Date: November 18, 2019
Customer: Nasser Al Hajri Corporation - Fab shop 2 Industrial
Ce: Mr. Ajish Nair (NSH ProjectiEngineering Manager)
Mr. Rawat Singh (TR QC Inspector)
Project: ARAMCO - TR HARAD AND HAWIYAH FIELD GAS PLAINT PROJECT
Subject: Coating system overlapping for field touch-up and repair inquiry
Dear Sir,
The following below are Jotun recommendation for the overlapping of different APCS
coating system:
‘A. APCS 2C and 1A overlapping
» After surface cleaning and preparation (abrasive blasting is preferred method)
feather to sound edge APCS 1A coating system.
> Apply APCS 2C system on the repair area with minimum overlapping to APCS 1A
coating system
» Apply APCS 1A topcoat to areas with service temperature 120 °C and below only.
B. APCS 2C and 11A overlapping
> After surface cleaning and preparation (abrasive blasting is preferred method)
feather to sound edge APCS 11A exposing Resist 78 (do not overlap APCS 2C
‘Tankguard AR to APCS 11A topcoat (Solvalitt)
> Apply APCS 2C system to the repair area with minimal overlapping to APCS 114
primer Resist 78.
> Apply APCS 11A topcoat overlapping to APCS 2C coating system
Note: There will be no technical issue when minor portion of APCS 11A and 1A are
under insulation since the primer Resist 78 for both systems are approved under
insulation.
Please refer to Jotun Product Data Sheet and Application guide for more details.
A &
2, VERRY ES.
Jotun Saudia Co. Ltd. Qa Roe Bagaonl pagal! (sige Spe
‘daddah Heed Office -C.R, No, 4030088663, Industa Licence No $2054025674 TNT“ TAMWE RB, gatinn mab SLPS“ AMANT hy cay Fale ga ISA
Branches:
Jeddah -C.R. 4020121816 - 4090280355
Yanbu -C.R. 4700001837
Dammam CR, 2050023927
Riyadh -C.R. 1010087896
19s Mushalt CR. S8ss060084
CR, 2058025425
No: 920029908, Fax: +966 12 6362489,
P.O. Box 24608, Jeddah 24478
kingdom of Sauel Arabi
een venting
TOA Re PIMA roe
www.Jotun.com/me yoga Appa 2a!