SARJANA SITE VISIT SCHEDULE
Sl.No Date Area/Dept Total Suggestions Remarks
CHP (Operation) 2 Completed
CHP (Mech Maint) 16 Completed
05/08/2020 CHP (Elect Maint) 4 Completed
1
Wednesday CRS 1 Completed
Civil Maint (Inside Plant) 12 Completed
Total 35
RCPH-1 & 2 6 Scheduled
FOPH-3 2 Scheduled
ASPH-5 1 Scheduled
06/08/2020 WTP (Oprn) 6 Scheduled
2 Thursday WTP (Maint) 2 Scheduled
AMD 3 Scheduled
Civil Maint (Outside Plant) 2 Scheduled
Total 22
Unit #1 & #2 12 Scheduled
Unit #3 & #4 9 Scheduled
07/08/2020 Unit #5 & #6 10 Scheduled
3
Friday Compressor House-1 1 Scheduled
CWPH 2 Scheduled
Total 34
08/08/2020 Unit #7 & #8 37 Scheduled
4
Saturday Total 37
10/08/2020 Unit #9 & #10 19 Scheduled
5
Monday Total 19
Total Suggestions 147
SARJANA SITE VISIT SCHEDULE (05/08/2020)
Sl SuggestionD
Suggestion No. Suggestion Title
No. ate
1 202002762003 29/07/2020 Addition power source for CRS Cabin-B
Provision of Remote Close/Trip for Coal Yard -3 HT Outgoing Feeder
2 202008571003 14/04/2020
Breaker
3 202008571004 10/03/2020 Modification in the Logic of BC-120 to eliminate Auto Starting of
Conveyor
4 202008592001 29/04/2020 LAYOUT MODIFICATION OF ZONE-7, 8 YARD SPRINKLER LINE HEADER
5 202008592002 25/03/2020 MOUNTING BASE MODIFICATION FOR CONV.4A SNUB PULLEY
DAMAGED DUCT REMOVAL FROM ROOF CEILING AND ROOF TOP
6 202008592003 25/02/2020 AREA OF BUNKER FLOOR (U # 1-6)
7 202008592004 06/05/2020 CONVEYOR 5B GTU BEND PULLEY MODIFICATION
8 202008592005 05/07/2020 DRAINAGE FOR CONV.1A NORTH END SUMP PUMP DISCHARGE
9 202008592006 15/04/2020 PLOUGH FEEDER-1 HOPPER MOTHER PLATE MODIFICATION
10 202008592007 04/07/2020 DEVELOPMENT OF STORAGE FACILITY FOR IDLERS
11 202008592008 05/07/2020 CONVEYOR 1A NORTH END SUMP PUMP FOUNDATION WITH WATER
DRAINAGE FACILITY
12 202008592009 21/02/2020 CONVEYOR 1B HEAD END SCRAPPER MODIFICATION
13 202008592010 15/02/2020 PLOUGH FEEDER-3 PCRD BEARING CASING RENOVATION
14 202008592011 20/05/2020 CHP-3X YARD SPRINKLING SYSTEM FOR FIRE QUENCHING
15 202005524005 07/04/2020 Redsigning of NDE Pulley of conveyor BC-120
Redesigning of BC-121 conveyor inlet flap gate and inlet chute for
16 202005524006 04/06/2020 reliablity during coal feeding
17 202005524009 23/05/2020 Safe guarding of BC-116 conveyor Tail pulley and tail end conveyor.
18 202005524010 09/07/2020 Provision of inspection door for prior intimation of hopper chocking.
19 202005524011 11/06/2020 Stone removal arrangement at Reclaimer-4 boom conveyor walkway.
Provision of suitable approach to Conv.6A head end inspection chute
20 202001974003 01/08/2020 at TP-5 .
21 202001974004 29/07/2020 Modification of BC104 - 2A chute Inspection door at JH-3 .
22 202005534002 30/06/2020 Incorporation of hot engine interlock of locomotive
23 202006768004 30/03/2020 Hand free washing system in view of COVID-19 pandamic
24 202006768005 17/04/2020 Hand free Sanitiser System
CONSTRUCTION OF VERTIGO TEST STRUCTURE AND SCAFFOLDING
25 202006911003 18/07/2020
MODEL FOR SAFETY PARK
26 202006911004 01/07/2020 EXTENSION /MODIFICATION OF OLD SWITCH YARD VEHICLE SHED
27 202006911005 04/07/2020 MODIFICATION OF PASS SECTION
28 202006911006 01/06/2020 PROCUREMENT AND INSTALLATION OF 04 NOS. OF PORTABLE TOILETS
29 202006911008 20/07/2020 MODIFICATION OF HILL TOP CANTEEN
Construction of drainage channel for disposal of storm water at main
30 202008241001 30/06/2020 canteen
31 202008241002 01/07/2020 Construction of oil water separation pit at steel yard.
Provision of approach stair case to access ESP-3 pass C actuator
32 202009564001 10/03/2020 platform
33 202009564002 17/07/2020 Construction of cross drain near CPP main gate
34 202009564003 10/03/2020 Provision of platform at Unit#3 TG floor to lift passage
Suggestor
Sarjana Area Project Type Department Mobile No.
Name
CRS Cabin-B Availability C.H.P (ELECT.MAINT) B.C.Mohanta 9437071262
PMMC-1 HT Switchgear Safety C.H.P (ELECT.MAINT) M.Samajdar 9437012873
BC-120 Safety C.H.P (ELECT.MAINT) M.Samajdar 9437012873
YARD SPRINKING LINE
Housekeeping C.H.P (MECH.MAINT) M.K.Khatua 9437370987
HEADER
Ease in
TP-4/ CONVEYOR 4A Maintenance C.H.P (MECH.MAINT) M.K.Khatua 9437370987
BUNKER FLOOR/
CONV.5A/B Safety C.H.P (MECH.MAINT) M.K.Khatua 9437370987
CONVEYOR 5B Productivity C.H.P (MECH.MAINT) M.K.Khatua 9437370987
TRACH HOPPER-1 NORTH
END/ CONV.1A NE SUMP Quality C.H.P (MECH.MAINT) M.K.Khatua 9437370987
PUMP
CONVEYOR 1A. PLOUGH
FEEDER-01 Housekeeping C.H.P (MECH.MAINT) M.K.Khatua 9437370987
Ease in
FABRICATION YARD/ CHP C.H.P (MECH.MAINT) M.K.Khatua 9437370987
Maintenance
TP-7/ CONV1A NORTH END Cost Saving C.H.P (MECH.MAINT) M.K.Khatua 9437370987
SUMP PUMP
TP-1/ CONVEYOR 1B Productivity C.H.P (MECH.MAINT) M.K.Khatua 9437370987
CONVEYOR 1B TUNNEL/
Availability C.H.P (MECH.MAINT) M.K.Khatua 9437370987
PLOUGH FEEDER-03
CHP-3X COAL YARD/
WATER SPRINKLING Energy Saving C.H.P (MECH.MAINT) M.K.Khatua 9437370987
SYSTEM
Belt Conveyor BC-120 Cost Saving C.H.P (MECH.MAINT) P.M.Pradhan 9437061487
coal conveyor BC-121 Cost Saving C.H.P (MECH.MAINT) P.M.Pradhan 9437061487
Coal conveyor BC-116 tail
Safety C.H.P (MECH.MAINT) P.M.Pradhan 9437061487
end.
BC-104 Conveyor Time Saving C.H.P (MECH.MAINT) P.M.Pradhan 9437061487
Ease in
Recliamer-4 C.H.P (MECH.MAINT) P.M.Pradhan 9437061487
Operation
Conv.6A Head chute at TP-5 Safety C.H.P (OPERATION) P.K.Lenka 9437019701
BC-104 to Conv.2A chute at
Time Saving C.H.P (OPERATION) P.K.Lenka 9437019701
JH-3.
Ease in
Locomotive C.R.S S.S.Nathan 9437020824
Maintenance
Punching Booths at main Safety CIVIL ENGG. DEPT Raju Purty 9437209451
gate and Adm. Bldg.
civil office Safety CIVIL ENGG. DEPT Raju Purty 9437209451
SAFETY PARK Safety CIVIL ENGG. DEPT D.K.Sahoo 9437005349
OLD SWITCH YARD Energy Saving CIVIL ENGG. DEPT D.K.Sahoo 9437005349
CPP MAIN GATE Quality CIVIL ENGG. DEPT D.K.Sahoo 9437005349
MECON PROJECT CANTEEN Cost Saving CIVIL ENGG. DEPT D.K.Sahoo 9437005349
HILLTOP CANTEEN Housekeeping CIVIL ENGG. DEPT D.K.Sahoo 9437005349
Main canteen Quality CIVIL ENGG. DEPT D.Behera 9437479933
steel yard Safety CIVIL ENGG. DEPT D.Behera 9437479933
Ease in
ESP-3 CIVIL ENGG. DEPT A.Kumar 9437187065
Maintenance
CPP NH road Quality CIVIL ENGG. DEPT A.Kumar 9437187065
Unit-3 Safety CIVIL ENGG. DEPT A.Kumar 9437187065
SARJANA SITE VISIT SCHEDULE (06/08/2020)
Sl No. Suggestion No. Suggestion Suggestion Title Sarjana Project
Date Area Type
Arrangement For Easy Transfer Of Material Ash Pond Time
1 202002769002 13/07/2020
During Emergency Dyke Repair Dyke Saving
Ease in
Flash Bar
2 202007072002 20/07/2020 Re-Arrangement of Ash Slurry Pipeline Maintena
region nce
3 202009790002 23/04/2020 Tackling COVID-19 at PCU PCU Safety
PROVISION OF CW & ACW PUMPS AUTO Ease in
4 202003111008 15/07/2020 STANDBY INDICATION IN HMI RCPH-2 Operation
Ease in
Construction of RCC Syphon at Km 11.850 of CRS kM
5 202008652001 25/07/2020 track (Near Gobra Village) 11.850 Maintena
nce
Diversion rain water from railway track to FCI level
6 202008652002 20/07/2020 natural nallah at FCI level crossing Safety
crossing
FOPH#3 Ease in
Re-routing of Steamlines at FOPH # 3 Pump
7 202008492002 03/02/2020 Pump- Maintena
house.
