Activity ID Activity Name DISCIPLINE Original Durat
CONSTRUCTION (VCCI) 256
100 Bagbag WRF Modification/ Upgrade Works 164
100 Rehabilitation Sequence 155
SBR 1 94
*Install Temporary Line & Pump to Divert flow from nitake
100HCCMN0101 to SBR1 Mech 11
100HCCMN0102 *Stop, Drain, Disinfect No.1 SBR tank Mech 16
100HC8001001 *Conduit / Trays E&I 20
100HC8001003 *Cabling Installation / Termination E&I 17
*Improve aeration control to Automate the VFD
100HC7000113 adjustment at SCADA Room (Existing) E&I 10
Decanter SBR 1 103
100HC30001001 Steel Fabrication / Delivery Mech 22
*Personnel access platform, around the decanter for
100HC30001002 Maintenance Civil 25
*Construction/installation of support railings, and toe
100HC30001003 boards in the SBR tanks Civil 25
100HC8001005 Conduits / Tray,Cabling Installation / Termination E&I 24
100HC7000107 *Float level Switch E&I 3
100HC7000104 *Installation of secondary protection such as Pressure E&I 3
100HC7000108 *Electrode level Switch E&I 3
*Integrate decanter controls PLC in the SCADA room
100HC7000111 (Existing) E&I 12
100HCPRE00101 *Testing & Precomm T&C 7
Dewatering Room 46
*Screw Conveyor with Receiving Hopper for dewatered
100HC5001001 sludge Mech 15
100HC5001002 Rehabilitation of Return Filtrate Line of Dewatering System Mech 22
100HC5001003 *Return Liquire Pump Mech 4
Installation / Replacement of sludge flowmeters *Thermal
100HC7000114 Mass Gas Flow Meters Mech 4
Installation / Replacement of sludge flowmeters
100HC7000116 (*Electromagnetic Flow Meter) Mech 4
100HC5001004 *Install waste bin for dewatered sludge Mech 4
100HC5001005 *Air compressor (including Dehumidifier) Mech 5
SBR 2 38
*Install Temporary Line & Pump to Divert flow from nitake
100HCCMN0103 to SBR2 Mech 11
100HCCMN0104 *Stop, Drain, Disinfect No.1 SBR tank No.2 SBR tank Mech 16
100HC8001008 *Conduit / Trays E&I 20
100HC7000121 *Residual Chlorine analyzer E&I 3
100HC8001011 *Cabling Installation / Termination E&I 12
100HC7000126 *Ammonia & Nitrates analyzer installation E&I 3
100HC7000127 *Level Indicating Transmitter (Ultrasonic Type) E&I 3
*Improve aeration control to Automate the VFD
100HC7000130 adjustment at SCADA Room E&I 10
100HC7000132 *pH meter E&I 3
Decanter SBR 2 30
*Personnel access platform, around the decanter for
100HC30001005 Maintenance Civil 18
*Construction/installation of support railings, and toe
100HC30001007 boards in the SBR tanks Civil 25
100HC8001010 Conduits / Tray,Cabling Installation / Termination E&I 12
100HC7000118 *Installation of secondary protection Pressure Switch E&I 2
100HC7000125 *Float level Switch E&I 2
100HC7000128 *Electrode level Switch E&I 2
100HC7000123 *Integrate decanter controls PLC in the SCADA room E&I 12
100HCPRE00102 *Testing & Precomm T&C 7
Aeration 6
100HC7000119 For the aeration blowers *Thermal Mass Gas Flow Meters E&I 3
100HC7000120 For the aeration blowers *Electromagnetic Flow Meter E&I 3
CCT 53
*Fabrication Metal Pipe Material (incl. Galvanized Iron,
100HC6000101 Stainless Steel) Mech 23
100HC30001004 *Chlorine Tank Shelter Fabrication Mech 14
100HC2001001 *Foundation for New Chemical Dosing System Mech 17
*Installation Metal Pipe Material (incl. Galvanized Iron,
100HC6000102 Stainless Steel) Mech 30
100HC30001006 *Chlorine Tank Shelter - Installation Mech 14
100HC8001009 *Conduits / Tray,Cabling Installation / Termination E&I 12
100HC4000301 Container for Sodium acetate Mech 18
100HC4000302 Hazardous Waste Storage Shelter Mech 18
100HC7000124 *Replacement of Residual Chlorine analyzer Mech 4
100HC5001006 *New PAC Storage Tank Mech 4
100HC4000303 Chemical Housing for New Chemical Dosing System Mech 18
100HC5001007 *New PAC dosing pumps Mech 4
100HC8001012 *Conduit / Tray / Cabling Nstallation / Termination E&I 18
100HC5001008 *Sodium Acetate Dissolution Unit Mech 4
100HC5001009 *NaOH storage tanks Mech 4
100HC5001010 *Sodium Acetate dosing pump Mech 4
100HC6000103 *Pressute Test Mech 16
100HC5001011 *NaOH dosing pump Mech 4
100HC5001012 *Install UV protection and ventilation Mech 2
100HC30001017 Fire Protection (emergency Shower) Mech 5
100HC8001013 *Install new MCC at Existing electrical room Mech 9
100HC7000133 *Relocate Existing flow meter from Divert line to new line Mech 5
100HC6000104 *Valves Installation & Test Mech 7
Others 132
Paving & Fencing Repair 77
100HC1001003 Paving Access path to the different facilities Civil 27
100HC1001004 Replacement of Defective Fencing Civil 15
100HC1001002 Earthworks (UG Trench) Civil 32
Re-painting & De-rusting 92
100HCA000102 SBR1 Painting Civil 16
100HCA000104 De-rusting of steel ladders, railings, gratings, and pipes. Civil 24
100HCA000105 Re-painting of existing buildings, and process tanks Civil 16
100HCA000108 SBR2 Painting Civil 16
Demolition 7
100HCDEM0101 DIsmantling of Eqpts Gen 7
Inspection & Precommissioning 9
100HCPRE00103 *Precommision (Dry / Wet Test) T&C 9
200 Congressional WRF Modification/ Upgrade Works 159
Rehabilitation Sequence 149
CCT Chlorine Contact Tank 118
200HCCMN00210Shift Existing Disinfection Gen 4
Shift the position of Existing disinfection unit for keep area
200HCCMN00210of civil work Gen 4
200HC30002001 New Buiding Foundation Civil 28
Divert Existing effluent line with Flow meter for keep area
200HCCMN00210of civil work Gen 5
200HC40001101 New Chemical Building beside SBR2 Mech 69
200HC40001102 New Hazardous Waste Shelter Mech 50
200HC30002002 New Disinfection Buiding at CCT Shelter Mech 44
200HC20002001 New Stair at L/S Civil 46
200HC8001006 Conduits / Tray,Cabling Installation / Termination E&I 23
200HC50002011 Carbon Source Preparation system Mech 4
200HC50002012 Chlorine dosing pump Mech 4
200HC50002016 PAC storage tank Mech 5
200HC50002018 PAC dosing pump Mech 4
200HC50002019 Carbon Source dosing pump Mech 4
200HC50002020 Lifting Device for Chemical filling Mech 4
200HC50002022 Water Supply Unit Mech 5
STP / SBR Section 47
Install temporary pump into Inlet chamber, then stop
200HCCMN00210water by sand bag Mech 8
200HC10002001 Excavation Between INlet Chamber & L/S Civil 12
200HC10002002 Manhole construction for Valve (Precast) Civil 18
200HC50002001 Install New Inlet Valve Mech 3
Recover Operation Condition to Remove Temporary
200HCCMN00210Facilities Gen 3
200HCPRE02001 Precommissioning (Wet Test Actual Influent Sewage) T&C 10
CCT / SBR 2 Tank 56
200HC60002001 FAbrication of Piping Mech 22
Install Suction pipe & Others into new Building / Chlorine
200HC60002003 contact tank (CCT) Mech 17
200HC70002002 Conduit, Tray, Cabling, Termination E&I 18
200HC70002103 Local Control Panel E&I 8
200HC60002005 Piping Test Mech 9
200HC70002003 Install new MCC at Existing electrical room E&I 12
200HC70002104 Relocate Existing flow meter from Divert line to new line Mech 3
200HC60002004 Instal Valves Mech 3
200HC60002011 Changeover valve Mech 3
200HCPRE02002 Precommision (Dry / Wet Test) T&C 15
CCT Effluent Pump 13
200HCDEM00110Demolish existing effluent pump and pipe Mech 9
200HC50002030 Lifting Device for Effluent pump Mech 4
200HC50002031 Effluent Pump Mech 4
Blower Room 51
Build foundation for Existing small blower and new no.3
200HC20002002 blower Civil 16
200HC50002002 Relocate the existing small blower to new foundation Mech 2
200HCDEM00110Dismantling of Existing Blower C Mech 4
200HC70002131 New foundation for blower C Mech 10
200HC50002013 Lifting Device for Blower Mech 3
200HC50002003 Install new blower C Mech 2
200HC60002002 Install new Duct Pipe for blower C Mech 5
200HCDEM00110Dismantling of Existing Blowers A&B Mech 2
200HC20002004 New foundation for New no.A & B blowers Mech 10
200HC50002023 Install New Blowers A&B Mech 2
200HC60002012 Install Remaining new Duct Pipe for blowers Mech 12
SBR 1 33
200HCCMN00210Stop, Drain, Disinfection No.1 SBR tank Mech 16
200HC50002004 Decanter for no.1 SBR Mech 3
200HC50002005 Install new submersible Mixer Mech 3
200HC50002008 Replace all air diffuser for no.1 SBR Mech 5
200HC50002006 Install Decanter Pumps Mech 5
200HC50002009 Excess Sludge Pump Mech 5
PLC Panel (programing and SCADA/HMI development)
200HC70002102 SBR1 E&I 16
200HC50002010 Lifting Device for SBR Mech 3
200HC70002001 Conduit, Trat, Cabling Installation / Termination E&I 8
SBR 2 35
200HC30002004 Build Platform around SBR Civil 22
200HCCMN00210Stop, Drain, Disinfection of No.2 SBR tank Mech 15
200HC50002024 Decanter for no.2 SBR Mech 3
200HC50002026 Install new submersible Mixer Mech 3
200HC50002025 Replace all air diffuser for no.1 SBR Mech 5
200HC50002027 Install Decanter Pumps Mech 5
200HC50002028 Excess Sludge Pump Mech 5
PLC Panel (programing and SCADA/HMI development)
200HC70002108 SBR2 E&I 11
200HC50002029 Lifting Device for SBR Mech 5
200HC70002005 Conduit, Trat, Cabling Installation / Termination E&I 8
Instrumentation 23
200HC70002004 Conduit, Trat, Cabling Installation / Termination E&I 27
200HC70002105 Electrode level Switch E&I 2
200HC70002106 Level Indicating Transmitter (Ultrasonic Type) E&I 2
200HC70002107 Electromagnetic Flow Meter E&I 2
200HC70002110 Orifice Type Flow Meters (Local indication) E&I 2
200HC70002111 Pressure Indicating Transmitter E&I 2
200HC70002112 Temperature Sensor and Transmitter E&I 2
200HC70002113 DO meter E&I 2
200HC70002114 pH meter E&I 2
200HC70002115 ORP meter E&I 2
200HC70002116 Ammonium and Nitrates analyzer E&I 2
