1. A can do a piece of work in 20 days and B can do (a)12 days (b) 15 days
same work in 30 days. They start the work to-
(c)10 days (d) 20 days
gether. In how many days, the work will be com-
pleted? 5. Ram can do a piece of work in 10 days and mohan
can do the same piece of work in 15 days. They
A B started the work together but after 3 days, Ram
left the work. In how many days, the total work
got completed?
1 1
(c) 9 days (d) 7 days
4 2
5 5
(a) 35 days (b) 25 days 6. Raju can do a piece of work in 15 days while
7 7 Rinki can do the same piece of work in 25 days.
They started the work together but after 5 days,
5 15 Rinki has to leave the work, in how many days,
(c) 15 days (d) 25 days
7 17 Raju can do the double of the remaining work?
1 Adutiya Sir
8. A can complete a work in 30 days. B can com- how many days the work was finished.
plete it in 36 days while C can finish it in 45
days, A and B started the work together but A B
after 9 days A left and C joined in how many C A, B C
days the work was finished. C
A 30 B 36
C 45 A B (A) 12 days (B) 15 days
9 A C (C) 16 days (D) 18 days
13. A can complete a work in 60 days. B can com-
(A) 12 days (B) 12 days pleted it in 72 days while C can finish it in 90
days. A, B and C started the work together but
(C) 15 days (D) 18 days
A left the work before 5 days of completion in
9. A can do a piece of work in 18 days while B can how many days work was finished.
do the same piece o f work in 24 days, they started
A 60 B 72
the work together, but before 4 days of comple-
tion the work, B left and A completes the remain-
C 90 A, B C
ing work. In how many days the total work com- A
pleted?
A, B C 3
(A) 29 days (B) 31 days
10
A 3 4
(C) 35 days (D) 32 days
B 5 11
21. A can complete a work in 80 days. B can com-
plete it in 96 days while C can finish it in 120
5 5 days. A, B and C started the work together but
(a) 8 days (b) 9 days A left the work before 10 days of completion
11 11
and C left 15 days after beginning the work. In
(c) 11 days (d) 8 days how many days the work was finished.
18. A can complete a work in 30 days. B can com- A 80 B 96
plete it in 36 days, while C can finish it in 45 C 120 A, B C
days. A, B and C started the work together but
A 10
A left before 5 days of completion and B left 6
days after beginning the work in how many C
days the work was finished.
A 30 B 36 3 7
(A) 42 days (B) 43 days
C 45 A, B C 7 11
A 5
4 3
B (C) 45 days (D) 46 days
9 10
22. A can complete a work in 36 days. B can finish
(A) 12 days (B) 15 days it in 45 days. In how many days the work was
(C) 16 days (D) 18 days finished if A and B work at alternate days re-
spectively?
19. A can complete a work in 36 days. B can com-
plete it in 45 days and C can finish it in 60 A 36 B 45
days. A, B and C started the work together but A, B
B left before 12 days of completion and C left
after 10 days from beginning the work in how
many days the work was finished. (A) 30 days (B) 35 days
A 36 B 45 (C) 36 days (D) 40 days
C 60 A, B C 23. A can do a certain piece of work in 18 days, B
B 12 can do the same work in 24 days and C do the
C same work in 36 days. In how many days the
work was finished if A, B and C work at alter-
3 Adutiya Sir
nate days respectively? 4 3
(A) 22 days (B) 23 days
A 18 B 24 9 7
C 36 A B 5 3
C (C) 25 days (D) 21 days
9 7
27. A + B together can complete a work in 30 days
B + C together finish it in 36 days while C + A
(A) 24 days (B) 25 days
together finish it in 45 days. In how many days
(C) 30 days (D) 28 days A, B and C together can finish it
3 1
(A) 4 days (B) 3 days
13 13
5 3
(C) 2 days (D) 5 days
11 13
2 5 7
33. A can complete a work in 14 days working 5 (A) 41 hrs. (B) 48 hrs.
5
11 11
hrs per day. B can complete it in 15 days
working 6 hrs per day while C can finish it in 7 7
1 (C) 43 hrs. (D) 42 hrs.
