for welds of 8 inch HRDH -1191
5329 CPP-NGCP-W-5327 1400165305 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1191FL TA-669429 29-Jul-19 4.30 PM Saif Mr.Rajesh OPEN No Action
KP0+800 to KP1+000
Pre-welding and weld joint fit up inspection for 8 Mr.Joy
5330 CPP-NGCP-W-5328 1400165297 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1157 F/L TA-843641 29-Jul-19 7:30 AM Shanmuga OPEN No Action
inch HRDH -1157 KM0+600 to KM0+700 Kumar
Post-welding visual inspection for 8 inch HRDH Mr.Joy
5331 CPP-NGCP-W-5329 1400165306 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1157 F/L TA-843641 29-Jul-19 2.30 PM Shanmuga OPEN No Action
-1157 KM0+600 to KM0+700 Kumar
NDE selection for welds of 8 inch HRDH -1157 Mr.Joy
5332 CPP-NGCP-W-5330 1400165333 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1157 F/L TA-843641 29-Jul-19 4.30 PM Shanmuga OPEN No Action
KM0+600 to KM0+700 Kumar
Pre-welding and weld joint fit up inspection for 16 Mr.
5333 CPP-NGCP-W-5331 1400165314 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 29-Jul-19 8:00 AM IRSHAD CLOSED
inch HRDH GK-RH TR/L KP4+500 to KP4+900; Rajendran
Post-welding visual inspection for 16 inch HRDH Mr.
5334 CPP-NGCP-W-5332 1400165182 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 29-Jul-19 2.00 PM IRSHAD CLOSED
GK-RH TR/L KP4+500 to KP4+900; Rajendran
NDE selection for welds of 16 inch HRDH GK-RH Mr.
5335 CPP-NGCP-W-5333 1400165323 Welding SATIP-W-012-01 SAIC-W-2054 HRDH GK-RH TR/L TA-843956 29-Jul-19 4.00 PM IRSHAD OPEN No Action
TR/L KP4+500 to KP4+900; Rajendran
Pre-welding and weld joint fit up inspection for 10
Mr.
5336 CPP-NGCP-W-5334 1400165302 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH-902 at KM-4+400 TO KM-5+450 HRDH -902 FL TA-843606 29-Jul-19 8:00 AM Sarfaraz OPEN No Action
Rajendran
and km-2+508 to km 2+581
Post-welding visual inspection for 10 inch
Mr.
5337 CPP-NGCP-W-5335 1400165298 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-902 at KM-4+400 TO KM-5+450 and km- HRDH -902 FL TA-843606 29-Jul-19 2.00 PM Sarfaraz OPEN No Action
Rajendran
2+508 to km 2+581
NDE selection for welds of 10 inch HRDH-902 at
Mr.
5338 CPP-NGCP-W-5336 1400165324 Welding SATIP-W-012-01 SAIC-W-2054 KM-4+400 TO KM-5+450 and km-2+508 to km HRDH -902 FL TA-843606 29-Jul-19 4.00 PM Sarfaraz OPEN No Action
2+581 Rajendran
Temperature Tie in Welding HWYH-1078 at
5339 CPP-NGCP-W-5337 1400165299 Welding SATIP-W-012-01 SAIC-W-2057 HWYH -1078 FL TA-843586 29-Jul-19 10:00 AM Farhan Mr. Ashok OPEN No Action
KM-2+600 to KM 3+000
Pre-welding and weld joint fit up inspection for 8
5340 CPP-NGCP-W-5338 1400165231 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL TA-843586 29-Jul-19 8:00 AM Farhan Mr. Ashok OPEN No Action
inch HWYH-1078 at KM-2+600 to KM 3+000
Post-welding visual inspection for 8inch
5341 CPP-NGCP-W-5339 1400165316 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL TA-843586 29-Jul-19 2.00 PM Farhan Mr. Ashok OPEN No Action
HWYH-1078 at KM-2+600 to KM 3+000
NDE selection for welds of 8 inch HWYH-1078 at
5342 CPP-NGCP-W-5340 1400165325 Welding SATIP-W-012-01 SAIC-W-2054 HWYH -1078 FL TA-843586 29-Jul-19 4.00 PM Farhan Mr. Ashok OPEN No Action
KM-2+600 to KM 3+000
In-Process Verification - RT Techniques &
HRDH-1307, GK-RH, 1192, 1191, Mr.
5343 CPP-NGCP-W-5341 1400165301 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1307, GK- VARIOUS 29-Jul-19 8:00 AM RAMEEZ OPEN No Action
902, 1182, DK-RH Rajendran
RH, 1192, 1191, 902, 1182, DK-RH
In-Process Verification - RT Techniques &
HWYH-1078, GGM-TRL-1, LSS-
1400165288 Procedure Implementation o f HWYH-1078, GGM- VARIOUS
5344 CPP-NGCP-W-5342 Welding SATIP-NDE-RT-01 SAIC-RT-2007 TRL-1, 1134, 1114, 1087, CJ-RH, 29-Jul-19 8:00 AM RAMEEZ Mr. Suresh OPEN No Action
TRL-1, LSS-TRL-1, 1134, 1114, 1087, CJ-RH,
UTMN-2201
UTMN-2201
Pre-welding and weld joint fit up inspection for 16
Mr.
5345 CPP-NGCP-W-5343 1400165315 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH DK -RH TR/L KP3+000 to HRDH DK-RH TR/L TA-843954 29-Jul-19 8:00 AM Shadab OPEN No Action
Rajendran
KP3+200;
Post-welding visual inspection for 16 inch HRDH Mr.
5346 CPP-NGCP-W-5344 1400165252 Welding SATIP-W-012-01 SAIC-W-2048 HRDH DK-RH TR/L TA-843954 29-Jul-19 2.00 PM Shadab OPEN No Action
DK -RH TR/L KP3+000 to KP3+200; Rajendran
NDE selection for welds of 16 inch HRDH DK -RH Mr.
5347 CPP-NGCP-W-5345 1400165300 Welding SATIP-W-012-01 SAIC-W-2054 HRDH DK-RH TR/L TA-843954 29-Jul-19 4.00 PM Shadab OPEN No Action
TR/L KP3+000 to KP3+200; Rajendran
Pre-welding and weld joint fit up inspection for
5348 CPP-NGCP-W-5346 1400165722 Welding SATIP-W-012-01 SAIC-W-2048 UTMN 2201 TA-445963 30-Jul-19 8:00 AM Shahbaz Mr. Suresh CLOSED
UTMN 2201
5349 CPP-NGCP-W-5347 1400165600 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for UTMN 2201 UTMN 2201 TA-445963 30-Jul-19 2.00 PM Shahbaz Mr. Suresh CLOSED
5350 CPP-NGCP-W-5348 1400165701 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of UTMN 2201 UTMN 2201 TA-445963 30-Jul-19 4:00 PM Shahbaz Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
5351 CPP-NGCP-W-5349 1400165803 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1070 TA-445897 30-Jul-19 8:00 AM Umair Mr. Suresh OPEN No Action
HWYH-1070
5352 CPP-NGCP-W-5350 1400165712 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1070 HWYH-1070 TA-445897 30-Jul-19 2.00 PM Umair Mr. Suresh CLOSED
5353 CPP-NGCP-W-5351 1400165767 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1070 HWYH-1070 TA-445897 30-Jul-19 4:00 PM Umair Mr. Suresh CLOSED
Weld repair verification of joints 03-FW-335,01-
5354 CPP-NGCP-W-5352 1400165755 Welding SATIP-W-012-01 SAIC-W-2051 HYWH-CJ-RH TA-445887 30-Jul-19 8:10 AM sanjeev Mr. Suresh CLOSED
FW-155, at HYWH-CJ-RH
1400165804 Post-welding visual inspection of repair joints TA-445887
5355 CPP-NGCP-W-5353 Welding SATIP-W-012-01 SAIC-W-2048 HYWH-CJ-RH 30-Jul-19 11:00 AM sanjeev Mr. Suresh CLOSED
03-FW-335,01-FW-155, at HYWH-CJ-RH
Weld repair verification of joints FW-023, at
5356 CPP-NGCP-W-5354 1400165806 Welding SATIP-W-012-01 SAIC-W-2051 HYWH-1091 TA-445958 30-Jul-19 8:10 AM sanjeev Mr. Ashok OPEN No Action
HYWH-1091
1400166167 Post-welding visual inspection of repair joints TA-445958
5357 CPP-NGCP-W-5355 Welding SATIP-W-012-01 SAIC-W-2048 HYWH-1091 30-Jul-19 11:00 AM sanjeev Mr. Ashok OPEN No Action
FW-023, at HYWH-1091
Pre-welding and weld joint fit up inspection for
5358 CPP-NGCP-W-5356 1400166280 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1114 TA-445961 30-Jul-19 8:00 AM VARUN Mr. Suresh CLOSED
HWYH-1114
5359 CPP-NGCP-W-5357 1400166282 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1114 HWYH-1114 TA-445961 30-Jul-19 2.00 PM VARUN Mr. Suresh CLOSED
5360 CPP-NGCP-W-5358 1400166257 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1114 HWYH-1114 TA-445961 30-Jul-19 4:00 PM VARUN Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
5361 CPP-NGCP-W-5359 1400165737 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH LSS TRL-1 TA-445981 30-Jul-19 8:00 AM abdul raheem Mr. Suresh CLOSED
16″HWYH LSS TRL-1
Post-welding visual inspection for 16″HWYH
5362 CPP-NGCP-W-5360 1400165769 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH LSS TRL-1 TA-445981 30-Jul-19 2.00 PM abdul raheem Mr. Suresh CLOSED
LSS TRL-1
NDE selection for welds of 16″HWYH LSS TRL-
5363 CPP-NGCP-W-5361 1400165757 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH LSS TRL-1 TA-445981 30-Jul-19 4:00 PM abdul raheem Mr. Suresh CLOSED
1
1400165823 Pre-welding and weld joint fit up inspection for 8 TA-445836
5364 CPP-NGCP-W-5362 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL 30-Jul-19 8:00 AM PRATHAB Mr. Ashok OPEN No Action
inch HWYH-1134
Post-welding visual inspection for 8 inch HWYH-
5365 CPP-NGCP-W-5363 1400165758 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 30-Jul-19 2.00 PM PRATHAB Mr. Ashok OPEN No Action
1134 FL
5366 CPP-NGCP-W-5364 1400165748 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 FL HWYH-1134 FL TA-445836 30-Jul-19 4:00 PM PRATHAB Mr. Ashok OPEN No Action
Pre-welding and weld joint fit up inspection for 8 RE-SHEDULE TO 31-
5367 CPP-NGCP-W-5365 1400165810 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-843656 30-Jul-19 8:00 AM Asish Mr. Ashok OPEN No Action
inch HWYH-1134 JULY-2019
Post-welding visual inspection for 8 inch HWYH- RE-SHEDULE TO 31-
5368 CPP-NGCP-W-5366 1400165749 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-843656 30-Jul-19 2.00 PM asish Mr. Ashok OPEN No Action
1134 FL JULY-2019
RE-SHEDULE TO 31-
5369 CPP-NGCP-W-5367 1400165738 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 FL HWYH-1134 FL TA-843656 30-Jul-19 4:00 PM asish Mr. Ashok OPEN No Action
JULY-2019
Pre-welding and weld joint fit up inspection for 24“
5370 CPP-NGCP-W-5368 1400165824 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 30-Jul-19 8:00 AM JUNAID Mr. Suresh CLOSED
HWYH GGM TRL1
Post-welding visual inspection for 24“ HWYH
5371 CPP-NGCP-W-5369 1400165814 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 30-Jul-19 2.00 PM JUNAID Mr. Suresh CLOSED
GGM TRL1
5372 CPP-NGCP-W-5370 1400165833 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24“ HWYH GGM TRL1 24“ HWYH GGM TRL1 TA-445988 30-Jul-19 4:00 PM JUNAID Mr. Suresh CLOSED
Pre-welding and weld joint fit up inspection for
5373 CPP-NGCP-W-5371 1400165795 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 30-Jul-19 8:00 AM BINEESH Mr. Ashok OPEN No Action
HWYH-1093
5374 CPP-NGCP-W-5372 1400165752 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 30-Jul-19 2.00 PM BINEESH Mr. Ashok OPEN No Action
5375 CPP-NGCP-W-5373 1400165785 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 30-Jul-19 4:00 PM BINEESH Mr. Ashok OPEN No Action

1400165553 Pre-welding and weld joint fit up inspection for 8 TA-843637


5376 CPP-NGCP-W-5374 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1146 F/L 29-Jul-19 8:00 AM Shanmuga Mr. Rajesh OPEN No Action
inch HRDH -1146 KM1+000 to KM1+200
Post-welding visual inspection for 8 inch HRDH
5377 CPP-NGCP-W-5375 1400165508 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1146 F/L TA-843637 29-Jul-19 2.00 PM Shanmuga Mr. Rajesh OPEN No Action
-1146 KM1+000 to KM1+200
1400165546 NDE selection for welds of 8 inch HRDH -1146 TA-843637
5378 CPP-NGCP-W-5376 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1146 F/L 29-Jul-19 4.00 PM Shanmuga Mr. Rajesh OPEN No Action
KM1+000 to KM1+200
Pre-welding and weld joint fit up inspection for 8
5379 CPP-NGCP-W-5377 1400166646 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1347 FL TA-669340 30-Jul-19 8:00 AM Rajesh Mr. Rajesh OPEN No Action
inch HRDH-1347 KP0+450 to KP0+600

1400166675 Post-welding visual inspection for 8 inch HRDH- TA-669340


5380 CPP-NGCP-W-5378 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1347 FL 30-Jul-19 2.00 PM Rajesh Mr. Rajesh OPEN No Action
1347 KP0+450 to KP0+600
NDE selection for welds of 8 inch HRDH-1347
5381 CPP-NGCP-W-5379 1400166690 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1347 FL TA-669340 30-Jul-19 4.00 PM Rajesh Mr. Rajesh OPEN No Action
KP0+450 to KP0+600
1400166612 Pre-welding and weld joint fit up inspection for 8 TA-669422
5382 CPP-NGCP-W-5380 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1168 FL 30-Jul-19 7:30 AM Saif Mr.Rajesh OPEN No Action
inch HRDH -1168 KP0+500 to KP0+800
Post-welding visual inspection for 8 inch HRDH
5383 CPP-NGCP-W-5381 1400166691 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1168 FL TA-669422 30-Jul-19 2.30 PM Saif Mr.Rajesh OPEN No Action
-1168 KP0+500 to KP0+800

1400166670 NDE selection for welds of 8 inch HRDH -1168 TA-669422


5384 CPP-NGCP-W-5382 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1168 FL 30-Jul-19 4.30 PM Saif Mr.Rajesh OPEN No Action
KP0+500 to KP0+800
Pre-welding and weld joint fit up inspection for 8 Mr.Joy
5385 CPP-NGCP-W-5383 1400166647 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1146 F/L TA-843637 30-Jul-19 8:00 AM Shanmuga OPEN No Action
inch HRDH -1146 KM0+800 to KM1+000 Kumar

1400166703 Post-welding visual inspection for 8 inch HRDH TA-843637 Mr.Joy


5386 CPP-NGCP-W-5384 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1146 F/L 30-Jul-19 2.00 PM Shanmuga OPEN No Action
-1146 KM0+800 to KM1+000 Kumar
NDE selection for welds of 8 inch HRDH -1146 Mr.Joy
5387 CPP-NGCP-W-5385 1400166713 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1146 F/L TA-843637 30-Jul-19 4.00 PM Shanmuga CLOSED
KM0+800 to KM1+000 Kumar
Pre-welding and weld joint fit up inspection for 16 Mr.
5388 CPP-NGCP-W-5386 1400166661 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 30-Jul-19 8:00 AM IRSHAD CLOSED
inch HRDH GK-RH TR/L KP4+900 to KP5+200; Rajendran
Post-welding visual inspection for 16 inch HRDH Mr.
5389 CPP-NGCP-W-5387 1400166715 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 30-Jul-19 2.00 PM IRSHAD CLOSED
GK-RH TR/L KP4+900 to KP5+200; Rajendran
NDE selection for welds of 16 inch HRDH GK-RH Mr.
5390 CPP-NGCP-W-5388 1400166713 Welding SATIP-W-012-01 SAIC-W-2054 HRDH GK-RH TR/L TA-843956 30-Jul-19 4.00 PM IRSHAD CLOSED
TR/L KP4+900 to KP5+200; Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
5391 CPP-NGCP-W-5389 1400166661 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1160 FL TA-843565 30-Jul-19 8:00 AM Sarfaraz CLOSED
inch HRDH-1160 at km-2+562to km 2+650 Rajendran
Post-welding visual inspection for 8 inch Mr.
5392 CPP-NGCP-W-5390 1400166715 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1160 FL TA-843565 30-Jul-19 2.00 PM Sarfaraz CLOSED
HRDH-1160 at km-2+562to km 2+650 Rajendran
NDE selection for welds of 8 inch HRDH-1160 at Mr.
5393 CPP-NGCP-W-5391 1400166642 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1160 FL TA-843565 30-Jul-19 4.00 PM Sarfaraz OPEN No Action
km-2+562to km 2+650 Rajendran
Pre-welding and weld joint fit up inspection for 8
5394 CPP-NGCP-W-5392 1400166716 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL TA-843586 30-Jul-19 8:00 AM Farhan Mr. Ashok OPEN No Action
inch HWYH-1078 at KM-2+400 to KM 2+800
Post-welding visual inspection for 8inch
5395 CPP-NGCP-W-5393 1400166723 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL TA-843586 30-Jul-19 2.00 PM Farhan Mr. Ashok OPEN No Action
HWYH-1078 at KM-2+400 to KM 2+800
NDE selection for welds of 8 inch HWYH-1078 at
5396 CPP-NGCP-W-5394 1400166705 Welding SATIP-W-012-01 SAIC-W-2054 HWYH -1078 FL TA-843586 30-Jul-19 4.00 PM Farhan Mr. Ashok OPEN No Action
KM-2+400 to KM 2+800
In-Process Verification - RT Techniques &
Mr.
5397 CPP-NGCP-W-5395 1400166725 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1192, 1191, HRDH-1192, 1191, 902, 1182, 1157 VARIOUS 30-Jul-19 8:00 AM RAMEEZ OPEN No Action
Rajendran
902, 1182, 1157
In-Process Verification - RT Techniques &
1400166717 HWYH-1114, 1093, 1134, 1071, CJ- VARIOUS
5398 CPP-NGCP-W-5396 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation o f HWYH-1114, 1093, 30-Jul-19 8:00 AM RAMEEZ Mr. Suresh OPEN No Action
RH, LSS-TRL-1, UTMN-2201
1134, 1071, CJ-RH, LSS-TRL-1, UTMN-2201
Pre-welding and weld joint fit up inspection for 16
Mr.
5399 CPP-NGCP-W-5397 1400166694 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH DK -RH TR/L KP3+200 to HRDH DK-RH TR/L TA-843954 30-Jul-19 8:00 AM Shadab OPEN No Action
Rajendran
KP3+500;
1400166733 Post-welding visual inspection for 16 inch HRDH TA-843954 Mr.
5400 CPP-NGCP-W-5398 Welding SATIP-W-012-01 SAIC-W-2048 HRDH DK-RH TR/L 30-Jul-19 2.00 PM Shadab OPEN No Action
DK -RH TR/L KP3+200 to KP3+500; Rajendran

1400166707 NDE selection for welds of 16 inch HRDH DK -RH TA-843954 Mr.
5401 CPP-NGCP-W-5399 Welding SATIP-W-012-01 SAIC-W-2054 HRDH DK-RH TR/L 30-Jul-19 4.00 PM Shadab OPEN No Action
TR/L KP3+200 to KP3+500; Rajendran
Pre-welding and weld joint fit up inspection for 8
5402 CPP-NGCP-W-5400 1400167268 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1347 FL TA-669340 31-Jul-19 8:00 AM Rajesh Mr. Rajesh OPEN No Action
inch HRDH-1347 KP0+600 to KP0+800
Post-welding visual inspection for 8 inch HRDH-
5403 CPP-NGCP-W-5401 1400167161 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1347 FL TA-669340 31-Jul-19 2.00 PM Rajesh Mr. Rajesh OPEN No Action
1347 KP0+600 to KP0+800
NDE selection for welds of 8 inch HRDH-1347
5404 CPP-NGCP-W-5402 1400167273 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1347 FL TA-669340 31-Jul-19 4.00 PM Rajesh Mr. Rajesh OPEN No Action
KP0+600 to KP0+800
Pre-welding and weld joint fit up inspection for 8
5405 CPP-NGCP-W-5403 1400167255 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1168 FL TA-669422 31-Jul-19 7:30 AM Saif Mr.Rajesh OPEN No Action
inch HRDH -1168 KP0+800 to KP1+300
Post-welding visual inspection for 8 inch HRDH
5406 CPP-NGCP-W-5404 1400167275 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1168 FL TA-669422 31-Jul-19 2.30 PM Saif Mr.Rajesh OPEN No Action
-1168 KP0+800 to KP1+300
NDE selection for welds of 8 inch HRDH -1168
5407 CPP-NGCP-W-5405 1400167277 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1168 FL TA-669422 31-Jul-19 4.30 PM Saif Mr.Rajesh OPEN No Action
KP0+800 to KP1+300
Pre-welding and weld joint fit up inspection for 8 Mr.Joy
5408 CPP-NGCP-W-5406 1400167304 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1146 F/L TA-843637 31-Jul-19 8:00 AM Shanmuga OPEN No Action
inch HRDH -1146 KM0+600 to KM0+800 Kumar
Post-welding visual inspection for 8 inch HRDH Mr.Joy
5409 CPP-NGCP-W-5407 1400167284 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1146 F/L TA-843637 31-Jul-19 2.00 PM Shanmuga OPEN No Action
-1146 KM0+600 to KM0+800 Kumar
NDE selection for welds of 8 inch HRDH -1146 Mr.Joy
5410 CPP-NGCP-W-5408 1400167278 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1146 F/L TA-843637 31-Jul-19 4.00 PM Shanmuga OPEN No Action
KM0+600 to KM0+800 Kumar
Pre-welding and weld joint fit up inspection for 16 Mr.
5411 CPP-NGCP-W-5409 1400167313 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 31-Jul-19 8:00 AM IRSHAD OPEN No Action
inch HRDH GK-RH TR/L KP5+200 to KP5+400; Rajendran
Post-welding visual inspection for 16 inch HRDH Mr.
5412 CPP-NGCP-W-5410 1400167242 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 31-Jul-19 2.00 PM IRSHAD OPEN No Action
GK-RH TR/L KP5+200 to KP5+400; Rajendran
NDE selection for welds of 16 inch HRDH GK-RH Mr.
5413 CPP-NGCP-W-5411 1400167296 Welding SATIP-W-012-01 SAIC-W-2054 HRDH GK-RH TR/L TA-843956 31-Jul-19 4.00 PM IRSHAD OPEN No Action
TR/L KP5+200 to KP5+400; Rajendran
1400167302 Pre-welding and weld joint fit up inspection for 8 TA-843565 Mr.
5414 CPP-NGCP-W-5412 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1160 FL 31-Jul-19 8:00 AM Sarfaraz OPEN No Action
inch HRDH-1160 at km-2+562to km 2+700 Rajendran
Post-welding visual inspection for 8 inch Mr.
5415 CPP-NGCP-W-5413 1400167344 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1160 FL TA-843565 31-Jul-19 2.00 PM Sarfaraz OPEN No Action
HRDH-1160 at km-2+562to km 2+700 Rajendran
1400167262 NDE selection for welds of 8 inch HRDH-1160 at TA-843565 Mr.
5416 CPP-NGCP-W-5414 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1160 FL 31-Jul-19 4.00 PM Sarfaraz OPEN No Action
km-2+562to km 2+700 Rajendran
Pre-welding and weld joint fit up inspection for 8
5417 CPP-NGCP-W-5415 1400167250 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL TA-843586 31-Jul-19 8:00 AM Farhan Mr. Ashok OPEN No Action
inch HWYH-1078 at KM-2+400 to KM 2+700
1400167335 Post-welding visual inspection for 8inch TA-843586
5418 CPP-NGCP-W-5416 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL 31-Jul-19 2.00 PM Farhan Mr. Ashok OPEN No Action
HWYH-1078 at KM-2+400 to KM 2+700
NDE selection for welds of 8 inch HWYH-1078 at
5419 CPP-NGCP-W-5417 1400167591 Welding SATIP-W-012-01 SAIC-W-2054 HWYH -1078 FL TA-843586 31-Jul-19 4.00 PM Farhan Mr. Ashok OPEN No Action
KM-2+400 to KM 2+700
In-Process Verification - RT Techniques &
HRDH-GK-RH, 902, 1182, DK-RH, Mr.
5420 CPP-NGCP-W-5418 1400167383 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-GK-RH, 902, VARIOUS 31-Jul-19 8:00 AM RAMEEZ OPEN No Action
1191, 1160, 1192 Rajendran
1182, DK-RH, 1191, 1160, 1192
In-Process Verification - RT Techniques &
HWYH-LSS-TRL-1, 1093, 1114,
Procedure Implementation o f HWYH-LSS-TRL-1,
5421 CPP-NGCP-W-5419 1400167384 Welding SATIP-NDE-RT-01 SAIC-RT-2007 1093, 1114, 1134, GGM-TRL-1, 1078, UTMN- 1134, GGM-TRL-1, 1078, UTMN- VARIOUS 31-Jul-19 8:00 AM RAMEEZ Mr. Suresh OPEN No Action
2201
2201
In-Process Inspection of MPT using
Mr.
5422 CPP-NGCP-W-5420 1400167310 Welding SATIP-NDE-MPT-01 SAIC-MPT-2004 Yoke Method, HWYh-GGM-TRL-1 HWYh-GGM-TRL-1 VARIOUS 31-Jul-19 8:00 AM RAMEEZ OPEN No Action
Rajendran
Pre-welding and weld joint fit up inspection for 16
Mr.
5423 CPP-NGCP-W-5421 1400167357 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH DK -RH TR/L KP3+500 to HRDH DK-RH TR/L TA-843954 31-Jul-19 8:00 AM Shadab OPEN No Action
Rajendran
KP3+700;
Post-welding visual inspection for 16 inch HRDH Mr.
5424 CPP-NGCP-W-5422 1400167363 Welding SATIP-W-012-01 SAIC-W-2048 HRDH DK-RH TR/L TA-843954 31-Jul-19 2.00 PM Shadab OPEN No Action
DK -RH TR/L KP3+500 to KP3+700; Rajendran
NDE selection for welds of 16 inch HRDH DK -RH Mr.
5425 CPP-NGCP-W-5423 1400167252 Welding SATIP-W-012-01 SAIC-W-2054 HRDH DK-RH TR/L TA-843954 31-Jul-19 4.00 PM Shadab OPEN No Action
TR/L KP3+500 to KP3+700; Rajendran
1400168010 Pre-welding and weld joint fit up inspection for 8 TA-843973 Mr.
5426 CPP-NGCP-W-5424 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1161 FL 31-Jul-19 7:30 AM Sarfaraz OPEN No Action
inch HRDH-1161 at km-2+650to km 3+200 Rajendran
Post-welding visual inspection for 8 inch Mr.
5427 CPP-NGCP-W-5425 1400168113 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1161 FL TA-843973 31-Jul-19 2.30 PM Sarfaraz OPEN No Action
HRDH-1161 at 2+650to km 3+200 Rajendran
1400168103 NDE selection for welds of 8 inch HRDH-1161 at TA-843973 Mr.
5428 CPP-NGCP-W-5426 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1161 FL 31-Jul-19 4.30 PM Sarfaraz OPEN No Action
km-2+650to km 3+200 Rajendran
Pre-welding and weld joint fit up inspection for
5429 CPP-NGCP-W-5427 1400167089 Welding SATIP-W-012-01 SAIC-W-2048 UTMN 2201 TA-445963 31-Jul-19 8:00 AM PRATHAB Mr. Suresh OPEN No Action
UTMN 2201
5430 CPP-NGCP-W-5428 1400167061 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for UTMN 2201 UTMN 2201 TA-445963 31-Jul-19 2.00 PM PRATHAB Mr. Suresh OPEN No Action
5431 CPP-NGCP-W-5429 1400167070 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of UTMN 2201 UTMN 2201 TA-445963 31-Jul-19 4:00 PM PRATHAB Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for
5432 CPP-NGCP-W-5430 1400167051 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1070 TA-445897 31-Jul-19 8:00 AM Umair Mr. Suresh OPEN No Action
HWYH-1070
5433 CPP-NGCP-W-5431 1400167095 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1070 HWYH-1070 TA-445897 31-Jul-19 2.00 PM Umair Mr. Suresh OPEN No Action
5434 CPP-NGCP-W-5432 1400167108 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1070 HWYH-1070 TA-445897 31-Jul-19 4:00 PM Umair Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for 8
5435 CPP-NGCP-W-5433 1400167379 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 31-Jul-19 8:00 AM sanjeev Mr. Ashok OPEN No Action
inch HWYH-1134
1400167424 Post-welding visual inspection for 8 inch HWYH- TA-445836
5436 CPP-NGCP-W-5434 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL 31-Jul-19 2.00 PM sanjeev Mr. Ashok OPEN No Action
1134 FL
5437 CPP-NGCP-W-5435 1400167312 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 FL HWYH-1134 FL TA-445836 31-Jul-19 4:00 PM sanjeev Mr. Ashok OPEN No Action
Pre-welding and weld joint fit up inspection for
5438 CPP-NGCP-W-5436 1400167123 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1074 TA-445962 31-Jul-19 8:00 AM VARUN Mr. Suresh OPEN No Action
HWYH-1074
5439 CPP-NGCP-W-5437 1400167133 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1074 HWYH-1074 TA-445962 31-Jul-19 2.00 PM VARUN Mr. Suresh OPEN No Action
5440 CPP-NGCP-W-5438 1400167096 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1074 HWYH-1074 TA-445962 31-Jul-19 4:00 PM VARUN Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for
5441 CPP-NGCP-W-5439 1400167052 Welding SATIP-W-012-01 SAIC-W-2048 HWYH BK-RH TA-445888 31-Jul-19 8:00 AM abdul raheem Mr. Suresh OPEN No Action
HWYH BK-RH
5442 CPP-NGCP-W-5440 1400167143 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH BK-RH HWYH BK-RH TA-445888 31-Jul-19 2.00 PM abdul raheem Mr. Suresh OPEN No Action
5443 CPP-NGCP-W-5441 1400167154 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH BK-RH HWYH BK-RH TA-445888 31-Jul-19 4:00 PM abdul raheem Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for 8
5444 CPP-NGCP-W-5442 1400167134 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 31-Jul-19 8:00 AM Imran Mr. Ashok OPEN No Action
inch HWYH-1134
Post-welding visual inspection for 8 inch HWYH-
5445 CPP-NGCP-W-5443 1400167144 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 31-Jul-19 2.00 PM Imran Mr. Ashok OPEN No Action
1134 FL
5446 CPP-NGCP-W-5444 1400167135 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 FL HWYH-1134 FL TA-445836 31-Jul-19 4:00 PM Imran Mr. Ashok OPEN No Action
1400167097 Pre-welding and weld joint fit up inspection for 24“ TA-445988
5447 CPP-NGCP-W-5445 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 31-Jul-19 8:00 AM JUNAID Mr. Suresh OPEN No Action
HWYH GGM TRL1
Post-welding visual inspection for 24“ HWYH
5448 CPP-NGCP-W-5446 1400167136 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 31-Jul-19 2.00 PM JUNAID Mr. Suresh OPEN No Action
GGM TRL1
5449 CPP-NGCP-W-5447 1400167137 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24“ HWYH GGM TRL1 24“ HWYH GGM TRL1 TA-445988 31-Jul-19 4:00 PM JUNAID Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for
5450 CPP-NGCP-W-5448 1400167126 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 31-Jul-19 8:00 AM BINEESH Mr. Ashok OPEN No Action
HWYH-1093
5451 CPP-NGCP-W-5449 1400167138 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 31-Jul-19 2.00 PM BINEESH Mr. Ashok OPEN No Action
5452 CPP-NGCP-W-5450 1400167098 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 31-Jul-19 4:00 PM BINEESH Mr. Ashok OPEN No Action
1400168257 Verification of Hardness testing of HWYH-CKRH TA-445912
5453 CPP-NGCP-W-5451 Welding SATIP-W-012-01 SAIC-W-2014 HWYH-CK-RH 1-Aug-19 7:00 AM Mohamed othman Mr. Ashok OPEN No Action
03-FW-335R2
Pre-welding and weld joint fit up inspection for
5454 CPP-NGCP-W-5452 1400168340 Welding SATIP-W-012-01 SAIC-W-2048 UTMN 2201 TA-445963 1-Aug-19 8:00 AM PRATHAB Mr. Suresh OPEN No Action
UTMN 2201
5455 CPP-NGCP-W-5453 1400168341 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for UTMN 2201 UTMN 2201 TA-445963 1-Aug-19 2.00 PM PRATHAB Mr. Suresh OPEN No Action
5456 CPP-NGCP-W-5454 1400168386 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of UTMN 2201 UTMN 2201 TA-445963 1-Aug-19 4:00 PM PRATHAB Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for
5457 CPP-NGCP-W-5455 1400168330 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1070 TA-445897 1-Aug-19 8:00 AM Umair Mr. Suresh OPEN No Action
HWYH-1070
5458 CPP-NGCP-W-5456 1400168385 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1070 HWYH-1070 TA-445897 1-Aug-19 2.00 PM Umair Mr. Suresh OPEN No Action
5459 CPP-NGCP-W-5457 1400168393 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1070 HWYH-1070 TA-445897 1-Aug-19 4:00 PM Umair Mr. Suresh OPEN No Action
RE-SCHEDULE TO 3-
5460 CPP-NGCP-W-5458 1400169124 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1134 HWYH-1134 FL TA-445836 1-Aug-19 7:00 AM sanjeev Mr. Ashok OPEN No Action
AUG-2019
Pre-welding and weld joint fit up inspection for 8
5461 CPP-NGCP-W-5459 1400168384 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 1-Aug-19 8:00 AM sanjeev Mr. Ashok OPEN No Action
inch HWYH-1134
Post-welding visual inspection for 8 inch HWYH-
5462 CPP-NGCP-W-5460 1400168354 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 1-Aug-19 2.00 PM sanjeev Mr. Ashok OPEN No Action
1134 FL
5463 CPP-NGCP-W-5461 1400168342 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 FL HWYH-1134 FL TA-445836 1-Aug-19 4:00 PM sanjeev Mr. Ashok OPEN No Action
Pre-welding and weld joint fit up inspection for
5464 CPP-NGCP-W-5462 1400168395 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1074 TA-445962 1-Aug-19 8:00 AM VARUN Mr. Suresh OPEN No Action
HWYH-1074
5465 CPP-NGCP-W-5463 1400168397 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1074 HWYH-1074 TA-445962 1-Aug-19 2.00 PM VARUN Mr. Suresh OPEN No Action
5466 CPP-NGCP-W-5464 1400168379 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1074 HWYH-1074 TA-445962 1-Aug-19 4:00 PM VARUN Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for
5467 CPP-NGCP-W-5465 1400168396 Welding SATIP-W-012-01 SAIC-W-2048 HWYH BK-RH TA-445888 1-Aug-19 8:00 AM abdul raheem Mr. Suresh OPEN No Action
HWYH BK-RH
5468 CPP-NGCP-W-5466 1400168356 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH BK-RH HWYH BK-RH TA-445888 1-Aug-19 2.00 PM abdul raheem Mr. Suresh OPEN No Action
5469 CPP-NGCP-W-5467 1400168398 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH BK-RH HWYH BK-RH TA-445888 1-Aug-19 4:00 PM abdul raheem Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for 8
5470 CPP-NGCP-W-5468 1400168366 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 1-Aug-19 8:00 AM Imran Mr. Ashok OPEN No Action
inch HWYH-1134
Post-welding visual inspection for 8 inch HWYH-
5471 CPP-NGCP-W-5469 1400168357 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 1-Aug-19 2.00 PM Imran Mr. Ashok OPEN No Action
1134 FL
5472 CPP-NGCP-W-5470 1400168403 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 FL HWYH-1134 FL TA-445836 1-Aug-19 4:00 PM Imran Mr. Ashok OPEN No Action
Pre-welding and weld joint fit up inspection for 8
5473 CPP-NGCP-W-5471 1400167116 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-843656 1-Aug-19 8:00 AM Asish Mr. Ashok OPEN No Action
inch HWYH-1134
1400167145 Post-welding visual inspection for 8 inch HWYH- TA-843656
5474 CPP-NGCP-W-5472 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL 1-Aug-19 2.00 PM asish Mr. Ashok OPEN No Action
1134 FL
5475 CPP-NGCP-W-5473 1400167124 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 FL HWYH-1134 FL TA-843656 1-Aug-19 4:00 PM asish Mr. Ashok OPEN No Action
Pre-welding and weld joint fit up inspection for 24“
5476 CPP-NGCP-W-5474 1400168399 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 1-Aug-19 8:00 AM JUNAID Mr. Suresh OPEN No Action
HWYH GGM TRL1
Post-welding visual inspection for 24“ HWYH
5477 CPP-NGCP-W-5475 1400168367 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 1-Aug-19 2.00 PM JUNAID Mr. Suresh OPEN No Action
GGM TRL1
5478 CPP-NGCP-W-5476 1400168368 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24“ HWYH GGM TRL1 24“ HWYH GGM TRL1 TA-445988 1-Aug-19 4:00 PM JUNAID Mr. Suresh OPEN No Action
1400168904 TA-445838 RE-SCHEDULE TO 3-
5479 CPP-NGCP-W-5477 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1093 HWYH-1093 1-Aug-19 7:00 AM BINEESH Mr. Ashok OPEN No Action
AUG-2019
Pre-welding and weld joint fit up inspection for
5480 CPP-NGCP-W-5478 1400168381 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 1-Aug-19 8:00 AM BINEESH Mr. Ashok OPEN No Action
HWYH-1093
5481 CPP-NGCP-W-5479 1400168382 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 1-Aug-19 2.00 PM BINEESH Mr. Ashok OPEN No Action
5482 CPP-NGCP-W-5480 1400168400 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 1-Aug-19 4:00 PM BINEESH Mr. Ashok OPEN No Action
Weld repair verification of joints FW-22BT1, FW-
5483 CPP-NGCP-W-5481 1400168827 Welding SATIP-W-012-01 SAIC-W-2051 HWYH-1071 TA-445830 2-Aug-19 8:00 AM PRATHAB Mr. Ashok OPEN No Action
22CT1 HWYH-1071
Post-welding visual inspection of repair joints FW-
5484 CPP-NGCP-W-5482 1400168914 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1071 TA-445830 2-Aug-19 2.00 PM PRATHAB Mr. Ashok OPEN No Action
22BT1, FW-22CT1 HWYH-1071
Weld repair verification of joints01-FW-153 01-
5485 CPP-NGCP-W-5483 1400168898 Welding SATIP-W-012-01 SAIC-W-2051 HWYH-GK-RH TA-445912 2-Aug-19 8:00 AM sanjeev Mr. Ashok OPEN No Action
FW-167 HWYH-GK-RH
Post-welding visual inspection of repair joints 01-
5486 CPP-NGCP-W-5484 1400168908 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-GK-RH TA-445912 2-Aug-19 2.00 PM sanjeev Mr. Ashok OPEN No Action
FW-153 01-FW-167 HWYH-GK-RH
In-Process Verification - RT Techniques &
HRDH-GK-RH, 902, 1182, DK-RH, Mr.
5487 CPP-NGCP-W-5485 1400169112 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-GK-RH, 902, VARIOUS 1-Aug-19 8:00 AM RAMEEZ OPEN No Action
1191, 1160, 1192 Rajendran
1182, DK-RH, 1191, 1160, 1192
In-Process Verification - RT Techniques &
Procedure Implementation o f HWYH-1093, 1070, HWYH-1093, 1070, 952, LSS-TRL-
5488 CPP-NGCP-W-5486 1400169134 Welding SATIP-NDE-RT-01 SAIC-RT-2007 952, LSS-TRL-1, GGM-TRL-1, 1114, 1074, CJ- 1, GGM-TRL-1, 1114, 1074, CJ-RH, VARIOUS 1-Aug-19 8:00 AM RAMEEZ Mr. Suresh OPEN No Action
RH, 1091, UTMN-2201 1091, UTMN-2201

1400170682 Pre-welding and weld joint fit up inspection for 8 TA-669340


5489 CPP-NGCP-W-5487 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1347 FL 3-Aug-19 8:00 AM Rajesh Mr. Rajesh OPEN No Action
inch HRDH-1347 KP0+600 to KP0+800
Post-welding visual inspection for 8 inch HRDH-
5490 CPP-NGCP-W-5488 1400170776 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1347 FL TA-669340 3-Aug-19 2.00 PM Rajesh Mr. Rajesh OPEN No Action
1347 KP0+600 to KP0+800
1400170785 NDE selection for welds of 8 inch HRDH-1347 TA-669340
5491 CPP-NGCP-W-5489 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1347 FL 3-Aug-19 4.00 PM Rajesh Mr. Rajesh OPEN No Action
KP0+600 to KP0+800
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a Pre-welding and weld joint fit up inspection for 8
5492 CPP-NGCP-W-5490 1400170823 l Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1168 FL TA-669422 3-Aug-19 7:30 AM Saif Mr.Rajesh OPEN No Action
inch HRDH -1168 KP0+300 to KP0+400
Post-welding visual inspection for 8 inch HRDH
5493 CPP-NGCP-W-5491 1400170833 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1168 FL TA-669422 3-Aug-19 2.30 PM Saif Mr.Rajesh OPEN No Action
-1168 KP0+300 to KP0+400
NDE selection for welds of 8 inch HRDH -1168
5494 CPP-NGCP-W-5492 1400170813 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1168 FL TA-669422 3-Aug-19 4.30 PM Saif Mr.Rajesh OPEN No Action
KP0+300 to KP0+400
Pre-welding and weld joint fit up inspection for 8 Mr.
5495 CPP-NGCP-W-5493 1400170835 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1306 F/L TA-843649 3-Aug-19 8:00 AM Shanmuga OPEN No Action
inch HRDH -1306 KM1+300 to KM1+400 Rajendran
Post-welding visual inspection for 8 inch HRDH Mr.
5496 CPP-NGCP-W-5494 1400170834 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1306 F/L TA-843649 3-Aug-19 2.00 PM Shanmuga OPEN No Action
-1306 KM1+300 to KM1+400 Rajendran
NDE selection for welds of 8 inch HRDH -1306 Mr.
5497 CPP-NGCP-W-5495 1400170786 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1306 F/L TA-843649 3-Aug-19 4.00 PM Shanmuga OPEN No Action
KM1+300 to KM1+400 Rajendran
Pre-welding and weld joint fit up inspection for 16 Mr.
5498 CPP-NGCP-W-5496 1400170691 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 3-Aug-19 8:00 AM IRSHAD OPEN No Action
inch HRDH GK-RH TR/L KP5+400 to KP5+700; Rajendran
Post-welding visual inspection for 16 inch HRDH Mr.
5499 CPP-NGCP-W-5497 1400170802 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 3-Aug-19 2.00 PM IRSHAD OPEN No Action
GK-RH TR/L KP5+400 to KP5+700; Rajendran
NDE selection for welds of 16 inch HRDH GK-RH Mr.
5500 CPP-NGCP-W-5498 1400170801 Welding SATIP-W-012-01 SAIC-W-2054 HRDH GK-RH TR/L TA-843956 3-Aug-19 4.00 PM IRSHAD OPEN No Action
TR/L KP5+400 to KP5+700; Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
5501 CPP-NGCP-W-5499 1400170757 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1160 FL TA-843565 3-Aug-19 8:00 AM Sarfaraz OPEN No Action
inch HRDH-1160 at km-2+650to km 2+750 Rajendran
Post-welding visual inspection for 8 inch Mr.
5502 CPP-NGCP-W-5500 1400170814 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1160 FL TA-843565 3-Aug-19 2.00 PM Sarfaraz OPEN No Action
HRDH-1160 at km-2+650to km 2+750 Rajendran
NDE selection for welds of 8 inch HRDH-1160 at Mr.
5503 CPP-NGCP-W-5501 1400170787 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1160 FL TA-843565 3-Aug-19 4.00 PM Sarfaraz OPEN No Action
km-2+650to km 2+750 Rajendran
Pre-welding and weld joint fit up inspection for 8
5504 CPP-NGCP-W-5502 1400170759 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL TA-843586 3-Aug-19 8:00 AM Farhan Mr. Ashok OPEN No Action
inch HWYH-1078 at KM-2+400 to KM 2+600
Post-welding visual inspection for 8inch
5505 CPP-NGCP-W-5503 1400170843 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL TA-843586 3-Aug-19 2.00 PM Farhan Mr. Ashok OPEN No Action
HWYH-1078 at KM-2+400 to KM 2+600
NDE selection for welds of 8 inch HWYH-1078 at
5506 CPP-NGCP-W-5504 1400170844 Welding SATIP-W-012-01 SAIC-W-2054 HWYH -1078 FL TA-843586 3-Aug-19 4.00 PM Farhan Mr. Ashok OPEN No Action
KM-2+400 to KM 2+600
In-Process Verification - RT Techniques &
HRDH-1307, GK-RH, 1347, 1168, Mr.
5507 CPP-NGCP-W-5505 1400170845 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1307, GK- VARIOUS 3-Aug-19 8:00 AM RAMEEZ OPEN No Action
1160, 1146, DK-RH Rajendran
RH, 1347, 1168, 1160, 1146, DK-RH
In-Process Verification - RT Techniques &
HWYH-1078, BK-
1400170815 Procedure Implementation o f HWYH-1078, BK- VARIOUS
5508 CPP-NGCP-W-5506 Welding SATIP-NDE-RT-01 SAIC-RT-2007 RH, 1070, 1074, 1093, 1102, 1134,  3-Aug-19 8:00 AM RAMEEZ Mr. Suresh OPEN No Action
RH, 1070, 1074, 1093, 1102, 1134, GGM-TRL-
GGM-TRL-1, UTMN-2201
1, UTMN-2201
Pre-welding and weld joint fit up inspection for 8
5509 CPP-NGCP-W-5507 1400170836 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1198 FL TA-669341 3-Aug-19 8:00 AM Saif Mr.Rajesh OPEN No Action
inch HRDH -1198 KP0+200 to KP0+300
Post-welding visual inspection for 8 inch HRDH
5510 CPP-NGCP-W-5508 1400170846 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1198 FL TA-669341 3-Aug-19 2.00 PM Saif Mr.Rajesh OPEN No Action
-1198 KP0+200 to KP0+300
NDE selection for welds of 8 inch HRDH -1198
5511 CPP-NGCP-W-5509 1400170788 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1198 FL TA-669341 3-Aug-19 4.00 PM Saif Mr.Rajesh OPEN No Action
KP0+200 to KP0+300
Pre-welding and weld joint fit up inspection for 16
Mr. RE-SCHEDULE TO 4-
5512 CPP-NGCP-W-5510 1400170805 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH DK -RH TR/L KP3+700 to HRDH DK-RH TR/L TA-843954 3-Aug-19 8:00 AM Shadab OPEN No Action
Rajendran AUG-2019
KP3+900;
Post-welding visual inspection for 16 inch HRDH Mr. RE-SCHEDULE TO 4-
5513 CPP-NGCP-W-5511 1400170789 Welding SATIP-W-012-01 SAIC-W-2048 HRDH DK-RH TR/L TA-843954 3-Aug-19 2.00 PM Shadab OPEN No Action
DK -RH TR/L KP3+700 to KP3+900; Rajendran AUG-2019
NDE selection for welds of 16 inch HRDH DK -RH Mr. RE-SCHEDULE TO 4-
5514 CPP-NGCP-W-5512 1400170848 Welding SATIP-W-012-01 SAIC-W-2054 HRDH DK-RH TR/L TA-843954 3-Aug-19 4.00 PM Shadab OPEN No Action
TR/L KP3+700 to KP3+900; Rajendran AUG-2019
Pre-welding and weld joint fit up inspection for
5515 CPP-NGCP-W-5513 1400169444 Welding SATIP-W-012-01 SAIC-W-2048 UTMN 2201 TA-445963 8/3/2019 8:00 AM Shahbaz Mr. Suresh OPEN No Action
UTMN 2201
5516 CPP-NGCP-W-5514 1400169453 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for UTMN 2201 UTMN 2201 TA-445963 8/3/2019 2.00 PM Shahbaz Mr. Suresh OPEN No Action
5517 CPP-NGCP-W-5515 1400169473 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of UTMN 2201 UTMN 2201 TA-445963 8/3/2019 4:00 PM Shahbaz Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for
5518 CPP-NGCP-W-5516 1400169371 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1070 TA-445897 8/3/2019 8:00 AM Umair Mr. Suresh OPEN No Action
HWYH-1070
5519 CPP-NGCP-W-5517 1400169457 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1070 HWYH-1070 TA-445897 8/3/2019 2.00 PM Umair Mr. Suresh OPEN No Action
5520 CPP-NGCP-W-5518 1400169460 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1070 HWYH-1070 TA-445897 8/3/2019 4:00 PM Umair Mr. Suresh OPEN No Action
1400169440 Pre-welding and weld joint fit up inspection for 8 TA-445836
5521 CPP-NGCP-W-5519 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL 8/3/2019 8:00 AM sanjeev Mr. Ashok OPEN No Action
inch HWYH-1134
Post-welding visual inspection for 8 inch HWYH-
5522 CPP-NGCP-W-5520 1400169474 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 8/3/2019 2.00 PM sanjeev Mr. Ashok OPEN No Action
1134 FL
5523 CPP-NGCP-W-5521 1400169446 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 FL HWYH-1134 FL TA-445836 8/3/2019 4:00 PM sanjeev Mr. Ashok OPEN No Action
Pre-welding and weld joint fit up inspection for
5524 CPP-NGCP-W-5522 1400169448 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1074 TA-445962 8/3/2019 8:00 AM VARUN Mr. Suresh OPEN No Action
HWYH-1074
5525 CPP-NGCP-W-5523 1400169432 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1074 HWYH-1074 TA-445962 8/3/2019 2.00 PM VARUN Mr. Suresh OPEN No Action
5526 CPP-NGCP-W-5524 1400169486 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1074 HWYH-1074 TA-445962 8/3/2019 4:00 PM VARUN Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for
5527 CPP-NGCP-W-5525 1400169494 Welding SATIP-W-012-01 SAIC-W-2048 HWYH BK-RH TA-445888 8/3/2019 8:00 AM PRATHAB Mr. Suresh OPEN No Action
HWYH BK-RH
5528 CPP-NGCP-W-5526 1400169451 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH BK-RH HWYH BK-RH TA-445888 8/3/2019 2.00 PM PRATHAB Mr. Suresh OPEN No Action
5529 CPP-NGCP-W-5527 1400169452 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH BK-RH HWYH BK-RH TA-445888 8/3/2019 4:00 PM PRATHAB Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for 8
5530 CPP-NGCP-W-5528 1400169468 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 8/3/2019 8:00 AM Imran Mr. Ashok OPEN No Action
inch HWYH-1134
Post-welding visual inspection for 8 inch HWYH-
5531 CPP-NGCP-W-5529 1400169496 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 8/3/2019 2.00 PM Imran Mr. Ashok OPEN No Action
1134 FL
5532 CPP-NGCP-W-5530 1400169514 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 FL HWYH-1134 FL TA-445836 8/3/2019 4:00 PM Imran Mr. Ashok OPEN No Action
RE-SCHEDULE TO 4-
5533 CPP-NGCP-W-5531 1400170612 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1134 HWYH-1134 TA-843656 8/3/2019 7:00 AM Imran Mr. Ashok OPEN No Action
AUG-2019
Pre-welding and weld joint fit up inspection for 8
5534 CPP-NGCP-W-5532 1400169543 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-843656 8/3/2019 8:00 AM Asish Mr. Ashok OPEN No Action
inch HWYH-1134
Post-welding visual inspection for 8 inch HWYH-
5535 CPP-NGCP-W-5533 1400169535 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-843656 8/3/2019 2.00 PM asish Mr. Ashok OPEN No Action
1134 FL
5536 CPP-NGCP-W-5534 1400169499 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 FL HWYH-1134 FL TA-843656 8/3/2019 4:00 PM asish Mr. Ashok OPEN No Action
1400169538 Pre-welding and weld joint fit up inspection for 24“ TA-445988
5537 CPP-NGCP-W-5535 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 8/3/2019 8:00 AM JUNAID Mr. Suresh OPEN No Action
HWYH GGM TRL1
Post-welding visual inspection for 24“ HWYH
5538 CPP-NGCP-W-5536 1400169471 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 8/3/2019 2.00 PM JUNAID Mr. Suresh OPEN No Action
GGM TRL1
5539 CPP-NGCP-W-5537 1400169544 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24“ HWYH GGM TRL1 24“ HWYH GGM TRL1 TA-445988 8/3/2019 4:00 PM JUNAID Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for
5540 CPP-NGCP-W-5538 1400169541 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 8/3/2019 8:00 AM BINEESH Mr. Ashok OPEN No Action
HWYH-1093
5541 CPP-NGCP-W-5539 1400169528 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 8/3/2019 2.00 PM BINEESH Mr. Ashok OPEN No Action

5542 CPP-NGCP-W-5540 1400169477 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 8/3/2019 4:00 PM BINEESH Mr. Ashok OPEN No Action

Pre-welding and weld joint fit up inspection for


5543 CPP-NGCP-W-5541 1400170948 Welding SATIP-W-012-01 SAIC-W-2048 UTMN 2201 TA-445963 8/4/2019 8:00 AM Shahbaz Mr. Suresh OPEN No Action
UTMN 2201

5544 CPP-NGCP-W-5542 1400170969 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for UTMN 2201 UTMN 2201 TA-445963 8/4/2019 2.00 PM Shahbaz Mr. Suresh OPEN No Action

5545 CPP-NGCP-W-5543 1400170993 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of UTMN 2201 UTMN 2201 TA-445963 8/4/2019 4:00 PM Shahbaz Mr. Suresh OPEN No Action

Pre-welding and weld joint fit up inspection for


5546 CPP-NGCP-W-5544 1400170950 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1070 TA-445897 8/4/2019 8:00 AM Umair Mr. Suresh OPEN No Action
HWYH-1070

5547 CPP-NGCP-W-5545 1400171015 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1070 HWYH-1070 TA-445897 8/4/2019 2.00 PM Umair Mr. Suresh OPEN No Action

5548 CPP-NGCP-W-5546 1400170931 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1070 HWYH-1070 TA-445897 8/4/2019 4:00 PM Umair Mr. Suresh OPEN No Action

1400171901 TA-843656 RE-SCHEDULE TO 4- CANCELLED DUE TO JOB


5549 CPP-NGCP-W-5547 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1134 HWYH-1134 8/4/2019 7:00 AM sanjeev Mr. Ashok OPEN No Action
AUG-2019 NOT READY

Pre-welding and weld joint fit up inspection for 8 RE-SCHEDULE TO 4-


5550 CPP-NGCP-W-5548 1400171016 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 8/4/2019 8:00 AM sanjeev Mr. Ashok OPEN No Action
inch HWYH-1134 AUG-2019

Post-welding visual inspection for 8 inch HWYH- RE-SCHEDULE TO 4-


5551 CPP-NGCP-W-5549 1400170952 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 8/4/2019 2.00 PM sanjeev Mr. Ashok OPEN No Action
1134 FL AUG-2019

RE-SCHEDULE TO 4-
5552 CPP-NGCP-W-5550 1400171023 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 FL HWYH-1134 FL TA-445836 8/4/2019 4:00 PM sanjeev Mr. Ashok OPEN No Action
AUG-2019

1400171006 Pre-welding and weld joint fit up inspection for TA-445962


5553 CPP-NGCP-W-5551 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1074 8/4/2019 8:00 AM VARUN Mr. Suresh OPEN No Action
HWYH-1074

5554 CPP-NGCP-W-5552 1400170994 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1074 HWYH-1074 TA-445962 8/4/2019 2.00 PM VARUN Mr. Suresh OPEN No Action

5555 CPP-NGCP-W-5553 1400171007 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1074 HWYH-1074 TA-445962 8/4/2019 4:00 PM VARUN Mr. Suresh OPEN No Action

Pre-welding and weld joint fit up inspection for


5556 CPP-NGCP-W-5554 1400171034 Welding SATIP-W-012-01 SAIC-W-2048 HWYH BK-RH TA-445888 8/4/2019 8:00 AM PRATHAB Mr. Suresh OPEN No Action
HWYH BK-RH

5557 CPP-NGCP-W-5555 1400171035 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH BK-RH HWYH BK-RH TA-445888 8/4/2019 2.00 PM PRATHAB Mr. Suresh OPEN No Action

5558 CPP-NGCP-W-5556 1400171019 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH BK-RH HWYH BK-RH TA-445888 8/4/2019 4:00 PM PRATHAB Mr. Suresh OPEN No Action

Pre-welding and weld joint fit up inspection for 8


5559 CPP-NGCP-W-5557 1400171009 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 8/4/2019 8:00 AM Imran Mr. Ashok OPEN No Action
inch HWYH-1134

Post-welding visual inspection for 8 inch HWYH-


5560 CPP-NGCP-W-5558 1400170986 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 8/4/2019 2.00 PM Imran Mr. Ashok OPEN No Action
1134 FL

5561 CPP-NGCP-W-5559 1400171044 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 FL HWYH-1134 FL TA-445836 8/4/2019 4:00 PM Imran Mr. Ashok OPEN No Action

Pre-welding and weld joint fit up inspection for


5562 CPP-NGCP-W-5560 1400171012 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 8/4/2019 8:00 AM Asish Mr. Ashok OPEN No Action
HWYH-1093

5563 CPP-NGCP-W-5561 1400171053 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 8/4/2019 2.00 PM asish Mr. Ashok OPEN No Action

5564 CPP-NGCP-W-5562 1400171039 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 8/4/2019 4:00 PM asish Mr. Ashok OPEN No Action

1400171040 Pre-welding and weld joint fit up inspection for 24“ TA-445988 CANCELLED DUE TO
5565 CPP-NGCP-W-5563 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 8/4/2019 8:00 AM JUNAID Mr. Suresh OPEN No Action
HWYH GGM TRL1 JOB NOT READY

Post-welding visual inspection for 24“ HWYH CANCELLED DUE TO


5566 CPP-NGCP-W-5564 1400171064 Welding SATIP-W-012-01 SAIC-W-2048 24“ HWYH GGM TRL1 TA-445988 8/4/2019 2.00 PM JUNAID Mr. Suresh OPEN No Action
GGM TRL1 JOB NOT READY

CANCELLED DUE TO
5567 CPP-NGCP-W-5565 1400171054 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 24“ HWYH GGM TRL1 24“ HWYH GGM TRL1 TA-445988 8/4/2019 4:00 PM JUNAID Mr. Suresh OPEN No Action
JOB NOT READY

Pre-welding and weld joint fit up inspection for


5568 CPP-NGCP-W-5566 1400171046 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 8/4/2019 8:00 AM BINEESH Mr. Ashok OPEN No Action
HWYH-1093

5569 CPP-NGCP-W-5567 1400171075 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 8/4/2019 2.00 PM BINEESH Mr. Ashok OPEN No Action

5570 CPP-NGCP-W-5568 1400171085 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 8/4/2019 4:00 PM BINEESH Mr. Ashok OPEN No Action

Review of weekly welder performance and


5571 CPP-NGCP-W-5569 1400172265 Welding SATIP-W-012-01 SAIC-W-2056 production weld status from 5-Aug-2019 to 10- CPP site office N/A 7/28/2019 8:00 AM Ruhul Mr. Rajesh OPEN No Action
Aug-2019 at CPP site office.

Pre-welding and weld joint fit up inspection for 8


5572 CPP-NGCP-W-5570 1400172113 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1347 FL TA-669340 8/4/2019 8:00 AM Rajesh Mr. Rajesh OPEN No Action
inch HRDH-1347 KP1+000 to KP1+300
Post-welding visual inspection for 8 inch HRDH-
5573 CPP-NGCP-W-5571 1400172236 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1347 FL TA-669340 8/4/2019 2.00 PM Rajesh Mr. Rajesh OPEN No Action
1347 KP1+000 to KP1+300
NDE selection for welds of 8 inch HRDH-1347
5574 CPP-NGCP-W-5572 400172263 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1347 FL TA-669340 8/4/2019 4.00 PM Rajesh Mr. Rajesh OPEN No Action
KP1+000 to KP1+300
Pre-welding and weld joint fit up inspection for 8
5575 CPP-NGCP-W-5573 1400172255 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1198 FL TA-669341 8/4/2019 8:00 AM Saif Mr.Rajesh OPEN No Action
inch HRDH -1198 KP0+300 to KP0+500
Post-welding visual inspection for 8 inch HRDH
5576 CPP-NGCP-W-5574 1400172264 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1198 FL TA-669341 8/4/2019 2.00 PM Saif Mr.Rajesh OPEN No Action
-1198 KP0+300 to KP0+500
NDE selection for welds of 8 inch HRDH -1198
5577 CPP-NGCP-W-5575 1400172244 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1198 FL TA-669341 8/4/2019 4.00 PM Saif Mr.Rajesh OPEN No Action
KP0+300 to KP0+500
Pre-welding and weld joint fit up inspection for 8 Mr.
5578 CPP-NGCP-W-5576 1400172226 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1306 F/L TA-843649 8/4/2019 8:00 AM Shanmuga OPEN No Action
inch HRDH -1306 KM1+100 to KM1+300 Rajendran
Post-welding visual inspection for 8 inch HRDH Mr.
5579 CPP-NGCP-W-5577 1400172237 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1306 F/L TA-843649 8/4/2019 2.00 PM Shanmuga OPEN No Action
-1306 KM1+100 to KM1+300 Rajendran
NDE selection for welds of 8 inch HRDH -1306 Mr.
5580 CPP-NGCP-W-5578 1400172245 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1306 F/L TA-843649 8/4/2019 4.00 PM Shanmuga OPEN No Action
KM1+100 to KM1+300 Rajendran
Pre-welding and weld joint fit up inspection for 16 Mr.
5581 CPP-NGCP-W-5579 1400172256 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 8/4/2019 8:00 AM IRSHAD OPEN No Action
inch HRDH GK-RH TR/L KP5+700 to KP5+800; Rajendran
Post-welding visual inspection for 16 inch HRDH Mr.
5582 CPP-NGCP-W-5580 1400172273 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 8/4/2019 2.00 PM IRSHAD OPEN No Action
GK-RH TR/L KP5+700 to KP5+800; Rajendran
NDE selection for welds of 16 inch HRDH GK-RH Mr.
5583 CPP-NGCP-W-5581 1400172227 Welding SATIP-W-012-01 SAIC-W-2054 HRDH GK-RH TR/L TA-843956 8/4/2019 4.00 PM IRSHAD OPEN No Action
TR/L KP5+700 to KP5+800; Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
5584 CPP-NGCP-W-5582 1400172216 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1160 FL TA-843565 8/4/2019 8:00 AM Sarfaraz OPEN No Action
inch HRDH-1160 at km-2+700 to km 2+800 Rajendran
Post-welding visual inspection for 8 inch Mr.
5585 CPP-NGCP-W-5583 1400172228 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1160 FL TA-843565 8/4/2019 2.00 PM Sarfaraz OPEN No Action
HRDH-1160 at km-2+700 to km 2+800 Rajendran
NDE selection for welds of 8 inch HRDH-1160 at Mr.
5586 CPP-NGCP-W-5584 1400172229 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1160 FL TA-843565 8/4/2019 4.00 PM Sarfaraz OPEN No Action
km-2+700 to km 2+800 Rajendran
Pre-welding and weld joint fit up inspection for 8
5587 CPP-NGCP-W-5585 1400172246 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL TA-843586 8/4/2019 8:00 AM Farhan Mr. Ashok OPEN No Action
inch HWYH-1078 at KM-2+350 to KM 2+500
Post-welding visual inspection for 8inch
5588 CPP-NGCP-W-5586 1400172230 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL TA-843586 8/4/2019 2.00 PM Farhan Mr. Ashok OPEN No Action
HWYH-1078 at KM-2+350 to KM 2+500
NDE selection for welds of 8 inch HWYH-1078 at
5589 CPP-NGCP-W-5587 1400172231 Welding SATIP-W-012-01 SAIC-W-2054 HWYH -1078 FL TA-843586 8/4/2019 4.00 PM Farhan Mr. Ashok OPEN No Action
KM-2+350 to KM 2+500

1400172232 In-Process Verification - RT Techniques & VARIOUS Mr.


5590 CPP-NGCP-W-5588 Welding SATIP-NDE-RT-01 SAIC-RT-2007 HRDH-DK-RH 8/4/2019 8:00 AM RAMEEZ OPEN No Action
Procedure Implementation of HRDH-DK-RH Rajendran
In-Process Verification - RT Techniques & HWYH-1086, 1078, GK-
Procedure Implementation o f HWYH-1086, 1078, RH, 1071, 1093, CK-
5591 CPP-NGCP-W-5589 1400172238 Welding SATIP-NDE-RT-01 SAIC-RT-2007 VARIOUS 8/4/2019 8:00 AM RAMEEZ Mr. Suresh OPEN No Action
GK-RH, 1071, 1093, CK-RH, 1070, 1074, 1134, RH, 1070, 1074, 1134, GGM-TRL-
GGM-TRL-1, UTMN-2201 1, UTMN-2201
Pre-welding and weld joint fit up inspection for
5592 CPP-NGCP-W-5590 1400172292 Welding SATIP-W-012-01 SAIC-W-2048 UTMN 2201 TA-445963 8/5/2019 8:00 AM Shahbaz Mr. Suresh OPEN No Action
UTMN 2201
5593 CPP-NGCP-W-5591 1400172332 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for UTMN 2201 UTMN 2201 TA-445963 8/5/2019 2.00 PM Shahbaz Mr. Suresh OPEN No Action
5594 CPP-NGCP-W-5592 1400172393 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of UTMN 2201 UTMN 2201 TA-445963 8/5/2019 4:00 PM Shahbaz Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for
5595 CPP-NGCP-W-5593 1400172377 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1070 TA-445897 8/5/2019 8:00 AM Umair Mr. Suresh OPEN No Action
HWYH-1070
5596 CPP-NGCP-W-5594 1400172271 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1070 HWYH-1070 TA-445897 8/5/2019 2.00 PM Umair Mr. Suresh OPEN No Action
5597 CPP-NGCP-W-5595 1400172340 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1070 HWYH-1070 TA-445897 8/5/2019 4:00 PM Umair Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for
5598 CPP-NGCP-W-5596 1400172272 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1074 TA-445962 8/5/2019 8:00 AM VARUN Mr. Suresh OPEN No Action
HWYH-1074
5599 CPP-NGCP-W-5597 1400172341 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1074 HWYH-1074 TA-445962 8/5/2019 2.00 PM VARUN Mr. Suresh OPEN No Action
5600 CPP-NGCP-W-5598 1400172423 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1074 HWYH-1074 TA-445962 8/5/2019 4:00 PM VARUN Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for
5601 CPP-NGCP-W-5599 1400172415 Welding SATIP-W-012-01 SAIC-W-2048 HWYH BK-RH TA-445888 8/5/2019 8:00 AM PRATHAB Mr. Suresh OPEN No Action
HWYH BK-RH
5602 CPP-NGCP-W-5600 1400172370 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH BK-RH HWYH BK-RH TA-445888 8/5/2019 2.00 PM PRATHAB Mr. Suresh OPEN No Action
5603 CPP-NGCP-W-5601 1400172371 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH BK-RH HWYH BK-RH TA-445888 8/5/2019 4:00 PM PRATHAB Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for 8
5604 CPP-NGCP-W-5602 1400172359 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 8/5/2019 8:00 AM Imran Mr. Ashok OPEN No Action
inch HWYH-1134
Post-welding visual inspection for 8 inch HWYH-
5605 CPP-NGCP-W-5603 1400172435 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 8/5/2019 2.00 PM Imran Mr. Ashok OPEN No Action
1134 FL
5606 CPP-NGCP-W-5604 1400172428 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 FL HWYH-1134 FL TA-445836 8/5/2019 4:00 PM Imran Mr. Ashok OPEN No Action
Pre-welding and weld joint fit up inspection for
5607 CPP-NGCP-W-5605 1400172360 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1076 TA-445838 8/5/2019 8:00 AM Asish Mr. Suresh OPEN No Action
HWYH-1076
5608 CPP-NGCP-W-5606 1400172453 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1076 HWYH-1076 TA-445838 8/5/2019 2.00 PM asish Mr. Suresh OPEN No Action
5609 CPP-NGCP-W-5607 1400172454 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds ofHWYH-1076 HWYH-1076 TA-445838 8/5/2019 4:00 PM asish Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for
5610 CPP-NGCP-W-5608 1400172361 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 8/5/2019 8:00 AM JUNAID Mr. Ashok OPEN No Action
HWYH-1093
5611 CPP-NGCP-W-5609 1400172362 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection forHWYH-1093 HWYH-1093 TA-445838 8/5/2019 2.00 PM JUNAID Mr. Ashok OPEN No Action
5612 CPP-NGCP-W-5610 1400172430 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 8/5/2019 4:00 PM JUNAID Mr. Ashok OPEN No Action
Pre-welding and weld joint fit up inspection for
5613 CPP-NGCP-W-5611 1400172438 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 8/5/2019 8:00 AM BINEESH Mr. Ashok OPEN No Action
HWYH-1093
5614 CPP-NGCP-W-5612 1400172464 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 8/5/2019 2.00 PM BINEESH Mr. Ashok OPEN No Action
5615 CPP-NGCP-W-5613 1400172420 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 8/5/2019 4:00 PM BINEESH Mr. Ashok OPEN No Action
Pre-welding and weld joint fit up inspection for 8
5616 CPP-NGCP-W-5614 1400172488 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1347 FL TA-669340 8/5/2019 8:00 AM Rajesh Mr. Rajesh OPEN No Action
inch HRDH-1347 KP1+300 to KP1+500
Post-welding visual inspection for 8 inch HRDH-
5617 CPP-NGCP-W-5615 1400172564 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1347 FL TA-669340 8/5/2019 2.00 PM Rajesh Mr. Rajesh OPEN No Action
1347 KP1+300 to KP1+500
NDE selection for welds of 8 inch HRDH-1347
5618 CPP-NGCP-W-5616 1400172539 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1347 FL TA-669340 8/5/2019 4.00 PM Rajesh Mr. Rajesh OPEN No Action
KP1+300 to KP1+500
Pre-welding and weld joint fit up inspection for 8
5619 CPP-NGCP-W-5617 1400172502 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1198 FL TA-669341 8/5/2019 8:00 AM Saif Mr.Rajesh OPEN No Action
inch HRDH -1198 KP1+000 to KP1+200
Post-welding visual inspection for 8 inch HRDH
5620 CPP-NGCP-W-5618 1400172527 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1198 FL TA-669341 8/5/2019 2.00 PM Saif Mr.Rajesh OPEN No Action
-1198 KP1+000 to KP1+200
NDE selection for welds of 8 inch HRDH -1198
5621 CPP-NGCP-W-5619 1400172550 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1198 FL TA-669341 8/5/2019 4.00 PM Saif Mr.Rajesh OPEN No Action
KP1+000 to KP1+200
Pre-welding and weld joint fit up inspection for 8 Mr.
5622 CPP-NGCP-W-5620 1400172540 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1306 F/L TA-843649 8/5/2019 8:00 AM Shanmuga OPEN No Action
inch HRDH -1306 KM0+700 to KM0+900 Rajendran
1400172557 Post-welding visual inspection for 8 inch HRDH TA-843649 Mr.
5623 CPP-NGCP-W-5621 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1306 F/L 8/5/2019 2.00 PM Shanmuga OPEN No Action
-1306 KM0+700 to KM0+900 Rajendran
NDE selection for welds of 8 inch HRDH -1306 Mr.
5624 CPP-NGCP-W-5622 1400172573 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1306 F/L TA-843649 8/5/2019 4.00 PM Shanmuga OPEN No Action
KM0+700 to KM0+900 Rajendran
1400172511 Pre-welding and weld joint fit up inspection for 16 TA-843956 Mr.
5625 CPP-NGCP-W-5623 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L 8/5/2019 8:00 AM IRSHAD OPEN No Action
inch HRDH GK-RH TR/L KP5+900 to KP6+200; Rajendran
Post-welding visual inspection for 16 inch HRDH Mr.
5626 CPP-NGCP-W-5624 1400172604 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 8/5/2019 2.00 PM IRSHAD OPEN No Action
GK-RH TR/L KP5+900 to KP6+200; Rajendran
1400172586 NDE selection for welds of 16 inch HRDH GK-RH TA-843956 Mr.
5627 CPP-NGCP-W-5625 Welding SATIP-W-012-01 SAIC-W-2054 HRDH GK-RH TR/L 8/5/2019 4.00 PM IRSHAD OPEN No Action
TR/L KP5+900 to KP6+200; Rajendran
Pre-welding and weld joint fit up inspection for 8 Mr.
5628 CPP-NGCP-W-5626 1400172567 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1160 FL TA-843565 8/5/2019 8:00 AM Sarfaraz OPEN No Action
inch HRDH-1160 at km-2+800 to km 2+900 Rajendran

1400172512 Post-welding visual inspection for 8 inch TA-843565 Mr.


5629 CPP-NGCP-W-5627 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1160 FL 8/5/2019 2.00 PM Sarfaraz OPEN No Action
HRDH-1160 at km-2+800 to km 2+900 Rajendran
NDE selection for welds of 8 inch HRDH-1160 at Mr.
5630 CPP-NGCP-W-5628 1400172492 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1160 FL TA-843565 8/5/2019 4.00 PM Sarfaraz OPEN No Action
km-2+800 to km 2+900 Rajendran

1400172704 Temperature Tie in Welding HWYH-1078 at KM- TA-843586


5631 CPP-NGCP-W-5629 Welding SATIP-W-012-01 SAIC-W-2057 HWYH -1078 FL 8/5/2019 8:00 AM Farhan Mr. Ashok OPEN No Action
2+400 to KM 2+460
Pre-welding and weld joint fit up inspection for 8
5632 CPP-NGCP-W-5630 1400172665 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL TA-843586 8/5/2019 8:00 AM Farhan Mr. Ashok OPEN No Action
inch HWYH-1078 at KM-2+400 to KM 2+460

1400172713 Post-welding visual inspection for 8inch TA-843586


5633 CPP-NGCP-W-5631 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL 8/5/2019 2.00 PM Farhan Mr. Ashok OPEN No Action
HWYH-1078 at KM-2+400 to KM 2+460
NDE selection for welds of 8 inch HWYH-1078 at
5634 CPP-NGCP-W-5632 1400172690 Welding SATIP-W-012-01 SAIC-W-2054 HWYH -1078 FL TA-843586 8/5/2019 4.00 PM Farhan Mr. Ashok OPEN No Action
KM-2+400 to KM 2+460
In-Process Verification - RT Techniques &
1400173583 HRDH-GK-RH, 1347,1168,1198, VARIOUS Mr.
5635 CPP-NGCP-W-5633 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-GK-RH, 8/5/2019 8:00 AM RAMEEZ OPEN No Action
1160, 1306 Rajendran
1347,1168,1198, 1160, 1306
In-Process Verification - RT Techniques & HWYH-BK-
5636 CPP-NGCP-W-5634 1400173520 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation o f HWYH-BK- RH, 1070, 1074, 1134, GGM-TRL- VARIOUS 8/5/2019 8:00 AM RAMEEZ Mr. Suresh OPEN No Action
RH, 1070, 1074, 1134, GGM-TRL-1, UTMN-2201 1, UTMN-2201
Pre-welding and weld joint fit up inspection for 16
Mr.
5637 CPP-NGCP-W-5635 1400172691 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH DK -RH TR/L KP4+100 to HRDH DK-RH TR/L TA-843954 8/5/2019 8:00 AM Shadab OPEN No Action
Rajendran
KP4+300;
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003

T CPP RFI LOG (Welding)


o Last Updated:
Total Actioned By Contractor (Out
Summary of t Open Closed Rejected 3th August 2019
Issued of Open) @ 7.00 PM
RFIs a
l 283
5534 ### 4988 263 0
T
r
a
n
s
m DRAWING DATE OF TIME OF
S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID CLOSING DATE STATUS Mapped Status REMARKS
i NUMBER INSPECTION INSPECTION
t
t
a Post-welding visual inspection for 16 inch HRDH Mr.
5638 CPP-NGCP-W-5636 1400172679 l Welding SATIP-W-012-01 SAIC-W-2048 HRDH DK-RH TR/L TA-843954 8/5/2019 2.00 PM Shadab OPEN No Action
DK -RH TR/L KP4+100 to KP4+300; Rajendran
NDE selection for welds of 16 inch HRDH DK -RH Mr.
5639 CPP-NGCP-W-5637 1400172692 Welding SATIP-W-012-01 SAIC-W-2054 HRDH DK-RH TR/L TA-843954 8/5/2019 4.00 PM Shadab OPEN No Action
TR/L KP4+100 to KP4+300; Rajendran
Pre-welding and weld joint fit up inspection for
5640 CPP-NGCP-W-5638 1400173893 Welding SATIP-W-012-01 SAIC-W-2048 UTMN 2201 TA-445963 8/6/2019 8:00 AM Shahbaz Mr. Suresh OPEN No Action
UTMN 2201
5641 CPP-NGCP-W-5639 1400173884 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for UTMN 2201 UTMN 2201 TA-445963 8/6/2019 2.00 PM Shahbaz Mr. Suresh OPEN No Action
5642 CPP-NGCP-W-5640 1400173885 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of UTMN 2201 UTMN 2201 TA-445963 8/6/2019 4:00 PM Shahbaz Mr. Suresh OPEN No Action
1400173886 Pre-welding and weld joint fit up inspection for TA-445897
5643 CPP-NGCP-W-5641 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1070 8/6/2019 8:00 AM Umair Mr. Suresh OPEN No Action
HWYH-1070
5644 CPP-NGCP-W-5642 1400173770 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1070 HWYH-1070 TA-445897 8/6/2019 2.00 PM Umair Mr. Suresh OPEN No Action
5645 CPP-NGCP-W-5643 1400173887 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1070 HWYH-1070 TA-445897 8/6/2019 4:00 PM Umair Mr. Suresh OPEN No Action
1400172413 Pre-welding and weld joint fit up inspection for 8 TA-445836
5646 CPP-NGCP-W-5644 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL 8/6/2019 8:00 AM sanjeev Mr. Ashok OPEN No Action
inch HWYH-1134
Post-welding visual inspection for 8 inch HWYH-
5647 CPP-NGCP-W-5645 1400172414 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 8/6/2019 2.00 PM sanjeev Mr. Ashok OPEN No Action
1134 FL
5648 CPP-NGCP-W-5646 1400172397 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 FL HWYH-1134 FL TA-445836 8/6/2019 4:00 PM sanjeev Mr. Ashok OPEN No Action
Pre-welding and weld joint fit up inspection for
5649 CPP-NGCP-W-5647 1400173866 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1074 TA-445962 8/6/2019 8:00 AM VARUN Mr. Suresh OPEN No Action
HWYH-1074
5650 CPP-NGCP-W-5648 1400173781 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1074 HWYH-1074 TA-445962 8/6/2019 2.00 PM VARUN Mr. Suresh OPEN No Action
5651 CPP-NGCP-W-5649 1400173831 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1074 HWYH-1074 TA-445962 8/6/2019 4:00 PM VARUN Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for
5652 CPP-NGCP-W-5650 1400173857 Welding SATIP-W-012-01 SAIC-W-2048 HWYH BK-RH TA-445888 8/6/2019 8:00 AM PRATHAB Mr. Suresh OPEN No Action
HWYH BK-RH
5653 CPP-NGCP-W-5651 1400173771 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH BK-RH HWYH BK-RH TA-445888 8/6/2019 2.00 PM PRATHAB Mr. Suresh OPEN No Action
5654 CPP-NGCP-W-5652 1400173888 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH BK-RH HWYH BK-RH TA-445888 8/6/2019 4:00 PM PRATHAB Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for 8
5655 CPP-NGCP-W-5653 1400173923 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 8/6/2019 8:00 AM Imran Mr. Ashok OPEN No Action
inch HWYH-1134
Post-welding visual inspection for 8 inch HWYH-
5656 CPP-NGCP-W-5654 1400173911 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 8/6/2019 2.00 PM Imran Mr. Ashok OPEN No Action
1134 FL
5657 CPP-NGCP-W-5655 1400172399 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 FL HWYH-1134 FL TA-445836 8/6/2019 4:00 PM Imran Mr. Ashok OPEN No Action
Pre-welding and weld joint fit up inspection for
5658 CPP-NGCP-W-5656 1400173859 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1076 TA-445838 8/6/2019 8:00 AM Asish Mr. Suresh OPEN No Action
HWYH-1076
5659 CPP-NGCP-W-5657 1400173890 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1076 HWYH-1076 TA-445838 8/6/2019 2.00 PM asish Mr. Suresh OPEN No Action
5660 CPP-NGCP-W-5658 1400173933 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds ofHWYH-1076 HWYH-1076 TA-445838 8/6/2019 4:00 PM asish Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for
5661 CPP-NGCP-W-5659 1400174208 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 8/6/2019 8:00 AM JUNAID Mr. Ashok OPEN No Action
HWYH-1093
5662 CPP-NGCP-W-5660 1400174180 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection forHWYH-1093 HWYH-1093 TA-445838 8/6/2019 2.00 PM JUNAID Mr. Ashok OPEN No Action
5663 CPP-NGCP-W-5661 1400174169 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 8/6/2019 4:00 PM JUNAID Mr. Ashok OPEN No Action
Pre-welding and weld joint fit up inspection for
5664 CPP-NGCP-W-5662 1400174137 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 8/6/2019 8:00 AM BINEESH Mr. Ashok OPEN No Action
HWYH-1093
5665 CPP-NGCP-W-5663 1400174223 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 8/6/2019 2.00 PM BINEESH Mr. Ashok OPEN No Action
5666 CPP-NGCP-W-5664 1400174225 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 8/6/2019 4:00 PM BINEESH Mr. Ashok OPEN No Action
1400174219 Pre-welding and weld joint fit up inspection for TA-445981
5667 CPP-NGCP-W-5665 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH LSS TRL-1 8/10/2019 8:00 AM PRATHAB Mr. Suresh OPEN No Action
16″HWYH LSS TRL-1

1400174139 Post-welding visual inspection for 16″HWYH TA-445981


5668 CPP-NGCP-W-5666 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH LSS TRL-1 8/10/2019 2.00 PM PRATHAB Mr. Suresh OPEN No Action
LSS TRL-1
1400174235 NDE selection for welds of 16″HWYH LSS TRL- TA-445981
5669 CPP-NGCP-W-5667 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH LSS TRL-1 8/10/2019 4:00 PM PRATHAB Mr. Suresh OPEN No Action
1
Pre-welding and weld joint fit up inspection for 8
5670 CPP-NGCP-W-5668 1400174274 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1066 TA-445893 8/10/2019 8:00 AM sanjeev Mr. Suresh OPEN No Action
inch HWYH-1066
1400174232 Post-welding visual inspection for 8 inchHWYH- TA-445893
5671 CPP-NGCP-W-5669 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1066 8/10/2019 2.00 PM sanjeev Mr. Suresh OPEN No Action
1066
5672 CPP-NGCP-W-5670 1400174190 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1066 HWYH-1066 TA-445893 8/10/2019 4:00 PM sanjeev Mr. Suresh OPEN No Action
AWS D1.1 Application incl Repair
Mr. structural welding
5673 CPP-NGCP-W-5671 1400174457 Welding SATIP-M-001-01 SAIC-M-2012 Pre-Welding Inspection of anchor TCF-1 N/A 8/10/2019 8:00 AM Asish OPEN No Action
Rajendran
flange for HWYH-1088 @ TCF1
AWS D1.1 Application incl Repair
Mr. structural welding
5674 CPP-NGCP-W-5672 1400174427 Welding SATIP-M-001-01 SAIC-M-2012 In-process Welding Inspection of TCF-1 N/A 8/10/2019 2.00 PM Asish OPEN No Action
Rajendran
anchor flange for HWYH-1088 @ TCF1
AWS D1.1 Application incl Repair
1400174606 N/A Mr. structural welding
5675 CPP-NGCP-W-5673 Welding SATIP-M-001-01 SAIC-M-2012 Post Welding Final Inspection of TCF-1 8/10/2019 4:00 PM Asish OPEN No Action
Rajendran
anchor flange for HWYH-1088 @ TCF1
Pre-welding and weld joint fit up inspection for
5676 CPP-NGCP-W-5674 1400174238 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH LSS TRL-1 TA-445981 8/11/2019 8:00 AM PRATHAB Mr. Suresh OPEN No Action
16″HWYH LSS TRL-1
Post-welding visual inspection for 16″HWYH
5677 CPP-NGCP-W-5675 1400174246 Welding SATIP-W-012-01 SAIC-W-2048 16″HWYH LSS TRL-1 TA-445981 8/11/2019 2.00 PM PRATHAB Mr. Suresh OPEN No Action
LSS TRL-1
NDE selection for welds of 16″HWYH LSS TRL-
5678 CPP-NGCP-W-5676 1400174273 Welding SATIP-W-012-01 SAIC-W-2054 16″HWYH LSS TRL-1 TA-445981 8/11/2019 4:00 PM PRATHAB Mr. Suresh OPEN No Action
1
Pre-welding and weld joint fit up inspection for 8
5679 CPP-NGCP-W-5677 1400174596 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1066 TA-445893 8/11/2019 8:00 AM sanjeev Mr. Suresh OPEN No Action
inch HWYH-1066
Post-welding visual inspection for 8 inchHWYH-
5680 CPP-NGCP-W-5678 1400174568 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1066 TA-445893 8/11/2019 2.00 PM sanjeev Mr. Suresh OPEN No Action
1066
5681 CPP-NGCP-W-5679 1400174577 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1066 HWYH-1066 TA-445893 8/11/2019 4:00 PM sanjeev Mr. Suresh OPEN No Action
AWS D1.1 Application incl Repair
Mr. structural welding
5682 CPP-NGCP-W-5680 1400174625 Welding SATIP-M-001-01 SAIC-M-2012 Pre-Welding Inspection of anchor TCF-1 N/A 8/12/2019 8:00 AM Asish OPEN No Action
Rajendran
flange for HWYH-1088 @ TCF1
AWS D1.1 Application incl Repair
Mr. structural welding
5683 CPP-NGCP-W-5681 1400174612 Welding SATIP-M-001-01 SAIC-M-2012 In-process Welding Inspection of TCF-1 N/A 8/12/2019 2.00 PM Asish OPEN No Action
Rajendran
anchor flange for HWYH-1088 @ TCF1
AWS D1.1 Application incl Repair
Mr. structural welding
5684 CPP-NGCP-W-5682 1400174629 Welding SATIP-M-001-01 SAIC-M-2012 Post Welding Final Inspection of TCF-1 N/A 8/12/2019 4:00 PM Asish OPEN No Action
Rajendran
anchor flange for HWYH-1088 @ TCF1