200HC70002117 Residual Chlorine analyzer E&I 2
200HC70002118 Float level Switch E&I 2
200HC70002119 Pressure Switch E&I 2
200HC70002120 Vibration Sensor for Motor E&I 2
200HC70002121 Temperature Sensor for Motor E&I 2
Others - Existing Facility 65
200HCA000104 SBR1 Painting Civil 12
200HC40001104 Exterior and Interior Finishing Civil 36
200HC40001103 Heating, Ventilation & Air Conditioning (HVAC) Mech 12
200HCA000106 SBR2 Painting Civil 14
Inspection & Precommissioning 9
200HCPRE103 *Precommision (Dry / Wet Test) T&C 9
300 Project 7 SSpTP Modification/ Upgrade Works 183
Rehabilitation Sequence 172
SBR 3 & Dewatering Press 1,2 11
Operation stop and Close the penetrate pipe by Stop
300HCCMN01001flange Mech 4
Set Temporary pump for pumping to Dewatering press,
300HCCMN01002and Lay Temporary pipe Mech 7
Septage Acceptance Unit 55
300HC60001001 Piping Fabrication Mech 12
300HC50001001 Replace Stone trap for no.1,2 SAU Mech 7
Install Penetrate Pipe at Floor of Septage Area discharging
300HC60001002 to SBR3 Mech 2
300HC60001003 Install Piping (Drain & Spool from Stone trap) Mech 10
300HCDEM00100Demolition of Dry Wall Civil 3
300HC10001002 New Masonry Wall (Replacing Dry Wall) Civil 6
300HC50001012 Temporary manual bar screen Installation Civil 3
Septage Dewatering Unit 34
300HC50001002 Install Support for NEw Conveyor Mech 6
300HC50001003 Install New Conveyor with Modification of Chute Mech 7
300HC30001001 Install Guard Rail Mech 12
300HCPRE01001 Dry Test T&C 5
Cover Existing conveyor, No.1,2 chute - FRP cover / Install
300HC50001021 Liftiing device Mech 4
Septage Holding Tank 68
SBR3 tank to receive Septage - Temporary Bypass
300HCCMN01003installation / Temp Pump Mech 5
Install Temporary pump & Piping from No.3 SBR to feed
300HCCMN01004septage to Existing dewatering press Mech 12
300HC60001004 Dewatering of Septage Holding Tank Mech 12
300HCDEM00100Demolish Existing Pump & Piping (except one line) Mech 7
300HC50001004 Effluent Transfer Pump at Dewatering Room Mech 4
300HC50001006 Lifting device for Septage feed pump Mech 4
300HC50001007 Lifting Device for Mixer, Sludge extraction pump Mech 4
300HC50001009 Lifting Hoist for Effluent Transfer Pump Mech 4
300HC50001010 Septage Feed Pump Mech 4
300HCPRE01002 Precommissioning T&C 7
Electrical Room 46
300HC80001001 Installation of New MCC E&I 12
300HC80001003 Complete PLC panel E&I 12
300HC80001004 Cabling / Termination Works / Inspection E&I 9
Odor Control / Scrubber Area 36
300HCDEM00100Demolish Existing Duct Mech 8
300HC80001075 Foundation for New Odor Control Unit Civil 9
Install New Odor Control Unit Ducting (Support / Including
300HC50001018 Scaffolding) Mech 22
300HC50001019 Install New Odor Control Unit Mech 6
300HC50001023 Fan for Odor Control unit Mech 5
Chlorine Dosing Area 53
300HCDEM00100Chlorine Dosing Area - Demolish 6 Dosing Pumps Mech 7
300HC50001008 Install Chlorine dosing pump Mech 9
300HC60001005 Chlorine Dosing Area - Piping (Including Test) Mech 24
300HC70001002 PLC Panel (programing and SCADA/HMI development) E&I 15
300HC80001085 Emergency Eye Wash Mech 3
300HC80001005 Complete Cabling / Termination E&I 12
300HCPRE01003 Pre-commissioning (Dry/Wet) T&C 7
Instrument 17
300HC70001003 Conduits / Wiring & Termination E&I 18
300HC70001004 Cable Float level Switch E&I 2
300HC70001005 Level Indicating Transmitter (Ultrasonic Type) E&I 2
300HC70001006 Electromagnetic Flow Meter E&I 2
300HC70001007 Thermal Mass Gas Flow Meters E&I 2
300HC70001008 DO meter E&I 2
300HC70001009 pH meter E&I 2
300HC70001010 ORP meter E&I 2
300HC70001012 Electrode level Switch E&I 2
300HC70001013 Ammonium and Nitrates analyzer E&I 2
300HC70001014 Residual Chlorine analyzer E&I 2
300HC70001015 Pressure Switch E&I 2
300HC70001017 Float level Switch E&I 2
SBR 3 21
Stop operation and Drain no.3 SBR /discharge to Septage
300HCCMN01005holding tank by Temp Pump Mech 12
300HCDEM00100Demolish Existings Civil 3
300HC50001005 Sludge Extraction Pump Mech 3
300HC80001035 Cover the surface of Septage holding tank - FRP cover Mech 2
300HC80001045 Cabling / Wiring & Termination E&I 10
300HC50001016 Install Decanter Mech 2
300HC50001017 Install Decanter Pump Mech 2
300HC60001006 Install Piping (Including Test) / Reinstatement Mech 6
300HC50001020 Install New Mixer Mech 2
300HC50001022 Replace Equipments (Air Diffuser) Mech 3
SBR 2 25
Stop operation and Drain no.2 SBR /discharge to Septage
300HCCMN01006holding tank by Temp Pump Mech 12
300HCDEM00100Demolish Existings Mech 2
300HC50001025 Install Decanter Mech 2
300HC80001055 Sludge Extraction Pump Mech 3
300HC50001026 Install New Mixer Mech 2
300HC60001007 Install Piping (Including Test) Mech 6
300HC70001018 Cabling / Wiring & Termination Mech 10
300HC50001027 Install Decanter Pump Mech 2
300HC50001028 Replace Equipments (Air Diffuser) Mech 3
Tertiary Treatment System 30
Stop operation of Tertiary treatment and Demolish all
300HCDEM00100 equipment's / pipe Mech 14
300HC20001002 Foundation for new Chemical dosing system (Polymer) Civil 19
300HC50001033 Install Air Compressor for Polymer system Mech 2
300HC50001036 Install Carbon Source & Polymer Preparation system Mech 3
300HC50001034 Install Carbon Source dosing system Mech 2
300HC50001035 Install Polymer dosing system Mech 3
300HC50001011 Install PAC dosing pump Mech 2
300HC50001014 PAC storage tank Mech 2
300HCPRE01006 Pre-commissioning T&C 7
SBR 1 27
Stop operation and Drain no.1 SBR to discharge Septage
300HCCMN01011holding tank bytemp pump Mech 12
300HCDEM00101Demolish Existings Mech 3
300HC50001030 Install Decanter Mech 2
300HC50001031 Install New Mixer Mech 2
300HC60001010 Install Piping (Including Test) Mech 7
300HC70001019 Cabling / Wiring & Termination E&I 9
300HC50001032 Sludge Extraction Pump Mech 2
300HC50001037 Replace Equipments (Air Diffuser) Mech 4
300HC80001065 Install Decanter Pump Mech 2
Effluent Holding Tank 26
Install Temporary pipe from Discharge decanter of No.2,3
300HCCMN01007SBR to CCT - Bypass of Effluent holding tank Mech 6
Discharge to Chlorine Contact tank by the existing effluent
300HCCMN01008pump and Temp PUMP Mech 4
300HC50001024 Replace Effluent transfer pump Mech 3
300HC60001008 Install new Piping Mech 5
300HC80001025 Install Flow Meter Mech 2
300HCPRE01004 Precomissioning (Dry/Wet) T&C 7
Install Temporary pipe for Bypass of chlorine contact tank
300HC60001009 to replace Flow meter Mech 5
300HCCMN01009By Temporary pump, drain the manhole of Flow meter Mech 3
300HCCMN01010Stop water in Effluent manhole by Sand bag Mech 2
300HC50001029 Replace flow meter and recover all temporary after install Mech 2
Others Works 109
Steel Structures / Platforms Repair 48
300HC30001002Steel PLatforms/ Shelter Fabrication Civil 30
300HC30001003Steel PLatforms / Handrail repair Civil 18
300HC30001004Steel Support Civil 18
Existing Facility Demolition 92
300HC40002002Electrical E&I 36
300HCA0002002Re-Painting Of SBR3 Internal Civil 10
300HCA0002003Re-Painting & De-rusting Civil 33
300HC40002003Fire Protection Civil 10
300HCA0002004Re-Painting Of SBR2 Internal Civil 10
300HCA0002005Re-Painting Of SBR1 Internal Civil 10
Other Works Installation 23
300HC40002001Cannopy Repair Civil 23
Inspection & Precommissioning 15
300HCPRE113 *Precommision (Dry / Wet Test) T&C 15
400 Tatalon WRF Modification/ Upgrade Works 138
400 Rehabilitation Sequence 147
SBR 1 75
*Install Temporary Line & Pump to Divert flow from nitake
400HCCMN00101to SBR1 Mech 11
400HCCMN00102*Stop, Drain, Disinfect No.1 SBR tank Mech 16
400HC80001001 *Conduit / Trays E&I 14
400HC80001002 *Cabling Installation / Termination E&I 9
*Improve aeration control to Automate the VFD
400HC70001012 adjustment at SCADA Room (Existing) E&I 7
Decanter SBR 1 85
400HC30001001 Steel Structure Fabrication Civil 22
*Personnel access platform, around the decanter for
400HC30001002 Maintenance Civil 18
*Construction/installation of support railings, and toe
400HC30001003 boards in the SBR tanks Civil 28
100HC8001002 Conduits / Tray,Cabling Installation / Termination E&I 19
400HC70001001 *Installation of secondary protection such as Pressure Mech 3
400HC70001003 *Float level Switch E&I 3
400HC70001007 *Electrode level Switch E&I 3
*Integrate decanter controls PLC in the SCADA room
400HC70001011 (Existing) E&I 12
400HCPRE00101 *Testing & Precomm T&C 5
Dewatering Room 63
*Screw Conveyor with Receiving Hopper for dewatered
400HC50001001 sludge Mech 15
400HC50001002 Rehabilitation of Return Filtrate Line of Dewatering System Mech 15
400HC50001003 Submersible Pumps Mech 4
100HC8001007 Conduits / Tray,Cabling Installation / Termination E&I 10
400HC50001004 *Install waste bin for dewatered sludg Mech 4
400HC50001006 *Air compressor (including Dehumidifier) Mech 5
SBR 2 53
*Install Temporary Line & Pump to Divert flow from nitake
400HCCMN00103to SBR2 Mech 10
400HCCMN00104*Stop, Drain, Disinfect No.2 SBR tank Mech 16
400HC80001003 *Conduit / Trays E&I 14
400HC80001004 *Cabling Installation / Termination E&I 10
400HC70001020 *Residual Chlorine analyzer E&I 3
400HC70001022 ORP Meter E&I 3
400HC70001023 *Ammonia & Nitrates analyzer installation E&I 3
400HC70001024 *Level Indicating Transmitter (Ultrasonic Type) E&I 3
*Improve aeration control to Automate the VFD
400HC70001029 adjustment at SCADA Room E&I 7
400HC70001030 *pH meter E&I 3
Decanter SBR 2 21
400HC70001015 *Integrate decanter controls PLC in the SCADA room E&I 10