17 days working 7 hrs per day. In how many 11 11
7
36. The ratio of the efficiencies of A, B and C is 2 : 5
days together they finish it if they work 6 hr
: 3. Working together, they can complete a work
per day.
5 Adutiya Sir
4 A B B C
in 27 days. B and C together can complete th A,B C
9
part of the work in : [CGL Pre 2017] 16 B
A, B C 2:5:3
B
(a) 42 days (b) 49 days
(c) 56 days (d) 64 days
4
C,
9 41. A is twice as fast as B and thrice as fast as C.
They working together complete a work in 15
days. In how many days B and C together can
(a) 27 days (b) 15 days finish it.
1 A B C A
(c) 17 days (d) 24 days ,B C 15
7
B C
37. The ratio of the efficiencies of A, B and C is 4 : 5
: 3. Working together, they can complete that work
in 25 days. A and C together will complete 35% of
(a) 25 days (b) 33 days
that work in: [CGL Pre 2017]
(c) 36 days (d) 39 days
A, B C 4:5:3
42. Man is twice as fast as a woman, and thrice as
A C 35% fast as a boy. If 1 man, 2 women and 3 boys
together can finish it in 3 days. In how many
days 1 boy alone can finish it.
(a) 12 days (b) 10 days
(c) 18 days (d) 15 days
1 2 3
38. The ratio of the efficiencies of A, B and C is 7 : 5
: 4. Working together, they can finish a work in 3 1
35 days. A and B work together for 28 days. The
remaining work will be completed (in days) by C
alone: [CGL Pre 2017] (a) 18 days (b) 24 days
6 Adutiya Sir
48. A and B together can finish a work in 24 days
they started the work together but after 21
(a) 24 days (b) 30 days days B left and A finish the remaining work in
(c) 36 days (d) 45 days 5 days. In how many days B alone can finish
at.
45. A and B can complete a work in 1/3rd time
that of C while B and C complete the work in A B 24
1/4th time that of A. They together completer 21
a work in 22 days. In how many days B alone B A, 5
can finish it.
B
A B C 1/3
B C A 1/4
(a) 45 days (b) 60 days
A B
B (a) 24 days (b) 21 days
A 48 (c) 20 days (d) 18 days
1
11 B 57. A and B together complete a work in 16 days,
3
B and C together complete it in 20 days. If A
4 work for 6 days, B for 16 days and C complete
[CGL (Pre) 2018] the remaining work in 15 days. In how many
days C alone can finish it.
(a) 24 days (b) 32 days
A B 16
(c) 27 days (d) 30 days
B C 20
53. A is thrice as good as workman as B and A 6 B 16 C
therefore able to finish a job in 60 days less
15 C
than B. In how many days A and B together
can do it
A B A B (a) 35 days (b) 40 days
60 A B (c) 42 days (d) 45 days
58. A alone would takes 9 days more to complete
1 a work than A and B together, B takes 4 days
(a) 20 days (b) 22 days more to complete a work alone that of A and B
2
together. In how many days they together do
(c) 25 days (d) 30 days it.
54. A is four times good as B therefore able to finish A A B 9
a job in 45 days less than B. In how many days
B, A B
A and B together can do it.
4 A
A B A B B
45 A B
(a) 4 days (b) 6 days
(c) 8 days (d) 9 day
(a) 10 days (b) 12 days
59. A and B together can complete a work in 'D'
(c) 15 days (d) 18 days
days. If A work alone it takes (D + 18) days and
55. A is 5/3 times good as B therefore able to if B work alone it takes (D + 8) days. What is
finish a job in 20 days less than B. In how many the value of 'D'?
days A and B together can do it.
