Professional Documents
Culture Documents
2021
Name of Work: Construction of Super Speciality Hospital, Jagdalp
PROJECT
Employer: CPWD
Contractor: M/s. SBEC Projects Private Limited
Dur. in Days: Total
Rain Interrupted External
Main Building
1 Earthwork
2 Sand Filling
3 PCC(1:3:6)
4 Water Proofing work
a Horizontal Surface
b Vertical Surface
5 Reinforcement Work
6 Form work
7 M35 Grade(RMC)
8 M40 Grade(RMC)
9 M25 Grade Grade Slab
10 M25 Grade Lintel
11 230mm thick Brickwork
12 115mm thick Brickwork
13 Door Frames Fixing
14 Internal Plastering work
15 Solid Blocks
16 CC(1:2:4)
17 Gypsum Plastering
a Ceiling Plastering
b Wall Plastering
c External Plasterings
18 Floorings and Claddings
a Granite Flooring
b Granite Cladding/Sill
c Vitrified Tiles Flooring
d Vitrified Tiles Cladding
e Ceramic Tiles - Cladding
f Kota Stone Flooring
19 Putty Plastering
20 Dolpur Stone Clading
WORK PROGRESS
Service Building
1 Earthwork
2 Sand Filling
3 PCC(1:3:6)
4 Reinforcement Work
5 M35 Grade(RMC)
6 Back Filling
7 M25 Grade
8 230mm thick Brickwork
9 Gypsum Wall Plastering
10 Internal Plastering work
UG Sump
1 Earthwork
2 PCC(1:3:6)
3 Water Proofing work
4 M35 Grade(RMC)
5 M40 Grade(RMC)
Compound wall
1 Earthwork
2 PCC(1:3:6)
3 Reinforcement Work
4 M25 Grade
5 Backfilling
6 230mm thick Brickwork
Road work
1 Gravel Filling
2 PCC(1:3:6)
3 M25 Grade
4 M35 Grade(RMC)
5 Internal Plastering work
6 GSB Laying
Sl. No. Name of the Contractor Name of the work
1 Nikilesh Misc Works
30 GSB Cum
31 MS Foot rest Nos
32 MS Pipes(91.5mmX91.5mm) Rmt
33 MS Pipes(60mmX60mm) Rmt
34 MS L-Angle(75mmX8mm) Rmt
35 MS Plates(12mm) Sqm
36 Aluminium Extrusion(Jindal)-21977 KG
37 Aluminium Extrusion(Jindal)-21978 KG
38 Aluminium Extrusion(Jindal)-21977 KG
39 Epoxy Grout KG
40 Birla white(Putty) MT
41 Crusher Dust Cum
42 External Primer Ltrs
43 Door Shutters No's
Other Materials
1 Cast iron Pipes Fitting Received from Jaiswal Ind
2 Sanitaryware - Samples Parryware - Wash Basin, Sensor U
3 GI Pipes - for Waste Lines Received for FF and 2F from Guja
4 DBs,MCCBs Recieved MS Junction Boxes 280
5 Wire coils Received Wire coils - 2056 Nos
6 MS Brackets Received MS Brackets of 1089 No
7 TPN Dbs Received TPN DBs of 376 Nos
8 Tower Hoist Received Tower Hoist Unit- 1 No
9 Chillers - 550Tr. Received Chillers and Its Panel - 3
10 CI Pipes - for Exposed Water Supplyfor Total Floors
11 SS Pipes - for Recessed Water Supplfor Total Floors
12 DG Sets - 2 Nos Received DG Sets 2 Nos of 1500 K
13 Hilti - Frame Anchors Received 50 Nos
14 RMG Steels Pvt Ltd Received - 1770 Nos of MS Bends
SIGN.
imited
Elapse
Interrupted External Works Partly From: To:
FOR TH
Location Unit TOTAL QTY.