*Personnel access platform, around the decanter for
400HC30001004 Maintenance Civil 18
*Construction/installation of support railings, and toe
400HC30001005 boards in the SBR tanks Mech 20
400HC70001017 *Installation of secondary protection such as Pressure E&I 2
400HC70001018 *Float level Switch E&I 2
400HC70001019 *Electrode level Switch E&I 2
400HCPRE00102 *Testing & Precomm T&C 7
Aeration 79
400HC70001002 For the aeration blowers *Thermal Mass Gas Flow Meters E&I 3
400HC70001021 For the aeration blowers *Electromagnetic Flow Meter E&I 3
CCT 74
400HC60001001 *Fabrication of Piping Mech 30
400HC40001001 *Chlorine Tank Shelter - Fabriction Mech 22
400HC20001001 *Foundation for New Chemical Dosing System Mech 18
400HC60001002 *Installation of Piping Mech 36
400HC40001002 *Chlorine Tank Shelter - Installation Mech 12
400HC50001005 *New PAC Storage Tank Mech 4
400HC40001003 *Hazardous Waste Storage Shelter Mech 16
400HC40001004 *Container for Sodium acetate Mech 16
400HC80001016 Emergency Eye Shower Mech 4
400HC40001005 *Chemical Housing for New Chemical Dosing System Mech 18
400HC50001007 *New PAC dosing pumps Mech 4
400HC80001005 *Conduit / Tray E&I 17
400HC60001003 *Pressure Test E&I 18
400HC50001009 *Sodium Acetate Dissolution Unit Mech 4
400HC50001008 *Install UV protection and ventilation Mech 2
400HC50001010 *Sodium Acetate dosing pump Mech 4
400HC50001011 *NaOH storage tanks Mech 4
400HC50001012 *NaOH dosing pump Mech 4
400HC70001031 *Replacement of Residual Chlorine analyzer Mech 4
400HC80001006 *Install new MCC at Existing electrical room E&I 11
400HC70001032 *Relocate Existing flow meter from Divert line to new line Mech 7
400HC80001026 Cabling Installation / Termination E&I 10
400HC60001005 Installation of Valves Mech 9
Others Works 92
Re-painting & De-rusting 92
400HCA0001002De-rusting of steel ladders, railings, gratings, and pipes. Civil 26
400HCA000109 SBR1 Painting Civil 16
400HCA0001001Re-painting of existing buildings, and process tanks Civil 22
400HC1001001 Earthworks (UG Trench) Civil 32
400HCA000107 SBR2 Painting Civil 16
Demolition 12
400HCDEM0010 DIsmantling of Eqpts Civil 12
Inspection & Precommissioning 14
400HCPRE00103 *Precommision (Dry / Wet Test) T&C 14
500 Paco WRF Modification/ Upgrade Works 232
Preliminaries 88
SOIL Investigation 38
500HC14001000 Subcontract Award (Soil Investigation) Gen 0
500HC14001001 Soil Investigation + Report Gen 26
Subcon Civil Deliverables 81
A1180 Subcontract Award (PACO Package) Gen 0
A1150 IFC Drawings (1st Issue) Foundations / Basin Gen 0
A1130 Rebar Testing Gen 0
Cutting List 1st Batch + Pre Bending prior delivery to site
A1120 (Foundations / Basin) Gen 24
A1000 Trial Mix concrete + Concrete Cylinder Test Complete Gen 0
A1010 Complete Pre-bended Bars + Delivery Gen 0
Isolation / Dewatering / Demolition 31
Site Preparation 24
Preparation needed documents and permit / Dewatering
500HCDEM00100 Preparation Gen 2
500HC10001001 Site Preparation Gen 2
500HC10001002 Temporary Drainage System if required Mech 20
500HC10001003 Temporary Sliding Gate for Site Entry Mech 3
Dewatering / Demollition of Train B 21
500HC5A240 Demolition Start Civil 0
500HCDEM00100Train B Isolating / Rerouting of pipelines Mech 2
500HCDEM00100Preparation of Temporary Bypass / Dewatering of Train B Mech 3
500HCDEM00100DIsmantling of Pumps (Lifting &Equalization Tanks) Mech 2
Train B Cutting of Platforms using oxy-acelylene/Lifting /
500HCDEM00100 Hauling Mech 4
500HCDEM00100Flushing / Cleaning inside FRP Mech 2
Train B FRP Johkasu Vessel Train A (MBR) (Cut, Transport &
500HCDEM00100 Handover) Mech 4
500HCDEM00100Train B Paving Demolition & Refurbishment Civil 2
Dewatering / Demollition of Train A 14
Train A Isolating / Rerouting of pipelines, Electrical,
500HCDEM00100 Structures Mech 2
500HCDEM00101Preparation of Temporary Bypass / Dewatering of Train A Mech 2
500HCDEM00101DIsmantling of Pumps (Lifting &Equalization Tanks) Mech 1
Train A Cutting of Platforms using oxy-acelylene - Lifting /
500HCDEM00101 Hauling Mech 4
500HCDEM00101Flushing / Cleaning inside FRP Mech 2
Train A FRP Johkasu Vessel Train A (MBR) (Cut, Transport &
500HCDEM00101 Handover) Mech 4
Train A Existing Storage facility Demolition & Paving
500HCDEM00101 Refurbishment Civil 2
Construction 144
Building & SBR 125
New Blower Rooms / Electrical Room 107
500HC40001001Surface Preparation Civil 3
500HC40001002Ground Floor - Slab Civil 9
A1020 1st Pour (Foundations) Civil 0
500HC40001004Ground Floor - Columns 1st & 2nd Lift Civil 20
A1030 Ground Floor Pouring (1st Lift) Civil 0
A1050 Ground Floor Pouring (2nd Lift) Civil 0
500HC40001008Second Floor - Elevated Beams Civil 13
A1040 2nd Flr Pouring (Elev Beams) Civil 0
500HC40001011Second Floor - Slab Civil 13
A1060 2nd Flr Pouring (Slab) Civil 0
500HC40001014Second Floor - Columns 1st & 2nd Lift Civil 20
A1070 2nd Floor Pouring (1st Lift) Civil 0
500HC40001019Ground Floor - Masonry & Plastering Civil 19
A1080 2nd Floor Pouring (2nd Lift) Civil 0
500HC40001023Roof Elevation - Roof Frame Civil 6
500HC40001026Roof Elevation - Steel Roof Civil 4
500HC40001027Finishes (Doors, Windows etc) Civil 18
A1090 Roof Deck Pouring (Beams) Civil 0
500HC40001030Painting Works Civil 16
500HC40001032Second Floor - Masonry & Plastering Civil 10
A1100 Complete Roof Civil 0
500HC8000797 Building Ready tno recieve Eqpts Mech 0
Disinfection Tank / Chemical Bldg) 99
500HC40001003Refurbishment of Slab for Foundation Works Civil 10
A400134620 1st Pour (Foundations) Civil 0
500HC40001005Concrete Wall (1st Lift) Civil 12
A400134630 Pouring (1st Lift) Civil 0
500HC40001007Concrete Wall (2nd Lift) Civil 12
A400134640 Pouring (2nd Lift) Civil 0
500HC40001010Second Floor - Slab Civil 12
500HC40001012Second Floor - Columns 1st & 2nd Lift Civil 22
500HC40001013Ground Floor - Masonry & Plastering Civil 18
500HC40001021Roof Elevation - Roof Steel Frame Civil 6
500HC40001022Finishes (Doors, Windows etc) Civil 21
500HC40001025Roof Elevation - Steel Roof Civil 7
500HC40001028Second Floor - Masonry & Plastering Civil 18
500HC40001033Painting Works Civil 15
SBR Tank A & B 71
500HC2000102 Refurbishment of Slab for Foundation Works Civil 12
500HC50001001Concrete Wall (1st Lift) Civil 22
500HC50001002Concrete Wall (2nd Lift) Civil 21
500HC50001003Surface Lining Civil 14
Laboratory & ENgineering Office 69
500HC40001006Ground Floor - Slab Civil 7
500HC40001009Ground Floor - Columns 1st & 2nd Lift Civil 22
500HC40001015Roof Elevation - Roof Frame Civil 6
500HC40001016Masonry & Plastering Civil 18
500HC40001017Roof Elevation - Roof Cladding Civil 5
500HC40001020Finishes (Doors, Windows etc) Civil 21
500HC40001029Painting Works Civil 12
Plumbing / Electrical /HVAC 55
500HC40001018PLUMBINGANDDRAINAGE (Conduits / Embedments) Mech 50
500HC40001024ELECTRICALWORKS E&I 40
500HC40001035HVAC Mech 10
500HC40001037FIREPROTECTION E&I 9
Other Civil Works 26
500HC40001031Chemical Storage Housing (Roof) Civil 16
500HC40001034Rehabilitation - Repainting of Building Civil 21
500HC40001036Rehabilitation - De-rusting of ladder, pipe, etc. Civil 18
500HC40001038Hazardous waste storage area Civil 13
Steel Structures & Platforms & Ladders including Fabrication 63
500HC30001001 Steel Structure Fabrication Mech 33
500HC30001002 Platforms & Stairs Mech 16
500HC30001003 Handrails & Miscellneous Steel Mech 14
Equipments 46
SBR 1 Equipments 12
500HC50001004Installation of Decanter SBR1 Mech 12
SBR 2 Equipments 12
500HC50001005Installation of Decanter SBR2 Mech 12
Blower / Ducting 29
500HC50001006Installation of Compressor Mech 5
500HC50001007Installation of Aeration Blower for SBR Mech 6
500HC50001016Installation of Ducting Mech 16
500HC50001017Installation of Solenoid Mech 2
500HC80001016Installation of Aeration Blower for Equalization Mech 6
Pre-Treatment 6
500HC50001008Installation of Fine Screen (A) Mech 3
500HC50001012Lifting Pump Mech 5
500HC50001013Equalization Pump Mech 5
500HC50001015Installation of Fine Screen (B) Mech 3
Biological Reactor 7
500HC50001009Installation of Mixer for SBR Mech 5
500HC50001011Installation of Excess Sludge Pump Mech 5
500HC50001014Installation of Effluent Pump Mech 5
500HC50001025Installation of Diffuser for SBR Mech 2
Chemical Facilities 7
500HC50001018Installation of PAC Dosing Pump Mech 4
500HC50001021Installation of NaOH Dosing Pump Mech 4
500HC50001019Installation of PAC Storage Tank Mech 4
500HC80001026Emergency Eye Wash Mech 5
500HC50001022Installation of Sodium Acetate Dissolution Mech 4
500HC50001023Installation of NaOH Dosing Tank Mech 5
500HC50001024Installation of Sodium Acetate Dosing Pump Mech 4
Piping & Support Steel (Fabrication / Installation / Testing) 87
PIPING Train A 87
500HC60001001Prefabrication - PIPING Mech 34
500HC60001002Installation of Supports Mech 20
500HC60001003Installation of AG Piping Mech 24
500HC60001006NDE / Inspection Mech 10
500HC60001007Piping TIe-in Mech 3
500HC60001009Valve Test & Installation Mech 6
500HC60001012Testing & Flushing T&C 6
PIPING Trani B 57
500HC60001004INSTALLATION SUPPORT Mech 24
500HC60001005Installation of AG Piping Mech 24
500HC60001008NDE / Inspection Mech 10
500HC60001011Valve Test & Installation Mech 6
500HC60001014Piping TIe-in Mech 3
500HC60001013Testing & Flushing T&C 6
Instrumentation 43
500HCDEM00108DEMOLITION Civil 10