A B D
A B A B A (D+18) B
20 A B (D+8) D
(a) 37/2 days (b) 75/4 days (a) 8 days (b) 12 days
(c) 75/2 days (d) 75 days (c) 15 days (d) 18 day
8 Adutiya Sir
60. A takes 5 days more than B to complete a work 64. A and B together can complete a work in 100/
and 9 days more than C. A and B together can 9 days. If A work alone it takes 5 days more
do the same work in same time as C. How many that of B alone. In how many days B alone can
days A would take to do it? do it.
A B 5 C 9 A B 100/9
A B A B 5
C A B
(a) 20 days (b) 25 days
(a) 16 days (b) 10 days (c) 30 days (d) 40 day
(c) 15 days (d) 20 days
3
61. Three men A, B and C working together can 65. A and B together can complete a work in 9
5
do a work in 6 hrs less than that of A alone do,
days. If A work alone it takes 8 days more that
1 hrs less time than B alone and half the time
of B alone. In how many days B alone can do
needed by C. In how many days will A and B
it.
together can finish it?
A, B C A 3
A B 9
6 B 1 C 5
A B A B 8
B
(a) 12 days (b) 16 days
2 4
(a) days (b) days (c) 18 days (d) 24 day
3 3
66. 40 men can complete a piece of work in 40
5 7 days. They started the work together but at
(c) days (d) days
3 3 the end of each 10th day 5 men left the job. In
how many days work would hav e been
62. A and B together can complete a work in 12 completed.
days. If A work alone it takes 10 days more
that of B alone. In how many days B alone can 40 40
do it. 10
A B 12 5
A B 10
B
2 2
(a) 56 days (b) 64 days
(a) 20 days (b) 30 days 3 3
(c) 35 days (d) 45 day
1 1
(c) 56 days (d) 48 days
1 3 3
63. A and B together can complete a work in 7
5 67. 33 men can do a job in 30 days. If 44 men
days. If A work alone it takes 6 days more that started the work together and after every day
of B alone. In how many days B alone can do one person leave the work. Find the minimum
it. number of days required to complete the work.
1 33 30 44
A B 7
5
A B 6
B
(a) 12 days (b) 18 days (a) 35 days (b) 40 days
9 Adutiya Sir
68. A group of men decided to do a job in 4 days, B A 25%
but 20 men dropped out everyday. The job was 13
completed at the end of 7th day. Find the men
who are in the work initially. A
A B 4
4
5% B
20
7
(a) 16(b) 18
(c) 140 men (d) 150 men 72. Ram and Shyam together take an arsignment.
Ram takes 6 hours to type 32 pages while Shyam
69. A group of worker can completed a piece of takes 5hrs. to type 40 pages. How much time
work in 50 days when they are working they should take to type an arisgment of 110
individually. On the first day one person work, pages if they work together?
on the second day another person join him, on
the third day one more person join them and 6
th is pr ocess cont inue ti ll the work is 32 5 40
completed. How many approx. days are needed 110
to complete the work.
1 1
(a) 3 days (b) 9 days
4 4
1 3
(c) 8 days (d) 9 days
4 4
73. Three cooks have to make 80 golgappe. They
are known to make 20 pieces every minute
(a) 8 days (b) 9 days working together. The first cook began working
(c) 10 days (d) 11 day alone and made 20 piece having worked for
so me ti mes mor e than 3 minutes. The
70. A, B and C finished a work in 10 days. Initially remaining part of work was done by second
they started the work together but C work only and third cook together. It took total 8 minute
for 3 days when 37/100 of job was done. Work to complete 80 golgappe. How many minute
done by A in 5 days equals the work done by B would it take the first cook alone to cook 80
in 4 days. How many days required to fasted golgappe.
person to complete entire work.
80
A, B C 10
C 20 3
37/100
B 4 A 5 8 80
80
10 Adutiya Sir
(a) 3 men (b) 5 men 80. If the work done by (x–1) men in (x+1) days is
to the work done by (x+2) men in (x–1) days
(c) 8 men (d) 10 men are in the ratio 9 : 10, then the value of x is
75. A certain number of engineers can develop a equal to:
design in 40 days. If there were 5 more (x–1) (x+1)
engineers it could be finished 10 days earlier. (x+2) (x–1)
How many engineers were there in the
9:10 x
beginning.
