ROAD CENTER LINE

Plinth Level (502.61 m)


(Top Level-501.86 m)
Drain Top Level Finish Ground Slope 0.5% Finish Ground Level (502.20 m)

1'-5"
3'-3"

7"
1'-1"

1'-10"
Manhole Bottom Level (501.61 m)
1'-10"
3'-4"

160 mm to 250 mm Ø Sewerage Pipe Slope 1%


Typical Manhole
1'-0"

Drain Bottom Level


(IL-500.81m)
Cross Section of Sewerage Pipe Line
ROAD CENTER LINE
Paved level (99.85 m) Plinth Level (100.00 m)
(Top Level-99.28 m)
Drain Top Level Finish Ground Slope 0.5%
MH-IL (99.60 m)
160 to 300 mm Ø Sewerage Pipe Slope 1%
Drain Bottom Level
(IL-98.28m)
Typical Cross Section of Sewerage Pipe Line