Unit [t CO2/yr]
059c Absolute gross
CO2* Type calculated
Comment: Total direct emissions from raw materials, kiln fuels and non-kiln fuels; excluding
CO2 from on-site power generation ;
Formula: IF(OR( line059 ="", line045c =""),"", line059 - line045c )
Unit [t CO2/yr]
059a calcination
component* Type calculated
Comment: Direct emissions from raw materials; ;
Formula: line039
Unit [t CO2/yr]
059b fuel component*
Type calculated
Comment: Direct emissions from kiln fuels and non-kiln fuels, excluding CO2 from on-site
power generation
Formula: IF(OR( line043 ="", line044 ="", line045a ="", line045b =""),"", line043 +
line044 + line045a + line045b )
https://www.cement-co2-protocol.org/en/Content/Internet_Manual/kpi.htm 1/7
11/12/2020 List of Key Performance Indicators (KPI)
Unit [t CO2/yr]
071 Absolute net CO2*
Type calculated
Comment: Total direct emissions from raw materials, kiln fuels and non-kiln fuels, excluding
CO2 from on-site power generation, minus alternative fossil fuels
Validation: Validation Ranges for plant with kiln operation: (n.a.) - (n.a.) ; Validation Ranges
for grinding centre:0 - 703.36
Formula: IF(OR( line059c ="", line041 =""),"", line059c - line041 )
Unit [t CO2/yr]
083a Absolute CO2 from
biomass sources Type calculated
(including biomass Validation: Validation Ranges for plant with kiln operation: 0 - 2,000,000
content of mixed
Formula: line050
fuels)*
https://www.cement-co2-protocol.org/en/Content/Internet_Manual/kpi.htm 2/7
11/12/2020 List of Key Performance Indicators (KPI)
https://www.cement-co2-protocol.org/en/Content/Internet_Manual/kpi.htm 3/7
11/12/2020 List of Key Performance Indicators (KPI)
Unit [%]
091 Net outbound
clinker per net Type calculated
clinker Comment: percentage of direct clinker sales versus clinker consumed to produce cement
consumption*
Formula: IF( line011 ="","",IF( line011 =0,"n. appl.",( line010 - line009 - line010b -
line010c )/ line011 ))
Unit [%]
092a Clinker/cement (eq.)
factor** Type calculated
Comment: Calculated based on total clinker consumed and total Portland + Blended
cements
Comment: This value is an important indicator for your production. It presents the ratio of the
clinker in the cement produced. The output value is in percentage.
Comment: * Clinker/cement (eq.) factor The clinker/cement (eq.) factor is defined as: Total
clinker consumed / (own clinker consumed plus gypsum, lime stone, CKD plus
clinker substitute consumed for blending plus clinker bought and consumed).
Definition of clinker/cement (eq.) factor as in Protocol Guidance Document
Version 3, Section 6.3. The factor is based on clinker consumption. Hence, in the
denominator sold clinker is excluded and bought clinker is included. Cement
substitutes are excluded. See also the equation for its calculation in the comment
sheet.
Validation: Validation Ranges for plant with kiln operation: 0 - .970; Validation Ranges for
grinding centre:0 - .970
Formula: IF(OR( line011 ="", line020 ="", line011 =0, line020 =0),"n. appl.", line011 /
line020 )
https://www.cement-co2-protocol.org/en/Content/Internet_Manual/kpi.htm 4/7
11/12/2020 List of Key Performance Indicators (KPI)
Unit [%]
092 Clinker/cementitious
factor* Type calculated
Comment: Total clinker consumed divided by the total of cements produced
Comment: * Clinker/cementitious factor Definition of clinker / cementitious factor as in
Protocol Guidance Document Version 3, Section 6.3. The factor is based on
clinker consumption. Hence, in the denominator sold clinker is excluded and
bought clinker is included. Furthermore, cement substitutes are included. See
also the equation for its calculation in the comment sheet.
