You are on page 1of 10

Presentation on leasing of

equipment
BEDFORD EARTH MOVERS INC.

ADDRESS:
The Chambers, 4th Floor,
Office # 401, 1865,
Rajdanga Main Road,
Kolkata, West Bengal-700107,
T : +91-3340623001.
WHAT CAN WE DO

MARC UG MINES CAPABILITIES

TAKING CARE OFF


OF DOING O&M
“MARC”(MAINTENA PARTICIPATING IN
OF ALL KIND
NCE & REPAIR UNDERGROUND
HEMM BEING
CONTRACT) OF 23 COAL MINING
USED FOR MINING
NUMBERS OF TENDERS TO WORK
& PLANT
SURFACE MINERS AS AN M.D.O
OPERATIONS.
OF L&T.
Requirement vs. Mfg Capacity vs.
Availability
CM EQUIPMENT PKG REQUIRED FOR CIL BY FY29-30 TOTAL CM REQUIREMENT BY FY29-30
SN
Subsidiary 22-23 23-24 24-25 25-26 26-27 27-28 28-29 29-30 Total Area Of Deployment No Of CM Packages
ECL 1 3 9 7 12 10 - - 42
1 Already Auctioned Coal Mines 40
BCCL - - 2 3 3 4 1 - 13
Coal India Ltd.’s Ambitious Plan to
CCL - - - 6 1 - - - 7 2 achieve 100MTPA Coal production by 140
FY28
WCL 1 1 3 5 5 2 2 1 20
Re-Opening of abandoned coal mines of
3 CIL 41
SECL - 5 2 10 0 13 - - 39

NCL - - - - - 4 6 5 15 4 Private Mines 150


Total Requirement 371
MCL 4 - - - - - - - 4

Total for CIL 6 9 16 31 30 33 9 6 140

PRESENT INDIGINIOUS MANUFACTURING CAPACITY

SN Manufacturer Indigenous Remarks


Capacity
SHORTFALL CM QUANTITY
1 Gainwell Commosales Pvt Ltd 5 Manufacturing yet to be started
Total CM Packages in India No. of Sets
2 Eimco Elecon (India) Ltd 3 Though the Eimco has manufactured their 1st unit but Expected demand by FY 2029-30 371
yet to be deployed and to be proved
3 Sandvik Mining & Rock Solutions 0 No manufacturing in India Indigenous manufacturing capacity by FY 2029-30 8

4 Joy (Global) India Pvt Ltd (Komatsu) 0 No manufacturing in India Expected import 15
5 Caterpillar India Pvt Ltd 0 UG Coal Mining equipment
Anticipated Shortfall > 150 sets
manufacturing stopped
6 Eichkoff 0
7 JAE 0 No manufacturing in India
Total Production Capacity 8
Coal Mines alloted in the YEAR 22-23

Status of Coal Mines No. of Mines


Operational (Producing coal) 39
Operation yet to start 90
Cancelled Nil
Total 129
STATUS OF COAL MINES AWARDED SINCE 01-04-2015

CMSPA MMDR DIRECT TOTAL

COAL BLOCKS AWARDED

COAL BLOCK CANCELLED


COAL BLOCKS CAME IN
PRODUCTION
COAL BLOCKS UNDER
CLEARENCES
OPPORTUNITES.
• UNDERGROUD COAL MINING.
As per CIL Chairman presentation in JUNE 2023, and as per Government of India’s guide lines, CIL has Ambitious Mission to
quadruple the production up to 100 Million tones from underground coal mining by 2028 by auction of upcoming 316 coal
blocks. In order to meet out the requirement of machinery, around 330 sets of Continuous Miner package shall be required.

Each Continuous Miner package is costing around Rs 70- 95 Crores based on the manufacturer. So there is a huge
opportunity of providing equipment on hiring basis to the mines owners.

•OPEN CAST MINING.


In order to achieve the mission of government of India to minimize the import of Coal so as to grow Country economically
by saving foreign currency and reduction of cost, already auction of 129 number of coal blocks have taken and most of them
are yet to be made operational. Thereby huge fleet of opencast equipment like Dumpers/Dozers/Excavators etc shall be
required.

•OTHER ALLIED PLANTS.


Lot of Excavator/Dumper/Dozers and other allied equipments are required for raw material handling in Cement/Steel/Other
plants.
OPPORTUNITY FOR LEASING
OF EQUIPMENT AND O&M
COAL MINING OTHER SURFACE PROJECTS
UNDERGROUND MINES • Sectors like cement/steel/power to other
• As per ambitious plan of CIL production plants.
from Underground coal mine is to be
ramped up to 100 MTPA by 2028. • Sectors like construction to road
• In order to meet out above plan of CIL construction.
estimated quantity of Continuous Miner
package will be 330 sets.
• Each Continuous Miner package cost
ranges from 70 crores to 95 crores
approximately depending up to selection
of equipment manufacturer.

OPENCAST MINES
Leasing of equipment to M.D.O contractors
of Open cast mines.
.
SWOT
STRENGTH THREATS

 GMMCO can lease the equipment.


 Cancellation of lease by Owner.
 Bedford can take care of:
1. Maintenance.
 Non Performance of the equipment due to
2. Repairs. mining geology.
3. Operation Services.  Changes in any law or regulation affecting
 GMMCO & Bedford combined have good mining operation.
liaison capability to explore new
 Demand of coal get reduced due to
opportunities
alternative source of energy.
 Global coal prices.
PROPOSAL
In today’s scenario, of outsourcing to reduce the burden of capital investment,
Mine / plant owners give preferences to the service providers, those can take
care of capital cost also for their services.

Viewing in the huge opportunity of leasing and O&M subsequently, we BEDFORD


EARTH MOVERS INC propose to enter into an agreement with GMMCO where in
GMMCO shall be leasing the equipment and BEDFORD EARTH MOVERS INC shall
take care of operations and maintenance.

There shall be a tripartite agreement between GMMCO, BEDFORD EARTH


MOVERS INC & Client, GMMCO will lease the equipment directly to the client &
BEDFORD EARTH MOVERS INC will take care of O&M.
THANK YOU

You might also like