Uganda National Roads Authority c
Pot 25 Now Pot Bal Roa UAP Bienes Pak Nala Bok C&D
ampna Uns
WUNIRA) nezcorermes eeu
Poaceae No UNRA WORKS/2018-1900178N0DS
21 September 2021
Construction and Supervision Department.
Directorate of Roads and Bridges Development,
Uganda National Roads Authority
For the attention of Eng. Ronald Mua
1a, Authorized Re
CIVIL WORKS FOR THE RECONSTRUCTION OF ALWI-NEBBI ROAD (33Km)
AND UPGRADING OF PAKWACH AND NEBBI TOWN ROADS (4.3Km),
PROCUREMENT REF NO: UNRA/WORKS/18-19/00178.
Appointment of the Engineer
Reference is made to the arrangement to have an inchouse Supervision Team
temporarily take on’ the Construction Supervision of the above project as the
procurement of a Supervision Consultant is being finalized
‘This is to notify you that Construction Supervision Department has been appointed as
the Engineer for the Supervision of the Reconstruction of Alwi-Nebbi Road (33Km) &
Upgrading of Pakwach Town Roads (4.3Km). The effective date of assumption of duty
and takeover of the authority vested in the Engineer is 01 October 2021
In accordance with Sub-Ciause 3.1(Engineer’s Duties and Authority) of the Particular
Conditions of Contract of the Works Contract, there are actions for which specific
approval of the Employer must be sought. Sub-Clause 3.2 (Delegation by tho
Engineer) ofthe Particular Conditions of Contract further requires Engineer to delegate
‘of authority to suitably qualified engineers and other professionals who are competent
to carryout these duties.
Please, notify the Employer and the Contractor of any delegated authority by 01
(October 2021
\ sane’ .
‘Ag. EXECUTIVE DIRECTOR
Copy to: Mr, Wan Longgen - Authorized Representative, China Raivays 18° Bureau Group
Co tts
Lpleagicklarba
accom 2tatoo aesst4stemn Fac abe 442207, 816 Ea acteurs 2 Wee i