1400174668 Pre-welding and weld joint fit up inspection for 8 TA-445893


5685 CPP-NGCP-W-5683 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1066 8/13/2019 8:00 AM sanjeev Mr. Suresh OPEN No Action
inch HWYH-1066
Post-welding visual inspection for 8 inchHWYH-
5686 CPP-NGCP-W-5684 1400174622 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1066 TA-445893 8/13/2019 2.00 PM sanjeev Mr. Suresh OPEN No Action
1066
5687 CPP-NGCP-W-5685 1400174647 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1066 HWYH-1066 TA-445893 8/13/2019 4:00 PM sanjeev Mr. Suresh OPEN No Action
AWS D1.1 Application incl Repair
1400174686 N/A Mr. structural welding
5688 CPP-NGCP-W-5686 Welding SATIP-M-001-01 SAIC-M-2012 Pre-Welding Inspection of anchor TCF-1 8/13/2019 8:00 AM Asish OPEN No Action
Rajendran
flange for HWYH-1088 @ TCF1
AWS D1.1 Application incl Repair
Mr. structural welding
5689 CPP-NGCP-W-5687 1400174726 Welding SATIP-M-001-01 SAIC-M-2012 In-process Welding Inspection of TCF-1 N/A 8/13/2019 2.00 PM Asish OPEN No Action
Rajendran
anchor flange for HWYH-1088 @ TCF1
AWS D1.1 Application incl Repair
Mr. structural welding
5690 CPP-NGCP-W-5688 1400174680 Welding SATIP-M-001-01 SAIC-M-2012 Post Welding Final Inspection of TCF-1 N/A 8/13/2019 4:00 PM Asish OPEN No Action
Rajendran
anchor flange for HWYH-1088 @ TCF1
Pre-welding and weld joint fit up inspection for 8
5691 CPP-NGCP-W-5689 1400174769 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1186 FL TA-669423 8/6/2019 8:00 AM Rajesh Mr. Rajesh OPEN No Action
inch HRDH-1186 KP1+800 to KP2+000
Post-welding visual inspection for 8 inch HRDH-
5692 CPP-NGCP-W-5690 1400174712 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1186 FL TA-669423 8/6/2019 2.00 PM Rajesh Mr. Rajesh OPEN No Action
1186 KP1+800 to KP2+000
NDE selection for welds of 8 inch HRDH-1186
5693 CPP-NGCP-W-5691 1400174785 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1186 FL TA-669423 8/6/2019 4.00 PM Rajesh Mr. Rajesh OPEN No Action
KP1+800 to KP2+000
Pre-welding and weld joint fit up inspection for 8
5694 CPP-NGCP-W-5692 1400174803 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1198 FL TA-669341 8/6/2019 8:00 AM Saif Mr.Rajesh OPEN No Action
inch HRDH -1198KP1+200 to KP1+700
Post-welding visual inspection for 8 inch HRDH
5695 CPP-NGCP-W-5693 1400174805 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1198 FL TA-669341 8/6/2019 2.00 PM Saif Mr.Rajesh OPEN No Action
-1198 KP1+200 to KP1+700
NDE selection for welds of 8 inch HRDH -1198
5696 CPP-NGCP-W-5694 1400174767 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1198 FL TA-669341 8/6/2019 4.00 PM Saif Mr.Rajesh OPEN No Action
KP1+200 to KP1+700
Pre-welding and weld joint fit up inspection for 8 Mr.
5697 CPP-NGCP-W-5695 1400174816 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1306 F/L TA-843649 8/6/2019 8:00 AM Shanmuga OPEN No Action
inch HRDH -1306 KM0+700 to KM0+400 Rajendran
Post-welding visual inspection for 8 inch HRDH Mr.
5698 CPP-NGCP-W-5696 1400174843 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1306 F/L TA-843649 8/6/2019 2.00 PM Shanmuga OPEN No Action
-1306 KM0+700 to KM0+400 Rajendran
1400174817 NDE selection for welds of 8 inch HRDH -1306 TA-843649 Mr.
5699 CPP-NGCP-W-5697 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1306 F/L 8/6/2019 4.00 PM Shanmuga OPEN No Action
KM0+700 to KM0+400 Rajendran
Pre-welding and weld joint fit up inspection for 16 Mr.
5700 CPP-NGCP-W-5698 1400174835 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 8/6/2019 8:00 AM Rizwan OPEN No Action
inch HRDH GK-RH TR/L KP6+200 to KP6+500; Rajendran

1400174778 Post-welding visual inspection for 16 inch HRDH TA-843956 Mr.


5701 CPP-NGCP-W-5699 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L 8/6/2019 2.00 PM Rizwan OPEN No Action
GK-RH TR/LKP6+200 to KP6+500; Rajendran
NDE selection for welds of 16 inch HRDH GK-RH Mr.
5702 CPP-NGCP-W-5700 1400174779 Welding SATIP-W-012-01 SAIC-W-2054 HRDH GK-RH TR/L TA-843956 8/6/2019 4.00 PM Rizwan OPEN No Action
TR/L KP6+200 to KP6+500; Rajendran

1400174818 Pre-welding and weld joint fit up inspection for 8 TA-843565 Mr.
5703 CPP-NGCP-W-5701 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1160 FL 8/6/2019 8:00 AM Sarfaraz OPEN No Action
inch HRDH-1160 at km-2+800 to km 2+900 Rajendran
Post-welding visual inspection for 8 inch Mr.
5704 CPP-NGCP-W-5702 1400174837 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1160 FL TA-843565 8/6/2019 2.00 PM Sarfaraz OPEN No Action
HRDH-1160 at km-2+800 to km 2+900 Rajendran
1400174853 NDE selection for welds of 8 inch HRDH-1160 at TA-843565 Mr.
5705 CPP-NGCP-W-5703 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1160 FL 8/6/2019 4.00 PM Sarfaraz OPEN No Action
km-2+800 to km 2+900 Rajendran
Temperature Tie in Welding HWYH-1078 at KM-
5706 CPP-NGCP-W-5704 1400174847 Welding SATIP-W-012-01 SAIC-W-2057 HWYH -1078 FL TA-843586 8/6/2019 8:00 AM Farhan Mr. Ashok OPEN No Action
1+600 to KM 2+000

1400174842 Pre-welding and weld joint fit up inspection for 8 TA-843586


5707 CPP-NGCP-W-5705 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL 8/6/2019 8:00 AM Farhan Mr. Ashok OPEN No Action
inch HWYH-1078 at KM-1+600 to KM 2+000
Post-welding visual inspection for 8inch
5708 CPP-NGCP-W-5706 1400174863 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL TA-843586 8/6/2019 2.00 PM Farhan Mr. Ashok OPEN No Action
HWYH-1078 at KM-1+600 to KM 2+000
1400174826 NDE selection for welds of 8 inch HWYH-1078 at TA-843586
5709 CPP-NGCP-W-5707 Welding SATIP-W-012-01 SAIC-W-2054 HWYH -1078 FL 8/6/2019 4.00 PM Farhan Mr. Ashok OPEN No Action
KM-1+600 to KM 2+000
In-Process Verification - RT Techniques &
HRDH-1198, 1306, 1347, DK_RH, Mr.
5710 CPP-NGCP-W-5708 1400174858 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1198, 1306, VARIOUS 8/6/2019 8:00 AM RAMEEZ OPEN No Action
GK_RH Rajendran
1347, DK_RH, GK_RH
In-Process Verification - RT Techniques &
HWYH-1078, 1070, 1074, 1093, BK-
5711 CPP-NGCP-W-5709 1400174780 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation o f HWYH-1078, 1070, VARIOUS 8/6/2019 8:00 AM RAMEEZ Mr. Suresh OPEN No Action
RH, GGM-TRL-1
1074, 1093, BK-RH, GGM-TRL-1
Pre-welding and weld joint fit up inspection for 16 Mr.
5712 CPP-NGCP-W-5710 1400174781 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH DK -RH TR/L KP4+300 to HRDH DK-RH TR/L TA-843954 8/6/2019 8:00 AM Shadab OPEN No Action
Rajendran
KP4+700;
Post-welding visual inspection for 16 inch HRDH Mr.
5713 CPP-NGCP-W-5711 1400174782 Welding SATIP-W-012-01 SAIC-W-2048 HRDH DK-RH TR/L TA-843954 8/6/2019 2.00 PM Shadab OPEN No Action
DK -RH TR/L KP4+300 to KP4+700; Rajendran
NDE selection for welds of 16 inch HRDH DK -RH Mr.
5714 CPP-NGCP-W-5712 1400174859 Welding SATIP-W-012-01 SAIC-W-2054 HRDH DK-RH TR/L TA-843954 8/6/2019 4.00 PM Shadab OPEN No Action
TR/L KP4+300 to KP4+700; Rajendran

ADD THIS RFI into your


5715 CPP-NGCP-W-5713 1400172403 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1134 HWYH-1134 TA-843656 8/6/2019 7:00 AM sanjeev Mr. Ashok OPEN No Action
log

1400175122 Pre-welding and weld joint fit up inspection for TA-445963


5716 CPP-NGCP-W-5714 Welding SATIP-W-012-01 SAIC-W-2048 UTMN 2201 8/7/2019 8:00 AM Shahbaz Mr. Suresh OPEN No Action
UTMN 2201
5717 CPP-NGCP-W-5715 1400175173 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for UTMN 2201 UTMN 2201 TA-445963 8/7/2019 2.00 PM Shahbaz Mr. Suresh OPEN No Action
5718 CPP-NGCP-W-5716 1400175136 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of UTMN 2201 UTMN 2201 TA-445963 8/7/2019 4:00 PM Shahbaz Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for
5719 CPP-NGCP-W-5717 1400175172 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1070 TA-445897 8/7/2019 8:00 AM Umair Mr. Suresh OPEN No Action
HWYH-1070
5720 CPP-NGCP-W-5718 1400175101 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1070 HWYH-1070 TA-445897 8/7/2019 2.00 PM Umair Mr. Suresh OPEN No Action
5721 CPP-NGCP-W-5719 1400175154 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1070 HWYH-1070 TA-445897 8/7/2019 4:00 PM Umair Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for 8
5722 CPP-NGCP-W-5720 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 8/7/2019 8:00 AM sanjeev Mr. Ashok OPEN No Action
1400175177 inch HWYH-1134
Post-welding visual inspection for 8 inch HWYH-
5723 CPP-NGCP-W-5721 1400175184 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 8/7/2019 2.00 PM sanjeev Mr. Ashok OPEN No Action
1134 FL
5724 CPP-NGCP-W-5722 1400175155 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 FL HWYH-1134 FL TA-445836 8/7/2019 4:00 PM sanjeev Mr. Ashok OPEN No Action
Pre-welding and weld joint fit up inspection for
5725 CPP-NGCP-W-5723 1400175203 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1074 TA-445962 8/7/2019 8:00 AM VARUN Mr. Suresh OPEN No Action
HWYH-1074
5726 CPP-NGCP-W-5724 1400175209 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1074 HWYH-1074 TA-445962 8/7/2019 2.00 PM VARUN Mr. Suresh OPEN No Action
5727 CPP-NGCP-W-5725 1400175194 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1074 HWYH-1074 TA-445962 8/7/2019 4:00 PM VARUN Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for
5728 CPP-NGCP-W-5726 1400175713 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1114 TA-445961 8/7/2019 8:00 AM VARUN Mr. Suresh OPEN No Action
HWYH-1114
5729 CPP-NGCP-W-5727 1400175715 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection foHWYH-1114 HWYH-1114 TA-445961 8/7/2019 2.00 PM VARUN Mr. Suresh OPEN No Action
5730 CPP-NGCP-W-5728 1400175689 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds ofHWYH-1114 HWYH-1114 TA-445961 8/7/2019 4:00 PM VARUN Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for
5731 CPP-NGCP-W-5729 1400175158 Welding SATIP-W-012-01 SAIC-W-2048 HWYH BK-RH TA-445888 8/7/2019 8:00 AM PRATHAB Mr. Suresh OPEN No Action
HWYH BK-RH
5732 CPP-NGCP-W-5730 1400175211 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH BK-RH HWYH BK-RH TA-445888 8/7/2019 2.00 PM PRATHAB Mr. Suresh OPEN No Action
5733 CPP-NGCP-W-5731 1400175140 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH BK-RH HWYH BK-RH TA-445888 8/7/2019 4:00 PM PRATHAB Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for 8
5734 CPP-NGCP-W-5732 1400175180 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 8/7/2019 8:00 AM Imran Mr. Ashok OPEN No Action
inch HWYH-1134
Post-welding visual inspection for 8 inch HWYH-
5735 CPP-NGCP-W-5733 1400175152 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1134 FL TA-445836 8/7/2019 2.00 PM Imran Mr. Ashok OPEN No Action
1134 FL
5736 CPP-NGCP-W-5734 1400175160 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of 8 inch HWYH-1134 FL HWYH-1134 FL TA-445836 8/7/2019 4:00 PM Imran Mr. Ashok OPEN No Action

5737 CPP-NGCP-W-5735 1400176087 Welding SATIP-W-012-01 SAIC-W-2057 Temperature Tie in Welding HWYH-1076 HWYH-1076 TA-445838 8/7/2019 7:00 AM Asish Mr. Suresh OPEN No Action

Pre-welding and weld joint fit up inspection for


5738 CPP-NGCP-W-5736 1400175253 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1076 TA-445838 8/7/2019 8:00 AM Asish Mr. Suresh OPEN No Action
HWYH-1076
5739 CPP-NGCP-W-5737 1400175225 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1076 HWYH-1076 TA-445838 8/7/2019 2.00 PM asish Mr. Suresh OPEN No Action
5740 CPP-NGCP-W-5738 1400175255 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds ofHWYH-1076 HWYH-1076 TA-445838 8/7/2019 4:00 PM asish Mr. Suresh OPEN No Action
Pre-welding and weld joint fit up inspection for
5741 CPP-NGCP-W-5739 1400175228 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 8/7/2019 8:00 AM JUNAID Mr. Ashok OPEN No Action
HWYH-1093
5742 CPP-NGCP-W-5740 1400175229 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection forHWYH-1093 HWYH-1093 TA-445838 8/7/2019 2.00 PM JUNAID Mr. Ashok OPEN No Action
5743 CPP-NGCP-W-5741 1400175264 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 8/7/2019 4:00 PM JUNAID Mr. Ashok OPEN No Action
Pre-welding and weld joint fit up inspection for
5744 CPP-NGCP-W-5742 1400175181 Welding SATIP-W-012-01 SAIC-W-2048 HWYH-1093 TA-445838 8/7/2019 8:00 AM BINEESH Mr. Ashok OPEN No Action
HWYH-1093
5745 CPP-NGCP-W-5743 1400175198 Welding SATIP-W-012-01 SAIC-W-2048 Post-welding visual inspection for HWYH-1093 HWYH-1093 TA-445838 8/7/2019 2.00 PM BINEESH Mr. Ashok OPEN No Action
5746 CPP-NGCP-W-5744 1400175217 Welding SATIP-W-012-01 SAIC-W-2054 NDE selection for welds of HWYH-1093 HWYH-1093 TA-445838 8/7/2019 4:00 PM BINEESH Mr. Ashok OPEN No Action
Pre-welding and weld joint fit up inspection for 8
5747 CPP-NGCP-W-5745 1400176333 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1183 FL TA-669339 8/7/2019 8:00 AM Rajesh Mr. Rajesh OPEN No Action
inch HRDH-1183 KP1+300 to KP1+800
Post-welding visual inspection for 8 inch HRDH-
5748 CPP-NGCP-W-5746 1400176272 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1183 FL TA-669339 8/7/2019 2.00 PM Rajesh Mr. Rajesh OPEN No Action
1183 KP1+300 to KP1+800
NDE selection for welds of 8 inch HRDH-1183
5749 CPP-NGCP-W-5747 1400176309 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1183 FL TA-669339 8/7/2019 4.00 PM Rajesh Mr. Rajesh OPEN No Action
KP1+300 to KP1+800
Pre-welding and weld joint fit up inspection for 8
5750 CPP-NGCP-W-5748 1400176324 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1198 FL TA-669341 8/7/2019 8:00 AM Saif Mr.Rajesh OPEN No Action
inch HRDH -1198KP1+700 to KP1+900
Post-welding visual inspection for 8 inch HRDH
5751 CPP-NGCP-W-5749 1400176354 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1198 FL TA-669341 8/7/2019 2.00 PM Saif Mr.Rajesh OPEN No Action
-1198KP1+700 to KP1+900
NDE selection for welds of 8 inch HRDH -1198
5752 CPP-NGCP-W-5750 1400176363 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1198 FL TA-669341 8/7/2019 4.00 PM Saif Mr.Rajesh OPEN No Action
KP1+700 to KP1+900
Pre-welding and weld joint fit up inspection for 8
5753 CPP-NGCP-W-5751 1400176280 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1176 F/L TA-843587 8/7/2019 8:00 AM Shanmuga Mr. Ashok OPEN No Action
inch HRDH -1176 KM1+500 to KM1+400
1400176310 Post-welding visual inspection for 8 inch HRDH TA-843587
5754 CPP-NGCP-W-5752 Welding SATIP-W-012-01 SAIC-W-2048 HRDH-1176 F/L 8/7/2019 2.00 PM Shanmuga Mr. Ashok OPEN No Action
-1176 KM1+500 to KM1+400
NDE selection for welds of 8 inch HRDH -1176
5755 CPP-NGCP-W-5753 1400176311 Welding SATIP-W-012-01 SAIC-W-2054 HRDH-1176 F/L TA-843587 8/7/2019 4.00 PM Shanmuga Mr. Ashok OPEN No Action
KM1+500 to KM1+400

1400176336 Pre-welding and weld joint fit up inspection for 16 TA-843956


5756 CPP-NGCP-W-5754 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L 8/7/2019 8:00 AM Rizwan Mr. Ashok OPEN No Action
inch HRDH GK-RH TR/L KP6+500 to KP6+700;
Post-welding visual inspection for 16 inch HRDH
5757 CPP-NGCP-W-5755 1400176281 Welding SATIP-W-012-01 SAIC-W-2048 HRDH GK-RH TR/L TA-843956 8/7/2019 2.00 PM Rizwan Mr. Ashok OPEN No Action
GK-RH TR/L KP6+500 to KP6+700;

1400176345 NDE selection for welds of 16 inch HRDH GK-RH TA-843956


5758 CPP-NGCP-W-5756 Welding SATIP-W-012-01 SAIC-W-2054 HRDH GK-RH TR/L 8/7/2019 4.00 PM Rizwan Mr. Ashok OPEN No Action
TR/L KP6+500 to KP6+700;
Pre-welding and weld joint fit up inspection for 8
5759 CPP-NGCP-W-5757 1400176317 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1160 FL TA-843565 8/7/2019 8:00 AM Sarfaraz Mr. Ashok OPEN No Action
inch HRDH-1160 at km-2+900 to km 3+000

1400176318 Post-welding visual inspection for 8 inch TA-843565


5760 CPP-NGCP-W-5758 Welding SATIP-W-012-01 SAIC-W-2048 HRDH -1160 FL 8/7/2019 2.00 PM Sarfaraz Mr. Ashok OPEN No Action
HRDH-1160 at km-2+900 to km 3+000
NDE selection for welds of 8 inch HRDH-1160 at
5761 CPP-NGCP-W-5759 1400176319 Welding SATIP-W-012-01 SAIC-W-2054 HRDH -1160 FL TA-843565 8/7/2019 4.00 PM Sarfaraz Mr. Ashok OPEN No Action
km-2+900 to km 3+000
1400176320 Pre-welding and weld joint fit up inspection for 8 TA-843586
5762 CPP-NGCP-W-5760 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL 8/7/2019 8:00 AM Farhan Mr. Ashok OPEN No Action
inch HWYH-1078 at KM-1+600 to KM 1+700
Post-welding visual inspection for 8inch
5763 CPP-NGCP-W-5761 1400176358 Welding SATIP-W-012-01 SAIC-W-2048 HWYH -1078 FL TA-843586 8/7/2019 2.00 PM Farhan Mr. Ashok OPEN No Action
HWYH-1078 at KM-1+600 to KM 1+700
1400176364 NDE selection for welds of 8 inch HWYH-1078 at TA-843586
5764 CPP-NGCP-W-5762 Welding SATIP-W-012-01 SAIC-W-2054 HWYH -1078 FL 8/7/2019 4.00 PM Farhan Mr. Ashok OPEN No Action
KM-1+600 to KM 1+700
In-Process Verification - RT Techniques &
HRDH-1160, 1198, 1306, 1307,
5765 CPP-NGCP-W-5763 1400176359 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation of HRDH-1160, 1198, VARIOUS 8/7/2019 8:00 AM RAMEEZ Mr. Ashok OPEN No Action
1347, DK-RH, GK-RH
1306, 1307, 1347, DK-RH, GK-RH
In-Process Verification - RT Techniques &
HWYH-1070, 1074, 1076, 1093,
5766 CPP-NGCP-W-5764 1400176321 Welding SATIP-NDE-RT-01 SAIC-RT-2007 Procedure Implementation o f HWYH-1070, 1074, VARIOUS 8/7/2019 8:00 AM RAMEEZ Mr. Suresh OPEN No Action
1134, BK-RH, UTMN-2201
1076, 1093, 1134, BK-RH, UTMN-2201
Pre-welding and weld joint fit up inspection for 16
5767 CPP-NGCP-W-5765 1400176360 Welding SATIP-W-012-01 SAIC-W-2048 inch HRDH DK -RH TR/L KP4+700 to HRDH DK-RH TR/L TA-843954 8/7/2019 8:00 AM Shadab Mr. Ashok OPEN No Action
KP5+000;
Post-welding visual inspection for 16 inch HRDH
5768 CPP-NGCP-W-5766 1400176282 Welding SATIP-W-012-01 SAIC-W-2048 HRDH DK-RH TR/L TA-843954 8/7/2019 2.00 PM Shadab Mr. Ashok OPEN No Action
DK -RH TR/L KP4+700 to KP5+000;
NDE selection for welds of 16 inch HRDH DK -RH
5769 CPP-NGCP-W-5767 1400176312 Welding SATIP-W-012-01 SAIC-W-2054 HRDH DK-RH TR/L TA-843954 8/7/2019 4.00 PM Shadab Mr. Ashok OPEN No Action
TR/L KP4+700 to KP5+000;
PROJECT TITLE:- North Gas Compression Pipeline Project
CONTRACT No. / BI-10- 02029-003
CPP RFI LOG (Civil)

Total Actioned By Contractor Last Updated:


Open Closed Rejected 3th August 2019
Summary of RFIs Issued (Out of Open) @ 7.00 PM

2568 164 2234 170 0

DRAWING DATE OF TIME OF CLOSING


S. No. CPP RFI NO EPM RFI NO. DISCIPLINE SATIP SAIC DESCRIPTION LOCATION CPP QC SAPID RFI STATUS Mapped Status REMARKS
NUMBER INSPECTION INSPECTION DATE

Visual inspection for compaction water sampling


1 CPP-NGCP-CIV-0001 1400038803 Civil Visual Visual and testing from water well beside HWYH- HWYH-1036 FL N/A 26-Dec-18 Hameed Ullah Mr.Adriano CLOSED
1036,sta. N=2739276, E=311886

Clean sand samling and testing from stockpile


2 CPP-NGCP-CIV-0002 1400038813 Civil SATIP-A-114-0 SAIC-A-1001 number 01 near HWYH-1036, HWYH-1036 FL N/A 26-Dec-18 Hameed Ullah Mr.Adriano CLOSED
Sta.N=2736960,E=320966

Visual inspection for compaction water sampling


sta. N=242255,
3 CPP-NGCP-CIV-0003 1400039030 Civil Visual Visual and testing from water well from sta. N=242255, N/A 27-Dec-18 Hameed Ullah Mr.Adriano CLOSED
E=490715
E=490715

Visual inspection for compaction water sampling


sta. N=243316,
4 CPP-NGCP-CIV-0004 1400039019 Civil Visual Visual and testing from water well from sta. N=243316, N/A 27-Dec-18 Hameed Ullah Mr.Adriano CLOSED
E=490767N/A
E=490767

Soil samling and testing for Marl material from


stockpile number 01 near HRDH-1122, borrow Sta.N=242326.1,
5 CPP-NGCP-CIV-0005 1400039345 Civil SATIP-A-114-0 SAIC-A-1001 N/A 29-Dec-18 Hameed Ullah Mr.Adriano CLOSED Samples failed
pit 1 :stockpile 1,stockpile 2,stockpile E=490142.6
3,stockpile 4 Sta.N=242326.1,E=490142.6

Soil samling and testing for Marl material from


Borrow pit 2 stockpile 01 near HWYH-1036 Sta. Sta. E 318645.000,
6 CPP-NGCP-CIV-0006 1400039573 Civil SATIP-A-114-0 SAIC-A-1001 N/A 30-Dec-18 Hameed Ullah Mr.Adriano CLOSED
E 318645.000, N 2738219.000 N 2738219.000

Soil samling and testing for Select fill material


from Borrow pit-01 stockpile-01 near HWYH- Sta. E 321845.000,
7 CPP-NGCP-CIV-0007 1400039826 Civil SATIP-A-114-0 SAIC-A-1001 N/A 31-Dec-18 3:00 PM Hameed Ullah Mr.Adriano CLOSED
1065 Sta. E 321845.000, N 2742583.000 N 2742583.000

Soil sampling and testing of existing ground for


8 CPP-NGCP-CIV-0008 1400040130 Civil SATIP-A-114-0 SAIC-A-1001 pad area at HWYH-1065 HWYH-1065 N/A 01-Jan-19 3:00 PM Hameed Ullah Mr.Adriano CLOSED

Review of Test reports for Clean sand sampled 02-Jan-19


9 CPP-NGCP-CIV-0009 1400040319 Civil SATIP-A-114-0 SAIC-A-1001 HWYH-1036 N/A 4:00 PM Hameed Ullah Mr.Adriano CLOSED
against EPM-RFI-38813

Soil samling and testing of existing ground for


10 CPP-NGCP-CIV-0010 1400041283 Civil SATIP-A-114-0 SAIC-A-1001 pad area at HRDH-1117 HRDH-1117 N/A 06-Jan-19 3:00 PM Hameed Ullah Mr.Adriano CLOSED

Review of Test reports for Select fill material


11 CPP-NGCP-CIV-0011 1400042675 Civil SATIP-A-114-0 SAIC-A-1001 from Borrow pit-01 stockpile-01 near HWYH- HWYH-1036 N/A 10-Jan-19 3:00 PM Hameed Ullah Mr. Raymund CLOSED
1065 sampled against EPM-RFI-39826

Review of Test reports of existing ground


12 CPP-NGCP-CIV-0012 1400042679 Civil SATIP-A-114-0 SAIC-A-1001 material for pad area at HWYH-1065 sampled HWYH-1065 N/A 10-Jan-19 4:00 PM Hameed Ullah Mr. Raymund CLOSED
against EPM-RFI-40130

Soil samling and testing of SelectFill Material


13 CPP-NGCP-CIV-0013 1400042649 Civil SATIP-A-114-0 SAIC-A-1001 Borrow Pit#2,Stockpile#01(E-309916.962,N- HRDH-1117 N/A 10-Jan-19 10:00 AM Hameed Ullah Mr. Raymund CLOSED
2699500.932 Beside HRDH-1117

Review of Test reports of existing ground


14 CPP-NGCP-CIV-0014 1400042845 Civil SATIP-A-114-0 SAIC-A-1001 material for pad area at HRDH-1117 sampled HRDH-1117 N/A 12-Jan-19 9:50 AM Hameed Ullah Mr. Raymund CLOSED
against EPM-RFI-41283

Compaction test inspection of existing ground


15 CPP-NGCP-CIV-0015 1400042856 Civil SATIP-A-114-0 SAIC-A-1005 HRDH-1117 TA-843656 12-Jan-19 3:00 PM Hameed Ullah Mr. Raymund CLOSED
material for pad area at HRDH-1117

Compaction test inspection of existing ground


16 CPP-NGCP-CIV-0016 1400042802 Civil SATIP-A-114-0 SAIC-A-1005 HWYH-1065 TA-843656 12-Jan-19 4:00 PM Hameed Ullah Mr. Raymund CLOSED
material for pad area at HWYH-1065

Trench excavation and trench bottom


17 CPP-NGCP-CIV-0017 1400042961 Civil SATIP-L- 450- 01 SAIC-L-1002 preparation inspection prior to sand bedding for HRDH-1171 FL TA-843656 12-Jan-19 10:00 AM Hameed Ullah Mr. Raymund CLOSED
HRDH-1171 FL at sta. 0+340 to 0+580,

Trench excavation and trench bottom


18 CPP-NGCP-CIV-0018 1400043023 Civil SATIP-L- 450- 01 SAIC-L-1002 preparation inspection prior to sand bedding for HRDH-1171 FL TA-843656 12-Jan-19 10:10 AM Hameed Ullah Mr. Raymund CLOSED
HRDH-1171 FL at sta. 0+633 to 0+700

Trench excavation and trench bottom


19 CPP-NGCP-CIV-0019 1400043005 Civil SATIP-L- 450- 01 SAIC-L-1002 preparation inspection for prior to sand bedding HRDH-1171 FL TA-843656 12-Jan-19 10:20 AM Hameed Ullah Mr. Raymund CLOSED
HRDH-1171 FL at sta. 0+712 to 2+022

Trench excavation and trench bottom


20 CPP-NGCP-CIV-0020 1400042968 Civil SATIP-L- 450- 01 SAIC-L-1002 preparation inspection for prior to sand bedding HRDH-1171 FL TA-843656 12-Jan-19 10:30 AM Hameed Ullah Mr. Raymund CLOSED
HRDH-1171 FL at sta. 2+070 to 2+495

Trench excavation and trench bottom


21 CPP-NGCP-CIV-0021 1400042988 Civil SATIP-L- 450- 01 SAIC-L-1002 preparation inspection for prior to sand bedding HRDH-1171 FL TA-843656 12-Jan-19 10:40 AM Hameed Ullah Mr. Raymund CLOSED
HRDH-1171 FL at sta. 2+547.05 to 2+854.65

Trench excavation and trench bottom


22 CPP-NGCP-CIV-0022 1400043001 Civil SATIP-L- 450- 01 SAIC-L-1002 preparation inspection for prior to sand bedding HRDH-1171 FL TA-843656 12-Jan-19 10:50 AM Hameed Ullah Mr. Raymund CLOSED
HRDH-1171 FL at sta. 2+963 to 3+346.50

Trench excavation and trench bottom


23 CPP-NGCP-CIV-0023 1400042978 Civil SATIP-L- 450- 01 SAIC-L-1002 preparation inspection for prior to sand bedding HRDH-1171 FL TA-843656 12-Jan-19 11:00 AM Hameed Ullah Mr. Raymund CLOSED
HRDH-1171 FL at sta. 3+388.4 to 4+500

Review of Test reports for Marl material from


Borrow pit 2 stockpile 01 near HWYH-1036 Sta. 14-Jan-19
24 CPP-NGCP-CIV-0024 1400043335 Civil SATIP-A- 114- 01 SAIC-A-1001 HWYH-1036 N/A 9:00 AM Hameed Ullah Mr. Raymund CLOSED
E 318645.000, N 2738219.000 sampled against
EPM-RFI-39573

Review of Test reports for Select fill material


beside HRDH-1117(Borrow
25 CPP-NGCP-CIV-0025 1400043780 Civil SATIP-A- 114- 01 SAIC-A-1001 Pit#2,Stockpile#01(E-309916.962,N- HRDH-1117 N/A 16-Jan-19 9:00 AM Hameed Ullah Mr. Raymund CLOSED
2699500.932 Beside HRDH-1117) sampled
against EPM-RFI-42649

Material Receiving inspection for 1st layer back


26 CPP-NGCP-CIV-0026 1400044829 Civil SATIP-A- 114- 01 SAIC-A-1002 HWYH-1065 TA-843656 19-Jan-19 7:00 AM Asif Bilal Mr. Raymund CLOSED
filling for pad area at HWYH-1065

Fill placement and compaction inspection for 1st


27 CPP-NGCP-CIV-0027 1400044864 Civil SATIP-A- 114- 01 SAIC-A-1004 layer back filling for HWYH-1065 TA-843656 19-Jan-19 7:30 AM Asif Bilal Mr. Raymund CLOSED
pad area at HWYH-1065

Compaction test inspection of 1st layer for pad


28 CPP-NGCP-CIV-0028 1400044818 Civil SATIP-A-114-0 SAIC-A-1005 HWYH-1065 TA-843656 19-Jan-19 8:00 AM Asif Bilal Mr. Raymund CLOSED
area at HWYH-1065

Compaction test inspection of 2nd layer for pad This RFI covers only Zone-B
29 CPP-NGCP-CIV-0029 1400044752 Civil SATIP-A-114-0 SAIC-A-1005 HWYH-1065 TA-843656 19-Jan-19 11:00 AM Asif Bilal Mr. Raymund CLOSED
area at HWYH-1065 of HWYH-1065

This RFI covers only Zone-A


of HWYH-1065. As layer
Compaction test inspection of 3rd layer for pad
30 CPP-NGCP-CIV-0030 1400044812 Civil SATIP-A-114-0 SAIC-A-1005 HWYH-1065 TA-843656 19-Jan-19 3:00 PM Asif Bilal Mr. Raymund CLOSED thickness is 500mm so 2nd
area at HWYH-1065
and 3rd layers are covered
in this RFI.

Trench excavation and trench bottom


31 CPP-NGCP-CIV-0031 1400044791 Civil SATIP-L- 450- 01 SAIC-L-1002 preparation inspection for HRDH-922 FL at sta. HRDH-922 TA-843656 19-Jan-19 9:00 AM Hameed Ullah Mr. Raymund CLOSED
0+333 to 0+519

Trench excavation and trench bottom


32 CPP-NGCP-CIV-0032 1400044798 Civil SATIP-L- 450- 01 SAIC-L-1002 preparation inspection for HRDH-922 FL at sta. HRDH-922 TA-843656 19-Jan-19 10:00 AM Hameed Ullah Mr. Raymund CLOSED
0+714 to 1+839.62

Trench excavation and trench bottom


33 CPP-NGCP-CIV-0033 1400044874 Civil SATIP-L- 450- 01 SAIC-L-1002 preparation inspection for HRDH-922 FL at HRDH-922 TA-843656 19-Jan-19 10:30 AM Hameed Ullah Mr. Raymund CLOSED
sta.1+839.62 to 1+932.00

Trench excavation and trench bottom


34 CPP-NGCP-CIV-0034 1400044828 Civil SATIP-L- 450- 01 SAIC-L-1002 preparation inspection for HWYH-1134 FL at HWYH-1134 TA-843656 19-Jan-19 11:00 AM Hameed Ullah Mr. Raymund CLOSED
sta.0+608 to 2+946

Soil sampling, testing and review of test reports


for Marl material from Borrow pit 1 stockpile 05
35 CPP-NGCP-CIV-0035 1400044790 Civil SATIP-A-114-0 SAIC-A-1001 near HRDH-1122 Sta. E-309577.273, N- HRDH-1122 N/A 19-Jan-19 9:00 AM Hameed Ullah Mr. Raymund CLOSED
2697862.557

Soil sampling, testing and review of test reports


36 CPP-NGCP-CIV-0036 1400044844 Civil SATIP-A-114-0 SAIC-A-1001 HRDH-1122 N/A 19-Jan-19 9:00 AM Hameed Ullah Mr. Raymund CLOSED
for Existing ground material of HRDH-1122

Trench excavation and trench bottom


37 CPP-NGCP-CIV-0037 1400045372 Civil SATIP-L- 450- 01 SAIC-L-1002 preparation inspection for prior to sand bedding HWYH-1076 TA-445861 21-Jan-19 3:00 PM Hameed Ullah Mr. Raymund CLOSED
HWYH-1076 FL at sta. 0+351 to 1+611

Trench excavation and trench bottom


38 CPP-NGCP-CIV-0038 1400045485 Civil SATIP-L- 450- 01 SAIC-L-1002 preparation inspection for prior to sand bedding HRDH-1170 TA-843656 21-Jan-19 11:00 AM Hameed Ullah Mr. Raymund CLOSED
HRDH-1170 FL at sta. 0+350 to 1+420

Compaction test inspection of Existing ground


39 CPP-NGCP-CIV-0039 1400045720 Civil SATIP-A-114-0 SAIC-A-1005 HRDH-1122 TA-843656 22-Jan-19 3:00 PM Hameed Ullah Mr. Raymund CLOSED
material of pad area at HRDH-1122

borrow pit#1,
Soil sampling, testing and review of test reports
stockpile#1 sta.
40 CPP-NGCP-CIV-0040 1400046029 Civil SATIP-A-114-0 SAIC-A-1001 for clean sand at borrow pit#1, stockpile#1 sta. N/A 23-Jan-19 9:00 AM Hameed Ullah Mr. Raymund CLOSED
N=2670950.629,
N=2670950.629, E=339117.463
E=339117.463

Compaction test inspection of 3rd layer of Zone-


41 CPP-NGCP-CIV-0041 1400046083 Civil SATIP-A-114-0 SAIC-A-1005 HWYH-1065 TA-843656 23-Jan-19 3:00 PM Asif Bilal Mr. Raymund CLOSED
B for pad area at HWYH-1065

Material Receiving inspection for 1st layer back


42 CPP-NGCP-CIV-0042 1400046330 Civil SATIP-A- 114- 01 SAIC-A-1002 HRDH-1117 TA-843656 24-Jan-19 3:00 PM Hameed Ullah Mr. Raymund CLOSED
filling for pad area at HRDH-1117

Fill placement and compaction inspection for 1st 24-Jan-19


43 CPP-NGCP-CIV-0043 1400046331 Civil SATIP-A- 114- 01 SAIC-A-1004 HRDH-1117 TA-843656 3:00 PM Hameed Ullah Mr. Raymund CLOSED
layer back filling for pad area at HRDH-1117

Compaction test inspection of 1st layer for pad 24-Jan-19


44 CPP-NGCP-CIV-0044 1400046348 Civil SATIP-A-114-0 SAIC-A-1005 HRDH-1117 TA-843656 3:00 PM Hameed Ullah Mr. Raymund CLOSED
area at HRDH-1117

Soil sampling, testing and review of test reports


45 CPP-NGCP-CIV-0045 1400046696 Civil SATIP-A-114-0 SAIC-A-1001 HRDH-1308 TA-843656 26-Jan-19 9:00 AM Hameed Ullah Mr. Raymund CLOSED
for existing ground material of HRDH-1308

Soil sampling, testing and review of test reports


46 CPP-NGCP-CIV-0046 1400046651 Civil SATIP-A-114-0 SAIC-A-1001 HRDH-1035 TA-843656 26-Jan-19 9:10 AM Hameed Ullah Mr. Raymund CLOSED
for existing ground material of HRDH-1035

Soil sampling, testing and review of test reports


47 CPP-NGCP-CIV-0047 1400046639 Civil SATIP-A-114-0 SAIC-A-1001 for Borrow Pit 1 NEAR-HRDH-1035 TA-843656 26-Jan-19 9:20 AM Hameed Ullah Mr. Raymund CLOSED ON HOLD
,Stockpile 1(E-490459.0, N-242553.1)

Soil sampling, testing and review of test reports


for Borrow Pit 1
48 CPP-NGCP-CIV-0048 1400046697 Civil SATIP-A-114-0 SAIC-A-1001 NEAR-HRDH-1035 TA-843656 26-Jan-19 9:30 AM Hameed Ullah Mr. Raymund CLOSED ON HOLD
Stockpile 2(E-490400.523,
N-242579.54)

Soil sampling, testing and review of test reports


for Borrow Pit 2
49 CPP-NGCP-CIV-0049 1400046680 Civil SATIP-A-114-0 SAIC-A-1001 NEAR-HRDH-1308 TA-843656 26-Jan-19 9:40 AM Hameed Ullah Mr. Raymund CLOSED ON HOLD
Stockpile 1(E-470826.90.,
N-244304.87)

Compaction test inspection of 2nd layer of


50 CPP-NGCP-CIV-0050 1400046674 Civil SATIP-A-114-0 SAIC-A-1005 500mm for pad area at HWYH-1065 (Zone A & HWYH-1065 TA-843656 26-Jan-19 3:00 PM Asif Bilal Mr. Raymund CLOSED
B)

Compaction test inspection of 3rd layer of


51 CPP-NGCP-CIV-0051 1400046909 Civil SATIP-A-114-0 SAIC-A-1005 500mm for pad area at HWYH-1065 (Zone A & HWYH-1065 TA-843656 27-Jan-19 3:00 PM Asif Bilal Mr. Raymund CLOSED
B)

Material Receiving inspection for 1st layer back


52 CPP-NGCP-CIV-0052 1400047517 Civil SATIP-A- 114- 01 SAIC-A-1002 filling for pad at HRDH-1122 HRDH-1122 TA-843656 28-Jan-19 2:40 PM Hameed Ullah Mr. Raymund CLOSED
Zone A and B

Fill placement and compaction inspection for 1st


53 CPP-NGCP-CIV-0053 1400047523 Civil SATIP-A- 114- 01 SAIC-A-1004 layer back filling for pad at HRDH-1122 Zone A HRDH-1122 TA-843656 28-Jan-19 2:50 PM Hameed Ullah Mr. Raymund CLOSED
and B

Compaction test inspection of 1st layer for pad


54 CPP-NGCP-CIV-0054 1400047450 Civil SATIP-A-114-0 SAIC-A-1005 at HRDH-1122 HRDH-1122 TA-843656 28-Jan-19 3:00 PM Hameed Ullah Mr. Raymund CLOSED
Zone A and B

Compaction test inspection of 2nd layer


55 CPP-NGCP-CIV-0055 1400047451 Civil SATIP-A-114-0 SAIC-A-1005 HRDH-1117 TA-843656 28-Jan-19 2:00 PM Hameed Ullah Mr. Raymund CLOSED
(300mm) for pad area at HRDH-1117
Compaction test inspection of 6th layer (300mm) 28-Jan-19
56 CPP-NGCP-CIV-0056 1400047518 Civil SATIP-A-114-0 SAIC-A-1005 HWYH-1065 TA-843656 3:00 PM Asif Bilal Mr. Raymund CLOSED
for pad at HWYH-1065 Re-scheduled for 29th
jan. because of sandstorm
work not completed.

Compaction test inspection of 1st layer back 29-Jan-19


57 CPP-NGCP-CIV-0057 1400047507 Civil SATIP-A-114-0 SAIC-A-1005 HRDH-1122 TA-843656 3:00 PM Hameed Ullah Mr. Raymund CLOSED
filling for pad at HRDH-1122 Zone C

Compaction test inspection of 2nd layer back


58 CPP-NGCP-CIV-0058 1400047780 Civil SATIP-A-114-0 SAIC-A-1005 HRDH-1122 TA-843656 30-Jan-19 3:00 PM Hameed Ullah Mr. Raymund CLOSED
filling for pad at HRDH-1122 Zone C

Compaction test inspection of 7th layer (300mm)


59 CPP-NGCP-CIV-0059 1400047793 Civil SATIP-A-114-0 SAIC-A-1005 HWYH-1065 TA-843656 30-Jan-19 2:00 PM Asif Bilal Mr. Raymund CLOSED
for pad at HWYH-1065

Compaction test inspection of 2nd layer back


60 CPP-NGCP-CIV-0060 1400047990 Civil SATIP-A-114-0 SAIC-A-1005 HRDH-1122 TA-843656 01-Feb-19 3:00 PM Hameed Ullah Mr. Raymund CLOSED
filling for pad at HRDH-1122 Zone A,B & C

Compaction test inspection of 8th layer (300mm)


61 CPP-NGCP-CIV-0061 1400047956 Civil SATIP-A-114-0 SAIC-A-1005 HWYH-1065 TA-843656 01-Feb-19 2:00 PM Asif Bilal Mr. Raymund Rejected Job Not Ready
for pad at HWYH-1065

Compaction test inspection of 3rd layer (300mm)


62 CPP-NGCP-CIV-0062 1400047978 Civil SATIP-A-114-0 SAIC-A-1005 HRDH-1117 TA-843656 31-Jan-19 2:00 PM Hameed Ullah Mr. Raymund CLOSED
for pad area at HRDH-1117 (Area 159.2 x 18.5)

Compaction test inspection of Existing layer


63 CPP-NGCP-CIV-0063 1400048015 Civil SATIP-A-114-0 SAIC-A-1005 (300mm) for pad area at HRDH-1035 HRDH-1035 TA-843656 31-Jan-19 2:00 PM Asif Bilal Mr. Raymund CLOSED

Soil sampling, testing and review of test reports.


64 CPP-NGCP-CIV-0064 1400048520 Civil SATIP-A-114-0 SAIC-A-1001 HWYH-1134 N/A 03-Feb-19 9:40 AM Asif Bilal Mr. Raymund CLOSED
Existing Material at well pad-HWYH-1134

Soil sampling, testing and review of test reports.


65 CPP-NGCP-CIV-0065 1400048440 Civil SATIP-A-114-0 SAIC-A-1001 HWYH-1093 N/A 03-Feb-19 9:40 AM Asif Bilal Mr. Raymund CLOSED
Existing Material at well pad-HWYH-1093

HWYH Area (E-


Soil sampling, testing and review of test reports.
66 CPP-NGCP-CIV-0066 1400048573 Civil SATIP-A-114-0 SAIC-A-1001 318700.00 - N- N/A 03-Feb-19 9:40 AM Hameed Ullah Mr. Raymund CLOSED
Borrow pit#1 (E-318700.00 - N-2733550)
273355)

Compaction test inspection of 9th layer (300mm) 02-Feb-19 AAMIR


67 CPP-NGCP-CIV-0067 1400048122 Civil SATIP-A-114-0 SAIC-A-1005 HWYH-1065 TA-843656 2:00 PM Mr. Raymund CLOSED
for pad at HWYH-1065 SOLANGI

Compaction test inspection of 8th layer (300mm) RE-shedule on 4-feb-2019


68 CPP-NGCP-CIV-0068 1400048584 Civil SATIP-A-114-0 SAIC-A-1005 HWYH-1065 TA-843656 03-Feb-19 2:00 PM Asif Bilal Mr. Raymund Rejected (Correction in Desc. 10th
for pad at HWYH-1065 layer instead of 8th)

Compaction Test inspection of Existing Ground Replied in the EPM as work


69 CPP-NGCP-CIV-0069 1400048590 Civil SATIP-A-114-0 SAIC-A-1005 Surface for Zone B of Well HRDH-1035 TA-843657 03-Feb-19 8:30 AM Hameed Ullah Mr. Raymund CLOSED could not be started due to
Pad 1035 work permit issue

Compaction Test inspection of 1st Layer area


70 CPP-NGCP-CIV-0070 1400048644 Civil SATIP-A-114-0 SAIC-A-1005 205.298m2 for Zone A of HRDH-1035 TA-843658 03-Feb-19 9:00 AM Hameed Ullah Mr. Raymund CLOSED
Well Pad 1035

Compaction Test inspection of 2nd Layer for


71 CPP-NGCP-CIV-0071 1400048580 Civil SATIP-A-114-0 SAIC-A-1005 Zone A of HRDH-1035 TA-843659 03-Feb-19 2:00 PM Hameed Ullah Mr. Raymund Rejected Job Not Ready
Well Pad 1035

Compaction Test inspection of 3rd Layer for


Zone A area 708.640m2 and
72 CPP-NGCP-CIV-0072 1400048645 Civil SATIP-A-114-0 SAIC-A-1005 HRDH-1122 TA-843660 03-Feb-19 1:15 PM Hameed Ullah Mr. Raymund CLOSED
Zone B area 983.410m2 and Zone C 860.00 of
Well Pad 1122

Compaction test inspection of 4th layer (300mm)


73 CPP-NGCP-CIV-0073 1400048739 Civil SATIP-A-114-0 SAIC-A-1005 HRDH-1117 TA-843656 04-Feb-19 2:00 PM Hameed Ullah Mr. Raymund CLOSED
Area(159.2m x 18.53) for HRDH-1117

Soil sampling, testing and review of test reports


74 CPP-NGCP-CIV-0074 1400048959 Civil SATIP-A-114-0 SAIC-A-1001 HRDH-1116 TA-843656 05-Feb-19 9:00 AM Hameed Ullah Mr. Raymund CLOSED
for existing ground material of HRDH-1116

Soil sampling, testing and review of test reports


75 CPP-NGCP-CIV-0075 1400048947 Civil SATIP-A-114-0 SAIC-A-1001 HRDH-1170 TA-843656 05-Feb-19 9:40 AM Hameed Ullah Mr. Raymund CLOSED
for existing ground material of HRDH-1170

Compaction Test inspection of 4th Layer for


Well Pad 1122. ZoneA_ 40 L 21.500 W, Zone B
76 CPP-NGCP-CIV-0076 1400049200 Civil SATIP-A-114-0 SAIC-A-1005 HRDH 1122 N/A 06-Feb-19 1:15 PM Hameed Ullah Mr. Raymund CLOSED
_ 50 L 21.500 W, Zone _C_ 40 L 21.5 W

Re-Schedule to 09-Feb-
Compaction test inspection of 5th layer (300mm)
77 CPP-NGCP-CIV-0077 1400049637 Civil SATIP-A-114-0 SAIC-A-1005 HRDH-1117 TA-843656 07-Feb-19 2:00 PM Hameed Ullah Mr. Raymund CLOSED 2019due to grader
Area(159.2m x 18.53) for HRDH-1117
breakdown

Soil sampling, testing and review of test reports


78 CPP-NGCP-CIV-0078 1400050339 Civil SATIP-A-114-0 SAIC-A-1001 HWYH-1102 N/A 10-Feb-19 9:40 AM Asif Bilal Mr. Raymund CLOSED
for existing ground material of HWYH-1102

Trench excavation and trench bottom


preparation inspection from KM-4+500 to KM-
4+582.5,KM-4+592 to KM-4+983.5,KM-
6+205.18 to KM-6+288.24,KM-6+294.22 to
79 CPP-NGCP-CIV-0079 1400050154 Civil SATIP-L- 450- 01 SAIC-L-1002 HRDH-1171 N/A 09-Feb-19 11:00 AM Hameed Ullah Mr. Raymund CLOSED
KM6+541,KM-6+567.82 to KM-6+913,KM-6+992
to KM-7+087,KM-7+140 to KM8+100 for Flow
Line-1171
HRDH-1171 FL

Compaction test inspection of 2nd layer Zone A


80 CPP-NGCP-CIV-0080 1400050118 Civil SATIP-A-114-0 SAIC-A-1005 HRDH-1035 N/A 09-Feb-19 2:00 PM Hameed Ullah Mr. Raymund CLOSED
(300mm) Area (281.446 m2) at Well pad 1035

Compaction Test inspection of Existing Ground


81 CPP-NGCP-CIV-0081 1400050096 Civil SATIP-A-114-0 SAIC-A-1005 Surface for Zone B Area (1521.292) at Well HRDH-1035 N/A 09-Feb-19 8:30 AM Hameed Ullah Mr. Raymund CLOSED
Pad 1035

Compaction Test inspection of Existing Ground


82 CPP-NGCP-CIV-0082 1400050399 Civil SATIP-A-114-0 SAIC-A-1005 HWYH-1102 N/A 10-Feb-19 8:30 AM Asif Bilal Mr. Raymund CLOSED
in HWYH-1102

Trench excavation and bottom of trench


preparation for 8'' F/L HRDH 922 from Sta-
83 CPP-NGCP-CIV-0083 1400050370 Civil SATIP-L- 450- 01 SAIC-L-1002 2+000-2+040,2+066-2+650,2+700- HRDH 922 TA-843609 10-Feb-19 11:00 AM Hameed Ullah Mr. Raymund CLOSED
2+866,2+894-2-980,3+011-3+249,3+312-3+565,
total 2750.62m/4191m
Compaction test inspection for 5th layer of Zone
84 CPP-NGCP-CIV-0084 1400050433 Civil SATIP-A-114-0 SAIC-A-1005 B 50m x 21.500m and Zone C 40m x 21.500m HRDH 1122 BA-407560 10-Feb-19 2:00 PM Hameed Ullah Mr. Raymund CLOSED
at wellpad HRDH 1122
Select fill Material Receiving Inspection for
85 CPP-NGCP-CIV-0085 1400050798 Civil SATIP-A-114-0 SAIC-A-1002 HWYH 1102 Well pad extension Zone A, B, C HWYH-1102 N/A 11-Feb-19 2:00 PM Asif Bilal Mr. Raymund CLOSED
and D
Fill Placement and compaction Inspection
86 CPP-NGCP-CIV-0086 1400050834 Civil SATIP-A-114-0 SAIC-A-1004 HWYH 1102 Well pad extension Zone A, B, C HWYH-1102 N/A 11-Feb-19 3:00 PM Asif Bilal Mr. Raymund CLOSED
and D
Compaction Test inspection of 1st layer Zone 11-Feb-19
87 CPP-NGCP-CIV-0087 1400050799 Civil SATIP-A-114-0 SAIC-A-1005 HWYH-1102 N/A 2:00 PM Asif Bilal Mr. Raymund CLOSED
A,B,C and D HWYH-1102
Compaction test inspection of 8th layer (300mm)
88 CPP-NGCP-CIV-0088 1400050824 Civil SATIP-A-114-0 SAIC-A-1005 for pad at HWYH-1065 (Old EPM No: HWYH-1065 TA-843656 11-Feb-19 9:00 PM Asif Bilal Mr. Raymund CLOSED
1400047956)

Trench excavation and bottom of trench


preparation for 8" F/L HRDH-1116 from Sta-
0+550-0+919,1+025-1+207,1+229- 11-Feb-19
89 CPP-NGCP-CIV-0089 1400050835 Civil SATIP-L- 450- 01 SAIC-L-1002 HRDH-1116 TA-843608 11:00 AM Hameed Ullah Mr. Raymund CLOSED
1+814,1+863-2+022,2+050-2+382.5,2+450-
2+700,2+791-3+015,3+080.73-
3+114.73,3+156.73-3+247.73 total 2226.5/3281

Material Receiving inspection of General fill 11-Feb-19


90 CPP-NGCP-CIV-0090 1400050826 Civil SATIP-A- 114- 01 SAIC-A-1002 HRDH-1035 BA-502572 10:00 AM Hameed Ullah Mr. Raymund CLOSED
material for wellpad 1035
3rd layer compaction test for zone A Area 372.
91 CPP-NGCP-CIV-0091 1400050800 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1035 BA-502572 11-Feb-19 8:30 AM Hameed Ullah Mr. Raymund CLOSED
237 m2 at well pad 1035
1st layer compaction test for Zobe B aarea319. 11-Feb-19
92 CPP-NGCP-CIV-0092 1400050782 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1035 BA-502572 8:00 AM Hameed Ullah Mr. Raymund CLOSED
534 m2 at well pad 1035
Fill placement and compaction inspection for
93 CPP-NGCP-CIV-0093 1400050828 Civil SATIP-A- 114- 01 SAIC-A-1004 HRDH-1035 BA-502572 11-Feb-19 2:50 PM Hameed Ullah Mr. Raymund CLOSED
General Fill material at well 1035

1400050863 2nd layer compaction test for Zone B Area 11-Feb-19


94 CPP-NGCP-CIV-0094 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1035 BA-502572 8:15 AM Hameed Ullah Mr. Raymund CLOSED
339.904 m2 at wellpad 1035
4th layer compaction test for Zone A Area
95 CPP-NGCP-CIV-0095 1400050873 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1035 BA-502572 11-Feb-19 1:00 PM Hameed Ullah Mr. Raymund CLOSED
396.702 m2 at well pad 1035
Compaction Test inspection of 2nd layer Zone A
96 CPP-NGCP-CIV-0096 1400050917 Civil SATIP-A- 114- 01 SAIC-A-1005 Area 686m2,B Area 438m2,C Area 309m2and D HWYH-1102 BA-083535 12-Feb-19 2:00 PM Asif Bilal Mr. Raymund CLOSED
Area 655 m2 HWYH-1102

Existing Ground compaction test for extension


97 CPP-NGCP-CIV-0097 1400051233 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1116 TA-843608 12-Feb-19 9:00 AM Talal Shabbir Mr. Raymund CLOSED
area (1508 m2) at wellpad HRDH-1116

Compaction test inspection of 6th layer Area


98 CPP-NGCP-CIV-0098 1400051243 Civil SATIP-A- 114- 01 SAIC-A-1005 168m x 17m ompaction test inspection for HRDH-1117 TA-843656 12-Feb-19 9:00 AM Hameed Ullah Mr. Raymund CLOSED
wellpad HRDH-1117
Compaction Test inspection of 3rd layer Zone
99 CPP-NGCP-CIV-0099 1400051605 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-1102 BA-083535 13-Feb-19 2:00 PM Asif Bilal Mr. Raymund CLOSED
A,B,C and D HWYH-1102

100 CPP-NGCP-CIV-0100 1400051594 Civil SATIP-A- 114- 01 SAIC-A-1001 Existing Ground sampling testing and review HRDH-1162 N/A 13-Feb-19 9:00 AM Hameed Ullah Mr. Raymund CLOSED
of test reports. HRDH-1162

Compaction Testing of Zone A 5 Layer 300 mm 14-Feb-19 11:00 AM


101 CPP-NGCP-CIV-0101 1400051999 Civil SATIP-A- 114- 01 SAIC-A-1005 Area 385.609 sq.m and Zone B 3rd Layer HRDH-1035 BA-502572 Talal Shabbir Mr. Raymund CLOSED
300mm Area 377.204 Well Pad Extension
Compaction Test inspection of 4th layer Zone
102 CPP-NGCP-CIV-0102 1400052000 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-1102 BA-083535 14-Feb-19 2:00 PM Asif Bilal Mr. Raymund CLOSED
A,B,C and D HWYH-1102
COMPACTION TESTING OF ZONE A 6TH
LAYER 300MM AREA=529.687 sq.m AND
103 CPP-NGCP-CIV-0103 1400052396 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1035 BA-502572 16-Feb-19 11:00 AM Talal Shabbir Mr. Raymund CLOSED
ZONE B 4TH LAYER 300MM AREA=362.934
sq.m HRDH-1035 WELL PAD EXTENSION
Material Receiving inspection of General filll/marl
104 CPP-NGCP-CIV-0104 1400052450 Civil SATIP-A- 114- 01 SAIC-A-1002 HRDH-1116 BA-797796 16-Feb-19 10:00 AM Talal Shabbir Mr. Raymund CLOSED
material for wellpad 1116
Fill placement and compaction inspection for
105 CPP-NGCP-CIV-0105 1400052453 Civil SATIP-A- 114- 01 SAIC-A-1004 HRDH-1116 BA-797796 16-Feb-19 10:30 AM Talal Shabbir Mr. Raymund CLOSED
General Fill/Marl material at well 1116
COMPACTION TESTING OF ZONE A 1ST
LAYER 300MM AREA=147.635 sq.m & ZONE B
106 CPP-NGCP-CIV-0106 1400052446 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1116 BA-797796 16-Feb-19 11:30 AM Talal Shabbir Mr. Raymund CLOSED
1ST LAYER 300MM AREA=83.322 sq.m
HRDH-1116 WELL PAD EXTENSION
Compaction Test inspection of 5th layer Zone
107 CPP-NGCP-CIV-0107 1400052449 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-1102 BA-083535 16-Feb-19 2:00 PM Asif Bilal Mr. Raymund CLOSED
A,B,C and D HWYH-1102
Trench excavation and bottom of trench
preparation for 8" F/L HWYH-1134 from Station
108 CPP-NGCP-CIV-0108 1400052488 Civil SATIP-L-450- 01 SAIC-L-1002 HWYH-1134 TA-445836 16-Feb-19 10:00 AM Asif Bilal Mr. Raymund CLOSED
3+577 to 3+607 , 30 meters as per Drawing TA- Re-Schedule to 17-Feb-
445836-004 2019
Pipe lowering 8" F/L HWYH-1134 from Station
109 CPP-NGCP-CIV-0109 1400052536 Civil SATIP-L-450- 01 SAIC-L-1003 3+577 to 3+607 , 30 meters as per Drawing TA- HWYH-1134 TA-445836 16-Feb-19 1:00 PM Asif Bilal Mr. Raymund CLOSED Re-Schedule to 17-Feb-
445836-004 2019
Backfilling of 8" F/L HWYH-1134 from Station
110 CPP-NGCP-CIV-0110 1400052461 Civil SATIP-L-450- 01 SAIC-L-1004 3+577 to 3+607 , 30 meters as per Drawing TA- HWYH-1134 TA-445836 16-Feb-19 2:00 PM Asif Bilal Mr. Raymund CLOSED Re-Schedule to 17-Feb-
445836-004 2019
Existing ground compaction test for HRDH
111 CPP-NGCP-CIV-0111 1400052807 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1162 BA-805095 17-Feb-19 3:00 PM Hameed Ullah Mr. Raymund CLOSED
WELL 1162
Final(7th) Layer Compaction test for HRDH
112 CPP-NGCP-CIV-0112 1400052776 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1117 BA-797882 17-Feb-19 3:15 PM Hameed Ullah Mr. Raymund CLOSED
WELL 1117
COMPACTION TEST INSPECTION OF ZONE A
1400052834 7TH FINAL LAYER 300MM AND ZONE B 5TH 17-Feb-19 TALAL
113 CPP-NGCP-CIV-0113 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1035 BA-502572 11:00 AM Mr. Raymund CLOSED Re-Schedule to 18-Feb-
LAYER 300MM HRDH-1035 WELL PAD SHABBIR 2019 Due to Equipment
EXTENSION Break Down
COMPACTION TEST INSPECTION OF ZONE A
1400052843 17-Feb-19 TALAL
114 CPP-NGCP-CIV-0114 Civil SATIP-A- 114- 01 SAIC-A-1005 2ND LAYER 300MM & ZONE B 2ND LAYER HRDH-1116 BA-797796 11:30 AM Mr. Raymund CLOSED
SHABBIR
300MM HRDH-1116 WELL PAD EXTENSION

Compaction Test inspection of 6th layer Zone AAMIR


115 CPP-NGCP-CIV-0115 1400052815 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-1102 BA-083535 16-Feb-19 2:00 PM Mr. Raymund CLOSED
A,B,C and D HWYH-1102 SOLANGI
1st layer base course compaction test for 8"F/L
203 CPP-NGCP-CIV-0203 1400061546 Civil SATIP-Q- 006- 02 SAIC-A-1005 HRDH-1171 asphalt open HRDH-1171 TA-843547 07-Mar-19 9:00 AM Hameed Ullah Mr. Raymund CLOSED
cut near RH AK

AAMIR
370 CPP-NGCP-CIV-0368 1400073506 Civil SATIP-Q-006-02 SAIC-Q-1037 Aggregate Base Course Material Receiving HWYH-1134 N/A 26-Mar-19 11.00 AM Mr. Randy CLOSED Cancelled
SOLANGI
Inspection HWYH-1134 KM-3+150 to 3+180
ASPHALT OPEN CUT

Asphalt concrete Receiving, Placement and


246 CPP-NGCP-CIV-0244 1400065351 Civil SATIP-Q-006-02 SAIC-Q-1061 Testing Inspection for Open cut road crossing at HRDH-1171 TA-843547 13-Mar-19 16:00 PM Hameed Ullah Mr. Raymund CLOSED Cancelled
HRDH-1171 sta.9+000 to 9+014

1400057038 Clean sand Receiving Inspection for Asphalt 27-Feb-19 11:00 AM


160 CPP-NGCP-CIV-0159 Civil SATIP-A- 114- 01 SAIC-A-1002 Open Cut Road Hrdh 1171 HRDH-1171 TA-843656 Hameed Ullah Mr. Raymund CLOSED
- Job not Ready

Compaction Testing Aggregate Base Course AAMIR


372 CPP-NGCP-CIV-0370 1400073508 Civil SATIP-Q-006-02 SAIC-A-1005 Material HWYH-1134 KM-3+150 to 3+180 HWYH-1134 N/A 26-Mar-19 11.30 AM Mr. Randy CLOSED Cancelled
SOLANGI
ASPHALT OPEN CUT

121 CPP-NGCP-CIV-0120 1400052982 Civil SATIP-A- 114- 01 SAIC-A-1002 Material Receiving inspection for General HRDH-1122 BA-407560 18-Feb-19 9:00 AM Hameed Ullah Mr. Raymund CLOSED
Fill material for wellpad HRDH 1122
122 CPP-NGCP-CIV-0121 1400053076 Civil SATIP-A- 114- 01 SAIC-A-1004 Fill placement and compaction inspection HRDH-1122 BA-407560 18-Feb-19 10:30 AM Hameed Ullah Mr. Raymund CLOSED
for 6th layer at wellpad 1122

COMPACTION TESTING OF ZONE A 3rd LAYER TALAL


123 CPP-NGCP-CIV-0122 1400053186 Civil SATIP-A- 114- 01 SAIC-A-1005 300MM & ZONE B 3rd LAYER 300MM HRDH-1116 HRDH-1116 BA-797796 18-Feb-19 1:00 PM Mr. Raymund CLOSED
SHABBIR
WELL PAD EXTENSION
Compaction Test inspection of 7th layer Zone AAMIR
124 CPP-NGCP-CIV-0123 1400053407 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-1102 BA-083535 19-Feb-19 2:00 PM Mr. Raymund CLOSED
A,B,C and D HWYH-1102 SOLANGI ON HOLD

Trench excavation and bottom of trench


125 CPP-NGCP-CIV-0124 1400053522 Civil SATIP-L-450- 01 SAIC-L-1002 preparation for 8'' F/L HRDH 1162 feom Sta- HRDH-1162 BA-805095 19-Feb-19 9:00 AM Hameed Ullah Mr. Raymund CLOSED
0+060-0+150,0+224-0+525,0+570-1+059,1+091-
1+300,1+318-1+378,1+408.133-1+463,Total
1204/1500
126 CPP-NGCP-CIV-0125 1400053633 Civil SATIP-A- 114- 01 SAIC-A-1005 6th layer(300mm) compaction test for Zone C HRDH-1122 BA-407560 19-Feb-19 10:30 AM Hameed Ullah Mr. Raymund CLOSED
at HRDH wellpad 1122
COMPACTION TEST INSPECTION OF ZONE B
TALAL
127 CPP-NGCP-CIV-0126 1400053561 Civil SATIP-A- 114- 01 SAIC-A-1005 6TH LAYER 300MM HRDH-1035 WELL PAD HRDH-1035 BA-502572 19-Feb-19 1:00 PM Mr. Raymund CLOSED
SHABBIR
EXTENSION

COMPACTION TEST INSPECTION OF ZONE A


TALAL
128 CPP-NGCP-CIV-0127 1400053604 Civil SATIP-A- 114- 01 SAIC-A-1005 4th LAYER 300MM & ZONE B 4th LAYER HRDH-1116 BA-797796 19-Feb-19 1:00 PM Mr. Raymund CLOSED
SHABBIR
300MM HRDH-1116 WELL PAD EXTENSION

129 CPP-NGCP-CIV-0128 1400053703 Civil SATIP-A- 114- 01 SAIC-A-1002 Sand Materials Receiving Inspection for HWYH-1134 TA-445836 19-Feb-19 9:00 AM Asif Bilal Mr. Raymund CLOSED
HWYH-1134 8" FL

Fill Placement and Compaction Inspection of


130 CPP-NGCP-CIV-0129 1400053694 Civil SATIP-A- 114- 01 SAIC-A-1004 Open Cut HWYH-1134 8" Flowline from Station HWYH-1134 TA-445836 19-Feb-19 10:00 PM Asif Bilal Mr. Raymund CLOSED
03+575 to Station 03+600 (Sand) 300 mm
Layer 1st Layer

Compaction Test Inspection of Open Cut


131 CPP-NGCP-CIV-0130 1400053665 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-1134 8" Flowline from Station 03+575 to HWYH-1134 TA-445836 19-Feb-19 11:00 PM Asif Bilal Mr. Raymund CLOSED
Station 03+600 (Sand) 300 mm Layer 1st Layer
ON HOLD

Compaction Test Inspection of Open Cut


132 CPP-NGCP-CIV-0131 1400053685 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-1134 8" Flowline from Station 03+575 to HWYH-1134 TA-445836 19-Feb-19 1:00 PM Asif Bilal Mr. Raymund CLOSED
Station 03+600 (Sand) 300 mm Layer 2nd Layer
ON HOLD

Compaction Test Inspection of Open Cut


133 CPP-NGCP-CIV-0132 1400053648 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-1134 8" Flowline from Station 03+575 to HWYH-1134 TA-445836 19-Feb-19 2:00 PM Asif Bilal Mr. Raymund CLOSED
Station 03+600 (Sand) 300 mm Layer 3rd Layer

Compaction Test Inspection of Open Cut


HWYH-1134 8" Flowline from Station 03+575 to
134 CPP-NGCP-CIV-0133 1400053678 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-1134 TA-445836 19-Feb-19 3:00 PM Asif Bilal Mr. Raymund CLOSED
Station 03+600 (Select fill) 200 mm Layer 4th
Layer
Compaction Test Inspection of Open Cut
HWYH-1134 8" Flowline from Station 03+575 to
135 CPP-NGCP-CIV-0134 1400053679 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-1134 TA-445836 19-Feb-19 3:30 PM Asif Bilal Mr. Raymund CLOSED
Station 03+600 (Select fill) 200 mm Layer 5th
Layer

136 CPP-NGCP-CIV-0135 1400054029 Civil SATIP-A-114-01 SAIC-A-1001 Soil sampling testing and review of test HRDH-1145 N/A 20-Feb-19 9:00 AM Hameed Ullah Mr. Raymund CLOSED
reports for General Fill(Marl) material
Hrdh Borrow Pit#3, stockpile#1(E-
310860.442,N-2699011.793) Near Wellpad 1145

Soil sampling testing and review of test


137 CPP-NGCP-CIV-0136 1400053968 Civil SATIP-A-114-01 SAIC-A-1001 reports for General Fill(Marl) material HRDH-1180 N/A 20-Feb-19 9:30 AM Hameed Ullah Mr. Raymund CLOSED
Hrdh Borrow Pit#4, stockpile#1(E-308210.
110,N-2695797.310) Near Wellpad 1180

138 CPP-NGCP-CIV-0137 1400054031 Civil SATIP-A-114-01 SAIC-A-1006 Final Fill Inspection for HRDH WELL PAD-1117 HRDH-1117 TA-843656 20-Feb-19 11:00 AM Hameed Ullah Mr. Raymund CLOSED

Material Receiving inspection for General Fill


139 CPP-NGCP-CIV-0138 1400054049 Civil SATIP-A- 114- 01 SAIC-A-1002 HRDH-1162 BA-805095 20-Feb-19 1:00 PM Hameed Ullah Mr. Raymund CLOSED
material at HRDH 1162

Fill placement and compaction inspection of 1st


140 CPP-NGCP-CIV-0139 1400053998 Civil SATIP-A- 114- 01 SAIC-A-1004 HRDH-1162 BA-805095 20-Feb-19 1:30 PM Hameed Ullah Mr. Raymund CLOSED
layer for Zone A and B at HRDH wellpad 1162

1400054032 1st Layer(300mm) Compaction test inspection 20-Feb-19


141 CPP-NGCP-CIV-0140 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1162 BA-805095 2:00 PM Hameed Ullah Mr. Raymund CLOSED
for Zone A and B at HRDH wellpad 1162

COMPACTION TEST INSPECTION OF ZONE B


TALAL
142 CPP-NGCP-CIV-0141 1400053971 Civil SATIP-A- 114- 01 SAIC-A-1005 7TH LAYER 300MM HRDH-1035 WELL PAD HRDH-1035 BA-502572 20-Feb-19 08:00:00 AM Mr. Raymund CLOSED
SHABBIR
EXTENSION

COMPACTION TEST INSPECTION OF ZONE A


1400054063 20-Feb-19 TALAL
143 CPP-NGCP-CIV-0142 Civil SATIP-A- 114- 01 SAIC-A-1005 5th LAYER 300MM & ZONE B 5th LAYER HRDH-1116 BA-797796 11:30:00 AM Mr. Raymund CLOSED
SHABBIR
300MM HRDH-1116 WELL PAD EXTENSION

COMPACTION TEST INSPECTION OF ZONE B


1400054053 20-Feb-19 TALAL
144 CPP-NGCP-CIV-0143 Civil SATIP-A- 114- 01 SAIC-A-1005 8TH LAYER 300MM HRDH-1035 WELL PAD HRDH-1035 BA-502572 12:00:00 PM Mr. Raymund CLOSED
SHABBIR
EXTENSION

1400054402 Compaction Test inspection of 8th layer Zone 21-Feb-19 AAMIR


145 CPP-NGCP-CIV-0144 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-1102 BA-083535 2:00 PM Mr. Raymund CLOSED
A,B,C and D HWYH-1102 SOLANGI

146 CPP-NGCP-CIV-0145 1400054443 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1122 BA-407560 21-Feb-19 1:00 PM Hameed Ullah Mr. Raymund CLOSED
7th layer(300mm) Compaction Test for Zone C
of HRDH wellpad-1122
147 CPP-NGCP-CIV-0146 1400054894 Civil SATIP-A- 114- 01 SAIC-A-1005 8th layer(300mm) Compaction Test for Zone C HRDH-1122 BA-407560 23-Feb-19 1:00 PM Hameed Ullah Mr. Raymund CLOSED
of HRDH wellpad-1122

Trench excavation and bottom of trench


148 CPP-NGCP-CIV-0147 1400055484 Civil SATIP-L-450- 01 SAIC-L-1002 preparation for 8'' F/L HWYH 1100 from Sta- HWYH-1100 TA-445959 24-Feb-19 10:00 AM Asif Bilal Mr. Raymund CLOSED
1+700-2+540,3+340-4+150,4+200-4+800,2+785-
3+300

Trench excavation and bottom of trench


149 CPP-NGCP-CIV-0148 1400055504 Civil SATIP-L-450- 01 SAIC-L-1002 preparation for 8'' F/L HWYH 1055 from Sta- HWYH-1055 VARIOUS 24-Feb-19 11:00 AM Asif Bilal Mr. Raymund CLOSED
0+608-1+830

150 CPP-NGCP-CIV-0149 1400055467 Civil SATIP-A- 114- 01 SAIC-A-1005 2nd layer(300mm) Compaction Test for Zone A HRDH-1162 BA-805095 24-Feb-19 3:00 PM Hameed Ullah Mr. Raymund CLOSED
and B of Wellpad HRDH-1162

Trench Excavation and bottom of trench


151 CPP-NGCP-CIV-0150 1400055513 Civil SATIP-L-450- 01 SAIC-L-1002 preparation for 8'' F/L (HRDH-1122 to RH- HRDH-1122 BA-407560 24-Feb-19 2:00 PM Hameed Ullah Mr. Raymund CLOSED
GK) From Sta-0+146-0+250,0+316-0+980,1+041-
1+169,1+195-1+215,1+276-1+384. Total Total Excavation:
1135.60/1633.93 1024/1606

Trench excavation and bottom of trench


152 CPP-NGCP-CIV-0151 1400056104 Civil SATIP-L-450- 01 SAIC-L-1002 Inspection for 8''F/L HRDH - 1309 To HRDH HRDH - 1309 TA-843624 25-Feb-19 11:00 AM Hameed Ullah Mr. Raymund CLOSED
918 from Sta-0+244-0+655,0+740-1+250,1+300-
1+350,1+372.818-1+487.418. Total
1085.6/1633.93

Trench Excavation and bottom of trench


153 CPP-NGCP-CIV-0152 1400056529 Civil SATIP-L-450- 01 SAIC-L-1002 preparation for 8'' F/L HWYH-1134 From Sta- HWYH-1134 TA-445836 26-Feb-19 8:00 AM Asif Bilal Mr. Raymund CLOSED
2+900-4+902

Trench Excavation and bottom of trench


154 CPP-NGCP-CIV-0153 1400056537 Civil SATIP-L-450- 01 SAIC-L-1002 preparation for 8'' F/L HWYH-1071 From Sta- HWYH-1071 TA-445830 26-Feb-19 10:00 AM Asif Bilal Mr. Raymund CLOSED
0+213-2+075

Compaction test inspection of 9th


155 CPP-NGCP-CIV-0154 1400056539 Civil SATIP-A- 114- 01 SAIC-A-1005 Layer(300mm) for Zone A, B and C of wellpad HRDH-1122 BA-407560 26-Feb-19 8:00 AM Hameed Ullah Mr. Raymund CLOSED
HRDH-1122

Soil sampling, testing and review of test


156 CPP-NGCP-CIV-0155 1400056602 Civil SATIP-A-114-01 SAIC-A-1001 reports for Existing Ground Material of HRDH-1145 VARIOUS 26-Feb-19 9:00 AM Hameed Ullah Mr. Raymund CLOSED
HRDH-1145
Soil sampling from Borrow Pit No.1 Stock
Pile No. 3 Near TCF-1 Access Road HRDH Area
N 2703309.834 E 305491.501 Description Corrected:
Soil Sampling and Review
Borrow Pit#1, of Test Reports of
1400056644 VARIOUS 26-Feb-19 9:00 AM TALAL General Fill/Marl
157 CPP-NGCP-CIV-0156 Civil SATIP-A-114-01 SAIC-A-1001 stockpile#3 Near Mr. Raymund CLOSED
SHABBIR Material from Borrow
TCF-1
pit#1 Stockpile#3 Near
TCF-1 Access Road Haradh
Area N 2703309.834- E
305491.501

158 CPP-NGCP-CIV-0157 1400056974 Civil SATIP-A- 114- 01 SAIC-A-1005 Compaction Test Inspection for Existing HRDH-1145 TA-737563 27-Feb-19 9:00 AM Hameed Ullah Mr. Raymund CLOSED
ground of HRDH Wellpad 1145

Compaction Test Inspection of 3rd Layer


159 CPP-NGCP-CIV-0158 1400056916 Civil SATIP-A- 114- 01 SAIC-A-1005 (300mm) for Zone A and B at HRDH wellpad HRDH-1162 BA-805095 27-Feb-19 10:00 AM Hameed Ullah Mr. Raymund CLOSED
1162
Conventional Asphalt & Sulfur Extended
AAMIR
479 CPP-NGCP-CIV-0477 1400078464 Civil SATIP-Q- 006- 02 SAIC-Q-1061 Asphalt Concrete Receiving, Placement and HWYH-1134 N/A 03-Apr-19 10.10 AM Mr. Randy CLOSED Re-Schedule to 18-Feb-
Testing Inspection STA:- 3+150 TO 3+180 SOLANGI
2019
118 CPP-NGCP-CIV-0118 1400052852 Civil SATIP-Q- 006- 02 SAIC-A-1005 Copaction testing for HWYH-1134, Asphalt HWYH-1134 TA-445836 17-Feb-19 2:00 PM Asif Bilal Mr. Raymund Reject
road (open cut) CANCELLED
Material Receiving inspection of Select fill
116 CPP-NGCP-CIV-0116 1400052903 Civil SATIP-A- 114- 01 SAIC-A-1002 material for HWYH-1134, Asphalt road (open HWYH-1134 TA-445836 17-Feb-19 8:00 AM Asif Bilal Mr. Raymund CLOSED Re-Schedule to 18-Feb-
cut) 2019

Trench excavation and preparation for open


163 CPP-NGCP-CIV-0162 1400057679 Civil SATIP-L-450- 01 SAIC-L-1002 cutt HWYH-1134 HWYH-1134 TA-445836 28-Feb-19 9:00 AM Asif Bilal Mr. Raymund CLOSED
8" flow line
From station 03+150 to 03+180
164 CPP-NGCP-CIV-0163 1400057694 Civil SATIP-A- 114- 01 SAIC-A-1005 4th layer(300mm) Compaction Test for Zone B HRDH-1162 BA-805095 28-Feb-19 9:00 AM Hameed Ullah Mr. Raymund CLOSED
(Area-499.500 sqm) at HRDH wellpad 1162
COMPACTION TEST INSPECTION OF
TALAL
165 CPP-NGCP-CIV-0164 1400057670 Civil SATIP-A- 114- 01 SAIC-A-1005 EXISTING BASE LAYER OF ZONE A & B HRDH-1308 TA-262451 28-Feb-19 11:00 AM Mr. Raymund CLOSED
SHABBIR
HRDH-1308 WELL PAD EXTENSION

COMPACTION TEST INSPECTION OF ZONE A


TALAL
166 CPP-NGCP-CIV-0165 1400057647 Civil SATIP-A- 114- 01 SAIC-A-1005 6th LAYER 300MM & ZONE B 6th LAYER HRDH-1116 BA-797796 28-Feb-19 11:30 AM Mr. Raymund CLOSED
SHABBIR
300MM HRDH-1116 WELL PAD EXTENSION

COMPACTION TEST INSPECTION OF ZONE A


TALAL
167 CPP-NGCP-CIV-0166 1400058020 Civil SATIP-A- 114- 01 SAIC-A-1005 7th LAYER 300MM & ZONE B 7th LAYER HRDH-1116 BA-797796 02-Mar-19 08:30:00 AM Mr. Raymund CLOSED
SHABBIR
300MM HRDH-1116 WELL PAD EXTENSION

COMPACTION TEST INSPECTION OF ZONE A


TALAL
168 CPP-NGCP-CIV-0167 1400057988 Civil SATIP-A- 114- 01 SAIC-A-1005 8th Final LAYER 300MM & ZONE B 8th LAYER HRDH-1116 BA-797796 02-Mar-19 01:00:00 PM Mr. Raymund CLOSED
SHABBIR
300MM HRDH-1116 WELL PAD EXTENSION

169 CPP-NGCP-CIV-0168 1400058042 Civil SATIP-L-450- 01 SAIC-L-1003 8'' F/L HRDH 1171-RH-AK Pipe lowering at HRDH-1171 TA-843547 02-Mar-19 8:00 AM Hameed Ullah Mr. Raymund CLOSED
sta-9+000-9+014
170 CPP-NGCP-CIV-0169 1400058022 Civil SATIP-L-450- 01 SAIC-L-1004 Sand Covering and backfilling for 8'' F/L HRDH-1171 TA-843547 02-Mar-19 10:30 AM Hameed Ullah Mr. Raymund CLOSED
HRDH 1171-RH-AK AT Sta-9+000-9+014

1400058089 1st layer(SelectFill 200mm) Compaction Test TA-843547 02-Mar-19


171 CPP-NGCP-CIV-0170 Civil SATIP-A- 114- 01 SAIC-A-1005 at Road Crossing(Opencut) Sta-9+000-9+014 HRDH-1171 1:30 PM Hameed Ullah Mr. Raymund CLOSED
for 8''F/L HRDH 1171-RH-AK
COMPACTION TEST INSPECTION OF ZONE B
TALAL
172 CPP-NGCP-CIV-0171 1400058662 Civil SATIP-A- 114- 01 SAIC-A-1005 9th AND Final LAYER 200MM HRDH-1035 HRDH-1035 BA-502572 03-Mar-19 1:00 PM Mr. Raymund CLOSED
SHABBIR
WELL PAD EXTENSION
COMPACTION TEST INSPECTION OF ZONE B
TALAL
173 CPP-NGCP-CIV-0172 1400058642 Civil SATIP-A- 114- 01 SAIC-A-1005 9th LAYER 300MM HRDH-1116 WELL PAD HRDH-1116 BA-797796 03-Mar-19 1:30 PM Mr. Raymund CLOSED
SHABBIR
EXTENSION

174 CPP-NGCP-CIV-0173 1400058727 Civil SATIP-A- 114- 01 SAIC-A-1005 1st layer(300mm) Compaction Test for Zone A HRDH-1145 TA-737563 03-Mar-19 9:00 AM Hameed Ullah Mr. Raymund CLOSED
and B at Hrdh-1145 wellpad Extension
175 CPP-NGCP-CIV-0174 1400058801 Civil SATIP-A- 114- 01 SAIC-A-1005 Final(10th Layer)300mm Compaction Test for HRDH-1122 BA-407560 03-Mar-19 9:30 AM Hameed Ullah Mr. Raymund CLOSED
Hrdh-1122 Wellpad Extension

KM0+362-KM0+398(00-FW-23--00-FW-24)
176 CPP-NGCP-CIV-0175 1400058730 Civil SATIP-L-450- 01 SAIC-L-1002 KM0+518-KM0+580(00-FW-36--00-FW-39) HRDH-1170 TA-843656 03-Mar-19 8:30 AM Hameed Ullah Mr. Raymund CLOSED
KM0+692-KM0+802(00-FW-50--00-FW-57) Trench
excavation and preparation Inspection for
8'' F/L HRDH 1170 to 919

KM0+362-KM0+398(00-FW-23--00-FW-24)
177 CPP-NGCP-CIV-0176 1400058769 Civil SATIP-L-450- 01 SAIC-L-1003 KM0+518-KM0+580(00-FW-36--00-FW-39) HRDH-1170 TA-843656 03-Mar-19 10:00 AM Hameed Ullah Mr. Raymund CLOSED
KM0+692-KM0+802(00-FW-50--00-FW-57) Pipe
Lowering for 8'' F/L HRDH 1170 to 919

