You are on page 1of 1
Uganda National Roads Authority c Pot 25 Now Pot Bal Roa UAP Bienes Pak Nala Bok C&D ampna Uns WUNIRA) nezcorermes eeu Poaceae No UNRA WORKS/2018-1900178N0DS 21 September 2021 Construction and Supervision Department. Directorate of Roads and Bridges Development, Uganda National Roads Authority For the attention of Eng. Ronald Mua 1a, Authorized Re CIVIL WORKS FOR THE RECONSTRUCTION OF ALWI-NEBBI ROAD (33Km) AND UPGRADING OF PAKWACH AND NEBBI TOWN ROADS (4.3Km), PROCUREMENT REF NO: UNRA/WORKS/18-19/00178. Appointment of the Engineer Reference is made to the arrangement to have an inchouse Supervision Team temporarily take on’ the Construction Supervision of the above project as the procurement of a Supervision Consultant is being finalized ‘This is to notify you that Construction Supervision Department has been appointed as the Engineer for the Supervision of the Reconstruction of Alwi-Nebbi Road (33Km) & Upgrading of Pakwach Town Roads (4.3Km). The effective date of assumption of duty and takeover of the authority vested in the Engineer is 01 October 2021 In accordance with Sub-Ciause 3.1(Engineer’s Duties and Authority) of the Particular Conditions of Contract of the Works Contract, there are actions for which specific approval of the Employer must be sought. Sub-Clause 3.2 (Delegation by tho Engineer) ofthe Particular Conditions of Contract further requires Engineer to delegate ‘of authority to suitably qualified engineers and other professionals who are competent to carryout these duties. Please, notify the Employer and the Contractor of any delegated authority by 01 (October 2021 \ sane’ . ‘Ag. EXECUTIVE DIRECTOR Copy to: Mr, Wan Longgen - Authorized Representative, China Raivays 18° Bureau Group Co tts Lpleagicklarba accom 2tatoo aesst4stemn Fac abe 442207, 816 Ea acteurs 2 Wee i

You might also like