durajoint PVC waterstops

Range of externally and centrally placed waterstops

DESCRIPTION PHYSICAL PROPERTIES must be left protruding from the


waterstop to enable the head of the
The durajoint waterstop range is Extruded thermoplastic nail to be cast into the concrete.
Form
PVC sections The relationship between profile
extruded from specially formulated
pvc material, which whilst flexible is Colour Aqua green widths is that the 250 mm wide
easily welded on site to provide the durajoint CB and DB should be used
Joint
primary seal in the waterproofing, for Up to 10 mm in walls or floors 250 mm thick and
movement
water retaining and/or excluding above, and the narrower widths in
structures. Hydrostatic sections thinner than 250 mm.
Up to 10 m head
head
USES Tensile
> 14 MPa
SITE JOINTING
strength
The prevention of regress or ingress Elongation at Only butt joints should be welded on
> 300% site. Special function-made
of water or liquids through break
construction or expansion joints in intersections are available from abe
water retaining or excluding Construction Chemicals. The ends
structures such as: Construction joint externally placed of the butt joints must be cut square.
* Dams, reservoirs, digesters, water durajoint PVC external C – 150 mm These cut ends should then be
towers, canals durajoint PVC external C – 200 mm pushed against the pre-heated heater
* Basements, car parks, retaining durajoint PVC external C – 250 mm blade (supplied by abe) until a molten
walls bead appears against the blade.
In addition, factory made Remove the blade and firmly press
BENEFITS intersections are available for the full the two molten ends of the waterstop
range: together and hold firmly until these
Co-ordinated profiles - Mitre on flat ends are fused together.
ƒ Ensures bulb continuity throughout - 3-way on flat A piece of shutterboard or similar
the network - 4-way on flat material placed under the joint prior to
ƒ Making onsite jointing simpler - T-piece the operation will facilitate the
ƒ Allows for jointing of external to - 90º on edge jointing. This jointing must be
centrally placed sections - 270º on edge undertaken in a well-ventilated area
ƒ Allows for jointing of expansion joint All these sections can be made for as the fumes given off when the PVC
section to construction joint section both similar and dissimilar sections. is being melted are an irritant to the
ƒ Flat top to centre bulb ensures All intersections to be factory lungs and eyes. In enclosed areas
snug fit of filler board produced by abe Construction forced ventilation is a pre-requisite.
Chemicals to minimize site joints. A wire brush is used to clean the PVC
RANGE residue on the heater blade after
INSTALLATION TECHNIQUES every jointing operation.
Expansion joint centrally placed
durajoint PVC centre bulb – 150 mm Centrally placed waterstops - MODEL SPECIFICATION
durajoint PVC centre bulb – 200 mm durajoint CB and dumbbell - are to
durajoint PVC centre bulb – 250 mm be fully tied to the re-bar to eliminate Waterstop durajoint external C
possible displacement during the
Expansion joint externally placed concreting and vibrating process. It is Externally placed waterstop for
durajoint PVC external E – 150 mm imperative that care is taken to fully construction and contraction joints
durajoint PVC external E – 200 mm compact the concrete around the in walls and floors to water
durajoint PVC external E – 250 mm waterstop in order to eliminate any retaining and water excluding
voids or honeycombing in that area. structures.
Construction joint centrally placed Externally placed waterstops, The waterstop will be durajoint
durajoint PVC dumbbell – 150 mm durajoint external E and external C external C, an externally placed
durajoint PVC dumbbell – 200 mm are fixed by washing through the extruded plasticized PVC compound
durajoint PVC dumbbell – 250 mm external flange with the blinding, in applied in accordance with the
the case of floor slabs, or into the recommendations of abe
shuttering where it is used in a wall Construction Chemicals. The
joint. In both instances, the nails used waterstop will comply with the