(A) 5 (B) 6
40 5
10 (C) 7 (D) 8
81. If 90 men can do a certain job in 16 days, work-
ing 12 hours per day, then the part of that
(a) 18 (b) 20 work which can be completed by 70 men in 24
(c) 15 (d) 25 days, working 8 hours per day is
X X X X
Y Y Y
(A) 10 days (B) 13 days
(C) 14 days (D) 15 days
11 Adutiya Sir
find the ration b/w efficiency of 1 man and 1
X2
(a) Y (b) woman.
Y
2 X Y
X3 Y3 3 1 1
(c) 2 (d) 2
Y X
5d 3d
(a) days (b) days
14 14
9d 11
(c) days (d) day
14 7
9 7½
1 1
2x 26 2x 32 (A) 10 days (B) 11 days
(a) (b) 5 5
x 1 x 1
1 1
2x 26 2x 32 (C) 5 days (D) 7 days
(c) (d) 5 5
x 1 x 1
98. 3 Men or 4 Boys can complete a work in 43
94. Alford got an order from a garment manufacturer days. 7 Men and 5 boys together complete it?
for 480 Denim Shirts. He brought 12 sewing ma-
chines and appointed some expert tailors to do 3 4 43
the job. However, many didn't report to duty. As 7 5
a result, each of those who did, had to stitch 32
more shirts than originally planned by Alford,
with equal distribution of work. How many tai- (a) 12 days (b) 15 days
lors had been appointed earlier and how many
(c) 18 days (d) 20 days
had not reported for work?
99. 5 Men or 9 Women can finish a work in 19
days. In how many days 3 men and 6 women
can complete 3/5 of work.
5 9 19
3 6
(a) 10 days (b) 12 days 107. A, B and C can do a work in 12 days, 18 days
and 30 days respectively. They finish the work
1 1 together and earn 31000. What is the share of
(c) 12 days (d) 13 day A.
2 3
A B
A CGL Mains 2018
B (A) 20 (B) 30
(C) 18 (D) 24
123. A can do 50% of the job in 16 days, B can do 1/
(A) Rs. 67.50 (B) Rs. 27.50 4th of the job in 24 days. In how many days can
they do 3/4th of the job working together?
(C) Rs. 60.50 (D) Rs. 70.50
120. S, T and U can complete a work in 40, 48 and A 50% 16
60 days respectively. They received Rs. 10800 B 1/4 24
to complete the work. They begin the work 3/4
together but T left 2 days before the comple-
tion of the work and U left 5 days before the
completion of the work. S has completed the CGL Mains 2018
remaining work alone. What is the share of S
(in Rs.) from total money? (A) 24 (B) 9
(C) 21 (D) 18
S, T U 40, 48 60
124. A and B can together complete a task in 18
T hours. After 6 hours A leaves. B takes 36 hours
U5 S to finish rest of the task. How many hours
would A have taken to do the task if he worked
alone?
(A) 4000 (B) 4320
A B 18 6
(C) 4500 (D) 4860 A
B 36 A
16 Adutiya Sir
A, B C
CGL Mains 2018 9, 12 36
A
(A) 54 (B) 45
B C
(C) 21 (D) 27
125. A can do a work in 36 days and B in 12 days. If
CGL Mains 2018
they work on it together for 3 days, then what
fraction of work is left? (A) 3 (B) 4
A 36 B, 12 (C) 5 (D) 6
3 129. A is thrice as productive as C. Together they
can complete a job in 22.5 days. If B joins them
after they have worked for 15 days then in how
CGL Mains 2018
many days can they finish the rest of the job if
B alone can do the job in 15 days?
2 1
(A) (B)
3 3 A C
22.5
1 1 15 B
(C) (D)
4 5
B 15
126. A can paint a house in 45 days and B can do it
in 15 days. Along with C, they did the job in 5 CGL Mains 2018
days only. Then, C alone can do the job in how
(A) 6 (B) 3
many days?
