Sen =DBT = OF Rev No: Date: 07/05/2019
Plant: Coke Oven Section: Battery Process
+ Battery#t1 DN1200 Gate valve replacement swith control valve at Battery Intermediate
Hazards/Risk Zafety control Measures
Check seal pot water level and ensure
no leakage by checking with portable
co.Ga tera co Detector. U-seal overflow
BFG U-Sealing at Battery#1 phartd abe ttle over’ *
* Fall from height Use Safety Harness Full Body Double
Lanyard See ek eae
‘near chimney
fee ad
i
1 = Beate
i “Area should be barricaded and no
| Fire Hazard Cutting welding Is allowed near 92s
Pore peebvent oS
|2 | purging of BF Gas line T ;
: | area should be barricaded near 925
igo. Ces ere vent « Avex ¥ pe vaunted,
One cellar operator will continuously
monitor U-tube manometer and he
will control the pressure by vent
valve at battery end.
stop cock removal
from housing which
may hit the working
_man and/or equipment
Job will Be carried out after ensuring
Gas exposure CO% of BFG line. Test ‘will be done |
by laboratory.
fecpeweee etc
Non Sparking tools
eles Fire hazard
one
}
|
Calibrated CO detectea must be
Gas exposu
eppesy Sed while performing the }9b
Scanned by CamScanner7
Jno ‘
Job Safety Analysis
Datei f
Start lifting and installation of valve
with proper positioning of lifting
| clamp and sling as per approved
Gate valve may fall | Protocol, Use tested and healthy
miei jown during shifting | tools and tackles. Do not stand
Removal of DNi200 gate below the equipment while itis been
valve shifted.
During cutting and welding work
area will be cordoned off
Cutting and welding near eee
7 DNI200 valve's anges, | Fire hazard Fire hydrant hoses will be ready for
| use-condition emergent = ___|
Fire extinguishers wili be ready for
use-condition emeienly .
Start lifting and installation of valve
. with proper positioning of lifting
clamp and sling as per approved
\ Protocol. Use tested and healthy
\ “Sly tools and tackles. Do not stand
8 | Control vaive fixing below the equipment while it is been
| | | shifted.
Electrical hazards Power isolation by using LOTO
| rection of control valve High pressure air While doing connection pressure of
8. exposure
eae ‘After Installation of control valve,
| before giving clearance to process
please ensure ali the manpower
working there have vacated the
place and are in safe area, Make
sure the removal of all the tools,
| tackles and scraps if any near
working area.
10, | Assembly and trial of the | Operational/Electrical
contro} valve hazard
|
——+ 2
Gas exposure
——} Job wif be carried out after ensuring
‘ZevPCO% et BFG line. Test will be done
by laboratory.
Non Sparking tools must be used
Fire hazard
its
Scanned by CamScannerJindal Steel & Power Limited
Occupational Health & "Safety Department)
J Ensure gas sample has <1% and
"| must be checked by laboratory then
only heating will be started
Ler $/0s 14
e S
TWane BHAVENDRASAHU Designation: AGM Signature \—__ pate:
ier 5
Designation: 06M ages Date: osfesht9
es Name: RK SABAT Designation: VP Signature. Ai pee