You are on page 1of 15

Original Qty Executed

Sl.no Item Description Unit % of comp


Scope (Qty) till 31st Jul'21

RCC Building
Structure
1 Grade Slab -P3 ( PCC + RCC) Cum 150 100 67%
2 Overhead tank - Wall + Slab Cum 35
3 Sky light beam Cum 50
4 Terrace Screed - 1st layer Cum 240
5 Plinth Protection ( PCC + RCC) Cum 90
6 Other Misc Concreting Cum 135
7 Internal Rooms - Concrete Flooring Cum 300
1000 100
Finishes
1 Solid Block Work Cum 74 40 54%
2 AAC Block Work Cum 2511 275 11%
3 Cement Plaster - Internal Sqm 6393 520 8%
4 Cement Plaster - External Sqm 3845
5 Gypsum Plaster Sqm 16500
6 Fire Rated- Door Frames Rmts 504
7 Fire Rated Doors Nos 100
8 Non Fire Rated Doors Nos 44
9 Laminated Doors Nos 155
10 Granite - Zeera White Sqm 165
11 Concrete Floor with Dust Proof Coating Sqm 1385
12 Kota Stone Flooring (Polished & River W Sqm 4626
13 Ceramic Tile Flooring Sqm 1526
14 Vitrified Floor Tiling Sqm 3522
15 Granite - C-Pink Sqm 276
16 Granite - Elite Brown Sqm 335
17 Anti-bacterial Tiling Sqm 253
18 Gypsum Ceiling Sqm 1095
19 Calcium Silicate Ceiling Sqm 2890
20 Grid Ceiling Sqm 524
21 Ceiling Plaster Sqm 1230
22 Precast designer blocks No. 2139
23 Poly Carbonate Sheet Sqm 410

23 Terrace Water Proofing Sqm 1900

24 Over deck Insulation- 40 mm Sqm 1900

25 Top Screed on Overdeck Sqm 1900


26 Terrace Tiling Sqm 1900

# Sensitivity: LNT Construction Internal Use


27 Water Proofing - Toilets Sqm 290

28 Aluminium Work- Windows MT 4000


29 Glass- Windows Sqm 122
30 Structural Steel MT 40
RCC

31 Internal Painting Sqm 24130


32 Land scape and Horticulture LS 1
33 Concrete Paver Sqm 2600
34 Grass Paver Sqm 650
35 Road Works LS 1
MEP
PVC CONDUIT Km 46 43 93%
MS CONDUIT Km 2 0 5%
WIRING Km 40 0%
ELECTRICAL

CABLE TRAY METER 1340 110 8%


LT CABLE METER 11731 0%
LT PANELS NOS 180 0%
DISTRIBUTION BOARD NOS 146 0%
OCCUPANY / DAY LIGHT SENSOR NOS 107 0%
LIGHT FIXTURES NOS 2092 0%
FAN COIL UNIT NOS 11 0%
AC SPLIT UNITS NOS 2 0%
AUTO SEQUENTIAL PANEL NOS 1 0%
AHU / CSU /TFA NOS 91 0%
FANS NOS 72 0%
HVAC

MS PIPES METER 5388 960 18%


VALVES NOS 481 0%
GI DUCTING SQM 2314 0%
DUCT INSULATION SQM 2604 0%
FIRE DAMPERS SQM 24 0%
DIFFUSERS SQM 134 0%
UG PIPING METER 309 250 81%
AG PIPING METER 926 750 81%
FIRE PUMPS NOS 3 0%
VALVES NOS 107 0%
FPS

FIRE HYDRANT ACCESSORIES SET 32 0%


FLOW SWITCH NOS 14 0%
FIRE ALARM VALVE NOS 1 0%
CONTROL PANEL NOS 1 0%
FIRE EXTINGUISHER NOS 103 0%
PP PIPE METER 2271 701 31%
CPVC METER 1764 22 1%
GI PIPES METER 413 0%
VALVES NOS 208 0%
PHE

WATER METER NOS 41 0%

# Sensitivity: LNT Construction Internal Use


PHE
RCC HUME PIPES METER 491 400 81%
CP FITTINGS NOS 285 0%
SANITARY FITTINGS NOS 152 0%
FA CABLE METER 11000 5870 53%
DETECTOR NOS 398 0%
ELV

ICT CABLE METER 16000 0%


RACK NOS 22 0%
DUCT TEMP SENSOR NOS 156 0%
PASSENGER ELEVATOR NOS 2 0%
LIFT

SERVICE ELEVATOR NOS 1 0%


TESTING AND COMMISSIONING

# Sensitivity: LNT Construction Internal Use


IIT HYD PHASE II - PROGRESS STATUS - RCC BU

Material
Target to Staff Workmen Status as Target Date for
Balance Qty Available for
finish Responsibility of 09-Aug-21 Mobilization
balance qty