KM0+362-KM0+398(00-FW-23--00-FW-24)
178 CPP-NGCP-CIV-0177 1400058802 Civil SATIP-L-450- 01 SAIC-L-1004 KM0+518-KM0+580(00-FW-36--00-FW-39) HRDH-1170 TA-843656 03-Mar-19 1:30 PM Hameed Ullah Mr. Raymund CLOSED
KM0+692-KM0+802(00-FW-50--00-FW-57)
backfilling for 8'' F/L HRDH 1170 to 919

1400059293 Soil Sampling,testing and review of test BA-915665 04-Mar-19


179 CPP-NGCP-CIV-0178 Civil SATIP-A-114-01 SAIC-A-1001 reports for Existing Ground Material of HRDH-1180 9:00 AM Hameed Ullah Mr. Raymund CLOSED
HRDH 1180 Wellpad Extension
180 CPP-NGCP-CIV-0179 1400059279 Civil SATIP-A- 114- 01 SAIC-A-1005 5th layer(300mm) Compaction test for Zone B HRDH-1162 BA-805095 04-Mar-19 1:00 PM Hameed Ullah Mr. Raymund CLOSED
at HRDH-1162 wellpad Extension

1400059241 Soil sampling and testing of existing pad N/A 04-Mar-19 AAMIR
181 CPP-NGCP-CIV-0180 Civil SATIP-A-114-0 SAIC-A-1001 HWYH-GK-RH HWYH-GK RH 8:00 AM Mr. Raymund CLOSED
SOLANGI

1400059256 Soil sampling and testing of Marl Well Pad N/A 04-Mar-19 AAMIR
182 CPP-NGCP-CIV-0181 Civil SATIP-A-114-0 SAIC-A-1001 HWYH- GK-RH HWYH-GK RH 9:00 AM Mr. Raymund CLOSED
SOLANGI

1400059221 Soil sampling and testing of Marl Well Pad HWYH-1065 and VARIOUS 04-Mar-19 AAMIR
183 CPP-NGCP-CIV-0182 Civil SATIP-A-114-0 SAIC-A-1001 HWYH-1065 and HWYH-1102 10:00 AM Mr. Raymund CLOSED
1102 SOLANGI

1400059282 Soil sampling and testing of Sub base Well HWYH-1065 and VARIOUS 04-Mar-19 AAMIR
184 CPP-NGCP-CIV-0183 Civil SATIP-A-114-0 SAIC-A-1001 Pad HWYH-1065 and HWYH-1102 11:00 AM Mr. Raymund CLOSED
1102 SOLANGI

Compaction Testing Existing Well Pad GK-RH AAMIR


185 CPP-NGCP-CIV-0184 1400059296 Civil SATIP-A-114-0 SAIC-A-1005 HWYH-GK RH N/A 04-Mar-19 1:00 PM Mr. Raymund Reject reject -job not ready
Zone A, B, C, D SOLANGI
FINAL FILL INSPECTION OF WELL HRDH- TALAL
186 CPP-NGCP-CIV-0185 1400059362 Civil SATIP-A- 114- 01 SAIC-A-1006 HRDH-1035 BA-502572 04-Mar-19 1:00 PM Mr. Raymund Reject reject -job not ready
1035 WELL PAD EXTENSION SHABBIR
COMPACTION TEST INSPECTION OF 1ST &
TALAL
187 CPP-NGCP-CIV-0186 1400059311 Civil SATIP-A- 114- 01 SAIC-A-1005 FINAL LAYER OF ZONE A & B HRDH-1308 HRDH-1308 TA-262451 12:00 AM 1:15 PM Mr. Raymund CLOSED
SHABBIR
WELL PAD EXTENSION
COMPACTION TEST INSPECTION OF ZONE B
TALAL Re-Schedule to 5th Mar
188 CPP-NGCP-CIV-0187 1400059330 Civil SATIP-A- 114- 01 SAIC-A-1005 10th & FINAL LAYER 300MM HRDH-1116 HRDH-1116 BA-797796 12:00 AM 1:30 PM Mr. Raymund CLOSED 2019 due to Euipment
SHABBIR
WELL PAD EXTENSION Breakdown
Material Receiving inspection for Sub Base AAMIR
189 CPP-NGCP-CIV-0188 1400060043 Civil SATIP-A- 114- 01 SAIC-A-1002 HWYH-1102 BA-083535 12:00 AM 9:00 AM Mr. Raymund CLOSED
wellpad HWYH-1102 SOLANGI
1400060007 Compaction Test 8th Layer Sub Base (150mm) AAMIR
190 CPP-NGCP-CIV-0189 Civil SATIP-A-114-0 SAIC-A-1005 HWYH-1102 BA-083535 12:00 AM 1:00 PM Mr. Raymund CLOSED
Well Pad HWYH-1102 SOLANGI
Material Receiving Inspection for General
191 CPP-NGCP-CIV-0190 1400059988 Civil SATIP-A- 114- 01 SAIC-A-1002 HRDH-1145 TA-737563 12:00 AM 8:00 AM Hameed Ullah Mr. Raymund CLOSED
Fill(Marl) at HRDH 1145 Wellpad Extension
Fill placement and compaction inspection for 2nd
192 CPP-NGCP-CIV-0191 1400060026 Civil SATIP-A- 114- 01 SAIC-A-1004 HRDH-1145 TA-737563 12:00 AM 9:00 AM Hameed Ullah Mr. Raymund CLOSED
layer at 1145
6th layer(300mm) Compaction test for Zone B at
193 CPP-NGCP-CIV-0192 1400060028 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1162 BA-805095 12:00 AM 10:00 AM Hameed Ullah Mr. Raymund CLOSED
HRDH-1162 wellpad Extension
2nd layer(300mm) Compaction test for Zone A
194 CPP-NGCP-CIV-0193 1400059990 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1145 TA-737563 12:00 AM 11:00 AM Hameed Ullah Mr. Raymund CLOSED
and B at HRDH-1145 wellpad Extension
Existing Ground compaction test for Zone A and
195 CPP-NGCP-CIV-0194 1400060457 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1180 BA-915665 12:00 AM 8:00 AM Hameed Ullah Mr. Raymund CLOSED
B at HRDH-1180 Wellpad Extension
Trench Excavation and Bottom of Trench
Preparation for 8" FL HRDH-1063 RH-AK from
196 CPP-NGCP-CIV-0195 1400060422 Civil SATIP-L-450- 01 SAIC-L-1002 Sta: 0+110-0+323,0+352.5-0+745,0+810- HRDH-1063 TA-843953 12:00 AM 9:00 AM Hameed Ullah Mr. Raymund CLOSED
1+169,1+182-1+445,1+520-1+598, Total
1305/1675

1400061186 3rd layer(300mm) Compaction test for Zone A


197 CPP-NGCP-CIV-0196 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1145 TA-737563 12:00 AM 11:00 AM Hameed Ullah Mr. Raymund CLOSED
and B at HRDH-1145 wellpad Extension
7th layer(300mm) Compaction test for Zone A
198 CPP-NGCP-CIV-0197 1400061167 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1162 BA-805095 12:00 AM 11:30 AM Hameed Ullah Mr. Raymund CLOSED
and B at HRDH-1162 wellpad Extension

Placement and Compaction of Aggregate Base AAMIR


371 CPP-NGCP-CIV-0369 1400073507 Civil SATIP-Q-006-02 SAIC-Q-1040 Course Inspection HWYH-1134 KM-3+150 to HWYH-1134 N/A 12:00 AM 11.15 AM Mr. Randy CLOSED
SOLANGI
3+180 ASPHALT OPEN CUT
Placement and compaction aggregate base
200 CPP-NGCP-CIV-0199 1400061221 Civil SATIP-Q- 006- 02 SAIC-Q-1040 course inspection for 8" FL HRDH-1171 RH-AK HRDH-1171 N/A 12:00 AM 2:00 PM Hameed Ullah Mr. Raymund CLOSED
at road crossing (open cut)
CPP Precast yard acceptance inspection at
201 CPP-NGCP-CIV-0201 1400061562 Civil SATIP-Q- 001- 02 Not Applicable HRDH N/A 12:00 AM 2:00 PM Hameed Ullah Mr. Raymund CLOSED
Haradh Village HACO concrete plant.
Fill placement and compaction 1st layer base
202 CPP-NGCP-CIV-0202 1400061528 Civil SATIP-Q- 006- 02 SAIC-Q-1040 course at Road crossing HRDH-1171 TA-843547 12:00 AM 8:50 AM Hameed Ullah Mr. Raymund Reject
HRDH-1171
Re-Schedule to 18-Feb-
Placement and compaction of subbase and 2019
117 CPP-NGCP-CIV-0117 1400052890 Civil SATIP-Q- 006- 02 SAIC-Q-1040 aggregate base course inspection HWYH-1134, HWYH-1134 TA-445836 12:00 AM 11:00 AM Asif Bilal Mr. Raymund Reject
Asphalt road (open cut) CANCELLED
Material receiving inspection for 1st layer base
204 CPP-NGCP-CIV-0204 1400061547 Civil SATIP-Q- 006- 02 SAIC-Q-1037 course at road crossing HRDH-1171 TA-843547 12:00 AM 8:45 AM Hameed Ullah Mr. Raymund Reject
HRDH-1171
AAMIR
205 CPP-NGCP-CIV-0204 1400061884 Civil SATIP-A-114-0 SAIC-A-1001 Soil sampling and testing for Marl BK-HWYH BK-HWYH VARIOUS 12:00 AM 8:00 AM Mr. Raymund CLOSED
SOLANGI
AAMIR
206 CPP-NGCP-CIV-0205 1400061869 Civil SATIP-A-114-0 SAIC-A-1001 Soil sampling and testing for Marl CJ-EJ-HWYH CJ-EJ-HWYH VARIOUS 12:00 AM 9:00 AM Mr. Raymund CLOSED
SOLANGI
AAMIR
207 CPP-NGCP-CIV-0206 1400061895 Civil SATIP-A-114-0 SAIC-A-1001 Soil sampling and testing for Marl LSS-HWYH LSS-HWYH VARIOUS 12:00 AM 10:00 AM Mr. Raymund CLOSED
SOLANGI
Compaction Test 9th Layer Sub Base (150mm) AAMIR
208 CPP-NGCP-CIV-0207 1400061871 Civil SATIP-A-114-0 SAIC-A-1005 HWYH-1102 BA-083535 12:00 AM 11:00 AM Mr. Raymund CLOSED
Well Pad HWYH-1102 SOLANGI
Material Receiving inspection for General Fill
209 CPP-NGCP-CIV-0208 1400061904 Civil SATIP-A- 114- 01 SAIC-A-1002 HRDH-1180 BA-915665 12:00 AM 10:00 AM Hameed Ullah Mr. Raymund CLOSED
material at HRDH 1180
1st Layer Fill placement and compaction
210 CPP-NGCP-CIV-0209 1400061899 Civil SATIP-A- 114- 01 SAIC-A-1004 HRDH-1180 BA-915665 3/9/2019 11:00 AM Hameed Ullah Mr. Raymund CLOSED
inspection at HRDH-1180 wellpad Extension
1st layer(300mm) Compaction test Inspection
211 CPP-NGCP-CIV-0210 1400061906 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1180 BA-915665 3/9/2019 1:00 PM Hameed Ullah Mr. Raymund CLOSED
HRDH-1180 wellpad Extension
Water sampling HRDH water well No. 829 E-
Near HRDH-1135
212 CPP-NGCP-CIV-0211 1400061917 Civil Visual Visual 310436.992, N-2702229.929 Near HRDH-1135 N/A 09-Mar-19 1:30 PM Hameed Ullah Mr. Raymund CLOSED
well
well
Trench excavation and preparation of Sand
Location Change: HRDH-
213 CPP-NGCP-CIV-0212 1400062092 Civil SATIP-L- 450- 01 SAIC-L-1002 Bedding for 8'' F/L HRDH 1179-919 Sta: 1079.82 HRDH 1179-919 TA-843656 09-Mar-19 2:00 PM Hameed Ullah Mr. Raymund CLOSED
1170-919
-1353.696

214 CPP-NGCP-CIV-0213 1400062134 Civil SATIP-A- 114- 01 SAIC-A-1002 Sand Material Receiving inspection at HRDH- HRDH-1170 TA-843656 09-Mar-19 8:00 AM Hameed Ullah Mr. Raymund CLOSED
1170
FINAL FILL INSPECTION FOR HRDH-1162
215 CPP-NGCP-CIV-0214 1400062929 Civil SATIP-A- 114- 01 SAIC-A-1006 HRDH-1162 BA-805095 10-Mar-19 10:00 AM Hameed Ullah Mr. Raymund CLOSED
WELL PAD EXTENSION

Trench Excavation and Bottom of Trench


1400062954 10-Mar-19 Sta: 0+700 to 0+722 and
216 CPP-NGCP-CIV-0215 Civil SATIP-L-450- 01 SAIC-L-1002 Inspection for 8" FL HRDH-1172-1061 from Sta: HRDH-1172 AA-843627 11:00 AM Hameed Ullah Mr. Raymund CLOSED 0+950 to 0+965 excluded
0+240-0+813,0+870-1+000, Total 703/1070

2nd Layer compaction test for Zone A and B at


217 CPP-NGCP-CIV-0216 1400062930 Civil SATIP-A- 114- 01 SAIC-A-1004 HRDH-1180 BA-915665 10-Mar-19 11:30 AM Hameed Ullah Mr. Raymund CLOSED
HRDH-1180 wellpad Extension
4th layer(300mm) Compaction test for Zone A
218 CPP-NGCP-CIV-0217 1400062956 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1145 TA-737563 10-Mar-19 1:00 PM Hameed Ullah Mr. Raymund CLOSED
and B at HRDH-1145 wellpad Extension
Pipe lowering 8" F/L HRDH-1170-919 from
219 CPP-NGCP-CIV-0218 1400062931 Civil SATIP-L-450- 01 SAIC-L-1003 HRDH 1170-919 TA-843656 10-Mar-19 2:00 PM Hameed Ullah Mr. Raymund Reject
Station 1079.92-1353.696

Sand Covering and backfilling Inspection


220 CPP-NGCP-CIV-0219 1400062901 Civil SATIP-L-450- 01 SAIC-L-1004 for 8" F/L HRDH-1170-919 from Station HRDH 1170-919 TA-843656 10-Mar-19 2:30 PM Hameed Ullah Mr. Raymund CLOSED
1079.92-1353.696
10th layer(150mm) Compaction test of sub base AAMIR
221 CPP-NGCP-CIV-0220 1400062910 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-1102 BA-083535 10-Mar-19 11:00 AM Mr. Raymund CLOSED
well pad HWYH-1102 SOLANGI
11th layer(200mm) Compaction test of marl
AAMIR
222 CPP-NGCP-CIV-0221 1400063603 Civil SATIP-A- 114- 01 SAIC-A-1005 capping well pad HWYH-1102 Zone A, B, C and HWYH-1102 BA-083535 11-Mar-19 11:00 AM Mr. Raymund CLOSED
SOLANGI
D

Soil sampling and testing existing material AAMIR


223 CPP-NGCP-CIV-0222 1400063581 Civil SATIP-A-114-0 SAIC-A-1001 HWYH-GK-RH HWYH-GK RH N/A 11-Mar-19 10:00 AM Mr. Raymund CLOSED
SOLANGI

3rd Layer (300mm) compaction test for Zone A


224 CPP-NGCP-CIV-0223 1400063512 Civil SATIP-A- 114- 01 SAIC-A-1004 HRDH-1180 BA-915665 11-Mar-19 2:30 PM Hameed Ullah Mr. Raymund CLOSED
and B at HRDH-1180 wellpad Extension
COMPACTION TEST INSPECTION OF
1400063715 BA-914797 11-Mar-19 TALAL
225 CPP-NGCP-CIV-0224 Civil SATIP-A- 114- 01 SAIC-A-1005 EXTISTING BASE LAYER OF ZONE A&B HRDH-1170 8.30AM Mr. Raymund CLOSED
SHABBIR
HRDH 1170 WELL PAD EXTENTION

1400064244 5th layer(300mm) Compaction test for Zone A TA-843976 12-Mar-19


226 CPP-NGCP-CIV-0225 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1145 1:00 PM Hameed Ullah Mr. Raymund CLOSED
and B at HRDH-1145 wellpad Extension
Compaction Test Inspection of 1st Layer of Zone TALAL
227 CPP-NGCP-CIV-0226 1400064294 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1170 N/A 12-Mar-19 11:00 AM Mr. Raymund CLOSED
A & B HRDH-1170 well pad extension SHABBIR

228 CPP-NGCP-CIV-0227 1400065366 Civil SATIP-A- 114- 01 SAIC-A-1001 Existing Ground compaction testing and HRDH-1182 BA-649949 13-Mar-19 4.00 PM Hameed Ullah Mr. Raymund CLOSED
Review of Test reports for HRDH-1182

1400064583 Material Receiving Inspection of general fill BA-914797 12-Mar-19 TALAL


229 CPP-NGCP-CIV-0228 Civil SATIP-A- 114- 01 SAIC-A-1002 HRDH-1170 10.30 AM Mr. Raymund CLOSED
material @ HRDH-1170 well pad extention SHABBIR
Fill Placement inspection of 1st layer of zone A & TALAL
230 CPP-NGCP-CIV-0229 1400064531 Civil SATIP-A- 114- 01 SAIC-A-1004 HRDH-1170 BA-914797 12-Mar-19 10.45 AM Mr. Raymund CLOSED
B HRDH-1170 well pad extention SHABBIR
1400065050 FINAL FILL INSPECTION FOR HRDH-1116 13-Mar-19 TALAL
231 CPP-NGCP-CIV-0230 Civil SATIP-A- 114- 01 SAIC-A-1006 HRDH-1116 BA-797796 10:45 AM Mr. Raymund CLOSED
WELL PAD EXTENSION SHABBIR
FINAL FILL INSPECTION FOR HRDH-1308 TALAL
232 CPP-NGCP-CIV-0231 1400065061 Civil SATIP-A- 114- 01 SAIC-A-1006 HRDH-1308 TA-262451 13-Mar-19 10:15 AM Mr. Raymund CLOSED
WELL PAD EXTENSION SHABBIR
FINAL FILL INSPECTION OF WELL HRDH-
1035 WELL PAD EXTENSION (EPM RFI 3 TALAL
233 CPP-NGCP-CIV-0185 R1 1400065051 Civil SATIP-A- 114- 01 SAIC-A-1006 HRDH-1035 BA-502572 13-Mar-19 10:00 AM Mr. Raymund CLOSED
1400059362 WAS REJECTED BEFORE SO RFI SHABBIR
ISSUED AGAIN AS REVISION-01)

1400064832 4th Layer (300mm) compaction test for Zone A BA-915665 13-Mar-19
234 CPP-NGCP-CIV-0232 Civil SATIP-A- 114- 01 SAIC-A-1004 HRDH-1180 9:00 PM Hameed Ullah Mr. Raymund CLOSED
and B at HRDH-1180 wellpad Extension

119 CPP-NGCP-CIV-0119 1400052866 Civil SATIP-Q- 006- 02 SAIC-Q-1041 Prime coating and tack coating inspection HWYH-1134 TA-445836 17-Feb-19 3:00 PM Asif Bilal Mr. Raymund Rejected Re-Schedule to 18-Feb-
for HWYH-1134, Asphalt road (open cut) 2019
Trench excavation and preparation inspection
TASEER
236 CPP-NGCP-CIV-0234 1400065298 Civil SATIP-L- 450- 01 SAIC-L-1002 prior to sand bedding at HWYH-1088 sta.0+080 HWYH-1088 BA-083535 13-Mar-19 9:30 AM Mr. Randy CLOSED
KHAN
to 0+245
Trench bedding preparation inspection prior to
1400065331 13-Mar-19 TASEER
237 CPP-NGCP-CIV-0235 Civil SATIP-L- 450- 01 SAIC-L-1002 pipe lowering at HWYH-1088 sta.0+080 to HWYH-1088 BA-083535 10:00 AM Mr. Randy Reject
KHAN
0+245
Pipe lowering inspection prior to backfilling at TASEER
238 CPP-NGCP-CIV-0236 1400065332 Civil SATIP-L-450- 01 SAIC-L-1003 HWYH-1088 BA-083535 13-Mar-19 10:30 AM Mr. Randy CLOSED
HWYH-1088 sta.0+080 to 0+245 KHAN
Pipe covering and backfilling sand material
TASEER
239 CPP-NGCP-CIV-0237 1400065292 Civil SATIP-A- 114- 01 SAIC-A-1002 receiving inspection at HWYH-1088 sta.0+080 to HWYH-1088 BA-083535 13-Mar-19 11:00 AM Mr. Randy Reject
KHAN
0+245

1400065338 Pipe covering sand material placement 13-Mar-19 TASEER


240 CPP-NGCP-CIV-0238 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1088 BA-083535 14:00 PM Mr. Randy Reject
inspection at HWYH-1088 sta.0+080 to 0+245 KHAN

Trench bedding preparation inspection prior to


TASEER
241 CPP-NGCP-CIV-0239 1400065373 Civil SATIP-L- 450- 01 SAIC-L-1002 pipe lowering at HWYH-1034 sta.3+150 to HWYH-1134 TA-445836 13-Mar-19 11:10 AM Mr. Randy CLOSED
KHAN
3+180
Pipe lowering inspection prior to backfilling at TASEER
242 CPP-NGCP-CIV-0240 1400065318 Civil SATIP-L-450- 01 SAIC-L-1003 HWYH-1134 TA-445836 13-Mar-19 11:30 AM Mr. Randy CLOSED
HWYH-1034 sta.3+150 to 3+180 KHAN Location Change to HWYH-1134
Pipe covering and backfilling sand material
1400065350 TA-445836 13-Mar-19 TASEER
243 CPP-NGCP-CIV-0241 Civil SATIP-A- 114- 01 SAIC-A-1002 receiving inspection at HWYH-1034 sta.3+150 to HWYH-1134 13:00 PM Mr. Randy CLOSED
KHAN
3+180 Location Change to HWYH-1134
Pipe covering sand material placement TASEER
244 CPP-NGCP-CIV-0242 1400065383 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1134 TA-445836 13-Mar-19 15:00 PM Mr. Randy CLOSED
inspection at at HWYH-1034 sta.3+150 to 3+180 KHAN
Location Change to HWYH-1134
Prime coat application for Open cut road
245 CPP-NGCP-CIV-0243 1400065393 Civil SATIP-Q-006-02 SAIC-Q-1041 HRDH-1171 TA-843547 13-Mar-19 9:00 AM Hameed Ullah Mr. Raymund CLOSED
crossing at HRDH-1171 sta.9+000 to 9+014

Prime coating and tack coating inspection


120 CPP-NGCP-CIV-0119 R1 1400057402 Civil SATIP-Q- 006- 02 SAIC-Q-1041 for HWYH-1134, Asphalt road (open cut) [Old HWYH-1134 TA-445836 27-Feb-19 3:00 PM Asif Bilal Mr. Raymund Reject
EPM 1400052866] CANCELLED

AAMIR
478 CPP-NGCP-CIV-0476 1400078473 Civil SATIP-Q- 006- 02 SAIC-Q-1041 Prime coating and tack coating inspection HWYH-1134 N/A 03-Apr-19 10.00 AM Mr. Randy CLOSED
for HWYH-1134, Asphalt road (open cut) SOLANGI
STA:-3+150 TO 3+180
248 CPP-NGCP-CIV-0246 1400065707 Civil SATIP-A-114-01 SAIC-A-1001 Exiting ground material sampling testing HRDH RH-GK N/A 14-Mar-19 10.00 AM Hameed Ullah Mr. Raymund CLOSED
and review of test reports for HRDH RH-GK

Soil Sampling Testing and Review of test HRDH BORROW


249 CPP-NGCP-CIV-0247 1400065722 Civil SATIP-A-114-01 SAIC-A-1001 reports for general fill material at HRDH N/A 14-Mar-19 10.15 AM Hameed Ullah Mr. Raymund CLOSED
PIT#1
borrow Pit#1, stockpile#06 (E-309231.105,N-
2697940.265)
1400065780 6th layer(300mm) Compaction test for Zone A TA-843976 14-Mar-19
250 CPP-NGCP-CIV-0248 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1145 1.00 PM Hameed Ullah Mr. Raymund CLOSED
and B at HRDH-1145 wellpad Extension

251 CPP-NGCP-CIV-0249 1400065742 Civil SATIP-A- 114- 01 SAIC-A-1005 Exiting Ground Compaction Test for Zone A HRDH RH-GK N/A 14-Mar-19 2.00 PM Hameed Ullah Mr. Raymund CLOSED
and B at HRDH RH-GK
Trench Excavation and Preparation
1400065896 Inspection for 8" F/L HRDH 1170 to HRDH 919 N/A 14-Mar-19
252 CPP-NGCP-CIV-0250 Civil SATIP-L- 450- 01 SAIC-L-1002 from sta: 1170-919 km 0+594.45 to km HRDH 1170-919 2.15 PM Hameed Ullah Mr. Raymund CLOSED
0+638.83

Soil Sampling,testing & Review of Test Reports


Borrow Pit # 5 S #
from Borrow Pit # 5 Stockpile # 1 General TALAL
253 CPP-NGCP-CIV-0251 1400066733 Civil SATIP-A- 114- 01 SAIC-A-1001 1Near TCF-1 N/A 16-Mar-19 3:00 PM Mr. Raymund CLOSED
Fill/Marl material near TCF-1 Access Road SHABBIR
Access Road
Haradh Area N 2703175.37 -E 305611.48

Trench bedding and preparation inspection prior


TASEER
254 CPP-NGCP-CIV-0252 1400066151 Civil SATIP-L- 450- 01 SAIC-L-1002 to pipe loweing at HWYH-1134 sta.2+850 - HWYH-1134 TA-445836 14-Mar-19 9:00 AM Mr. Randy CLOSED
KHAN
3+000
Pipe lowering inspection prior to backfilling at TASEER
255 CPP-NGCP-CIV-0253 1400066193 Civil SATIP-L-450- 01 SAIC-L-1003 HWYH-1134 TA-445836 14-Mar-19 10:30 AM Mr. Randy CLOSED
HWYH-1134 sta.2+850 - 3+000 KHAN
Trench bedding and preparation inspection prior
AAMIR
256 CPP-NGCP-CIV-0254 1400066177 Civil SATIP-L- 450- 01 SAIC-L-1002 to pipe loweing at HWYH-1134 sta.3+000 - HWYH-1134 TA-445836 14-Mar-19 9:00 AM Mr. Randy CLOSED
SOLANGI
3+150

1400066206 Pipe lowering inspection prior to backfilling at TA-445836 14-Mar-19 AAMIR


257 CPP-NGCP-CIV-0255 Civil SATIP-L-450- 01 SAIC-L-1003 HWYH-1134 10:30 AM Mr. Randy CLOSED
HWYH-1134 sta. 3+000 - 3+150 SOLANGI
Backfilling inspection at HWYH-1134 sta.2+850 - TASEER
258 CPP-NGCP-CIV-0256 1400066159 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1134 TA-445836 14-Mar-19 10.45 AM Mr. Randy CLOSED
3+000 KHAN

1400066169 Backfilling inspection at HWYH-1134 sta. 3+000 TA-445836 14-Mar-19 AAMIR


259 CPP-NGCP-CIV-0257 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1134 10.45 AM Mr. Randy CLOSED
- 3+150 SOLANGI
Pipe lowering inspection prior to backfilling at AAMIR
260 CPP-NGCP-CIV-0258 1400066234 Civil SATIP-L-450- 01 SAIC-L-1003 HWYH-1134 TA-445836 14-Mar-19 10:30 AM Mr. Randy CLOSED
HWYH-1134 sta. 1+790 - 1+822 SOLANGI

Trench bedding and preparation Inspection TASEER


261 CPP-NGCP-CIV-0259 1400066692 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH-1134 TA-445836 16-Mar-19 9:30 AM Mr. Randy CLOSED
for 8" FL HWYH-1134, KM +1+800 to 2+760 KHAN

8'' F/L HWYH 1134 Pipe lowering at HWYH- TASEER


262 CPP-NGCP-CIV-0260 1400066744 Civil SATIP-L-450- 01 SAIC-L-1003 HWYH-1134 TA-445836 16-Mar-19 10:00 AM Mr. Randy CLOSED
1134, KM +1+800 to 2+760 KHAN

263 CPP-NGCP-CIV-0261 1400066753 Civil SATIP-L-450- 01 SAIC-L-1004


Sand Covering and backfilling Inspection for HWYH-1134 TA-445836 16-Mar-19 10:30 AM
TASEER
Mr. Randy CLOSED
8" F/L HWYH-1134, KM +1+800 to 2+760 KHAN

Trench bedding and preparation Inspection


TASEER
264 CPP-NGCP-CIV-0262 1400066707 Civil SATIP-L- 450- 01 SAIC-L-1002 for 8" FL HWYH-1134, road crossing pipe HWYH-1134 TA-445836 16-Mar-19 11:00 AM Mr. Randy CLOSED
KHAN
KP1+803 to KP1+809
8'' F/L HWYH 1134 road crossing Pipe
TASEER
265 CPP-NGCP-CIV-0263 1400066698 Civil SATIP-L-450- 01 SAIC-L-1003 lowering at HWYH-1134,KP1+803 to HWYH-1134 TA-445836 16-Mar-19 14:00 PM Mr. Randy CLOSED
KHAN
KP1+809
Sand Covering and backfilling Inspection for
TASEER
266 CPP-NGCP-CIV-0264 1400066739 Civil SATIP-L-450- 01 SAIC-L-1004 8" F/L HWYH-1134, road crossing pipe HWYH-1134 TA-445836 16-Mar-19 11:10 AM Mr. Randy CLOSED
KHAN
KP1+803 to KP1+809
Trench bedding and preparation Inspection prior to
pipe lowering at 8" FL HARADH-1063 KP01-83.7 to
267 CPP-NGCP-CIV-0265 1400066681 Civil SATIP-L- 450- 01 SAIC-L-1002 KP01-114.63, KP01-166.3 to KP01-241.3, KP01-
HRDH-1063 TA-843953 16-Mar-19 11:30 AM Hameed Ullah Mr. Randy Reject
291.05 to KP01-452.25

8'' F/L HRDH1063--AK Pipe lowering at KP01-


268 CPP-NGCP-CIV-0266 1400066682 Civil SATIP-L-450- 01 SAIC-L-1003 83.7 to KP01-114.63, KP01-166.3 to KP01-241.3, HRDH-1063 TA-843953 16-Mar-19 13:00 PM Hameed Ullah Mr. Randy Reject
KP01-291.05 to KP01-452.25

269 CPP-NGCP-CIV-0267 1400066708 Civil SATIP-L-450- 01 SAIC-L-1004 Sand Covering and backfilling Inspection for 8" HRDH-1063 TA-843953 16-Mar-19 15:00 PM Hameed Ullah Mr. Randy CLOSED
F/LHARADH-1063 KP01-83.7 to KP01-114.63, KP01-
166.3 to KP01-241.3, KP01-291.05 to KP01-452.25
Pipe covering and send material placement AAMIR
270 CPP-NGCP-CIV-0268 1400066709 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1134 TA-445836 16-Mar-19 9:30 AM Mr. Randy CLOSED
inspection station 1+790 1+822 2nd layer 300mm SOLANGI
Hwyh 1134

Pipe covering and send material placement AAMIR


271 CPP-NGCP-CIV-0269 1400066742 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1134 TA-445836 16-Mar-19 10:00 AM Mr. Randy CLOSED
inspection station 1+790 1+822 3rd layer 300 mm SOLANGI
Hwyh 1134

1400066787 Pipe covering and send material placement TA-445836 16-Mar-19 AAMIR
272 CPP-NGCP-CIV-0270 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1134 10:30 AM Mr. Randy CLOSED
inspection station 3+150 3+180 2nd layer Hwyh SOLANGI
1134

Pipe covering and send material placement AAMIR


273 CPP-NGCP-CIV-0271 1400066776 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1134 TA-445836 16-Mar-19 11:00 AM Mr. Randy CLOSED
inspection station 3+150 3+180 3rd layer Hwyh SOLANGI
1134
Compaction testing select fill 300 mm station AAMIR
274 CPP-NGCP-CIV-0272 1400066778 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-1134 TA-445836 16-Mar-19 14:00 PM Mr. Randy CLOSED
3+150 3+180 Hwyh 1134 open cut SOLANGI

Pipe covering and back filling sand material AAMIR


275 CPP-NGCP-CIV-0273 1400066765 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1134 TA-445836 16-Mar-19 11:10 AM Mr. Randy CLOSED
placement inspection 1st layer 300mm station SOLANGI
1+790 1+822 Hwyh 1134
Material Receiving Inspection select fill 300 AAMIR
276 CPP-NGCP-CIV-0274 1400066710 Civil SATIP-A- 114- 01 SAIC-A-1002 HWYH-1134 TA-445836 16-Mar-19 11:30 AM Mr. Randy CLOSED
mm station 3+150 3+180 Hwyh 1134 open cut SOLANGI
Fill Placement Inspection select fill 300 mm AAMIR
277 CPP-NGCP-CIV-0275 1400066790 Civil SATIP-A- 114- 01 SAIC-A-1004 HWYH-1134 TA-445836 16-Mar-19 13:00 PM Mr. Randy CLOSED
station 3+150 3+180 Hwyh 1134 open cut SOLANGI
Trench excavation and sand bedding Inspection
278 CPP-NGCP-CIV-0276 1400066792 Civil SATIP-L- 450- 01 SAIC-L-1002 for 8''F/L HRDH 1063 to RH-AK. From Sta:1+100- HRDH-1063 TA-843953 16-Mar-19 8:00 AM Hameed Ullah Mr. Raymund CLOSED
1+160,1+196-1+268,1+340-1+412

279 CPP-NGCP-CIV-0277 1400066750 Civil SATIP-A- 114- 01 SAIC-A-1002 Material Receiving inspection for General Fill HRDH RH-GK N/A 16-Mar-19 9:00 AM Hameed Ullah Mr. Raymund CLOSED
Material at RH-GK
280 CPP-NGCP-CIV-0278 1400066751 Civil SATIP-A- 114- 01 SAIC-A-1004 Fill Placement and compaction inspection for HRDH RH-GK N/A 16-Mar-19 10:00 AM Hameed Ullah Mr. Raymund CLOSED
1st layer(300mm)at HRDH RH-GK

281 CPP-NGCP-CIV-0279 1400066712 Civil SATIP-A- 114- 01 SAIC-A-1005 1st Layer(300mm) Compaction Test Inspection At HRDH RH-GK N/A 16-Mar-19 11:00 AM Hameed Ullah Mr. Raymund CLOSED
RH-GK

282 CPP-NGCP-CIV-0280 1400066730 Civil SATIP-A- 114- 01 SAIC-A-1005 2nd layer (300mm) Compaction test Inspection at HRDH RH-GK N/A 16-Mar-19 2:30 PM Hameed Ullah Mr. Raymund CLOSED
RH-GK

283 CPP-NGCP-CIV-0281 1400066780 Civil SATIP-A- 114- 01 SAIC-A-1005 5th(Final) Layer( 300mm) Compaction Test at HRDH-1180 BA-915665 16-Mar-19 3:00 PM Hameed Ullah Mr. Raymund CLOSED
HRDH 1180 wellpad Extension

284 CPP-NGCP-CIV-0282 1400066813 Civil SATIP-A- 114- 01 SAIC-A-1005 Existing Ground Surface Compaction Test HRDH-1182 BA-649949 16-Mar-19 3:30 PM Hameed Ullah Mr. Raymund CLOSED
Inspection At HRDH-1182 Wellpad Extension
Lowering Inspection for 8''F/L HRDH 1063 to RH-
285 CPP-NGCP-CIV-0283 1400066768 Civil SATIP-L-450- 01 SAIC-L-1003 AK. From Sta:1+100-1+160,1+196-1+268,1+340- HRDH-1063 TA-843953 16-Mar-19 4:00 PM Hameed Ullah Mr. Raymund CLOSED
1+412

Testing & Review of test report of existing TALAL


286 CPP-NGCP-CIV-0284 1400067471 Civil SATIP-A- 114- 01 SAIC-A-1001 material from well pad # HWYH -996 sample HWYH-996 N/A 17-Mar-19 2.00 PM Mr. Raymund CLOSED
SHABBIR
#1 and sample #2
1400067479 Testing & Review of test report of existing N/A 17-Mar-19 TALAL
287 CPP-NGCP-CIV-0285 Civil SATIP-A- 114- 01 SAIC-A-1001 HRDH-1063 9.00 AM Mr. Raymund CLOSED
material from well pad # HRDH-1063 SHABBIR

1400067442 Testing & Review of test report of existing N/A 17-Mar-19 TALAL
288 CPP-NGCP-CIV-0286 Civil SATIP-A- 114- 01 SAIC-A-1001 HRDH-RH-FK 10.00 AM Mr. Raymund CLOSED
material from well pad # HRDH-RH-FK SHABBIR

1400067515 N/A 17-Mar-19 TALAL


289 CPP-NGCP-CIV-0287 Civil SATIP-A- 114- 01 SAIC-A-1001 TESTING & REVIEW OF TEST REPORTS FROM NEAR HYWH-996 3.00 PM Mr. Raymund CLOSED
SHABBIR
BORROW PIT #7 STOCKPILE #1 GENERAL
FILL/MARL MATERIAL NEAR WELL PAD HYWH-996

290 CPP-NGCP-CIV-0288 1400067481 Civil SATIP-A- 114- 01 SAIC-A-1005 3rd layer (300mm) Compaction test HRDH RH-GK N/A 17-Mar-19 2:30 PM Hameed Ullah Mr. Raymund CLOSED Re-Schedule to 18-Mar-
Inspection at RH-GK 2019
291 CPP-NGCP-CIV-0289 1400067544 Civil SATIP-A- 114- 01 SAIC-A-1005 7th layer(300mm) Compaction test for Zone A HRDH-1145 TA-843976 17-Mar-19 1.00 PM Hameed Ullah Mr. Raymund CLOSED Re-Schedule to 18-Mar-
and B at HRDH-1145 wellpad Extension 2019

TALAL Re-Schedule to 18-Mar-


292 CPP-NGCP-CIV-0290 1400067507 Civil SATIP-A- 114- 01 SAIC-A-1005 Compaction test inspection of 2nd layer of HRDH-1170 BA-914797 17-Mar-19 11.00 AM Mr. Raymund CLOSED 2019 due to heavy
SHABBIR
zone A&B HRDH-1170 WELL PAD EXTENTION sandstorm
Compaction testing existing material well AAMIR Re-Schedule to 18-Mar-
293 CPP-NGCP-CIV-0291 1400067566 Civil SATIP-A- 114- 01 SAIC-A-1005 HYWH-RH-GK N/A 17-Mar-19 9:30 AM Mr. Randy CLOSED
pad RH GK hawyh. Zone A SOLANGI 2019
Compaction testing existing material well AAMIR Re-Schedule to 18-Mar-
294 CPP-NGCP-CIV-0292 1400067501 Civil SATIP-A- 114- 01 SAIC-A-1005 HYWH-RH-GK N/A 17-Mar-19 10:00 AM Mr. Randy CLOSED
pad RH GK hawyh. Zone B SOLANGI 2019
Soil sampling and testing gernal fill marl
well pad 201 Hwyh Barrow pit no 8 stock HWYH BARROW PIT AAMIR
295 CPP-NGCP-CIV-0293 1400068145 Civil SATIP-A- 114- 01 SAIC-A-1001 N/A 18-Mar-19 2.00 PM Mr. Randy CLOSED
pile 1 NO 8 SOLANGI

296 CPP-NGCP-CIV-0294 1400068514 Civil SATIP-A-114-01 SAIC-A-1001 Existing Ground material sampling testing HRDH-RH-EK N/A 19-Mar-19 10.00 AM Hameed Ullah Mr. Raymund CLOSED
and review of test reports for RH-EK HRDH
297 CPP-NGCP-CIV-0295 1400068477 Civil SATIP-A-114-01 SAIC-A-1001 Existing Ground material sampling testing HRDH-RH-K2 N/A 19-Mar-19 10.30 AM Hameed Ullah Mr. Raymund CLOSED
and review of test reports for RH-K2 HRDH

Soil sampling and testing sub base material Al kifa supplyer AAMIR
298 CPP-NGCP-CIV-0296 1400068589 Civil SATIP-A- 114- 01 SAIC-A-1001 al kifa crusher supplyer barrow pit no 9 N/A 19-Mar-19 2.00 PM Mr. Randy CLOSED
barrow pit no 9 SOLANGI
stock pile no 1
Soil Sampling and testing base course
material al kifa supplyer barrow pit no 9 Al kifa supplyer AAMIR
299 CPP-NGCP-CIV-0297 1400068647 Civil SATIP-A- 114- 01 SAIC-A-1001 N/A 19-Mar-19 2.30 PM Mr. Randy CLOSED
stok pile no 2 barrow pit no 9 SOLANGI
COMPACTION TEST INSPECTION OF 3rd
Mr.RAYMON
300 CPP-NGCP-CIV-0298 1400068597 Civil SATIP-A- 114- 01 SAIC-A-1005 LAYER OF ZONE A & B HRDH-1170 WELL HRDH-1170 BA-914797 19-Mar-19 08:30:00 AM Talal Shabbir CLOSED
D RUBILOUS
PAD EXTENSION
FBE Coated Rebars Receiving Inspection of
OPTF Area Pipe Support Foundations PS-01 to
CPP Yard Haradh Mr.RAYMON
301 CPP-NGCP-CIV-0299 1400068621 Civil SATIP-Q- 001- 02 SAIC-Q-1007 PS-06 (10mm & 16mm cut and bended rebars) Various 19-Mar-19 10:00:00 AM Talal Shabbir CLOSED
Near Haco D RUBILOUS
for various wells of Haradh & Hawaiyah as per
the Delivery Note # 19030106 attached. PS-3 IS NOT INCLUDED
302 CPP-NGCP-CIV-0300 1400068722 Civil SATIP-A- 114- 01 SAIC-A-1002 Material Receiving Inspection for General HRDH-1182 N/A 19-Mar-19 9.00 AM Hameed Ullah Mr. Raymund CLOSED
Fill Material
303 CPP-NGCP-CIV-0301 1400068813 Civil SATIP-A- 114- 01 SAIC-A-1004 1st layer Fill Placement and compactio HRDH-1182 N/A 19-Mar-19 9.30 AM Hameed Ullah Mr. Raymund CLOSED
n inspection

304 CPP-NGCP-CIV-0302 1400068867 Civil SATIP-A- 114- 01 SAIC-A-1004 1st Layer (300mm) Compaction test at HRDH- HRDH-1182 N/A 19-Mar-19 8.00 AM Hameed Ullah Mr. Raymund CLOSED
1182
305 CPP-NGCP-CIV-0303 1400069297 Civil SATIP-A- 114- 01 SAIC-A-1004 2nd Layer Compaction Test at HRDH 1182 well HRDH-1182 N/A 20-Mar-19 8.00 AM Hameed Ullah Mr. Raymund CLOSED
pad extension
306 CPP-NGCP-CIV-0304 1400069262 Civil SATIP-A- 114- 01 SAIC-A-1004 3rd Layer (300mm) Compaction Test at HRDH- HRDH-1182 N/A 20-Mar-19 2.00 PM Hameed Ullah Mr. Raymund CLOSED
1182 well pad extension

307 CPP-NGCP-CIV-0305 1400069338 Civil SATIP-A- 114- 01 SAIC-A-1004 4th Layer Compaction test at HRDH RH-GK HRDH RH-GK N/A 20-Mar-19 9.00 AM Hameed Ullah Mr. Raymund CLOSED
extension
308 CPP-NGCP-CIV-0306 1400069300 Civil SATIP-A- 114- 01 SAIC-A-1004 5th Layer Compaction test at HRDH RH-GK HRDH RH-GK N/A 20-Mar-19 2.30 PM Hameed Ullah Mr. Raymund CLOSED
extension
309 CPP-NGCP-CIV-0307 1400069373 Civil SATIP-A- 114- 01 SAIC-A-1002 Material Receiving inspection at HRDH RH-GK HRDH RH-GK N/A 20-Mar-19 7.00 AM Hameed Ullah Mr. Raymund CLOSED

310 CPP-NGCP-CIV-0308 1400069282 Civil SATIP-A- 114- 01 SAIC-A-1004 8th Layer Compaction test for Zone A and B HRDH-1145 N/A 20-Mar-19 3.00 PM Hameed Ullah Mr. Raymund CLOSED
at HRDH 1145 well pad extension
Compaction testing existing material well AAMIR
311 CPP-NGCP-CIV-0309 1400069558 Civil SATIP-A- 114- 01 SAIC-A-1005 HYWH-RH-GK N/A 20-Mar-19 9:30 AM Mr. Randy CLOSED
pad RH GK hawyh. Zone C SOLANGI
Compaction testing existing material well AAMIR
312 CPP-NGCP-CIV-0310 1400069614 Civil SATIP-A- 114- 01 SAIC-A-1005 HYWH-RH-GK N/A 20-Mar-19 10.00 AM Mr. Randy CLOSED
pad RH GK hawyh. Zone D SOLANGI
Trench excavation and preparation inspection
AAMIR
313 CPP-NGCP-CIV-0311 1400069559 Civil SATIP-L- 450- 01 SAIC-L-1002 from station 1+534 to 1+796 prior to Pipe HWYH-1134 TA-445836 20-Mar-19 10.00 AM Mr. Randy Reject CANCELLED DUE TO NO
SOLANGI
Lowering HWYH- 1134 HOLIDAY TEST
Pipe lowering inspection prior to backfilling at AAMIR CANCELLED DUE TO NO
314 CPP-NGCP-CIV-0312 1400069626 Civil SATIP-L-450- 01 SAIC-L-1003 HWYH-1134 TA-445836 20-Mar-19 10:30 AM Mr. Randy Reject
HWYH-1134 sta. 1+534 to 1+796 SOLANGI HOLIDAY TEST

315 CPP-NGCP-CIV-0313 1400070317 Civil SATIP-A- 114- 01 SAIC-A-1004 4th Layer Compaction test at HRDH-1182 well HRDH-1182 N/A 21-Mar-19 9.00 AM Hameed Ullah Mr. Raymund CLOSED
pad extension
316 CPP-NGCP-CIV-0314 1400070343 Civil SATIP-A- 114- 01 SAIC-A-1004 6th Layer Compaction test at HRDH RH-GK HRDH RH-GK N/A 21-Mar-19 10.00 AM Hameed Ullah Mr. Raymund CLOSED Re-Schedule to 23-Mar-
extension 2019 due to no permit
Trench excavation and preparation inspection
1400070450 TA-445836 21-Mar-19 AAMIR
317 CPP-NGCP-CIV-0315 Civil SATIP-L- 450- 01 SAIC-L-1002 from station 1+534 to 1+796 prior to Pipe HWYH-1134 10.00 AM Mr. Randy CLOSED
SOLANGI
Lowering HWYH- 1134

Pipe lowering inspection prior to backfilling at AAMIR


318 CPP-NGCP-CIV-0316 1400070362 Civil SATIP-L-450- 01 SAIC-L-1003 HWYH-1134 TA-445836 21-Mar-19 10:30 AM Mr. Randy CLOSED
HWYH-1134 sta. 1+534 to 1+796 SOLANGI

Pipe covering sand material placement


AAMIR
319 CPP-NGCP-CIV-0317 1400070440 Civil SATIP-L-450- 01 SAIC-L-1004 inspection at at HWYH-1034 sta.KP0+600 to HWYH-1134 TA-445836 21-Mar-19 10.00 AM Mr. Randy Reject
SOLANGI
KP1+800
Trench excavation and preparation inspection
320 CPP-NGCP-CIV-0318 1400070537 Civil SATIP-L- 450- 01 SAIC-L-1002 from station , at HARADH1116 at KP0-500 to HRDH-1116 FL TA-843608 21-Mar-19 9.00 AM Hameed Ullah Mr. Raymund CLOSED Re-Schedule to 24-Mar-
KP0-900;KP 1-050 to KP 1-180 2019
Pipe lowering inspection prior to backfilling , at
321 CPP-NGCP-CIV-0319 1400070490 Civil SATIP-L-450- 01 SAIC-L-1003 HARADH1116 at KP0-500 to KP0-900;KP HRDH-1116 FL TA-843608 21-Mar-19 9.00 AM Hameed Ullah Mr. Raymund CLOSED Re-Schedule to 24-Mar-
1+050 to KP 1+180 2019
Pipe covering sand material placement
322 CPP-NGCP-CIV-0320 1400070544 Civil SATIP-L-450- 01 SAIC-L-1004 inspection at HARADH1116 at KP0-500 to KP0- HRDH-1116 FL TA-843608 21-Mar-19 9.00 AM Hameed Ullah Mr. Raymund CLOSED Re-Schedule to 24-Mar-
900;KP 1-050 to KP 1-180 2019
Compaction testing existing well pad RHGK AAMIR
323 CPP-NGCP-CIV-0321 1400070781 Civil SATIP-A- 114- 01 SAIC-A-1005 HYWH-RH-GK N/A 23-Mar-19 9:30 AM Mr. Randy CLOSED
Zone E Hwyh SOLANGI
Compaction testing existing well pad RHGK AAMIR
324 CPP-NGCP-CIV-0322 1400070824 Civil SATIP-A- 114- 01 SAIC-A-1005 HYWH-RH-GK N/A 23-Mar-19 10.00 AM Mr. Randy CLOSED
Zone F Hwyh SOLANGI
5th layer compaction test at HRDH-1182 Well
325 CPP-NGCP-CIV-0323 1400070809 Civil SATIP-A- 114- 01 SAIC-A-1004 HRDH-1182 N/A 23-Mar-19 9.00 AM Hameed Ullah Mr. Raymund CLOSED
Pad Extention

8'' F/L HWYH 1134 Pipe lowering at HWYH-


TASEER
326 CPP-NGCP-CIV-0324 1400071074 Civil SATIP-L-450- 01 SAIC-L-1003 1134, KP0+600 to KP1+534 HWYH-1134 TA-445836 23-Mar-19 9.00 AM Mr. Randy CLOSED
KHAN
Welde reference :01-FW-123 to 00-FW-50 Re-Schedule to 24-Mar-
2019
1400071051
Trench Bedding Inspection for 8" FL HWYH- TA-445836 23-Mar-19
TASEER Re-Schedule to 24-Mar-
327 CPP-NGCP-CIV-0325 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH-1134 9:30 AM Mr. Randy CLOSED
1134, KP0+600 to KP1+600 KHAN 2019
Sand Covering and backfilling Inspection for TASEER
328 CPP-NGCP-CIV-0326 1400071097 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1134 TA-445836 23-Mar-19 10.00 AM Mr. Randy CLOSED
8" F/L HWYH-1134, KP0+600 to KP1+600 KHAN Re-Schedule to 24-Mar-
2019
8'' F/L HARADH1116 Pipe lowering at
KP1+230 to KP1+300;
KP1+350 to KP1+830;
KP1+870 to KP 2+040
329 CPP-NGCP-CIV-0327 1400071400 Civil SATIP-L-450- 01 SAIC-L-1003 Weld reference : 01- HRDH-1116 FL TA-843608 24-Mar-19 8.00 AM Hameed Ullah Mr. Raymund CLOSED
FW-93 to 01-FW-96 01-FW-
100 to 01-FW-129, 01-FW-132
to 01-FW-137; 01-FW-144 to 01-
FW-154
Trench Bedding Inspection for 8" FLHARADH1116 at
KP1+230 to
330 CPP-NGCP-CIV-0328 1400071420 Civil SATIP-L- 450- 01 SAIC-L-1002 KP1+300; HRDH-1116 FL TA-843608 24-Mar-19 8.10 AM Hameed Ullah Mr. Raymund CLOSED
KP1+350 to KP1+830;
KP1+870 to KP 2+040
Sand Covering and backfilling Inspection for 8" F/L
HARADH1116 at KP1+230
331 CPP-NGCP-CIV-0329 1400071441 Civil SATIP-L-450- 01 SAIC-L-1004 to KP1+300; HRDH-1116 FL TA-843608 24-Mar-19 8.20 AM Hameed Ullah Mr. Raymund CLOSED
KP1+350 to KP1+830;
KP1+870 to KP 2+040
Material Receiving inspection for General Fill
332 CPP-NGCP-CIV-0330 1400071739 Civil SATIP-A- 114- 01 SAIC-A-1002 HRDH-1182 FL N/A 24-Mar-19 8.00 AM Hameed Ullah Mr. Raymund CLOSED
material at HRDH 1182
Fill placement and compaction inspection
333 CPP-NGCP-CIV-0331 1400071773 Civil SATIP-A- 114- 01 SAIC-A-1004 for 6th layer at HRDH 1182 well pad HRDH-1182 FL N/A 24-Mar-19 9.00 AM Hameed Ullah Mr. Raymund CLOSED
extension
334 CPP-NGCP-CIV-0332 1400071774 Civil SATIP-A- 114- 01 SAIC-A-1004 6th Layer (300mm) Compaction test at HRDH HRDH-1182 FL N/A 24-Mar-19 11.00 AM Hameed Ullah Mr. Raymund CLOSED
1182 well pad extension
335 CPP-NGCP-CIV-0333 1400071682 Civil SATIP-A- 114- 01 SAIC-A-1004 9th Layer (300mm) Compaction test for Zone HRDH-1145 FL N/A 24-Mar-19 11.30 AM Hameed Ullah Mr. Raymund CLOSED
A and B at HRDH 1145 well pad extension
336 CPP-NGCP-CIV-0334 1400071756 Civil SATIP-A- 114- 01 SAIC-A-1004 7th Layer (300mm) Compaction test at HRDH HRDH RH-GK N/A 24-Mar-19 11.45 AM Hameed Ullah Mr. Raymund CLOSED
RH-GK extension
COMPACTION TEST INSPECTION OF 4th
Mr.RAYMON
337 CPP-NGCP-CIV-0335 1400071955 Civil SATIP-A- 114- 01 SAIC-A-1005 LAYER OF ZONE B HRDH-1170 WELL PAD HRDH-1170 BA-914797 3/24/2019 10:00:00 AM Talal Shabbir CLOSED
D RUBILOUS
EXTENSION
FBE Coated Rebars Receiving Inspection of 8"
CPP Yard Haradh Mr.RAYMON
338 CPP-NGCP-CIV-0336 1400072015 Civil SATIP-Q- 001- 02 SAIC-Q-1007 Thrust Anchor as per the Delivery Note # Various 3/24/2019 08:30:00 AM Talal Shabbir CLOSED
Near Haco D RUBILOUS
0353/2019 attached.
COMPACTION TEST INSPECTION OF RH-FK Mr.RAYMON
339 CPP-NGCP-CIV-0337 1400071892 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1170 TA-723803 3/24/2019 10:30:00 AM Talal Shabbir CLOSED
EXISTING LAYER PAD EXTENSION D RUBILOUS

1400071989 WATER SAMPLING OF CURING WATER IN CPP Yard Haradh Mr.RAYMON


340 CPP-NGCP-CIV-0338 Civil VISUAL VISUAL NA 3/24/2019 08:00:00 AM Talal Shabbir Reject
CPP PRECAST YARD HARADH NEAR HACO Near Haco D RUBILOUS
TESTING & REVIEW OF TEST REPORTS OF Mr.RAYMUN
341 CPP-NGCP-CIV-0339 1400079011 Civil SATIP-A- 114- 01 SAIC-A-1001 HRDH-1172 NA 4/4/2019 09:00:00 AM Talal Shabbir CLOSED
WELL PAD HRDH-1172 EXISTING MATERIAL D
8'' F/L HARADH 922 Pipe lowering at at
HARADH922
KP1+230 to KP1+300;
KP1+350 to KP1+830;
KP1+870 to KP
2+040
343 CPP-NGCP-CIV-0341 1400071958 Civil SATIP-L-450- 01 SAIC-L-1003 Weld reference : HRDH-922 FL TA-843609 3/24/2019 8.00 AM Hameed Ullah Mr. Raymund CLOSED RE-SCHEDULE TO 26-03-2019
01-FW-93 to 01-
FW-96;
01-FW-100 to 01-FW-129,
01-FW-132 to 01-FW-137;
01-FW-
144 to 01-FW-154
Trench Bedding Inspection for 8" at
HARADH922
KP1+230 to KP1+300;
344 CPP-NGCP-CIV-0342 1400071990 Civil SATIP-L- 450- 01 SAIC-L-1002 KP1+350 to KP1+830; HRDH-922 FL TA-843609 3/24/2019 8.10 AM Hameed Ullah Mr. Raymund CLOSED RE-SCHEDULE TO 26-03-2019
KP1+870 to KP
2+040

Sand Covering and backfilling Inspection


for 8" at HARADH922
KP1+230 to KP1+300;
345 CPP-NGCP-CIV-0343 1400071972 Civil SATIP-L-450- 01 SAIC-L-1004 KP1+350 to KP1+830; HRDH-922 FL TA-843609 3/24/2019 8.20 AM Hameed Ullah Mr. Raymund CLOSED RE-SCHEDULE TO 26-03-2019
KP1+870 to KP
2+040

346 CPP-NGCP-CIV-0344 1400072043 Civil SATIP-A- 114- 01 SAIC-A-1005 Existing ground compaction test for zone HRDH-RH-EK N/A 3/24/2019 2.00 PM Hameed Ullah Mr. Raymund CLOSED
A&B at HRDH RH-EK
Sand Covering and backfilling Inspection for TASEER
347 CPP-NGCP-CIV-0345 1400072011 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1134 TA-445836 3/24/2019 10.00 AM Mr. Randy CLOSED
8" F/L HWYH-1134, KP1+534 to KP1+796 KHAN
Testing & Review of Test Reports from Borrow
1400072036 Pit # 7 Stockpile # 1 material near wellpad Near HRDH-1171 Mr.RAYMON
348 CPP-NGCP-CIV-0346 Civil SATIP-A- 114- 01 SAIC-A-1001 N/A 3/24/2019 11:00:00 AM Talal Shabbir CLOSED
HRDH-1171 Haradh Area N2722403.54- Haradh Area D RUBILOUS
E313322.832
Testing & Review of Test Reports of Existing Mr.RAYMON
349 CPP-NGCP-CIV-0347 1400072020 Civil SATIP-A- 114- 01 SAIC-A-1001 HRDH-1171 N/A 3/24/2019 11:00:00 AM Talal Shabbir CLOSED
Material from Well Pad # HRDH-1171 D RUBILOUS
Pipe lowering atHWYH- 1134 , KM 0+655 to
1+529, 3+310 to 3+346, 3+406 to 3+465,
TASEER
350 CPP-NGCP-CIV-0348 1400072849 Civil SATIP-L-450- 01 SAIC-L-1003 4+053 to 4+397 HWYH-1134 TA-445836 3/25/2019 8.00 AM Mr. Randy CLOSED
KHAN
fw-50 -123, fw-272-275, fw-280-285, fw-334- Re-Schedule to 26-Mar-
362 2019
Trench Bedding Inspection for HWYH-
TASEER
351 CPP-NGCP-CIV-0349 1400072874 Civil SATIP-L- 450- 01 SAIC-L-1002 1134 , KM 0+655 to 1+529, 3+310 to 3+346, HWYH-1134 TA-445836 3/25/2019 8.10 AM
KHAN
Mr. Randy CLOSED Re-Schedule to 26-Mar-
3+406 to 3+465, 4+053 to 4+397 2019
Sand Covering and backfilling Inspection for
TASEER
352 CPP-NGCP-CIV-0350 1400072854 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH- 1134 , KM 0+655 to 1+529, 3+310 HWYH-1134 TA-445836 3/25/2019 8.15 AM Mr. Randy CLOSED Re-Schedule to 26-Mar-
KHAN
to 3+346, 3+406 to 3+465, 4+053 to 4+397 2019
8th Layer (300mm) Compaction Test at RE-SCHEDULE TO 26-03-2019
353 CPP-NGCP-CIV-0351 1400072886 Civil SATIP-A- 114- 01 SAIC-A-1004 HRDH RH-GK N/A 3/25/2019 9.00 AM Hameed Ullah Mr. Raymund CLOSED DUE TO BAD WEATHER
HRDH RH-GK Extension
CONDITION
7th Layer (300mm) Compaction Test at HRDH-1182 well RE-SCHEDULE TO 26-03-2019
354 CPP-NGCP-CIV-0352 1400072875 Civil SATIP-A- 114- 01 SAIC-A-1004 N/A 3/25/2019 10.00 AM Hameed Ullah Mr. Raymund CLOSED DUE TO BAD WEATHER
HRDH-1182 well pad extension pad
CONDITION
Soil Sampling, testing and review of test
reports For HRDH-Borrow pit#08 stockpile RE-SCHEDULE TO 26-03-2019
355 CPP-NGCP-CIV-0353 1400072876 Civil SATIP-A- 114- 01 SAIC-A-1001 HRDH RH-K2 N/A 3/25/2019 2.00 PM Hameed Ullah Mr. Raymund CLOSED DUE TO BAD WEATHER
#1 near RH-K2 N2685696.245
E.306645.543 CONDITION
Soil Sampling testing and review of test cancelled due to already
356 CPP-NGCP-CIV-0354 1400072905 Civil SATIP-A- 114- 01 SAIC-A-1001 reports for existing ground material of HRDH HRDH RH-K2 N/A 3/25/2019 2.00 PM Hameed Ullah Mr. Raymund CLOSED raised this RFI. OLD EPM
RH-K2 No 68477
Existing Material Sampling testing and RE-SCHEDULE TO 26-03-2019
357 CPP-NGCP-CIV-0355 1400072856 Civil SATIP-A- 114- 01 SAIC-A-1001 review of test reports for Zone A at HRDH HRDH RH-K13 N/A 3/25/2019 2.00 PM Hameed Ullah Mr. Raymund CLOSED DUE TO BAD WEATHER
RH-K13 CONDITION
Existing Material Sampling testing and RE-SCHEDULE TO 26-03-2019
358 CPP-NGCP-CIV-0356 1400072879 Civil SATIP-A- 114- 01 SAIC-A-1001 review of test reports for Zone B at HRDH HRDH RH-K13 N/A 3/25/2019 2.00 PM Hameed Ullah Mr. Raymund CLOSED DUE TO BAD WEATHER
RH-K13 CONDITION
Existing Material Sampling testing and RE-SCHEDULE TO 26-03-2019
359 CPP-NGCP-CIV-0357 1400072907 Civil SATIP-A- 114- 01 SAIC-A-1001 HRDH RH-K1 N/A 3/25/2019 2.00 PM Hameed Ullah Mr. Raymund CLOSED DUE TO BAD WEATHER
review of test reports for HRDH RH-K1
CONDITION
Compaction Testing 1st Layer General fill AAMIR
360 CPP-NGCP-CIV-0358 1400072924 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH RH-GK N/A 3/25/2019 9.00 AM Mr. Randy CLOSED
marl well pad RHGK Zone A HWYH RHGK SOLANGI

1400072934
Material Receiving Inspection marl well pad N/A AAMIR
361 CPP-NGCP-CIV-0359 Civil SATIP-A- 114- 01 SAIC-A-1002 HWYH RH-GK 3/25/2019 10.00 AM Mr. Randy CLOSED
RHGK Zone A HWYH RHGK SOLANGI
Fill placement and Compaction inspection AAMIR
362 CPP-NGCP-CIV-0360 1400072917 Civil SATIP-A- 114- 01 SAIC-A-1004 HWYH RH-GK N/A 3/25/2019 10.30 AM Mr. Randy CLOSED
marl well pad RHGK HWYH RHGK SOLANGI
5th Layer Area 186.478 sqm Compaction
363 CPP-NGCP-CIV-0361 1400073392 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1170 N/A 3/26/2019 9.00 AM Hameed Ullah Mr. Raymund CLOSED
test for Zone B at HRDH well pad 1170
1400073432
Existing Ground Compaction Test at HRDH N/A
364 CPP-NGCP-CIV-0362 Civil SATIP-A- 114- 01 SAIC-A-1005 HRHD RH-K2 3/26/2019 9.15 AM Hameed Ullah Mr. Raymund CLOSED
RH-K2 EXTENSION
Existing Ground Compaction Test at HRDH
365 CPP-NGCP-CIV-0363 1400073475 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH RH-K1 N/A 3/26/2019 9.30 AM Hameed Ullah Mr. Raymund CLOSED
RH-K1 EXTENSION
Existing Ground Compaction Test for Zone
366 CPP-NGCP-CIV-0364 1400073449 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH RH-K13 N/A 3/26/2019 9.45 AM Hameed Ullah Mr. Raymund CLOSED
A and B at HRDH RH-K13 Extention
1400073401
Soil Sampling and Testing existing soil well N/A
AAMIR
367 CPP-NGCP-CIV-0365 Civil SATIP-A- 114- 01 SAIC-A-1001 HWYH-201 3/26/2019 9.00 AM Mr. Randy CLOSED
pad 201 HWYH SOLANGI
Soil Sampling an Testing sub base material
AAMIR
368 CPP-NGCP-CIV-0366 1400073465 Civil SATIP-A- 114- 01 SAIC-A-1001 Barrow pit 8 stock pile no 2 well pad 201 HWYH-201 N/A 3/26/2019 10.00 AM Mr. Randy CLOSED
SOLANGI
HWYH
Soil Sampling and Testing select fill Barrow AAMIR
369 CPP-NGCP-CIV-0367 1400073515 Civil SATIP-A- 114- 01 SAIC-A-1001 HWYH-201 N/A 3/26/2019 10.30 AM Mr. Randy CLOSED
pit no 8 stock pile 3 well pad 201 HWYH SOLANGI
Receiving Aggregate Base Course material
199 CPP-NGCP-CIV-0198 1400061202 Civil SATIP-Q- 006- 02 SAIC-Q-1037 inspection at Asphalt Road Crossing (Open Cut) HRDH-RH-AK N/A 3/7/2019 1:00 PM Hameed Ullah Mr. Raymund CLOSED
Near RH-AK HRDH
1400057039 Select fill Material Receiving inspection 11:30 AM
161 CPP-NGCP-CIV-0160 Civil SATIP-A- 114- 01 SAIC-A-1002 for Asphalt Open Cut Road Hrdh 1171 HRDH-1171 TA-843656 2/27/2019 Hameed Ullah Mr. Raymund CLOSED

Trench excavation and preparation


162 CPP-NGCP-CIV-0161 1400057057 Civil SATIP-L-450- 01 SAIC-L-1002 Inspection for 8''F/L HRDH 1171 to RH-AK AT HRDH-1171 TA-843656 2/27/2019 10:30 AM Hameed Ullah Mr. Raymund CLOSED
Asphalt Road Crossing (Sta-9+000-9+014)
Soil Sampling and Testing select fill AAMIR
373 CPP-NGCP-CIV-0371 1400073599 Civil SATIP-A- 114- 01 SAIC-A-1001 Barrow pit no 3 stock pile 2 well pad RHGK HWYH-RHGK N/A 3/26/2019 10.00 AM Mr. Randy CLOSED
SOLANGI
HWYH
Soil Sampling Testing and review of test
1400074309
reports for HRDH Borrow pit # 08, stock pile- HRDH BORROW N/A
374 CPP-NGCP-CIV-0372 Civil SATIP-A- 114- 01 SAIC-A-1001 3/27/2019 8.15 AM Hameed Ullah Mr. Raymund CLOSED
02, N-2685790.333, E-306534.446 select fill PIT#08
material
Soil Sampling Testing and Review of test
reports for select fill material at HRDH HRDH BORROW
375 CPP-NGCP-CIV-0373 1400074363 Civil SATIP-A- 114- 01 SAIC-A-1001 N/A 3/27/2019 8.15 AM Hameed Ullah Mr. Raymund CLOSED
Borrow pit # 4, stock pile - 02 E- PIT#04
308169.69,N-2698793.00
Existing Ground material sampling testing an
376 CPP-NGCP-CIV-0374 1400074297 Civil SATIP-A- 114- 01 SAIC-A-1001 review of test reports for HRDH 614 WELL HRDH-614 N/A 3/27/2019 8.15 AM Hameed Ullah Mr. Raymund CLOSED
PAD EXTENSION
8'' F/L HRDH 1116-RH-FK Pipe lowering at
377 CPP-NGCP-CIV-0375 1400074317 Civil SATIP-L-450- 01 SAIC-L-1003
sta HRDH-1116 FL TA-843608 3/27/2019 8.00 AM Hameed Ullah Mr. Raymund CLOSED
KP2+240 to KP2+400;
02-FW-(173-184);
Trench Bedding Inspection for 8" FL HRDH-
378 CPP-NGCP-CIV-0376 1400074325 Civil SATIP-L- 450- 01 SAIC-L-1002 1116-FK Station , HRDH-1116 FL TA-843608 3/27/2019 8.10 AM Hameed Ullah Mr. Raymund CLOSED
KP2+240 to KP2+400;
Sand Covering and backfilling Inspection for
379 CPP-NGCP-CIV-0377 1400074354 Civil SATIP-L-450- 01 SAIC-L-1004 8" F/L HRDH-1116-FK from Station HRDH-1116 FL TA-843608 3/27/2019 8.20 AM Hameed Ullah Mr. Raymund CLOSED
KP2+240 to KP2+400;
8'' F/L HRDH 1116-RH-FK Pipe lowering at
sta
380 CPP-NGCP-CIV-0378 1400074326 Civil SATIP-L-450- 01 SAIC-L-1003 HRDH-1116 FL TA-843608 3/27/2019 8.30 AM Hameed Ullah Mr. Raymund CLOSED
KP 2+470 to KP2+650;
02-FW-(191-205)
Trench Bedding Inspection for 8" FL HRDH-
381 CPP-NGCP-CIV-0379 1400074311 Civil SATIP-L- 450- 01 SAIC-L-1002 1116-FK Station , HRDH-1116 FL TA-843608 3/27/2019 8.40 AM Hameed Ullah Mr. Raymund CLOSED
KP 2+470 to KP2+650;
Sand Covering and backfilling Inspection for
382 CPP-NGCP-CIV-0380 1400074300 Civil SATIP-L-450- 01 SAIC-L-1004 8" F/L HRDH-1116-FK from Station HRDH-1116 FL TA-843608 3/27/2019 8.50 AM Hameed Ullah Mr. Raymund CLOSED
KP 2+470 to KP2+650;
8'' F/L HRDH 1116-RH-FK Pipe lowering at
sta
383 CPP-NGCP-CIV-0381 1400074291 Civil SATIP-L-450- 01 SAIC-L-1003 HRDH-1116 FL TA-843608 3/27/2019 9.00 AM Hameed Ullah Mr. Raymund CLOSED
KP2+880 to KP3+030
02-FW-(225-234)
Trench Bedding Inspection for 8" FL HRDH-
384 CPP-NGCP-CIV-0382 1400074356 Civil SATIP-L- 450- 01 SAIC-L-1002 1116-FK Station , HRDH-1116 FL TA-843608 3/27/2019 9.10 AM Hameed Ullah Mr. Raymund CLOSED
KP2+880 to KP3+030
Sand Covering and backfilling Inspection for
385 CPP-NGCP-CIV-0383 1400074374 Civil SATIP-L-450- 01 SAIC-L-1004 8" F/L HRDH-1116-FK from Station HRDH-1116 FL TA-843608 3/27/2019 9.20 AM Hameed Ullah Mr. Raymund CLOSED
KP2+880 to KP3+030
386 CPP-NGCP-CIV-0384 1400074367 Civil SATIP-A- 114- 01 SAIC-A-1005 COMPACTION TEST INSPECTION OF 6TH LAYER HRHD-1170 N/A 3/27/2019 8.30 AM Hameed Ullah Mr. Raymund CLOSED
ZONE B HARAD WELL #1170 AREA 154.829 Sqm
COMPACTION TEST INSPECTION EXSITING LAYER
387 CPP-NGCP-CIV-0385 1400074376 Civil SATIP-A- 114- 01 SAIC-A-1005 PAD EXTENTION WELL # 1063 AREA ZONE A. HRDH-1063 N/A 3/27/2019 9.00 AM Hameed Ullah Mr. Raymund CLOSED
445.75 ZONE B. 2754.739 TOTAL 3200.739
388 CPP-NGCP-CIV-0386 1400074377 Civil SATIP-A- 114- 01 SAIC-A-1002 MATERIAL RECEVING OF GENERAL FILL MATRIAL HRDH-1063 N/A 3/27/2019 9.30 AM Hameed Ullah Mr. Raymund CLOSED
WELL # 1063 WELL PAD EXTENTION TIME 9.30AM
389 CPP-NGCP-CIV-0387 1400074292 Civil SATIP-A- 114- 01 SAIC-A-1004 FILL PLACEMENT INSPECTION OF 1ST LAYER ZONE HRDH-1063 N/A 3/27/2019 1.00 PM Hameed Ullah Mr. Raymund CLOSED
A & B WELL PAD # 1063 TIME 1 PM

COMPACTION TEST INSPECTION OF 1ST & 2ND Deep test could not be
LAYER (TRAIL DEEP TEST) WELL #1063 TIME ready due to permit
390 CPP-NGCP-CIV-0388 1400074383 Civil SATIP-A- 114- 01 SAIC-A-1005 1.30 PM AREA 300MM LAYER ZONE A. 309.986 HRDH-1063 N/A 3/27/2019 1.30 PM Hameed Ullah Mr. Raymund CLOSED issue. So only 1st layer
Sqm zone B 2158.518 sqm AND 200mm LAYER compaction test conducted
AREA ZONE A 294.490 sqm ZONE B AREA and found satisfactory
2023.607 Sqm result
391 CPP-NGCP-CIV-0389 1400074359 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH RH-GK N/A 3/27/2019 2.00 PM Hameed Ullah Mr. Raymund CLOSED
9th Layer Compaction Test at HRDH RH-GK
392 CPP-NGCP-CIV-0390 1400074378 Civil SATIP-A- 114- 01 SAIC-A-1005 8th Layer Compaction Test at HRDH 1182 HRDH-1182 N/A 3/27/2019 2.15 PM Hameed Ullah Mr. Raymund CLOSED
well pad extension
Pipe lowering atHWYH- 1134 , KM 0+655 to TASEER
393 CPP-NGCP-CIV-0391 1400074811 Civil SATIP-L-450- 01 SAIC-L-1003 HWYH-1134 TA-445836 3/28/2019 8.00 AM Mr. Randy CLOSED
1+529,fw-50 -123 KHAN
1400074791 Trench Bedding Inspection for HWYH- 1134 , KM TA-445836 TASEER
394 CPP-NGCP-CIV-0392 Civil SATIP-L- 450- 01 SAIC-L-1002 0+655 to 1+529 HWYH-1134 3/28/2019 8.10 AM Mr. Randy CLOSED
KHAN
Sand Covering and backfilling Inspection for TASEER
395 CPP-NGCP-CIV-0393 1400074812 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1134 TA-445836 3/28/2019 8.20 AM Mr. Randy CLOSED
HWYH- 1134 , KM 0+655 to 1+529 KHAN
1400074740 Pipe lowering atHWYH- 1134 , KM 3+310 to 3+34, TA-445836 TASEER
396 CPP-NGCP-CIV-0394 Civil SATIP-L-450- 01 SAIC-L-1003 fw-272-275 HWYH-1134 3/28/2019 8.30 AM Mr. Randy Reject
KHAN
Trench Bedding Inspection for HWYH- 1134 , KM TASEER
397 CPP-NGCP-CIV-0395 1400074817 Civil SATIP-L- 450- 01 SAIC-L-1002 3+310 to 3+346
HWYH-1134 TA-445836 3/28/2019 8.40 AM Mr. Randy Reject
KHAN
1400074838 Sand Covering and backfilling Inspection for TA-445836 TASEER
398 CPP-NGCP-CIV-0396 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH- 1134 , KM3+310 to 3+346 HWYH-1134 3/28/2019 8.50 AM Mr. Randy Reject
KHAN
Pipe lowering atHWYH- 1134 , KM 3+406 to TASEER
399 CPP-NGCP-CIV-0397 1400074826 Civil SATIP-L-450- 01 SAIC-L-1003 HWYH-1134 TA-445836 3/28/2019 9.00 AM Mr. Randy Reject
3+465, fw-280-285 KHAN
1400074827 Trench Bedding Inspection for HWYH- 1134 , KM TA-445836 TASEER
400 CPP-NGCP-CIV-0398 Civil SATIP-L- 450- 01 SAIC-L-1002 3+406 to 3+465,
HWYH-1134 3/28/2019 9.10 AM Mr. Randy CLOSED
KHAN
Sand Covering and backfilling Inspection for TASEER
401 CPP-NGCP-CIV-0399 1400074874 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1134 TA-445836 3/28/2019 9.20 AM Mr. Randy Reject
HWYH- 1134 , KM 3+406 to 3+465, KHAN
Pipe lowering atHWYH- 1134 , KM 4+053 to TASEER
402 CPP-NGCP-CIV-0400 1400074819 Civil SATIP-L-450- 01 SAIC-L-1003 4+397, fw-334-362 HWYH-1134 TA-445836 3/28/2019 9.30 AM Mr. Randy CLOSED
KHAN
Trench Bedding Inspection for HWYH- 1134 ,KM TASEER
403 CPP-NGCP-CIV-0401 1400074866 Civil SATIP-L- 450- 01 SAIC-L-1002 4+053 to 4+397 HWYH-1134 TA-445836 3/28/2019 9.40 AM Mr. Randy CLOSED
KHAN
Sand Covering and backfilling Inspection for TASEER
404 CPP-NGCP-CIV-0402 1400074828 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH- 1134 , KM 4+053 to 4+397 HWYH-1134 TA-445836 3/28/2019 9.50 AM Mr. Randy CLOSED
KHAN

10th final layer (300 mm) Compaction test for


405 CPP-NGCP-CIV-0403 1400074976 Civil SATIP-A- 114- 01 SAIC-A-1005 zone A and B at HRDH-1145 WELL PAD EXTENSION HRDH-1145 N/A 3/28/2019 9.00 AM Hameed Ullah Mr. Raymund CLOSED

10th Layer Compaction test at HRDH RH-GK


406 CPP-NGCP-CIV-0404 1400074942 Civil SATIP-A- 114- 01 SAIC-A-1005 EXTENSION HRDH RH-GK N/A 3/28/2019 10.00 AM Hameed Ullah Mr. Raymund CLOSED

9th final layer (300mm) Compaction Test at HRDH


407 CPP-NGCP-CIV-0405 1400074980 Civil SATIP-A- 114- 01 SAIC-A-1005 1182 well pad extension HRDH-1182 N/A 3/28/2019 11.00 AM Hameed Ullah Mr. Raymund CLOSED
RE-SCHEDULE TO 30-03-2019
Compaction Test 1st layer 300mm select fill AAMIR
408 CPP-NGCP-CIV-0406 1400075023 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH RH-GK N/A 3/28/2019 10.00 AM Mr. Randy CLOSED
well pad RHGK zone B HWYH SOLANGI
Compaction Test inspection of 2nd layer of well
409 CPP-NGCP-CIV-0407 1400075064 Civil SATIP-A- 114- 01 SAIC-A-1005 pad # 1063 (area zone A 249.49sqm zone B HRDH-1063 N/A 3/28/2019 1.30PM Hameed Ullah Mr. Raymund CLOSED
2023.60sqm)
Compaction Test inspection 3rd layer well head
410 CPP-NGCP-CIV-0408 1400075650 Civil SATIP-A- 114- 01 SAIC-A-1005 # 1063 area zone A 260.81 sqm zone B 1284.551 HRDH-1063 N/A 3/30/2019 10.30 AM Hameed Ullah Mr. Raymund CLOSED
sqm
8'' F/L HRDH 922-RH-FK Pipe lowering at
sta KP3+280 to KP3+400;
411 CPP-NGCP-CIV-0409 1400075786 Civil SATIP-L-450- 01 SAIC-L-1003 HRDH-922 FL TA-843609 3/30/2019 8.00 AM Hameed Ullah Mr. Raymund CLOSED
03-FW-(253-262);03-FW-(269-283);03-FW-
(304-311)
Trench Bedding Inspection for 8" FL HRDH-
412 CPP-NGCP-CIV-0410 1400075776 Civil SATIP-L- 450- 01 SAIC-L-1002 HRDH-922 FL TA-843609 3/30/2019 8.10 AM Hameed Ullah Mr. Raymund CLOSED
922, KP3+280 to KP3+400 ;
Sand Covering and backfilling Inspection for
413 CPP-NGCP-CIV-0411 1400075758 Civil SATIP-L-450- 01 SAIC-L-1004 8" F/L HRDH-922, KP3+280 to KP3+400; HRDH-922 FL TA-843609 3/30/2019 8.20 AM Hameed Ullah Mr. Raymund CLOSED

8'' F/L HRDH 922-RH-FK Pipe lowering at


sta KP3+500 to KP3+680;
414 CPP-NGCP-CIV-0412 1400075651 Civil SATIP-L-450- 01 SAIC-L-1003 HRDH-922 FL TA-843609 3/30/2019 8.30 AM Hameed Ullah Mr. Raymund CLOSED
03-FW-(253-262);03-FW-(269-283);03-FW-
(304-311)

415 CPP-NGCP-CIV-0413 1400075752 Civil SATIP-L- 450- 01 SAIC-L-1002


Trench Bedding Inspection for 8" FL HRDH- HRDH-922 FL TA-843609 3/30/2019 8.40 AM Hameed Ullah Mr. Raymund CLOSED
922, KP 3+500 to KP3+680;

Sand Covering and backfilling Inspection for


416 CPP-NGCP-CIV-0414 1400075803 Civil SATIP-L-450- 01 SAIC-L-1004 HRDH-922 FL TA-843609 3/30/2019 8.50 AM Hameed Ullah Mr. Raymund CLOSED
8" F/L HRDH-922,KP 3+500 to KP3+680;

8'' F/L HRDH 922-RH-FK Pipe lowering at


417 CPP-NGCP-CIV-0415 1400075823 Civil SATIP-L-450- 01 SAIC-L-1003
sta KP3+950 to KP4+040 HRDH-922 FL TA-843609 3/30/2019 9.00 AM Hameed Ullah Mr. Raymund CLOSED
03-FW-(253-262);03-FW-(269-283);03-FW-
(304-311)
Trench Bedding Inspection for 8" FL HRDH-
418 CPP-NGCP-CIV-0416 1400075814 Civil SATIP-L- 450- 01 SAIC-L-1002 HRDH-922 FL TA-843609 3/30/2019 9.10 AM Hameed Ullah Mr. Raymund CLOSED
922, KP3+950 to KP4+040

Sand Covering and backfilling Inspection for


419 CPP-NGCP-CIV-0417 1400075824 Civil SATIP-L-450- 01 SAIC-L-1004 HRDH-922 FL TA-843609 3/30/2019 9.20 AM Hameed Ullah Mr. Raymund CLOSED
8" F/L HRDH-922, KP3+950 to KP4+040

Existing Ground Materail Soil Sampling Testing


420 CPP-NGCP-CIV-0418 1400076229 Civil SATIP-A- 114- 01 SAIC-A-1001 and Review of test report for HRDH 1307 WELLPAD HRDH-1307 N/A 3/31/2019 8.00 AM Hameed Ullah Mr. Raymund CLOSED
EXTENSION

421 CPP-NGCP-CIV-0419 1400076230 Civil SATIP-A- 114- 01 SAIC-A-1005 11th Layer Compaction test at HRDH RH-GK HRDH RH-GK N/A 3/31/2019 3.00 PM Hameed Ullah Mr. Raymund CLOSED
EXTENSION
Pipe lowering at HWYH- 1134 KP4+579 TO TASEER
422 CPP-NGCP-CIV-0420 1400076270 Civil SATIP-L-450- 01 SAIC-L-1003 KP4+663 , HWYH-1134 TA-445836 3/31/2019 8.00 AM Mr. Randy CLOSED
fw-377-384, FW388-410 KHAN
Trench Bedding Inspection for HWYH- 1134 TASEER
423 CPP-NGCP-CIV-0421 1400076343 Civil SATIP-L- 450- 01 SAIC-L-1002 KP4+579 TO KP4+663 HWYH-1134 TA-445836 3/31/2019 8.10 AM Mr. Randy CLOSED
KHAN
Sand Covering and backfilling Inspection for TASEER
424 CPP-NGCP-CIV-0422 1400076336 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1134 TA-445836 3/31/2019 8.20 AM Mr. Randy CLOSED
HWYH- 1134 KP4+579 TO KP4+663 KHAN
Pipe lowering at HWYH- 1134 KP4+711 TO
1400076306 TA-445836 TASEER
425 CPP-NGCP-CIV-0423 Civil SATIP-L-450- 01 SAIC-L-1003 KP4+983 HWYH-1134 3/31/2019 8.30 AM Mr. Randy CLOSED
fw-377-384, FW388-410 KHAN
Trench Bedding Inspection for HWYH- 1134 TASEER
426 CPP-NGCP-CIV-0424 1400076346 Civil SATIP-L- 450- 01 SAIC-L-1002 KP4+711 TO KP4+983
HWYH-1134 TA-445836 3/31/2019 8.40 AM Mr. Randy CLOSED
KHAN
Sand Covering and backfilling Inspection for TASEER
427 CPP-NGCP-CIV-0425 1400076318 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH- 1134 KP4+711 TO KP4+983 HWYH-1134 TA-445836 3/31/2019 8.50 AM Mr. Randy CLOSED
KHAN
1400076364 Compaction Test 1st layer 300mm select fill AAMIR Cancelled due to already
428 CPP-NGCP-CIV-0426 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH RH-GK N/A 3/31/2019 10.00 Am Mr. Randy CLOSED
well pad RHGK zone B HWYH SOLANGI raised this RFI 75023
1400076328 Compaction testing existing material well N/A AAMIR
429 CPP-NGCP-CIV-0427 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-201 3/31/2019 10.30 AM Mr. Randy CLOSED
pad 201 zone A and C hwyh SOLANGI

