1. The document appears to be a bill of quantities for construction work up to the 5th floor of a building, listing items, quantities, rates, and amounts.
2. It includes items for columns, slabs, walls, staircases, and other structural elements from the ground floor up to the 5th floor as well as for three silo structures.
3. The total amount for all items listed is Rs. 20,51,380.
1. The document appears to be a bill of quantities for construction work up to the 5th floor of a building, listing items, quantities, rates, and amounts.
2. It includes items for columns, slabs, walls, staircases, and other structural elements from the ground floor up to the 5th floor as well as for three silo structures.
3. The total amount for all items listed is Rs. 20,51,380.
1. The document appears to be a bill of quantities for construction work up to the 5th floor of a building, listing items, quantities, rates, and amounts.
2. It includes items for columns, slabs, walls, staircases, and other structural elements from the ground floor up to the 5th floor as well as for three silo structures.
3. The total amount for all items listed is Rs. 20,51,380.
Detaile and Abstract Estimate For The Proposed Construction of Ground Floor RCC Roof Residential Building in Site No-132, SF No 455 .Saravanampatti Village, Coinbatore North (TK), Coimbatore (Dist)