DATE: 07/06/2022
C0-0rdinator: DURATION:
Blast Furnace will be under shut
down 07th Jun 2022. be uscd lor batlery
healing in coke
OKeoven.
During this shutdown period COG will
NitrogenConsumplion lor purging will be around 80nm3/hr period
from Coke oven TO
ldown
Preparatory jobs:
SI.No Description Resposibility_ Status
& Coke
T o arrange skilled group ol man power to cxecute the Central Uulity
job. Oven
& Coke
5 To arrange SCBA set and calibrated portable CO detector. Central Utility
|Oven
& Coke
6 Ensure that working platform is ready. |Central Utility
Oven
Revision of bolts of DN 1000 valve flange. Coke Oven
9 Fill U-seal in both CDQ 1&2 and ensure continue overflow of water from it. Coke Oven
Shutdown Jobs:
SI INo Description Responsibility Remarks
|After getting clearance for gas changeover from gas control room Coke oven will
&4Coke Oven
startbatttery heating gas changeover from BFG to COG one by one of B#1,2
After gas changcover in battery heating is completed, BFG line U-Seal to be filled Coke Oven
located in battery side for all 4 batteries and gas fired boilers.
After U-Seal in all 4 batteries ciearance will be given for filling U-Scal TOP CokeCoke Oven
oven by gas control room.
After U-Seal in TOP nitrogen purging to start in BFG header by opening vent Coke Oven
located near Battery area gate valve V1, V2, V3,V4,V5 and V6.
Raise a permit for deblanking from DN 1000 MM valve in BFG pipeline. Coke Oven
while removing flange and a manlifter
|Placement of 75T crane for lifting pipeline Central Utility & Coke
detector and other PPEs.
for shifting manpower with SCBA set, CO Oven
Central Utility & Coke
Remove the blind plate and provide the gasket with spacer ring.
Oven
Central Utility & Coke
9 Check the tightening of nut bolts
|Oven
10 After tightning of nut and bolts check leakages from flange using soap solution |Central Utility & Coke
Oven
I After ensuring there is no leakage in flange joints ,cloOse the acblanking permit Central Utility & Coke
Oven
Resumption after Shutdown Jobs:
After BFG gas clearance from gas control
room, first drain Coke Oven
oven. U-Scal at TOP coKC
After draining TOP U-Seal is complete. drain all 4 batteries and
Seals. eas fircd boiler Coke
BFG to blecd from BFG pipe through cellar and vent on oven
Coke Oven
top each batery
Gas Sampling to be done and ensure
oxygen % should be less than 0.8%% for at
consecutive time for individual ica |Coke
battery
Then gas changeover in Battery will be carried out one by one after
gas control room from COG to BFG. discussion wiCoke Ove
Safety precautions:_
SLNo Description Responsibility
Trained and skilled people are only allowed to perform this job followed tool box Central Utility & Coke
4
Keep Adequate numbers of CO gas detector, Multi gas detector & SCBA Set
Central Utility & Coke
Oven
5 Fire Extinguisher to be taken near the Job Central Utility & Coke
Oven
Coke
6 Applicable work permit & JSA will be followed. Central Utility &
Oven
Coke
House keeping must be done well after the job completion. Central Utulity &
Oven
Central Uility & Coke
8 Safety Supervision@24x7 basis at site
|Oven
9 Fire Tender & Fire hydrent hose will be kept ready at site. Coke Oven
S e y a s s c h
V4
N3
DN
900
CDQ#2
VS
NITROGEN NITROGEN
BFG U-SEAL
DN 1000 DN 1200
CDQ#1
V2 NITROGEN NITROGEN
BFG U-SEAL
DN 1200
V BFG U SEAL BATTERY # 2
TO GAS FIRED
BOILER U-SEAL
V1
NITROGEN
OHSM-02.03
Jindal Steel& Power Limited
(Occupational Health &Safety Departme JINDAL
Rev. 00
December 2018 Job Safety Analysis
Attachment
Leakage testing of flanges CO gas exposure used while performing the job
4 SCBA set must be kept ready at job
site
Use tested and healthy tools and
Dummy plate may fall
5 De-blanking of valve tackles.
during shifting Do not stand below it while shifting
Make at least 50m distance from
Cutting and welding near
Fire hazard de-blanking for cuttingand welding
de-blanking area Use fire extinguisher and fire
hydrant line readyY
Gas sample must be checked
BFG line charging with BFG Fire hazard
<0.8% before gas charging.
Prepared By:
Name: W-AA huesau Designation: M Signature: VA Date: ch
Reviewed By:
1e Visk h Designation: Signature: Date 6/6/2n
Approved By:
Name: 1- Reddy Designation:AVP Signature: Date /4/22
OHSM-02.03 Rev 00/ December 2018 Page 1 of 1