house nce
8 202008650001 20/02/2020 Provision of agitation in settling basin inlet IDWRS Productivi
trench at Industrial drain water recycling system ty
Installatio of higher capacity PAC unloading Chemical Availabilit
9 202008650002 15/06/2020
pump and modification of its suction line. House y
Availability of thrust bearing temperature Ease in
10 202008776002 05/06/2020 RCPH-2
indication at local of RCPH-2. Operation
ASPH 5
CONVEYI
Performance improvement of air compressors by NG AIR
11 202007634010 13/04/2020 rectification of DP across airfilter pressure Safety
COMPRES
setting.
SOR
HOUSE
RCPH-
Provision for clear and glowing open/close Ease in
12 202009556005 22/07/2020 indication of pump discharge valve at local. 1/RCW- Operation
1A
CHANGEOVER V/V PIT DEWATERING P/P Housekee
13 202007550008 06/07/2020 DISCHARGE LINE RCPH-1 ping
Ease in
providing auto water drainage system in oil
14 202008822001 08/07/2020 FOPH-3 Maintena
water separator pit.
nce
MODIFICATION IN ACW PUMP GLAND COOLING Productivi
15 202006610001 20/06/2020 UTILITY
WATER LINE ty
DM WATER SAVING BY REPLACING GLAND SEAL CT PUMP Productivi
16 202009067004 01/05/2020
WITH MECH. SEAL HOUSE-II ty
PROVISION OF DIGITAL LEVEL INDICATOR AT SLUDGE Ease in
17 202002771001 15/03/2020 PUMP
GRAVITY FILTER BED FLOOR Operation
HOUSE
18 202002771002 15/03/2020 FABRICATION AND ERECTION OF SHED OVER THE CLPH Productivi
DISCHARGE VALVES OF CLP LINE ty
Chemical Ease in
19 202006377004 18/07/2020 PAC tank level indicator installation
house Operation
Construction of approach road to CLP discharge
20 202006377005 20/07/2020 header flowmeter CLP Safety
Renovation of VAT with approach road Housekee
21 202006377006 20/07/2020 DM plant
concreting near NPIT. ping
Development of berm and display board of DM Housekee
22 202006377007 21/07/2020 plant. DM plant
ping
Department Suggestor Name Mobile No.
ASH
Jaya Krishna Sahu 9437664658
MANAGEMENT
ASH
Anuranjan Kumar Minz 9437125741
MANAGEMENT
ASH
Arpit Somani 8895979277
MANAGEMENT
C & I (OFFICE) Ashok Kumar Nayak 9437025596
CIVIL ENGG. DEPT Matruprasad Behera 9437963594
CIVIL ENGG. DEPT Matruprasad Behera 9437963594
MECH MAINT,BLR
SANTOSH KUMAR BEHERA 9437360165
& AUX
MECH MAINT. WT Manoj Kumar Chandan 943795924
PLANT
MECH MAINT. WT
Manoj Kumar Chandan 943795924
PLANT
OPRN DEPT.
Suvendu Kumar Mohanty 9437963958
GROUP -I
OPRN DEPT. G-
Manoj Kumar Singh 9437041579
SHIFT
OPRN
DEPT.GROUP - II Ritesh Sakre 9861284436
OPRN
DEPT.GROUP - IV Rajnish Kumar Gupta 9437006648
OPRN.SUPP.OFFICE Goutam Kumar Nayak 9437962968
MECHANICAL
Samar Kanti Mohanty 9437029637
UTILITY
MECH MAINT,TUR
Amaresh Das 9439411860
& AUX
WTP (Oprn) R.K.Biswal 9437013025
WTP (Oprn) R.K.Biswal 9437013025
WTP (Oprn) P.K.Swain 9437206542
WTP (Oprn) P.K.Swain 9437206542
WTP (Oprn) P.K.Swain 9437206542
WTP (Oprn) P.K.Swain 9437206542
SARJANA SITE VISIT SCHEDULE (07/08/2020)
Sl SuggestionD
Suggestion No. Suggestion Title Sarjana Area
No. ate
MODIFICATION AND RECONDITIONING OF BOILER DRUM
1 202005704002 01/02/2020 UNIT#2
LEVEL MEASUREMENT SYSTEM (HYDRASTEP-U#2)
2 202006644001 18/06/2020 MODIFICATION OF ID FAN H/C OIL IMPULSE LINE unit#06
3 202006644002 10/06/2020 Modification of economizer outlet temp.sensor mounting unit#6
Provision of condensate storage tank (CST) level indication
4 202009645004 01/06/2020 at local and unit Control Room 1&2. UCR-1 & 2
DEVELOPING EFFECTIVE CLEANING FACILITY OF AHU COIL AC_VENTILATIO
5 202007687002 20/07/2020 AND FINS ASSY FOR UCR-1 -2 AND 3-4 N
MODIFICATION OF BOWL MILL VANE WHEEL LOCKING UNIT # 6 BOWL
6 202006516002 26/05/2020 ARRANGEMENT
MILL
Installation of twin seal flap isolator in PA duct at APH PA Duct at APH
7 202008488003 15/04/2020 outlet.
outlet
Unit-1 to 10 oil
8 202009151001 13/05/2020 Arrangement for oil cooler cleaning with steam coolers
9 202008034001 08/07/2020 Restoration of unit # 4 Thrust bearing filter Turbine Area
10 202008825003 16/06/2020 FREQUENT PASSING OF FW-78 OF UNIT#4 TG AUX
11 202008594006 02/07/2020 Provision of All CW Pumps Status in Unit #1 UCR Unit #1
Relocation of FD Fan Control Oil Pressure Regulating Valve
12 202008594007 06/04/2020 Unit #6
of Unit #6
Provision of Access to Operate HP Water Isolation Valve of
13 202008594008 15/07/2020 Unit 3
Unit#3
Provision of Auto Drain Trap & Reorientation of TASH&
14 202008594009 30/03/2020 BASH Drain System in Unit #6 Unit 6
15 202008779002 15/06/2020 Provision for HFO Temp Alarm in DCS Unit 1&2
Provision for CG & SC Motor Taking High Current Alarm in
16 202008779004 31/05/2020 DCS Unit 2&5
Auto closing of oil gun air elevation after cutting of oil gun
17 202009481002 21/10/2020 in respected elevation unit 1
18 202009481003 22/10/2020 auto closing of LOTV/HOTV on dry gun selection unit1
19 202009481004 25/11/2020 auto opening of corresponding coal feeder air elevation by unit1
5% when feeder is proven
Provision for PTW maintainance Tag for CT pumps in Unit
20 202009747003 22/07/2020 CT Pump
#3 & #4
21 202009845003 21/01/2020 Auto Opening Logic for E-12 on MFT Economiser
Water Wall
22 202009845004 21/01/2020 Placing New Manual Isolation V/V before SB-42
Soot Blowing
compressor
23 202007550004 06/02/2020 identification of drain line
house-1
24 202007550010 15/07/2020 staircase to i/l damper of #4 Esp pass-c ESP 4
TASH Header
25 202008191001 15/05/2020 Provision of TASH Header Temperature in Unit - 1 DCS.
Unit-1
PREVENTING ASH INGRESS INTO ESP-5 CONTROL ROOM ESP-5 CONTROL
26 202008600001 01/07/2020 THROUGH CABLE TRENCH
ROOM
TOTAL GUN HOUR CLACULATION PROVISION IN UNIT-4
27 202008765002 22/07/2020 UNIT-4 DCS
DCS
PROVISON OF A PLATFORM WITH APPROACH LADDER FOR MOT-6 COOLER
28 202008765003 02/07/2020 OPERATION OF MOT COOLER OIL VENT
AREA
PROVISION OF AVERAGE TOP & BOTTOM DRUM METAL
29 202008765004 22/07/2020 TEMPERATURE TRENDS IN DCS OF UNIT-4 GROUP-IV
30 202008765005 21/07/2020 PROVISION OF DRUM METAL TEMP AVERAGE RATE UNIT-4 DCS
HIGH/LOW ALARM IN DCS OF UNIT-4
31 202008765006 03/02/2020 MODIFICATION IN UNIT-6 ESP HOPPER APPROACH UNIT-6 ESP
LADDERS
32 202009562001 19/07/2020 Concrete Flooring of front area of Ash Water forebay. CWPH AND
AWPH-1
Electrical Annex
Provision of Smoke Evacuation System in Electrical Annex
33 202004037001 10/07/2020 3, 7.5mtr,
building Power House
modification in ACW Cloum pipecutles rubber bearing in
34 202006610002 02/06/2020 CWPH
old pump house
Project Type Department Suggestor Name Mobile No.