Select fill Material Receiving Inspection for


430 CPP-NGCP-CIV-0428 1400076819 Civil SATIP-A-114-01 SAIC-A-1002
HRDH RH-K2 Well pad extension (Borrow pit # 08, HRDH RH-K2 N/A 4/1/2019 9:00 AM Christan Mr. Raymund CLOSED
Stockpile-02, N-2685790.333, E-306534.446 )
Fill placement and compaction inspection of 1st
431 CPP-NGCP-CIV-0429 1400076791 Civil SATIP-A- 114- 01 SAIC-A-1004 layer backfilling for HRDH RH-K2 TA-723424 4/1/2019 9:15 AM Christan Mr. Raymund CLOSED
HRDH RH-K2 Well pad extension

432 CPP-NGCP-CIV-0430 1400076792 Civil SATIP-A- 114- 01 SAIC-A-1005 1st Layer (Select fill 300mm) Compaction HRDH RH-K2 TA-723424 4/1/2019 10:00 AM Christan Mr. Raymund CLOSED
Testing
Final for HRDH of
Inspection RH-K2 Well pad
HRDH-1180 extension
well pad
433 CPP-NGCP-CIV-0431 1400076893 Civil SATIP-A- 114- 01 SAIC-A-1006 exxtension HRDH-1180 N/A 4/1/2019 9.00 AM Hameed Ullah Mr. Raymund CLOSED
Final Inspection of HRDH-1122 well pad
434 CPP-NGCP-CIV-0432 1400076837 Civil SATIP-A- 114- 01 SAIC-A-1006 exxtension HRDH-1122 N/A 4/1/2019 10.00 AM Hameed Ullah Mr. Raymund CLOSED
435 CPP-NGCP-CIV-0433 1400076868 Civil SATIP-A- 114- 01 SAIC-A-1005 Existing ground compaction test at HRDH-1307 HRDH-1307 N/A 4/1/2019 11.00 AM Hameed Ullah Mr. Raymund CLOSED
well pad extension

436 CPP-NGCP-CIV-0434 1400076926 Civil SATIP-A- 114- 01 SAIC-A-1005 12th layer Compaction test at HRDH RH-GK HRDH RH-GK N/A 4/1/2019 2.00 PM Hameed Ullah Mr. Raymund CLOSED
EXTENSION

437 CPP-NGCP-CIV-0435 1400076964 Civil SATIP-A- 114- 01 SAIC-A-1005 Existing Ground Compaction test at HRDH 614 HRDH-614 N/A 4/1/2019 2.30 PM Hameed Ullah Mr. Raymund CLOSED
wellpad extension
8'' F/L HRDH-922 -RH-FK Pipe lowering at sta-
438 CPP-NGCP-CIV-0436 1400077614 Civil SATIP-L-450- 01 SAIC-L-1003 KP 1 +900 to 1+950; HRDH-922 FL TA-843609 4/2/2019 8.00 AM Hameed Ullah Mr. Raymund CLOSED
01-FW-(146-150);
Trench Bedding Inspection for 8" FL HRDH-922
439 CPP-NGCP-CIV-0437 1400077604 Civil SATIP-L- 450- 01 SAIC-L-1002 HRDH-922 FL TA-843609 4/2/2019 8.05 AM Hameed Ullah Mr. Raymund CLOSED
KP 1 +900 to 1+950;
Sand Covering and backfilling Inspection for 8"
440 CPP-NGCP-CIV-0438 1400077616 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-922-FK from Station KP 1 +900 to HRDH-922 FL TA-843609 4/2/2019 8.10 AM Hameed Ullah Mr. Raymund CLOSED
1+950;
8'' F/L HRDH-922 -RH-FK Pipe lowering at sta-
441 CPP-NGCP-CIV-0439 1400077643 Civil SATIP-L-450- 01 SAIC-L-1003 KP 2 +010 to 2+120; HRDH-922 FL TA-843609 4/2/2019 8.15 AM Hameed Ullah Mr. Raymund CLOSED
01-FW-(155-163);
Trench Bedding Inspection for 8" FL HRDH-922
442 CPP-NGCP-CIV-0440 1400077653 Civil SATIP-L- 450- 01 SAIC-L-1002 HRDH-922 FL TA-843609 4/2/2019 8.20 AM Hameed Ullah Mr. Raymund CLOSED
KP 2 +010 to 2+120;
Sand Covering and backfilling Inspection for 8"
443 CPP-NGCP-CIV-0441 1400077617 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-922-FK from Station KP 2 +010 to HRDH-922 FL TA-843609 4/2/2019 8.25 AM Hameed Ullah Mr. Raymund CLOSED
2+120;
8'' F/L HRDH-922 -RH-FK Pipe lowering at sta-
444 CPP-NGCP-CIV-0442 1400077654 Civil SATIP-L-450- 01 SAIC-L-1003 KP 2 +240 to 2+280; HRDH-922 FL TA-843609 4/2/2019 8.30 AM Hameed Ullah Mr. Raymund CLOSED
02-FW-(172-175);
Trench Beddingh Inspection for 8" FL HRDH-
445 CPP-NGCP-CIV-0443 1400077655 Civil SATIP-L- 450- 01 SAIC-L-1002 HRDH-922 FL TA-843609 4/2/2019 8.35 AM Hameed Ullah Mr. Raymund CLOSED
922 KP 2 +240 to 2+280;
Sand Covering and backfilling Inspection for 8"
446 CPP-NGCP-CIV-0444 1400077644 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-922-FK from Station KP 2 +240 to HRDH-922 FL TA-843609 4/2/2019 8.40 AM Hameed Ullah Mr. Raymund CLOSED
2+280;
8'' F/L HRDH-922 -RH-FK Pipe lowering at sta-
447 CPP-NGCP-CIV-0445 1400077634 Civil SATIP-L-450- 01 SAIC-L-1003 KP 2 +330 to 2+690; HRDH-922 FL TA-843609 4/2/2019 8.45 AM Hameed Ullah Mr. Raymund CLOSED
02-FW-(179-207);
Trench Bedding Inspection for 8" FL HRDH-922
448 CPP-NGCP-CIV-0446 1400077635 Civil SATIP-L- 450- 01 SAIC-L-1002 HRDH-922 FL TA-843609 4/2/2019 8.50 AM Hameed Ullah Mr. Raymund CLOSED
KP 2 +330 to 2+690;
Sand Covering and backfilling Inspection for 8"
449 CPP-NGCP-CIV-0447 1400077621 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-922-FK from Station KP 2 +330 to HRDH-922 FL TA-843609 4/2/2019 8.55 AM Hameed Ullah Mr. Raymund CLOSED
2+690;
8'' F/L HRDH-922 -RH-FK Pipe lowering at sta-
450 CPP-NGCP-CIV-0448 1400077586 Civil SATIP-L-450- 01 SAIC-L-1003 KP 2 +740 to 2+810; HRDH-922 FL TA-843609 4/2/2019 9.00 AM Hameed Ullah Mr. Raymund CLOSED
02-FW-(211-216);
Trench Bedding Inspection for 8" FL HRDH-922
451 CPP-NGCP-CIV-0449 1400077664 Civil SATIP-L- 450- 01 SAIC-L-1002 HRDH-922 FL TA-843609 4/2/2019 9.05 AM Hameed Ullah Mr. Raymund CLOSED
KP 2 +740 to 2+810;
Sand Covering and backfilling Inspection for 8"
452 CPP-NGCP-CIV-0450 1400077626 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-922-FK from Station KP 2 +740 to HRDH-922 FL TA-843609 4/2/2019 9.10 AM Hameed Ullah Mr. Raymund CLOSED
2+810;
8'' F/L HRDH-922 -RH-FK Pipe lowering at sta-
453 CPP-NGCP-CIV-0451 1400077629 Civil SATIP-L-450- 01 SAIC-L-1003 KP 2 +990 to 3+030; HRDH-922 FL TA-843609 4/2/2019 9.15 AM Hameed Ullah Mr. Raymund Reject
CANCELLED DUE TO NO
02-FW-(230-233) PERMIT
Trench Bedding Inspection for 8" FL HRDH-922 CANCELLED DUE TO NO
454 CPP-NGCP-CIV-0452 1400077637 Civil SATIP-L- 450- 01 SAIC-L-1002 HRDH-922 FL TA-843609 4/2/2019 9.20 AM Hameed Ullah Mr. Raymund Reject
KP 2 +990 to 3+030; PERMIT
Sand Covering and backfilling Inspection for 8"
455 CPP-NGCP-CIV-0453 1400077656 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-922-FK from Station KP 2 +990 to HRDH-922 FL TA-843609 4/2/2019 9.25 AM Hameed Ullah Mr. Raymund Reject
CANCELLED DUE TO NO
3+030; PERMIT

Soil sampling and testing general fill marl AAMIR


456 CPP-NGCP-CIV-0454 1400077668 Civil SATIP-A- 114- 01 SAIC-A-1001 Barrow pit no 10 stock pile no 1 Well pad HWYH RH-EJ N/A 4/2/2019 8.00 AM Mr. Randy CLOSED
SOLANGI
JAUF RH-EJ hawyh
1400077670 Soil sampling and testing existing material N/A AAMIR
457 CPP-NGCP-CIV-0455 Civil SATIP-A- 114- 01 SAIC-A-1001 HWYH RH-EJ 4/2/2019 8.00 AM Mr. Randy CLOSED
well pad JAUF RH-EJ Hwyh SOLANGI

1400077687 Compaction testing 300mm 1st layer well pad N/A AAMIR
458 CPP-NGCP-CIV-0456 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH RH-GK 4/2/2019 10.00 AM Mr. Randy CLOSED
RH-GK zone C Hwyh SOLANGI

AAMIR
459 CPP-NGCP-CIV-0457 1400077659 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH RH-GK N/A 4/2/2019 11.00 AM Mr. Randy CLOSED
Compaction testing 300 mm 1st layer well SOLANGI
pad RH-GK zone D Hwyh
COMPACTION TEST INSPECTION OF 4th
460 CPP-NGCP-CIV-0458 1400077678 Civil SATIP-A- 114- 01 SAIC-A-1005 LAYER OF ZONE A & B HRDH-1063 WELL HRDH-1063 BA-561604 4/2/2019 10:00:00 AM Talal Shabbir Mr. Raymund CLOSED
PAD EXTENSION

8'' F/L HWYH-1088 Pipe lowering at sta-KP


TASEER
461 CPP-NGCP-CIV-0459 1400077660 Civil SATIP-L-450- 01 SAIC-L-1003 0+079 to 0+228 HWYH-1088 FL TA-445837 4/2/2019 8.00 AM Mr. Randy CLOSED
KHAN
00-FW-2 TO 14

Trench Bedding Inspection for HWYH-1088 TASEER


462 CPP-NGCP-CIV-0460 1400077590 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH-1088 FL TA-445837 4/2/2019 8.05 AM Mr. Randy CLOSED
KP0+079 to KP0+228 KHAN

Sand Covering and backfilling Inspection for TASEER


463 CPP-NGCP-CIV-0461 1400077705 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1088 FL TA-445837 4/2/2019 8.10 AM Mr. Randy CLOSED
HWYH-1088 KP0+079 to KP0+228 KHAN
Final Fill Inspection of HRDH 1145 Wellpad
464 CPP-NGCP-CIV-0462 1400077787 Civil SATIP-A- 114- 01 SAIC-A-1006 HRDH-1145 N/A 4/2/2019 9.30 AM Hameed Ullah Mr. Raymund CLOSED
Extension
13th layer compaction test Inspection at HRDH
465 CPP-NGCP-CIV-0463 1400077700 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH RH-GK N/A 4/2/2019 10.00 AM Hameed Ullah Mr. Raymund CLOSED
RH-GK Extension
Material Receiving Inspection at HRDH-1307 RE-SCHEDULE TO 03-04-2019
466 CPP-NGCP-CIV-0464 1400077837 Civil SATIP-A- 114- 01 SAIC-A-1002 HRDH-1307 N/A 4/2/2019 10.30 AM Hameed Ullah Mr. Raymund CLOSED
well pad extention DUE TO NO PERMIT
Fill placement and Compaction inspection
467 CPP-NGCP-CIV-0465 1400077876 Civil SATIP-A- 114- 01 SAIC-A-1004 for 1st layer at HRDH-1307 Well Pad HRDH-1307 N/A 4/2/2019 11.00 AM Hameed Ullah Mr. Raymund CLOSED RE-SCHEDULE TO 03-04-2019
Extension DUE TO NO PERMIT

1st Layer COMPACTION TEST INSPECTION


468 CPP-NGCP-CIV-0466 1400077810 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1307 N/A 4/2/2019 1.00 PM Hameed Ullah Mr. Raymund CLOSED
OF at HRDH-1307 WELL PAD EXTENSION RE-SCHEDULE TO 03-04-2019
DUE TO NO PERMIT
Soil sampling testing and review of test reports
469 CPP-NGCP-CIV-0467 1400078254 Civil SATIP-A- 114- 01 SAIC-A-1001 for Selectfill Material (E-309058.709,N- HRDH Borrow Pit N/A 4/3/2019 8.00 AM Hameed Ullah Mr. Raymund CLOSED
#01
2698073.605),Stockpile-07
Soil sampling testing and review of test reports
470 CPP-NGCP-CIV-0468 1400078276 Civil SATIP-A- 114- 01 SAIC-A-1001 for Selectfill Material (E-309235.709,N- HRDH Borrow N/A 4/3/2019 8.00 AM Hameed Ullah Mr. Raymund CLOSED
Pit#01
2697938.300) Stockpile-08
Soil sampling, testing and review of test reports
1400078285 HRDH Borrow Pit 8.00 AM
471 CPP-NGCP-CIV-0469 Civil SATIP-A- 114- 01 SAIC-A-1001 for Selectfill Material (E-302730.391, 11,stockpile #1 N/A 4/3/2019 Hameed Ullah Mr. Raymund CLOSED
N-2692561.237)
Existing Material Sampling Testing and Review
472 CPP-NGCP-CIV-0470 1400078229 Civil SATIP-A- 114- 01 SAIC-A-1001 HRDH-1194 N/A 4/3/2019 8.00 AM Hameed Ullah Mr. Raymund CLOSED
of test reports for HRDH-1194
COMPACTION TEST INSPECTION OF 5th
Mr.RAYMON
473 CPP-NGCP-CIV-0471 1400078230 Civil SATIP-A- 114- 01 SAIC-A-1005 LAYER OF ZONE A & B HRDH-1063 WELL HRDH-1063 BA-561604 4/3/2019 11.00 AM Talal Shabbir CLOSED
D RUBILOUS
PAD EXTENSION
Compaction Testing 300mm 1st layer well pad AAMIR
474 CPP-NGCP-CIV-0472 1400078280 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-201 N/A 4/3/2019 11.00 AM Mr. Randy CLOSED
201 zone A and C HWYH SOLANGI
Material Receiving Inspection at HRDH RH-EK AQIB
475 CPP-NGCP-CIV-0473 1400078352 Civil SATIP-A- 114- 01 SAIC-A-1002 HRDH RH-EK N/A 4/3/2019 8.00 AM Mr. Raymund CLOSED
1st Layer well pad extention HUSSEIN
Fill placement and Compaction inspection
AQIB
476 CPP-NGCP-CIV-0474 1400078389 Civil SATIP-A- 114- 01 SAIC-A-1004 for 1st layer at HRDH-RH-EK Well Pad HRDH RH-EK N/A 4/3/2019 8.30 AM
HUSSEIN
Mr. Raymund CLOSED
Extension

1st Layer COMPACTION TEST INSPECTION AQIB


477 CPP-NGCP-CIV-0475 1400078369 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH RH-EK N/A 4/3/2019 9.00 AM Mr. Raymund CLOSED
OF at HRDH-RH-EK WELL PAD EXTENSION HUSSEIN

Trench excavation and preparation inspection


AAMIR
235 CPP-NGCP-CIV-0233 1400064943 Civil SATIP-L- 450- 01 SAIC-L-1002 from station 1+790 to 1+822 Asphalt road open HWYH-1134 TA-445836 3/13/2019 9:00 PM Mr. Raymund CLOSED
SOLANGI
cut HWYH- 1134 Prior to Sand Bedding
Trench excavation and preparation inspection
AAMIR
247 CPP-NGCP-CIV-0245 1400065426 Civil SATIP-L- 450- 01 SAIC-L-1002 from station 1+790 to 1+822 Asphalt road open HWYH-1134 TA-445836 3/13/2019 9:15 AM Mr. Raymund CLOSED
SOLANGI
cut prior to Pipe Lowering HWYH- 1134

480 CPP-NGCP-CIV-0478 1400078699 Civil SATIP-L-450- 01 Pipe lowering at KP1+639 to 1+853, fw132-
SAIC-L-1003 HWYH-1100 FL TA-445959 4/4/2019 8.00 AM TASEER
Mr. Randy CLOSED
150 KHAN
Trench Bedding Inspection for KP1+639 to TASEER
481 CPP-NGCP-CIV-0479 1400078756 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH-1100 FL TA-445959 4/4/2019 8.10 AM Mr. Randy CLOSED
1+853 KHAN
482 CPP-NGCP-CIV-0480 1400078757 Civil SATIP-L-450- 01 SAIC-L-1004 Sand Covering and backfilling Inspection for HWYH-1100 FL TA-445959 4/4/2019 8.15 AM TASEER
Mr. Randy CLOSED
from KP1+639 to 1+853 KHAN

483 CPP-NGCP-CIV-0481 1400078889 Civil SATIP-L-450- 01 SAIC-L-1003 8'' F/L HWYH-1088 Pipe lowering at sta- HWYH-1088 FL TA-445837 4/4/2019 8.00 AM TASEER
Mr. Randy Reject CANCELLED THIS RFI
KP0+079 to KP0+228 KHAN ALREADY RAISED
Trench Bedding Inspection for HWYH-1088 TASEER CANCELLED THIS RFI
484 CPP-NGCP-CIV-0482 1400078862 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH-1088 FL TA-445837 4/4/2019 8.05 AM KHAN
Mr. Randy Reject
KP0+079 to KP0+228 ALREADY RAISED
Sand Covering and backfilling Inspection for TASEER
485 CPP-NGCP-CIV-0483 1400078973 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1088 FL TA-445837 4/4/2019 8.10 AM KHAN
Mr. Randy Reject CANCELLED THIS RFI
HWYH-1088 KP0+079 to KP0+228
ALREADY RAISED
8'' F/L HRDH-922 -RH-FK Pipe lowering at Hameed Mr.
486 CPP-NGCP-CIV-0484 1400078955 Civil SATIP-L-450- 01 SAIC-L-1003 HRDH-922 FL TA-843609 4/4/2019 8.00 AM CLOSED
sta-KP 0+360 to 0+516; 00-FW-(23-34) Ullah Raymund
Trench Bedding Inspection for 8" FL HRDH- Hameed Mr.
487 CPP-NGCP-CIV-0485 1400078927 Civil SATIP-L- 450- 01 SAIC-L-1002 HRDH-922 FL TA-843609 4/4/2019 8.10 AM CLOSED
922 sta-KP 0+360 to 0+516; 00-FW-(23-34) Ullah Raymund
Sand Covering and backfilling Inspection for
Hameed Mr.
488 CPP-NGCP-CIV-0486 1400078965 Civil SATIP-L-450- 01 SAIC-L-1004 8" F/L HRDH-922-FK from sta-KP 0+360 to HRDH-922 FL TA-843609 4/4/2019 8.20 AM CLOSED
0+516; 00-FW-(23-34) Ullah Raymund

489 CPP-NGCP-CIV-0487 1400078967 Civil SATIP-L-450- 01 SAIC-L-1003 8'' F/L HRDH-922 -RH-FK Pipe lowering at HRDH-922 FL TA-843609 4/4/2019 8.30 AM Hameed Mr. CLOSED
sta-KP 0 +912 to 1+200; 01-FW-(75-98); Ullah Raymund

Trench Bedding Inspection for 8" FL HRDH-


922 sta-KP 0 +912 to 1+200; 01-FW-(75- Hameed Mr.
490 CPP-NGCP-CIV-0488 1400078928 Civil SATIP-L- 450- 01 SAIC-L-1002 HRDH-922 FL TA-843609 4/4/2019 8.40 AM CLOSED
98); Ullah Raymund
01-FW-(111-140)
Sand Covering and backfilling Inspection for
8" F/L HRDH-922-FK from sta-KP 0 +912 to Hameed Mr.
491 CPP-NGCP-CIV-0489 1400078929 Civil SATIP-L-450- 01 SAIC-L-1004 1+200; 01-FW-(75-98); HRDH-922 FL TA-843609 4/4/2019 8.50 AM CLOSED
Ullah Raymund
01-FW-(111-140)

492 CPP-NGCP-CIV-0490 1400078983 Civil SATIP-L-450- 01 SAIC-L-1003 8'' F/L HRDH-922 -RH-FK Pipe lowering at HRDH-922 FL TA-843609 4/4/2019 9.00 AM Hameed Mr. CLOSED
sta-KP 1 +350 to 1+722; 01-FW-(111-140) Ullah Raymund

Trench Bedding Inspection for 8" FL HRDH-


922 sta-KP 1 +350 to 1+722; 01-FW-(111- Hameed Mr.
493 CPP-NGCP-CIV-0491 1400078957 Civil SATIP-L- 450- 01 SAIC-L-1002 HRDH-922 FL TA-843609 4/4/2019 9.10 AM CLOSED
140) Ullah Raymund
01-FW-(111-140)
Sand Covering and backfilling Inspection for
8" F/L HRDH-922-FK from sta-KP 1 +350 to Hameed Mr.
494 CPP-NGCP-CIV-0492 1400078993 Civil SATIP-L-450- 01 SAIC-L-1004 1+722; 01-FW-(111-140) HRDH-922 FL TA-843609 4/4/2019 9.20 AM CLOSED
Ullah Raymund
01-FW-(111-140)
Soil sampling and testing existing material AAMIR
495 CPP-NGCP-CIV-0493 1400078970 Civil SATIP-A- 114- 01 SAIC-A-1001 HWYH-1023 N/A 4/4/2019 8.00 AM Mr. Randy CLOSED
well pad 1023 Hwyh SOLANGI
Fill placement and compaction inspection se AAMIR
496 CPP-NGCP-CIV-0494 1400078951 Civil SATIP-A- 114- 01 SAIC-A-1004 HWYH-201 N/A 4/4/2019 9.00 AM SOLANGI
Mr. Randy CLOSED
lect fill well pad 201 Hwyh
Material receiving inspection select fill well AAMIR
497 CPP-NGCP-CIV-0495 1400078975 Civil SATIP-A- 114- 01 SAIC-A-1002 HWYH-201 N/A 4/4/2019 9.30 AM Mr. Randy CLOSED
pad 201 Hwyh SOLANGI
Soil sampling testing and review of test
reports for General Fill Material HRDH- HRDH-Borrow
Hameed Mr.
498 CPP-NGCP-CIV-0496 1400079036 Civil SATIP-A- 114- 01 SAIC-A-1001 Borrow pit#10,stockpile#01,(E- pit#10,stockpile#0 N/A 4/4/2019 8.00 AM Ullah Raymund CLOSED
307212.372,N-2685507.901) 1

Soil Sampling testing and review of test


reports for General Fill Material HRDH- HRDH-BORROW
Hameed Mr.
499 CPP-NGCP-CIV-0497 1400079044 Civil SATIP-A- 114- 01 SAIC-A-1001 BORROW PIT#1, Stockpile#09(E- PIT#1, N/A 4/4/2019 8.00 AM CLOSED
Ullah Raymund
309147.243,N-2698175.435) Stockpile#09

500 CPP-NGCP-CIV-0498 1400078997 Civil SATIP-A- 114- 01 SAIC-A-1005 14th Layer Compaction test Inspection at HRDH RH-GK N/A 4/4/2019 8.30 AM Hameed Mr. CLOSED
HRDH RH-GK Ullah Raymund
Existing ground Compaction test at HRDH Hameed Mr.
501 CPP-NGCP-CIV-0499 1400078980 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH 1194 N/A 4/4/2019 9.00 AM CLOSED
1194 wellpad Extension Ullah Raymund
2nd Layer Compaction test Inspection for Hameed Mr.
502 CPP-NGCP-CIV-0500 1400078987 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH 1307 N/A 4/4/2019 9.30 AM CLOSED
Zone A at HRDH 1307 wellpad Extension Ullah Raymund
COMPACTION TEST INSPECTION OF
503 CPP-NGCP-CIV-0501 1400078981 Civil SATIP-A- 114- 01 SAIC-A-1005 EXISTING BASE LAYER OF ZONE B HWYH- HWYH-996 BA-561764 4/4/2019 8.00 AM Talal Shabbir Mr.RANDY CLOSED
996 WELL PAD EXTENSION
Compaction test inspection 2nd Layer AQIB Mr.
504 CPP-NGCP-CIV-0502 1400079204 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH RH-EK N/A 4/4/2019 8.00 AM CLOSED
(200mm) at HRDH RH-EK well pad HUSSEIN Raymund
Trench Bottom Inspection prior to sand AQIB Mr.
505 CPP-NGCP-CIV-0503 1400079171 Civil SATIP-L- 450- 01 SAIC-L-1002 bedding 8" HRDH-1314 FL at Sta:-0+200 to HRDH-1314 FL TA-843626 4/4/2019 9.00 AM HUSSEIN Raymund CLOSED
0+500
Trench Bottom Inspection prior to sand AQIB Mr.
506 CPP-NGCP-CIV-0504 1400079172 Civil SATIP-L- 450- 01 SAIC-L-1002 bedding 8" HRDH-1314 FL at Sta:-0+500 to HRDH-1314 FL TA-843626 4/4/2019 10.00 AM CLOSED
HUSSEIN Raymund
0+900
Pipe lowering at HWYH-1100 FL KP2+019 TASEER
507 CPP-NGCP-CIV-0505 1400079225 Civil SATIP-L-450- 01 SAIC-L-1003 HWYH-1100 FL TA-445959 4/5/2019 8.00 AM Mr. Randy CLOSED
to 2+446, FW164-200 KHAN

508 CPP-NGCP-CIV-0506 1400079251 Civil SATIP-L- 450- 01 SAIC-L-1002 Trench Bedding Inspection for HWYH-1100 HWYH-1100 FL TA-445959 4/5/2019 8.10 AM TASEER
Mr. Randy CLOSED
FL KP2+019 to 2+446 KHAN
TASEER
509 CPP-NGCP-CIV-0507 1400079304 Civil SATIP-L-450- 01 SAIC-L-1004 Sand Covering and backfilling Inspection for HWYH-1100 FL TA-445959 4/5/2019 8.15 AM KHAN
Mr. Randy CLOSED
from HWYH-1100 FL KP2+019 to 2+446
Fill placement and compaction inspection of
Mr.
510 CPP-NGCP-CIV-0508 1400079667 Civil SATIP-A- 114- 01 SAIC-A-1004 2nd layer (Select Fill 300mm) backfilling for HRDH RH-K2 TA-723424 4/6/2019 2.00 PM Christan CLOSED
HRDH RH-K2 Well pad extension Raymund
2nd Layer (Select fill 300mm) Compaction Mr. RE-SCHEDULE TO 07-
511 CPP-NGCP-CIV-0509 1400079695 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH RH-K2 TA-723424 4/6/2019 2.30 PM Christan CLOSED
Testing for HRDH RH-K2 Well pad Raymund 04-2019
extension
Compaction testing existing well pad 201 zo AAMIR
512 CPP-NGCP-CIV-0510 1400079611 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH 201 N/A 4/6/2019 8.00 AM SOLANGI
Mr. Randy CLOSED
ne B Hwyh
Compaction testing 2nd layer 200mm well p AAMIR
513 CPP-NGCP-CIV-0511 1400079625 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH 201 N/A 4/6/2019 9.00 AM Mr. Randy CLOSED
ad 201 zone A Hwyh SOLANGI

514 CPP-NGCP-CIV-0512 1400079618 Civil SATIP-A- 114- 01 SAIC-A-1004


Placement and compaction testing sub base HWYH 201 N/A 4/6/2019 10.00 AM AAMIR
Mr. Randy CLOSED
 well pad 201 Hwyh SOLANGI

AAMIR
515 CPP-NGCP-CIV-0513 1400079636 Civil SATIP-A- 114- 01 SAIC-A-1002 Material receiving inspection sub base well p HWYH 201 N/A 4/6/2019 11.00 AM Mr. Randy CLOSED
SOLANGI
ad 201 Hwyh

Compaction testing sub base 150mm 2nd la AAMIR
516 CPP-NGCP-CIV-0514 1400079637 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH 201 N/A 4/6/2019 11.30 AM SOLANGI
Mr. Randy CLOSED
yer well pad 201 zone C  Hwyh
Hameed Mr.
517 CPP-NGCP-CIV-0515 1400079647 Civil SATIP-A- 114- 01 SAIC-A-1005 15th layer compaction test Inspection at HR HRDH RH-GK N/A 4/6/2019 9.00 AM CLOSED
DH RH-GK Extension Ullah Raymund
COMPACTION TEST INSPECTION OF 6th
Mr.RAYMON
518 CPP-NGCP-CIV-0516 1400079806 Civil SATIP-A- 114- 01 SAIC-A-1005 LAYER OF ZONE A & B HRDH-1063 WELL HRDH-1063 BA-561604 4/6/2019 8.30 AM Talal Shabbir CLOSED
D RUBILOUS
PAD EXTENSION
COMPACTION TEST INSPECTION OF 3RD AQIB Mr.RAYMON
519 CPP-NGCP-CIV-0517 1400079968 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-RH-EK N/A 4/6/2019 10:00 AM CLOSED
LAYER (200 MM) HRDH-RH-EK WELL PAD HUSSEIN D RUBILOUS RE-SCHEDULE TO 07-04-2019
8'' F/L HRDH-1171 -RH-AK Pipe lowering at
Hameed Mr.
520 CPP-NGCP-CIV-0518 1400080776 Civil SATIP-L-450- 01 SAIC-L-1003 sta-KP 1+500 to 1+560; HRDH-1171 FL TA-843547 4/7/2019 8.00 AM CLOSED
Ullah Raymund
00-FW-(120-125);
Trench Bedding Inspection for 8" FL HRDH-
Hameed Mr.
521 CPP-NGCP-CIV-0519 1400080778 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 KP 1+500 to 1+560; HRDH-1171 FL TA-843547 4/7/2019 8.05 AM CLOSED
Ullah Raymund
00-FW-(120-125);
Sand Covering and backfilling Inspection for 8"
F/L HRDH-1171-AK from Station KP 1+500 to Hameed Mr.
522 CPP-NGCP-CIV-0520 1400080750 Civil SATIP-L-450- 01 SAIC-L-1004 1+560; HRDH-1171 FL TA-843547 4/7/2019 8.10 AM CLOSED
Ullah Raymund
00-FW-(120-125);
8'' F/L HRDH-1171 -RH-AK Pipe lowering at
sta-KP 1 +620 to 1+690; Hameed Mr.
523 CPP-NGCP-CIV-0521 1400080815 Civil SATIP-L-450- 01 SAIC-L-1003 HRDH-1171 FL TA-843547 4/7/2019 8.15 AM CLOSED
01-FW-(130-136); Ullah Raymund

Trench Bedding Inspection for 8" FL HRDH-


Hameed Mr.
524 CPP-NGCP-CIV-0522 1400080796 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 KP 1 +620 to 1+690; HRDH-1171 FL TA-843547 4/7/2019 8.20 AM CLOSED
Ullah Raymund
01-FW-(130-136);
Sand Covering and backfilling Inspection for 8"
F/L HRDH-1171-AK from Station KP 1 +620 to Hameed Mr.
525 CPP-NGCP-CIV-0523 1400080797 Civil SATIP-L-450- 01 SAIC-L-1004 1+690; HRDH-1171 FL TA-843547 4/7/2019 8.25 AM CLOSED
Ullah Raymund
01-FW-(130-136);
8'' F/L HRDH-1171 -RH-AK Pipe lowering at
Hameed Mr.
526 CPP-NGCP-CIV-0524 1400080817 Civil SATIP-L-450- 01 SAIC-L-1003 sta-KP 1 +740 to 1+900; HRDH-1171 FL TA-843547 4/7/2019 8.30 AM CLOSED
Ullah Raymund
01-FW-(140-153);
Trench Bedding Inspection for 8" FL HRDH-
Hameed Mr.
527 CPP-NGCP-CIV-0525 1400080809 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 KP 1 +740 to 1+900; HRDH-1171 FL TA-843547 4/7/2019 8.35 AM CLOSED
Ullah Raymund
01-FW-(140-153);
Sand Covering and backfilling Inspection for 8"
F/L HRDH-1171-AK from Station KP 1 +740 to Hameed Mr.
528 CPP-NGCP-CIV-0526 1400080818 Civil SATIP-L-450- 01 SAIC-L-1004 1+900; HRDH-1171 FL TA-843547 4/7/2019 8.40 AM CLOSED
Ullah Raymund
01-FW-(140-153);
529 CPP-NGCP-CIV-0527 1400080781 Civil SATIP-L-450- 01 SAIC-L-1003 8'' F/L HRDH-1171 -RH-AK Pipe lowering at HRDH-1171 FL TA-843547 4/7/2019 8.45 AM Hameed Mr. CLOSED
sta-KP 1 +970 to 2+000;02 -FW-(159-162); Ullah Raymund
Trench Bedding Inspection for 8" FL HRDH- Hameed Mr.
530 CPP-NGCP-CIV-0528 1400080752 Civil SATIP-L- 450- 01 SAIC-L-1002 HRDH-1171 FL TA-843547 4/7/2019 8.50 AM CLOSED
1171 KP 1 +970 to 2+000;02 -FW-(159-162);; Ullah Raymund
Sand Covering and backfilling Inspection for 8" Hameed Mr.
531 CPP-NGCP-CIV-0529 1400080772 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1171-AK from Station KP 1 +970 to HRDH-1171 FL TA-843547 4/7/2019 8.55 AM CLOSED
Ullah Raymund
2+000;02 -FW-(159-162);;
8'' F/L HRDH-1171 -RH-AK Pipe lowering at
Hameed Mr.
532 CPP-NGCP-CIV-0530 1400080873 Civil SATIP-L-450- 01 SAIC-L-1003 sta-KP 2 +100 to 2+140; HRDH-1171 FL TA-843547 4/7/2019 9.00 AM CLOSED
Ullah Raymund
02-FW-(170-173);
Inspection for 8" FL HRDH-1171 KP 2 +100 to
Hameed Mr.
533 CPP-NGCP-CIV-0531 1400080826 Civil SATIP-L- 450- 01 SAIC-L-1002 2+140; HRDH-1171 FL TA-843547 4/7/2019 9.05 AM CLOSED
Ullah Raymund
02-FW-(170-173);
Sand Covering and backfilling Inspection for 8"
F/L HRDH-1171-AK from Station KP 2 +100 to Hameed Mr.
534 CPP-NGCP-CIV-0532 1400080828 Civil SATIP-L-450- 01 SAIC-L-1004 2+140; HRDH-1171 FL TA-843547 4/7/2019 9.10 AM CLOSED
Ullah Raymund
02-FW-(170-173);
8'' F/L HRDH-1171 -RH-AK Pipe lowering at
Hameed Mr.
535 CPP-NGCP-CIV-0533 1400080867 Civil SATIP-L-450- 01 SAIC-L-1003 sta-KP 2 +190 to 2+330; HRDH-1171 FL TA-843547 4/7/2019 9.15 AM CLOSED
Ullah Raymund
02-FW-(177-189);
Trench Bedding Inspection for 8" FL HRDH-
Hameed Mr.
536 CPP-NGCP-CIV-0534 1400080835 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 KP 2 +190 to 2+330; HRDH-1171 FL TA-843547 4/7/2019 9.20 AM CLOSED
Ullah Raymund
02-FW-(177-189);
Sand Covering and backfilling Inspection for 8"
F/L HRDH-1171-AK from Station KP 2 +190 to Hameed Mr.
537 CPP-NGCP-CIV-0535 1400080879 Civil SATIP-L-450- 01 SAIC-L-1004 2+330; HRDH-1171 FL TA-843547 4/7/2019 9.25 AM CLOSED
Ullah Raymund
02-FW-(177-189);
AAMIR
538 CPP-NGCP-CIV-0536 1400080876 Civil SATIP-A- 114- 01 SAIC-A-1001 Soil sampling and testing existing soil well pad HWYH-1069 N/A 4/7/2019 8.00 AM SOLANGI
Mr. Randy CLOSED
1069 Hwyh
AAMIR
539 CPP-NGCP-CIV-0537 1400080854 Civil SATIP-A- 114- 01 SAIC-A-1005 Compaction Testing 3rd layer 200mm well pad HWYH-201 N/A 4/7/2019 9.00 AM Mr. Randy CLOSED
201 zone A Hwyh SOLANGI
AAMIR
540 CPP-NGCP-CIV-0538 1400080844 Civil SATIP-A- 114- 01 SAIC-A-1005 Compaction testing 1st layer 150 mm sub base HWYH-ZONE B N/A 4/7/2019 10.00 AM Mr. Randy CLOSED
zone B Hwyh SOLANGI
HWYH-201 ZONE AAMIR
541 CPP-NGCP-CIV-0539 1400080864 Civil SATIP-A- 114- 01 SAIC-A-1005 Compaction testing 3rd layer 150mm sub base N/A 4/7/2019 11.00 AM Mr. Randy CLOSED
well pad 201 zone C Hwyh C SOLANGI
AAMIR
542 CPP-NGCP-CIV-0540 1400080845 Civil SATIP-A- 114- 01 SAIC-A-1005 Compaction testing 1st layer well pad RHGK HWYH-RH-GK N/A 4/7/2019 11.30 AM SOLANGI
Mr. Randy CLOSED
zone E and F hwyh
16th layer compaction test Inspection at HR Hameed Mr. RESCHEDULE TO 8-04-
543 CPP-NGCP-CIV-0541 1400080827 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH RH-GK N/A 4/7/2019 9.00 AM CLOSED
DH RH-GK Extension Ullah Raymund 2019
Compaction testing 4th layer 200 mm  well p AAMIR Mr Abdul
544 CPP-NGCP-CIV-0542 1400081227 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-201 N/A 4/8/2019 8.00 AM SOLANGI Malik CLOSED
ad 201 zone A Hwyh
Compaction testing 2nd layer 150mm sub AAMIR Mr Abdul
545 CPP-NGCP-CIV-0543 1400081284 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-201 N/A 4/8/2019 9.00 AM CLOSED
base well pad 201 zone B Hwyh SOLANGI Malik
Compaction testing existing well pad 1069 zone  AAMIR Mr Abdul
546 CPP-NGCP-CIV-0544 1400081269 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-1069 N/A 4/8/2019 10.00 AM CLOSED
C Hwyh SOLANGI Malik
MATERIAL RECEIVING OF GENERAL
547 CPP-NGCP-CIV-0545 1400081270 Civil SATIP-A- 114- 01 SAIC-A-1002 FILL/MARL MATERIAL HWYH-996 WELL PAD HWYH-996 BA-561764 4/8/2019 0.4166666667 Talal Shabbir Mr.RANDY Reject
EXTENSION
FILL PLACEMENT INSPECTION OF 1ST
LAYER 300MM DEEP & 2ND LAYER 200MM
548 CPP-NGCP-CIV-0546 1400081248 Civil SATIP-A- 114- 01 SAIC-A-1004 HWYH-996 BA-561764 4/8/2019 0.4270833333 Talal Shabbir Mr.RANDY CLOSED
TOP OF ZONE B HWYH-996 WELL PAD
EXTENSION

COMPACTION TEST INSPECTION OF 500MM


TRIAL 1ST DEEP LAYER 300MM & 2ND TOP
549 CPP-NGCP-CIV-0547 1400081272 Civil SATIP-A- 114- 01 SAIC-A-1005
LAYER 200MM OF ZONE B HWYH-996 WELL
HWYH-996 BA-561764 4/8/2019 0.4375 Talal Shabbir Mr.RANDY Reject
PAD EXTENSION
COMPACTION TEST INSPECTION OF 7th
Mr.RAYMON
550 CPP-NGCP-CIV-0548 1400081292 Civil SATIP-A- 114- 01 SAIC-A-1005 LAYER OF ZONE A & B HRDH-1063 WELL HRDH-1063 BA-561604 4/8/2019 0.375 Talal Shabbir
D RUBILOUS
Reject
PAD EXTENSION
Bottom of trench Inspection for 8'' F/L 1153 To
RH-HK From Sta-0+442-0+521,0+548-
HRDH-1153 TO
551 CPP-NGCP-CIV-0549 1400081447 Civil SATIP-L- 450- 01 SAIC-L-1002 0+603,0+637-0+652.699,0+688-1+073,1+113- N/A 4/8/2019 0.375 Hameed Ullah Mr. Raymund CLOSED
1+482,1+532-1+588,1+633-1+723,1+774- RH-HK
2+550,2+569-2+751,Total 2700/2582.05
Soil sampling and testing chemical testing well AAMIR Mr Abdul
552 CPP-NGCP-CIV-0550 1400082150 Civil SATIP-A- 114- 01 SAIC-A-1001 HWYH-RHGK N/A 4/9/2019 9.00 AM CLOSED
pad RHGK HWYH SOLANGI Malik
COMPACTION TEST INSPECTION OF 7th
Mr.RAYMON
553 CPP-NGCP-CIV-0548-R1 1400082127 Civil SATIP-A- 114- 01 SAIC-A-1005 LAYER OF ZONE A & B HRDH-1063 WELL HRDH-1063 BA-561604 4/9/2019 0.375 Talal Shabbir CLOSED
D RUBILOUS
PAD EXTENSION
17th layer zone A(6650 sqm) Compaction Test
554 CPP-NGCP-CIV-0551 1400082198 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH RH-GK N/A 4/9/2019 10.00 AM Hameed Ullah Mr. Raymund CLOSED
at HRDH RH-GK Extension
1st Layer Zone B(4140sq.m) Fill placement
555 CPP-NGCP-CIV-0552 1400082181 Civil SATIP-A- 114- 01 SAIC-A-1004 HRDH RH-GK N/A 4/9/2019 11.00 AM Hameed Ullah Mr. Raymund CLOSED
Compaction at HRDH RH-GK Extension
1st Layer Zone B(4140sq.m) Compaction Test at
556 CPP-NGCP-CIV-0553 1400082161 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH RH-GK N/A 4/9/2019 12.00 AM Hameed Ullah Mr. Raymund CLOSED
HRDH RH-GK Extension
4th Layer zone A and B compaction test AQIB
557 CPP-NGCP-CIV-0554 1400082122 Civil SATIP-A- 114- 01 SAIC-A-1005
inspection (200mm) at HRDH RH-EK well Pad
HRDH RH-EK N/A 4/9/2019 8.30 AM HUSSEIN
Mr. Raymund CLOSED

Compaction testing 5th layer 200mm well pad AAMIR Mr Abdul


558 CPP-NGCP-CIV-0555 1400082987 Civil SATIP-A- 114- 01 SAIC-A-1005
201 zone A Hwyh
HWYH-201 N/A 4/10/2019 8.30 AM SOLANGI Malik
CLOSED
Compaction testing 200 mm marl caping well AAMIR Mr Abdul
559 CPP-NGCP-CIV-0556 1400082999 Civil SATIP-A- 114- 01 SAIC-A-1005
pad 201 zone B and C Hwyh
HWYH-201 N/A 4/10/2019 9.00 AM SOLANGI Malik
CLOSED

MATERIAL RECEIVING FOR CLEAN SAND AT HRDH AQIB Mr. RE-SCHEDULE


560 CPP-NGCP-CIV-0557 1400083000 Civil SATIP-A- 114- 01 SAIC-A-1002 HRDH-1171 FL TA-843547 4/10/2019 8.00 AM HUSSEIN
CLOSED
4/11/2019
1171 FL Raymund
COMPACTION TEST INSPECTION OF 8th
Mr.RAYMON
561 CPP-NGCP-CIV-0558 1400082949 Civil SATIP-A- 114- 01 SAIC-A-1005 LAYER OF ZONE A & B HRDH-1063 WELL HRDH-1063 BA-561604 4/10/2019 8.00 AM Talal Shabbir CLOSED
D RUBILOUS
PAD EXTENSION
COMPACTION TEST INSPECTION OF 1ST
562 CPP-NGCP-CIV-0559 1400083016 Civil SATIP-A- 114- 01 SAIC-A-1005 LAYER ZONE B HWYH-996 WELL PAD HWYH-996 BA-561764 4/10/2019 9.00 AM Talal Shabbir Mr.RANDY CLOSED
EXTENSION
COMPACTION TEST INSPECTION OF 2nd
563 CPP-NGCP-CIV-0560 1400082988 Civil SATIP-A- 114- 01 SAIC-A-1005 LAYER ZONE B HWYH-996 WELL PAD HWYH-996 BA-561764 4/10/2019 2.00 PM Talal Shabbir Mr.RANDY Reject
EXTENSION
5th Layer zone A and B compaction test AQIB
564 CPP-NGCP-CIV-0561 1400083028 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH RH-EK N/A 4/10/2019 8.30 AM Mr. Raymund CLOSED
inspection (200mm) at HRDH RH-EK well Pad HUSSEIN
2nd layer for zone B (4140SQM)
565 CPP-NGCP-CIV-0562 1400083002 Civil SATIP-A- 114- 01 SAIC-A-1005 COMPACTION TEST AT HRDH RH-GK HRDH RH-GK N/A 4/10/2019 8.30 AM Hameed Ullah Mr. Raymund CLOSED RESCHEDULE TO 8-04-
EXTENSION 2019
TASEER RESCHEDULE TO 11-
566 CPP-NGCP-CIV-0563 1400082980 Civil SATIP-L-450- 01 SAIC-L-1003 Pipe lowering at KP1+067 to KP1+076, FW057 HWYH-1071 FL TA-445836 4/10/2019 8.00 AM KHAN
Mr. Randy CLOSED
04-2020
Trench Bedding Inspection for KP1+067 to TASEER RESCHEDULE TO 11-
567 CPP-NGCP-CIV-0564 1400083029 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH-1071 FL TA-445836 4/10/2019 8.15 AM Mr. Randy CLOSED
KP1+076 KHAN 04-2020
Sand Covering and backfilling Inspection for TASEER RESCHEDULE TO 11-
568 CPP-NGCP-CIV-0565 1400083034 Civil SATIP-L-450- 01 SAIC-L-1004 KP1+067 to KP1+076 HWYH-1071 FL TA-445836 4/10/2019 8.30 AM KHAN
Mr. Randy CLOSED
04-2020
TASEER RESCHEDULE TO 11-
569 CPP-NGCP-CIV-0566 1400083009 Civil SATIP-L-450- 01 SAIC-L-1003 Pipe lowering at KP2+506 to 2+673,fw205-219 HWYH-1100 FL TA-445959 4/10/2019 8.40 AM Mr. Randy CLOSED
KHAN 04-2020
Trench Bedding Inspection for KP2+506 to TASEER RESCHEDULE TO 11-
570 CPP-NGCP-CIV-0567 1400082969 Civil SATIP-L- 450- 01 SAIC-L-1002 2+673 HWYH-1100 FL TA-445959 4/10/2019 8.50 AM KHAN
Mr. Randy CLOSED
04-2020
Sand Covering and backfilling Inspection for TASEER RESCHEDULE TO 11-
571 CPP-NGCP-CIV-0568 1400082950 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1100 FL TA-445959 4/10/2019 9.00 AM Mr. Randy CLOSED
from KP2+506 to 2+673 KHAN 04-2020
8'' F/L HRDH-1171 -RH-AK Pipe lowering at
AQIB Mr.
572 CPP-NGCP-CIV-0569 1400082932 Civil SATIP-L-450- 01 SAIC-L-1003 sta-KP 0 +280 to 0+320; HRDH-1171 FL TA-843547 4/10/2019 8.30 AM CLOSED
HUSSEIN Raymund
00-FW-(20-23);
Trench Bedding Inspection for 8" FL HRDH-
AQIB Mr.
573 CPP-NGCP-CIV-0570 1400083043 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 sta-KP 0 +280 to 0+320; HRDH-1171 FL TA-843547 4/10/2019 8.35 AM CLOSED
HUSSEIN Raymund
00-FW-(20-23);
Sand Covering and backfilling Inspection for 8" AQIB Mr.
574 CPP-NGCP-CIV-0571 1400082970 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1171-sta-KP 0 +280 to 0+320; HRDH-1171 FL TA-843547 4/10/2019 8.40 AM CLOSED
HUSSEIN Raymund
00-FW-(20-23);
8'' F/L HRDH-1171 -RH-AK Pipe lowering at
575 CPP-NGCP-CIV-0572 1400083044 Civil SATIP-L-450- 01 SAIC-L-1003 sta-KP 0 +380 to 0+470;00 -FW-(28-35); HRDH-1171 FL TA-843547 4/10/2019 8.50 AM AQIB Mr. CLOSED
HUSSEIN Raymund

Trench Bedding Inspection for 8" FL HRDH- AQIB Mr.


576 CPP-NGCP-CIV-0573 1400083045 Civil SATIP-L- 450- 01 SAIC-L-1002 HRDH-1171 FL TA-843547 4/10/2019 9.00 AM CLOSED
1171 sta-KP 0 +380 to 0+470;00 -FW-(28-35); HUSSEIN Raymund
Sand Covering and backfilling Inspection for 8" AQIB Mr.
577 CPP-NGCP-CIV-0574 1400083017 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1171-sta-KP 0 +380 to 0+470;00 HRDH-1171 FL TA-843547 4/10/2019 9.10 AM CLOSED
HUSSEIN Raymund
-FW-(28-35);
8'' F/L HRDH-1171 -RH-AK Pipe lowering at AQIB Mr. RE-SCHEDULE
578 CPP-NGCP-CIV-0575 1400083030 Civil SATIP-L-450- 01 SAIC-L-1003 HRDH-1171 FL TA-843547 4/10/2019 9.20 AM CLOSED
sta-KP 0 +670 to 1+390;00-FW-(52-111); HUSSEIN Raymund 4/11/2019
Trench Bedding Inspection for 8" FL HRDH- AQIB Mr. RE-SCHEDULE
579 CPP-NGCP-CIV-0576 1400083046 Civil SATIP-L- 450- 01 SAIC-L-1002 HRDH-1171 FL TA-843547 4/10/2019 9.30 AM CLOSED
1171 sta-KP 0 +670 to 1+390;00-FW-(52-111); HUSSEIN Raymund 4/11/2019
Sand Covering and backfilling Inspection for 8" AQIB Mr.
580 CPP-NGCP-CIV-0577 1400082971 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1171-sta-KP 0 +670 to 1+390;00- HRDH-1171 FL TA-843547 4/10/2019 9.40 AM HUSSEIN
CLOSED RE-SCHEDULE
Raymund
FW-(52-111); 4/11/2019
Compaction testing 1st layer 200mm well pad AAMIR Mr Abdul
581 CPP-NGCP-CIV-0578 1400083680 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-1069 N/A 4/11/2019 9.00 AM SOLANGI Malik
CLOSED
1069 zone A Hwyh
Fill placement and compaction testing 1st layer AAMIR Mr Abdul
582 CPP-NGCP-CIV-0579 1400083704 Civil SATIP-A- 114- 01 SAIC-A-1004 HWYH-1069 N/A 4/11/2019 9.00 AM CLOSED
well pad 1069 Hwyh SOLANGI Malik
Material receiving inspaction select fill well pad AAMIR Mr Abdul
583 CPP-NGCP-CIV-0580 1400083681 Civil SATIP-A- 114- 01 SAIC-A-1002 HWYH-1069 N/A 4/11/2019 9.00 AM CLOSED
1069 Hwyh SOLANGI Malik
Compaction testing existing GROUND well AAMIR Mr Abdul
584 CPP-NGCP-CIV-0581 1400083824 Civil SATIP-A- 114- 01 SAIC-A-1002 HWYH-201 N/A 4/11/2019 9.00 AM CLOSED
paid 1069 zone A HWYH SOLANGI Malik
18th layer zone A(6650 sqm) Compaction Test
585 CPP-NGCP-CIV-0582 1400084241 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH RH-GK N/A 4/11/2019 10.00 AM Hameed Ullah Mr. Raymund Reject
at HRDH RH-GK Extension

586 CPP-NGCP-CIV-0583 1400084303 Civil SATIP-A- 114- 01 SAIC-A-1005


6th Layer zone A and B compaction test
HRDH RH-EK N/A 4/13/2019 2.00 PM
AQIB
Mr. Raymund CLOSED
RE-SCHEDULE RE-SCHEDULE
inspection (200mm) at HRDH RH-EK well Pad HUSSEIN 4/14/2019
RE-SCHEDULE 4/15/2019
Sand Material Receiving inspection at HWYH- TASEER
587 CPP-NGCP-CIV-0584 1400084257 Civil SATIP-A- 114- 01 SAIC-A-1002 HWYH-1071 N/A 4/13/2019 8:00 AM Mr.RANDY CLOSED 4/14/2019
1071 Covering and backfilling Inspection for
Sand KHAN
TASEER RE-SCHEDULE
588 CPP-NGCP-CIV-0585 1400084306 Civil SATIP-L-450- 01 SAIC-L-1004 raod crosing sta 1+067 to 1+076 HWYH-1071 HWYH-1071 N/A 4/13/2019 8:10 AM Mr.RANDY CLOSED
1st layer KHAN 4/14/2019
Sand Covering and backfilling Inspection for RE-SCHEDULE
TASEER
589 CPP-NGCP-CIV-0586 1400084314 Civil SATIP-L-450- 01 SAIC-L-1004 raod crosing sta 1+067 to 1+076 HWYH-1071 HWYH-1071 N/A 4/13/2019 8:20 AM
KHAN
Mr.RANDY CLOSED
2st layer 4/14/2019
Sand Covering and backfilling Inspection for
raod crosing sta 1+067 to 1+076 HWYH-1071
TASEER RE-SCHEDULE
590 CPP-NGCP-CIV-0587 1400084277 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1071 N/A 4/13/2019 8:30 AM
KHAN
Mr.RANDY CLOSED
4/14/2019
3st layer
Compaction test inspection for raod crosing sta TASEER RE-SCHEDULE
591 CPP-NGCP-CIV-0588 1400084295 Civil SATIP-A- 114- 01 SAIC-A-1002 HWYH-1071 N/A 4/13/2019 11:00 AM Mr.RANDY CLOSED
1+067 to 1+076 HWYH-1071 subbase KHAN 4/14/2019
592 CPP-NGCP-CIV-0589 1400084222 Civil SATIP-A- 114- 01 SAIC-A-1002
Material receiving inspaction for raod crosing
HWYH-1071 N/A 4/13/2019 9:30 AM
TASEER
Mr.RANDY CLOSED
RE-SCHEDULE
sta 1+067 to 1+076 HWYH-1071 subbase KHAN 4/14/2019
2nd layer for zone B (4140SQM) COMPACTION RE-SCHEDULE
593 CPP-NGCP-CIV-0590 1400084252 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH RH-GK N/A 4/13/2019 8.30 AM Hameed Ullah Mr. Raymund CLOSED
TEST AT HRDH RH-GK EXTENSION 4/14/2019

19th layer zone A(6650 sqm) Compaction Test


594 CPP-NGCP-CIV-0591 1400084333 Civil SATIP-A- 114- 01 SAIC-A-1005
at HRDH RH-GK Extension
HRDH RH-GK N/A 4/13/2019 10.00 AM Hameed Ullah Mr. Raymund CLOSED RE-SCHEDULE
4/14/2019

Material receiving inspection 6th layer150mm AAMIR


595 CPP-NGCP-CIV-0592 1400084298 Civil SATIP-A- 114- 01 SAIC-A-1002
Subbase at well pad 201 zone A Hwyh
HWYH 201 N/A 4/13/2019 8.30 AM
SOLANGI
Mr. Randy CLOSED
RE-SCHEDULE
4/14/2019

Placement and compaction 6th layer150mm AAMIR


596 CPP-NGCP-CIV-0593 1400084299 Civil SATIP-A- 114- 01 SAIC-A-1004
Subbase at well pad 201 zone A Hwyh
HWYH 201 N/A 4/13/2019 10.00 AM
SOLANGI
Mr. Randy CLOSED RE-SCHEDULE
4/14/2019

Compaction testing 6th layer150mm Subbase at AAMIR Mr Abdul


597 CPP-NGCP-CIV-0594 1400084342 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-201 N/A 4/13/2019 10.30 AM CLOSED RE-SCHEDULE
well pad 201 zone A Hwyh SOLANGI Malik
4/14/2019
Compaction testing 2nd layer 200mm well pad AAMIR Mr Abdul RE-SCHEDULE RE-SCHEDULE
598 CPP-NGCP-CIV-0595 1400084405 Civil SATIP-A- 114- 01 SAIC-A-1005
1069 zone C Hwyh
HWYH-1069 N/A 4/13/2019 9.00 AM
SOLANGI Malik
CLOSED
4/14/2019 4/15/2019
8'' F/L HRDH-1171 -RH-AK Pipe lowering at
AQIB Mr.
599 CPP-NGCP-CIV-0596 1400083999 Civil SATIP-L-450- 01 SAIC-L-1003 sta-KP 2 +410 to 2+680; HRDH-1171 FL TA-843547 4/13/2019 8.00 AM HUSSEIN
CLOSED RE-SCHEDULE RE-SCHEDULE
02-FW-(196-218); Raymund
4/14/2019 4/15/2019
Trench Bedding Inspection for 8" FL HRDH-
600 CPP-NGCP-CIV-0597 1400083987 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 sta-KP 2 +410 to 2+680; HRDH-1171 FL TA-843547 4/13/2019 8.10 AM AQIB Mr. CLOSED
HUSSEIN Raymund RE-SCHEDULE RE-SCHEDULE
02-FW-(196-218); 4/14/2019 4/15/2019
Sand Covering and backfilling Inspection for 8" AQIB Mr.
601 CPP-NGCP-CIV-0598 1400084001 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1171-sta-KP 2 +410 to 2+680; HRDH-1171 FL TA-843547 4/13/2019 8.20 AM CLOSED RE-SCHEDULE RE-SCHEDULE
HUSSEIN Raymund
02-FW-(196-218); 4/14/2019 4/15/2019
8'' F/L HRDH-1171 -RH-AK Pipe lowering at
AQIB Mr.
602 CPP-NGCP-CIV-0599 1400084063 Civil SATIP-L-450- 01 SAIC-L-1003 sta-KP 2+870 to 3+200; HRDH-1171 FL TA-843547 4/13/2019 8.30 AM CLOSED
HUSSEIN Raymund RE-SCHEDULE RE-SCHEDULE
03 -FW-(234-261);
4/14/2019 4/15/2019
Trench Bedding Inspection for 8" FL HRDH- Mr.
AQIB
603 CPP-NGCP-CIV-0600 1400083990 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 sta-KP 2+870 to 3+200; HRDH-1171 FL TA-843547 4/13/2019 8.40 AM CLOSED
HUSSEIN Raymund RE-SCHEDULE RE-SCHEDULE
03 -FW-(234-261);
4/14/2019 4/15/2019

AQIB Mr.
604 CPP-NGCP-CIV-0601 1400084060 Civil SATIP-L-450- 01 SAIC-L-1004 Sand Covering and backfilling Inspection for 8" HRDH-1171 FL TA-843547 4/13/2019 8.50 AM CLOSED
HUSSEIN Raymund
F/L HRDH-1171-sta-KP 2+870 to 3+200; RE-SCHEDULE RE-SCHEDULE
03 -FW-(234-261); 4/14/2019 4/15/2019
Compaction testing 7th layer150mm Subbase at AAMIR
605 CPP-NGCP-CIV-0602 1400085199 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-201 N/A 4/15/2019 10.30 AM RANDY CLOSED
well pad 201 zone A Hwyh SOLANGI
Compaction testing 2nd layer 300mm Subbase AAMIR
606 CPP-NGCP-CIV-0603 1400085201 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-RGHK N/A 4/15/2019 10.30 AM RANDY CLOSED
at well pad RGHK zone A and D HWYH SOLANGI

Compaction testing 2nd layer 300mm Subbase AAMIR


607 CPP-NGCP-CIV-0604 1400085267 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-RGHK N/A 4/15/2019 10.30 AM RANDY CLOSED
at well pad RGHK zone B and E HWYH SOLANGI

Pipe lowering at HWYH-1100 FL KP3+200 to TASEER


608 CPP-NGCP-CIV-0605 1400085230 Civil SATIP-L-450- 01 SAIC-L-1003 3+740 fw263-308
HWYH-1100 FL TA-445959 4/15/2019 8.40 AM KHAN
Mr. Randy CLOSED
Trench Bedding Inspection for HWYH-1100 FL TASEER
609 CPP-NGCP-CIV-0606 1400085232 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH-1100 FL TA-445959 4/15/2019 8.50 AM Mr. Randy CLOSED
KP3+200 to 3+740 KHAN
Sand Covering and backfilling Inspection for TASEER
610 CPP-NGCP-CIV-0607 1400085286 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1100 FL from KP3+200 to 3+740
HWYH-1100 FL TA-445959 4/15/2019 9.00 AM KHAN
Mr. Randy CLOSED

4th layer for zone B (4140M2) COMPACTION


611 CPP-NGCP-CIV-0608 1400085440 Civil SATIP-A- 114- 01 SAIC-A-1005
TEST AT HRDH RH-GK EXTENSION
HRDH RH-GK N/A 4/15/2019 8.30 AM Hameed Ullah Mr. Raymund CLOSED

Visual inspection for prime coat TASEER


612 CPP-NGCP-CIV-0609 1400085627 Civil SATIP-Q- 006- 02 SAIC-Q-1041 application at HWYH 1071 station 1+067 to HWYH-1071 N/A 4/15/2019 10.00 AM
KHAN
Mr. Randy CLOSED
1+076
Visual inspection for Asphalt material TASEER
613 CPP-NGCP-CIV-0610 1400085628 Civil SATIP-Q- 006- 02 SAIC-Q-1061 receiving and placement at HAWYH-1071 HWYH-1071 N/A 4/15/2019 10.00 AM
KHAN
Mr. Randy CLOSED
STATION 1+067 TO 1+1076
8'' F/L HRDH-1171 -RH-AK Pipe lowering at
AQIB Mr.
614 CPP-NGCP-CIV-0611 1400085268 Civil SATIP-L-450- 01 SAIC-L-1003 sta-KP 3 +270 to 3+330; HRDH-1171 FL TA-843547 4/15/2019 8.00 AM CLOSED
HUSSEIN Raymund
03-FW-(267-272);
Trench Bedding Inspection for 8" FL HRDH-
AQIB Mr.
615 CPP-NGCP-CIV-0612 1400085251 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 sta-KP 3 +270 to 3+330; HRDH-1171 FL TA-843547 4/15/2019 8.10 AM CLOSED
HUSSEIN Raymund
03-FW-(267-272);
Sand Covering and backfilling Inspection for 8" AQIB Mr.
616 CPP-NGCP-CIV-0613 1400085258 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1171-sta-KP 3 +270 to 3+330; HRDH-1171 FL TA-843547 4/15/2019 8.20 AM CLOSED
HUSSEIN Raymund
03-FW-(267-272);
8'' F/L HRDH-1171 -RH-AK Pipe lowering at Mr.
AQIB
617 CPP-NGCP-CIV-0614 1400085285 Civil SATIP-L-450- 01 SAIC-L-1003 sta-KP 3+400 to 3+460; HRDH-1171 FL TA-843547 4/15/2019 8.30 AM CLOSED
HUSSEIN Raymund
03 -FW-(277-282);
Trench Bedding Inspection for 8" FL HRDH-
618 CPP-NGCP-CIV-0615 1400085334 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 sta-KP 3+400 to 3+460; HRDH-1171 FL TA-843547 4/15/2019 8.40 AM AQIB Mr. CLOSED
HUSSEIN Raymund
03 -FW-(277-282);

Sand Covering and backfilling Inspection for 8" AQIB Mr.


619 CPP-NGCP-CIV-0616 1400085305 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1171-sta-KP 3+400 to 3+460; HRDH-1171 FL TA-843547 4/15/2019 8.50 AM CLOSED
HUSSEIN Raymund
03 -FW-(277-282);
8'' F/L HRDH-1171 -RH-AK Pipe lowering at
AQIB Mr.
620 CPP-NGCP-CIV-0617 1400085277 Civil SATIP-L-450- 01 SAIC-L-1003 sta-KP 3 +580 to 3+700; HRDH-1171 FL TA-843547 4/15/2019 8.05 AM CLOSED
HUSSEIN Raymund
03-FW-(292-302);
Trench Bedding Inspection for 8" FL HRDH-
AQIB Mr.
621 CPP-NGCP-CIV-0618 1400085317 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 sta-KP 3 +580 to 3+700; HRDH-1171 FL TA-843547 4/15/2019 8.15 AM CLOSED
HUSSEIN Raymund
03-FW-(292-302);
Sand Covering and backfilling Inspection for 8" AQIB Mr.
622 CPP-NGCP-CIV-0619 1400085282 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1171-sta-KP 3 +580 to 3+700; HRDH-1171 FL TA-843547 4/15/2019 8.25 AM CLOSED
HUSSEIN Raymund
03-FW-(292-302);
8'' F/L HRDH-1171 -RH-AK Pipe lowering at
AQIB Mr.
623 CPP-NGCP-CIV-0620 1400085292 Civil SATIP-L-450- 01 SAIC-L-1003 sta-KP 3 +790 to 4+420; HRDH-1171 FL TA-843547 4/15/2019 8.35 AM CLOSED
HUSSEIN Raymund
03 -FW-(309-360);
Trench Bedding Inspection for 8" FL HRDH-
AQIB Mr.
624 CPP-NGCP-CIV-0621 1400085368 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 sta-KP 3 +790 to 4+420; HRDH-1171 FL TA-843547 4/15/2019 8.45 AM CLOSED
HUSSEIN Raymund
03 -FW-(309-360);
Sand Covering and backfilling Inspection for 8" AQIB Mr.
625 CPP-NGCP-CIV-0622 1400085371 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1171-sta-KP 3 +790 to 4+420; HRDH-1171 FL TA-843547 4/15/2019 8.55 AM CLOSED
HUSSEIN Raymund
03 -FW-(309-360);
Soil Sampling testing and review of test
Hameed Mr.
626 CPP-NGCP-CIV-0623 1400086015 Civil SATIP-A- 114- 01 SAIC-A-1001 reports for existing ground material zone B HRDH 1307 N/A 4/16/2019 8.00 AM CLOSED
at HRDH 1307 wellpad Ullah Raymund
Existing Ground Materail Soil Sampling
627 CPP-NGCP-CIV-0624 1400086033 Civil SATIP-A- 114- 01 SAIC-A-1001 Testing and Review of test report for HRDH HRDH-1108 N/A 4/16/2019 8.00 AM Hameed Ullah Mr. Raymund CLOSED
1108 WELLPAD EXTENSION
sampling testing and review of test reports
for select fill material at Borrow pit#09,
628 CPP-NGCP-CIV-0625 1400086262 Civil SATIP-A- 114- 01 SAIC-A-1001 stockpile#01,(E-306479.504) HRDH-1108 N/A 4/16/2019 8.00 AM Hameed Ullah Mr. Raymund CLOSED
(N-2692999.798)
Formwork Inspection of Pipe Support CPP Precast Yard Mr.RAYMON Foundaions Footing PS-06=
629 CPP-NGCP-CIV-0626 1400086024 Civil SATIP-Q- 001- 02 SAIC-Q-1012
Foundaions Footing PS-06= 50 Nos Haradh Haradh Near Haco
TA-725674 4/16/2019 10:00:00 AM Talal Shabbir
D RUBILOUS
CLOSED
37 Nos only
Installation of Epoxy Coated Steel Bars,
CPP Precast Yard Mr.RAYMON Foundaions Footing PS-06=
630 CPP-NGCP-CIV-0627 1400086038 Civil SATIP-Q- 001- 02 SAIC-A-1013 Embedded Items and Form Closure Inspection
Haradh Near Haco
TA-725674 4/16/2019 10:30:00 AM Talal Shabbir
D RUBILOUS
CLOSED
37 Nos only
of Pipe Support Foundations PS-06= 50 nos
Fresh Concrete Sampling & Testing Inspection HARADH HACO Mr.RAYMON RFI Cancelled due to
631 CPP-NGCP-CIV-0628 1400086007 Civil SATIP-Q- 001- 02 SAIC-Q-1004 NA 4/16/2019 01:50:00 PM Talal Shabbir CLOSED
@ The Batch Plants BATCH PLANT D RUBILOUS Concerete is not arrange
Concrete Pump/Transit Mixer Inspection @ CPP CPP Precast Yard Mr.RAYMON RFI Cancelled due to
632 CPP-NGCP-CIV-0629 1400086029 Civil SATIP-Q- 001- 02 SAIC-Q-1010 NA 4/16/2019 02:00:00 PM Talal Shabbir CLOSED
Precast Yard Haradh Near Haco Haradh Near Haco D RUBILOUS Concerete is not arrange
Concrete Sampling, Testing & Placement
CPP Precast Yard Mr.RAYMON RFI Cancelled due to
633 CPP-NGCP-CIV-0630 1400086054 Civil SATIP-Q- 001- 02 SAIC-Q-1060 Inspection for Pipe Support Foundations Footing TA-725674 4/16/2019 02:15:00 PM Talal Shabbir CLOSED
Haradh Near Haco D RUBILOUS Concerete is not arrange
PS-06= 50 Nos
Compaction testing 8th layer300mm MARL AAMIR ABDUL
634 CPP-NGCP-CIV-0631 1400086008 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-201 N/A 4/16/2019 11:00:00 AM CLOSED
caping well pad 201 zone A Hwyh SOLANGI MALIK 4/17/2019
5th layer for zone B (4140M2) COMPACTION
635 CPP-NGCP-CIV-0632 1400086061 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH RH-GK N/A 4/16/2019 8.30 AM Hameed Ullah Mr. Raymund CLOSED
TEST AT HRDH RH-GK EXTENSION
Pipe lowering at HWYH-1100 KP3+800 to TASEER
636 CPP-NGCP-CIV-0633 1400085712 Civil SATIP-L-450- 01 SAIC-L-1003 kp3+883 fw313-320
HWYH-1100 FL TA-445959 4/16/2019 8.00 AM KHAN
Mr. Randy CLOSED

Trench Bedding Inspection for HWYH-1100 TASEER


637 CPP-NGCP-CIV-0634 1400085742 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH-1100 FL TA-445959 4/16/2019 8.10 AM Mr. Randy CLOSED
KP3+800 to kp3+883 fw313-320 KHAN

Sand Covering and backfilling Inspection for TASEER


638 CPP-NGCP-CIV-0635 1400085785 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1100 FL TA-445959 4/16/2019 8.20 AM Mr. Randy CLOSED
HWYH-1100 KP3+800 to kp3+883 fw313-320 KHAN
Pipe lowering at HWYH-1100 KP3+972 to TASEER
639 CPP-NGCP-CIV-0636 1400085776 Civil SATIP-L-450- 01 SAIC-L-1003 4+159 FW330-343
HWYH-1100 FL TA-445959 4/16/2019 9.00 AM KHAN
Mr. Randy CLOSED

Trench Bedding Inspection for HWYH-1100 TASEER


640 CPP-NGCP-CIV-0637 1400085777 Civil SATIP-L- 450- 01 SAIC-L-1002 KP3+972 to 4+159 FW330-343
HWYH-1100 FL TA-445959 4/16/2019 9.10 AM KHAN
Mr. Randy CLOSED

Sand Covering and backfilling Inspection for TASEER


641 CPP-NGCP-CIV-0638 1400085759 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1100 FL TA-445959 4/16/2019 9.20 AM Mr. Randy CLOSED
HWYH-1100 KP3+972 to 4+159 FW330-343 KHAN

Material receiving inspection 8th layer 300mm AAMIR Mr Abdul


642 CPP-NGCP-CIV-0639 1400086264 Civil SATIP-A- 114- 01 SAIC-A-1002 HWYH 201 N/A 4/16/2019 8.30 AM CLOSED
marl general fill at well pad 201 zone A Hwyh SOLANGI Malik
Fill placement and compaction testing 8th layer AAMIR Mr Abdul
643 CPP-NGCP-CIV-0640 1400086273 Civil SATIP-A- 114- 01 SAIC-A-1004 HWYH-201 N/A 4/16/2019 9.00 AM SOLANGI Malik
CLOSED
marl general fill well pad 201 zon A Hwyh
Compaction testing 3rd layer 300mm well pad AAMIR Mr Abdul
644 CPP-NGCP-CIV-0641 1400087154 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-1069 N/A 4/17/2019 9.00 AM CLOSED
1069 zone C Hwyh SOLANGI Malik RE-SHUDLE4/18/2019
Bottom of trench Excavation Inspection for 8''F/L
HRDH 1145 to HRDH 1117 from Sta-0+122-
645 CPP-NGCP-CIV-0642 1400087060 Civil SATIP-L-450- 01 SAIC-L-1002 HRDH N/A 4/17/2019 10.00 AM Hameed Ullah Mr. Raymund CLOSED
0+791,0+821-0+850,0+950-1+075, total
829/1319 meters

Bottom of trench Excavation Inspection for 8''F/L


HRDH 1117 to RH-GK From Sta-0+018-0+750,
646 CPP-NGCP-CIV-0643 1400087112 Civil SATIP-L-450- 01 SAIC-L-1002 0+800-1+148,1+1802+150,2+150-2+350,2+550- HRDH N/A 4/17/2019 11.00 AM Hameed Ullah Mr. Raymund CLOSED
2+695,2+732-2+755,2+801-2+837 total
2454/3372 meters

8'' F/L HRDH-1171 -RH-AK Pipe lowering at


AQIB Mr.
647 CPP-NGCP-CIV-0644 1400086575 Civil SATIP-L-450- 01 SAIC-L-1003 sta-KP 4+470 to4+800; HRDH-1171 FL TA-843547 4/17/2019 8.00 AM HUSSEIN
CLOSED
04-FW-(364-391); Raymund

Trench Bedding Inspection for 8" FL HRDH-


AQIB Mr.
648 CPP-NGCP-CIV-0645 1400086566 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 sta-KP 4+470 to4+800; HRDH-1171 FL TA-843547 4/17/2019 8.10 AM HUSSEIN
CLOSED
Raymund
04-FW-(364-391);
Sand Covering and backfilling Inspection for 8"
F/L HRDH-1171-sta-KP 4+470 to4+800; AQIB Mr.
649 CPP-NGCP-CIV-0646 1400086586 Civil SATIP-L-450- 01 SAIC-L-1004 HRDH-1171 FL TA-843547 4/17/2019 8.20 AM CLOSED
04-FW-(364-391); HUSSEIN Raymund
8'' F/L HRDH-1171 -RH-AK Pipe lowering at
AQIB Mr.
650 CPP-NGCP-CIV-0647 1400086550 Civil SATIP-L-450- 01 SAIC-L-1003 sta-KP 6+350 to 6+460; HRDH-1171 FL TA-843547 4/17/2019 8.30 AM HUSSEIN Raymund CLOSED
06 -FW-(520-529);
Trench Bedding Inspection for 8" FL HRDH- Mr.
AQIB
651 CPP-NGCP-CIV-0648 1400086656 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 sta-KP 6+350 to 6+460; HRDH-1171 FL TA-843547 4/17/2019 8.40 AM CLOSED
HUSSEIN Raymund
06 -FW-(520-529);
Sand Covering and backfilling Inspection for 8" AQIB Mr.
652 CPP-NGCP-CIV-0649 1400086683 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1171-sta-KP 6+350 to 6+460; HRDH-1171 FL TA-843547 4/17/2019 8.50 AM CLOSED
HUSSEIN Raymund
06 -FW-(520-529);

8'' F/L HRDH-1171 -RH-AK Pipe lowering at


AQIB Mr.
653 CPP-NGCP-CIV-0650 1400086618 Civil SATIP-L-450- 01 SAIC-L-1003 sta-KP 6+520 to 6+820; HRDH-1171 FL TA-843547 4/17/2019 8.05 AM CLOSED
HUSSEIN Raymund
06-FW-(534-558);

Trench Bedding Inspection for 8" FL HRDH-


AQIB Mr.
654 CPP-NGCP-CIV-0651 1400086675 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 sta-KP 6+520 to 6+820; HRDH-1171 FL TA-843547 4/17/2019 8.15 AM CLOSED
HUSSEIN Raymund
06-FW-(534-558);

AQIB Mr.
655 CPP-NGCP-CIV-0652 1400086649 Civil SATIP-L-450- 01 SAIC-L-1004 Sand Covering and backfilling Inspection for 8" HRDH-1171 FL TA-843547 4/17/2019 8.25 AM HUSSEIN
CLOSED
F/L HRDH-1171-sta-KP 6+520 to 6+820; Raymund
06-FW-(534-558);

6th layer for zone B (4140SQM) COMPACTION


656 CPP-NGCP-CIV-0653 1400086698 Civil SATIP-A- 114- 01 SAIC-A-1005
TEST AT HRDH RH-GK EXTENSION
HRDH RH-GK B590536 4/17/2019 8.35 AM Hameed Ullah Mr. Raymund CLOSED

20th layer zone A(6650 sqm) Compaction Test


657 CPP-NGCP-CIV-0654 1400086744 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH RH-GK B590536 4/17/2019 10.00 AM Hameed Ullah Mr. Raymund CLOSED
at HRDH RH-GK Extension

Soil Sampling Testing and review of test reports


for HRDH Borrow pit # 10, stock pile-02, N- AQIB Mr.
658 CPP-NGCP-CIV-0655 1400087868 Civil SATIP-A- 114- 01 SAIC-A-1001
2685507.901, E-307212.372 General fill/Marl
HRDH N/A 4/18/2019 8.25 AM HUSSEIN
CLOSED
Raymund
material
Existing ground soil sampling testing and review
659 CPP-NGCP-CIV-0656 1400087628 Civil SATIP-A- 114- 01 SAIC-A-1001 HRDH-1157 N/A 4/18/2019 10.00 AM Hameed Ullah Mr. Raymund CLOSED
of test reports fot HRDH wellpad 1157

Existing ground soil sampling testing and review


660 CPP-NGCP-CIV-0657 1400087681 Civil SATIP-A- 114- 01 SAIC-A-1001 HRDH-1146 N/A 4/18/2019 10.00 AM Hameed Ullah Mr. Raymund CLOSED
of test reports fot HRDH wellpad 1146

Existing ground soil sampling testing and review


661 CPP-NGCP-CIV-0658 1400087214 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH RH-GK B590536 4/18/2019 8.30 AM Hameed Ullah Mr. Raymund CLOSED
of test reports fot HRDH wellpad 1146

21th layer zone A(6650 sqm) Compaction Test RE-SCHEDULE


662 CPP-NGCP-CIV-0659 1400087226 Civil SATIP-A- 114- 01 SAIC-A-1005
at HRDH RH-GK Extension
HRDH RH-GK B590536 4/18/2019 10.00 AM Hameed Ullah Mr. Raymund CLOSED
4/22/2019

Final Layer (General Fill/Marl 300mm)


663 CPP-NGCP-CIV-0660 1400087869 Civil SATIP-A- 114- 01 SAIC-A-1005 Compaction Testing for HRDH RH-K2 Well pad HRDH RH-K2 TA-723424 4/18/2019 9.45 AM Christan Mr. Raymund CLOSED
extension - 150m x 82.24m Inner Portion RE-SCHEDULE
4/20/2019
Soil sampling and testing general fill marl Barrow AAMIR
662 CPP-NGCP-CIV-0661 1400088089 Civil SATIP-A- 114- 01 SAIC-A-1001 HWYH-RHGK N/A 4/20/2019 9.00 AM Mr. Randy CLOSED
pit no 11 stock pile no 1 RH-GK HWYH SOLANGI
Pipe lowering at HWYH-1100 FL KM4+418 to
TASEER
664 CPP-NGCP-CIV-0662 1400088117 Civil SATIP-L-450- 01 SAIC-L-1003 KM4+266, KM4+314 to KM4+469 FW348-352, HWYH-1100 FL TA-445959 4/20/2019 8.30 AM Mr. Randy CLOSED
KHAN
FW356-369
Trench Bedding Inspection for HWYH-1100 FL TASEER
665 CPP-NGCP-CIV-0663 1400088072 Civil SATIP-L- 450- 01 SAIC-L-1002
KM4+418 to KM4+266, KM4+314 to KM4+469
HWYH-1100 FL TA-445959 4/20/2019 8.40 AM KHAN
Mr. Randy CLOSED

Sand Covering and backfilling Inspection for


TASEER
666 CPP-NGCP-CIV-0664 1400088096 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1100 FL KM4+418 to KM4+266, HWYH-1100 FL TA-445959 4/20/2019 8.50 AM KHAN
Mr. Randy CLOSED
KM4+314 to KM4+469
Trench Excavation and Bottom of Trench
Inspection at km0+483 to km1+600, km2+240 TASEER
667 CPP-NGCP-CIV-0665 1400088173 Civil SATIP-L- 450- 01 SAIC-L-1002 to 3+150, km3+200 to km4+700, km4+700 to HWYH1091 TA-445958 4/20/2019 8.10 AM KHAN
Mr. Randy CLOSED
km5+150
Trench Excavation and Bottom of Trench
TASEER
668 CPP-NGCP-CIV-0666 1400088164 Civil SATIP-L- 450- 01 SAIC-L-1002 Inspection at km0+320 to 0+963, km1+080 to HWYH1118 TA-445909 4/20/2019 8.20 AM Mr. Randy CLOSED
KHAN
2+285
7nd layer for zone B (4140SQM) COMPACTION RE-SCHEDULE
669 CPP-NGCP-CIV-0667 1400088170 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH RH-GK B590536 4/20/2019 8.00 AM Hameed Ullah Mr. Raymund CLOSED
TEST AT HRDH RH-GK EXTENSION 4/21/2019
1ST layer for zone C (4140SQM) COMPACTION RE-SCHEDULE
670 CPP-NGCP-CIV-0668 1400088139 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH RH-GK B590536 4/20/2019 9.00 AM Hameed Ullah Mr. Raymund CLOSED
TEST AT HRDH RH-GK EXTENSION 4/21/2019
Compaction testing 1st layer zone C (4140SQM) RE-SCHEDULE
671 CPP-NGCP-CIV-0669 1400088101 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH RH-GK B590536 4/20/2019 10.00 AM Hameed Ullah Mr. Raymund CLOSED
well pad HRDH RH-GK 4/21/2019
Fill placement and compaction testing 1st layer RE-SCHEDULE
672 CPP-NGCP-CIV-0670 1400088162 Civil SATIP-A- 114- 01 SAIC-A-1004 HRDH RH-GK B590536 4/20/2019 10.00 AM Hameed Ullah Mr. Raymund CLOSED
zone C (4140SQM) well pad HRDH RH-GK 4/21/2019
Compaction testing 2nd layer 300mm well pad AAMIR
673 CPP-NGCP-CIV-0671 1400088863 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH RH-GK N/A 4/21/2019 10.00 AM Mr. Randy CLOSED
RH-GK zone C and F HWYH SOLANGI
Sand Covering and backfilling Inspection for 8" AQIB
676 CPP-NGCP-CIV-0674 1400088762 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1171-sta-KP 7+212 to7+400; HRDH-1171 FL TA-843547 4/21/2019 8.10 AM
HUSSEIN
Mr. Raymund CLOSED
07-FW-(577-656);
Sand Covering and backfilling Inspection for 8" AQIB
679 CPP-NGCP-CIV-0677 1400088772 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1171-sta-KP 7+400 to7+600; HRDH-1171 FL TA-843547 4/21/2019 8.25 AM
HUSSEIN
Mr. Raymund CLOSED
07-FW-(577-656);
Sand Covering and backfilling Inspection for 8" AQIB
682 CPP-NGCP-CIV-0680 1400088797 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1171-sta-KP 7+600 to7+800; HRDH-1171 FL TA-843547 4/21/2019 8.40 AM
HUSSEIN
Mr. Raymund CLOSED
07-FW-(577-656);
Sand Covering and backfilling Inspection for 8" AQIB
685 CPP-NGCP-CIV-0683 1400088859 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1171-sta-KP 7+800 to8+000; HRDH-1171 FL TA-843547 4/21/2019 8.55 AM
HUSSEIN
Mr. Raymund CLOSED
07-FW-(577-656);
Sand Covering and backfilling Inspection for 8" AQIB
688 CPP-NGCP-CIV-0686 1400088790 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1171-sta-KP 8+000 to8+200; HRDH-1171 FL TA-843547 4/21/2019 9.10 AM Mr. Raymund CLOSED
HUSSEIN
07-FW-(577-656);
CPP Precast Yard Mr.RAYMON
689 CPP-NGCP-CIV-0687 1400088881 Civil SATIP-Q- 001- 02 SAIC-Q-1012 Formwork Inspection of Pipe Support TA-725674 4/20/2019 04:00:00 PM Talal Shabbir CLOSED
Foundaions Footing PS-06= 11 Nos Haradh Near Haco D RUBILOUS
Installation of Epoxy Coated Steel Bars,
Embedded Items and Form Closure Inspection CPP Precast Yard Mr.RAYMON
690 CPP-NGCP-CIV-0688 1400088910 Civil SATIP-Q- 001- 02 SAIC-A-1013 TA-725674 4/20/2019 04:15:00 PM Talal Shabbir Reject
of Pipe Support Foundations PS-06= 11 nos Haradh Near Haco D RUBILOUS
CPP Precast Yard Haradh Near Haco
Concrete Sampling, Testing & Placement
Inspection for Pipe Support Foundations Footing CPP Precast Yard Mr.RAYMON
691 CPP-NGCP-CIV-0689 1400088915 Civil SATIP-Q- 001- 02 SAIC-Q-1060 PS-06= 34 Nos CPP Precast Yard Haradh Near TA-725674 4/20/2019 04:30:00 PM Talal Shabbir CLOSED
Haradh Near Haco D RUBILOUS
Haco
CPP Precast Yard Mr.RAYMON
692 CPP-NGCP-CIV-0690 1400088911 Civil SATIP-Q- 001- 02 SAIC-Q-1015 Concrete finishing & curing inspection for Pipe TA-725674 4/21/2019 07:00:00 AM Talal Shabbir CLOSED
Support Foundations Footing PS-06= 16 Nos Haradh Near Haco D RUBILOUS

