Professional Documents
Culture Documents
PROJECT TITLE: EPIC FOR UTLIZATION OF PRODUCED WATER FROM STORAGE TANKS AT DREGASSING STATIONS FOR PWI.
Work Order / Reference No: ALB/O&G/TECHNOLAX/158/22-SC-001 Project no : 4293 - GC20107100 Date: 19/05/2022
SCOPE DESCRIPTION: CIVIL WORKS FOR KHATIYAH, JALEHA AND FAHAIL MAIN DEGASSING STATIONS - DUKHAN AREA. Progress Period: March 2022 to April 2022 month
STATION NAME : FAHAIL MAIN STATION.( FMDS )
Al Balagh Progress up to
BOQ Progress Qty previous Cummulative
Sr.no refernece DESCRIPTION UNIT for this period measurement Progress Qty Remarks
No period
A 2.1.2 PWCT Concret Pit in FMDS
1 2.1.3.1 Earth work excavation (L- 16.30 x W -9.00 x D 5.55 = 814.185 Cu.m). CU.M 0 814.185 814.2
Technolax AL BALAGH
Progress Measurement S
PROJECT TITLE: EPIC FOR UTLIZATION OF PRODUCED WATER FROM STOR
Work Order / Reference No: ALB/O&G/TECHNOLAX/158/22-SC-001
SCOPE DESCRIPTION: CIVIL WORKS FOR KHATIYAH, JALEHA AND FAHAIL MAIN DEGASSING STAT
STATION NAME : KHATIYAH MAIN STAT
Al Balagh
BOQ
Sr.no
refernece DESCRIPTION
No
Foundation Blinding concrete grade C15 and Cement Mortor screed. Total
18 Cu.m. as per site condition Blinding 34 + Screed 6 = 40 Cu.m - total qty 18
3 2.1.3.5 Cu.m is equal to 22 Cu.m excess qty x 50 % Claiming concrete Qty. Therfore
total Qty 18 + 11 ( Excess qty 50 % Claiming ) = 29 Cu.m
Prepared by:
Technolax
Measurement Sheet
WATER FROM STORAGE TANKS AT DREGASSING STATIONS FOR PWI.
Project no : 4293 - GC20107100 Date: 19/05/2022
MAIN DEGASSING STATIONS - DUKHAN AREA. Progress Period: March 2022 to April 2022 month
HATIYAH MAIN STATION.( KMDS )
A
Progress up to m
UNIT Progress Qty previous Cummulative o Remarks
for this period measurement Progress Qty u
period n
t
CU.M 3 26 29 ###
Approved by:
AL BALAGH
Progress Measurement S
PROJECT TITLE: EPIC FOR UTLIZATION OF PRODUCED WATER FROM STOR
Work Order / Reference No: ALB/O&G/TECHNOLAX/158/22-SC-001
SCOPE DESCRIPTION: CIVIL WORKS FOR KHATIYAH, JALEHA AND FAHAIL MAIN DEGASSING STAT
STATION NAME : JALEHA STATION
Al Balagh
BOQ
Sr.no
refernece DESCRIPTION
No
Earth work excavation for the JMDS Qty (Claiming 50% completed qty) ( L-
1 2.1.3.1 16.30 x B- 9.0 x Average depth 5.75x50% = 421.762 Cu.m.
Prepared by:
Technolax
Measurement Sheet
WATER FROM STORAGE TANKS AT DREGASSING STATIONS FOR PWI.
Project no : 4293 - GC20107100 Date: 19/05/2022
MAIN DEGASSING STATIONS - DUKHAN AREA. Progress Period: March 2022 to April 2022 month
E : JALEHA STATION.( JMDS )
Progress up to
UNIT Progress Qty previous Cummulative Remarks
for this period measurement Progress Qty
period
CU.M 90 90
Approved by:
AL BALAGH
Progress Measurement S
PROJECT TITLE: EPIC FOR UTLIZATION OF PRODUCED WATER FROM STOR
Work Order / Reference No: ALB/O&G/TECHNOLAX/158/22-SC-001
SCOPE DESCRIPTION: PIPE LINES CIVIL WORKS AT KHATIYAH - DUKHAN ARE
STATION NAME : Right of way.(
Al Balagh
BOQ
Sr.no
refernece DESCRIPTION
No
Prepared by:
Technolax
Measurement Sheet
WATER FROM STORAGE TANKS AT DREGASSING STATIONS FOR PWI.
Project no : 4293 - GC20107100 Date: 19/05/2022
TIYAH - DUKHAN AREA. Progress Period: March 2022 to April 2022 month
AME : Right of way.( ROW )
Progress up to
UNIT Progress Qty previous Cummulative Remarks
for this period measurement Progress Qty
period
LM 300.00 300
Approved by:
AL BALAGH
PROJECT TITLE: EPIC FOR UTLIZATION OF PRODUCED WATER FROM STORAGE TANKS AT DREGASSING STATIONS
CLIENT: QE Dukhan
CONTRACTOR: AL-BALAGH TRADING AND CONTACTING CO.
SUBCONTRACTOR: Technolax Trading and Contracting Company
Work Order / Reference No: ALB/O&G/TECHNOLAX/158/22-SC-001
SCOPE OF WORK : CIVIL WORKS FOR KHATIYAH, JALEHA AND FAHAIL M
EVALUATION SH
2.1 Civil
2.1.1 PWCT General area
2.1.3 PWCT concrete pit
Prepared by:
Praveen raj
Project QS
DREGASSING STATIONS FOR PWI.
- - - - -
Checked by:
Rajiv gandhi
Project Manager.
LUATION DATE: 19-05-2022
CUMULATIVE CERTIFIED
AMOUNT (QR)
358,208.56
385,189.56
52,248.02
-
795,646.14
ed by:
gandhi
ct Manager.
INVOICE
BILL TO
M/s. AL-BALAGH TRADING AND CONTACTING CO.
Project Name : EPIC FOR UTLIZATION OF PRODUCED WATER FROM STORAGE
TANKS AT DREGASSING STATIONS FOR PWI.
Project no : 4293 - GC20107100
Work Order / Reference No: ALB/O&G/TECHNOLAX/158/22-SC-001
S.No DESCRIPTION
SCOPE OF WORK : CIVIL WORKS FOR KHATIYAH, JALEHA, FAHAIL MAIN DEGASSING
1) STATIONS AND ROW - DUKHAN AREA.
MAIN STATION works. As per approved Measurement sheet attached for your
reference
AMOUNT IN WORDS:
(Six Hundred Thirty Two Thousand Three hundred Ten Qatar riyal and Thirty Three d
Prepared by
Rajiv Gandhi
N DEGASSING
ed for your
1 1.00 LS 632,310.33
[42]
TOTAL 632,310.33
Checked/approved by
our Business!