Availability C & I (OFFICE) K.K.Behera 9437018353
Productivity C & I (OFFICE) Bishnudhara Behera 9437966509
Availability C & I (OFFICE) Bishnudhara Behera 9437966509
Ease in
Operation C & I (OFFICE) Kirti Khaira 9437563713
Quality M.M. AC VENT & SHIFT Apurba Halder 9437069282
MECH
Availability Nirada Chandra Barik 9437578945
MAINT(BOWLMILL)
MECH MAINT,BLR &
Availability Jayadev Sahoo 9437360154
AUX
MECH MAINT,BLR &
Quality AUX Pradipta Kishore Behera 9778046764
MECH MAINT,TUR &
Availability Saroj Kumar Naha 9437577810
AUX
Quality MECH MAINT,TUR & Susanta Kumar Samal 9437964021
AUX
Ease in
OPRN DEPT.GROUP - II Dibya Lochan Swain 9437450086
Operation
Ease in
OPRN DEPT.GROUP - II Dibya Lochan Swain 9437450086
Operation
Availability OPRN DEPT.GROUP - II Dibya Lochan Swain 9437450086
Productivity OPRN DEPT.GROUP - II Dibya Lochan Swain 9437450086
Availability OPRN DEPT.GROUP - II Ajay Kumar Mishra 9437963807
Productivity OPRN DEPT.GROUP - II Ajay Kumar Mishra 9437963807
Productivity OPRN DEPT.GROUP - II Sanjoy Roy 9437553740
Productivity OPRN DEPT.GROUP - II Sanjoy Roy 9437553740
Productivity OPRN DEPT.GROUP - II Sanjoy Roy 9437553740
Safety OPRN DEPT.GROUP - II Ram Saweak Meena 8280758907
Availability OPRN DEPT.GROUP - II Nitish Kumar 9437361065
Energy Saving OPRN DEPT.GROUP - II Nitish Kumar 9437361065
Ease in
OPRN DEPT.GROUP - IV Rajnish Kumar Gupta 9437006648
Operation
Safety OPRN DEPT.GROUP - IV Rajnish Kumar Gupta 9437006648
Ease in
OPRN DEPT.GROUP - IV Sanjay Gupta 9437492597
Operation
Safety OPRN DEPT.GROUP - IV Birakishore Dash 9437963627
Time Saving OPRN DEPT.GROUP - IV Sabyasachi Pradhan 9437012810
Safety OPRN DEPT.GROUP - IV Sabyasachi Pradhan 9437012810
Ease in
Operation OPRN DEPT.GROUP - IV Sabyasachi Pradhan 9437012810
Ease in
OPRN DEPT.GROUP - IV Sabyasachi Pradhan 9437012810
Operation
Safety OPRN DEPT.GROUP - IV Sabyasachi Pradhan 9437012810
Ease in OPRN DEPT.GROUP - IV Basanta Kumar Jena 9937714130
Operation
Productivity ELEC.MAINT(OFFICE) Satyabadi Mishra 9437064178
Productivity MECHANICAL UTILITY Samar Kanti Mohanty 9437029637
SARJANA SITE VISIT SCHEDULE (08/08/2020)
Sl SuggestionD Sarjana Project
Suggestion No. Suggestion Title
No. ate Area Type
UNIT #7 & Productivi
1 202008579009 10/06/2020 MODIFICATION OF PA/FD FAN LOP AUTO START LOGIC
8 ty
2 202008579010 18/06/2020 PROVISION OF COAL FOLW INTEGRATOR IN DCS UCR #7&8 Productivi
ty
Drum
Energy
3 202009786001 01/04/2020 Energy conservation by reduction of FRS DP in unit 7&8 level
Saving
control
PROVISION OF DRUM LEVEL PROTECTION BYPASS Productivi
4 202009786002 18/06/2020 SWITCH UNIT#7 ty
MODIFICATION INCW WATER CIRCULATION LINE OF turbine & Ease in
5 202008651003 25/06/2020 CONTROL OIL COOLER , UNIT#7
auxillary Maintena
nce
1. PROVISION OF PLATFORM FOR SAFE OPERATION &
6 202008825006 08/07/2020 MAINTENANCE OF TASH&BASH UNIT HEADER NRVs OF TG AUX Safety
UNIT-7
UNIT-7 &
8
7 202007634007 25/06/2020 UNIT-7 & 8 CONTROL OIL PUMPS LOGIC MODIFICATION CONTROL Productivi
FOR AVOIDING UNIT TRIPPING OIL ty
SYSTEM
Provision of UNIT -7 & 8 HFO tank level and UCR #7 & Availabilit
8 202007551004 08/07/2020
temperature in DCS. 8 y
Relocation of BASH to APH soot blowing steam isolation BOILER
9 202007551005 14/07/2020 Safety
valve of boiler unit-7 UNIT-7
UNIT-8
Ease in
10 202007551006 18/03/2020 Provision of actuator operated CST inlet valve of UNIT-8. CST INLET Operation
VALVE
UNIT#7:
TASH&
BASH Productivi
11 202008779003 01/07/2020 Re-location of TASH and BASH flash box and its outlet. DRAIN ty
FLASH
TANK.
UNIT #08 Productivi
12 202009073001 22/02/2020 Provision of CW DP IN DCS
UCR ty
Provision of Specific coal consumption in DCS of Unit #07 Energy
13 202009073002 19/06/2020
UNIT#07 UCR Saving
UNIT#7 & Ease in
14 202009556002 24/06/2020 Provision of 'FD/PA to 3 MILL' protection switch in UCR.
UNIT #8 Operation
Modification & relocation of CW temperature gauges of UNIT#7 Ease in
15 202009556003 15/07/2020 CONDENS
UNIT#7 condenser ER Operation
Bunker-A Ease in
16 202009556004 04/05/2020 Provision of platform for opening of bunker poking door.
UNIT#7 Operation
#7 & #8 Ease in
17 202009747002 24/06/2020 Provision of Mill Currents & Coal flow rate Trends in DCS
UCR Operation
UNIT-7 Availabilit
18 202009656001 21/07/2020 Availability of BAH refractory cooling water BOTTOM
y
ASH AREA
19 202007550005 06/07/2020 SAFETY WHILE GOING UP OR COMING DOWN TO CRM ESP 7 Safety
FLOOR
20 202007550006 06/07/2020 No provision to operate the suction valve of Seal Air fan. #7-SEAL Safety
AIR FAN
21 202007550007 06/07/2020 no provision to operate the v/v from sealing water line
#8 clinker
Safety
to clinker grinder from service water header grinder
Ease in
22 202007550009 13/07/2020 PROBLEM IN OPERATING CTBD#8 ISOLATION VALVE. UNIT-#8
Operation
UNIT 8
BOTTOM
PROVISION OF ONLINE CLEARING OF CHOKING OF ASH Productivi
23 202008640002 22/07/2020 BOTTOM ASH HOPPER OVERFLOW LINE INLET POINT
OVERFLO ty
W
SYSTEM
UNIT-7
24 202009340005 30/06/2020 RELOCATION OF UNIT-7 GSC SIPHON GSC Quality
RELOCATION OF HD-2 DOWNSTREAM MANUAL UNIT-7
25 202009340006 01/07/2020 ISOLATION VALVE HP Safety
HEATERS
UNIT-7,8
MODIFICATION IN UNIT-7,8 BASH HEADER DRAIN Cost
26 202009340008 06/07/2020 BASH
CONFIGURATION HEADER Saving
UNIT 7 Ease in
27 202009739002 01/04/2020 PROVISION OF BYPASSING LESS THAN 30% AIR FLOW
DCS Operation
PROVISION OF ID/FD/PA BEARING TEMPERATURE Ease in
28 202009754001 01/06/2020 UNIT 7& 8
PROTECTION BYPASS SWITCH Operation
Unit 8
UNIT-8 SCANNER FAN AUTO START LOGIC
29 202009779002 06/06/2020 scanner Quality
MODIFICATION
air fan
BFP MOTOR BRG TEMP PROTECTION MODIFICATION OF UCR#7 & Productivi
30 202008187001 08/01/2020 U#7&8
8 ty
TURBINE Ease in
MODIFICATION IN CONDENSER COOLING WATER
31 202008651004 06/07/2020 OUTLET VENTING SYSTEM &AUXILLA Maintena
RY nce
32 202007670006 15/07/2020 Provision of support to Current Transducer in UPS UPS Safety
unit 7
Ease in
33 202008640003 29/07/2020 Relocation of HPH 5 VENT LINE TO DEARATOR HPH 5
Operation
area
Ease in
34 202009067005 02/07/2020 FABRICATION OF JACKING SYSTEM FOR BFP SUCTION BFP 7A & Maintena
STRAINER COVER 7B nce
REPLACEMENT OF UNION JOINTS WITH FLANGES IN UNIT#7 Productivi
35 202009067006 15/06/2020
MECHANICAL SEAL COOLING LINE BFP-A&B ty
unit 7 and
PROVISION OF ORIFICE IN HOPPER FLUSHING LINE TO Ease in
36 202008598007 23/07/2020 8 bottom
RESTRICT TRIPPING OF CLINKER GRINDER Operation
ash area
Tech-II,
37 202006737001 31/07/2020 awereness Conferen Safety
ce Hall
Department Suggestor Name Mobile No.
