No Description L W H Unit N0> det Qty Rate

1 Excavation of foudation treanch 0 0 0 M3 0 0 $ 7.00

Construction of Rubble stone


foundation.All joints between
stone filled with cement/sand
mortar (1:4 rotio). Minimum
height of foundation wall from
2 ground level is 50 cm 94 0.4 0.5 M3 18.8 $ 50.00

Construction of Rcc Tie beam on


foundation (40cmX20cm), 1:2:4
(1-3" maximum aggregate size)
ratio with 12mm rebar & 20cm,c/c
staffs.Concrete mix should be
thorought vibrated to remove any
3 air spaces. 94 0.4 0.2 M3 7.52 $ 180.00
4 Back filling and compact 108 1 0.7 M3 75.6 $ 7.00
5 lean concrete for floor 108 1 0.06 M3 6.48 $ 80.00
6 Hallow block construction walls 94 1 3.2 M2 47 254 $ 16.00
7 Rcc for linters for Block wall 94 0.2 0.2 M3 3.76 $ 180.00
8 Iron sheet for roofing M2 140 $ 16.00
9 Tying facia board 15 cm M 28 $ 3.00
10 Ceiling M2 94 $ 16.00
11 Plastering of internal and external 94 3.2 M2 2 47 508 $ 3.00
12 Floor tiles M2 108 $ 16.00
13 White washing 94 3.2 M2 2 47 508 $ 1.00
14 Distambar 94 3.2 M2 2 47 508 $ 2.00
15 Imported wooder doors +frame+ locks& hings Pcs 10 $ 130.00
16 Aluminium windows M2 8 $ 95.00
17 Septictank 2 2 5 M3 20 $ 65.00
18 Electrical instalation Ls
19 chines steel doors Ls 1 $ 100.00
20 elevated water tank Ls 1 $ 300.00
21 Water instalation Ls
Amount
$ -

$ 940.00

$ 1,353.60
$ 529.20
$ 518.40
$ 4,060.80
$ 676.80
$ 2,240.00
$ 84.00
$ 1,504.00
$ 1,522.80
$ 1,728.00
$ 507.60
$ 1,015.20
$ 1,300.00
$ 760.00
$ 1,300.00
$ 1,200.00
$ 100.00
$ 300.00
$ 1,200.00
$ 22,840.40
JAMHUURIYADDA SOOMAALILAND

AFLAX CONSTRUCTION COMPANY


Head Office HargeisaTel:-514220(Telsom L
& 4436426( Telsom Mobile)/ 217449(Afro online)

Email:-AflahConstraction@hotmail.com
No Description Unit Qty Rate Amount
1 Site clearance Ls 150
2 Excavation of foudation treanch60x,5x,4 Cum 12 9 108
3 Excavation of footing of ( 20x1.2x1.2x1.2 ) Cum 34.56 9 311.04
4 Lean concrete 10cm, thick Cum 2.4 80 192
5 Rcc concrete for footing Cum 8 325 2600
Construction of Rubble stone foundation.All
joints between stone filled with cement/sand
mortar (1:4 rotio). Minimum height of foundation
6 wall from ground level is 50 cm Cum 33.2 45 1494
Construction of Rcc Tie beam on foundation
(40cmX20cm), 1:2:4 (1-3" maximum aggregate
size) ratio with 12mm rebar & 20cm,c/c
staffs.Concrete mix should be thorought
7 vibrated to remove any air spaces. Cum 6.72 325 2184
8 Back filling and compact Cum 45 12 540
9 Hardcore filling 10cm, thick Cum 10.2 15 153
10 lean concrete for floor Cum 10.2 75 765
11 Rcc for colums Cum 9.6 325 3120
12 Hallow block construction walls Sqm 250 14 3500
13 Rcc Sill under Windows Cum 0.3 300 90
14 Rcc for linters Cum 3.32 325 1079
15 Iron sheet for roofing Sqm 0
Tying facia board 15 cm 0
16 Ceiling Sqm 0
17 Rcc beam under slab Cum 5 325 1625
18 Rcc slab Cum 20.175 325 6556.875
19 Rcc For Varanda Cum 1.075 325 349.375
20 Plastering of internal and external Sqm 500 3.5 1750
21 Dressing stone Cum 0
22 Floor tiles Sqm 154 14 2156
23 Wall tiles Sqm 70 14 980
24 Local floor tiles Sqm 0
25 White washing Sqm 500 1.5 750
26 Distambar Sqm 500 1.5 750
27 Imported wooder doors Pcs 8 190 1520
28 Local Steel door Pcs 0
Painting of red oxide on the roof Sqm 0
Painting on the Frem doors Sqm 0
29 Aluminium windows Sqm 11.2 125 1400
30 Rcc for stair Cum 2.88 325 936
31 Hand rail Lm 8 90 720
32 Wc accessories Set 2 500 1000
33 Water instalation Ls 0
34 Electrical instalation Sqm 134.5 9.5 1277.75
35 Septictank 4x3x4.3m Qum 51.6 40 2064
36 Staircase + Batuto Ls 3500
37 Brimetr Wall Ls 0