(C) 9 (D) 2
A 45 B
15 C 130. If A, B and C can do a job working alone in 12,
18 and 36 days respectively. They all work to-
5 C
gether for 2 day, then B quits. How many days
will A and C take to finish rest of the job?
CGL Mains 2018 A, B C 12, 18 36
(A) 12 (B) 9 2
(C) 15 (D) 8 B
A C
127. A, B and C together can finish a task in 7.5
days. C is thrice as productive as A and B alone CGL Mains 2018
can do the task in 15 days. In how many days
(A) 9 (B) 6
can A and C do the job if B goes on leave?
(C) 3 (D) 4
A, B C 7.5
C A 131. If A, B and C together do a job in 4 days, A and
C together do the job in 4.5 days and B and C
B 15
together do the job in 12 days then in how many
B A C days can C along do the job?
A, B C 4 A
CGL Mains 2018 C 4.5
(A) 30 (B) 10 B C 12 C
(C) 20 (D) 15
128. A, B and C can do job in 9, 12 and 36 respec- CGL Mains 2018
tively if they worked alone. A leaves after they (A) 36 (B) 6
have worked together for 3 days. In how many
days can B can C do the rest of the job? (C) 18 (D) 12
17 Adutiya Sir
132. If A alone can do a job in 40 days then, in how (A) 22 (B) 44
many days can B alone do the job if together
(C) 20 (D) 40
they can do the job in 8 days?
136. B would have taken 10 hours more than what
A 40 B A would have taken to complete a task if each
of them worked alone. Working together they
8 can complete the task in 12 hours. How many
hours would B take to do 50% of the task?
CGL Mains 2018
B A 10
(A) 15 (B) 10
(C) 20 (D) 25
133. Working alone A can do the task in 27 hours 12 B
and B can do it in 54 hours. Find C’s share (in 50%
Rs.) if A, B and C get paid Rs. 4,320 for com-
pleting a task in 12 hours on which they worked CGL Mains 2018
together? (A) 30 (B) 15
A 27 (C) 20 (D) 10
B 54 C 137. A can do a work in 21 days and B in 42 days. If
A, B C 12 they work on it together for 7 days, then what
4,320 fraction of work is left?
A 21 B 42
CGL Mains 2018 7
(A) 1440 (B) 960
(C) 1920 (D) 1280 CGL Mains 2018
(A) 10 (B) 20 C, B 5 A
60 A, B C
(C) 15 (D) 18
12
140. A, B and C can together do a job in 9 days. C
B
alone can do the job in 36 days. In how many
days can A and B do 50% of the job working
together?
CGL Mains 2018
A, B C 9 (A) 18 (B) 27
C 36 A
(C) 90 (D) 72
B 50%
144. A can complete 50% of a job in 9 days and B
can complete 25% of the job in 9 days if they
CGL Mains 2018 worked alone. If they worked together how
much of the job (in %) can they complete in 9
(A) 6 (B) 12
days?
(C) 9 (D) 15
A9 50% B9
141. A can do a work in 72 days and B in 90 days. If 25%
they work on it together for 10 days, then what
fraction of work is left?
9 %
A 72 B 90
CGL Mains 2018
10
(A) 80 (B) 90
(A) 32 (B) 64 1
(C) 96 (D) 72 (C) 4 days (D) 5
2
19 Adutiya Sir
146. A and B can do a piece of work in 6 days and 8 X Y
days, respectively. With the help of C, they com- 5 : 4
pleted the work in 3 days and earned Rs. 1,848.
10 Y
What was the share of C?