C & I (OFFICE) Suryakanta Mohapatra 9437962944
C & I (OFFICE) Suryakanta Mohapatra 9437962944
C & I (OFFICE) Dibyajyoti Mohapatra 8149464657
C & I (OFFICE) Dibyajyoti Mohapatra 8149464657
MECH
MAINT,TUR & Satya Narayan Barik 9437054888
AUX
MECH
MAINT,TUR & Susanta Kumar Samal 9437964021
AUX
OPRN DEPT. G- Manoj Kumar Singh 9437041579
SHIFT
OPRN
DEPT.GROUP - Subrat Kumar Mandal 9437071023
II
OPRN
DEPT.GROUP - Subrat Kumar Mandal 9437071023
II
OPRN
DEPT.GROUP - Subrat Kumar Mandal 9437071023
II
OPRN
DEPT.GROUP - Ajay Kumar Mishra 9437963807
II
OPRN
DEPT.GROUP - Akshaya Kumar Sahoo 9437554434
II
OPRN
DEPT.GROUP - Akshaya Kumar Sahoo 9437554434
II
OPRN
DEPT.GROUP - Ritesh Sakre 9861284436
II
OPRN
DEPT.GROUP - Ritesh Sakre 9861284436
II
OPRN
DEPT.GROUP - Ritesh Sakre 9861284436
II
OPRN
DEPT.GROUP - Ram Saweak Meena 8280758907
II
OPRN
DEPT.GROUP - Akhil Kumar 9437565338
III
OPRN
DEPT.GROUP - Rajnish Kumar Gupta 9437006648
IV
OPRN
DEPT.GROUP - Rajnish Kumar Gupta 9437006648
IV
OPRN
DEPT.GROUP - Rajnish Kumar Gupta 9437006648
IV
OPRN
DEPT.GROUP - Rajnish Kumar Gupta 9437006648
IV
OPRN
DEPT.GROUP - Yesuraj Toppo 9437966952
IV
OPRN
DEPT.GROUP - Somesh Mohapatra 9437063178
IV
OPRN
DEPT.GROUP - Somesh Mohapatra 9437063178
IV
OPRN
DEPT.GROUP - Somesh Mohapatra 9437063178
IV
OPRN
DEPT.GROUP - Rajat Saxena 8280758915
IV
OPRN
DEPT.GROUP - Yogesh Chandra Bhatt 8280758911
IV
OPRN
DEPT.GROUP - Ashok Kumar Garai 9674449430
IV
OPRN DEPT.
Praveen Kumar Upadhyay 9437158691
GROUP -I
MECH
MAINT,TUR & Satya Narayan Barik 9437054888
AUX
C & I (OFFICE) Swaroop Ramdas Taksande 9437005171
OPRN
DEPT.GROUP - Yesuraj Toppo 9437966952
IV
MECH
MAINT,TUR & Amaresh Das 9439411860
AUX
MECH
MAINT,TUR & Amaresh Das 9439411860
AUX
OPRN
DEPT.GROUP - Chirantan Shyam 9437585319
IV
SAFETY K Pulamani Jarlina Baxla 9437189650
SARJANA SITE VISIT SCHEDULE (10/08/2020)
Sl No. Suggestion No. SuggestionDate Suggestion Title
1 202008034002 04/06/2020 Air Jack to dismantle the seized piston of Power cylinder
of unit # 9 Extraction NRV-4
INADEQUATE FLOW THROUGH TAS LOW CAPACITY
2 202008825004 18/06/2020
CONTROL VALVE(AS-86)
3 202007634005 22/07/2020 PREVENTION OF FREQUENT HAG OUTAGES IN UNIT-9
PREVENTION OF STEAM INGRESS TO TG BEARINGS IN
4 202007634006 24/01/2020
UNIT-10
CORRECTION OF TURBINE GLAND STEAM HEADER
5 202007634008 22/07/2020 PRESSURE SETTING IN UNIT-9 & 10
ENERGY SAVING BY STOPPAGE OF AIR LEAKAGE FROM
6 202007634009 03/06/2020 INSTRUMENT AIR CIRCUIT INTO UNIT 9 CW OUTLET
PIPELINE.
7 202008158001 28/02/2020 Flooring and railing around condensor of unit-10
STARTING EJECTOR'S STEAM AND AIR VALVE LOGIC
8 202009785002 18/02/2020
MODIFICATION
Provision of platform for accesing DM makeup pump
9 202009785003 08/06/2020 area operation of unit#9&10
Provision of MS Barricade in unit#10 BFP ACW line v/v
10 202009785004 15/06/2020
operation.
11 202009785005 20/05/2020 Provision of shading over both the seal air fan motor of
unit#10
Provision of SLD shortcuts in different pages of BOP in
12 202008598004 01/07/2020
DCS
Provision of visual indication with additional seal of GSC
13 202008598005 04/07/2020
overflow line
Modification in ESP 10 3rd field for smooth conveying in
14 202008598006 12/07/2020
case of problem in 1st field conveying
DETECTION OF CONTROLLER FORCED MANUAL
15 202009340007 21/07/2020
CONDITION IN UNIT-9
PREVENTION OF WATER FALLING FROM EJECTOR
16 202009340009 25/07/2020
FLOOR OVER HOTWELL MAKEUP VALVES
ADDITION OF DRIVE AND PARAMETERS VALUE IN UNIT
17 202009586001 15/07/2020
9 10 DCS GRAPHICS
Improvement of Process Stability,Availability & Safety
18 202007159002 17/03/2020
during Field Data Collection
19 202008598008 01/06/2020 Safety arrangements near MRHC- 5 in Unit 9
Sarjana Area Project Type Department Suggestor Name Mobile No.
Turbine Area Availability MECH MAINT,TUR Saroj Kumar Naha 9437577810
& AUX
MECH MAINT,TUR
TG AUX,UNIT#10 Quality Susanta Kumar Samal 9437964021
& AUX
UNIT-9 HAGs Productivity OPRN DEPT. G- Manoj Kumar Singh 9437041579
SHIFT
OPRN DEPT. G-
UNIT-10 TURBINE Availability Manoj Kumar Singh 9437041579
SHIFT
UNIT-9,10 GLAND STEAM OPRN DEPT. G-
SYSTEM Quality SHIFT Manoj Kumar Singh 9437041579
UNIT 9 COMPRESSOR OPRN DEPT. G-
Energy Saving Manoj Kumar Singh 9437041579
HOUSE SHIFT
OPRN DEPT.GROUP
Unit-10 condensor Safety Laxmidhar Kar 9437966764
- II
UNIT-9 AND 10 STARTING OPRN DEPT.GROUP
Productivity Rakesh Kumar Behera 9778330150
EJECTOR - II
Unit#9&10 DM makeup p/p OPRN DEPT.GROUP
area Safety - II Rakesh Kumar Behera 9778330150
Unit#10 BFP ACW line v/v OPRN DEPT.GROUP
Safety Rakesh Kumar Behera 9778330150
operation. - II
Unit#10 seal air fan Availability OPRN DEPT.GROUP Rakesh Kumar Behera 9778330150
- II
OPRN DEPT.GROUP
DCS of unit 9 and 10 Ease in Operation Chirantan Shyam 9437585319
- IV
near condenser 10 boiler OPRN DEPT.GROUP
Productivity Chirantan Shyam 9437585319
side - IV
OPRN DEPT.GROUP
ESP 10 3rd field Productivity Chirantan Shyam 9437585319
- IV
OPRN DEPT.GROUP
DCS,UCR Ease in Operation Somesh Mohapatra 9437063178
- IV
UNIT-9 EJECTOR FLOOR (4.5 OPRN DEPT.GROUP
Cost Saving Somesh Mohapatra 9437063178
MTR) - IV
OPRN DEPT.GROUP
unit 9 and 10 DCS Ease in Operation Ravi Shankar 9437479386
- IV
U10-Boiler Energy Saving TECHNICAL SERVICE Kallol Bala 9937022532
OPRN DEPT.GROUP
Unit 9 MRHC 5 area Safety Chirantan Shyam 9437585319
- IV
Sl No. Suggn.No. Suggn.Date Suggn.Title
Arrangement For Easy Transfer Of Material
1 202002769002 13/07/2020 During Emergency Dyke Repair
2 202007072002 20/07/2020 Re-Arrangement of Ash Slurry Pipeline
3 202009790002 23/04/2020 Tackling COVID-19 at PCU
PROVISION OF CW & ACW PUMPS AUTO
4 202003111008 15/07/2020 STANDBY INDICATION IN HMI
MODIFICATION AND RECONDITIONING OF
BOILER DRUM LEVEL MEASUREMENT
5 202005704002 01/02/2020 SYSTEM (HYDRASTEP-U#2)
MODIFICATION OF ID FAN H/C OIL IMPULSE
6 202006644001 18/06/2020 LINE
Modification of economizer outlet
7 202006644002 10/06/2020 temp.sensor mounting
MODIFICATION OF PA/FD FAN LOP AUTO
8 202008579009 10/06/2020 START LOGIC
PROVISION OF COAL FOLW INTEGRATOR IN
9 202008579010 18/06/2020 DCS
Provision of condensate storage tank (CST)
level indication at local and unit Control
10 202009645004 01/06/2020 Room 1&2.