CPP Precast Yard Mr.RAYMON


693 CPP-NGCP-CIV-0691 1400088934 Civil SATIP-Q- 001- 02 SAIC-Q-1016 Formwork stripping inspection for Pipe Support
Haradh Near Haco
TA-725674 4/21/2019 07:30:00 AM Talal Shabbir
D RUBILOUS
CLOSED
Foundations Footing PS-06= 16 Nos
8'' F/L HRDH-1171 -RH-AK Pipe lowering at
AQIB Mr.
694 CPP-NGCP-CIV-0692 1400088769 Civil SATIP-L-450- 01 SAIC-L-1003 sta- KP 7+212 to7+400; HRDH-1171 FL TA-843547 4/21/2019 8.00 AM HUSSEIN
CLOSED
Raymund
07-FW-(577-656);
Trench Bedding Inspection for 8" FL HRDH-
AQIB Mr.
695 CPP-NGCP-CIV-0693 1400088760 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 sta-KP 7+212 to7+400; HRDH-1171 FL TA-843547 4/21/2019 8.05 AM HUSSEIN
CLOSED
07-FW-(577-656); Raymund

8'' F/L HRDH-1171 -RH-AK Pipe lowering at


AQIB Mr.
697 CPP-NGCP-CIV-0695 1400088752 Civil SATIP-L-450- 01 SAIC-L-1003 sta- KP 7+400 to7+600; HRDH-1171 FL TA-843547 4/21/2019 8.15 AM HUSSEIN
CLOSED
07-FW-(577-656); Raymund

Trench Bedding Inspection for 8" FL HRDH-


AQIB Mr.
698 CPP-NGCP-CIV-0696 1400088770 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 sta-KP 7+400 to7+600; HRDH-1171 FL TA-843547 4/21/2019 8.20 AM HUSSEIN
CLOSED
Raymund
07-FW-(577-656);
8'' F/L HRDH-1171 -RH-AK Pipe lowering at
AQIB Mr.
700 CPP-NGCP-CIV-0698 1400088817 Civil SATIP-L-450- 01 SAIC-L-1003 sta- KP 7+600 to7+800; HRDH-1171 FL TA-843547 4/21/2019 8.30 AM HUSSEIN
CLOSED
Raymund
07-FW-(577-656);
Trench Bedding Inspection for 8" FL HRDH-
AQIB Mr.
701 CPP-NGCP-CIV-0699 1400088854 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 sta-KP 7+600 to7+800; HRDH-1171 FL TA-843547 4/21/2019 8.35 AM CLOSED
HUSSEIN Raymund
07-FW-(577-656);
8'' F/L HRDH-1171 -RH-AK Pipe lowering at Mr.
AQIB
703 CPP-NGCP-CIV-0701 1400088858 Civil SATIP-L-450- 01 SAIC-L-1003 sta- KP 7+800 to8+000; HRDH-1171 FL TA-843547 4/21/2019 8.45 AM CLOSED
HUSSEIN Raymund
07-FW-(577-656);
Trench Bedding Inspection for 8" FL HRDH-
704 CPP-NGCP-CIV-0702 1400088818 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 sta-KP 7+800 to8+000; HRDH-1171 FL TA-843547 4/21/2019 8.50 AM AQIB Mr. CLOSED
HUSSEIN Raymund
07-FW-(577-656);
8'' F/L HRDH-1171 -RH-AK Pipe lowering at
706 CPP-NGCP-CIV-0704 1400088866 Civil SATIP-L-450- 01 SAIC-L-1003 sta- KP 8+000 to8+200; HRDH-1171 FL TA-843547 4/21/2019 9.00 AM AQIB Mr. CLOSED
HUSSEIN Raymund
07-FW-(577-656);
Trench Bedding Inspection for 8" FL HRDH-
AQIB Mr.
707 CPP-NGCP-CIV-0705 1400088808 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 sta-KP 8+000 to8+200; HRDH-1171 FL TA-843547 4/21/2019 9.05 AM HUSSEIN
CLOSED
07-FW-(577-656); Raymund
Pipe lowering at HWYH1071 km0+911 to
TASEER
709 CPP-NGCP-CIV-0707 1400089349 Civil SATIP-L-450- 01 SAIC-L-1003 km0+960, KM1+008 to 1+143 FW60-64, HWYH1071 TA-445830 4/22/2019 8.30 AM Mr. Randy CLOSED
FW68-79 KHAN

Trench Bedding Inspection for HWYH1071 TASEER


710 CPP-NGCP-CIV-0708 1400089389 Civil SATIP-L- 450- 01 SAIC-L-1002 km0+911 to km0+960, KM1+008 to 1+143 HWYH1071 TA-445830 4/22/2019 8.40 AM Mr. Randy CLOSED
KHAN
FW60-64, FW68-79
Sand Covering and backfilling Inspection for TASEER
711 CPP-NGCP-CIV-0709 1400089379 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH1071 km0+911 to km0+960, KM1+008 HWYH1071 TA-445830 4/22/2019 8.50 AM KHAN
Mr. Randy CLOSED
to 1+143 FW60-64, FW68-79
TASEER
712 CPP-NGCP-CIV-0710 1400090406 Civil SATIP-A- 114- 01 SAIC-A-1005 Compaction testing 3rd layer 300 mm well pad HWYH RH-GK N/A 4/23/2019 10.00 AM Mr. Randy CLOSED
RHGK zone D and E Hwyh KHAN

COMPACTION TEST INSPECTION OF 8th


TASEER
712A CPP-NGCP-CIV-0710A 1400089441 Civil SATIP-A- 114- 01 SAIC-A-1005 LAYER OF ZONE A B HRDH-1063 HRDH-1063 N/A 4/23/2019 10.00 AM Mr. Randy CLOSED
WELL PAD EXTENSION KHAN

AAMIR
713 CPP-NGCP-CIV-0711 1400090408 Civil SATIP-A- 114- 01 SAIC-A-1005 Compaction testing 3rd layer 300 mm well pad HWYH RH-GK N/A 4/23/2019 10.00 AM SOLANGI
Mr. Randy CLOSED
RHGK zone A ND B Hwyh
8'' F/L HRDH-1063 -RH-AK Pipe lowering at AQIB Mr.
714 CPP-NGCP-CIV-0712 1400090114 Civil SATIP-L-450- 01 SAIC-L-1003 sta- KP 0+312to0+487; HRDH-1063 FL TA-843953 4/23/2019 8.00 AM HUSSEIN
CLOSED RE-SCHEDULE
Raymund
00-FW-(25-39); 4/25/2019
Trench Bedding Inspection for 8" FL HRDH- AQIB Mr.
715 CPP-NGCP-CIV-0713 1400090041 Civil SATIP-L- 450- 01 SAIC-L-1002 1063 sta- KP 0+312to0+487; HRDH-1063 FL TA-843953 4/23/2019 8.05 AM HUSSEIN
CLOSED RE-SCHEDULE
Raymund
00-FW-(25-39); 4/25/2019
Sand Covering and backfilling Inspection for 8" AQIB Mr.
716 CPP-NGCP-CIV-0714 1400090125 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1063-sta- KP 0+312to0+487; HRDH-1063 FL TA-843953 4/23/2019 8.10 AM HUSSEIN
CLOSED RE-SCHEDULE
Raymund
00-FW-(25-39); 4/25/2019
8'' F/L HRDH-1063 -RH-AK Pipe lowering at AQIB Mr.
717 CPP-NGCP-CIV-0715 1400090126 Civil SATIP-L-450- 01 SAIC-L-1003 sta- KP 0+512 to0+675; HRDH-1063 FL TA-843953 4/23/2019 8.15 AM HUSSEIN
CLOSED RE-SCHEDULE
Raymund
00-FW-(41-54); 4/25/2019
Trench Bedding Inspection for 8" FL HRDH- AQIB Mr.
718 CPP-NGCP-CIV-0716 1400090042 Civil SATIP-L- 450- 01 SAIC-L-1002 1063sta-KP 0+512 to0+675; HRDH-1063 FL TA-843953 4/23/2019 8.20 AM CLOSED RE-SCHEDULE
HUSSEIN Raymund
00-FW-(41-54); 4/25/2019
Sand Covering and backfilling Inspection for 8" AQIB Mr.
719 CPP-NGCP-CIV-0717 1400090079 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1063-sta-KP 0+512 to0+675; HRDH-1063 FL TA-843953 4/23/2019 8.25 AM CLOSED RE-SCHEDULE
HUSSEIN Raymund
00-FW-(41-54); 4/25/2019
8'' F/L HRDH-1063 -RH-AK Pipe lowering at AQIB Mr.
720 CPP-NGCP-CIV-0718 1400090081 Civil SATIP-L-450- 01 SAIC-L-1003 sta- KP 0+887 to1+050; HRDH-1063 FL TA-843953 4/23/2019 8.30 AM CLOSED RE-SCHEDULE
HUSSEIN Raymund
00-FW-(71-84); 4/25/2019
Trench Bedding Inspection for 8" FL HRDH- AQIB Mr.
721 CPP-NGCP-CIV-0719 1400090127 Civil SATIP-L- 450- 01 SAIC-L-1002 1063 sta-KP 0+887 to1+050; HRDH-1063 FL TA-843953 4/23/2019 8.35 AM CLOSED RE-SCHEDULE
HUSSEIN Raymund
00-FW-(71-84); 4/25/2019
Sand Covering and backfilling Inspection for 8" AQIB Mr.
722 CPP-NGCP-CIV-0720 1400090144 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1063-sta-KP 0+887 to1+050; HRDH-1063 FL TA-843953 4/23/2019 8.40 AM HUSSEIN Raymund CLOSED RE-SCHEDULE
00-FW-(71-84);
COMPACTION TEST INSPECTION OF 9th 4/25/2019
Mr.
723 CPP-NGCP-CIV-0721 1400090154 Civil SATIP-A- 114- 01 SAIC-A-1005 LAYER OF ZONE B HRDH-1063 WELL PAD HRDH-1063 FL BA-561604 4/23/2019 8.40 AM Talal Shabbir CLOSED
EXTENSION Raymund
8nd layer for zone B (4140SQM)
Mr.
724 CPP-NGCP-CIV-0722 1400090213 Civil SATIP-A- 114- 01 SAIC-A-1005 COMPACTION TEST AT HRDH RH-GK HRDH RH-GK B590536 4/23/2019 8.50 AM Hameed Ullah CLOSED
EXTENSION Raymund
725 CPP-NGCP-CIV-0723 1400090189 Civil SATIP-A- 114- 01 SAIC-A-1005 2nd layer for zone C (4140SQM) COMPACTION HRDH RH-GK B590536 4/23/2019 9.00 AM Hameed Ullah
Mr. CLOSED
TEST AT HRDH RH-GK EXTENSION Raymund RE-SCHEDULE TO 25-04-2019
Mr.
726 CPP-NGCP-CIV-0724 1400090180 Civil SATIP-A- 114- 01 SAIC-A-1005 Existing ground compaction test at HRDH-1307 HRDH-1307 FL N/A 4/23/2019 11.00 AM Hameed Ullah CLOSED
well pad extension Raymund
727 CPP-NGCP-CIV-0725 1400090307 Civil SATIP-A- 114- 01 SAIC-A-1006 Final fill inspection for HRDH Wellpad 1182 HRDH-1182 FL N/A 4/23/2019 10.05 AM Hameed Ullah Mr. Raymund CLOSED
Existing ground soil sampling testing and
728 CPP-NGCP-CIV-0726 1400090652 Civil SATIP-A- 114- 01 SAIC-A-1001 review of test reports fot HRDH wellpad HRDH-1144 N/A 4/24/2019 10.00 AM Hameed Ullah Mr. Raymund CLOSED
1144
Existing ground soil sampling testing and
729 CPP-NGCP-CIV-0727 1400090632 Civil SATIP-A- 114- 01 SAIC-A-1001 review of test reports fot HRDH wellpad HRDH-1189 N/A 4/24/2019 10.00 AM Hameed Ullah Mr. Raymund CLOSED
1189
Soil sampling and testing select fill material
Barrow pit no 10 stock pile 2 well pad RH AAMIR Mr Abdul
730 CPP-NGCP-CIV-0728 1400091609 Civil SATIP-A-114-0 SAIC-A-1001 HWYH RH EJ N/A 4/24/2019 10.00 AM CLOSED
EJ Hwyh SOLANGI Malik

731 CPP-NGCP-CIV-0729 1400091536 Civil SATIP-A- 114- 01 SAIC-A-1005 Existing ground compaction testing at Hrdh Hrdh 1144 N/A 4/25/2019 8.00 AM Hameed Ullah Mr. Raymund CLOSED
1144 Well pad extension
Existing ground compaction testing at Hrdh
732 CPP-NGCP-CIV-0730 1400091501 Civil SATIP-A- 114- 01 SAIC-A-1005 Hrdh 1189 N/A 4/25/2019 8.00 AM Hameed Ullah Mr. Raymund CLOSED
1189 Well pad extension
Soil sampling and testing select fill material
733 CPP-NGCP-CIV-0731 1400091494 Civil SATIP-A-114-01 SAIC-A-1001 Barrow pit no 10 stock pile 2 well pad RH HWYH RH EJ N/A 4/25/2019 10.00 AM
AAMIR Mr Abdul
CLOSED
EJ Hwyh SOLANGI Malik

Soil sampling and testing Existing material AAMIR Mr Abdul


734 CPP-NGCP-CIV-0732 1400091470 Civil SATIP-A- 114- 01 SAIC-A-1001 HWYH-RH CJ N/A 4/25/2019 9.30 AM SOLANGI Malik
CLOSED
well pad RH CJ Hawyah
Soil sampling and testing Existing material AAMIR Mr Abdul
735 CPP-NGCP-CIV-0733 1400091504 Civil SATIP-A- 114- 01 SAIC-A-1001 HWYH- 1079 N/A 4/25/2019 9.30 AM CLOSED
well pad 1079 zone A and B Hawyah SOLANGI Malik

736 CPP-NGCP-CIV-0734 1400091954 Civil SATIP-A- 114- 01 SAIC-A-1005 Compaction Testing 3rd layer 300mm well HWYH RH-GK N/A 4/27/2019 10.00 AM TASEER
Mr. Randy Reject
pad RHGK zone C and F hawyah KHAN
Compaction test Inspection 300mm Selectfill 3rd AAMIR
737 CPP-NGCP-CIV-0735 1400091984 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH RH-GK N/A 4/27/2019 10.00 AM SOLANGI
Mr. Randy Reject
layer at RH-GK zone 5 to 6 HWYH
Existing ground compaction test at HRDH- Mr.
738 CPP-NGCP-CIV-0736 1400092152 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1307 FL N/A 4/27/2019 10.00 AM Hameed Ullah CLOSED
1307 well pad extension Raymund Cancelled due to repeatation joint no
22h layer zone A(6650 sqm) Compaction Test at
739 CPP-NGCP-CIV-0737 1400092119 Civil SATIP-A- 114- 01 SAIC-A-1005
HRDH RH-GK Extension
HRDH RH-GK B590536 4/27/2019 11.00 AM Hameed Ullah Mr. Raymund CLOSED

Material Receiving Inspection at HRDH-


740 CPP-NGCP-CIV-0738 1400092433 Civil SATIP-A- 114- 01 SAIC-A-1002 HRDH-1144 N/A 4/27/2019 10.30 AM Hameed Ullah Mr. Raymund CLOSED
1144
1st extention
Layer Fill placement and compaction
741 CPP-NGCP-CIV-0739 1400092434 Civil SATIP-A- 114- 01 SAIC-A-1004
inspection 1st layer at HRDH-1144 HRDH-1144 N/A 4/27/2019 10:05 AM Hameed Ullah Mr. Raymund CLOSED
Extension
1st Layer compaction test inspection at
742 CPP-NGCP-CIV-0740 1400092382 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1145 N/A 4/27/2019 9.00 AM Hameed Ullah Mr. Raymund CLOSED
HRDH-1144 wellpad Extension
Material Receiving Inspection at HRDH-
743 CPP-NGCP-CIV-0741 1400092443 Civil SATIP-A- 114- 01 SAIC-A-1002 HRDH-1307 N/A 4/27/2019 10.25 AM Hameed Ullah Mr. Raymund CLOSED
1307 wellpad extention

744 CPP-NGCP-CIV-0742 1400092435 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1307 N/A 4/27/2019 9.05 AM Hameed Ullah Mr. Raymund CLOSED
Final/3rd layer compaction test inspection for
Zone A and B at HRDH 1307 wellpad
Extension

Borrow
745 CPP-NGCP-CIV-0744 1400093098 Civil SATIP-A- 114- 01 SAIC-A-1001 HRDH-Borrow Pit#11 Stockpile#02(E- Pit#11,Stockpile#02 N/A 4/28/2019 9.15 AM Hameed Ullah Mr. Raymund CLOSED
490319.9,N-242001.2 Near HRDH-RH-EK Near RH-EK
General Fill/Marl Material sampling,testing
andn review of test reports

Borrow
746 CPP-NGCP-CIV-0745 1400093173 Civil SATIP-A- 114- 01 SAIC-A-1001 HRDH-Borrow Pit#13 Stockpile#01(E- Pit#13,Stockpile#01 N/A 4/28/2019 9.25 AM Hameed Ullah Mr. Raymund CLOSED
306757.458,N-2683669)Near HRDH-1189 Near HRDH-1189
Wellpad General Fill/Marl Material
sampling,testing andn review of test reports
HRDH-Borrow Pit#12 Stockpile#01(E- Borrow
747 CPP-NGCP-CIV-0746 1400093068 Civil SATIP-A- 114- 01 SAIC-A-1001 307580.430,N-2685187.250 Near HRDH- Pit#12,Stockpile#01 N/A 4/28/2019 9.20 AM Hameed Ullah Mr. Raymund CLOSED
1144 Wellpad SELECTFILLMaterial Near HRDH-1144
sampling,testing andn review of test reports

Aggregate Base course Material Sampling


748 CPP-NGCP-CIV-0747 1400093863 Civil SATIP-Q-006-02 SAIC-Q-1035 testing and review of test reports (Crusher Al N/A N/A 4/29/2019 9.50 AM Hameed Ullah Mr. Raymund CLOSED
Samah)
Concrete Testing & Final Acceptance
Inspection of 7 days Compressive strenght (CPP Precast
of site and lab cured samples of Pipe Yard Haradh) Mr.RAYMON
750 CPP-NGCP-CIV-0748 1400092534 Civil SATIP-Q- 001- 02 SAIC-Q-1017 Support PS-06 Foundations Footings =16 TA-725674 4/25/2019 02:00:00 PM Talal Shabbir CLOSED
(Osaimi Lab D RUBILOUS
Nos casted on 18-April-2019 @ CPP Khobar)
Precast Yard Haradh
Concrete Testing & Final Acceptance
Inspection of 7 days Compressive strenght (CPP Precast
of site and lab cured samples of Pipe Yard Haradh) Mr.RAYMON
751 CPP-NGCP-CIV-0749 1400092489 Civil SATIP-Q- 001- 02 SAIC-Q-1017 Support PS-06 Foundations Footings=34 TA-725674 4/27/2019 02:00:00 PM Talal Shabbir CLOSED
(Osaimi Lab D RUBILOUS
Nos Casted on 20-April-2019 @ CPP Khobar)
Precast
Soil Yard Haradh
sampling and testing select fill Barrow
pit no 13 stock pile no 1 Well pad 1023 AAMIR Mr Abdul
752 CPP-NGCP-CIV-0750 1400092685 Civil SATIP-A- 114- 01 SAIC-A-1001 HWYH-1023 N/A 4/28/2019 9.30 AM
SOLANGI Malik
CLOSED
Hwyh
Soil sampling and testing general fill Barrow AAMIR Mr Abdul
753 CPP-NGCP-CIV-0751 1400092704 Civil SATIP-A- 114- 01 SAIC-A-1001 HWYH-1023 N/A 4/28/2019 9.30 AM CLOSED
pit no 13 stock pile no 2 well pad 1023 Hwyh SOLANGI Malik
Soil sampling and testing
Soil sampling and testing general fill Barrow AAMIR Mr Abdul Select fill Barrow pit no 10
754 CPP-NGCP-CIV-0752 1400092708 Civil SATIP-A- 114- 01 SAIC-A-1001 HWYH-RH CJ N/A 4/28/2019 11.00 AM
SOLANGI Malik
CLOSED
pit no 10 stock pile no 1 Well pad RH CJ stock pile no 1 Well pad
Hawyah RH CJ Hawyah
Soil sampling and testing
Soil sampling and testing general fill Barrow AAMIR Mr Abdul Select fill Barrow pit 10
755 CPP-NGCP-CIV-0753 1400092735 Civil SATIP-A- 114- 01 SAIC-A-1001 HWYH-RH CJ N/A 4/28/2019 11.00 AM CLOSED
pit 10 stock pile no 2 well pad RH CJ SOLANGI Malik stock pile no 2 well pad
Hawyah RH CJ Hawyah
Compaction testing 4th layer 300 mm well TASEER
756 CPP-NGCP-CIV-0754 1400092980 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH RH-GK N/A 4/28/2019 10.00 AM
KHAN
Mr. Randy CLOSED RE-SCHEDULE TO 29-04-2019
pad RH GK zone D and E hwyah
Compaction testing 3rd layer 300 mm well TASEER
757 CPP-NGCP-CIV-0755 1400093006 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH RH-GK N/A 4/28/2019 10.00 AM Mr. Randy CLOSED RE-SCHEDULE TO 29-04-2019
pad RH GK zone C and F hwya KHAN
Final /3rd layer Fill placement and
758 CPP-NGCP-CIV-0756 1400092421 Civil SATIP-A- 114- 01 SAIC-A-1006 compaction Inspection for Zone A and B at HRDH-1307 N/A 4/28/2019 9.30 AM Hameed Ullah Mr. Raymund CLOSED
HRDH 1307 wellpad Extension
8'' F/L HRDH-1122 -RH-GK Pipe lowering at Mr.
AQIB
759 CPP-NGCP-CIV-0757 1400092707 Civil SATIP-L-450- 01 SAIC-L-1003 sta- KP 0+375 to0+437; HRDH-1122 FL TA-843611 4/28/2019 8.00 AM CLOSED
HUSSEIN Raymund
00-FW-(30-35);
Trench Bedding Inspection for 8" FL HRDH-
760 CPP-NGCP-CIV-0758 1400092686 Civil SATIP-L- 450- 01 SAIC-L-1002 1122 sta-KP 0+375 to0+437; HRDH-1122 FL TA-843611 4/28/2019 8.05 AM AQIB Mr. CLOSED
HUSSEIN Raymund
00-FW-(30-35);

Sand Covering and backfilling Inspection for 8" AQIB Mr.


761 CPP-NGCP-CIV-0759 1400092733 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1122-sta-KP 0+375 to0+437; HRDH-1122 FL TA-843611 4/28/2019 8.10 AM HUSSEIN
CLOSED
Raymund
00-FW-(30-35);
8'' F/L HRDH-1122 -RH-GK Pipe lowering at
AQIB Mr.
762 CPP-NGCP-CIV-0760 1400092710 Civil SATIP-L-450- 01 SAIC-L-1003 sta- KP 0+537 to0+737; HRDH-1122 FL TA-843611 4/28/2019 8.15 AM CLOSED
HUSSEIN Raymund
00-FW-(43-73);
Trench Bedding Inspection for 8" FL HRDH-
AQIB Mr.
763 CPP-NGCP-CIV-0761 1400092632 Civil SATIP-L- 450- 01 SAIC-L-1002 1122 sta-KP 0+537 to0+737; HRDH-1122 FL TA-843611 4/28/2019 8.20 AM CLOSED
HUSSEIN Raymund
00-FW-(43-73);
Sand Covering and backfilling Inspection for 8" AQIB Mr.
764 CPP-NGCP-CIV-0762 1400092662 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1122-sta-KP 0+537 to0+737; HRDH-1122 FL TA-843611 4/28/2019 8.25 AM CLOSED
HUSSEIN Raymund
00-FW-(43-73);
8'' F/L HRDH-1122 -RH-GK Pipe lowering at
AQIB Mr.
765 CPP-NGCP-CIV-0763 1400092781 Civil SATIP-L-450- 01 SAIC-L-1003 sta- KP 0+737 to0+987; HRDH-1122 FL TA-843611 4/28/2019 8.30 AM CLOSED
HUSSEIN Raymund
00-FW-(43-73);
Trench Bedding Inspection for 8" FL HRDH-
AQIB Mr.
766 CPP-NGCP-CIV-0764 1400092738 Civil SATIP-L- 450- 01 SAIC-L-1002 1122 sta-KP 0+737 to0+987; HRDH-1122 FL TA-843611 4/28/2019 8.35 AM CLOSED
HUSSEIN Raymund
00-FW-(43-73);
Sand Covering and backfilling Inspection for 8" AQIB Mr.
767 CPP-NGCP-CIV-0765 1400092758 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1122-sta-KP 0+737 to0+987; HRDH-1122 FL TA-843611 4/28/2019 8.40 AM CLOSED
HUSSEIN Raymund
00-FW-(43-73);
8'' F/L HRDH-1122 -RH-GK Pipe lowering at
AQIB Mr.
768 CPP-NGCP-CIV-0766 1400092689 Civil SATIP-L-450- 01 SAIC-L-1003 sta- KP 1+100 to1+190; HRDH-1122 FL TA-843611 4/28/2019 8.45 AM CLOSED
HUSSEIN Raymund
01-FW-(88-95);
Trench Bedding Inspection for 8" FL HRDH-
AQIB Mr.
769 CPP-NGCP-CIV-0767 1400092698 Civil SATIP-L- 450- 01 SAIC-L-1002 1122 sta-KP 1+100 to1+190; HRDH-1122 FL TA-843611 4/28/2019 8.50 AM HUSSEIN
CLOSED
Raymund
01-FW-(88-95);

Sand Covering and backfilling Inspection for 8" AQIB Mr.


770 CPP-NGCP-CIV-0768 1400092784 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1122-sta-KP 1+100 to1+190; HRDH-1122 FL TA-843611 4/28/2019 8.55 AM HUSSEIN
CLOSED
Raymund
01-FW-(88-95);
771 CPP-NGCP-CIV-0769 1400093056 Civil SATIP-A- 114- 01 SAIC-A-1005 Compaction testing inspection for 3rd layer for HRDH RH-GK B590536 4/28/2019 9.00 AM Hameed Ullah Mr. Raymund CLOSED
zone C at HRDH RH-GK Extension
772 CPP-NGCP-CIV-0770 1400093047 Civil SATIP-A- 114- 01 SAIC-A-1004 2nd Layer Fill placement and compaction HRDH-1144 N/A 4/28/2019 9;05:AM Hameed Ullah Mr. Raymund CLOSED
inspection at HRDH-1144
773 CPP-NGCP-CIV-0771 1400093048 Civil SATIP-A- 114- 01 SAIC-A-1005 2nd Layer compaction HRDH-1144 N/A 4/28/2019 9.10 AM Hameed Ullah Mr. Raymund CLOSED
Test inspection at HRDH-1144
8'' F/L HRDH-1162 -1122 Pipe lowering at sta-
AQIB
774 CPP-NGCP-CIV-0772 1400093380 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+037 to KP0+100; HRDH-1162 FL TA843974 4/29/2019 8.00 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(03-08);
Trench Bedding Inspection for 8" FL HRDH-
AQIB
775 CPP-NGCP-CIV-0773 1400093422 Civil SATIP-L- 450- 01 SAIC-L-1002 1162 at sta-KP0+037 to KP0+100; HRDH-1162 FL TA843974 4/29/2019 8.05 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(03-08)
Sand Covering and backfilling Inspection for 8" AQIB
776 CPP-NGCP-CIV-0774 1400093537 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1162-sta-KP0+037 to KP0+100; HRDH-1162 FL TA843974 4/29/2019 8.10 AM HUSSEIN
Mr. Edgardo CLOSED
00-FW-(03-08)
8'' F/L HRDH-1162 -1122 Pipe lowering at sta-
AQIB
777 CPP-NGCP-CIV-0775 1400093506 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+462 to KP0+525; HRDH-1162 FL TA843974 4/29/2019 8.15 AM HUSSEIN
Mr. Edgardo CLOSED CANCELLED DU TO
00-FW-(37-42); WADI AREA
Trench Bedding Inspection for 8" FL HRDH-
AQIB
778 CPP-NGCP-CIV-0776 1400093470 Civil SATIP-L- 450- 01 SAIC-L-1002 1162 at sta- KP0+462 to KP0+525; HRDH-1162 FL TA843974 4/29/2019 8.20 AM Mr. Edgardo CLOSED CANCELLED DU TO
HUSSEIN
00-FW-(37-42); WADI AREA
Sand Covering and backfilling Inspection for 8" AQIB
779 CPP-NGCP-CIV-0777 1400093526 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1162-sta- KP0+462 to KP0+525; HRDH-1162 FL TA843974 4/29/2019 8.25 AM Mr. Edgardo CLOSED CANCELLED DU TO
HUSSEIN
00-FW-(37-42); WADI AREA
8'' F/L HRDH-1162 -1122 Pipe lowering at sta-
AQIB
780 CPP-NGCP-CIV-0778 1400093515 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+678 to KP0+878; HRDH-1162 FL TA843974 4/29/2019 8.30 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(48-80);
Trench Bedding Inspection for 8" FL HRDH-
AQIB
781 CPP-NGCP-CIV-0779 1400093528 Civil SATIP-L- 450- 01 SAIC-L-1002 1162 at sta-KP0+678 to KP0+878; HRDH-1162 FL TA843974 4/29/2019 8.35 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(48-80);
Sand Covering and backfilling Inspection for 8" AQIB
782 CPP-NGCP-CIV-0780 1400093471 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1162-sta-KP0+678 to KP0+878; HRDH-1162 FL TA843974 4/29/2019 8.40 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(48-80);
8'' F/L HRDH-1162 -1122 Pipe lowering at sta- AQIB
783 CPP-NGCP-CIV-0781 1400093554 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+878 to KP1+067; HRDH-1162 FL TA843974 4/29/2019 8.45 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(48-80);
Trench Bedding Inspection for 8" FL HRDH-
AQIB
784 CPP-NGCP-CIV-0782 1400093529 Civil SATIP-L- 450- 01 SAIC-L-1002 1162 at sta-KP0+878 to KP1+067; HRDH-1162 FL TA843974 4/29/2019 8.50 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(48-80);
Sand Covering and backfilling Inspection for 8" AQIB
785 CPP-NGCP-CIV-0783 1400093573 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1162-sta-KP0+878 to KP1+067; HRDH-1162 FL TA843974 4/29/2019 8.55 AM HUSSEIN
Mr. Edgardo CLOSED
00-FW-(48-80);
8'' F/L HRDH-1162 -1122 Pipe lowering at sta-
AQIB
786 CPP-NGCP-CIV-0784 1400093472 Civil SATIP-L-450- 01 SAIC-L-1003 KP1+175 to KP1+344; HRDH-1162 FL TA843974 4/29/2019 9.00 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(94-105);
Trench Bedding Inspection for 8" FL HRDH-
AQIB
787 CPP-NGCP-CIV-0785 1400093564 Civil SATIP-L- 450- 01 SAIC-L-1002 1162 at sta-KP1+175 to KP1+344; HRDH-1162 FL TA843974 4/29/2019 9.05 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(94-105);

Sand Covering and backfilling Inspection for 8" AQIB


788 CPP-NGCP-CIV-0786 1400093530 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1162-sta-KP1+175 to KP1+344; HRDH-1162 FL TA843974 4/29/2019 9.10 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(94-105);
3rd/Final Marl Layer  compaction test 
789 CPP-NGCP-CIV-0787 1400093790 Civil SATIP-A- 114- 01 SAIC-A-1005 inspection for HRDH 1144 wellpad Extensio HRDH 1144 N/A 4/29/2019 9.15 AM Hameed Ullah Mr. Raymund CLOSED
n
3rd/Final Marl Layer Fill Placement and
790 CPP-NGCP-CIV-0788 1400093792 Civil SATIP-A- 114- 01 SAIC-A-1004 compaction inspection for HRDH 1144 HRDH-1144 N/A 4/29/2019 9;20:AM Hameed Ullah Mr. Raymund CLOSED
wellpad Extension
791 CPP-NGCP-CIV-0789 1400093806 Civil SATIP-A- 114- 01 SAIC-A-1006 Final Fill Inspection for HRDH 1307 wellpad HRDH-1307 N/A 4/29/2019 9.25 AM Hameed Ullah Mr. Raymund CLOSED
Compaction test inspection of 23rd layer for
792 CPP-NGCP-CIV-0790 1400093837 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-GK-RH N/A 4/29/2019 9.30 AM Hameed Ullah Mr. Raymund CLOSED
Zone A at HRDH RH-GK Extension
Material Receiving Inspection at HRDH
793 CPP-NGCP-CIV-0791 1400093853 Civil SATIP-A- 114- 01 SAIC-A-1001 1189 HRDH-1189 N/A 4/29/2019 9.35AM Hameed Ullah Mr. Raymund CLOSED
Wellpad
1st layer Fill Placement and compaction
794 CPP-NGCP-CIV-0792 1400093841 Civil SATIP-A- 114- 01 SAIC-A-1004 inspection at HRDH 1189 wellpad HRDH-1189 N/A 4/29/2019 9.40 AM Hameed Ullah Mr. Raymund CLOSED
Extension
1st layer compaction test inspection at
795 CPP-NGCP-CIV-0793 1400093826 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH HRDH-1189 N/A 4/29/2019 9.45 AM Hameed Ullah Mr. Raymund CLOSED
1189 wellpad
Trench Extension
Excavation and Bottom of Trench TASEER
796 CPP-NGCP-CIV-0794 1400094052 Civil SATIP-L- 450- 01 SAIC-L-1002 Inspection at HWYH1076 km0+351 to HWYH1076 TA-445861 4/30/2019 8.20 AM Mr. Randy CLOSED
KHAN
km2+350
797 CPP-NGCP-CIV-0795 1400094167 Civil SATIP-A- 114- 01 SAIC-A-1001 Soil sampling and testing general fill Barrow HWYH- RH GK N/A 4/30/2019 9.00 AM
AAMIR
Mr. Randy CLOSED
pit no 11 stock pile 4 well pad RH GK hwyah SOLANGI
2nd Layer Fill placement and compaction
798 CPP-NGCP-CIV-0796 1400094330 Civil SATIP-A- 114- 01 SAIC-A-1004 inspection at HRDH-1189 Wellpad Extension
HRDH-1189 BA-911451 4/30/2019 1.30 PM Hameed Ullah Mr. Edgardo CLOSED
2nd layer (300mm) Compaction test Inspection
799 CPP-NGCP-CIV-0797 1400094408 Civil SATIP-A- 114- 01 SAIC-A-1005 at HRDH-1189 BA-911451 4/30/2019 2.00 PM Hameed Ullah Mr. Edgardo CLOSED RE-SCHEDULE TO 01-05-2019
HRDH-1189 Wellpad Extension
Compaction Test inspection of 4th layer for
800 CPP-NGCP-CIV-0798 1400094372 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-GK-RH N/A 4/30/2019 2.10 PM Hameed Ullah Mr. Edgardo CLOSED
zone C at HRDH RH-GK Extension
fill placement and compaction inspection for
TASEER
801 CPP-NGCP-CIV-0799 1400094458 Civil SATIP-A- 114- 01 SAIC-A-1004 Hawiyah RH Gk zone A and B 4th layer Hawiyah RH Gk N/A 4/30/2019 10.00 AM
KHAN
Mr. Randy CLOSED
300mm
Compaction test inspection for hawiyah Rh TASEER
802 CPP-NGCP-CIV-0800 1400094446 Civil SATIP-A- 114- 01 SAIC-A-1005 Hawiyah RH Gk N/A 4/30/2019 10.00 AM Mr. Randy CLOSED
Gk zone A and B 4th layer 300mm KHAN
Compaction testing existing ground well pad AAMIR Mr Abdul
803 CPP-NGCP-CIV-0801 1400094517 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-1079 N/A 4/30/2019 9.30 AM CLOSED
1079 zone A and ZONEB hwyah SOLANGI Malik
HRDH Borrow Pit #14, stockpile #01Near
HRDH 1142 well( N-2687047.096 E- stockpile #01Near
804 CPP-NGCP-CIV-0802 1400094851 Civil SATIP-A- 114- 01 SAIC-A-1001 N/A 5/1/2019 9.30 AM Hameed Ullah Mr. Edgardo CLOSED
303690.350 ) Soil sampling testing and HRDH 1142
review of test reports for Selectfill Material
HRDH Borrow Pit #14, stockpile #02 Near
HRDH 1142 well (N-2687344.458 E-
#02 Near HRDH
805 CPP-NGCP-CIV-0803 1400094949 Civil SATIP-A- 114- 01 SAIC-A-1001 303728.887 (General Fill/MARL) Soil N/A 5/1/2019 9.30 AM Hameed Ullah Mr. Edgardo CLOSED
1142
sampling testing and review of test reports
for General Fill/MARL Materi
Pipe lowering at HWYH1076 KM1+618 to TASEER
806 CPP-NGCP-CIV-0804 1400094739 Civil SATIP-L-450- 01 SAIC-L-1003 HWYH-1076 FL TA-445861 5/1/2019 9.05AM Mr. Randy CLOSED
2+350 FW136-172,FW177-185 KHAN
Sand Covering and backfilling Inspection for TASEER
807 CPP-NGCP-CIV-0805 1400094765 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1076 FL TA-445861 5/1/2019 9.15 AM Mr. Randy CLOSED
HWYH1076 KM1+618 to 2+350 KHAN
Compaction testing existing well pad 1023 AAMIR Mr Abdul
808 CPP-NGCP-CIV-0806 1400095007 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-1023 N/A 5/1/2019 9.00 AM CLOSED
zone A B C and D hwyah SOLANGI Malik
Compaction test inspection for hawiyah Rh TASEER Mr. RE-SCHEDULE TO 02-
809 CPP-NGCP-CIV-0807 1400095008 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH Rh Gk N/A 5/1/2019 9.00 AM CLOSED
Gk zone C and F 4th layer 300mm KHAN Raymund 05-2019
fill placement and compaction inspection for
TASEER
810 CPP-NGCP-CIV-0808 1400095027 Civil SATIP-A- 114- 01 SAIC-A-1004 Hawiyah RH Gk zone C and F 4th layer HWYH Rh Gk N/A 5/1/2019 9.00 AM Mr. Randy CLOSED
KHAN
300mm
8'' F/L HRDH-1171 -RH-AK Pipe lowering at
AQIB
811 CPP-NGCP-CIV-0809 1400094782 Civil SATIP-L-450- 01 SAIC-L-1003 sta- KP2+450 to KP2+600; HRDH-1171 FL TA843547 5/1/2019 8.00 AM Mr. Raymund Reject
HUSSEIN
02-FW-(196-218) CANCELLED
Trench Bedding Inspection for 8" FL HRDH-
AQIB
812 CPP-NGCP-CIV-0810 1400094808 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 at sta-KP2+450 to KP2+600; HRDH-1171 FL TA843547 5/1/2019 8.05 AM Mr. Raymund CLOSED
HUSSEIN
02-FW-(196-218) CANCELLED
Sand Covering and backfilling Inspection for 8" AQIB
813 CPP-NGCP-CIV-0811 1400094752 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1171 at sta-KP2+450 to KP2+600; HRDH-1171 FL TA843547 5/1/2019 8.15 AM Mr. Raymund CLOSED
HUSSEIN
02-FW-(196-218) CANCELLED
8'' F/L HRDH-1171 -RH-AK Pipe lowering at
AQIB
814 CPP-NGCP-CIV-0812 1400094861 Civil SATIP-L-450- 01 SAIC-L-1003 sta-KP2+600 to KP2+725; HRDH-1171 FL TA843547 5/1/2019 8.20 AM Mr. Raymund Reject
HUSSEIN
02-FW-(196-218) CANCELLED
Trench Bedding Inspection for 8" FL HRDH-
AQIB
815 CPP-NGCP-CIV-0813 1400094865 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 at sta-KP2+600 to KP2+725; HRDH-1171 FL TA843547 5/1/2019 8.25 AM Mr. Raymund CLOSED
HUSSEIN
02-FW-(196-218)) CANCELLED
Sand Covering and backfilling Inspection for 8" AQIB
816 CPP-NGCP-CIV-0814 1400094831 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1171 at sta-KP2+600 to KP2+725; HRDH-1171 FL TA843547 5/1/2019 8.30 AM Mr. Raymund CLOSED
HUSSEIN
02-FW-(196-218) CANCELLED
8'' F/L HRDH-1171 -RH-AK Pipe lowering at
AQIB
817 CPP-NGCP-CIV-0815 1400094866 Civil SATIP-L-450- 01 SAIC-L-1003 sta- -KP2+925to KP3+100; HRDH-1171 FL TA843547 5/1/2019 8.35 AM Mr. Raymund Reject
HUSSEIN
03-FW-(234-261) CANCELLED
Trench Bedding Inspection for 8" FL HRDH-
AQIB
818 CPP-NGCP-CIV-0816 1400094867 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 at sta-KP2+925to KP3+100; HRDH-1171 FL TA843547 5/1/2019 8.40AM Mr. Raymund CLOSED
HUSSEIN
03-FW-(234-261) CANCELLED
Sand Covering and backfilling Inspection for 8" AQIB
819 CPP-NGCP-CIV-0817 1400094840 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1171 at sta-KP2+925to KP3+100; HRDH-1171 FL TA843547 5/1/2019 8.45AM Mr. Raymund CLOSED
HUSSEIN
03-FW-(234-261) CANCELLED
8'' F/L HRDH-1171 -RH-AK Pipe lowering at
AQIB
820 CPP-NGCP-CIV-0818 1400094868 Civil SATIP-L-450- 01 SAIC-L-1003 sta- -KP3+100 to KP3+262; HRDH-1171 FL TA843547 5/1/2019 8.50AM Mr. Raymund CLOSED
HUSSEIN
03-FW-(234-261) CANCELLED
Trench Bedding Inspection for 8" FL HRDH-
AQIB
821 CPP-NGCP-CIV-0819 1400094841 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 at sta-KP3+100 to KP3+262; HRDH-1171 FL TA843547 5/1/2019 8.55 AM HUSSEIN
Mr. Raymund CLOSED
03-FW-(234-261) CANCELLED
Sand Covering and backfilling Inspection for 8" AQIB
822 CPP-NGCP-CIV-0820 1400094812 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1171 at sta-KP3+100 to KP3+262; HRDH-1171 FL TA843547 5/1/2019 9.05 AM Mr. Raymund CLOSED
HUSSEIN
03-FW-(234-261) CANCELLED
823 CPP-NGCP-CIV-0821 1400095009 Civil SATIP-A- 114- 01 SAIC-A-1005 24th layer Compaction Test inspection for zone HRDH-GK-RH N/A 5/1/2019 2.10 PM Hameed Ullah Mr. Edgardo CLOSED
A at sampling
Soil HRDH RH-GKtestingExtension
and review of test reports
824 CPP-NGCP-CIV-0822 1400096044 Civil SATIP-A- 114- 01 SAIC-A-1001 of Existing ground Material at HRDH 1142 HRDH 1142 N/A 5/2/2019 2.10 PM Hameed Ullah Mr. Edgardo CLOSED
wellpad
Material receiving inspaction select fill well AAMIR Mr Abdul
825 CPP-NGCP-CIV-0823 1400095812 Civil SATIP-A- 114- 01 SAIC-A-1002
pad 1079 zone A and B hwyah HWYH 1079 N/A 5/2/2019 10.00 AM
SOLANGI Malik
CLOSED

Fill placement and compaction inspaction AAMIR Mr Abdul


826 CPP-NGCP-CIV-0824 1400095860 Civil SATIP-A- 114- 01 SAIC-A-1004 HWYH 1079 N/A 5/2/2019 10.00 AM CLOSED
well pad 1079 zone A and B hwyah SOLANGI Malik
Compaction testing 300 mm well pad 1079 AAMIR Mr Abdul
827 CPP-NGCP-CIV-0825 1400095917 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH 1079 N/A 5/2/2019 10.00 AM CLOSED
zone A and B hwyah SOLANGI Malik
8'' F/L HRDH-1145 -1117 Pipe lowering at sta-
AQIB
828 CPP-NGCP-CIV-0826 1400095587 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+150 to KP0+237; HRDH-1145 FL TA843976 5/2/2019 8.00 AM
HUSSEIN
Mr. Edgardo CLOSED
00-FW-(12-19);
Trench Bedding Inspection for 8" FL HRDH-
AQIB
829 CPP-NGCP-CIV-0827 1400095633 Civil SATIP-L- 450- 01 SAIC-L-1002 1145 at sta-KP0+150 to KP0+237; HRDH-1145 FL TA843976 5/2/2019 8.05 AM
HUSSEIN
Mr. Edgardo CLOSED
00-FW-(12-19);
Sand Covering and backfilling Inspection for 8" AQIB
830 CPP-NGCP-CIV-0828 1400095579 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1145 at sta-KP0+150 to KP0+237; HRDH-1145 FL TA843976 5/2/2019 8.10 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(12-19);
8'' F/L HRDH-1145 -1117 Pipe lowering at sta- AQIB
831 CPP-NGCP-CIV-0829 1400095624 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+312 to KP0+512; HRDH-1145 FL TA843976 5/2/2019 8.20 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(25-59);
Trench Bedding Inspection for 8" FL HRDH-
AQIB
832 CPP-NGCP-CIV-0830 1400095588 Civil SATIP-L- 450- 01 SAIC-L-1002 1145 at sta-KP0+312 to KP0+512; HRDH-1145 FL TA843976 5/2/2019 8.25 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(25-59);

Sand Covering and backfilling Inspection for 8" AQIB


833 CPP-NGCP-CIV-0831 1400095626 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1145 at sta-KP0+312 to KP0+512; HRDH-1145 FL TA843976 5/2/2019 8.30 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(25-59);
8'' F/L HRDH-1145 -1117 Pipe lowering at sta-
AQIB
834 CPP-NGCP-CIV-0832 1400095561 Civil SATIP-L-450- 01 SAIC-L-1003 -KP0+512to KP0+737; HRDH-1145 FL TA843976 5/2/2019 8.35 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(25-59);
Trench Bedding Inspection for 8" FL HRDH-
AQIB
835 CPP-NGCP-CIV-0833 1400095580 Civil SATIP-L- 450- 01 SAIC-L-1002 1145at sta-KP0+512to KP0+737; HRDH-1145 FL TA843976 5/2/2019 8.40AM HUSSEIN
Mr. Edgardo CLOSED
00-FW-(25-59);
Sand Covering and backfilling Inspection for 8" AQIB
836 CPP-NGCP-CIV-0834 1400095635 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1145 at sta-KP0+512to KP0+737; HRDH-1145 FL TA843976 5/2/2019 8.45AM HUSSEIN
Mr. Edgardo CLOSED
00-FW-(25-59);
8'' F/L HRDH-1145 -1117 Pipe lowering at sta-
AQIB
837 CPP-NGCP-CIV-0835 1400095632 Civil SATIP-L-450- 01 SAIC-L-1003 -KP0+937 to KP1+037; HRDH-1145 FL TA843976 5/2/2019 8.50AM HUSSEIN
Mr. Edgardo Reject
00-FW-(75-83);
Trench Bedding Inspection for 8" FL HRDH-
AQIB
838 CPP-NGCP-CIV-0836 1400095644 Civil SATIP-L- 450- 01 SAIC-L-1002 1145 at sta-KP0+937 to KP1+037; HRDH-1145 FL TA843976 5/2/2019 8.55 AM HUSSEIN
Mr. Edgardo CLOSED
00-FW-(75-83);
Sand Covering and backfilling Inspection for 8" AQIB
839 CPP-NGCP-CIV-0837 1400095631 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1145 at sta-KP0+937 to KP1+037; HRDH-1145 FL TA843976 5/2/2019 9.00 AM HUSSEIN
Mr. Edgardo CLOSED
00-FW-(75-83);
placement &
compaction Inspection at Hrdh-1189
840 CPP-NGCP-CIV-0838 1400096055 Civil SATIP-A- 114- 01 SAIC-A-1004 wellpad HRDH-1189 BA-911451 5/2/2019 8.00 AM Hameed Ullah Mr. Edgardo CLOSED
extension
3rd layer (General fill 300mm) compaction
841 CPP-NGCP-CIV-0839 1400096065 Civil SATIP-A- 114- 01 SAIC-A-1005 testing inspection at Hrdh-1189 wellpad HRDH-1189 BA-911451 5/2/2019 8.15 AM Hameed Ullah Mr. Edgardo CLOSED
expansion

842 CPP-NGCP-CIV-0840 1400095960 Civil SATIP-A- 114- 01 SAIC-A-1005 Compaction test inspection of 5th layer for HWYH -Gk -RH N/A 5/2/2019 9.00 AM Hameed Ullah Mr. Edgardo CLOSED
Zone
C at HRDH RH-GK Extension

843 CPP-NGCP-CIV-0841 1400096460 Civil SATIP-A- 114- 01 SAIC-A-1001 Zone A Existing ground Material Sampling HRDH 1188 N/A 5/4/2019 9.30 AM Hameed Ullah Mr. Edgardo CLOSED
testing and review of test reports for HRDH
1188

844 CPP-NGCP-CIV-0842 1400096468 Civil SATIP-A- 114- 01 SAIC-A-1001 Zone B Existing ground Material Sampling HRDH 1188 N/A 5/4/2019 10.30 AM Hameed Ullah Mr. Edgardo CLOSED
testing and review of test reports for HRDH
1188

HRDH Borrow Pit#15, stockpile #01,( N-


845 CPP-NGCP-CIV-0843 1400096506 Civil SATIP-A- 114- 01 SAIC-A-1001 2676115.743,E-308855.425) Selectfill RDH Borrow Pit#15, N/A 5/4/2019 9.30 AM Hameed Ullah Mr. Edgardo CLOSED
Material Sampling testing and review of test
reports
HRDH 15,Stockpile #2, (N-2676122.882,E- HRDH 15,Stockpile
846 CPP-NGCP-CIV-0844 1400096507 Civil SATIP-A- 114- 01 SAIC-A-1001 308940.863) General Fill Material Sampling N/A 5/4/2019 11.30 AM Hameed Ullah Mr. Edgardo CLOSED
#2
testing and review of test reports
4th layer (General fill 300mm) Fill placement
848 CPP-NGCP-CIV-0846 1400096448 Civil SATIP-A- 114- 01 SAIC-A-1001 & compaction Inspection at Hrdh-1189 Hrdh-1189 BA-911451 5/4/2019 7.30 AM Hameed Ullah Mr. Edgardo CLOSED
wellpad
4th layerextension
(General fill 300mm) compaction
849 CPP-NGCP-CIV-0847 1400096449 Civil SATIP-A- 114- 01 SAIC-A-1001
testing inspection at Hrdh-1189 wellpad Hrdh-1189 BA-911451 5/4/2019 7.45 AM Hameed Ullah Mr. Edgardo CLOSED
expansion
5th Layer Compaction test Inspection for
850 CPP-NGCP-CIV-0848 1400096517 Civil SATIP-A- 114- 01 SAIC-A-1001 HRDH RH-GK N/A 5/4/2019 7.45 AM Hameed Ullah Mr. Edgardo CLOSED
Zone C at HRDH RH-GK Extension
Compaction testing 2 ND layer 300 mm well AAMIR Mr Abdul
851 CPP-NGCP-CIV-0849 1400096444 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH 1079 N/A 5/4/2019 10.00 AM CLOSED
pad 1079 zone B hwyah SOLANGI Malik

852 CPP-NGCP-CIV-0850 1400097023 Civil SATIP-L-450- 01 SAIC-L-1003 Pipe lowering at HWYH1076 KM0+418 to HWYH-1076 FL TA-445861 5/5/2019 9.05AM
TASEER
Mr. Randy CLOSED
0+834 FW30-46, FW52-64 KHAN
Sand Covering and backfilling Inspection for TASEER
853 CPP-NGCP-CIV-0851 1400096931 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1076 FL TA-445861 5/5/2019 9.15 AM Mr. Randy CLOSED
HWYH1076 KM0+418 to 0+834 KHAN
Compaction testing existing well pad RH CJ AAMIR Mr Abdul RE-SCHEDULE TO 6-
854 CPP-NGCP-CIV-0852 1400097258 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH RH CJ N/A 5/5/2019 9.00 AM CLOSED
zone B and C hwyah SOLANGI Malik MAY-2019
8'' F/L HRDH-1135 -1118 Pipe lowering at sta-
AQIB
855 CPP-NGCP-CIV-0853 1400097064 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+112 to KP0+287; HRDH-1135 FL TA-843650 5/5/2019 8.00 AM
HUSSEIN
Mr. Edgardo CLOSED
00-FW-(09-23);
Trench Bedding Inspection for 8" FL HRDH-
AQIB
856 CPP-NGCP-CIV-0854 1400097039 Civil SATIP-L- 450- 01 SAIC-L-1002 1135 at sta-KP0+112 to KP0+287; HRDH-1135 FL TA-843650 5/5/2019 8.05 AM
HUSSEIN
Mr. Edgardo CLOSED
00-FW-(09-23);

Sand Covering and backfilling Inspection for 8" AQIB


857 CPP-NGCP-CIV-0855 1400097007 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1135 at sta-KP0+112 to KP0+287; HRDH-1135 FL TA-843650 5/5/2019 8.10 AM
HUSSEIN
Mr. Edgardo CLOSED
00-FW-(09-23);
8'' F/L HRDH-1135 -1118 Pipe lowering at sta-
AQIB
858 CPP-NGCP-CIV-0856 1400097075 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+475 to KP0+600; HRDH-1135 FL TA-843650 5/5/2019 8.20 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(38-112);
Trench Bedding Inspection for 8" FL HRDH-
AQIB
859 CPP-NGCP-CIV-0857 1400097045 Civil SATIP-L- 450- 01 SAIC-L-1002 1135 sta-KP0+475 to KP0+600; HRDH-1135 FL TA-843650 5/5/2019 8.25 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(38-112);
Sand Covering and backfilling Inspection for 8" AQIB
860 CPP-NGCP-CIV-0858 1400097008 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1135 at sta-KP0+475 to KP0+600; HRDH-1135 FL TA-843650 5/5/2019 8.30 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(38-112);

8'' F/L HRDH-1135-1118 Pipe lowering at sta-


AQIB
861 CPP-NGCP-CIV-0859 1400097056 Civil SATIP-L-450- 01 SAIC-L-1003 -KP0+600to KP0+800; HRDH-1135 FL TA-843650 5/5/2019 8.35 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(38-112);

Trench Bedding Inspection for 8" FL HRDH-


AQIB
862 CPP-NGCP-CIV-0860 1400097009 Civil SATIP-L- 450- 01 SAIC-L-1002 1135 at sta-KP0+600to KP0+800; HRDH-1135 FL TA-843650 5/5/2019 8.40AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(38-112);

AQIB
863 CPP-NGCP-CIV-0861 1400097066 Civil SATIP-L-450- 01 SAIC-L-1004 Sand Covering and backfilling Inspection for 8" HRDH-1135 FL TA-843650 5/5/2019 8.45AM HUSSEIN
Mr. Edgardo CLOSED
F/L HRDH-1135 at sta-KP0+600to KP0+800;
00-FW-(38-112);

8'' F/L HRDH-1135 -1118 Pipe lowering at sta-


AQIB
864 CPP-NGCP-CIV-0862 1400097077 Civil SATIP-L-450- 01 SAIC-L-1003 -KP0+800 to KP1+000; HRDH-1135 FL TA-843650 5/5/2019 8.50AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(38-112);

Trench Bedding Inspection for 8" FL HRDH-


AQIB
865 CPP-NGCP-CIV-0863 1400097010 Civil SATIP-L- 450- 01 SAIC-L-1002 1135 at sta-KP0+800 to KP1+000; HRDH-1135 FL TA-843650 5/5/2019 8.55 AM HUSSEIN
Mr. Edgardo CLOSED
00-FW-(38-112);

Sand Covering and backfilling Inspection for 8" AQIB


866 CPP-NGCP-CIV-0864 1400097078 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1135 at sta-KP0+800 to KP1+000; HRDH-1135 FL TA-843650 5/5/2019 9.00 AM HUSSEIN
Mr. Edgardo CLOSED
00-FW-(38-112);
8'' F/L HRDH-1135 -1118 Pipe lowering at sta-
AQIB
867 CPP-NGCP-CIV-0865 1400096971 Civil SATIP-L-450- 01 SAIC-L-1003 -KP1+000 to KP1+200; HRDH-1135 FL TA-843650 5/5/2019 9.05AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(38-112);
Trench Bedding Inspection for 8" FL HRDH-
AQIB
868 CPP-NGCP-CIV-0866 1400097031 Civil SATIP-L- 450- 01 SAIC-L-1002 1135 at sta-KP1+000 to KP1+200; HRDH-1135 FL TA-843650 5/5/2019 9.10 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(38-112);
Sand Covering and backfilling Inspection for 8" AQIB
869 CPP-NGCP-CIV-0867 1400097095 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1135 at sta-KP1+000 to KP1+200; HRDH-1135 FL TA-843650 5/5/2019 9.15 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(38-112);
8'' F/L HRDH-1135 -1118 Pipe lowering at sta-
AQIB
870 CPP-NGCP-CIV-0868 1400097032 Civil SATIP-L-450- 01 SAIC-L-1003 -KP1+200 to KP1+400; HRDH-1135 FL TA-843650 5/5/2019 9.20AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(38-112);
Trench Bedding Inspection for 8" FL HRDH-
AQIB
871 CPP-NGCP-CIV-0869 1400097048 Civil SATIP-L- 450- 01 SAIC-L-1002 1135 at sta-KP1+200 to KP1+400; HRDH-1135 FL TA-843650 5/5/2019 9.25 AM HUSSEIN
Mr. Edgardo CLOSED
00-FW-(38-112);
Sand Covering and backfilling Inspection for 8" AQIB
872 CPP-NGCP-CIV-0870 1400097103 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1135 at sta-KP1+200 to KP1+400; HRDH-1135 FL TA-843650 5/5/2019 9.30 AM HUSSEIN
Mr. Edgardo CLOSED
00-FW-(38-112);
5th final layer (General fill 300mm) Fill
873 CPP-NGCP-CIV-0871 1400097440 Civil SATIP-A- 114- 01 SAIC-A-1004 placement & compaction Inspection at HRDH-1189 FL BA-911451 5/5/2019 8.00 AM Hameed Ullah Mr. Edgardo CLOSED
HRDH-1189 Wellpad extension
5th final layer (General fill 300mm)
874 CPP-NGCP-CIV-0872 1400097401 Civil SATIP-A- 114- 01 SAIC-A-1005 compaction testing inspection at Hrdh-1189 HRDH-1189 FL BA-911451 5/5/2019 8.15 AM Hameed Ullah Mr. Edgardo CLOSED
wellpad expansion
Trench excavation and bottom of trench
Inspection for 8''F/L HRDH-1135-HRDH-
875 CPP-NGCP-CIV-0873 1400097441 Civil SATIP-L-450- 01 SAIC-L-1002 1118 from KM-0+174-0+882,0+255- HRDH-1135 FL TA-843650 5/5/2019 9.30 AM Hameed Ullah Mr. Edgardo CLOSED
0+463,0+564-1+400,
1+450-1+647,1+764-1+781 total 1312/1890
meters.
Trench excavation and bottom of trench
Inspection for 8'' F/L HRDH-1118-RH-CK
876 CPP-NGCP-CIV-0874 1400097489 Civil SATIP-L-450- 01 SAIC-L-1002 from KM-0+264-0+324,0+370-1+305,1+342- HRDH-1118 FL TA-843605 5/5/2019 10.00 AM Hameed Ullah Mr. Edgardo CLOSED
2+000,
2+050-2+179 total 1782 /2290 meters
877 CPP-NGCP-CIV-0875 1400097457 Civil SATIP-A- 114- 01 SAIC-A-1002 Material Receiving Inspection at HRDH 1194 HRDH-1194 FL N/A 5/5/2019 10.10 AM Hameed Ullah Mr. Edgardo CLOSED
1st layer fill placement and compaction 
878 CPP-NGCP-CIV-0876 1400097507 Civil SATIP-A- 114- 01 SAIC-L-1004 HRDH-1194 FL N/A 5/5/2019 10.20 AM Hameed Ullah Mr. Edgardo CLOSED
inspection at HRDH 1194
879 CPP-NGCP-CIV-0877 1400097516 Civil SATIP-A- 114- 01 SAIC-A-1005 1st layer compaction test Inspection at  HRDH-1194 FL N/A 5/5/2019 10.30 AM Hameed Ullah Mr. Edgardo CLOSED
HRDH 1194
HRDH BORROW PIT#01 , Stockpile
-10(e309007 N 2697950) Near well 1122 HRDH BORROW
880 CPP-NGCP-CIV-0878 1400098103 Civil SATIP-A- 114- 01 SAIC-A-1001 soil sampling testing and review of test PIT#01 1122 N/A 5/6/2019 10.30 AM Hameed Ullah Mr. Edgardo CLOSED
reports for selectfill Material

Compaction test inspection for hawiyah TASEER Mr.


881 CPP-NGCP-CIV-0879 1400098002 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH RH GK N/A 5/6/2019 10.00 AM CLOSED
RH_GK zone d and e 5th layer KHAN Raymund

882 CPP-NGCP-CIV-0880 1400098057 Civil SATIP-A- 114- 01 SAIC-A-1004 Fill placement and compaction inspection HWYH RH GK N/A 5/6/2019 10.00 AM TASEER Mr. CLOSED
for zone d and e hawiyah RH_GK 5th layer KHAN Raymund

8'' F/L HRDH-1118 -CK Pipe lowering at sta-


AQIB
883 CPP-NGCP-CIV-0881 1400098195 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+364 to KP0+500; HRDH-1118 FL TA-843605 5/6/2019 8.00 AM
HUSSEIN
Mr. Raymund CLOSED
00-FW-(24-96);
Trench Bedding Inspection for 8" FL HRDH-
AQIB
884 CPP-NGCP-CIV-0882 1400098196 Civil SATIP-L- 450- 01 SAIC-L-1002 1118 at sta-KP0+364 to KP0+500; HRDH-1118 FL TA-843605 5/6/2019 8.05 AM Mr. Raymund CLOSED
HUSSEIN
00-FW-(24-96);
Sand Covering and backfilling Inspection for 8" AQIB
885 CPP-NGCP-CIV-0883 1400098184 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1118 at sta-KP0+500 to KP0+700; HRDH-1118 FL TA-843605 5/6/2019 8.10 AM Mr. Raymund CLOSED
HUSSEIN
00-FW-(24-96);
8'' F/L HRDH-1118 -CK Pipe lowering at sta-
AQIB
886 CPP-NGCP-CIV-0884 1400098207 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+500 to KP0+700; HRDH-1118 FL TA-843605 5/6/2019 8.20 AM Mr. Raymund CLOSED
HUSSEIN
00-FW-(24-96);
Trench Bedding Inspection for 8" FL HRDH-
AQIB
887 CPP-NGCP-CIV-0885 1400098186 Civil SATIP-L- 450- 01 SAIC-L-1002 1118 at sta-KP0+500 to KP0+700; HRDH-1118 FL TA-843605 5/6/2019 8.25 AM Mr. Raymund CLOSED
HUSSEIN
00-FW-(24-96);
Sand Covering and backfilling Inspection for 8" AQIB
888 CPP-NGCP-CIV-0886 1400098216 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1118 at sta-KP0+500 to KP0+700; HRDH-1118 FL TA-843605 5/6/2019 8.30 AM Mr. Raymund CLOSED
HUSSEIN
00-FW-(24-96);
8'' F/L HRDH-1118 -CK Pipe lowering at sta-
AQIB
889 CPP-NGCP-CIV-0887 1400098157 Civil SATIP-L-450- 01 SAIC-L-1003 -KP0+700 to KP0+900; HRDH-1118 FL TA-843605 5/6/2019 8.35 AM HUSSEIN
Mr. Raymund CLOSED
00-FW-(24-96);
Trench Bedding Inspection for 8" FL HRDH-
AQIB
890 CPP-NGCP-CIV-0888 1400098234 Civil SATIP-L- 450- 01 SAIC-L-1002 1118 at sta-KP0+700 to KP0+900; HRDH-1118 FL TA-843605 5/6/2019 8.40AM HUSSEIN
Mr. Raymund CLOSED
00-FW-(24-96);

Sand Covering and backfilling Inspection for 8" AQIB


891 CPP-NGCP-CIV-0889 1400098158 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1118 at sta-KP0+700 to KP0+900; HRDH-1118 FL TA-843605 5/6/2019 8.45AM HUSSEIN
Mr. Raymund CLOSED
00-FW-(24-96);
8'' F/L HRDH-1118 -CK Pipe lowering at sta-
AQIB
892 CPP-NGCP-CIV-0890 1400098235 Civil SATIP-L-450- 01 SAIC-L-1003 -KP0+900 to KP1+100; HRDH-1118 FL TA-843605 5/6/2019 8.50AM HUSSEIN
Mr. Raymund CLOSED
00-FW-(24-96);
Trench Bedding Inspection for 8" FL HRDH-
AQIB
893 CPP-NGCP-CIV-0891 1400098237 Civil SATIP-L- 450- 01 SAIC-L-1002 1118 at sta-KP0+900 to KP1+100; HRDH-1118 FL TA-843605 5/6/2019 8.55 AM Mr. Raymund CLOSED
HUSSEIN
00-FW-(24-96);
Sand Covering and backfilling Inspection for 8" AQIB
894 CPP-NGCP-CIV-0892 1400098187 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1118 at sta-KP0+900 to KP1+100; HRDH-1118 FL TA-843605 5/6/2019 9.00 AM Mr. Raymund CLOSED
HUSSEIN
00-FW-(24-96);
8'' F/L HRDH-1118 -CK Pipe lowering at sta-
AQIB
895 CPP-NGCP-CIV-0893 1400098255 Civil SATIP-L-450- 01 SAIC-L-1003 -KP1+100 to KP1+256; HRDH-1118 FL TA-843605 5/6/2019 9.05AM Mr. Raymund CLOSED
HUSSEIN
00-FW-(24-96);
Trench Bedding Inspection for 8" FL HRDH-
AQIB
896 CPP-NGCP-CIV-0894 1400098263 Civil SATIP-L- 450- 01 SAIC-L-1002 1118 at sta-KP1+100 to KP1+256; HRDH-1118 FL TA-843605 5/6/2019 9.10 AM Mr. Raymund CLOSED
HUSSEIN
00-FW-(24-96);
Sand Covering and backfilling Inspection for 8" AQIB
897 CPP-NGCP-CIV-0895 1400098264 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1118 at sta-KP1+100 to KP1+256; HRDH-1118 FL TA-843605 5/6/2019 9.15 AM HUSSEIN
Mr. Raymund CLOSED
00-FW-(24-96);
898 CPP-NGCP-CIV-0896 1400098265 Civil SATIP-A- 114- 01 SAIC-A-1005 Existing ground compaction testing at HRDH-1142 BA-872429 5/6/2019 9.15 AM Hameed Ullah Mr. Edgardo CLOSED
hrdh-1142 wellpad extension
Fill placement and compaction 
899 CPP-NGCP-CIV-0897 1400098239 Civil SATIP-A- 114- 01 SAIC-A-1004 inspection of 25th layer for Zone A HEDH-GK-RH N/A 5/6/2019 9.15 AM Hameed Ullah Mr. Edgardo CLOSED
 at HRDH RH-GK Extension

Material Receiving Inspction for


900 CPP-NGCP-CIV-0898 1400098245 Civil SATIP-A- 114- 01 SAIC-A-1002 HEDH-GK-RH N/A 5/6/2019 9.15 AM Hameed Ullah Mr. Edgardo CLOSED
Selectfill Material at HRDH RH-GK
eXTENSION

Compaction test inspection of 25th layer


901 CPP-NGCP-CIV-0899 1400098190 Civil SATIP-A- 114- 01 SAIC-A-1005 HEDH-GK-RH N/A 5/6/2019 9.15 AM Hameed Ullah Mr. Edgardo CLOSED
for Zone A atHRDH RH-GK Extension

Soil sampling and testing sub base Barrow


AAMIR
902 CPP-NGCP-CIV-0900 1400098218 Civil SATIP-A- 114- 01 SAIC-A-1001 pit no 11 stock pile no 3 well pad RHGK RHGK hwyah N/A 5/6/2019 9.00 AM Mr. Raymund CLOSED
SOLANGI
hwyah

Fill placement and compaction 
903 CPP-NGCP-CIV-0901 1400098791 Civil SATIP-A- 114- 01 SAIC-A-1004 inspection of 7th layer for Zone C HEDH-GK-RH N/A 5/7/2019 9.15 AM Hameed Ullah Mr. Edgardo CLOSED
 at HRDH RH-GK Extension

TASEER
904 CPP-NGCP-CIV-0902 1400098597 Civil SATIP-L- 450- 01 SAIC-L-1002 Trench Bedding Inspection for HWYH1134 HWYH-1134 FL TA-445836 5/7/2019 8.40 AM Mr. Raymund CLOSED
KHAN
KM0+840-870, KM3+030-192

TASEER
905 CPP-NGCP-CIV-0903 1400098643 Civil SATIP-L-450- 01 SAIC-L-1004 Sand Covering and backfilling Inspection for HWYH-1134 FL TA-445836 5/7/2019 8.50 AM Mr. Raymund CLOSED
KHAN
HWYH1134 KM0+840-870, KM3+030-192

AAMIR
906 CPP-NGCP-CIV-0904 1400098575 Civil SATIP-A- 114- 01 SAIC-A-1001 Soil sampling and testing select fill Barrow 1065 hwyah N/A 5/7/2019 9.00 AM Mr. Raymund CLOSED
SOLANGI
pit no 1 stock pile 3 well pad 1065 hwyah
Pipe lowering at HWYH1134 KM0+840- TASEER
907 CPP-NGCP-CIV-0905 1400098883 Civil SATIP-L-450- 01 SAIC-L-1003 870, KM3+030-192 FW150,152,249-252, HWYH1134 TA-445836 5/7/2019 8.30AM KHAN
Mr. Raymund CLOSED
FW260T

AAMIR Mr Abdul
908 CPP-NGCP-CIV-0906 1400099055 Civil SATIP-A- 114- 01 SAIC-A-1005 Compaction testing existing material well HWYH RH CJ N/A 5/8/2019 7.00 AM CLOSED RE-SCHEDULE TO 9-
SOLANGI Malik
pad RH CJ zone A hwyah MAY-2019

AAMIR Mr Abdul
909 CPP-NGCP-CIV-0907 1400099107 Civil SATIP-A- 114- 01 SAIC-A-1005 Compaction testing existing material well HWYH RH CJ N/A 5/8/2019 7.00 AM SOLANGI Malik
CLOSED RE-SCHEDULE TO 9-
pad RHCJ zone D hwyah MAY-2019

TASEER
910 CPP-NGCP-CIV-0908 1400099124 Civil SATIP-A- 114- 01 SAIC-A-1005 Compaction test inspection for hawiyah HWYH RH_GK N/A 5/8/2019 7.00 AM Mr. Raymund CLOSED
KHAN
RH_GK zone A and B 5th layer

TASEER
911 CPP-NGCP-CIV-0909 1400099135 Civil SATIP-A- 114- 01 SAIC-A-1004 Fill placement and compaction inspection for HWYH RH_GK N/A 5/8/2019 7.00 AM Mr. Raymund CLOSED
KHAN
zone A and B hawiyah RH_GK 5th layer

912 CPP-NGCP-CIV-0910 1400099497 Civil SATIP-A- 114- 01 SAIC-A-1002 Material receiving inspection for HRDH-1142 HRDH-1142 N/A 5/8/2019 7.00 AM Hameed Ullah Mr. Edgardo CLOSED
wellpad expansion
8'' F/L HRDH-1117 -GK Pipe lowering at sta- AQIB
913 CPP-NGCP-CIV-0911 1400098981 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+319 to KP0+368; HRDH-1117 FL TA843610 5/8/2019 8.00 AM HUSSEIN
Mr. Edgardo CLOSED
00-FW-(22-26);
Trench Bedding Inspection for 8" FL HRDH- AQIB
914 CPP-NGCP-CIV-0912 1400098982 Civil SATIP-L- 450- 01 SAIC-L-1002 1117 at sta-KP0+319 to KP0+368; HRDH-1117 FL TA843610 5/8/2019 8.05 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(22-26);
Sand Covering and backfilling Inspection for 8" AQIB
915 CPP-NGCP-CIV-0913 1400099066 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1117 at sta-KP0+319 to KP0+368; HRDH-1117 FL TA843610 5/8/2019 8.10 AM HUSSEIN
Mr. Edgardo CLOSED
00-FW-(22-26);
8'' F/L HRDH-1117 -GK Pipe lowering at sta- AQIB
916 CPP-NGCP-CIV-0914 1400099047 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+452 to KP0+702; HRDH-1117 FL TA843610 5/8/2019 8.20 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(33-53);
Trench Bedding Inspection for 8" FL HRDH- AQIB
917 CPP-NGCP-CIV-0915 1400098961 Civil SATIP-L- 450- 01 SAIC-L-1002 1117 at sta-KP0+452 to KP0+702; HRDH-1117 FL TA843610 5/8/2019 8.25 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(33-53);
Sand Covering and backfilling Inspection for 8" AQIB
918 CPP-NGCP-CIV-0916 1400099089 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1117 at sta-KP0+452 to KP0+702; HRDH-1117 FL TA843610 5/8/2019 8.30 AM HUSSEIN
Mr. Edgardo CLOSED
00-FW-(33-53);
8'' F/L HRDH-1117 -GK Pipe lowering at sta- AQIB
919 CPP-NGCP-CIV-0917 1400099080 Civil SATIP-L-450- 01 SAIC-L-1003 -KP0+787 to KP0+987; HRDH-1117 FL TA843610 08-May-19 8.35 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(60-108);
Trench Bedding Inspection for 8" FL HRDH- AQIB
920 CPP-NGCP-CIV-0918 1400099116 Civil SATIP-L- 450- 01 SAIC-L-1002 1117 at sta-KP0+787 to KP0+987; HRDH-1117 FL TA843610 08-May-19 8.40AM HUSSEIN
Mr. Edgardo CLOSED
00-FW-(60-108);
Sand Covering and backfilling Inspection for 8" AQIB
921 CPP-NGCP-CIV-0919 1400099258 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1117 at sta-KP0+787 to KP0+987; HRDH-1117 FL TA843610 08-May-19 8.45AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(60-108);
8'' F/L HRDH-1117 -GK Pipe lowering at sta- AQIB
922 CPP-NGCP-CIV-0920 1400099180 Civil SATIP-L-450- 01 SAIC-L-1003 -KP0+987 to KP1+187; HRDH-1117 FL TA843610 08-May-19 8.50AM HUSSEIN
Mr. Edgardo CLOSED
00-FW-(60-108);
Trench Bedding Inspection for 8" FL HRDH- AQIB
923 CPP-NGCP-CIV-0921 1400099266 Civil SATIP-L- 450- 01 SAIC-L-1002 1117 at sta-KP0+987 to KP1+187; HRDH-1117 FL TA843610 08-May-19 8.55 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(60-108);
Sand Covering and backfilling Inspection for 8" AQIB
924 CPP-NGCP-CIV-0922 1400099267 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1117 at sta-KP0+987 to KP1+187; HRDH-1117 FL TA843610 08-May-19 9.00 AM HUSSEIN
Mr. Edgardo CLOSED
00-FW-(60-108);
8'' F/L HRDH-1117 -GK Pipe lowering at sta- AQIB
925 CPP-NGCP-CIV-0923 1400099275 Civil SATIP-L-450- 01 SAIC-L-1003 -KP1+187 to KP1+385; HRDH-1117 FL TA843610 08-May-19 9.05AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(60-108);
Trench Bedding Inspection for 8" FL HRDH- AQIB
926 CPP-NGCP-CIV-0924 1400099231 Civil SATIP-L- 450- 01 SAIC-L-1002 1117 at sta-KP1+187 to KP1+385; HRDH-1117 FL TA843610 08-May-19 9.10 AM HUSSEIN
Mr. Edgardo CLOSED
00-FW-(60-108);
Sand Covering and backfilling Inspection for 8" AQIB
927 CPP-NGCP-CIV-0925 1400099284 Civil SATIP-L-450- 01 SAIC-L-1004 Through pipe at sta-KP1+187 to KP1+385;
F/L HRDH-1117 HRDH-1117 FL TA843610 08-May-19 9.15 AM Mr. Edgardo CLOSED
HUSSEIN
Trench excavation and bottom of trench
00-FW-(60-108);
Inspection for 8''F/L HRDH-1170-HRDH-919
from KM-0+900 to 1+100,otal 200/1460
928 CPP-NGCP-CIV-0926 1400099479 Civil SATIP-L-450- 01 SAIC-L-1002 meters. HRDH-1170 FL TA-843656 08-May-19 9.30 AM Hameed Ullah Mr. Edgardo CLOSED

1st layer 300mm General fill/marl fill


929 CPP-NGCP-CIV-0927 1400099476 Civil SATIP-A- 114- 01 SAIC-A-1004 placement and compaction inspection in HRDH-1142 BA-872429 08-May-19 10.00 AM Hameed Ullah Mr. Edgardo CLOSED
HRDH-1142 Wellpad expansion
1st layer 300mm General fill/marl
930 CPP-NGCP-CIV-0928 1400099446 Civil SATIP-A- 114- 01 SAIC-A-1005 compaction testing inspection in HRDH- HRDH-1142 BA-872429 08-May-19 10.00 AM Hameed Ullah Mr. Edgardo CLOSED
1142 wellpad expansion

931 CPP-NGCP-CIV-0929 1400099432 Civil SATIP-A- 114- 01 SAIC-A-1006 HRDH-1189 BA-911451 08-May-19 10.00 AM Hameed Ullah Mr. Edgardo CLOSED
Final fill inspection for HRDH-1189
8'' F/L HRDH-1117 -GK Pipe lowering at sta- AQIB
932 CPP-NGCP-CIV-0930 1400099794 Civil SATIP-L-450- 01 SAIC-L-1003 KP1+447 to KP1+782; HRDH-1117 FL TA843610 09-May-19 8.00 AM HUSSEIN
Mr. Edgardo CLOSED
01-FW-(113-140);
Trench Bedding Inspection for 8" FL HRDH- AQIB
933 CPP-NGCP-CIV-0931 1400099815 Civil SATIP-L- 450- 01 SAIC-L-1002 1117 at sta-KP1+447 to KP1+782; HRDH-1117 FL TA843610 09-May-19 8.05 AM HUSSEIN
Mr. Edgardo CLOSED
01-FW-(113-140);
Sand Covering and backfilling Inspection for 8" AQIB
934 CPP-NGCP-CIV-0932 1400099836 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1117 at sta-KP1+447 to KP1+782; HRDH-1117 FL TA843610 09-May-19 8.10 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(113-140);
8'' F/L HRDH-1117 -GK Pipe lowering at sta- AQIB
935 CPP-NGCP-CIV-0933 1400099777 Civil SATIP-L-450- 01 SAIC-L-1003 KP1+806 to KP2+000; HRDH-1117 FL TA843610 09-May-19 8.20 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(142-233);
Trench Bedding Inspection for 8" FL HRDH- AQIB
936 CPP-NGCP-CIV-0934 1400099792 Civil SATIP-L- 450- 01 SAIC-L-1002 1117 at sta-KP1+806 to KP2+000; HRDH-1117 FL TA843610 09-May-19 8.25 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(142-233);
Sand Covering and backfilling Inspection for 8" AQIB
937 CPP-NGCP-CIV-0935 1400099853 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1117 at sta-KP1+806 to KP2+000; HRDH-1117 FL TA843610 09-May-19 8.30 AM HUSSEIN
Mr. Edgardo CLOSED
01-FW-(142-233);
8'' F/L HRDH-1117 -GK Pipe lowering at sta- AQIB
938 CPP-NGCP-CIV-0936 1400099854 Civil SATIP-L-450- 01 SAIC-L-1003 -KP2+000 to KP2+200; HRDH-1117 FL TA843610 09-May-19 8.35 AM HUSSEIN
Mr. Edgardo CLOSED
01-FW-(142-233);
Trench Bedding Inspection for 8" FL HRDH- AQIB
939 CPP-NGCP-CIV-0937 1400099830 Civil SATIP-L- 450- 01 SAIC-L-1002 1117 at sta-KP2+000 to KP2+200; HRDH-1117 FL TA843610 09-May-19 8.40AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(142-233);
Sand Covering and backfilling Inspection for 8" AQIB
940 CPP-NGCP-CIV-0938 1400099874 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1117 at sta-KP2+000 to KP2+200; HRDH-1117 FL TA843610 09-May-19 8.45AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(142-233);
8'' F/L HRDH-1117 -GK Pipe lowering at sta- AQIB
941 CPP-NGCP-CIV-0939 1400099867 Civil SATIP-L-450- 01 SAIC-L-1003 -KP2+200 to KP2+400; HRDH-1117 FL TA843610 09-May-19 8.50AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(142-233);
Trench Bedding Inspection for 8" FL HRDH- AQIB
942 CPP-NGCP-CIV-0940 1400099868 Civil SATIP-L- 450- 01 SAIC-L-1002 1117 at sta-KP2+200 to KP2+400; HRDH-1117 FL TA843610 09-May-19 8.55 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(142-233);
Sand Covering and backfilling Inspection for 8" AQIB
943 CPP-NGCP-CIV-0941 1400099858 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1117 at sta-KP2+200 to KP2+400; HRDH-1117 FL TA843610 09-May-19 9.00 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(142-233);

AQIB
944 CPP-NGCP-CIV-0942 1400099870 Civil SATIP-L-450- 01 SAIC-L-1003 8'' F/L HRDH-1117 -GK Pipe lowering at sta- HRDH-1117 FL TA843610 09-May-19 9.05AM Mr. Edgardo CLOSED
HUSSEIN
-KP2+400 to KP2+600;
01-FW-(142-233);

AQIB
945 CPP-NGCP-CIV-0943 1400099861 Civil SATIP-L- 450- 01 SAIC-L-1002 Trench Bedding Inspection for 8" FL HRDH- HRDH-1117 FL TA843610 09-May-19 9.10 AM HUSSEIN
Mr. Edgardo CLOSED
1117 at sta-KP2+400 to KP2+600;
01-FW-(142-233);

AQIB
946 CPP-NGCP-CIV-0944 1400099779 Civil SATIP-L-450- 01 SAIC-L-1004 Sand Covering and backfilling Inspection for 8" HRDH-1117 FL TA843610 09-May-19 9.15 AM Mr. Edgardo CLOSED
HUSSEIN
F/L HRDH-1117 at sta-KP2+400 to KP2+600;
01-FW-(142-233);

AQIB
947 CPP-NGCP-CIV-0945 1400099889 Civil SATIP-L-450- 01 SAIC-L-1003 8'' F/L HRDH-1117 -GK Pipe lowering at sta- HRDH-1117 FL TA843610 09-May-19 9.20AM Mr. Edgardo CLOSED
HUSSEIN
-KP2+600 to KP2+800;
01-FW-(142-233);

AQIB
948 CPP-NGCP-CIV-0946 1400099801 Civil SATIP-L- 450- 01 SAIC-L-1002 Trench Bedding Inspection for 8" FL HRDH- HRDH-1117 FL TA843610 09-May-19 9.25 AM HUSSEIN
Mr. Edgardo CLOSED
1117 at sta-KP2+600 to KP2+800;
01-FW-(142-233);

AQIB
949 CPP-NGCP-CIV-0947 1400099898 Civil SATIP-L-450- 01 SAIC-L-1004 Sand Covering and backfilling Inspection for 8" HRDH-1117 FL TA843610 09-May-19 9.30 AM Mr. Edgardo CLOSED
HUSSEIN
F/L HRDH-1117 at sta-KP2+600 to KP2+800;
01-FW-(142-233);

AQIB
950 CPP-NGCP-CIV-0948 1400100002 Civil SATIP-L-450- 01 SAIC-L-1003 8'' F/L HRDH-1117 -GK Pipe lowering at sta- HRDH-1117 FL TA843610 09-May-19 9.35AM HUSSEIN
Mr. Edgardo CLOSED
-KP2+800 to KP2+943;
01-FW-(142-233);
Trench Bedding Inspection for 8" FL HRDH- AQIB
951 CPP-NGCP-CIV-0949 1400099981 Civil SATIP-L- 450- 01 SAIC-L-1002 1117 at sta-KP2+800 to KP2+943; HRDH-1117 FL TA843610 09-May-19 9.40 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(142-233);
Sand Covering and backfilling Inspection for 8" AQIB
952 CPP-NGCP-CIV-0950 1400100019 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1117 at sta-KP2+800 to KP2+943; HRDH-1117 FL TA843610 09-May-19 9.45 AM HUSSEIN
Mr. Edgardo CLOSED
01-FW-(142-233);
953 CPP-NGCP-CIV-0951 1400100069 Civil SATIP-A- 114- 01 SAIC-A-1002 Material receiving inspection for HRDH-614 HRDH-614 FL N/A 09-May-19 10.00 AM Hameed Ullah Mr. Edgardo CLOSED
Fill placement and compaction 
954 CPP-NGCP-CIV-0952 1400100077 Civil SATIP-A- 114- 01 SAIC-L-1004 HRDH-614 FL N/A 09-May-19 10.20 AM Hameed Ullah Mr. Edgardo CLOSED
inspectionfor 1st layer at HRDH-614
1st layer compaction test Inspection at 
955 CPP-NGCP-CIV-0953 1400100030 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-614 FL N/A 09-May-19 10.30 AM Hameed Ullah Mr. Edgardo CLOSED
HRDH-614
Trench excavation and preparation Inspection for
956 CPP-NGCP-CIV-0954 1400100139 Civil SATIP-L-450- 01 SAIC-L-1002 16''F/L HRDH -AK to GGM AT Asphalt Road HRDH-AK TA-843960 09-May-19 10.35 AM Hameed Ullah Mr. Edgardo CLOSED
Crossing (Sta-0+792-0+812)
AAMIR Mr Abdul
957 CPP-NGCP-CIV-0955 1400099958 Civil SATIP-A- 114- 01 SAIC-A-1005 Compaction testing 3rd layer 300mm well pad HWYH 1079 N/A 09-May-19 8.00 AM SOLANGI
CLOSED
1079 zone B hwyah Malik
Pipe lowering at HWYH-1055 km0+379- TASEER RE-SCHEDULE TO 12-
958 CPP-NGCP-CIV-0956 1400100806 Civil SATIP-L-450- 01 SAIC-L-1003 HWYH-1055 TA-445993 11-May-19 8.30AM Mr. Raymund CLOSED
930 FW27-45,60T1-72 KHAN MAY-2019
Trench Bedding Inspection for HWYH-1055 TASEER RE-SCHEDULE TO 12-
959 CPP-NGCP-CIV-0957 1400100720 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH-1055 TA-445993 11-May-19 8.40 AM Mr. Raymund CLOSED
km0+379-930 KHAN MAY-2019
Sand Covering and backfilling Inspection for TASEER RE-SCHEDULE TO 12-
960 CPP-NGCP-CIV-0958 1400100721 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1055 TA-445993 11-May-19 8.50 AM KHAN
Mr. Raymund CLOSED
HWYH-1055 km0+379-930 MAY-2019
Compaction test inspection for hawiyah TASEER RE-SCHEDULE TO 12-
961 CPP-NGCP-CIV-0959 1400100884 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH RH_GK N/A 11-May-19 7.00 AM Mr. Raymund CLOSED
RH_GK zone C and F 5th layer KHAN MAY-2019
Fill placement and compaction inspection for TASEER RE-SCHEDULE TO 12-
962 CPP-NGCP-CIV-0960 1400100838 Civil SATIP-A- 114- 01 SAIC-A-1004 HWYH RH_GK N/A 11-May-19 7.00 AM Mr. Raymund CLOSED
zone c and f hawiyah RH_GK 5th layer KHAN MAY-2019
Soil sampling and testing general fill Barrow
AAMIR
963 CPP-NGCP-CIV-0961 1400101272 Civil SATIP-A- 114- 01 SAIC-A-1001 pit no 14 stock pile no 1 near LSS flow line hwyah LSS N/A 12-May-19 9.00 AM SOLANGI
Mr. Raymund CLOSED
hwyah
Soil sampling and testing general fill Barrow AAMIR
964 CPP-NGCP-CIV-0962 1400101494 Civil SATIP-A- 114- 01 SAIC-A-1001 pit no 14 stock pile 2 near LSS flow line hwyah LSS N/A 12-May-19 9.00 AM Mr. Raymund CLOSED
SOLANGI
hwyah
8'' F/L HRDH-1314 -920 Pipe lowering at sta- AQIB
965 CPP-NGCP-CIV-0963 1400101421 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+223 to KP0+456; HRDH-1314 FL TA-843626 12-May-19 8.00 AM HUSSEIN
Mr. Raymund CLOSED
00-FW-(11-30);
Trench Bedding Inspection for 8" FL HRDH- AQIB
966 CPP-NGCP-CIV-0964 1400101474 Civil SATIP-L- 450- 01 SAIC-L-1002 1314 at sta-KP0+223 to KP0+456; HRDH-1314 FL TA-843626 12-May-19 8.05 AM Mr. Raymund CLOSED
HUSSEIN
00-FW-(11-30);
Sand Covering and backfilling Inspection for 8" AQIB
967 CPP-NGCP-CIV-0965 1400101455 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1314 at sta-KP0+223 to KP0+456; HRDH-1314 FL TA-843626 12-May-19 8.10 AM Mr. Raymund CLOSED
HUSSEIN
00-FW-(11-30);
8'' F/L HRDH-1314 -920 Pipe lowering at sta- AQIB
968 CPP-NGCP-CIV-0966 1400101475 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+492 to KP0+665; HRDH-1314 FL TA-843626 12-May-19 8.20 AM Mr. Raymund CLOSED
HUSSEIN
00-FW-(33-47);
Trench Bedding Inspection for 8" FL HRDH- AQIB
969 CPP-NGCP-CIV-0967 1400101456 Civil SATIP-L- 450- 01 SAIC-L-1002 1314 at sta-KP0+492 to KP0+665; HRDH-1314 FL TA-843626 12-May-19 8.25 AM Mr. Raymund CLOSED
HUSSEIN
00-FW-(33-47);
Sand Covering and backfilling Inspection for 8" AQIB
970 CPP-NGCP-CIV-0968 1400101483 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1314 at sta-KP0+492 to KP0+665; HRDH-1314 FL TA-843626 12-May-19 8.30 AM Mr. Raymund CLOSED
HUSSEIN
00-FW-(33-47);
8'' F/L HRDH-1314 -920 Pipe lowering at sta- AQIB
971 CPP-NGCP-CIV-0969 1400101484 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+749 to KP0+887; HRDH-1314 FL TA-843626 12-May-19 8.35 AM HUSSEIN
Mr. Raymund CLOSED
00-FW-(54-65);
Trench Bedding Inspection for 8" FL HRDH- AQIB
972 CPP-NGCP-CIV-0970 1400101438 Civil SATIP-L- 450- 01 SAIC-L-1002 1314 at sta-KP0+749 to KP0+887; HRDH-1314 FL TA-843626 12-May-19 8.40AM HUSSEIN
Mr. Raymund CLOSED
00-FW-(54-65);
Sand Covering and backfilling Inspection for 8" AQIB
973 CPP-NGCP-CIV-0971 1400101464 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1314 at sta-KP0+749 to KP0+887; HRDH-1314 FL TA-843626 12-May-19 8.45AM HUSSEIN
Mr. Raymund CLOSED
00-FW-(54-65);
8'' F/L HRDH-1314 -920 Pipe lowering at sta- AQIB
974 CPP-NGCP-CIV-0972 1400101458 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+923 to KP0+961; HRDH-1314 FL TA-843626 12-May-19 8.50AM HUSSEIN
Mr. Raymund CLOSED
00-FW-(68-71);
Trench Bedding Inspection for 8" FL HRDH- AQIB
975 CPP-NGCP-CIV-0973 1400101476 Civil SATIP-L- 450- 01 SAIC-L-1002 1314 at sta-KP0+923 to KP0+961; HRDH-1314 FL TA-843626 12-May-19 8.55 AM Mr. Raymund CLOSED
HUSSEIN
00-FW-(68-71);
Sand Covering and backfilling Inspection for 8" AQIB
976 CPP-NGCP-CIV-0974 1400101477 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1314 at sta-KP0+923 to KP0+961; HRDH-1314 FL TA-843626 12-May-19 9.00 AM Mr. Raymund CLOSED
HUSSEIN
00-FW-(68-71);

AQIB
977 CPP-NGCP-CIV-0975 1400101460 Civil SATIP-L-450- 01 SAIC-L-1003 HRDH-1314 FL TA-843626 12-May-19 9.05AM Mr. Raymund CLOSED
8'' F/L HRDH-1314 -920 Pipe lowering at sta- HUSSEIN
KP0+997 to KP1+035;
01-FW-(74-77);

AQIB
978 CPP-NGCP-CIV-0976 1400101381 Civil SATIP-L- 450- 01 SAIC-L-1002 HRDH-1314 FL TA-843626 12-May-19 9.10 AM Mr. Raymund CLOSED
HUSSEIN
Trench Bedding Inspection for 8" FL HRDH-
1314 at sta- KP0+997 to KP1+035;
01-FW-(74-77);

AQIB
979 CPP-NGCP-CIV-0977 1400101465 Civil SATIP-L-450- 01 SAIC-L-1004 HRDH-1314 FL TA-843626 12-May-19 9.15 AM HUSSEIN
Mr. Raymund CLOSED
Sand Covering and backfilling Inspection for 8"
F/L HRDH-1314 at sta- KP0+997 to KP1+035;
01-FW-(74-77);

AQIB
980 CPP-NGCP-CIV-0978 1400101462 Civil SATIP-L-450- 01 SAIC-L-1003 HRDH-1314 FL TA-843626 12-May-19 9.20AM Mr. Raymund CLOSED
8'' F/L HRDH-1314 -920 Pipe lowering at sta- HUSSEIN
KP1+120 to KP1+157;
01-FW-(84-87);

AQIB
981 CPP-NGCP-CIV-0979 1400101382 Civil SATIP-L- 450- 01 SAIC-L-1002 HRDH-1314 FL TA-843626 12-May-19 9.25 AM Mr. Raymund CLOSED
Trench Bedding Inspection for 8" FL HRDH- HUSSEIN
1314 at sta-KP1+120 to KP1+157;
01-FW-(84-87);

AQIB
982 CPP-NGCP-CIV-0980 1400101466 Civil SATIP-L-450- 01 SAIC-L-1004 HRDH-1314 FL TA-843626 12-May-19 9.30 AM Mr. Raymund CLOSED
HUSSEIN
Sand Covering and backfilling Inspection for 8"
F/L HRDH-1314 at sta-KP1+120 to KP1+157;
01-FW-(84-87);

983 CPP-NGCP-CIV-0981 1400101141 Civil SATIP-A- 114- 01 SAIC-A-1005 2nd layer Compaction test Inspection HRDH-614 FL N/A 12-May-19 10.00 AM Hameed Ullah Mr. Edgardo CLOSED
at HRDH 614
2nd layer General fill/marl (300mm) fill
984 CPP-NGCP-CIV-0982 1400101960 Civil SATIP-A- 114- 01 SAIC-A-1004 placement and compaction inspection at Hrdh- HRDH-1142 FL BA-872429 13-May-19 10.00 AM Hameed Ullah Mr. Edgardo CLOSED
1142 wellpad extension
985 CPP-NGCP-CIV-0983 1400102012 Civil SATIP-A- 114- 01 SAIC-A-1005 2nd layer General Fill/Marl Compaction testing HRDH-1142 FL BA-872429 13-May-19 10.05 AM Hameed Ullah Mr. Edgardo CLOSED
Inspection at Hrdh-1142 wellpad extension.