50 12-Aug-21 Available Available


35 20-Aug-21 Available Available
50 20-Aug-21 Available Available
240 31-Aug-21 Sivanarayana Available Available
90 31-Aug-21 Available Available
135 31-Aug-21 Available Available
300 20-Sep-21 Available Available
900

34 22-Aug-21 Available
2236 21-Sep-21 Available
5873 11-Oct-21 50 / 450 available 31-Aug-21 Available
3845 11-Oct-21 Available
16500 11-Oct-21 Available
504 30-Sep-21 Not Available Available
100 10-Oct-21 Not Available Available
44 30-Sep-21 Not Available 16
155 15-Oct-21 Not Available
165 15-Oct-21 Not Available Available
1385 16-Oct-21 Not Available Available
4626 17-Oct-21 Not Available 1000
1526 17-Oct-21 Not Available Available
3522 19-Oct-21 Not Available Available
276 21-Oct-21 Not Available Available
335 15-Oct-21 Not Available
253 15-Oct-21 Not Available
1095 21-Oct-21 Not Available
2890 21-Oct-21 Krishnanand / Not Available
524 15-Oct-21 Sivanarayana/ Not Available
1230 10-Oct-21 Iswar Patil Not Available As and When Available
2139 25-Oct-21 Not Available respective
workfronts are
410 25-Oct-21 Not Available available based on Available
the Targets Agency to be
1900 10-Sep-21 Not Available
finalized
Agency to be
1900 30-Sep-21 Not Available
finalized
1900 10-Oct-21 Not Available Available
1900 31-Oct-21 Not Available Available

# Sensitivity: LNT Construction Internal Use


Agency to be
290 20-Sep-21 Not Available
finalized
4000 10-Oct-21 Not Available WO to be issued
to WOW Buildon
122 20-Oct-21 Not Available and Al Glaze
40 20-Oct-21 Not Available Available
24130 25-Oct-21 Not Available Available
1 31-Oct-21 Not Available
2600 31-Oct-21 Not Available
650 31-Oct-21 Not Available
1 31-Oct-21 Not Available

3 10-Oct-21 Not Available 3


2 10-Oct-21 Not Available 2
40 20-Oct-21 Not Available 0
1230 16-Oct-21 Not Available 0
11731 23-Oct-21 Ratna Naik Not Available 31-Aug-21 9600
180 20-Oct-21 Not Available 72
146 16-Oct-21 Not Available 142
107 31-Oct-21 Not Available 0
2092 31-Oct-21 Not Available 0
11 10-Oct-21 Not Available 11
2 26-Oct-21 Not Available 2
1 27-Oct-21 Not Available 0
91 25-Oct-21 Not Available 0
72 25-Sep-21 Not Available 30
4428 10-Oct-21 Krishna Prasad Not Available 31-Aug-21 2
481 25-Oct-21 Not Available 481
2314 25-Oct-21 Not Available 500
2604 31-Oct-21 Not Available 1000
24 25-Oct-21 Not Available 0
134 31-Oct-21 Not Available 0
59 31-Aug-21 Not Available 59
176 10-Sep-21 Not Available 176
3 20-Sep-21 Not Available 3
107 20-Sep-21 Not Available 107
32 31-Oct-21 Ravishankar Not Available 31-Aug-21 32
14 31-Oct-21 Not Available
1 31-Oct-21 Not Available
1 31-Oct-21 Not Available
103 31-Oct-21 Not Available
1570 16-Oct-21 Not Available 500
1742 16-Oct-21 Not Available 380
413 25-Sep-21 Not Available
208 25-Sep-21 Not Available
Khan 31-Aug-21
41 31-Oct-21 Not Available

# Sensitivity: LNT Construction Internal Use


Khan 31-Aug-21

91 20-Aug-21 Not Available 91


285 5-Nov-21 Not Available
152 31-Oct-21 Not Available
5130 10-Oct-21 Not Available 5130
398 5-Nov-21 Not Available 398
16000 15-Oct-21 Balaji Not Available 31-Aug-21 16000
22 20-Oct-21 Not Available 22
156 20-Oct-21 Not Available
2 30-Sep-21 Not Available 2
1 10-Oct-21 Balaji Not Available 31-Aug-21 1
25-Oct-21 Not Available

# Sensitivity: LNT Construction Internal Use


PROGRESS STATUS - RCC BUILDING

Aug'21
Target to
Balance Material Asking Rate Strike
Receive at
yet to receive / Day Rate / Day Wk1 Wk2 Wk3
site
(01-07) (08-14) (15-21)