Energy conservation by reduction of FRS DP
11 202009786001 01/04/2020 in unit 7&8
PROVISION OF DRUM LEVEL PROTECTION
12 202009786002 18/06/2020 BYPASS SWITCH
LAYOUT MODIFICATION OF ZONE-7, 8 YARD
13 202008592001 29/04/2020 SPRINKLER LINE HEADER
MOUNTING BASE MODIFICATION FOR
14 202008592002 25/03/2020 CONV.4A SNUB PULLEY
DAMAGED DUCT REMOVAL FROM ROOF
CEILING AND ROOF TOP AREA OF BUNKER
15 202008592003 25/02/2020 FLOOR (U # 1-6)
CONVEYOR 5B GTU BEND PULLEY
16 202008592004 06/05/2020 MODIFICATION
DRAINAGE FOR CONV.1A NORTH END SUMP
17 202008592005 05/07/2020 PUMP DISCHARGE
PLOUGH FEEDER-1 HOPPER MOTHER PLATE
18 202008592006 15/04/2020 MODIFICATION
DEVELOPMENT OF STORAGE FACILITY FOR
19 202008592007 04/07/2020 IDLERS
CONVEYOR 1A NORTH END SUMP PUMP
FOUNDATION WITH WATER DRAINAGE
20 202008592008 05/07/2020 FACILITY
CONVEYOR 1B HEAD END SCRAPPER
21 202008592009 21/02/2020 MODIFICATION
PLOUGH FEEDER-3 PCRD BEARING CASING
22 202008592010 15/02/2020 RENOVATION
CHP-3X YARD SPRINKLING SYSTEM FOR FIRE
23 202008592011 20/05/2020 QUENCHING
Incorporation of “hot engine interlock of
24 202005534002 30/06/2020 locomotive
Hand free washing system in view of COVID-
25 202006768004 30/03/2020 19 pandamic
26 202006768005 17/04/2020 Hand free Sanitiser System
CONSTRUCTION OF VERTIGO TEST
STRUCTURE AND SCAFFOLDING MODEL FOR
27 202006911003 18/07/2020 SAFETY PARK
EXTENSION /MODIFICATION OF OLD
28 202006911004 01/07/2020 SWITCH YARD VEHICLE SHED
29 202006911005 04/07/2020 MODIFICATION OF PASS SECTION
PROCUREMENT AND INSTALLATION OF 04
30 202006911006 01/06/2020 NOS. OF PORTABLE TOILETS
31 202006911008 20/07/2020 MODIFICATION OF HILL TOP CANTEEN
Construction of drainage channel for
32 202008241001 30/06/2020 disposal of storm water at main canteen
Construction of oil water separation pit at
33 202008241002 01/07/2020 steel yard.
Construction of RCC Syphon at Km 11.850 of
34 202008652001 25/07/2020 CRS track (Near Gobra Village)
Diversion rain water from railway track to
35 202008652002 20/07/2020 natural nallah at FCI level crossing
Provision of approach stair case to access
36 202009564001 10/03/2020 ESP-3 pass C actuator platform
Construction of cross drain near CPP main
37 202009564002 17/07/2020 gate
Provision of platform at Unit#3 TG floor to
38 202009564003 10/03/2020 lift passage
DEVELOPING EFFECTIVE CLEANING FACILITY
OF AHU COIL AND FINS ASSY FOR UCR-1 -2
39 202007687002 20/07/2020 AND 3-4
MODIFICATION OF BOWL MILL VANE WHEEL
40 202006516002 26/05/2020 LOCKING ARRANGEMENT
Installation of twin seal flap isolator in PA
41 202008488003 15/04/2020 duct at APH outlet-Unit #6
Re-routing of Steamlines at FOPH # 3 Pump
42 202008492002 03/02/2020 house.
Arrangement for oil cooler cleaning with
43 202009151001 13/05/2020 steam-Unit #4
44 202008034001 08/07/2020 Restoration of unit # 4 Thrust bearing filter
Air Jack to dismantle the seized piston of
45 202008034002 04/06/2020 Power cylinder of unit # 9 Extraction NRV-4
MODIFICATION INCW WATER CIRCULATION
46 202008651003 25/06/2020 LINE OF CONTROL OIL COOLER , UNIT#7
MODIFICATION IN CONDENSER COOLING
47 202008651004 06/07/2020 WATER OUTLET VENTING SYSTEM
48 202008825003 16/06/2020 FREQUENT PASSING OF FW-78 OF UNIT#4
INADEQUATE FLOW THROUGH TAS LOW
49 202008825004 18/06/2020 CAPACITY CONTROL VALVE(AS-86)
1. PROVISION OF PLATFORM FOR SAFE
OPERATION & MAINTENANCE OF
50 202008825006 08/07/2020 TASH&BASH UNIT HEADER NRVs OF UNIT-7
Provision of agitation in settling basin inlet
trench at Industrial drain water recycling
51 202008650001 20/02/2020 system
Installatio of higher capacity PAC unloading
52 202008650002 15/06/2020 pump and modification of its suction line.
Availability of thrust bearing temperature
53 202008776002 05/06/2020 indication at local of RCPH-2.
BFP MOTOR BRG TEMP PROTECTION
54 202008187001 08/01/2020 MODIFICATION OF U#7&8
PREVENTION OF FREQUENT HAG OUTAGES
55 202007634005 22/07/2020 IN UNIT-9
PREVENTION OF STEAM INGRESS TO TG
56 202007634006 24/01/2020 BEARINGS IN UNIT-10
UNIT-7 & 8 CONTROL OIL PUMPS LOGIC
MODIFICATION FOR AVOIDING UNIT
57 202007634007 25/06/2020 TRIPPING
CORRECTION OF TURBINE GLAND STEAM
58 202007634008 22/07/2020 HEADER PRESSURE SETTING IN UNIT-9 & 10
ENERGY SAVING BY STOPPAGE OF AIR
LEAKAGE FROM INSTRUMENT AIR CIRCUIT
59 202007634009 03/06/2020 INTO UNIT 9 CW OUTLET PIPELINE.
Performance improvement of air
compressors by rectification of DP across
60 202007634010 13/04/2020 airfilter pressure setting.
Provision of UNIT -7 & 8 HFO tank level and
61 202007551004 08/07/2020 temperature in DCS.
Relocation of BASH to APH soot blowing
62 202007551005 14/07/2020 steam isolation valve of boiler unit-7
Provision of actuator operated CST inlet
63 202007551006 18/03/2020 valve of UNIT-8.
Flooring and railing around condensor of
64 202008158001 28/02/2020 unit-10
Provision of All CW Pumps Status in Unit #1
65 202008594006 02/07/2020 UCR
Relocation of FD Fan Control Oil Pressure
66 202008594007 06/04/2020 Regulating Valve of Unit #6
Provision of Access to Operate HP Water
67 202008594008 15/07/2020 Isolation Valve of Unit#3
Provision of Auto Drain Trap & Reorientation
68 202008594009 30/03/2020 of TASH& BASH Drain System in Unit #6
69 202008779002 15/06/2020 Provision for HFO Temp Alarm in DCS
Re-location of TASH and BASH flash box and
70 202008779003 01/07/2020 its outlet.
Provision for CG & SC Motor Taking High
71 202008779004 31/05/2020 Current Alarm in DCS
72 202009073001 22/02/2020 Provision of CW DP IN DCS
Provision of Specific coal consumption in
73 202009073002 19/06/2020 DCS of UNIT#07
Auto closing of oil gun air elevation after
74 202009481002 21/10/2020 cutting of oil gun in respected elevation
auto closing of LOTV/HOTV on dry gun
75 202009481003 22/10/2020 selection
auto opening of corresponding coal feeder
76 202009481004 25/11/2020 air elevation by 5% when feeder is proven
Provision of 'FD/PA to 3 MILL' protection
77 202009556002 24/06/2020 switch in UCR.
Modification & relocation of CW
78 202009556003 15/07/2020 temperature gauges of UNIT#7 condenser
Provision of platform for opening of bunker
79 202009556004 04/05/2020 poking door.
Provision for clear and glowing open/close
80 202009556005 22/07/2020 indication of pump discharge valve at local.
Provision of Mill Currents & Coal flow rate
81 202009747002 24/06/2020 Trends in DCS
Provision for PTW maintainance Tag for CT
82 202009747003 22/07/2020 pumps in Unit #3 & #4
STARTING EJECTOR'S STEAM AND AIR VALVE
83 202009785002 18/02/2020 LOGIC MODIFICATION
Provision of platform for accesing DM
84 202009785003 08/06/2020 makeup pump area operation of unit#9&10
Provision of MS Barricade in unit#10 BFP
85 202009785004 15/06/2020 ACW line v/v operation.
Provision of shading over both the seal air
86 202009785005 20/05/2020 fan motor of unit#10
87 202009845003 21/01/2020 Auto Opening Logic for E-12 on MFT
Placing New Manual Isolation V/V before SB-
88 202009845004 21/01/2020 42
89 202009656001 21/07/2020 Availability of BAH refractory cooling water
90 202007550004 06/02/2020 identification of drain line
SAFETY WHILE GOING UP OR COMING
91 202007550005 06/07/2020 DOWN TO CRM FLOOR
No provision to operate the suction valve of
92 202007550006 06/07/2020 Seal Air fan.
no provision to operate the v/v from sealing
water line to clinker grinder from service
93 202007550007 06/07/2020 water header
CHANGEOVER V/V PIT DEWATERING P/P
94 202007550008 06/07/2020 DISCHARGE LINE
PROBLEM IN OPERATING CTBD#8
95 202007550009 13/07/2020 ISOLATION VALVE.
