TODAY’S NEED

FOR

“MAKE IN INDIA”
THROUGH
TRANSFER OF TECHNOLOGY/( DPIIT)

VM Indomines Pvt. Ltd.


A leading innovative mining
services enterprise
Introduction

Who are we? What do we do?

We are a special purpose conglomerate, Geological Exploration


established by M/s Bedford Earth Movers Inc. Scientific Studies
and M/s Maheshwari Mining Pvt. Ltd - with the
vision of being a one stop solution for the Indian Design, engineering, & supply of equipment
underground mining industry – from concept to Mine development including incline drivage &
commission. shaft sinking
Development of mine infrastructure
Requirement vs. Mfg Capacity vs. Availability
CM EQUIPMENT PKG REQUIRED FOR CIL BY FY29-30 TOTAL CM REQUIREMENT BY FY29-30

Subsidiary 22-23 23-24 24-25 25-26 26-27 27-28 28-29 29-30 Total SN
Area Of Deployment No Of CM Packages
ECL 1 3 9 7 12 10 - - 42
1 Already Auctioned Coal Mines 40
BCCL - - 2 3 3 4 1 - 13
Coal India Ltd.’s Ambitious Plan to
CCL - - - 6 1 - - - 7 2 achieve 100MTPA Coal production by 140
FY28
WCL 1 1 3 5 5 2 2 1 20
Re-Opening of abandoned coal mines of
3 41
SECL - 5 2 10 0 13 - - 39 CIL

NCL - - - - - 4 6 5 15 4 Private Mines 150


Total Requirement 371
MCL 4 - - - - - - - 4

Total for CIL 6 9 16 31 30 33 9 6 140

PRESENT INDIGINIOUS MANUFACTURING CAPACITY

SN Manufacturer Indigenous Remarks


Capacity
SHORTFALL CM QUANTITY
1 Gainwell Commosales Pvt Ltd 5 Manufacturing yet to be started
Total CM Packages in India No. of Sets
2 Eimco Elecon (India) Ltd 3 Though the Eimco has manufactured their 1st unit but
Expected demand by FY 2029-30 371
yet to be deployed and to be proved
3 Sandvik Mining & Rock Solutions 0 No manufacturing in India Indigenous manufacturing capacity by FY 2029-30 8

4 Joy (Global) India Pvt Ltd (Komatsu) 0 No manufacturing in India Expected import 15
5 Caterpillar India Pvt Ltd 0 UG Coal Mining equipment manufacturing stopped
Anticipated Shortfall > 150 sets
6 Eichkoff 0
7 JAE 0 No manufacturing in India
Total Production Capacity 8
Advantages to India

Employment Economic Growth Cost Savings GOI’s Policy Goals


The combination of As per a release by the PIB on Setting up an in-house
Setting up a manufacturing employment generation, in- the 23rd of November, CIL manufacturing facility of a
facility will generate local house production, as well as currently pays Rs. 1000 crores globally renowned giant will be
employment as well as provide the potential to export mining annually in customs duty for a milestone in achieving the
skill training opportunities to equipment in the future the import of various high- GOI’s ambitious goal of “Make
the youth across the country. contribute to the overall capacity equipment. in India”.
economic growth of India. Locally manufactured mining
Production of such equipment equipment also aligns with the
locally will save significant costs goal of “Atmanirbhar Bharat”.
such as customs duty,
transport, exchange rate
fluctuations, etc.
SOLUTION / VMI PROPOSAL

Shouldering the responsibility with CIL Mission of achieving 100MTPA


coal production from underground Mines by Fy28. Through
manufacturing of suitable Equipment in INDIA by “Transfer of
Technology” by joining hands with Global manufacturers.

Considering the several advantages of “Make In India” , Our Company


“VM Indomines Pvt Ltd” intent to setup a world-class manufacturing
unit in India by expanding their existing word of art workshop at
Raniganj in West Bengal for which we shall be getting technology
transferred from Shanxi Tiandi Coal Mining Machineries Co.,Ltd which
is situated in Shanxi province of China and is largest manufacturer of
underground coal mining machineries .

Expression of Interest is being submitted for DPIIT registration for


“Transfer of Technology (ToT)”