# 3, ( Old # 33 ), 'M' - Block, Annanagar East, Chennai - 600 102 Tel : 26212506, Fax : 26215364
e - mail : bharatchen@gmail.com web site : bharatbuilders.com
Budget
Sl.No Description of Work Unit Qty Rate Amount
3 P.C.C work
Cement Bags 78 320 24,960
Sand Cft 670 65 43,550
Coarse aggregate Cft 984 55 54,120
4 Concrete
Jelly CFT 6372 35 223,020
M Sand CFT 4854 45 218,430
Cement Bags 1800 320 576,000
5 Brick Work
Bricks Nos 98937 10 989,370
Cement Bags 249 320 79,680
M Sand CFT 1869 65 121,485
6 Internal Plastering
Cement Bags 401 320 128,320
Sand CFT 3011 65 195,715
7 External Plastering
Cement Bags 155 320 49,600
Sand CFT 1164 65 75,660
17 UPVC (KOMMERLING)
Sliding Door Sft 224 800 179,200
W1 Sliding window 2 shutters ( 6'0"x4' ) Sft 24 500 12,000
W2 Sliding window 2 shutters ( 4'0"x4' ) Sft 264 500 132,000
W3 Sliding window 2 shutters ( 3'0"x4' ) Sft 72 500 36,000
W4 Sliding window 2 shutters ( 2'0"x4') Sft 8 500 4,000
W5 Sliding window 3 shutters ( 6'0"x6') Sft 72 520 37,440
W6 Sliding window 2 shutters ( 3'0"x6' ) Sft 108 500 54,000
KW1 Sliding window 2 shutters ( 3'0"x3'6") Sft 84 480 40,320
KW2 Sliding window 2 shutters ( 2'0"x3'6") Sft 7 480 3,360
Ventilator Sft 48 530 25,440
W7 Openable Shutter ( 2'0"x6' ) Sft 60 635 38,100
19 Door Fixing
Main Door Nos 6 29500 177,000
Room Door Nos 18 15100 271,800
Toilet Door Nos 14 13000 182,000
COST DETAILS
S.NO DESCRIPTION RATE AREA
1 Main Door Frame
Main Door shutter 150 24.5
Veneer 70 56
Labour cost for fixing 160 24.5
Hinges 160
Tower bolt 350
Door lock 4500
Melamyne spray 120 24.5
Total
2000/cft 4*2'6"
2000/cft 4*2'6"
AMOUNT
6097
3675
3920
3920
480
700
4500
2940
26232
7000
2520
480
700
1500
1050
13250
7000
2520
480
700
1500
1050
13250
TYPE OF FRAME
S.NO DESCRIPTION SECTION SIZE UNIT
WOOD AREA
African
MAIN DOOR Teak wood
1 5*3 7*3'6" CFT 1.82
FRAME (first
quality)
African
BED ROOM Teak wood
2 4*2'6" 7*3 CFT 1.17
DOOR FRAME (first
quality)
African
TOILET DOOR Teak wood
3 4*2'6" 7*2'6" CFT 1.14
FRAME (first
quality)
DIFFERENCE
TOTAL B/W TOTAL
BASIC COST TOTAL TEAK
TEAK BASIC COST
(As per BASIC WOOD
WOOD AND TOTAL
specification) COST COST
COST TEAK WOOD
COST
RS RS RS RS RS