1 x 25 M W B I O M A S S R EN E W A B L E
EN E R G Y I ND I P END E N T P O W ER
PLANT
Table of Contents
SR Description Page No
No
2
Purok Maunlad brgy. Irawan, Puerto Princesa palawan
GEL-TECH CONSTRUCTION INDUSTRIAL CORPORATION
The project will entail a total amount of Php 6,750,000,000.00 [ Six Billion
Seven Hundred Fifty Million pesos]. 1 Unit 25 Mega Watt. The bulk of the
project cost shall be used for the purchase of equipment such as biomass
power generation equipment, Turbine Generator set and balance of
equipment including Civil and site development work for power plant.
Equity IRR and project IRR of 11 and 06 per cent respectively can be
achieved from the project during the 8-year project duration.
As output of simulation, overall power generation electrical and thermal
efficiency of the system are tabulated. All the technical details including
formula, detailed description of the technology and related calculations
are presented in the attached Annex.
3.Features of the Projects:-
1 Bana Grass₱2.50360040% 7%
Note: Fuel Price Based On Study at Actual We May Reduced With Contract Of
Supplier
Environmenta l Sustainability:
Substituting the electricity requirement form grid by Cogeneration
scheme thereby eliminating the generation of equivalent quantum of
electricity using conventional fuel feeding the grid.
Converting coal and other non- renewable natural resource. .Mitigating
the emission of biomass in a carbon neutral fuel.
Economic
Sustainability:
Purok Maunlad brgy. Irawan, Puerto Princesa palawan
GEL-TECH CONSTRUCTION INDUSTRIAL CORPORATION
.Antique Province Area had a peak power deficit at every year to
meeting the grooving demand of power in the province. The
biomass based power plants will contribute, through in a small
measure, to bridging the gap between the supply and demand of
power in the Antique Province .
.The plant is situated far from an urban centre, creating rural employment. It is estimated that
the project has potential to create
approximately 10,000 man- days of work per year. Certain of
employment opportunities in rural area have long been recognized
as a major element of sustainable development and to stem the
large – scale migration from rural to urban areas. To this extent,
the project directly addresses a core national concern.
8.Project Participants:
Control ling Stockholders & Company Directors and Office (list of board
members and company officers)
NamePosition
-Economizer system
The boiler is provided with one steam and one water drum and the drums
shall be of fusion welded type. Both the drums will be provided with Tori
spherical / Semi-Ellipsoidal dished ends fitted with man-ways on both the ends. The man way
doors shall be arranged to open inwards. The drum shell, dished ends and the man way
doors shall conform to SA 515 Gr. 70 or equivalent material specification. The system of
internals consisting of the cyclone
separators shall ensure steam of highest purity at all loads of the boiler.
Furnace - Water Wall System
The Furnace envelope is constructed of fully water cooled membrane /
fin welded walls and adequately supported. The construction is fully gas pressure tight,
with welded
Purok Maunlad brgy. Irawan, Puerto Princesa palawan
GEL-TECH CONSTRUCTION INDUSTRIAL CORPORATION
corners, and the furnace shall be strengthened by providing buck-stay and tie-bar system.
The buck-stay system shall be adequately designed to stiffen the furnace walls against the
internal and external pressures and also to transfer the wind and seismic loading from the
boiler envelope to the boiler structures through suitably designed guides. Necessary
provisions are made in the furnace for admitting the required quantity of over fire air at
various levels.
The furnace EPRS will be so selected to give acceptable furnace outlet
temperatures, while firing the fuels or any combination of the other fuels. The furnace design
shall incorporate necessary manholes, peep holes, openings for the fuel distributors, ignition
/ reflection arch and refractory covering in the lower furnace area if required.
Adequate number of inlet and outlet headers, with the necessary stubs,
commensurate with the arrangement of the furnace will be provided. The down comers,
supply pipes and relief tube sizing will be based on the circulation calculations.
Super heaters
The super heater (SH) system will be of Two (2) stage design with inter-stage de
super heating to achieve the rated steam temperature over 60 to 100% load range while
firing the design fuels mentioned. The super heater will be of convection or a combination of
convection and radiation type arranged to give the minimum metal temperature. The super
heater pressure drop, the inlet and outlet header sizing, arrangement and sizing of their
respective inlet and take off connections shall be so as to give minimum unbalance and the
tube element material selection shall be based on the actual metal temperature calculations.
The tube spacing of the super heater will be designed to minimize bridging and tube
erosion and shall be suitable for proper on-load cleaning by means of soot blowers. Suitable
spacers will be provided both along and transverse to the gas flow directions.
Attemperator
The attemperator system to control the temperature of the final super heater outlet
steam temperature within the specified value shall be provided in between the two stages of
the super heaters. The inter stage attemperator shall be of the spray type, using the boiler
feed water tapped off at the outlet of the boiler feed water pumps, to control the final steam
temperature between 60 % to 100 % MCR load.
