400.

320.0
106.7
106.7

14.2
106.7
SECTION-Z7

ZONE 9
SECTION-L

ZONE 4
SECTION-K

ZONE 3
20.0
SECTION-Z6
SECTION-M
SECTION-J

20.0
SECTION-Z5
SECTION-N SECTION-I

20.0
SECTION-Z4
SECTION-O
SECTION-H

20.0

ZONE 8
SECTION-Z3

ZONE 5

ZONE 2
SECTION-P
SECTION-G

199.5
310.0

20.0
SECTION-Z2

199.5
SECTION-Q

310.0
SECTION-F
20.0
SECTION-Z1
SECTION-R
SECTION-E
20.0

SECTION-Z SECTION-S
SECTION-D
ZONE 7

ZONE 6
20.0

ZONE 1
SECTION-Y SECTION-T
SECTION-C
10.3 15.0

SECTION-X
SECTION-U
SECTION-B
SECTION-W
SECTION-V
SECTION-A
320.0

KEY: 400.0

EXCAVATION IN PROCESS, POWER


DISTRIBUTION & UTILITY AREA AS TODAY'S WORK IN FILL SECTION:
OF TODAY EMBARKMENT, ZONE 1; 11TH LAYER DUMPED
SECTION D; 9TH LAYER DUMPED
CUT & FILL AREA CLOSE TO SECTION E; 8TH LAYER TESTED
FINISHED GRADE LEVEL SECTION I; 6TH LAYER TESTED
SECTION J; 10TH LAYER PREPARED
PREVIOUS WORK IN FILL SECTION: SECTION K; 11TH LAYER PREPARED
SECTION A; 10TH LAYER, TESTED EMBARKMENT, ZONE 3; 11TH LAYER TESTED
SECTION B; 9TH LAYER, TESTED
SECTION C; 9TH LAYER, TESTED
SECTION F; 6TH LAYER, TESTED
SECTION G; 5TH LAYER, TESTED
SECTION H; 5TH LAYER, TESTED