1 202207072005 05/04/2022 Alternate arrangement for flushing of PCU Ease in Operation AMD A.K.Minz 9437125741
Turbo Circulator sludge line
2 202209790006 09/03/2022 Release of hydrostatic pressure Settling Pit Safety AMD A.Somani 8895979277
3 202202769005 24/03/2022 Alternate Tanker Loading Arrangement PCU Availability AMD J.K.Sahu 9437664658
5 202203111013 01/03/2022 PROVISION OF CURRENT INDICATION OF OBPH/IPH ALL PUMPS Ease in Operation C & I Maint A.K.Nayak 9437025596
ALL MOTORS OF OBPH AND IPH IN PLC
6 202209072007 01/04/2022 PROVISION OF RTD FAULT RESET PAGE UCR 9 Productivity C & I Maint A.Bhardwaj 9437558066
IN #9 DCS PAGE
COMMISSIONING OF ELECTRO-
11 202208164008 19/07/2022 MECHANICAL ACTUATOR FOR BFP6A HY. BFP-A UNIT-6 Ease in Maintenance C & I Maint S.Kumar 9437576496
CPLNG SCOOP CONTROL
12 202208164009 30/04/2022 Provision of CO Analyser at Unit-1 Boiler Unit-1 Boiler Productivity C & I Maint S.Kumar 9437576496
13 202208164010 01/03/2022 Upgradation of VAM-A Unit-1 HMI VAM-A Unit-1 PLC Availability C & I Maint S.Kumar 9437576496
24 202207373004 24/06/2022 BC-122 Discharge chute flange joint CHP-2 Mech.maint Cost Saving C.H.P (MECH.MAINT) B.B.Dandpat 9438207304
modification.
Stacker/Reclaimer-3 Impact idler frame
25 202207373005 08/07/2022 modification. CHP-2 Mech.maint Cost Saving C.H.P (MECH.MAINT) B.B.Dandpat 9438207304
33 202208592033 18/05/2022 PROVISION OF DRAIN VALVE IN COAL TP-5/ COAL YARD Ease in Maintenance C.H.P (MECH.MAINT) M.K.Khatua 9437370987
YARD SPRINKLER HEADER PIPELINE. SPRINKLING SYSTEM
37 202208592037 19/05/2022 PROVISION OF AUTO DUST CONTROL CONVEYOR 2A/2B Safety C.H.P (MECH.MAINT) M.K.Khatua 9437370987
UNIT AT CONVEYOR 2A/B.
Effective Change in Coal Truck
38 202205534006 20/07/2022 Weighment Process to Save Printing COAL Ease in Operation C.R.S S.S.Nathan 9437020824
Paper
39 202205534007 20/07/2022 Effective Utilization of compressed Air in CRS Painting Shop Productivity C.R.S S.S.Nathan 9437020824
CRS Painting shop
Test rack for Locomotives Air Brake Locomotive
40 202205534008 09/05/2022 Valves Maintenance Maitenance Ease in Maintenance C.R.S S.S.Nathan 9437020824
Suggestion
Sl.No Suggestion No. Suggestion Title Sarjana Area Project Type Department Suggestor Mobile No.
Date
Construction of morcha, watching
41 202209564006 12/07/2022 platform & driver rest shed at Coal COAL CORRIDOR GATE Safety CIVIL ENGG. DEPT A.Kumar 9437187065
Corridor Gate.
Provision of Working Platform near Unit-
42 202209564007 11/05/2022 Unit-1 boiler Ease in Operation CIVIL ENGG. DEPT A.Kumar 9437187065
1 boiler
River training work of Brahmani river at
43 202206768015 30/05/2022 IPH to ensure water availability to Nalco Intake Pump House Ease in Operation CIVIL ENGG. DEPT R.Purty 9437209451
CPP
Installation of eye wash fountain at ESP-
44 202206768016 04/04/2022 1 to 10 ESP-1 to 10 Safety CIVIL ENGG. DEPT R.Purty 9437209451
58 202208239024 20/04/2022 Development of Road Berm near TP#2. TP#2 Housekeeping CIVIL ENGG. DEPT S.K.Sahoo 9438475665
59 202208239025 13/07/2022 Strengthening of Column base of ID Fan ID FAN#7 Safety CIVIL ENGG. DEPT S.K.Sahoo 9438475665
Duct.
60 202208239026 17/06/2022 Modification of Unit Control Room#8 for UCR#8 Energy Saving CIVIL ENGG. DEPT S.K.Sahoo 9438475665
increasing efficiency of AC System
62 202208239028 20/04/2022 Renovation of drainage system near JH-4 JH-4 Quality CIVIL ENGG. DEPT S.K.Sahoo 9438475665
64 202208887001 25/07/2022 EASE IN FINDING THE FAULTY WSB WSB(WALL SOOT Productivity ELECT MAINT R.M.Sahoo 9437201503
HOME POSITION. BLOWER)
INSTALLATION OF ALTERNATIVE
69 202208005003 15/03/2022 CONTROL PANEL FOR EMERGENCY UNIT#9&10 Productivity ELECT MAINT D.R.Behera 9437031354
STARTING OF UNIT#9&10 TG OIL PUMPS
70 202209618002 14/07/2022 Modification in Auxiliary supply scheme DAVR Productivity ELECT MAINT M.Chand 9437477938
of Unit-05 & 06 DAVR Transducers
72 202108822004 20/10/2021 Modification of the Sludge Pit Valve IPH Bharatpur Ease in Operation LSP G.K.Nayak 9437962968
Alternative drainage arrangement at IPH
73 202208822002 10/01/2022 IPH Bharatpur Ease in Operation LSP G.K.Nayak 9437962968
Bharatpur
Provision of Drinking water at IPH
74 202208822003 15/01/2022 IPH Bharatpur Availability LSP G.K.Nayak 9437962968
Bharatpur
75 202106222002 06/12/2021 Maintaining continuity of Return water IPH Bharatpur Availability LSP R.C.Mahalik 9437187961
from Mines to CPP.