5
A B 6 8 X
C 3
CGL Mains 2019
1848 C
(A) 14 days (B) 12 days
(C) 10 days (D) 15 days
CGL Mains 2019
150. A can do one-third of a work in 15 days, B can
(A) Rs. 462 (B) Rs. 693 do 75% of the same work in 18 days and C can
do the same work in 36 days. B and C work
(C) Rs. 231 (D) Rs. 924
together for 8 days. In how many days will A
147. A can do 40% of a work in 12 days, whereas B alone complete the remaining work?
can do 60% of the same work in 15 days. Both
A 15
work together for 10 days. C completes the
remaining work alone in 4 days. A, B and C B 75% 18 C
together will complete 28% of the same work 36 B C, 8
in: A
A 40% 12
B 60% 15 CGL Mains 2019
10 C 4 (A) 18 days (B) 20 days
A, B C (C) 16 days (D) 24 days
28% 151. A is as efficient as B and C together. Working
CGL Mains 2019 together A and B can complete a work in 36
days and C alone can complete it in 60 days. A
1 and C work together for 10 days. B alone will
(A) 2 days (B) 2 days complete the remaining work in:
2
A B C,
1
(C) 1 days (D) 3 days A B 36
2
C 60
148. 4 men and 5 women can complete a work in 15 A C 10
days, whereas 9 men and women can do it in B
10 days. To complete the same work in 7 days,
how many women should assist 4 men?
CGL Mains 2019
4 5 15
(A) 110 days (B) 90 days
9 6 10
7 (C) 84 days (D) 88 days
4 152. 25 persons can complete a work in 60 days.
They started the work. 10 persons left the work
after x days. If the whole work was completed
CGL Mains 2019 in 80 days, then what is the value of x?
(A) 14 (B) 11 25 60
(C) 13 (D) 12 x 10
80
149. To do a certain work, the ratio of the efficien-
x
cies of X and Y is 5 : 4. Working together, they
can complete the same work in 10 days. Y alone CGL Mains 2019
starts the work and leaves after 5 days. The (A) 12 (B) 9
remaining work will be completed by X alone
in: (C) 15 (D) 8
20 Adutiya Sir
ANSWER KEY
1. (a) 18. (d) 35. (c) 52. (c) 69. (c) 86. (c) 103. (a) 120.(d) 137.(d)
2. (b) 19. (b) 36. (b) 53. (b) 70. (a) 87. (b) 104. (d) 121.(b) 138.(d)
3. (b) 20. (c) 37. (d) 54. (b) 71. (c) 88. (c) 105. (a) 122.(a) 139.(d)
4. (c) 21. (b) 38. (a) 55. (b) 72. (c) 89. (c) 106. (c) 123.(d) 140.(a)
5. (d) 22. (d) 39. (a) 56. (a) 73. (c) 90. (a) 107. (a) 124.(d) 141.(a)
6. (a) 23. (a) 40. (c) 57. (b) 74. (b) 91. (a) 108. (c) 125.(a) 142. (c)
7. (b) 24. (b) 41. (b) 58. (b) 75. (c) 92. (a) 109. (d) 126.(b) 143. (c)
8. (d) 25. (b) 42. (d) 59. (b) 76. (d) 93. (a) 110. (b) 127.(d) 144. (c)
9. (b) 26. (a) 43. (a) 60. (c) 77. (a) 94. (c) 111. (d) 128.(a) 145. (*)
10. (a) 27. (d) 44. (c) 61. (b) 78. (a) 95. (a) 112. (a) 129.(b) 146. (c)
11. (c) 28. (a) 45. (b) 62. (a) 79. (b) 96. (b) 113. (d) 130.(b) 147.(a)
12. (c) 29. (b) 46. (c) 63. (a) 80. (d) 97. (d) 114. (a) 131. (c) 148. (c)
13. (c) 30. (c) 47. (b) 64. (a) 81. (c) 98. (a) 115. (b) 132.(b) 149.(a)
14. (b) 31. (c) 48. (b) 65. (b) 82. (c) 99. (c) 116. (d) 133.(a) 150.(b)
15. (c) 32. (b) 49. (c) 66. (a) 83. (a) 100. (c) 117.(d) 134. (c) 151.(a)
16. (c) 33. (b) 50. (a) 67. (d) 84. (d) 101. (b) 118. (c) 135. (c) 152. (*)
17. (a) 34. (a) 51. (d) 68. (c) 85. (b) 102. (c) 119. (*) 136.(b)
21 Adutiya Sir