96 202007550010 15/07/2020 staircase to i/l damper of #4 Esp pass-c
Provision of TASH Header Temperature in
97 202008191001 15/05/2020 Unit - 1 DCS.
Provision of SLD shortcuts in different pages
98 202008598004 01/07/2020 of BOP in DCS
Provision of visual indication with additional
99 202008598005 04/07/2020 seal of GSC overflow line
Modification in ESP 10 3rd field for smooth
conveying in case of problem in 1st field
100 202008598006 12/07/2020 conveying
PREVENTING ASH INGRESS INTO ESP-5
101 202008600001 01/07/2020 CONTROL ROOM THROUGH CABLE TRENCH
PROVISION OF ONLINE CLEARING OF
CHOKING OF BOTTOM ASH HOPPER
102 202008640002 22/07/2020 OVERFLOW LINE INLET POINT
TOTAL GUN HOUR CLACULATION
103 202008765002 22/07/2020 PROVISION IN UNIT-4 DCS
PROVISON OF A PLATFORM WITH
APPROACH LADDER FOR OPERATION OF
104 202008765003 02/07/2020 MOT COOLER OIL VENT
PROVISION OF AVERAGE TOP & BOTTOM
DRUM METAL TEMPERATURE TRENDS IN
105 202008765004 22/07/2020 DCS OF UNIT-4
PROVISION OF DRUM METAL TEMP
AVERAGE RATE HIGH/LOW ALARM IN DCS
106 202008765005 21/07/2020 OF UNIT-4
MODIFICATION IN UNIT-6 ESP HOPPER
107 202008765006 03/02/2020 APPROACH LADDERS
108 202009340005 30/06/2020 RELOCATION OF UNIT-7 GSC SIPHON
RELOCATION OF HD-2 DOWNSTREAM
109 202009340006 01/07/2020 MANUAL ISOLATION VALVE
DETECTION OF CONTROLLER FORCED
110 202009340007 21/07/2020 MANUAL CONDITION IN UNIT-9
MODIFICATION IN UNIT-7,8 BASH HEADER
111 202009340008 06/07/2020 DRAIN CONFIGURATION
PREVENTION OF WATER FALLING FROM
EJECTOR FLOOR OVER HOTWELL MAKEUP
112 202009340009 25/07/2020 VALVES
Concrete Flooring of front area of Ash Water
113 202009562001 19/07/2020 forebay.
ADDITION OF DRIVE AND PARAMETERS
114 202009586001 15/07/2020 VALUE IN UNIT 9 10 DCS GRAPHICS
PROVISION OF BYPASSING LESS THAN 30%
115 202009739002 01/04/2020 AIR FLOW
PROVISION OF ID/FD/PA BEARING
TEMPERATURE PROTECTION BYPASS
116 202009754001 01/06/2020 SWITCH
UNIT-8 SCANNER FAN AUTO START LOGIC
117 202009779002 06/06/2020 MODIFICATION
providing auto water drainage system in oil
118 202008822001 08/07/2020 water separator pit.
Improvement of Process Stability,Availability
119 202007159002 17/03/2020 & Safety during Field Data Collection
PROVISION OF DIGITAL LEVEL INDICATOR AT
120 202002771001 15/03/2020 GRAVITY FILTER BED FLOOR
FABRICATION AND ERECTION OF SHED OVER
121 202002771002 15/03/2020 THE DISCHARGE VALVES OF CLP LINE
122 202006377004 18/07/2020 PAC tank level indicator installation
Construction of approach road to CLP
123 202006377005 20/07/2020 discharge header flowmeter
Renovation of VAT with approach road
124 202006377006 20/07/2020 concreting near NPIT.
Development of berm and display board of
125 202006377007 21/07/2020 DM plant.
Provision of suitable approach to Conv.6A
126 202001974003 01/08/2020 head end inspection chute at TP-5 .
Modification of BC104 - 2A chute Inspection
127 202001974004 29/07/2020 door at JH-3 .
128 202002762003 29/07/2020 Addition power source for CRS Cabin-B
Provision of Smoke Evacuation System in
129 202004037001 10/07/2020 Electrical Annex building
Redsigning of NDE Pulley of conveyor BC-
130 202005524005 07/04/2020 120
Redesigning of BC-121 conveyor inlet flap
gate and inlet chute for reliablity during coal
131 202005524006 04/06/2020 feeding
Safe guarding of BC-116 conveyor Tail pulley
132 202005524009 23/05/2020 and tail end conveyor.
Provision of inspection door for prior
133 202005524010 09/07/2020 intimation of hopper chocking.
Stone removal arrangement at Reclaimer-4
134 202005524011 11/06/2020 boom conveyor walkway.
MODIFICATION IN ACW PUMP GLAND
135 202006610001 20/06/2020 COOLING WATER LINE
modification in ACW Cloum pipecutles
136 202006610002 02/06/2020 rubber bearing in old pump house
137 202006737001 31/07/2020 awereness
Provision of support to Current Transducer
138 202007670006 15/07/2020 in UPS
Provision of Remote Close/Trip for Coal Yard
139 202008571003 14/04/2020 -3 HT Outgoing Feeder Breaker
Modification in the Logic of BC-120 to
140 202008571004 10/03/2020 eliminate Auto Starting of Conveyor
141 202008598008 01/06/2020 Safety arrangements near MRHC- 5 in Unit 9
Relocation of HPH 5 VENT LINE TO
142 202008640003 29/07/2020 DEARATOR
DM WATER SAVING BY REPLACING GLAND
143 202009067004 01/05/2020 SEAL WITH MECH. SEAL
FABRICATION OF JACKING SYSTEM FOR BFP
144 202009067005 02/07/2020 SUCTION STRAINER COVER
REPLACEMENT OF UNION JOINTS WITH
FLANGES IN MECHANICAL SEAL COOLING
145 202009067006 15/06/2020 LINE
PROVISION OF ORIFICE IN HOPPER
FLUSHING LINE TO RESTRICT TRIPPING OF
146 202008598007 23/07/2020 CLINKER GRINDER
Sarj.Area Sarj.SubArea Func.Dept2.
ASH MANAGEMENT DEPT Ash Pond Dyke AMD
ASH MANAGEMENT DEPT Flash Bar region AMD
ASH MANAGEMENT DEPT PCU
WATER TREATMENT PLANT RCPH-2 C&I
C&I MAINTENANCE UNIT#2 C&I
C&I MAINTENANCE unit#06 C&I
C&I MAINTENANCE unit#6 C&I
C&I MAINTENANCE UNIT #7 & 8 C&I
C&I MAINTENANCE UCR #7&8 C&I
C&I MAINTENANCE UNIT 1 & 2 CONTROL ROOM & LOCAL C&I
C&I MAINTENANCE Drum level control C&I
C&I MAINTENANCE UNIT#7 C&I
COAL HANDLING PLANT YARD SPRINKING LINE HEADER Mechanical
COAL HANDLING PLANT TP-4/ CONVEYOR 4A Mechanical
COAL HANDLING PLANT BUNKER FLOOR/ CONV.5A/B Mechanical
COAL HANDLING PLANT CONVEYOR 5B Mechanical
TRACH HOPPER-1 NORTH END/ CONV.1A NE
COAL HANDLING PLANT SUMP PUMP Mechanical
COAL HANDLING PLANT CONVEYOR 1A. PLOUGH FEEDER-01 Mechanical
COAL HANDLING PLANT FABRICATION YARD/ CHP Mechanical
COAL HANDLING PLANT TP-7/ CONV1A NORTH END SUMP PUMP Mechanical
COAL HANDLING PLANT TP-1/ CONVEYOR 1B Mechanical
COAL HANDLING PLANT CONVEYOR 1B TUNNEL/ PLOUGH FEEDER-03 Mechanical
CHP-3X COAL YARD/ WATER SPRINKLING
COAL HANDLING PLANT SYSTEM Mechanical
CAPTIVE RAIL SYSTEM Locomotive Mechanical
Punching Booths at main gate and Adm.
