You are on page 1of 2

Balaji Cement Industries Pvt.

Limited
Dharam Nager, Kapilvastu, Nepal
Dated: 04/09/2020
Miti: 2077/05/19
MECHANICAL WORK PROGRESS REPORT

Sr. Area Name / Manpower Manpower


No. Description of Work Location Name (BCIPL) (NICE) Remarks

Fabrication of a new gate for fixing to Main Gate ( for


Under
1 South-West side entry) in progress. Pending welding HOPPER 0 3 Progress
and buffing work under progress.

Flyash feeding line from venturi to flyash bin bend


2 portion modification work done. Pending welding work FLYASH Completed
also completed. Trial is required to be taken.

Flyash silo top bag filter air line FR-unit required 3 0


3 FLYASH Completed
maintenance work done.

4 VRM/ Mill sealing air fan all the draft point checked
and found satisfactory. VRM Completed

Gypsum crusher shed sheet fixing work started by


5 shifting of material and followed by measurement & GYPSUM 2 2 Under
cutting work. Progress

PSC silo top bag filter hopper high level indicator PACKING
6 position revised as per need of E & I Department. PLANT Completed

Routine inspection of entire circuit for both the


packer-1 & 2 done and found smooth operation. Both 2 1
OPC & PPC Cement loading in progress ; total cement
dispatch = 140.000 MT ( OPC = 5.000 MT & PPC =
PACKING As per
7 135.000 MT). PLANT Requirement
Now the silo level are as under-----
a) OPC Silo = 2.90 Mtr
b) PPC Silo = 9.64 Mtr.
c) PSC Silo = 2.30 Mtr.

ABOVE SUB-TOTAL OF MAN-POWER = 7 6

Prepared By----- Checked By-----


Kaushal Kishore Yadav Vinod Kumar Verma
Engineer HOD
Mechanical Department Mechanical Department