PLANNED
Cum 19150.00
Cum 796.41
Cum 500.00
Sqm 1200.00
Sqm 300.00
MT 2093.00
Sqm 61535.00
Cum 11000.00
Cum 3200.00
Cum 250.00
Cum 450.00
Cum 5000.00
Sqm 12000.00
Each 320.00
Sqm 2500.00
Cum 25.00
Cum 120.00
Sqm 24222.00
Sqm 39621.00
Sqm 12000.00
Sqm 12385.00
Sqm 8868.00
Sqm 6823.00
Sqm 4609.00
Sqm 4763.00
Sqm 2500.00
Sqm 63843.00
Sqm 1800.00
Cum 1300.00
Cum 300.00
Cum 150.00
MT 70.00
Cum 550.00
Cum 1100.00
Cum 95.00
Cum 209.71
Sqm 1000.00
Sqm 300.00
Cum 2800.00
Cum 85.00
Sqm 2200.00
Cum 650.00
Cum 5.00
Cum 1688.00
Cum 77.00
Cum 414.00
Cum 1747.00
Cum 98.43
MT 29.74
Cum 376.00
Cum 1374.00
Cum 357.00
Cum 5514.00
Cum 81.00
Cum 326.00
Cum 250.00
Sqm 675.00
Sqm 1700.00
ame of the work Type of the Unit Skilled M/C F/C
work
s NMR Nos 4.0
s NMR Nos
RECEIPTS CONSUME
FOR DAY TILL DATE FOR DAY TILL DATE
19.50 9506.90 0.50 9449.7
16632.47 0.00 14983.3
5455.75 0.00 5320.4
9436.43 0.00 9467.8
483.65 0.00 506.2
2920427.00 0.00 2844654.5
8526.00 1600.0
5576.96
5126.40 0.00 8214.5
1265.76
4762.80 0.00 5159.4
17880.50 0.00 17522.9
1088.10 0.00 1102.8
946.00 0.00 858.5
849.44 850.7
249825.00 113800.0
4085.00 4085.0
200.46 200.4
280.00 280.0
70.98 0.00 63.5
97.00 0.00 86.4
47.00 47.0
621.00 0.00 567.2
7200.00 7200.0
7480.00 7480.0
70.00 28.0
201.50 63.0
28.00 6007.6
6049.28 538.9
625.23 625.2
180.00 526.0
526.00
1153.00 118.0
118.00 23.9
23.90 2565.1
3585.10 2572.1
6162.10 5726.3
13016.3 715.0
1115.00 715.0
20.01 8.4
74.43 74.4
500.00 0.0
62.00
18936.11
663.80
475.67
1024.97
296.34
1956.00
49032.75
0.00 11342.05
3344.66
323.69
0.00 524.65
0.00 5356.01
0.00 9704.19
153.00
0.00 15935.38
7.25
0.00 121.20
10951.58
0.00 43381.57
0.00 11505.67
0.00 9544.37
0.00 5628.82
0.00 5298.50
0.00 3249.41
0.00 3817.03
901.30
0 9666.29
0.00 918.82
1174.95
42.01
106.76
70.22
327.17
984.40
187.74
117.52
1624.85
62.00
2609.52
77.51
536.90
645.40
2.00
1688.00
25.17
420.90
907.14
43.04
8.85
212.75
750.00
162.92
5386.17
61.82
0.00 230.82
57.00
0.00 198.72
14.16
Location of the work Description of the work
Main Building Sacffolding Fixing on South Side
CONSUMED RECEIPTS
TILL DATE ITEM Unit FOR DAY TILL DATE
9449.73 STEEL 301.00
14983.36 8mm Dia MT 329.40
5320.48 10mm Dia MT 448.08
9467.85 12mm Dia MT 240.19
506.27 16mm Dia MT 400.38
2844654.50 20mm Dia MT 171.54
1600.00 25mm Dia MT 350.73
32mm Dia MT 406.81
8214.50
5159.43
17522.90 RMC
1102.86 M10 Cum 12.70
858.55 M15 Cum 63.00
850.72 M25 Cum 1036.59
113800.00 M35 Cum 12283.83
4085.00 M40 Cum 3408.12
200.46
280.00
63.58 370.000
86.42 264.500
47.00 0.000
567.20 1345.000
7200.00
7480.00
28.00
63.00
6007.69
538.95
625.23
526.00
118.00
23.90
2565.10
2572.10
5726.30
715.00
715.00
8.46
74.43
0.00
Project Manager
In-charge:E.RAMBABU
10.08.2018
20.07.2021
Dry
% COMP
98.9%
83.3%
95.1%
85.4%
98.8%
93.5%
79.7%
103.1%
104.5%
129.5%
116.6%
107.1%
80.9%
47.8%
637.4%
29.0%
101.00%
45.21%
109.49%
95.88%
77.06%
63.47%
77.66%
70.50%
80.14%
36.05%
15.14%
51.05%
90.4%
14.00%
71.2%
100.3%
59.5%
89.5%
197.6%
56.0%
162.49%
20.67%
93.2%
91.2%
24.4%
99.3%
40.0%
100.0%
32.7%
101.7%
51.9%
43.7%
29.8%
56.6%
54.6%
45.64%
97.7%
76.3%
70.8%
22.8%
29.44%
0.83%
Qty
36.00
Qty
CEIPTS
TILL DATE
301.00
329.40
448.08
240.19
400.38
171.54
350.73
406.81
12.70
63.00
1036.59
12283.83
3408.12
e:E.RAMBABU