986 CPP-NGCP-CIV-0984 1400101967 Civil SATIP-A- 114- 01 SAIC-A-1006 FINAL fill inspection at Hrdh-1144 wellpad HRDH-1144 FL BA-863732 13-May-19 10.10 AM Hameed Ullah Mr. Edgardo CLOSED
extension
Trench bedding and preparation Inspection
987 CPP-NGCP-CIV-0985 1400102149 Civil SATIP-L- 450- 01 SAIC-L-1002
for 16''F/L HRDH -AK to GGM AT Asphalt HRDH-AK TA-843960 13-May-19 8:00 AM
AQIB
Mr. Raymund CLOSED
Road Crossing (Sta-0+792 to 0+812) HUSSEIN
00-FW-(52-53);
16'' F/L HRDH-AK to GGM Pipe lowering
AT Asphalt Road Crossing (Sta-0+792 to AQIB
988 CPP-NGCP-CIV-0986 1400102156 Civil SATIP-L-450- 01 SAIC-L-1003 HRDH-AK TA-843960 13-May-19 8:05 AM Mr. Raymund CLOSED
0+812) HUSSEIN
00-FW-(52-53);
Sand Covering and backfilling Inspection for
16" F/L HRDH-AK, AT Asphalt Road AQIB
989 CPP-NGCP-CIV-0987 1400102100 Civil SATIP-L-450- 01 SAIC-L-1004 HRDH-AK TA-843960 13-May-19 8:10 AM
HUSSEIN
Mr. Raymund CLOSED
Crossing (Sta-0+792 to 0+812)
00-FW-(52-53);
Compaction testing select fill 300 mm station AQIB RE-SCHEDULE TO 14- RE-SCHEDULE TO
990 CPP-NGCP-CIV-0988 1400102221 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-AK TA-843960 13-May-19 10:15 AM Mr. Raymund CLOSED
0+792 to 0+812 HRDH- AK open cut HUSSEIN MAY-2019 15-MAY-2019
991 CPP-NGCP-CIV-0989 1400102122 Civil SATIP-A- 114- 01 SAIC-A-1004
Fill Placement Inspection select fill 300 mm HRDH-AK TA-843960 13-May-19 10:20 AM
AQIB
Mr. Raymund CLOSED RE-SCHEDULE TO 14- RE-SCHEDULE TO
station 0+792 to 0+812 HRDH- AK open cut HUSSEIN MAY-2019 15-MAY-2019
Material receiving inspection for AQIB RE-SCHEDULE TO 14- RE-SCHEDULE TO
992 CPP-NGCP-CIV-0990 1400102234 Civil SATIP-A- 114- 01 SAIC-A-1002 HRDH-AK TA-843960 13-May-19 10:25 AM Mr. Raymund CLOSED
0+792 to 0+812 HRDH- AK open cut HUSSEIN MAY-2019 15-MAY-2019
Pipe lowering at HWYH-1055 km0+781 to TASEER
993 CPP-NGCP-CIV-0991 1400102045 Civil SATIP-L-450- 01 SAIC-L-1003 HWYH-1055 TA-445993 13-May-19 7.10AM Mr. Raymund CLOSED
KM1+806 FW60T1-72, 99-144 KHAN
Trench Bedding Inspection for HWYH-1055 TASEER
994 CPP-NGCP-CIV-0992 1400102035 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH-1055 TA-445993 13-May-19 7.20AM
KHAN
Mr. Raymund CLOSED
km0+781 to KM1+806 FW60T1-72, 99-144
Sand Covering and backfilling Inspection for TASEER
995 CPP-NGCP-CIV-0993 1400102103 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1055 TA-445993 13-May-19 7.30AM Mr. Raymund CLOSED
HWYH-1055 km0+379 to KM1+806 KHAN
AQIB RE-SCHEDULE TO 15-
996 CPP-NGCP-CIV-0994 1400102752 Civil SATIP-L-450- 01 SAIC-L-1003 8'' F/L HRDH-1171 -RH-AK Pipe lowering at sta- KP8+274 FL
HRDH-1171 to KP8+373;
TA843547 14-May-19 6.50 AM HUSSEIN
Mr. Raymund CLOSED
08-FW-(674-682); MAY-2019
Trench Bedding Inspection for 8" FL HRDH-
AQIB
997 CPP-NGCP-CIV-0995 1400102783 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 at sta-KP8+274 to KP8+373; HRDH-1171 FL TA843547 14-May-19 7.00 AM HUSSEIN
Mr. Raymund CLOSED RE-SCHEDULE TO 15-
08-FW-(674-682); MAY-2019
Sand Covering and backfilling Inspection for 8" AQIB
998 CPP-NGCP-CIV-0996 1400102784 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1171 at sta-KP8+274 to KP8+373; HRDH-1171 FL TA843547 14-May-19 7.05 AM HUSSEIN
Mr. Raymund CLOSED RE-SCHEDULE TO 15-
08-FW-(674-682); MAY-2019
8'' F/L HRDH-1171 -RH-AK Pipe lowering at
AQIB
999 CPP-NGCP-CIV-0997 1400102787 Civil SATIP-L-450- 01 SAIC-L-1003 sta-KP8+533 to KP8+595; HRDH-1171 FL TA843547 14-May-19 7.10 AM HUSSEIN
Mr. Raymund CLOSED RE-SCHEDULE TO 15-
;08-FW-(695-700); MAY-2019
Trench Bedding Inspection for 8" FL HRDH-
AQIB
1000 CPP-NGCP-CIV-0998 1400102701 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 at sta-KP8+533 to KP8+595; HRDH-1171 FL TA843547 14-May-19 7.15 AM Mr. Raymund CLOSED RE-SCHEDULE TO 15-
HUSSEIN
;08-FW-(695-700); MAY-2019
Sand Covering and backfilling Inspection for 8"
AQIB
1001 CPP-NGCP-CIV-0999 1400102702 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1171 at sta-KP8+533 to KP8+595; HRDH-1171 FL TA843547 14-May-19 7.20 AM Mr. Raymund CLOSED RE-SCHEDULE TO 15-
HUSSEIN
;08-FW-(695-700); MAY-2019
8'' F/L HRDH-1171 -RH-AK Pipe lowering at
AQIB
1002 CPP-NGCP-CIV-1000 1400102711 Civil SATIP-L-450- 01 SAIC-L-1003 sta- -KP8+728 to KP8+815; HRDH-1171 FL TA843547 14-May-19 7.25 AM Mr. Raymund CLOSED RE-SCHEDULE TO 15-
HUSSEIN
08-FW-(711-718); MAY-2019
Trench Bedding Inspection for 8" FL HRDH-
AQIB
1003 CPP-NGCP-CIV-1001 1400102765 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 at sta-KP8+728 to KP8+815; HRDH-1171 FL TA843547 14-May-19 7.30 AM Mr. Raymund CLOSED RE-SCHEDULE TO 15-
HUSSEIN
08-FW-(711-718); MAY-2019
Sand Covering and backfilling Inspection for 8"
AQIB
1004 CPP-NGCP-CIV-1002 1400102776 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1171 at sta-KP8+728 to KP8+815; HRDH-1171 FL TA843547 14-May-19 7.35 AM HUSSEIN
Mr. Raymund CLOSED RE-SCHEDULE TO 15-
08-FW-(711-718); MAY-2019
8th layer compaction test Inspection for Zone C
1005 CPP-NGCP-CIV-1003 1400102810 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-RH-GK N/A 14-May-19 7.00 AM Hameed Ullah Mr. Edgardo CLOSED
at HRDH-RH-GK Extension
Soil sampling and testing existing material well AAMIR
1006 CPP-NGCP-CIV-1004 1400102352 Civil SATIP-A- 114- 01 SAIC-A-1001 HWYH-1092 N/A 14-May-19 9.00 AM Mr. Raymund CLOSED
pad 1092 hwyah SOLANGI
Soil sampling and testing and review of test
report for HRDH BORROW PIT 16, STOCK
1007 CPP-NGCP-CIV-1005 1400103478 Civil SATIP-A- 114- 01 SAIC-A-1001 HRDH-RH-DK N/A 15-May-19 7.00 AM Hameed Ullah Mr. Edgardo CLOSED
PILE-01(N2697724.625,E306687.928)Select fill
material near RH-DK
9th layer compaction test Inspection for Zone C
1008 CPP-NGCP-CIV-1006 1400103114 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-RH-GK N/A 15-May-19 7.00 AM Hameed Ullah Mr. Edgardo CLOSED
at HRDH RH-GK Extension
Fill placement and compaction inspection for TASEER
1009 CPP-NGCP-CIV-1007 1400103389 Civil SATIP-A- 114- 01 SAIC-A-1004 zone D hawiyah RH_GK 6th layer marl HWYH RH_GK N/A 15-May-19 7.00 AM Mr. Raymund CLOSED
KHAN
material
Compaction test inspection for hawiyah RH_GK TASEER
1010 CPP-NGCP-CIV-1008 1400103407 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH RH_GK N/A 15-May-19 7.00 AM Mr. Raymund CLOSED
zone D a 6th layer marl material KHAN

1011 CPP-NGCP-CIV-1009 1400103815 Civil SATIP-A- 114- 01 SAIC-A-1001 Soil sampling and testing and review of test HRDH 1151 N/A 16-May-19 7.00 AM Hameed Ullah Mr. Edgardo CLOSED
report for HRDH 1151 exisiting ground material
Soil sampling and testing review of test reports AAMIR
1012 CPP-NGCP-CIV-1010 1400104034 Civil SATIP-A- 114- 01 SAIC-A-1001 HWYH-1036 N/A 16-May-19 9.00 AM Mr. Raymund CLOSED
Existing material well pad 1036 hwyah SOLANGI
Soil sampling and testing review of test reports AAMIR
1013 CPP-NGCP-CIV-1011 1400104046 Civil SATIP-A- 114- 01 SAIC-A-1001 General fill Barrow pit no 16 stock pile 2 well HWYH-1071 N/A 16-May-19 9.00 AM Mr. Raymund CLOSED
SOLANGI
pad 1071 hwyah
8'' F/L HRDH-1171 -RH-AK Pipe lowering at
AQIB
1014 CPP-NGCP-CIV-1012 1400104021 Civil SATIP-L-450- 01 SAIC-L-1003 sta- KP2+441 to KP2+705; HRDH-1171 FL TA843547 16-May-19 7.50 AM Mr. Raymund CLOSED
HUSSEIN
02-FW-(196-218);

Trench Bedding Inspection for 8" FL HRDH-


AQIB
1015 CPP-NGCP-CIV-1013 1400104072 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 at sta-KP2+441 to KP2+705; HRDH-1171 FL TA843547 16-May-19 8.00 AM Mr. Raymund CLOSED
HUSSEIN
02-FW-(196-218);

AQIB
1016 CPP-NGCP-CIV-1014 1400103991 Civil SATIP-L-450- 01 SAIC-L-1004 Sand Covering and backfilling Inspection for 8" HRDH-1171 FL TA843547 16-May-19 8.05 AM Mr. Raymund CLOSED
HUSSEIN
F/L HRDH-1171 at sta-KP2+441 to KP2+705;
02-FW-(196-218);

8'' F/L HRDH-1171 -RH-AK Pipe lowering at


AQIB
1017 CPP-NGCP-CIV-1015 1400104086 Civil SATIP-L-450- 01 SAIC-L-1003 sta-KP2+897 to KP3+097; HRDH-1171 FL TA843547 16-May-19 8.10 AM Mr. Raymund CLOSED
HUSSEIN
03-FW-(234-261);

Trench Bedding Inspection for 8" FL HRDH-


AQIB
1018 CPP-NGCP-CIV-1016 1400104051 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 at sta-KP2+897 to KP3+097; HRDH-1171 FL TA843547 16-May-19 8.15 AM Mr. Raymund CLOSED
HUSSEIN
03-FW-(234-261);

Sand Covering and backfilling Inspection for 8"


AQIB
1019 CPP-NGCP-CIV-1017 1400104123 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1171 at sta-KP2+897 to KP3+097; HRDH-1171 FL TA843547 16-May-19 8.20 AM Mr. Raymund CLOSED
HUSSEIN
03-FW-(234-261);

8'' F/L HRDH-1171 -RH-AK Pipe lowering at


AQIB
1020 CPP-NGCP-CIV-1018 1400103992 Civil SATIP-L-450- 01 SAIC-L-1003 sta- -KP3+097 to KP3+228; HRDH-1171 FL TA843547 16-May-19 8.25 AM HUSSEIN
Mr. Raymund CLOSED
03-FW-(234-261);
Trench Bedding Inspection for 8" FL HRDH-
AQIB
1021 CPP-NGCP-CIV-1019 1400104052 Civil SATIP-L- 450- 01 SAIC-L-1002 1171 at sta-KP3+097 to KP3+228; HRDH-1171 FL TA843547 16-May-19 8.30 AM HUSSEIN
Mr. Raymund CLOSED
03-FW-(234-261);
Sand Covering and backfilling Inspection for 8"
AQIB
1022 CPP-NGCP-CIV-1020 1400104095 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1171 at sta-KP3+097 to KP3+228; HRDH-1171 FL TA843547 16-May-19 8.35 AM HUSSEIN
Mr. Raymund CLOSED
03-FW-(234-261);
compaction test of base course inspection for 16"
AQIB
1023 CPP-NGCP-CIV-1021 1400104108 Civil SATIP-Q- 006- 02 SAIC-A-1005 FL HRDH-AK RH-AK at road crossing (open HRDH-AK TA-843960 16-May-19 7.40 AM Mr. Raymund CLOSED
HUSSEIN
cut)
26th layer Compaction test Inspection for Zone A
1024 CPP-NGCP-CIV-1022 1400104090 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-GK-RH N/A 16-May-19 10.00 AM Hameed Ullah Mr. Edgardo CLOSED
Part 1 at HRDH RH-GK Extension
3rd layer General fill/marl (300mm) fill
1025 CPP-NGCP-CIV-1023 1400104173 Civil SATIP-A- 114- 01 SAIC-A-1004 placement and compaction inspection at HRDH- HRDH-1142 BA-872429 16-May-19 10.10 AM Hameed Ullah Mr. Edgardo CLOSED
1142 wellpad extension
3rd layer General Fill/Marl Compaction testing
1026 CPP-NGCP-CIV-1024 1400104119 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1142 BA-872429 16-May-19 10.20 AM Hameed Ullah Mr. Edgardo CLOSED
Inspection at HRDH-1142 wellpad extension.
Soil sampling testing and review of test
reports for (Selectfill Material) HRDH
1027 CPP-NGCP-CIV-1025 1400105484 Civil SATIP-A- 114- 01 SAIC-A-1001 Borrow Pit #16, stockpile#01, HRDH- 1151 FL N/A 19-May-19 9.40 AM Hameed Ullah Mr. Edgardo CLOSED
(N-2684462.810,E-304516.104) Near Wellpad
HRDH -1151
Concrete Testing & Final Acceptance Inspection
(CPP Precast Yard
of 28 days Compressive strenght of site and lab
Haradh)
1028 CPP-NGCP-CIV-1026 1400104219 Civil SATIP-Q- 001- 02 SAIC-Q-1017 cured samples of Pipe Support PS-06 TA-725674 5/16/2019 11:00:00 AM Talal Shabbir Mr. Edgar CLOSED
(Osaimi Lab
Foundations Footings =16 Nos casted on 18-
Khobar)
April-2019 @ CPP Precast Yard Haradh

Concrete Testing & Final Acceptance Inspection


(CPP Precast Yard
of 28 days Compressive strenght of site and lab
Haradh)
1029 CPP-NGCP-CIV-1027 1400104256 Civil SATIP-Q- 001- 02 SAIC-Q-1017 cured samples of Pipe Support PS-06
(Osaimi Lab
TA-725674 5/18/2019 11:00:00 AM Talal Shabbir Mr.Edgar CLOSED
Foundations Footings=34 Nos Casted on 20-
Khobar)
April-2019 @ CPP Precast Yard Haradh
Pipe lowering at HWYH-1071 KM0+100 to
TASEER
1030 CPP-NGCP-CIV-1028 1400104638 Civil SATIP-L-450- 01 SAIC-L-1003 KM0+800 FW10-13A1,FW25-30 FW32-38, HWYH1071 TA-445830 5/18/2019 7.30AM
KHAN
Mr. Raymund CLOSED
FW45-51
Trench Bedding Inspection for HWYH-1071
TASEER
1031 CPP-NGCP-CIV-1029 1400104659 Civil SATIP-L- 450- 01 SAIC-L-1002 KM0+100 to KM0+800 FW10-13A1,FW25-30 HWYH1071 TA-445830 5/18/2019 7.40 AM
KHAN
Mr. Raymund CLOSED
FW32-38, FW45-51
Sand Covering and backfilling Inspection for TASEER
1032 CPP-NGCP-CIV-1030 1400104639 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH1071 TA-445830 5/18/2019 7.50 AM Mr. Raymund CLOSED
HWYH-1071 KM0+100 to KM0+800 KHAN
Fill placement and compaction inspection for TASEER
1033 CPP-NGCP-CIV-1031 1400104661 Civil SATIP-A- 114- 01 SAIC-A-1004 HWYH RH_GK N/A 5/18/2019 7.00 AM Mr. Raymund CLOSED
zone A hawiyah RH_GK 6th layer marl material KHAN
Compaction test inspection for hawiyah RH_GK TASEER
1034 CPP-NGCP-CIV-1032 1400104641 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH RH_GK N/A 5/18/2019 7.00 AM Mr. Raymund CLOSED
zone A 6th layer marl material KHAN
Fill placement and compaction inspection for TASEER
1035 CPP-NGCP-CIV-1033 1400104705 Civil SATIP-A- 114- 01 SAIC-A-1004 HWYH RH_GK N/A 5/18/2019 7.00 AM Mr. Raymund CLOSED
zone E hawiyah RH_GK 6th layer marl material KHAN
Compaction test inspection for hawiyah RH_GK TASEER
1036 CPP-NGCP-CIV-1034 1400104707 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH RH_GK N/A 5/18/2019 7.00 AM Mr. Raymund CLOSED
zone E 6th layer marl material KHAN
Prime coating and tack coating inspection for
1037 CPP-NGCP-CIV-1035 1400104674 Civil SATIP-Q- 006- 02 SAIC-Q-1041 HRDH-AK, Asphalt road (open cut) STA:-0+792 HRDH-AK TA-843960 5/18/2019 09.00 AM AQIB
Mr. Edgardo CLOSED
RE-SCHEDULE TO 19-
HUSSEIN MAY-2019
TO 0+812
Conventional Asphalt & Sulfur Extended Asphalt
AQIB
1038 CPP-NGCP-CIV-1036 1400104636 Civil SATIP-Q- 006- 02 SAIC-Q-1061 Concrete Receiving, Placement and Testing HRDH-AK TA-843960 5/18/2019 09.10 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 19-
HUSSEIN
Inspection STA:-0+792 TO 0+812 MAY-2019

Soil sampling and testing review of test reports


AAMIR
1039 CPP-NGCP-CIV-1037 1400105423 Civil SATIP-A- 114- 01 SAIC-A-1001 General fill Barrow pit 10 stock pile 4 well pad HWYH- RH-CJ N/A 5/19/2019 9.00 AM Mr. Raymund CLOSED
SOLANGI
RH-CJ hwyah

Soil sampling and testing review of test reports


AAMIR
1040 CPP-NGCP-CIV-1038 1400105301 Civil SATIP-A- 114- 01 SAIC-A-1001 General fill Barrow pit no 10 stock pile 5 well pad HWYH- RH-CJ N/A 5/19/2019 9.00 AM
SOLANGI
Mr. Raymund CLOSED
RHCJ hwyah

8'' F/L HRDH-1309 -918 Pipe lowering at sta-


AQIB
1041 CPP-NGCP-CIV-1039 1400105407 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+331 to KP0+630; HRDH-1309 FL TA843624 5/19/2019 7.50 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(20-44);
Trench Bedding Inspection for 8" FL HRDH-1309
AQIB
1042 CPP-NGCP-CIV-1040 1400105408 Civil SATIP-L- 450- 01 SAIC-L-1002 at sta-KP0+331 to KP0+630; HRDH-1309 FL TA843624 5/19/2019 8.00 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(20-44);
Sand Covering and backfilling Inspection for 8"
AQIB
1043 CPP-NGCP-CIV-1041 1400105302 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1309 at sta-KP0+331 to KP0+630; HRDH-1309 FL TA843624 5/19/2019 8.05 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(20-44);
8'' F/L HRDH-1309 -918 Pipe lowering at sta-
AQIB
1044 CPP-NGCP-CIV-1042 1400105424 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+751 to KP0+813; HRDH-1309 FL TA843624 5/19/2019 8.10 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(54-59);
Trench Bedding Inspection for 8" FL HRDH-1309
AQIB
1045 CPP-NGCP-CIV-1043 1400105425 Civil SATIP-L- 450- 01 SAIC-L-1002 at sta-KP0+751 to KP0+813; HRDH-1309 FL TA843624 5/19/2019 8.15 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(54-59);
Sand Covering and backfilling Inspection for 8"
AQIB
1046 CPP-NGCP-CIV-1044 1400105377 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1309 at sta-KP0+751 to KP0+813; HRDH-1309 FL TA843624 5/19/2019 8.20 AM
HUSSEIN
Mr. Edgardo CLOSED
00-FW-(54-59);
8'' F/L HRDH-1309 -918 Pipe lowering at sta-
AQIB
1047 CPP-NGCP-CIV-1045 1400105433 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+860 to KP0+910; HRDH-1309 FL TA843624 5/19/2019 8.25 AM
HUSSEIN
Mr. Edgardo CLOSED
00-FW-(63-67);

Trench Bedding Inspection for 8" FL HRDH-1309


AQIB
1048 CPP-NGCP-CIV-1046 1400105434 Civil SATIP-L- 450- 01 SAIC-L-1002 at sta-KP0+860 to KP0+910; HRDH-1309 FL TA843624 5/19/2019 8.30 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(63-67);

Sand Covering and backfilling Inspection for 8"


AQIB
1049 CPP-NGCP-CIV-1047 1400105386 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1309 at sta-KP0+860 to KP0+910; HRDH-1309 FL TA843624 5/19/2019 8.35 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(63-67);

8'' F/L HRDH-1309 -918 Pipe lowering at sta-


AQIB
1050 CPP-NGCP-CIV-1048 1400105443 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+946 to KP0+983; HRDH-1309 FL TA843624 5/19/2019 8.40 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(70-73);

Trench Bedding Inspection for 8" FL HRDH-1309


AQIB
1051 CPP-NGCP-CIV-1049 1400105435 Civil SATIP-L- 450- 01 SAIC-L-1002 at sta-KP0+946 to KP0+983; HRDH-1309 FL TA843624 5/19/2019 8.45 AM
HUSSEIN
Mr. Edgardo CLOSED
00-FW-(70-73);

Sand Covering and backfilling Inspection for 8"


AQIB
1052 CPP-NGCP-CIV-1050 1400105429 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1309 at sta-KP0+946 to KP0+983; HRDH-1309 FL TA843624 5/19/2019 8.50 AM
HUSSEIN
Mr. Edgardo CLOSED
00-FW-(70-73);
8'' F/L HRDH-1309 -918 Pipe lowering at sta-
AQIB
1053 CPP-NGCP-CIV-1051 1400105431 Civil SATIP-L-450- 01 SAIC-L-1003 KP1+055 to KP1+080; HRDH-1309 FL TA843624 5/19/2019 8.55 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(79-81);
Trench Bedding Inspection for 8" FL HRDH-1309
AQIB
1054 CPP-NGCP-CIV-1052 1400105430 Civil SATIP-L- 450- 01 SAIC-L-1002 at sta-KP1+055 to KP1+080; HRDH-1309 FL TA843624 5/19/2019 9.00 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(79-81);
Sand Covering and backfilling Inspection for 8"
AQIB
1055 CPP-NGCP-CIV-1053 1400105411 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1309at sta-KP1+055 to KP1+080; HRDH-1309 FL TA843624 5/19/2019 9.05 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(79-81);
8'' F/L HRDH-1309 -918 Pipe lowering at sta-
AQIB
1056 CPP-NGCP-CIV-1054 1400105417 Civil SATIP-L-450- 01 SAIC-L-1003 KP1+116 to KP1+214; HRDH-1309 FL TA843624 5/19/2019 9.10 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(84-92);
Trench Bedding Inspection for 8" FL HRDH-1309
AQIB
1057 CPP-NGCP-CIV-1055 1400105453 Civil SATIP-L- 450- 01 SAIC-L-1002 at sta-KP1+116 to KP1+214; HRDH-1309 FL TA843624 5/19/2019 9.15 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(84-92);
Sand Covering and backfilling Inspection for 8"
AQIB
1058 CPP-NGCP-CIV-1056 1400105418 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1309at sta-KP1+116 to KP1+214; HRDH-1309 FL TA843624 5/19/2019 9.20 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(84-92);
Compaction test inspection of 26th layer
1059 CPP-NGCP-CIV-1057 1400105474 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-GK-RH N/A 5/19/2019 9.30 AM Hameed Ullah Mr. Edgardo CLOSED
for Zone A Part 2 at HRDH RH-GK Extension
4th layer General fill/marl (300mm) fill placement
1060 CPP-NGCP-CIV-1058 1400105485 Civil SATIP-A- 114- 01 SAIC-A-1004 and compaction inspection at HRDH-1142 HRDH-1142 FL BA-872429 5/19/2019 10.30 AM Hameed Ullah Mr. Edgardo CLOSED
wellpad extension
4th layer General Fill/Marl Compaction testing
1061 CPP-NGCP-CIV-1059 1400105493 Civil SATIP-A- 114- 01 SAIC-A-1005
Inspection at Hrdh-1142 wellpad extension.
HRDH-1142 FL BA-872429 5/19/2019 10.45 AM Hameed Ullah Mr. Edgardo CLOSED

Soil Sampling testing and review of chemical test


reports for Selectfill Material (HRDH Borrow pit
1062 CPP-NGCP-CIV-1060 1400105621 Civil SATIP-A- 114- 01 SAIC-A-1001
16,stockpile #1 N-2697724.625, E-306687.925)
HRDH-RH-DK N/A 5/20/2019 10.45 AM Hameed Ullah Mr. Edgardo CLOSED
near RH-DK
Soil Sampling testing and review of chemical test
reports for Selectfill Material (HRDH-Borrow pit
1063 CPP-NGCP-CIV-1061 1400105703 Civil SATIP-A- 114- 01 SAIC-A-1001 HRDH 1122 N/A 5/20/2019 10.45 AM Hameed Ullah Mr. Edgardo CLOSED
01,stockpile #10, N2697950. 00,E-309007.00)
Near HRDH 1122
8'' F/L HRDH-1063 -RH-AK Pipe lowering at
AQIB
1064 CPP-NGCP-CIV-1062 1400106199 Civil SATIP-L-450- 01 SAIC-L-1003 sta- KP1+206 to KP1+240; HRDH-1063 FL TA-843953 5/20/2019 8.00 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 21-
HUSSEIN
01-FW-(91T-93); MAY-2019
Trench Bedding Inspection for 8" FL HRDH-1063
AQIB
1065 CPP-NGCP-CIV-1063 1400106165 Civil SATIP-L- 450- 01 SAIC-L-1002 sta- KP1+206 to KP1+240; HRDH-1063 FL TA-843953 5/20/2019 8.05 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 21-
HUSSEIN
01-FW-(91T-93); MAY-2019
Sand Covering and backfilling Inspection for 8"
AQIB
1066 CPP-NGCP-CIV-1064 1400106139 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1063-sta- KP1+206 to KP1+240; HRDH-1063 FL TA-843953 5/20/2019 8.10 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 21-
HUSSEIN
01-FW-(91T-93); MAY-2019
8'' F/L HRDH-1063 -RH-AK Pipe lowering at
AQIB
1067 CPP-NGCP-CIV-1065 1400106181 Civil SATIP-L-450- 01 SAIC-L-1003 sta- KP1+290 to KP1+366; HRDH-1063 FL TA-843953 5/20/2019 8.15 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 21-
HUSSEIN
01-FW-(97-103); MAY-2019
Trench Bedding Inspection for 8" FL HRDH-
AQIB
1068 CPP-NGCP-CIV-1066 1400106167 Civil SATIP-L- 450- 01 SAIC-L-1002 1063sta-KP1+290 to KP1+366; HRDH-1063 FL TA-843953 5/20/2019 8.20 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 21-
HUSSEIN
01-FW-(97-103); MAY-2019
Sand Covering and backfilling Inspection for 8"
AQIB
1069 CPP-NGCP-CIV-1067 1400106178 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1063-sta-KP1+290 to KP1+366; HRDH-1063 FL TA-843953 5/20/2019 8.25 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 21-
HUSSEIN
01-FW-(97-103); MAY-2019
8'' F/L HRDH-1063 -RH-AK Pipe lowering at
AQIB
1070 CPP-NGCP-CIV-1068 1400106184 Civil SATIP-L-450- 01 SAIC-L-1003 sta- KP1+540 to KP1+663; HRDH-1063 FL TA-843953 5/20/2019 8.30 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 21-
HUSSEIN
01-FW-(117-127); MAY-2019
Trench Bedding Inspection for 8" FL HRDH-1063
AQIB
1071 CPP-NGCP-CIV-1069 1400106168 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP1+540 to KP1+663; HRDH-1063 FL TA-843953 5/20/2019 8.35 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 21-
HUSSEIN
01-FW-(117-127); MAY-2019
Sand Covering and backfilling Inspection for 8"
AQIB
1072 CPP-NGCP-CIV-1070 1400106169 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1063-sta-KP1+540 to KP1+663; HRDH-1063 FL TA-843953 5/20/2019 8.40 AM Mr. Edgardo CLOSED Accepted RE-SCHEDULE TO 21-
HUSSEIN
01-FW-(117-127); MAY-2019
Fill placement and compaction inspection for TASEER
1073 CPP-NGCP-CIV-1071 1400105962 Civil SATIP-A- 114- 01 SAIC-A-1004 HWYH RH_GK N/A 5/20/2019 7.00 AM Mr. Raymund CLOSED
zone B hawiyah RH_GK 6th layer marl material KHAN
Compaction test inspection for hawiyah RH_GK TASEER
1074 CPP-NGCP-CIV-1072 1400105999 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH RH_GK N/A 5/20/2019 7.00 AM Mr. Raymund CLOSED
zone B 6th layer marl material KHAN
Soil sampling and testing review of test reports
AAMIR
1075 CPP-NGCP-CIV-1073 1400106049 Civil SATIP-A- 114- 01 SAIC-A-1001 select fill Barrow pit 17 stock pile 1 Well pad HWYH 1092 N/A 5/20/2019 9.00 AM Mr. Raymund CLOSED
SOLANGI
1092 hwyah

Fill placement and compaction inspaction 1st AAMIR Mr Abdul


1076 CPP-NGCP-CIV-1074 1400106074 Civil SATIP-A- 114- 01 SAIC-A-1004 HWYH RH CJ N/A 5/20/2019 7.00 AM CLOSED
layer well pad RHCJ zone C hwyah SOLANGI Malik

Material receiving inspaction select fill 1st layer AAMIR Mr Abdul


1077 CPP-NGCP-CIV-1075 1400106075 Civil SATIP-A- 114- 01 SAIC-A-1002 HWYH-RHCJ N/A 5/20/2019 6.00 AM CLOSED
well pad RHCJ zone C hwyah SOLANGI Malik

Compaction testing 1st layer 300mm well pad AAMIR Mr Abdul


1078 CPP-NGCP-CIV-1076 1400106103 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH RHCJ N/A 5/20/2019 8.00 AM CLOSED
RHCJ zone C hwyah SOLANGI Malik
Pipe lowering at HWYH-1071 KM1+520 to TASEER
1079 CPP-NGCP-CIV-1077 1400106158 Civil SATIP-L-450- 01 SAIC-L-1003 HWYH1071 TA-445830 5/20/2019 7.30AM Mr. Raymund CLOSED
KM1+760 FW111-130 KHAN
Trench Bedding Inspection for HWYH-1071 TASEER
1080 CPP-NGCP-CIV-1078 1400106235 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH1071 TA-445830 5/20/2019 7.40 AM Mr. Raymund CLOSED
KM1+520 to KM1+760 FW111-130 KHAN
Sand Covering and backfilling Inspection for TASEER
1081 CPP-NGCP-CIV-1079 1400106171 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH1071 TA-445830 5/20/2019 7.50 AM Mr. Raymund CLOSED
HWYH-1071 KM1+520 to KM1+760 KHAN
10th layer compaction test Inspection for Zonr RE-SCHEDULE TO 22-
1082 CPP-NGCP-CIV-1080 1400106877 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-GK-RH N/A 5/21/2019 9.30 AM Hameed Ullah Mr. Edgardo CLOSED
C at HRDH RH-GK Extension MAY-2019
Anchor bolt assembly Receiving inspection as
per delivery Note#165976 for Foundations
1083 CPP-NGCP-CIV-1081 1400106878 Civil SATIP-Q- 001- 02 SAIC-M-2021 TCF-1 N/A 5/21/2019 9.30 AM Hameed Ullah Mr. Edgardo CLOSED
(PS-04,PS-05,PS-06) AT CPP YARD STORAGE
TCF-1
Bottom trench excavation inspection for thurst
TASEER
1084 CPP-NGCP-CIV-1082 1400106847 Civil SATIP-L- 450- 01 SAIC-L-1002 Boring at hawiyah 975 HWYH 975 TA-446045 5/21/2019 6.30 AM Mr. Raymund CLOSED
KHAN
Km 0+530.05 to 0+749.65
Bottom trench excavation inspection for hawiyah
TASEER
1085 CPP-NGCP-CIV-1083 1400106809 Civil SATIP-L- 450- 01 SAIC-L-1002 975 HWYH 975 TA-446045 5/21/2019 7.00 AM
KHAN
Mr. Raymund CLOSED
Km 0+749.65
Bottom trench to 1+754 inspection for hawiyah
excavation TASEER
1086 CPP-NGCP-CIV-1084 1400106818 Civil SATIP-L- 450- 01 SAIC-L-1002 975 HWYH 975 TA-446045 5/21/2019 7.30 AM
KHAN
Mr. Raymund CLOSED
Km 1+754
Trench to 3+360and bottom of Tranch
excavation
AAMIR Mr. Abdul
1087 CPP-NGCP-CIV-1085 1400106859 Civil SATIP-L- 450- 01 SAIC-L-1002 inspaction station (0+422 to 0+805) 36" TR/L1 HWYH GGM TR/L1 N/A 5/21/2019 6.30 AM
SOLANGI Malik
CLOSED
GGM Hwyah
Trench excavation and bottom trunch inspaction AAMIR Mr. Abdul
1088 CPP-NGCP-CIV-1086 1400106889 Civil SATIP-L- 450- 01 SAIC-L-1002
station (0+492 to 0+833) 36"TR/L2 GGM Hwyah
HWYH GGM TR/L2 N/A 5/21/2019 7.00 AM
SOLANGI Malik
CLOSED
Tranch excavation and bottom of Tranch
AAMIR Mr. Abdul
1089 CPP-NGCP-CIV-1087 1400106916 Civil SATIP-L- 450- 01 SAIC-L-1002 inspaction station (0+487 to 0+830) 24" TR/L1 HWYH GGM TR/L1 N/A 5/21/2019 7.30 AM CLOSED
SOLANGI Malik
GGM Hwyah
Compaction testing 2nd layer 300mm well pad AAMIR Mr Abdul
1090 CPP-NGCP-CIV-1088 1400106917 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH RHCJ N/A 5/21/2019 8.00 AM CLOSED
RHCJ zone C hwyah SOLANGI Malik
Soil sampling and testing review of test reports
1091 CPP-NGCP-CIV-1089 1400106929 Civil SATIP-A- 114- 01 SAIC-A-1001 HWYH RH Ck N/A 5/21/2019 9.00 AM Christan Mr. Raymund CLOSED
Existing ground well pad RH Ck hwyah
Soil sampling and testing review of test reports
HRDH BORROW #PIT 18 Stock pile 1 (N-
1092 CPP-NGCP-CIV-1090 1400107183 Civil SATIP-A- 114- 01 SAIC-A-1001 HRDH-1122 N/A 5/22/2019 9.00 AM Hameed Ullah Mr. Edgardo CLOSED
2697908.850 , E-309158.100)Sub base material
class A near HRDH-1122
Pipe lowering at HWYH-1076 km0+418 to
TASEER
1093 CPP-NGCP-CIV-1091 1400107564 Civil SATIP-L-450- 01 SAIC-L-1003 km1+527 fw30-46, fw52-64, fw71-109, fw114- HWYH1076 TA-445861 5/22/2019 7.30AM Mr. Raymund CLOSED
120 KHAN
Trench Bedding Inspection for HWYH-1076
TASEER
1094 CPP-NGCP-CIV-1092 1400107596 Civil SATIP-L- 450- 01 SAIC-L-1002 km0+418 to km1+527 fw30-46, fw52-64, fw71- HWYH1076 TA-445861 5/22/2019 7.40 AM Mr. Raymund CLOSED
KHAN
109, fw114-120
Sand Covering and backfilling Inspection for TASEER
1095 CPP-NGCP-CIV-1093 1400107584 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH1076 TA-445861 5/22/2019 7.50 AM Mr. Raymund CLOSED
HWYH-1076 km0+418 to km1+527 KHAN
8'' F/L HRDH-1194 -614 Pipe lowering at sta-
AQIB
1096 CPP-NGCP-CIV-1094 1400107562 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+367 to KP0+525; HRDH-1194 FL TA-843652 5/22/2019 7.00 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(23-36);
Trench Bedding Inspection for 8" FL HRDH-1194
AQIB
1097 CPP-NGCP-CIV-1095 1400107574 Civil SATIP-L- 450- 01 SAIC-L-1002 sta- KP0+367 to KP0+525; HRDH-1194 FL TA-843652 5/22/2019 7.05 AM
HUSSEIN
Mr. Edgardo CLOSED
00-FW-(23-36);
Sand Covering and backfilling Inspection for 8"
AQIB
1098 CPP-NGCP-CIV-1096 1400107613 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1194-sta- KP0+367 to KP0+525; HRDH-1194 FL TA-843652 5/22/2019 7.10 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(23-36);
8'' F/L HRDH-1194 -614 Pipe lowering at sta-
AQIB
1099 CPP-NGCP-CIV-1097 1400107597 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+586 to KP0+795; HRDH-1194 FL TA-843652 5/22/2019 7.15 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(41-58);
Trench Bedding Inspection for 8" FL HRDH-1194
AQIB
1100 CPP-NGCP-CIV-1098 1400107539 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP0+586 to KP0+795; HRDH-1194 FL TA-843652 5/22/2019 7.20 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(41-58);
Sand Covering and backfilling Inspection for 8"
AQIB
1101 CPP-NGCP-CIV-1099 1400107598 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1194-sta-KP0+586 to KP0+795; HRDH-1194 FL TA-843652 5/22/2019 7.25 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(41-58);
8'' F/L HRDH-1194 -614 Pipe lowering at sta-
AQIB
1102 CPP-NGCP-CIV-1100 1400107566 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+976 to KP1+221; HRDH-1194 FL TA-843652 5/22/2019 7.30 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(73-93);
Trench Bedding Inspection for 8" FL HRDH-1194
AQIB
1103 CPP-NGCP-CIV-1101 1400107605 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP0+976 to KP1+221; HRDH-1194 FL TA-843652 5/22/2019 7.35 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(73-93);
Sand Covering and backfilling Inspection for 8"
AQIB
1104 CPP-NGCP-CIV-1102 1400107567 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1194-sta-KP0+976 to KP1+221; HRDH-1194 FL TA-843652 5/22/2019 7.40 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(73-93);
8'' F/L HRDH-1194 -614 Pipe lowering at sta-
AQIB
1105 CPP-NGCP-CIV-1103 1400107606 Civil SATIP-L-450- 01 SAIC-L-1003 KP1+462 to KP1+634; HRDH-1194 FL TA-843652 5/22/2019 7.45 AM
HUSSEIN
Mr. Edgardo CLOSED
01-FW-(113-127);
Trench Bedding Inspection for 8" FL HRDH-1194
AQIB
1106 CPP-NGCP-CIV-1104 1400107542 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP1+462 to KP1+634; HRDH-1194 FL TA-843652 5/22/2019 7.50 AM Mr. Edgardo Reject
HUSSEIN
01-FW-(113-127);
Sand Covering and backfilling Inspection for 8"
AQIB
1107 CPP-NGCP-CIV-1105 1400107625 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1194-sta-KP1+462 to KP1+634; HRDH-1194 FL TA-843652 5/22/2019 7.55 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(113-127);
Trench inspection of HDD (Asphalt Road
1108 CPP-NGCP-CIV-1106 1400107678 Civil SATIP-L- 450- 01 SAIC-L-1002 Crossing)for 8''Flowline HRDH 902 to HRDH HRDH-902 FL TA-843606 5/22/2019 9.00AM Hameed Ullah Mr. Edgardo CLOSED
RH-DK
Lowering inspection at HDD (Asphalt Road
1109 CPP-NGCP-CIV-1107 1400107680 Civil SATIP-L-450- 01 SAIC-L-1003 Crossing) for 8''Flowline HRDH 902 to HRDH HRDH-902 FL TA-843606 5/22/2019 9.05 AM Hameed Ullah Mr. Edgardo CLOSED
RH-DK
8'' F/L HRDH-611 -CK-RH Pipe lowering at sta-
AQIB
1110 CPP-NGCP-CIV-1108 1400108338 Civil SATIP-L-450- 01 SAIC-L-1003 KP2+033 to KP2+233; HRDH-611 FL TA-843565 5/23/2019 6.45AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(161-206);
Trench Bedding Inspection for 8" FL HRDH-611
AQIB
1111 CPP-NGCP-CIV-1109 1400108344 Civil SATIP-L- 450- 01 SAIC-L-1002 sta- KP2+033 to KP2+233; HRDH-611 FL TA-843565 5/23/2019 6.50 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(161-206);
Sand Covering and backfilling Inspection for 8"
AQIB
1112 CPP-NGCP-CIV-1110 1400108345 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-611-sta- KP2+033 to KP2+233; HRDH-611 FL TA-843565 5/23/2019 6.55 AM
HUSSEIN
Mr. Edgardo CLOSED
01-FW-(161-206);
8'' F/L HRDH-611 -CK-RH Pipe lowering at sta-
AQIB
1113 CPP-NGCP-CIV-1111 1400108315 Civil SATIP-L-450- 01 SAIC-L-1003 KP2+233 to KP2+584; HRDH-611 FL TA-843565 5/23/2019 7.00 AM
HUSSEIN
Mr. Edgardo CLOSED
01-FW-(161-206);
Trench Bedding Inspection for 8" FL HRDH-611
AQIB
1114 CPP-NGCP-CIV-1112 1400108316 Civil SATIP-L- 450- 01 SAIC-L-1002 sta- KP2+233 to KP2+584; HRDH-611 FL TA-843565 5/23/2019 7.05 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(161-206);
Sand Covering and backfilling Inspection for 8"
AQIB
1115 CPP-NGCP-CIV-1113 1400108363 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-611-sta- KP2+233 to KP2+584; HRDH-611 FL TA-843565 5/23/2019 7.10 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(161-206);
8'' F/L HRDH-611 -CK-RH Pipe lowering at sta-
AQIB
1116 CPP-NGCP-CIV-1114 1400108271 Civil SATIP-L-450- 01 SAIC-L-1003 KP2+981 to KP3+118 HRDH-611 FL TA-843565 5/23/2019 7.15 AM Mr. Edgardo CLOSED
HUSSEIN
02-FW-(239-250);
Trench Bedding Inspection for 8" FL HRDH-611
AQIB
1117 CPP-NGCP-CIV-1115 1400108383 Civil SATIP-L- 450- 01 SAIC-L-1002 sta- KP2+981 to KP3+118 HRDH-611 FL TA-843565 5/23/2019 7.20 AM Mr. Edgardo CLOSED
HUSSEIN
02-FW-(239-250);
Sand Covering and backfilling Inspection for 8"
AQIB
1118 CPP-NGCP-CIV-1116 1400108356 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-611-sta- KP2+981 to KP3+118 HRDH-611 FL TA-843565 5/23/2019 7.25 AM Mr. Edgardo CLOSED
HUSSEIN
02-FW-(239-250);
8'' F/L HRDH-611 -CK-RH Pipe lowering at sta-
AQIB
1119 CPP-NGCP-CIV-1117 1400108319 Civil SATIP-L-450- 01 SAIC-L-1003 KP3+190 to KP3+302; HRDH-611 FL TA-843565 5/23/2019 7.30 AM Mr. Edgardo CLOSED
HUSSEIN
03-FW-(256-265);
Trench Bedding Inspection for 8" FL HRDH-611
AQIB
1120 CPP-NGCP-CIV-1118 1400108357 Civil SATIP-L- 450- 01 SAIC-L-1002 sta- KP3+190 to KP3+302; HRDH-611 FL TA-843565 5/23/2019 7.35 AM
HUSSEIN
Mr. Edgardo CLOSED
03-FW-(256-265);
Sand Covering and backfilling Inspection for 8"
AQIB
1121 CPP-NGCP-CIV-1119 1400108358 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-611-sta- KP3+190 to KP3+302; HRDH-611 FL TA-843565 5/23/2019 7.40 AM
HUSSEIN
Mr. Edgardo CLOSED
03-FW-(256-265);
8'' F/L HRDH-611 -CK-RH Pipe lowering at sta-
AQIB
1122 CPP-NGCP-CIV-1120 1400108347 Civil SATIP-L-450- 01 SAIC-L-1003 KP3+376 to KP3+550; HRDH-611 FL TA-843565 5/23/2019 7.45 AM Mr. Edgardo CLOSED
HUSSEIN
03-FW-(271-285);
Trench Bedding Inspection for 8" FL HRDH-611
AQIB
1123 CPP-NGCP-CIV-1121 1400108320 Civil SATIP-L- 450- 01 SAIC-L-1002 sta- KP3+376 to KP3+550; HRDH-611 FL TA-843565 5/23/2019 7.50 AM Mr. Edgardo CLOSED
HUSSEIN
03-FW-(271-285);
Sand Covering and backfilling Inspection for 8"
AQIB
1124 CPP-NGCP-CIV-1122 1400108414 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-611-sta- KP3+376 to KP3+550; HRDH-611 FL TA-843565 5/23/2019 7.55 AM Mr. Edgardo CLOSED
HUSSEIN
03-FW-(271-285);
5th layer General fill/marl (300mm) fill placement
1125 CPP-NGCP-CIV-1123 1400108390 Civil SATIP-A- 114- 01 SAIC-A-1004 and compaction inspection at Hrdh-1142 wellpad HRDH-1142 FL BA-872429 5/23/2019 10.30AM Hameed Ullah Mr. Edgardo CLOSED
extension
5th layer General Fill/Marl Compaction testing
1126 CPP-NGCP-CIV-1124 1400108321 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1142 FL BA-872429 5/23/2019 10.45 AM Hameed Ullah Mr. Edgardo CLOSED
Inspection at Hrdh-1142 wellpad extension.
Compaction test inspection for existing surface TASEER
1127 CPP-NGCP-CIV-1125 1400108448 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH 1092 N/A 5/23/2019 7.00 AM Mr. Randy CLOSED
of HWYH 1092 KHAN
Fill placement and compaction inspection for TASEER
1128 CPP-NGCP-CIV-1126 1400108464 Civil SATIP-A- 114- 01 SAIC-A-1004
zone C hawiyah RH_GK 6th layer marl material
HWYH RH_GK N/A 5/23/2019 7.30 AM
KHAN
Mr. Randy CLOSED
Compaction test inspection for hawiyah RH_GK TASEER
1129 CPP-NGCP-CIV-1127 1400108458 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH RH_GK N/A 5/23/2019 8.00 AM Mr. Randy CLOSED
zone C 6th layer marl material KHAN
Fill placement and compaction inspection for TASEER
1130 CPP-NGCP-CIV-1128 1400108459 Civil SATIP-A- 114- 01 SAIC-A-1004
zone F hawiyah RH_GK 6th layer marl material
HWYH RH_GK N/A 5/23/2019 8.30 AM
KHAN
Mr. Randy Reject
Compaction test inspection for hawiyah RH_GK TASEER
1131 CPP-NGCP-CIV-1129 1400108460 Civil SATIP-A- 114- 01 SAIC-A-1005
zone F 6th layer marl material
HWYH RH_GK N/A 5/23/2019 9.00 AM
KHAN
Mr. Randy CLOSED
Compaction testing 3rd layer 300mm well pad AAMIR Mr. Mr Abdul
1132 CPP-NGCP-CIV-1130 1400108449 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH RHCJ N/A 5/23/2019 8.30 AM CLOSED
RHCJ zone C hwyah SOLANGI Malik
Compaction testing 1st layer 300 mm well pad AAMIR Mr. Mr Abdul
1133 CPP-NGCP-CIV-1131 1400108399 Civil SATIP-A- 114- 01 SAIC-A-1005
RHCJ zone B hwyah
HWYH RHCJ N/A 5/23/2019 8.30 AM
SOLANGI Malik
CLOSED

Bottom of trench preparation for 8''F/L HRDH-


1164 TO HRDH-RH-DK from KM 0+218-0+380,
1134 CPP-NGCP-CIV-1132 1400108993 Civil SATIP-L- 450- 01 SAIC-L-1002 0+676-1+085,1+292-3+697,3+964-4+399, HRDH-1164 FL TA-843592 5/25/2019 9.00 AM Hameed Ullah Mr. Edgardo CLOSED
4+696-5+837 total 4552/6366 meters

Compaction test inspection for existing surface TASEER


1135 CPP-NGCP-CIV-1133 1400108829 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH 1036 N/A 5/25/2019 7.30 AM Mr. Randy CLOSED
of HWYH 1036 KHAN
Tranch excavation and bottom of Tranch
AAMIR Mr. Mr Abdul
1136 CPP-NGCP-CIV-1134 1400109157 Civil SATIP-L- 450- 01 SAIC-L-1002 inspaction station (1+100 to 1+175) (1+305 HWYH GGM TR/L1 N/A 5/26/2019 7.00 AM CLOSED RE-SCHEDULE TO 27-
SOLANGI Malik
to1+420) 36"TR/L1 GGM Hwyah MAY-2019
AAMIR Mr. Mr Abdul
1137 CPP-NGCP-CIV-1135 1400109206 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH GGM TR/L2 N/A 5/26/2019 7.30 AM CLOSED RE-SCHEDULE TO 27-
SOLANGI Malik
MAY-2019
Tranch excavation and bottom of Tranch
AAMIR Mr. Mr Abdul
1138 CPP-NGCP-CIV-1136 1400109161 Civil SATIP-L- 450- 01 SAIC-L-1002 inspaction station (1+140 to 1+230)(1+375 to HWYH GGM TR/L1 N/A 5/26/2019 8.00 AM CLOSED RE-SCHEDULE TO 27-
SOLANGI Malik
1+400) 24" TR/L1 GGM Hwyah MAY-2019
Fill placement and compaction inspection for TASEER
1139 CPP-NGCP-CIV-1137 1400109468 Civil SATIP-A- 114- 01 SAIC-A-1004
hawiyah 1092 1st layer
HWYH 1092 N/A 5/26/2019 7.30 AM
KHAN
Mr. Randy CLOSED
compaction test inspection for hawiyah 1092 1st TASEER
1140 CPP-NGCP-CIV-1138 1400109534 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH 1092 N/A 5/26/2019 8.00 AM Mr. Randy CLOSED
layer KHAN
8'' F/L HRDH-611 -CK-RH Pipe lowering at sta-
AQIB
1141 CPP-NGCP-CIV-1139 1400109746 Civil SATIP-L-450- 01 SAIC-L-1003 KP1+207 to KP1+329; HRDH-611 FL TA-843565 5/26/2019 6.30 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(93-103);
Trench Bedding Inspection for 8" FL HRDH-611
AQIB
1142 CPP-NGCP-CIV-1140 1400109763 Civil SATIP-L- 450- 01 SAIC-L-1002 sta- KP1+207 to KP1+329; HRDH-611 FL TA-843565 5/26/2019 6.35 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(93-103);
Sand Covering and backfilling Inspection for 8"
AQIB
1143 CPP-NGCP-CIV-1141 1400109715 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-611-sta- KP1+207 to KP1+329; HRDH-611 FL TA-843565 5/26/2019 6.40 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(93-103);
8'' F/L HRDH-611 -CK-RH Pipe lowering at sta-
AQIB
1144 CPP-NGCP-CIV-1142 1400109690 Civil SATIP-L-450- 01 SAIC-L-1003 KP1+391 to KP1+611; HRDH-611 FL TA-843565 5/26/2019 6.45 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(108-126);
Trench Bedding Inspection for 8" FL HRDH-611
AQIB
1145 CPP-NGCP-CIV-1143 1400109665 Civil SATIP-L- 450- 01 SAIC-L-1002 sta- KP1+391 to KP1+611; HRDH-611 FL TA-843565 5/26/2019 6.50 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(108-126);
Sand Covering and backfilling Inspection for 8"
AQIB
1146 CPP-NGCP-CIV-1144 1400109728 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-611-sta- KP1+391 to KP1+611; HRDH-611 FL TA-843565 5/26/2019 6.55 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(108-126);
8'' F/L HRDH-611 -CK-RH Pipe lowering at sta-
AQIB
1147 CPP-NGCP-CIV-1145 1400109777 Civil SATIP-L-450- 01 SAIC-L-1003 KP1+875 to KP1+911; HRDH-611 FL TA-843565 5/26/2019 7.00 AM
HUSSEIN
Mr. Edgardo CLOSED
01-FW-(148-151);
Trench Bedding Inspection for 8" FL HRDH-611
AQIB
1148 CPP-NGCP-CIV-1146 1400109666 Civil SATIP-L- 450- 01 SAIC-L-1002 sta- KP1+875 to KP1+911; HRDH-611 FL TA-843565 5/26/2019 7.05 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(148-151);
Sand Covering and backfilling Inspection for 8"
AQIB
1149 CPP-NGCP-CIV-1147 1400109738 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-611-sta- KP1+875 to KP1+911; HRDH-611 FL TA-843565 5/26/2019 7.10 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(148-151);
6th layer General fill/marl (300mm) fill placement
1150 CPP-NGCP-CIV-1148 1400109749 Civil SATIP-A- 114- 01 SAIC-A-1004 and compaction inspection at Hrdh-1142 wellpad HRDH -1142 FL TA-669367 5/26/2019 9.00 AM Hameed Ullah Mr. Edgardo CLOSED
extension
6th layer General Fill/Marl Compaction testing
1151 CPP-NGCP-CIV-1149 1400109767 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH -1142 FL TA-669367 5/26/2019 9.20 AM Hameed Ullah Mr. Edgardo CLOSED
Inspection at Hrdh-1142 wellpad extension.
Fill placement and compaction inspection for TASEER
1152 CPP-NGCP-CIV-1150 1400110319 Civil SATIP-A- 114- 01 SAIC-A-1004 HWYH 1092 N/A 5/27/2019 7.30 AM Mr. Randy CLOSED
hawiyah 1092 2nd layer KHAN
compaction test inspection for hawiyah 1092 TASEER
1153 CPP-NGCP-CIV-1151 1400110321 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH 1092 N/A 5/27/2019 8.00 AM Mr. Randy CLOSED
2nd layer KHAN
Pipe lowering at HWYH-1100 km4+560 to TASEER RE-SCHEDULE TO 28-
1154 CPP-NGCP-CIV-1152 1400110375 Civil SATIP-L-450- 01 SAIC-L-1003 HWYH1100 TA-445959 5/27/2019 7.30AM Mr. Randy CLOSED
5+100, fw377-422 KHAN MAY-2019
1155 CPP-NGCP-CIV-1153 1400110381 Civil SATIP-L- 450- 01 SAIC-L-1002
Trench Bedding Inspection for HWYH-1100
HWYH1100 TA-445959 5/27/2019 7.40 AM TASEER
Mr. Randy CLOSED
RE-SCHEDULE TO 28-
km4+560 to 5+100, fw377-422 KHAN MAY-2019
Sand Covering and backfilling Inspection for TASEER RE-SCHEDULE TO 28-
1156 CPP-NGCP-CIV-1154 1400110341 Civil SATIP-L-450- 01 SAIC-L-1004
HWYH-1100 km4+560 to 5+100, fw377-422
HWYH1100 TA-445959 5/27/2019 7.50 AM
KHAN
Mr. Randy CLOSED
MAY-2019
10'' F/L HRDH-902 -DK-RH Pipe lowering at
AQIB
1157 CPP-NGCP-CIV-1155 1400110505 Civil SATIP-L-450- 01 SAIC-L-1003 sta- KP4+613 to KP4+952; HRDH-902 TA-843606 5/27/2019 6.30 AM
HUSSEIN
Mr. Edgardo CLOSED
04-FW-(368-395);
Trench Bedding Inspection for 10" FL HRDH-902
AQIB
1158 CPP-NGCP-CIV-1156 1400110466 Civil SATIP-L- 450- 01 SAIC-L-1002 sta- KP4+613 to KP4+952; HRDH-902 TA-843606 5/27/2019 6.35 AM
HUSSEIN
Mr. Edgardo CLOSED
04-FW-(368-395);
Sand Covering and backfilling Inspection for 10"
AQIB
1159 CPP-NGCP-CIV-1157 1400110486 Civil SATIP-L-450- 01 SAIC-L-1004 FL HRDH-902 sta- KP4+613 to KP4+952; HRDH-902 TA-843606 5/27/2019 6.40 AM
HUSSEIN
Mr. Edgardo CLOSED
04-FW-(368-395);
10'' F/L HRDH-902 -DK-RH Pipe lowering at
AQIB
1160 CPP-NGCP-CIV-1158 1400110498 Civil SATIP-L-450- 01 SAIC-L-1003 sta-KP5+000 to KP5+153; HRDH-902 TA-843606 5/27/2019 6.45 AM Mr. Edgardo CLOSED
HUSSEIN
04-FW-(399-411);
Trench Bedding Inspection for 10" FL HRDH-902
AQIB
1161 CPP-NGCP-CIV-1159 1400110451 Civil SATIP-L- 450- 01 SAIC-L-1002 sta- KP5+000 to KP5+153; HRDH-902 TA-843606 5/27/2019 6.50 AM Mr. Edgardo CLOSED
HUSSEIN
04-FW-(399-411);
Sand Covering and backfilling Inspection for 10"
AQIB
1162 CPP-NGCP-CIV-1160 1400110506 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-902-sta- KP5+000 to KP5+153; HRDH-902 TA-843606 5/27/2019 6.55 AM Mr. Edgardo CLOSED
HUSSEIN
04-FW-(399-411);
Trench excavation and preparation Inspection
1163 CPP-NGCP-CIV-1161 1400110496 Civil SATIP-L-450- 01 SAIC-L-1002 for 16''F/L HRDH -1142 to 938 AT Road HRDH-1142 FL TA-669367 5/27/2019 07.30 AM Hameed Ullah Mr. Edgardo Reject
Crossing (Sta-0+463)
27th layer for Zone A part 2 compaction test
1164 CPP-NGCP-CIV-1162 1400110436 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-GK-RH N/A 5/27/2019 10.00 AM Hameed Ullah Mr. Edgardo CLOSED
Inspection at HRDH RH-GK Extension
Bottom of trench Inspection for 10'' F/L HRDH
902 TO HRDH RH-DK from KM-0+311-1+029,
1165 CPP-NGCP-CIV-1163 1400110429 Civil SATIP-L- 450- 01 SAIC-L-1002
1+080-1+128,1+278-2+125,2+279-2+711,
HRDH-902 TA-843606 5/27/2019 6.30 AM Hameed Ullah Mr. Edgardo CLOSED
3+053-5+017 total 4009/5509 meters
Trench bedding and preparation Inspection for
8''F/L HRDH -1142 to 938 AT Asphalt Road AQIB
1166 CPP-NGCP-CIV-1164 1400110432 Civil SATIP-L- 450- 01 SAIC-L-1002
Crossing (Sta-0+425 to 0+437)
HRDH -1142 FL TA-669367 5/27/2019 6.00 AM
HUSSEIN
Mr. Edgardo CLOSED
00-FW-34;
8'' F/L HRDH-1142 to 938 Pipe lowering AT
AQIB
1167 CPP-NGCP-CIV-1165 1400110508 Civil SATIP-L-450- 01 SAIC-L-1003 Asphalt Road Crossing (Sta-0+425 to 0+437) HRDH -1142 FL TA-669367 5/27/2019 6.05 AM
HUSSEIN
Mr. Edgardo CLOSED
00-FW-34;
Sand Covering and backfilling Inspection for 8"
F/L HRDH-1142, AT Asphalt Road Crossing AQIB
1168 CPP-NGCP-CIV-1166 1400110481 Civil SATIP-L-450- 01 SAIC-L-1004 HRDH -1142 FL TA-669367 5/27/2019 6.10 AM Mr. Edgardo CLOSED
(Sta-0+425 to 0+437) HUSSEIN
00-FW-34;
Fill placement and compaction inspection for TASEER
1169 CPP-NGCP-CIV-1167 1400111123 Civil SATIP-A- 114- 01 SAIC-A-1004 HWYH 1092 N/A 5/28/2019 7.30 AM Mr. Randy CLOSED
hawiyah 1092 3rd layer KHAN
compaction test inspection for hawiyah 1092 3rd TASEER
1170 CPP-NGCP-CIV-1168 1400111108 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH 1092 N/A 5/28/2019 8.00 AM Mr. Randy CLOSED
layer KHAN
Compaction testing 4th layer 300mm well pad AAMIR Mr. Mr Abdul
1171 CPP-NGCP-CIV-1169 1400111127 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH RHCJ N/A 5/28/2019 8.00 AM CLOSED
RHCJ zone C hwyah SOLANGI Malik
Soil sampling and testing select fill Barrow pit no TASEER
1172 CPP-NGCP-CIV-1170 1400111143 Civil SATIP-A- 114- 01 SAIC-A-1001 HWYH 1071 N/A 5/28/2019 9.00 AM Mr. Randy CLOSED
16 stock pile 3 well pad 1071 hwyah KHAN
Compaction testing select fill 300 mm station RE-SCHEDULE TO 29-
1173 CPP-NGCP-CIV-1171 1400111110 Civil SATIP-A- 114- 01 SAIC-A-1005
0+425 to 0+437 HRDH- 1142 open cut
HRDH -1142 FL TA-669367 5/28/2019 10:15:00 AM Hameed Ullah Mr. Edgardo CLOSED
MAY-2019
Fill Placement Inspection select fill 300 mm RE-SCHEDULE TO 29-
1174 CPP-NGCP-CIV-1172 1400111062 Civil SATIP-A- 114- 01 SAIC-A-1004 HRDH -1142 FL TA-669367 5/28/2019 10:20:00 AM Hameed Ullah Mr. Edgardo CLOSED
station 0+425 to 0+437 HRDH- 1142 open cut MAY-2019
Material receiving inspection for RE-SCHEDULE TO 29-
1175 CPP-NGCP-CIV-1173 1400111111 Civil SATIP-A- 114- 01 SAIC-A-1002 HRDH -1142 FL TA-669367 5/28/2019 10:25:00 AM Hameed Ullah Mr. Edgardo CLOSED
0+425 to 0+437 HRDH- 1142 open cut MAY-2019
Bottom of trench Inspection for 8'' F/L HRDH
AQIB
1176 CPP-NGCP-CIV-1174 1400111157 Civil SATIP-L- 450- 01 SAIC-L-1002 1178 TO 619 from KM0+185.00 to 1+545.00, HRDH-1178 TA843955 5/28/2019 7.30 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 29-
HUSSEIN
1+596 to 2+710, total 2332/2710 meters MAY-2019
Bottom trench excavation inspection for hawiyah TASEER
1177 CPP-NGCP-CIV-1175 1400111807 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH1003 TA-445909 5/29/2019 7.00 AM Mr. Randy CLOSED
1003 Km 0+504 to 1+000 KHAN
Bottom trench excavation inspection for hawiyah TASEER
1178 CPP-NGCP-CIV-1176 1400111782 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH1003 TA-445909 5/29/2019 7.15 AM Mr. Randy CLOSED
1003 Km 1+000 to 2+002 KHAN
Bottom trench excavation inspection for hawiyah TASEER
1179 CPP-NGCP-CIV-1177 1400111833 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH1003 TA-445909 5/29/2019 7.30 AM Mr. Randy CLOSED
1003 Km 2+002 to 3+000 KHAN
Bottom trench excavation inspection for hawiyah TASEER
1180 CPP-NGCP-CIV-1178 1400111796 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH1003 TA-445909 5/29/2019 7.45 AM Mr. Randy CLOSED
1003 Km 3+000 to 4+531.82 KHAN
Bottom trench excavation inspection for hawiyah TASEER
1181 CPP-NGCP-CIV-1179 1400111845 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH1003 TA-445909 5/29/2019 8.40 AM Mr. Randy CLOSED
1003 Km 4+531.82 to 5+550 KHAN
Bottom trench excavation inspection for hawiyah TASEER
1182 CPP-NGCP-CIV-1180 1400111875 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH1003 TA-445909 5/29/2019 8.15 AM Mr. Randy CLOSED
1003 Km 7+150 to 7+600 KHAN
Fill placement and compaction inspection for TASEER
1183 CPP-NGCP-CIV-1181 1400111879 Civil SATIP-A- 114- 01 SAIC-A-1004 HWYH 1092 N/A 5/29/2019 7.30 AM Mr. Randy CLOSED
hawiyah 1092 4th layer KHAN
compaction test inspection for hawiyah 1092 4th TASEER
1184 CPP-NGCP-CIV-1182 1400111855 Civil SATIP-A- 114- 01 SAIC-A-1005
layer
HWYH 1092 N/A 5/29/2019 8.00 AM
KHAN
Mr. Randy CLOSED

Fill placement and compaction inspection for TASEER


1185 CPP-NGCP-CIV-1183 1400111825 Civil SATIP-A- 114- 01 SAIC-A-1004 HWYH 1036 N/A 5/29/2019 7.30 AM Mr. Randy CLOSED
hawiyah 1036 1st layer KHAN
compaction test inspection for hawiyah 1036 1st TASEER
1186 CPP-NGCP-CIV-1184 1400111791 Civil SATIP-A- 114- 01 SAIC-A-1005
layer
HWYH 1036 N/A 5/29/2019 8.00 AM
KHAN
Mr. Randy CLOSED

Soil sampling, testing, and review of test reports


1187 CPP-NGCP-CIV-1185 1400111885 Civil SATIP-A- 114- 01 SAIC-A-1001 for Hwyh Borrow pit # 18 Stockpile # 1 Hwyh RH/CK N/A 5/29/2019 9.00 AM Christan Mr. Randy CLOSED
N2735399.805, E314362.166 Select fill material
27th layer for Zone A Part 1 Compaction test
1188 CPP-NGCP-CIV-1186 1400111904 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-GK-RH N/A 5/29/2019 10.00 AM Hameed Ullah Mr. Edgardo CLOSED
inspection at RH-GK Extension
7t h layer General fill/marl (300mm) fill
1189 CPP-NGCP-CIV-1187 1400111899 Civil SATIP-A- 114- 01 SAIC-A-1004 placement and compaction inspection at Hrdh- HRDH -1142 FL TA-669367 5/29/2019 10.05 AM Hameed Ullah Mr. Edgardo CLOSED
1142 wellpad extension
7th layer General Fill/Marl Compaction testing
1190 CPP-NGCP-CIV-1188 1400111859 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH -1142 FL TA-669367 5/29/2019 10.10 AM Hameed Ullah Mr. Edgardo CLOSED
Inspection at Hrdh-1142 wellpad extension.
compaction test of base course inspection for 8"
1191 CPP-NGCP-CIV-1189 1400111900 Civil SATIP-Q- 006- 02 SAIC-A-1005 HRDH -1142 FL TA-669367 5/29/2019 10.30 AM Hameed Ullah Mr. Edgardo CLOSED
FL HRDH-1142 -938 at road crossing (open cut)
Bottom of trench Inspection for 8'' F/L HRDH
619 to CK-RH from KM0+266 to 0+411,
AQIB
1192 CPP-NGCP-CIV-1190 1400111905 Civil SATIP-L- 450- 01 SAIC-L-1002 0+470 to 0+638, 0+669 to 0+734,0+824 to HRDH-619 TA843560 5/29/2019 8.30 AM Mr. Edgardo CLOSED
HUSSEIN
1+042,1+100to 2+000,2+000 to 2+598,2+829 to
3+600,3+600 to 4+898,total 4898/4925 meters
Geogrid reinforcement sheet receiving Mr.
1193 CPP-NGCP-CIV-1191 1400111944 Civil SATIP-Q- 006- 02 N/A
inspection at 1142 Asphalt road Crossing
HRDH -1142 FL N/A 5/29/2019 10.40 AM Hameed Ullah
RAYMUND
CLOSED

Aggregate Base course Material Receiving Mr. RE-SCHEDULE TO 30-


1194 CPP-NGCP-CIV-1192 1400111868 Civil SATIP-Q- 006- 02 SAIC-Q-1037 HRDH -1142 FL N/A 5/29/2019 10.45 AM Hameed Ullah CLOSED
Inspection at HRDH 1142 RAYMUND MAY-2019
Placement and Compaction of aggregate base
Mr.
1195 CPP-NGCP-CIV-1193 1400111934 Civil SATIP-Q- 006- 02 SAIC-Q-1040 course inspection at Asphalt Road(Open Cut) at HRDH -1142 FL N/A 5/29/2019 10.50 AM Hameed Ullah CLOSED RE-SCHEDULE TO 30-
RAYMUND
HRDH 1142 MAY-2019
Fill placement and compaction inspection for TASEER
1196 CPP-NGCP-CIV-1194 1400112488 Civil SATIP-A- 114- 01 SAIC-A-1004 HWYH 1092 N/A 5/30/2019 7.30 AM Mr. Randy CLOSED
hawiyah 1092 5th layer KHAN
compaction test inspection for hawiyah 1092 5th TASEER
1197 CPP-NGCP-CIV-1195 1400112381 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH 1092 N/A 5/30/2019 8.00 AM Mr. Randy CLOSED
layer KHAN
Compaction testing 5th layer 300 mm well pad AAMIR Mr. Mr Abdul
1198 CPP-NGCP-CIV-1196 1400112382 Civil SATIP-A- 114- 01 SAIC-A-1005
RHCJ zone C hwyah
HWYH RHCJ N/A 5/30/2019 8.00 AM
SOLANGI Malik
CLOSED
Fill placement and compaction inspection for TASEER
1199 CPP-NGCP-CIV-1197 1400112511 Civil SATIP-A- 114- 01 SAIC-A-1004 HWYH 1036 N/A 5/30/2019 7.30 AM Mr. Randy CLOSED
hawiyah 1036 2nd layer KHAN
compaction test inspection for hawiyah 1036 2nd TASEER
1200 CPP-NGCP-CIV-1198 1400112544 Civil SATIP-A- 114- 01 SAIC-A-1005
layer
HWYH 1036 N/A 5/30/2019 8.00 AM
KHAN
Mr. Randy CLOSED

8'' F/L HRDH-1170 -919 Pipe lowering at sta-


AQIB
1201 CPP-NGCP-CIV-1199 1400112528 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+194 to KP0+368; HRDH-1170 FL TA-843656 5/30/2019 6.30 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 01-
HUSSEIN
00-FW-(08-22); JUNE-2019
Trench Bedding Inspection for 8" FL HRDH-1170
AQIB
1202 CPP-NGCP-CIV-1200 1400112546 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP0+194 to KP0+368; HRDH-1170 FL TA-843656 5/30/2019 6.35 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 01-
HUSSEIN
00-FW-(08-22); JUNE-2019
Sand Covering and backfilling Inspection for 8"
AQIB
1203 CPP-NGCP-CIV-1201 1400112534 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1170-sta- KP0+194 to KP0+368; HRDH-1170 FL TA-843656 5/30/2019 6.40 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 01-
HUSSEIN
00-FW-(08-22); JUNE-2019
8'' F/L HRDH-1170 -919 Pipe lowering at sta-
AQIB
1204 CPP-NGCP-CIV-1202 1400112529 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+404 to KP0+525; HRDH-1170 FL TA-843656 5/30/2019 6.45 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 01-
HUSSEIN
00-FW-(25-35); JUNE-2019
Trench Bedding Inspection for 8" FL HRDH-1170
AQIB
1205 CPP-NGCP-CIV-1203 1400112535 Civil SATIP-L- 450- 01 SAIC-L-1002 sta- KP0+404 to KP0+525; HRDH-1170 FL TA-843656 5/30/2019 6.50 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 01-
HUSSEIN
00-FW-(25-35); JUNE-2019
Sand Covering and backfilling Inspection for 8"
AQIB
1206 CPP-NGCP-CIV-1204 1400112530 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1170sta- KP0+404 to KP0+525; HRDH-1170 FL TA-843656 5/30/2019 6.55 AM
HUSSEIN
Mr. Edgardo CLOSED RE-SCHEDULE TO 01-
00-FW-(25-35); JUNE-2019
8'' F/L HRDH-1170 -919 Pipe lowering at sta-
AQIB
1207 CPP-NGCP-CIV-1205 1400112537 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+588 to KP0+721; HRDH-1170 FL TA-843656 5/30/2019 7.00 AM
HUSSEIN
Mr. Edgardo CLOSED RE-SCHEDULE TO 01-
00-FW-(40-49); JUNE-2019
Trench Bedding Inspection for 8" FL HRDH-1170
AQIB
1208 CPP-NGCP-CIV-1206 1400112547 Civil SATIP-L- 450- 01 SAIC-L-1002 sta- KP0+588 to KP0+721; HRDH-1170 FL TA-843656 5/30/2019 7.05 AM
HUSSEIN
Mr. Edgardo CLOSED RE-SCHEDULE TO 01-
00-FW-(40-49); JUNE-2019
Sand Covering and backfilling Inspection for 8"
AQIB
1209 CPP-NGCP-CIV-1207 1400112479 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1170-sta- KP0+588 to KP0+721; HRDH-1170 FL TA-843656 5/30/2019 7.10 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 01-
HUSSEIN
00-FW-(40-49); JUNE-2019
8'' F/L HRDH-1170 -919 Pipe lowering at sta-
AQIB
1210 CPP-NGCP-CIV-1208 1400112469 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+832 to KP1+127; HRDH-1170 FL TA-843656 5/30/2019 7.15 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 01-
HUSSEIN
00-FW-(58-82); JUNE-2019
Trench Bedding Inspection for 8" FL HRDH-1170
AQIB
1211 CPP-NGCP-CIV-1209 1400112492 Civil SATIP-L- 450- 01 SAIC-L-1002 sta- KP0+832 to KP1+127; HRDH-1170 FL TA-843656 5/30/2019 7.20 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 01-
HUSSEIN
00-FW-(58-82); JUNE-2019
Sand Covering and backfilling Inspection for 8"
AQIB
1212 CPP-NGCP-CIV-1210 1400112401 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1170-sta- KP0+832 to KP1+127; HRDH-1170 FL TA-843656 5/30/2019 7.25 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 01-
HUSSEIN
00-FW-(58-82); JUNE-2019
Prime coat inspection for Asphalt Road Crossing
1213 CPP-NGCP-CIV-1211 1400112566 Civil SATIP-Q- 006- 02 SAIC-Q-1041
at HRDH 1142 (Open Cut)
HRDH -1142 FL N/A 5/30/2019 11.00 AM Hameed Ullah Mr. Edgardo CLOSED

Aggregate Base course Material Receiving AQIB


1214 CPP-NGCP-CIV-1212 1400112573 Civil SATIP-Q- 006- 02 SAIC-Q-1037 HRDH-RH-EK N/A 5/30/2019 10.45 AM Mr. Edgardo CLOSED
Inspection at RH-EK well pad HUSSEIN
Placement and Compaction of aggregate base AQIB
1215 CPP-NGCP-CIV-1213 1400112583 Civil SATIP-Q- 006- 02 SAIC-Q-1040
course inspection zone A & B at RH-EK
HRDH-RH-EK N/A 5/30/2019 10.50 AM
HUSSEIN
Mr. Edgardo CLOSED

Bottom trench excavation inspection for hawiyah


TASEER
1216 CPP-NGCP-CIV-1214 1400113176 Civil SATIP-L- 450- 01 SAIC-L-1002 Ck-RH open cut HWYH CK-RH TA-445974 6/1/2019 7.00 AM
KHAN
Mr. Randy CLOSED
Km 4+412 to 4+440
Bottom trench excavation inspection for hawiyah
TASEER
1217 CPP-NGCP-CIV-1215 1400113152 Civil SATIP-L- 450- 01 SAIC-L-1002 GK -RH open cut HWYH GK-RH TA-445912 6/1/2019 7.00 AM
KHAN
Mr. Randy CLOSED
Km 8+835 to 8+863
Fill placement and compaction inspection for TASEER
1218 CPP-NGCP-CIV-1216 1400113168 Civil SATIP-A- 114- 01 SAIC-A-1004 HWYH 1036 N/A 6/1/2019 7.30 AM Mr. Randy CLOSED
hawiyah 1036 3rd layer KHAN
compaction test inspection for hawiyah 1036 3rd TASEER
1219 CPP-NGCP-CIV-1217 1400113213 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH 1036 N/A 6/1/2019 8.00 AM Mr. Randy CLOSED
layer KHAN
Compaction test inspection at RH-EK zone A & AQIB
1220 CPP-NGCP-CIV-1218 1400113149 Civil SATIP-Q- 006- 02 SAIC-Q-1005 HRDH-RH-EK N/A 6/1/2019 08.00 AM Mr. Edgardo CLOSED
B HUSSEIN
Pipe lowering at HWYH CK-RH open cut TASEER
1221 CPP-NGCP-CIV-1219 1400113219 Civil SATIP-L-450- 01 SAIC-L-1003 HWYH CK-RH TA-445974 6/2/2019 7.30AM Mr. Raymund CLOSED
KM4+413 to KM4+440 FW-356 KHAN
Trench Bedding Inspection for HWYH CK-RH TASEER
1222 CPP-NGCP-CIV-1220 1400113248 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH CK-RH TA-445974 6/2/2019 7.40 AM Mr. Raymund CLOSED
open cut KM4+413 to KM4+440 KHAN
Sand Covering and backfilling Inspection for TASEER
1223 CPP-NGCP-CIV-1221 1400113230 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH CK-RH TA-445974 6/2/2019 7.50 AM Mr. Raymund CLOSED
HWYH CK-RH open cut KM4+413 to KM4+440 KHAN
Pipe lowering at HWYH GK-RH open cut TASEER
1224 CPP-NGCP-CIV-1222 1400113249 Civil SATIP-L-450- 01 SAIC-L-1003 HWYH GK-RH TA-445912 6/2/2019 7.30AM Mr. Raymund CLOSED
KMK8+835 to KM8+862 FW-732 KHAN
Trench Bedding Inspection for HWYH GK-RH TASEER
1225 CPP-NGCP-CIV-1223 1400113263 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH GK-RH TA-445912 6/2/2019 7.40 AM Mr. Raymund CLOSED
open cut KMK8+835 to KM8+862 KHAN
Sand Covering and backfilling Inspection for TASEER
1226 CPP-NGCP-CIV-1224 1400113254 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH GK-RH TA-445912 6/2/2019 7.50 AM Mr. Raymund CLOSED
HWYH GK-RH open cut KMK8+835 to KM8+862 KHAN
Soil sampling and testing for existing surface of TASEER
1227 CPP-NGCP-CIV-1225 1400113391 Civil SATIP-A- 114- 01 SAIC-A-1001
wellpad 1112
Hwyh 1112 N/A 6/2/2019 9.00 AM
KHAN
Mr. Raymund CLOSED

Asphalt Concrete Receiving, Placement and


1228 CPP-NGCP-CIV-1226 1400113792 Civil SATIP-Q- 006- 02 SAIC-Q-1061 Compaction inspection for 8 '' F/L at HRDH HRDH-1142 N/A 6/1/2019 08.00 AM Hameed Ullah Mr. Edgardo CLOSED
1142 road crossing

8th layer General fill/marl (300mm) fill placement


1229 CPP-NGCP-CIV-1227 1400113887 Civil SATIP-A- 114- 01 SAIC-A-1004 and compaction inspection at Hrdh-1142 wellpad HRDH-1142 N/A 6/2/2019 10.00 AM Hameed Ullah Mr. Edgardo CLOSED
extension

8th layer General Fill/Marl Compaction testing


1230 CPP-NGCP-CIV-1228 1400113914 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1142 N/A 6/2/2019 10.30AM Hameed Ullah Mr. Edgardo CLOSED
Inspection at Hrdh-1142 wellpad extension.

