Evaluation Result of Tunnel Soil Investigation

Range of
Tunnel Start Station End Station Borehole
SPT
SDZK1 17-20
1 5+520.00 6+185.00 SDZK2 44-50
SDZK3 16-50
SDZK4 31-47
2 7+930.00 8+380.00 SDZK5 16-26
SDZK6 24-50
SDZK7 28-36
3 13+050.00 14+885.00 SDZK8 15-50
SDZK9 15-50