500HC70001002 Support and Painting Mech 20
500HC70001001 PLC CONTROL SYSTEM INSTALLATION (INDOOR) E&I 16
500HC70001003 Upgrading / Introduction of SCADA E&I 17
500HC70001004 CABLING & PIPING E&I 22
500HC70001005 Orifice Type Flow Meters (Local indication) E&I 2
500HC70001007 Electromagnetic Flow Meter E&I 2
500HC70001006 CALIBRATION, TEST & INSPECTION E&I 12
500HC70001008 ORP meter E&I 2
500HC70001009 Ammonia and Nitrate Analyzer E&I 2
500HC70001011 pH Meter E&I 2
500HC70001012 DO meter E&I 2
500HC70001013 Level Indicating Transmitter (Ultrasonic Type) E&I 2
500HC70001014 Residual Chlorine analyzer E&I 2
500HC70001015 Float level Switch E&I 2
500HC70001016 Temperature Sensor for Motor E&I 2
500HC70001017 Vibration Sensor for Motor E&I 2
500HC70001018 Electrode level Switch E&I 1
500HC70001019 Pressure Switch E&I 1
500HC70001021 Cable Float level Switch E&I 1
Electrical 49
500HC80001001 EARTHING Civil 40
Pole Installation (Includding Accessories), Connection ad
500HC80001036 Testing E&I 20
500HC80001003 CABLING WORK E&I 28
500HC80001005 LIGHTING E&I 16
500HC80001006 MCC E&I 15
Inspection & Precommissioning 15
500HCPRE001001 Precommissioning T&C 15
Start Finish Activity Status
21-Feb-24 13-Feb-25
19-Jun-24 9-Jan-25
19-Jun-24 23-Dec-24
19-Jun-24 9-Oct-24
19-Jun-24 2-Jul-24 Not Started
26-Jun-24 15-Jul-24 Not Started
13-Aug-24 7-Sep-24 Not Started
7-Sep-24 27-Sep-24 Not Started
27-Sep-24 9-Oct-24 Not Started
19-Jun-24 19-Oct-24
19-Jun-24 15-Jul-24 Not Started
15-Jul-24 13-Aug-24 Not Started
29-Jul-24 29-Aug-24 Not Started
7-Sep-24 5-Oct-24 Not Started
14-Sep-24 18-Sep-24 Not Started
16-Sep-24 19-Sep-24 Not Started
17-Sep-24 20-Sep-24 Not Started
27-Sep-24 11-Oct-24 Not Started
11-Oct-24 19-Oct-24 Not Started
5-Sep-24 29-Oct-24
5-Sep-24 23-Sep-24 Not Started
23-Sep-24 18-Oct-24 Not Started
19-Oct-24 24-Oct-24 Not Started
21-Oct-24 25-Oct-24 Not Started
22-Oct-24 26-Oct-24 Not Started
23-Oct-24 28-Oct-24 Not Started
23-Oct-24 29-Oct-24 Not Started
28-Oct-24 14-Dec-24
28-Oct-24 12-Nov-24 Not Started
30-Oct-24 20-Nov-24 Not Started
20-Nov-24 14-Dec-24 Not Started
28-Nov-24 3-Dec-24 Not Started
29-Nov-24 14-Dec-24 Not Started
29-Nov-24 4-Dec-24 Not Started
2-Dec-24 5-Dec-24 Not Started
3-Dec-24 14-Dec-24 Not Started
4-Dec-24 7-Dec-24 Not Started
11-Nov-24 17-Dec-24
11-Nov-24 3-Dec-24 Not Started
13-Nov-24 13-Dec-24 Not Started
16-Nov-24 2-Dec-24 Not Started
18-Nov-24 20-Nov-24 Not Started
20-Nov-24 22-Nov-24 Not Started
22-Nov-24 25-Nov-24 Not Started
23-Nov-24 9-Dec-24 Not Started
9-Dec-24 17-Dec-24 Not Started
28-Nov-24 6-Dec-24
28-Nov-24 3-Dec-24 Not Started
3-Dec-24 6-Dec-24 Not Started
18-Oct-24 23-Dec-24
18-Oct-24 16-Nov-24 Not Started
24-Oct-24 12-Nov-24 Not Started
5-Nov-24 25-Nov-24 Not Started
9-Nov-24 16-Dec-24 Not Started
12-Nov-24 28-Nov-24 Not Started
12-Nov-24 26-Nov-24 Not Started
14-Nov-24 6-Dec-24 Not Started
19-Nov-24 11-Dec-24 Not Started
20-Nov-24 25-Nov-24 Not Started
25-Nov-24 29-Nov-24 Not Started
25-Nov-24 17-Dec-24 Not Started
25-Nov-24 29-Nov-24 Not Started
2-Dec-24 23-Dec-24 Not Started
4-Dec-24 9-Dec-24 Not Started
4-Dec-24 9-Dec-24 Not Started
4-Dec-24 9-Dec-24 Not Started
4-Dec-24 23-Dec-24 Not Started
5-Dec-24 10-Dec-24 Not Started
7-Dec-24 10-Dec-24 Not Started
10-Dec-24 16-Dec-24 Not Started
12-Dec-24 23-Dec-24 Not Started
12-Dec-24 18-Dec-24 Not Started
14-Dec-24 23-Dec-24 Not Started
15-Jul-24 21-Dec-24
15-Jul-24 15-Oct-24
15-Jul-24 15-Aug-24 Not Started
1-Aug-24 19-Aug-24 Not Started
7-Sep-24 15-Oct-24 Not Started
2-Sep-24 21-Dec-24
2-Sep-24 20-Sep-24 Not Started
16-Sep-24 14-Oct-24 Not Started
20-Sep-24 9-Oct-24 Not Started
3-Dec-24 21-Dec-24 Not Started
20-Nov-24 28-Nov-24
20-Nov-24 28-Nov-24 Not Started
23-Dec-24 9-Jan-25
23-Dec-24 9-Jan-25 Not Started
3-Jun-24 11-Jan-25
3-Jun-24 27-Dec-24
3-Jun-24 14-Nov-24
3-Jun-24 7-Jun-24 Not Started
7-Jun-24 13-Jun-24 Not Started
7-Jun-24 11-Jul-24 Not Started
13-Jun-24 19-Jun-24 Not Started
19-Jun-24 10-Sep-24 Not Started
29-Jun-24 29-Aug-24 Not Started
11-Jul-24 3-Sep-24 Not Started
11-Jul-24 5-Sep-24 Not Started
14-Oct-24 12-Nov-24 Not Started
15-Oct-24 18-Oct-24 Not Started
16-Oct-24 21-Oct-24 Not Started
29-Oct-24 4-Nov-24 Not Started
5-Nov-24 8-Nov-24 Not Started
5-Nov-24 8-Nov-24 Not Started
8-Nov-24 13-Nov-24 Not Started
8-Nov-24 14-Nov-24 Not Started
24-Jul-24 19-Sep-24
24-Jul-24 2-Aug-24 Not Started
2-Aug-24 16-Aug-24 Not Started
7-Aug-24 30-Aug-24 Not Started
31-Aug-24 4-Sep-24 Not Started
4-Sep-24 7-Sep-24 Not Started
7-Sep-24 19-Sep-24 Not Started
19-Sep-24 7-Dec-24
19-Sep-24 15-Oct-24 Not Started
15-Oct-24 6-Nov-24 Not Started
30-Oct-24 22-Nov-24 Not Started
6-Nov-24 15-Nov-24 Not Started
6-Nov-24 16-Nov-24 Not Started
7-Nov-24 21-Nov-24 Not Started
13-Nov-24 16-Nov-24 Not Started
15-Nov-24 19-Nov-24 Not Started
15-Nov-24 19-Nov-24 Not Started
19-Nov-24 7-Dec-24 Not Started
7-Dec-24 25-Dec-24
7-Dec-24 18-Dec-24 Not Started
19-Dec-24 24-Dec-24 Not Started
20-Dec-24 25-Dec-24 Not Started
10-Sep-24 20-Nov-24
10-Sep-24 28-Sep-24 Not Started
28-Sep-24 1-Oct-24 Not Started
1-Oct-24 5-Oct-24 Not Started
5-Oct-24 17-Oct-24 Not Started
15-Oct-24 17-Oct-24 Not Started
17-Oct-24 19-Oct-24 Not Started
19-Oct-24 25-Oct-24 Not Started
19-Oct-24 22-Oct-24 Not Started
22-Oct-24 5-Nov-24 Not Started
5-Nov-24 7-Nov-24 Not Started
6-Nov-24 20-Nov-24 Not Started
10-Sep-24 25-Oct-24
10-Sep-24 28-Sep-24 Not Started
28-Sep-24 2-Oct-24 Not Started
30-Sep-24 3-Oct-24 Not Started
1-Oct-24 7-Oct-24 Not Started
1-Oct-24 7-Oct-24 Not Started
2-Oct-24 8-Oct-24 Not Started
7-Oct-24 25-Oct-24 Not Started
14-Oct-24 16-Oct-24 Not Started
14-Oct-24 23-Oct-24 Not Started
9-Nov-24 27-Dec-24
9-Nov-24 6-Dec-24 Not Started
20-Nov-24 9-Dec-24 Not Started
9-Dec-24 12-Dec-24 Not Started
9-Dec-24 12-Dec-24 Not Started
10-Dec-24 16-Dec-24 Not Started
10-Dec-24 16-Dec-24 Not Started
12-Dec-24 18-Dec-24 Not Started
13-Dec-24 27-Dec-24 Not Started
13-Dec-24 19-Dec-24 Not Started
14-Dec-24 23-Dec-24 Not Started
20-Nov-24 23-Dec-24
20-Nov-24 23-Dec-24 Not Started
12-Dec-24 13-Dec-24 Not Started
13-Dec-24 16-Dec-24 Not Started
13-Dec-24 16-Dec-24 Not Started
16-Dec-24 17-Dec-24 Not Started
16-Dec-24 17-Dec-24 Not Started
16-Dec-24 17-Dec-24 Not Started
16-Dec-24 17-Dec-24 Not Started
16-Dec-24 17-Dec-24 Not Started
16-Dec-24 17-Dec-24 Not Started
16-Dec-24 17-Dec-24 Not Started
16-Dec-24 17-Dec-24 Not Started
16-Dec-24 17-Dec-24 Not Started
16-Dec-24 17-Dec-24 Not Started
16-Dec-24 17-Dec-24 Not Started
16-Dec-24 17-Dec-24 Not Started
7-Oct-24 27-Dec-24
7-Oct-24 21-Oct-24 Not Started
25-Oct-24 10-Dec-24 Not Started
25-Oct-24 11-Nov-24 Not Started
9-Dec-24 27-Dec-24 Not Started
28-Dec-24 11-Jan-25
28-Dec-24 11-Jan-25 Not Started
3-Jun-24 13-Feb-25
3-Jun-24 29-Jan-25
3-Jun-24 17-Jun-24
3-Jun-24 7-Jun-24 Not Started
7-Jun-24 17-Jun-24 Not Started
10-Jun-24 26-Aug-24
10-Jun-24 25-Jun-24 Not Started
24-Jun-24 1-Jul-24 Not Started
2-Jul-24 3-Jul-24 Not Started
4-Jul-24 15-Jul-24 Not Started
16-Jul-24 18-Jul-24 Not Started
19-Jul-24 26-Jul-24 Not Started
22-Aug-24 26-Aug-24 Not Started
26-Jul-24 12-Sep-24
26-Jul-24 2-Aug-24 Not Started
2-Aug-24 10-Aug-24 Not Started
2-Aug-24 16-Aug-24 Not Started
10-Aug-24 16-Aug-24 Not Started
9-Sep-24 12-Sep-24 Not Started
17-Jun-24 19-Sep-24
17-Jun-24 22-Jun-24 Not Started
22-Jun-24 6-Jul-24 Not Started
6-Jul-24 20-Jul-24 Not Started
20-Jul-24 29-Jul-24 Not Started
17-Aug-24 23-Aug-24 Not Started
20-Aug-24 23-Aug-24 Not Started
2-Sep-24 5-Sep-24 Not Started
3-Sep-24 6-Sep-24 Not Started
6-Sep-24 11-Sep-24 Not Started
11-Sep-24 19-Sep-24 Not Started
30-Jul-24 2-Oct-24
30-Jul-24 13-Aug-24 Not Started
5-Aug-24 20-Aug-24 Not Started
23-Sep-24 2-Oct-24 Not Started
4-Sep-24 24-Oct-24
4-Sep-24 13-Sep-24 Not Started
13-Sep-24 24-Sep-24 Not Started
28-Sep-24 24-Oct-24 Not Started
28-Sep-24 5-Oct-24 Not Started
8-Oct-24 14-Oct-24 Not Started
10-Aug-24 14-Oct-24
10-Aug-24 19-Aug-24 Not Started
22-Aug-24 3-Sep-24 Not Started
22-Aug-24 20-Sep-24 Not Started
13-Sep-24 1-Oct-24 Not Started
17-Sep-24 20-Sep-24 Not Started
23-Sep-24 5-Oct-24 Not Started
7-Oct-24 14-Oct-24 Not Started
12-Oct-24 5-Nov-24
12-Oct-24 5-Nov-24 Not Started
21-Oct-24 22-Oct-24 Not Started
22-Oct-24 23-Oct-24 Not Started
23-Oct-24 24-Oct-24 Not Started
24-Oct-24 25-Oct-24 Not Started
25-Oct-24 28-Oct-24 Not Started
28-Oct-24 29-Oct-24 Not Started
28-Oct-24 29-Oct-24 Not Started
28-Oct-24 29-Oct-24 Not Started
29-Oct-24 30-Oct-24 Not Started
30-Oct-24 31-Oct-24 Not Started
30-Oct-24 31-Oct-24 Not Started
31-Oct-24 1-Nov-24 Not Started
19-Sep-24 19-Oct-24
19-Sep-24 3-Oct-24 Not Started
3-Oct-24 7-Oct-24 Not Started
8-Oct-24 10-Oct-24 Not Started
8-Oct-24 9-Oct-24 Not Started
8-Oct-24 19-Oct-24 Not Started
8-Oct-24 10-Oct-24 Not Started
10-Oct-24 12-Oct-24 Not Started
12-Oct-24 19-Oct-24 Not Started
12-Oct-24 15-Oct-24 Not Started
16-Oct-24 19-Oct-24 Not Started
19-Oct-24 22-Nov-24
19-Oct-24 5-Nov-24 Not Started
5-Nov-24 7-Nov-24 Not Started
7-Nov-24 9-Nov-24 Not Started
8-Nov-24 12-Nov-24 Not Started
9-Nov-24 12-Nov-24 Not Started
11-Nov-24 18-Nov-24 Not Started
11-Nov-24 22-Nov-24 Not Started
11-Nov-24 13-Nov-24 Not Started
13-Nov-24 16-Nov-24 Not Started
9-Dec-24 20-Jan-25
9-Dec-24 27-Dec-24 Not Started
12-Dec-24 10-Jan-25 Not Started
27-Dec-24 3-Jan-25 Not Started
3-Jan-25 6-Jan-25 Not Started