10'' F/L HRDH-902 -DK Pipe lowering at sta-


AQIB
1231 CPP-NGCP-CIV-1229 1400113879 Civil SATIP-L-450- 01 SAIC-L-1003 KP2+454 to KP2+664; HRDH-902 FL TA-843606 6/2/2019 6.30 AM Mr. Edgardo CLOSED
HUSSEIN
02-FW-(193-210);

Trench Bedding Inspection for 10" FL HRDH-902


AQIB
1232 CPP-NGCP-CIV-1230 1400113905 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP2+454 to KP2+664; HRDH-902 FL TA-843606 6/2/2019 6.35 AM
HUSSEIN
Mr. Edgardo CLOSED
02-FW-(193-210);
Sand Covering and backfilling Inspection for 10"
AQIB
1233 CPP-NGCP-CIV-1231 1400113841 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-902-sta- KP2+454 to KP2+664; HRDH-902 FL TA-843606 6/2/2019 6.40 AM Mr. Edgardo CLOSED
HUSSEIN
02-FW-(193-210);
10'' F/L HRDH-902 -DK Pipe lowering at sta-
AQIB
1234 CPP-NGCP-CIV-1232 1400113923 Civil SATIP-L-450- 01 SAIC-L-1003 KP3+073to KP3+296;; HRDH-902 FL TA-843606 6/2/2019 6.45 AM Mr. Edgardo CLOSED
HUSSEIN
03-FW-(244-261);
Trench Bedding Inspection for 10" FL HRDH-902
AQIB
1235 CPP-NGCP-CIV-1233 1400113842 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP3+073to KP3+296;; HRDH-902 FL TA-843606 6/2/2019 6.50 AM Mr. Edgardo CLOSED
HUSSEIN
03-FW-(244-261);
Sand Covering and backfilling Inspection for 10"
AQIB
1236 CPP-NGCP-CIV-1234 1400113915 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-902-sta- KP3+073to KP3+296;; HRDH-902 FL TA-843606 6/2/2019 6.55 AM Mr. Edgardo CLOSED
HUSSEIN
03-FW-(244-261);
10'' F/L HRDH-902 -DK Pipe lowering at sta-
AQIB
1237 CPP-NGCP-CIV-1235 1400113924 Civil SATIP-L-450- 01 SAIC-L-1003 KP3+477 to KP3+749; HRDH-902 FL TA-843606 6/2/2019 7.00 AM Mr. Edgardo CLOSED
HUSSEIN
03-FW-(276-297);
Trench Bedding Inspection for 10" FL HRDH-902
AQIB
1238 CPP-NGCP-CIV-1236 1400113933 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP3+477 to KP3+749; HRDH-902 FL TA-843606 6/2/2019 7.05 AM Mr. Edgardo CLOSED
HUSSEIN
03-FW-(276-297);
Sand Covering and backfilling Inspection for 10"
AQIB
1239 CPP-NGCP-CIV-1237 1400113925 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-902-sta- KP3+477 to KP3+749; HRDH-902 FL TA-843606 6/2/2019 7.10 AM Mr. Edgardo CLOSED
HUSSEIN
03-FW-(276-297);
8'' F/L HRDH-1170 -919 Pipe lowering at sta-
AQIB
1240 CPP-NGCP-CIV-1238 1400113926 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+537 to KP0+575; HRDH-1170 FL TA-843656 6/2/2019 8.00 AM
HUSSEIN
Mr. Edgardo CLOSED
00-FW-(43-46);
Trench Bedding Inspection for 8" FL HRDH-1170
AQIB
1241 CPP-NGCP-CIV-1239 1400113934 Civil SATIP-L- 450- 01 SAIC-L-1002 sta- KP0+537 to KP0+575; HRDH-1170 FL TA-843656 6/2/2019 8.10 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(43-46);
Sand Covering and backfilling Inspection for 8"
AQIB
1242 CPP-NGCP-CIV-1240 1400113935 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1170-sta- KP0+537 to KP0+575; HRDH-1170 FL TA-843656 6/2/2019 8.20 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(43-46);
Fill placement and compaction inspection for TASEER
1243 CPP-NGCP-CIV-1241A 1400114351 Civil SATIP-A- 114- 01 SAIC-A-1004 HWYH 1036 N/A 6/3/2019 7.30 AM Mr. Randy CLOSED
hawiyah 1036 4th layer KHAN
compaction test inspection for hawiyah 1036 4th TASEER
1244 CPP-NGCP-CIV-1242A 1400114376 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH 1036 N/A 6/3/2019 8.00 AM Mr. Randy CLOSED
layer KHAN
Pipe lowering at HWYH-1118 KM2+319 to
KM2+218 , km1+918 to 1+335, km1+214 to TASEER
1245 CPP-NGCP-CIV-1243A 1400114342 Civil SATIP-L-450- 01 SAIC-L-1003 HWYH-1118 TA-445909 6/3/2019 6.30AM Mr. Raymund CLOSED
km1+153, km1+056 to km0+969 fw183t-175, KHAN
fw150-103, fw93-88, fw80-73
Trench Bedding Inspection for HWYH-1118
TASEER
1246 CPP-NGCP-CIV-1244A 1400114391 Civil SATIP-L- 450- 01 SAIC-L-1002 KM2+319 to KM2+218 , km1+918 to 1+335, HWYH-1118 TA-445909 6/3/2019 6.40 AM Mr. Raymund CLOSED
KHAN
km1+214 to km1+153, km1+056 to km0+969
Sand Covering and backfilling Inspection for
HWYH-1118 KM2+319 to KM2+218 , km1+918 TASEER
1247 CPP-NGCP-CIV-1245A 1400114433 Civil SATIP-L-450- 01 SAIC-L-1004 to 1+335, km1+214 to km1+153, km1+056 to HWYH-1118 TA-445909 6/3/2019 6.50 AM Mr. Raymund CLOSED
KHAN
km0+969
Material receiving inspection for selectfill HWYH CK-RH TASEER
1248 CPP-NGCP-CIV-1246A 1400114467 Civil SATIP-A- 114- 01 SAIC-A-1003
material for open cut CK-RH AND GK_RH AND GK_RH
N/A 6/3/2019 7.30 AM
KHAN
Mr. Randy CLOSED

10'' F/L HRDH-902 -DK Pipe lowering at sta-


AQIB
1249 CPP-NGCP-CIV-1247 1400114854 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+391 to KP0+452 HRDH-902 FL TA-843606 6/9/2019 6.30 AM
HUSSEIN
Mr. Edgardo CLOSED RE-SCHEDULE TO 10-
00-FW-(25-30); JUNE-2019
Trench Bedding Inspection for 10" FL HRDH-902
AQIB
1250 CPP-NGCP-CIV-1248 1400114810 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP0+391 to KP0+452 HRDH-902 FL TA-843606 6/9/2019 6.35 AM
HUSSEIN
Mr. Edgardo CLOSED RE-SCHEDULE TO 10-
00-FW-(25-30); JUNE-2019
Sand Covering and backfilling Inspection for 10"
AQIB
1251 CPP-NGCP-CIV-1249 1400114802 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-902-sta- KP0+391 to KP0+452 HRDH-902 FL TA-843606 6/9/2019 6.40 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 10-
HUSSEIN
00-FW-(25-30); JUNE-2019
10'' F/L HRDH-902 -DK Pipe lowering at sta-
AQIB
1252 CPP-NGCP-CIV-1250 1400114856 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+513 to KP0+871; HRDH-902 FL TA-843606 6/9/2019 6.45 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 10-
HUSSEIN
00-FW-(35-64); JUNE-2019
Trench Bedding Inspection for 10" FL HRDH-902
AQIB
1253 CPP-NGCP-CIV-1251 1400114779 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP0+513 to KP0+871; HRDH-902 FL TA-843606 6/9/2019 6.50 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 10-
HUSSEIN
00-FW-(35-64); JUNE-2019
Sand Covering and backfilling Inspection for 10"
AQIB
1254 CPP-NGCP-CIV-1252 1400114857 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-902-sta- KP0+513 to KP0+871; HRDH-902 FL TA-843606 6/9/2019 6.55 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 10-
HUSSEIN
00-FW-(35-64); JUNE-2019
10'' F/L HRDH-902 -DK Pipe lowering at sta-
AQIB
1255 CPP-NGCP-CIV-1253 1400114844 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+979 to KP1+016; HRDH-902 FL TA-843606 6/9/2019 7.00 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 10-
HUSSEIN
00-FW-(73-76); JUNE-2019
Trench Bedding Inspection for 10" FL HRDH-902
AQIB
1256 CPP-NGCP-CIV-1254 1400114863 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP0+979 to KP1+016; HRDH-902 FL TA-843606 6/9/2019 7.05 AM
HUSSEIN
Mr. Edgardo CLOSED RE-SCHEDULE TO 10-
00-FW-(73-76); JUNE-2019
Sand Covering and backfilling Inspection for 10"
AQIB
1257 CPP-NGCP-CIV-1255 1400114859 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-902-sta- KP0+979 to KP1+016; HRDH-902 FL TA-843606 6/9/2019 7.10 AM
HUSSEIN
Mr. Edgardo CLOSED RE-SCHEDULE TO 10-
00-FW-(73-76); JUNE-2019
10'' F/L HRDH-902 -DK Pipe lowering at sta-
AQIB
1258 CPP-NGCP-CIV-1256 1400114781 Civil SATIP-L-450- 01 SAIC-L-1003 KP1+184 to KP2+057; HRDH-902 FL TA-843606 6/9/2019 7.15 AM
HUSSEIN
Mr. Edgardo CLOSED RE-SCHEDULE TO 10- RE-SCHEDULE TO
01-FW-(90-160); JUNE-2019 11-JUNE-2019
Trench Bedding Inspection for 10" FL HRDH-902
AQIB
1259 CPP-NGCP-CIV-1257 1400114846 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP1+184 to KP2+057; HRDH-902 FL TA-843606 6/9/2019 7.20 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 10- RE-SCHEDULE TO
HUSSEIN
01-FW-(90-160); JUNE-2019 11-JUNE-2020
Sand Covering and backfilling Inspection for 10"
AQIB
1260 CPP-NGCP-CIV-1258 1400114811 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-902-sta- KP1+184 to KP2+057; HRDH-902 FL TA-843606 6/9/2019 7.25 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 10- RE-SCHEDULE TO
HUSSEIN
01-FW-(90-160); JUNE-2019 11-JUNE-2021
9th lyer General fill/Marl Fillplacement and
1261 CPP-NGCP-CIV-1259 1400115364 Civil SATIP-A-114-01 SAIC-A-1004 compaction inspection at HRDH-1142 Wellpad HRDH-1142 BA-872429 6/9/2019 9.00 AM Hameed Ullah Mr. Edgardo CLOSED
Extension
9th lyer General fill/Marl compaction test
1262 CPP-NGCP-CIV-1260 Hameed Civil SATIP-A-114-01 SAIC-A-1005 HRDH-1142 BA-872429 6/9/2019 9.45 AM Hameed Ullah Mr. Edgardo CLOSED
inspection at HRDH-1142 Wellpad Extension
SOIL SAMPLING,TESTING AND REVIEW OF
HRDH BORROW
CHEMICAL TEST REPORTS FOR HRDH
1263 CPP-NGCP-CIV-1241 1400115914 Civil SATIP-A-114-01 SAIC-A-1001 PIT#11,STOCKPIL N/A 6/10/2019 10.25 AM Hameed Ullah Mr.RANDY CLOSED
BORROW PIT#11,STOCKPILE 01-NEAR RH-
E 01-NEAR RH-EK
EK
SOIL SAMPLING,TESTING AND REVIEW OF HRDH BORROW
CHEMICAL TEST REPORTS FOR HRDH PIT#02,STOCKPIL
1264 CPP-NGCP-CIV-1242 1400115910 Civil SATIP-A-114-01 SAIC-A-1001
BORROW PIT#02,STOCKPILE-01 ,NEAR E-01 ,NEAR
N/A 6/10/2019 10.30AM Hameed Ullah Mr.RANDY CLOSED
HRDH-1117 HRDH-1117
SOIL SAMPLING,TESTING AND REVIEW OF HRDH BORROW
PIT
CHEMICAL TEST REPORTS FOR HRDH
1265 CPP-NGCP-CIV-1243 1400115850 Civil SATIP-A-114-01 SAIC-A-1001
BORROW PIT #01,STOCKPILE-07 NEAR
#01,STOCKPILE- N/A 6/10/2019 10.35AM Hameed Ullah Mr.RANDY CLOSED
HRDH-1122 07 NEAR HRDH-
1122
SOIL SAMPLING,TESTING AND REVIEW OF HRDH BORROW
PIT
CHEMICAL TEST REPORTS FOR HRDH
1266 CPP-NGCP-CIV-1244 1400115791 Civil SATIP-A-114-01 SAIC-A-1001 #01,STOCKPILE- N/A 6/10/2019 10.40AM Hameed Ullah Mr.RANDY CLOSED
BORROW PIT #01,STOCKPILE-08 NEAR
HRDH-1122 08 NEAR HRDH-
1122
SOIL SAMPLING,TESTING AND REVIEW OF HRDH BORROW
CHEMICAL TEST REPORTS FOR HRDH
1267 CPP-NGCP-CIV-1245 1400115860 Civil SATIP-A-114-01 SAIC-A-1001 PIT#08,STOCKPIL N/A 6/10/2019 10.45AM Hameed Ullah Mr.RANDY CLOSED
BORROW PIT#08,STOCKPILE-02 NEAR RH-
E-02 NEAR RH-K2
K2
SOIL SAMPLING,TESTING AND REVIEW OF HRDH-BORROW
CHEMICAL TEST REPORTS FOR HRDH- PIT#04,STOCKPIL
1268 CPP-NGCP-CIV-1246 1400115917 Civil SATIP-A-114-01 SAIC-A-1001 N/A 6/10/2019 10.50AM Hameed Ullah Mr.RANDY CLOSED
BORROW PIT#04,STOCKPILE-02 NEAR E-02 NEAR HRDH-
HRDH-1180 1180

Material receiving inspaction General fill right of AAMIR Mr. Mr Abdul


1269 CPP-NGCP-CIV-1261 1400115967 Civil SATIP-A- 114- 01 SAIC-A-1002
way RHCJ hwyah
HWYH-RHCJ N/A 6/10/2019 9.00 AM
SOLANGI Malik
CLOSED

Fill placement and compaction inspaction right of AAMIR Mr. Mr Abdul


1270 CPP-NGCP-CIV-1262 1400115968 Civil SATIP-A- 114- 01 SAIC-A-1004 HWYH-RHCJ N/A 6/10/2019 9.30 AM CLOSED
way RHCJ hwyah SOLANGI Malik

Pipeline right of way ROW inspaction RHCJ AAMIR Mr. Mr Abdul


1271 CPP-NGCP-CIV-1263 1400116037 Civil SATIP-L- 450- 01 SAIC-L-1001 HWYH-RHCJ N/A 6/10/2019 9.30 AM CLOSED
hwyah SOLANGI Malik

Compaction testing right of way marl road RHCJ AAMIR Mr. Mr Abdul
1272 CPP-NGCP-CIV-1264 1400115988 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-RHCJ N/A 6/10/2019 10.00 AM CLOSED RE-SCHEDULE TO 11-
hwyah SOLANGI Malik
JUNE-2019

Compaction test inspection of 11th layer for


1273 CPP-NGCP-CIV-1265 1400116036 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-GK-RH N/A 6/10/2019 08.00 AM Hameed Ullah Mr. Edgardo CLOSED
Zone C at HRDH RH-GK Extension
Compaction test inspection of 28th layer for
1274 CPP-NGCP-CIV-1266 1400115969 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-GK-RH N/A 6/10/2019 08.00 AM Hameed Ullah Mr. Edgardo CLOSED
Zone A part 2 at HRDH RH-GK Extension

10th layer General fill/marl (300mm) fill


1275 CPP-NGCP-CIV-1267 1400115972 Civil SATIP-A- 114- 01 SAIC-A-1004 placement and compaction inspection at Hrdh- HRDH-1142 FL BA-872429 6/10/2019 03.00 PM Hameed Ullah Mr. Edgardo Reject
1142 wellpad extension
10th layer General Fill/Marl Compaction testing
1276 CPP-NGCP-CIV-1268 1400116006 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1142 FL BA-872429 6/10/2019 03.00 PM Hameed Ullah Mr. Edgardo CLOSED
Inspection at Hrdh-1142 wellpad extension
Compaction test inspection for hawiyah 1112 TASEER
1277 CPP-NGCP-CIV-1269 1400116202 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH-1112 N/A 6/10/2019 8.00 AM Mr. Raymund CLOSED
existing surface KHAN
Bottom trench excavation inspection for hawiyah
TASEER
1278 CPP-NGCP-CIV-1270 1400116247 Civil SATIP-L- 450- 01 SAIC-L-1002 1112 hawiyah 1112 N/A 6/10/2019 9.00 AM Mr. Raymund CLOSED
KHAN
Km 0+800 to 1+180
Fill placement and compaction inspection for TASEER
1279 CPP-NGCP-CIV-1271 1400116267 Civil SATIP-A- 114- 01 SAIC-A-1004 HWYH 1036 N/A 6/10/2019 9.30 AM Mr. Raymund CLOSED
hawiyah 1036 5th layer KHAN
compaction test inspection for hawiyah 1036 5th TASEER
1280 CPP-NGCP-CIV-1272 1400116212 Civil SATIP-A- 114- 01 SAIC-A-1005
layer
HWYH 1036 N/A 6/10/2019 9.30 AM
KHAN
Mr. Raymund CLOSED

SOIL SAMPLING,TESTING AND REVIEW OF


1281 CPP-NGCP-CIV-1273 1400116554 Civil SATIP-A-114-01 SAIC-A-1001 CHEMICAL TEST REPORTS FOR HRDH 1306 HRDH-1306 N/A 6/11/2019 9.00 AM Hameed Ullah Mr.RANDY CLOSED
EXISTING GROUND MATERIAL
SOIL SAMPLING,TESTING AND REVIEW OF
1282 CPP-NGCP-CIV-1274 1400116529 Civil SATIP-A-114-01 SAIC-A-1001 CHEMICAL TEST REPORTS FOR HRDH 1023 HRDH-1023 N/A 6/11/2019 9.30 AM Hameed Ullah Mr.RANDY CLOSED
EXISTING GROUND MATERIAL
SOIL SAMPLING,TESTING AND REVIEW OF
TEST REPORTS FOR HRDH -BORROW HRDH-1306
1283 CPP-NGCP-CIV-1275 1400116596 Civil SATIP-A-114-01 SAIC-A-1001
PIT#19,STOCKPILE-01(N-2703100.450,E- BORROW PIT
N/A 6/11/2019 9.30 AM Hameed Ullah Mr.RANDY CLOSED
310803.450) NEAR HRDH -1306 WELLPAD
COMPACTION TEST INSPECTION OF FINAL
1284 CPP-NGCP-CIV-1276 1400116430 Civil SATIP-A-114-01 SAIC-A-1005 LAYER(MARL) FOR ZONE A AND B AT RH- HRDH-RH-EK N/A 6/11/2019 9.30 AM Hameed Ullah Mr. Edgardo CLOSED
EK-HRDH
10'' F/L HRDH-902 -DK Pipe lowering at sta- RFI has been canceled due
AQIB
1285 CPP-NGCP-CIV-1277 1400117099 Civil SATIP-L-450- 01 SAIC-L-1003 KP1+184 to KP2+057; HRDH-902 FL TA-843606 6/11/2019 7.15 AM Mr. Edgardo CLOSED to the double raised in
HUSSEIN
01-FW-(90-160); the EPM.
Trench Bedding Inspection for 10" FL HRDH-902 RFI has been canceled due
AQIB
1286 CPP-NGCP-CIV-1278 1400117105 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP1+184 to KP2+057; HRDH-902 FL TA-843606 6/11/2019 7.20 AM Mr. Edgardo CLOSED to the double raised in
HUSSEIN
01-FW-(90-160); the EPM.
Sand Covering and backfilling Inspection for 10"
AQIB RFI has been canceled due
1287 CPP-NGCP-CIV-1279 1400117100 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-902-sta- KP1+184 to KP2+057; HRDH-902 FL TA-843606 6/11/2019 7.25 AM Mr. Edgardo Reject to the double raised in
HUSSEIN
01-FW-(90-160); the EPM.
10'' F/L HRDH-902 -DK Pipe lowering at sta-
AQIB
1288 CPP-NGCP-CIV-1280 1400117101 Civil SATIP-L-450- 01 SAIC-L-1003 KP2+357 to KP2+394; HRDH-902 FL TA-843606 6/11/2019 7.15 AM Mr. Edgardo CLOSED
HUSSEIN
02-FW-(185-188);
Trench Bedding Inspection for 10" FL HRDH-902
AQIB
1289 CPP-NGCP-CIV-1281 1400117102 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP2+357 to KP2+394; HRDH-902 FL TA-843606 6/11/2019 7.20 AM
HUSSEIN
Mr. Edgardo CLOSED
02-FW-(185-188);
Sand Covering and backfilling Inspection for 10"
AQIB
1290 CPP-NGCP-CIV-1282 1400117116 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-902-sta- KP2+357 to KP2+394; HRDH-902 FL TA-843606 6/11/2019 7.25 AM
HUSSEIN
Mr. Edgardo CLOSED
02-FW-(185-188);
Tranch excavation and bottom of Tranch
hawiyah GGM 24" AAMIR Mr. Mr Abdul
1291 CPP-NGCP-CIV-1283 1400116760 Civil SATIP-L- 450- 01 SAIC-L-1002 inspaction GGM 24" TR/L1 station 1+400 to N/A 6/11/2019 8.00 AM CLOSED
TR/L1 SOLANGI Malik
1+490 - 1+615 to 1+708 - 1+765 to 1+822
Tranch excavation and bottom of Tranch
hawiyah GGM 24" AAMIR Mr. Mr Abdul
1292 CPP-NGCP-CIV-1284 1400116782 Civil SATIP-L- 450- 01 SAIC-L-1002 inspaction GGM 24"TR/L1 station 1+914 to N/A 6/11/2019 8.00 AM CLOSED
TR/L1 SOLANGI Malik
2+036 - 2+067 to 2+147 - 2+293 to 2+553
Tranch excavation bottom of Tranch inspaction
hawiyah GGM AAMIR Mr. Mr Abdul
1293 CPP-NGCP-CIV-1285 1400116711 Civil SATIP-L- 450- 01 SAIC-L-1002 GGM 36"TR/L1 hwyah station 1+420 to 1+510 - N/A 6/11/2019 8.30 AM CLOSED
36"TR/L1 SOLANGI Malik
1+620 to 1+709 - 1+765 to 1+800
Tranch excavation and bottom of Tranch
hawiyah GGM AAMIR Mr. Mr Abdul
1294 CPP-NGCP-CIV-1286 1400116818 Civil SATIP-L- 450- 01 SAIC-L-1002 inspaction GGM 36" TR/L1 hwyah station 1+955 N/A 6/11/2019 9.00 AM CLOSED
36"TR/L1 SOLANGI Malik
to 2+020 - 2+055 to 2+155 - 2+320 to 2+730
Tranch excavation and bottom of Tranch
hawiyah GGM AAMIR Mr. Mr Abdul
1295 CPP-NGCP-CIV-1287 1400116844 Civil SATIP-L- 450- 01 SAIC-L-1002 inspaction GGM 36" TR/L2 hwyah station 1+415 N/A 6/11/2019 9.30 AM CLOSED
36"TR/L2 SOLANGI Malik
to 1+512 - 1+627 to 1+724 - 1+786 to 1+848
Tranch excavation and bottom of Tranch
hawiyah GGM AAMIR Mr. Mr Abdul
1296 CPP-NGCP-CIV-1288 1400116732 Civil SATIP-L- 450- 01 SAIC-L-1002 inspaction GGM 36" TR/L2 hwyah station 1+947
36"TR/L2
N/A 6/11/2019 10.00 AM
SOLANGI Malik
CLOSED
to 2+040 - 2+070 to 2+160 - 2+324 to 2+654
Soil sampling and testing for borrow pit 11 TASEER
1297 CPP-NGCP-CIV-1289 1400116836 Civil SATIP-A- 114- 01 SAIC-A-1001
stockpile no 4
Hwyh 1112 N/A 6/11/2019 8.00 AM
KHAN
Mr. Raymund CLOSED
Fill placement and compaction inspection for TASEER
1298 CPP-NGCP-CIV-1290 1400116821 Civil SATIP-A- 114- 01 SAIC-A-1004 Hwyh 1112 N/A 6/11/2019 9.30 AM Mr. Raymund CLOSED
hawiyah 1112 1st layer KHAN
Compaction test inspection for hawiyah 1112 1st TASEER
1299 CPP-NGCP-CIV-1291 1400116822 Civil SATIP-A- 114- 01 SAIC-A-1005 Hwyh 1112 N/A 6/11/2019 9.30 AM Mr. Raymund CLOSED
layer KHAN
Pipe lowering at HWYH-1112 KM1+632 TO TASEER
1300 CPP-NGCP-CIV-1292 1400117276 Civil SATIP-L-450- 01 SAIC-L-1003
1+695 FW127-132
HWYH-1112 TA-445906 6/12/2019 7.30AM
KHAN
Mr. Raymund Reject
Trench Bedding Inspection for HWYH-1112 TASEER
1301 CPP-NGCP-CIV-1293 1400117310 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH-1112 TA-445906 6/12/2019 7.40 AM Mr. Raymund Reject
KM1+632 TO 1+695 KHAN
Sand Covering and backfilling Inspection for TASEER
1302 CPP-NGCP-CIV-1294 1400117343 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1112 TA-445906 6/12/2019 7.50 AM Mr. Raymund Reject
HWYH-1112 KM1+632 TO 1+695 KHAN
Pipe lowering at HWYH-1112 KM1+363 TO TASEER
1303 CPP-NGCP-CIV-1295 1400117261 Civil SATIP-L-450- 01 SAIC-L-1003 HWYH-1112 TA-445906 6/12/2019 7.30AM Mr. Raymund Reject
1+523 FW105-118 KHAN
Trench Bedding Inspection for HWYH-1112 TASEER
1304 CPP-NGCP-CIV-1296 1400117314 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH-1112 TA-445906 6/12/2019 7.40 AM Mr. Raymund Reject
KM1+363 TO 1+523 KHAN
Sand Covering and backfilling Inspection for TASEER
1305 CPP-NGCP-CIV-1297 1400117354 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1112 TA-445906 6/12/2019 7.50 AM Mr. Raymund Reject
HWYH-1112 KM1+363 TO 1+523 KHAN
Pipe lowering at HWYH-1112 KM1+204 TO TASEER
1306 CPP-NGCP-CIV-1298 1400117278 Civil SATIP-L-450- 01 SAIC-L-1003
1+290 FW92-99
HWYH-1112 TA-445906 6/12/2019 7.30AM
KHAN
Mr. Raymund Reject

Trench Bedding Inspection for HWYH-1112 TASEER


1307 CPP-NGCP-CIV-1299 1400117375 Civil SATIP-L- 450- 01 SAIC-L-1002
KM1+204 TO 1+290
HWYH-1112 TA-445906 6/12/2019 7.40 AM
KHAN
Mr. Raymund Reject
Sand Covering and backfilling Inspection for TASEER
1308 CPP-NGCP-CIV-1300 1400117381 Civil SATIP-L-450- 01 SAIC-L-1004
HWYH-1112 KM1+204 TO 1+290
HWYH-1112 TA-445906 6/12/2019 7.50 AM
KHAN
Mr. Raymund Reject

Pipe lowering at HWYH-1112 KM1+044 to TASEER


1309 CPP-NGCP-CIV-1301 1400117331 Civil SATIP-L-450- 01 SAIC-L-1003
1+156 FW79-88
HWYH-1112 TA-445906 6/12/2019 7.30AM
KHAN
Mr. Raymund CLOSED
Trench Bedding Inspection for HWYH-1112 TASEER
1310 CPP-NGCP-CIV-1302 1400117433 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH-1112 TA-445906 6/12/2019 7.40 AM Mr. Raymund Reject
KM1+044 to 1+156 KHAN
Sand Covering and backfilling Inspection for TASEER
1311 CPP-NGCP-CIV-1303 1400117425 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1112 TA-445906 6/12/2019 7.50 AM Mr. Raymund CLOSED
HWYH-1112 KM1+044 to 1+156 KHAN
Pipe lowering at HWYH-1112 KM 0+934 to TASEER
1312 CPP-NGCP-CIV-1304 1400117444 Civil SATIP-L-450- 01 SAIC-L-1003 HWYH-1112 TA-445906 6/12/2019 7.30AM Mr. Raymund CLOSED
0+971 FW 70-73 KHAN
Trench Bedding Inspection for HWYH-1112 KM TASEER
1313 CPP-NGCP-CIV-1305 1400117454 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH-1112 TA-445906 6/12/2019 7.40 AM Mr. Raymund Reject
0+934 to 0+971 KHAN
Sand Covering and backfilling Inspection for TASEER
1314 CPP-NGCP-CIV-1306 1400117435 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1112 TA-445906 6/12/2019 7.50 AM Mr. Raymund Reject
HWYH-1112 KM1+044 to 1+156 KHAN
Pipe lowering at HWYH-1112 KM0+752 to TASEER
1315 CPP-NGCP-CIV-1307 1400117417 Civil SATIP-L-450- 01 SAIC-L-1003 HWYH-1112 TA-445906 6/12/2019 7.30AM Mr. Raymund Reject
0+789 FW55-58 KHAN
Trench Bedding Inspection for HWYH-1112 KM TASEER
1316 CPP-NGCP-CIV-1308 1400117431 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH-1112 TA-445906 6/12/2019 7.40 AM Mr. Raymund Reject
0+752 to 0+789 KHAN
Sand Covering and backfilling Inspection for TASEER
1317 CPP-NGCP-CIV-1309 1400117402 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1112 TA-445906 6/12/2019 7.50 AM Mr. Raymund Reject
HWYH-1112 KM 0+752 to 0+789 KHAN
Pipe lowering at HWYH-1112 KM 0+655 to TASEER
1318 CPP-NGCP-CIV-1310 1400117436 Civil SATIP-L-450- 01 SAIC-L-1003
0+716 FW47-52
HWYH-1112 TA-445906 6/12/2019 7.30AM
KHAN
Mr. Raymund Reject

Trench Bedding Inspection for HWYH-1112 KM TASEER


1319 CPP-NGCP-CIV-1311 1400117473 Civil SATIP-L- 450- 01 SAIC-L-1002
0+655 to 0+716
HWYH-1112 TA-445906 6/12/2019 7.40 AM
KHAN
Mr. Raymund Reject
Sand Covering and backfilling Inspection for TASEER
1320 CPP-NGCP-CIV-1312 1400117418 Civil SATIP-L-450- 01 SAIC-L-1004
KM 0+655 to 0+716
HWYH-1112 TA-445906 6/12/2019 7.50 AM
KHAN
Mr. Raymund Reject
Prime coat material placement inspection for HWYH-RH_GK and TASEER
1321 CPP-NGCP-CIV-1313 1400117761 Civil SATIP-Q-006-02 SAIC-Q-1041
hawiyah for open cut at RH_GK and RH_CK RH_CK
N/A 6/12/2019 9:30:00 AM
KHAN
Mr. Raymund CLOSED
Asphalt material placement inspection for HWYH-RH_GK and TASEER
1322 CPP-NGCP-CIV-1314 1400117793 Civil SATIP-Q-006-02 SAIC-Q-1061 N/A 6/12/2019 9:30:00 AM Mr. Raymund CLOSED
hawiyah open cut RH_GK and RH_CK RH_CK KHAN
11th final layer General fill/marl (300mm) fill
1323 CPP-NGCP-CIV-1315 1400117379 Civil SATIP-A- 114- 01 SAIC-A-1004 placement and compaction inspection at Hrdh- HRDH-1142 FL BA-872429 6/12/2019 08.00 AM Hameed Ullah Mr. Edgardo CLOSED RE-SCHEDULE TO 13-
1142 wellpad extension JUNE-2019
11th final layer General Fill/Marl Compaction
1324 CPP-NGCP-CIV-1316 1400117367 Civil SATIP-A- 114- 01 SAIC-A-1005 testing Inspection at Hrdh-1142 wellpad HRDH-1142 FL BA-872429 6/12/2019 08.15 AM Hameed Ullah Mr. Edgardo Reject
RE-SCHEDULE TO 13-
extension JUNE-2019
Material Receiving Inspection for Selectfill
1325 CPP-NGCP-CIV-1317 1400117808 Civil SATIP-A- 114- 01 SAIC-A-1002 HRDH RH-GK N/A 6/12/2019 09.00 AM Hameed Ullah Mr. Edgardo CLOSED
Material at HRDH RH-GK
Fill placement and compaction inspection of 28th
1326 CPP-NGCP-CIV-1318 1400117835 Civil SATIP-A- 114- 01 SAIC-A-1004 layer for Zone A Part 1 at HRDH RH-GK HRDH RH-GK N/A 6/12/2019 09.05 AM Hameed Ullah Mr. Edgardo CLOSED
Extension
Compaction test inspection of 28th layer for
1327 CPP-NGCP-CIV-1319 1400117712 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH RH-GK N/A 6/12/2019 09.10 AM Hameed Ullah Mr. Edgardo CLOSED
Zone A Part 1 at HRDH RH-GK Extension
Trench Bedding Inspection for 8" FL HRDH-1178
AQIB
1328 CPP-NGCP-CIV-1320 1400117797 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP0+259 to KP0+394; HRDH-1178 FL TA-843955 6/12/2019 7.00 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(14-25);
Trench Bedding Inspection for 8" FL HRDH-1178
AQIB
1329 CPP-NGCP-CIV-1321 1400117840 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP0+491 to KP0+627; HRDH-1178 FL TA-843955 6/12/2019 7.05 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(33-44);
Trench Bedding Inspection for 8" FL HRDH-1178
AQIB
1330 CPP-NGCP-CIV-1322 1400117810 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP0+663 to KP0+738; HRDH-1178 FL TA-843955 6/12/2019 7.10 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(47-53);
Trench Bedding Inspection for 8" FL HRDH-1178
AQIB
1331 CPP-NGCP-CIV-1323 1400117855 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP0+798 to KP0+885; HRDH-1178 FL TA-843955 6/12/2019 7.15 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(58-65);
Trench Bedding Inspection for 8" FL HRDH-1178
AQIB
1332 CPP-NGCP-CIV-1324 1400117825 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP0+958 to KP1+019; HRDH-1178 FL TA-843955 6/12/2019 7.20 AM
HUSSEIN
Mr. Edgardo CLOSED
00-FW-(71-76);
Trench Bedding Inspection for 8" FL HRDH-1178
AQIB
1333 CPP-NGCP-CIV-1325 1400117883 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP1+104 to KP1+474; HRDH-1178 FL TA-843955 6/12/2019 7.25 AM
HUSSEIN
Mr. Edgardo CLOSED
01-FW-(83-113);
Trench Bedding Inspection for 8" FL HRDH-1178
AQIB
1334 CPP-NGCP-CIV-1326 1400117884 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP1+548 to KP1+994; HRDH-1178 FL TA-843955 6/12/2019 7.30 AM Mr. Edgardo CLOSED
HUSSEIN
01-FW-(119-155);
Trench Bedding Inspection for 8" FL HRDH-1178
AQIB
1335 CPP-NGCP-CIV-1327 1400117828 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP2+186 to KP2+210; HRDH-1178 FL TA-843955 6/12/2019 7.35 AM Mr. Edgardo CLOSED
HUSSEIN
02-FW-(171-173);
Trench Bedding Inspection for 8" FL HRDH-1178
AQIB
1336 CPP-NGCP-CIV-1328 1400117846 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP2+283 to KP2+332; HRDH-1178 FL TA-843955 6/12/2019 7.40 AM Mr. Edgardo CLOSED
HUSSEIN
02-FW-(179-183);
8'' F/L HRDH-1178 -619 Pipe lowering at sta-
AQIB
1338 CPP-NGCP-CIV-1330 1400118913 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+259 to KP0+394; HRDH-1178 FL TA-843955 6/13/2019 6.30 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(14-25);
Sand Covering and backfilling Inspection for 8"
AQIB
1339 CPP-NGCP-CIV-1331 1400118914 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1178-sta- KP0+259 to KP0+394; HRDH-1178 FL TA-843955 6/13/2019 6.40 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(14-25);
8'' F/L HRDH-1178 -619 Pipe lowering at sta-
AQIB
1340 CPP-NGCP-CIV-1332 1400118898 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+491 to KP0+627; HRDH-1178 FL TA-843955 6/13/2019 6.45 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(33-44);
Sand Covering and backfilling Inspection for 8"
AQIB
1341 CPP-NGCP-CIV-1333 1400118878 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1178-sta- KP0+491 to KP0+627; HRDH-1178 FL TA-843955 6/13/2019 6.55 AM
HUSSEIN
Mr. Edgardo CLOSED
00-FW-(33-44);
8'' F/L HRDH-1178 -619 Pipe lowering at sta-
AQIB
1342 CPP-NGCP-CIV-1334 1400118900 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+663 to KP0+738; HRDH-1178 FL TA-843955 6/13/2019 7.00 AM
HUSSEIN
Mr. Edgardo CLOSED
00-FW-(47-53);
Sand Covering and backfilling Inspection for 8"
AQIB
1343 CPP-NGCP-CIV-1335 1400118880 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1178-sta- KP0+663 to KP0+738; HRDH-1178 FL TA-843955 6/13/2019 7.10 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(47-53);
8'' F/L HRDH-1178 -619 Pipe lowering at sta-
AQIB
1344 CPP-NGCP-CIV-1336 1400118881 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+798 to KP0+885; HRDH-1178 FL TA-843955 6/13/2019 7.15 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(58-65);
Sand Covering and backfilling Inspection for 8"
AQIB
1345 CPP-NGCP-CIV-1337 1400118925 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1178-sta- KP0+798 to KP0+885; HRDH-1178 FL TA-843955 6/13/2019 7.25 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(58-65);
8'' F/L HRDH-1178 -619 Pipe lowering at sta-
AQIB
1346 CPP-NGCP-CIV-1338 1400118945 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+958 to KP1+019; HRDH-1178 FL TA-843955 6/13/2019 7.15 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(71-76);
Sand Covering and backfilling Inspection for 8"
AQIB
1347 CPP-NGCP-CIV-1339 1400118936 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1178-sta- KP0+958 to KP1+019; HRDH-1178 FL TA-843955 6/13/2019 7.25 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(71-76);
Fill placement and compaction inspection for TASEER
1348 CPP-NGCP-CIV-1340 1400118694 Civil SATIP-A- 114- 01 SAIC-A-1004 Hwyh 1112 N/A 6/13/2019 8.30 AM Mr. Randy CLOSED
hawiyah 1112 2nd layer KHAN
Compaction test inspection for hawiyah 1112 TASEER
1349 CPP-NGCP-CIV-1341 1400118726 Civil SATIP-A- 114- 01 SAIC-A-1005 Hwyh 1112 N/A 6/13/2019 8.30 AM Mr. Randy CLOSED
2nd layer KHAN
Fill placement and compaction inspection for TASEER
1350 CPP-NGCP-CIV-1342 1400118676 Civil SATIP-A- 114- 01 SAIC-A-1004
hawiyah 1036 6th layer
HWYH 1036 N/A 6/13/2019 9.30 AM
KHAN
Mr. Randy CLOSED
compaction test inspection for hawiyah 1036 6th TASEER
1351 CPP-NGCP-CIV-1343 1400118689 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH 1036 N/A 6/13/2019 9.30 AM Mr. Randy CLOSED
layer KHAN
Fill placement and compaction inspection for TASEER
1352 CPP-NGCP-CIV-1344 1400119658 Civil SATIP-A- 114- 01 SAIC-A-1004
hawiyah 1112 3rd layer
Hwyh 1112 N/A 6/15/2019 8.30 AM
KHAN
Mr. Randy CLOSED

Compaction test inspection for hawiyah 1112 3rd TASEER


1353 CPP-NGCP-CIV-1345 1400119630 Civil SATIP-A- 114- 01 SAIC-A-1005 Hwyh 1112 N/A 6/15/2019 8.30 AM Mr. Randy CLOSED
layer KHAN
Bottom trench excavation inspection for hawiyah
TASEER
1354 CPP-NGCP-CIV-1346 1400119602 Civil SATIP-L- 450- 01 SAIC-L-1002 1093 hawiyah 1093 N/A 6/15/2019 9.00 AM Mr. Randy CLOSED
KHAN
Km 0+188 to 3+136
Soil sampling for subbase material stockpile no 3 TASEER
1355 CPP-NGCP-CIV-1347 1400119703 Civil SATIP-A- 114- 01 SAIC-A-1001 HWYH-1036 N/A 6/15/2019 8.00 AM Mr. Randy CLOSED
borrow pit 17 KHAN

1356 CPP-NGCP-CIV-1348 1400119717 Civil SATIP-A- 114- 01 SAIC-A-1005


Compaction testing 1 st layer 300 mm well pad
Hwyh RH CJ N/A 6/15/2019 8.30 AM AAMIR Mr. Mr Abdul
CLOSED
RE-SCHEDULE TO 16-
RH CJ zone A hwyah SOLANGI Malik JUNE-2019
Compaction testing 1 st layer 300 mm well pad AAMIR Mr. Mr Abdul RE-SCHEDULE TO 16-
1357 CPP-NGCP-CIV-1349 1400119698 Civil SATIP-A- 114- 01 SAIC-A-1005
RHCJ zone D hwyah
Hwyh RH CJ N/A 6/15/2019 8.30 AM
SOLANGI Malik
CLOSED
JUNE-2019

1358 CPP-NGCP-CIV-1350 1400119983 Civil SATIP-A- 114- 01 SAIC-A-1006 Final fill inspection for RH-EK Extension HRDH-RH-EK N/A 6/15/2019 9.30 AM Hameed Ullah Mr. Edgardo CLOSED

Pipe lowering at HWYH-975 KM0+972 to


TASEER
1359 CPP-NGCP-CIV-1351 1400120065 Civil SATIP-L-450- 01 SAIC-L-1003 KM1+513, KM1+670 to KM2+244 FW70-114 , HWYH-975 FL TA-446045 6/16/2019 7.30AM
KHAN
Mr. Randy CLOSED
FW127-173
Trench Bedding Inspection for HWYH-975 TASEER
1360 CPP-NGCP-CIV-1352 1400119961 Civil SATIP-L- 450- 01 SAIC-L-1002
KM0+972 to KM1+513, KM1+670 to KM2+244
HWYH-975 FL TA-446045 6/16/2019 7.40 AM
KHAN
Mr. Randy CLOSED

Sand Covering and backfilling Inspection for


TASEER
1361 CPP-NGCP-CIV-1353 1400119981 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-975 KM0+972 to KM1+513, KM1+670 to HWYH-975 FL TA-446045 6/16/2019 7.50 AM Mr. Randy CLOSED
KHAN
KM2+244
Trench excavation bottom of trench inspaction hawiyah GGM 24" AAMIR Mr. Mr Abdul RE-SCHEDULE TO 17-
1362 CPP-NGCP-CIV-1354 1400120300 Civil SATIP-L- 450- 01 SAIC-L-1002
station 2+920 to 3+423 GGM 24" T/R 1 hwyah TR/L1
N/A 6/16/2019 8.00 AM
SOLANGI Malik
CLOSED
JUNE-2019
Trench excavation bottom of trench inspaction hawiyah GGM AAMIR Mr. Mr Abdul RE-SCHEDULE TO 17-
1363 CPP-NGCP-CIV-1355 1400120348 Civil SATIP-L- 450- 01 SAIC-L-1002 N/A 6/16/2019 9.00 AM CLOSED
station 3+235 to 3+370 GGM 36" TR/1 hwyah 36"TR/L1 SOLANGI Malik JUNE-2019
Trench excavation bottom of trench inspaction hawiyah GGM AAMIR Mr. Mr Abdul RE-SCHEDULE TO 17-
1364 CPP-NGCP-CIV-1356 1400120282 Civil SATIP-L- 450- 01 SAIC-L-1002 N/A 6/16/2019 9.30 AM CLOSED
station 3+122 to 3+428 GGM TR/L 2 hwyah TR/L2 SOLANGI Malik JUNE-2019
Fill placement and compaction inspection for TASEER
1365 CPP-NGCP-CIV-1357 1400120393 Civil SATIP-A- 114- 01 SAIC-A-1004 Hwyh 1112 N/A 6/16/2019 8.00 AM Mr. Randy CLOSED
hawiyah 1112 4th layer KHAN
Compaction test inspection for hawiyah 1112 4th TASEER
1366 CPP-NGCP-CIV-1358 1400120331 Civil SATIP-A- 114- 01 SAIC-A-1005 Hwyh 1112 N/A 6/16/2019 8.00 AM Mr. Randy CLOSED
layer KHAN
Fill placement and compaction inspection for TASEER
1367 CPP-NGCP-CIV-1359 1400120386 Civil SATIP-A- 114- 01 SAIC-A-1004 Hwyh 1036 N/A 6/16/2019 8.30 AM Mr. Randy CLOSED
hawiyah 1036 7th layer KHAN
Compaction test inspection for hawiyah 1036 7th TASEER
1368 CPP-NGCP-CIV-1360 1400120414 Civil SATIP-A- 114- 01 SAIC-A-1005 Hwyh 1036 N/A 6/16/2019 8.30 AM Mr. Randy CLOSED
layer KHAN
Compaction test inspection for existing surface TASEER
1369 CPP-NGCP-CIV-1361 1400120379 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah 1002 N/A 6/16/2019 9.00 AM Mr. Randy CLOSED
of hawiyah 1002 KHAN
Soil sampling and testing inspection for existing TASEER
1370 CPP-NGCP-CIV-1362 1400120426 Civil SATIP-A- 114- 01 SAIC-A-1001 hawiyah 1002 N/A 6/16/2019 9.00 AM Mr. Randy CLOSED
surface of hawiyah 1002 KHAN
Compaction test inspection for right of way for 3 TASEER
1371 CPP-NGCP-CIV-1363 1400120388 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah RH_GK N/A 6/16/2019 9.30 AM Mr. Randy CLOSED
electrical poles near RH_GK KHAN
8'' F/L HRDH-1178 -619 Pipe lowering at sta-
AQIB
1372 CPP-NGCP-CIV-1364 1400120604 Civil SATIP-L-450- 01 SAIC-L-1003 KP1+104 to KP1+474; HRDH-1178 FL TA-843955 6/16/2019 6.30 AM Mr. Edgardo Reject RE-SCHEDULE TO 17-
HUSSEIN
01-FW-(83-113); JUNE-2019
Sand Covering and backfilling Inspection for 8"
AQIB
1373 CPP-NGCP-CIV-1365 1400120559 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1178-sta- KP1+104 to KP1+474; HRDH-1178 FL TA-843955 6/16/2019 6.40 AM
HUSSEIN
Mr. Edgardo Reject RE-SCHEDULE TO 17-
01-FW-(83-113); JUNE-2019
8'' F/L HRDH-1178 -619 Pipe lowering at sta-
AQIB
1374 CPP-NGCP-CIV-1366 1400120568 Civil SATIP-L-450- 01 SAIC-L-1003 KP1+548 to KP1+994; HRDH-1178 FL TA-843955 6/16/2019 6.45 AM
HUSSEIN
Mr. Edgardo CLOSED RE-SCHEDULE TO 17-
01-FW-(119-155); JUNE-2019
Sand Covering and backfilling Inspection for 8"
AQIB
1375 CPP-NGCP-CIV-1367 1400120598 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1178-sta- KP1+548 to KP1+994; HRDH-1178 FL TA-843955 6/16/2019 6.55 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 17-
HUSSEIN
01-FW-(119-155); JUNE-2019
8'' F/L HRDH-1178 -619 Pipe lowering at sta-
AQIB
1376 CPP-NGCP-CIV-1368 1400120530 Civil SATIP-L-450- 01 SAIC-L-1003 KP2+186 to KP2+210; HRDH-1178 FL TA-843955 6/16/2019 7.00 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 17-
HUSSEIN
02-FW-(171-173); JUNE-2019
Sand Covering and backfilling Inspection for 8"
AQIB
1377 CPP-NGCP-CIV-1369 1400120560 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1178-sta- KP2+186 to KP2+210; HRDH-1178 FL TA-843955 6/16/2019 7.10 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 17-
HUSSEIN
02-FW-(171-173); JUNE-2019
8'' F/L HRDH-1178 -619 Pipe lowering at sta-
AQIB
1378 CPP-NGCP-CIV-1370 1400120624 Civil SATIP-L-450- 01 SAIC-L-1003 KP2+283 to KP2+332; HRDH-1178 FL TA-843955 6/16/2019 7.15 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 17-
HUSSEIN
02-FW-(179-183); JUNE-2019
Sand Covering and backfilling Inspection for 8"
AQIB
1379 CPP-NGCP-CIV-1371 1400120540 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1178-sta- KP2+283 to KP2+332; HRDH-1178 FL TA-843955 6/16/2019 7.25 AM Mr. Edgardo CLOSED RE-SCHEDULE TO 17-
HUSSEIN
02-FW-(179-183); JUNE-2019
Trench Bedding Inspection for 8" FL HRDH-619
AQIB
1380 CPP-NGCP-CIV-1372 1400120626 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP0+259 to KP0+394; HRDH-619 FL TA-843560 6/16/2019 14.00 PM Mr. Edgardo Reject
HUSSEIN
00-FW-(17-26);
Trench Bedding Inspection for 8" FL HRDH-619
AQIB
1381 CPP-NGCP-CIV-1373 1400120627 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP0+259 to KP0+394; HRDH-619 FL TA-843560 6/16/2019 14.05 PM
HUSSEIN
Mr. Edgardo Reject
00-FW-(32-35);
Trench Bedding Inspection for 8" FL HRDH-619
AQIB
1382 CPP-NGCP-CIV-1374 1400120601 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP0+259 to KP0+394; HRDH-619 FL TA-843560 6/16/2019 14.10 PM
HUSSEIN
Mr. Edgardo Reject
00-FW-(61-76);
Trench Bedding Inspection for 8" FL HRDH-619
AQIB
1383 CPP-NGCP-CIV-1375 1400120605 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP0+259 to KP0+394; HRDH-619 FL TA-843560 6/16/2019 14.15 PM Mr. Edgardo Reject
HUSSEIN
00-FW-(83-166);
Existing ground compaction testing on HRDH-
1384 CPP-NGCP-CIV-1376 1400120634 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1188 FL N/A 6/16/2019 15.00 PM Hameed Ullah Mr. Edgardo CLOSED
1188 wellpad extension (zone-A)
Existing ground compaction testing on HRDH-
1385 CPP-NGCP-CIV-1377 1400120606 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1188 FL N/A 6/16/2019 15.15 PM Hameed Ullah Mr. Edgardo CLOSED
1188 wellpad extension (zone-B)
Aggregate Sub base material Receiving
1386 CPP-NGCP-CIV-1378 1400120644 Civil SATIP-Q- 006- 02 SAIC-Q-1037 HRDH-1194 FL N/A 6/16/2019 08.00 AM Hameed Ullah Mr. Edgardo CLOSED
Inspection at HRDH 1194
Grade, elevation and surface preparation
1387 CPP-NGCP-CIV-1379 1400120542 Civil SATIP-Q- 006- 02 SAIC-Q-1039 Inspection for Access road inside wellpad HRDH HRDH-1194 FL N/A 6/16/2019 09.00 AM Hameed Ullah Mr. Edgardo CLOSED
1194
Placement and Compaction of aggregate sub
1388 CPP-NGCP-CIV-1380 1400120629 Civil SATIP-Q- 006- 02 SAIC-Q-1040 HRDH-1194 FL N/A 6/16/2019 10.00 AM Hameed Ullah Mr. Edgardo CLOSED
base material at HRDH 1194
Compaction test inspection of Sub base material
1389 CPP-NGCP-CIV-1381 1400120619 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1194 FL N/A 6/16/2019 11.30 AM Hameed Ullah Mr. Edgardo CLOSED
for Access road inside well pad at HRDH 1194
Marl Material Receiving Inspection at
1390 CPP-NGCP-CIV-1382 1400120649 Civil SATIP-A- 114- 01 SAIC-A-1002
HRDH 1194
HRDH-1194 FL N/A 6/16/2019 08.05 AM Hameed Ullah Mr. Edgardo CLOSED
2nd layer Fill Placement and compaction
1391 CPP-NGCP-CIV-1383 1400120663 Civil SATIP-A- 114- 01 SAIC-A-1004
inspection at HRDH 1194
HRDH-1194 FL N/A 6/16/2019 14.00 PM Hameed Ullah Mr. Edgardo CLOSED
2nd layer Compaction test Inspection at HRDH
1392 CPP-NGCP-CIV-1384 1400120620 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1194 FL N/A 6/16/2019 14.05 PM Hameed Ullah Mr. Edgardo CLOSED
1194
Compaction test inspection of 12th layer for
1393 CPP-NGCP-CIV-1385 1400121613 Civil SATIP-A- 114- 01 SAIC-A-1005
Zone C at HRDH RH-GK Extension
HRDH-GK-RH N/A 6/17/2019 08.00 AM Hameed Ullah Mr. Edgardo CLOSED
Material Receiving Inspection at HRDH 1188
1394 CPP-NGCP-CIV-1386 1400121531 Civil SATIP-A- 114- 01 SAIC-A-1002 HRDH-1188 FL N/A 6/17/2019 15.00 PM Hameed Ullah Mr. Edgardo Reject
wellpad
1st layer Fill Placement and compaction
1395 CPP-NGCP-CIV-1387 1400121590 Civil SATIP-A- 114- 01 SAIC-A-1004 inspection HRDH-1188 FL N/A 6/17/2019 15.00 PM Hameed Ullah Mr. Edgardo CLOSED
for Zone
1st layer A at HRDH 1188
compaction wellpad for Zone A
test inspection
1396 CPP-NGCP-CIV-1388 1400121623 Civil SATIP-A- 114- 01 SAIC-A-1005 at HRDH-1188 FL N/A 6/17/2019 15.00 PM Hameed Ullah Mr. Edgardo CLOSED
HRDH
1st layer1188 wellpad and compaction
Fill Placement
1397 CPP-NGCP-CIV-1389 1400121635 Civil SATIP-A- 114- 01 SAIC-A-1004 inspection HRDH-1188 FL N/A 6/17/2019 15.00 PM Hameed Ullah Mr. Edgardo CLOSED
for layer
1st Zone compaction
B at HRDH test
1188inspection
wellpad for Zone B
1398 CPP-NGCP-CIV-1390 1400121636 Civil SATIP-A- 114- 01 SAIC-A-1005 at HRDH-1188 FL N/A 6/17/2019 15.00 PM Hameed Ullah Mr. Edgardo CLOSED
HRDH 1188 wellpad
Soil sampling for Borrow pit#20,
stockpile#01(E305672 -207 , N-2718648-668
1399 CPP-NGCP-CIV-1391 1400121579 Civil SATIP-A-114-01 SAIC-A-1001
)
HRDH-1170 FL N/A 6/17/2019 9.30 AM Hameed Ullah Mr. Edgardo CLOSED
HRDH 1170
Trench excavation bottom of trench Imspaction
hawiyah GGM 24" AAMIR Mr. Mr Abdul
1400 CPP-NGCP-CIV-1392 1400121197 Civil SATIP-L- 450- 01 SAIC-L-1002 station 5+567 to 5+624 - 5+796 to 5+836 GGM
TR/L1
N/A 6/17/2019 8.00 AM
SOLANGI Malik
CLOSED
24" TR/L 1 hwyah
Trench excavation bottom of trench inspaction
hawiyah GGM AAMIR Mr. Mr Abdul
1401 CPP-NGCP-CIV-1393 1400121247 Civil SATIP-L- 450- 01 SAIC-L-1002 station 5+408 to 5+507 - 5+577 to 5+625 -
36"TR/L1
N/A 6/17/2019 9.00 AM
SOLANGI Malik
CLOSED
5+765 to 5+804 GGM 36" TR/L 1 hwyah
Trench excavation bottom of trench inspaction
hawiyah GGM AAMIR Mr. Mr Abdul
1402 CPP-NGCP-CIV-1394 1400121250 Civil SATIP-L- 450- 01 SAIC-L-1002 station 5+465 to 5+524 - 5+585 to 5+664 - N/A 6/17/2019 9.30 AM CLOSED
TR/L2 SOLANGI Malik
5+790 to 5+835 GGM 36" TR /L2 hwyah
Material receiving inspsction general fill right of AAMIR Mr. Mr Abdul
1403 CPP-NGCP-CIV-1395 1400121253 Civil SATIP-A- 114- 01 SAIC-A-1002 HWYH-RH EJ N/A 6/17/2019 10.00 AM CLOSED
way RH-EJ hwyah SOLANGI Malik
Fill placement and compaction inspaction right AAMIR Mr. Mr Abdul
1404 CPP-NGCP-CIV-1396 1400121172 Civil SATIP-A- 114- 01 SAIC-A-1004 HWYH-RH EJ N/A 6/17/2019 10.00 AM CLOSED
of way RH - EJ hwyah SOLANGI Malik
Pipe line right of way ROW inspaction RH EJ AAMIR Mr. Mr Abdul
1405 CPP-NGCP-CIV-1397 1400121339 Civil SATIP-L- 450- 01 SAIC-L-1001 HWYH-RH EJ N/A 6/17/2019 10.30 AM CLOSED
hwyah SOLANGI Malik

1406 CPP-NGCP-CIV-1398 1400121267 Civil SATIP-A- 114- 01 SAIC-A-1005


Compaction Test inspaction right of way RH-EJ
HWYH-RH EJ N/A 6/17/2019 10.30 AM AAMIR Mr. Mr Abdul
OPEN No Action
RE-SCHEDULE TO 18- RE-SCHEDULE TO
hwyah SOLANGI Malik JUNE-2019 19-JUNE-2019
Compaction Test Inspaction 300 mm 6th layer AAMIR Mr. Mr Abdul
1407 CPP-NGCP-CIV-1399 1400121238 Civil SATIP-A- 114- 01 SAIC-A-1005
well pad RH CJ zone C hwyah
HWYH-RH CJ N/A 6/17/2019 10.30 AM
SOLANGI Malik
CLOSED

Fill placement and compaction inspection for TASEER RE-SCHEDULE TO 18-


1408 CPP-NGCP-CIV-1400 1400121291 Civil SATIP-A- 114- 01 SAIC-A-1004
hawiyah 1036 8th layer
Hwyh 1036 N/A 6/17/2019 8.30 AM
KHAN
Mr. Randy CLOSED
JUNE-2019
Compaction test inspection for hawiyah 1036 8th TASEER RE-SCHEDULE TO 18-
1409 CPP-NGCP-CIV-1401 1400121308 Civil SATIP-A- 114- 01 SAIC-A-1005 Hwyh 1036 N/A 6/17/2019 8.30 AM Mr. Randy CLOSED
layer KHAN JUNE-2019
1410 CPP-NGCP-CIV-1402 1400121368 Civil SATIP-A- 114- 01 SAIC-A-1005
Compaction test inspection for existing surface
hawiyah 1118 N/A 6/17/2019 8.30 AM TASEER
Mr. Randy CLOSED
RE-SCHEDULE TO 18-
of hawiyah 1118 KHAN JUNE-2019
TASEER
1411 CPP-NGCP-CIV-1403 1400121327 Civil SATIP-A- 114- 01 SAIC-A-1001 Soil sampling for existing surface of 1118 hawiyah 1118 N/A 6/17/2019 9.00 AM Mr. Randy CLOSED
KHAN
TASEER
1412 CPP-NGCP-CIV-1404 1400121386 Civil SATIP-A- 114- 01 SAIC-A-1001 Soil sampling for existing surface of 1091 hawiyah 1091 N/A 6/17/2019 9.00 AM Mr. Randy CLOSED
KHAN
TASEER
1413 CPP-NGCP-CIV-1405 1400121394 Civil SATIP-A- 114- 01 SAIC-A-1001 Soil sampling for existing surface of 1088 hawiyah 1088 N/A 6/17/2019 9.30 AM Mr. Randy CLOSED
KHAN
Compaction test inspection for right of way TASEER
1414 CPP-NGCP-CIV-1406 1400121423 Civil SATIP-A- 114- 01 SAIC-A-1005
electrical poles near RH_GK
hawiyah RH_GK N/A 6/17/2019 10.00 AM
KHAN
Mr. Randy CLOSED
Fill placement and compaction inspection for TASEER
1415 CPP-NGCP-CIV-1407 1400122249 Civil SATIP-A- 114- 01 SAIC-A-1004 hawiyah 1002 N/A 6/18/2019 8.30 AM Mr. Randy CLOSED
hawiyah 1002 1st layer KHAN
compaction inspection for hawiyah 1002 1st TASEER
1416 CPP-NGCP-CIV-1408 1400122324 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah 1002 N/A 6/18/2019 8.30 AM Mr. Randy CLOSED
layer KHAN
1417 CPP-NGCP-CIV-1409 1400122557 Civil SATIP-A- 114- 01 SAIC-A-1005 Existing ground Compaction test at HRDH 1023 HRDH 1023 Various 6/18/2019 7.00 AM Hameed Ullah Mr. Edgardo CLOSED
1418 CPP-NGCP-CIV-1410 1400122578 Civil SATIP-A- 114- 01 SAIC-A-1005 Existing ground Compaction test at HRDH 1306 HRDH 1306 Various 6/18/2019 7.10 AM Hameed Ullah Mr. Edgardo CLOSED
3rd/Final layer Compaction test Inspection at
1419 CPP-NGCP-CIV-1411 1400122589 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH 1194 Various 6/18/2019 7.15 AM Hameed Ullah Mr. Edgardo CLOSED
HRDH 1194
2nd layer fill placement and compaction
1420 CPP-NGCP-CIV-1412 1400122618 Civil SATIP-A- 114- 01 SAIC-A-1004 inspection at hrdh-1188 wellpad extension hrdh-1188 Various 6/18/2019 7.25 AM Hameed Ullah Mr. Edgardo CLOSED
(zone-A)
2nd layer fill placement and compaction
1421 CPP-NGCP-CIV-1413 1400122619 Civil SATIP-A- 114- 01 SAIC-A-1004 inspection at hrdh-1188 wellpad extension hrdh-1188 Various 6/18/2019 7.30 AM Hameed Ullah Mr. Edgardo CLOSED
(zone-B)
2nd layer compaction testing inspection at hrdh
1422 CPP-NGCP-CIV-1414 1400122549 Civil SATIP-A- 114- 01 SAIC-A-1005
1188 wellpad extension (Zone-A)
hrdh 1188 Various 6/18/2019 7.35 AM Hameed Ullah Mr. Edgardo CLOSED

2nd layer compaction testing inspection at hrdh


1423 CPP-NGCP-CIV-1415 1400122559 Civil SATIP-A- 114- 01 SAIC-A-1005
1188 wellpad extension (Zone-B)
hrdh 1188 Various 6/18/2019 7.40 AM Hameed Ullah Mr. Edgardo CLOSED
Existing ground Compaction test for Zone A at
1424 CPP-NGCP-CIV-1416 1400122644 Civil SATIP-A- 114- 01 SAIC-A-1005
HRDH RH-K13
HRDH RH-K13 Various 6/18/2019 7.45 AM Hameed Ullah Mr. Edgardo CLOSED

Existing ground Compaction test for Zone B at


1425 CPP-NGCP-CIV-1417 1400122598 Civil SATIP-A- 114- 01 SAIC-A-1005
HRDH RH-K13
HRDH RH-K13 Various 6/18/2019 7.50 AM Hameed Ullah Mr. Edgardo CLOSED

8'' F/L HRDH-619 -CK Pipe lowering at sta-


AQIB
1426 CPP-NGCP-CIV-1418 1400122301 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+259 to KP0+394; HRDH-619 FL TA-843560 6/18/2019 6.30 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(17-26);
Sand Covering and backfilling Inspection for 8"
AQIB
1427 CPP-NGCP-CIV-1419 1400122302 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-619-sta- KP0+259 to KP0+394; HRDH-619 FL TA-843560 6/18/2019 6.40 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(17-26);
8'' F/L HRDH-619 -CK Pipe lowering at sta-
AQIB
1428 CPP-NGCP-CIV-1420 1400122272 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+480 to KP0+517; HRDH-619 FL TA-843560 6/18/2019 6.45 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(32-35);
Sand Covering and backfilling Inspection for 8"
AQIB
1429 CPP-NGCP-CIV-1421 1400122359 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-619-sta- KP0+480 to KP0+517; HRDH-619 FL TA-843560 6/18/2019 6.55 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(32-35);
8'' F/L HRDH-619 -CK Pipe lowering at sta-
AQIB
1430 CPP-NGCP-CIV-1422 1400122311 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+831 to KP1+017; HRDH-619 FL TA-843560 6/18/2019 7.00 AM Mr. Edgardo CLOSED
HUSSEIN
00-FW-(61-76);
Sand Covering and backfilling Inspection for 8"
AQIB
1431 CPP-NGCP-CIV-1423 1400122383 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-619-sta- KP0+831 to KP1+017; HRDH-619 FL TA-843560 6/18/2019 7.10 AM
HUSSEIN
Mr. Edgardo CLOSED
00-FW-(61-76);
8'' F/L HRDH-619 -CK Pipe lowering at sta-
AQIB
1432 CPP-NGCP-CIV-1424 1400122369 Civil SATIP-L-450- 01 SAIC-L-1003 KP1+101 to KP2+130; HRDH-619 FL TA-843560 6/18/2019 7.15 AM
HUSSEIN
Mr. Edgardo Reject RFI has been canceled due
00-FW-(83-166); to the RT NO DONE
Sand Covering and backfilling Inspection for 8"
AQIB
1433 CPP-NGCP-CIV-1425 1400122421 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-619-sta- KP1+101 to KP2+130; HRDH-619 FL TA-843560 6/18/2019 7.25 AM
HUSSEIN
Mr. Edgardo Reject RFI has been canceled due
00-FW-(83-166); to the RT NO DONE
Trench Bedding Inspection for 8" FL HRDH-619
AQIB
1434 CPP-NGCP-CIV-1426 1400122394 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP2+262 to KP2+548; HRDH-619 FL TA-843560 6/18/2019 14.10 PM Mr. Edgardo CLOSED
HUSSEIN
02-FW-(177-200);
Trench Bedding Inspection for 8" FL HRDH-619
AQIB
1435 CPP-NGCP-CIV-1427 1400122332 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP2+933 to KP3+678; HRDH-619 FL TA-843560 6/18/2019 14.15 PM Mr. Edgardo CLOSED
HUSSEIN
02-FW-(232-292);
Existing Ground sampling testing and review of
1436 CPP-NGCP-CIV-1428 1400122901 Civil SATIP-A- 114- 01 SAIC-A-1001 HRDH-1178 Various 6/19/2019 7.00 AM Hameed Ullah Mr. Edgardo CLOSED
test reports. HRDH-1178
Existing Ground sampling testing and review of
1437 CPP-NGCP-CIV-1429 1400122902 Civil SATIP-A- 114- 01 SAIC-A-1001 HRDH-1135 Various 6/19/2019 8.00 AM Hameed Ullah Mr. Edgardo CLOSED
test reports. HRDH-1135
Trench excavation and bottom of trench
inspaction station 6+642 to 6+900 - 6+950 to hawiyah GGM 24" AAMIR Mr. Mr Abdul
1438 CPP-NGCP-CIV-1430 1400123324 Civil SATIP-L- 450- 01 SAIC-L-1002 N/A 6/19/2019 8.00 AM OPEN No Action
7+089 - 7+207 to 7+290 GGM 24" TR/L 1 TR/L1 SOLANGI Malik
Hwyah
Trench excavation bottom of trench inspaction
hawiyah GGM AAMIR Mr. Mr Abdul
1439 CPP-NGCP-CIV-1431 1400123335 Civil SATIP-L- 450- 01 SAIC-L-1002 station 6+611 to 7+081 - 7+199 to 7+240 GGM N/A 6/19/2019 9.00 AM OPEN No Action
36"TR/L1 SOLANGI Malik
36" TR/L1 hwyah
Trench excavation bottom of trench inspaction
hawiyah GGM AAMIR Mr. Mr Abdul
1440 CPP-NGCP-CIV-1432 1400123329 Civil SATIP-L- 450- 01 SAIC-L-1002 station 6+648 to 7+099 - 7+217 to 7+298 GGM N/A 6/19/2019 9.30 AM CLOSED
TR/L2 SOLANGI Malik
36" TR /L2 hwyah
Fill placement and compaction inspection for TASEER
1441 CPP-NGCP-CIV-1433 1400123393 Civil SATIP-A- 114- 01 SAIC-A-1004
hawiyah 1118 1st layer
hawiyah 1118 N/A 6/19/2019 8.30 AM
KHAN
Mr. Randy CLOSED
compaction inspection for hawiyah 1118 1st TASEER
1442 CPP-NGCP-CIV-1434 1400123386 Civil SATIP-A- 114- 01 SAIC-A-1005
layer
hawiyah 1118 N/A 6/19/2019 8.30 AM
KHAN
Mr. Randy CLOSED
Soil sampling for selectfill material at borrow pit TASEER
1443 CPP-NGCP-CIV-1435 1400123403 Civil SATIP-A- 114- 01 SAIC-A-1001 hawiyah RH_GK N/A 6/19/2019 9.30 AM Mr. Randy CLOSED
no 11 stockpile no 3 near RH_GK KHAN
Fill placement and compaction inspection for TASEER
1444 CPP-NGCP-CIV-1436 1400123270 Civil SATIP-A- 114- 01 SAIC-A-1004
hawiyah 1002 2nd layer
hawiyah 1002 N/A 6/19/2019 10.00 AM
KHAN
Mr. Randy CLOSED
compaction inspection for hawiyah 1002 2nd TASEER
1445 CPP-NGCP-CIV-1437 1400123359 Civil SATIP-A- 114- 01 SAIC-A-1005
layer
hawiyah 1002 N/A 6/19/2019 10.00 AM
KHAN
Mr. Randy CLOSED
8'' F/L HRDH-619 -CK Pipe lowering at sta-
AQIB
1446 CPP-NGCP-CIV-1438 1400123602 Civil SATIP-L-450- 01 SAIC-L-1003 KP2+262 to KP2+548; HRDH-619 FL TA-843560 6/19/2019 6.30 AM Mr. Edgardo CLOSED
HUSSEIN
02-FW-(177-200);
Sand Covering and backfilling Inspection for 8"
AQIB
1447 CPP-NGCP-CIV-1439 1400123627 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-619-sta-KP2+262 to KP2+548; HRDH-619 FL TA-843560 6/19/2019 6.40 AM
HUSSEIN
Mr. Edgardo CLOSED
02-FW-(177-200);
8'' F/L HRDH-619 -CK Pipe lowering at sta-
AQIB
1448 CPP-NGCP-CIV-1440 1400123661 Civil SATIP-L-450- 01 SAIC-L-1003 KP2+933 to KP3+678; HRDH-619 FL TA-843560 6/19/2019 6.45 AM Mr. Edgardo CLOSED
HUSSEIN
02-FW-(232-292);
Sand Covering and backfilling Inspection for 8"
AQIB
1449 CPP-NGCP-CIV-1441 1400123647 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-619-sta- KP2+933 to KP3+678; HRDH-619 FL TA-843560 6/19/2019 6.55 AM Mr. Edgardo CLOSED
HUSSEIN
02-FW-(232-292);
Trench Bedding Inspection for 8" FL HRDH-619
AQIB
1450 CPP-NGCP-CIV-1442 1400123673 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP3+750 to KP4+073; HRDH-619 FL TA-843560 6/19/2019 14.10 PM Mr. Edgardo CLOSED
HUSSEIN
03-FW-(298-324);
Trench Bedding Inspection for 8" FL HRDH-619
AQIB
1451 CPP-NGCP-CIV-1443 1400123631 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP4+436 to KP4+499; HRDH-619 FL TA-843560 6/19/2019 14.15 PM Mr. Edgardo CLOSED
HUSSEIN
02-FW-(354-359);
Trench Bedding Inspection for 8" FL HRDH-619
AQIB
1452 CPP-NGCP-CIV-1444 1400123648 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP4+631to KP4+655; HRDH-619 FL TA-843560 6/19/2019 14.20 PM Mr. Edgardo CLOSED
HUSSEIN
02-FW-(370-372);
Trench Bedding Inspection for 8" FL HRDH-619
AQIB
1453 CPP-NGCP-CIV-1445 1400123677 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP4+776 to KP4+925; HRDH-619 FL TA-843560 6/19/2019 14.25 PM Mr. Edgardo CLOSED
HUSSEIN
02-FW-(382-394);
Material Receiving Inspection at HRDH 1306
1454 CPP-NGCP-CIV-1446 1400123669 Civil SATIP-A- 114- 01 SAIC-A-1002 HRDH 1306 Various 6/19/2019 7.50 AM Hameed Ullah Mr. Edgardo CLOSED
wellpad
1st layer Fill Placement and compaction
1455 CPP-NGCP-CIV-1447 1400123784 Civil SATIP-A- 114- 01 SAIC-A-1004 HRDH 1306 Various 6/19/2019 7.55 AM Hameed Ullah Mr. Edgardo CLOSED
inspection at HRDH 1306 wellpad Extension
1st layer Compaction test inspection at HRDH
1456 CPP-NGCP-CIV-1448 1400123785 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH 1306 Various 6/19/2019 8.00 AM Hameed Ullah Mr. Edgardo CLOSED
1306
3rd layer fill placement and compaction
1457 CPP-NGCP-CIV-1449 1400123747 Civil SATIP-A- 114- 01 SAIC-A-1004 inspection at hrdh-1188 wellpad extension HRDH-1188 Various 6/19/2019 8.10 AM Hameed Ullah Mr. Edgardo CLOSED
(zone-A)
3rd layer fill placement and compaction
1458 CPP-NGCP-CIV-1450 1400123793 Civil SATIP-A- 114- 01 SAIC-A-1004 inspection at hrdh-1188 wellpad extension HRDH-1188 Various 6/19/2019 8.20 AM Hameed Ullah Mr. Edgardo CLOSED
(zone-B)
3rd layer compaction testing inspection at
1459 CPP-NGCP-CIV-1451 1400123749 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1188 Various 6/19/2019 8.30 AM Hameed Ullah Mr. Edgardo CLOSED
hrdh 1188 wellpad extension (Zone-A)
3rd layer compaction testing inspection at
1460 CPP-NGCP-CIV-1452 1400123670 Civil SATIP-A- 114- 01 SAIC-A-1005
hrdh 1188 wellpad extension (Zone-B)
HRDH-1188 Various 6/19/2019 8.40 AM Hameed Ullah Mr. Edgardo CLOSED
4th layer fill placement and compaction
1461 CPP-NGCP-CIV-1453 1400123776 Civil SATIP-A- 114- 01 SAIC-A-1004 inspection at hrdh-1188 wellpad extension HRDH-1188 Various 6/19/2019 14.00 AM Hameed Ullah Mr. Edgardo CLOSED
(zone-A)
4th layer fill placement and compaction
1462 CPP-NGCP-CIV-1454 1400123795 Civil SATIP-A- 114- 01 SAIC-A-1004 inspection at hrdh-1188 wellpad extension HRDH-1188 Various 6/19/2019 14.10 AM Hameed Ullah Mr. Edgardo CLOSED
(zone-B)
4th layer compaction testing inspection at
1463 CPP-NGCP-CIV-1455 1400123768 Civil SATIP-A- 114- 01 SAIC-A-1005
hrdh 1188 wellpad extension (Zone-A)
HRDH-1188 Various 6/19/2019 14.20 AM Hameed Ullah Mr. Edgardo CLOSED
4th layer compaction testing inspection at
1464 CPP-NGCP-CIV-1456 1400123786 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1188 Various 6/19/2019 14.30 AM Hameed Ullah Mr. Edgardo CLOSED
hrdh 1188 wellpad extension (Zone-B)
8'' F/L HRDH-619 -CK Pipe lowering at sta-
AQIB
1465 CPP-NGCP-CIV-1457 1400124273 Civil SATIP-L-450- 01 SAIC-L-1003 KP3+750 to KP4+073; HRDH-619 FL TA-843560 6/20/2019 6.30 AM Mr. Randy CLOSED
HUSSEIN
03-FW-(298-324);
Sand Covering and backfilling Inspection for 8"
AQIB
1466 CPP-NGCP-CIV-1458 1400124150 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-619-sta- KP3+750 to KP4+073; HRDH-619 FL TA-843560 6/20/2019 6.40 AM Mr. Randy CLOSED
HUSSEIN
03-FW-(298-324);
8'' F/L HRDH-619 -CK Pipe lowering at sta-
AQIB
1467 CPP-NGCP-CIV-1459 1400124229 Civil SATIP-L-450- 01 SAIC-L-1003 KP4+436 to KP4+499; HRDH-619 FL TA-843560 6/20/2019 6.45 AM Mr. Randy CLOSED
HUSSEIN
02-FW-(354-359);
Sand Covering and backfilling Inspection for 8"
AQIB
1468 CPP-NGCP-CIV-1460 1400124230 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-619-sta- KP4+436 to KP4+499; HRDH-619 FL TA-843560 6/20/2019 6.55 AM Mr. Randy CLOSED
HUSSEIN
02-FW-(354-359);
8'' F/L HRDH-619 -CK Pipe lowering at sta-
AQIB
1469 CPP-NGCP-CIV-1461 1400124142 Civil SATIP-L-450- 01 SAIC-L-1003 KP4+631to KP4+655; HRDH-619 FL TA-843560 6/20/2019 7.00 AM
HUSSEIN
Mr. Randy CLOSED
02-FW-(370-372);
Sand Covering and backfilling Inspection for 8"
AQIB
1470 CPP-NGCP-CIV-1462 1400124151 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-619-sta- KP4+631to KP4+655; HRDH-619 FL TA-843560 6/20/2019 7.10 AM
HUSSEIN
Mr. Randy CLOSED
02-FW-(370-372);
8'' F/L HRDH-619 -CK Pipe lowering at sta-
AQIB
1471 CPP-NGCP-CIV-1463 1400124222 Civil SATIP-L-450- 01 SAIC-L-1003 KP4+776 to KP4+925; HRDH-619 FL TA-843560 6/20/2019 7.15 AM Mr. Randy CLOSED
HUSSEIN
02-FW-(382-394);
Sand Covering and backfilling Inspection for 8"
AQIB
1472 CPP-NGCP-CIV-1464 1400124152 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-619-sta- KP4+776 to KP4+925; HRDH-619 FL TA-843560 6/20/2019 7.25 AM Mr. Randy CLOSED
HUSSEIN
02-FW-(382-394);
8'' F/L HRDH-1118 -CK Pipe lowering at sta-
AQIB
1473 CPP-NGCP-CIV-1465 1400124295 Civil SATIP-L-450- 01 SAIC-L-1003 KP1+498 to KP1+536; HRDH-1118 FL TA-843605 6/20/2019 7.30 AM Mr. Randy CLOSED
HUSSEIN
00-FW-(116-119);
Trench Bedding Inspection for 8" FL HRDH-
AQIB
1474 CPP-NGCP-CIV-1466 1400124238 Civil SATIP-L- 450- 01 SAIC-L-1002 1118 at sta-KP1+498 to KP1+536; HRDH-1118 FL TA-843605 6/20/2019 7.35 AM Mr. Randy CLOSED
HUSSEIN
00-FW-(116-119);
Sand Covering and backfilling Inspection for 8" AQIB
1475 CPP-NGCP-CIV-1467 1400124258 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1118 at sta-KP1+498 to KP1+536; HRDH-1118 FL TA-843605 6/20/2019 7.40AM Mr. Randy CLOSED
HUSSEIN
00-FW-(116-119);
8'' F/L HRDH-1118 -CK Pipe lowering at sta-
AQIB
1476 CPP-NGCP-CIV-1468 1400124296 Civil SATIP-L-450- 01 SAIC-L-1003 KP1+873 to KP2+009; HRDH-1118 FL TA-843605 6/20/2019 7.45 AM Mr. Randy CLOSED
HUSSEIN
01-FW-(147-158);
Trench Bedding Inspection for 8" FL HRDH-
AQIB
1477 CPP-NGCP-CIV-1469 1400124305 Civil SATIP-L- 450- 01 SAIC-L-1002 1118 at sta-KP1+873 to KP2+009; HRDH-1118 FL TA-843605 6/20/2019 7.50 AM Mr. Randy CLOSED
HUSSEIN
01-FW-(147-158);

Sand Covering and backfilling Inspection for 8" AQIB


1478 CPP-NGCP-CIV-1470 1400124286 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1118 at sta-KP1+873 to KP2+009; HRDH-1118 FL TA-843605 6/20/2019 7.55 AM Mr. Randy CLOSED
HUSSEIN
01-FW-(147-158);
Trench Bedding Inspection for 8" FL HRDH-1177
AQIB
1479 CPP-NGCP-CIV-1471 1400124299 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP1+776 to KP1+885; HRDH-1177 FL TA-843575 6/20/2019 14.10 PM Mr. Randy CLOSED
HUSSEIN
03-FW-(139-148);
Trench Bedding Inspection for 8" FL HRDH-1177
AQIB
1480 CPP-NGCP-CIV-1472 1400124300 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP1+969 to KP2+165; HRDH-1177 FL TA-843575 6/20/2019 14.15 PM Mr. Randy CLOSED
HUSSEIN
02-FW-(155-171);
Trench Bedding Inspection for 8" FL HRDH-1177
AQIB
1481 CPP-NGCP-CIV-1473 1400124242 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP2+262 to KP2+708; HRDH-1177 FL TA-843575 6/20/2019 14.20 PM
HUSSEIN
Mr. Randy CLOSED
02-FW-(179-215);
2nd layer Compaction test inspection at
1482 CPP-NGCP-CIV-1474 1400124726 Civil SATIP-A- 114- 01 SAIC-A-1005
HRDH 1306 wellpad Extension
HRDH 1306 Various 6/20/2019 7.50 AM Hameed Ullah Mr. Randy CLOSED