Validation: Validation Ranges for plant with kiln operation: 0 - .970; Validation Ranges for
grinding centre:0 - .970
Formula: IF( line021 ="","",IF( line021 =0,"n. appl.", line011 / line021 ))
Unit [%]
094 Conventional fossil
fuel rate (kiln fuels)* Type calculated
Comment: Consumption of conventional fossil fuels divided by the total heat consumption of
kilns
Formula: IF( line025 ="","",IF( line025 =0,"n. appl.", line026 / line025 ))
Unit [%]
095 Alternative fossil
fuel rate (kiln fuels)* Type calculated
Comment: Consumption of alternative fossil fuels divided by the total heat consumption of
kilns
Validation: Validation Ranges for plant with kiln operation: 0 - 1; Validation Ranges for
grinding centre:0 - 1
Formula: IF( line025 ="","",IF( line025 =0,"n. appl.", line027 / line025 ))
Unit [%]
096 Biomass fuel rate
(kiln fuels)* Type calculated
Comment: Consumption of biomass fuels divided by the total heat consumption of kilns
Validation: Validation Ranges for plant with kiln operation: 0 - 1; Validation Ranges for
grinding centre:0 - 1
Formula: IF( line025 ="","",IF( line025 =0,"n. appl.", line028 / line025 ))
Unit [t CO2/GJ]
096a CO2 emission factor
for kiln fuel mix* Type calculated
Comment: Total CO2 from fossil-based kiln fuels divided by total heat consumption of kilns
Formula: IF( line043 ="","",IF( line043 =0,"n. appl.", line043 / line025 ))
https://www.cement-co2-protocol.org/en/Content/Internet_Manual/kpi.htm 5/7
11/12/2020 List of Key Performance Indicators (KPI)
Unit [%]
096b Total conventional
fossil fuel rate at Type calculated
plant level* Comment: Total conventional fossil fuel energy used in the whole plant divided by total fuel
energy use in %
Formula: IF(AND( line025 =0, line321 =0, line321c =0, line322 =0, line323k =0,
line323g =0, line323i =0, line324aa =0, line324f =0, line324h =0),"n. appl.",(
line026 + line321 +( line321c *(1- line200g ))+ line322 + line323k +
line324aa )/( line025 + line321 + line321c + line322 + line323k + line323g +
line323i + line324aa + line324f + line324h ))
Unit [%]
096c Total alternative
fossil fuel rate at Type calculated
plant level* Comment: Total alternative fossil fuel energy used in the whole plant divided by total fuel
energy use in %
Formula: IF(AND( line025 =0, line321 =0, line321c =0, line322 =0, line323k =0,
line323g =0, line323i =0, line324aa =0, line324f =0, line324h =0),"n. appl.",(
line027 + line323g + line324f )/( line025 + line321 + line321c + line322 +
line323k + line323g + line323i + line324aa + line324f + line324h ))
Unit [%]
096d Total biomass fuel
rate at plant level* Type calculated
Comment: Total biomass fuel energy used in the whole plant divided by total fuel energy use
in %
Formula: IF(AND( line025 =0, line321 =0, line321c =0, line322 =0, line323k =0,
line323g =0, line323i =0, line324aa =0, line324f =0, line324h =0),"n. appl.",(
line028 +( line321c * line200g )+ line323i + line324h )/( line025 + line321 +
line321c + line322 + line323k + line323g + line323i + line324aa + line324f +
line324h ))
Unit [kWh/t cement]
097 Specific total power
consumption* Type calculated
Comment: Total plant power consumption divided by total cements and substitutes produced
Comment: * In this KPI the total power consumption is related to the processing of
cementitous products. Hence, it is referenced to cements and substitutes
produced. In the denominator sold clinker is excluded and bought clinker is
included. See also the equation for its calculation in the comment sheet. Note:
The reference is different from the definition, which is used to report specific CO2
emissions per ton of cementitous product in the Protocol Guidance Document
Version 3, Section 6.2.
Validation: Validation Ranges for plant with kiln operation: 80 - 250; Validation Ranges for
grinding centre:30 - 120
Formula: IF( line021 ="","",IF( line021 =0,"n. appl.", line033 / line021 *1000))
Unit [kWh/t clinker]
098 Specific power
consumption of Type calculated
clinker production* Comment: Power consumption up to and including clinker production divided by clinker
production
Formula: IF( line008 ="","",IF( line008 =0,"n. appl.", line033e / line008 *1000))
https://www.cement-co2-protocol.org/en/Content/Internet_Manual/kpi.htm 6/7
11/12/2020 List of Key Performance Indicators (KPI)
https://www.cement-co2-protocol.org/en/Content/Internet_Manual/kpi.htm 7/7