CIVIL MAINTENANCE Bldg. Civil
CIVIL MAINTENANCE civil office Civil
SAFETY SAFETY PARK Civil
OTHERS OLD SWITCH YARD Civil
CIVIL MAINTENANCE CPP MAIN GATE Civil
OTHERS MECON PROJECT CANTEEN Civil
HRD & IR/ADMN/PR HILLTOP CANTEEN Civil
CIVIL MAINTENANCE Main canteen Civil
OTHERS steel yard Civil
CAPTIVE RAIL SYSTEM kM 11.850 Civil
CAPTIVE RAIL SYSTEM FCI level crossing Civil
CIVIL MAINTENANCE ESP-3 Civil
CIVIL MAINTENANCE CPP NH road Civil
CIVIL MAINTENANCE Unit-3 Civil
MECHANICAL MAINTENANCE AC_VENTILATION Mechanical
MECHANICAL MAINTENANCE UNIT # 6 BOWL MILL Mechanical
MECHANICAL MAINTENANCE Primary air duct at Air preheater outlet Mechanical
MECHANICAL MAINTENANCE FOPH#3 Pump-house Mechanical
MECHANICAL MAINTENANCE Unit-1 to 10 oil coolers Mechanical
MECHANICAL MAINTENANCE Turbine Area Mechanical
MECHANICAL MAINTENANCE Turbine Area Mechanical
MECHANICAL MAINTENANCE turbine & auxillary Mechanical
MECHANICAL MAINTENANCE TURBINE &AUXILLARY Mechanical
MECHANICAL MAINTENANCE TG AUX Mechanical
MECHANICAL MAINTENANCE TG AUX,UNIT#10 Mechanical
MECHANICAL MAINTENANCE TG AUX Mechanical
ENV & POLLN CONTROL IDWRS Operation
WATER TREATMENT PLANT Chemical House Operation
POWER HOUSE OPERATION RCPH-2 Operation
POWER HOUSE OPERATION UCR#7 & 8 C&I
POWER HOUSE OPERATION UNIT-9 HAGs Operation
POWER HOUSE OPERATION UNIT-10 TURBINE Operation
POWER HOUSE OPERATION UNIT-7 & 8 CONTROL OIL SYSTEM Operation
POWER HOUSE OPERATION UNIT-9,10 GLAND STEAM SYSTEM Operation
POWER HOUSE OPERATION UNIT 9 COMPRESSOR HOUSE Operation
ASPH 5 CONVEYING AIR COMPRESSOR
POWER HOUSE OPERATION HOUSE Operation
POWER HOUSE OPERATION UCR #7 & 8 Operation
POWER HOUSE OPERATION BOILER UNIT-7 Operation
POWER HOUSE OPERATION UNIT-8 CST INLET VALVE Operation
POWER HOUSE OPERATION Unit-10 condensor Operation
POWER HOUSE OPERATION Unit #1 Operation
POWER HOUSE OPERATION Unit #6 Operation
POWER HOUSE OPERATION Unit 3 Operation
POWER HOUSE OPERATION Unit 6 Operation
POWER HOUSE OPERATION Unit 1&2 Operation
POWER HOUSE OPERATION UNIT#7: TASH& BASH DRAIN FLASH TANK. Operation
POWER HOUSE OPERATION Unit 2&5 Operation
POWER HOUSE OPERATION UNIT #08 UCR Operation
POWER HOUSE OPERATION Unit #07 UCR Operation
POWER HOUSE OPERATION unit 1 Operation
POWER HOUSE OPERATION unit1 Operation
POWER HOUSE OPERATION unit1 Operation
POWER HOUSE OPERATION UNIT#7 & UNIT #8 Operation
POWER HOUSE OPERATION UNIT#7 CONDENSER Operation
POWER HOUSE OPERATION Bunker-A UNIT#7 Operation
POWER HOUSE OPERATION RCPH-1/RCW-1A Operation
POWER HOUSE OPERATION #7 & #8 UCR Operation
POWER HOUSE OPERATION CT Pump Operation
POWER HOUSE OPERATION UNIT-9 AND 10 STARTING EJECTOR Operation
POWER HOUSE OPERATION Unit#9&10 DM makeup p/p area Operation
POWER HOUSE OPERATION Unit#10 BFP ACW line v/v operation. Operation
POWER HOUSE OPERATION Unit#10 seal air fan Operation
POWER HOUSE OPERATION Economiser Operation
POWER HOUSE OPERATION Water Wall Soot Blowing Operation
POWER HOUSE OPERATION UNIT-7 BOTTOM ASH AREA Operation
POWER HOUSE OPERATION compressor house-1 Operation
POWER HOUSE OPERATION ESP 7 Operation
POWER HOUSE OPERATION #7-SEAL AIR FAN Operation
POWER HOUSE OPERATION #8 clinker grinder Operation
POWER HOUSE OPERATION RCPH-1 Operation
POWER HOUSE OPERATION UNIT-#8 Operation
POWER HOUSE OPERATION ESP 4 Operation
POWER HOUSE OPERATION TASH Header Unit-1 Operation
POWER HOUSE OPERATION DCS of unit 9 and 10 Operation
POWER HOUSE OPERATION near condenser 10 boiler side Operation
POWER HOUSE OPERATION ESP 10 3rd field Operation
POWER HOUSE OPERATION ESP-5 CONTROL ROOM Operation
POWER HOUSE OPERATION UNIT 8 BOTTOM ASH OVERFLOW SYSTEM Operation
POWER HOUSE OPERATION UNIT-4 DCS Operation
POWER HOUSE OPERATION MOT-6 COOLER AREA GR IV
POWER HOUSE OPERATION GROUP-IV Operation
POWER HOUSE OPERATION UNIT-4 DCS GROUP-IV
POWER HOUSE OPERATION UNIT-6 ESP GROUP-IV
POWER HOUSE OPERATION UNIT-7 GSC Operation
POWER HOUSE OPERATION UNIT-7 HP HEATERS Operation
POWER HOUSE OPERATION DCS,UCR Operation
POWER HOUSE OPERATION UNIT-7,8 BASH HEADER Operation
POWER HOUSE OPERATION UNIT-9 EJECTOR FLOOR (4.5 MTR) Operation
POWER HOUSE OPERATION CWPH AND AWPH-1 Operation
POWER HOUSE OPERATION unit 9 and 10 DCS Operation
POWER HOUSE OPERATION UNIT 7 DCS Operation
POWER HOUSE OPERATION UNIT 7& 8 C&I
POWER HOUSE OPERATION Unit 8 scanner air fan Operation
OPERATION SUPPORT FOPH-3 OPERATION SUPPORT
POWER HOUSE OPERATION U10-Boiler EEMD
WATER TREATMENT PLANT SLUDGE PUMP HOUSE W.T.PLANT OPN
WATER TREATMENT PLANT CLPH W.T.PLANT
WATER TREATMENT PLANT Chemical house Operation
WATER TREATMENT PLANT CLP Operation
WATER TREATMENT PLANT DM plant Operation
WATER TREATMENT PLANT DM plant Operation
COAL HANDLING PLANT Conv.6A Head chute at TP-5 Operation
COAL HANDLING PLANT BC-104 to Conv.2A chute at JH-3. Operation
CAPTIVE RAIL SYSTEM CRS Cabin-B Electrical
ELECTRICAL MAINTENANCE Electrical Annex 3, 7.5mtr, Power House Electrical
COAL HANDLING PLANT Belt Conveyor BC-120 Mechanical
COAL HANDLING PLANT coal conveyor BC-121 Mechanical
COAL HANDLING PLANT Coal conveyor BC-116 tail end. Mechanical
COAL HANDLING PLANT BC-104 Conveyor Mechanical
COAL HANDLING PLANT Recliamer-4 Mechanical
MECHANICAL MAINTENANCE UTILITY Mechanical
MECHANICAL MAINTENANCE Mechanical
ENV & POLLN CONTROL Tech-II, Conference Hall E&S
C&I MAINTENANCE UPS C&I
COAL HANDLING PLANT PMMC-1 HT Switchgear Electrical
COAL HANDLING PLANT BC-120 C&I
POWER HOUSE OPERATION Unit 9 MRHC 5 area Operation
POWER HOUSE OPERATION unit 7 HPH 5 area Operation
MECHANICAL MAINTENANCE CT PUMP HOUSE-II Mechanical
POWER HOUSE OPERATION BFP 7A & 7B Mechanical
POWER HOUSE OPERATION UNIT#7 BFP-A&B Mechanical
POWER HOUSE OPERATION unit 7 and 8 bottom ash area Operation
Project Type HOD PersNo HOD Name Dept.Cd.
