You are on page 1of 6

RE-MEASUREMENT SHEET

FOR

UNIT 148

INTERCONNECTING PIPERACK M44- PR3

MTO REF. MTO-C-148-M44-PR3

OA 23-JULY-15 Issued for Approval


~
MA
a ..........
SK MIJ

Rev. Date Description Originator Checked By Approved By

Kuwait National Petroleum Company (K.S.C.)


Clean Fuels Project b ,,.,.""",.n'"'-,aJ,;o,JI
.. .. .. . ..,.... , ,
Kuwait ':".:.?..:;~·:..":::._:.~.:,:;::: KNPC ~

Petrofac I Samsung I CB&I


PSCJ Job No. Jl-2025 Petrofac & Q1U1H 1 1~'~
SAMSUNG
ENGINEERING (••1•
""1fC_ ~

CONTRACT NO. CONTRACTOR JOB NO. DOCUMENT NO. REV

CFP/EPC/0054-MAB 1 Jl-2025 P6012MAB.148.19.1.A413 OA


RE-MEASUREMENT CONTRACT NO. CFP/EPC/0054-MAB1

CONSOLIDATED CONTRACTORS COMPANY Rev MTO Ref


CFP Project - Kuwait - Contract Number JI-2025/03-001
C-148-M44-
PROJECT:- JI-2025/03-001 - Subcontract For CMEI, EPC of Buildings and Temp. Facilities Discipline:- Civil OA
PR3
PORTION-:- QUANTITY TAKE-OFF AS PER AFC DRAWINGS Date Issued :- ……./….... /2015
DRAWING NO. P6012MAB-148-19-4-F001-029&030 REV. - S1 Date Agreed :-____/____/2015
S.No BOQ Code Discipline Description Size AFC Qty Unit Remarks
Inch
1 INTERCONNECTING PIPERACK PR3-M44
2 GREEN FIELD
3 2.4.1 Excavation in Normal Soil & Sand:
4 2.4.1.2 Machine excavation
5 2.4.1.2-V01 Civil 0 to 1.5m depth 225.630 m3

6 2.4.1.2-V02 Civil 1.5 to 3.0m depth 188.025 m3

7 2.4.1.2-V03 Civil 3.0 to 4.5m depth - m3

8 2.4.1.2-V04 Civil 4.5 to 6.0m depth m3

9 2.4.1.2-V05 Civil > 6.0m depth m3

10 2.6 Backfilling and Compaction


Backfilling with approved excavated soil at site available from foundation, pits, trenches
11 2.6.1 Civil 312.822 m3
etc.

12 2.7 Disposal
Disposal of excess earth (suitable/unsuitable) from excavation of
13 2.7.2 Civil 100.833 m3
foundation/pits/trenches etc. under item no. 2.4 above
14 4 BLINDING CONCRETE / MASS CONCRETE
15 4.1 Civil Blinding Concrete for all foundation, sump, pits etc.. 8.142 m3

AGREED FOR AND ON BEHALF OF PSC-JV


QUANTITY SURVEYOR - CCC Page 1 of 3
RE-MEASUREMENT CONTRACT NO. CFP/EPC/0054-MAB1

CONSOLIDATED CONTRACTORS COMPANY Rev MTO Ref


CFP Project - Kuwait - Contract Number JI-2025/03-001
C-148-M44-
PROJECT:- JI-2025/03-001 - Subcontract For CMEI, EPC of Buildings and Temp. Facilities Discipline:- Civil OA
PR3
PORTION-:- QUANTITY TAKE-OFF AS PER AFC DRAWINGS Date Issued :- ……./….... /2015
DRAWING NO. P6012MAB-148-19-4-F001-029&030 REV. - S1 Date Agreed :-____/____/2015
S.No BOQ Code Discipline Description Size AFC Qty Unit Remarks
Inch
16 5 REINFORCED CEMENT CONCRETE (RCC)
17 Substructure/Foundation
18 5.1.1 Civil Each individual item volume < 2 M3 14.808 m3

