ID : 51Q-PI-0008

KNPC CFP – MAB2 PROJECT


PIPING MATERIAL RECEIVING
INSPECTION CHECKLIST
(PIPE & PIPE FITTINGS)
Contractor procured materials
Tag Description: Tag No.:
System No.:
Subcontractor: I.S.C.O. Sub-System No.:
Work Package: P.O No.: Unit / Train:
Drawing Ref.: Report No.: P6022-MAB-RIR-PA-191
ITP Ref No / Rev. No.: P6022MAB.000.51Q.037, Rev F5 & P6022MAB.000.51Q.006,
Rev F5
RFI No.:

Item Description :

Pipes Butt welding fittings & swages


Forged/ wrought fittings Flanges
Blinds (Spectacle/ paddle) Flange blinds
Ring Spacers Drip rings
Plugs Bolts & nuts
Valves Other flanged components
Spiral wound gaskets Ring - joint gaskets
Others, specify

COMPLIANCE
SL. No REQUIREMENTS REMARKS
YES NO N/A
Copy of SQS Release Report or Inspection release
1 certificate by TPI agency, if applicable

2 Quantity is as per Packing List

3 Size and schedule/ rating are as per Packing List

Heat Nos. or manufacturer's markings are as per


4
approved specification

5 Visually acceptable.

6 Color coding

REMARK :

Description Subcontractor Contractor Company


Name S. ANSAR BASHA ZAFIR AHMAD ANIL KOTTUR
Signature
Date
51Q-PI-0008 REV.2