Time Saving 04686 Rabindra Kumar 010
Ease in Maintenance 04686 Rabindra Kumar 010
Safety 04686 Rabindra Kumar 010
Ease in Operation 01924 Nihar Ranjan Mohanty 040
Availability 01255 Soubhagya Ranjan Nayak 040
Productivity 01255 Soubhagya Ranjan Nayak 040
Availability 01255 Soubhagya Ranjan Nayak 040
Productivity 01255 Soubhagya Ranjan Nayak 040
Productivity 01255 Soubhagya Ranjan Nayak 040
Ease in Operation 01924 Nihar Ranjan Mohanty 040
Energy Saving 01924 Nihar Ranjan Mohanty 040
Productivity 01255 Soubhagya Ranjan Nayak 040
Housekeeping 01957 Pradeepta Kishore Mohanty 063
Ease in Maintenance 01957 Pradeepta Kishore Mohanty 063
Safety 01957 Pradeepta Kishore Mohanty 063
Productivity 01957 Pradeepta Kishore Mohanty 063
Quality 01957 Pradeepta Kishore Mohanty 063
Housekeeping 01957 Pradeepta Kishore Mohanty 063
Ease in Maintenance 01957 Pradeepta Kishore Mohanty 063
Cost Saving 01957 Pradeepta Kishore Mohanty 063
Productivity 01957 Pradeepta Kishore Mohanty 063
Availability 01957 Pradeepta Kishore Mohanty 063
Energy Saving 01957 Pradeepta Kishore Mohanty 063
Ease in Maintenance 01319 Bikram Kishore Nandi 067
Safety 02390 Jacob Dayakar 050
Safety 02390 Jacob Dayakar 050
Safety 02390 Jacob Dayakar 050
Energy Saving 02390 Jacob Dayakar 050
Quality 02390 Jacob Dayakar 050
Cost Saving 02390 Jacob Dayakar 050
Housekeeping 02390 Jacob Dayakar 050
Quality 02390 Jacob Dayakar 050
Safety 02390 Jacob Dayakar 050
Ease in Maintenance 02390 Jacob Dayakar 050
Safety 02390 Jacob Dayakar 050
Ease in Maintenance 02390 Jacob Dayakar 050
Quality 02390 Jacob Dayakar 050
Safety 02390 Jacob Dayakar 050
Quality 01299 Satchidananda Mishra 024
Availability 01952 Nirod Kumar Rout 021
Availability 01952 Nirod Kumar Rout 022
Ease in Maintenance 01952 Nirod Kumar Rout 022
Quality 01952 Nirod Kumar Rout 022
Availability 01952 Nirod Kumar Rout 023
Availability 01952 Nirod Kumar Rout 023
Ease in Maintenance 01952 Nirod Kumar Rout 023
Ease in Maintenance 01952 Nirod Kumar Rout 023
Quality 01952 Nirod Kumar Rout 023
Quality 01952 Nirod Kumar Rout 023
Safety 01952 Nirod Kumar Rout 023
Productivity 01299 Satchidananda Mishra 013
Availability 01299 Satchidananda Mishra 013
Ease in Operation 01931 Manoranjan Acharya 051
Productivity 01931 Manoranjan Acharya 051
Productivity 01931 Manoranjan Acharya 055
Availability 01931 Manoranjan Acharya 055
Productivity 01931 Manoranjan Acharya 055
Quality 01931 Manoranjan Acharya 055
Energy Saving 01931 Manoranjan Acharya 055
Safety 01931 Manoranjan Acharya 055
Availability 01931 Manoranjan Acharya 052
Safety 01931 Manoranjan Acharya 052
Ease in Operation 01931 Manoranjan Acharya 052
Safety 01931 Manoranjan Acharya 052
Ease in Operation 01931 Manoranjan Acharya 052
Ease in Operation 01931 Manoranjan Acharya 052
Availability 01931 Manoranjan Acharya 052
Productivity 01931 Manoranjan Acharya 052
Availability 01931 Manoranjan Acharya 052
Productivity 01931 Manoranjan Acharya 052
Productivity 01931 Manoranjan Acharya 052
Productivity 01931 Manoranjan Acharya 052
Energy Saving 01931 Manoranjan Acharya 052
Productivity 01931 Manoranjan Acharya 052
Productivity 01931 Manoranjan Acharya 052
Productivity 01931 Manoranjan Acharya 052
Ease in Operation 01931 Manoranjan Acharya 052
Ease in Operation 01931 Manoranjan Acharya 052
Ease in Operation 01931 Manoranjan Acharya 052
Ease in Operation 01931 Manoranjan Acharya 052
Ease in Operation 01931 Manoranjan Acharya 052
Safety 01931 Manoranjan Acharya 052
Productivity 01931 Manoranjan Acharya 052
Safety 01931 Manoranjan Acharya 052
Safety 01931 Manoranjan Acharya 052
Availability 01931 Manoranjan Acharya 052
Availability 01931 Manoranjan Acharya 052
Energy Saving 01931 Manoranjan Acharya 052
Availability 01931 Manoranjan Acharya 053
Ease in Operation 01931 Manoranjan Acharya 054
Safety 01931 Manoranjan Acharya 054
Safety 01931 Manoranjan Acharya 054
Safety 01931 Manoranjan Acharya 054
Housekeeping 01931 Manoranjan Acharya 054
Ease in Operation 01931 Manoranjan Acharya 054
Safety 01931 Manoranjan Acharya 054
Ease in Operation 01931 Manoranjan Acharya 054
Ease in Operation 01931 Manoranjan Acharya 054
Productivity 01931 Manoranjan Acharya 054
Productivity 01931 Manoranjan Acharya 054
Safety 01931 Manoranjan Acharya 054
Productivity 01931 Manoranjan Acharya 054
Time Saving 01931 Manoranjan Acharya 054
Safety 01931 Manoranjan Acharya 054
Ease in Operation 01931 Manoranjan Acharya 054
Ease in Operation 01931 Manoranjan Acharya 054
Safety 01931 Manoranjan Acharya 054
Quality 01931 Manoranjan Acharya 054
Safety 01931 Manoranjan Acharya 054
Ease in Operation 01931 Manoranjan Acharya 054
Cost Saving 01931 Manoranjan Acharya 054
Cost Saving 01931 Manoranjan Acharya 054
Ease in Operation 01931 Manoranjan Acharya 054
Ease in Operation 01931 Manoranjan Acharya 054
Ease in Operation 01931 Manoranjan Acharya 054
Ease in Operation 01931 Manoranjan Acharya 054
Quality 01931 Manoranjan Acharya 054
Ease in Maintenance 01321 Bikash Chandra Ghadei 014
Energy Saving 01289 Surendra Kumar Naik 019
Ease in Operation 01881 Sourindra Mohan Sahu 012
Productivity 01881 Sourindra Mohan Sahu 012
Ease in Operation 01881 Sourindra Mohan Sahu 012
Safety 01881 Sourindra Mohan Sahu 012
Housekeeping 01881 Sourindra Mohan Sahu 012
Housekeeping 01881 Sourindra Mohan Sahu 012
Safety 01954 Bhula Nath Adha 062
Time Saving 01954 Bhula Nath Adha 062
Availability 01319 Bikram Kishore Nandi 064
Productivity 01277 Lakshmi Kanta Swain 030
Cost Saving 01957 Pradeepta Kishore Mohanty 063
Cost Saving 01957 Pradeepta Kishore Mohanty 063
Safety 01957 Pradeepta Kishore Mohanty 063
Time Saving 01957 Pradeepta Kishore Mohanty 063
Ease in Operation 01957 Pradeepta Kishore Mohanty 063
Productivity 01299 Satchidananda Mishra 046
Productivity 01299 Satchidananda Mishra 046
Safety 07178 Padmalochan Pradhan 078
Safety 01900 Girija Sankar Ray 040
Safety 01277 Lakshmi Kanta Swain 064
Safety 01277 Lakshmi Kanta Swain 064
Safety 01931 Manoranjan Acharya 054
Ease in Operation 01931 Manoranjan Acharya 054
Productivity 01952 Nirod Kumar Rout 023
Ease in Maintenance 01952 Nirod Kumar Rout 023
Productivity 01952 Nirod Kumar Rout 023
Ease in Operation 01931 Manoranjan Acharya 054
Dept.Name
ASH MANAGEMENT
ASH MANAGEMENT
ASH MANAGEMENT
C & I (OFFICE)
C & I (OFFICE)
C & I (OFFICE)
C & I (OFFICE)
C & I (OFFICE)
C & I (OFFICE)
C & I (OFFICE)
C & I (OFFICE)
C & I (OFFICE)
C.H.P (MECH.MAINT)
C.H.P (MECH.MAINT)
C.H.P (MECH.MAINT)
C.H.P (MECH.MAINT)
C.H.P (MECH.MAINT)
C.H.P (MECH.MAINT)
C.H.P (MECH.MAINT)
C.H.P (MECH.MAINT)
C.H.P (MECH.MAINT)
C.H.P (MECH.MAINT)
C.H.P (MECH.MAINT)
C.R.S
CIVIL ENGG. DEPT
CIVIL ENGG. DEPT
CIVIL ENGG. DEPT
CIVIL ENGG. DEPT
CIVIL ENGG. DEPT
CIVIL ENGG. DEPT
CIVIL ENGG. DEPT
CIVIL ENGG. DEPT
CIVIL ENGG. DEPT
CIVIL ENGG. DEPT
CIVIL ENGG. DEPT
CIVIL ENGG. DEPT
CIVIL ENGG. DEPT
CIVIL ENGG. DEPT
M.M. AC VENT & SHIFT
MECH MAINT(BOWLMILL)
MECH MAINT,BLR & AUX
MECH MAINT,BLR & AUX
MECH MAINT,BLR & AUX
MECH MAINT,TUR & AUX
MECH MAINT,TUR & AUX
MECH MAINT,TUR & AUX
MECH MAINT,TUR & AUX
MECH MAINT,TUR & AUX
MECH MAINT,TUR & AUX
MECH MAINT,TUR & AUX
MECH MAINT. WT PLANT
MECH MAINT. WT PLANT
OPRN DEPT. GROUP -I
OPRN DEPT. GROUP -I
OPRN DEPT. G-SHIFT
OPRN DEPT. G-SHIFT
OPRN DEPT. G-SHIFT
OPRN DEPT. G-SHIFT
OPRN DEPT. G-SHIFT
OPRN DEPT. G-SHIFT
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - II
OPRN DEPT.GROUP - III
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
OPRN.SUPP.OFFICE
TECHNICAL SERVICE
WATER TRATMENT PLANT
WATER TRATMENT PLANT
WATER TRATMENT PLANT
WATER TRATMENT PLANT
WATER TRATMENT PLANT
WATER TRATMENT PLANT
C.H.P (OPERATION)
C.H.P (OPERATION)
C.H.P (ELECT.MAINT)
ELEC.MAINT(OFFICE)
C.H.P (MECH.MAINT)
C.H.P (MECH.MAINT)
C.H.P (MECH.MAINT)
C.H.P (MECH.MAINT)
C.H.P (MECH.MAINT)
MECHANICAL UTILITY
MECHANICAL UTILITY
SAFETY
C & I (OFFICE)
C.H.P (ELECT.MAINT)
C.H.P (ELECT.MAINT)
OPRN DEPT.GROUP - IV
OPRN DEPT.GROUP - IV
MECH MAINT,TUR & AUX
MECH MAINT,TUR & AUX
MECH MAINT,TUR & AUX
OPRN DEPT.GROUP - IV