19 5.1.2 Civil Each individual item volume > 2 M3 & < 10 M3 36.960 m3

20 5.1.3 Civil Each individual item volume > 10 M3 & < 50 M3 45.900 m3

21 5.1.4 Civil Each individual item volume > 50 M3 - m3

22 Superstructure (suspended Floor slab etc.)

23 5.3.1 Civil Each individual item volume < 2 M3-- - m3

24 5.3.4 Civil Each individual item volume > 50 M3-- - m3

25 6 PRE-CAST CONCRETE
Supply & Installation of Precast Pipe rack including Reinforcement Bar, Embedded
26 6.3 Civil steel & Sleeves, grouting as per approved drawing & specification excluding Supply of - m3
Anchor Bolt.

27 10 REINFORCEMENT STEEL
28 10.1 Civil Without Epoxy coating - mt

AGREED FOR AND ON BEHALF OF PSC-JV


QUANTITY SURVEYOR - CCC Page 2 of 3
RE-MEASUREMENT CONTRACT NO. CFP/EPC/0054-MAB1

CONSOLIDATED CONTRACTORS COMPANY Rev MTO Ref


CFP Project - Kuwait - Contract Number JI-2025/03-001
C-148-M44-
PROJECT:- JI-2025/03-001 - Subcontract For CMEI, EPC of Buildings and Temp. Facilities Discipline:- Civil OA
PR3
PORTION-:- QUANTITY TAKE-OFF AS PER AFC DRAWINGS Date Issued :- ……./….... /2015
DRAWING NO. P6012MAB-148-19-4-F001-029&030 REV. - S1 Date Agreed :-____/____/2015
S.No BOQ Code Discipline Description Size AFC Qty Unit Remarks
Inch
29 11 ANCHOR BOLTS & EMEBEDDED ITEMS
30 11.1 Galvanized Anchor Bolts
31 11.1.1 Civil Supply of all material, fabricating and Installing Galvanized Anchor bolts 0.114 mt

32 Embedded Steel

Supply of all material, fabrication and fixing Galvanized Insert plates/pipe sleeve etc.
made from plates, angles, steel pipe etc. to true line and levels with fixing of suitable
33 11.2 Civil MS lugs on insert plate/sleeve, including Chromate treatment (if applicable) in addition - mt
to galvanizing and all associated work, all complete as per project specifications,
standards and drawings.

34 12 GROUTING
35 12.4 Civil Non Shrink Cement Grout 0.153 m3
36
NOTE: REMAINING ITEMS QUANTITY TAKE OFF WILL BE INCORPORATED WITH THE REVISION OF DRAWING

AGREED FOR AND ON BEHALF OF PSC-JV


QUANTITY SURVEYOR - CCC Page 3 of 3
DETAILED QUANTITY TAKE-OFF

PROJECT:- CFP Project - Kuwait - Contract Number JI-2025/03-001


DETAILS OF QUANTITY TAKE-OFF AS PER AFC DRAWINGS

Total
Location / Remar
S.No BOQ Ref Description REQ / MTO Rev Drawing no Rev Description of BOQ Item Item Name/Location Unit Nos Length Width Depth Measured
Area ks
Qty
Code BOQ No (L) (B) (H) AFC
a b c d f g h j k l m n o p q s
1

