You are on page 1of 14
epic of he Popes DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CENTRAL OFFICE ania dune 2, 2021 BRIAN KANE Project Manager! Highway Engineer Renardet S.A Consulting Engineers Mezzanine oor, 60M Ext. Bulcing ‘DPWH Compound, 2" St, Port Are, Manila aTtN [FREDELINO F. FRANCO Deputy Project Menager ALL RESIDENT ENGINEERS ‘CORE and Non CORE PROJECTS SUBJECT 0.0. No. 56, series of 2005 RE: Guidelines for the Implementation of DOLE D.0 13s. 1998 on ‘Occupational Safety and Heath inthe Construction industry Dear Mr Kane: Tas been an observation, that during st inspections of ou on-going projec tagether wth the Undersecretary for UPHO Operations EMIL K. SADAIN, CESO 1, the staff and bores are being ‘alowed to work, without wearing or with incomplete Personal Protective Equpment (PPE). Lkewse, the waming signe and sgnages dtnbuted along the project mt are not n_ acordance with Speciicaten and provisions of B.O. 13 series of 2018, where the guidelines fr the preparation of Cost Estimates on Trafe Management are specie forthe pay item on Safty and Heath in the ‘approved Program of Work. Further, the Regional Projet Monitoring Commitee with NEDA a its secetarit sted non-comphance ‘of these Grecves. These ae evdenty shown in your drone presentations as well 3s progress ‘Photographs submitted to ths ofice for monitoring purpose. ‘nent this, be instructed to comply wth the provision ofboth issuances, as pkdged in your COSH Program that was approved bythe Department of Labor and Employment for adoption during the entire project duration. Further, there must be ample quantity of PEs sll nteded for use of each Wc va Ue projet re Wo Ue ‘tached for your ready reference & a copy of Department Order No, 56, series of 2005, on the Implementation of Occupational Safety end Health nthe Constucton Indust as mrad By aw. compliance is enjoined. Project RMU (Mutlatera), UPHO ay ta: MILK SADAIN,CE501, doses UNO Options Repu of the Pipes DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CENTRAL OFFICE ani June 2, 2021 MEMORANDUM FOR PROJECT MANAGERS PROJECT ENGINEERS SUBJECT: D.O. No. 56, series of 2005 RE: Guldelines for the Implementation of DOLE DO 13 s. 1998 on ‘Occupational Safety and Health in the Construction Industry IR has been observed that during my ste Inspection with Undersecretary EMIL K. SADAIN on our or-going projects, the staff and laborers are being allowed to work without wearing or with incomplete Personal Protective Equipment (PPE). The Constructon signages, fistibuted along the project mit, are Tkewise not in accordance with specication and provisions of the D.0. 13, s. of 2018, stipulating the guidelines forthe preparation of Cost Estimates on Traffic Management thot was used asa bass in the preparation of the approved Program of Work for pay item on Safety and Health Program. ‘nent this, you are Instructed to revisit the provisions and ensure the fathful compliance of the contractor at al times. Further, there must be ample quanty of PPE intended for use of all nspectrs visting the project from time to time ‘tached for your ready reference isa copy of Department Order No. 56, series of 2005 for the implementation of Occupational Safety and Health in the Construction Industry that is ‘mandated to be observed during the entire duration ofthe project. MCT (Muller), UPHO oe morraeesn 8 28 SESE memes © 2.1 Checklist of Personal Protective Equipment per Type of Road Project (siote: Chocktist of PPE aa reflected herein are the minimum requirements only. Should the implementing Offlces identity the (EO Se Incheon of specialized PPEs, necessary sdustmnen shall be made accoraingiy > romoraccaron | wows | ar | ey fawn] “ans [amcons] me! | osm [tees | wae | ar | cous Foreman ¢ ¢ ¥ ~ ase pena ares poeme | ae = Ie pet bine ar B.7.2. On-site Safety Officer B.7.3. Protective Clothing and Safety Equipment or PPE PROTEC eer eWoR ARPS UST ASK scion TEcne tors veer Los B.7.4. Medical and First-Aid Facilities B.7.4. Medical and First-Aid Facilities |-- Stangars Stn Panel of peropiteshostg fasted ‘lmatenale are 22" 253mm Angular Bar + Vaties depending onthe teeta son pena! + a3 ——-+ 060m lar spacing Foe 2 eta ote twos sgn tome 1 Dinch 0 GL. Pipe Gauge # 8 Steel Mat/ Mesh , 6f wide with 2° X 2° whole 2 mm thick MS Plate 3° x 6" x 4 mm thick Flat Bar for the Stand _ WARNING! DEEP EXCAVATION — Provision for connections/linking of barricades i 6¢é WARNING! | DEEP EXCAVATION B.7.6. Measurement and Payment DOLE Department Order No. 198, Series of 2018 Implementing Rules and Regulations of RA No. 11058 Entitled “An Act strengthening compliance with Occupational Safety and Health Standards and providing Penalties for Violations Thereof” DPWH Department Order No. 56, Series of 2005 Official 1st Offense 2nd Offense _3rd Offense Succeeding Offense Head, Implementing Office__Warning Susp. for 1 week Susp. for 2 week Susp. for 1 month Project Manager, 10 ‘Warning Susp. for2 week Susp. for1month __Susp. for 2 month Project Engineer, 10 ‘Warning ‘Susp. for 2 week ‘Susp. for 1 month Susp. for2 month _ feam Leader, Consultant farning, Susp. for 1 weel usp. for 2 weel Susp, for 1 mont (Chief RE, Consultant Warning Susp. for2 week Susp.forimonth Susp. for2 month IRE, Consultant Warning Susp.for2 week _Susp.forimonth Susp. for 2 month IRE, Contractor Reprimand Susp.for2week _Susp.forimonth Susp. for 2 month fafety Man, Contractor Reprimand _Susp.fori month susp. for2month Termination ] (Contrator Reprimand ist warning nd warning Blacklisting Note: The corresponding cost of non-compliance shall be deducted from the contractor's billing for the period

You might also like