50
35
50
120
45
34 34 34
60
34 84 344

-0.7 1.4 0.0 11 11 11


-131.5 5.0 0.0 196 238 280
1957.7 28.6 0.0 514 624
1281.7 0.0 336 409
5500.0 0.0 1444 1753
-63.0 0.0 44 54
50.0 0.0 9
28 20-Aug-21 -5.5 0.0
155 20-Aug-21 22.1 0.0 14
23.6 0.0
173.1 0.0
3626 20-Aug-21 514.0 0.0
169.6 0.0 134
320.2 0.0 308
21.2 0.0
335 25-Aug-21 47.9 0.0
253 20-Aug-21 36.1 0.0
1095 25-Aug-21 84.2 0.0
2890 25-Aug-21 222.3 0.0
524 25-Aug-21 74.9 0.0
615.0 0.0
2139 25-Aug-21 125.8 0.0
24.1 0.0

1900 16-Aug-21 -67.9 0.0

1900 16-Aug-21 -237.5 0.0

950.0 0.0
82.6 0.0

# Sensitivity: LNT Construction Internal Use


-16.1 0.0

4000 31-Aug-21 2000.0 0.0


122 31-Aug-21 10.2 0.0
3.3 0.0
1419.4 0.0
1 30-Sep-21 0.0 0.0
2600 31-Aug-21 113.0 0.0
650 31-Aug-21 28.3 0.0
31-Aug-21 0.0 0.0

3.1 1
1.9
40 3.6
1230 20-Sep-21 176
2131 27-Sep-21 838
108 20-Sep-21 16
4 25-Aug-21 21
107 10-Sep-21 5
2092 30-Sep-21 95
11
0
1 10-Sep-21 0
91 30-Sep-21 6
42 15-Sep-21 -5
2 22-Aug-21 4428
30
1814 15-Sep-21 145
1604 15-Sep-21 118
24 15-Sep-21 2
134 10-Sep-21 6

-6
0
-6
1
14 16-Sep-21 1
1 16-Sep-21 0
1 16-Sep-21 0
103 16-Sep-21 5
1070 15-Sep-21 224
1362 10-Sep-21 249
413 5-Sep-21 -30
208 10-Sep-21 -15
41 15-Sep-21 2

# Sensitivity: LNT Construction Internal Use


-2
285 30-Sep-21 11
152 30-Sep-21 7
5130
15
2667
2
156 30-Sep-21 14
0
1

# Sensitivity: LNT Construction Internal Use


21 Sep'21 Oct'21

Wk4 Wk1 Wk2 Wk3 Wk4 Wk1 Wk2 Wk3


(22-31) (01-07) (08-14) (15-21) (22-30) (01-07) (08-14) (15-21)

120
45
34
60 60 60 60
259 60 60 60 0 0 0 0

335 363 377 335 112


661 734 808 844 808 587 294
433 481 529 553 529 385 192
1856 2063 2269 2372 2269 1650 825
63 82 82 82 72 25
11 11 13 14 14 14 10 5
11 11 11 11
16 17 19 21 22 21 16 8
29 37 50
121 147 156 173 190 199 190 139
405 492 520 578 636 665 636 463
162 172 191 210 219 210 153 76
374 396 440 484 506 484 352 176
48 62 83
59 75 101
114 139
274 274 274
723 723 723
262 262
308 308 308 308
535 535 535
410

633 633 633

633 633 633

633 633 633


633 633 633

# Sensitivity: LNT Construction Internal Use


97 97 97

1333 1333 1333


41 41 41
7 7 7 7 7 7
1508 2111 2715 3016 3620 4223 3921

867
217
0.3

1 1
1 1
5 5 5 10 10 5
480 450 300
2500 3000 3000 3000 231
40 40 40 40 20
28 28 28 28 34
107
350 350 350 350
11

1
24 24 24 19
9 21 21 21
1000 1000 1000 800 628
100 181 100 100
300 300 600 600 514
1000 500 500 604
12 12
64 35
50 50
50 50 50 26
3
57 50
12 20
7 7
1
1
52
300 300 300 300 370
400 400 400 400 242
100 200 113
50 50 50 58
11 20

# Sensitivity: LNT Construction Internal Use


20 30 30 11
100 100
50 51
600 500 1000 1000 500 500 1000
48 100 50 50 50 50
2000 2000 2000 2000 2000 2000 2000 2000
5 5 5 7
50 50 56
1

# Sensitivity: LNT Construction Internal Use


DATE: 31-Jul-2021

21 10/8/2021
Nov'21
Wk4
(22-31)

50
69
231

83
101

274
723

535

# Sensitivity: LNT Construction Internal Use


3016
0.5 0.5
867 867
217 217
0.3 0.3

692

35

51

10

# Sensitivity: LNT Construction Internal Use


85
51

50

1
1
1

# Sensitivity: LNT Construction Internal Use