TABLE SHOWING FEE CHARGED BY EIL FOR OBE PROJECTS

Sl. Description of job Reimbursa EIL Fee % Client Year


No ble Cost
. (Rs. Cr)
1 Revamping of Slug Catcher at Uran 201.75 18 ONGC 2018
2 SRU Revamping at ONGC Hazira 203.75 18 ONGC 2017
3 BS-IV Project at CPCL Manali Refinery 1050 18.585 CPCL 2016
4 Installation of Lean Gas Comp. at 169.40 18 ONGC 2016
ONGC Hazira Plant
5 Modification job under Daman 305 18 ONGC 2015
development project at ONGC Hazira
Plant
6 Butane –I project at IOCL Panipat 120 18.75 IOCL 2012
Naptha Cracker Complex
7 Onshore Gas Terminal project (OGT) for 1626 18.76 GSPC 2010
Deen Dayal Field Development Project
at KG Basin
8 Poly propelene Project at MRPL 662.12 21.75 MRPL 2009
9 Petro chemical Fluidised Catalytic 1424.50 25 MRPL 2008
Cracking Unit (PFCC) Ph-III at MRPL
10 SRU Project at MRPL 679.80 25 MRPL 2008
11 EPCC Package for EURO-IV Project at 874 27 CPCL 2007
CPCL Manali Refinery