Economizer
Air Heater
The Air heater shall be arranged as the last heat recovery section
downstream of the economizer. The Air heater shall be recuperative type with
flue gas flowing inside the tubes and the combustion air flowing over the tubes. The Air
heater will be arranged with the tubes in the vertical direction. The
tubes except those required for staying purposes shall be welded into the tube sheets on
both ends.
Considering the high moisture in the flue gases, suitable precautions will
be taken to prevent the tube corrosion at the air inlet side of the air-heater. The
low temperature bank of the Air pre-heater will be designed to prevent
corrosion.
Sample coolers
All The fans will be suitable for outdoor installation. The ID fan will be a
Variable speed drive, FD & SA fans will be a constant speed, horizontal, radial,
backward curved and electric motor driven. Primarily the fan control shall be
pneumatic operated damper at the inlet of fans. Damper operating links/drives
should be mounted outside to the extent possible to avoid settlement of dust on
links.
Ducting system
of the pumps shall be 10% of its maximum discharge pressure requirements for the
continuous operation of the boiler. The pump shall be single suction, multi stage
centrifugal type with drive motor of suitable rating, coupling, common base frame,
foundation bolts etc.
GENERAL
The upper and lower casing halves are almost symmetrical, except parts
for the live- steam connection and the supports. All thermal stresses in the case
of load changes or temperature variations are thus reduced to a minimum. It is
horizontally split and held together by thermally pre-stressed expansion bolts.
The surfaces of the casing joints are steam-tight milled.
SERVO-MOTOR
The two casing halves are assembled with bolts at the horizontal split.
The bolts are also employed for bolting the exhaust casing to the HP turbine casing at 8
the vertical split flange.
Purok Maunlad brgy. Irawan, Puerto Princesa palawan
GEL-TECH CONSTRUCTION INDUSTRIAL CORPORATION
GUIDE-BLADE CARRIERS
The suspension and construction of the guide blade carriers shall
ensure high thermal elasticity and easy assembly. The thermal masses of
guide blade carriers and the rotor shall be well harmonized so as to cause only little relative
expansion during transient operating conditions.
ROTOR
The turbine rotor shall be made from one single forging and shall be
subjected to severe tests (non-destruction tests, over-speed test).
The bladed rotor shall be high-speed balanced under vacuum conditions.
LABYRINTH SEALS
The labyrinths ensure contact-free sealing of the shaft, balance piston, and
blading. The sealing effect is achieved by the fact that the steam passes through
a great number of successive ring gaps and ring spaces whereby the pressure is
converted into velocity energy and the leak steam flow is limited by the
increasing steam volume.
BLADING
The rotor blades shall be milled from the solid. The roots shall be fitted
radially to the rotor and the blades shall have an integral shroud. The guide
blades shall be made from drawn profile material.
Those rotor blades which, due to their height, are exposed to high
centrifugal forces, shall have no integral shrouding, but shall be fitted with
damping wires instead. The damping wires shall be loosely inserted into bores
and shall develop their damping effect in operation. In the wet-steam zone, the
inlet edges shall be flame hardened in the upper area, if necessary.
The guide blades shall be fastened in the fixing groove of the carrier.
Sealing against the shaft shall be done with double labyrinth sealing tips.
LUBE OIL SYSTEM
The Lube oil system supplies the necessary lubricating oil under all
conditions to the bearings of turbine, gear box and generator. The lubrication oil
system consists of the oil supply section and the oil cooler and filtration system.
The oil supply section consists of oil reservoir, on top of which are
mounted pumps and oil vapour extraction fan (with oil filter). The oil cooling
and filtration section consists of oil coolers and filters
DRAIN SYSTEM
The drain system ensures proper draining of the steam turbine during
start-up, normal operation and coast-down. It prevents water from entering into
the turbine. Each drain line shall have a manually controlled drain (used during
start-up and after shut down).
GENERATOR
The lower part of the casing shall consist of bearing support plates, side
beams and a bottom plate, all of which shall form a single unit.
The stator shall be a separate unit with the end plates bolted to the side
beams of the lower casing part to achieve maximum stiffness. With this
arrangement, all dynamic and static loads are transmitted directly to the
foundation.
The rotor shaft shall be a one-piece forging made of high quality steel. The
rotor shall be of the cylindrical pole design with a single layer copper bar winding
surrounding each pole. The coils shall be compressed and cured under heat and
pressure and shall be insulated from the pole plates and rotor hub by a collar of
laminated glass fibre.
Two axial flow fans shall supply cooling air to the stator and rotor from both
sides.
The hot air is discharged radially at the centre of the machine and is re-
cooled in the air/water heat exchangers mounted on top.