76 202106222003 15/11/2021 Alternative seal water arrangement IPH Bharatpur Ease in Operation LSP R.C.Mahalik 9437187961
Modification of Return water pump
77 202206222001 05/01/2022 suction header & repositioning of LP seal Pump House Ease in Operation LSP R.C.Mahalik 9437187961
water pump
78 202109092002 10/11/2021 Provision of Retaining Wall Barge Area Safety LSP U.K.Maharana 9437567474
Restricting Overflow water of
79 202209092001 07/01/2022 IPH Bharatpur Cost Saving LSP U.K.Maharana 9437567474
Clariflocculator
80 202209092003 12/01/2022 Water proofing of Ash water sumps IPH Bharatpur Ease in Operation LSP U.K.Maharana 9437567474
86 202208901031 18/02/2022 Eliminating difficulties in center feed #1 Mill/Center Feed Ease in Maintenance MECH MAINT-1 S.K.Maharana 9437236482
coal pipe maintenance. Pipe
87 202208901032 25/02/2022 Minimize the vertical shaft upper radial #1 Mill/VS Radial Productivity MECH MAINT-1 S.K.Maharana 9437236482
bearing outer racer dislocation. Bearing
93 202207686010 14/02/2022 In-situ repair of HRH safety valve. BOILER Time Saving MECH MAINT-1 P.K.Sethy 9437037821
CONVERSION OF EXISTING HFO SYSTEM
94 202208492009 11/07/2022 BOILER/FOPH Availability MECH MAINT-1 S.K.Behera 9437360165
TO LDO IN FOPH-2
various modifications for upgrading
95 202208034006 20/04/2022 safety measures in EOT crane area of Turbine& auxillary Safety MECH MAINT-1 S.K.Naha 9437577810
unit#1 to #6
MODIFICATION IN EHG/MHG
96 202208651015 22/06/2022 Turbine& auxillary Quality MECH MAINT-1 S.N.Barik 9437054888
CHANGEOVER VALVE UNIT#4
Suggestion
Sl.No Suggestion No. Suggestion Title Sarjana Area Project Type Department Suggestor Mobile No.
Date
105 202206610006 20/06/2022 Modification of CW pump-10 TBH UTILITY Productivity MECH MAINT-2 S.K.Mohanty 9437029637
housing
NORMALISATION OF 15 MINUTE
111 202208764007 23/02/2022 STARTING DELAY AFTER STOPPAGE OF UNIT#7 BFP AND CEP Productivity OPRN GROUP - I D.G.Pattanayak 9437012758
U#7 BFP AND CEP.
CEP CONDENSATE MINIMUM R/C VALVE
112 202208764008 16/02/2022 UNIT#7 DCS Availability OPRN GROUP - I D.G.Pattanayak 9437012758
CD-37 AUTO PROVISION.
WATER INGRESS TO ASPH-4 NEGATIVE
113 202208764009 20/02/2022 METER DURING OF AWPH-2 OVERFLOW ASPH-4/AWPH-2 Availability OPRN GROUP - I D.G.Pattanayak 9437012758
CONDITION.
Dynamic set point alarm for APH UNIT #07 & #08 APH
118 202208187010 19/07/2022 GUIDE/SUPPORT bearing temperature of Productivity OPRN GROUP - I P.K.Upadhyay 9437158691
unit #07 & 08 GB/SB AREA
Unit 7 LP Water
NEW Isolation valve in LP water header
130 202208598023 01/07/2022 near Economiser flushing box. header for economizer Productivity OPRN GROUP - III C.Shyam 9437585319
flusing box.
131 202208598024 01/07/2022 Provision of new drain box for unit 10 BFP of unit 10. Safety OPRN GROUP - III C.Shyam 9437585319
BFP A.
DCS annunciation for sharp fall in HFO
132 202208598025 01/07/2022 DCS of unit 9 and 10 Productivity OPRN GROUP - III C.Shyam 9437585319
LDO tank level
136 202209779011 01/02/2022 relocation of ejector vent to atmosphere Ejector of UNIT-06 Ease in Operation OPRN GROUP - IV A.K.Garai 9674449430
line of unit -06
RELOCATION OF UNIT 6 BFP A AW-95
137 202209739004 01/07/2022 VALVE Ease in Operation OPRN GROUP - IV R.Saxena 8280758915
141 202208191004 08/06/2022 Relocation of LCC panel of EFF pump -3 CWPH Safety OPRN GROUP - IV S.Gupta 9437492597
145 202209340045 15/07/2022 PROVISION OF GSC DRIP TEMPERATURE UNIT-7-10 DCS Quality OPRN GROUP - IV S.Mohapatra 9437063178
IN DCS IN UNIT-7-10
156 202109650002 01/10/2021 Development of NEFFARS Application Ease in Operation SYSTEMS K.Pandey 9437563832
158 202209650003 05/01/2022 Implementation of IPsec to provide LAN Availability SYSTEMS K.Pandey 9437563832
connection to Intake Pump House