29th Layer Compaction test Inspection for Zone


1483 CPP-NGCP-CIV-1475 1400124561 Civil SATIP-A- 114- 01 SAIC-A-1005
A Part 1 at HRDH-RH-GK Extension
HRDH-RH-GK Various 6/20/2019 8.50 AM Hameed Ullah Mr. Edgardo CLOSED
11th final layer General Fill/Marl Compaction
1484 CPP-NGCP-CIV-1476 1400124711 Civil SATIP-A- 114- 01 SAIC-A-1005 testing Inspection at Hrdh-1142 wellpad HRDH-1142 FL BA-872429 6/20/2019 09.50AM Hameed Ullah Mr. Edgardo CLOSED
extension
1485 CPP-NGCP-CIV-1477 1400124691 Civil SATIP-A- 114- 01 SAIC-A-1002 Material Receiving Inspection at HRDH RH-K13 HRDH-K13 FL Various 6/20/2019 14.00 AM Hameed Ullah Mr. Edgardo CLOSED
1st layer Fill Placement and compaction
1486 CPP-NGCP-CIV-1478 1400124727 Civil SATIP-A- 114- 01 SAIC-A-1004
inspection for Zone A at HRDH RH-K13
HRDH-K13 FL Various 6/20/2019 14.05AM Hameed Ullah Mr. Edgardo CLOSED

1st layer compaction test inspection for Zone A


1487 CPP-NGCP-CIV-1479 1400124698 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-K13 FL Various 6/20/2019 14.10 AM Hameed Ullah Mr. Edgardo CLOSED
at HRDH RH-K13
2nd layer Compaction test inspection at
1488 CPP-NGCP-CIV-1480 1400124714 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH 1306 Various 6/20/2019 14.20 AM Hameed Ullah Mr. Randy CLOSED
HRDH 1306 wellpad Extension
Fill placement and compaction inspection for TASEER
1489 CPP-NGCP-CIV-1481 1400124209 Civil SATIP-A- 114- 01 SAIC-A-1004 hawiyah 1118 N/A 6/20/2019 8.30 AM Mr. Randy CLOSED
hawiyah 1118 2nd layer KHAN
compaction inspection for hawiyah 1118 2nd TASEER
1490 CPP-NGCP-CIV-1482 1400124253 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah 1118 N/A 6/20/2019 8.30 AM Mr. Randy CLOSED
layer KHAN
Compaction test inspection for existing surface TASEER
1491 CPP-NGCP-CIV-1483 1400124182 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah 1088 N/A 6/20/2019 8.30 AM Mr. Randy CLOSED
of hawiyah 1088 KHAN
Compaction Test right of way electrical pol RHEJ AAMIR Mr. Mr Abdul
1492 CPP-NGCP-CIV-1484 1400124245 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah RHEJ N/A 6/20/2019 8.30 AM CLOSED
hwyah SOLANGI Malik
Compaction test inspection for existing surface cancelled due to job not
1493 CPP-NGCP-CIV-1485 1400124619 Civil SATIP-A- 114- 01 SAIC-A-1005
of hawiyah RH_CK
hawiyah RH_CK N/A 6/20/2019 8.30 AM Francis fontolo Mr. Imran CLOSED
ready
Soil sampling, testing, and review of test reports
for Hwyh Borrow pit # 18 Stockpile # 2
1494 CPP-NGCP-CIV-1486 1400124587 Civil SATIP-A- 114- 01 SAIC-A-1001
N2735371.85, E314378.04 Select fill material
hawiyah RH_CK N/A 6/20/2019 9.30 AM Christan Mr. Randy Reject
Near Hwyh RH/CK
Soil sampling and testing for selectfill material TASEER
1495 CPP-NGCP-CIV-1487 1400124626 Civil SATIP-A- 114- 01 SAIC-A-1001
borrow pit no 18 stockpile no 1
hawiyah 1002 N/A 6/20/2019 9.30 AM
KHAN
Mr. Randy Reject

Soil sampling and testing inspection for marl TASEER


1496 CPP-NGCP-CIV-1488 1400124572 Civil SATIP-A- 114- 01 SAIC-A-1001 hawiyah 1002 N/A 6/20/2019 9.30 AM Mr. Randy Reject
material borrow pit no 18 stockpile no 2 KHAN
Final fill inspection for HRDH 1194 wellpad
1497 CPP-NGCP-CIV-1489 1400125255 Civil SATIP-A- 114- 01 SAIC-A-1006 HRDH 1194 Various 6/22/2019 7.50 AM Hameed Ullah Mr. Edgardo CLOSED
Extension
4th layer compaction test Inspection at
1498 CPP-NGCP-CIV-1490 1400125218 Civil SATIP-A- 114- 01 SAIC-A-1005
HRDH 1306 wellpad Extension
HRDH 1306 Various 6/22/2019 8.10 AM Hameed Ullah Mr. Randy CLOSED
Compaction test inspection of 1st layer for Zone
1499 CPP-NGCP-CIV-1491 1400125256 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH RH-K13 Various 6/22/2019 8.30 AM Hameed Ullah Mr. Edgardo CLOSED
B at HRDH RH-K13
5th layer fill placement and compaction
1500 CPP-NGCP-CIV-1492 1400125249 Civil SATIP-A- 114- 01 SAIC-A-1004 inspection at hrdh-1188 wellpad extension HRDH-1188 Various 6/22/2019 8.50 AM Hameed Ullah Mr. Edgardo CLOSED
(zone-A)
5th layer fill placement and compaction
1501 CPP-NGCP-CIV-1493 1400125315 Civil SATIP-A- 114- 01 SAIC-A-1004 inspection at hrdh-1188 wellpad extension HRDH-1188 Various 6/22/2019 9.10 AM Hameed Ullah Mr. Edgardo CLOSED
(zone-B)
5th layer compaction testing inspection at
1502 CPP-NGCP-CIV-1494 1400125353 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1188 Various 6/22/2019 9.30 AM Hameed Ullah Mr. Edgardo CLOSED
hrdh 1188 wellpad extension (Zone-A)
5th layer compaction testing inspection at
1503 CPP-NGCP-CIV-1495 1400125344 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1188 Various 6/22/2019 9.50 AM Hameed Ullah Mr. Edgardo CLOSED
hrdh 1188 wellpad extension (Zone-B)
6th layer fill placement and compaction
1504 CPP-NGCP-CIV-1496 1400125366 Civil SATIP-A- 114- 01 SAIC-A-1004 inspection at hrdh-1188 wellpad extension HRDH-1188 Various 6/22/2019 3.30 PM Hameed Ullah Mr. Edgardo CLOSED
(zone-A)
6th layer fill placement and compaction
inspection at hrdh-1188 wellpad extension
1505 CPP-NGCP-CIV-1497 1400125297 Civil SATIP-A- 114- 01 SAIC-A-1004
(zone-B)
HRDH-1188 Various 6/22/2019 3.40 PM Hameed Ullah Mr. Edgardo CLOSED

6th layer compaction testing inspection at


1506 CPP-NGCP-CIV-1498 1400125383 Civil SATIP-A- 114- 01 SAIC-A-1005
hrdh 1188 wellpad extension (Zone-A)
HRDH-1188 Various 6/22/2019 3.50 PM Hameed Ullah Mr. Edgardo CLOSED

6th layer compaction testing inspection at


1507 CPP-NGCP-CIV-1499 1400125370 Civil SATIP-A- 114- 01 SAIC-A-1005 hrdh 1188 wellpad extension (Zone-B) HRDH-1188 Various 6/22/2019 4.00 PM Hameed Ullah Mr. Edgardo CLOSED

Final fill Inspection for HRDH-1142


1508 CPP-NGCP-CIV-1500 1400125385 Civil SATIP-A- 114- 01 SAIC-A-1006 HRDH-1142 Various 6/22/2019 10.30 PM Hameed Ullah Mr. Edgardo CLOSED
Pipe lowering at HWYH-1112 KM1+632 TO
TASEER
1509 CPP-NGCP-CIV-1501 1400125377 Civil SATIP-L-450- 01 SAIC-L-1003 1+695 , KM1+363 TO 1+523 FW127-132, HWYH-1112 TA-445906 6/22/2019 8.30AM Mr. Imran CLOSED
KHAN
FW105-118
Trench Bedding Inspection for HWYH-1112 TASEER
1510 CPP-NGCP-CIV-1502 1400125419 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH-1112 TA-445906 6/22/2019 8.40 AM Mr. Imran CLOSED
KM1+632 TO 1+695 , KM1+363 TO 1+523 KHAN
Sand Covering and backfilling Inspection for
TASEER
1511 CPP-NGCP-CIV-1503 1400125436 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1112 KM1+632 TO 1+695 , KM1+363 HWYH-1112 TA-445906 6/22/2019 8.50 AM Mr. Imran CLOSED
KHAN
TO 1+523
Fill placement and compaction inspection for TASEER
1512 CPP-NGCP-CIV-1504 1400125453 Civil SATIP-A- 114- 01 SAIC-A-1004 hawiyah 1118 N/A 6/22/2019 8.30 AM Mr. Imran CLOSED
hawiyah 1118 3rd layer KHAN
compaction inspection for hawiyah 1118 3rd TASEER
1513 CPP-NGCP-CIV-1505 1400125454 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah 1118 N/A 6/22/2019 8.30 AM Mr. Imran CLOSED
layer KHAN
Fill placement and compaction inspection for TASEER
1514 CPP-NGCP-CIV-1506 1400125463 Civil SATIP-A- 114- 01 SAIC-A-1004 hawiyah 1088 N/A 6/22/2019 9.30 AM Mr. Imran CLOSED
hawiyah 1088 1st layer KHAN
compaction inspection for hawiyah 1088 1st TASEER
1515 CPP-NGCP-CIV-1507 1400125455 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah 1088 N/A 6/22/2019 9.30 AM Mr. Imran CLOSED
laye KHAN
Fill placement and compaction inspection for TASEER
1516 CPP-NGCP-CIV-1508 1400125483 Civil SATIP-A- 114- 01 SAIC-A-1004 hawiyah 1002 N/A 6/22/2019 10.30 AM Mr. Imran CLOSED
hawiyah 1002 3rd layer KHAN
compaction inspection for hawiyah 1002 3rd TASEER
1517 CPP-NGCP-CIV-1509 1400125485 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah 1002 N/A 6/22/2019 10.30 AM Mr. Imran CLOSED
layer KHAN
Trench Bedding Inspection for 8" FL HRDH-1177
AQIB
1518 CPP-NGCP-CIV-1510 1400126101 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP1+776 to KP1+885; HRDH-1177 FL TA-843575 6/23/2019 6.25 PM Mr. Randy CLOSED
HUSSEIN
03-FW-(139-148);
8'' F/L HRDH-1177 -CK Pipe lowering at sta-
AQIB
1519 CPP-NGCP-CIV-1511 1400126148 Civil SATIP-L-450- 01 SAIC-L-1003 KP1+776 to KP1+885; HRDH-1177 FL TA-843575 6/23/2019 6.30 AM Mr. Randy CLOSED
HUSSEIN
01-FW-(139-148);
Sand Covering and backfilling Inspection for 8"
AQIB
1520 CPP-NGCP-CIV-1512 1400126153 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1177-sta- KP1+776 to KP1+885; HRDH-1177 FL TA-843575 6/23/2019 6.40 AM Mr. Randy Reject
HUSSEIN
01-FW-(139-148);
Trench Bedding Inspection for 8" FL HRDH-1177
AQIB
1521 CPP-NGCP-CIV-1513 1400126102 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP1+969 to KP2+165; HRDH-1177 FL TA-843575 6/23/2019 6.45 PM Mr. Randy CLOSED
HUSSEIN
02-FW-(155-171);
8'' F/L HRDH-1177 -CK Pipe lowering at sta-
AQIB
1522 CPP-NGCP-CIV-1514 1400126070 Civil SATIP-L-450- 01 SAIC-L-1003 KP1+969 to KP2+165; HRDH-1177 FL TA-843575 6/23/2019 6.50 AM Mr. Randy CLOSED
HUSSEIN
01-FW-(155-171);
Sand Covering and backfilling Inspection for 8"
AQIB
1523 CPP-NGCP-CIV-1515 1400126118 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1177-sta- KP1+969 to KP2+165; HRDH-1177 FL TA-843575 6/23/2019 6.55 AM Mr. Randy Reject
HUSSEIN
01-FW-(155-171);
Trench Bedding Inspection for 8" FL HRDH-1177
AQIB
1524 CPP-NGCP-CIV-1516 1400126107 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP2+262 to KP2+708; HRDH-1177 FL TA-843575 6/23/2019 7.00 PM Mr. Randy CLOSED
HUSSEIN
02-FW-(179-215);
8'' F/L HRDH-1177 -CK Pipe lowering at sta-
AQIB
1525 CPP-NGCP-CIV-1517 1400126183 Civil SATIP-L-450- 01 SAIC-L-1003 KP2+262 to KP2+708; HRDH-1177 FL TA-843575 6/23/2019 7.05 AM Mr. Randy CLOSED
HUSSEIN
02-FW-(179-215);
Sand Covering and backfilling Inspection for 8"
AQIB
1526 CPP-NGCP-CIV-1518 1400126130 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1177-sta- KP2+262 to KP2+708; HRDH-1177 FL TA-843575 6/23/2019 7.10 AM Mr. Randy Reject
HUSSEIN
02-FW-(179-215);
Trench Bedding Inspection for 8" FL HRDH-1177
AQIB
1527 CPP-NGCP-CIV-1519 1400126158 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP0+355 to KP0+428; HRDH-1177 FL TA-843575 6/23/2019 14.10 PM Mr. Randy CLOSED
HUSSEIN
00-FW-(22-28);
Trench Bedding Inspection for 8" FL HRDH-1177
AQIB
1528 CPP-NGCP-CIV-1520 1400126109 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP0+623 to KP0+660; HRDH-1177 FL TA-843575 6/23/2019 14.15 PM Mr. Randy CLOSED
HUSSEIN
00-FW-(44-47);
Trench Bedding Inspection for 8" FL HRDH-1177
AQIB
1529 CPP-NGCP-CIV-1521 1400126122 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP0+757 to KP0+793; HRDH-1177 FL TA-843575 6/23/2019 14.20 PM Mr. Randy CLOSED
HUSSEIN
00-FW-(55-58);
Trench Bedding Inspection for 8" FL HRDH-1177
AQIB
1530 CPP-NGCP-CIV-1522 1400126160 Civil SATIP-L- 450- 02 SAIC-L-1003 sta-KP0+877 to KP0+913; HRDH-1177 FL TA-843576 6/23/2019 14.30 PM Mr. Randy CLOSED
HUSSEIN
00-FW-(65-68);
Trench Bedding Inspection for 8" FL HRDH-1177
AQIB
1531 CPP-NGCP-CIV-1523 1400126193 Civil SATIP-L- 450- 03 SAIC-L-1004 sta-KP0+998 to KP1+292; HRDH-1177 FL TA-843577 6/23/2019 14.40 PM
HUSSEIN
Mr. Randy CLOSED
00-FW-(75-99);
Trench Bedding Inspection for 8" FL HRDH-1177
AQIB
1532 CPP-NGCP-CIV-1524 1400126203 Civil SATIP-L- 450- 04 SAIC-L-1005 sta-KP1+413 to KP1+584; HRDH-1177 FL TA-843578 6/23/2019 14.50 PM Mr. Randy CLOSED
HUSSEIN
01-FW-(109-123);
Visual inspection for material receving of
1533 CPP-NGCP-CIV-1525 1400125987 Civil VISUAL VISUAL Repairng material (QTY=15 bags/bag 25kg) and CPP Laydonw yard N/A 6/23/2019 9:00:00 AM Hameed Ullah Mr. Edgardo CLOSED
Bonding agent (QTY=4drums/drum 20 Ltrs)

1534 CPP-NGCP-CIV-1526 1400126232 Civil SATIP-A- 114- 01 SAIC-A-1005 5th layer compaction test Inspection HRDH 1306 Various 6/23/2019 8:00:00 AM Hameed Ullah Mr. Randy CLOSED
at HRDH 1306
7th layer fill placement and
1535 CPP-NGCP-CIV-1527 1400126251 Civil SATIP-A- 114- 01 SAIC-A-1004 compaction inspection at hrdh-1188 HRDH-1188 Various 6/23/2019 8:05:00 AM Hameed Ullah Mr. Edgardo CLOSED RE-SCHEDULE TO 24-
wellpad extension (zone-A) JUNE-2019
7th layer compaction testing
1536 CPP-NGCP-CIV-1528 1400126285 Civil SATIP-A- 114- 01 SAIC-A-1005 inspection at hrdh 1188 wellpad HRDH-1188 Various 6/23/2019 8:10:00 AM Hameed Ullah Mr. Edgardo CLOSED
extension (Zone-A)

7th final layer fill placement and


1537 CPP-NGCP-CIV-1529 1400126241 Civil SATIP-A- 114- 01 SAIC-A-1004 compaction inspection at hrdh-1188 HRDH-1188 Various 6/23/2019 8:15:00 AM Hameed Ullah Mr. Edgardo CLOSED RE-SCHEDULE TO 24-
wellpad extension (zone-B) JUNE-2019
7th layer compaction testing
1538 CPP-NGCP-CIV-1530 1400126315 Civil SATIP-A- 114- 01 SAIC-A-1005 inspection at hrdh 1188 wellpad HRDH-1188 Various 6/23/2019 8:20:00 AM Hameed Ullah Mr. Edgardo CLOSED
extension (Zone-B)

8th final layer fill placement and


1539 CPP-NGCP-CIV-1531 1400126286 Civil SATIP-A- 114- 01 SAIC-A-1004 compaction inspection at hrdh-1188 HRDH-1188 Various 6/23/2019 8:25:00 AM Hameed Ullah Mr. Edgardo CLOSED
wellpad extension (zone-A)
8th final layer compaction testing
1540 CPP-NGCP-CIV-1532 1400126267 Civil SATIP-A- 114- 01 SAIC-A-1005 inspection at hrdh 1188 wellpad HRDH-1188 Various 6/23/2019 8:00:00 AM Hameed Ullah Mr. Edgardo CLOSED RE-SCHEDULE TO 24-
extension (Zone-A) JUNE-2019
1541 CPP-NGCP-CIV-1533 1400126317 Civil SATIP-A- 114- 01 SAIC-A-1002 Material Receiving Inspection at HRDH 1023 Various 6/23/2019 8:00:00 AM Hameed Ullah Mr. Randy CLOSED
HRDH 1023
1542 CPP-NGCP-CIV-1534 1400126278 Civil SATIP-A- 114- 01 SAIC-A-1004 1st layer fill placement and compaction HRDH 1023 Various 6/23/2019 8:00:00 AM Hameed Ullah Mr. Randy CLOSED
inspection for Zone A at HRDH 1023
1543 CPP-NGCP-CIV-1535 1400126269 Civil SATIP-A- 114- 01 SAIC-A-1005 1st layer compaction test Inspection HRDH 1023 Various 6/23/2019 8:00:00 AM Hameed Ullah Mr. Randy CLOSED
for Zone A at HRDH 1023
1544 CPP-NGCP-CIV-1536 1400126305 Civil SATIP-A- 114- 01 SAIC-A-1005 2nd layer Compaction test inspection HRDH RH-K13 Various 6/23/2019 8:00:00 AM Hameed Ullah Mr. Edgardo CLOSED
for Zone B at HRDH RH-K13
Pipe lowering at HWYH-1093 KM1+616 TO
KM1+707, KM1+948 TO KM2+146, KM2+196 TASEER
1545 CPP-NGCP-CIV-1537 1400126350 Civil SATIP-L-450- 01 SAIC-L-1003
TO KM2+405, KM2+491 TO KM2+882 FW118-
HWYH-1093 TA-445838 6/23/2019 7.30AM
KHAN
Mr. Imran CLOSED
125, FW145-160, FW164 -180, FW187-218
Trench Bedding Inspection for HWYH-1093
KM1+616 TO KM1+707, KM1+948 TO TASEER
1546 CPP-NGCP-CIV-1538 1400126280 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH-1093 TA-445838 6/23/2019 7.40 AM Mr. Imran CLOSED
KM2+146, KM2+196 TO KM2+405, KM2+491 KHAN
TO KM2+882
Sand Covering and backfilling Inspection for
HWYH-1093 KM1+616 TO KM1+707, KM1+948 TASEER
1547 CPP-NGCP-CIV-1539 1400126354 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1093 TA-445838 6/23/2019 7.50 AM Mr. Imran CLOSED
TO KM2+146, KM2+196 TO KM2+405, KHAN
KM2+491 TO KM2+882
Fill placement and compaction inspection for TASEER
1548 CPP-NGCP-CIV-1540 1400126351 Civil SATIP-A- 114- 01 SAIC-A-1004 hawiyah 1002 N/A 6/23/2019 10.30 AM Mr. Imran CLOSED
hawiyah 1002 4th layer KHAN
compaction inspection for hawiyah 1002 4th TASEER
1549 CPP-NGCP-CIV-1541 1400126352 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah 1002 N/A 6/23/2019 10.30 AM Mr. Imran CLOSED
layer KHAN
Fill placement and compaction inspection for TASEER
1550 CPP-NGCP-CIV-1542 1400126339 Civil SATIP-A- 114- 01 SAIC-A-1004 hawiyah 1118 N/A 6/23/2019 8.30 AM Mr. Imran CLOSED
hawiyah 1118 4th layer KHAN
compaction inspection for hawiyah 1118 4th TASEER
1551 CPP-NGCP-CIV-1543 1400126373 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah 1118 N/A 6/23/2019 8.30 AM Mr. Imran CLOSED
layer KHAN
Fill placement and compaction inspection for TASEER
1552 CPP-NGCP-CIV-1544 1400126383 Civil SATIP-A- 114- 01 SAIC-A-1004 hawiyah 1088 N/A 6/23/2019 9.30 AM Mr. Imran CLOSED
hawiyah 1088 2nd layer KHAN
compaction inspection for hawiyah 1088 2nd TASEER
1553 CPP-NGCP-CIV-1545 1400126384 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah 1088 N/A 6/23/2019 9.30 AM Mr. Imran CLOSED
laye KHAN
Bottom trench excavation inspection for hawiyah
TASEER
1554 CPP-NGCP-CIV-1546 1400126329 Civil SATIP-L- 450- 01 SAIC-L-1002 Ck-RH hawiyah Ck-RH N/A 6/23/2019 8.00 AM Mr. Imran CLOSED
KHAN
Km 0+680 to 7+780.147
Compaction testing 7th layer 300 mm well pad AAMIR Mr. Mr Abdul
1555 CPP-NGCP-CIV-1547 1400126340 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah RHCJ N/A 6/23/2019 9.30 AM CLOSED
RHCJ zone C hwyah SOLANGI Malik
29th layer compaction test Inspection for Zone A
1556 CPP-NGCP-CIV-1548 1400126733 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH RH-GK Various 6/24/2019 8:00:00 AM Hameed Ullah Mr. Edgardo CLOSED
part at HRDH RH-GK Extension
8'' F/L HRDH-1177 -CK Pipe lowering at sta-
AQIB
1557 CPP-NGCP-CIV-1549 1400126662 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+355 to KP0+428; HRDH-1177 FL TA-843575 6/24/2019 6.30 AM Mr. Randy CLOSED
HUSSEIN
00-FW-(22-28);
Sand Covering and backfilling Inspection for 8"
AQIB
1558 CPP-NGCP-CIV-1550 1400126611 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1177-sta- KP0+355 to KP0+428; HRDH-1177 FL TA-843575 6/24/2019 6.40 AM Mr. Randy Reject
HUSSEIN
00-FW-(22-28);
8'' F/L HRDH-1177 -CK Pipe lowering at sta-
AQIB
1559 CPP-NGCP-CIV-1551 1400126639 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+623 to KP0+660; HRDH-1177 FL TA-843575 6/24/2019 6.50 AM Mr. Randy CLOSED RE-SCHEDULE TO 25-
HUSSEIN
00-FW-(44-47); JUNE-2019
Sand Covering and backfilling Inspection for 8"
AQIB
1560 CPP-NGCP-CIV-1552 1400126693 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1177-sta- KP0+623 to KP0+660; HRDH-1177 FL TA-843575 6/24/2019 6.55 AM Mr. Randy CLOSED RE-SCHEDULE TO 25-
HUSSEIN
00-FW-(44-47); JUNE-2019
8'' F/L HRDH-1177 -CK Pipe lowering at sta-
AQIB
1561 CPP-NGCP-CIV-1553 1400126704 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+757 to KP0+793; HRDH-1177 FL TA-843575 6/24/2019 7.05 AM Mr. Randy CLOSED RE-SCHEDULE TO 25-
HUSSEIN
00-FW-(55-58); JUNE-2019
Sand Covering and backfilling Inspection for 8"
AQIB
1562 CPP-NGCP-CIV-1554 1400126612 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1177-sta- KP0+757 to KP0+793; HRDH-1177 FL TA-843575 6/24/2019 7.10 AM Mr. Randy CLOSED RE-SCHEDULE TO 25-
HUSSEIN
00-FW-(55-58); JUNE-2019
8'' F/L HRDH-1177 -CK Pipe lowering at sta-
AQIB
1563 CPP-NGCP-CIV-1555 1400126695 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+877 to KP0+913; HRDH-1177 FL TA-843575 6/24/2019 7.15 AM Mr. Randy CLOSED RE-SCHEDULE TO 25-
HUSSEIN
00-FW-(65-68); JUNE-2019
Sand Covering and backfilling Inspection for 8"
AQIB
1564 CPP-NGCP-CIV-1556 1400126647 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1177-sta- KP0+877 to KP0+913; HRDH-1177 FL TA-843575 6/24/2019 7.20 AM Mr. Randy CLOSED RE-SCHEDULE TO 25-
HUSSEIN
00-FW-(65-68); JUNE-2019
8'' F/L HRDH-1177 -CK Pipe lowering at sta-
AQIB
1565 CPP-NGCP-CIV-1557 1400126713 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+998 to KP1+292; HRDH-1177 FL TA-843575 6/24/2019 7.25 AM Mr. Randy CLOSED RE-SCHEDULE TO 25-
HUSSEIN
00-FW-(75-99); JUNE-2019
Sand Covering and backfilling Inspection for 8"
AQIB
1566 CPP-NGCP-CIV-1558 1400126696 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1177-sta- KP0+998 to KP1+292; HRDH-1177 FL TA-843575 6/24/2019 7.30 AM Mr. Randy CLOSED RE-SCHEDULE TO 25-
HUSSEIN
00-FW-(75-99); JUNE-2019
8'' F/L HRDH-1177 -CK Pipe lowering at sta-
AQIB
1567 CPP-NGCP-CIV-1559 1400126642 Civil SATIP-L-450- 01 SAIC-L-1003 KP1+413 to KP1+584; HRDH-1177 FL TA-843575 6/24/2019 7.35 AM Mr. Randy CLOSED RE-SCHEDULE TO 25-
HUSSEIN
01-FW-(109-123); JUNE-2019
Sand Covering and backfilling Inspection for 8"
AQIB
1568 CPP-NGCP-CIV-1560 1400126697 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1177-sta- KP1+413 to KP1+584; HRDH-1177 FL TA-843575 6/24/2019 7.40 AM Mr. Randy CLOSED RE-SCHEDULE TO 25-
HUSSEIN
01-FW-(109-123); JUNE-2019
Trench Bedding Inspection for 8" FL HRDH-619
AQIB
1569 CPP-NGCP-CIV-1561 1400126650 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP1+045 to KP2+091; HRDH-619 FL TA-843560 6/24/2019 14.00 PM Mr. Randy CLOSED RE-SCHEDULE TO 25-
HUSSEIN
00-FW-(83-166); JUNE-2019
Pipe lowering at HWYH-1093 KM0+671 to
TASEER
1570 CPP-NGCP-CIV-1562 1400127005 Civil SATIP-L-450- 01 SAIC-L-1003 km0+908, KM0+945 TO KM1+320, KM1+447 HWYH-1093 TA-445838 6/24/2019 7.30AM Mr. Imran CLOSED
KHAN
TO KM1+579, FW48-66, FW69-95, FW105-115
Trench Bedding Inspection for HWYH-1093
TASEER
1571 CPP-NGCP-CIV-1563 1400126932 Civil SATIP-L- 450- 01 SAIC-L-1002 KM0+671 to km0+908, KM0+945 TO KM1+320, HWYH-1093 TA-445838 6/24/2019 7.40 AM Mr. Imran CLOSED
KHAN
KM1+447 TO KM1+579
Sand Covering and backfilling Inspection for
TASEER
1572 CPP-NGCP-CIV-1564 1400127034 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1093 KM0+671 to km0+908, KM0+945 HWYH-1093 TA-445838 6/24/2019 7.50 AM Mr. Imran CLOSED
KHAN
TO KM1+320, KM1+447 TO KM1+579
Fill placement and compaction inspection for TASEER
1573 CPP-NGCP-CIV-1565 1400127046 Civil SATIP-A- 114- 01 SAIC-A-1004 hawiyah 1002 N/A 6/24/2019 10.30 AM Mr. Imran CLOSED
hawiyah 1002 5th layer KHAN
compaction inspection for hawiyah 1002 5th TASEER
1574 CPP-NGCP-CIV-1566 1400127021 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah 1002 N/A 6/24/2019 10.30 AM Mr. Imran CLOSED
layer KHAN
Fill placement and compaction inspection for TASEER
1575 CPP-NGCP-CIV-1567 1400127064 Civil SATIP-A- 114- 01 SAIC-A-1004 hawiyah 1118 N/A 6/24/2019 8.30 AM Mr. Imran CLOSED
hawiyah 1118 5th layer KHAN
compaction inspection for hawiyah 1118 5th TASEER
1576 CPP-NGCP-CIV-1568 1400127001 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah 1118 N/A 6/24/2019 8.30 AM Mr. Imran CLOSED
layer KHAN
Fill placement and compaction inspection for TASEER
1577 CPP-NGCP-CIV-1569 1400127075 Civil SATIP-A- 114- 01 SAIC-A-1004 hawiyah 1088 N/A 6/24/2019 9.30 AM Mr. Imran CLOSED
hawiyah 1088 3rd layer KHAN
compaction inspection for hawiyah 1088 3rd TASEER
1578 CPP-NGCP-CIV-1570 1400127037 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah 1088 N/A 6/24/2019 9.30 AM Mr. Imran CLOSED
laye KHAN
Review of Soil Sample test report for Borrow
HRDH-1170 Borrow
1579 CPP-NGCP-CIV-1571 1400127871 Civil SATIP-A- 114- 01 SAIC-A-1001 Pit#20,Stockpile#01,(E-305672.207,N- N/A 6/25/2019 8:00:00 AM Hameed Ullah Mr.RANDY CLOSED
Pit#20,Stockpile#01
2718648.668) Near HRDH-1170 Wellpad
Final fill inspection @ hrdh-1188 wellpad
1580 CPP-NGCP-CIV-1572 1400127870 Civil SATIP-A- 114- 01 SAIC-A-1006 HRDH-1188 Various 6/25/2019 8:40:00 AM Hameed Ullah Mr. Edgardo CLOSED
extension (zone-B)
Existing ground compaction testing at hrdh-1151
1581 CPP-NGCP-CIV-1573 1400127859 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1151 Various 6/25/2019 9:00:00 AM Hameed Ullah Mr. Edgardo CLOSED
wellpad extension
3rd layer Compaction test inspection for
1582 CPP-NGCP-CIV-1574 1400127839 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH RH-K13 Various 6/25/2019 9:20:00 AM Hameed Ullah Mr. Edgardo CLOSED
Zone B at HRDH RH-K13
2nd layer Compaction test Inspection for
1583 CPP-NGCP-CIV-1575 1400127932 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH -1023 Various 6/25/2019 9:40:00 AM Hameed Ullah Mr. Randy CLOSED
Zone A at HRDH 1023 wellpad Extension
6th layer compaction test Inspection at
1584 CPP-NGCP-CIV-1576 1400127963 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH 1306 wellpad Extension HRDH 1306 Various 6/25/2019 10:00:00 AM Hameed Ullah Mr. Randy CLOSED

1585 CPP-NGCP-CIV-1577 1400127973 Civil SATIP-A- 114- 01 SAIC-A-1005 2nd layer Compaction test inspection HRDH RH-K13 Various 6/24/2019 10:30:00 AM Hameed Ullah Mr. Edgardo CLOSED
for Zone A at HRDH RH-K13
Final fill inspection @ hrdh-1188 wellpad
1586 CPP-NGCP-CIV-1578 1400127878 Civil SATIP-A- 114- 01 SAIC-A-1006 HRDH-1188 Various 6/25/2019 8:20:00 AM Hameed Ullah Mr. Edgardo CLOSED
extension (zone-A)
Pipe lowering at HWYH-1091 KM5+109 TO KM
TASEER
1587 CPP-NGCP-CIV-1579 1400127593 Civil SATIP-L-450- 01 SAIC-L-1003 5+208, KM4+494 TO KM4+976 FW413- HWYH-1091 TA-445958 6/25/2019 7.30AM Mr. Imran CLOSED
KHAN
421,FW363-402
Trench Bedding Inspection for HWYH-1091
TASEER
1588 CPP-NGCP-CIV-1580 1400127550 Civil SATIP-L- 450- 01 SAIC-L-1002 KM5+109 TO KM 5+208, KM4+494 TO HWYH-1091 TA-445958 6/25/2019 7.40 AM Mr. Imran CLOSED
KHAN
KM4+976
Sand Covering and backfilling Inspection for
TASEER
1589 CPP-NGCP-CIV-1581 1400127615 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1091 KM5+109 TO KM 5+208, KM4+494 HWYH-1091 TA-445958 6/25/2019 7.50 AM Mr. Imran CLOSED
KHAN
TO KM4+976
Fill placement and compaction inspection for TASEER
1590 CPP-NGCP-CIV-1582 1400127540 Civil SATIP-A- 114- 01 SAIC-A-1004 hawiyah 1002 N/A 6/25/2019 10.30 AM Mr. Imran CLOSED
hawiyah 1002 6th layer KHAN
compaction inspection for hawiyah 1002 6th TASEER
1591 CPP-NGCP-CIV-1583 1400127606 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah 1002 N/A 6/25/2019 10.30 AM Mr. Imran CLOSED
layer KHAN
Fill placement and compaction inspection for TASEER
1592 CPP-NGCP-CIV-1584 1400127643 Civil SATIP-A- 114- 01 SAIC-A-1004 hawiyah 1118 N/A 6/25/2019 8.30 AM Mr. Imran Reject
hawiyah 1118 6th layer KHAN
compaction inspection for hawiyah 1118 6th TASEER
1593 CPP-NGCP-CIV-1585 1400127758 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah 1118 N/A 6/25/2019 8.30 AM Mr. Imran CLOSED
layer KHAN
Fill placement and compaction inspection for TASEER
1594 CPP-NGCP-CIV-1586 1400127777 Civil SATIP-A- 114- 01 SAIC-A-1004 hawiyah 1088 N/A 6/25/2019 9.30 AM Mr. Imran CLOSED
hawiyah 1088 4th layer KHAN
compaction inspection for hawiyah 1088 4th TASEER
1595 CPP-NGCP-CIV-1587 1400127799 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah 1088 N/A 6/25/2019 9.30 AM Mr. Imran CLOSED
layer KHAN
Compaction test inspection for hawiyah RH_Ck
1596 CPP-NGCP-CIV-1588 1400127790 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah RH_CK N/A 6/25/2019 8.30 AM Francis fontolo Mr. Imran CLOSED
existing surface at zone 1
8'' F/L HRDH-619 -CK Pipe lowering at sta-
AQIB
1597 CPP-NGCP-CIV-1589 1400128703 Civil SATIP-L-450- 01 SAIC-L-1003 KP1+101 to KP2+130; HRDH-619 FL TA-843560 6/26/2019 7.15 AM Mr.RANDY CLOSED
HUSSEIN
00-FW-(83-166);
Sand Covering and backfilling Inspection for 8"
AQIB
1598 CPP-NGCP-CIV-1590 1400128678 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-619-sta- KP1+101 to KP2+130; HRDH-619 FL TA-843560 6/26/2019 7.25 AM Mr.RANDY Reject
HUSSEIN
00-FW-(83-166);
3rd layer compaction test Inspection for
1599 CPP-NGCP-CIV-1591 1400128704 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH RH-K13 Various 6/26/2019 10:30:00 AM Hameed Ullah Mr. Edgardo CLOSED
Zone A at HRDH RH-K13
7th layer compaction test Inspection at
1600 CPP-NGCP-CIV-1592 1400128695 Civil SATIP-A- 114- 01 SAIC-A-1005
HRDH 1306 wellpad Extension
HRDH 1306 Various 6/26/2019 10:00:00 AM Hameed Ullah Mr. Randy Reject

Trench Inspection prior to sand bedding AQIB


1601 CPP-NGCP-CIV-1593 1400128602 Civil SATIP-L- 450- 01 SAIC-L-1002
@ HRDH-1086 sta 0+319 to 0+964
HRDH-1086 FL TA-843625 6/26/2019 14.00 PM
HUSSEIN
Mr. Randy CLOSED

Trench Inspection prior to sand bedding AQIB


1602 CPP-NGCP-CIV-1594 1400128640 Civil SATIP-L- 450- 01 SAIC-L-1002 HRDH-1086 FL TA-843625 6/26/2019 14.10 PM Mr. Randy CLOSED
@HRDH-1086 sta 1+012.12 to 1+170.22 HUSSEIN
Trench Inspection prior to sand bedding AQIB
1603 CPP-NGCP-CIV-1595 1400128667 Civil SATIP-L- 450- 01 SAIC-L-1002
@ HRDH-1086 sta 1+191.07 to 1+835.94
HRDH-1086 FL TA-843625 6/26/2019 14.20 PM
HUSSEIN
Mr. Randy CLOSED

Trench Inspection prior to sand bedding AQIB


1604 CPP-NGCP-CIV-1596 1400128679 Civil SATIP-L- 450- 01 SAIC-L-1002
@ HRDH-1086 sta 1+867.52 to 2+070
HRDH-1086 FL TA-843625 6/26/2019 14.30 PM
HUSSEIN
Mr. Randy CLOSED

Trench Inspection prior to sand bedding AQIB


1605 CPP-NGCP-CIV-1597 1400128641 Civil SATIP-L- 450- 01 SAIC-L-1002 HRDH-1086 FL TA-843625 6/26/2019 14.40 PM Mr. Randy CLOSED
@ HRDH-1086 sta 2+155.812 to 2+227.97 HUSSEIN
Trench Inspection prior to sand bedding AQIB
1606 CPP-NGCP-CIV-1598 1400128682 Civil SATIP-L- 450- 01 SAIC-L-1002
@ HRDH-1086 sta 2+323.17 to 2+593.57
HRDH-1086 FL TA-843625 6/26/2019 14.50 PM
HUSSEIN
Mr. Randy CLOSED

Trench Inspection prior to sand bedding


AQIB
1607 CPP-NGCP-CIV-1599 1400128656 Civil SATIP-L- 450- 01 SAIC-L-1002 @ HRDH-1086 sta 2+609.92 to 2+655.99 & HRDH-1086 FL TA-843625 6/26/2019 15.00 PM Mr. Randy CLOSED
HUSSEIN
2+707.063 to 3+034.475
Trench Inspection prior to sand bedding
AQIB
1608 CPP-NGCP-CIV-1600 1400128723 Civil SATIP-L- 450- 01 SAIC-L-1002 @ HRDH-1086 sta 3+101.152 to 3+115.016 & HRDH-1086 FL TA-843625 6/26/2019 15.10 PM Mr. Randy CLOSED
HUSSEIN
3+134.69 to 3+384.981
3rd layer compaction test Inspection for
1609 CPP-NGCP-CIV-1601 1400128669 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH RH-K13 Various 6/26/2019 8:00:00 AM Hameed Ullah Mr. Edgardo Reject
Zone A at HRDH RH-K13
7th layer compaction test Inspection at
1610 CPP-NGCP-CIV-1602 1400128628 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH 1306 Various 6/26/2019 8:30:00 AM Hameed Ullah Mr. Randy CLOSED
HRDH 1306 wellpad Extension
1611 CPP-NGCP-CIV-1603 1400128687 Civil SATIP-A- 114- 01 SAIC-A-1002 Material Receiving Inspection at HRDH 1151 HRDH 1151 Various 6/26/2019 9:00:00 AM Hameed Ullah Mr. Edgardo CLOSED
1st layer fill placement and compaction
1612 CPP-NGCP-CIV-1604 1400128725 Civil SATIP-A- 114- 01 SAIC-A-1004 inspection at hrdh-1151 wellpad HRDH 1151 Various 6/26/2019 09:30:00AM Hameed Ullah Mr. Edgardo CLOSED
extension (zone-A)
1st layer compaction testing inspection
1613 CPP-NGCP-CIV-1605 1400128705 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH 1151 Various 6/26/2019 9:40:00 AM Hameed Ullah Mr. Edgardo CLOSED
at hrdh 1151 wellpad extension (Zone-A)
Bottom trench excavation inspection for hawiyah
TASEER
1614 CPP-NGCP-CIV-1606 1400128527 Civil SATIP-L- 450- 01 SAIC-L-1002 1071 hawiyah 1071 N/A 6/26/2019 8.00 AM Mr. Imran CLOSED
KHAN
km0+160 to km0+200,km0+397 to km0+650
Pipe lowering at HWYH-1091 km4+227 to
km4+289, km4+033 to km4+119, km3+621 to TASEER
1615 CPP-NGCP-CIV-1607 1400128303 Civil SATIP-L-450- 01 SAIC-L-1003
km3+780 FW341-FW346, FW325-FW332,
HWYH-1091 TA-445958 6/26/2019 1.05 PM
KHAN
Mr. Imran CLOSED
FW291-FW304
Trench Bedding Inspection for HWYH-1091
TASEER
1616 CPP-NGCP-CIV-1608 1400128228 Civil SATIP-L- 450- 01 SAIC-L-1002 km4+227 to km4+289, km4+033 to km4+119, HWYH-1091 TA-445958 6/26/2019 1.15 PM
KHAN
Mr. Imran CLOSED
km3+621 to km3+780
Sand Covering and backfilling Inspection for
TASEER
1617 CPP-NGCP-CIV-1609 1400128305 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1091 km4+227 to km4+289, km4+033 to HWYH-1091 TA-445958 6/26/2019 1.25 PM Mr. Imran CLOSED
KHAN
km4+119, km3+621 to km3+780
Soil sampling and testing review of test reports AAMIR ABDUL
1618 CPP-NGCP-CIV-1610 1400128323 Civil SATIP-A- 114- 01 SAIC-A-1001 hwyah RH HK N/A 6/26/2019 9.30 AM CLOSED
General fill marl RH Hk right of way hwyah SOLANGI MALIK
Compaction testing existing material well pad AAMIR ABDUL
1619 CPP-NGCP-CIV-1611 1400128333 Civil SATIP-A- 114- 01 SAIC-A-1005 hwyah RH CJ N/A 6/26/2019 8.30 AM Reject
RHCJ zone E, F, and G hwyah SOLANGI MALIK
Fill placement and compaction inspection for TASEER
1620 CPP-NGCP-CIV-1612 1400128535 Civil SATIP-A- 114- 01 SAIC-A-1004
hawiyah 1088 5th layer
hawiyah 1088 N/A 6/26/2019 9.30 AM
KHAN
Mr. Imran CLOSED
compaction inspection for hawiyah 1088 5th TASEER
1621 CPP-NGCP-CIV-1613 1400128554 Civil SATIP-A- 114- 01 SAIC-A-1005
layer
hawiyah 1088 N/A 6/26/2019 9.30 AM
KHAN
Mr. Imran CLOSED
Fill placement and compaction inspection for TASEER
1622 CPP-NGCP-CIV-1614 1400128502 Civil SATIP-A- 114- 01 SAIC-A-1004
hawiyah 1118 7th layer
hawiyah 1118 N/A 6/26/2019 8.30 AM
KHAN
Mr. Imran CLOSED
compaction inspection for hawiyah 1118 7th TASEER
1623 CPP-NGCP-CIV-1615 1400128584 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah 1118 N/A 6/26/2019 8.30 AM Mr. Imran CLOSED
layer KHAN
Soil sampling and testing for Borrow pit 11 stock TASEER
1624 CPP-NGCP-CIV-1616 1400128575 Civil SATIP-A- 114- 01 SAIC-A-1001
pile 5 select fill near rh GK Hawiyah
hawiyah rh GK N/A 6/26/2019 9.30 AM
KHAN
Mr. Imran CLOSED
Soil sampling and testing for Borrow pit 11 stock TASEER
1625 CPP-NGCP-CIV-1617 1400128521 Civil SATIP-A- 114- 01 SAIC-A-1001
pile 6 genaral fill near rh GK Hawiyah
hawiyah rh GK N/A 6/26/2019 9.30 AM
KHAN
Mr. Imran CLOSED

Soil sampling and testing for Borrow pit 13 stock TASEER


1626 CPP-NGCP-CIV-1618 1400128522 Civil SATIP-A- 114- 01 SAIC-A-1001
pile 4 general fill near well pad 1071 Hawiyah
hawiyah 1071 N/A 6/26/2019 9.30 AM
KHAN
Mr. Imran CLOSED

Soil sampling and testing Borrow pit 18 stock TASEER


1627 CPP-NGCP-CIV-1619 1400128538 Civil SATIP-A- 114- 01 SAIC-A-1001 Borrow pit 18 N/A 6/26/2019 9.30 AM Mr. Imran CLOSED
pile 1sub base class A KHAN
Soil sampling and testing for Borrow pit 18stock TASEER
1628 CPP-NGCP-CIV-1620 1400128578 Civil SATIP-A- 114- 01 SAIC-A-1001 Borrow pit 18 N/A 6/26/2019 9.30 AM Mr. Imran CLOSED
pile 2 select fill 13 KHAN
Soil sampling and testing for Borrow pit 17 stock TASEER
1629 CPP-NGCP-CIV-1621 1400128547 Civil SATIP-A- 114- 01 SAIC-A-1001 Borrow pit 17 N/A 6/26/2019 9.30 AM Mr. Imran CLOSED
pile 3 sub base class A KHAN
Pipe lowering at HWYH-1091 KM2+315 TO TASEER
1630 CPP-NGCP-CIV-1622 1400129278 Civil SATIP-L-450- 01 SAIC-L-1003 HWYH-1091 TA-445958 6/27/2019 7.30 AM Mr. Imran CLOSED
KM3+201 FW184-FW256 KHAN
Trench Bedding Inspection for HWYH-1091 TASEER
1631 CPP-NGCP-CIV-1623 1400129271 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH-1091 TA-445958 6/27/2019 7.45 AM Mr. Imran CLOSED
KM2+315 TO KM3+201 KHAN
Sand Covering and backfilling Inspection for TASEER
1632 CPP-NGCP-CIV-1624 1400129321 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH-1091 TA-445958 6/27/2019 8.00 AM Mr. Imran CLOSED
HWYH-1091 KM2+315 TO KM3+201 KHAN
Soil sampling and testing for Borrow pit 21stock TASEER
1633 CPP-NGCP-CIV-1625 1400129326 Civil SATIP-A- 114- 01 SAIC-A-1001 hawaiyh 1088 N/A 6/27/2019 9.30 AM Mr. Imran CLOSED
pile 2 general fill near well pad 1088 hawaiyh KHAN
Soil sampling and testing for existing surface of TASEER
1634 CPP-NGCP-CIV-1626 1400129374 Civil SATIP-A- 114- 01 SAIC-A-1001 hawiyah 1087 N/A 6/27/2019 9.30 AM Mr. Imran CLOSED
hawiyah 1087 KHAN
Fill placement and compaction inspection for TASEER
1635 CPP-NGCP-CIV-1627 1400129383 Civil SATIP-A- 114- 01 SAIC-A-1004
hawiyah 1088 6th layer
hawiyah 1088 N/A 6/27/2019 9.30 AM
KHAN
Mr. Imran CLOSED
compaction inspection for hawiyah 1088 6th TASEER
1636 CPP-NGCP-CIV-1628 1400129385 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah 1088 N/A 6/27/2019 9.30 AM Mr. Imran CLOSED
layer KHAN
Fill placement and compaction inspection for TASEER
1637 CPP-NGCP-CIV-1629 1400129394 Civil SATIP-A- 114- 01 SAIC-A-1004 hawiyah 1118 N/A 6/27/2019 8.30 AM Mr. Imran CLOSED
hawiyah 1118 8th layer KHAN
compaction inspection for hawiyah 1118 8th TASEER
1638 CPP-NGCP-CIV-1630 1400129396 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah 1118 N/A 6/27/2019 8.30 AM Mr. Imran CLOSED
layer KHAN
Soil sampling and testing for Borrow pit 21 stock TASEER
1639 CPP-NGCP-CIV-1631 1400129352 Civil SATIP-A- 114- 01 SAIC-A-1001 hawaiyh 1088 N/A 6/27/2019 9.30 AM Mr. Imran CLOSED
pile 1 general fill near well pad 1088 hawaiyh KHAN
Compaction testing 8th layer 300 mm well pad AAMIR ABDUL
1640 CPP-NGCP-CIV-1632 1400129399 Civil SATIP-A- 114- 01 SAIC-A-1005 HWYH- RH CJ N/A 6/27/2019 8.30 AM CLOSED
RH CJ zone C hwyah SOLANGI MALIK
3rd layer compaction test Inspection for RE-SCHEDULE TO 29-
1641 CPP-NGCP-CIV-1633 1400129576 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH 1023 N/A 6/27/2019 8:30:00 AM Hameed Ullah Mr. Edgardo CLOSED
Zone A at HRDH 1023 JUNE-2019
1st layer fill placement and compaction
1642 CPP-NGCP-CIV-1634 1400129452 Civil SATIP-A- 114- 01 SAIC-A-1004 inspection at hrdh-1151 wellpad hrdh-1151 N/A 6/27/2019 8:40:00 AM Hameed Ullah Mr. Randy CLOSED
extension (zone-B)
1st layer compaction testing inspection
1643 CPP-NGCP-CIV-1635 1400129577 Civil SATIP-A- 114- 01 SAIC-A-1005 hrdh-1151 N/A 6/27/2019 8:50:00 AM Hameed Ullah Mr. Edgardo CLOSED
at hrdh 1151 wellpad extension (Zone-B)
2nd layer fill placement and compaction
1644 CPP-NGCP-CIV-1636 1400129583 Civil SATIP-A- 114- 01 SAIC-A-1004 inspection at hrdh-1151 wellpad hrdh-1151 N/A 6/27/2019 9:00:00 AM Hameed Ullah Mr. Edgardo CLOSED
extension (zone-A)
2nd layer compaction testing inspection
1645 CPP-NGCP-CIV-1637 1400129584 Civil SATIP-A- 114- 01 SAIC-A-1005 at hrdh 1151 wellpad extension (Zone-A) hrdh-1151 N/A 6/27/2019 9:10:00 AM Hameed Ullah Mr. Edgardo CLOSED

Trench bedding and preparation Inspection for


8''F/L HRDH -922 AT Road Crossing KM: 2+066 AQIB
1646 CPP-NGCP-CIV-1638 1400129537 Civil SATIP-L- 450- 01 SAIC-L-1002
to 2+154
HRDH-922 FL TA-843609 5/27/2019 6.20 AM
HUSSEIN
Mr. Randy CLOSED RE-SCHEDULE TO 29-
01-FW-(164-171) JUNE-2019
8'' F/L HRDH-922 to FK Pipe lowering AT
AQIB
1647 CPP-NGCP-CIV-1639 1400129522 Civil SATIP-L-450- 01 SAIC-L-1003 Road Crossing KM: 2+066 to 2+154 HRDH-922 FL TA-843609 5/27/2019 6.25 AM
HUSSEIN
Mr. Randy CLOSED RE-SCHEDULE TO 29-
01-FW-(164-171) JUNE-2019
Sand Covering and backfilling Inspection for 8"
F/L HRDH-922, AT Road Crossing KM: 2+066 to AQIB
1648 CPP-NGCP-CIV-1640 1400129587 Civil SATIP-L-450- 01 SAIC-L-1004 2+154 HRDH-922 FL TA-843609 5/27/2019 6.30 AM Mr. Randy CLOSED RE-SCHEDULE TO 29-
HUSSEIN
01-FW-(164-171) JUNE-2019
Trench bedding and preparation Inspection for
8''F/L HRDH -922 ATKP1+776 to KP1+827 AQIB
1649 CPP-NGCP-CIV-1641 1400129604 Civil SATIP-L- 450- 01 SAIC-L-1002 HRDH-922 FL TA-843609 5/27/2019 6.35 AM Mr. Randy Reject RFI CANCEL BECAUSE
01-FW-(141-145); 01-FW-(151-154T); 02-FW- HUSSEIN RE-SCHEDULE TO 29- OF PIPE NOT RELEASED
(176-178); JUNE-2019 FROM COATING
8'' F/L HRDH-922 to FK Pipe lowering AT
KP1+776 to KP1+827 AQIB
1650 CPP-NGCP-CIV-1642 1400129595 Civil SATIP-L-450- 01 SAIC-L-1003 HRDH-922 FL TA-843609 5/27/2019 6.40 AM Mr. Randy Reject RFI CANCEL BECAUSE
01-FW-(141-145); 01-FW-(151-154T); 02-FW- HUSSEIN RE-SCHEDULE TO 29- OF PIPE NOT RELEASED
(176-178); JUNE-2019 FROM COATING
Sand Covering and backfilling Inspection for 8"
F/L HRDH-922, AT KP1+776 to KP1+827 AQIB
1651 CPP-NGCP-CIV-1643 1400129605 Civil SATIP-L-450- 01 SAIC-L-1004
01-FW-(141-145); 01-FW-(151-154T); 02-FW-
HRDH-922 FL TA-843609 5/27/2019 6.45 AM
HUSSEIN
Mr. Randy Reject RFI CANCEL BECAUSE
RE-SCHEDULE TO 29- OF PIPE NOT RELEASED
(176-178); JUNE-2019 FROM COATING
Trench bedding and preparation Inspection for
8''F/L HRDH -1116 AT Road Crossing KM: AQIB
1652 CPP-NGCP-CIV-1644 1400129596 Civil SATIP-L- 450- 01 SAIC-L-1002
1+071 to 1+159
HRDH-1116 FL TA-843608 5/27/2019 6.50AM
HUSSEIN
Mr. Randy CLOSED
RE-SCHEDULE TO 29-
01-FW-(85-92A) JUNE-2019
8'' F/L HRDH-1116 to FK Pipe lowering AT
AQIB
1653 CPP-NGCP-CIV-1645 1400129613 Civil SATIP-L-450- 01 SAIC-L-1003 Road Crossing KM: 1+071 to 1+159 HRDH-1116 FL TA-843608 5/27/2019 6.55 AM Mr. Randy CLOSED RE-SCHEDULE TO 29-
HUSSEIN
01-FW-(85-92A) JUNE-2019
Sand Covering and backfilling Inspection for 8"
F/L HRDH-1116 AT Road Crossing KM: 1+071 AQIB
1654 CPP-NGCP-CIV-1646 1400129606 Civil SATIP-L-450- 01 SAIC-L-1004 HRDH-1116 FL TA-843608 5/27/2019 7.00 AM Mr. Randy CLOSED
to 1+159 HUSSEIN RE-SCHEDULE TO 29-
01-FW-(85-92A) JUNE-2019
Trench bedding and preparation Inspection for
8''F/L HRDH -1116 AT Road Crossing AQIB
1655 CPP-NGCP-CIV-1647 1400129538 Civil SATIP-L- 450- 01 SAIC-L-1002 HRDH-1116 FL TA-843608 5/27/2019 7.05AM Mr. Randy Reject RFI CANCEL BECAUSE
KP1+222 to KP1+260 HUSSEIN RE-SCHEDULE TO 29- OF PIPE NOT RELEASED
01-FW-(97-100) JUNE-2019 FROM COATING
8'' F/L HRDH-1116 to FK Pipe lowering AT
Road Crossing KP1+222 to KP1+260 AQIB RFI CANCEL BECAUSE
1656 CPP-NGCP-CIV-1648 1400129597 Civil SATIP-L-450- 01 SAIC-L-1003 HRDH-1116 FL TA-843608 5/27/2019 7.10 AM Mr. Randy Reject RE-SCHEDULE TO 29- OF PIPE NOT RELEASED
01-FW-(97- HUSSEIN
100) JUNE-2019 FROM COATING
Sand Covering and backfilling Inspection for 8"
F/L HRDH-1116 AT Road Crossing KP1+222 to AQIB
1657 CPP-NGCP-CIV-1649 1400129614 Civil SATIP-L-450- 01 SAIC-L-1004 HRDH-1116 FL TA-843608 5/27/2019 7.15 AM Mr. Randy CLOSED RFI CANCEL BECAUSE
KP1+260 HUSSEIN RE-SCHEDULE TO 29- OF PIPE NOT RELEASED
01-FW-(97-100) JUNE-2019 FROM COATING
Trench Bedding Inspection for 8" FL HRDH-1086
1658 CPP-NGCP-CIV-1650 1400129561 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP0+355 to KP0+428; HRDH-1086 FL TA-843625 5/27/2019 14.00 PM Hameed Ullah Mr. Randy Reject
00-FW-(18-40);
Trench Bedding Inspection for 8" FL HRDH-1086
1659 CPP-NGCP-CIV-1651 1400129607 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP0+623 to KP0+660; HRDH-1086 FL TA-843625 5/27/2019 14.10 PM Hameed Ullah Mr. Randy Reject
00-FW-(48-67);
Compaction test of 30th layer for Zone A
1660 CPP-NGCP-CIV-1652 1400130220 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH RH-GK N/A 6/29/2019 8:30:00 AM Hameed Ullah Mr. Edgardo CLOSED
part 1 at HRDH RH-GK Extension
8th layer compaction test Inspection
1661 CPP-NGCP-CIV-1653 1400130159 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH 1306 N/A 6/29/2019 8:40:00 AM Hameed Ullah Mr. Randy CLOSED
at HRDH 1306 wellpad Extension
Trench Bedding Inspection for 8" FL HRDH-1086
1662 CPP-NGCP-CIV-1654 1400130253 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP0+932 to KP1+058; HRDH-1086 FL TA-843625 6/29/2019 14.00 PM Hameed Ullah Mr. Randy Reject
00-FW-(74-84);
Trench Bedding Inspection for 8" FL HRDH-1086
1663 CPP-NGCP-CIV-1655 1400130197 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP0+623 to KP0+660; HRDH-1086 FL TA-843625 6/29/2019 14.10 PM Hameed Ullah Mr. Randy Reject
00-FW-(88-104);
Pipe lowering at HWYH 1036 KM2+967 TO TASEER
1664 CPP-NGCP-CIV-1656 1400130046 Civil SATIP-L-450- 01 SAIC-L-1003 HWYH 1036 TA-445826 6/29/2019 7.30 AM Mr. Imran CLOSED
KM3+007 FW250,FW251 KHAN
Trench Bedding Inspection for HWYH 1036 TASEER
1665 CPP-NGCP-CIV-1657 1400130031 Civil SATIP-L- 450- 01 SAIC-L-1002 HWYH 1036 TA-445826 6/29/2019 7.45 AM Mr. Imran CLOSED
KM2+967 TO KM3+007 FW250,FW251 KHAN
Sand Covering and backfilling Inspection for
TASEER
1666 CPP-NGCP-CIV-1658 1400129959 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH 1036 KM2+967 TO KM3+007 HWYH 1036 TA-445826 6/29/2019 8.00 AM Mr. Imran CLOSED
KHAN
FW250,FW251
Fill placement and compaction inspection for TASEER
1667 CPP-NGCP-CIV-1659 1400130115 Civil SATIP-A- 114- 01 SAIC-A-1004 hawiyah 1118 N/A 6/29/2019 8.30 AM Mr. Imran CLOSED
hawiyah 1118 9th layer KHAN
compaction inspection for hawiyah 1118 9th TASEER
1668 CPP-NGCP-CIV-1660 1400130116 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah 1118 N/A 6/29/2019 8.30 AM Mr. Imran CLOSED
layer KHAN
Fill placement and compaction inspection for TASEER
1669 CPP-NGCP-CIV-1661 1400130121 Civil SATIP-A- 114- 01 SAIC-A-1004 hawiyah 1088 N/A 6/29/2019 9.30 AM Mr. Imran CLOSED
hawiyah 1088 7th layer KHAN
compaction inspection for hawiyah 1088 7th TASEER
1670 CPP-NGCP-CIV-1662 1400130187 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah 1088 N/A 6/29/2019 9.30 AM Mr. Imran CLOSED
layer KHAN
2nd layer fill placement and compaction
1671 CPP-NGCP-CIV-1663 1400130511 Civil SATIP-A- 114- 01 SAIC-A-1004 inspection at hrdh-1151 wellpad HRDH-1151 N/A 6/29/2019 11:00:00 AM Hameed Ullah Mr. Edgardo CLOSED
extension (zone-B)
2nd layer compaction testing inspection
1672 CPP-NGCP-CIV-1664 1400130516 Civil SATIP-A- 114- 01 SAIC-A-1005
at hrdh 1151 wellpad extension (Zone-B)
HRDH-1151 N/A 6/29/2019 11:10:00 AM Hameed Ullah Mr. Edgardo CLOSED

3rd layer fill placement and compaction


1673 CPP-NGCP-CIV-1665 1400130512 Civil SATIP-A- 114- 01 SAIC-A-1004 inspection at hrdh-1151 wellpad HRDH-1151 N/A 6/29/2019 11:20:00 AM Hameed Ullah Mr. Edgardo CLOSED
extension (zone-a)
3rd layer compaction testing inspection
1674 CPP-NGCP-CIV-1666 1400130527 Civil SATIP-A- 114- 01 SAIC-A-1005
at hrdh 1151 wellpad extension (Zone-A)
HRDH-1151 N/A 6/29/2019 11:30:00 AM Hameed Ullah Mr. Edgardo CLOSED

Soil sampling testing and review of test reports f
or General Fill Materialat HRDH Borrow Pit# 21,
1675 CPP-NGCP-CIV-1667 1400131179 Civil SATIP-A- 114- 01 SAIC-A-1001 HRDH-RH-K13 Various 6/30/2019 08.30 AM Hameed Ullah Mr. Edgardo CLOSED
stockpile#01(N-241122.1,E-
490513.5) Near HRDH-RH-K13
Compaction test inspection for hawiyah RH/CK
1676 CPP-NGCP-CIV-1668 1400131155 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah RH_CK N/A 6/30/2019 10.00 AM Francis fontolo Mr. Imran CLOSED
existing surface at zone 2
Compaction test 2nd layer 300 mm well pad AAMIR ABDUL
1677 CPP-NGCP-CIV-1669 1400131129 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah RH_CJ N/A 6/30/2019 8.00 AM CLOSED
RHCJ zone D hwyah SOLANGI MALIK
Visual final inspection for TASEER
1678 CPP-NGCP-CIV-1670 1400131162 Civil SATIP-A- 114- 01 SAIC-A-1006 various N/A 6/30/2019 8.30 AM Mr. Imran CLOSED
1036,1112,1002,1112,1092,1118 KHAN
Fill placement and compaction inspection for TASEER
1679 CPP-NGCP-CIV-1671 1400131173 Civil SATIP-A- 114- 01 SAIC-A-1004 hawiyah 1088 N/A 6/30/2019 9.30 AM Mr. Imran CLOSED
hawiyah 1088 8th layer KHAN
compaction inspection for hawiyah 1088 8th TASEER
1680 CPP-NGCP-CIV-1672 1400131166 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah 1088 N/A 6/30/2019 9.30 AM Mr. Imran CLOSED
layer KHAN
8'' F/L HRDH-1086 -1030 Pipe lowering at sta-
AQIB
1681 CPP-NGCP-CIV-1673 1400130658 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+307 to KP0+580; HRDH-1086 FL TA-843625 6/30/2019 6.30 AM Mr. Randy CLOSED
HUSSEIN
00-FW-(14-40);
Sand Covering and backfilling Inspection for 8"
AQIB
1682 CPP-NGCP-CIV-1674 1400130620 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1086-sta- KP0+307 to KP0+580; HRDH-1086 FL TA-843625 6/30/2019 6.35 AM Mr. Randy CLOSED
HUSSEIN
00-FW-(14-40);
8'' F/L HRDH-1086 -1030 Pipe lowering at sta-
AQIB
1683 CPP-NGCP-CIV-1675 1400130651 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+676 to KP0+911; HRDH-1086 FL TA-843625 6/30/2019 6.40 AM Mr. Randy CLOSED
HUSSEIN
00-FW-(48-67);
Sand Covering and backfilling Inspection for 8"
AQIB
1684 CPP-NGCP-CIV-1676 1400130652 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1086-sta- KP0+676 to KP0+911; HRDH-1086 FL TA-843625 6/30/2019 6.45 AM
HUSSEIN
Mr. Randy CLOSED
00-FW-(48-67);
8'' F/L HRDH-1086 -1030 Pipe lowering at sta-
AQIB
1685 CPP-NGCP-CIV-1677 1400130621 Civil SATIP-L-450- 01 SAIC-L-1003 KP0+996 to KP1+118; HRDH-1086 FL TA-843625 6/30/2019 6.50AM
HUSSEIN
Mr. Randy Reject
00-FW-(74-84);
Sand Covering and backfilling Inspection for 8"
AQIB
1686 CPP-NGCP-CIV-1678 1400130659 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1086-sta- KP0+996 to KP1+118; HRDH-1086 FL TA-843625 6/30/2019 6.55AM
HUSSEIN
Mr. Randy CLOSED
00-FW-(74-84);
8'' F/L HRDH-1086 -1030 Pipe lowering at sta-
AQIB
1687 CPP-NGCP-CIV-1679 1400130804 Civil SATIP-L-450- 01 SAIC-L-1003 KP1+166 to KP1+363; HRDH-1086 FL TA-843625 6/30/2019 7.00 AM Mr. Randy CLOSED
HUSSEIN
01-FW-(88-104);
Sand Covering and backfilling Inspection for 8"
AQIB
1688 CPP-NGCP-CIV-1680 1400130814 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1086-sta- KP1+166 to KP1+363; HRDH-1086 FL TA-843625 6/30/2019 7.05 AM Mr. Randy CLOSED
HUSSEIN
01-FW-(88-104);
Trench Bedding Inspection for 8" FL HRDH-1086
AQIB
1689 CPP-NGCP-CIV-1681 1400130795 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP1+615 to KP1+764; HRDH-1086 FL TA-843625 6/30/2019 14.00 PM Mr. Randy CLOSED
HUSSEIN
01-FW-(125-137);
Trench Bedding Inspection for 8" FL HRDH-1086
AQIB
1690 CPP-NGCP-CIV-1682 1400130732 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP1+837 to KP1+996; HRDH-1086 FL TA-843625 6/30/2019 14.10 PM Mr. Randy CLOSED
HUSSEIN
01-FW-(143-156);
Trench Bedding Inspection for 8" FL HRDH-1086
AQIB
1691 CPP-NGCP-CIV-1683 1400130823 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP2+272 to KP2+309; HRDH-1086 FL TA-843625 6/30/2019 14.00 PM Mr. Randy CLOSED
HUSSEIN
02-FW-(179-182);
Trench Bedding Inspection for 8" FL HRDH-1086
AQIB
1692 CPP-NGCP-CIV-1684 1400130796 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP2+670 to KP2+932; HRDH-1086 FL TA-843625 6/30/2019 14.10 PM
HUSSEIN
Mr. Randy CLOSED
02-FW-(212-233);
Trench Bedding Inspection for 8" FL HRDH-1086
AQIB
1693 CPP-NGCP-CIV-1685 1400130758 Civil SATIP-L- 450- 01 SAIC-L-1002 sta-KP3+089 to KP3+201; HRDH-1086 FL TA-843625 6/30/2019 14.10 PM
HUSSEIN
Mr. Randy CLOSED
03-FW-(246-255);
Deformed Fabricated Epoxy Coated Steel 16mm
Quantity 18046kg;Saudi Epoxy Stirrup , Chairs ,
1694 CPP-NGCP-CIV-1686 1400131132 Civil SATIP-Q- 001- 02 SAIC-Q-1007
Rings , Spiral Bar 10mm Quantity 2446kg
HRDH-Yard-2 Various 6/30/2019 08.40 AM Hameed Ullah Mr. Edgardo CLOSED
Receiving Inspection at HRDH-Yard-2
4th layer compaction test Inspection for Zone A
1695 CPP-NGCP-CIV-1687 1400131178 Civil SATIP-A- 114- 01 SAIC-A-1005
at HRDH 1023 wellpad
HRDH 1023 Various 6/30/2019 08.50 AM Hameed Ullah Mr. Edgardo CLOSED
9th layer compaction test Inspection
1696 CPP-NGCP-CIV-1688 1400131213 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH 1306 Various 6/30/2019 09.00 AM Hameed Ullah Mr. Randy CLOSED
at HRDH 1306 wellpad
Base coarse material Receiving
1697 CPP-NGCP-CIV-1689 1400131202 Civil SATIP-Q- 006- 02 SAIC-Q-1037 HRDH RH-K13 Various 6/30/2019 09.10 AM Hameed Ullah Mr. Edgardo CLOSED
inspection at HRDH RH-K13
Base coarse placement and compaction
1698 CPP-NGCP-CIV-1690 1400131177 Civil SATIP-Q- 006- 02 SAIC-Q-1040 inspection for Access road inside HRDH RH-K13 Various 6/30/2019 09.20 AM Hameed Ullah Mr. Edgardo CLOSED
HRDH RH-K13
1st layer of base coarse compaction
1699 CPP-NGCP-CIV-1691 1400131170 Civil SATIP-Q- 006- 02 Saic-Q-1005 test Inspection at HRDH RH-K13 HRDH RH-K13 Various 6/30/2019 09.30 AM Hameed Ullah Mr. Edgardo CLOSED

3rd layer fill placement and


1700 CPP-NGCP-CIV-1692 1400131224 Civil SATIP-A- 114- 01 SAIC-A-1004 compaction inspection at hrdh-1151 HRDH-1151 Various 6/30/2019 09.40 AM Hameed Ullah Mr. Randy CLOSED
wellpad extension (zone-B)
4th layer fill placement and compaction
1701 CPP-NGCP-CIV-1693 1400131233 Civil SATIP-A- 114- 01 SAIC-A-1004 inspection at hrdh-1151 wellpad HRDH-1151 Various 6/30/2019 09.50 AM Hameed Ullah Mr. Randy CLOSED
extension (zone-A)
4th layer compaction testing inspection
1702 CPP-NGCP-CIV-1694 1400131112 Civil SATIP-A- 114- 01 SAIC-A-1005
at hrdh 1151 wellpad extension (Zone-A)
HRDH-1151 Various 6/30/2019 10.00 AM Hameed Ullah Mr. Randy CLOSED

Handling, storage and preservation


1703 CPP-NGCP-CIV-1696-A 1400131204 Civil SATIP-Q- 001- 02 SAIC-Q-1008 of Epoxy Coated steel bars Inspection HRDH-Yard-2 Various 6/30/2019 10.10 AM Hameed Ullah Mr. Edgardo CLOSED

3rd layer compaction testing inspection


1704 CPP-NGCP-CIV-1697 1400131886 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH-1151 Various 6/30/2019 09.40 AM Hameed Ullah Mr. Randy CLOSED
at hrdh 1151 wellpad extension (Zone-B)
Soil sampling and testing for borrow pit no 21
1704 CPP-NGCP-CIV-1696 1400131999 Civil SATIP-A- 114- 01 SAIC-A-1001 hawiyah RH_CK N/A 7/1/2019 9.30 AM Francis fontolo Mr. Imran OPEN No Action
stockpile no 1 general fill material at RH_CK
8'' F/L HRDH-1086 -1030 Pipe lowering at sta-
AQIB
1705 CPP-NGCP-CIV-1698 1400131872 Civil SATIP-L-450- 01 SAIC-L-1003 KP1+615 to KP1+764; HRDH-1086 FL TA-843625 7/1/2019 6.30 AM Mr. Randy CLOSED
HUSSEIN
01-FW-(125-137);
Sand Covering and backfilling Inspection for 8"
AQIB
1706 CPP-NGCP-CIV-1699 1400131937 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1086-sta- KP1+615 to KP1+764; HRDH-1086 FL TA-843625 7/1/2019 6.35 AM Mr. Randy CLOSED
HUSSEIN
01-FW-(125-137);
8'' F/L HRDH-1086 -1030 Pipe lowering at sta-
AQIB
1707 CPP-NGCP-CIV-1700 1400131927 Civil SATIP-L-450- 01 SAIC-L-1003 KP1+837 to KP1+996; HRDH-1086 FL TA-843625 7/1/2019 6.40 AM Mr. Randy CLOSED
HUSSEIN
01-FW-(143-156);
Sand Covering and backfilling Inspection for 8"
AQIB
1708 CPP-NGCP-CIV-1701 1400131953 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1086-sta- KP1+837 to KP1+996; HRDH-1086 FL TA-843625 7/1/2019 6.45 AM Mr. Randy CLOSED
HUSSEIN
01-FW-(143-156);
8'' F/L HRDH-1086 -1030 Pipe lowering at sta-
AQIB
1709 CPP-NGCP-CIV-1702 1400131963 Civil SATIP-L-450- 01 SAIC-L-1003 KP2+272 to KP2+309; HRDH-1086 FL TA-843625 7/1/2019 6.50AM Mr. Randy CLOSED
HUSSEIN
02-FW-(179-182);
Sand Covering and backfilling Inspection for 8"
AQIB
710 CPP-NGCP-CIV-1703 1400131973 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1086-sta- KP2+272 to KP2+309; HRDH-1086 FL TA-843625 7/1/2019 6.55AM
HUSSEIN
Mr. Randy CLOSED
02-FW-(179-182);
8'' F/L HRDH-1086 -1030 Pipe lowering at sta-
AQIB
1711 CPP-NGCP-CIV-1704 1400131974 Civil SATIP-L-450- 01 SAIC-L-1003 KP2+670 to KP2+932; HRDH-1086 FL TA-843625 7/1/2019 7.00 AM
HUSSEIN
Mr. Randy CLOSED
02-FW-(212-233);
Sand Covering and backfilling Inspection for 8"
AQIB
1712 CPP-NGCP-CIV-1705 1400131954 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1086-sta- KP2+670 to KP2+932; HRDH-1086 FL TA-843625 7/1/2019 7.05 AM Mr. Randy CLOSED
HUSSEIN
02-FW-(212-233);
8'' F/L HRDH-1086 -1030 Pipe lowering at sta-
AQIB
1713 CPP-NGCP-CIV-1706 1400131965 Civil SATIP-L-450- 01 SAIC-L-1003 KP3+089 to KP3+201; HRDH-1086 FL TA-843625 7/1/2019 7.10 AM Mr. Randy CLOSED
HUSSEIN
03-FW-(246-255);
Sand Covering and backfilling Inspection for 8"
AQIB
1714 CPP-NGCP-CIV-1707 1400131892 Civil SATIP-L-450- 01 SAIC-L-1004 F/L HRDH-1086-sta- KP3+089 to KP3+201; HRDH-1086 FL TA-843625 7/1/2019 7.15 AM Mr. Randy CLOSED
HUSSEIN
03-FW-(246-255);
5th layer compaction test Inspection
1715 CPP-NGCP-CIV-1708 1400132044 Civil SATIP-A- 114- 01 SAIC-A-1005 for Zone A at HRDH 1023 wellpad HRDH 1023 Various 7/1/2019 08.30 AM Hameed Ullah Mr. Edgardo CLOSED
Extension
4th layer fill placement and
1716 CPP-NGCP-CIV-1709 1400131981 Civil SATIP-A- 114- 01 SAIC-A-1004 compaction inspection at hrdh-1151 HRDH-1151 Various 7/1/2019 08.40 AM Hameed Ullah Mr. Randy CLOSED
wellpad extension (zone-B)
4th layer compaction testing
1717 CPP-NGCP-CIV-1710 1400132035 Civil SATIP-A- 114- 01 SAIC-A-1005 inspection at hrdh 1151 wellpad HRDH-1151 Various 7/1/2019 08.50 AM Hameed Ullah Mr. Randy CLOSED
extension (Zone-B)
5th layer fill placement and
1718 CPP-NGCP-CIV-1711 1400132015 Civil SATIP-A- 114- 01 SAIC-A-1004 compaction inspection at hrdh-1151 HRDH-1151 Various 7/1/2019 10.00 AM Hameed Ullah Mr. Randy CLOSED
wellpad extension (zone-a)
5th layer compaction testing
1719 CPP-NGCP-CIV-1712 1400131982 Civil SATIP-A- 114- 01 SAIC-A-1005 inspection at hrdh 1151 wellpad HRDH-1151 Various 7/1/2019 10.05 AM Hameed Ullah Mr. Randy CLOSED
extension (Zone-A)
5th layer fill placement and
1720 CPP-NGCP-CIV-1713 1400131959 Civil SATIP-A- 114- 01 SAIC-A-1004 compaction inspection at hrdh-1151 HRDH-1151 Various 7/1/2019 10.10 AM Hameed Ullah Mr. Randy CLOSED
wellpad extension (zone-B)
5th layer compaction testing
1721 CPP-NGCP-CIV-1714 1400132016 Civil SATIP-A- 114- 01 SAIC-A-1005 inspection at hrdh 1151 wellpad HRDH-1151 Various 7/1/2019 10.15AM Hameed Ullah Mr. Randy CLOSED
extension (Zone-B)
6th layer fill placement and
1722 CPP-NGCP-CIV-1715 1400132017 Civil SATIP-A- 114- 01 SAIC-A-1004 compaction inspection at hrdh-1151 HRDH-1151 Various 7/1/2019 10.20 AM Hameed Ullah Mr. Randy CLOSED
wellpad extension (zone-a)
6th layer compaction testing
1723 CPP-NGCP-CIV-1716 1400131960 Civil SATIP-A- 114- 01 SAIC-A-1005 inspection at hrdh 1151 wellpad HRDH-1151 Various 7/1/2019 10.25 AM Hameed Ullah Mr. Randy CLOSED
extension (Zone-A)
Compaction Test 2nd layer 300 mm well pad AAMIR ABDUL
1724 CPP-NGCP-CIV-1717 1400131986 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah RH_CJ N/A 7/1/2019 8.00 AM CLOSED
RHCJ zone B hwyah SOLANGI MALIK
Fill placement and compaction inspection for TASEER
1725 CPP-NGCP-CIV-1718 1400131947 Civil SATIP-A- 114- 01 SAIC-A-1004 hawiyah 1088 N/A 7/1/2019 9.30 AM Mr. Imran CLOSED
hawiyah 1088 9th layer KHAN
compaction inspection for hawiyah 1088 9th TASEER
1726 CPP-NGCP-CIV-1719 1400132043 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah 1088 N/A 7/1/2019 9.30 AM Mr. Imran CLOSED
layer KHAN
Compaction test inspection for hawiyah 1087 TASEER
1727 CPP-NGCP-CIV-1720 1400131950 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah 1087 N/A 7/1/2019 9.30 AM Mr. Imran CLOSED
existing surface KHAN
Compaction test inspection for hawiyah 1091 TASEER
1728 CPP-NGCP-CIV-1721 1400132036 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah 1091 N/A 7/1/2019 9.30 AM Mr. Imran CLOSED
existing surface KHAN
Bottom trench excavation inspection for hawiyah
TASEER
1729 CPP-NGCP-CIV-1722 1400131987 Civil SATIP-L- 450- 01 SAIC-L-1002 GK_RH HWYH-GK_RH N/A 7/1/2019 9.30 AM
KHAN
Mr. Imran CLOSED
Km 0+979 to 12+240
Prime coat material placement inspection for TASEER
1731 CPP-NGCP-CIV-1724 1400132006 Civil SATIP-Q-006-02 SAIC-Q-1041
hawiyah 1036 Km 2+967 to 3+007
hawiyah 1036 N/A 7/1/2019 9.30 AM
KHAN
Mr. Imran CLOSED

Asphalt material placement inspection for


TASEER
1732 CPP-NGCP-CIV-1725 1400131988 Civil SATIP-Q-006-02 SAIC-Q-1061 hawiyah 1036 hawiyah 1036 N/A 7/1/2019 9.30 AM
KHAN
Mr. Imran CLOSED
Km 2+967 to 3+007
Pipe lowering at HWYH 1134 KM4+725 to TASEER
1733 CPP-NGCP-CIV-1726 1400132528 Civil SATIP-L-450- 01 SAIC-L-1003 HWYH 1134 TA-445836 7/2/2019 7.30 AM Mr. Imran CLOSED
KM4+690 FW386 KHAN
Trench Bedding Inspection for HWYH 1134 TASEER
1734 CPP-NGCP-CIV-1727 1400132558 Civil SATIP-L- 450- 01 SAIC-L-1002
KM4+725 to KM4+690
HWYH 1134 TA-445836 7/2/2019 7.45 AM
KHAN
Mr. Imran CLOSED
Sand Covering and backfilling Inspection for TASEER
1735 CPP-NGCP-CIV-1728 1400132519 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH 1134 TA-445836 7/2/2019 8.00 AM Mr. Imran CLOSED
HWYH 1134 KM4+725 to KM4+690 KHAN
Pipe lowering at HWYH 1003 KM4+895 TO
TASEER
1736 CPP-NGCP-CIV-1729 1400132521 Civil SATIP-L-450- 01 SAIC-L-1003 KM5+448 ,KM5+473 TO KM5+906 FW395- HWYH 1003 TA-445909 7/2/2019 7.30 AM Mr. Imran CLOSED
KHAN
FW418, FW420-455
Trench Bedding Inspection for HWYH 1003
TASEER
1737 CPP-NGCP-CIV-1730 1400132633 Civil SATIP-L- 450- 01 SAIC-L-1002 KM4+895 TO KM5+448 ,KM5+473 TO KM5+906 HWYH 1003 TA-445909 7/2/2019 7.45 AM Mr. Imran CLOSED
KHAN
FW395-FW418, FW420-455
Sand Covering and backfilling Inspection for
TASEER
1738 CPP-NGCP-CIV-1731 1400132610 Civil SATIP-L-450- 01 SAIC-L-1004 HWYH 1003 KM4+895 TO KM5+448 ,KM5+473 HWYH 1003 TA-445909 7/2/2019 8.00 AM Mr. Imran CLOSED
KHAN
TO KM5+906 FW395-FW418, FW420-455
Fill placement and compaction inspection for TASEER
1739 CPP-NGCP-CIV-1732 1400132636 Civil SATIP-A- 114- 01 SAIC-A-1004 hawiyah 1088 N/A 7/2/2019 9.30 AM Mr. Imran CLOSED
hawiyah 1088 10th layer KHAN
compaction inspection for hawiyah 1088 10th TASEER
1740 CPP-NGCP-CIV-1733 1400132664 Civil SATIP-A- 114- 01 SAIC-A-1005 hawiyah 1088 N/A 7/2/2019 9.30 AM Mr. Imran CLOSED
layer KHAN
Soil sampling for Existing Ground at
1741 CPP-NGCP-CIV-1734 1400132411 Civil SATIP-A- 114- 01 SAIC-A-1001 HRDH RH-CK Various 7/2/2019 09.30 AM Hameed Ullah Mr. Randy CLOSED
HRDH RH-CK
30th layer compaction test Inspection
1742 CPP-NGCP-CIV-1735 1400132883 Civil SATIP-A- 114- 01 SAIC-A-1005 HRDH RH-GK Various 7/2/2019 09.40 AM Hameed Ullah Mr. Edgardo CLOSED
for Zone A part 2 at HRDH RH-GK Extension
10th layer compaction test Inspection
1743 CPP-NGCP-CIV-1736 1400132809 Civil SATIP-A- 114- 01 SAIC-A-1005
at HRDH 1306 wellpad Extension
HRDH 1306 Various 7/2/2019 09.50 AM Hameed Ullah Mr. Randy CLOSED

6th layer fill placement and


1744 CPP-NGCP-CIV-1737 1400132884 Civil SATIP-A- 114- 01 SAIC-A-1004 compaction inspection at hrdh-1151 HRDH-1151 Various 7/2/2019 10.00 AM Hameed Ullah Mr. Randy CLOSED
wellpad extension (zone-B)
6th layer compaction testing inspection
1745 CPP-NGCP-CIV-1738 1400132867 Civil SATIP-A- 114- 01 SAIC-A-1005
at hrdh 1151 wellpad extension (Zone-B)
HRDH-1151 Various 7/2/2019 10.10 AM Hameed Ullah Mr. Randy CLOSED

7th layer fill placement and compaction


1746 CPP-NGCP-CIV-1739 1400132790 Civil SATIP-A- 114- 01 SAIC-A-1004 inspection at hrdh-1151 wellpad HRDH-1151 Various 7/2/2019 10.20 AM Hameed Ullah Mr. Randy CLOSED
extension (zone-a)
7th layer compaction testing
1747 CPP-NGCP-CIV-1740 1400132868 Civil SATIP-A- 114- 01 SAIC-A-1005 inspection at hrdh 1151 wellpad HRDH-1151 Various 7/2/2019 10.30 AM Hameed Ullah Mr. Randy CLOSED
extension (Zone-A)
7th final layer fill placement and
1748 CPP-NGCP-CIV-1741 1400132885 Civil SATIP-A- 114- 01 SAIC-A-1004 compaction inspection at hrdh-1151 HRDH-1151 Various 7/2/2019 10.40 AM Hameed Ullah Mr. Randy Reject RE-SCHEDULE TO3-
wellpad extension (zone-B) JULY-2019
7th final layer compaction testing
1749 CPP-NGCP-CI