GRATE & FLY ASH HANDLING SYSTEM:
Capacity : **
Air shall be drawn from air entry at the bottom and shall pass through
heat and mass transfer FILM surfaces. Design air flow rate shall be discharged from the
axial flow FRP bladed fans at the top. Hot water shall be uniformly distributed from the
top.
Purok Maunlad brgy. Irawan, Puerto Princesa palawan
GEL-TECH CONSTRUCTION INDUSTRIAL CORPORATION
The cooling tower shall be designed taking into consideration the requirement of
continuous, stable and reliable operation with best availability. Safety and reliability shall be
the two paramount considerations in the design of cooling tower.
Purchaser shall provide the raw water at the inlet of water treatment plant.
Based on the actual analysis scheme may be changed and same shall be confirmed during
detail engineering.
The Clarified water / Bore water is passed through a Multi grade sand filter to reduce
the Suspended solids. The suspended particles in the raw water get entrapped in the filter
media. Influent water with suspended solids is pumped to the Multi grade sand filter. Media
used for this filtration is Graded Sand. Filter need to be backwash with influent water at least
once in a day for 10 to 15 min.
Reverse Osmosis
Degasification unit
The treated effluent from the Reverse Osmosis unit is fed to the degasser tower to
reduce carbon dioxide content. The degasser tower is a packed column (Pall Rings) where
water, sprayed from top of the packing, breaks into fine droplets, thereby increasing the
surface area for contact. These droplets come in contact with a counter current flow of air
supplied by degasser fans. In the scrubbing action, therefore, the unstable carbonic acid, is
broken into water and carbon dioxide. The air containing liberated carbon dioxide is vented
and degassed water (Free from alkalinity or carbonic acids) is collected in the degassed
water tank, from where it is pumped to the anion exchanger.
Purok Maunlad brgy. Irawan, Puerto Princesa palawan
GEL-TECH CONSTRUCTION INDUSTRIAL CORPORATION
The compressed air system includes Two (2) (1W +1S) nos. Compressors
for Instrument air system of twin rotary, positive displacement, energy efficient,
air compressors with delivery pressure of 10.0 Kg/ cm2.
All other motors as required in the proposed power plant within the battery
limits as specified in the offer.
UPS AND BATTERY – BATTERY CHARGER
One (1) number 110V AC UPS system with redundant meeting the
requirement of the proposed control system.
One (1) number Battery bank of SMF battery with 30 minutes backup of
proposed UPS requirement.
One (1) number 110V DC Battery charger with VRLA battery, one Float and
one float cum boost chargers.
One (1) number PLC Panels & Computer UPS Dedicated with 30 Min Back up
One (1) Lot LT Power cable (Al, Armoured, XLPE insulated and
insulated and Sheathed). One (1) Lot of local push button station
One (1) Lot Cable glands (SC type), Cable lugs etc.
The disign. Manufacture, factory inspection ,installation, testing and commissioning of equipment
covered under this contract wll comply with all currently applicable statutory regulations and safety
codes in the locality where the equipment will be installed and will comfort to the latest editions of
Indian/international standards and codes as aplicable including but not be limited to those mentioned in
the specification.
All field instruments and equipment will be suitable for hot,humid,tropical and dusty environment wih
necessary protection clause. All transmitters will be SMART type with local indication and output as 4-
20mA. Conopy will be provided at necessary location.
Pressure gauges shall have a dial size of 150mm with weather proof casing screwed bezels, zero
adjusment, over range protection. Sensing element material for pressure gauges shall be SS316.
Presure switches & differential pressure switches will be supplied for interlocking/alarm as required.
Pressure / DP type transmitters shall be SMART 2 wire 24 V DC loop powered with 4-20mA outpot.
Temperature gauges shall have a dial size of 150mm with weather proof casing screwed bezels, zero
adjustments, over range protection. RTDs shall be provided for temperature measurement . All RTD
shall be of PT100(platinum element-100 ohms at 0+c)3-wire type.
For Main steam flow measurement, flow Nozzle shall be used. For feed water, condensate, spray water
flow measurement and LP steam , Soot blowing steam flow measurement orifice shall be used. For air
flow measurement, Venturi shall be used. For oil flow measurements, PD meter shall be used.
Control valves for steam, water and condensate services shall be of global type. Body and flange rating
and body material of the control valves shall be as per piping class. Generally body size shall be limited
to 1",1 1/2"2"to 10"and 12" trim material shall be SS316.
Need for monitoringg the boiler operation, needs no further justification. However such monitoring
cannot be done by conventional manual logging of data every houre. This calls for Machine to Machine
(M2M) based monitoring that tracks critical parameters of operations minute by minute oe even second
by second, followed by outo mated analytics and managing the operation of the boiler through on line
reports, alerts exactly like the net banking transactions, report and alert!