Revision 9203

Karachi: Room No.1, Mezzanine Floor, Al-Hayat Chambers, A-7, Block-7/8, K.C.H.S. Tel: +92 21 4535898-99, Fax: +92 21 4558071
Lahore: 25-A, FCC, Syed Maratib Ali Road, Gulberg 4, Tel: +92 42 5763360 Fax: +92 42 5875384
requirements of CKS 3890:1973 and Waterstop durajoint centre bulb the company cannot - because abe
have an elongation at break of 300%. has no direct or continuous control
Waterstop durajoint dumbbell Centrally placed waterstop for over where
expansion joints in walls and and how abe products are applied -
A centrally placed waterstop for floors to water retaining and water accept any liability either directly or
construction and contraction joints excluding structures. indirectly arising from the use of abe
in walls and floors to water The waterstop will be durajoint products, whether or not in
retaining and water excluding centre bulb, an externally placed accordance with any advice,
structures. extruded plasticized PVC compound specification, recommendation or
The waterstop will be durajoint applied in accordance with the information given by the company.
dumbbell, a centrally placed recommendations of abe
extruded plasticized PVC compound Construction Chemicals. FURTHER INFORMATION
applied in accordance with the
recommendations of abe HEALTH & SAFETY Where other products are to be used
Construction Chemicals. The in conjunction with this material, the
waterstop will comply with the Always carry out the jointing of relevant technical data sheets should
requirements of CKS 3890:1973 and durajoint PVC waterstops in a well be consulted to determine total
have an elongation at break of 300%. ventilated area as the fumes given off requirements.
are an irritant to both eyes and lungs. abe Construction Chemicals has a
Waterstop durajoint external E In confined areas forced ventilation is wealth of technical and practical
a prerequisite. experience built up over years in the
Externally placed waterstop for company’s pursuit of excellence in
expansion joints in walls and IMPORTANT NOTE building and construction technology.
floors to water retaining / water
excluding structures. This data sheet is issued as a guide
The waterstop will be durajoint to the use of the product(s)
external E, an externally placed concerned. Whilst abe Construction
extruded plasticized PVC compound Chemicals endeavours to ensure
applied in accordance with the that any advice, recommendation,
recommendations of abe specification or information is
Construction Chemicals. The accurate and correct,
waterstop will comply with the
requirements of CKS 3890:1973 and
have an elongation at break of 300%.

ESTIMATING Section width Approximate mass Minimum radii on Minimum radii on Roll length
per roll flat edge
durajoint mm kg m m m
durajoint CB 250 32,2 15 0,15 15
durajoint CB 200 25,8 14 0,15 15
durajoint CB 150 39,6 12 0,075 30
durajoint dumbbell 250 30,8 15 0,15 15
durajoint dumbbell 200 24,8 14 0,15 15
durajoint dumbbell 150 36,8 12 0,075 30
durajoint external C 250 35,5 10 0,15 15
durajoint external C 200 27,8 9 0,15 15
durajoint external C 150 39,5 8 0,075 30
durajoint external E 250 38,7 10 5,0 15
durajoint external E 200 30,4 9 5,0 15
durajoint external E 150 43,4 8 5,0 30
durajoint CB10 250 65,3 15 0,23 15

Revision 9203

Karachi: Room No.1, Mezzanine Floor, Al-Hayat Chambers, A-7, Block-7/8, K.C.H.S. Tel: +92 21 4535898-99, Fax: +92 21 4558071
Lahore: 25-A, FCC, Syed Maratib Ali Road, Gulberg 4, Tel: +92 42 5763360 Fax: +92 42 5875384
Standard Profiles
durajoint pvc external e

durajoint pvc external c

durajoint pvc dumbell

Karachi: Room No.1, Mezzanine Floor, Al-Hayat Chambers, A-7, Block-7/8, K.C.H.S. Tel: +92 21 4535898-99, Fax: +92 21 4558071
Lahore: 25-A, FCC, Syed Maratib Ali Road, Gulberg 4, Tel: +92 42 5763360 Fax: +92 42 5875384
durajoint pvc centrebulb

Karachi: Room No.1, Mezzanine Floor, Al-Hayat Chambers, A-7, Block-7/8, K.C.H.S. Tel: +92 21 4535898-99, Fax: +92 21 4558071
Lahore: 25-A, FCC, Syed Maratib Ali Road, Gulberg 4, Tel: +92 42 5763360 Fax: +92 42 5875384
Standard Intersections

Typical Details \

Karachi: Room No.1, Mezzanine Floor, Al-Hayat Chambers, A-7, Block-7/8, K.C.H.S. Tel: +92 21 4535898-99, Fax: +92 21 4558071
Lahore: 25-A, FCC, Syed Maratib Ali Road, Gulberg 4, Tel: +92 42 5763360 Fax: +92 42 5875384