10-Jan-25 13-Jan-25 Not Started
10-Jan-25 14-Jan-25 Not Started
13-Jan-25 14-Jan-25 Not Started
13-Jan-25 14-Jan-25 Not Started
13-Jan-25 20-Jan-25 Not Started
21-Dec-24 29-Jan-25
21-Dec-24 11-Jan-25 Not Started
11-Jan-25 15-Jan-25 Not Started
15-Jan-25 17-Jan-25 Not Started
16-Jan-25 18-Jan-25 Not Started
18-Jan-25 27-Jan-25 Not Started
18-Jan-25 29-Jan-25 Not Started
18-Jan-25 21-Jan-25 Not Started
18-Jan-25 23-Jan-25 Not Started
18-Jan-25 21-Jan-25 Not Started
5-Nov-24 11-Dec-24
5-Nov-24 12-Nov-24 Not Started
12-Nov-24 16-Nov-24 Not Started
14-Nov-24 18-Nov-24 Not Started
16-Nov-24 22-Nov-24 Not Started
20-Nov-24 22-Nov-24 Not Started
22-Nov-24 2-Dec-24 Not Started
2-Dec-24 7-Dec-24 Not Started
3-Dec-24 6-Dec-24 Not Started
6-Dec-24 9-Dec-24 Not Started
10-Dec-24 11-Dec-24 Not Started
12-Sep-24 28-Jan-25
12-Sep-24 9-Nov-24
12-Sep-24 17-Oct-24 Not Started
8-Oct-24 29-Oct-24 Not Started
17-Oct-24 9-Nov-24 Not Started
3-Oct-24 28-Jan-25
3-Oct-24 15-Nov-24 Not Started
8-Oct-24 19-Oct-24 Not Started
9-Nov-24 19-Dec-24 Not Started
9-Nov-24 21-Nov-24 Not Started
9-Nov-24 21-Nov-24 Not Started
16-Jan-25 28-Jan-25 Not Started
19-Oct-24 18-Nov-24
19-Oct-24 18-Nov-24 Not Started
29-Jan-25 13-Feb-25
29-Jan-25 13-Feb-25 Not Started
1-Jul-24 9-Jan-25
1-Jul-24 27-Dec-24
1-Jul-24 28-Sep-24
1-Jul-24 13-Jul-24 Not Started
8-Jul-24 26-Jul-24 Not Started
24-Aug-24 11-Sep-24 Not Started
11-Sep-24 21-Sep-24 Not Started
20-Sep-24 28-Sep-24 Not Started
8-Jul-24 17-Oct-24
8-Jul-24 2-Aug-24 Not Started
2-Aug-24 24-Aug-24 Not Started
5-Aug-24 9-Sep-24 Not Started
29-Aug-24 20-Sep-24 Not Started
7-Sep-24 11-Sep-24 Not Started
9-Sep-24 12-Sep-24 Not Started
10-Sep-24 13-Sep-24 Not Started
27-Sep-24 11-Oct-24 Not Started
11-Oct-24 17-Oct-24 Not Started
9-Sep-24 23-Nov-24
9-Sep-24 26-Sep-24 Not Started
26-Sep-24 14-Oct-24 Not Started
9-Oct-24 14-Oct-24 Not Started
9-Oct-24 21-Oct-24 Not Started
18-Nov-24 22-Nov-24 Not Started
18-Nov-24 23-Nov-24 Not Started
21-Oct-24 27-Dec-24
21-Oct-24 4-Nov-24 Not Started
28-Oct-24 18-Nov-24 Not Started
18-Nov-24 5-Dec-24 Not Started
5-Dec-24 17-Dec-24 Not Started
10-Dec-24 13-Dec-24 Not Started
10-Dec-24 13-Dec-24 Not Started
11-Dec-24 14-Dec-24 Not Started
11-Dec-24 14-Dec-24 Not Started
17-Dec-24 27-Dec-24 Not Started
17-Dec-24 20-Dec-24 Not Started
18-Nov-24 13-Dec-24
18-Nov-24 29-Nov-24 Not Started
18-Nov-24 10-Dec-24 Not Started
19-Nov-24 13-Dec-24 Not Started
22-Nov-24 25-Nov-24 Not Started
22-Nov-24 25-Nov-24 Not Started
23-Nov-24 26-Nov-24 Not Started
29-Nov-24 9-Dec-24 Not Started
9-Sep-24 13-Dec-24
9-Sep-24 12-Sep-24 Not Started
10-Dec-24 13-Dec-24 Not Started
25-Sep-24 26-Dec-24
25-Sep-24 30-Oct-24 Not Started
21-Oct-24 18-Nov-24 Not Started
25-Oct-24 18-Nov-24 Not Started
30-Oct-24 14-Dec-24 Not Started
18-Nov-24 3-Dec-24 Not Started
18-Nov-24 22-Nov-24 Not Started
18-Nov-24 7-Dec-24 Not Started
18-Nov-24 7-Dec-24 Not Started
18-Nov-24 22-Nov-24 Not Started
20-Nov-24 12-Dec-24 Not Started
22-Nov-24 27-Nov-24 Not Started
25-Nov-24 16-Dec-24 Not Started
27-Nov-24 19-Dec-24 Not Started
29-Nov-24 5-Dec-24 Not Started
29-Nov-24 3-Dec-24 Not Started
29-Nov-24 5-Dec-24 Not Started
2-Dec-24 6-Dec-24 Not Started
2-Dec-24 6-Dec-24 Not Started
3-Dec-24 7-Dec-24 Not Started
3-Dec-24 16-Dec-24 Not Started
5-Dec-24 13-Dec-24 Not Started
12-Dec-24 26-Dec-24 Not Started
13-Dec-24 26-Dec-24 Not Started
24-Aug-24 14-Dec-24
24-Aug-24 14-Dec-24
24-Aug-24 25-Sep-24 Not Started
24-Aug-24 13-Sep-24 Not Started
13-Sep-24 9-Oct-24 Not Started
25-Sep-24 4-Nov-24 Not Started
25-Nov-24 14-Dec-24 Not Started
6-Nov-24 20-Nov-24
6-Nov-24 20-Nov-24 Not Started
26-Dec-24 9-Jan-25
26-Dec-24 9-Jan-25 Not Started
21-Feb-24 12-Jan-25
21-Feb-24 8-Jun-24
21-Feb-24 10-Apr-24
21-Feb-24 Not Started
6-Mar-24 10-Apr-24 Not Started
29-Feb-24 8-Jun-24
29-Feb-24 Not Started
29-Apr-24 Not Started
8-May-24 Not Started
11-May-24 8-Jun-24 Not Started
31-May-24 Not Started
8-Jun-24 Not Started
7-Jun-24 15-Jul-24
7-Jun-24 6-Jul-24
7-Jun-24 10-Jun-24 Not Started
10-Jun-24 13-Jun-24 Not Started
13-Jun-24 6-Jul-24 Not Started
13-Jun-24 17-Jun-24 Not Started
7-Jun-24 3-Jul-24
7-Jun-24 Not Started
8-Jun-24 11-Jun-24 Not Started
13-Jun-24 17-Jun-24 Not Started
17-Jun-24 19-Jun-24 Not Started
19-Jun-24 24-Jun-24 Not Started
24-Jun-24 26-Jun-24 Not Started
26-Jun-24 1-Jul-24 Not Started
1-Jul-24 3-Jul-24 Not Started
28-Jun-24 15-Jul-24
28-Jun-24 1-Jul-24 Not Started
1-Jul-24 3-Jul-24 Not Started
3-Jul-24 4-Jul-24 Not Started
3-Jul-24 8-Jul-24 Not Started
8-Jul-24 10-Jul-24 Not Started
10-Jul-24 15-Jul-24 Not Started
12-Jul-24 15-Jul-24 Not Started
5-Jul-24 28-Dec-24
5-Jul-24 4-Dec-24
5-Jul-24 12-Nov-24
5-Jul-24 9-Jul-24 Not Started
10-Jul-24 20-Jul-24 Not Started
17-Jul-24 Not Started
20-Jul-24 13-Aug-24 Not Started
27-Jul-24 Not Started
12-Aug-24 Not Started
13-Aug-24 30-Aug-24 Not Started
27-Aug-24 Not Started
28-Aug-24 12-Sep-24 Not Started
9-Sep-24 Not Started
12-Sep-24 5-Oct-24 Not Started
20-Sep-24 Not Started
21-Sep-24 14-Oct-24 Not Started
28-Sep-24 Not Started
5-Oct-24 12-Oct-24 Not Started
12-Oct-24 17-Oct-24 Not Started
12-Oct-24 5-Nov-24 Not Started
14-Oct-24 Not Started
16-Oct-24 6-Nov-24 Not Started
17-Oct-24 29-Oct-24 Not Started
17-Oct-24 Not Started
12-Nov-24 Not Started
13-Jul-24 11-Nov-24
13-Jul-24 25-Jul-24 Not Started
18-Jul-24 Not Started
25-Jul-24 8-Aug-24 Not Started
1-Aug-24 Not Started
8-Aug-24 23-Aug-24 Not Started
16-Aug-24 Not Started
23-Aug-24 7-Sep-24 Not Started
7-Sep-24 3-Oct-24 Not Started
12-Sep-24 3-Oct-24 Not Started
3-Oct-24 10-Oct-24 Not Started
3-Oct-24 28-Oct-24 Not Started
10-Oct-24 18-Oct-24 Not Started
17-Oct-24 9-Nov-24 Not Started
22-Oct-24 11-Nov-24 Not Started
18-Jul-24 11-Oct-24
18-Jul-24 1-Aug-24 Not Started
1-Aug-24 29-Aug-24 Not Started
29-Aug-24 23-Sep-24 Not Started
25-Sep-24 11-Oct-24 Not Started
7-Aug-24 29-Oct-24
7-Aug-24 15-Aug-24 Not Started
15-Aug-24 12-Sep-24 Not Started
12-Sep-24 19-Sep-24 Not Started
19-Sep-24 10-Oct-24 Not Started
19-Sep-24 25-Sep-24 Not Started
26-Sep-24 21-Oct-24 Not Started
15-Oct-24 29-Oct-24 Not Started
27-Sep-24 4-Dec-24
27-Sep-24 27-Nov-24 Not Started
15-Oct-24 4-Dec-24 Not Started
29-Oct-24 12-Nov-24 Not Started
29-Oct-24 11-Nov-24 Not Started
17-Oct-24 19-Nov-24
17-Oct-24 7-Nov-24 Not Started
19-Oct-24 15-Nov-24 Not Started
26-Oct-24 19-Nov-24 Not Started
29-Oct-24 15-Nov-24 Not Started
2-Aug-24 17-Oct-24
2-Aug-24 12-Sep-24 Not Started
12-Sep-24 1-Oct-24 Not Started
1-Oct-24 17-Oct-24 Not Started
21-Oct-24 16-Dec-24
21-Oct-24 5-Nov-24
21-Oct-24 5-Nov-24 Not Started
6-Nov-24 19-Nov-24
6-Nov-24 19-Nov-24 Not Started
12-Nov-24 16-Dec-24
12-Nov-24 18-Nov-24 Not Started
20-Nov-24 26-Nov-24 Not Started
27-Nov-24 16-Dec-24 Not Started
27-Nov-24 28-Nov-24 Not Started
27-Nov-24 4-Dec-24 Not Started
20-Nov-24 26-Nov-24
20-Nov-24 22-Nov-24 Not Started
21-Nov-24 26-Nov-24 Not Started
21-Nov-24 26-Nov-24 Not Started
23-Nov-24 26-Nov-24 Not Started
21-Nov-24 28-Nov-24
21-Nov-24 26-Nov-24 Not Started
21-Nov-24 26-Nov-24 Not Started
22-Nov-24 27-Nov-24 Not Started
27-Nov-24 28-Nov-24 Not Started
29-Nov-24 9-Dec-24
29-Nov-24 5-Dec-24 Not Started
2-Dec-24 6-Dec-24 Not Started
2-Dec-24 6-Dec-24 Not Started
2-Dec-24 7-Dec-24 Not Started
3-Dec-24 7-Dec-24 Not Started
3-Dec-24 9-Dec-24 Not Started
4-Dec-24 9-Dec-24 Not Started
30-Aug-24 13-Dec-24
30-Aug-24 13-Dec-24
30-Aug-24 9-Oct-24 Not Started
20-Sep-24 14-Oct-24 Not Started
26-Oct-24 25-Nov-24 Not Started
23-Nov-24 5-Dec-24 Not Started
26-Nov-24 28-Nov-24 Not Started
2-Dec-24 9-Dec-24 Not Started
6-Dec-24 13-Dec-24 Not Started
4-Oct-24 13-Dec-24
4-Oct-24 4-Nov-24 Not Started
7-Nov-24 5-Dec-24 Not Started
26-Nov-24 7-Dec-24 Not Started
2-Dec-24 7-Dec-24 Not Started
6-Dec-24 9-Dec-24 Not Started
6-Dec-24 13-Dec-24 Not Started
6-Nov-24 28-Dec-24
6-Nov-24 16-Nov-24 Not Started
7-Nov-24 29-Nov-24 Not Started
12-Nov-24 2-Dec-24 Not Started
18-Nov-24 7-Dec-24 Not Started
23-Nov-24 20-Dec-24 Not Started
11-Dec-24 13-Dec-24 Not Started
11-Dec-24 13-Dec-24 Not Started
12-Dec-24 28-Dec-24 Not Started
12-Dec-24 14-Dec-24 Not Started
12-Dec-24 14-Dec-24 Not Started
12-Dec-24 14-Dec-24 Not Started
12-Dec-24 14-Dec-24 Not Started
13-Dec-24 16-Dec-24 Not Started
13-Dec-24 16-Dec-24 Not Started
13-Dec-24 16-Dec-24 Not Started
13-Dec-24 16-Dec-24 Not Started
14-Dec-24 17-Dec-24 Not Started
14-Dec-24 16-Dec-24 Not Started
14-Dec-24 16-Dec-24 Not Started
14-Dec-24 16-Dec-24 Not Started
18-Oct-24 18-Dec-24
18-Oct-24 7-Dec-24 Not Started
11-Nov-24 5-Dec-24 Not Started
14-Nov-24 18-Dec-24 Not Started
20-Nov-24 9-Dec-24 Not Started
28-Nov-24 17-Dec-24 Not Started
28-Dec-24 12-Jan-25
28-Dec-24 12-Jan-25 Not Started
Activity ID Activity Name DISCIPLINEOriginal Du
PROCUREMENT (JGC) 265
100 - BAGBAG WRF 227
Equipment 227
Inquiry, Award, Manufacturing & Delivery: Dehumidifier - Delivery
100EC50480 to Site 157
Inquiry, Award, Manufacturing & Delivery: Air Compressor -
100EC50430 Delivery to Site 157
Inquiry, Award, Manufacturing & Delivery: Submersible Pumps-
100EC50330 Delivery to Site 172
Inquiry, Award, Manufacturing & Delivery: Waste Bin - Delivery to
100EC50580 Site 127
Inquiry, Award, Manufacturing & Delivery: Dosing Pumps (NaOH
100EC50180 dosing pump) - Delivery to Site 165
Inquiry, Award, Manufacturing & Delivery: Sodium Acetate Dosing
100EC50230 Pump - Delivery to Site 165