C-148-M44- P6012MAB-148-19-4-F001- Excavation in Normal Soil & Sand: Machine


2 2.4.1.2-V01 Excavation OA Unit-148 S1 Foundations F1 m3 4 8.800 2.100 1.500 110.880
PR3 029&030 excavation; 0 to 1.5m depth
C-148-M44- P6012MAB-148-19-4-F001- Excavation in Normal Soil & Sand: Machine
3 2.4.1.2-V02 Excavation OA Unit-148 S1 Foundations F1 m3 4 8.800 2.100 1.250 92.400
PR3 029&030 excavation; 1.5 to 3.0m depth
C-148-M44- P6012MAB-148-19-4-F001- Excavation in Normal Soil & Sand: Machine
4 2.4.1.2-V01 Excavation OA Unit-148 S1 Foundations F2 m3 1 9.000 8.500 1.500 114.750
PR3 029&030 excavation; 0 to 1.5m depth
C-148-M44- P6012MAB-148-19-4-F001- Excavation in Normal Soil & Sand: Machine
5 2.4.1.2-V02 Excavation OA Unit-148 S1 Foundations F2 m3 1 9.000 8.500 1.250 95.625
PR3 029&030 excavation; 1.5 to 3.0m depth
C-148-M44- P6012MAB-148-19-4-F001-
6 4.1 Blinding OA Unit-148 S1 Blinding Concrete for all foundation, sump, pits etc.. Foundations F1 m3 4 9.000 2.300 0.050 4.140
PR3 029&030
C-148-M44- P6012MAB-148-19-4-F001-
7 4.1 Blinding OA Unit-148 S1 Blinding Concrete for all foundation, sump, pits etc.. Foundations F2 m3 1 9.200 8.700 0.050 4.002
PR3 029&030
C-148-M44- P6012MAB-148-19-4-F001- Reinforced Cement Concrete, Each individual item
8 5.1.2 RCC-Fdn OA Unit-148 S1 Foundation F1 m3 4 8.800 2.100 0.500 36.960
PR3 029&030 volume > 2 M3 & < 10 M3
C-148-M44- P6012MAB-148-19-4-F001- Reinforced Cement Concrete, Each individual item
9 5.1.3 RCC-Fdn OA Unit-148 S1 Foundations F2 m3 1 9.000 8.500 0.600 45.900
PR3 029&030 volume > 10 M3 & < 50 M3
C-148-M44- P6012MAB-148-19-4-F001- Reinforced Cement Concrete, Each individual item
10 5.1.1 RCC-Fdn OA Unit-148 S1 Foundations Pedestals F1/P1 m3 8 0.600 0.600 3.100 8.928
PR3 029&030 volume < 2 M3
C-148-M44- P6012MAB-148-19-4-F001- Reinforced Cement Concrete, Each individual item
11 5.1.1 RCC-Fdn OA Unit-148 S1 Foundations Pedestals F2/P2 m3 4 0.700 0.700 3.000 5.880
PR3 029&030 volume < 2 M3
C-148-M44- P6012MAB-148-19-4-F001-
12 2.6.1 Backfilling OA Unit-148 S1 Backfilling and Compaction with excavated materials Total Excavation Quantities of F1 m3 1 203.280 1.000 1.000 203.280
PR3 029&030
C-148-M44- P6012MAB-148-19-4-F001-
13 2.6.1 Backfilling OA Unit-148 S1 Backfilling and Compaction with excavated materials Less Blinding Quantities of F1 m3 -4 8.800 2.100 0.050 -3.696
PR3 029&030
C-148-M44- P6012MAB-148-19-4-F001-
14 2.6.1 Backfilling OA Unit-148 S1 Backfilling and Compaction with excavated materials Less RCC Foundations of F1 m3 -4 8.800 2.100 0.500 -36.960
PR3 029&030
C-148-M44- P6012MAB-148-19-4-F001-
15 2.6.1 Backfilling OA Unit-148 S1 Backfilling and Compaction with excavated materials Less Foundations Pedestals upto GL F1/P1 m3 -8 0.600 0.600 2.200 -6.336
PR3 029&030
C-148-M44- P6012MAB-148-19-4-F001-
16 2.6.1 Backfilling OA Unit-148 S1 Backfilling and Compaction with excavated materials Total Excavation Quantities of F2 m3 1 210.375 1.000 1.000 210.375
PR3 029&030
C-148-M44- P6012MAB-148-19-4-F001-
17 2.6.1 Backfilling OA Unit-148 S1 Backfilling and Compaction with excavated materials Less Blinding Quantities of F2 m3 -1 9.000 8.500 0.050 -3.825
PR3 029&030
C-148-M44- P6012MAB-148-19-4-F001-
18 2.6.1 Backfilling OA Unit-148 S1 Backfilling and Compaction with excavated materials Less RCC Foundations OF F2 m3 -1 9.000 8.500 0.600 -45.900
PR3 029&030
C-148-M44- P6012MAB-148-19-4-F001- Less RCC Foundations Pedestals upto GL
19 2.6.1 Backfilling OA Unit-148 S1 Backfilling and Compaction with excavated materials m3 -4 0.700 0.700 2.100 -4.116
PR3 029&030 F2/P2
C-148-M44- P6012MAB-148-19-4-F001- Disposal of excess earth (suitable/unsuitable) from
20 2.7.2 Disposal OA Unit-148 S1 Total Excavation Quantities of F1 m3 1 203.280 1.000 1.000 203.280
PR3 029&030 excavation of foundation
C-148-M44- P6012MAB-148-19-4-F001- Disposal of excess earth (suitable/unsuitable) from
21 2.7.2 Disposal OA Unit-148 S1 Less Backfilled Quantities of F1 m3 -1 156.288 1.000 1.000 -156.288
PR3 029&030 excavation of foundation
C-148-M44- P6012MAB-148-19-4-F001- Disposal of excess earth (suitable/unsuitable) from
22 2.7.2 Disposal OA Unit-148 S1 Total Excavation Quantities of F2 m3 1 210.375 1.000 1.000 210.375
PR3 029&030 excavation of foundation
C-148-M44- P6012MAB-148-19-4-F001- Disposal of excess earth (suitable/unsuitable) from
23 2.7.2 Disposal OA Unit-148 S1 Less Backfilled Quantities of F2 m3 -1 156.534 1.000 1.000 -156.534
PR3 029&030 excavation of foundation
C-148-M44- P6012MAB-148-19-4-F001-
24 12.4 Grouting OA Unit-148 S1 Non Shrink Cement Grout For Foundation Pedestal F1/P1 m3 8 0.600 0.600 0.025 0.072
PR3 029&030
C-148-M44- P6012MAB-148-19-4-F001- For Foundation Pedestal F1/P1 Shear Key
25 12.4 Grouting OA Unit-148 S1 Non Shrink Cement Grout m3 8 0.150 0.150 0.100 0.018
PR3 029&030 pocket