However such monitoring cannot be done by conventional manual logging of data every
hour. This calls for Machine-to-Machine (M2M) based monitoring that tracks critical
parameters of operations minute-by-minute or even second-by second, followed by
automated analytics and managing the operation of the boiler through on-line reports, alerts
– exactly like the net- banking
transactions, reports and alerts!
Purok Maunlad brgy. Irawan, Puerto Princesa palawan
GEL-TECH CONSTRUCTION INDUSTRIAL CORPORATION
How to monitor
First step is to select critical parameters like: temp profile across flue
gas path - the radiant zone, convective heat transfer surfaces, economizer and APH zones, as
also percentage O2 in flue gas, exit flue gas temperature, fuel & steam flow, run hours, feed
water characteristics etc. Thus parameters selected could be on-line, set point parameters or
off-line parameters like: fuel calorific value enabling calculations of efficiency / steam to fuel
ratio, availability etc.
Second step is to establish connectivity for pick up of this data from PLC
and/or sensors and configure it in a data historian. With viewer function of
database, the stored data can be viewed in tabular, excel, or PDF formats. This
enables trending / analysis of data for periodic reviews & corrections.
Lastly customized software algorithms can be built for developing alerts,
reports as needed by the users.
Benefits of monitoring
Individual tracking of run hours of ID/FD fans, grates etc. empowers users
to perform condition based maintenance of moving parts as against traditional
time based maintenance.
of financial internal rate of return & cash flow statement of the project.
Purok Maunlad brgy. Irawan, Puerto Princesa palawan
GEL-TECH CONSTRUCTION INDUSTRIAL CORPORATION
Since this projected is funded 100% by Buyer. The same will enjoy the savings that
can be generated brought about by the difference on their energy
consumption from their existing system and the proposed biomass power plant.
Several equipment Are to be procured with the installation of biomass- thermal Power
Project. These are: biomass Power Plant, Boiler,Steam Turbine, water treatment plant,
transformers, storage yard and balance of equipment such as controls, storage tank,
heat exchanger, water pump, pipes, cooling tower,ACC etc. There is enough space at
present to locate the new equipment.
There will be attendant cost in installing the equipment.
COST COMPONENTS
43
%
52
%
5%
Capital Recovery
Operation &
Maintenace Fuel
32
Purok Maunlad brgy. Irawan, Puerto Princesa palawan
GEL-TECH CONSTRUCTION INDUSTRIAL CORPORATION
OFF SHORE
ON SHORE
APre-develoment Activities₱86,937,430.53
33
Purok Maunlad brgy. Irawan, Puerto Princesa palawan
GEL-TECH CONSTRUCTION INDUSTRIAL CORPORATION
Internal Roads
3 60,556,230.77
213,607,486.88
Workshop & Lab testing equipments
6
1,420,715,609.22
₱75,354,248.18
2Truck Scale, 1 unit
₱46,354,248.18
Purok Maunlad brgy. Irawan, Puerto Princesa palawan
GEL-TECH CONSTRUCTION INDUSTRIAL CORPORATION
₱66,354,248.18
4 Elephant Grass Harvester Chopper, 6 Units
₱193,854,248.17
5 Fuel Warehouse, 8-units 40m x 80m
₱111,554,248.18
6 Lubrican & Grease ( Initial Filling)
₱89,237,010.93
7 Testing Commissioning Instruments
₱649,062,500.00
TOTAL OTHER PLANT REQUIREMENTS
Operating 24
hours
Gross MW = 25
Net MW = 21.25
Fuel cost/year, P
O&M, P
74,529,375.50
(0.1 P/Kwh)DOE Fund, P
37,500,000.00
Financing cost/year
18,216,000.00
Capital cost, P
Payback Period
Per Half Income PhasingCumm. IncomeNoted
Year 5
1st Half 557,659,607.325,018,936,465.89
Green
2nd Half 557,659,607.325,576,596,073.21denotes
payback of
Year 6 1st Half
557,659,607.326,134,255,680.53capital
2nd Half costs
557,659,607.326,691,915,287.85
Year 7 1st Half 557,659,607.327,249,574,895.17
For other operation and maintenance costs, the plant will require about
43,200 tons of Biomass Fuel per year or a cost equivalent of about Php 64,800,000.00
based on Php
1.50 per kilogram of Biomass Fuel . For plant maintenance, the project will require a
total of about 9,050.00 kg of lube oil per year. A considerable amount of spare parts
shall also be utilized for preventive maintenance, minor overhauls, and major
overhauls. Total cost of spare parts is pegged at about Php 20,000,000.00 Million per
year. All the costs provided in this proposal are based on 2020 current prices.
President
ENGR. ENRIQUE T. GELA
CEO/PRESIDENT GEL-TECH CONSTRUCTION
INDUSTRIAL CORPORATION
Prepared by:
CRHISTOPHERG. DUMENCEL