Inquiry, Award, Manufacturing & Delivery: PAC Dosing Pump -
100EC50280 Delivery to Site 165
Inquiry, Award, Manufacturing & Delivery: Tanks (PAC Storage) -
100EC50030 Delivery to Site 127
Inquiry, Award, Manufacturing & Delivery: Movable Screw
100EC50530 Conveyor w Receiving Hopper - Delivery to Site 37
Inquiry, Award, Manufacturing & Delivery: Tanks (NaOH Storage) -
100EC50080 Delivery to Site 127
Inquiry, Award, Manufacturing & Delivery: Sodium Acetate
100EC50380 Dissolution Unit - Delivery to Site 30
Inquiry, Award, Manufacturing & Delivery: Container for Sodium
100EC50130 Acetate - Delivery to Site 30
Piping 187
Inquiry, Award, Manufacturing & Delivery: Hose & Hose Coupling
100EC60390 (Local) - Delivery to Site 187
Inquiry, Award, Manufacturing & Delivery: Stainless Steel Valves
100EC60404 (Local) - Delivery to Site 157
Inquiry, Award, Manufacturing & Delivery: Emergency Shower And
100EC60290 Eyewash - Delivery to Site 30
Inquiry, Award, Manufacturing & Delivery: Stainless Steel Pipes And
100EC60140 Fittings - Delivery to Site 14
Inquiry, Award, Manufacturing & Delivery: PVC Pipes And Fittings -
100EC60040 Delivery to Site 67
Inquiry, Award, Manufacturing & Delivery: HDPE Pipes And Fittings -
100EC60090 Delivery to Site 67
100EC60408 Inquiry, Award, Manufacturing & Delivery: Fittings - Delivery to Site 67
Inquiry, Award, Manufacturing & Delivery: Pressure Relief Valve -
100EC60190 Delivery to Site 7
Inquiry, Award, Manufacturing & Delivery: Hose and Hose Coupling
100EC60240 - Delivery to Site 30
Inquiry, Award, Manufacturing & Delivery: Stainless Steel Valves -
100EC60340 Delivery to Site 7
Instrumentation 88
Inquiry, Award, Manufacturing & Delivery: Bulk Materials - Delivery
100EC70090 to Site 30
Inquiry, Award, Manufacturing & Delivery: Instrument Cable -
100EC70040 Delivery to Site 7
Inquiry, Award, Manufacturing & Delivery: Residual Chlorine
H100EC70160 analyzer - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Ammonia and Nitrate
H100EC70140 Analyzer - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: pH meter - Delivery to
H100EC70150 Site 0
Inquiry, Award, Manufacturing & Delivery: Level Indicating
H100EC70190 Transmitter (Ultrasonic Type) - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Pressure Switch -
H100EC70210 Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Float level Switch -
H100EC70180 Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Electrode level Switch -
H100EC70200 Delivery to Site 0
H100EC70110 Inquiry, Award, Manufacturing & Delivery: SCADA - Delivery to Site 0
H100EC70120 Inquiry, Award, Manufacturing & Delivery: PLC - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Thermal Mass Gas Flow
H100EC70130 Meters - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Electromagnetic Flow
H100EC70170 Meter - Delivery to Site 0
Electrical 142
Inquiry, Award, Manufacturing & Delivery: Bulk Materials - Delivery
100EC80090 to Site 30
Inquiry, Award, Manufacturing & Delivery: Electrical Power And
100EC80040 Control Cables - Delivery to Site 30
Inquiry, Award, Manufacturing & Delivery: LV MCC Panel - Delivery
100EC80140 to Site 7
Mandatory Spares 72
Inquiry, Award, Manufacturing & Delivery: Dehumidifier - Delivery
100EC50599 to Site 7
Inquiry, Award, Manufacturing & Delivery: Air Compressor -
100EC50594 Delivery to Site 7
Inquiry, Award, Manufacturing & Delivery: Sodium Acetate
100EC50604 Dissolution Unit - Delivery to Site 30
Inquiry, Award, Manufacturing & Delivery: Submersible Pump -
100EC50609 Delivery to Site 7
Inquiry, Award, Manufacturing & Delivery: Dosing Pumps - Delivery
100EC50614 to Site 7
200 - CONGRESSIONAL WRF 222
Equipment 93
Inquiry, Award, Manufacturing & Delivery: Inlet Valve - Delivery to
H200EC50480 Site ** 0
H200EC50240 Inquiry, Award, Manufacturing & Delivery: Blower - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Air Diffuser - Delivery to
H200EC50090 Site 0
Inquiry, Award, Manufacturing & Delivery: Decanter - Delivery to
H200EC50140 Site ** 0
Inquiry, Award, Manufacturing & Delivery: SBR tank Mixer- Delivery
H200EC50040 to Site 0
Inquiry, Award, Manufacturing & Delivery: Decanter Pump -
H200EC50190 Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Carbon Source
200EC900490 Preparation system - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Chlorine dosing pump -
H200EC50440 Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Lifting Device for SBR -
H200EC50560 Delivery to Site ** 0
Inquiry, Award, Manufacturing & Delivery: Lifting Device for Blower
H200EC50600 - Delivery to Site ** 0
Inquiry, Award, Manufacturing & Delivery: Effluent Pump - Delivery
H200EC50640 to Site 0
Inquiry, Award, Manufacturing & Delivery: PAC Dosing Pump -
H200EC50390 Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Changeover Valve -
H200EC50520 Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Water Supply Unit-
H200EC50810 Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Carbon Source dosing
H200EC50340 pump - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: PAC Storage Tank -
H200EC50720 Delivery to Site ** 0
Inquiry, Award, Manufacturing & Delivery: Lifting Device for
H200EC50760 Chemical filling - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Lifting Device for Effluent
H200EC50680 Pump - Delivery to Site 0
Piping 119
Inquiry, Award, Manufacturing & Delivery: Plastic Pipe Material
200EC60040 (incl. HDPE) - Delivery to Site 74
Inquiry, Award, Manufacturing & Delivery: Plastic Pipe Material
200EC60055 (incl. PVC) - Delivery to Site 74
Inquiry, Award, Manufacturing & Delivery: Valve, Fitting, Flexible
200EC60143 Joints - Delivery to Site 74
Inquiry, Award, Manufacturing & Delivery: Metal Pipe Mat'l (incl.
200EC60130 Galvanized Iron,StainlessSteel) - Delivery to Site 7
Inquiry, Award, Manufacturing & Delivery: Valves, Fitting, Flexible
200EC60081 Joint - Delivery to Site 14
Instrumentation 145
Inquiry, Award, Manufacturing & Delivery: Support (incl. Cable Tray,
200EC70093 Pipe Support) - Delivery to Site 129
Inquiry, Award, Manufacturing & Delivery: Cabling Material -
200EC70083 Delivery to Site 138
H200EC70030 Inquiry, Award, Manufacturing & Delivery: PLC - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: A&I Instruments -
H200EC70070 Delivery to Site 0
Electrical 157
Inquiry, Award, Manufacturing & Delivery: Conduit Pipe - Delivery
200EC80090* to Site 129
Inquiry, Award, Manufacturing & Delivery: Cabling Material -
200EC80040* Delivery to Site 152
Inquiry, Award, Manufacturing & Delivery: Support (incl. Cable Tray,
200EC80140* Pipe Support) - Delivery to Site 129
H200EC60180 Inquiry, Award, Manufacturing & Delivery: MCC - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Local Control Panel -
H200EC60220 Delivery to Site 0
300 - PROJECT 7 SSpTP-htc 302
Civil 0
Inquiry, Award, Manufacturing & Delivery: Anchor Bolts - Delivery
300EC10030 to Site 0
Equipment 198
Inquiry, Award, Manufacturing & Delivery: Inline Stone Trap -
H300EC50780 Delivery to Site ** 0
Inquiry, Award, Manufacturing & Delivery: Lifting device for Lifting
H300EC50940 Hoist Effluent Transfer Pump - Delivery to Site ** 0
Inquiry, Award, Manufacturing & Delivery: Lifting device for PAC
H300EC50980 storage tank - Delivery to Site ** 0
Inquiry, Award, Manufacturing & Delivery: Lifting device for Lifting
H300EC50950 Hoist Effluent Transfer Pump - Install / Accept 0
Inquiry, Award, Manufacturing & Delivery: Lifting device for Septage
H300EC50820 feed pump - Delivery to Site ** 0
Inquiry, Award, Manufacturing & Delivery: Effluent Transfer Pump -
H300EC50340 Delivery to Site ** 0
Inquiry, Award, Manufacturing & Delivery: Lifting device for
H300EC50900 Temporary manual bar screen - Delivery to Site ** 0
Inquiry, Award, Manufacturing & Delivery: Chlorine dosing pump -
H300EC50690 Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Sludge Extraction Pump -
H300EC50290 Delivery to Site ** 0
Inquiry, Award, Manufacturing & Delivery: PAC dosing pump -
H300EC50390 Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Septage Feed Pump -
H300EC50040 Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Carbon Source dosing
H300EC50440 pump - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Lifting device for FRP
H300EC50860 cover - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Lifting device for FRP
H300EC50998 cover - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Decanter - Delivery to
H300EC50190 Site 0
Inquiry, Award, Manufacturing & Delivery: SBR tank Mixer- Delivery
H300EC50090 to Site 0
Inquiry, Award, Manufacturing & Delivery: Decanter Pump -
H300EC50240 Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Odor control unit -
H300EC50740 Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Air Diffusser - Delivery to
H300EC50140 Site 0
Inquiry, Award, Manufacturing & Delivery: Air Compressor for
H300EC50640 Polymer - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Polymer Preparation
H300EC50590 Unit - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Carbon Source
H300EC50490 Preparation system - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Polymer Dosing Pump -
H300EC50540 Delivery to Site 0
Piping 274
Inquiry, Award, Manufacturing & Delivery: Valve - Delivery to Site
300EC60169 ** 5
Inquiry, Award, Manufacturing & Delivery: Metal Pipe Mat'l (incl.