Page 1 of 2
DETAILED QUANTITY TAKE-OFF

PROJECT:- CFP Project - Kuwait - Contract Number JI-2025/03-001


DETAILS OF QUANTITY TAKE-OFF AS PER AFC DRAWINGS

Total
Location / Remar
S.No BOQ Ref Description REQ / MTO Rev Drawing no Rev Description of BOQ Item Item Name/Location Unit Nos Length Width Depth Measured
Area ks
Qty
Code BOQ No (L) (B) (H) AFC
a b c d f g h j k l m n o p q s
C-148-M44- P6012MAB-148-19-4-F001-
26 12.4 Grouting OA Unit-148 S1 Non Shrink Cement Grout For Foundation Pedestal F2/P2 m3 4 0.700 0.700 0.025 0.049
PR3 029&030
C-148-M44- P6012MAB-148-19-4-F001-
27 12.4 Grouting OA Unit-148 S1 Non Shrink Cement Grout For Foundation Pedestal F2/P2 Shear Key m3 4 0.150 0.150 0.150 0.014
PR3 029&030
C-148-M44- P6012MAB-148-19-4-F001- Supply of all material, fabricating and Installing
28 11.1.1 Anchor Bolts OA Unit-148 S1 Anchor Bolts for F1/P1 4-24d-A-115P-2N Kg 32 2.38 76.160
PR3 029&030 Galvanized Anchor bolts
C-148-M44- P6012MAB-148-19-4-F001- Supply of all material, fabricating and Installing
29 11.1.1 Anchor Bolts OA Unit-148 S1 Anchor Bolts for F2/P2 4-24d-A-115P-2N Kg 16 2.38 38.080
PR3 029&030 Galvanized Anchor bolts

Page 2 of 2