3 Bangalore Electricity Supply Company Limited
S (uty ened Goumnent of Kamala der)
‘Office ofthe
‘Telephone : 080-2234 1199 General Manager (Be),
‘Email ID. : gmdsmabescom co.in DSM, Corporate Office,
RefNo, BESCOM/BC-51/2021-22/C¥S-21 BESCOM, KR. Circle,
Enel: Annexures A to D Hangalore-560 OO!.
Date: 03.09.2021
OFFICIAL MEMORANDUM
‘Sub: Determination of tariff and other norms in respect of Grid connected S
Photo Voltaic plants (SRTFV) in BESCOM for FY22 & 23-reg
Refi 1. KERC Order for “Determination of tariff in respect af Solar Power Projects (including
‘Solar Rooftop Phoso Voltaic plants (SRTPU) for FY-22 & 27 dated:18,08.2021
2. Approval of MD, 3ESCOM dated: 08.09.2021
1 Rooftop
PREAMBLE:
‘The section 86{1) (@) of the Electricity Act, 2003 has mandated the State Blectecity
Regulatory Commission to promote generation of electricity from renewable sources of
energy. Accordingly, the Karnataka Electricity regulatory Commission (KERC) has been
promoting generation of power from renewable sources by determining the feed in tarift
(generic tari) periodically based on the normative operational and financial parameters for
ifferent control periods frem the year 2005 onwards,
‘The Commission vide order cited under reff) has approved the timeline for various,
‘activites involved in implementation of SRTPV projects as detailed below:
[ ‘Astley [_ Responsibiy Timeline
‘Sisson of Applicaton Consumer | Zero date
‘Acknowledgement of Appization by] ESCOM | Within O¥ days
Escom
Site. Verification Technical Fensibiiy| ESCOM | Within 10-day fom the date-of
a issuance of ter of acknowledging the apliention
‘Approval Rejection of Application
Execution of PPincluding | ESCOM& | WRln OS working days fom the
countersignature ty the controlling | Consumer | date of isauance “of etter of
ofcer for lesa than SOOKW‘SRTPV foroval
Sates ie wpe PI EOCON Win OF wanking diya
Comuniasion(ore than SOOK) date of execution of PPA
‘Submission of Work Compleson Repor'| Consumer | 180. days. trom the dale oF
by the consumer cxccution of Pa
Inspection by the ESCOM afala or] ESCOM | Within 0S working days Fom the
commissioning. of the prject alter ‘eceipt of wore completion seport
fect of work completion report
Commissioning of the Rootop Solar | Cansumer/ESCOM | Within Sx montha Font the date
| system if approval er deemed approval of
‘iling Process BSCOW [30 days from the date of
_ ‘commissioning of the sol plant |In view of this, BESCOM hi
revised the guidelines for the grid connected solar rooftop PV
plants for capacities from LlcW to 2000KW and is enclosed with this OM.
Further, the Commission vide order cited under reff}) has determined the tariff rates of
SRTPV projects for FY-22 23. Hence, this OM.
No: BESCOM/BC-51/2021-22/ CYS-21
1
ated:03,09.2021
‘The Hon'ble KERC has determined the tariff of grid connected Solar rooftop photovoltaic
plants as below:
] Ta Ra por wale
stne.| capeeity [a Remarks
Capit | capt
say | eais _—
Te TAT
1 | Domete | maa.oa- | maa. ;
The BE of6, OW dviaton
‘ew te hall executive PPae fom
a | come, Rs3.19/- S0OKWp upto 2000Kt%p and
other tha Commision & Syachtoniee
feces aoe eet
| contumere | ‘uh Mt stat
“The above tariff shall be applicable to all such new SRTPV projects for which PPAS
are entered into on or after 01.04.2021,
‘The tenure of the PPA shall be for the life of the solar power projects Le, Twenty
ive (25) years.
{Al other issues not covered under this Order, shall be governed by the respective
Regulations and Orders issued by the Commission and PPAS signed by the parties.
‘This order shall be in force with effeet from 1s April 2021 and applicable for
control period FY22 & FY23.
Installed capacity of Solar Rooftop PV plants should
Limited to 100% of the
sanctioned load of the respective consumer's installation based on gross or net
‘metering.
Hone KERC in its order dated: 11.11.2016 has determined tariff and other norms
for installation of SRTPV plants on the Government buildings under funding from the
Government.
‘The Commission has continued the scheme but with the tariff for any surplus
energy injected as determined by KERC in its order dated: 18.08.2021, for
the purpose of accounting the Power Purchase Cost towards the surplusenergy in view of the fact that the respective ESCOMs has to maintain the
SRTPV plant.
AR. Hon'ble KERC: in ite ander dated: 18.09,2017 hs allowed installation of multiple
SRIPY units or single SRTPY unit with the combined installed capacity in single
premises not exceeding the total sanctioned load of all the consumers in that
premises.
‘The Commission has continued the scheme but with 90% of the tariff as
determined by KERC in its order dated: 18.08.2021,
9. It may also be noted that, while exccution of FPA, the tariff rates should be written
The
this circular as Annewure-A to C and revised BESCOM guidelines a8 Anné
‘and typed compulscrily in figures and words, both,
10.1n ease of any ambiguity in BESCOM timelines, the KERC timelines syledfied in order
dated: 18,08,2021 shall be preferred,
KERC SRIPV Orders dated:11.11.2016, 15.09.2017 & 18.08.2021
Copy to:
1
‘The CEE of BMANZ/BMASZ/BRAZ/CTAZ of C, O&M Zone, BESCOM for information,
‘The SEEs/BEBs of C, O&M Cicles/Divisions, BESCOM
‘The Assistant General Manager, CBC, DSM Section, Corporate Olice, BESCOM,
PS to MD/D (7|/D(F) with a request to place before the chair,
MF / 0c.