Compliance Note On HSSE Alert For Fire Prevention at Plot # 019

Evidence
Sl.No Description Action Taken Remarks
(Photographs)

Review waste management plans to As the project is in the completion and


ensure that they remain fit for handing over stage, therefore few numbers of
1 purpose, and where necessary apply employees are still working and amount of
additional efforts to the clearing of waste being generated and stored at site is
waste from site. minimal and is being cleared regularly.

Ensure that waste skips are not


2 located closer than 10 meters from Waste skip is located in open area.
any building.

Chemical Storage is approximately 20


Ensure rest areas / smoking areas meters far away from rest area /
3 are not located next to chemical smoking area.
stores.

Inspect smoking areas and ensure There is only one smoking area provided
adequate bins, which are emptied at the site, bin provided and being
4 daily, and a suitable fire extinguisher emptied regularly and suitable fire
are in place. extinguisher placed nearby.

Ensure that all fire extinguishers are Suitable Fire Extinguishers are correctly
Attached Fire Extinguishers
5 correctly positioned, inspected, and positioned, inspected and maintained as
Monthly Inspection Record
maintained. per periodically. .
Inspection (as a reoccurring action) Yes, all the exit paths/ routes are clear
that all emergency exit routes are
6 free from obstructions and lead to a
from obstructions leading to safe
place of safety. assembly point.

Complete a tool box talk on all

fire prevention arrangements Tool Box Talks was conducted on 12th


July on Fire Prevention and Attached Tool Box Talk
7
arrangements. Attendance Sheet
and,

Confirm that a fire /


emergency evacuation drill As the project commenced in April 2017,
the Fire / Emergency Evacuation Drill will
8 has been completed within be conducted in due time as stipulated
the past six (6) months and above.
repeated thereafter.