300EC60140 Galvanized Iron,StainlessSteel) - Delivery to Site 14
Inquiry, Award, Manufacturing & Delivery: Plastic Pipe Material
300EC60040 (HDPE) - Delivery to Site 74
Inquiry, Award, Manufacturing & Delivery: Fitting (Local) - Delivery
300EC60159 to Site ** 74
Inquiry, Award, Manufacturing & Delivery: Plastic Pipe Material
300EC60054 (PVC) - Delivery to Site 74
Inquiry, Award, Manufacturing & Delivery: Valve (Local) - Delivery
300EC60164 to Site ** 157
300EC60155 Inquiry, Award, Manufacturing & Delivery: Fitting - Delivery to Site 14
Inquiry, Award, Manufacturing & Delivery: Emergency Shower and
300EC60174 Eyewash- Delivery to Site ** 30
Inquiry, Award, Manufacturing & Delivery: Valve, Fitting, Flexible
H300EC60180 Joints (Local) - Delivery to Site ** 0
Inquiry, Award, Manufacturing & Delivery: Valve, Fitting, Flexible
H300EC60090 Joints - Delivery to Site 0
Instrumentation 152
Inquiry, Award, Manufacturing & Delivery: Cabling Material -
300EC70012 Delivery to Site 152
Inquiry, Award, Manufacturing & Delivery: Support (incl. Cable Tray,
300EC70017 Pipe Support) - Delivery to Site 37
Inquiry, Award, Manufacturing & Delivery: PLC & SCADA - Delivery
H300EC70030 to Site 0
Inquiry, Award, Manufacturing & Delivery: Automation &
H300EC70070 Instrumentation Devices - Delivery to Site 0
Electrical 158
Inquiry, Award, Manufacturing & Delivery: Cabling Material -
300EC80110 Delivery to Site 140
Inquiry, Award, Manufacturing & Delivery: Support (incl. Cable Tray,
300EC80191 Pipe Support) - Delivery to Site 37
Inquiry, Award, Manufacturing & Delivery: Conduit Pipe - Delivery
300EC80160 to Site 129
H300EC80030 Inquiry, Award, Manufacturing & Delivery: MCC - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Local Control Panel -
H300EC80070 Delivery to Site ** 0
400 TATALON WRF 220
Steel Structure 0
Inquiry, Award, Manufacturing & Delivery: Anchor Bolts - Delivery
400EC10040 to Site 0
Equipment 225
Inquiry, Award, Manufacturing & Delivery: Dehumidifier - Delivery
400EC50440 to Site 157
Inquiry, Award, Manufacturing & Delivery: Air Compressor -
400EC50390 Delivery to Site 157
Inquiry, Award, Manufacturing & Delivery: Submersible Pump -
400EC50579 Delivery to Site 172
Inquiry, Award, Manufacturing & Delivery: Waste Bin - Delivery to
400EC50540 Site 127
Inquiry, Award, Manufacturing & Delivery: Sodium Acetate Dosing
400EC50240 Pump - Delivery to Site 164
Inquiry, Award, Manufacturing & Delivery: PAC Dosing Pump -
400EC50290 Delivery to Site 164
Inquiry, Award, Manufacturing & Delivery: Dosing Pumps (NaOH
400EC50190 dosing pump) - Delivery to Site 172
Inquiry, Award, Manufacturing & Delivery: Tanks (PAC Storage) -
400EC50040 Delivery to Site 127
Inquiry, Award, Manufacturing & Delivery: Tanks (NaOH Storage) -
400EC50090 Delivery to Site 127
Inquiry, Award, Manufacturing & Delivery: Movable Screw
400EC50490 Conveyor w Receiving Hopper - Delivery to Site 37
Inquiry, Award, Manufacturing & Delivery: Sodium Acetate
400EC50340 Dissolution Unit - Delivery to Site 30
Inquiry, Award, Manufacturing & Delivery: Container for Sodium
400EC50140 Acetate - Delivery to Site 30
Piping 260
Inquiry, Award, Manufacturing & Delivery: Stainless Steel Valves -
400EC60340 Delivery to Site 157
Inquiry, Award, Manufacturing & Delivery: PVC Pipes And Fittings -
400EC60040 Delivery to Site 67
400EC60240 Inquiry, Award, Manufacturing & Delivery: Fittings - Delivery to Site 67
Inquiry, Award, Manufacturing & Delivery: HDPE Pipes And Fittings -
400EC60090 Delivery to Site 67
Inquiry, Award, Manufacturing & Delivery: Stainless Steel Pipes And
400EC60140 Fittings - Delivery to Site 14
Inquiry, Award, Manufacturing & Delivery: Valves, Fitting, Flexible
400EC60190 Joint - Delivery to Site 14
Instrumentation 98
Inquiry, Award, Manufacturing & Delivery: Instrument Bulk -
400EC70054 Delivery to Site 30
Inquiry, Award, Manufacturing & Delivery: Ammonia and Nitrate
H400EC70100 Analyzer - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Residual Chlorine
H400EC70120 analyzer - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Instrument Cable -
400EC70040 Delivery to Site 7
Inquiry, Award, Manufacturing & Delivery: Thermal Mass Gas Flow
H400EC70080 Meters - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Electromagnetic Flow
H400EC70130 Meter - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: ORP meter - Delivery to
H400EC70090 Site 0
Inquiry, Award, Manufacturing & Delivery: pH meter - Delivery to
H400EC70110 Site 0
Inquiry, Award, Manufacturing & Delivery: Float level Switch -
H400EC70140 Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Level Indicating
H400EC70150 Transmitter (Ultrasonic Type) - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Electrode level Switch -
H400EC70160 Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Pressure Switch -
H400EC70170 Delivery to Site 0
H400EC70060 Inquiry, Award, Manufacturing & Delivery: SCADA - Delivery to Site 0
H400EC70070 Inquiry, Award, Manufacturing & Delivery: PLC - Delivery to Site 0
Electrical 165
Inquiry, Award, Manufacturing & Delivery: LV MCC Panel - Delivery
400EC80090 to Site 157
Inquiry, Award, Manufacturing & Delivery: Bulk Materials - Delivery
400EC80040 to Site 30
Inquiry, Award, Manufacturing & Delivery: Electrical Power And
400EC80140 Control Cables - Delivery to Site 30
Mandatory Spares 82
Inquiry, Award, Manufacturing & Delivery: Submersible Pump -
400EC50569 Delivery to Site 30
Inquiry, Award, Manufacturing & Delivery: Dehumidifier - Delivery
400EC50559 to Site 7
Inquiry, Award, Manufacturing & Delivery: Air Compressor -
400EC50554 Delivery to Site 7
Inquiry, Award, Manufacturing & Delivery: Sodium Acetate
400EC50564 Dissolution Unit - Delivery to Site 30
Inquiry, Award, Manufacturing & Delivery: Dosing Pumps - Delivery
400EC50574 to Site 7
500 PACO WRF 185
Equipment 52
Inquiry, Award, Manufacturing & Delivery: Aeration Blowers (for
500EC50140 SBR) - Delivery to Site 30
Inquiry, Award, Manufacturing & Delivery: Aeration Blowers (for
500EC50154 Equalization) - Delivery to Site 30
Inquiry, Award, Manufacturing & Delivery: Decanter for SBR -
500EC50090 Delivery to Site 14
Inquiry, Award, Manufacturing & Delivery: Fine Screen (A) - Delivery
500EC50190 to Site 30
Inquiry, Award, Manufacturing & Delivery: Fine Screen (B) - Delivery
500EC50240 to Site 30
Inquiry, Award, Manufacturing & Delivery: Tanks (PAC Storage) -
500EC50290 Delivery to Site 7
Inquiry, Award, Manufacturing & Delivery: Tanks (NaOH Storage) -
500EC50340 Delivery to Site 7
Inquiry, Award, Manufacturing & Delivery: Sodium Acetate
500EC50040 Dissolution Unit - Delivery to Site 30
Inquiry, Award, Manufacturing & Delivery: Mixer for SBR - Delivery
500EC50740 to Site 7
Inquiry, Award, Manufacturing & Delivery: Diffuser for SBR -
500EC50790 Delivery to Site 14
Inquiry, Award, Manufacturing & Delivery: Lifting Pump - Delivery to
500EC50390 Site 7
Inquiry, Award, Manufacturing & Delivery: Equalization Pump -
500EC50440 Delivery to Site 7
Inquiry, Award, Manufacturing & Delivery: Excess Sludge Pump -
500EC50490 Delivery to Site 7
Inquiry, Award, Manufacturing & Delivery: Effluent Pump - Delivery
500EC50540 to Site 7
Inquiry, Award, Manufacturing & Delivery: Dosing Pumps (NaOH
500EC50590 dosing pump) - Delivery to Site 7
Inquiry, Award, Manufacturing & Delivery: Sodium Acetate Dosing
500EC50640 Pump - Delivery to Site 7
Inquiry, Award, Manufacturing & Delivery: PAC Dosing Pump -
500EC50690 Delivery to Site 7
Piping 111
Inquiry, Award, Manufacturing & Delivery: Stainless Steel Pipes And
500EC60140 Fittings - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: HDPE Pipes And Fittings -
500EC60090 Delivery to Site 7
Inquiry, Award, Manufacturing & Delivery: Emergency Shower And
500EC60290 Eyewash - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: PVC Pipes And Fittings -
500EC60040 Delivery to Site 7
Inquiry, Award, Manufacturing & Delivery: Stainless Steel Valves -
500EC60340 Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Pressure Relief Valve -
500EC60190 Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Flexible Metal Tubes -
500EC60240 Delivery to Site 0
Instrumentation 104
Inquiry, Award, Manufacturing & Delivery: Bulk Materials - Delivery
500EC70190 to Site 30
Inquiry, Award, Manufacturing & Delivery: Ammonia and Nitrate
H500EC70260 Analyzer - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Residual Chlorine
H500EC70300 analyzer - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Orifice Type Flow Meters
H500EC70230 (Local indication) - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Electromagnetic Flow
H500EC70240 Meter - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: ORP meter - Delivery to
H500EC70250 Site 0
Inquiry, Award, Manufacturing & Delivery: pH Meter - Delivery to
H500EC70270 Site 0
Inquiry, Award, Manufacturing & Delivery: DO meter - Delivery to
H500EC70280 Site 0
Inquiry, Award, Manufacturing & Delivery: Level Indicating
H500EC70290 Transmitter (Ultrasonic Type) - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Float level Switch -
H500EC70310 Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Electrode level Switch -
H500EC70320 Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Pressure Switch -
H500EC70330 Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Cable Float level Switch -
H500EC70340 Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Vibration Sensor for
H500EC70350 Motor - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Temperature Sensor for
H500EC70360 Motor - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Instrument Cable -
500EC70140 Delivery to Site 7
H500EC70210 Inquiry, Award, Manufacturing & Delivery: SCADA - Delivery to Site 0
H500EC70220 Inquiry, Award, Manufacturing & Delivery: PLC - Delivery to Site 0
Electrical 99
Inquiry, Award, Manufacturing & Delivery: Bulk Materials - Delivery
500EC80040 to Site 30
Inquiry, Award, Manufacturing & Delivery: Requisition For First
500EC80190 Pole/ Du Tapping - Delivery to Site 0
Inquiry, Award, Manufacturing & Delivery: Electrical Power And
500EC80140 Control Cables - Delivery to Site 30
Inquiry, Award, Manufacturing & Delivery: LV MCC Panel - Delivery
500EC80090 to Site 7
Mandatory Spares 92
Inquiry, Award, Manufacturing & Delivery: Air compressor &
500EC50804 Humidifier - Delivery to Site 7
Inquiry, Award, Manufacturing & Delivery: Aeration Blowers (for
500EC50829 SBR) - Delivery to Site 30
Inquiry, Award, Manufacturing & Delivery: Aeration Blowers (for
500EC50834 Equalization) - Delivery to Site 30
Inquiry, Award, Manufacturing & Delivery: Submersible Pumps -
500EC50814 Delivery to Site 7
Inquiry, Award, Manufacturing & Delivery: Decanter for SBR -
500EC50824 Delivery to Site 14
Inquiry, Award, Manufacturing & Delivery: Sodium Acetate
500EC50809 Dissolution Unit - Delivery to Site 30
Inquiry, Award, Manufacturing & Delivery: Dosing Pumps - Delivery
500EC50819 to Site 7
Start Finish Activity Status
3-Jan-24 7-Jan-25
25-Mar-24 7-Nov-24
25-Mar-24 7-Nov-24
25-Mar-24 29-Aug-24* Not Started
25-Mar-24 29-Aug-24* Not Started
24-Apr-24 13-Oct-24* Not Started
30-Apr-24 04-Sep-24* Not Started
14-May-24 26-Oct-24* Not Started
14-May-24 26-Oct-24* Not Started
14-May-24 26-Oct-24* Not Started
10-Jun-24 15-Oct-24* Not Started
10-Jun-24 17-Jul-24* Not Started
10-Jun-24 15-Oct-24* Not Started
29-Sep-24 29-Oct-24* Not Started
8-Oct-24 07-Nov-24* Not Started
20-Apr-24 24-Oct-24
20-Apr-24 24-Oct-24* Not Started
4-May-24 08-Oct-24* Not Started
6-Jun-24 06-Jul-24* Not Started
21-Jun-24 05-Jul-24* Not Started
5-Jul-24 10-Sep-24* Not Started
13-Jul-24 18-Sep-24* Not Started
13-Jul-24 18-Sep-24* Not Started
22-Jul-24 29-Jul-24* Not Started
17-Sep-24 17-Oct-24* Not Started
1-Oct-24 08-Oct-24* Not Started
30-Jun-24 26-Sep-24
30-Jun-24 30-Jul-24* Not Started
15-Jul-24 22-Jul-24* Not Started
24-Jul-24* Not Started
25-Jul-24* Not Started
08-Aug-24* Not Started
09-Aug-24* Not Started
19-Aug-24* Not Started
07-Sep-24* Not Started
07-Sep-24* Not Started
20-Sep-24* Not Started
20-Sep-24* Not Started
26-Sep-24* Not Started
26-Sep-24* Not Started
6-Jun-24 25-Oct-24
6-Jun-24 05-Jul-24* Not Started
28-Jul-24 27-Aug-24* Not Started
18-Oct-24 25-Oct-24* Not Started
22-Aug-24 2-Nov-24
22-Aug-24 29-Aug-24* Not Started
22-Aug-24 29-Aug-24* Not Started
29-Sep-24 29-Oct-24* Not Started
6-Oct-24 13-Oct-24* Not Started
26-Oct-24 02-Nov-24* Not Started
17-Apr-24 25-Nov-24
24-Aug-24 25-Nov-24
24-Aug-24* Not Started
01-Sep-24* Not Started
07-Sep-24* Not Started
14-Sep-24* Not Started
16-Sep-24* Not Started
24-Sep-24* Not Started
03-Oct-24* Not Started
06-Oct-24* Not Started
06-Oct-24* Not Started
06-Oct-24* Not Started
07-Oct-24* Not Started
11-Oct-24* Not Started
11-Oct-24* Not Started
11-Oct-24* Not Started
16-Oct-24* Not Started
21-Oct-24* Not Started
31-Oct-24* Not Started
25-Nov-24* Not Started
17-Apr-24 14-Aug-24
17-Apr-24 30-Jun-24* Not Started
1-Jun-24 14-Aug-24* Not Started
1-Jun-24 14-Aug-24* Not Started
23-Jun-24 30-Jun-24* Not Started
30-Jun-24 14-Jul-24* Not Started
24-May-24 15-Oct-24
24-May-24 29-Sep-24* Not Started
29-May-24 14-Oct-24* Not Started
20-Sep-24* Not Started
15-Oct-24* Not Started
31-May-24 4-Nov-24
31-May-24 07-Oct-24* Not Started
5-Jun-24 04-Nov-24* Not Started
19-Jun-24 26-Oct-24* Not Started
22-Oct-24* Not Started
22-Oct-24* Not Started
12-Mar-24 7-Jan-25
16-Jul-24 16-Jul-24
16-Jul-24* Not Started
23-Jun-24 7-Jan-25
23-Jun-24* Not Started
30-Jul-24* Not Started
30-Jul-24* Not Started
6-Aug-24 Not Started
11-Aug-24* Not Started
17-Aug-24* Not Started
21-Aug-24* Not Started
22-Aug-24* Not Started
01-Sep-24* Not Started
01-Sep-24* Not Started
02-Sep-24* Not Started
03-Sep-24* Not Started
06-Sep-24* Not Started
06-Sep-24* Not Started
25-Sep-24* Not Started
26-Sep-24* Not Started
28-Sep-24* Not Started
28-Sep-24* Not Started
29-Sep-24* Not Started
05-Oct-24* Not Started
27-Dec-24* Not Started
31-Dec-24* Not Started
07-Jan-25* Not Started
12-Mar-24 10-Dec-24
12-Mar-24 16-Mar-24* Not Started
30-Mar-24 13-Apr-24* Not Started
2-Apr-24 15-Jun-24* Not Started
20-Apr-24 03-Jul-24* Not Started
20-Apr-24 03-Jul-24* Not Started
20-Apr-24 24-Sep-24* Not Started
9-May-24 23-May-24* Not Started
7-Jun-24 07-Jul-24* Not Started
29-Aug-24* Not Started
10-Dec-24* Not Started
6-May-24 4-Oct-24
6-May-24 04-Oct-24* Not Started
6-May-24 11-Jun-24* Not Started
13-Sep-24* Not Started
13-Sep-24* Not Started
6-May-24 10-Oct-24
6-May-24 22-Sep-24* Not Started
11-May-24 17-Jun-24* Not Started
3-Jun-24 10-Oct-24* Not Started
09-Jul-24* Not Started
12-Jul-24* Not Started
3-Jan-24 5-Nov-24
15-Oct-24 15-Oct-24
15-Oct-24* Not Started
25-Mar-24 5-Nov-24
25-Mar-24 29-Aug-24* Not Started
25-Mar-24 29-Aug-24* Not Started
17-Apr-24 06-Oct-24* Not Started
7-May-24 11-Sep-24* Not Started
14-May-24 25-Oct-24* Not Started
14-May-24 25-Oct-24* Not Started
17-May-24 05-Nov-24* Not Started
1-Jun-24 06-Oct-24* Not Started
1-Jun-24 06-Oct-24* Not Started
18-Jun-24 25-Jul-24* Not Started
4-Sep-24 04-Oct-24* Not Started
21-Sep-24 21-Oct-24* Not Started
3-Jan-24 18-Sep-24
3-Jan-24 07-Jun-24* Not Started
18-Jun-24 24-Aug-24* Not Started
13-Jul-24 18-Sep-24* Not Started
13-Jul-24 18-Sep-24* Not Started
16-Jul-24 30-Jul-24* Not Started
16-Jul-24 30-Jul-24* Not Started
14-Jun-24 20-Sep-24
14-Jun-24 14-Jul-24* Not Started
14-Jul-24* Not Started
14-Jul-24* Not Started
19-Jul-24 26-Jul-24* Not Started
28-Jul-24* Not Started
28-Jul-24* Not Started
08-Aug-24* Not Started
08-Aug-24* Not Started
08-Aug-24* Not Started
08-Aug-24* Not Started
08-Aug-24* Not Started
08-Aug-24* Not Started
20-Sep-24* Not Started
20-Sep-24* Not Started
18-Mar-24 29-Aug-24
18-Mar-24 21-Aug-24* Not Started
16-Jun-24 15-Jul-24* Not Started
30-Jul-24 29-Aug-24* Not Started
15-Aug-24 5-Nov-24
15-Aug-24 14-Sep-24* Not Started
22-Aug-24 29-Aug-24* Not Started
22-Aug-24 29-Aug-24* Not Started
4-Sep-24 04-Oct-24* Not Started
29-Oct-24 05-Nov-24* Not Started
10-Jun-24 12-Dec-24
1-Oct-24 22-Nov-24
1-Oct-24 31-Oct-24* Not Started
1-Oct-24 31-Oct-24* Not Started
6-Oct-24 20-Oct-24* Not Started
11-Oct-24 10-Nov-24* Not Started
11-Oct-24 10-Nov-24* Not Started
16-Oct-24 23-Oct-24* Not Started
16-Oct-24 23-Oct-24* Not Started
23-Oct-24 22-Nov-24* Not Started
25-Oct-24 01-Nov-24* Not Started
5-Nov-24 19-Nov-24* Not Started
6-Nov-24 13-Nov-24* Not Started
6-Nov-24 13-Nov-24* Not Started
6-Nov-24 13-Nov-24* Not Started
6-Nov-24 13-Nov-24* Not Started
15-Nov-24 22-Nov-24* Not Started
15-Nov-24 22-Nov-24* Not Started
15-Nov-24 22-Nov-24* Not Started
23-Aug-24 12-Dec-24
23-Aug-24* Not Started
3-Sep-24 10-Sep-24* Not Started
09-Sep-24* Not Started
10-Sep-24 17-Sep-24* Not Started
01-Oct-24* Not Started
25-Nov-24* Not Started
12-Dec-24* Not Started
10-Jun-24 22-Sep-24
10-Jun-24 10-Jul-24* Not Started
14-Jul-24* Not Started
14-Jul-24* Not Started
28-Jul-24* Not Started
28-Jul-24* Not Started
08-Aug-24* Not Started
08-Aug-24* Not Started
08-Aug-24* Not Started
08-Aug-24* Not Started
08-Aug-24* Not Started
08-Aug-24* Not Started
08-Aug-24* Not Started
08-Aug-24* Not Started
08-Aug-24* Not Started
08-Aug-24* Not Started
15-Sep-24 22-Sep-24* Not Started
20-Sep-24* Not Started
20-Sep-24* Not Started
21-Aug-24 28-Nov-24
21-Aug-24 20-Sep-24* Not Started
15-Sep-24* Not Started
12-Oct-24 11-Nov-24* Not Started
21-Nov-24 28-Nov-24* Not Started
22-Aug-24 22-Nov-24
22-Aug-24 29-Aug-24* Not Started
1-Oct-24 31-Oct-24* Not Started
1-Oct-24 31-Oct-24* Not Started
6-Oct-24 13-Oct-24* Not Started
6-Oct-24 20-Oct-24* Not Started
23-Oct-24 22-Nov-24* Not Started
15-Nov-24 22-Nov-24* Not Started